Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP6237078B2 - Pile joint structure and pile standing method - Google Patents
[go: Go Back, main page]

JP6237078B2 - Pile joint structure and pile standing method - Google Patents

Pile joint structure and pile standing method Download PDF

Info

Publication number
JP6237078B2
JP6237078B2 JP2013208378A JP2013208378A JP6237078B2 JP 6237078 B2 JP6237078 B2 JP 6237078B2 JP 2013208378 A JP2013208378 A JP 2013208378A JP 2013208378 A JP2013208378 A JP 2013208378A JP 6237078 B2 JP6237078 B2 JP 6237078B2
Authority
JP
Japan
Prior art keywords
pile
flange
joint structure
upper flange
lower flange
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2013208378A
Other languages
Japanese (ja)
Other versions
JP2014122541A (en
Inventor
弘信 松宮
弘信 松宮
坂井 孝行
孝行 坂井
惟史 望月
惟史 望月
妙中 真治
真治 妙中
津留 英司
英司 津留
義法 藤井
義法 藤井
壮哉 東
壮哉 東
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Corp
Original Assignee
Nippon Steel and Sumitomo Metal Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Steel and Sumitomo Metal Corp filed Critical Nippon Steel and Sumitomo Metal Corp
Priority to JP2013208378A priority Critical patent/JP6237078B2/en
Publication of JP2014122541A publication Critical patent/JP2014122541A/en
Application granted granted Critical
Publication of JP6237078B2 publication Critical patent/JP6237078B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Description

本発明は、下端部及び中間部の何れか一方又は両方に螺旋状羽根が設けられた下部杭に対して、機械式継手によって上部杭を連接するための杭の継手構造及び杭の立設方法に関する。   The present invention relates to a pile joint structure for connecting an upper pile with a mechanical joint to a lower pile provided with a spiral blade at either one or both of a lower end portion and an intermediate portion, and a pile standing method. About.

従来より、鋼管杭等は、近隣に住居等が密集する市街地や、他の構造物に近接した場所で、杭基礎として地盤に打ち込まれるときに、無騒音、無振動、無排土による施工が必要となる。   Conventionally, steel pipe piles, etc., have been constructed with no noise, no vibration, and no soil when driven into the ground as pile foundations in urban areas where there are densely populated houses and other structures. Necessary.

近年においては、地盤に打ち込まれる鋼管杭として、地盤に対して回転させて圧入することのできる回転圧入杭が多用される傾向にあり、特に、鋼管杭の本体に羽根を付属させた羽根付回転圧入杭が、地盤に打ち込まれる鋼管杭として用いられることが多い。この羽根付回転圧入杭は、鋼管杭の本体に付属させた羽根により、円滑に回転しながら地盤中に圧入される。   In recent years, as a steel pipe pile driven into the ground, there is a tendency to use a rotary press-fit pile that can be rotated and press-fitted to the ground, and in particular, rotation with blades with blades attached to the main body of the steel pipe pile. A press-fit pile is often used as a steel pipe pile driven into the ground. The bladed rotary press-fit pile is press-fitted into the ground while rotating smoothly by the blade attached to the main body of the steel pipe pile.

羽根付回転圧入杭は、地盤に対する回転圧入により、無騒音、無振動、無排土で施工できるものであることから、様々な施工条件において用いられ、例えば、鋼管杭が打ち込まれる地盤の上方の空間で他の構造物等による高さ制限のある場所で用いられることがある。このとき、羽根付回転圧入杭は、短尺に分割された複数の鋼管杭を用いて、これら複数の鋼管杭を地盤中に順次打ち込んで軸芯方向に連接することにより、地盤中の支持層まで回転圧入される。これにより、羽根付回転圧入杭は、他の構造物等による高さ制限のある場所においても、所定の深さに到達するまで打ち込まれ、地盤中の支持層まで打ち込まれた杭基礎が提供される。   The rotary press-fitted pile with blades can be constructed with no noise, no vibration, and no soil by rotary press-fitting to the ground, so it is used in various construction conditions, for example, above the ground where the steel pipe pile is driven It may be used in places where the height is restricted by other structures in the space. At this time, the rotary press-fit pile with blades uses a plurality of steel pipe piles divided into short lengths, and by sequentially driving these steel pipe piles into the ground and connecting them in the axial direction, the support layer in the ground Rotating press fit. Thereby, the rotary press-fit pile with blades is driven until reaching a predetermined depth even in a place where the height is restricted by other structures, etc., and a pile foundation driven into the support layer in the ground is provided. The

したがって、羽根付回転圧入杭は、複数の鋼管杭を地盤中に順次打ち込んで軸芯方向に連接するときに、鋼管杭の軸芯方向の端部を相互に接合させることが必要となる。鋼管杭の端部の接合は、例えば、鋼管杭の端部を溶接によって接合する方法や、鋼管杭の端部に機械式継手を設けて接合する方法が用いられる。鋼管杭の端部に設けられる機械式継手としては、例えば、特許文献1、2に開示されるような杭の継手構造が提案されている。   Therefore, the rotary press-fitted pile with blades needs to join the ends in the axial direction of the steel pipe piles when the plurality of steel pipe piles are sequentially driven into the ground and connected in the axial direction. For joining the ends of the steel pipe pile, for example, a method of joining the ends of the steel pipe pile by welding or a method of joining by providing a mechanical joint at the end of the steel pipe pile is used. As mechanical joints provided at the ends of steel pipe piles, for example, joint structures of piles as disclosed in Patent Documents 1 and 2 have been proposed.

特許文献1に開示された杭の継手構造は、ギア式に分類される鋼管杭の継手構造であり、鋼管杭の雄側端部において軸芯方向に沿って複数の外向き係合凸部を設けるとともに、鋼管杭の雌側端部において軸芯方向に沿って複数の内向き係合凸部を設けるものである。特許文献1に開示された杭の継手構造は、鋼管杭の雄側端部を雌側端部に挿入し、外向き係合凸部と内向き係合凸部とが噛み合うように鋼管杭を相対回転させることにより、上部鋼管杭と下部鋼管杭とを軸芯方向に連接させるものである。   The pile joint structure disclosed in Patent Document 1 is a steel pipe pile joint structure classified as a gear type, and has a plurality of outward engaging convex portions along the axial direction at the male end of the steel pipe pile. While providing, a some inward engagement convex part is provided along an axial center direction in the female side edge part of a steel pipe pile. In the joint structure of a pile disclosed in Patent Document 1, the male end of the steel pipe pile is inserted into the female end, and the steel pipe pile is fitted so that the outward engaging convex portion and the inward engaging convex portion are engaged with each other. By rotating relatively, the upper steel pipe pile and the lower steel pipe pile are connected in the axial direction.

特許文献2に開示された杭の継手構造は、ソイルセメント柱体と羽根付回転圧入杭との合成杭に用いられる羽根付回転圧入杭の継手構造であり、杭本体よりも外径の大きい端板を杭の端部に設けて、複数の杭の端部が端板で接合されることにより、複数の杭が軸芯方向に連接される。特許文献2に開示された杭の継手構造は、複数の杭が軸芯方向に対向する杭の端部において、一対の端板が設けられ、この一対の端板の各々に形成された鉛直方向の切込部を重ね合わせてH型金具を嵌め込むことにより、複数の杭の端部を接合するものである。   The joint structure of a pile disclosed in Patent Document 2 is a joint structure of a rotary press-fit pile with blades used for a composite pile of a soil cement column and a rotary press-fit pile with blades, and has an outer diameter larger than that of the pile body. A plurality of piles are connected in the axial direction by providing a plate at the end of the pile and joining the ends of the plurality of piles with the end plates. In the joint structure of the pile disclosed in Patent Document 2, a pair of end plates is provided at the end of the pile where the plurality of piles face in the axial direction, and the vertical direction formed on each of the pair of end plates The end portions of a plurality of piles are joined by overlapping the notch portions and fitting the H-shaped metal fittings.

特開平11−43937号公報(第6頁、図1)Japanese Patent Laid-Open No. 11-43937 (page 6, FIG. 1) 特開2003−49425号公報(第4頁、図2)JP 2003-49425 A (Page 4, FIG. 2)

しかし、鋼管杭の端部を溶接によって接合する方法は、地盤中に打ち込まれた鋼管杭の端部と、この鋼管杭に連接される他の鋼管杭の端部とを、現場溶接により接合するものであるため、鋼管杭の杭径、板厚の大きさに比例して、溶接作業に要する時間が増大することになり、杭の打ち込みの工期が長期化するだけでなく、杭の打ち込みの施工コストが増大することになるという問題点があった。また、鋼管杭の端部を溶接によって接合する方法は、屋外で鋼管杭が打ち込まれる場合に、雨天や強風等の荒天時に溶接を実施すると、溶接個所で溶接不良を発生させることになり、溶接個所が所定の強度(圧縮・引張・せん断等)を満たさないおそれがあるため、この溶接不良の発生を回避するために施工を中断する必要があり、杭の打ち込みの工期が長期化するおそれがあるという問題点があった。   However, the method of joining the ends of steel pipe piles by welding is to join the ends of steel pipe piles driven into the ground and the ends of other steel pipe piles connected to the steel pipe piles by field welding. Therefore, the time required for welding work increases in proportion to the pile diameter and thickness of the steel pipe pile, which not only prolongs the construction period of pile driving, There was a problem that the construction cost would increase. Also, the method of joining the ends of steel pipe piles by welding is that when steel pipe piles are driven outdoors, if welding is performed in stormy weather such as rain or strong winds, welding defects will occur at the welding points. Since there is a possibility that the part does not meet the prescribed strength (compression, tension, shear, etc.), it is necessary to interrupt the construction in order to avoid the occurrence of this welding failure, and there is a possibility that the construction period of pile driving will be prolonged. There was a problem that there was.

また、特許文献1に開示された杭の継手構造は、溶接による接合を必要としないで、鋼管杭の端部に機械式継手を設けて接合するものであるため、溶接による接合より短い工期での施工を実現するものである。しかし、特許文献1に開示された杭の継手構造は、鋼管杭の雄側端部及び雌側端部の構造が複雑であり、また、外向き係合凸部と内向き係合凸部とを係合させて、鋼管杭に作用する押込荷重、引張荷重、曲げ荷重に抵抗させるものであることから、全体的に、又は継手部分においてのみ、鋼管杭の板厚が増大するおそれがある。   Moreover, since the joint structure of the pile disclosed by patent document 1 does not require the joining by welding, and provides a mechanical joint in the edge part of a steel pipe pile, it is a construction period shorter than the joining by welding. It is to realize the construction of. However, in the joint structure of the pile disclosed in Patent Document 1, the structure of the male side end and the female side end of the steel pipe pile is complicated, and the outward engagement convex part and the inward engagement convex part are The plate thickness of the steel pipe pile may be increased as a whole or only at the joint portion because it is made to resist the indentation load, tensile load, and bending load acting on the steel pipe pile.

このため、特許文献1に開示された杭の継手構造は、全体的に、又は継手部分においてのみ、鋼管杭の板厚が内側に向けて増大し、鋼管杭の内径が小さいものとなることから、図12に示すハンマグラブ19を用いることが困難となるか、又は小径のハンマグラブ19を用いざるを得ないことになる。このとき、特許文献1に開示された杭の継手構造は、鋼管杭の打ち込みとともに、鋼管杭の内側からの排土をハンマグラブ19によって効率的に実施することができず、杭の打ち込みの工期が長期化するだけでなく、杭の打ち込みの施工コストが増大することになるという問題点があった。   For this reason, the joint structure of the pile disclosed in Patent Document 1 is such that the plate thickness of the steel pipe pile increases inward or only in the joint part, and the inner diameter of the steel pipe pile becomes small. 12 becomes difficult to use, or a small-diameter hammer magnet 19 must be used. At this time, the joint structure of the pile disclosed in Patent Document 1 cannot efficiently carry out the soil removal from the inside of the steel pipe pile with the hammer magnet 19 together with the driving of the steel pipe pile. There was a problem that the construction cost of driving piles would be increased as well as prolonged.

さらに、特許文献2に開示された杭の継手構造は、杭本体よりも外径の大きい端板が、軸芯方向に対して直角に設けられるため、杭が地盤に打ち込まれるときの進行方向に対して、端板が直角に抵抗することになり、杭の地盤に対する打ち込みに要する荷重が増大することから、杭の打ち込みの施工コストが増大するだけでなく、杭の打ち込みの工期が長期化するおそれがあるという問題点があった。   Furthermore, since the joint structure of the pile disclosed by patent document 2 has an end plate with an outer diameter larger than a pile main body at right angle with respect to an axial direction, it is in the advancing direction when a pile is driven into the ground. On the other hand, the end plate resists at right angles, and the load required for driving the pile into the ground increases, which not only increases the construction cost of driving the pile, but also extends the work period of driving the pile. There was a problem of fear.

そこで、本発明は、上述した問題点に鑑みて案出されたものであり、その目的とするところは、溶接による接合よりも短時間で杭の端部を接合できるとともに、杭の打ち込みを効率的に実施することができ、杭の打ち込みの施工コストの増大と、杭の打ち込みの工期の長期化とを回避することのできる杭の継手構造及び杭の立設方法を提供することにある。   Therefore, the present invention has been devised in view of the above-mentioned problems, and the object of the present invention is to be able to join the ends of the pile in a shorter time than joining by welding, and to efficiently drive the pile. An object of the present invention is to provide a pile joint structure and a method for erecting a pile that can be implemented in a practical manner and can avoid an increase in the construction cost of pile driving and a prolonged construction period of pile driving.

第1発明に係る杭の継手構造は、下端部及び中間部の何れか一方又は両方に螺旋状羽根が設けられた杭に他の杭を連接するための杭の継手構造であって、下部杭又は中間杭の上端部で外周面から外側に延びるように形成された下部フランジと、上部杭又は中間杭の下端部で外周面から外側に延びるように形成された上部フランジとを備え、前記下部フランジ及び前記上部フランジは、螺旋状に形成され、前記下部フランジの上面と前記上部フランジの下面とを面当接させた状態で、相互に接合され、前記下部フランジの軸心直交方向の幅及び前記上部フランジの軸心直交方向の幅は、前記螺旋状羽根の軸心直交方向の幅よりも小さく形成され、前記下部フランジ及び前記上部フランジは、相互に接合された状態で、杭の回転圧入による回転力と、軸芯方向に作用する圧縮力及び引張力の何れか一方又は両方とを、下部杭の上端及び上部杭の下端における螺旋状羽根の終端部から軸芯方向に所定の長さを有する杭の端面である下部係止部及び上部係止部から、杭本体に伝達することができるように、互いに湾曲した前記下部係止部と前記上部係止部とが相互に係合して食い込むように係止されることを特徴とする。 The pile joint structure according to the first invention is a pile joint structure for connecting another pile to a pile provided with a spiral blade at either one or both of a lower end portion and an intermediate portion, and a lower pile. Or a lower flange formed to extend outward from the outer peripheral surface at the upper end of the intermediate pile, and an upper flange formed to extend outward from the outer peripheral surface at the lower end of the upper pile or intermediate pile, The flange and the upper flange are formed in a spiral shape, and are joined to each other in a state where the upper surface of the lower flange and the lower surface of the upper flange are in surface contact with each other. The width of the upper flange in the direction orthogonal to the axial center is formed to be smaller than the width of the spiral blade in the direction orthogonal to the axial center, and the lower flange and the upper flange are joined to each other in the rotational press-fitting of the pile. Rotational force by One or both of the compressive force and the tensile force acting in the axial direction of the pile having a predetermined length in the axial direction from the terminal end of the spiral blade at the upper end of the lower pile and the lower end of the upper pile The lower locking portion and the upper locking portion that are curved with each other are engaged with each other so that they can be transmitted from the lower locking portion and the upper locking portion, which are end faces, to the pile body. locked and said Rukoto.

第2発明に係る杭の継手構造は、第1発明において、前記下部フランジ及び前記上部フランジは、各々の周方向の一部が切り欠かれ、前記下部杭に設けられた螺旋状羽根の螺旋ピッチと略同一の螺旋ピッチで、螺旋状に形成されることを特徴とする。   A pile joint structure according to a second aspect of the present invention is the pile structure according to the first aspect, wherein the lower flange and the upper flange are partly cut away in the circumferential direction, and the helical pitch of the spiral blades provided in the lower pile It is characterized by being formed in a spiral shape with substantially the same spiral pitch.

第3発明に係る杭の継手構造は、第1発明又は第2発明において、前記下部フランジ及び前記上部フランジは、各々にボルト孔が形成され、前記下部フランジの上面と前記上部フランジの下面とを面当接させた状態で、ボルト接合されることを特徴とする。   A pile joint structure according to a third invention is the first invention or the second invention, wherein the lower flange and the upper flange are each formed with a bolt hole, and an upper surface of the lower flange and a lower surface of the upper flange are formed. It is characterized in that it is bolted in a state where it is in surface contact.

第4発明に係る杭の継手構造は、第1発明〜第3発明の何れかにおいて、前記下部フランジ及び前記上部フランジは、前記下部フランジの上面及び前記上部フランジの下面の何れか一方又は両方に、上下方向に突出させて形成された凸部と、前記下部フランジの上面と前記上部フランジの下面とを面当接させた状態で、前記凸部が挿入される凹部とを有することを特徴とする。   The joint structure of the pile according to the fourth invention is any one of the first invention to the third invention, wherein the lower flange and the upper flange are provided on one or both of the upper surface of the lower flange and the lower surface of the upper flange. A convex portion formed by projecting in the vertical direction, and a concave portion into which the convex portion is inserted in a state where the upper surface of the lower flange and the lower surface of the upper flange are in surface contact with each other. To do.

第5発明に係る杭の継手構造は、第1発明〜第4発明の何れかにおいて、前記下部フランジ及び前記上部フランジは、上面側の端面が切り欠かれた下部溝が前記下部フランジの側面に形成されるとともに、下面側の端面が切り欠かれた上部溝が前記上部フランジの側面に形成され、前記下部フランジの上面と前記上部フランジの下面とを面当接させた状態で、前記下部溝と前記上部溝とにキー部材が架設されることを特徴とする。   In the pile joint structure according to a fifth aspect of the present invention, in any one of the first to fourth aspects of the present invention, the lower flange and the upper flange have a lower groove in which an end surface on the upper surface side is notched on a side surface of the lower flange. An upper groove formed on the side surface of the upper flange and having the upper surface of the lower flange and the lower surface of the upper flange in surface contact with each other. And a key member is installed in the upper groove.

発明に係る杭の立設方法は、下端部及び中間部の何れか一方又は両方に螺旋状羽根が設けられた杭に他の杭を連接して地盤中に立設する杭の立設方法であって、下部杭又は中間杭の上端部で外周面から外側に延びて螺旋状に形成されるとともに軸心直交方向の幅が前記螺旋状羽根の軸心直交方向の幅よりも小さく形成された下部フランジと、上部杭又は中間杭の下端部で外周面から外側に延びて螺旋状に形成されるとともに軸心直交方向の幅が前記螺旋状羽根の軸心直交方向の幅よりも小さく形成された上部フランジとを、前記下部フランジの上面と前記上部フランジの下面とを面当接させて相互に接合させた状態で、杭の回転圧入による回転力と、軸芯方向に作用する圧縮力及び引張力の何れか一方又は両方とを、下部杭の上端及び上部杭の下端における螺旋状羽根の終端部から軸芯方向に所定の長さを有する杭の端面である下部係止部及び上部係止部から、杭本体に伝達することができるように、互いに湾曲した前記下部係止部と前記上部係止部とが相互に係合して食い込むように係止させ、下部杭と上部杭及び中間杭の何れか一方又は両方とを一体に地盤中に回転圧入する圧入工程を備えることを特徴とする。 The pile erection method according to the sixth aspect of the present invention is the erection of a pile that is erected in the ground by connecting another pile to a pile provided with spiral blades at one or both of the lower end part and the intermediate part. The upper pile of the lower pile or intermediate pile extends outward from the outer peripheral surface and is formed in a spiral shape, and the width in the direction perpendicular to the axis is smaller than the width in the direction perpendicular to the axis of the spiral blade. The lower flange and the lower end of the upper pile or intermediate pile extend outward from the outer peripheral surface and are formed in a spiral shape, and the width in the direction perpendicular to the axis is smaller than the width in the direction perpendicular to the axis of the spiral blade In the state where the upper flange formed is brought into contact with the upper surface of the lower flange and the lower surface of the upper flange, the rotational force due to the rotary press-fitting of the pile and the compression acting in the axial direction One or both of the force and tensile force are applied to the upper and upper ends of the lower pile. Curved from each other so that it can be transmitted to the pile body from the lower locking part and the upper locking part which are end faces of the pile having a predetermined length in the axial direction from the terminal end of the spiral blade at the lower end of the pile The lower locking portion and the upper locking portion are engaged with each other so as to bite into each other, and either one or both of the lower pile, the upper pile and the intermediate pile are rotationally press-fitted into the ground. And a press-fitting step.

明に係る杭の立設方法は、第発明において、前記圧入工程の後で、さらに、地盤中に一体に回転圧入された下部杭と上部杭及び中間杭の何れか一方又は両方との内側から土砂を排出する排土工程を備えることを特徴とする。 The pile standing method according to the seventh aspect is the sixth invention, in the sixth invention, after the press-fitting step, and further, any one or both of the lower pile, the upper pile and the intermediate pile that are integrally rotationally press-fitted into the ground. It is characterized by including a soil removal process for discharging earth and sand from the inside.

発明に係る杭の立設方法は、第発明又は第発明において、前記圧入工程の後で、さらに、地盤中に一体に回転圧入された下部杭と上部杭及び中間杭の何れか一方又は両方との内側に一括して経時硬化性材料を注入して杭を補強する補強工程を備えることを特徴とする。 The pile standing method according to an eighth invention is the sixth invention or the seventh invention, wherein after the press-fitting step, any one of a lower pile, an upper pile, and an intermediate pile that are integrally rotationally press-fitted into the ground It is characterized by comprising a reinforcing step of reinforcing a pile by injecting a time-curable material together inside one or both.

第1発明〜第発明によれば、下部フランジと、上部フランジとを相互に接合した状態で、杭の継手構造が螺旋状に形成されるため、杭の継手構造の回転圧入抵抗を小さくすることができ、下部杭及び上部杭の打ち込みに要する荷重の増大を抑制することができ、杭の打ち込みの施工コストが増大することを回避することが可能となるとともに、杭の打ち込みの工期を短縮することが可能となる。 According to 1st invention- 5th invention, in the state which joined the lower flange and the upper flange mutually, since the joint structure of a pile is formed helically, the rotational press-fit resistance of the joint structure of a pile is made small. It is possible to suppress the increase in load required for driving the lower pile and upper pile, and it is possible to avoid an increase in the construction cost of driving the pile, and to shorten the construction period of the pile driving It becomes possible to do.

また、第1発明〜第発明によれば、下部フランジ及び上部フランジが軸芯方向に対して傾斜しているため、下部フランジ及び上部フランジだけでなく、下部杭本体及び上部杭本体にも、圧縮力、引張力、曲げ力及びせん断力の一部を負担させることができ、継手部分の設計を容易にすることを可能とし、さらに、下部フランジの板厚及び上部フランジの板厚を薄くすることができることから、杭の継手構造による回転圧入抵抗を小さくして、下部杭及び上部杭の打ち込みに要する荷重の増大を抑制することが可能となる。 Further, according to the first to fifth inventions, since the lower flange and the upper flange are inclined with respect to the axial direction, not only the lower flange and the upper flange, but also the lower pile body and the upper pile body, A part of the compressive force, tensile force, bending force and shearing force can be borne, making it easy to design the joint part, and reducing the thickness of the lower flange and the upper flange. Therefore, it is possible to reduce the rotational press-fit resistance due to the joint structure of the pile, and to suppress an increase in load required for driving the lower pile and the upper pile.

また、第1発明〜第発明によれば、下部杭、上部杭及び中間杭の外周面から外側に延びるように下部フランジ及び上部フランジが形成されるため、杭本体や継手部分の内径を大きくすることができ、杭の立設方法の圧入工程において、下部杭と上部杭又は中間杭との内側での土砂の移動を円滑にして、杭の回転圧入作業を容易に実施することが可能となる。 In addition, according to the first to fifth inventions, the lower flange and the upper flange are formed so as to extend outward from the outer peripheral surfaces of the lower pile, the upper pile, and the intermediate pile. In the press-fitting process of the pile standing method, it is possible to smoothly carry out the rotary press-fitting work of the pile by facilitating the movement of the earth and sand inside the lower pile and the upper pile or the intermediate pile. Become.

さらに、第1発明〜第発明によれば、杭本体や継手部分の内径を大きくすることで、杭の立設方法の排土工程において、下部杭、上部杭及び中間杭の内側に、外径の大きいハンマグラブを用いることができ、土砂の排出作業を効率的に実施することが可能となるとともに、杭の立設方法の補強工程において、下部杭、上部杭及び中間杭の内側での経時硬化性材料の継手部分の通過を円滑にして、経時硬化性材料の充填作業を容易に実施することが可能となる。これにより、第1発明〜第発明によれば、杭の打ち込みの工期を短縮することが可能となるとともに、杭の打ち込みの施工コストが増大することを回避することが可能となる。 Furthermore, according to 1st invention- 5th invention, by increasing the internal diameter of a pile main body or a joint part, in the earth removal process of the standing method of a pile, it is outside on the inner side of a lower pile, an upper pile, and an intermediate pile. A large-diameter hammaglab can be used, and it is possible to efficiently carry out the sediment discharge work, and in the reinforcement process of the pile standing method, the time inside the lower pile, upper pile and intermediate pile The passage of the curable material through the joint portion can be facilitated, and the filling operation of the time-curable material can be easily performed. Thereby, according to 1st invention- 5th invention, while it becomes possible to shorten the construction period of pile driving, it becomes possible to avoid that the construction cost of pile driving increases.

特に、第2発明によれば、杭の継手構造の螺旋ピッチと、螺旋状羽根の螺旋ピッチとが、略同一の螺旋ピッチとなるように構成されることで、杭の継手構造の回転圧入抵抗を極小化することができるため、下部杭及び上部杭の打ち込みに要する荷重の増大を抑制することができ、杭の打ち込みの施工コストが増大することを回避することが可能となるとともに、杭の打ち込みの工期を短縮することが可能となる。   In particular, according to the second invention, the rotational press-fit resistance of the pile joint structure is configured such that the spiral pitch of the pile joint structure and the spiral pitch of the spiral blades are substantially the same spiral pitch. Therefore, it is possible to suppress an increase in the load required for driving the lower pile and the upper pile, and to avoid an increase in the construction cost of driving the pile. It is possible to shorten the driving time.

また、第2発明によれば、軸芯方向に所定の長さを有する下部係止部と上部係止部とが相互に係止された状態となり、下部係止部から下部杭本体に回転力の一部が伝達されるとともに、上部係止部から上部杭本体に回転力の一部が伝達され、下部フランジと上部フランジとを接合するボルトに作用する回転力を小さいものとして、ボルトの数量を少なくし、また、小径のボルトを用いることができ、簡単な作業で短時間に接合することで、杭の打ち込みの工期を短縮することが可能となるとともに、材料コストが増大することを回避することが可能となる。   According to the second invention, the lower locking portion and the upper locking portion having a predetermined length in the axial direction are locked to each other, and the rotational force is applied from the lower locking portion to the lower pile body. Part of the torque is transmitted, and a part of the rotational force is transmitted from the upper locking part to the upper pile body, and the rotational force acting on the bolt that joins the lower flange and the upper flange is reduced. In addition, it is possible to use small-diameter bolts and to connect piles in a short time with simple work, thereby shortening the construction period of pile driving and avoiding an increase in material costs. It becomes possible to do.

特に、第3発明によれば、下部フランジと上部フランジとを、機械式のフランジ継手によりボルト接合するものであるため、溶接によって接合する場合と比べて、下部杭の上端部と上部杭の下端部とを短時間で接合することができ、また、簡単な作業で強固に接合することができる。これにより、杭の打ち込みの工期を短縮することが可能となるとともに、杭の打ち込みの施工コストが増大することを回避することが可能となる。   In particular, according to the third invention, since the lower flange and the upper flange are bolted by a mechanical flange joint, the upper end of the lower pile and the lower end of the upper pile are compared with the case of joining by welding. Can be joined to each other in a short time, and can be firmly joined by a simple operation. As a result, it is possible to shorten the construction period of pile driving and to avoid an increase in the construction cost of pile driving.

特に、第4発明によれば、下部フランジの凸部が上部フランジの凹部に係止された状態となるため、下部フランジの凸部から下部フランジ及び上部フランジに回転力の一部が伝達され、下部フランジと上部フランジとを接合するボルトに作用する回転力を小さいものとすることができる。これにより、ボルトに作用する回転力を小さいものとして、ボルトの数量を少なくすることができ、ボルト締結の作業量を減少させて、簡単な作業で短時間に接合することができ、杭の打ち込みの工期を短縮することが可能となる。   In particular, according to the fourth invention, since the convex portion of the lower flange is locked to the concave portion of the upper flange, a part of the rotational force is transmitted from the convex portion of the lower flange to the lower flange and the upper flange, The rotational force acting on the bolt that joins the lower flange and the upper flange can be reduced. As a result, the rotational force acting on the bolt can be reduced, the number of bolts can be reduced, the amount of bolt fastening work can be reduced, and the work can be joined in a short time with simple work. It is possible to shorten the construction period.

特に、第5発明によれば、下部溝と上部溝とに係止されたキー部材により連結された状態となるため、回転力の一部がキー部材に伝達され、下部フランジと上部フランジとを接合するボルトに作用する回転力を小さいものとすることができる。これにより、ボルトに作用する回転力を小さいものとして、ボルトの数量を少なくすることができ、ボルト締結の作業量を減少させて、簡単な作業で短時間に接合することができ、杭の打ち込みの工期を短縮することが可能となる。   In particular, according to the fifth aspect of the present invention, since the key member is engaged with the lower groove and the upper groove, a part of the rotational force is transmitted to the key member, and the lower flange and the upper flange are connected. The rotational force acting on the bolts to be joined can be reduced. As a result, the rotational force acting on the bolt can be reduced, the number of bolts can be reduced, the amount of bolt fastening work can be reduced, and the work can be joined in a short time with simple work. It is possible to shorten the construction period.

特に、第6発明によれば、下部係止部から下部杭本体に回転力の一部が伝達されるとともに、上部係止部から上部杭本体に回転力の一部が伝達されて、ボルトに作用する回転力を小さいものとすることができ、ボルトの数量を少なくし、また、小径のボルトを用いることができ、簡単な作業で短時間に接合することで、杭の打ち込みの工期を短縮することが可能となるとともに、材料コストが増大することを回避することが可能となる。   In particular, according to the sixth invention, a part of the rotational force is transmitted from the lower locking part to the lower pile body, and a part of the rotational force is transmitted from the upper locking part to the upper pile body, The acting rotational force can be reduced, the number of bolts can be reduced, and small-diameter bolts can be used. It becomes possible to avoid the increase in material cost.

特に、第発明によれば、下部係止部が湾曲して形成されるとともに、上部係止部が湾曲して形成されることで、湾曲した下部係止部と上部係止部とが係合して食い込むことにより、圧縮力、引張力に対する抵抗力を増大させることが可能となる。 In particular, according to the first aspect of the invention, the lower locking portion is formed to be curved, and the upper locking portion is formed to be curved, whereby the curved lower locking portion and the upper locking portion are engaged. By biting together, it becomes possible to increase the resistance to compressive force and tensile force.

発明によれば、下部フランジと上部フランジとが相互に接合された状態で螺旋状に形成されるため、下部杭、上部杭及び中間杭を一体とした杭の継手構造の回転圧入抵抗を小さくして、下部杭及び上部杭の打ち込みに要する回転力の増大を抑制しながら、複数の杭を連接させて一括して回転圧入させることができ、杭の回転圧入作業と接合作業とを交互に繰り返す手間を低減させることが可能となる。 According to the sixth invention, since the lower flange and the upper flange are formed in a spiral shape with each other, the rotational press-fitting resistance of the joint structure of the pile integrated with the lower pile, the upper pile and the intermediate pile is reduced. It is possible to reduce the increase in rotational force required for driving the lower and upper piles, and to connect multiple piles together for rotational press-fitting. Therefore, it is possible to reduce the trouble of repeating the process.

発明によれば、下部杭、上部杭及び中間杭を連接させてこれらの内側から一括して土砂を排出することができるため、土砂の排出作業と杭の接合作業とを交互に繰り返す手間を低減させることが可能となる。 According to the seventh invention, the lower pile, the upper pile, and the intermediate pile can be connected and the earth and sand can be discharged collectively from the inside, so it is time and labor to repeat the earth and sand discharging work and the pile joining work alternately. Can be reduced.

発明によれば、下部杭、上部杭及び中間杭を連接させてこれらの内側に一括して経時硬化性材料を注入することができるため、経時硬化性材料の注入作業と杭の接合作業とを交互に繰り返す手間を低減させることが可能となる。 According to the eighth invention, the lower pile, the upper pile, and the intermediate pile can be connected to each other and the time-curable material can be injected into the inside thereof. It is possible to reduce the trouble of repeating the steps alternately.

本発明を適用した杭の継手構造を用いて下部杭と上部杭との間に中間杭を連接させた状態を示す斜視図である。It is a perspective view which shows the state which connected the intermediate pile between the lower pile and the upper pile using the joint structure of the pile to which this invention is applied. 本発明を適用した杭の継手構造に用いられる下部杭を示す斜視図である。It is a perspective view which shows the lower pile used for the joint structure of the pile to which this invention is applied. 本発明を適用した杭の継手構造に用いられる上部杭を示す斜視図である。It is a perspective view which shows the upper pile used for the joint structure of the pile to which this invention is applied. 本発明を適用した杭の継手構造に用いられる中間杭を示す斜視図である。It is a perspective view which shows the intermediate | middle pile used for the joint structure of the pile to which this invention is applied. 本発明を適用した杭の継手構造に用いられる下部杭の螺旋状羽根を示す正面図である。It is a front view which shows the helical blade | wing of the lower pile used for the joint structure of the pile to which this invention is applied. 本発明を適用した杭の継手構造を用いて下部杭と上部杭とを連接させた状態を示す斜視図である。It is a perspective view which shows the state which connected the lower pile and the upper pile using the joint structure of the pile which applied this invention. 本発明を適用した杭の継手構造の第1実施形態における下部フランジを示す正面図である。It is a front view which shows the lower flange in 1st Embodiment of the joint structure of the pile to which this invention is applied. 本発明を適用した杭の継手構造の第1実施形態における下部フランジの変形例を示す正面図である。It is a front view which shows the modification of the lower flange in 1st Embodiment of the joint structure of the pile to which this invention is applied. 本発明を適用した杭の継手構造の第1実施形態における上部フランジを示す正面図である。It is a front view which shows the upper flange in 1st Embodiment of the joint structure of the pile to which this invention is applied. 本発明を適用した杭の継手構造の第1実施形態における上部フランジの変形例を示す正面図である。It is a front view which shows the modification of the upper flange in 1st Embodiment of the joint structure of the pile to which this invention is applied. 本発明を適用した杭の継手構造の第1実施形態を用いて下部杭と上部杭とを連接させた状態を示す正面図である。It is a front view which shows the state which connected the lower pile and the upper pile using 1st Embodiment of the joint structure of the pile to which this invention is applied. 杭の打ち込みとともに杭の内側からの排土を実施するためのハンマグラブを示す斜視図である。It is a perspective view which shows the hammaglab for implementing the earth removal from the inner side of a pile with driving of a pile. 本発明を適用した杭の継手構造に作用する圧縮力、引張力、曲げ力及びせん断力を説明するための説明図である。It is explanatory drawing for demonstrating the compressive force, tensile force, bending force, and shearing force which act on the joint structure of the pile to which this invention is applied. 本発明を適用した杭の継手構造に作用する圧縮力及び引張力を変形例において説明するための説明図である。It is explanatory drawing for demonstrating the compressive force and tensile force which act on the joint structure of the pile to which this invention is applied in a modification. 本発明を適用した杭の継手構造の第2実施形態を示す斜視図である。It is a perspective view which shows 2nd Embodiment of the joint structure of the pile to which this invention is applied. 本発明を適用した杭の継手構造の第2実施形態を用いて下部杭と上部杭とを連接させた状態を示す正面図である。It is a front view which shows the state which connected the lower pile and the upper pile using 2nd Embodiment of the joint structure of the pile to which this invention is applied. 本発明を適用した杭の継手構造に作用する回転力を説明するための説明図である。It is explanatory drawing for demonstrating the rotational force which acts on the joint structure of the pile to which this invention is applied. 本発明を適用した杭の継手構造の第3実施形態を示す斜視図である。It is a perspective view which shows 3rd Embodiment of the joint structure of the pile to which this invention is applied. 本発明を適用した杭の継手構造の第3実施形態を用いて下部杭と上部杭とを連接させた状態を示す正面図である。It is a front view which shows the state which connected the lower pile and the upper pile using 3rd Embodiment of the joint structure of the pile to which this invention is applied. 本発明を適用した杭の継手構造の第4実施形態を示す斜視図である。It is a perspective view which shows 4th Embodiment of the joint structure of the pile to which this invention is applied. 本発明を適用した杭の継手構造の第4実施形態を用いて下部杭と上部杭とを連接させた状態を示す正面図である。It is a front view which shows the state which connected the lower pile and the upper pile using 4th Embodiment of the joint structure of the pile to which this invention is applied. 本発明を適用した杭の継手構造の先鋭化させて形成された下部フランジ及び上部フランジの始端部の端面を示す正面図である。It is a front view which shows the end surface of the starting end part of the lower flange and upper flange which were formed by sharpening the joint structure of the pile to which this invention is applied. 本発明を適用した杭の継手構造の下部杭、上部杭及び中間杭に取り付けられる下部フランジ及び上部フランジを示す正面図である。It is a front view which shows the lower flange and upper flange which are attached to the lower pile of the pile joint structure to which this invention is applied, an upper pile, and an intermediate | middle pile. 本発明を適用した杭の継手構造の下部フランジ及び上部フランジに用いられるフランジ部材を示す斜視図である。It is a perspective view which shows the flange member used for the lower flange and upper flange of the joint structure of the pile to which this invention is applied. 本発明を適用した杭の継手構造のフランジ部材が下部杭本体、上部杭本体及び中間杭本体に固定される態様を示す拡大正面図である。It is an enlarged front view which shows the aspect by which the flange member of the joint structure of the pile to which this invention is applied is fixed to a lower pile main body, an upper pile main body, and an intermediate | middle pile main body. 本発明を適用した杭の立設方法の圧入工程を示す正面図である。It is a front view which shows the press-fit process of the standing installation method of the pile to which this invention is applied. 本発明を適用した杭の立設方法の排土工程を示す正面図である。It is a front view which shows the soil removal process of the erection method of the pile to which this invention is applied. 本発明を適用した杭の立設方法の補強工程を示す正面図である。It is a front view which shows the reinforcement process of the standing installation method of the pile to which this invention is applied.

以下、本発明を適用した杭の継手構造1を実施するための形態について、図面を参照しながら詳細に説明する。   EMBODIMENT OF THE INVENTION Hereinafter, the form for implementing the joint structure 1 of the pile to which this invention is applied is demonstrated in detail, referring drawings.

本発明を適用した杭の継手構造1は、下部杭2と上部杭3とを軸芯方向Xに連接するために用いられる。本発明を適用した杭の継手構造1は、図1に示すように、地盤中の支持層の深さに応じ、下部杭2と上部杭3との間に、所定の数量の中間杭4を連接させるものであり、下部杭2を所定の深さまで地盤中に打ち込むことができるものである。   The pile joint structure 1 to which the present invention is applied is used to connect the lower pile 2 and the upper pile 3 in the axial direction X. As shown in FIG. 1, the pile joint structure 1 to which the present invention is applied has a predetermined number of intermediate piles 4 between the lower pile 2 and the upper pile 3 according to the depth of the support layer in the ground. The lower pile 2 can be driven into the ground to a predetermined depth.

下部杭2は、図2に示すように、下端部2aに螺旋状羽根11が設けられるとともに、上端部2bに下部フランジ12が設けられる。下部杭2は、これに限らず、地盤中で必要となる支持力に応じ、中間部2cに螺旋状羽根11を設けることもでき、下端部2a及び中間部2cの何れか一方又は両方に螺旋状羽根11を設けることができる。   As shown in FIG. 2, the lower pile 2 is provided with a spiral blade 11 at the lower end 2a and a lower flange 12 at the upper end 2b. Not only this but the lower pile 2 can also provide the spiral blade | wing 11 in the intermediate part 2c according to the support force required in the ground, and it spirals in any one or both of the lower end part 2a and the intermediate part 2c. A blade 11 can be provided.

上部杭3は、図3に示すように、下端部3aに上部フランジ13が設けられる。上部杭3は、上端部3bに下部フランジ12を設けることもでき、地盤中で必要となる支持力に応じ、中間部3cに螺旋状羽根11を設けて、地盤の中間層で螺旋状羽根11が周辺土から反力を得ることにより、上部杭3の軸芯方向Xの抵抗力を増大させることもできる。   As shown in FIG. 3, the upper pile 3 is provided with an upper flange 13 at the lower end 3a. The upper pile 3 can also be provided with a lower flange 12 at the upper end portion 3b, and according to the supporting force required in the ground, a spiral blade 11 is provided in the intermediate portion 3c, and the spiral blade 11 is formed in the intermediate layer of the ground. However, by obtaining a reaction force from the surrounding soil, the resistance force in the axial direction X of the upper pile 3 can be increased.

中間杭4は、図4に示すように、下端部4aに上部フランジ13が設けられるとともに、上端部4bに下部フランジ12が設けられる。中間杭4は、地盤中で必要となる支持力に応じ、中間部4cに螺旋状羽根11を設けて、地盤の中間層で螺旋状羽根11が周辺土から反力を得ることにより、中間杭4の軸芯方向Xの抵抗力を増大させることもできる。   As shown in FIG. 4, the intermediate pile 4 is provided with an upper flange 13 at the lower end 4a and a lower flange 12 at the upper end 4b. The intermediate pile 4 is provided with a spiral blade 11 in the intermediate portion 4c according to the supporting force required in the ground, and the spiral blade 11 obtains a reaction force from the surrounding soil in the intermediate layer of the ground. The resistance force in the axial direction X of 4 can be increased.

螺旋状羽根11は、図5に示すように、下部杭2の下端部2aにおいて、下部杭2の外周面から外側に延びるように設けられる。螺旋状羽根11は、螺旋状羽根11の上面11a及び下面11bが平面状に形成され、螺旋状羽根11の始端部11cから終端部11dまで、軸芯方向Xに所定の長さL1を有する。螺旋状羽根11は、軸芯直交方向Yに所定の幅W1を有するとともに、所定の板厚T1を有するものであり、始端部11cの端面を先鋭化したものとすることにより、杭の回転圧入抵抗を減少させることができる。   As shown in FIG. 5, the spiral blade 11 is provided at the lower end portion 2 a of the lower pile 2 so as to extend outward from the outer peripheral surface of the lower pile 2. The spiral blade 11 has a flat upper surface 11a and a lower surface 11b of the spiral blade 11, and has a predetermined length L1 in the axial direction X from the start end portion 11c to the end portion 11d of the spiral blade 11. The spiral blade 11 has a predetermined width W1 in the axis-perpendicular direction Y and a predetermined plate thickness T1, and the end surface of the start end portion 11c is sharpened, thereby rotating the piles. Resistance can be reduced.

螺旋状羽根11は、螺旋状羽根11の始端部11cから終端部11dまで、杭の周方向Zに一回転させて溶接等によって設けられるものである。螺旋状羽根11は、地盤に対して下部杭2を回転圧入させる場合に、地盤中で下部杭2を周方向Zに一回転させることにより、下部杭2を地盤中で軸芯方向Xの所定の長さL1だけ圧入させることができるものであり、軸芯方向Xで長さL1と略同一長さの所定の螺旋ピッチP1により構成されるものとなる。   The spiral blade 11 is provided by welding or the like by rotating once in the circumferential direction Z of the pile from the start end portion 11c to the end portion 11d of the spiral blade 11. When the lower blade 2 is rotationally press-fitted into the ground, the spiral blade 11 rotates the lower pile 2 in the circumferential direction Z once in the ground, thereby causing the lower pile 2 to move in a predetermined direction in the axial direction X in the ground. Can be press-fitted only by the length L1, and is constituted by a predetermined helical pitch P1 having substantially the same length as the length L1 in the axial direction X.

本発明を適用した杭の継手構造1は、図6に示すように、下部杭2の上端部2bで外周面から外側に延びるように螺旋状に形成された下部フランジ12と、上部杭3の下端部3aで外周面から外側に延びるように螺旋状に形成された上部フランジ13とを備える。本発明を適用した杭の継手構造1は、下部フランジ12の図7に示す上面12aと、上部フランジ13の図9に示す下面13bとを面当接させた状態で、下部フランジ12と、上部フランジ13とをボルト接合等により相互に接合させるものである。   As shown in FIG. 6, the pile joint structure 1 to which the present invention is applied includes a lower flange 12 formed in a spiral shape so as to extend outward from an outer peripheral surface at an upper end 2 b of the lower pile 2, and an upper pile 3. And an upper flange 13 formed in a spiral shape so as to extend outward from the outer peripheral surface at the lower end 3a. The pile joint structure 1 to which the present invention is applied includes the lower flange 12 and the upper flange 12 in a state in which the upper surface 12a of the lower flange 12 shown in FIG. 7 and the lower surface 13b of the upper flange 13 shown in FIG. The flange 13 is joined to each other by bolting or the like.

本発明を適用した杭の継手構造1は、第1実施形態において、下部フランジ12の図7に示す上面12a及び下面12bが平面状に形成され、また、上部フランジ13の図9に示す上面13a及び下面13bが平面状に形成される。   In the joint structure 1 of the pile to which the present invention is applied, in the first embodiment, the upper surface 12a and the lower surface 12b of the lower flange 12 shown in FIG. 7 are formed in a planar shape, and the upper surface 13a of the upper flange 13 shown in FIG. And the lower surface 13b is formed in a planar shape.

下部フランジ12は、図7に示すように、下部フランジ12の始端部12cから終端部12dまで、下部杭2の上端部2bで、下部杭2の周方向Zに溶接等によって取り付けられる。下部フランジ12は、下部フランジ12の上面12aから下面12bまで、下部フランジ12の上面12a及び下面12bに直交する方向に貫通された複数のボルト孔12eが形成される。   As shown in FIG. 7, the lower flange 12 is attached to the circumferential direction Z of the lower pile 2 by welding or the like at the upper end portion 2 b of the lower pile 2 from the start end portion 12 c to the terminal end portion 12 d of the lower flange 12. The lower flange 12 is formed with a plurality of bolt holes 12e penetrating from the upper surface 12a to the lower surface 12b of the lower flange 12 in a direction perpendicular to the upper surface 12a and the lower surface 12b of the lower flange 12.

下部フランジ12は、下部杭2の上端部2bの一部を軸芯方向Xに直線状に切り欠くことにより、直線状の下部係止部14が形成される。下部フランジ12は、これに限らず、図8に示すように、下部杭2の上端部2bの一部を軸芯方向Xに湾曲させて切り欠くことにより、湾曲した下部係止部14が形成されてもよい。   The lower flange 12 is formed with a linear lower locking portion 14 by notching a part of the upper end portion 2b of the lower pile 2 linearly in the axial direction X. The lower flange 12 is not limited to this, and as shown in FIG. 8, a curved lower locking portion 14 is formed by curving a part of the upper end portion 2 b of the lower pile 2 in the axial direction X. May be.

下部フランジ12は、下部フランジ12の始端部12cから終端部12dまで、軸芯方向Xに所定の長さL2を有する。下部フランジ12は、複数のボルト孔12eを形成することができるように、軸芯直交方向Yに所定の幅W2を有するとともに、所定の板厚T2を有するものであり、始端部12cの端面を先鋭化したものとすることもできる。   The lower flange 12 has a predetermined length L2 in the axial direction X from the start end 12c to the end 12d of the lower flange 12. The lower flange 12 has a predetermined width W2 in the axial center orthogonal direction Y and a predetermined plate thickness T2 so that a plurality of bolt holes 12e can be formed. It can also be sharpened.

下部フランジ12は、下部フランジ12の始端部12cから終端部12dまで、杭の周方向Zに一回転させて設けられるものである。下部フランジ12は、地盤に対して下部杭2を回転圧入させる場合に、地盤中で下部杭2を周方向Zに一回転させることにより、下部杭2を地盤中で軸芯方向Xの所定の長さL2だけ圧入させることができるものであり、軸芯方向Xで長さL2と略同一長さの所定の螺旋ピッチP2により構成されるものとなる。   The lower flange 12 is provided by rotating once in the circumferential direction Z of the pile from the start end portion 12c to the end end portion 12d of the lower flange 12. The lower flange 12 rotates the lower pile 2 in the ground in the circumferential direction Z when the lower pile 2 is rotationally press-fitted into the ground. It can be press-fitted only by the length L2, and is constituted by a predetermined helical pitch P2 having substantially the same length as the length L2 in the axial direction X.

上部フランジ13は、図9に示すように、上部フランジ13の始端部13cから終端部13dまで、上部杭3の下端部3aで、上部杭3の周方向Zに溶接等によって取り付けられる。上部フランジ13は、上部フランジ13の上面13aから下面13bまで、上部フランジ13の上面13a及び下面13bに直交する方向に貫通された複数のボルト孔13eが形成される。   As shown in FIG. 9, the upper flange 13 is attached to the circumferential direction Z of the upper pile 3 by welding or the like at the lower end portion 3 a of the upper pile 3 from the start end portion 13 c to the terminal end portion 13 d of the upper flange 13. The upper flange 13 is formed with a plurality of bolt holes 13 e penetrating from the upper surface 13 a to the lower surface 13 b of the upper flange 13 in a direction perpendicular to the upper surface 13 a and the lower surface 13 b of the upper flange 13.

上部フランジ13は、上部杭3の下端部3aの一部を軸芯方向Xに直線状に切り欠くことにより、直線状の上部係止部15が形成される。上部フランジ13は、これに限らず、図10に示すように、上部杭3の下端部3aの一部を軸芯方向Xに湾曲させて切り欠くことにより、湾曲した上部係止部15が形成されてもよい。   The upper flange 13 is formed with a linear upper locking portion 15 by cutting a part of the lower end portion 3a of the upper pile 3 linearly in the axial direction X. The upper flange 13 is not limited to this, and as shown in FIG. 10, a curved upper locking portion 15 is formed by curving a part of the lower end portion 3 a of the upper pile 3 in the axial direction X. May be.

上部フランジ13は、上部フランジ13の始端部13cから終端部13dまで、軸芯方向Xに所定の長さL3を有する。上部フランジ13は、複数のボルト孔13eを形成することができるように、軸芯直交方向Yに所定の幅W3を有するとともに、所定の板厚T3を有するものであり、始端部13cの端面を先鋭化したものとすることもできる。   The upper flange 13 has a predetermined length L3 in the axial direction X from the start end 13c to the end end 13d of the upper flange 13. The upper flange 13 has a predetermined width W3 in the axial center orthogonal direction Y and a predetermined plate thickness T3 so that a plurality of bolt holes 13e can be formed. It can also be sharpened.

上部フランジ13は、上部フランジ13の始端部13cから終端部13dまで、杭の周方向Zに一回転させて設けられるものである。上部フランジ13は、地盤に対して上部杭3を回転圧入させる場合に、地盤中で上部杭3を周方向Zに一回転させることにより、上部杭3を地盤中で軸芯方向Xの所定の長さL3だけ圧入させることができるものであり、軸芯方向Xで長さL3と略同一長さの所定の螺旋ピッチP3により構成されるものとなる。   The upper flange 13 is provided by rotating once in the circumferential direction Z of the pile from the start end portion 13c to the end end portion 13d of the upper flange 13. When the upper flange 13 rotates and press-fits the upper pile 3 to the ground, the upper pile 3 is rotated once in the circumferential direction Z in the ground, whereby the upper pile 3 is rotated in the ground in a predetermined direction in the axial direction X. It can be press-fitted only by the length L3, and is constituted by a predetermined spiral pitch P3 having substantially the same length as the length L3 in the axial direction X.

本発明を適用した杭の継手構造1は、図11に示すように、下部フランジ12の螺旋ピッチP2と、上部フランジ13の螺旋ピッチP3とが、略同一の螺旋ピッチとなるように構成される。このため、本発明を適用した杭の継手構造1は、螺旋状に形成された下部フランジ12の図7に示す上面12aと、螺旋状に形成された上部フランジ13の図9に示す下面13bとが面当接されることになる。   As shown in FIG. 11, the pile joint structure 1 to which the present invention is applied is configured such that the helical pitch P2 of the lower flange 12 and the helical pitch P3 of the upper flange 13 have substantially the same helical pitch. . Therefore, the pile joint structure 1 to which the present invention is applied includes an upper surface 12a of the lower flange 12 formed in a spiral shape and a lower surface 13b of the upper flange 13 formed in a spiral shape shown in FIG. Is brought into surface contact.

本発明を適用した杭の継手構造1は、下部フランジ12の軸芯直交方向Yの幅W2及び上部フランジ13の軸芯直交方向Yの幅W3を、螺旋状羽根11の軸芯直交方向Yの幅W1よりも小さくすることで、杭の継手構造1の回転圧入抵抗を小さくすることができる。本発明を適用した杭の継手構造1は、これに限らず、下部フランジ12の軸芯直交方向Yの幅W2及び上部フランジ13の軸芯直交方向Yの幅W3を、螺旋状羽根11の軸芯直交方向Yの幅W1以上の大きさとして、回転圧入させるときの杭の継手構造1における推進力を向上させるとともに、杭の軸芯方向Xの抵抗力を増大させて、地盤の中間層で所定の支持力を得ることもできる。   The pile joint structure 1 to which the present invention is applied has a width W2 of the lower flange 12 in the direction perpendicular to the axis Y and a width W3 of the upper flange 13 in the direction perpendicular to the axis Y. By making it smaller than the width W1, the rotary press-fit resistance of the pile joint structure 1 can be reduced. The pile joint structure 1 to which the present invention is applied is not limited to this, and the width W2 of the lower flange 12 in the direction perpendicular to the axial center Y and the width W3 of the upper flange 13 in the direction perpendicular to the axial center Y are As the size of the width W1 or more in the direction perpendicular to the core, the propulsive force in the joint structure 1 of the pile when rotating and press-fitting is improved, and the resistance force in the axial direction X of the pile is increased, A predetermined supporting force can also be obtained.

本発明を適用した杭の継手構造1は、第1実施形態において、下部フランジ12の図7に示すボルト孔12eと、上部フランジ13の図9に示すボルト孔13eとを重ね合わせて、ボルト16を挿通して締結することにより、下部フランジ12と、上部フランジ13とがボルト接合される。本発明を適用した杭の継手構造1は、8本のボルト16を用いてボルト接合されるものであるが、これに限らず、杭を回転圧入させるときのトルクと、打ち込まれた杭に作用する図13に示す圧縮力p、引張力q、せん断力t及び曲げ力bに抵抗することができるように、所定の数量のボルト16を用いてボルト接合される。   In the first embodiment, the pile joint structure 1 to which the present invention is applied is such that the bolt hole 12e shown in FIG. 7 of the lower flange 12 and the bolt hole 13e shown in FIG. By inserting and fastening, the lower flange 12 and the upper flange 13 are bolted together. The joint structure 1 of the pile to which the present invention is applied is bolted using eight bolts 16, but is not limited to this, and acts on the pile that has been driven and the torque when rotating the pile. In order to resist the compressive force p, tensile force q, shear force t, and bending force b shown in FIG.

本発明を適用した杭の継手構造1は、下部フランジ12と上部フランジ13とをボルト接合した状態で螺旋状に形成されて、軸芯方向Xに所定の長さL4となるように、軸芯方向Xで長さL4と略同一長さの所定の螺旋ピッチP4となるように構成され、螺旋状羽根11の螺旋ピッチP1と、略同一の螺旋ピッチとなるように構成される。なお、本発明を適用した杭の継手構造1は、これに限らず、如何なる螺旋ピッチP4により構成されてもよく、螺旋状羽根11の螺旋ピッチP1より長い螺旋ピッチP4としてもよい。本発明を適用した杭の継手構造1は、螺旋状に形成されるため、継手部分が地上に設けられた場合であっても、雨水等を継手部分から下方に流下させることができ、継手部分に雨水が貯留することによって継手部分が錆びて腐食することを回避することができる。   The pile joint structure 1 to which the present invention is applied is formed in a spiral shape in a state where the lower flange 12 and the upper flange 13 are joined to each other by bolts, and has a predetermined length L4 in the axial direction X. In the direction X, it is configured to have a predetermined spiral pitch P4 having substantially the same length as the length L4, and is configured to have substantially the same spiral pitch as the spiral pitch P1 of the spiral blade 11. The pile joint structure 1 to which the present invention is applied is not limited to this, and may be configured by any spiral pitch P4, or may be a spiral pitch P4 longer than the spiral pitch P1 of the spiral blades 11. Since the joint structure 1 of the pile to which the present invention is applied is formed in a spiral shape, even if the joint part is provided on the ground, rainwater or the like can flow downward from the joint part. It is possible to avoid the joint portion from being rusted and corroded due to the rainwater being stored.

本発明を適用した杭の継手構造1は、下部フランジ12と上部フランジ13とを、機械式のフランジ継手によりボルト接合するものであるため、溶接によって接合する場合と比べて、下部杭2の上端部2bと上部杭3の下端部3aとを短時間で接合することができ、また、簡単な作業で強固に接合することができる。   Since the joint structure 1 of the pile to which the present invention is applied is that the lower flange 12 and the upper flange 13 are bolted by a mechanical flange joint, the upper end of the lower pile 2 is compared with the case of joining by welding. The part 2b and the lower end part 3a of the upper pile 3 can be joined in a short time, and can be firmly joined by a simple operation.

これにより、本発明を適用した杭の継手構造1は、杭の打ち込みの工期を短縮することが可能となるとともに、杭の打ち込みの施工コストが増大することを回避することが可能となる。   As a result, the pile joint structure 1 to which the present invention is applied can shorten the construction period of pile driving and avoid an increase in the construction cost of pile driving.

また、本発明を適用した杭の継手構造1は、下部杭2の上端部2bで外周面から外側に延びるように下部フランジ12が形成されるとともに、上部杭3の下端部3aで外周面から外側に延びるように上部フランジ13が形成される。このため、本発明を適用した杭の継手構造1は、下部杭2本体、上部杭3本体及び継手部分の板厚が内側に向けて増大することを回避して、下部杭2本体、上部杭3本体及び継手部分の内径が小さくなることを回避することができる。   Further, the pile joint structure 1 to which the present invention is applied has a lower flange 12 formed so as to extend outward from the outer peripheral surface at the upper end portion 2b of the lower pile 2, and from the outer peripheral surface at the lower end portion 3a of the upper pile 3. An upper flange 13 is formed so as to extend outward. For this reason, the joint structure 1 of the pile which applied this invention avoids that the plate | board thickness of a lower pile 2 main body, an upper pile 3 main body, and a joint part increases toward an inner side, a lower pile 2 main body, an upper pile 3. It can avoid that the internal diameter of 3 main body and a joint part becomes small.

ここで、回転圧入杭は、全周旋回機により施工されることが一般的である。この全周旋回機は、回転圧入杭を回転させるために、螺旋状羽根11と同一の螺旋ピッチで傾斜して溝切りされたスパイラルカラーが形成されたチャック部を備える。このとき、回転圧入杭は、軸芯方向Xの連接が当該チャック部の上方で実施されるものであるが、本発明を適用した杭の継手構造1は、螺旋状のフランジ継手が用いられるため、軸芯方向Xに対して直角のフランジ継手が用いられる場合に比べて、継手部分を容易にスパイラルカラーに通過させることが可能となる。   Here, the rotary press-fit pile is generally constructed by an all-around swirler. In order to rotate the rotary press-fitting pile, this all-around swirler includes a chuck portion on which a spiral collar is formed that is inclined and grooved at the same spiral pitch as the spiral blade 11. At this time, the rotary press-fit pile is connected in the axial direction X above the chuck portion, but the pile joint structure 1 to which the present invention is applied uses a helical flange joint. Compared with the case where a flange joint perpendicular to the axial direction X is used, the joint portion can be easily passed through the spiral collar.

本発明を適用した杭の継手構造1は、下部杭2及び上部杭3の内側において、外径の大きい図12に示すハンマグラブ19を用いることができ、下部杭2及び上部杭3の打ち込みとともに、下部杭2及び上部杭3の内側からの排土をハンマグラブ19によって効率的に実施することができる。これにより、本発明を適用した杭の継手構造1は、杭の打ち込みの工期を短縮することが可能となるとともに、杭の打ち込みの施工コストが増大することを回避することが可能となる。   The pile joint structure 1 to which the present invention is applied can use the hammaglab 19 shown in FIG. 12 having a large outer diameter inside the lower pile 2 and the upper pile 3, along with driving the lower pile 2 and the upper pile 3, The soil removal from the inside of the lower pile 2 and the upper pile 3 can be efficiently carried out by the hammer magnet 19. As a result, the pile joint structure 1 to which the present invention is applied can shorten the construction period of pile driving and avoid an increase in the construction cost of pile driving.

本発明を適用した杭の継手構造1は、下部フランジ12と、上部フランジ13とをボルト接合した状態で螺旋状に形成される。これにより、本発明を適用した杭の継手構造1は、下部杭2の上端部2bと上部杭3の下端部3aとが接合された状態で、下部杭2と上部杭3とを一体に地盤中に回転圧入するときに、下部杭2及び上部杭3の進行方向に対する杭の継手構造1の回転圧入抵抗を小さくすることができる。特に、本発明を適用した杭の継手構造1は、螺旋状羽根11の螺旋ピッチP1と、略同一の螺旋ピッチP4となるように構成されることで、杭の継手構造1の回転圧入抵抗を極小化することができるため、下部杭2及び上部杭3の打ち込みに要する荷重の増大を抑制することができ、杭の打ち込みの施工コストが増大することを回避することが可能となるとともに、杭の打ち込みの工期を短縮することが可能となる。   A pile joint structure 1 to which the present invention is applied is formed in a spiral shape in a state where a lower flange 12 and an upper flange 13 are bolted. Thereby, the joint structure 1 of the pile to which the present invention is applied is the ground where the lower pile 2 and the upper pile 3 are integrally formed in a state where the upper end 2b of the lower pile 2 and the lower end 3a of the upper pile 3 are joined. When rotary press-fitting in, the rotary press-fit resistance of the pile joint structure 1 with respect to the traveling direction of the lower pile 2 and the upper pile 3 can be reduced. In particular, the pile joint structure 1 to which the present invention is applied is configured so that the spiral pitch P1 of the spiral blades 11 is substantially the same as the spiral pitch P4, thereby reducing the rotational press-fit resistance of the pile joint structure 1. Since it can be minimized, an increase in the load required for driving the lower pile 2 and the upper pile 3 can be suppressed, and it is possible to avoid an increase in the construction cost of driving the pile. It is possible to shorten the construction period of the driving.

本発明を適用した杭の継手構造1は、図13に示すように、下部杭2の上端部2bと上部杭3の下端部3aとが接合された部位に、圧縮力p、引張力q及びせん断力tが作用する。このとき、本発明を適用した杭の継手構造1は、下部フランジ12及び上部フランジ13が軸芯方向Xに対して傾斜しているため、下部フランジ12及び上部フランジ13だけでなく、下部杭2本体及び上部杭3本体にも、圧縮力p、引張力q及びせん断力tの一部を負担させることができる。これにより、本発明を適用した杭の継手構造1は、下部フランジ12の板厚T2及び上部フランジ13の板厚T3を薄くすることができ、杭の継手構造1による回転圧入抵抗をさらに小さくして、下部杭2及び上部杭3の打ち込みに要する荷重の増大を抑制することが可能となる。   As shown in FIG. 13, the pile joint structure 1 to which the present invention is applied has a compressive force p, a tensile force q, and a portion where the upper end 2 b of the lower pile 2 and the lower end 3 a of the upper pile 3 are joined. A shearing force t acts. At this time, in the pile joint structure 1 to which the present invention is applied, since the lower flange 12 and the upper flange 13 are inclined with respect to the axial direction X, not only the lower flange 12 and the upper flange 13 but also the lower pile 2 The main body and the upper pile 3 main body can also bear a part of the compressive force p, tensile force q, and shear force t. Thereby, the pile joint structure 1 to which the present invention is applied can reduce the plate thickness T2 of the lower flange 12 and the plate thickness T3 of the upper flange 13, and further reduce the rotational press-fit resistance by the pile joint structure 1. Thus, it is possible to suppress an increase in the load required for driving the lower pile 2 and the upper pile 3.

本発明を適用した杭の継手構造1は、下部フランジ12及び上部フランジ13が軸芯方向Xに対して直角となっていないため、継手部分に曲げ力b、せん断力tが作用した場合に、継手部分のみで全ての曲げ力b、せん断力tを負担することが必要でなくなる。本発明を適用した杭の継手構造1は、例えば、継手部分と下部杭2本体及び上部杭3本体とが負担する曲げ力b、せん断力tの比率を1対9とすることにより、曲げ力b、せん断力tの一部を下部杭2本体及び上部杭3本体に負担させることができ、継手部分に必要となる曲げ力b、せん断力tに対する強度を低く設定することができるため、継手部分の設計を容易にすることが可能となる。   In the joint structure 1 of the pile to which the present invention is applied, since the lower flange 12 and the upper flange 13 are not perpendicular to the axial direction X, when a bending force b and a shearing force t are applied to the joint part, It is not necessary to bear all the bending force b and shear force t only at the joint portion. The pile joint structure 1 to which the present invention is applied has, for example, a bending force b and a shear force t ratio of 1: 9 to be borne by the joint portion, the lower pile 2 main body, and the upper pile 3 main body. b, part of the shear force t can be borne by the lower pile 2 main body and the upper pile 3 main body, and the strength against the bending force b and shear force t required for the joint portion can be set low. It becomes possible to easily design the portion.

本発明を適用した杭の継手構造1は、軸芯方向Xに所定の長さを有する下部係止部14と上部係止部15とが相互に係止された状態となる。このため、本発明を適用した杭の継手構造1は、下部係止部14から下部杭2本体に回転力rの一部が伝達されるとともに、上部係止部15から上部杭3本体に回転力rの一部が伝達され、下部フランジ12と上部フランジ13とを接合するボルト16に作用する回転力rを小さいものとすることができる。これにより、本発明を適用した杭の継手構造1は、ボルト16の数量を少なくし、また、小径のボルト16を用いることができ、簡単な作業で短時間に接合することで、杭の打ち込みの工期を短縮することが可能となるとともに、材料コストが増大することを回避することが可能となる。   In the pile joint structure 1 to which the present invention is applied, the lower locking portion 14 and the upper locking portion 15 having a predetermined length in the axial direction X are locked to each other. For this reason, the pile joint structure 1 to which the present invention is applied transmits a part of the rotational force r from the lower locking portion 14 to the lower pile 2 main body and rotates from the upper locking portion 15 to the upper pile 3 main body. A part of the force r is transmitted, and the rotational force r acting on the bolt 16 that joins the lower flange 12 and the upper flange 13 can be reduced. As a result, the pile joint structure 1 to which the present invention is applied can reduce the quantity of bolts 16 and can use small-diameter bolts 16. It is possible to shorten the construction period of the material and to avoid an increase in material cost.

本発明を適用した杭の継手構造1は、図14に示すように、下部係止部14が湾曲して形成されるとともに、上部係止部15が湾曲して形成されることで、湾曲した下部係止部14と上部係止部15とが係合して食い込むことにより、圧縮力p、引張力qに対する抵抗力を増大させることが可能となる。   As shown in FIG. 14, the pile joint structure 1 to which the present invention is applied is curved by forming the lower locking portion 14 curved and forming the upper locking portion 15 curved. When the lower locking portion 14 and the upper locking portion 15 are engaged and bite, it is possible to increase the resistance force against the compression force p and the tensile force q.

次に、本発明を適用した杭の継手構造1の第2実施形態について説明する。なお、上述した構成要素と同一の構成要素については、同一の符号を付すことにより以下での説明を省略する。   Next, a second embodiment of a pile joint structure 1 to which the present invention is applied will be described. In addition, about the component same as the component mentioned above, the description below is abbreviate | omitted by attaching | subjecting the same code | symbol.

本発明を適用した杭の継手構造1は、第2実施形態において、図15に示すように、所定の螺旋ピッチP2により構成される下部フランジ12が、第1下部フランジ121と、第2下部フランジ122とに2分割され、また、所定の螺旋ピッチP3により構成される上部フランジ13が、第1上部フランジ131と、第2上部フランジ132とに2分割されたものである。本発明を適用した杭の継手構造1は、これに限らず、如何なる数量に分割されてもよい。   As shown in FIG. 15, the pile joint structure 1 to which the present invention is applied is, as shown in FIG. 15, a lower flange 12 constituted by a predetermined helical pitch P <b> 2 includes a first lower flange 121 and a second lower flange. The upper flange 13 is divided into two parts 122 and a predetermined spiral pitch P3. The upper flange 13 is divided into two parts, a first upper flange 131 and a second upper flange 132. The pile joint structure 1 to which the present invention is applied is not limited to this, and may be divided into any quantity.

下部フランジ12は、第2実施形態において、下部杭2の上端部2bの一部を軸芯方向Xに所定の長さh14で切り欠くことにより、周方向Zに2箇所の下部係止部14が形成される。また、上部フランジ13は、第2実施形態において、上部杭3の下端部3aの一部を軸芯方向Xに所定の長さh15で切り欠くことにより、周方向Zに2箇所の上部係止部15が形成される。   In the second embodiment, the lower flange 12 has two lower locking portions 14 in the circumferential direction Z by notching a part of the upper end portion 2b of the lower pile 2 with a predetermined length h14 in the axial direction X. Is formed. Further, in the second embodiment, the upper flange 13 has two upper locking points in the circumferential direction Z by notching a part of the lower end portion 3a of the upper pile 3 with a predetermined length h15 in the axial direction X. Part 15 is formed.

本発明を適用した杭の継手構造1は、図16に示すように、下部係止部14の長さh14と、上部係止部15の長さh15とを略同一の長さとして、第1下部フランジ121と第2下部フランジ122とを併せた下部フランジ12の螺旋ピッチP2と、第1上部フランジ131と第2上部フランジ132とを併せた上部フランジ13の螺旋ピッチP3とが、略同一の螺旋ピッチとなるように構成される。このため、本発明を適用した杭の継手構造1は、第1下部フランジ121の図15に示す上面121aと、第1上部フランジ131の図15に示す下面131bとが面当接されるとともに、第2下部フランジ122の図15に示す上面122aと、第2上部フランジ132の図15に示す下面132bとが面当接され、第1下部フランジ121及び第1上部フランジ131の軸芯方向Xの長さL41と、第2下部フランジ122及び第2上部フランジ132の軸芯方向Xの長さL42とを併せて、軸芯方向Xに所定の長さL4となるように、軸芯方向Xで長さL4と略同一長さの所定の螺旋ピッチP4となるように構成される。   As shown in FIG. 16, the pile joint structure 1 to which the present invention is applied has a length h14 of the lower locking portion 14 and a length h15 of the upper locking portion 15 that are substantially the same length. The helical pitch P2 of the lower flange 12 that combines the lower flange 121 and the second lower flange 122 and the helical pitch P3 of the upper flange 13 that combines the first upper flange 131 and the second upper flange 132 are substantially the same. It is configured to have a helical pitch. For this reason, the pile joint structure 1 to which the present invention is applied has the upper surface 121a of the first lower flange 121 shown in FIG. 15 and the lower surface 131b of the first upper flange 131 shown in FIG. The upper surface 122a of the second lower flange 122 shown in FIG. 15 and the lower surface 132b of the second upper flange 132 shown in FIG. 15 are in surface contact with each other, and the axial direction X of the first lower flange 121 and the first upper flange 131 is In the axial direction X, the length L41 and the length L42 in the axial direction X of the second lower flange 122 and the second upper flange 132 are combined to be a predetermined length L4 in the axial direction X. A predetermined spiral pitch P4 having substantially the same length as the length L4 is formed.

本発明を適用した杭の継手構造1は、第2実施形態においても、第1実施形態と同様に、機械式のフランジ継手によりボルト接合されるため、簡単な作業で短時間に接合することができ、杭の打ち込みの工期を短縮することが可能となるとともに、杭の打ち込みの施工コストが増大することを回避することが可能となる。   As in the first embodiment, the pile joint structure 1 to which the present invention is applied is bolted by a mechanical flange joint as in the first embodiment. It is possible to shorten the construction period of pile driving and to avoid an increase in the construction cost of pile driving.

本発明を適用した杭の継手構造1は、下部フランジ12が外側に延びるように形成されるとともに、上部フランジ13が外側に延びるように形成される。これにより、本発明を適用した杭の継手構造1は、下部杭2本体、上部杭3本体及び継手部分の板厚が内側に向けて増大し、内径が小さくなることを回避することができ、外径の大きいハンマグラブ19を用いることで、下部杭2及び上部杭3の内側からの排土を効率的に実施することが可能となる。   The pile joint structure 1 to which the present invention is applied is formed such that the lower flange 12 extends outward and the upper flange 13 extends outward. Thereby, the joint structure 1 of the pile which applied this invention can avoid that the plate | board thickness of a lower pile 2 main body, an upper pile 3 main body, and a joint part increases toward an inner side, and an internal diameter becomes small, By using the hammaglab 19 having a large outer diameter, it is possible to efficiently carry out the soil removal from the inside of the lower pile 2 and the upper pile 3.

本発明を適用した杭の継手構造1は、下部フランジ12と上部フランジ13とが、ボルト接合された状態で螺旋状に形成され、下部杭2と上部杭3とを一体に地盤中に回転圧入するときに、杭の継手構造1の回転圧入抵抗を小さくすることができる。特に、本発明を適用した杭の継手構造1は、螺旋状羽根11の螺旋ピッチP1と、略同一の螺旋ピッチP4となるように構成されることで、杭の継手構造1の回転圧入抵抗を極小化することが可能となる。これにより、本発明を適用した杭の継手構造1は、下部杭2及び上部杭3の打ち込みに要する荷重の増大を抑制することができ、杭の打ち込みの施工コストが増大することを回避することが可能となるとともに、杭の打ち込みの工期を短縮することが可能となる。   A pile joint structure 1 to which the present invention is applied is formed in a spiral shape with a lower flange 12 and an upper flange 13 bolted together, and the lower pile 2 and the upper pile 3 are integrally rotated and pressed into the ground. When this is done, the rotational press-fit resistance of the pile joint structure 1 can be reduced. In particular, the pile joint structure 1 to which the present invention is applied is configured so that the spiral pitch P1 of the spiral blades 11 is substantially the same as the spiral pitch P4, thereby reducing the rotational press-fit resistance of the pile joint structure 1. Minimization is possible. Thereby, the joint structure 1 of the pile which applied this invention can suppress the increase in the load required for driving of the lower pile 2 and the upper pile 3, and avoid that the construction cost of driving of the pile increases. It becomes possible to shorten the construction period of pile driving.

本発明を適用した杭の継手構造1は、図17に示すように、下部フランジ12及び上部フランジ13が2分割され、軸芯方向Xに任意の長さを有する下部係止部14と上部係止部15とが周方向Zの2箇所で相互に係止された状態となる。このため、本発明を適用した杭の継手構造1は、下部係止部14から下部杭2本体に回転力rの一部が伝達されるとともに、上部係止部15から上部杭3本体に回転力rの一部が伝達され、下部フランジ12と上部フランジ13とを接合するボルト16に作用する回転力rを小さいものとすることができる。これにより、本発明を適用した杭の継手構造1は、ボルト16の数量を少なくし、また、小径のボルト16を用いることができ、簡単な作業で短時間に接合することで、杭の打ち込みの工期を短縮することが可能となるとともに、材料コストが増大することを回避することが可能となる。   As shown in FIG. 17, the pile joint structure 1 to which the present invention is applied is divided into a lower flange 12 and an upper flange 13, and a lower locking portion 14 having an arbitrary length in the axial direction X and an upper engagement. It will be in the state where the stop part 15 was mutually locked in two places of the circumferential direction Z. For this reason, the pile joint structure 1 to which the present invention is applied transmits a part of the rotational force r from the lower locking portion 14 to the lower pile 2 main body and rotates from the upper locking portion 15 to the upper pile 3 main body. A part of the force r is transmitted, and the rotational force r acting on the bolt 16 that joins the lower flange 12 and the upper flange 13 can be reduced. As a result, the pile joint structure 1 to which the present invention is applied can reduce the quantity of bolts 16 and can use small-diameter bolts 16. It is possible to shorten the construction period of the material and to avoid an increase in material cost.

本発明を適用した杭の継手構造1は、下部フランジ12及び上部フランジ13が軸芯方向Xに対して傾斜しているため、下部杭2本体及び上部杭3本体にも、圧縮力p、引張力q、曲げ力b及びせん断力tの一部を負担させることができ、継手部分の設計を容易にすることを可能とし、さらに、下部フランジ12の板厚T2及び上部フランジ13の板厚T3を薄くすることにより、杭の継手構造1による回転圧入抵抗をさらに小さくして、下部杭2及び上部杭3の打ち込みに要する荷重の増大を抑制することが可能となる。   In the pile joint structure 1 to which the present invention is applied, the lower flange 12 and the upper flange 13 are inclined with respect to the axial direction X. Therefore, the compression force p, tensile force is applied to the lower pile 2 body and the upper pile 3 body. A part of the force q, the bending force b, and the shearing force t can be borne, and the joint portion can be easily designed. Further, the plate thickness T2 of the lower flange 12 and the plate thickness T3 of the upper flange 13 are provided. By reducing the thickness of the pile, the rotational press-fit resistance by the joint structure 1 of the pile can be further reduced, and an increase in the load required for driving the lower pile 2 and the upper pile 3 can be suppressed.

次に、本発明を適用した杭の継手構造1の第3実施形態について説明する。なお、上述した構成要素と同一の構成要素については、同一の符号を付すことにより以下での説明を省略する。   Next, a third embodiment of a pile joint structure 1 to which the present invention is applied will be described. In addition, about the component same as the component mentioned above, the description below is abbreviate | omitted by attaching | subjecting the same code | symbol.

本発明を適用した杭の継手構造1は、第3実施形態において、図18に示すように、さらに、下部フランジ12の上面12aから上方に向けて突出させて形成された凸部17aを有する。また、本発明を適用した杭の継手構造1は、第3実施形態において、上部フランジ13の一部のボルト孔13eが、凸部17aが挿入される凹部17bとして用いられる。   In the third embodiment, the pile joint structure 1 to which the present invention is applied further has a convex portion 17a formed by projecting upward from the upper surface 12a of the lower flange 12, as shown in FIG. Moreover, the joint structure 1 of the pile to which this invention is applied WHEREIN: The bolt hole 13e of a part of upper flange 13 is used as the recessed part 17b in which the convex part 17a is inserted in 3rd Embodiment.

凸部17aは、これに限らず、上部フランジ13の下面13bから下方に向けて突出させて形成されてもよく、下部フランジ12の上面12a及び上部フランジ13の下面13bの何れか一方又は両方に形成されてもよい。凸部17aは、略円柱状に形成されるものであるが、これに限らず、略角柱状に形成されてもよい。凸部17aは、下部フランジ12を鍛造することにより形成され、又は下部フランジ12の上面12aに対するスタッド溶接により取り付けられて形成されてもよい。   The convex portion 17a is not limited to this, and may be formed so as to protrude downward from the lower surface 13b of the upper flange 13, and may be formed on one or both of the upper surface 12a of the lower flange 12 and the lower surface 13b of the upper flange 13. It may be formed. The convex portion 17a is formed in a substantially cylindrical shape, but is not limited thereto, and may be formed in a substantially prismatic shape. The convex portion 17a may be formed by forging the lower flange 12, or may be formed by being attached by stud welding to the upper surface 12a of the lower flange 12.

本発明を適用した杭の継手構造1は、図19に示すように、下部フランジ12の螺旋ピッチP2と、上部フランジ13の螺旋ピッチP3とが、略同一の螺旋ピッチとなるように構成され、下部フランジ12の図18に示す上面12aと、上部フランジ13の図18に示す下面13bとが面当接された状態で、軸芯方向Xに所定の長さL4となるように、軸芯方向Xで長さL4と略同一長さの所定の螺旋ピッチP4となるように構成されるとともに、下部フランジ12の凸部17aが上部フランジ13の凹部17bに挿入される。   The pile joint structure 1 to which the present invention is applied is configured so that the helical pitch P2 of the lower flange 12 and the helical pitch P3 of the upper flange 13 are substantially the same helical pitch, as shown in FIG. In the state where the upper surface 12a of the lower flange 12 shown in FIG. 18 and the lower surface 13b of the upper flange 13 shown in FIG. 18 are in surface contact with each other, the axial direction is set to a predetermined length L4 in the axial direction X. The convex portion 17a of the lower flange 12 is inserted into the concave portion 17b of the upper flange 13 while being configured to have a predetermined spiral pitch P4 that is substantially the same length as the length L4.

本発明を適用した杭の継手構造1は、第3実施形態においても、機械式のフランジ継手によりボルト接合されるため、簡単な作業で短時間に接合することができ、杭の打ち込みの工期を短縮することが可能となるとともに、杭の打ち込みの施工コストが増大することを回避することが可能となる。   The pile joint structure 1 to which the present invention is applied is also bolted by a mechanical flange joint in the third embodiment, so that it can be joined in a short time with a simple operation, and the work period of pile driving is reduced. It becomes possible to shorten, and it becomes possible to avoid that the construction cost of driving a pile increases.

本発明を適用した杭の継手構造1は、下部フランジ12が外側に延びるように形成されるとともに、上部フランジ13が外側に延びるように形成される。これにより、本発明を適用した杭の継手構造1は、下部杭2本体、上部杭3本体及び継手部分の板厚が内側に向けて増大し、内径が小さくなることを回避することができ、外径の大きいハンマグラブ19を用いることで、下部杭2及び上部杭3の内側からの排土を効率的に実施することが可能となる。   The pile joint structure 1 to which the present invention is applied is formed such that the lower flange 12 extends outward and the upper flange 13 extends outward. Thereby, the joint structure 1 of the pile which applied this invention can avoid that the plate | board thickness of a lower pile 2 main body, an upper pile 3 main body, and a joint part increases toward an inner side, and an internal diameter becomes small, By using the hammaglab 19 having a large outer diameter, it is possible to efficiently carry out the soil removal from the inside of the lower pile 2 and the upper pile 3.

本発明を適用した杭の継手構造1は、下部フランジ12と上部フランジ13とが、ボルト接合された状態で螺旋状に形成され、下部杭2と上部杭3とを一体に地盤中に回転圧入するときに、杭の継手構造1の回転圧入抵抗を小さくすることができる。特に、本発明を適用した杭の継手構造1は、螺旋状羽根11の螺旋ピッチP1と、略同一の螺旋ピッチP4となるように構成されることで、杭の継手構造1の回転圧入抵抗を極小化することが可能となる。これにより、本発明を適用した杭の継手構造1は、下部杭2及び上部杭3の打ち込みに要する荷重の増大を抑制することができ、杭の打ち込みの施工コストが増大することを回避することが可能となるとともに、杭の打ち込みの工期を短縮することが可能となる。   A pile joint structure 1 to which the present invention is applied is formed in a spiral shape with a lower flange 12 and an upper flange 13 bolted together, and the lower pile 2 and the upper pile 3 are integrally rotated and pressed into the ground. When this is done, the rotational press-fit resistance of the pile joint structure 1 can be reduced. In particular, the pile joint structure 1 to which the present invention is applied is configured so that the spiral pitch P1 of the spiral blades 11 is substantially the same as the spiral pitch P4, thereby reducing the rotational press-fit resistance of the pile joint structure 1. Minimization is possible. Thereby, the joint structure 1 of the pile which applied this invention can suppress the increase in the load required for driving of the lower pile 2 and the upper pile 3, and avoid that the construction cost of driving of the pile increases. It becomes possible to shorten the construction period of pile driving.

本発明を適用した杭の継手構造1は、第3実施形態において、下部フランジ12の凸部17aが上部フランジ13の凹部17bに係止された状態となる。このため、本発明を適用した杭の継手構造1は、下部フランジ12の凸部17aから下部フランジ12及び上部フランジ13に回転力rの一部が伝達され、下部フランジ12と上部フランジ13とを接合するボルト16に作用する回転力rを小さいものとすることができる。これにより、本発明を適用した杭の継手構造1は、ボルト16に作用する回転力rを小さいものとして、ボルト16の数量を少なくすることができ、ボルト締結の作業量を減少させて、簡単な作業で短時間に接合することができ、杭の打ち込みの工期を短縮することが可能となる。   The pile joint structure 1 to which the present invention is applied is in a state in which the convex portion 17a of the lower flange 12 is locked to the concave portion 17b of the upper flange 13 in the third embodiment. Therefore, in the pile joint structure 1 to which the present invention is applied, a part of the rotational force r is transmitted from the convex portion 17a of the lower flange 12 to the lower flange 12 and the upper flange 13, and the lower flange 12 and the upper flange 13 are connected. The rotational force r acting on the bolt 16 to be joined can be made small. As a result, the pile joint structure 1 to which the present invention is applied can reduce the number of bolts 16 with a small rotational force r acting on the bolts 16, reduce the amount of bolt fastening, and easily It can be joined in a short time with a simple operation, and the construction period of pile driving can be shortened.

本発明を適用した杭の継手構造1は、下部フランジ12及び上部フランジ13が軸芯方向Xに対して傾斜しているため、下部杭2本体及び上部杭3本体にも、圧縮力p、引張力q、曲げ力b及びせん断力tの一部を負担させることができ、継手部分の設計を容易にすることを可能とし、さらに、下部フランジ12の板厚T2及び上部フランジ13の板厚T3を薄くすることにより、杭の継手構造1による回転圧入抵抗をさらに小さくして、下部杭2及び上部杭3の打ち込みに要する荷重の増大を抑制することが可能となる。   In the pile joint structure 1 to which the present invention is applied, the lower flange 12 and the upper flange 13 are inclined with respect to the axial direction X. Therefore, the compression force p, tensile force is applied to the lower pile 2 body and the upper pile 3 body. A part of the force q, the bending force b, and the shearing force t can be borne, and the joint portion can be easily designed. Further, the plate thickness T2 of the lower flange 12 and the plate thickness T3 of the upper flange 13 are provided. By reducing the thickness of the pile, the rotational press-fit resistance by the joint structure 1 of the pile can be further reduced, and an increase in the load required for driving the lower pile 2 and the upper pile 3 can be suppressed.

次に、本発明を適用した杭の継手構造1の第4実施形態について説明する。なお、上述した構成要素と同一の構成要素については、同一の符号を付すことにより以下での説明を省略する。   Next, a fourth embodiment of a pile joint structure 1 to which the present invention is applied will be described. In addition, about the component same as the component mentioned above, the description below is abbreviate | omitted by attaching | subjecting the same code | symbol.

本発明を適用した杭の継手構造1は、第4実施形態において、図20に示すように、さらに、下部フランジ12の上面12a側の端面が切り欠かれた下部溝18aが、下部フランジ12の側面12fに形成されるとともに、上部フランジ13の下面13b側の端面が切り欠かれた上部溝18bが、上部フランジ13の側面13fに形成される。   As shown in FIG. 20, in the pile joint structure 1 to which the present invention is applied, as shown in FIG. 20, a lower groove 18 a in which an end surface on the upper surface 12 a side of the lower flange 12 is notched is further provided on the lower flange 12. An upper groove 18b formed in the side surface 12f and having an end surface on the lower surface 13b side of the upper flange 13 cut out is formed in the side surface 13f of the upper flange 13.

下部溝18a及び上部溝18bは、図21に示すように、下部フランジ12の図20に示す上面12aと、上部フランジ13の図20に示す下面13bとが面当接された状態で、略矩形状に形成される溝部18を構成することになり、下部溝18aと上部溝18bとにキー部材18cを架設して、キー部材18cをネジ等で固定することにより、キー部材18cが溝部18に取り付けられる。   As shown in FIG. 21, the lower groove 18a and the upper groove 18b are substantially rectangular in a state where the upper surface 12a of the lower flange 12 shown in FIG. 20 and the lower surface 13b of the upper flange 13 shown in FIG. The groove portion 18 formed in a shape is formed, and the key member 18c is installed in the lower groove 18a and the upper groove 18b, and the key member 18c is fixed to the groove portion 18 by fixing the key member 18c with a screw or the like. It is attached.

本発明を適用した杭の継手構造1は、下部フランジ12の螺旋ピッチP2と、上部フランジ13の螺旋ピッチP3とが、略同一の螺旋ピッチとなるように構成され、下部フランジ12の図20に示す上面12aと、上部フランジ13の図20に示す下面13bとが面当接された状態で、軸芯方向Xに所定の長さL4となるように、軸芯方向Xで長さL4と略同一長さの所定の螺旋ピッチP4となるように構成される。   The pile joint structure 1 to which the present invention is applied is configured such that the helical pitch P2 of the lower flange 12 and the helical pitch P3 of the upper flange 13 are substantially the same helical pitch. In the state where the upper surface 12a shown and the lower surface 13b shown in FIG. 20 of the upper flange 13 are in surface contact, the length L4 in the axial direction X is substantially equal to the predetermined length L4 in the axial direction X. It is comprised so that it may become the predetermined spiral pitch P4 of the same length.

本発明を適用した杭の継手構造1は、第4実施形態においても、機械式のフランジ継手によりボルト接合されるため、簡単な作業で短時間に接合することができ、杭の打ち込みの工期を短縮することが可能となるとともに、杭の打ち込みの施工コストが増大することを回避することが可能となる。   The pile joint structure 1 to which the present invention is applied is also bolt-bonded by a mechanical flange joint in the fourth embodiment, so that it can be joined in a short time with a simple operation, and the work period of pile driving is reduced. It becomes possible to shorten, and it becomes possible to avoid that the construction cost of driving a pile increases.

本発明を適用した杭の継手構造1は、下部フランジ12が外側に延びるように形成されるとともに、上部フランジ13が外側に延びるように形成される。これにより、本発明を適用した杭の継手構造1は、下部杭2本体、上部杭3本体及び継手部分の板厚が内側に向けて増大し、内径が小さくなることを回避することができ、外径の大きいハンマグラブ19を用いることで、下部杭2及び上部杭3の内側からの排土を効率的に実施することが可能となる。   The pile joint structure 1 to which the present invention is applied is formed such that the lower flange 12 extends outward and the upper flange 13 extends outward. Thereby, the joint structure 1 of the pile which applied this invention can avoid that the plate | board thickness of a lower pile 2 main body, an upper pile 3 main body, and a joint part increases toward an inner side, and an internal diameter becomes small, By using the hammaglab 19 having a large outer diameter, it is possible to efficiently carry out the soil removal from the inside of the lower pile 2 and the upper pile 3.

本発明を適用した杭の継手構造1は、下部フランジ12と上部フランジ13とが、ボルト接合された状態で螺旋状に形成され、下部杭2と上部杭3とを一体に地盤中に回転圧入するときに、杭の継手構造1の回転圧入抵抗を小さくすることができる。特に、本発明を適用した杭の継手構造1は、螺旋状羽根11の螺旋ピッチP1と、略同一の螺旋ピッチP4となるように構成されることで、杭の継手構造1の回転圧入抵抗を極小化することが可能となる。これにより、本発明を適用した杭の継手構造1は、下部杭2及び上部杭3の打ち込みに要する荷重の増大を抑制することができ、杭の打ち込みの施工コストが増大することを回避することが可能となるとともに、杭の打ち込みの工期を短縮することが可能となる。   A pile joint structure 1 to which the present invention is applied is formed in a spiral shape with a lower flange 12 and an upper flange 13 bolted together, and the lower pile 2 and the upper pile 3 are integrally rotated and pressed into the ground. When this is done, the rotational press-fit resistance of the pile joint structure 1 can be reduced. In particular, the pile joint structure 1 to which the present invention is applied is configured so that the spiral pitch P1 of the spiral blades 11 is substantially the same as the spiral pitch P4, thereby reducing the rotational press-fit resistance of the pile joint structure 1. Minimization is possible. Thereby, the joint structure 1 of the pile which applied this invention can suppress the increase in the load required for driving of the lower pile 2 and the upper pile 3, and avoid that the construction cost of driving of the pile increases. It becomes possible to shorten the construction period of pile driving.

本発明を適用した杭の継手構造1は、第4実施形態において、下部溝18aと上部溝18bとに係止されたキー部材18cにより連結された状態となる。このため、本発明を適用した杭の継手構造1は、回転力rの一部がキー部材18cに伝達され、下部フランジ12と上部フランジ13とを接合するボルト16に作用する回転力rを小さいものとすることができる。これにより、本発明を適用した杭の継手構造1は、ボルト16に作用する回転力rを小さいものとして、ボルト16の数量を少なくすることができ、ボルト締結の作業量を減少させて、簡単な作業で短時間に接合することができ、杭の打ち込みの工期を短縮することが可能となる。   In the fourth embodiment, the pile joint structure 1 to which the present invention is applied is connected by a key member 18c locked to the lower groove 18a and the upper groove 18b. Therefore, in the pile joint structure 1 to which the present invention is applied, a part of the rotational force r is transmitted to the key member 18c, and the rotational force r acting on the bolt 16 that joins the lower flange 12 and the upper flange 13 is small. Can be. As a result, the pile joint structure 1 to which the present invention is applied can reduce the number of bolts 16 with a small rotational force r acting on the bolts 16, reduce the amount of bolt fastening, and easily It can be joined in a short time with a simple operation, and the construction period of pile driving can be shortened.

本発明を適用した杭の継手構造1は、下部フランジ12及び上部フランジ13が軸芯方向Xに対して傾斜しているため、下部杭2本体及び上部杭3本体にも、圧縮力p、引張力q、曲げ力b及びせん断力tの一部を負担させることができ、継手部分の設計を容易にすることを可能とし、さらに、下部フランジ12の板厚T2及び上部フランジ13の板厚T3を薄くすることにより、杭の継手構造1による回転圧入抵抗をさらに小さくして、下部杭2及び上部杭3の打ち込みに要する荷重の増大を抑制することが可能となる。   In the pile joint structure 1 to which the present invention is applied, the lower flange 12 and the upper flange 13 are inclined with respect to the axial direction X. Therefore, the compression force p, tensile force is applied to the lower pile 2 body and the upper pile 3 body. A part of the force q, the bending force b, and the shearing force t can be borne, and the joint portion can be easily designed. Further, the plate thickness T2 of the lower flange 12 and the plate thickness T3 of the upper flange 13 are provided. By reducing the thickness of the pile, the rotational press-fit resistance by the joint structure 1 of the pile can be further reduced, and an increase in the load required for driving the lower pile 2 and the upper pile 3 can be suppressed.

本発明を適用した杭の継手構造1は、第1実施形態〜第4実施形態の何れにおいても、図22に示すように、下部フランジ12の始端部12c及び上部フランジ13の始端部13cの何れか一方又は両方の端面を、先鋭化させて形成されたものとすることができる。   In any of the first to fourth embodiments, the pile joint structure 1 to which the present invention is applied includes any one of the start end portion 12c of the lower flange 12 and the start end portion 13c of the upper flange 13 as shown in FIG. Either or both of the end faces can be formed by sharpening.

このとき、下部フランジ12及び上部フランジ13は、例えば、図22(a)に示すように、下部フランジ12の始端部12cの端面及び上部フランジ13の始端部13cの端面が、各々の軸芯方向Xの略中央を突出させることによって先鋭化される。また、下部フランジ12及び上部フランジ13は、図22(b)に示すように、下部フランジ12の始端部12cの端面の上端を突出させるとともに、上部フランジ13の始端部13cの端面の下端を突出させることで、これらの端面が先鋭化されてもよい。さらに、下部フランジ12及び上部フランジ13は、図22(c)に示すように、上部フランジ13の始端部13cの端面の下端を突出させるとともに、上部フランジ13の始端部13cの端面の下端と下部フランジ12の始端部12cの端面の上端とを連続させて、下部フランジ12の始端部12cの端面の下端を突出させることで、これらの端面が先鋭化されてもよい。   At this time, as shown in FIG. 22A, for example, the lower flange 12 and the upper flange 13 have an end surface of the start end portion 12c of the lower flange 12 and an end surface of the start end portion 13c of the upper flange 13 in the respective axial directions. It is sharpened by projecting the approximate center of X. Further, as shown in FIG. 22B, the lower flange 12 and the upper flange 13 project the upper end of the end surface of the start end portion 12c of the lower flange 12, and project the lower end of the end surface of the start end portion 13c of the upper flange 13. By doing so, these end surfaces may be sharpened. Furthermore, as shown in FIG. 22C, the lower flange 12 and the upper flange 13 project the lower end of the end face of the start end portion 13c of the upper flange 13, and the lower end and the lower end of the end face of the start end portion 13c of the upper flange 13 These end faces may be sharpened by making the upper end of the end face of the start end part 12c of the flange 12 continuous and projecting the lower end of the end face of the start end part 12c of the lower flange 12.

これにより、本発明を適用した杭の継手構造1は、第1実施形態〜第4実施形態の何れにおいても、下部フランジ12の始端部12c及び上部フランジ13の始端部13cの何れか一方又は両方の端面が先鋭化して形成されることで、杭の継手構造1の回転圧入抵抗を著しく低減させることが可能となる。   Thereby, the pile joint structure 1 to which the present invention is applied is any one or both of the start end portion 12c of the lower flange 12 and the start end portion 13c of the upper flange 13 in any of the first to fourth embodiments. It becomes possible to remarkably reduce the rotational press-fit resistance of the joint structure 1 of the pile.

本発明を適用した杭の継手構造1は、第1実施形態〜第4実施形態の何れにおいても、図23(a)に示すように、下部杭2や中間杭4の側面に下部フランジ12が溶接等によって取り付けられるとともに、上部杭3や中間杭4の側面に上部フランジ13が溶接等によって取り付けられる。本発明を適用した杭の継手構造1は、これに限らず、図23(b)に示すように、下部杭2や中間杭4の上端面に下部フランジ12が溶接等によって取り付けられるとともに、上部杭3や中間杭4の下端面に上部フランジ13が溶接等によって取り付けられてもよい。   In any one of the first to fourth embodiments, the pile joint structure 1 to which the present invention is applied has lower flanges 12 on the side surfaces of the lower pile 2 and the intermediate pile 4 as shown in FIG. While being attached by welding or the like, the upper flange 13 is attached to the side surfaces of the upper pile 3 or the intermediate pile 4 by welding or the like. The pile joint structure 1 to which the present invention is applied is not limited to this, and as shown in FIG. 23 (b), the lower flange 12 is attached to the upper end surfaces of the lower pile 2 and the intermediate pile 4 by welding or the like. The upper flange 13 may be attached to the lower end surface of the pile 3 or the intermediate pile 4 by welding or the like.

本発明を適用した杭の継手構造1は、第1実施形態〜第4実施形態の何れにおいても、図24、図25に示すように、下部フランジ12及び上部フランジ13の何れか一方又は両方について、挿入部21が設けられたフランジ部材20が用いられてもよい。フランジ部材20は、図24に示すように、軸芯方向Xに所定の長さを有する挿入部21が杭の内周面に沿うように延びて設けられる。フランジ部材20は、図25に示すように、挿入部21が杭の内側に挿入されて溶接等で取り付けられて、下部杭2本体、上部杭3本体及び中間杭4本体に固定される。   In any of the first to fourth embodiments, the pile joint structure 1 to which the present invention is applied is shown in FIG. 24 and FIG. 25 with respect to any one or both of the lower flange 12 and the upper flange 13. The flange member 20 provided with the insertion portion 21 may be used. As shown in FIG. 24, the flange member 20 is provided with an insertion portion 21 having a predetermined length in the axial direction X extending along the inner peripheral surface of the pile. As shown in FIG. 25, the flange member 20 is fixed to the lower pile 2 main body, the upper pile 3 main body, and the intermediate pile 4 main body by inserting the insertion portion 21 inside the pile and attaching it by welding or the like.

本発明を適用した杭の継手構造1は、第1実施形態〜第4実施形態の何れにおいても、下部フランジ12及び上部フランジ13の何れか一方又は両方に、フランジ部材20が用いられることで、フランジ部材20を後付けするときに挿入部21がガイドとして機能して、フランジ部材20の位置決めを容易にすることができる。これにより、本発明を適用した杭の継手構造1は、螺旋状に傾斜した下部フランジ12及び上部フランジ13であっても、フランジ部材20の位置決めを容易にして、溶接等の取付作業を確実に実施することができ、迅速かつ確実にフランジ部材20を後付けすることが可能となる。   In any of the first to fourth embodiments, the pile joint structure 1 to which the present invention is applied is that the flange member 20 is used for either one or both of the lower flange 12 and the upper flange 13. When the flange member 20 is retrofitted, the insertion portion 21 functions as a guide, and positioning of the flange member 20 can be facilitated. As a result, the pile joint structure 1 to which the present invention is applied can facilitate positioning of the flange member 20 and ensure attachment work such as welding, even when the lower flange 12 and the upper flange 13 are spirally inclined. The flange member 20 can be retrofitted quickly and reliably.

本発明を適用した杭の継手構造1は、第1実施形態〜第4実施形態の何れにおいても、下部フランジ12及び上部フランジ13の何れか一方又は両方に、フランジ部材20が用いられることで、杭の内周面に沿って挿入部21が設けられるものとなる。これにより、本発明を適用した杭の継手構造1は、図13に示す圧縮力p、引張力q及びせん断力tの一部を杭本体が負担する場合であっても、杭本体が変形、破損しないように、フランジ部材20の挿入部21で杭本体を部分的に補強することが可能となる。   In any of the first to fourth embodiments, the pile joint structure 1 to which the present invention is applied is that the flange member 20 is used for either one or both of the lower flange 12 and the upper flange 13. The insertion portion 21 is provided along the inner peripheral surface of the pile. Thereby, the pile joint structure 1 to which the present invention is applied is a case where the pile main body is deformed even when the pile main body bears a part of the compressive force p, tensile force q and shearing force t shown in FIG. The pile main body can be partially reinforced with the insertion portion 21 of the flange member 20 so as not to be damaged.

次に、本発明を適用した杭の立設方法について説明する。本発明を適用した杭の立設方法は、本発明を適用した杭の継手構造1が用いられて実施されるものである。   Next, a method for erecting a pile to which the present invention is applied will be described. The pile standing method to which the present invention is applied is carried out using the pile joint structure 1 to which the present invention is applied.

本発明を適用した杭の立設方法は、図26に示すように、下部杭2と上部杭3及び中間杭4の何れか一方又は両方とを軸芯方向Xに連接して、下部杭2が所定の深さに到達するまで地盤中に打ち込まれることによって、軸芯方向Xに連接された杭が地盤中に立設されるものとなる。   As shown in FIG. 26, the pile standing method to which the present invention is applied connects the lower pile 2, any one or both of the upper pile 3 and the intermediate pile 4 in the axial direction X, and lower pile 2. Is driven into the ground until it reaches a predetermined depth, whereby the pile connected in the axial direction X is erected in the ground.

本発明を適用した杭の立設方法は、下部杭2と上部杭3及び中間杭4の何れか一方又は両方とを一体に地盤中に回転圧入する圧入工程を備える。また、本発明を適用した杭の立設方法は、図27に示すように、圧入工程の後で、必要に応じて、地盤中に一体に回転圧入された下部杭2と上部杭3及び中間杭4の何れか一方又は両方との内側から一括して土砂を排出する排土工程を備えるものとすることができる。さらに、本発明を適用した杭の立設方法は、図28に示すように、圧入工程の後で、必要に応じて、地盤中に一体に回転圧入された下部杭2と上部杭3及び中間杭4の何れか一方又は両方との内側に一括して経時硬化性材料22を注入して杭を補強する補強工程を備えるものとすることができる。   The pile erection method to which the present invention is applied includes a press-fitting step of rotationally press-fitting the lower pile 2, the upper pile 3 and the intermediate pile 4 or both into the ground. In addition, as shown in FIG. 27, the pile erection method to which the present invention is applied is, as shown in FIG. It can be provided with a soil removal step for discharging the earth and sand collectively from the inside of either one or both of the piles 4. Furthermore, as shown in FIG. 28, the pile erection method to which the present invention is applied is, as shown in FIG. A reinforcing step of reinforcing the pile by injecting the time-curable material 22 into one or both of the piles 4 at once can be provided.

圧入工程では、下部フランジ12の図7に示す上面12aと、上部フランジ13の図9に示す下面13bとを面当接させて、下部フランジ12と上部フランジ13とをボルト接合等により相互に接合させた状態で、図26(a)に示すように、上部杭3又は中間杭4に回転力rが付与される。これにより、圧入工程では、図26(b)に示すように、下部杭2、上部杭3及び中間杭4が一体に地盤中に回転圧入されて立設されるものとなる。   In the press-fitting step, the upper surface 12a of the lower flange 12 shown in FIG. 7 and the lower surface 13b of the upper flange 13 shown in FIG. 9 are brought into surface contact, and the lower flange 12 and the upper flange 13 are joined to each other by bolting or the like. In this state, a rotational force r is applied to the upper pile 3 or the intermediate pile 4 as shown in FIG. Thereby, in a press-fit process, as shown in FIG.26 (b), the lower pile 2, the upper pile 3, and the intermediate | middle pile 4 are rotationally press-fitted in the ground integrally, and are erected.

排土工程では、図27(a)に示すように、下部杭2、上部杭3及び中間杭4が一体に地盤中に回転圧入された状態で、下部杭2、上部杭3及び中間杭4の内側から、ハンマグラブ19等によって土砂が排出される。これにより、排土工程では、図27(b)に示すように、下部杭2、上部杭3及び中間杭4の内側から一括して土砂が排出されるものとなる。   In the earth removal process, as shown in FIG. 27 (a), the lower pile 2, the upper pile 3 and the intermediate pile 4 are rotated and press-fitted into the ground as a whole. The earth and sand are discharged from the inside by the hammaglab 19 or the like. Thereby, in a soil removal process, as shown in FIG.27 (b), earth and sand will be discharged | emitted collectively from the lower pile 2, the upper pile 3, and the intermediate | middle pile 4 inside.

補強工程では、図28(a)に示すように、下部杭2、上部杭3及び中間杭4が一体に地盤中に回転圧入された状態で、排土工程を経て略中空状となった下部杭2、上部杭3及び中間杭4の内側に、コンクリート等の経時硬化性材料22が注入される。補強工程では、これに限らず、排土工程を経ることなく、圧入工程で杭の内側に残留した土砂を利用して経時硬化性材料22を硬化させてもよい。これにより、補強工程では、図28(b)に示すように、下部杭2、上部杭3及び中間杭4の内側に一括して経時硬化性材料22が注入、充填されて、この経時硬化性材料22が硬化することで、下部杭2、上部杭3及び中間杭4が一体に補強されるものとなる。   In the reinforcing process, as shown in FIG. 28 (a), the lower pile 2, the upper pile 3 and the intermediate pile 4 are integrally hollowed into the ground, and the lower part is substantially hollow after the earth removal process. A time curable material 22 such as concrete is injected into the inside of the pile 2, the upper pile 3 and the intermediate pile 4. In the reinforcement step, the time-curable material 22 may be cured by using the earth and sand remaining inside the pile in the press-fitting step without passing through the soil removal step. As a result, in the reinforcing step, as shown in FIG. 28 (b), the time-curable material 22 is injected and filled all together inside the lower pile 2, the upper pile 3, and the intermediate pile 4, and this time-curable property is increased. As the material 22 hardens, the lower pile 2, the upper pile 3, and the intermediate pile 4 are integrally reinforced.

本発明を適用した杭の立設方法は、図26に示すように、下部フランジ12と上部フランジ13とが相互に接合された状態で螺旋状に形成されるため、下部杭2、上部杭3及び中間杭4を一体とした杭の継手構造1の回転圧入抵抗を小さくすることができる。これにより、本発明を適用した杭の立設方法は、圧入工程で下部杭2及び上部杭3の打ち込みに要する回転力rの増大を抑制しながら、複数の杭を連接させて一括して回転圧入させることができ、杭の回転圧入作業と接合作業とを交互に繰り返す手間を低減させることが可能となる。   As shown in FIG. 26, the pile standing method to which the present invention is applied is formed in a spiral shape with the lower flange 12 and the upper flange 13 joined together. And the rotation press-fit resistance of the joint structure 1 of the pile which integrated the intermediate pile 4 can be made small. As a result, the pile erection method to which the present invention is applied is configured to rotate a plurality of piles together while suppressing an increase in the rotational force r required for driving the lower pile 2 and the upper pile 3 in the press-fitting process. It is possible to press-fit, and it is possible to reduce the trouble of repeating the rotary press-fitting work and the joining work of the pile alternately.

本発明を適用した杭の立設方法は、図27に示すように、排土工程で下部杭2、上部杭3及び中間杭4を連接させてこれらの内側から一括して土砂を排出することができるため、土砂の排出作業と杭の接合作業とを交互に繰り返す手間を低減させることが可能となる。また、本発明を適用した杭の立設方法は、図28に示すように、補強工程で下部杭2、上部杭3及び中間杭4を連接させてこれらの内側に一括して経時硬化性材料22を注入することができるため、経時硬化性材料22の注入作業と杭の接合作業とを交互に繰り返す手間を低減させることが可能となる。   As shown in FIG. 27, the pile erection method to which the present invention is applied is that the lower pile 2, the upper pile 3 and the intermediate pile 4 are connected in the soil removal process, and the earth and sand are discharged collectively from the inside. Therefore, it is possible to reduce the trouble of repeating the earth and sand discharging work and the pile joining work alternately. In addition, as shown in FIG. 28, the pile erection method to which the present invention is applied is such that the lower pile 2, the upper pile 3 and the intermediate pile 4 are connected in the reinforcement step and collectively aged over time inside these materials. Since 22 can be injected, it is possible to reduce the trouble of alternately repeating the injection work of the time-curable material 22 and the joining work of the piles.

本発明を適用した杭の継手構造1は、図26に示すように、下部杭2、上部杭3及び中間杭4の外周面から外側に延びるように下部フランジ12及び上部フランジ13が形成されるため、杭本体や継手部分の内径が小さくなることを回避することができる。これにより、本発明を適用した杭の継手構造1は、杭本体や継手部分の内径を大きくすることで、本発明を適用した杭の立設方法の圧入工程において、下部杭2、上部杭3及び中間杭4の内側での土砂の移動を円滑にして、杭の回転圧入作業を容易に実施することが可能となる。   In the pile joint structure 1 to which the present invention is applied, the lower flange 12 and the upper flange 13 are formed so as to extend outward from the outer peripheral surfaces of the lower pile 2, the upper pile 3, and the intermediate pile 4, as shown in FIG. Therefore, it can avoid that the internal diameter of a pile main body or a joint part becomes small. As a result, the pile joint structure 1 to which the present invention is applied increases the inner diameter of the pile main body and the joint portion, so that in the press-fitting process of the pile standing method to which the present invention is applied, the lower pile 2 and the upper pile 3 And the movement of the earth and sand inside the intermediate pile 4 can be made smooth, and the rotary press-fitting work of the pile can be easily performed.

本発明を適用した杭の継手構造1は、図27に示すように、杭本体や継手部分の内径を大きくすることで、本発明を適用した杭の立設方法の排土工程において、下部杭2、上部杭3及び中間杭4の内側に外径の大きいハンマグラブ19を用いることができ、土砂の排出作業を効率的に実施することが可能となる。本発明を適用した杭の継手構造1は、図28に示すように、杭本体や継手部分の内径を大きくすることで、本発明を適用した杭の立設方法の補強工程において、下部杭2、上部杭3及び中間杭4の内側での経時硬化性材料22の継手部分の通過を円滑にして、経時硬化性材料22の充填作業を容易に実施することが可能となる。   As shown in FIG. 27, the pile joint structure 1 to which the present invention is applied is a lower pile in the soil removal process of the pile standing method to which the present invention is applied by increasing the inner diameter of the pile body and the joint portion. 2. The hammaglab 19 having a large outer diameter can be used on the inner side of the upper pile 3 and the intermediate pile 4, so that the earth and sand can be discharged efficiently. As shown in FIG. 28, the pile joint structure 1 to which the present invention is applied is configured to increase the inner diameter of the pile main body and the joint portion, thereby lowering the lower pile 2 in the reinforcing step of the pile standing method to which the present invention is applied. In addition, the passage of the joint portion of the time-curable material 22 inside the upper pile 3 and the intermediate pile 4 is facilitated, and the filling operation of the time-curable material 22 can be easily performed.

なお、本発明を適用した杭の継手構造1は、図25に示すように、下部フランジ12及び上部フランジ13の何れか一方又は両方にフランジ部材20が用いられることで、杭の内周面に沿ってフランジ部材20の挿入部21が設けられるものとなる。これにより、本発明を適用した杭の継手構造1は、杭の内周面からある程度の高さでフランジ部材20の挿入部21が突出するものとなり、下部杭2、上部杭3及び中間杭4の内側において、硬化した経時硬化性材料22の付着性能を向上させることが可能となる。   In addition, the pile joint structure 1 to which the present invention is applied, as shown in FIG. 25, the flange member 20 is used for either one or both of the lower flange 12 and the upper flange 13, so that the inner peripheral surface of the pile is used. The insertion part 21 of the flange member 20 is provided along. Thereby, the pile joint structure 1 to which the present invention is applied is such that the insertion portion 21 of the flange member 20 protrudes at a certain height from the inner peripheral surface of the pile, and the lower pile 2, the upper pile 3, and the intermediate pile 4 It is possible to improve the adhesion performance of the cured time-curable material 22 on the inside.

以上、本発明の実施形態の例について詳細に説明したが、上述した実施形態は、何れも本発明を実施するにあたっての具体化の例を示したものに過ぎず、これらによって本発明の技術的範囲が限定的に解釈されてはならないものである。   As mentioned above, although the example of embodiment of this invention was demonstrated in detail, all the embodiment mentioned above showed only the example of actualization in implementing this invention, and these are the technical aspects of this invention. The range should not be construed as limiting.

例えば、本発明を適用した杭の継手構造1は、螺旋状羽根11とともに、上方から下方に向けて左回転の螺旋状に形成された例について詳細に説明したが、これに限らず、螺旋状羽根11とともに、上方から下方に向けて右回転の螺旋状に形成されてもよい。本発明を適用した杭の継手構造1は、杭の円周方向に2〜3分割された先端翼を備える先端翼付回転貫入鋼管杭や、杭の円周方向に2分割された傾斜板の先端翼を備える閉端型の鋼管杭等に用いられてもよい。   For example, the pile joint structure 1 to which the present invention is applied has been described in detail with respect to an example in which the spiral blade 11 and the spiral blade 11 are formed in a left-turned spiral shape from the top to the bottom. Together with the blades 11, it may be formed in a spiral shape that rotates clockwise from above to below. The pile joint structure 1 to which the present invention is applied includes a rotary pierced steel pipe pile with a tip wing provided with a tip wing divided into two to three in the circumferential direction of the pile, and an inclined plate divided into two in the circumferential direction of the pile. You may use for a closed-end type steel pipe pile provided with a tip wing.

1 :杭の継手構造
2 :下部杭
2a :下端部(下部杭)
2b :上端部(下部杭)
2c :中間部(下部杭)
3 :上部杭
3a :下端部(上部杭)
3b :上端部(上部杭)
3c :中間部(上部杭)
4 :中間杭
4a :下端部(中間杭)
4b :上端部(中間杭)
4c :中間部(中間杭)
11 :螺旋状羽根
11a :上面(螺旋状羽根)
11b :下面(螺旋状羽根)
11c :始端部(螺旋状羽根)
11d :終端部(螺旋状羽根)
12 :下部フランジ
12a :上面(下部フランジ)
12b :下面(下部フランジ)
12c :始端部(下部フランジ)
12d :終端部(下部フランジ)
12e :ボルト孔(下部フランジ)
12f :側面(下部フランジ)
121 :第1下部フランジ
121a :上面(第1下部フランジ)
122 :第2下部フランジ
122a :上面(第2下部フランジ)
13 :上部フランジ
13a :上面(上部フランジ)
13b :下面(上部フランジ)
13c :始端部(上部フランジ)
13d :終端部(上部フランジ)
13e :ボルト孔(上部フランジ)
13f :側面(上部フランジ)
131 :第1上部フランジ
131b :下面(第1上部フランジ)
132 :第2上部フランジ
132b :下面(第1上部フランジ)
14 :下部係止部
15 :上部係止部
16 :ボルト
17a :凸部
17b :凹部
18 :溝部
18a :下部溝
18b :上部溝
18c :キー部材
19 :ハンマグラブ
20 :フランジ部材
21 :挿入部
22 :経時硬化性材料
P1 :螺旋ピッチ(螺旋状羽根)
P2 :螺旋ピッチ(下部フランジ)
P3 :螺旋ピッチ(上部フランジ)
P4 :螺旋ピッチ(杭の継手構造)
T1 :板厚(螺旋状羽根)
T2 :板厚(下部フランジ)
T3 :板厚(上部フランジ)
X :軸芯方向
Y :軸芯直交方向
Z :周方向
p :圧縮力
q :引張力
r :回転力
t :せん断力
b :曲げ力
1: Pile joint structure 2: Lower pile 2a: Lower end (lower pile)
2b: Upper end (lower pile)
2c: Middle part (lower pile)
3: Upper pile 3a: Lower end (upper pile)
3b: Upper end (upper pile)
3c: Middle part (upper pile)
4: Intermediate pile 4a: Lower end (intermediate pile)
4b: Upper end (intermediate pile)
4c: Intermediate part (intermediate pile)
11: Spiral blade 11a: Upper surface (spiral blade)
11b: Lower surface (spiral blade)
11c: Start end (spiral blade)
11d: Terminal part (spiral blade)
12: Lower flange 12a: Upper surface (lower flange)
12b: bottom surface (lower flange)
12c: Start end (lower flange)
12d: Terminal part (lower flange)
12e: Bolt hole (lower flange)
12f: Side surface (lower flange)
121: First lower flange 121a: Upper surface (first lower flange)
122: Second lower flange 122a: Upper surface (second lower flange)
13: Upper flange 13a: Upper surface (upper flange)
13b: bottom surface (upper flange)
13c: Start end (upper flange)
13d: Terminal part (upper flange)
13e: Bolt hole (upper flange)
13f: Side surface (upper flange)
131: First upper flange 131b: Lower surface (first upper flange)
132: Second upper flange 132b: Lower surface (first upper flange)
14: Lower locking portion 15: Upper locking portion 16: Bolt 17a: Convex portion 17b: Recessed portion 18: Groove portion 18a: Lower groove 18b: Upper groove 18c: Key member 19: Hammaglab 20: Flange member 21: Insertion portion 22: Temporarily curable material P1: Spiral pitch (spiral blade)
P2: Spiral pitch (lower flange)
P3: Spiral pitch (upper flange)
P4: Spiral pitch (pile joint structure)
T1: Thickness (spiral blade)
T2: Plate thickness (lower flange)
T3: Plate thickness (upper flange)
X: axial direction Y: axial orthogonal direction Z: circumferential direction p: compression force q: tensile force r: rotational force t: shear force b: bending force

Claims (8)

下端部及び中間部の何れか一方又は両方に螺旋状羽根が設けられた杭に他の杭を連接するための杭の継手構造であって、
下部杭又は中間杭の上端部で外周面から外側に延びるように形成された下部フランジと、上部杭又は中間杭の下端部で外周面から外側に延びるように形成された上部フランジとを備え、
前記下部フランジ及び前記上部フランジは、螺旋状に形成され、前記下部フランジの上面と前記上部フランジの下面とを面当接させた状態で、相互に接合され、
前記下部フランジの軸心直交方向の幅及び前記上部フランジの軸心直交方向の幅は、前記螺旋状羽根の軸心直交方向の幅よりも小さく形成され
前記下部フランジ及び前記上部フランジは、相互に接合された状態で、杭の回転圧入による回転力と、軸芯方向に作用する圧縮力及び引張力の何れか一方又は両方とを、下部杭の上端及び上部杭の下端における螺旋状羽根の終端部から軸芯方向に所定の長さを有する杭の端面である下部係止部及び上部係止部から、杭本体に伝達することができるように、互いに湾曲した前記下部係止部と前記上部係止部とが相互に係合して食い込むように係止されること
を特徴とする杭の継手構造。
A pile joint structure for connecting another pile to a pile provided with a spiral blade at either one or both of the lower end portion and the intermediate portion,
A lower flange formed to extend outward from the outer peripheral surface at the upper end of the lower pile or intermediate pile, and an upper flange formed to extend outward from the outer peripheral surface at the lower end of the upper pile or intermediate pile,
The lower flange and the upper flange are formed in a spiral shape, and are joined to each other with the upper surface of the lower flange and the lower surface of the upper flange in surface contact with each other,
The width in the direction perpendicular to the axis of the lower flange and the width in the direction perpendicular to the axis of the upper flange are formed smaller than the width in the direction perpendicular to the axis of the spiral blade ,
The lower flange and the upper flange are connected to each other, and the rotational force due to the rotary press-fitting of the pile and the compression force and / or the tensile force acting in the axial direction are applied to the upper end of the lower pile. And from the lower locking part and the upper locking part which are the end faces of the pile having a predetermined length in the axial direction from the terminal end of the spiral blade at the lower end of the upper pile, so that it can be transmitted to the pile body, joint structure of piles which the lower locking portion which is curved to each other and said upper anchor portion is characterized Rukoto engaged to bite engaged with each other.
前記下部フランジ及び前記上部フランジは、各々の周方向の一部が切り欠かれ、前記下部杭に設けられた螺旋状羽根の螺旋ピッチと略同一の螺旋ピッチで、螺旋状に形成されること
を特徴とする請求項1記載の杭の継手構造。
The lower flange and the upper flange are partly cut out in the circumferential direction, and are formed in a spiral shape with a spiral pitch substantially the same as the spiral pitch of the spiral blade provided in the lower pile. The pile joint structure according to claim 1, wherein
前記下部フランジ及び前記上部フランジは、各々にボルト孔が形成され、前記下部フランジの上面と前記上部フランジの下面とを面当接させた状態で、ボルト接合されること を特徴とする請求項1又は2記載の杭の継手構造。   The lower flange and the upper flange are each formed with a bolt hole, and are bolt-bonded in a state where the upper surface of the lower flange and the lower surface of the upper flange are in surface contact with each other. Or the joint structure of the pile of 2 description. 前記下部フランジ及び前記上部フランジは、前記下部フランジの上面及び前記上部フランジの下面の何れか一方又は両方に、上下方向に突出させて形成された凸部と、前記下部フランジの上面と前記上部フランジの下面とを面当接させた状態で、前記凸部が挿入される凹部とを有すること
を特徴とする請求項1〜3の何れか1項記載の杭の継手構造。
The lower flange and the upper flange are formed by projecting in a vertical direction on one or both of the upper surface of the lower flange and the lower surface of the upper flange, the upper surface of the lower flange, and the upper flange The pile joint structure according to any one of claims 1 to 3, further comprising: a concave portion into which the convex portion is inserted in a state where the lower surface of the pile is in surface contact.
前記下部フランジ及び前記上部フランジは、上面側の端面が切り欠かれた下部溝が前記下部フランジの側面に形成されるとともに、下面側の端面が切り欠かれた上部溝が前記上部フランジの側面に形成され、前記下部フランジの上面と前記上部フランジの下面とを面当接させた状態で、前記下部溝と前記上部溝とにキー部材が架設されること
を特徴とする請求項1〜4の何れか1項記載の杭の継手構造。
In the lower flange and the upper flange, a lower groove in which an end surface on the upper surface side is notched is formed on a side surface of the lower flange, and an upper groove in which an end surface on the lower surface side is notched is formed on a side surface of the upper flange. The key member is constructed in the lower groove and the upper groove in a state where the upper surface of the lower flange and the lower surface of the upper flange are in surface contact with each other. The pile joint structure according to any one of the preceding claims.
下端部及び中間部の何れか一方又は両方に螺旋状羽根が設けられた杭に他の杭を連接して地盤中に立設する杭の立設方法であって、
下部杭又は中間杭の上端部で外周面から外側に延びて螺旋状に形成されるとともに軸心直交方向の幅が前記螺旋状羽根の軸心直交方向の幅よりも小さく形成された下部フランジと、上部杭又は中間杭の下端部で外周面から外側に延びて螺旋状に形成されるとともに軸心直交方向の幅が前記螺旋状羽根の軸心直交方向の幅よりも小さく形成された上部フランジとを、前記下部フランジの上面と前記上部フランジの下面とを面当接させて相互に接合させた状態で、杭の回転圧入による回転力と、軸芯方向に作用する圧縮力及び引張力の何れか一方又は両方とを、下部杭の上端及び上部杭の下端における螺旋状羽根の終端部から軸芯方向に所定の長さを有する杭の端面である下部係止部及び上部係止部から、杭本体に伝達することができるように、互いに湾曲した前記下部係止部と前記上部係止部とが相互に係合して食い込むように係止させ、下部杭と上部杭及び中間杭の何れか一方又は両方とを一体に地盤中に回転圧入する圧入工程を備えること
を特徴とする杭の立設方法。
It is a standing method of a pile in which other piles are connected to a pile provided with spiral blades at either one or both of the lower end part and the intermediate part, and standing in the ground,
A lower flange that extends outwardly from the outer peripheral surface at the upper end of the lower pile or the intermediate pile and is formed in a spiral shape and has a width in the direction perpendicular to the axial center smaller than the width in the direction perpendicular to the axial center of the spiral blade; The upper flange is formed in a spiral shape extending outward from the outer peripheral surface at the lower end of the upper pile or the intermediate pile, and the width in the direction perpendicular to the axis is smaller than the width in the direction perpendicular to the axis of the spiral blade In a state where the upper surface of the lower flange and the lower surface of the upper flange are brought into surface contact with each other, the rotational force due to the rotary press-fitting of the pile, and the compressive force and tensile force acting in the axial direction. Either one or both from the lower locking portion and the upper locking portion, which are end surfaces of the pile having a predetermined length in the axial direction from the terminal end of the spiral blade at the upper end of the lower pile and the lower end of the upper pile , So that it can be transmitted to the pile body There curved with the lower locking portion and the upper locking portion is engaged as bite engage mutually, ground in either one or both of the lower pile and the upper pile and intermediate pile together A method for erecting a pile characterized by comprising a press-fitting step of rotary press-fitting into the pile.
前記圧入工程の後で、さらに、地盤中に一体に回転圧入された下部杭と上部杭及び中間杭の何れか一方又は両方との内側から土砂を排出する排土工程を備えること
を特徴とする請求項記載の杭の立設方法。
After the press-fitting step, it further comprises a soil discharging step of discharging earth and sand from the inside of any one or both of the lower pile, the upper pile and the intermediate pile that are rotationally press-fitted into the ground. The method for erecting a pile according to claim 6 .
前記圧入工程の後で、さらに、地盤中に一体に回転圧入された下部杭と上部杭及び中間杭の何れか一方又は両方との内側に一括して経時硬化性材料を注入して杭を補強する補強工程を備えること
を特徴とする請求項又は記載の杭の立設方法。
After the press-fitting step, the time-hardening material is injected into the inner side of one or both of the lower pile, the upper pile, and the intermediate pile that are integrally rotationally press-fitted into the ground to reinforce the pile. A method for erecting a pile according to claim 6 or 7, further comprising a reinforcing step.
JP2013208378A 2012-11-21 2013-10-03 Pile joint structure and pile standing method Expired - Fee Related JP6237078B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013208378A JP6237078B2 (en) 2012-11-21 2013-10-03 Pile joint structure and pile standing method

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2012255298 2012-11-21
JP2012255298 2012-11-21
JP2013208378A JP6237078B2 (en) 2012-11-21 2013-10-03 Pile joint structure and pile standing method

Publications (2)

Publication Number Publication Date
JP2014122541A JP2014122541A (en) 2014-07-03
JP6237078B2 true JP6237078B2 (en) 2017-11-29

Family

ID=51403232

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013208378A Expired - Fee Related JP6237078B2 (en) 2012-11-21 2013-10-03 Pile joint structure and pile standing method

Country Status (1)

Country Link
JP (1) JP6237078B2 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6707221B2 (en) * 2016-06-03 2020-06-10 日之出水道機器株式会社 Spiral pile components
KR102164316B1 (en) * 2017-07-20 2020-10-12 신왕수 micro-pile boring casings pipe for one shot grouting
JP6644452B1 (en) * 2019-02-27 2020-02-12 株式会社シグマベース A connecting member for a different diameter steel pipe pile and a steel pipe pile using the same.
KR102090305B1 (en) * 2019-10-04 2020-03-17 이정섭 Big helical pile with easy grouting construction and construction method using the same
EP4101986A4 (en) * 2020-02-07 2023-07-26 JFE Steel Corporation Steel pipe pile

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH072677Y2 (en) * 1987-12-17 1995-01-25 吉田 耕之 Multi-blade steel pipe pile
JP2004316421A (en) * 1999-10-20 2004-11-11 Nippon Steel Corp Rotary press-in steel pipe pile
JP4511015B2 (en) * 2000-11-24 2010-07-28 大和ハウス工業株式会社 Joint structure of upper and lower piles
JP2003049425A (en) * 2001-08-07 2003-02-21 Asahi Kasei Corp Soil cement composite pile
JP3835229B2 (en) * 2001-09-28 2006-10-18 Jfeスチール株式会社 Steel pipe connection structure
JP2003160931A (en) * 2001-11-27 2003-06-06 Geotop Corp Connection structure and connection method of steel pipe pile
JP4496553B2 (en) * 2003-02-17 2010-07-07 三谷セキサン株式会社 Construction method of foundation pile and ready-made pile
JP2005133289A (en) * 2003-04-14 2005-05-26 Hiromi Kuwahata Pile hole excavating apparatus
JP4273991B2 (en) * 2004-02-17 2009-06-03 東京電力株式会社 Construction method of composite pile foundation
JP2006207117A (en) * 2005-01-25 2006-08-10 Orimoto Takumi Kozo Sekkei Kenkyusho:Kk Steel pipe pile joint structure
US7731454B1 (en) * 2007-10-02 2010-06-08 Heli-Crete “Eco-Friendly” Piling Systems, Llc Method for placing reinforced concrete piling without utilizing a pile driver or an auger
JP2010236344A (en) * 2009-03-30 2010-10-21 Kurinaa Korea Co Ltd Center axis correction device for facility strut fixing device
JP2011069072A (en) * 2009-09-24 2011-04-07 Ohbayashi Corp Structure and method for coupling steel pipes for steel pipe pile
JP2013112953A (en) * 2011-11-28 2013-06-10 Jfe Steel Corp Steel pipe pile connection structure

Also Published As

Publication number Publication date
JP2014122541A (en) 2014-07-03

Similar Documents

Publication Publication Date Title
JP6237078B2 (en) Pile joint structure and pile standing method
US11525232B2 (en) Modular foundation support systems and methods including shafts with interlocking torque transmitting couplings
EP2672012B1 (en) A mono-pile type foundation structure for connecting steel pipe pile and steel sleeve pipe
CA2985783C (en) Interlocking, self-aligning and torque transmitting coupler assembly, systems and methods for connecting, installing, and supporting foundation elements
US8079781B2 (en) Push pier assembly with hardened coupling sections
EP2756142B1 (en) Coupling assembly and method for coupling reinforcing bars
KR20140001554A (en) Steel pipe joint structures of rotary pile and pile construction method using the same
CN103649417A (en) Composite steel sheet pile, underground continuous wall, and reuse method of composite steel sheet pile
KR20100125162A (en) Prefab apparatus for reinforcing head of pile
KR101904491B1 (en) Seismic reinforcing method for column with structure lifting and ground reinforcement to improve aseismicity
JP4386804B2 (en) Seismic reinforcement structure for existing steel towers
US20220106758A1 (en) Coupler for helical pile and tieback support systems
JP2011032637A (en) Joint structure and joint method for steel pipe pole
JP5008532B2 (en) Pile head rebar fittings
JP5420392B2 (en) Pile head structure of steel pipe concrete pile
KR101444225B1 (en) Micropile
EP4310258A1 (en) Foundation support systems, assemblies and methods including sleeve coupler and shafts with torque transmitting profiled distal end edges
KR101644449B1 (en) Phc pile using joint plate and connecting fin
CN212835361U (en) Pile body corner protector and prefabricated building structure
CN212452613U (en) Pile body corner protector and prefabricated building structure
JP5730597B2 (en) Spacer
JP2013174119A (en) Shape steel pile and construction method for the same
JP3958153B2 (en) Support structure and method for widening tunnel
JP7360661B1 (en) boundary stake
JP4854607B2 (en) Segment joint structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20160603

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20170407

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20170418

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20170606

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20170627

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20170801

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20171003

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20171016

R151 Written notification of patent or utility model registration

Ref document number: 6237078

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees