Method of tamping under track, tamping machine and machine group Download PDF

Info

Publication number
JP6272839B2
JP6272839B2 JP2015514608A JP2015514608A JP6272839B2 JP 6272839 B2 JP6272839 B2 JP 6272839B2 JP 2015514608 A JP2015514608 A JP 2015514608A JP 2015514608 A JP2015514608 A JP 2015514608A JP 6272839 B2 JP6272839 B2 JP 6272839B2
Authority
JP
Japan
Prior art keywords
ballast
tamping
machine
track
measuring device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2015514608A
Other languages
Japanese (ja)
Other versions
JP2015521242A (en
Inventor
ガンツ イェアク
ガンツ イェアク
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Matisa Materiel Industriel SA
Original Assignee
Matisa Materiel Industriel SA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Matisa Materiel Industriel SA filed Critical Matisa Materiel Industriel SA
Publication of JP2015521242A publication Critical patent/JP2015521242A/en
Application granted granted Critical
Publication of JP6272839B2 publication Critical patent/JP6272839B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • E01B27/06Renewing or cleaning the ballast in situ, with or without concurrent work on the track
    • E01B27/10Renewing or cleaning the ballast in situ, with or without concurrent work on the track without taking-up track
    • E01B27/105Renewing or cleaning the ballast in situ, with or without concurrent work on the track without taking-up track the track having been lifted
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • E01B27/12Packing sleepers, with or without concurrent work on the track; Compacting track-carrying ballast
    • E01B27/13Packing sleepers, with or without concurrent work on the track
    • E01B27/16Sleeper-tamping machines
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • E01B27/12Packing sleepers, with or without concurrent work on the track; Compacting track-carrying ballast
    • E01B27/20Compacting the material of the track-carrying ballastway, e.g. by vibrating the track, by surface vibrators
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2203/00Devices for working the railway-superstructure
    • E01B2203/03Displacing or storing ballast
    • E01B2203/034Displacing or storing ballast using storing containers
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2203/00Devices for working the railway-superstructure
    • E01B2203/12Tamping devices
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • E01B27/12Packing sleepers, with or without concurrent work on the track; Compacting track-carrying ballast
    • E01B27/13Packing sleepers, with or without concurrent work on the track
    • E01B27/16Sleeper-tamping machines
    • E01B27/18Sleeper-tamping machines by introducing additional fresh material under the sleepers, e.g. by the measured-shovel method, by the blowing method

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Description

本発明は、軌道下を突き固める方法、突き固め機並びに機械群であって、作業方向に関して軌道下突き固めの手前で軌道下突き固めに対して並行して新バラストが軌道上に投下されるものに関する。   The present invention is a method, a tamping machine, and a machine group for tamping under a track, and a new ballast is dropped on the track in parallel to the lash under the track before the track ramming in the working direction. About things.

このような方法は、既にオーストリア国特許第389336号公報において公知であり、そこでは、まくらぎ交換の途中で収容されたバラストが軌道下突き固めの手前で軌道に戻される。   Such a method is already known from Austrian patent 389336, where the ballast accommodated in the middle of the sleeper exchange is returned to the track before the under-track tamping.

欧州特許公開第0436757号明細書において、直前に軌道からブラシにより収容された余剰のバラストが直接突き固め工具の域で過度に少ないバラストが存在する各区分に投下されることも公知である。   In EP 0 436 757 it is also known that the surplus ballast previously accommodated by the brush from the track is dropped directly into each section where there are too few ballasts in the area of the tamping tool.

そこで本発明の課題は、冒頭に記載した方法、突き固め機並びに機械群を改良して、作業コストを低減しつつ均等な軌道位置修正が最適化可能であるものを提供することである。   Accordingly, an object of the present invention is to improve the method, the tamping machine, and the machine group described at the beginning, and provide an apparatus capable of optimizing uniform track position correction while reducing the operation cost.

この課題は、本発明によれば、請求項1、4又は5の特徴部に記載の構成により解決される。   According to the present invention, this problem is solved by the configuration described in the characterizing portion of claim 1, 4 or 5.

本発明による特徴により、まくらぎ域(まくらぎの間の範囲)のバラストの最適な充填が保証される。これにより、全てのまくらぎ下突き固め区分に該当する、側方移動抵抗(水平抵抗)の増加も得られる。後続の突き固め及び締め固めを伴う均等なバラスト散布に基づいて、軌道位置修正の改善された持続性が得られる。更に、必要なバラスト量だけが軌道にあることが保証され、従ってこれにより余剰のバラストを搬出する又は排除するための追加的な作業が回避される。   The feature according to the invention ensures an optimal filling of the ballast in the sleeper area (range between sleepers). As a result, an increase in lateral movement resistance (horizontal resistance) corresponding to all sleeper lower tamping sections is also obtained. Based on an even ballast distribution with subsequent tamping and compaction, improved persistence of orbit position correction is obtained. Furthermore, it is ensured that only the required amount of ballast is in the track, thus avoiding the additional work of carrying out or eliminating excess ballast.

本発明の更なる利点は、別の請求項及び図面に関する記載から明らかである。   Further advantages of the invention are apparent from the description of the different claims and the drawings.

以下に図面に示された態様に基づいて本発明を詳説する。   The present invention will be described in detail below based on the embodiments shown in the drawings.

突き固め機の1つの態様の側面図である。1 is a side view of one embodiment of a tamping machine. FIG. 突き固め機の1つの態様の側面図である。1 is a side view of one embodiment of a tamping machine. FIG. 突き固め機の1つの態様の側面図である。1 is a side view of one embodiment of a tamping machine. FIG.

図1に示された突き固め機1は、レール走行装置2により、軌道3上を、作業方向4に走行可能である。軌道3の下を突き固めるために、高さ調節可能な突き固めアセンブリ5並びに突き固めアセンブリ5の前方に配置された軌道持上げアセンブリ6が設けられている。突き固めアセンブリ5の直ぐ後方にまくらぎクリーニングブラシ、まくらぎ域道床コンパクタ7並びに肩部コンパクタ8が位置決めされている。   The tamping machine 1 shown in FIG. 1 can travel in a working direction 4 on a track 3 by a rail traveling device 2. In order to ram down the track 3, a height-adjustable tamping assembly 5 and a track lifting assembly 6 arranged in front of the tamping assembly 5 are provided. A sleeper cleaning brush, a sleeper area roadbed compactor 7 and a shoulder compactor 8 are positioned immediately behind the tamping assembly 5.

作業方向4に関して、突き固めアセンブリ5の前方に、バラスト散布装置9及び前置された、バラスト貯蔵部11を備えるバラスト収容装置10が位置する。   With respect to the working direction 4, in front of the tamping assembly 5, a ballast distribution device 9 and a ballast storage device 10 with a ballast storage part 11 placed in front are located.

突き固め機1の前方の端部12に、軌道3を走査する、距離測定ユニット並びに記憶ユニット及び計算ユニットを備える測定装置13が配置されている。この測定装置13は、軌道位置狂いを求める機械測定ベース14に組み込まれている。   A measuring device 13 comprising a distance measuring unit, a storage unit and a calculation unit for scanning the track 3 is arranged at the front end 12 of the tamping machine 1. This measuring device 13 is incorporated in a mechanical measurement base 14 for obtaining a track position error.

機械1の作業中に、作業方向4で軌道下突き固めが行われ、その間、これに対して並行して、前置された測定装置13によって場合により軌道狂いが求められる。記憶ユニット及び計算ユニットでは、最適な軌道バラスト散布のために、その都度求められた軌道位置狂いに関係する、供給すべき新バラストの量が算出され、その都度の軌道箇所の場所に応じてバラスト所要量値として記憶される。   During the work of the machine 1, under-track tamping is performed in the working direction 4, and during this time, a trajectory error is sometimes required by the measuring device 13 placed in front. The storage unit and the calculation unit calculate the amount of new ballast to be supplied, which is related to the orbital position deviation obtained each time, in order to distribute the optimum ballast ballast. It is stored as a required amount value.

その際、高低狂いの場合、一方又は他方のレール区分に放出すべきバラスト量を様々に制御することができる。正確な配量は、軌道持ち上げ機能において適切な装置によりもたらされる、バラスト散布装置9を形成するバラストシュートの高さ調節により行われる。択一的に、バラスト散布装置9は、別の既知の装置によって形成してもよい。   At that time, in the case of high / low deviation, the amount of ballast to be discharged to one or the other rail section can be controlled variously. Accurate metering takes place by adjusting the height of the ballast chute that forms the ballast spreading device 9, provided by a suitable device in the trajectory lifting function. Alternatively, the ballast spreading device 9 may be formed by another known device.

作業方向4に関して測定装置13に後続するバラスト散布装置9が所定の軌道箇所に至ると、直ちに、記憶されたバラスト所要量値が、これに応じたバラスト量を投下するために呼び出される。   As soon as the ballast spraying device 9 following the measuring device 13 in the working direction 4 reaches a predetermined orbital location, the stored ballast required amount value is called to drop the ballast amount corresponding thereto.

これに対して並行して、作業方向4に関して測定装置13の後方でバラスト散布装置9の前方において、規定通りのバラスト道床プロフィールを越えて軌道肩部の域で突き出るバラストが自動的にバラスト収容装置により捕捉され、バラスト散布装置9によって必要に応じて投下するためにバラスト貯蔵部11に一時貯蔵される。   In parallel to this, the ballast protruding in the region of the track shoulder automatically exceeds the prescribed ballast roadbed profile behind the measuring device 13 and in front of the ballast spraying device 9 with respect to the working direction 4. And is temporarily stored in the ballast storage unit 11 for dropping by the ballast spraying device 9 as necessary.

バラスト貯蔵部11は、必要に応じて予め新バラストを充填することも、又は、例えば突き固め機に対して並行して作業するクリーニング機からクリーニングされたバラストを供給することもできる。   The ballast storage unit 11 can be pre-filled with new ballast as necessary, or can be supplied with a cleaned ballast from a cleaning machine working in parallel with the tamping machine, for example.

突き固め工具の後方に取り付けられたまくらぎクリーニングブラシは、まくらぎ表面上にあるバラスト砕石をまくらぎ域に押し込む。直後に、バラストは、道床コンパクタ7及び肩部コンパクタ8により、隣り合うまくらぎの間でもまくらぎ端部に続く肩部域でも締め固められる。好適には、道床コンパクタは、まくらぎ域において、突き固められたまくらぎの直ぐ後ろで作用し、これにより、突き固め工具から道床に導入された、突き固められたまくらぎの隣のまくらぎ域にまで作用するエネルギが、締め固め工程に際して一緒に使用され、そうして締め固めが改善される。この効果も、突き固め後の軌道の側方移動抵抗の回復に役立つ。追加的に肩部コンパクタが使用される。肩部コンパクタは、好適にはやはり突き固めに隣り合う域で使用され、軌道を強化するために追加的に役立つ。   A sleeper cleaning brush mounted behind the tamping tool pushes the ballast crushed stone on the sleeper surface into the sleeper area. Immediately afterwards, the ballast is compacted by the roadbed compactor 7 and the shoulder compactor 8 between the adjacent wells and in the shoulder area following the sleeper ends. Preferably, the roadbed compactor acts in the sleeper area directly behind the squeezed sleeper so that it is introduced into the sleeper area next to the squeezed sleeper introduced from the tamping tool to the roadbed. Energy acting up to is used together during the compaction process, thus improving compaction. This effect also helps to recover the lateral movement resistance of the track after tamping. In addition, a shoulder compactor is used. Shoulder compactors are preferably also used in the area adjacent to the tamping and additionally serve to strengthen the track.

様々な作業工程を単一の機械走行に集積するこの方法ステップにより、場合により生じる余剰バラスト及び最適なバラスト締め固めを可及的最良に利用して、軌道位置を持続的に修正し、側方移動抵抗を可及的最良に回復することができる。   This method step, which integrates the various work processes into a single machine run, makes the best use of the extra ballast and the optimum ballast compaction that can occur as much as possible to continually correct the trajectory position and The movement resistance can be restored as best as possible.

図2及び図3において看取される突き固め機1は、本発明の択一的な態様において、前置された貯蔵車両15により、機械群に拡張されている。この場合、バラスト貯蔵部11、バラスト散布装置9及び測定装置13は、貯蔵車両15に配置されている。図3による貯蔵車両15には、追加的に、更にバラスト収容装置10が配置されている。このバラスト収容装置10により、余剰のバラストは、前述のように、必要に応じた投下のためにバラスト貯蔵部11に一時貯蔵することができる。   The tamping machine 1 seen in FIGS. 2 and 3 is expanded into a group of machines by a storage vehicle 15 placed in front in an alternative embodiment of the invention. In this case, the ballast storage unit 11, the ballast spraying device 9, and the measurement device 13 are arranged in the storage vehicle 15. In addition to the storage vehicle 15 according to FIG. 3, a ballast storage device 10 is additionally arranged. With this ballast storage device 10, surplus ballast can be temporarily stored in the ballast storage unit 11 for dropping as necessary, as described above.

Claims (5)

作業方向に関して軌道下突き固めの前方で軌道下突き固めに対して並行して新バラストを軌道上に投下する、軌道下を突き固める方法であって、
以下の特徴:
a)測定装置(13)により軌道位置狂いを求め、最適な軌道バラスト散布を目的としてこれと関係する、供給すべき新バラストの量を算出し、その都度の軌道箇所の場所に応じてバラスト所要量値として記憶し、
b)作業方向(4)に関して測定装置(13)に後続するバラスト散布装置(9)が所定の軌道箇所に至ると、直ちに、記憶されたバラスト所要量値を、相応のバラスト量を投下するために呼び出す、
c)作業方向(4)に関して測定装置(13)の後方でバラスト散布装置(9)の前方において、規定通りの道床プロフィールを越えて突き出るバラストを収容し、バラスト散布装置(9)による必要に応じた投下のために一時貯蔵する、
を特徴とする、軌道下を突き固める方法。
A method of tamping under the track, in which a new ballast is dropped onto the track in parallel to the under track tamping in front of the under track tamping with respect to the working direction,
The following features:
a) The position of the orbital position is determined by the measuring device (13), the amount of new ballast to be supplied is calculated for the purpose of optimal distribution of the orbital ballast, and the ballast is required according to the location of the orbital location each time. Memorize as quantity value,
b) As soon as the ballast spraying device (9) following the measuring device (13) in the working direction (4) reaches a predetermined trajectory location, the stored ballast required amount value is dropped to the corresponding ballast amount. To call
c) With respect to the working direction (4), the ballast protruding beyond the specified road bed profile is accommodated in the rear of the measuring device (13) and in front of the ballast spraying device (9), as required by the ballast spraying device (9). Temporarily store for a drop
A method of solidifying under the orbit.
バラストを、軌道(3)下突き固めの直後に、隣り合うまくらぎの間でもまくらぎ端部に続く肩部域でも締め固める、請求項1記載の方法。   2. The method according to claim 1, wherein the ballast is compacted immediately after trajectory (3) down-tamping, either between adjacent flanks or in the shoulder area following the sleeper ends. 請求項1に記載の軌道下を突き固める方法に用いられる突き固め機であって、
機械(1)の前方の端部(12)に位置決めされた測定装置(13)と突き固めアセンブリ(5)との間に、バラスト収容装置(10)、バラスト貯蔵部(11)並びに後続のバラスト散布装置(9)が配置されていることを特徴とする、突き固め機。
A tamping machine for use in the method of tamping under a track according to claim 1,
Between the measuring device (13) positioned at the front end (12) of the machine (1) and the tamping assembly (5), the ballast receiving device (10), the ballast reservoir (11) and the subsequent ballast Damping machine, characterized in that a spraying device (9) is arranged.
請求項1に記載の軌道下を突き固める方法に用いられる機械群であって、
突き固め機(1)が、作業方向(4)に関して前置された、測定装置(13)とバラスト散布装置(9)とを備えた貯蔵車両(15)に結合されていることを特徴とする、機械群。
A machine group used in the method for tamping under the track according to claim 1,
The tamping machine (1) is connected to a storage vehicle (15) equipped with a measuring device (13) and a ballast spraying device (9), which is placed in front of the working direction (4). , Machinery group.
貯蔵車両(15)は、測定装置(13)とバラスト散布装置(9)との間に、バラスト収容装置(10)を備える、請求項4記載の機械群。   The machine group according to claim 4, wherein the storage vehicle (15) comprises a ballast housing device (10) between the measuring device (13) and the ballast spraying device (9).
JP2015514608A 2012-05-30 2013-05-06 Method of tamping under track, tamping machine and machine group Active JP6272839B2 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CH00744/12 2012-05-30
CH00744/12A CH706577B1 (en) 2012-05-30 2012-05-30 A method for tamping a track and a tamping machine and a machine group for performing the method.
PCT/IB2013/000856 WO2013179112A2 (en) 2012-05-30 2013-05-06 Method, tamping machine, and machine group for tamping a track

Publications (2)

Publication Number Publication Date
JP2015521242A JP2015521242A (en) 2015-07-27
JP6272839B2 true JP6272839B2 (en) 2018-01-31

Family

ID=48539305

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015514608A Active JP6272839B2 (en) 2012-05-30 2013-05-06 Method of tamping under track, tamping machine and machine group

Country Status (7)

Country Link
EP (1) EP2855774B1 (en)
JP (1) JP6272839B2 (en)
CN (1) CN104350205B (en)
CH (1) CH706577B1 (en)
ES (1) ES2666553T3 (en)
RU (1) RU2619145C2 (en)
WO (1) WO2013179112A2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106283981A (en) * 2016-08-30 2017-01-04 中国铁建大桥工程局集团有限公司 One has the railway maintenance small-sized machine of tamping flat quarrel device
CN106638177B (en) * 2017-01-13 2020-05-05 中铁四局集团有限公司 A process control method for continuous ballast unloading of ballast line
AT521850A1 (en) * 2018-10-24 2020-05-15 Plasser & Theurer Export Von Bahnbaumaschinen Gmbh Track construction machine and method for stuffing sleepers of a track
CN109778609A (en) * 2019-01-25 2019-05-21 中国铁建高新装备股份有限公司 A multifunctional tamping vehicle and its working method
CN110670430B (en) * 2019-10-15 2021-05-14 株洲时代电子技术有限公司 Sleeper position protection method
CN111501435A (en) * 2020-05-09 2020-08-07 中国铁建高新装备股份有限公司 A screen cleaning machine suitable for side slope cleaning operation and a side slope operation method

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58135201A (en) * 1982-02-05 1983-08-11 日本車輌製造株式会社 Automatic ballast scattering car
AT389336B (en) * 1986-02-12 1989-11-27 Plasser Bahnbaumasch Franz TRACKING MACHINE WITH LIFTING, STOPPING AND, IF NECESSARY, DIRECTIONAL UNIT
DE59000696D1 (en) 1990-01-10 1993-02-11 Plasser Bahnbaumasch Franz TRACKING MACHINE.
US5172637A (en) * 1991-02-01 1992-12-22 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. Track surfacing machine for the controlled lowering of the track
ES2060344T3 (en) * 1991-02-12 1994-11-16 Plasser Bahnbaumasch Franz CLEANING MACHINE.
EP0518845B1 (en) * 1991-06-12 1995-04-12 Franz Plasser Bahnbaumaschinen-Industriegesellschaft m.b.H. Method and tamping machine for the compaction of ballast of railway lines
AT403387B (en) * 1992-06-19 1998-01-26 Plasser Bahnbaumasch Franz MACHINE FOR TREATING THE GRAVEL BED
DE59502490D1 (en) * 1994-11-15 1998-07-16 Plasser Bahnbaumasch Franz Process and plant for the underground rehabilitation of ballast bedding of a track
EP0731217B1 (en) * 1995-03-07 2000-01-12 Franz Plasser Bahnbaumaschinen-Industriegesellschaft m.b.H. Tamping machine, assembly and method for tamping a railway track
ATE244793T1 (en) * 1997-11-05 2003-07-15 Plasser Bahnbaumasch Franz GRAVEL LEVELING MACHINE AND METHOD FOR GRADING A TRACK
RU2196860C1 (en) * 2001-11-19 2003-01-20 Общество с ограниченной ответственностью "Вагонпутьмашпроект" Track machine
RU2378441C1 (en) * 2008-06-24 2010-01-10 ЗАО "Центральное конструкторское бюро тяжелых путевых машин" Machine to straighten rail track

Also Published As

Publication number Publication date
ES2666553T3 (en) 2018-05-07
RU2014142357A (en) 2016-07-20
CN104350205A (en) 2015-02-11
CH706577A2 (en) 2013-12-13
CN104350205B (en) 2016-11-02
EP2855774B1 (en) 2018-01-31
CH706577B1 (en) 2015-12-31
JP2015521242A (en) 2015-07-27
WO2013179112A2 (en) 2013-12-05
RU2619145C2 (en) 2017-05-12
EP2855774A2 (en) 2015-04-08
WO2013179112A3 (en) 2014-04-17

Similar Documents

Publication Publication Date Title
JP6272839B2 (en) Method of tamping under track, tamping machine and machine group
US4257331A (en) Track surfacing machine
JP5453482B2 (en) System and method for laying and compacting asphalt layers
HU185354B (en) Driving apparatus and method for continuous ceasing of founding of railway tracks
JP5345632B2 (en) Method and machine for compacting ballasts in tracks
US10829897B2 (en) Tamping machine and method for correcting the position of a track
PL172920B1 (en) Method of compacting an aggregate bed and tamping machine therefor
CN1043179A (en) Track construction machinery equipped with track stabilizers
JP3921254B2 (en) Method and tamping machine for tamping under railroad sleepers
JP2023541302A (en) Method of tamping under the track and track tamping machine
US2184906A (en) Machine for paving streets
JP7453977B2 (en) Methods and track construction machines for processing ballast track
CN105401495B (en) Method for rapidly and directly paving 100 m long rail of ballast track of newly-built railway
CN104790271A (en) Method for finishing long rail of ballast track before straight laying
JPH08246404A (en) Compaction method under multiple railroad ties
CN219951622U (en) Roadbed paving leveling machine
CA1045899A (en) Track surfacing
JPS5941207Y2 (en) roadbed straightening machine
CA2570586C (en) Method for replacing old sleepers of a railway track by new sleepers
CN116791426B (en) Construction method for junction of new and old cast-in-place concrete pavement
CN210163879U (en) An engineering construction compaction device
JP2008531873A (en) Track position correcting method and track structure machine
CN208104980U (en) A kind of ramming machine
RU2545133C1 (en) Formation and compaction method of ballast section of railway

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20160329

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20161130

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20161220

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20170131

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20170626

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20170728

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20171204

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20180104

R150 Certificate of patent or registration of utility model

Ref document number: 6272839

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250