Elevator earthquake training operation system Download PDF

Info

Publication number
JP6244283B2
JP6244283B2 JP2014194074A JP2014194074A JP6244283B2 JP 6244283 B2 JP6244283 B2 JP 6244283B2 JP 2014194074 A JP2014194074 A JP 2014194074A JP 2014194074 A JP2014194074 A JP 2014194074A JP 6244283 B2 JP6244283 B2 JP 6244283B2
Authority
JP
Japan
Prior art keywords
elevator
training
earthquake
schedule
control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2014194074A
Other languages
Japanese (ja)
Other versions
JP2016064883A (en
Inventor
小池 幸裕
幸裕 小池
酒井 亮一
亮一 酒井
政和 金
政和 金
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Building Systems Co Ltd
Original Assignee
Hitachi Building Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Building Systems Co Ltd filed Critical Hitachi Building Systems Co Ltd
Priority to JP2014194074A priority Critical patent/JP6244283B2/en
Publication of JP2016064883A publication Critical patent/JP2016064883A/en
Application granted granted Critical
Publication of JP6244283B2 publication Critical patent/JP6244283B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Indicating And Signalling Devices For Elevators (AREA)
  • Maintenance And Inspection Apparatuses For Elevators (AREA)

Description

本発明は、地震発生時を想定した訓練用のエレベータの運転を行うエレベータの地震訓練運転システムに関する。   The present invention relates to an earthquake training operation system for an elevator that operates an elevator for training assuming an earthquake.

一般に、建物の利用者に対して行われる地震等の災害や火事を模擬した訓練においては、利用者はエレベータを利用せずに階段を利用して避難する。一方、エレベータを利用している間に地震が発生したことを想定する訓練を実施するためには、エレベータに接続された地震計を動作させてエレベータの運転を行う必要があった。   In general, in a training that simulates a disaster or fire such as an earthquake that is performed for a user of a building, the user evacuates using a staircase without using an elevator. On the other hand, in order to carry out training assuming that an earthquake occurred while using an elevator, it was necessary to operate the elevator by operating a seismometer connected to the elevator.

そこで、このような状況を考慮して訓練を実施する従来技術の1つとして、エレベータの運転制御を行うエレベータ運転制御装置と、乗場に設置され、乗りかご呼び登録を検出する乗場呼び検出装置と、乗りかご内に設置され、利用者の呼び登録を検出する乗りかご呼び検出装置と、エレベータ運転制御装置に接続され、擬似的な火災検出信号を発生する模擬火災検出信号発生装置とを備えたエレベータ救助運転訓練システムが提案されている(例えば、特許文献1参照)。   Therefore, as one of the prior arts for performing training in consideration of such a situation, an elevator operation control device that performs elevator operation control, and a hall call detection device that is installed at the landing and detects a car call registration, A car call detection device that is installed in the car and detects call registration of the user, and a simulated fire detection signal generator that is connected to the elevator operation control device and generates a pseudo fire detection signal. An elevator rescue driving training system has been proposed (see, for example, Patent Document 1).

特開2012−162359号公報JP 2012-162359 A

しかし、従来技術のエレベータ救助運転訓練システムが開示された特許文献1には、火災のみならず、地震等の災害による非常事態に適用可能である旨が記載されているが、通常、消防士がエレベータに対して救助運転における操作を行うので、エレベータに関する専門的な知識の習得が必要となる。また、救助運転が完了しなければ、エレベータの運転が通常運転に復帰されないので、万一、訓練の途中で救助運転の操作が分からなくなった場合に、当該操作に関してエレベータの保守会社に問い合わせる等の手間がかかる。従って、従来技術のエレベータ救助運転訓練システムは、地震発生時を想定した1回の体験や訓練に対して長時間を要することが問題になっている。   However, Patent Document 1 that discloses an elevator rescue driving training system of the prior art describes that it can be applied not only to a fire but also to an emergency situation due to a disaster such as an earthquake. Since the elevator is operated in the rescue operation, it is necessary to acquire specialized knowledge about the elevator. In addition, if the rescue operation is not completed, the elevator operation will not return to the normal operation, so in the unlikely event that the rescue operation is unknown during the training, the elevator maintenance company will be inquired regarding the operation. It takes time and effort. Therefore, the elevator rescue driving training system of the prior art has a problem that it takes a long time for one experience and training assuming the occurrence of an earthquake.

本発明は、このような従来技術の実情からなされたもので、その目的は、専門的な知識を必要とせず、地震発生時を想定した訓練を容易に実施することができるエレベータの地震訓練運転システムを提供することにある。   The present invention has been made based on such a state of the art, and the purpose thereof is an earthquake training operation of an elevator that does not require specialized knowledge and can easily carry out training assuming the occurrence of an earthquake. To provide a system.

上記の目的を達成するために、本発明のエレベータの地震訓練運転システムは、地震発生時を想定した訓練用のエレベータの運転を行うエレベータの地震訓練運転システムにおいて、前記訓練用の前記エレベータの運転が実行されるスケジュールを設定するスケジュール設定部と、前記スケジュール設定部によって設定された前記スケジュールに従って、前記エレベータの運転を通常運転から前記訓練用の地震管制運転に切替える制御を行う制御装置と、を備え、前記スケジュールは、所定の日付及び時刻以降に前記訓練用の前記エレベータの運転を実行させる予定日時情報と、前記訓練用の前記エレベータの運転を即時に実行させる即時実行情報と、を含み、前記スケジュール設定部は、通信回線を介して接続され、前記スケジュールの入力を行う機能を有する端末装置に含まれることを特徴としている。 To achieve the above object, an elevator earthquake training operation system according to the present invention is an elevator earthquake training operation system that operates an elevator for training assuming an earthquake occurrence. and scheduling unit to schedule but executed, therefore the schedule set by the schedule setting unit, and a control unit that performs control of switching the operation of the elevator from the normal operation to the seismic control oPERATION for the training The schedule includes : scheduled date and time information for executing the operation of the elevator for training after a predetermined date and time; and immediate execution information for immediately executing the operation of the elevator for training. The schedule setting unit is connected via a communication line, and the schedule input unit It is characterized in that included in the terminal device having a function of performing.

本発明のエレベータの地震訓練運転システムによれば、専門的な知識を必要とせず、地震発生時を想定した訓練を容易に実施することができる。前述した以外の課題、構成及び効果は、以下の実施形態の説明により明らかにされる。   According to the elevator earthquake training operation system of the present invention, it is possible to easily carry out the training assuming the occurrence of an earthquake without requiring specialized knowledge. Problems, configurations, and effects other than those described above will become apparent from the following description of embodiments.

本発明に係るエレベータの地震訓練運転システムの一実施形態の構成を示す機能ブロック図である。1 is a functional block diagram showing a configuration of an embodiment of an elevator earthquake training operation system according to the present invention. 本実施形態に係る顧客情報データベースに格納された顧客情報の構成を示す図である。It is a figure which shows the structure of the customer information stored in the customer information database which concerns on this embodiment. 本実施形態に係る訓練情報データベースに格納された訓練情報の構成を示す図である。It is a figure which shows the structure of the training information stored in the training information database which concerns on this embodiment. 本実施形態に係る顧客PC、監視センタ、監視端末、及びエレベータの各制御処理の流れを示すシーケンス図である。It is a sequence diagram which shows the flow of each control processing of customer PC, a monitoring center, a monitoring terminal, and an elevator concerning this embodiment.

以下、本発明に係るエレベータの地震訓練運転システムを実施するための形態を図に基づいて説明する。   EMBODIMENT OF THE INVENTION Hereinafter, the form for implementing the earthquake training operation system of the elevator which concerns on this invention is demonstrated based on figures.

図1は本発明に係るエレベータの地震訓練運転システムの一実施形態の構成を示す機能ブロック図である。   FIG. 1 is a functional block diagram showing a configuration of an embodiment of an elevator earthquake training operation system according to the present invention.

本発明に係るエレベータの地震訓練運転システムの一実施形態は、例えば図1に示すように、建物に設置されたエレベータ1と、このエレベータ1の異常を監視して通報を行う監視端末2と、この監視端末2とインターネット等の通信回線5を介して接続され、監視端末2から通報を受信してエレベータ1を遠隔的に監視する監視センタ3とを備えている。   One embodiment of an elevator earthquake training operation system according to the present invention includes, as shown in FIG. 1, for example, an elevator 1 installed in a building, and a monitoring terminal 2 that monitors and reports an abnormality of the elevator 1, A monitoring center 3 is connected to the monitoring terminal 2 via a communication line 5 such as the Internet, and receives a report from the monitoring terminal 2 and remotely monitors the elevator 1.

また、本実施形態に係るエレベータ1の地震訓練運転システムは、監視センタ3と通信回線5を介して接続され、エレベータ1の保守会社の顧客となる建物のオーナーが所有し、監視センタ3に対してエレベータ1の運転に関する各種の設定を行う端末装置としての顧客PC4を備えている。   Moreover, the earthquake training operation system of the elevator 1 according to the present embodiment is connected to the monitoring center 3 via the communication line 5 and is owned by the owner of the building that is a customer of the maintenance company of the elevator 1. The customer PC 4 is provided as a terminal device for performing various settings relating to the operation of the elevator 1.

そして、本実施形態に係るエレベータ1の地震訓練運転システムは、地震発生時を想定した訓練用のエレベータ1の運転を行うものである。なお、本実施形態では、図1に示すエレベータ1以外に複数のエレベータが通信回線5に接続されているが、これらの複数のエレベータの構成は図1のエレベータ1と同様であるので、重複する説明を省略する。   And the earthquake training driving | running system of the elevator 1 which concerns on this embodiment performs the driving | operation of the elevator 1 for training supposing the time of an earthquake occurrence. In the present embodiment, a plurality of elevators are connected to the communication line 5 in addition to the elevator 1 shown in FIG. 1, but the configuration of these elevators is the same as that of the elevator 1 in FIG. Description is omitted.

エレベータ1は、昇降路6内を昇降する乗りかご7と、一端が乗りかご7に取付けられた主ロープ8と、この主ロープ8の他端が取付けられ、昇降路6内に吊り下げられた釣合い錘9とを含んでいる。   The elevator 1 is suspended in the hoistway 6 with a car 7 that moves up and down in the hoistway 6, a main rope 8 that is attached to the car 7 at one end, and the other end of the main rope 8. A counterweight 9 is included.

また、エレベータ1は、昇降路6の上方に位置する機械室10に設けられ、乗りかご7及び釣合い錘9を駆動する巻上機11と、この巻上機11の近傍に配置されたそらせ車12と、乗りかご11の内壁に設けられ、乗りかご11の昇降動作やドア(図示せず)の開閉動作の操作を行う操作盤13と、機械室10に設けられ、当該エレベータ1の運転を制御する制御装置14と、この制御装置14に接続され、地震の揺れを検出して動作する地震計15と、乗りかご7内の利用者に対して各種の情報を報知する報知部16とを含んでいる。   Further, the elevator 1 is provided in a machine room 10 located above the hoistway 6, and a hoisting machine 11 that drives the car 7 and the counterweight 9, and a sled wheel disposed in the vicinity of the hoisting machine 11. 12, an operation panel 13 provided on the inner wall of the car 11, for operating the raising / lowering operation of the car 11 and the opening / closing operation of a door (not shown), and the machine room 10, for operating the elevator 1. A control device 14 for controlling, a seismometer 15 connected to the control device 14 and operating by detecting an earthquake shake, and an informing unit 16 for informing various users of users in the car 7 Contains.

巻上機11は、主ロープ8が巻き掛けられた駆動シーブ11Aと、この駆動シーブ11Aを回転させる電動機11Bと、駆動シーブ11Aの回転を制動するブレーキ装置(図示せず)とを有している。地震計15は、例えば、昇降路6の下部に設置され、地震の震度が所定値以上であるときに動作し、その地震の揺れを検出したことを示す地震検出信号を制御装置14へ送信する。   The hoisting machine 11 includes a driving sheave 11A around which the main rope 8 is wound, an electric motor 11B that rotates the driving sheave 11A, and a brake device (not shown) that brakes the rotation of the driving sheave 11A. Yes. For example, the seismometer 15 is installed in the lower part of the hoistway 6 and operates when the seismic intensity of the earthquake is equal to or higher than a predetermined value, and transmits an earthquake detection signal indicating that the earthquake shake is detected to the control device 14. .

制御装置14は、図示しないテールコードを介して操作盤13に接続されると共に、巻上機11の電動機11Bに接続されており、操作盤13の操作や乗場17に設置された乗場釦(図示せず)の操作に応じて、巻上機11の電動機11Bを駆動することにより、乗りかご7を釣合い錘9に対して相対的に昇降させるようにしている。   The control device 14 is connected to the operation panel 13 via a tail cord (not shown), and is connected to the electric motor 11B of the hoisting machine 11, and operates the operation panel 13 and a landing button (see FIG. The elevator car 11 is driven relative to the counterweight 9 by driving the electric motor 11B of the hoisting machine 11 in accordance with the operation of the hoisting machine 11.

また、制御装置14は、地震計15から地震検出信号を受信すると、エレベータ1の運転を通常運転から地震管制運転へ切替える。これにより、乗りかご7が通常運転の速度よりも低速で最寄階の乗場17へ走行し、乗りかご7が当該最寄階の乗場17に到着してドアを開放した後、エレベータ1の運転は休止状態となる。なお、地震発生時を想定した訓練用のエレベータ1の運転に関する制御装置14の機能の構成については、後で詳細に述べる。   Further, when receiving the earthquake detection signal from the seismometer 15, the control device 14 switches the operation of the elevator 1 from the normal operation to the seismic control operation. As a result, the car 7 travels to the nearest floor 17 at a lower speed than the normal driving speed. After the car 7 arrives at the nearest floor 17 and opens the door, the elevator 1 is operated. Becomes dormant. In addition, the structure of the function of the control apparatus 14 regarding the driving | operation of the elevator 1 for training supposing the time of the earthquake occurrence is described in detail later.

報知部16は、例えば、乗りかご7に設けられ、文字と画像を含む映像により情報を表示する液晶ディスプレイ16Aと、乗りかご7に設けられ、音声や信号音を発するスピーカ16Bとから構成されている。   For example, the notification unit 16 includes a liquid crystal display 16A that is provided in the car 7 and displays information using video including characters and images, and a speaker 16B that is provided in the car 7 and emits sound and signal sound. Yes.

監視端末2は、制御装置14に通信接続され、制御装置14から受信した各種の信号を処理する処理装置21と、通信回線5に接続され、この通信回線5を介して監視センタ3と通信を行う通信装置22とを含んでいる。   The monitoring terminal 2 is communicatively connected to the control device 14, is connected to the processing device 21 that processes various signals received from the control device 14, and the communication line 5, and communicates with the monitoring center 3 via the communication line 5. And a communication device 22 for performing.

処理装置21は、例えば図示しないが、エレベータ1の異常を監視するための各種の処理を行うCPU(Central Processing Unit)と、CPUによる処理を実行するためのプログラムを格納するROM(Read Only Memory)やHDD(Hard Disk Drive)等の記憶装置と、CPUがプログラムを実行する際の作業領域となるRAM(Random Access Memory)とを含むハードウェアから構成されている。   Although not shown, for example, the processing device 21 includes a CPU (Central Processing Unit) that performs various processes for monitoring an abnormality of the elevator 1 and a ROM (Read Only Memory) that stores a program for executing processes by the CPU. And hardware including a storage device such as an HDD (Hard Disk Drive) and a RAM (Random Access Memory) that is a work area when the CPU executes a program.

また、処理装置21は、制御装置14によるエレベータ1の制御指令の内容を示すエレベータ制御情報を読出し、このエレベータ制御情報に基づいて、エレベータ1の異常の有無を検出する。そして、処理装置21は、エレベータ1の異常を検出すると、通信装置22及び通信回線5を経由し、その旨を監視センタ3へ通報する。さらに、処理装置21は、制御装置14に対してエレベータ1の制御指令を送信する機能を有している。通信装置22は、監視センタ3との間で各種の信号の送受信を行う通信インターフェースとして機能する。   Moreover, the processing apparatus 21 reads the elevator control information which shows the content of the control command of the elevator 1 by the control apparatus 14, and detects the presence or absence of abnormality of the elevator 1 based on this elevator control information. When the processing device 21 detects an abnormality in the elevator 1, the processing device 21 notifies the monitoring center 3 to that effect via the communication device 22 and the communication line 5. Further, the processing device 21 has a function of transmitting a control command for the elevator 1 to the control device 14. The communication device 22 functions as a communication interface that transmits and receives various signals to and from the monitoring center 3.

顧客PC4は、例えば、図示しないが、ユーザーが操作するマウスやキーボード等の操作装置、及び映像を表示する液晶ディスプレイ等の表示装置を含んでおり、当該操作装置の操作を通じてユーザーによる後述のスケジュール等の入力を受け付けたり、表示装置の映像を通じてエレベータ1の運転に関する各種の情報をユーザーに提供したりするユーザーインターフェースとして機能する。   The customer PC 4 includes, for example, an operation device such as a mouse and a keyboard operated by a user, and a display device such as a liquid crystal display for displaying an image. It functions as a user interface that accepts the input of the user and provides the user with various information related to the operation of the elevator 1 through the video of the display device.

本実施形態では、顧客PC4は、訓練用のエレベータ1の運転が実行されるスケジュールを設定するスケジュール設定部4Aを含んでいる。このスケジュール設定部4Aによって設定されるスケジュールには、後述するように、所定の日付及び時刻以降に訓練用のエレベータ1の運転を実行させる予定日時情報と、訓練用のエレベータ1の運転を即時に実行させる即時実行情報とがスケジュール実行区分として区分けされて含まれている(図3参照)。   In this embodiment, customer PC4 contains the schedule setting part 4A which sets the schedule with which the operation | movement of the elevator 1 for training is performed. In the schedule set by the schedule setting unit 4A, as will be described later, the scheduled date and time information for executing the operation of the training elevator 1 after a predetermined date and time and the operation of the training elevator 1 are immediately set. Immediate execution information to be executed is included as a schedule execution category (see FIG. 3).

監視センタ3は、通信回線5に接続され、この通信回線5を介して監視端末2及び顧客PC4と通信を行う通信装置31と、この通信装置31に接続され、監視端末2及び顧客PC4から受信した各種の信号や情報を処理する処理装置32と、この処理装置32に対して各種の入力操作を行う操作卓33と、顧客情報を格納する顧客情報データベース34と、地震発生時を想定した訓練に関する訓練情報を格納する訓練情報データベース35とを含んでいる。なお、監視センタ3は、例えば、エレベータ1を定期的に保守・管理する上述のエレベータ1の保守会社内に設置されている。   The monitoring center 3 is connected to the communication line 5 and communicates with the monitoring terminal 2 and the customer PC 4 via the communication line 5, and is connected to the communication apparatus 31 and receives from the monitoring terminal 2 and the customer PC 4. Processing device 32 for processing various signals and information, a console 33 for performing various input operations on the processing device 32, a customer information database 34 for storing customer information, and training assuming the occurrence of an earthquake. And a training information database 35 for storing training information on. The monitoring center 3 is installed, for example, in the above-described maintenance company for the elevator 1 that regularly maintains and manages the elevator 1.

通信装置31は、監視端末2及び顧客PC4との間で各種の信号の送受信を行う通信インターフェースとして機能する。処理装置32は、例えば図示しないが、エレベータ1を遠隔的に監視するための各種の処理を行うCPU(Central Processing Unit)と、CPUによる処理を実行するためのプログラムを格納するROM(Read Only Memory)やHDD(Hard Disk Drive)等の記憶装置と、CPUがプログラムを実行する際の作業領域となるRAM(Random Access Memory)とを含むハードウェアから構成されている。   The communication device 31 functions as a communication interface that transmits and receives various signals between the monitoring terminal 2 and the customer PC 4. Although not shown, for example, the processing device 32 includes a CPU (Central Processing Unit) that performs various processes for remotely monitoring the elevator 1 and a ROM (Read Only Memory) that stores a program for executing processes by the CPU. ) And HDD (Hard Disk Drive), and hardware including a RAM (Random Access Memory) that is a work area when the CPU executes a program.

処理装置32は、監視端末2がエレベータ1の異常を監視して通報を行うための初期設定を行ったり、エレベータ1の運転状態等を示すエレベータ1の稼働情報を監視端末2から収集して管理したりする機能を有している。また、処理装置32は、顧客PC4のスケジュール設定部4Aによって設定されたスケジュールから訓練情報を作成して登録するスケジュール登録部32Aを有している。   The processing device 32 performs initial setting for the monitoring terminal 2 to monitor and notify the abnormality of the elevator 1, and collects and manages the operation information of the elevator 1 indicating the operation state of the elevator 1 from the monitoring terminal 2. It has a function to do. Further, the processing device 32 includes a schedule registration unit 32A that creates and registers training information from the schedule set by the schedule setting unit 4A of the customer PC 4.

操作卓33は、監視センタ3内のユーザーが操作するマウスやキーボード等の操作装置、及び映像を表示する液晶ディスプレイ等の表示装置を含むパソコンから構成されており、このパソコンの操作装置の操作を通じてユーザーの入力を受け付けたり、表示装置の映像を通じて顧客情報データベース34及び訓練情報データベース35にそれぞれ格納された情報等をユーザーに提供したりするユーザーインターフェースとして機能する。   The console 33 is composed of a personal computer including an operation device such as a mouse and a keyboard operated by a user in the monitoring center 3 and a display device such as a liquid crystal display for displaying an image. Through operation of the operation device of the personal computer, It functions as a user interface that accepts user input and provides information stored in the customer information database 34 and the training information database 35 to the user through the video of the display device.

ここで、新設の建物にエレベータ1が設置されると、顧客である建物のオーナーとエレベータ1の保守会社との間でエレベータ1の保守・管理に関する保守契約が結ばれる。そして、エレベータ1の保守会社によってエレベータ1に監視装置2が設置された後、エレベータ1の保守会社内で待機している作業員が監視センタ3の操作卓33を操作することにより、顧客情報を作成して顧客情報データベース34に登録する。   Here, when the elevator 1 is installed in a new building, a maintenance contract relating to the maintenance and management of the elevator 1 is made between the owner of the building as a customer and the maintenance company of the elevator 1. Then, after the monitoring device 2 is installed in the elevator 1 by the elevator 1 maintenance company, a worker waiting in the elevator 1 maintenance company operates the console 33 of the monitoring center 3 to obtain customer information. Create and register in the customer information database 34.

一方、エレベータ1の保守会社は、地震発生時を想定した訓練用のエレベータ1の運転を実行するために、保守契約を結んだ建物のオーナーが自分の顧客PC4から通信回線5を介して監視センタ3に接続するのに必要なユーザーIDとパスワードを当該建物のオーナーに対して発行する。   On the other hand, the maintenance company of the elevator 1 executes the operation of the elevator 1 for training assuming the occurrence of an earthquake, and the owner of the building that has signed a maintenance contract from the customer PC 4 through the communication line 5 3 is issued to the owner of the building.

処理装置32のスケジュール登録部32Aは、建物のオーナーが顧客PC4の操作装置を操作することにより、顧客PC4から通信回線5を介して受信したユーザーIDとパスワードを用いて当該顧客PC4と監視センタ3との接続の認証を行った後、スケジュール設定部4Aによって設定されたスケジュールを顧客PC4から受信する。そして、スケジュール登録部32Aは、受信したスケジュールに従って訓練情報を作成して訓練情報データベース35に登録する。   The schedule registration unit 32A of the processing device 32 operates the operation device of the customer PC 4 by the building owner, and uses the user ID and password received from the customer PC 4 via the communication line 5 and the customer PC 4 and the monitoring center 3. After authenticating the connection, the schedule set by the schedule setting unit 4A is received from the customer PC 4. Then, the schedule registration unit 32A creates training information according to the received schedule and registers it in the training information database 35.

図2は顧客情報データベース34に格納された顧客情報の構成を示す図である。   FIG. 2 is a diagram showing the configuration of customer information stored in the customer information database 34.

顧客情報データベース34は、例えば、情報を固定的に記憶するHDD等の記憶装置から構成されている。そして、顧客情報データベース34は、図2に示す顧客情報として、保守契約を結んだ顧客の建物を識別する管理番号34a、顧客の名称を示す顧客名34b、当該建物の郵便番号34c、当該建物の住所34d、当該建物に設置された監視端末2を識別する監視端末識別コード34e、当該監視端末2の電話番号34f、監視センタ3に接続するために顧客に割り当てられた固有の名称を示すユーザーID34g、監視センタ3への接続の認証を得るために入力する文字列を示すパスワード34hの情報を格納している。   The customer information database 34 includes, for example, a storage device such as an HDD that stores information in a fixed manner. Then, the customer information database 34 includes, as the customer information shown in FIG. 2, a management number 34a for identifying the customer's building with the maintenance contract, a customer name 34b indicating the customer's name, the postal code 34c of the building, An address 34d, a monitoring terminal identification code 34e for identifying the monitoring terminal 2 installed in the building, a telephone number 34f of the monitoring terminal 2, and a user ID 34g indicating a unique name assigned to the customer to connect to the monitoring center 3 The information of the password 34h indicating the character string input to obtain the authentication of the connection to the monitoring center 3 is stored.

図3は訓練情報データベース35に格納された訓練情報の構成を示す図である。   FIG. 3 is a diagram showing a configuration of training information stored in the training information database 35.

訓練情報データベース35は、例えば、情報を固定的に記憶するHDD等の記憶装置から構成されている。そして、訓練情報データベース35は、図3に示す訓練情報として、保守契約を結んだ顧客の建物を識別する管理番号35a、顧客の名称を示す顧客名35b、当該建物に設置された監視端末2を識別する監視端末識別コード35c、当該監視端末2の電話番号35d、スケジュール設定部32Aによって設定されたスケジュールに含まれるスケジュール実行区分35e、及び訓練用のエレベータ1の運転を実行させる日付と時刻を示す実行日時35fの情報を格納している。   The training information database 35 is composed of a storage device such as an HDD that stores information in a fixed manner. The training information database 35 includes, as the training information shown in FIG. 3, a management number 35 a that identifies a customer building with a maintenance contract, a customer name 35 b that indicates the customer name, and the monitoring terminal 2 installed in the building. The monitoring terminal identification code 35c to be identified, the telephone number 35d of the monitoring terminal 2, the schedule execution section 35e included in the schedule set by the schedule setting unit 32A, and the date and time at which the training elevator 1 is operated are shown. Information on the execution date 35f is stored.

次に、地震発生時を想定した訓練用のエレベータ1の運転に関する制御装置14の機能の構成について詳細に説明する。   Next, the functional configuration of the control device 14 related to the operation of the training elevator 1 assuming the occurrence of an earthquake will be described in detail.

本実施形態では、制御装置14は、スケジュール設定部4Aによって設定されたスケジュールに基づいて、エレベータ1の運転を通常運転及び訓練用の地震管制運転のいずれかに切替える制御を行う。   In the present embodiment, the control device 14 performs control to switch the operation of the elevator 1 to either the normal operation or the seismic control operation for training based on the schedule set by the schedule setting unit 4A.

さらに、制御装置14は、地震計15が動作していないときに、スケジュール設定部4Aによって設定されたスケジュールに従ってエレベータ1の運転を通常運転から訓練用の地震管制運転に切替え、エレベータ1の運転を訓練用の地震管制運転に切替えてから所定の時間が経過した後に、訓練用の地震管制運転から通常運転に切替えるようにしている。   Furthermore, when the seismometer 15 is not operating, the control device 14 switches the operation of the elevator 1 from the normal operation to the seismic control operation for training according to the schedule set by the schedule setting unit 4A, and operates the elevator 1. After a predetermined time has elapsed since switching to the seismic control operation for training, the seismic control operation for training is switched to the normal operation.

そして、制御装置14は、エレベータ1の運転を通常運転から訓練用の地震管制運転に切替えたとき、当該訓練が実施されている旨の情報を乗りかご7の液晶ディスプレイ16Aに表示すると共に、当該情報を乗りかご7のスピーカ16Bから出力する。   When the control device 14 switches the operation of the elevator 1 from the normal operation to the seismic control operation for training, the control device 14 displays information indicating that the training is being performed on the liquid crystal display 16A of the car 7, and Information is output from the speaker 16B of the car 7.

次に、本実施形態に係るエレベータ1の地震訓練運転システムにおける訓練用のエレベータ1の運転を実行するための制御処理について、図4のシーケンス図を参照しながら詳細に説明する。   Next, the control process for executing the operation of the elevator 1 for training in the earthquake training operation system of the elevator 1 according to the present embodiment will be described in detail with reference to the sequence diagram of FIG.

図4は顧客PC4、監視センタ3、監視端末2、及びエレベータ1の各制御処理の流れを示すシーケンス図である。   FIG. 4 is a sequence diagram showing the flow of each control process of the customer PC 4, the monitoring center 3, the monitoring terminal 2, and the elevator 1.

図4に示すように、まず建物のオーナー又は管理者は、所有する顧客PC4を操作し、通信回線5を介して監視センタ3に接続してログイン認証を行う(ステップ(以下、Sと記す)1)。このとき、ログインが許可されなければ(S1/NO)、顧客PC4の制御処理を終了する。   As shown in FIG. 4, the owner or manager of the building first operates the customer PC 4 owned by the building and connects to the monitoring center 3 via the communication line 5 to perform login authentication (step (hereinafter referred to as S)). 1). At this time, if login is not permitted (S1 / NO), the control process of the customer PC 4 is terminated.

一方、S1において、ログインが許可されると(S1/YES)、建物のオーナー又は管理者が顧客PC4を操作することにより、地震発生時を想定した訓練用のエレベータ1の運転を実行するためのスケジュール実行区分として、予定日時情報又は即時実行情報を指定する。これにより、顧客PC4のスケジュール設定部4Aは、訓練用のエレベータ1の運転が実行されるスケジュールを設定した後(S2)、通信回線5を介して当該スケジュールを監視センタ3へ送信し、顧客PC4の制御処理を終了する。   On the other hand, when the login is permitted in S1 (S1 / YES), the building owner or administrator operates the customer PC 4 to execute the operation of the training elevator 1 assuming the occurrence of an earthquake. Scheduled date / time information or immediate execution information is specified as the schedule execution category. As a result, the schedule setting unit 4A of the customer PC 4 sets the schedule for the operation of the training elevator 1 (S2), and then transmits the schedule to the monitoring center 3 via the communication line 5, and the customer PC 4 The control process is terminated.

次に、監視センタ3の処理装置32は、顧客PC4から通信回線5及び通信装置31を介してスケジュールを受信すると、顧客情報データベース34から監視端末2と通信するために必要な情報を取得する。次に、処理装置32のスケジュール登録部32Aは、受信したスケジュールに従って訓練情報を作成して訓練情報データベース35に登録する(S3)。   Next, when receiving the schedule from the customer PC 4 via the communication line 5 and the communication device 31, the processing device 32 of the monitoring center 3 acquires information necessary for communicating with the monitoring terminal 2 from the customer information database 34. Next, the schedule registration unit 32A of the processing device 32 creates training information according to the received schedule and registers it in the training information database 35 (S3).

そして、処理装置32は、通信装置31及び通信回線5を介して訓練情報データベース35に格納されている訓練情報のうちスケジュール実行区分35e及び実行日時35fの情報を監視端末2へ送信し(S4)、監視センタ3の制御処理を終了する。   And the processing apparatus 32 transmits the information of the schedule execution classification 35e and the execution date 35f among the training information stored in the training information database 35 via the communication apparatus 31 and the communication line 5 to the monitoring terminal 2 (S4). Then, the control process of the monitoring center 3 is finished.

監視端末2の処理装置21は、監視センタ3から通信回線5及び通信装置22を介して受信したスケジュール実行区分35eの情報を確認し、このスケジュール実行区分35eにおいて予定日時情報が指定されているかどうかを判断する(S5)。このとき、処理装置21は、スケジュール実行区分35eにおいて予定日時情報が指定されておらず、すなわち即時実行情報が指定されていると判断すると(S5/NO)、後述のS7の制御処理が行われる。   The processing device 21 of the monitoring terminal 2 confirms the information of the schedule execution category 35e received from the monitoring center 3 via the communication line 5 and the communication device 22, and whether the scheduled date / time information is specified in this schedule execution category 35e. Is determined (S5). At this time, if the processing device 21 determines that the scheduled date / time information is not specified in the schedule execution category 35e, that is, the immediate execution information is specified (S5 / NO), the control process of S7 described later is performed. .

一方、S5において、処理装置21は、スケジュール実行区分35eにおいて予定日時情報が指定されていると判断すると(S5/YES)、監視センタ3から通信回線5及び通信装置22を介して受信した実行日時35fの情報を確認する。そして、処理装置21は、現在の時刻が実行日時35fの日付及び時刻以降であるかどうかを判断する(S6)。このとき、処理装置21は、現在の時刻が実行日時35fの日付及び時刻以降でないと判断すると(S6/NO)、S6の制御処理が繰返される。   On the other hand, in S5, when the processing device 21 determines that the scheduled date / time information is designated in the schedule execution category 35e (S5 / YES), the execution date / time received from the monitoring center 3 via the communication line 5 and the communication device 22 is determined. The information of 35f is confirmed. Then, the processing device 21 determines whether or not the current time is after the date and time of the execution date and time 35f (S6). At this time, when the processing device 21 determines that the current time is not after the date and time of the execution date and time 35f (S6 / NO), the control processing of S6 is repeated.

S6において、処理装置21は、現在の時刻が実行日時35fの日付及び時刻以降であると判断すると(S6/YES)、制御装置14から地震計15の動作状態を取得し、地震計15が動作しているかどうかを判断する(S7)。このとき、処理装置21は、地震計15が動作していると判断すると(S7/YES)、訓練用のエレベータ1の運転を実行することなく、監視端末2の制御処理を終了する。一方、処理装置21は、地震計15が動作していないと判断すると(S7/NO)、訓練用のエレベータ1の運転を実行させる旨の訓練用運転制御指令を制御装置14へ送信し(S8)、監視端末2の制御処理を終了する。   In S6, when the processing device 21 determines that the current time is after the date and time of the execution date and time 35f (S6 / YES), it acquires the operation state of the seismometer 15 from the control device 14, and the seismometer 15 operates. It is determined whether or not (S7). At this time, when the processing device 21 determines that the seismometer 15 is operating (S7 / YES), the control processing of the monitoring terminal 2 is terminated without executing the operation of the training elevator 1. On the other hand, when the processing device 21 determines that the seismometer 15 is not operating (S7 / NO), the processing device 21 transmits a training operation control command to the controller 14 to execute the operation of the training elevator 1 (S8). ), The control process of the monitoring terminal 2 is terminated.

次に、エレベータ1の制御装置14は、監視端末2から訓練用運転制御指令を受信すると、エレベータ1の運転を通常運転から訓練用の地震管制運転に切替えることにより、訓練用の地震管制運転を実行する(S9)。そして、制御装置14は、S9において訓練用の地震管制運転を実行してから所定の時間が経過したかどうかを判断する(S10)。このとき、制御装置14は、所定の時間が経過していないと判断すると(S10/NO)、S10の制御処理が繰返される。   Next, upon receiving the training operation control command from the monitoring terminal 2, the control device 14 of the elevator 1 switches the operation of the elevator 1 from the normal operation to the earthquake control operation for training, thereby performing the earthquake control operation for training. Execute (S9). Then, the control device 14 determines whether or not a predetermined time has elapsed since the execution of the seismic control operation for training in S9 (S10). At this time, if the control device 14 determines that the predetermined time has not elapsed (S10 / NO), the control process of S10 is repeated.

一方、S10において、制御装置14は、所定の時間が経過したと判断すると(S10/YES)、地震計15の動作状態を取得し、地震計15が動作しているかどうかを判断する(S11)。このとき、制御装置14は、地震計15が動作していると判断すると(S11/YES)、訓練用の地震管制運転から通常運転に切替えることなく、制御装置14の制御処理を終了する。   On the other hand, when the control device 14 determines in S10 that the predetermined time has elapsed (S10 / YES), it acquires the operating state of the seismometer 15 and determines whether the seismometer 15 is operating (S11). . At this time, if the control device 14 determines that the seismometer 15 is operating (S11 / YES), the control process of the control device 14 is terminated without switching from the seismic control operation for training to the normal operation.

S11において、制御装置14は、地震計15が動作していないと判断すると(S11/NO)、訓練用の地震管制運転から通常運転に切替えた後(S12)、制御装置14の制御処理を終了する。   In S11, when the control device 14 determines that the seismometer 15 is not operating (S11 / NO), after switching from the seismic control operation for training to the normal operation (S12), the control processing of the control device 14 is terminated. To do.

このように構成した本実施形態に係るエレベータ1の地震訓練運転システムによれば、制御装置14は、スケジュール設定部4Aによって設定されたスケジュールに基づいて、エレベータ1の運転を通常運転及び訓練用の地震管制運転のいずれかに切替える制御を行うことにより、建物のオーナー又は管理者が、地震計15を動作させたり、エレベータ1の通常運転への復旧手順を行う等のエレベータ1に関する専門的な知識を習得しなくても、地震発生時を想定した訓練用のエレベータの運転を安全かつ容易に行うことができる。これにより、建物の住民や利用者が地震発生時に実行される地震管制運転を体験できるので、地震に対する効果的な非難訓練を実施することができる。   According to the earthquake training operation system of the elevator 1 according to the present embodiment configured as described above, the control device 14 performs the operation of the elevator 1 for normal operation and training based on the schedule set by the schedule setting unit 4A. By controlling to switch to either seismic control operation, the building owner or manager can operate the seismometer 15 or perform a procedure to restore the elevator 1 to normal operation. Even without learning, it is possible to safely and easily operate an elevator for training assuming the occurrence of an earthquake. Thereby, since the residents and users of the building can experience the seismic control operation that is performed when the earthquake occurs, it is possible to carry out effective blame training for earthquakes.

特に、本実施形態では、訓練用のエレベータ1の運転を実行するのに地震計15を動作させる必要がないので、建物のオーナーや管理人が、通常、エレベータ1の保守会社によって実施される地震計15の復旧作業を行わなくて済む。従って、エレベータ1の保守会社と保守契約を結んだ建物のオーナーや管理人であっても、訓練用のエレベータ1の運転を円滑に行うことができる。   In particular, in this embodiment, since it is not necessary to operate the seismometer 15 in order to execute the operation of the elevator 1 for training, a building owner or a manager usually performs an earthquake that is carried out by the maintenance company of the elevator 1. It is not necessary to perform a total of 15 restoration operations. Therefore, even a building owner or a manager who has a maintenance contract with the maintenance company of the elevator 1 can smoothly operate the elevator 1 for training.

また、本実施形態に係るエレベータ1の地震訓練運転システムは、訓練情報データベース35に格納された訓練情報のスケジュール実行区分35eにおいて予定日時情報が指定されると、制御装置14は、建物のオーナーや管理人が希望する日付及び時刻以降に、エレベータ1の運転を通常運転から訓練用の地震管制運転に切替えて実行させることができる。これにより、建物のオーナーや管理人が計画した通りに地震に対する非難訓練を行うことができるので、優れた利便性を提供することができる。   In addition, in the earthquake training operation system of the elevator 1 according to the present embodiment, when the scheduled date / time information is specified in the schedule execution section 35e of the training information stored in the training information database 35, the control device 14 After the date and time desired by the manager, the operation of the elevator 1 can be switched from the normal operation to the seismic control operation for training and executed. As a result, it is possible to perform a blame drill against earthquakes as planned by the owner and manager of the building, so that excellent convenience can be provided.

また、本実施形態に係るエレベータ1の地震訓練運転システムは、訓練情報データベース35に格納された訓練情報のスケジュール実行区分35eにおいて即時実行情報が指定されると、制御装置14は、エレベータ1の運転を通常運転から訓練用の地震管制運転に迅速に切替えて即時に実行させることができる。これにより、建物のオーナーや管理人は、エレベータ1の利用状況及び建物の住民や利用者の都合等を考慮して、訓練用のエレベータ1の運転をタイミング良く開始させることができる。   Further, in the earthquake training operation system of the elevator 1 according to the present embodiment, when the immediate execution information is designated in the schedule execution section 35e of the training information stored in the training information database 35, the control device 14 operates the elevator 1 Can be immediately switched from normal operation to seismic control operation for training. Thereby, the owner and manager of the building can start the operation of the elevator 1 for training in a timely manner in consideration of the usage status of the elevator 1 and the convenience of the residents and users of the building.

また、本実施形態に係るエレベータ1の地震訓練運転システムでは、制御装置14は、地震計15が動作していないときに限り、スケジュール設定部4Aによって設定されたスケジュールに従ってエレベータ1の運転を通常運転から訓練用の地震管制運転に切替えるようにしているので、地震計15の動作中にエレベータ1の通常運転が実行される誤作動を抑制することができる。これにより、地震発生時のエレベータ1の運転に対して高い信頼性を得ることができる。   Further, in the earthquake training operation system for the elevator 1 according to the present embodiment, the control device 14 performs normal operation of the elevator 1 according to the schedule set by the schedule setting unit 4A only when the seismometer 15 is not operating. Since the seismometer 15 is switched to the seismic control operation for training, a malfunction in which the normal operation of the elevator 1 is executed during the operation of the seismometer 15 can be suppressed. Thereby, high reliability can be obtained with respect to the operation of the elevator 1 when an earthquake occurs.

また、本実施形態に係るエレベータ1の地震訓練運転システムでは、建物のオーナー又は管理人は、所有する顧客PC4の操作装置を操作することにより、訓練用のエレベータ1の運転が実行されるスケジュールを意図通りに設定することができる。これにより、建物のオーナーや管理人にとって使い勝手がよいシステムを提供することができる。   Moreover, in the earthquake training operation system of the elevator 1 which concerns on this embodiment, the owner or manager of a building operates the operation apparatus of the customer PC4 which he owns, and schedules the driving | operation of the elevator 1 for training to be performed. It can be set as intended. As a result, it is possible to provide a system that is convenient for building owners and managers.

また、本実施形態に係るエレベータ1の地震訓練運転システムでは、制御装置14は、エレベータ1の運転を通常運転から訓練用の地震管制運転に切替えたとき、地震に対する訓練が実施されている旨の情報を乗りかご7の液晶ディスプレイ16Aに表示すると共に、当該情報を乗りかご7のスピーカ16Bから出力することにより、乗りかご7内の利用者に対して訓練中であることを容易に知らせることができる。これにより、地震に対する訓練の実施を知らされていなかった利用者の動揺を緩和することができる。   Moreover, in the earthquake training operation system of the elevator 1 which concerns on this embodiment, when the control apparatus 14 switches the driving | operation of the elevator 1 from normal operation to the earthquake control operation for training, it is said that the training with respect to an earthquake is implemented. By displaying the information on the liquid crystal display 16A of the car 7 and outputting the information from the speaker 16B of the car 7, the user in the car 7 can be easily informed that training is being performed. it can. As a result, it is possible to alleviate the shaking of the user who was not informed of the training for the earthquake.

なお、上述した本実施形態は、本発明を分かり易く説明するために詳細に説明したものであり、必ずしも説明した全ての構成を備えるものに限定されるものではない。また、ある実施形態の構成の一部を他の実施形態の構成に置き換えることが可能であり、また、ある実施形態の構成に他の実施形態の構成を加えることも可能である。   In addition, this embodiment mentioned above was described in detail in order to demonstrate this invention easily, and is not necessarily limited to what is provided with all the demonstrated structures. Further, a part of the configuration of an embodiment can be replaced with the configuration of another embodiment, and the configuration of another embodiment can be added to the configuration of an embodiment.

また、本実施形態では、スケジュール設定部4Aは、顧客が所有する顧客PC4に含まれる場合について説明したが、この場合に限らず、エレベータ1に設けられた操作装置として、例えば、乗りかご7の操作盤13に含まれていてもよい。この場合、建物のオーナー又は管理人が顧客PC4を使用しなくても、乗りかご7の操作盤13によりスケジュールの設定を迅速に行うことができる。   In the present embodiment, the schedule setting unit 4A has been described as being included in the customer PC 4 owned by the customer. However, the present invention is not limited to this case. For example, the operation device provided in the elevator 1 It may be included in the operation panel 13. In this case, even if the owner or manager of the building does not use the customer PC 4, the schedule can be quickly set by the operation panel 13 of the car 7.

1 エレベータ
2 監視端末
3 監視センタ
4 顧客PC
4A スケジュール設定部
5 通信回線
6 昇降路
7 乗りかご
13 操作盤
14 制御装置
15 地震計
16 報知部
16A 液晶ディスプレイ
16B スピーカ
21 処理装置
22 通信装置
31 通信装置
32 処理装置
32A スケジュール登録部
33 操作卓
34 顧客情報データベース
34a 管理番号
34b 顧客名
34c 郵便番号
34d 住所
34e 監視端末識別コード
34f 電話番号
34g ユーザーID
34h パスワード
35 訓練情報データベース
35a 管理番号
35b 顧客名
35c 監視端末識別コード
35d 電話番号
35e スケジュール実行区分
35f 実行日時
1 Elevator 2 Monitoring terminal 3 Monitoring center 4 Customer PC
4A Schedule setting unit 5 Communication line 6 Hoistway 7 Car 13 Operation panel 14 Control device 15 Seismometer 16 Notification unit 16A Liquid crystal display 16B Speaker 21 Processing device 22 Communication device 31 Communication device 32 Processing device 32A Schedule registration unit 33 Console 34 Customer information database 34a Management number 34b Customer name 34c Zip code 34d Address 34e Monitoring terminal identification code 34f Telephone number 34g User ID
34h Password 35 Training information database 35a Management number 35b Customer name 35c Monitoring terminal identification code 35d Telephone number 35e Schedule execution classification 35f Execution date and time

Claims (3)

地震発生時を想定した訓練用のエレベータの運転を行うエレベータの地震訓練運転システムにおいて、
前記訓練用の前記エレベータの運転が実行されるスケジュールを設定するスケジュール設定部と、
前記スケジュール設定部によって設定された前記スケジュールに従って、前記エレベータの運転を通常運転から前記訓練用の地震管制運転に切替える制御を行う制御装置と、を備え
前記スケジュールは、所定の日付及び時刻以降に前記訓練用の前記エレベータの運転を実行させる予定日時情報と、前記訓練用の前記エレベータの運転を即時に実行させる即時実行情報と、を含み、
前記スケジュール設定部は、通信回線を介して接続され、前記スケジュールの入力を行う機能を有する端末装置に含まれる
ことを特徴とするエレベータの地震訓練運転システム。
In an elevator earthquake training operation system that operates an elevator for training assuming the occurrence of an earthquake,
A schedule setting unit for setting a schedule for driving the elevator for training;
Thus the schedule set by the schedule setting unit, and a control unit that performs control of switching the operation of the elevator from the normal operation to the seismic control OPERATION for the training,
The schedule includes scheduled date and time information for executing the operation of the elevator for training after a predetermined date and time, and immediate execution information for immediately executing the operation of the elevator for training,
The elevator earthquake training operation system , wherein the schedule setting unit is included in a terminal device connected via a communication line and having a function of inputting the schedule .
請求項に記載のエレベータの地震訓練運転システムにおいて、
前記制御装置に接続され、地震の揺れを検出して動作する地震計を備え、
前記制御装置は、
前記地震計が動作していないときに、前記スケジュール設定部によって設定された前記スケジュールに従って前記エレベータの運転を前記通常運転から前記訓練用の地震管制運転に切替え、
前記エレベータの運転を前記訓練用の地震管制運転に切替えてから所定の時間が経過した後に前記地震計が動作している場合には、前記訓練用の地震管制運転を継続する
ことを特徴とするエレベータの地震訓練運転システム。
The elevator earthquake training operation system according to claim 1 ,
A seismometer connected to the control device and operating to detect seismic shaking;
The controller is
When the seismometer is not operating, the operation of the elevator is switched from the normal operation to the seismic control operation for training according to the schedule set by the schedule setting unit,
When the seismometer is operating after a predetermined time has elapsed since the operation of the elevator was switched to the training seismic control operation , the training seismic control operation is continued. Elevator earthquake training operation system characterized by
請求項1又は2に記載のエレベータの地震訓練運転システムにおいて、
前記エレベータは、
昇降路内を昇降する乗りかごと、
前記乗りかごに設けられ、前記制御装置によって前記エレベータの運転が前記通常運転から前記訓練用の地震管制運転に切替えられたとき、地震発生に対する訓練が実施されている旨を報知する報知部とを含む
ことを特徴とするエレベータの地震訓練運転システム。
In the elevator earthquake training operation system according to claim 1 or 2 ,
The elevator is
A car that goes up and down in the hoistway,
An informing unit that is provided in the car and notifies that an earthquake is being trained when the operation of the elevator is switched from the normal operation to the seismic control operation for training by the control device ; An elevator earthquake training operation system characterized by including:
JP2014194074A 2014-09-24 2014-09-24 Elevator earthquake training operation system Active JP6244283B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014194074A JP6244283B2 (en) 2014-09-24 2014-09-24 Elevator earthquake training operation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014194074A JP6244283B2 (en) 2014-09-24 2014-09-24 Elevator earthquake training operation system

Publications (2)

Publication Number Publication Date
JP2016064883A JP2016064883A (en) 2016-04-28
JP6244283B2 true JP6244283B2 (en) 2017-12-06

Family

ID=55803871

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014194074A Active JP6244283B2 (en) 2014-09-24 2014-09-24 Elevator earthquake training operation system

Country Status (1)

Country Link
JP (1) JP6244283B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021152841A1 (en) * 2020-01-31 2021-08-05 三菱電機ビルテクノサービス株式会社 Elevator disaster training device and elevator system for conducting training in event of disaster

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000242322A (en) * 1999-02-24 2000-09-08 Toshiba Corp Plant operation training equipment
JP2001261250A (en) * 2000-03-17 2001-09-26 Hitachi Building Systems Co Ltd Inspection device for elevator control operation
JP2009215019A (en) * 2008-03-12 2009-09-24 Toshiba Elevator Co Ltd Elevator
JP2012162359A (en) * 2011-02-07 2012-08-30 Toshiba Elevator Co Ltd System and method for training elevator rescue operation
JP2012201504A (en) * 2011-03-28 2012-10-22 Toshiba Elevator Co Ltd Simulative confirmation system for elevator function
JP2014172723A (en) * 2013-03-08 2014-09-22 Toshiba Elevator Co Ltd Control device for elevator

Also Published As

Publication number Publication date
JP2016064883A (en) 2016-04-28

Similar Documents

Publication Publication Date Title
CN111448155B (en) Elevator maintenance work assistance device and elevator maintenance work assistance system
JP2008265935A (en) Elevator simulator device and elevator simulation system
EP3301057B1 (en) Elevator system having lockdown mode
JP2007254039A (en) Restoration system for elevator
JP2012201504A (en) Simulative confirmation system for elevator function
JP5263723B2 (en) Elevator apparatus, elevator automatic recovery method and program thereof
JP6244283B2 (en) Elevator earthquake training operation system
JP2009298546A (en) Control system for elevator
JP6010156B2 (en) Elevator system
JP2019038650A (en) Remote diagnosis operation method of elevator, elevator control device, and remote diagnosis operation program of elevator
JP5937984B2 (en) Elevator monitoring system
WO2018122921A1 (en) Recovery system
JP2017178599A (en) Earthquake control operation system and earthquake control operation method for elevator
JP6469314B1 (en) Elevator system
CN105752779B (en) The dedicated operation device and reservation system of elevator
CN108025888A (en) The confirming operation system and method for confirming operation of elevator
CN112824299B (en) Elevator system and recovery method
JP5611491B1 (en) Remote monitoring support device
JP5656887B2 (en) Elevator monitoring device
JP2022178103A (en) Elevator system and maintenance method of elevator system
JP2008247505A (en) Elevator rescue control device
JP7673300B1 (en) Elevator control device, elevator system, and elevator control program
JP6896799B2 (en) Elevator remote diagnostic method and elevator remote diagnostic device
JP2019043751A (en) Remote diagnostic operation method of elevator, elevator control device, and program for remote diagnostic operation of elevator
JP4707977B2 (en) Supervisory control system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20160704

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20170417

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20170509

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20170703

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20171107

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20171113

R150 Certificate of patent or registration of utility model

Ref document number: 6244283

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150