JP6213764B2 - Work management apparatus, work management method and program - Google Patents
[go: Go Back, main page]

JP6213764B2 - Work management apparatus, work management method and program - Google Patents

Work management apparatus, work management method and program Download PDF

Info

Publication number
JP6213764B2
JP6213764B2 JP2013120066A JP2013120066A JP6213764B2 JP 6213764 B2 JP6213764 B2 JP 6213764B2 JP 2013120066 A JP2013120066 A JP 2013120066A JP 2013120066 A JP2013120066 A JP 2013120066A JP 6213764 B2 JP6213764 B2 JP 6213764B2
Authority
JP
Japan
Prior art keywords
time
work
unit
crane
load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2013120066A
Other languages
Japanese (ja)
Other versions
JP2014237505A (en
Inventor
加藤 登
登 加藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Corp
Original Assignee
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Corp filed Critical Shimizu Corp
Priority to JP2013120066A priority Critical patent/JP6213764B2/en
Publication of JP2014237505A publication Critical patent/JP2014237505A/en
Application granted granted Critical
Publication of JP6213764B2 publication Critical patent/JP6213764B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Control And Safety Of Cranes (AREA)
  • Jib Cranes (AREA)

Description

本発明は、作業管理装置、作業管理方法及びプログラムに関する。   The present invention relates to a work management apparatus, a work management method, and a program.

建設現場における作業状況などを把握することは、例えば適切な施工計画の効率化や工期短縮などのために重要である。
そこで、建設現場で使用される機器の稼働状況を確認する管理システムとして、以下のものが知られている。つまり、管理システムにおいて、建設現場で使用される高所作業車やクレーンなどの機器に加速度センサを設け、加速度センサの計測情報を機器から局を経由して機器管理装置に送信し、機器管理装置が受信した加速度センサの計測情報に基づいて機器の稼働状況を判定するというものである(例えば、特許文献1参照)。
It is important, for example, to improve the efficiency of an appropriate construction plan and shorten the construction period, for example, to grasp the work situation at the construction site.
Therefore, the following is known as a management system for confirming the operating status of equipment used at a construction site. In other words, in the management system, an acceleration sensor is provided in equipment such as an aerial work vehicle or a crane used at a construction site, and the measurement information of the acceleration sensor is transmitted from the equipment to the equipment management apparatus via the station. The operation status of the device is determined based on the acceleration sensor measurement information received (see, for example, Patent Document 1).

特開2013−54682号公報JP2013-54682A

ここで、クレーンを用いた作業に関しては、玉掛けすべき運搬物までのクレーンの移動、玉掛け、玉掛けした運搬物の移動、移動先での運搬物の玉外しという一連の作業のサイクルの繰り返しとなる。なお、以降において、このような作業のサイクルについては「揚重サイクル」と呼ぶ。
上記のように揚重サイクルにおいては複数の作業項目が含まれる。したがって、クレーンを用いた作業の効率化にあたっては、1揚重サイクルにおける個々の作業の状況にも留意する必要がある。このことからすれば、クレーンを用いる作業を管理するにあたっては、1揚重サイクルにおける作業ごとに状況を把握することが好ましい。
Here, regarding the work using the crane, a cycle of a series of work of moving the crane to the material to be slapped, slinging, moving the sluggish transported material, and removing the transported material at the destination is repeated. . Hereinafter, such an operation cycle is referred to as a “lifting cycle”.
As described above, a plurality of work items are included in the lifting cycle. Therefore, it is necessary to pay attention to the situation of each work in one lifting cycle in order to improve the work efficiency using the crane. Based on this, it is preferable to grasp the situation for each work in one lifting cycle when managing the work using the crane.

しかし、現状において1揚重サイクルにおける作業ごとの時間を把握しようとした場合には、例えば、測定者が作業状況を見ながらストップウォッチなどにより計測するということが行われている。この場合には、測定者のための人材を確保する必要があるために効率的ではなく、また、人的作業となるために安定して正確な時間を把握することも難しい。   However, in the present situation, when trying to grasp the time for each work in one lifting cycle, for example, the measurer measures with a stopwatch or the like while looking at the work situation. In this case, it is not efficient because it is necessary to secure human resources for the measurer, and it is difficult to grasp a stable and accurate time because it is a human work.

本発明は、このような事情に鑑みてなされたもので、クレーンを利用した作業状況として、1揚重サイクルにおける作業ごとの状況を効率的かつ正確に把握できるようにすることを目的とする。   This invention is made | formed in view of such a situation, and it aims at enabling it to grasp | ascertain now efficiently and correctly the condition for every operation | work in one lifting cycle as an operation | work condition using a crane.

上述した課題を解決するために、本発明の一態様としての作業管理装置は、クレーンにおいて検出された旋回角、起伏角、揚程及び荷重を時間と対応付けたクレーン稼働情報を取得するクレーン稼働情報取得部と、前記クレーン稼働情報取得部が取得したクレーン稼働情報に基づいて、前記クレーンを利用して行われる1揚重サイクル相当の単位作業において区分される所定の区分作業の境界を前回の単位作業の終了時刻以降の時系列旋回角データ、時系列起伏角データ、時系列揚程データ、時系列荷重データを解析対象とし当該解析対象の時系列荷重データの変化を時系列にしたがって解析することにより特定される荷重開始時刻から遡るように探索するとともに当該荷重開始時刻以降について探索することで、各区分作業時間の開始時刻を探索し、当該境界に基づいて前記区分作業ごとに要した区分作業時間を算出し、前記区分作業時間を含み、単位作業ごとの実績を示す単位作業履歴情報を生成する単位作業履歴情報管理部とを備える。 In order to solve the above-described problem, a work management apparatus as one aspect of the present invention is a crane operation information that acquires crane operation information in which a swing angle, an undulation angle, a lift, and a load detected in a crane are associated with time. Based on the crane operation information acquired by the acquisition unit and the crane operation information acquisition unit, the boundary of the predetermined division work divided in the unit work corresponding to one lifting cycle performed using the crane is the previous unit. By analyzing time-series turning angle data, time-series undulation angle data, time-series lift data, and time-series load data after the end time of work as the analysis target, and analyzing changes in the time-series load data of the analysis target according to the time series By searching backwards from the specified load start time and searching after the load start time, the start time of each division work time Searched, based on the boundary to calculate the sorting operation time required for each of the sorting operation, wherein the division operation time, the unit operation history information management unit for generating a unit operation history information indicating the performance of each unit operation Is provided.

また、上記の作業管理装置において、一定の作業期間の単位作業履歴情報を利用して、前記一定の作業期間において行われた作業の実績を示す作業実績情報を生成し、生成した作業実績情報を所定の態様により出力する作業実績情報出力部をさらに備えてもよい。   Further, in the above work management apparatus, using unit work history information for a fixed work period, work result information indicating a work result performed in the fixed work period is generated, and the generated work result information is You may further provide the work performance information output part output by a predetermined | prescribed aspect.

また、上記の作業管理装置において、前記クレーンにより運搬すべき運搬物に関連する運搬物情報を、運搬物の運搬に際して掛かる荷重と運搬物の移動先の位置と対応させた運搬物管理情報を記憶する運搬物管理情報記憶部をさらに備え、前記単位作業履歴情報管理部は、前記クレーン稼働情報における荷重と前記クレーン稼働情報に基づいて求めた運搬物の移動終了タイミングにおける前記クレーンのフック位置との組合せに対応付けられた運搬物情報を運搬物管理情報から検索し、検索した運搬物情報を対応の単位作業の単位作業履歴情報に含めてもよい。   In the above work management device, the transported object management information in which the transported object information related to the transported object to be transported by the crane is associated with the load applied when transporting the transported object and the position of the destination of the transported object is stored. The unit work history information management unit further includes a load in the crane operation information and a hook position of the crane at a movement end timing of the load obtained based on the crane operation information. It is also possible to search the transported object information associated with the combination from the transported object management information and include the searched transported object information in the unit work history information of the corresponding unit work.

また、上記の作業管理装置において、前記クレーン稼働情報取得部は、クレーンにより運搬される運搬物を撮像するようにクレーンに設けられる撮像装置が撮像して得られる撮像画像データをさらにクレーン稼働情報として取得し、前記作業実績情報出力部は、単位期間において行われた単位作業ごとに対応して得られた撮像画像データを示す情報を作業実績情報に含めてもよい。   In the work management apparatus, the crane operation information acquisition unit may further use captured image data obtained by imaging an imaging device provided on the crane so as to capture an image of a transported object carried by the crane as crane operation information. The work result information output unit may acquire information indicating captured image data obtained corresponding to each unit work performed in the unit period in the work result information.

また、本発明の一態様としての作業管理方法は、クレーンにおいて検出された旋回角、起伏角、揚程及び荷重を時間と対応付けたクレーン稼働情報を取得するクレーン稼働情報取得ステップと、前記クレーン稼働情報取得ステップが取得したクレーン稼働情報に基づいて、前記クレーンを利用して行われる1揚重サイクル相当の単位作業において区分される所定の区分作業の境界を前回の単位作業の終了時刻以降の時系列旋回角データ、時系列起伏角データ、時系列揚程データ、時系列荷重データを解析対象とし当該解析対象の時系列荷重データの変化を時系列にしたがって解析することにより特定される荷重開始時刻から遡るように探索するとともに当該荷重開始時刻以降について探索することで、各区分作業時間の開始時刻を探索し、当該境界に基づいて前記区分作業ごとに要した区分作業時間を算出し、前記区分作業時間を含み、単位作業ごとの実績を示す単位作業履歴情報を生成する単位作業履歴情報管理ステップとを備える。 The work management method as one aspect of the present invention includes a crane operation information acquisition step of acquiring crane operation information in which a turning angle, an undulation angle, a lift, and a load detected in a crane are associated with time, and the crane operation Based on the crane operation information acquired by the information acquisition step, the boundary of the predetermined division work divided in the unit work equivalent to one lifting cycle performed using the crane is the time after the end time of the previous unit work From the load start time specified by analyzing the change of the time series load data of the analysis target in accordance with the time series with the series turn angle data, time series undulation angle data, time series lift data, and time series load data being analyzed. by searching for the load start time later with searching as dates back to search a start time of each section working time, those Based on the boundary to calculate the sorting operation time required for each of the sorting operation, wherein said sorting operation time, and a unit operation history information management step of generating a unit operation history information indicating the performance of each unit operation.

また、本発明の一態様としてのプログラムは、コンピュータに、クレーンにおいて検出された旋回角、起伏角、揚程及び荷重を時間と対応付けたクレーン稼働情報を取得するクレーン稼働情報取得ステップと、前記クレーン稼働情報取得ステップが取得したクレーン稼働情報に基づいて、前記クレーンを利用して行われる1揚重サイクル相当の単位作業において区分される所定の区分作業の境界を前回の単位作業の終了時刻以降の時系列旋回角データ、時系列起伏角データ、時系列揚程データ、時系列荷重データを解析対象とし当該解析対象の時系列荷重データの変化を時系列にしたがって解析することにより特定される荷重開始時刻から遡るように探索するとともに当該荷重開始時刻以降について探索することで、各区分作業時間の開始時刻を探索し、当該境界に基づいて前記区分作業ごとに要した区分作業時間を算出し、前記区分作業時間を含み、単位作業ごとの実績を示す単位作業履歴情報を生成する単位作業履歴情報管理ステップとを実行させるためのものである。 According to another aspect of the present invention, a program includes a crane operation information acquisition step of acquiring, in a computer, crane operation information in which a swing angle, an undulation angle, a lift, and a load detected in a crane are associated with time, and the crane Based on the crane operation information acquired in the operation information acquisition step, the boundary of the predetermined division work divided in the unit work corresponding to one lifting cycle performed using the crane is determined after the end time of the previous unit work. Load start time specified by analyzing time-series turn angle data, time-series undulation angle data, time-series lift data, and time-series load data as the analysis target and analyzing changes in the time-series load data of the analysis target according to the time series By searching backwards from the load start time and searching after the load start time, Exploring, said section calculates the sorting operation time required for each work, including the sorting operation time, unit operation history information management step of generating a unit operation history information indicating the performance of each unit working on the basis of the boundary And to execute.

以上説明したように、本発明によれば、クレーンを利用した作業状況として、1揚重サイクルにおける作業ごとの状況を効率的かつ正確に把握できるようになるという効果が得られる。   As described above, according to the present invention, as a work situation using a crane, it is possible to efficiently and accurately grasp the situation for each work in one lifting cycle.

本実施形態における作業管理システムの構成例を示す図である。It is a figure which shows the structural example of the work management system in this embodiment. 本実施形態におけるクレーンが備えるセンサ部の構成例と作業管理装置の機能構成例を示す図である。It is a figure which shows the structural example of the sensor part with which the crane in this embodiment is provided, and the functional structural example of a work management apparatus. 本実施形態におけるクレーン稼働情報記憶部が記憶するクレーン稼働情報テーブルの構造例を示す図である。It is a figure which shows the structural example of the crane operation information table which the crane operation information storage part in this embodiment memorize | stores. 本実施形態における単位作業履歴情報記憶部が記憶する単位作業履歴情報テーブルの構造例を示す図である。It is a figure which shows the structural example of the unit work history information table which the unit work history information storage part in this embodiment memorize | stores. 本実施形態において、1つの単位作業に対応する単位作業履歴情報の構造例を示す図である。In this embodiment, it is a figure which shows the structural example of the unit work log | history information corresponding to one unit work. 本実施形態における運搬物管理情報記憶部が記憶する運搬物管理情報の構造例を示す図である。It is a figure which shows the structural example of the conveyance management information which the conveyance management information storage part in this embodiment memorize | stores. 本実施形態において、クレーンのフック位置を示す座標空間を示す図である。In this embodiment, it is a figure which shows the coordinate space which shows the hook position of a crane. 区分作業時間の算出手順例を示すタイミングチャートである。It is a timing chart which shows the example of a calculation procedure of a division | segmentation work time. 本実施形態における作業管理装置が実行する1日分の単位作業履歴情報の作成のための処理手順例を示すフローチャートである。It is a flowchart which shows the example of a process sequence for preparation of the unit work log | history information for 1 day which the work management apparatus in this embodiment performs. 本実施形態における作業管理装置が生成した作業実績情報に基づく日報を表示した場合の一態様例を示す図である。It is a figure which shows the example of 1 aspect at the time of displaying the daily report based on the work performance information which the work management apparatus in this embodiment produced | generated. 本実施形態における作業管理装置が作業実績情報に基づく日報を表示させるための処理手順例を示すフローチャートである。It is a flowchart which shows the example of a process sequence for the work management apparatus in this embodiment to display the daily report based on work performance information.

[作業管理システムの構成例]
図1は、本実施形態における作業管理システムの構成例を示している。本実施形態における作業管理システムは、作業現場1に配備されるクレーン100と、事務所2に設置された作業管理装置200を備える。なお、本実施形態においては、クレーン100がタワークレーンである場合を例に挙げる。
[Example of work management system configuration]
FIG. 1 shows a configuration example of a work management system in the present embodiment. The work management system in the present embodiment includes a crane 100 deployed at the work site 1 and a work management device 200 installed in the office 2. In the present embodiment, a case where the crane 100 is a tower crane will be described as an example.

クレーン100は、マスト101の上端部に対して旋回体102が設けられている。旋回体102は、マスト101を回転軸として例えば水平方向において旋回することができる。また、旋回体102には運転席が設けられる。
旋回体102にはジブ103が取り付けられる。ジブ103の先端には、フック105aを備えるフックブロック105がワイヤー104によって吊り下げられている。
The crane 100 is provided with a turning body 102 with respect to the upper end portion of the mast 101. The swivel body 102 can swivel in the horizontal direction, for example, with the mast 101 as a rotation axis. The revolving body 102 is provided with a driver's seat.
A jib 103 is attached to the swivel body 102. A hook block 105 including a hook 105 a is suspended from the tip of the jib 103 by a wire 104.

本実施形態のクレーン100は、センサ部110を備える。センサ部110は、クレーン100の旋回角、起伏角、揚程、荷重を検出する。
旋回角は、旋回体102が旋回する角度である。
起伏角は、ジブ103の起伏している角度である。
揚程は、ジブ103の先端からフック105aまでの距離であり、例えばワイヤー104の巻き上げ量に応じて変化する。
荷重は、フック105aに掛かる荷重である。
センサ部110により検出された旋回角、起伏角、揚程、荷重の情報は、クレーン情報処理装置130に入力される。
The crane 100 of this embodiment includes a sensor unit 110. The sensor unit 110 detects the turning angle, undulation angle, lift, and load of the crane 100.
The turning angle is an angle at which the turning body 102 turns.
The undulation angle is the angle at which the jib 103 is undulating.
The lift is the distance from the tip of the jib 103 to the hook 105a, and changes depending on the amount of winding of the wire 104, for example.
The load is a load applied to the hook 105a.
Information on the turning angle, the undulation angle, the lift, and the load detected by the sensor unit 110 is input to the crane information processing device 130.

また、フックブロック105には撮像装置120が備えられる。撮像装置120は、フック105aに玉掛けされた運搬物を撮像するように設けられている。
撮像装置120が撮像して得られた撮像画像データは、有線あるいは無線により伝送され、クレーン情報処理装置130に入力される。
The hook block 105 is provided with an imaging device 120. The imaging device 120 is provided so as to image a transported object slung on the hook 105a.
Captured image data obtained by imaging by the imaging device 120 is transmitted by wire or wirelessly and input to the crane information processing device 130.

クレーン情報処理装置130は、センサ部110から入力される旋回角、起伏角、揚程、荷重の情報を時刻に対応させて時系列データとしたクレーン稼働情報を生成する。
また、クレーン情報処理装置130は、撮像装置120から入力した撮像画像データもクレーン稼働情報に含める。撮像装置120から入力した撮像画像データは動画像であり、クレーン情報処理装置130は、クレーン稼働情報に含めるにあたり、撮像画像データについても撮像時の再生時刻に対応付ける。
The crane information processing device 130 generates crane operation information that is time-series data in which the information on the turning angle, the undulation angle, the lift, and the load input from the sensor unit 110 is associated with the time.
The crane information processing apparatus 130 also includes captured image data input from the imaging apparatus 120 in the crane operation information. The captured image data input from the imaging device 120 is a moving image, and the crane information processing device 130 associates the captured image data with the reproduction time at the time of imaging when it is included in the crane operation information.

また、クレーン100は、通信装置140を備える。通信装置140は、スリップリング(静止体から回転体に対して電力と電気信号を伝達することができる回転コネクタ)を介して作業管理装置200と有線で通信を実行する。なお、通信装置140は作業管理装置200と無線で通信を行ってもよい。
クレーン情報処理装置130は、生成したクレーン稼働情報を通信装置140から作業管理装置200に対して送信させる。
In addition, the crane 100 includes a communication device 140. The communication device 140 performs communication with the work management device 200 in a wired manner via a slip ring (a rotary connector that can transmit electric power and an electric signal from a stationary body to a rotating body). Note that the communication device 140 may communicate with the work management device 200 wirelessly.
The crane information processing device 130 causes the generated crane operation information to be transmitted from the communication device 140 to the work management device 200.

作業管理装置200は、受信したクレーン稼働情報に基づいて、1揚重サイクル相当の単位作業において区分された区分作業ごとに要した時間(区分作業時間)を算出する。また、作業管理装置200は、1揚重サイクルにおける作業ごとの実績を示す情報として、算出した区分作業時間を含む単位作業履歴情報を生成する。
また、作業管理装置200は、1日(単位期間の一例)の単位作業履歴情報を利用して、対応の1日の作業期間において行われた作業の実績を示す日報(単位期間作業実績情報)を生成する。作業管理装置200は、生成した日報を例えば表示などの態様によって出力させることができる。
The work management apparatus 200 calculates the time (separated work time) required for each divided work divided in the unit work corresponding to one lifting cycle based on the received crane operation information. In addition, the work management apparatus 200 generates unit work history information including the calculated section work time as information indicating the results for each work in one lifting cycle.
Further, the work management apparatus 200 uses the unit work history information for one day (an example of the unit period) to show a daily report (unit period work result information) indicating the results of work performed in the corresponding one day work period. Is generated. The work management apparatus 200 can output the generated daily report in a manner such as display.

[センサ部の構成例]
次に、図2を参照してクレーン100が備えるセンサ部110の構成例について説明する。なお、同図において図1と同一部分は同一符号を付して説明を省略する。
まず、センサ部110について説明する。図2に示すように、クレーン100におけるセンサ部110は、旋回角、起伏角、揚程、荷重をそれぞれ検出するために、旋回角センサ111、起伏角センサ112、揚程センサ113及び荷重センサ114を備える。
旋回角センサ111は、クレーン100の旋回角を検出するセンサである。具体的に、旋回角センサ111は、所定の位置を基準とする旋回体102の旋回角度を検出する。
起伏角センサ112は、クレーン100の起伏角を検出するセンサである。具体的には、起伏角センサ112は、例えば水平に対するジブ103の角度を検出する。
揚程センサ113は、クレーン100の揚程を検出するセンサである。具体的には、揚程センサ113は、例えばジブ103の先端からフック105aまでの距離に基づき、作業現場1の状況等に応じて設定される基準レベルからフック105aまでの高さを揚程として検出する。
荷重センサ114は、フック105aに掛かる荷重を検出するセンサである。
[Configuration example of sensor unit]
Next, a configuration example of the sensor unit 110 included in the crane 100 will be described with reference to FIG. In the figure, the same parts as those in FIG.
First, the sensor unit 110 will be described. As shown in FIG. 2, the sensor unit 110 in the crane 100 includes a turning angle sensor 111, an undulating angle sensor 112, a lifting sensor 113, and a load sensor 114 in order to detect the turning angle, the undulation angle, the lift, and the load, respectively. .
The turning angle sensor 111 is a sensor that detects the turning angle of the crane 100. Specifically, the turning angle sensor 111 detects the turning angle of the turning body 102 with a predetermined position as a reference.
The undulation angle sensor 112 is a sensor that detects the undulation angle of the crane 100. Specifically, the undulation angle sensor 112 detects the angle of the jib 103 with respect to the horizontal, for example.
The lift sensor 113 is a sensor that detects the lift of the crane 100. Specifically, the head sensor 113 detects the height from the reference level set according to the situation of the work site 1 to the hook 105a as the head based on the distance from the tip of the jib 103 to the hook 105a, for example. .
The load sensor 114 is a sensor that detects a load applied to the hook 105a.

なお、旋回角センサ111、起伏角センサ112、揚程センサ113及び荷重センサ114のそれぞれにおける検出方式については特に限定されない。
また、図1及び図2においては、起伏角センサ112、揚程センサ113及び荷重センサ114を1つのセンサ部110としてまとめて示しているが、センサ部110はあくまでも機能的なブロックである。起伏角センサ112、揚程センサ113及び荷重センサ114は、それぞれ、クレーン100における所定の位置に個別に備えられていてよい。
Note that detection methods in each of the turning angle sensor 111, the undulation angle sensor 112, the lift sensor 113, and the load sensor 114 are not particularly limited.
1 and 2, the undulation angle sensor 112, the lift sensor 113, and the load sensor 114 are collectively shown as one sensor unit 110, but the sensor unit 110 is a functional block to the last. The undulation angle sensor 112, the lift sensor 113, and the load sensor 114 may be individually provided at predetermined positions in the crane 100.

クレーン情報処理装置130は、クレーン稼働情報を生成するために、例えば以下のように処理を実行する。
つまり、クレーン情報処理装置130は、起伏角センサ112、揚程センサ113及び荷重センサ114から継続して旋回角、起伏角、揚程、荷重それぞれについての情報を入力する。そして、入力した旋回角、起伏角、揚程、荷重の情報のそれぞれに対して時刻を対応付けて時系列化したデータ(時系列旋回角データ、時系列起伏角データ、時系列揚程データ、時系列荷重データ)を生成する。
クレーン情報処理装置130は、撮像装置120から入力した撮像画像データについても再生時間に時刻を対応付ける。
In order to generate crane operation information, the crane information processing apparatus 130 executes processing as follows, for example.
That is, the crane information processing device 130 continuously inputs information about the turning angle, the undulation angle, the lift, and the load from the undulation angle sensor 112, the lift sensor 113, and the load sensor 114. Then, time-series data (time-series swivel angle data, time-series undulation angle data, time-series lift data, time-series) are associated with each of the entered swivel angle, undulation angle, lift, and load information. Load data).
The crane information processing apparatus 130 also associates a time with a reproduction time for the captured image data input from the imaging apparatus 120.

そして、クレーン情報処理装置130は、時系列旋回角データ、時系列起伏角データ、時系列揚程データ、時系列荷重データと時刻が対応付けられた撮像画像データとによりクレーン稼働情報を生成する。クレーン情報処理装置130は、生成したクレーン稼働情報を通信装置140から作業管理装置200に対して送信する。   Then, the crane information processing device 130 generates crane operation information from the time-series turning angle data, the time-series undulation angle data, the time-series lift data, the time-series load data, and the captured image data associated with the time. The crane information processing device 130 transmits the generated crane operation information from the communication device 140 to the work management device 200.

[作業管理装置の構成例]
次に、同じ図2を参照して、作業管理装置200の機能構成例について説明する。同図に示す作業管理装置200は、通信部201、制御部202、記憶部203、操作部204及び表示部205を備える。
[Configuration example of work management device]
Next, a functional configuration example of the work management apparatus 200 will be described with reference to the same FIG. A work management apparatus 200 shown in the figure includes a communication unit 201, a control unit 202, a storage unit 203, an operation unit 204, and a display unit 205.

通信部201は、クレーン100に備えられる通信装置140と通信を実行する。
制御部202は、作業管理装置200における各種の制御、処理を実行する。
本実施形態の制御部202は、クレーン100から入力したクレーン稼働情報を利用して作業管理を行うための機能部として、クレーン稼働情報取得部221、区分作業時間算出部222、単位作業履歴情報管理部223及び作業実績情報出力部224を備える。
The communication unit 201 performs communication with the communication device 140 provided in the crane 100.
The control unit 202 executes various controls and processes in the work management apparatus 200.
The control unit 202 of the present embodiment is a functional unit for performing work management using crane operation information input from the crane 100, as a crane operation information acquisition unit 221, a division work time calculation unit 222, and unit work history information management. Unit 223 and work result information output unit 224.

クレーン稼働情報取得部221は、クレーン稼働情報を取得する。クレーン100のクレーン情報処理装置130から送信されたクレーン稼働情報は、作業管理装置200の通信部201にて受信される。クレーン稼働情報取得部221は、通信部201が受信したクレーン稼働情報を取得する。
クレーン稼働情報取得部221は、取得したクレーン稼働情報を、記憶部203におけるクレーン稼働情報記憶部231に記憶させる。
The crane operation information acquisition unit 221 acquires crane operation information. The crane operation information transmitted from the crane information processing device 130 of the crane 100 is received by the communication unit 201 of the work management device 200. The crane operation information acquisition unit 221 acquires the crane operation information received by the communication unit 201.
The crane operation information acquisition unit 221 stores the acquired crane operation information in the crane operation information storage unit 231 in the storage unit 203.

区分作業時間算出部222は、クレーン稼働情報取得部221が取得したクレーン稼働情報に基づいて、クレーン100を利用して行われる1揚重サイクル相当の単位作業において区分される区分作業ごとの区分作業時間を算出する。
具体的に、クレーン100を利用した作業は、玉掛けすべき運搬物が置かれている位置までのクレーンの移動、玉掛け、玉掛けした運搬物の移動先への移動、移動先での運搬物の玉外しというようにさらに区分された一連の作業を含む揚重サイクルの繰り返しとなる。ここでの1揚重サイクル相当の単位作業とは1揚重サイクルに含まれる複数の作業である。区分作業時間算出部222は、1揚重サイクル相当の単位作業において区分される所定の区分作業ごとに要した時間を区分作業時間として算出する。
The sorting work time calculation unit 222 sorts the sorting work for each sorting work divided in unit work equivalent to one lifting cycle performed using the crane 100 based on the crane operation information acquired by the crane operation information acquisition unit 221. Calculate time.
Specifically, the operations using the crane 100 include the movement of the crane to the position where the object to be slapped is placed, the sling, the movement of the slung object to the destination, and the ball of the object at the destination. It is a repetition of a lifting cycle including a series of operations that are further divided, such as removal. Here, the unit work corresponding to one lifting cycle is a plurality of works included in one lifting cycle. The division work time calculation unit 222 calculates the time required for each predetermined division work divided in the unit work corresponding to one lifting cycle as the division work time.

単位作業履歴情報管理部223は、単位作業履歴情報を生成する。単位作業履歴情報は、単位作業ごとの実績を示す情報であり、区分作業時間算出部222が算出した区分作業時間を含む。   The unit work history information management unit 223 generates unit work history information. The unit work history information is information indicating a result for each unit work, and includes the divided work time calculated by the divided work time calculation unit 222.

また、単位作業履歴情報管理部223は、クレーン稼働情報における荷重と、クレーン稼働情報に基づいて求めた運搬物の移動終了タイミングに対応するクレーンのフック位置(座標)とを利用して、単位作業によって運搬された運搬物に関連する運搬物管理情報から検索する。
運搬物管理情報は、記憶部203において運搬物管理情報記憶部233が予め記憶しており、運搬物情報ごとに、クレーンにより運搬すべき運搬物を引き揚げたときにフック105aに掛かる荷重と、運搬物の移動先の位置に対応する座標とを対応させた情報である。
単位作業履歴情報管理部223は、検索した運搬物を対応の単位作業の単位作業履歴情報に含める。
In addition, the unit work history information management unit 223 uses the load in the crane operation information and the hook position (coordinates) of the crane corresponding to the movement end timing of the transported object obtained based on the crane operation information to perform the unit work. Search from the material management information related to the material conveyed by.
The transported object management information is stored in advance in the storage unit 203 in the transported object management information storage unit 233. For each transported object information, the load applied to the hook 105a when the transported object to be transported is lifted by the crane, This is information in which coordinates corresponding to the position of the movement destination of the object are associated.
The unit work history information management unit 223 includes the retrieved transported object in the unit work history information of the corresponding unit work.

このように、単位作業履歴情報には、単位作業における区分作業時間と、対応の単位作業により運搬された運搬物に関連する運搬物情報が含まれる。単位作業履歴情報管理部223は、生成した単位作業履歴情報を記憶部203における単位作業履歴情報記憶部232に記憶させる。   Thus, the unit work history information includes the section work time in the unit work and the transported object information related to the transported object transported by the corresponding unit work. The unit work history information management unit 223 stores the generated unit work history information in the unit work history information storage unit 232 in the storage unit 203.

作業実績情報出力部224は、一定の作業期間の単位作業履歴情報を利用して、この一定の作業期間において行われた作業の実績を示す作業実績情報を生成し、生成した作業実績情報を所定の態様により出力する。
具体的に、作業実績情報出力部224は、一定の作業期間として1日分の単位作業履歴情報を利用して、この1日において行われた作業の実績を示す作業実績情報を生成する。このように生成された1日分の作業実績情報は、1日分のクレーン作業の実績を示す「日報」として扱われる。作業実績情報出力部224は、このように生成した日報としての作業実績情報を、所定の態様によって表示部205に表示させる。
The work performance information output unit 224 uses the unit work history information of a certain work period to generate work performance information indicating the work performance performed in the certain work period, and the generated work performance information is predetermined. The output is performed according to the mode.
Specifically, the work performance information output unit 224 uses the unit work history information for one day as a fixed work period, and generates work performance information indicating the work performance performed on this day. The work result information for one day generated in this way is handled as “daily report” indicating the result of crane work for one day. The work record information output unit 224 causes the display unit 205 to display the work record information as the daily report generated in this manner in a predetermined manner.

記憶部203は、作業管理装置200が利用する各種の情報を記憶する。同図に示す記憶部203は、クレーン稼働情報を利用した作業管理に関連して、クレーン稼働情報記憶部231、単位作業履歴情報記憶部232及び運搬物管理情報記憶部233を備える。   The storage unit 203 stores various types of information used by the work management apparatus 200. The storage unit 203 shown in the figure includes a crane operation information storage unit 231, a unit work history information storage unit 232, and a transported item management information storage unit 233 in relation to work management using crane operation information.

クレーン稼働情報記憶部231は、クレーン稼働情報取得部221により取得されたクレーン稼働情報を記憶する。クレーン稼働情報記憶部231は、例えばクレーン稼働情報テーブルとしての構造によりクレーン稼働情報を記憶する。
図3は、クレーン稼働情報テーブルの構造例を示している。同図に示すクレーン稼働情報テーブルは、日付(例えば、年月日)ごとに対応して、時系列旋回角データ、時系列起伏角データ、時系列揚程データ、時系列荷重データ及び撮像画像データが記憶される。これらの時系列旋回角データ、時系列起伏角データ、時系列揚程データ、時系列荷重データ及び撮像画像データは、それぞれ、日付が示す1日において取得されたデータである。したがって、撮像画像データは、再生時間に時刻が対応付けられている。
The crane operation information storage unit 231 stores the crane operation information acquired by the crane operation information acquisition unit 221. The crane operation information storage unit 231 stores crane operation information, for example, with a structure as a crane operation information table.
FIG. 3 shows a structural example of the crane operation information table. The crane operation information table shown in the figure includes time-series turning angle data, time-series undulation angle data, time-series lift data, time-series load data, and captured image data corresponding to each date (for example, year, month, day). Remembered. These time-series turning angle data, time-series undulation angle data, time-series lift data, time-series load data, and captured image data are data acquired on one day indicated by the date. Therefore, in the captured image data, the time is associated with the reproduction time.

単位作業履歴情報記憶部232は、単位作業履歴情報管理部223が生成した単位作業履歴情報を記憶する。単位作業履歴情報記憶部232は、単位作業履歴情報テーブルの構造により単位作業履歴情報を記憶する。
図4は、単位作業履歴情報テーブルの構造例を示している。同図に示すように、単位作業履歴情報テーブルは、1つの日付に対して単位作業ごとに対応する単位作業履歴情報#1〜#Nを格納した構造である。これらの単位作業履歴情報#1〜#Nは、日付が示す1日において行われた単位作業のそれぞれに対応し、#1〜#Nの番号は、対応の単位作業が行われた順番に対応する。このように、単位作業履歴情報は、1日ごとに区分されるように管理される。これにより、例えば、1日単位の作業実績情報である日報の作成を効率的に行うことが可能になる。
The unit work history information storage unit 232 stores the unit work history information generated by the unit work history information management unit 223. The unit work history information storage unit 232 stores unit work history information according to the structure of the unit work history information table.
FIG. 4 shows an example of the structure of the unit work history information table. As shown in the figure, the unit work history information table has a structure storing unit work history information # 1 to #N corresponding to each unit work for one date. These unit work history information # 1 to #N correspond to each of the unit work performed on one day indicated by the date, and the numbers # 1 to #N correspond to the order in which the corresponding unit work is performed. To do. As described above, the unit work history information is managed so as to be divided every day. Thereby, for example, it is possible to efficiently create a daily report that is work result information for each day.

図5は、図4に示す単位作業履歴情報テーブルにおいて格納される1つの単位作業履歴情報の構造例を示している。
単位作業履歴情報は、図示するように、運搬物情報、開始終了時刻、区分作業時間及び所要時間を含む。
運搬物情報は、対応の単位作業によりクレーン100が運搬した運搬物に関連する情報である。具体的に、運搬物情報は、例えば運搬物の名称の情報を含む。また、運搬物情報には、運搬物を吊り下げたときの荷重などの情報も含めてよい。
開始終了時刻は、対応の単位作業が開始された時刻(開始時刻)と対応の単位作業が終了した時刻(終了時刻)を示す。
FIG. 5 shows an example of the structure of one unit work history information stored in the unit work history information table shown in FIG.
As shown in the figure, the unit work history information includes transported object information, start / end time, section work time, and required time.
The transported material information is information related to the transported material transported by the crane 100 by the corresponding unit work. Specifically, the transported object information includes, for example, information on the name of the transported object. Moreover, information, such as a load when a conveyed product is suspended, may be included in the conveyed product information.
The start / end time indicates the time when the corresponding unit work is started (start time) and the time when the corresponding unit work is ended (end time).

区分作業時間は、対応の単位作業において区分される区分作業ごとに要した時間を示す。本実施形態の場合、単位作業における区分作業の種別は、移動、玉掛け、揚重、調整、玉外しの5つである。これに対応して、図5に示す区分作業時間は、移動時間、玉掛け時間、揚重時間、調整時間、玉外し時間を含む。   The division work time indicates the time required for each division work divided in the corresponding unit work. In the case of this embodiment, there are five types of division work in unit work: movement, sling, lifting, adjustment, and ball removal. Correspondingly, the segmentation work time shown in FIG. 5 includes travel time, sling time, lifting time, adjustment time, and ball removal time.

区分作業としての移動は、単位作業における最初の作業であり、例えばクレーン100を前回の単位作業を終了したときの位置から、今回の単位作業により運搬すべき運搬物が玉掛け可能な位置にまでクレーンを移動させる作業である。そして、区分作業時間における移動時間は、移動の作業に要した時間を示す。
また、単位作業履歴情報の開始終了時刻における開始時刻は、移動時間の開始時刻と一致する。
The movement as the sorting work is the first work in the unit work. For example, the crane 100 is moved from the position when the previous unit work is finished to the position where the object to be transported by the current unit work can be slung. It is work to move. The travel time in the segment work time indicates the time required for the travel work.
The start time at the start / end time of the unit work history information matches the start time of the travel time.

玉掛けは、今回の単位作業により運搬すべき運搬物をクレーン100のフック105aに掛ける作業である。区分作業時間における玉掛け時間は、玉掛けの作業に要した時間を示す。   The sling is an operation to hang a material to be transported on the hook 105a of the crane 100 by this unit operation. The staking time in the section work time indicates the time required for the staking work.

揚重は、玉掛けの作業によってフック105aに掛けられた運搬物をクレーン100により引き揚げて玉外しすべき所定の位置にまで移動させる作業である。区分作業時間における揚重時間は、揚重の作業に要した時間を示す。   Lifting is an operation of lifting a transported object hung on the hook 105a by a slinging operation by the crane 100 and moving it to a predetermined position to be removed. The lifting time in the section work time indicates the time required for the lifting work.

調整は、揚重の作業によって所定の位置にまで移動された運搬物が正しく置かれるように、運搬物の位置や向きを調整する作業である。区分作業時間における調整時間は、調整に要した時間を示す。   The adjustment is an operation of adjusting the position and orientation of the transported object so that the transported object moved to a predetermined position by the lifting work is correctly placed. The adjustment time in the section work time indicates the time required for adjustment.

玉外しは、調整の作業によって正しい位置に置かれた状態の運搬物からフックを外す作業である。区分作業時間における玉外し時間は、玉外しに要した時間を示す。   The ball removal is an operation of removing the hook from the transported object that has been placed in the correct position by the adjustment operation. The ball removal time in the division work time indicates the time required for ball removal.

所要時間は、対応の単位作業を開始してから完了するまでの時間であり、開始時刻から終了時刻までの時間と同じになる。   The required time is the time from the start to completion of the corresponding unit work, and is the same as the time from the start time to the end time.

運搬物管理情報記憶部233は、運搬物管理情報を記憶する。
図6は、運搬物管理情報の構造例を示している。同図に示すように、運搬物管理情報は、運搬物情報(例えば運搬物の名称)に対して、荷重と座標とが対応付けられている。前述のように、運搬物管理情報における荷重は、対応の運搬物情報が示す運搬物をクレーン100により吊り下げたときの荷重を示す。運搬物管理情報に格納する荷重の値は、例えば、予めのシミュレーションや計算などにより求めてもよいし、実際に対応の運搬物を吊り下げて測定した値を用いてもよい。
運搬物管理情報における座標は、運搬物の移動先の位置として平面方向における位置を表す。この座標は、例えばクレーン100の回転軸(例えば、ジブ103の支点)を原点とする座標空間において示される。
The transported material management information storage unit 233 stores transported material management information.
FIG. 6 shows an example of the structure of the transported article management information. As shown in the figure, in the transported object management information, the load and the coordinates are associated with the transported object information (for example, the name of the transported object). As described above, the load in the transported object management information indicates the load when the transported object indicated by the corresponding transported object information is suspended by the crane 100. The value of the load stored in the transported material management information may be obtained by, for example, a simulation or calculation in advance, or a value actually measured by hanging the corresponding transported material may be used.
The coordinates in the transported object management information represent a position in the plane direction as the position of the transported object. The coordinates are indicated in a coordinate space having the origin of the rotation axis of the crane 100 (for example, the fulcrum of the jib 103), for example.

説明を図2に戻す。
操作部204は、作業管理装置200に備えられる操作デバイスや操作子を一括して示している。管理者は、例えば、操作部204により、日報を表示させるための操作を行うことができる。この操作に応じて、作業実績情報出力部224は、指定された日付の日報を表示部205に表示させる。
表示部205は、制御部202の制御に応じて画像を表示する。上記したように、作業実績情報出力部224の制御に応じて、表示部205は、日報の画面を表示させる。
Returning to FIG.
The operation unit 204 collectively indicates operation devices and operators provided in the work management apparatus 200. For example, the administrator can perform an operation for displaying a daily report using the operation unit 204. In response to this operation, the work performance information output unit 224 causes the display unit 205 to display a daily report for the designated date.
The display unit 205 displays an image according to the control of the control unit 202. As described above, the display unit 205 displays a daily report screen in accordance with the control of the work record information output unit 224.

[単位作業履歴情報を生成する処理の一例]
続いて、単位作業履歴情報管理部223が、1つの単位作業に対応する単位作業履歴情報を生成するための処理の一具体例について説明する。
本実施形態における単位作業履歴情報管理部223は、単位作業履歴情報を生成するにあたり、クレーン100のフック105aの位置を三次元の座標として表すことができる。この点について図7を参照して説明する。
[Example of processing for generating unit work history information]
Next, a specific example of a process for the unit work history information management unit 223 to generate unit work history information corresponding to one unit work will be described.
The unit work history information management unit 223 according to the present embodiment can represent the position of the hook 105a of the crane 100 as a three-dimensional coordinate when generating the unit work history information. This point will be described with reference to FIG.

図7(a)は、平面方向におけるフック105aの位置を示している。また、図7(b)は、図7(a)に対応する高さ方向のフック105aの位置を示している。
図7(a)に示すXY座標の原点Oは、例えばジブ103の支点(旋回の中心)に対応する。同図においては、Y軸に対応する基準旋回角(0°)から旋回角がαの位置にジブ103が在る状態が示されている。このときのクレーン100のジブ103の起伏角は、図7(b)に示すようにβである。
FIG. 7A shows the position of the hook 105a in the planar direction. FIG. 7B shows the position of the hook 105a in the height direction corresponding to FIG. 7A.
The origin O of the XY coordinates shown in FIG. 7A corresponds to, for example, the fulcrum (the center of turning) of the jib 103. The figure shows a state where the jib 103 is present at a position where the turning angle is α from the reference turning angle (0 °) corresponding to the Y axis. The undulation angle of the jib 103 of the crane 100 at this time is β as shown in FIG.

平面方向におけるフック105aの位置はジブ103の先端と対応する。したがって、フック105a位置の平面方向におけるフック位置平面座標P(X,Y)は、図7(a)に示されるように、旋回角がαで原点Oからジブ103の先端までの距離に対応する位置となる。このように、フック位置平面座標P(X,Y)は、ジブ103の支点から先端までの距離が既知であれば旋回角と起伏角とにより求めることができる。   The position of the hook 105 a in the planar direction corresponds to the tip of the jib 103. Accordingly, the hook position plane coordinate P (X, Y) in the plane direction of the hook 105a corresponds to the distance from the origin O to the tip of the jib 103 with a turning angle α as shown in FIG. Position. Thus, the hook position plane coordinates P (X, Y) can be obtained from the turning angle and the undulation angle if the distance from the fulcrum of the jib 103 to the tip is known.

また、図7(b)に示される基準レベルからフック105aまでの高さHが揚程である。揚程は、ジブ103の先端からフック105aまでの垂直方向の距離γ、起伏角β、ジブ103の長さと支点座標などから求めることができる。
このように、フック105aの位置は、平面方向におけるX,Y座標と、高さ方向におけるH座標との三次元座標によって表すことができる。
Further, the height H from the reference level shown in FIG. 7B to the hook 105a is the lift. The lift can be obtained from the vertical distance γ from the tip of the jib 103 to the hook 105a, the undulation angle β, the length of the jib 103 and the fulcrum coordinates.
Thus, the position of the hook 105a can be represented by three-dimensional coordinates of the X and Y coordinates in the plane direction and the H coordinate in the height direction.

次に、図8のタイミングチャートを参照して、単位作業履歴情報管理部223が、1つの単位作業における区分作業時間(移動時間、玉掛け時間、揚重時間、調整時間、玉外し時間)を算出する手順例について説明する。   Next, with reference to the timing chart of FIG. 8, the unit work history information management unit 223 calculates the division work time (movement time, sling time, lifting time, adjustment time, demount time) in one unit work. An example procedure is described.

図8においては、1回の単位作業に対応する旋回角、旋回速度、起伏角、起伏速度、揚程、巻き速度、荷重と、区分作業(移動、玉掛け、揚重、調整、玉外し)の時間帯が時間経過にしたがって示されている。なお、旋回速度、起伏速度及び巻き速度については、それぞれ、時系列旋回角データが示す旋回角、時系列起伏角データが示す起伏角、時系列揚程データが示す揚程を微分することにより求められる。
以降の説明にあたり、単位作業履歴情報管理部223は、旋回角、起伏、揚程の変化の有無を判定するにあたって、時系列旋回角データ、時系列起伏角データ、時系列揚程データが示す値の変化の有無を利用してもよい。あるいは、単位作業履歴情報管理部223は、旋回速度、起伏速度及び巻き速度が0であるか否かにより、旋回角、起伏、揚程の変化の有無を判定するようにしてもよい。
In FIG. 8, the turning angle, turning speed, hoisting angle, hoisting speed, lifting head, winding speed, load corresponding to one unit work, and time of sorting work (moving, slinging, lifting, adjusting, removing the ball) The bands are shown over time. Note that the turning speed, the undulation speed, and the winding speed are obtained by differentiating the turning angle indicated by the time series turning angle data, the undulation angle indicated by the time series undulation angle data, and the head indicated by the time series lift data, respectively.
In the following description, the unit work history information management unit 223 changes the values indicated by the time-series turning angle data, the time-series undulation angle data, and the time-series head data when determining whether or not there is a change in the turning angle, the undulation, and the lift. The presence or absence of may be used. Alternatively, the unit work history information management unit 223 may determine whether or not there is a change in the turning angle, the undulation, and the lift depending on whether the turning speed, the undulation speed, and the winding speed are zero.

単位作業履歴情報管理部223は、以下の手順により、上記の5つの区分作業ごとの区分作業時間を算出する。
単位作業履歴情報管理部223は、1つの単位作業に対応する区分作業時間の算出にあたり、クレーン稼働情報における前回の単位作業の終了時刻以降の時系列旋回角データ、時系列起伏角データ、時系列揚程データ、時系列荷重データを解析対象とする。
The unit work history information management unit 223 calculates the divided work time for each of the five divided works according to the following procedure.
The unit work history information management unit 223 calculates time series turning angle data, time series undulation angle data, time series after the end time of the previous unit work in the crane operation information in calculating the division work time corresponding to one unit work. The lift data and time-series load data are analyzed.

そのうえで、まず、単位作業履歴情報管理部223は、探索対象の時系列荷重データの変化を時系列にしたがって解析していくことで、荷重が0の状態から0を越える状態に変化する荷重開始時刻t5を探索する。なお、ここでの0の状態から0を越える状態についての検出対象となる荷重は、例えば吊り治具の分による荷重を除いた部材のみによる荷重の成分である。   In addition, first, the unit work history information management unit 223 analyzes the change in the time-series load data to be searched according to the time series, so that the load start time when the load changes from 0 to over 0 is obtained. Search for t5. Note that the load to be detected for the state exceeding 0 from the 0 state here is, for example, a component of the load by only the member excluding the load due to the hanging jig.

次に、単位作業履歴情報管理部223は、探索対象の時系列揚程データを解析して、荷重開始時刻t5以前において、これまで変化していなかった揚程が変化するタイミングである揚重開始時刻t3を探索する。このように、荷重開始時刻t5以前における最後の揚程開始タイミングは、揚重作業を開始するためのタイミングであるとみてよい。   Next, the unit work history information management unit 223 analyzes the time-series head data to be searched, and before the load start time t5, the lifting start time t3, which is the timing at which the lift that has not changed so far changes. Explore. Thus, it may be considered that the last lift start timing before the load start time t5 is a timing for starting the lifting work.

次に、単位作業履歴情報管理部223は、玉掛け開始時刻t2を探索する。玉掛け開始時刻t2は、揚重開始時刻t3以前において、先に探索した荷重開始時刻t5のときとフック位置平面座標P(X,Y)がほぼ同じで、かつ、旋回角、起伏角及び揚程のいずれもが停止して変化しなくなったタイミングである。単位作業履歴情報管理部223は、このタイミングを玉掛け開始時刻t2とする。
玉掛け作業の際には、クレーン100のフック105aの位置は、玉掛け作業がしやすい位置で定位している。したがって、揚重作業が開始される以前において、旋回角、起伏角及び揚程のいずれもが変化しない状態は、玉掛け作業が行われているときの状態であるとみてよい。
Next, the unit work history information management unit 223 searches for the sling start time t2. The sling start time t2 is substantially the same as the hook position plane coordinate P (X, Y) at the load start time t5 searched earlier before the lifting start time t3, and the swivel angle, the undulation angle, and the lift angle. Both of these are the timings that stopped and stopped changing. The unit work history information management unit 223 sets this timing as the staking start time t2.
During the sling operation, the position of the hook 105a of the crane 100 is localized at a position where the sling operation is easy. Therefore, before the lifting work is started, the state in which none of the turning angle, the undulation angle, and the lift is changed may be regarded as a state when the slinging work is performed.

ここで、本実施形態においては、荷重開始時刻t5を探索したうえで、この後に揚重開始時刻t3、玉掛け開始時刻t2を探索している。
例えば、揚重開始時刻t3を探索する際の条件である、「これまで変化していなかった揚程が変化するタイミング」は、揚重開始時刻t3以外のタイミングでも発生する可能性がある。同様に、玉掛け開始時刻t2を探索する際の条件である、「旋回角、起伏角及び揚程のいずれもが停止して変化しなくなったタイミング」も玉掛け開始時刻t2以外のタイミングで発生する可能性がある。この点を考慮すると、例えば、1回の単位作業の期間全体を対象とした場合、揚重開始時刻t3、玉掛け開始時刻t2を誤って探索する可能性が高くなる。
一方、荷重開始時刻t5としての荷重の掛かりが始まるタイミングは、玉掛けが完了して運搬物を引き揚げようとするときにのみ現れる。
Here, in this embodiment, after searching for the load start time t5, the lifting start time t3 and the sling start time t2 are searched.
For example, there is a possibility that “a timing at which the lift that has not changed so far”, which is a condition for searching for the lifting start time t3, occurs at a timing other than the lifting start time t3. Similarly, “timing at which all of the turning angle, the undulation angle, and the lift stop and no longer change”, which is a condition for searching for the sling start time t2, may also occur at a timing other than the sling start time t2. There is. Considering this point, for example, when the entire period of one unit work is targeted, the possibility of erroneously searching for the lifting start time t3 and the sling start time t2 increases.
On the other hand, the timing at which the loading of the load as the load start time t5 starts appears only when the sling is completed and the transported object is to be lifted.

そこで、本実施形態では、荷重開始時刻t5を探索したうえで、荷重開始時刻t5以前の期間のみを探索対象として、揚重開始時刻t3、玉掛け開始時刻t2を探索する。このようにすれば、荷重開始時刻t5以降の期間の旋回角、起伏角及び揚程は探索対象ではなくなるために、揚重開始時刻t3、玉掛け開始時刻t2についての探索精度が向上する。   Therefore, in the present embodiment, after searching for the load start time t5, the lifting start time t3 and the sling start time t2 are searched for only the period before the load start time t5. In this way, the turning angle, the undulation angle, and the lift during the period after the load start time t5 are not searched, so the search accuracy for the lifting start time t3 and the sling start time t2 is improved.

なお、上記のように、玉掛け開始時刻t2を探索するにあたり、単位作業履歴情報管理部223は、探索対象の時系列旋回角データと時系列起伏角データとを利用して、揚重開始時刻t3以前における時刻ごとのフック位置平面座標P(X,Y)を求める。同様に、単位作業履歴情報管理部223は、探索対象の時系列旋回角データと時系列起伏角データとを利用して、荷重開始時刻t5のときのフック位置平面座標P(X,Y)とを求める。
そして、単位作業履歴情報管理部223は、揚重開始時刻t3以前のフック位置平面座標P(X,Y)のうちから、荷重開始時刻t5のときのフック位置平面座標P(X,Y)と一定の誤差範囲のフック位置平面座標P(X,Y)を求めればよい。
また、旋回角、起伏角及び揚程のいずれもが変化しなくなっているタイミングについては、時系列旋回角データ、時系列起伏角データ、時系列揚程データを解析すればよい。図8の場合であれば、玉掛け開始時刻t2以前においては旋回角、起伏角、揚程に変化が現れているが、玉掛け開始時刻t2以降は、旋回角、起伏角、揚程のいずれも変化が無く、旋回速度、起伏速度及び巻き速度のいずれもが0の状態である。
As described above, when searching for the sling start time t2, the unit work history information management unit 223 uses the time series turning angle data and the time series undulation angle data to be searched, and the lifting start time t3. The hook position plane coordinate P (X, Y) for each previous time is obtained. Similarly, the unit work history information management unit 223 uses the time series turning angle data and time series undulation angle data to be searched, and the hook position plane coordinate P (X, Y) at the load start time t5. Ask for.
Then, the unit work history information management unit 223 uses the hook position plane coordinate P (X, Y) at the load start time t5 from the hook position plane coordinates P (X, Y) before the lifting start time t3. What is necessary is just to obtain | require the hook position plane coordinate P (X, Y) of a fixed error range.
For the timing at which any of the turning angle, the undulation angle, and the lift no longer change, the time series turning angle data, the time series undulation angle data, and the time series lift data may be analyzed. In the case of FIG. 8, there are changes in the turning angle, the undulation angle, and the lift before the sling start time t2, but there are no changes in any of the turning angle, the undulation angle, and the lift after the sling start time t2. The turning speed, the undulation speed, and the winding speed are all zero.

次に、単位作業履歴情報管理部223は、移動開始時刻t1を探索する。移動開始時刻t1は、運搬物の玉掛けを行う位置にまでクレーンを移動させる作業の開始時刻である。
移動開始時刻t1は、今回の単位作業の開始時刻でもある。また、移動開始時刻t1は、今回の単位作業が前回の単位作業に引き続いて行われる場合には、前回の単位作業の終了時刻と同じになる。ただし、休憩や作業待ちの場合には、移動開始時刻t1と前回の単位作業の終了時刻とが異なる場合がある。
Next, the unit work history information management unit 223 searches for the movement start time t1. The movement start time t1 is the start time of the operation of moving the crane to the position where the carrying object is slung.
The movement start time t1 is also the start time of the current unit work. The movement start time t1 is the same as the end time of the previous unit work when the current unit work is performed following the previous unit work. However, when resting or waiting for work, the movement start time t1 may be different from the end time of the previous unit work.

単位作業履歴情報管理部223は、移動開始時刻t1として、フック位置平面座標P(X,Y)が荷重開始時刻t5のときから一定以上に乖離しており、かつ、玉掛け開始時刻t2以前において、旋回角、起伏角及び揚程のうちのいずれもが変化していない状態から、すくなくともいずれか1つが変化を開始した時刻を探索する。   The unit work history information management unit 223 has the hook position plane coordinate P (X, Y) deviated more than a certain value from the load start time t5 as the movement start time t1, and before the sling start time t2, From the state in which none of the turning angle, the undulation angle, and the lift has changed, the time when at least one of them starts changing is searched.

荷重開始時刻t5は揚程作業によりフック105aに荷重が掛かり始めるタイミングであるが、このときの位置は、ほぼ玉掛けが行われる位置と対応している。これに対して、移動開始時刻t1における位置は前回の単位作業の終了タイミングに対応する。したがって、フック位置平面座標P(X,Y)は、荷重開始時刻t5と移動開始時刻t1とでは明らかに異なっている。
また、玉掛け開始時刻t2以前において、旋回角、起伏角及び揚程のうちのいずれもが変化していない状態から少なくともいずれか1つが変化を開始した時刻は、今回の単位作業において、運搬物の位置にクレーン100を移動させる作業を開始させたとみてよい。
The load start time t5 is a timing at which a load starts to be applied to the hook 105a by the lifting operation, and the position at this time substantially corresponds to the position at which staking is performed. On the other hand, the position at the movement start time t1 corresponds to the end timing of the previous unit work. Therefore, the hook position plane coordinates P (X, Y) are clearly different at the load start time t5 and the movement start time t1.
In addition, before the sling start time t2, the time at which at least one of the turning angle, the undulation angle, and the lift starts to change from the state in which none of them changes is the position of the transported object in this unit operation. It may be considered that the operation of moving the crane 100 is started.

単位作業履歴情報管理部223は、吊り直し時刻t4を探索する。吊り直しとは、例えば一旦運搬物を吊り上げたのであるが、もう一度運搬物を置いて、運搬物の方向の修正や、フック105aに吊り下げるワイヤーの調整などの作業を行うことである。
このような吊り直しの作業が行われた場合には、短時間の間に運搬物を吊り上げ、置くという動作が繰り返されるので荷重開始時刻t5としては複数が探索される。
そこで、単位作業履歴情報管理部223は、複数の荷重開始時刻t5が探索された場合、吊り直し時刻t4を探索し、複数の荷重開始時刻t5から吊り直し時刻t4と同じ時刻とみなせる時刻のものを除外する。これにより、例えば実際の地切りのタイミングに対応した真の荷重開始時刻t5が1つ特定される。
The unit work history information management unit 223 searches for the suspension time t4. The term “re-hanging” refers to, for example, once lifting a transported object, placing the transported object once again, and performing operations such as correcting the direction of the transported object and adjusting a wire suspended from the hook 105a.
When such a re-hanging operation is performed, the operation of lifting and placing the transported object in a short time is repeated, so a plurality of load start times t5 are searched.
Therefore, when the plurality of load start times t5 are searched, the unit work history information management unit 223 searches for the rehabilitation time t4 and has a time that can be regarded as the same time as the re-loading time t4 from the plurality of load start times t5. Is excluded. Thereby, for example, one true load start time t5 corresponding to the actual ground cutting timing is specified.

単位作業履歴情報管理部223は、荷重開始時刻t5とフック位置平面座標P(X,Y)がほぼ同じで、予め定めた時間(例えば15秒)内において荷重が0となり再度0を越える期間を探索する。単位作業履歴情報管理部223は、例えば、この期間において0を越えるタイミングを吊り直し時刻t4とする。
単位作業履歴情報管理部223は、例えば、1つの吊り直し時刻t4を探索するごとに、複数の荷重開始時刻t5のうちから、今回探索した吊り直し時刻t4と同じ時刻とみなせるものを除外する。単位作業履歴情報管理部223は、このような処理を、荷重開始時刻t5が1つになるまで繰り返す。
The unit work history information management unit 223 has a period in which the load start time t5 and the hook position plane coordinate P (X, Y) are substantially the same, and the load becomes 0 and exceeds 0 again within a predetermined time (for example, 15 seconds). Explore. For example, the unit work history information management unit 223 resuspends the timing exceeding 0 in this period as time t4.
For example, each time the unit work history information management unit 223 searches for one suspending time t4, the unit work history information management unit 223 excludes a plurality of load start times t5 that can be regarded as the same time as the suspending time t4 searched this time. The unit work history information management unit 223 repeats such processing until the load start time t5 becomes one.

次に、単位作業履歴情報管理部223は、荷重開始時刻t5以降において荷重が0を越えている状態から0に変化する荷重解除時刻t8を探索する。このように荷重が0に変化する荷重解除時刻t8は、運搬物を移動先にまで移動させて置いたタイミングであり、以降において玉外し作業が可能である。   Next, the unit work history information management unit 223 searches for a load release time t8 at which the load changes from 0 to 0 after the load start time t5. In this way, the load release time t8 when the load changes to 0 is the timing when the transported object is moved to the destination, and the ball removal work can be performed thereafter.

次に、単位作業履歴情報管理部223は、荷重解除時刻t8以前において、旋回角、起伏角及び揚程のいずれもが変化しなくなったタイミングを移動終了時刻t6として探索する。   Next, the unit work history information management unit 223 searches for the timing at which any of the turning angle, the undulation angle, and the lift no longer change before the load release time t8 as the movement end time t6.

また、単位作業履歴情報管理部223は、置き直し時刻t7を探索する。
置き直しとは、移動先まで移動させた運搬物を一旦置いたのであるが、置かれた向きが違っているなどしたために、もう一度運搬物を少しだけ吊り上げて運搬物の方向の修正などを行う作業である。
このような置き直しの作業が行われた場合にも、吊り直しの際と同様に、短時間の間に運搬物を吊り上げ、置くという動作が繰り返されるので複数の荷重解除時刻t8が探索される。
そこで、単位作業履歴情報管理部223は、置き直し時刻t7を探索し、複数の荷重解除時刻t8から置き直し時刻t7と同じとみなせる時刻のものを除外する。これにより、実際に置き直しも完了して運搬物の吊り上げを解除したタイミングに対応した、真の荷重開始時刻t5が1つ特定される。
In addition, the unit work history information management unit 223 searches for the repositioning time t7.
Repositioning means that the transported object that has been moved to the destination is temporarily placed. However, because the orientation of the transported object is different, the transported object is slightly lifted once again to correct the direction of the transported object. Work.
Even when such a repositioning operation is performed, the operation of lifting and placing the transported object in a short time is repeated as in the case of the rehanging, so that a plurality of load release times t8 are searched. .
Therefore, the unit work history information management unit 223 searches for the replacement time t7, and excludes a plurality of load release times t8 that have the same time as the replacement time t7. Thereby, one true load start time t5 corresponding to the timing at which the repositioning is actually completed and the lifting of the transported object is released is specified.

単位作業履歴情報管理部223は、荷重解除時刻t8のときとフック位置平面座標P(X,Y)がほぼ同じで、予め定めた時間(例えば15秒)内において、例えば荷重が0となった状態から0を越える状態となるように変化する期間を探索する。単位作業履歴情報管理部223は、例えば、この期間において荷重が0となったタイミングを置き直し時刻t7とする。
単位作業履歴情報管理部223は、例えば、1つの置き直し時刻t7を探索するごとに、複数の荷重解除時刻t8のうちから、今回探索した置き直し時刻t7と同じ時刻とみなしてよいものを除外する。単位作業履歴情報管理部223は、このような処理を、荷重解除時刻t8が1つになるまで繰り返せばよい。
The unit work history information management unit 223 has substantially the same hook position plane coordinate P (X, Y) as that at the load release time t8, and, for example, the load becomes 0 within a predetermined time (for example, 15 seconds). A period that changes from a state to a state exceeding 0 is searched. For example, the unit work history information management unit 223 resets the timing when the load becomes 0 in this period, and sets the time t7.
For example, each time the unit work history information management unit 223 searches for one replacement time t7, the unit work history information management unit 223 excludes a plurality of load release times t8 that may be regarded as the same time as the current replacement time t7. To do. The unit work history information management unit 223 may repeat such processing until the load release time t8 becomes one.

次に、単位作業履歴情報管理部223は、荷重解除時刻t8以降において、荷重解除時刻t8のときとフック位置平面座標P(X,Y)がほぼ同じで、かつ、旋回角、起伏、揚程のうちの少なくともいずれか1つの変化が一定以上に大きくなる単位作業終了時刻t9を探索する。
単位作業終了時刻t9は、今回の単位作業が終了した時刻であり、次の単位作業のためにクレーン100が移動を開始するタイミングである。
Next, after the load release time t8, the unit work history information management unit 223 has substantially the same hook position plane coordinate P (X, Y) as that at the load release time t8, and the turning angle, the undulation, and the lift. A unit work end time t9 at which at least any one of the changes becomes greater than a certain value is searched for.
The unit work end time t9 is the time when the current unit work is finished, and is the timing when the crane 100 starts moving for the next unit work.

単位作業履歴情報管理部223は、上記のように探索した時刻に基づいて、単位作業における区分作業(移動、玉掛け、揚重、調整、玉外し)ごとの区分作業時間(移動時間、玉掛け時間、揚重時間、調整時間、玉外し時間)を算出する。
具体的に、単位作業履歴情報管理部223は、移動開始時刻t1から玉掛け開始時刻t2までの時間を移動時間として算出する。つまり、移動時間は、(玉掛け開始時刻t2−移動開始時刻t1)の演算により求めることができる。
また、単位作業履歴情報管理部223は、玉掛け開始時刻t2から揚重開始時刻t3までの時間を玉掛け時間として算出する。
単位作業履歴情報管理部223は、揚重開始時刻t3から移動終了時刻t6までの時間を揚重時間として算出する。
単位作業履歴情報管理部223は、移動終了時刻t6から荷重解除時刻t8までの時間を調整時間として算出する。
単位作業履歴情報管理部223は、荷重解除時刻t8から単位作業終了時刻t9までの時間を玉外し時間として算出する。
Based on the time searched for as described above, the unit work history information management unit 223 performs the division work time (movement time, sling time) for each division work (movement, sling, lifting, adjustment, slack removal) in the unit work. Lifting time, adjustment time, ball removal time) are calculated.
Specifically, the unit work history information management unit 223 calculates the time from the movement start time t1 to the sling start time t2 as the movement time. That is, the movement time can be obtained by calculation of (slap start time t2−movement start time t1).
Further, the unit work history information management unit 223 calculates the time from the sling start time t2 to the lifting start time t3 as a sling time.
The unit work history information management unit 223 calculates the time from the lifting start time t3 to the movement end time t6 as the lifting time.
The unit work history information management unit 223 calculates the time from the movement end time t6 to the load release time t8 as the adjustment time.
The unit work history information management unit 223 calculates the time from the load release time t8 to the unit work end time t9 as a ball removal time.

また、単位作業履歴情報管理部223は、クレーン稼働情報における荷重とクレーン稼働情報に基づいて求めた運搬物の移動終了タイミングにおけるフック105aの位置を示す座標との組合せに対応付けられた運搬物情報を運搬物管理情報から検索する。そして、単位作業履歴情報管理部223は、検索した運搬物情報を対応の単位作業の単位作業履歴情報に含める。   Also, the unit work history information management unit 223 carries information on the load associated with the combination of the load in the crane operation information and the coordinates indicating the position of the hook 105a at the movement end timing of the load obtained based on the crane operation information. Is retrieved from the material management information. Then, the unit work history information management unit 223 includes the retrieved transported object information in the unit work history information of the corresponding unit work.

具体的に、単位作業履歴情報管理部223は、移動終了時刻t6を運搬物の移動終了タイミングとして、移動終了時刻t6における荷重とフック位置平面座標P(X,Y)とを取得する。移動終了時刻t6においては、運搬物が吊り下げられて荷重がかかった状態のままで、平面方向におけるフック位置としては、運搬物の移動先とほぼ一致している。
そして、単位作業履歴情報管理部223は、運搬物管理情報における運搬物情報のうちから、移動終了時刻t6のときと同じ荷重と、移動終了時刻t6のときのフック位置平面座標P(X,Y)と同じ座標が対応付けられている運搬物情報を検索する。
Specifically, the unit work history information management unit 223 acquires the load and the hook position plane coordinate P (X, Y) at the movement end time t6 using the movement end time t6 as the movement end timing of the transported object. At the movement end time t6, the transported object is suspended and a load is applied, and the hook position in the plane direction substantially coincides with the destination of the transported object.
Then, the unit work history information management unit 223 uses the same load at the movement end time t6 and the hook position plane coordinates P (X, Y at the movement end time t6) from the conveyed item information in the conveyance management information. ) Search for the transported goods information associated with the same coordinates.

なお、運搬物情報を取得するにあたっての移動終了タイミングは、上記の移動終了時刻t6でなくともよい。例えば、置き直しの作業が行われている場合には、置き直し時刻t7の探索にあたり検出された荷重が0を越えたタイミングを移動終了タイミングとしてもよい。つまり、この場合の単位作業履歴情報管理部223は、置き直し時刻t7の探索にあたり検出された荷重が0を越えたタイミングにおける荷重とフック位置平面座標P(X,Y)とを取得すればよい。   Note that the movement end timing for acquiring the transported object information may not be the above movement end time t6. For example, when a repositioning operation is being performed, the timing at which the load detected in the search for the repositioning time t7 exceeds 0 may be set as the movement end timing. In other words, the unit work history information management unit 223 in this case may acquire the load and the hook position plane coordinate P (X, Y) at the timing when the load detected in the search for the replacement time t7 exceeds 0. .

単位作業履歴情報管理部223は、図8にて説明したように算出した区分作業時間(移動時間、玉掛け時間、揚重時間、調整時間、玉外し時間)と、上記のように検索した運搬物情報を含めて、図5に示す単位作業履歴情報を生成する。なお、図5の単位作業履歴情報における開始終了時刻における開始時刻と終了時刻は、それぞれ、区分作業時間の算出に際して得られた移動開始時刻t1と単位作業終了時刻t9とを反映させればよい。また、単位作業履歴情報における所要時間は、区分作業時間のそれぞれを合計する、あるいは、開始時刻から終了時刻までの時間を算出することにより得られる。   The unit work history information management unit 223 performs the divided work time (movement time, sling time, lifting time, adjustment time, ball removal time) calculated as described with reference to FIG. The unit work history information shown in FIG. 5 including the information is generated. Note that the start time and the end time at the start / end time in the unit work history information of FIG. 5 may reflect the movement start time t1 and the unit work end time t9 obtained in the calculation of the segment work time, respectively. Further, the required time in the unit work history information is obtained by summing up the respective divided work times or by calculating the time from the start time to the end time.

[単位作業履歴情報テーブル生成のための処理手順例]
図9のフローチャートは、単位作業履歴情報管理部223が1日分の単位作業履歴情報テーブルを生成するための処理手順例を示している。
単位作業履歴情報管理部223は、1日における単位作業の順番に対応した番号を示す変数nについて初期値として1を代入する(ステップS101)。
また、単位作業履歴情報管理部223は、探索対象データとして、単位作業履歴情報テーブルを生成すべき日の日付に対応する時系列旋回角データ、時系列起伏角データ、時系列揚程データ、時系列荷重データをクレーン稼働情報記憶部231から読み込む(ステップS102)。
[Example of processing procedure for generating unit work history information table]
The flowchart of FIG. 9 shows an example of a processing procedure for the unit work history information management unit 223 to generate a unit work history information table for one day.
The unit work history information management unit 223 substitutes 1 as an initial value for a variable n indicating a number corresponding to the order of unit work in one day (step S101).
Further, the unit work history information management unit 223 uses time series turning angle data, time series undulation angle data, time series lift data, time series corresponding to the date on which the unit work history information table should be generated as search target data. Load data is read from the crane operation information storage unit 231 (step S102).

単位作業履歴情報管理部223は、以降のステップS103〜S111により区分作業の区分に対応する時刻を探索するにあたり、時系列旋回角データ、時系列起伏角データ、時系列揚程データ、時系列荷重データのうちから必要なデータを適宜対象として解析を行う。
この際、1番目の単位作業との対応では、時系列旋回角データ、時系列起伏角データ、時系列揚程データ、時系列荷重データの先頭から解析を開始すればよい。また、2番目以降の単位作業の単位作業との対応では、時系列旋回角データ、時系列起伏角データ、時系列揚程データ、時系列荷重データにおける、前回の単位作業の終了時刻(今回の単位作業の開始時刻)の位置から解析を開始すればよい。
When the unit work history information management unit 223 searches for the time corresponding to the classification of the division work in the subsequent steps S103 to S111, the time series turning angle data, the time series undulation angle data, the time series lift data, and the time series load data The necessary data is analyzed as appropriate.
At this time, in correspondence with the first unit work, the analysis may be started from the head of the time series turning angle data, time series undulation angle data, time series lift data, and time series load data. In correspondence with the unit work of the second and subsequent unit work, the end time of the previous unit work in the time series turning angle data, time series undulation angle data, time series lift data, and time series load data (the current unit work) The analysis may be started from the position of the work start time).

単位作業履歴情報管理部223は、区分作業に対応する各時刻を、以下のステップS103〜S111により探索する。
つまり、単位作業履歴情報管理部223は、荷重が0の状態から0を越える状態に変化する荷重開始時刻t5を探索する(ステップS103)。
The unit work history information management unit 223 searches each time corresponding to the division work by the following steps S103 to S111.
That is, the unit work history information management unit 223 searches for a load start time t5 at which the load changes from 0 to exceed 0 (step S103).

次に、単位作業履歴情報管理部223は、荷重開始時刻t5から遡って最初に揚程が開始されるタイミングである揚重開始時刻t3を探索する(ステップS104)。   Next, the unit work history information management unit 223 searches for a lifting start time t3 that is a timing at which a lifting head is first started retroactively from the load start time t5 (step S104).

次に、単位作業履歴情報管理部223は、揚重開始時刻t3以前において、荷重開始時刻t5のときとフック位置平面座標P(X,Y)がほぼ同じで、かつ、旋回角、起伏角及び揚程のいずれもが停止して変化しなくなったタイミングを玉掛け開始時刻t2として探索する(ステップS105)。   Next, the unit work history information management unit 223 has the hook position plane coordinate P (X, Y) substantially the same as that at the load start time t5 before the lifting start time t3, and the turning angle, the undulation angle, and The timing at which all the heads stop and no longer change is searched for as the sling start time t2 (step S105).

次に、単位作業履歴情報管理部223は、フック位置平面座標P(X,Y)が荷重開始時刻t5のときから一定以上に乖離しており、かつ、玉掛け開始時刻t2以前において、旋回角、起伏角及び揚程のうちのいずれもが変化していない状態から、少なくともいずれか1つが変化を開始した時刻を移動開始時刻t1として探索する(ステップS106)。   Next, the unit work history information management unit 223 determines that the hook position plane coordinate P (X, Y) has deviated more than a certain amount from the load start time t5 and before the sling start time t2, From the state in which neither the undulation angle nor the lift has changed, the time at which at least one of them starts changing is searched as the movement start time t1 (step S106).

単位作業履歴情報管理部223は、複数の荷重開始時刻t5が探索された場合には、吊り直し時刻t4を探索し、探索した吊り直し時刻t4により1つの荷重開始時刻t5を特定する(ステップS107)。   When a plurality of load start times t5 are searched, the unit work history information management unit 223 searches for the re-loading time t4, and specifies one load start time t5 based on the searched re-loading time t4 (step S107). ).

次に、単位作業履歴情報管理部223は、荷重開始時刻t5以降において荷重が0を越えている状態から0に変化するタイミングを荷重解除時刻t8として探索する(ステップS108)。
次に、単位作業履歴情報管理部223は、荷重解除時刻t8以前において、旋回角、起伏角及び揚程のいずれもが変化しなくなったタイミングを移動終了時刻t6として探索する(ステップS109)。
Next, the unit work history information management unit 223 searches for the timing when the load changes from 0 to 0 after the load start time t5 as the load release time t8 (step S108).
Next, the unit work history information management unit 223 searches for the timing at which any of the turning angle, the undulation angle, and the lift no longer change before the load release time t8 as the movement end time t6 (step S109).

また、単位作業履歴情報管理部223は、複数の荷重解除時刻t8が探索された場合には、置き直し時刻t7を探索し、探索した置き直し時刻t7により1つの荷重解除時刻t8を特定する(ステップS110)。   Further, when a plurality of load release times t8 are searched, the unit work history information management unit 223 searches for the replacement time t7, and specifies one load release time t8 based on the searched replacement time t7 ( Step S110).

次に、単位作業履歴情報管理部223は、単位作業終了時刻t9を探索する(ステップS111)。このために、単位作業履歴情報管理部223は、荷重解除時刻t8以降において、荷重解除時刻t8のときとフック位置平面座標P(X,Y)がほぼ同じで、かつ、旋回角、起伏、揚程のうちの少なくともいずれか1つの変化が一定以上に大きくなるタイミングを探索する。   Next, the unit work history information management unit 223 searches for the unit work end time t9 (step S111). For this reason, the unit work history information management unit 223 has a hook position plane coordinate P (X, Y) substantially the same as that at the load release time t8 after the load release time t8, and the turning angle, undulation, and lift. The timing when the change of at least one of the above becomes larger than a certain level is searched.

次に、単位作業履歴情報管理部223は、ステップS103〜S111により探索した時刻に基づいて、以下のように区分作業(移動、玉掛け、揚重、調整、玉外し)ごとの区分作業時間(移動時間、玉掛け時間、揚重時間、調整時間、玉外し時間)を算出する。
つまり、単位作業履歴情報管理部223は、移動開始時刻t1から玉掛け開始時刻t2までの時間を移動時間として算出する(ステップS112)。
単位作業履歴情報管理部223は、玉掛け開始時刻t2から揚重開始時刻t3までの時間を玉掛け時間として算出する(ステップS113)。
単位作業履歴情報管理部223は、揚重開始時刻t3から移動終了時刻t6までの時間を揚重時間として算出する(ステップS114)。
単位作業履歴情報管理部223は、移動終了時刻t6から荷重解除時刻t8までの時間を調整時間として算出する(ステップS115)。
単位作業履歴情報管理部223は、荷重解除時刻t8から単位作業終了時刻t9までの時間を玉外し時間として算出する(ステップS116)。
なお、ステップS112〜S116による区分作業時間の算出の処理については、処理の順序が変更されて構わない。
Next, based on the time searched in steps S103 to S111, the unit work history information management unit 223 performs the division work time (movement) for each division work (movement, slinging, lifting, adjustment, ball removal) as follows. Time, sling time, lifting time, adjustment time, ball removal time).
That is, the unit work history information management unit 223 calculates the time from the movement start time t1 to the sling start time t2 as the movement time (step S112).
The unit work history information management unit 223 calculates the time from the sling start time t2 to the lifting start time t3 as a sling time (step S113).
The unit work history information management unit 223 calculates the time from the lifting start time t3 to the movement end time t6 as the lifting time (step S114).
The unit work history information management unit 223 calculates the time from the movement end time t6 to the load release time t8 as the adjustment time (step S115).
The unit work history information management unit 223 calculates the time from the load release time t8 to the unit work end time t9 as a ball removal time (step S116).
In addition, about the process of the division | segmentation work time calculation by step S112-S116, the order of a process may be changed.

また、単位作業履歴情報管理部223は、n番目の単位作業により運搬された運搬物についての運搬物情報を運搬物管理情報から検索する(ステップS117)。この際、単位作業履歴情報管理部223は、前述のように、移動終了時刻t6における荷重とフック位置平面座標P(X,Y)を検索条件として、運搬物管理情報から運搬物情報を検索する。   Further, the unit work history information management unit 223 searches the transported object management information for the transported object information about the transported object transported by the nth unit work (step S117). At this time, as described above, the unit work history information management unit 223 searches for the transported object information from the transported object management information using the load and the hook position plane coordinate P (X, Y) at the movement end time t6 as search conditions. .

単位作業履歴情報管理部223は、ステップS112〜S116により算出した区分作業時間と、ステップS117により検索した運搬物情報を含む単位作業履歴情報#nを生成する、なお、運搬物情報には、例えば移動終了時刻t6における時系列荷重データが示す荷重を、運搬物の荷重として含めてよい。
単位作業履歴情報管理部223は、生成した単位作業履歴情報#nを、該当の日付に対応する単位作業履歴情報テーブルに格納する(ステップS118)。
The unit work history information management unit 223 generates unit work history information #n including the divided work time calculated in steps S112 to S116 and the transported object information searched in step S117. You may include the load which the time series load data in the movement end time t6 shows as a load of a conveyed product.
The unit work history information management unit 223 stores the generated unit work history information #n in the unit work history information table corresponding to the corresponding date (step S118).

次に、単位作業履歴情報管理部223は、変数nをインクリメントしたうえで(ステップS119)、変数nが、該当の日付において行われた単位作業数Nより大きいか否かについて判定する(ステップS120)。
変数nが単位作業数N以下である場合には(ステップS120−NO)、未だ単位作業履歴情報を生成していない単位作業が残っている。この場合、単位作業履歴情報管理部223は、ステップS103に戻ることにより、次の単位作業に対応する単位作業履歴情報を生成する処理に移行する。
そして、1日における全ての単位作業に対応する単位作業履歴情報#1〜#Nが生成され、単位作業履歴情報テーブルに格納されると、単位作業履歴情報管理部223は、変数nが単位作業数Nを越えたことを判定し(ステップS120−YES)、単位作業履歴情報生成のための処理を終了する。
この後、例えば他の1日分の単位作業履歴情報を生成する必要があれば、単位作業履歴情報管理部223は、他の1日分のクレーン稼働情報と運搬物管理情報とを利用して、同図に示す処理を実行すればよい。
Next, after incrementing the variable n (step S119), the unit work history information management unit 223 determines whether the variable n is greater than the number N of unit work performed on the corresponding date (step S120). ).
When the variable n is less than or equal to the number N of unit operations (step S120—NO), there are still unit operations for which unit operation history information has not been generated. In this case, by returning to step S103, the unit work history information management unit 223 shifts to a process of generating unit work history information corresponding to the next unit work.
When unit work history information # 1 to #N corresponding to all unit work in one day is generated and stored in the unit work history information table, the unit work history information management unit 223 indicates that the variable n is unit work. It is determined that the number N has been exceeded (step S120—YES), and the process for generating unit work history information is terminated.
Thereafter, for example, if it is necessary to generate unit work history information for another day, the unit work history information management unit 223 uses the crane operation information and the transported material management information for the other day. The process shown in FIG.

[日報の表示態様例]
本実施形態の作業管理装置200における作業実績情報出力部224は、上記のように生成された1日分の単位作業履歴情報を利用して、日報としての作業実績情報を生成し、生成した日報を、表示部205に表示させることができる。
ここで、作業実績情報出力部224が日報を表示するための制御は、例えば管理者などによって日報の表示を指示する操作が操作部204に対して行われるのに応じて実行されるようにすればよい。あるいは、作業実績情報出力部224は、予め定められた時刻において自動的に日報を表示部205に表示させるようにしてもよい。
[Example of daily report display]
The work record information output unit 224 in the work management apparatus 200 of the present embodiment generates work record information as a daily report using the unit work history information for one day generated as described above, and the generated daily report. Can be displayed on the display unit 205.
Here, the control for displaying the daily report by the work performance information output unit 224 is performed in response to an operation for instructing the display of the daily report by the administrator or the like performed on the operation unit 204, for example. That's fine. Alternatively, the work record information output unit 224 may automatically display a daily report on the display unit 205 at a predetermined time.

図10は、日報の表示態様例を示している。同図に示す日報は、1〜Nの作業番号ごとに、運搬物、カメラ画像、荷重、開始時刻、終了時刻、所要時間及び作業時間内訳の各項目が表示されている。
作業番号の項目は、1日において行われた単位作業のそれぞれに付した番号が表示される。作業番号は、例えば単位作業が行われた順番と対応している。
FIG. 10 shows an example of a daily report display mode. In the daily report shown in the figure, for each work number of 1 to N, items of transported goods, camera images, loads, start time, end time, required time, and work time breakdown are displayed.
In the work number item, a number assigned to each unit work performed in one day is displayed. The work number corresponds to, for example, the order in which unit work is performed.

運搬物の項目には、対応の単位作業により運搬された運搬物を示す情報として、例えば運搬物の名称が表示される。運搬物の項目の内容には、単位作業履歴情報における運搬物情報の内容が反映される。
カメラ画像の項目には、対応の単位作業が行われた期間において撮像装置120により撮像された撮像画像のサムネイルが表示される。サムネイルは、1日において行われた単位作業ごとに対応して得られた撮像画像データを示す情報である。
管理者は、カメラ画像の項目に表示されるサムネイルを見ることで、例えば、対応の単位作業により運搬していた運搬物が何であるのかを知ることができる。また、例えばカメラ画像の項目の領域をクリックしたりタッチするなどのカメラ画像の再生を指示する操作を管理者が行うと、対応の単位作業の期間における撮像画像データの再生が開始される。
In the item of the transported item, for example, the name of the transported item is displayed as information indicating the transported item transported by the corresponding unit work. The content of the item of the conveyed item reflects the content of the conveyed item information in the unit work history information.
In the camera image item, a thumbnail of the captured image captured by the imaging device 120 during the period in which the corresponding unit work is performed is displayed. The thumbnail is information indicating captured image data obtained corresponding to each unit work performed in one day.
By viewing the thumbnail displayed in the item of the camera image, the administrator can know, for example, what the transported item is transported by the corresponding unit work. In addition, when the administrator performs an operation for instructing the reproduction of the camera image such as clicking or touching the area of the item of the camera image, for example, the reproduction of the captured image data in the corresponding unit work period is started.

荷重の項目には、対応の単位作業の下で運搬物を揚重した際に測定された荷重が表示される。
開始時刻の項目には、対応の単位作業が開始された時刻が表示される。
終了時刻の項目には、対応の単位作業が終了した時刻が表示される。
所要時間の項目には、対応の単位作業に要した時間が表示される。
In the item of load, the load measured when the transported object is lifted under the corresponding unit work is displayed.
In the item of the start time, the time when the corresponding unit work is started is displayed.
In the end time item, the time at which the corresponding unit work is ended is displayed.
The time required for the corresponding unit work is displayed in the required time item.

区分作業時間の項目は、さらに準備、玉掛地切、移動取付、玉外し、復帰、合計時間の項目を含む。
準備の項目には、例えば玉掛けが完了するまでの作業時間が表示される。
玉掛地切の項目には、例えば玉掛けされた運搬物が地切りした時刻が表示される。
移動取付の項目には、例えば地切りした状態から運搬物が移動されて取り付けが行われるまでの時間が表示される。
玉外しの項目には、玉外し作業に要した時間が表示される。
復帰の項目には、玉外しが完了してから、次の単位作業のために運搬物が置かれた位置にまでクレーン100の位置を復帰させるのに要した時間が表示される。
合計時間の項目には、上記の準備、玉掛地切、移動取付、玉外し、復帰のそれぞれの作業に要した時間の合計が示される。
The item of the division work time further includes items of preparation, slinging, moving attachment, ball removal, return, and total time.
In the preparation item, for example, a work time until the sling is completed is displayed.
For example, the time at which the carrying object on which the sling has been ground is displayed in the slack ground cutting item.
In the item of moving attachment, for example, the time until the attachment is performed after the transported object is moved from the ground cut state is displayed.
The time required for the ball removal work is displayed in the item of ball removal.
In the return item, the time required to return the position of the crane 100 to the position where the transported object is placed for the next unit operation after the ball removal is completed is displayed.
The total time item indicates the total time required for each of the above preparation, slinging, moving attachment, ball removal, and return operations.

作業実績情報出力部224は、図10の日報における運搬物と荷重の項目の表示内容について、単位作業履歴情報における運搬物情報を利用して生成することができる。
また、作業実績情報出力部224は、カメラ画像の項目に表示されるサムネイルについては、例えば、荷重開始時刻t5、揚重開始時刻t3、移動終了時刻t6などのように、運搬物が確実にフック105aに掛けられている時刻の撮像画像データから生成することができる。これにより、運搬物が映っているサムネイルを確実に得ることができる。
この際、作業実績情報出力部224は、クレーン稼働情報に含まれている撮像画像データを利用してサムネイルを生成すればよい。
The work result information output unit 224 can generate the display contents of the items of load and load in the daily report of FIG. 10 using the load information in the unit work history information.
In addition, the work result information output unit 224 ensures that the thumbnails displayed in the camera image items are securely hooked by the transported object such as the load start time t5, the lifting start time t3, and the movement end time t6. It can generate | occur | produce from the picked-up image data of the time multiplied by 105a. As a result, it is possible to reliably obtain a thumbnail showing the transported object.
At this time, the work performance information output unit 224 may generate a thumbnail using captured image data included in the crane operation information.

また、図10の日報における開始時刻と終了時刻に表示される時刻は、単位作業履歴情報における開始終了時刻を利用して生成することができる。
図10の日報における所要時間は、単位作業履歴情報における所要時間を利用して生成することができる。
Also, the time displayed as the start time and end time in the daily report of FIG. 10 can be generated using the start / end time in the unit work history information.
The required time in the daily report of FIG. 10 can be generated using the required time in the unit work history information.

また、作業時間内訳における準備、玉掛地切、移動取付、玉外し、復帰の各項目に表示される時間または時刻は、単位作業履歴情報における区分作業時間(移動時間、玉掛け時間、揚重時間、調整時間、玉外し時間)のうちの所定の情報を利用して生成することができる。一例として、業時間内訳における玉外し、復帰の各項目に表示させるべき時間は、単位作業履歴情報における玉外し時間、移動時間をそれぞれ利用して生成すればよい。   In addition, the time or time displayed in each item of preparation, slinging out, moving attachment, removing ball, and returning in the work time breakdown is the divided work time (movement time, sling time, lifting time, It is possible to generate using predetermined information in the adjustment time and the ball removal time. As an example, the time to be displayed in each item of ball removal / return in the breakdown of work hours may be generated using the ball removal time and travel time in the unit work history information.

このように、本実施形態の作業管理装置200は、クレーンを使用する作業において、単位作業における区分作業ごとに要した区分作業時間を算出することができる。そのうえで、作業管理装置200は、算出した区分作業時間を利用して、例えば、図10に示した日報において、単位作業ごとにおける作業時間の内訳などを表示させることができる。
つまり、本実施形態の作業管理装置200は、クレーン作業として行われる1揚重サイクル相当の単位作業における区分作業ごとの時間を管理することができる。これにより、例えば、区分作業ごとの作業状況を効率的、かつ、的確に把握することが可能になるために、工事の効率化や遅延の改善などを有効に図っていくことが可能になる。
As described above, the work management apparatus 200 according to the present embodiment can calculate the divided work time required for each divided work in the unit work in the work using the crane. In addition, the work management apparatus 200 can display the breakdown of the work time for each unit work in the daily report shown in FIG. 10, for example, using the calculated segmented work time.
That is, the work management apparatus 200 according to the present embodiment can manage the time for each section work in a unit work corresponding to one lifting cycle performed as a crane work. Thereby, for example, since it becomes possible to efficiently and accurately grasp the work status for each division work, it becomes possible to effectively improve the construction efficiency and improve the delay.

[日報の表示のための処理手順例]
図11のフローチャートは、作業実績情報出力部224が日報を表示させるための処理手順例を示している。図11に示す処理は、操作部204に対して日報の表示を指示する操作が行われるのに応じて実行される。
作業実績情報出力部224は、日報の表示を指示する操作によって指定された日付のクレーン稼働情報と単位作業履歴情報とを、それぞれ、クレーン稼働情報記憶部231と単位作業履歴情報記憶部232から取得する(ステップS201)。
作業実績情報出力部224は、指定された日付における単位作業ごとの項目において表示させるべきデータを、ステップS201により取得したクレーン稼働情報と単位作業履歴情報とを利用して生成する(ステップS202)。このように、ステップS202にて作業実績情報出力部224が生成したデータを含む全体の情報が本実施形態の作業実績情報であり、日報を表示させるための日報データである。
作業実績情報出力部224は、ステップS202により生成したデータを利用して表示部205に日報を表示させる(ステップS203)。
なお、作業実績情報出力部224は、ステップS202により生成した作業実績情報を記憶部203に記憶させて保存するようにしてもよい。
[Example of processing procedure for displaying daily report]
The flowchart of FIG. 11 shows an example of a processing procedure for the work performance information output unit 224 to display a daily report. The processing shown in FIG. 11 is executed in response to an operation for instructing the operation unit 204 to display a daily report.
The work performance information output unit 224 obtains the crane operation information and unit work history information on the date specified by the operation for instructing the display of the daily report from the crane operation information storage unit 231 and the unit work history information storage unit 232, respectively. (Step S201).
The work result information output unit 224 generates data to be displayed in the item for each unit work on the specified date using the crane operation information and the unit work history information acquired in step S201 (step S202). Thus, the entire information including the data generated by the work record information output unit 224 in step S202 is the work record information of this embodiment, which is daily report data for displaying a daily report.
The work result information output unit 224 displays the daily report on the display unit 205 using the data generated in step S202 (step S203).
The work record information output unit 224 may store the work record information generated in step S202 in the storage unit 203.

なお、これまでの説明においては、事務所2に設置された作業管理装置200によりクレーン作業の履歴、実績の情報を管理するようにしているが、例えば、クレーン100内に備えたコンピュータシステムによっても作業管理装置200と同等の機能が実行されるようにしてもよい。
また、これまでの説明においては、クレーン100がタワークレーンである場合を例に挙げているが、例えばクレーン100が移動式クレーンなどである場合にも適用できる。
In the description so far, the work management device 200 installed in the office 2 manages the history and results of crane work. For example, a computer system provided in the crane 100 can also be used. A function equivalent to that of the work management apparatus 200 may be executed.
Moreover, in the description so far, the case where the crane 100 is a tower crane is mentioned as an example, However, For example, it is applicable also when the crane 100 is a mobile crane etc.

なお、上述のクレーン100や作業管理装置200の機能を実現するためのプログラムをコンピュータ読み取り可能な記録媒体に記録して、この記録媒体に記録されたプログラムをコンピュータシステムに読み込ませ、実行することにより上述のクレーン100、作業管理装置200の処理を行ってもよい。ここで、「記録媒体に記録されたプログラムをコンピュータシステムに読み込ませ、実行する」とは、コンピュータシステムにプログラムをインストールすることを含む。ここでいう「コンピュータシステム」とは、OSや周辺機器等のハードウェアを含むものとする。また、「コンピュータシステム」は、インターネットやWAN、LAN、専用回線等の通信回線を含むネットワークを介して接続された複数のコンピュータ装置を含んでもよい。また、「コンピュータ読み取り可能な記録媒体」とは、フレキシブルディスク、光磁気ディスク、ROM、CD−ROM等の可搬媒体、コンピュータシステムに内蔵されるハードディスク等の記憶装置のことをいう。このように、プログラムを記憶した記録媒体は、CD−ROM等の非一過性の記録媒体であってもよい。また、記録媒体には、当該プログラムを配信するために配信サーバからアクセス可能な内部または外部に設けられた記録媒体も含まれる。配信サーバの記録媒体に記憶されるプログラムのコードは、端末装置で実行可能な形式のプログラムのコードと異なるものでもよい。すなわち、配信サーバからダウンロードされて端末装置で実行可能な形でインストールができるものであれば、配信サーバで記憶される形式は問わない。なお、プログラムを複数に分割し、それぞれ異なるタイミングでダウンロードした後に端末装置で合体される構成や、分割されたプログラムのそれぞれを配信する配信サーバが異なっていてもよい。さらに「コンピュータ読み取り可能な記録媒体」とは、ネットワークを介してプログラムが送信された場合のサーバやクライアントとなるコンピュータシステム内部の揮発性メモリ(RAM)のように、一定時間プログラムを保持しているものも含むものとする。また、上記プログラムは、上述した機能の一部を実現するためのものであってもよい。さらに、上述した機能をコンピュータシステムにすでに記録されているプログラムとの組み合わせで実現できるもの、いわゆる差分ファイル(差分プログラム)であってもよい。   A program for realizing the functions of the crane 100 and the work management apparatus 200 described above is recorded on a computer-readable recording medium, and the program recorded on the recording medium is read into a computer system and executed. You may perform the process of the above-mentioned crane 100 and the work management apparatus 200. FIG. Here, “loading and executing a program recorded on a recording medium into a computer system” includes installing the program in the computer system. The “computer system” here includes an OS and hardware such as peripheral devices. Further, the “computer system” may include a plurality of computer devices connected via a network including a communication line such as the Internet, WAN, LAN, and dedicated line. The “computer-readable recording medium” refers to a storage device such as a flexible medium, a magneto-optical disk, a portable medium such as a ROM and a CD-ROM, and a hard disk incorporated in a computer system. As described above, the recording medium storing the program may be a non-transitory recording medium such as a CD-ROM. The recording medium also includes a recording medium provided inside or outside that is accessible from the distribution server in order to distribute the program. The code of the program stored in the recording medium of the distribution server may be different from the code of the program that can be executed by the terminal device. That is, the format stored in the distribution server is not limited as long as it can be downloaded from the distribution server and installed in a form that can be executed by the terminal device. Note that the program may be divided into a plurality of parts, downloaded at different timings, and combined in the terminal device, or the distribution server that distributes each of the divided programs may be different. Furthermore, the “computer-readable recording medium” holds a program for a certain period of time, such as a volatile memory (RAM) inside a computer system that becomes a server or a client when the program is transmitted via a network. Including things. The program may be for realizing a part of the functions described above. Furthermore, what can implement | achieve the function mentioned above in combination with the program already recorded on the computer system, what is called a difference file (difference program) may be sufficient.

100 クレーン
110 センサ部
111 旋回角センサ
112 起伏角センサ
113 揚程センサ
114 荷重センサ
120 撮像装置
130 クレーン情報処理装置
140 通信装置
200 作業管理装置
202 制御部
221 クレーン稼働情報取得部
222 区分作業時間算出部
223 単位作業履歴情報管理部
224 作業実績情報出力部
DESCRIPTION OF SYMBOLS 100 Crane 110 Sensor part 111 Turning angle sensor 112 Lifting angle sensor 113 Lift sensor 114 Load sensor 120 Imaging apparatus 130 Crane information processing apparatus 140 Communication apparatus 200 Work management apparatus 202 Control part 221 Crane operation information acquisition part 222 Classification work time calculation part 223 Unit work history information management unit 224 Work result information output unit

Claims (6)

クレーンにおいて検出された旋回角、起伏角、揚程及び荷重を時間と対応付けたクレーン稼働情報を取得するクレーン稼働情報取得部と、
前記クレーン稼働情報取得部が取得したクレーン稼働情報に基づいて、前記クレーンを利用して行われる1揚重サイクル相当の単位作業において区分される所定の区分作業の境界を前回の単位作業の終了時刻以降の時系列旋回角データ、時系列起伏角データ、時系列揚程データ、時系列荷重データを解析対象とし当該解析対象の時系列荷重データの変化を時系列にしたがって解析することにより特定される荷重開始時刻から遡るように探索するとともに当該荷重開始時刻以降について探索することで、各区分作業時間の開始時刻を探索し、当該境界に基づいて前記区分作業ごとに要した区分作業時間を算出し、前記区分作業時間を含み、単位作業ごとの実績を示す単位作業履歴情報を生成する単位作業履歴情報管理部と、
を備える作業管理装置。
A crane operation information acquisition unit that acquires crane operation information in which the turning angle, the undulation angle, the lift, and the load detected in the crane are associated with time;
Based on the crane operation information acquired by the crane operation information acquisition unit, the end of the previous unit operation is defined as the boundary of the predetermined division operation divided in the unit operation corresponding to one lifting cycle performed using the crane. Loads specified by analyzing the time-series load data of the analysis target in accordance with the time-series analysis of the subsequent time-series turning angle data, time-series undulation angle data, time-series lift data, and time-series load data. Searching backward from the start time and searching for the load start time and later, search for the start time of each division work time, calculate the division work time required for each of the division work based on the boundary, A unit work history information management unit for generating unit work history information including the section work time and indicating a result for each unit work;
A work management apparatus comprising:
一定の作業期間の単位作業履歴情報を利用して、前記一定の作業期間において行われた作業の実績を示す作業実績情報を生成し、生成した作業実績情報を所定の態様により出力する作業実績情報出力部
をさらに備える請求項1に記載の作業管理装置。
Using the unit work history information of a certain work period, work result information indicating the result of work performed in the given work period is generated, and the generated work result information is output in a predetermined manner. The work management apparatus according to claim 1, further comprising an output unit.
前記クレーンにより運搬すべき運搬物に関連する運搬物情報を、運搬物の運搬に際して掛かる荷重と運搬物の移動先の位置と対応させた運搬物管理情報を記憶する運搬物管理情報記憶部をさらに備え、
前記単位作業履歴情報管理部は、
前記クレーン稼働情報における荷重と前記クレーン稼働情報に基づいて求めた運搬物の移動終了タイミングにおける前記クレーンのフック位置との組合せに対応付けられた運搬物情報を運搬物管理情報から検索し、検索した運搬物情報を対応の単位作業の単位作業履歴情報に含める
請求項2に記載の作業管理装置。
A transported object management information storage unit for storing transported object management information in which transported object information related to the transported object to be transported by the crane is associated with the load applied when transporting the transported object and the position of the destination of the transported object; Prepared,
The unit work history information management unit
Searched for the transported object information associated with the combination of the load in the crane operating information and the hook position of the crane at the movement end timing of the transported object determined based on the crane operating information. The work management apparatus according to claim 2, wherein the transported object information is included in the unit work history information of the corresponding unit work.
前記クレーン稼働情報取得部は、
クレーンにより運搬される運搬物を撮像するようにクレーンに設けられる撮像装置が撮像して得られる撮像画像データをさらにクレーン稼働情報として取得し、
前記作業実績情報出力部は、
単位期間において行われた単位作業ごとに対応して得られた撮像画像データを示す情報を作業実績情報に含める
請求項2または3のいずれか一項に記載の作業管理装置。
The crane operation information acquisition unit
Captured image data obtained by imaging an imaging device provided in the crane so as to image a transported object carried by the crane is further acquired as crane operation information,
The work performance information output unit
The work management apparatus according to claim 2, wherein information indicating captured image data obtained corresponding to each unit work performed in a unit period is included in the work performance information.
クレーンにおいて検出された旋回角、起伏角、揚程及び荷重を時間と対応付けたクレーン稼働情報を取得するクレーン稼働情報取得ステップと、
前記クレーン稼働情報取得ステップが取得したクレーン稼働情報に基づいて、前記クレーンを利用して行われる1揚重サイクル相当の単位作業において区分される所定の区分作業の境界を前回の単位作業の終了時刻以降の時系列旋回角データ、時系列起伏角データ、時系列揚程データ、時系列荷重データを解析対象とし当該解析対象の時系列荷重データの変化を時系列にしたがって解析することにより特定される荷重開始時刻から遡るように探索するとともに当該荷重開始時刻以降について探索することで、各区分作業時間の開始時刻を探索し、当該境界に基づいて前記区分作業ごとに要した区分作業時間を算出し、前記区分作業時間を含み、単位作業ごとの実績を示す単位作業履歴情報を生成する単位作業履歴情報管理ステップと、
を備える作業管理方法。
A crane operation information acquisition step for acquiring crane operation information in which the turning angle, the undulation angle, the lift, and the load detected in the crane are associated with time;
Based on the crane operation information acquired by the crane operation information acquisition step, the boundary of the predetermined division work divided in the unit work equivalent to one lifting cycle performed using the crane is the end time of the previous unit work. Loads specified by analyzing the time-series load data of the analysis target in accordance with the time-series analysis of the subsequent time-series turning angle data, time-series undulation angle data, time-series lift data, and time-series load data. Searching backward from the start time and searching for the load start time and later, search for the start time of each division work time, calculate the division work time required for each of the division work based on the boundary, A unit work history information management step for generating unit work history information including the section work time and indicating a result for each unit work;
A work management method comprising:
コンピュータに、
クレーンにおいて検出された旋回角、起伏角、揚程及び荷重を時間と対応付けたクレーン稼働情報を取得するクレーン稼働情報取得ステップと、
前記クレーン稼働情報取得ステップが取得したクレーン稼働情報に基づいて、前記クレーンを利用して行われる1揚重サイクル相当の単位作業において区分される所定の区分作業の境界を前回の単位作業の終了時刻以降の時系列旋回角データ、時系列起伏角データ、時系列揚程データ、時系列荷重データを解析対象とし当該解析対象の時系列荷重データの変化を時系列にしたがって解析することにより特定される荷重開始時刻から遡るように探索するとともに当該荷重開始時刻以降について探索することで、各区分作業時間の開始時刻を探索し、当該境界に基づいて前記区分作業ごとに要した区分作業時間を算出し、前記区分作業時間を含み、単位作業ごとの実績を示す単位作業履歴情報を生成する単位作業履歴情報管理ステップと、
を実行させるためのプログラム。
On the computer,
A crane operation information acquisition step for acquiring crane operation information in which the turning angle, the undulation angle, the lift, and the load detected in the crane are associated with time;
Based on the crane operation information acquired by the crane operation information acquisition step, the boundary of the predetermined division work divided in the unit work equivalent to one lifting cycle performed using the crane is the end time of the previous unit work. Loads specified by analyzing the time-series load data of the analysis target in accordance with the time-series analysis of the subsequent time-series turning angle data, time-series undulation angle data, time-series lift data, and time-series load data. Searching backward from the start time and searching for the load start time and later, search for the start time of each division work time, calculate the division work time required for each of the division work based on the boundary, A unit work history information management step for generating unit work history information including the section work time and indicating a result for each unit work;
A program for running
JP2013120066A 2013-06-06 2013-06-06 Work management apparatus, work management method and program Active JP6213764B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013120066A JP6213764B2 (en) 2013-06-06 2013-06-06 Work management apparatus, work management method and program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013120066A JP6213764B2 (en) 2013-06-06 2013-06-06 Work management apparatus, work management method and program

Publications (2)

Publication Number Publication Date
JP2014237505A JP2014237505A (en) 2014-12-18
JP6213764B2 true JP6213764B2 (en) 2017-10-18

Family

ID=52135048

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013120066A Active JP6213764B2 (en) 2013-06-06 2013-06-06 Work management apparatus, work management method and program

Country Status (1)

Country Link
JP (1) JP6213764B2 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6653494B2 (en) * 2015-08-19 2020-02-26 清水建設株式会社 Work analysis device, work analysis method, program
US11599957B2 (en) 2017-07-18 2023-03-07 Komatsu Ltd. Construction site management device, output device, and construction site management method
JP7002418B2 (en) * 2018-07-23 2022-01-20 鹿島建設株式会社 Equipment management system
JP7310355B2 (en) * 2019-06-26 2023-07-19 株式会社タダノ Crane and production management device
KR102176042B1 (en) * 2020-05-22 2020-11-06 장명석 Managing system

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS55165888A (en) * 1979-06-07 1980-12-24 Takenaka Komuten Co Method of measuring operating condition of crane
JP3272976B2 (en) * 1997-05-07 2002-04-08 株式会社奥村組 Method and apparatus for creating operation process of tower crane
JP5637369B2 (en) * 2010-09-13 2014-12-10 清水建設株式会社 Construction monitoring system

Also Published As

Publication number Publication date
JP2014237505A (en) 2014-12-18

Similar Documents

Publication Publication Date Title
JP6213764B2 (en) Work management apparatus, work management method and program
JP7069110B2 (en) Assessment of robot grip
CN110388921B (en) Goods picking navigation method and device
US9656749B1 (en) Unmanned aerial vehicle physical metrics acquisition
CN107090823B (en) The dynamic compaction system of automation
JP5637369B2 (en) Construction monitoring system
JP2009122302A (en) Work information processing apparatus, program, and work information processing method
JP2007015055A (en) Handling device, working device, and program
US9891631B1 (en) Application program interface for weight and balance metrics
CN105442851B (en) Effectively vibrate depth and state real-time intelligent of concrete judges device and method
US10035592B1 (en) Unmanned aerial vehicle scale alignment
CN103696427B (en) Artificial vibrating spear Real-Time Monitoring station-keeping system
JP7634731B2 (en) Method and apparatus for updating an object detection model
JPWO2020136813A1 (en) Management method and server device
CN108921841A (en) Continuous casting of iron and steel base quality determining method, device, equipment and storage medium
JP2018163556A (en) Work management device, work management method, and program
JP6858053B2 (en) Work record management device and program
EP3626673A1 (en) Hoisting machine
JP6653494B2 (en) Work analysis device, work analysis method, program
JP6621649B2 (en) Information terminal and server
CN119358981B (en) A construction process management method and system based on AI
KR20160032735A (en) Method for manageing block using drone
CN119515605A (en) A construction safety early warning system based on BIM and the Internet of Things
CN106248058B (en) A kind of localization method, apparatus and system for means of transport of storing in a warehouse
CN113919794A (en) Method for rapidly analyzing lifting capacity of components in batches

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20151118

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20161019

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20161025

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20161222

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20170418

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20170712

A911 Transfer of reconsideration by examiner before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20170721

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20170822

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20170906

R150 Certificate of patent or registration of utility model

Ref document number: 6213764

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150