- Publication number
- JP6252500B2 JP6252500B2 JP2015005934A JP2015005934A JP6252500B2 JP 6252500 B2 JP6252500 B2 JP 6252500B2 JP 2015005934 A JP2015005934 A JP 2015005934A JP 2015005934 A JP2015005934 A JP 2015005934A JP 6252500 B2 JP6252500 B2 JP 6252500B2
- Authority
- JP
- Japan
- Prior art keywords
- plate
- rolling
- crown
- thickness
- agc
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Control Of Metal Rolling (AREA)
Description
本発明は、絶対値AGCおよび板クラウン制御を行う厚板圧延において、噛み込み端部および噛み抜け端部の板厚精度を向上させうる、厚板圧延における板厚制御方法に関する。なお、厚板圧延は、鋼スラブから厚鋼板への圧延であり、被圧延材は鋼板(略して板)である。前記鋼スラブは加熱炉で1000〜1250℃程度に加熱したものを用い、前記圧延は熱間で行う。また、厚鋼板とは、製品板厚が4.5〜360mmの鋼板をいう。 The present invention relates to a plate thickness control method in thick plate rolling that can improve the plate thickness accuracy of a biting end portion and a biting end portion in thick plate rolling that performs absolute value AGC and plate crown control. Thick plate rolling is rolling from a steel slab to a thick steel plate, and the material to be rolled is a steel plate (abbreviated as a plate). The steel slab is heated to about 1000 to 1250 ° C. in a heating furnace, and the rolling is performed hot. The thick steel plate means a steel plate having a product plate thickness of 4.5 to 360 mm.
厚板圧延の自動板厚制御(AGC:Automatic Gauge Control)では、絶対値AGCが広く採用され、また、圧下方式として応答性および高出力の点から油圧圧下が用いられている。また、厚板圧延では、4重式圧延機が広く用いられ、板は複数パスのリバース圧延により所望の製品に仕上げられる。 In automatic sheet thickness control (AGC: Automatic Gauge Control) of thick plate rolling, the absolute value AGC is widely adopted, and hydraulic reduction is used as a reduction method in terms of responsiveness and high output. In thick plate rolling, a quadruple rolling mill is widely used, and the plate is finished into a desired product by reverse rolling of a plurality of passes.
一般に、厚板圧延におけるAGCは、圧延荷重P、ミル剛性係数M、ロール開度S、出側板厚hの間に成り立つ下記(1)式で示される基本的な関係に基づいて行われる。
S=h−P/M …(1)
(1)式は圧延中の状態で常に成り立つ式であるが、板の噛み込み前の予測計算においても、目標出側板厚h*を得るために(1)式と同様の(2)式を用いて予測圧延荷重P*に基づいてロール開度S*を設定することが行われている。
S*=h*−P*/M …(2)
絶対値AGCは、(1)式で得られる出側板厚hを、(2)式で得られる目標出側板厚h*に一致させるために下記(3)式に従ってロール開度Sを設定制御するものである。
S=S*−(P−P*)/M …(3)
一方、厚板圧延では、圧延荷重を受けたロールが弾性変形することにより圧延機出側の板に板クラウンと称する幅方向板厚偏差(=板幅中央部の板厚−板幅端部の板厚)が発生する。板クラウンは圧延形状や歩留まりに大きく影響するため、ワークロールベンダーと呼ばれる加圧手段にて上下のワークロールの左右各端部に該左右各端部の上下対向間隔が拡がる向きのベンディング力(ベンダー荷重とも云う)を加えることにより板クラウンを適正範囲に制御する板クラウン制御も行われている。前記板クラウン制御では、圧延機出側の板クラウンである出側板クラウンとベンディング力の関係を理論乃至実験から予め求めてなる板クラウン予測モデルが用いられる。
In general, AGC in thick plate rolling is performed based on a basic relationship represented by the following formula (1) that is established among a rolling load P, a mill stiffness coefficient M, a roll opening degree S, and a delivery side plate thickness h.
S = h−P / M (1)
Equation (1) is an equation that always holds in the rolling state, but in the prediction calculation before the plate bites, the same equation (2) as equation (1) is used in order to obtain the target exit thickness h *. The roll opening S * is set based on the predicted rolling load P * .
S * = h * −P * / M (2)
The absolute value AGC sets and controls the roll opening degree S according to the following equation (3) in order to make the delivery side plate thickness h obtained by the equation (1) coincide with the target delivery side plate thickness h * obtained by the equation (2). Is.
S = S * -(PP * ) / M (3)
On the other hand, in thick plate rolling, a roll that receives a rolling load is elastically deformed to cause a plate thickness deviation in the width direction (= plate thickness at the center portion of the plate width−plate width end portion) on the plate on the delivery side of the rolling mill. (Thickness) occurs. Since the plate crown has a great influence on the rolling shape and the yield, the bending force (bender in the direction in which the vertical facing distance between the left and right end portions is widened to the left and right end portions of the upper and lower work rolls by a pressing means called a work roll bender. A plate crown control for controlling the plate crown to an appropriate range by applying a load) is also performed. In the plate crown control, a plate crown prediction model is used in which the relationship between the exit side plate crown, which is the plate crown on the exit side of the rolling mill, and the bending force is obtained in advance from theory or experiment.
特許文献1には、AGCとロールベンディングを併用する場合、前記(2)、(3)式の予測精度向上を図るために、圧延荷重とベンディング力の両方の影響をミル剛性係数Mに反映させる方法について記載されている。 In Patent Document 1, when AGC and roll bending are used in combination, the influence of both rolling load and bending force is reflected in the mill stiffness coefficient M in order to improve the prediction accuracy of the equations (2) and (3). The method is described.
特許文献2には、板クラウン予測モデルの精度向上を図るために、圧延ロールの摩耗とヒートクラウンを精度良く推定し、板クラウン予測モデルに反映させる方法について記載されている。
上述のように厚板圧延では絶対値AGCおよび板クラウン制御が用いられてきた。絶対値AGCを用いるとき、目標出側板厚を板幅方向の何処の位置に設定するかは、ミル(厚板圧延ラインのことである)によって異なる。例えば、目標出側板厚の設定位置を板幅方向中央部とするミルもあれば、板幅方向端部とするミルもある。というのは、一般に、ミルには実出側板厚を監視するためにγ線厚み計等の板厚計測手段が設置されており、この板厚計測手段の設置位置を目標出側板厚の設定位置としている。前記板厚計測手段の設置位置は、ミルにより異なる他設備との取り合い等の制約により決められるため、目標出側板厚の設置位置はミルによって異なる。 As described above, absolute value AGC and plate crown control have been used in thick plate rolling. When the absolute value AGC is used, the position at which the target delivery thickness is set in the sheet width direction varies depending on the mill (which is a thick plate rolling line). For example, there are mills that use the set position of the target outlet side plate thickness as the central portion in the plate width direction, and other mills that use the end portion in the plate width direction. This is because, in general, a thickness measuring means such as a γ-ray thickness meter is installed in the mill to monitor the actual delivery side thickness, and the installation position of this thickness measurement means is the set position of the target delivery side thickness. It is said. Since the installation position of the plate thickness measuring means is determined by restrictions such as the contact with other equipment that varies depending on the mill, the installation position of the target outlet thickness varies depending on the mill.
ところで、前記目標出側板厚の設定位置を板幅方向端部とするミルでは、絶対値AGCによって板幅方向端部で目標通りの出側板厚が得られた場合でも、特に、広幅材と称する板幅4800mm超の被圧延材において、出側板クラウンが負の値となる現象であるマイナスクラウンが生じることがある。このマイナスクラウンが過大(負の値の絶対値が過大)となると、板幅中央部の出側板厚が目標出側板厚の公差すなわち許容範囲を下に外れる。これを防止するために、仕上最終パスの目標出側板厚は、初期設定板厚に、予め歩留まりロス、厚み不合格が最小となる適正な加算量を加算したものとしておく必要がある。これを実現するため、仕上げ最終パス前に行う板厚学習にて、仕上げ最終パス前の正転パス出側で測定した板クラウン量を基に、前記適正な加算量を決定すると云う対処方法をとってきた。 By the way, in the mill having the set position of the target outlet side plate thickness in the end portion in the plate width direction, even when the target outlet side plate thickness is obtained at the end portion in the plate width direction by the absolute value AGC, it is particularly referred to as a wide material. In a material to be rolled having a sheet width exceeding 4800 mm, a minus crown, which is a phenomenon in which the exit side sheet crown has a negative value, may occur. If this minus crown becomes excessive (the absolute value of the negative value is excessive), the exit side plate thickness at the center of the plate width deviates from the tolerance of the target exit side plate thickness, that is, the allowable range. In order to prevent this, the target exit side plate thickness of the final finishing pass needs to be obtained by adding an appropriate addition amount that minimizes yield loss and thickness failure to the initial set plate thickness in advance. In order to achieve this, there is a method for determining the appropriate addition amount based on the plate crown amount measured on the exit side of the forward rotation pass before the final finishing pass in the plate thickness learning performed before the final finishing pass. I took it.
しかし、上記対処方法では、加熱炉内で発生するスキッドマークや、材炉時間等の影響により、長手方向の両端部が中央部よりも高温状態となって変形抵抗がより小さくなっている被圧延材において、特に噛み込み直後および噛み抜け直前のマイナスクラウンが定常部よりも過大となる場合があり、問題となっていた。なお、定常部は、板長手方向両端から1000mm程度の板長さ部分を板全長から除いた残りの板長さ部分を云う。 However, in the above countermeasure, due to the influence of skid marks generated in the heating furnace, material furnace time, etc., both ends in the longitudinal direction are hotter than the central part and the deformation resistance is smaller. In the material, the minus crown immediately after biting and immediately before biting may be larger than the steady portion, which is a problem. In addition, a stationary part means the remaining board length part remove | excluding the board length part of about 1000 mm from the board full length from the board longitudinal direction both ends.
本発明は、上記の問題を解決し、スラブ長手方向両端部が中央部よりも高温に加熱された場合でも、噛み込み端部および噛み抜け端部のマイナスクラウンが定常部よりも過大となるのを防止できる、厚板圧延における板厚制御方法を提供することを課題とした。 The present invention solves the above-described problem, and even when both ends in the longitudinal direction of the slab are heated to a higher temperature than the central portion, the minus crowns at the biting end and the biting end are larger than the steady portion. It was made into the subject to provide the plate | board thickness control method in thick plate rolling which can prevent.
本発明者らは、上記課題を解決するために鋭意検討し、その結果、以下の知見を得た。
(i) パススケジュール中の圧延荷重およびベンダー荷重のセットアップに用いる板クラウン予測モデルには、ロール変形、転写、遺伝等が板クラウンに及ぼす影響が組み込まれている。この板クラウン予測モデルにより、AGC周期毎に、板クラウン量を計算できれば、この計算結果をAGCに反映させて、噛み込み端部および噛み抜け端部のマイナスクラウンが定常部よりも過大となるのを防止することが可能ではある。
(ii) しかし、絶対値AGCのような高応答性が要求される制御では、AGC周期を、例えば50ms以下と、短くとる必要があり、斯かる短いAGC周期毎に、前記板クラウン予測モデルによりリアルタイムに板クラウン量を計算して絶対値AGCに反映させるのは、計算時間の観点から困難である。
(iii) そこで、計算時間に十分余裕があってリアルタイムでの適用が可能な板厚制御方法を検討し、次の方法を見出した。すなわち、圧延前に当該圧延のパススケジュール中の予測圧延荷重と設定ベンディング力を前記板クラウン予測モデルに当て嵌めて板クラウン量の計算を行い、この結果から、板クラウン量に及ぼす圧延荷重変化とベンディング力変化の影響係数をそれぞれ予め求めておき、実圧延中は、前記予め求めておいた影響係数を用いて実測圧延荷重及び実測ベンディング力から板クラウン量を計算する方法である。
(iv) 前記実圧延中は、該実圧延中の計算で得た板クラウン量を所定の閾値と比較し、板クラウン量が所定の閾値を下回ったことに応じて、該下回った分だけAGCの目標出側板厚を増加させることにより、マイナスクラウンが過大となるのを防止できる。
The present inventors diligently studied to solve the above problems, and as a result, obtained the following knowledge.
(I) The influence of roll deformation, transfer, inheritance, etc. on the plate crown is incorporated in the plate crown prediction model used for setting up the rolling load and the bender load during the pass schedule. If the plate crown amount can be calculated for each AGC cycle by this plate crown prediction model, the calculation result is reflected in the AGC, and the minus crown at the biting end and the biting end is excessively larger than the steady portion. It is possible to prevent.
(Ii) However, in the control that requires high responsiveness such as the absolute value AGC, it is necessary to make the AGC cycle as short as, for example, 50 ms or less, and the plate crown prediction model is used for each short AGC cycle. It is difficult to calculate the plate crown amount in real time and reflect it in the absolute value AGC from the viewpoint of calculation time.
(Iii) Therefore, a plate thickness control method capable of being applied in real time with sufficient time for calculation was studied, and the following method was found. That is, before rolling, the predicted rolling load and the set bending force in the rolling pass schedule are fitted to the plate crown prediction model to calculate the plate crown amount. In this method, the influence coefficient of the bending force change is obtained in advance, and during actual rolling, the plate crown amount is calculated from the measured rolling load and the measured bending force using the previously determined influence coefficient.
(Iv) During the actual rolling, the sheet crown amount obtained by the calculation during the actual rolling is compared with a predetermined threshold, and the AGC is reduced by an amount corresponding to the lower amount in response to the sheet crown amount being lower than the predetermined threshold. It is possible to prevent the minus crown from becoming excessive by increasing the target outlet side plate thickness.
本発明は、上記知見に基づいてなされたものであり、その要旨は以下のとおりである。
〔1〕 絶対値AGCによる長手方向板厚制御およびワークロールベンダーによる板クラウン制御を行う厚板圧延の板厚制御方法において、
圧延前に当該圧延の予測圧延荷重と設定ベンディング力を板クラウン予測モデルに当て嵌めて板クラウン量を計算し、得た板クラウン量に及ぼす圧延荷重変化とベンディング力変化の影響係数をそれぞれ予め求めておく工程と、
前記圧延の実行中に、前記予め求めておいた影響係数を用いて実績圧延荷重および実績ベンディング力から板クラウン量を計算し、得た板クラウン量が所定の閾値を下回った場合は、該下回った分だけAGCの目標出側板厚を増加させた上で次ステップ(230)へ進み、一方、前記得た板クラウン量が前記所定の閾値以上であった場合は、直ちに前記次ステップ(230)へ進む工程と
を有することを特徴とする厚板圧延における板厚制御方法。
〔2〕 前記目標出側板厚の設定位置を板幅方向端部とする〔1〕に記載の厚板圧延における板厚制御方法。
This invention is made | formed based on the said knowledge, The summary is as follows.
[1] In a plate thickness control method for plate rolling in which longitudinal thickness control by absolute value AGC and plate crown control by work roll bender are performed,
Apply the predicted rolling load and the set bending force of the rolling to the plate crown prediction model before rolling to calculate the plate crown amount, and obtain the influence factors of the rolling load change and bending force change on the obtained plate crown amount in advance. And the process to keep
While the rolling is being performed, the plate crown amount is calculated from the actual rolling load and the actual bending force using the previously determined influence coefficient, and when the obtained plate crown amount falls below a predetermined threshold, the lower value is exceeded. Then, the AGC target delivery side plate thickness is increased by that amount, and the process proceeds to the next step (230). On the other hand, if the obtained plate crown amount is equal to or greater than the predetermined threshold, the next step (230) is immediately performed. thickness control method in thick plate rolling, characterized in that a step proceeding.
[2] The plate thickness control method in plate rolling according to [1], wherein the set position of the target delivery side plate thickness is an end portion in the plate width direction.
本発明によれば、スラブ長手方向両端部が中央部よりも高温に加熱された場合でも、噛み込み端部および噛み抜け端部のマイナスクラウンが定常部よりも過大となるのを防止できる。 According to the present invention, even when both end portions in the longitudinal direction of the slab are heated to a temperature higher than that of the central portion, it is possible to prevent the negative crowns of the biting end portion and the biting end portion from being excessively larger than the steady portion.
図1は、本発明の実施形態の一例を示すフロー図である。本発明ではまず圧延前にステップ100およびステップ110を実行する。ステップ100では、予測圧延荷重と設定ベンディング力を板クラウン予測モデルに当て嵌めて板クラウン量を計算する。前記予測圧延荷重および前記設定ベンディング力は、パススケジュール計算にて求める。前記板クラウン予測モデルは、次の(4)式および(5)式で表す。
Cr=a・Cm+b・Crin …(4)
Cm=f(P,Pb) …(5)
ここで、Crは出側板クラウン(以下、板クラウン量と呼ぶ)、Crinは入側板クラウン、Cmはメカニカルクラウン、aは転写率、bは遺伝係数、Pは圧延荷重、Pbはベンダー荷重(ベンディング力)である。fはPおよびPbの関数であり、メカニカルクラウン量Cmを求めるモデル式による演算形式である。また、a、bは過去の圧延におけるクラウン量から求められる定数である。前記当て嵌めの際には、前記予測圧延荷重はPに、前記設定ベンディング力はPbに、それぞれ代入する。演算形式fによる計算時間は50msを超えるから、前述のとおり、圧延中のAGC周期ごとの計算は困難である。しかし、圧延前なら、ある1本の被圧延材の圧延完了から後続の1本の圧延開始までに通常少なくとも10秒はかかるため、その間に演算形式fでも十分余裕を持って計算を終えることができる。
FIG. 1 is a flowchart showing an example of an embodiment of the present invention. In the present invention,
C r = a · C m + b · C rin (4)
C m = f (P, P b ) (5)
Here, Cr is an exit side plate crown (hereinafter referred to as plate crown amount), C rin is an entrance side plate crown, C m is a mechanical crown, a is a transfer rate, b is a genetic coefficient, P is a rolling load, and P b is Bender load (bending force). f is a function of P and P b, an operational form by the model formula for determining the mechanical crown amount C m. Further, a and b are constants obtained from the crown amount in the past rolling. During the fitting, the predicted rolling load to P, the set bending force is P b, the values are. Since the calculation time in the calculation format f exceeds 50 ms, as described above, calculation for each AGC cycle during rolling is difficult. However, if it is before rolling, it usually takes at least 10 seconds from the completion of rolling of one material to be rolled to the start of the subsequent one rolling, so that the calculation can be completed with a sufficient margin during that time. it can.
ステップ110では、ステップ100での計算結果および計算条件から、板クラウン量に及ぼす圧延荷重変化とベンディング力変化の影響係数をそれぞれ導出する。この導出方法は以下のとおりである。すなわち、前記板クラウン量に及ぼす圧延荷重変化とベンディング力変化の影響係数は(4)式のCrをP、Pbでそれぞれ偏微分したときの偏微分係数に相当し、それぞれ次の(6)、(7)式で表される。
∂Cr/∂P=a・∂Cm/∂P …(6)
∂Cr/∂Pb=a・∂Cm/∂Pb …(7)
(6)式中の∂Cm/∂Pおよび(7)式中の∂Cm/∂Pbは、(5)式から差分形式にすると、それぞれ次の(8)、(9)式になる。
∂Cm/∂P={f(P0+ΔP,Pb0)−f(P0,Pb0)}/ΔP …(8)
∂Cm/∂Pb={f(P0,Pb0+ΔPb)−f(P0,Pb0)}/ΔPb …(9)
(8)、(9)式の右辺から、P0に予測圧延荷重、Pb0に設定ベンディング力をそれぞれ代入することで、左辺の値を導出することができる。なお、P0、Pb0は一般に圧延パスごとに異なるから、(8)、(9)式の左辺はそれぞれ圧延荷重、ベンディング力の関数として例えばテーブル形式で記述される。また、ΔP、ΔPbはそれぞれ圧延荷重基準偏差、ベンダー荷重基準偏差であり、これらは適宜設定する。例えばΔP、ΔPbはそれぞれ100トン、30トンを初期値とし、基準テーブルで修正可能に設定する。
In
∂C r / ∂P = a · ∂C m / ∂P (6)
∂C r / ∂P b = a · ∂C m / ∂P b (7)
(6) ∂C m / ∂P b of ∂C m / ∂P and (7) wherein in the formula, from (5) to the difference form, the following respective (8), equation (9) Become.
∂C m / ∂P = {f (P 0 + ΔP, P b0 ) −f (P 0 , P b0 )} / ΔP (8)
∂C m / ∂P b = {f (P 0 , P b0 + ΔP b ) −f (P 0 , P b0 )} / ΔP b (9)
(8), (9) from the right-hand side of the equation, by substituting predicted rolling load P 0, the set bending force P b0, respectively, can be derived the value of the left side. Since P 0 and P b0 are generally different for each rolling pass, the left sides of equations (8) and (9) are described in a table format, for example, as functions of rolling load and bending force. Further, [Delta] P, [Delta] P b respectively rolling load standard deviation is a vendor load standard deviation, these are appropriately set. For example [Delta] P, [Delta] P b is 100 tons, respectively, 30 tons as an initial value, set to be fixed in a reference table.
また、基準メカニカルクラウンCm0を次の(10)式で計算しておく。
Cm0=f(P0,Pb0) …(10)
次いで、圧延の実行中は、ステップ200から230までをAGC周期で繰り返す。
Further, the reference mechanical crown C m0 is calculated by the following equation (10).
C m0 = f (P 0 , P b0 ) (10)
Next, during the rolling,
ステップ200では、前記ステップ110で導出しておいた前記影響係数∂Cm/∂P、∂Cm/∂Pbを用い、AGC周期(例えば2ms)でサンプリングされる実測圧延荷重および実測ベンディング力から、板クラウン量Crを算出する。
In
この算出には次の(11)式を用いる。
Cr=a・{(∂Cm/∂P)・(P−P0)+(∂Cm/∂Pb)・(Pb−Pb0)+Cm0}+b・Crin=a・(∂Cr/∂P)・(P−P0)+a・(∂Cr/∂Pb)・(Pb−Pb0)+a・Cm0+b・Crin …(11)
(11)式は、(4)式においてメカニカルクラウンCmの計算式を(5)式に代えて次の(12)式としたものである。
Cm=(∂Cm/∂P)・(P−P0)+(∂Cm/∂Pb)・(Pb−Pb0)+Cm0 …(12)
(11)式において、P、Pb以外の変数には圧延前に求めておいた既知の数値を代入する。P、Pbには、圧延の実行中に検出される実績圧延荷重、実績ベンディング力を直ちにそれぞれ代入する。(11)式は簡易な1次関数式であり、また、代入する実績圧延荷重、実績ベンディング力にそれぞれ対応する影響係数(∂Cr/∂P)、(∂Cr/∂Pb)は例えばテーブル参照などの簡単な変換処理で決定できるゆえ計算時間は1ms未満である。したがって、(11)式からリアルタイムに板クラウン量Crを算出することができる。
The following equation (11) is used for this calculation.
C r = a · {(∂C m / ∂P) · (P−P 0 ) + (∂C m / ∂P b ) · (P b −P b0 ) + C m0 } + b · C rin = a · ( ∂C r / ∂P) · (P−P 0 ) + a · (∂C r / ∂P b ) · (P b −P b0 ) + a · C m0 + b · C rin (11)
The expression (11) is obtained by replacing the expression for calculating the mechanical crown C m with the expression (5) in the expression (4) and the following expression (12).
C m = (∂C m / ∂P) · (P−P 0 ) + (∂C m / ∂P b ) · (P b −P b0 ) + C m0 (12)
In (11), P, the variables other than P b Substituting known numbers had been determined before the rolling. P, the P b, performance rolling load detected during rolling, immediately assigns each actual bending force. Equation (11) is a simple linear function, and the influence coefficients (∂C r / ∂P) and (∂C r / ∂P b ) corresponding to the actual rolling load and the actual bending force to be substituted are For example, the calculation time is less than 1 ms because it can be determined by a simple conversion process such as table reference. Therefore, the plate crown amount Cr can be calculated in real time from the equation (11).
前記算出したCrは、ステップ210において、Cr<閾値αであるか否かを判定するのに用いる。マイナスクラウンの場合、Crは負の値になる。αは予め、従来の板厚不足分(=目標出側板厚下限を下回った板厚−目標出側板厚下限)の実績程度の値に設定しておく。なお、前記板厚不足分の実績は負の値である。
The calculated Cr is used in
Cr<αならばステップ220でAGCの目標出側板厚を(α−Cr)だけ増加させ、その後ステップ230へ進む。なお、(α−Cr)は正の値である。ここで、前記AGCの目標出側板厚は(2)式中のh*である。一方、(α−Cr)≧αならば直ちにステップ230へ進む。
If C r <α, the target outlet side thickness of the AGC is increased by (α−C r ) in
ステップ230ではAGC終了か否かを判定し、AGC終了ならばこのフローの動作を終了する。AGC終了でなければステップ200に戻り、以下繰り返す。
In
以上のとおり、本発明では、圧延前に予め求めておいた板クラウン量Crへの圧延荷重変化、ベンディング力変化それぞれの影響係数∂Cr/∂P、∂Cr/∂Pbを用いて、圧延の実行中に実績圧延荷重および実績ベンディング力からAGC周期でリアルタイムに板クラウン量を計算し、計算結果が閾値を下回った分だけAGCの目標出側板厚を嵩上げするようにしたから、スラブ長手方向両端部が中央部よりも高温に加熱された場合でも、噛み込み端部および噛み抜け端部のマイナスクラウンが定常部よりも過大となるのを防止することができると云う効果を奏する。 As described above, in the present invention, the influence coefficients ∂C r / ∂P and ∂C r / ∂P b of the rolling load change and bending force change to the plate crown amount C r previously obtained before rolling are used. The amount of crown of the sheet is calculated in real time in the AGC cycle from the actual rolling load and the actual bending force during the rolling, and the AGC target outlet thickness is increased by an amount corresponding to the calculation result falling below the threshold. Even when both ends in the longitudinal direction of the slab are heated to a higher temperature than the central portion, there is an effect that it is possible to prevent the minus crown of the biting end portion and the biting end portion from being excessively larger than the steady portion. .
本発明は、前記目標出側板厚の設定位置を板幅方向端部としたとき、前記目標出側板厚の設定位置を板幅方向端部以外例えば板幅中央部としたときと比べ、上記効果がより顕著に発現する。したがって、本発明では、前記目標出側板厚の設定位置を板幅方向端部とすることが好ましい。 In the present invention, when the setting position of the target outlet side plate thickness is set to the end portion in the plate width direction, the above effect is obtained as compared with the case where the setting position of the target outlet side plate thickness is set to the center portion other than the end portion in the plate width direction. Is more prominently expressed. Therefore, in the present invention, it is preferable that the set position of the target outlet side plate thickness is an end portion in the plate width direction.
スラブ厚=80〜403mm、スラブ幅=1100〜2345mm、スラブ長=1620〜5310mmの鋼スラブを加熱炉で加熱し、4重式圧延機で熱間リバース圧延して、圧延厚=5.08〜228.11mm(ただし、スラブ厚未満)、圧延幅=1120〜5331mm(ただし、スラブ幅超)、圧延長=3.1〜54.2mの製品(厚鋼板)に仕上げる厚板圧延ラインにおける自動板厚制御に、本発明を実施し、本発明例とした。 A steel slab having a slab thickness of 80 to 403 mm, a slab width of 1100 to 2345 mm, and a slab length of 1620 to 5310 mm is heated in a heating furnace, hot reverse-rolled by a quadruple rolling mill, and a rolling thickness of 5.08 to Automatic plate in a thick plate rolling line to finish a product (thick steel plate) of 228.11 mm (but less than slab thickness), rolling width = 1120 to 5331 mm (exceeding slab width) and rolling length = 3.1 to 54.2 m The present invention was carried out for thickness control, and an example of the present invention was obtained.
上記厚板圧延ラインでは、目標出側板厚の設定位置を板幅方向端部にとっている。また、上記厚板圧延ラインでは、従来、板幅中央部の出側板厚が目標出側板厚の公差を下に外れるのを防止すべく、仕上最終パスの目標出側板厚は、初期設定板厚に、予め歩留まりロス、厚み不合格が最小となる適正な加算量を加算したものとしておく必要がある。これを実現するため、仕上げ最終パス前に行う板厚学習にて、仕上げ最終パス前の正転パス出側で測定した板クラウン量を基に、前記適正な加算量を決定すると云う対処方法をとってきた。これを従来例とする。 In the thick plate rolling line, the setting position of the target delivery side plate thickness is set at the end in the plate width direction. Further, in the above-described thick plate rolling line, in order to prevent the exit side plate thickness at the center portion of the plate width from deviating below the tolerance of the target exit side plate thickness, the target exit side plate thickness of the final finishing pass is conventionally set to the initial set plate thickness. In addition, it is necessary to add in advance an appropriate addition amount that minimizes yield loss and thickness failure. In order to achieve this, there is a method for determining the appropriate addition amount based on the plate crown amount measured on the exit side of the forward rotation pass before the final finishing pass in the plate thickness learning performed before the final finishing pass. I took it. This is a conventional example.
図2は本発明例を示すブロック図である。 FIG. 2 is a block diagram showing an example of the present invention.
被圧延材1は、4重式圧延機内で上下一対のバックアップロール2、2にバックアップされる上下一対のワークロール3、3で圧延されるが、その圧下量は油圧シリンダ4によって制御される。その際、ワークロール3、3のロール開度Sはマグネスケール5、圧延荷重Pはロードセル6でそれぞれ検出される。また、ベンディング力Pbはワークロールベンダーサーボ弁13に付属の図示しない圧力センサで検出される。検出された圧延荷重P、ロール開度S、ベンディング力Pbはそれぞれ実績圧延荷重P、実績ロール開度S、実績ベンディング力PbとしてAGC制御盤8へ伝送される。
The material 1 to be rolled is rolled by a pair of upper and lower work rolls 3 and 3 backed up by a pair of upper and lower backup rolls 2 and 2 in a quadruple rolling mill, and the amount of reduction is controlled by a hydraulic cylinder 4. At that time, the roll opening degree S of the work rolls 3 and 3 is detected by the magnescale 5, and the rolling load P is detected by the
コントローラ9は、パルスジェネレータ7で検出したワークロール3のロール回転数から板長方向位置情報を求めてAGC制御盤8へ伝送するとともに、AGC制御盤8から伝送される実績圧延荷重Pおよび実績ロール開度Sをプロセスコンピュータ10へ転送し、また、図示しない幅計で検出された板幅Wを実績板幅Wとしてプロセスコンピュータ10へ伝送する。
The
一方、プロセスコンピュータ10は、図1における「圧延前」のフローを実行し、板クラウン量Crへの圧延荷重変化、ベンディング力変化それぞれの影響係数∂Cr/∂P、∂Cr/∂Pbを導出する。該導出された影響係数∂Cr/∂P、∂Cr/∂Pbは、前記(11)式中の転写率a、遺伝係数b、予測圧延荷重P0、設定ベンディング力Pb0、基準メカニカルクラウンCm0、入側板クラウンCrinと一緒に、コントローラ9を介してAGC制御盤8へ伝送される。
On the other hand, the
AGC制御盤8は、前記伝送された設定ベンディング力Pb0をワークロールベンダーサーボ弁13に設定するが、それとともに、図1における「圧延の実行中」のフローを実行する。すなわち前述したように(11)式にてAGC周期でリアルタイムに板クラウン量Crを求め、Cr<αのとき、目標出側板厚を(α−Cr)だけ増加させる。この増加分ΔS=(α−Cr)はロール開度補正量としてAGC制御盤8からサーボアンプ11を経て、サーボ弁12を作動して油圧シリンダ4を動作させ、上下ワークロール3のロール開度SがΔSだけ開き側に変更されることとなる。
The AGC control panel 8 sets the transmitted set bending force Pb0 to the work roll
なお、本発明例において、閾値αは、従来の板厚不足分(=目標出側板厚下限を下回った板厚−目標出側板厚下限)の実績程度の値=−500μmに設定した。 In the example of the present invention, the threshold value α is set to a value of about the actual result of the conventional sheet thickness deficiency (= thickness below the lower limit of the target delivery side thickness−lower limit of the target delivery side thickness) = − 500 μm.
本発明例と従来例とで、噛み込み端部、噛み出し端部の何れか一方または両方における板厚不足に起因する不合格重量比率を調査し、比較した。その結果、本発明例では、前記不合格重量比率が、従来例とくらべ0.02%低減(歩留まりは0.02%向上)し、本発明の効果が確認できた。 In the present invention example and the conventional example, the failure weight ratio caused by insufficient plate thickness at one or both of the biting end and the biting end was investigated and compared. As a result, in the example of the present invention, the unacceptable weight ratio was reduced by 0.02% compared to the conventional example (yield was improved by 0.02%), and the effect of the present invention was confirmed.
1 被圧延材(鋼板、略して板)
2 バックアップロール
3 ワークロール
4 油圧シリンダ
5 マグネスケール
6 ロードセル
7 パルスジェネレータ
8 AGC制御盤
9 コントローラ
10 プロセスコンピュータ
11 サーボアンプ
12 サーボ弁
13 ワークロールベンダーサーボ弁
100、110、200、210、220、230 ステップ
1 Material to be rolled (steel plate, plate for short)
2
Claims (2)
圧延前に当該圧延の予測圧延荷重と設定ベンディング力を板クラウン予測モデルに当て嵌めて板クラウン量を計算し、得た板クラウン量に及ぼす圧延荷重変化とベンディング力変化の影響係数をそれぞれ予め求めておく工程と、
前記圧延の実行中に、前記予め求めておいた影響係数を用いて実績圧延荷重および実績ベンディング力から板クラウン量を計算し、得た板クラウン量が所定の閾値を下回った場合は、該下回った分だけAGCの目標出側板厚を増加させた上で次ステップ(230)へ進み、一方、前記得た板クラウン量が前記所定の閾値以上であった場合は、直ちに前記次ステップ(230)へ進む工程と
を有することを特徴とする厚板圧延における板厚制御方法。 In the plate thickness control method of the plate rolling that performs the plate thickness control by the absolute value AGC and the plate crown control by the work roll bender,
Apply the predicted rolling load and the set bending force of the rolling to the plate crown prediction model before rolling to calculate the plate crown amount, and obtain the influence factors of the rolling load change and bending force change on the obtained plate crown amount in advance. And the process to keep
While the rolling is being performed, the plate crown amount is calculated from the actual rolling load and the actual bending force using the previously determined influence coefficient, and when the obtained plate crown amount falls below a predetermined threshold, the lower value is exceeded. Then, the AGC target delivery side plate thickness is increased by that amount, and the process proceeds to the next step (230). On the other hand, if the obtained plate crown amount is equal to or greater than the predetermined threshold, the next step (230) is immediately performed. thickness control method in thick plate rolling, characterized in that a step proceeding.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2015005934A JP6252500B2 (en) | 2015-01-15 | 2015-01-15 | Thickness control method in thick plate rolling |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2015005934A JP6252500B2 (en) | 2015-01-15 | 2015-01-15 | Thickness control method in thick plate rolling |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2016131975A JP2016131975A (en) | 2016-07-25 |
| JP6252500B2 true JP6252500B2 (en) | 2017-12-27 |
Family
ID=56437137
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2015005934A Active JP6252500B2 (en) | 2015-01-15 | 2015-01-15 | Thickness control method in thick plate rolling |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP6252500B2 (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111266405B (en) * | 2020-02-27 | 2021-11-02 | 北京首钢股份有限公司 | Plate and strip hot rolling process control method and control device |
| EP4029618A1 (en) * | 2021-01-18 | 2022-07-20 | Primetals Technologies Germany GmbH | Rolling with minimization of collapse of bending force in tapping |
| CN113909297B (en) * | 2021-10-12 | 2022-10-11 | 福建三宝特钢有限公司 | Rolling forming method for ultrathin corrosion-resistant hot rolled strip steel |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH06304630A (en) * | 1993-04-27 | 1994-11-01 | Hitachi Ltd | Automatic plate thickness control device for rolling mill |
| JP4224375B2 (en) * | 2003-10-10 | 2009-02-12 | 新日本製鐵株式会社 | Thickness / crown control method |
-
2015
- 2015-01-15 JP JP2015005934A patent/JP6252500B2/en active Active
Also Published As
| Publication number | Publication date |
|---|---|
| JP2016131975A (en) | 2016-07-25 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| RU2448789C2 (en) | Method of tracking hot metal sheet or strip physical state in control over plate mill | |
| US12121946B2 (en) | Rolling mill and rolling mill adjustment method | |
| US8490447B2 (en) | Method for adjusting a state of a rolling stock, particularly a near-net strip | |
| CN102441576B (en) | Automatic control method for camber and wedge shape of hot-rolled rough rolling intermediate slab | |
| JPS6121729B2 (en) | ||
| CN102886385B (en) | Method for determining relative movement-related degree of wear for roller | |
| CN102172637B (en) | High-accuracy automatic thickness control method and equipment based on thickness gauge subsection monitoring | |
| JP6252500B2 (en) | Thickness control method in thick plate rolling | |
| CN106984651A (en) | An On-Line Control System for Improving the Precision of Rolling Thickness Control | |
| JP4983589B2 (en) | Control device for cold continuous rolling equipment | |
| JPH11104721A (en) | Strip crown and shape control method in hot rolling | |
| JP4423763B2 (en) | Steel plate manufacturing method | |
| JP3521081B2 (en) | Strip width control method in hot finishing mill | |
| JP2010064103A (en) | Control device of plate width of hot-rolling machine, and control method thereof | |
| JP2993414B2 (en) | Plate Profile Control Method in Hot Rolling | |
| JP4028786B2 (en) | Sheet shape control method in cold rolling | |
| JPS649086B2 (en) | ||
| JP4402570B2 (en) | Plate profile control device | |
| JPH0413413A (en) | Method for controlling strip thickness at passing time on hot continuous rolling mill | |
| JP2001137931A (en) | Method for producing hot-rolled steel sheet with excellent uniformity of steel sheet crown and shape | |
| JPH11285718A (en) | Strip width control method in hot rolling | |
| JPS6347522B2 (en) | ||
| JPH0636929B2 (en) | Method for controlling strip width of rolled material | |
| JPH0818061B2 (en) | Method for preventing narrowing of rolled steel sheet in hot continuous rolling | |
| JPH01130806A (en) | Method for control of work roll crown |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20160825 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20170526 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20170606 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20170804 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20171031 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20171113 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 6252500 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |