JP6283525B2 - Cable protection conduit construction method and sheath tube exchange joint used therefor - Google Patents
[go: Go Back, main page]

JP6283525B2 - Cable protection conduit construction method and sheath tube exchange joint used therefor - Google Patents

Cable protection conduit construction method and sheath tube exchange joint used therefor Download PDF

Info

Publication number
JP6283525B2
JP6283525B2 JP2014024414A JP2014024414A JP6283525B2 JP 6283525 B2 JP6283525 B2 JP 6283525B2 JP 2014024414 A JP2014024414 A JP 2014024414A JP 2014024414 A JP2014024414 A JP 2014024414A JP 6283525 B2 JP6283525 B2 JP 6283525B2
Authority
JP
Japan
Prior art keywords
cable protection
sheath
tube
tube member
sheath tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2014024414A
Other languages
Japanese (ja)
Other versions
JP2014195393A (en
Inventor
一洋 川畑
一洋 川畑
昌隆 村上
昌隆 村上
康孝 松尾
康孝 松尾
克吏 都築
克吏 都築
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kubota ChemiX Co Ltd
Original Assignee
Kubota ChemiX Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kubota ChemiX Co Ltd filed Critical Kubota ChemiX Co Ltd
Priority to JP2014024414A priority Critical patent/JP6283525B2/en
Publication of JP2014195393A publication Critical patent/JP2014195393A/en
Application granted granted Critical
Publication of JP6283525B2 publication Critical patent/JP6283525B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Protection Of Pipes Against Damage, Friction, And Corrosion (AREA)
  • Electric Cable Installation (AREA)
  • Laying Of Electric Cables Or Lines Outside (AREA)

Description

この発明はケーブル保護管路の施工方法およびそれに用いる鞘管やりとり継手に関し、特にたとえば、内部にケーブルが挿通される鞘管と鞘管を収容するボディ管とを備えるケーブル保護管路を所定の施工区間に対して施工する、ケーブル保護管路の施工方法およびそれに用いる鞘管やりとり継手に関する。   BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a cable protection pipe construction method and a sheath pipe exchange joint used therefor, and in particular, for example, a cable protection pipe having a sheath pipe into which a cable is inserted and a body pipe that accommodates the sheath pipe in a predetermined construction The present invention relates to a cable protection pipe construction method and a sheath pipe exchange joint used therefor, which are constructed for a section.

従来、通信ケーブル等のケーブルを地中に配線する際には、大口径のボディ管に複数の小口径の鞘管を収容したケーブル保護管路を地中に施工し、各鞘管内にケーブルを挿通することが知られている。   Conventionally, when laying cables such as communication cables in the ground, cable protection pipes that contain multiple small-diameter sheath tubes in the large-diameter body tube are installed in the ground, and cables are installed in each sheath tube. It is known to be inserted.

このようなケーブル保護管路は、ケーブルの接続や点検などのために設けられるハンドホール間を1区切り(つまり所定の施工区間)として施工される。特許文献1に開示されているように、ケーブル保護管路を施工する際には、先ず、施工区間の両端に対してダクトスリーブを備えるハンドホールを設置した後、各ダクトスリーブに対して複数の鞘管ダクトスリーブを備えるロータス管を装着する。続いて、一方のハンドホールに設けた鞘管ダクトスリーブのそれぞれに鞘管部材を接続すると共に、ダクトスリーブにボディ管部材を接続し、その後、鞘管部材およびボディ管部材のそれぞれを順次連結していく。つまり、一方のハンドホールを起点としてケーブル保護管路を順次施工していく。そして、ケーブル保護管路が他方のハンドホールの近傍に達すると、その場所でやりとり配管を行う。すなわち、最終番目の各鞘管部材と他方のハンドホールに設けた各鞘管ダクトスリーブとを、各鞘管ダクトスリーブに対してスライド可能に挿通された鞘管短管と長さ調整用の鞘管とを用いてやりとり接続すると共に、最終番目のボディ管部材と他方のハンドホールに設けたダクトスリーブとを、ボディ管やりとり継手(スライド管)および長さ調整用のボディ管を用いてやりとり接続する。
特開2008−278734号公報 [H02G 9/10]
Such a cable protection conduit is constructed with a hand-hole provided for cable connection or inspection as one partition (that is, a predetermined construction section). As disclosed in Patent Document 1, when constructing a cable protection conduit, first, after installing a handhole having duct sleeves at both ends of the construction section, a plurality of duct sleeves are provided for each duct sleeve. A lotus tube with a sheath tube duct sleeve is fitted. Subsequently, the sheath tube member is connected to each of the sheath tube duct sleeves provided in one hand hole, and the body tube member is connected to the duct sleeve, and then each of the sheath tube member and the body tube member is sequentially connected. To go. In other words, cable protection pipelines are constructed sequentially starting from one handhole. Then, when the cable protection conduit reaches the vicinity of the other hand hole, exchange piping is performed at that location. In other words, the last sheath tube member and each sheath tube duct sleeve provided in the other hand hole are inserted into the sheath tube duct sleeve so as to be slidable, and the length adjusting sheath. In addition to exchange connection using a pipe, the final body pipe member and the duct sleeve provided in the other hand hole are exchanged using a body pipe exchange joint (slide pipe) and a body pipe for length adjustment. To do.
JP 2008-278734 A [H02G 9/10]

上述のように、従来のケーブル保護管路の施工においては、一方のハンドホールを起点としてケーブル保護管路を他方のハンドホールの近傍まで順次施工した後、ロータス管(鞘管ダクトスリーブ)およびボディ管やりとり継手を用いて、他方(終点側)のハンドホールの近傍でやりとり配管を行うことが標準化されている。すなわち、ダクトスリーブを備えたハンドホールを設置した後に、それを起点としてケーブル保護管路の配管を開始することが標準化されている。しかしながら、ハンドホールは、施工現場に合わせて受注生産されることが通常であり、その製作には1ヶ月ないし1ヶ月半程度かかる。このため、ケーブル保護管路の施工を開始するまでにハンドホール待ちの状況が発生する場合があり、ケーブル保護管路の施工を開始したくても開始することができずに、工期が延びてしまうという問題が生じていた。   As described above, in the construction of the conventional cable protection pipeline, after the cable protection pipeline is sequentially constructed from one hand hole to the vicinity of the other hand hole, the lotus pipe (sheath duct duct sleeve) and the body It is standardized to perform exchange piping in the vicinity of the other hand (end point side) hand hole using a pipe exchange joint. That is, it is standardized to start the piping of the cable protection conduit from the start of the installation of the handhole provided with the duct sleeve. However, hand holes are usually produced on order according to the construction site, and the production takes about one month to one and a half months. For this reason, the situation of waiting for a handhole may occur before the start of construction of the cable protection pipeline, and even if it is desired to start construction of the cable protection pipeline, it cannot be started and the construction period is extended. The problem that it ends up has arisen.

それゆえに、この発明の主たる目的は、新規な、ケーブル保護管路の施工方法およびそれに用いる鞘管やりとり継手を提供することである。   Therefore, a main object of the present invention is to provide a novel cable protection pipe construction method and a sheath pipe exchange joint used therefor.

この発明の他の目的は、工期の短縮を図ることができる、ケーブル保護管路の施工方法およびそれに用いる鞘管やりとり継手を提供することである。   Another object of the present invention is to provide a cable protection conduit construction method and a sheath tube exchange joint used therefor, which can shorten the construction period.

この発明は、上記の課題を解決するために、以下の構成を採用した。なお、括弧内の参照符号および補足説明などは、本発明の理解を助けるために後述する実施の形態との対応関係を示したものであって、この発明を何ら限定するものではない。   The present invention employs the following configuration in order to solve the above problems. Note that reference numerals in parentheses and supplementary explanations indicate correspondence with embodiments described later in order to help understanding of the present invention, and do not limit the present invention.

第1の発明は、内部にケーブルが挿通される鞘管と鞘管を収容するボディ管とを備えるケーブル保護管路を所定の施工区間に対して施工するケーブル保護管路の施工方法であって、(a)ハンドホールを設置する場所から離れた場所を起点として鞘管部材およびボディ管部材のそれぞれを順次接続して施工区間の一部にケーブル保護管路を施工するステップ、(b)施工区間の一方端に第1ハンドホールを設けるステップ、(c)施工区間の他端に第2ハンドホールを設けるステップ、(d)ステップ(a)で形成したケーブル保護管路の起点側とステップ(b)で設けた第1ハンドホールとを接続するケーブル保護管路を施工するステップ、および(e)ステップ(a)で形成したケーブル保護管路の終点側とステップ(c)で設けた第2ハンドホールとを接続するケーブル保護管路を施工するステップを含む、ケーブル保護管路の施工方法である。   1st invention is the construction method of the cable protection pipe line which constructs the cable protection pipe line provided with the sheath pipe in which a cable is penetrated inside, and the body pipe which accommodates a sheath pipe to a predetermined construction section, (A) A step of constructing a cable protection conduit in a part of the construction section by sequentially connecting each of the sheath pipe member and the body pipe member starting from a place away from the place where the hand hole is installed, (b) Construction A step of providing a first hand hole at one end of the section, (c) a step of providing a second hand hole at the other end of the construction section, (d) a starting side of the cable protection conduit formed in step (a) and a step ( a step of constructing a cable protection conduit connecting the first hand hole provided in b), and (e) an end point side of the cable protection conduit formed in step (a) and a second provided in step (c). Comprising the step of applying a cable protection duct connecting the Ndohoru a method of constructing the cable protection duct.

第1の発明では、通信ケーブル等のケーブルを地中に配線するために、内部にケーブルが挿通される小口径の複数の鞘管(102)とこれら鞘管を収容する大口径のボディ管(104)とを備えるケーブル保護管路(100)を所定の施工区間に対して施工する。ステップ(a)では、ハンドホール(106a,106b)を設置する場所から離れた場所を起点として、つまり施工区間の途中から鞘管部材(22)およびボディ管部材(20)のそれぞれを順次接続して、施工区間の中間部分にケーブル保護管路を施工する。また、ステップ(b)では、施工区間の一方端に第1ハンドホール(106a)を設け、ステップ(c)では、施工区間の他端に第2ハンドホール(106b)を設ける。そして、ステップ(d)では、中間部分に形成したケーブル保護管路の起点側と第1ハンドホールとを連結するケーブル保護管路の施工を行い、ステップ(e)では、中間部分に形成したケーブル保護管路の終点側と第2ハンドホールとを連結するケーブル保護管路の施工を行う。これによって、施工区間の全体に亘る一連のケーブル保護管路が形成される。   In the first invention, in order to route a cable such as a communication cable in the ground, a plurality of small-diameter sheath tubes (102) into which the cables are inserted and a large-diameter body tube that accommodates these sheath tubes ( 104) is constructed with respect to a predetermined construction section. In step (a), the sheath pipe member (22) and the body pipe member (20) are sequentially connected starting from a place away from the place where the hand hole (106a, 106b) is installed, that is, from the middle of the construction section. Then, install a cable protection conduit in the middle of the construction section. In step (b), a first hand hole (106a) is provided at one end of the construction section, and in step (c), a second hand hole (106b) is provided at the other end of the construction section. In step (d), a cable protection conduit that connects the starting side of the cable protection conduit formed in the intermediate portion and the first hand hole is constructed, and in step (e), the cable formed in the intermediate portion. Construction of a cable protection pipe connecting the end point side of the protection pipe and the second hand hole is performed. Thereby, a series of cable protection pipelines are formed over the entire construction section.

なお、ステップ(a)‐(e)のそれぞれは、同時並行的に行ってもよいし、その順序または開始するタイミングを前後させてもよい。一例として、施工区間の中間部分にケーブル保護管路を施工している途中でハンドホール製作が完了した場合には、中間部分へのケーブル保護管路の施工と並行して、施工区間の両端にハンドホールを設置する工程、および施工区間の中間部分に形成したケーブル保護管路の起点側または終点側と各ハンドホールとを接続するケーブル保護管路を施工する工程を行うようにしてもよい。   Each of the steps (a) to (e) may be performed in parallel, or the order or timing of starting may be changed. As an example, if hand hole production is completed while the cable protection pipeline is being constructed in the middle part of the construction section, it will be installed at both ends of the construction section in parallel with the construction of the cable protection pipeline to the middle section. You may make it perform the process of installing the cable protection pipe line which connects the process of installing the handhole, and the starting point side or end point side of the cable protection pipe line formed in the intermediate part of the construction section, and each hand hole.

第1の発明によれば、施工区間の途中からケーブル保護管路を施工するので、ハンドホール製作に左右されることなくケーブル保護管路を施工でき、工期短縮を図ることができる。   According to the first invention, since the cable protection pipeline is constructed from the middle of the construction section, the cable protection pipeline can be constructed without being influenced by the handhole production, and the construction period can be shortened.

第2の発明は、第1の発明に従属し、ステップ(d)およびステップ(e)の少なくとも一方において、ケーブル保護管路を施工する際に鞘管やりとり継手およびボディ管やりとり継手を用いてやりとり接続するステップを含む。   The second invention is dependent on the first invention, and at least one of the step (d) and the step (e) uses the sheath tube exchange joint and the body tube exchange joint when constructing the cable protection conduit. Including connecting.

第2の発明では、ステップ(d)およびステップ(e)の少なくとも一方において、中間部分に形成したケーブル保護管路(100)の起点側または終点側と、第1ハンドホール(106a)または第2ハンドホール(106b)とを連結するケーブル保護管路を施工する際に、鞘管やりとり継手(14)およびボディ管やりとり継手(12)を用いてやりとり接続する作業工程を含む。   In the second invention, in at least one of step (d) and step (e), the starting point side or the ending point side of the cable protection conduit (100) formed in the intermediate portion, the first hand hole (106a), or the second When constructing the cable protection conduit for connecting the hand hole (106b), it includes an operation step of performing exchange connection using the sheath tube exchange joint (14) and the body tube exchange joint (12).

第2の発明によれば、鞘管やりとり継手およびボディ管やりとり継手を用いてやりとり接続を行うため、施工区間のいずれかに直線区間があればやりとり接続を行うことが可能となり、施工の自由度が高まる。   According to the second invention, since the exchange connection is performed using the sheath pipe exchange joint and the body pipe exchange joint, the exchange connection can be performed if there is a straight section in any of the construction sections. Will increase.

この発明によれば、施工区間の途中からケーブル保護管路を施工するので、ハンドホール製作に左右されることなくケーブル保護管路を施工でき、工期短縮を図ることができる。   According to this invention, since the cable protection pipeline is constructed from the middle of the construction section, the cable protection pipeline can be constructed without being influenced by the handhole production, and the construction period can be shortened.

この発明の上述の目的、その他の目的、特徴および利点は、図面を参照して行う後述の実施例の詳細な説明から一層明らかとなろう。   The above object, other objects, features, and advantages of the present invention will become more apparent from the following detailed description of embodiments with reference to the drawings.

この発明の一実施例であるケーブル保護管路の施工方法によって形成したケーブル保護管路の一例を示す図解図である。It is an illustration figure which shows an example of the cable protection pipeline formed with the construction method of the cable protection pipeline which is one Example of this invention. 図1のケーブル保護管路を径方向に切断した縦断面を示す断面図の一例である。It is an example of sectional drawing which shows the longitudinal cross-section which cut | disconnected the cable protection pipeline of FIG. 1 to radial direction. ケーブル保護管部材の一例を模式的に示す図解図である。It is an illustration figure which shows an example of a cable protection tube member typically. 図3のケーブル保護管部材を径方向に切断した縦断面を示す断面図の一例である。It is an example of sectional drawing which shows the longitudinal cross-section which cut | disconnected the cable protection tube member of FIG. 3 to radial direction. ボディ管部材の一例を示す図解図であり、(A)は外観を示し、(B)は軸方向に切断した縦断面を示す。It is an illustration figure which shows an example of a body pipe member, (A) shows an external appearance, (B) shows the longitudinal cross-section cut | disconnected in the axial direction. 鞘管部材の一例を示す図解図であり、(A)は外観を示し、(B)は軸方向に切断した縦断面を示す。It is an illustration figure which shows an example of a sheath pipe member, (A) shows an external appearance, (B) shows the longitudinal cross-section cut | disconnected to the axial direction. ボディ管やりとり継手の一例を示す図解図であり、(A)は外観を示し、(B)は軸方向に切断した縦断面を示す。It is an illustration figure which shows an example of a body pipe exchange coupling, (A) shows an external appearance, (B) shows the longitudinal cross-section cut | disconnected in the axial direction. 図7に示すボディ管やり継手を備えるボディ管やりとりユニットを示す断面図であり、(A)は受−差構造を有するものを示し、(B)は差−差構造を有するものを示す。It is sectional drawing which shows a body pipe exchange unit provided with the body pipe coupling shown in FIG. 7, (A) shows what has a receiving-difference structure, (B) shows what has a difference-difference structure. 鞘管やりとり継手の一例を示す図解図であり、(A)は外観を示し、(B)は軸方向に切断した縦断面を示す。It is an illustration figure which shows an example of a sheath pipe exchange coupling, (A) shows an external appearance, (B) shows the longitudinal cross-section cut | disconnected in the axial direction. 図9に示す鞘管やりとり継手を備える鞘管やりとりユニットを示す断面図であり、(A)は受−差構造を有するものを示し、(B)は差−差構造を有するものを示す。It is sectional drawing which shows a sheath pipe exchange unit provided with the sheath pipe exchange joint shown in FIG. 9, (A) shows what has a receiving-difference structure, (B) shows what has a difference-difference structure. 施工区間の途中からケーブル保護管路を順次施工する様子を模式的に示す図解図である。It is an illustration figure which shows typically a mode that a cable protection pipeline is constructed sequentially from the middle of a construction area. ハンドホールのダクトスリーブにボルト固定式ロータス管を取り付けた状態を模式的に示す図解図である。It is an illustration figure which shows typically the state which attached the bolt fixation type | mold Lotus pipe | tube to the duct sleeve of a handhole. ハンドホールを起点としてケーブル保護管路を順次施工する様子を模式的に示す図解図である。It is an illustration figure which shows typically a mode that a cable protection pipeline is constructed sequentially from a handhole. 施工区間の途中から施工したケーブル保護管路の起点側とハンドホールを起点として施工したケーブル保護管路の終点側とをやりとり接続する前の状態を模式的に示す図解図である。It is an illustration figure which shows typically the state before exchanging and connecting the starting point side of the cable protection conduit constructed from the middle of the construction section, and the end point side of the cable protection conduit constructed from the hand hole. 鞘管やりとり継手を用いて鞘管部材をやりとり接続するときの様子を模式的に示す図解図である。It is an illustration figure which shows typically a mode when a sheath pipe member is exchanged and connected using a sheath pipe exchange coupling. ボディやりとり継手を用いてボディ管部材をやりとり接続するときの様子を模式的に示す図解図である。It is an illustration figure which shows typically a mode when a body pipe member is exchanged and connected using a body exchange coupling. 鞘管やりとり継手によって鞘管部材がやりとり接続するときの様子を模式的に示す図解図である。It is an illustration figure which shows typically a mode when a sheath pipe member exchanges and connects by a sheath pipe exchange coupling. ケーブル保護管路がやりとり接続された状態を模式的に示す図解図である。It is an illustration figure which shows typically the state by which the cable protection pipeline was exchanged and connected. 施工区間の途中から施工したケーブル保護管路の終点側とハンドホールを起点として施工したケーブル保護管路の終点側とをやりとり接続するときの様子を模式的に示す図解図である。It is an illustration figure which shows typically a mode when the end point side of the cable protection pipeline constructed from the middle of the construction section and the end point side of the cable protection pipeline constructed from the hand hole are exchanged and connected. 鞘管やりとり継手の他の例を示す図解図であり、(A)は外観を示し、(B)は軸方向に切断した縦断面を示す。It is an illustration figure which shows the other example of a sheath pipe exchange coupling, (A) shows an external appearance, (B) shows the longitudinal cross-section cut | disconnected to the axial direction. 図20に示す鞘管やりとり継手を備える鞘管やりとりユニットを示す断面図であり、(A)は受−受構造を有するものを示し、(B)は受−差構造を有するものを示す。It is sectional drawing which shows a sheath pipe exchange unit provided with the sheath pipe exchange joint shown in FIG. 20, (A) shows what has a receiving-receiving structure, (B) shows what has a receiving-difference structure. ハンドホールの近傍において、施工区間の途中から施工したケーブル保護管路の起点側をやりとり接続するときの様子を模式的に示す図解図である。It is an illustration figure which shows typically a mode when exchanging and connecting the origin side of the cable protection pipeline constructed from the middle of the construction section in the vicinity of the handhole. 図22に続く作業手順を模式的に示す図解図である。FIG. 23 is an illustrative view schematically showing a work procedure following FIG. 22. ハンドホールの近傍において、施工区間の途中から施工したケーブル保護管路の終点側をやりとり接続するときの様子を模式的に示す図解図である。It is an illustration figure which shows typically a mode when the end point side of the cable protection pipeline constructed from the middle of the construction section is exchanged and connected in the vicinity of the handhole. 図24に続く作業手順を模式的に示す図解図である。FIG. 25 is an illustrative view schematically showing a work procedure following FIG. 24. ボディ管やりとり継手の他の例を示す図解図であり、(A)は外観を示し、(B)は軸方向に切断した縦断面を示す。It is an illustration figure which shows the other example of a body pipe exchange coupling, (A) shows an external appearance, (B) shows the longitudinal cross-section cut | disconnected to the axial direction. 図26に示すボディ管やりとり継手を備えるボディ管やりとりユニットを示す断面図であり、(A)は受−差構造を有するものを示し、(B)は差−差構造を有するものを示す。It is sectional drawing which shows a body pipe exchange unit provided with the body pipe exchange joint shown in FIG. 26, (A) shows what has a receiving-difference structure, (B) shows what has a difference-difference structure.

図1および図2を参照して、この発明の一実施例であるケーブル保護管路の施工方法は、通信ケーブルや電力ケーブル等のケーブル(図示せず)を地中に配線するために、内部にケーブルが挿通される小口径の複数の鞘管102とこれら鞘管102を収容して保護する大口径のボディ管104とを備えるケーブル保護管路100を所定の施工区間に対して施工するものである。   With reference to FIG. 1 and FIG. 2, the construction method of the cable protection pipe line which is one Example of this invention is the inside for wiring cables (not shown), such as a communication cable and a power cable, in the ground. A cable protection conduit 100 including a plurality of small-diameter sheath tubes 102 through which cables are inserted and a large-diameter body tube 104 that accommodates and protects these sheath tubes 102 for a predetermined construction section It is.

このケーブル保護管路の施工方法は、ケーブルの接続や点検などのために設けられるハンドホール106a,106b間を1区切りの施工区間としており、図3−図10に示すようなケーブル保護管部材10、ボディ管やりとり継手12、および鞘管やりとり継手14などを用いて実施される。   In this cable protection pipe line construction method, a space between the hand holes 106a and 106b provided for cable connection and inspection is defined as one section, and the cable protection pipe member 10 as shown in FIGS. The body tube exchange joint 12 and the sheath tube exchange joint 14 are used.

詳細は後述するように、この実施例では、ハンドホール106a,106bを設置する場所から離れた場所を起点として、つまり施工区間の任意の中間地点を起点としてケーブル保護管部材10を順次接続し、ハンドホール106a,106bとは独立したケーブル保護管路100を施工区間の一部(中間部分)に施工する。その後、ボディ管やりとり継手12および鞘管やりとり継手14を用いたやりとり接続を適宜利用して、中間部分に形成したケーブル保護管路100の起点側および終点側のそれぞれと、第1ハンドホール106aおよび第2ハンドホール106bのそれぞれとを連結するケーブル保護管路100の施工を行い、一連のケーブル保護管路100を形成する。   As will be described in detail later, in this embodiment, the cable protection pipe member 10 is sequentially connected starting from a place away from the place where the hand holes 106a and 106b are installed, that is, starting from any intermediate point of the construction section, The cable protection conduit 100 independent of the hand holes 106a and 106b is constructed in a part (intermediate part) of the construction section. Thereafter, using the exchange connection using the body tube exchange joint 12 and the sheath tube exchange joint 14 as appropriate, each of the start side and the end side of the cable protection conduit 100 formed in the intermediate portion, the first hand hole 106a, Construction of the cable protection conduit 100 that connects each of the second hand holes 106b is performed to form a series of cable protection conduits 100.

先ず、ケーブル保護管路100の施工に用いる主要な部材について説明する。図3および図4に示すように、ケーブル保護管部材10は、その軸方向の端部同士を接続して連続させることによってケーブル保護管路100を形成するものであり、ボディ管部材20と、ボディ管部材20の内部に所定の配置態様で収容される複数の鞘管部材22と、これら鞘管部材22をスライド可能に所定の配置態様で保持する整列部材24とを含む。   First, main members used for construction of the cable protection conduit 100 will be described. As shown in FIG. 3 and FIG. 4, the cable protection tube member 10 forms the cable protection conduit 100 by connecting the end portions in the axial direction to be continuous, the body tube member 20, The body tube member 20 includes a plurality of sheath tube members 22 accommodated in a predetermined arrangement manner, and an alignment member 24 that holds the sheath tube members 22 in a predetermined arrangement manner so as to be slidable.

図5に示すように、ボディ管部材20は、ボディ管104を構成するための直管状の部材であり、土圧などの外力に耐え得る強度を有する。具体的には、ボディ管部材20は、円筒状に形成される直管部26を含み、ポリエチレン、ポリ塩化ビニルおよびABS等の合成樹脂によって形成される。直管部26の一方端部には、拡径されたゴム輪受口28が形成され、他端部は差口30として利用される。ゴム輪受口28には、先端付近の内周面にゴム輪溝が形成されており、このゴム輪溝に止水用のゴム輪32が装着される。ボディ管部材20の長さは、たとえば5210mmであり、ボディ管部材20(直管部26)の内径は、たとえば250mmである。このようなボディ管部材20は、ゴム輪受口28に他のボディ管部材20の差口30を差し込んでゴム輪接合することによって、ボディ管104を形成する。   As shown in FIG. 5, the body tube member 20 is a straight tubular member for constituting the body tube 104 and has a strength capable of withstanding an external force such as earth pressure. Specifically, the body tube member 20 includes a straight pipe portion 26 formed in a cylindrical shape, and is formed of a synthetic resin such as polyethylene, polyvinyl chloride, and ABS. A rubber ring receiving port 28 having an enlarged diameter is formed at one end portion of the straight pipe portion 26, and the other end portion is used as the insertion port 30. A rubber ring groove is formed in the inner peripheral surface near the tip of the rubber ring receiving port 28, and a water stop rubber ring 32 is mounted in the rubber ring groove. The length of body tube member 20 is, for example, 5210 mm, and the inner diameter of body tube member 20 (straight tube portion 26) is, for example, 250 mm. Such a body tube member 20 forms a body tube 104 by inserting the insertion port 30 of another body tube member 20 into the rubber ring receiving port 28 and joining the rubber ring.

図6に示すように、鞘管部材22は、ボディ管104内で複数のケーブル収容スペースを個別に確保する鞘管102を構成するための直管状の部材である。この実施例では、8つの鞘管部材22aおよび6つの鞘管部材22bがボディ管部材20の内部に所定の配置態様で収容されている(図3および図4参照)。なお、説明の際に鞘管部材22aと鞘管部材22bとを区別する必要がない場合には、単に鞘管部材22と記載する。   As shown in FIG. 6, the sheath tube member 22 is a straight tubular member for constituting the sheath tube 102 that individually secures a plurality of cable accommodation spaces in the body tube 104. In this embodiment, eight sheath tube members 22a and six sheath tube members 22b are accommodated in the body tube member 20 in a predetermined arrangement mode (see FIGS. 3 and 4). In the description, when it is not necessary to distinguish between the sheath tube member 22a and the sheath tube member 22b, they are simply referred to as the sheath tube member 22.

具体的には、鞘管部材22は、円筒状に形成される直管部34を含み、ポリエチレン、ポリ塩化ビニルおよびABS等の合成樹脂によって形成される。直管部34の一方端部には、拡径された接着受口36が形成され、他端部は差口38とされる。鞘管部材22の長さは、たとえば5110mmである。また、鞘管部材22aの内径は、たとえば50mmであり、鞘管部材22bの内径は、たとえば30mmである。なお、鞘管部材22の長さがボディ管部材20の長さよりも小さい理由は、鞘管部材22の接着受口36の受容長さがボディ管部材20のゴム輪受口28の受容長さよりも小さく設定されているためであり、鞘管部材22同士を接合したものとボディ管部材20同士を接合したものとでは、ほぼ同じ長さとなる。このような鞘管部材22は、接着受口36に他の鞘管部材22の差口38を差し込んで接着接合することによって、鞘管102を形成する。   Specifically, the sheath tube member 22 includes a straight tube portion 34 formed in a cylindrical shape, and is formed of a synthetic resin such as polyethylene, polyvinyl chloride, and ABS. An enlarged diameter adhesive receiving port 36 is formed at one end portion of the straight pipe portion 34, and the other end portion is set as an insertion port 38. The length of the sheath tube member 22 is, for example, 5110 mm. The inner diameter of the sheath tube member 22a is, for example, 50 mm, and the inner diameter of the sheath tube member 22b is, for example, 30 mm. The reason why the length of the sheath tube member 22 is smaller than the length of the body tube member 20 is that the acceptance length of the adhesive receiving port 36 of the sheath tube member 22 is greater than the received length of the rubber ring receiving port 28 of the body tube member 20. This is because the length is set to be small, and the length obtained by joining the sheath tube members 22 and the shape obtained by joining the body tube members 20 are substantially the same. Such a sheath tube member 22 forms the sheath tube 102 by inserting and joining the difference port 38 of the other sheath tube member 22 to the adhesion receiving port 36.

また、図3および図4に示すように、整列部材24は、ボディ管部材20内において各鞘管部材22を所定の配置態様に整列させた状態で保持するものである。整列部材22は、スポンジ等の軟質材料によって複数の貫通孔40を有する円板状に形成され、軸方向に移動可能かつ軸周りに回転可能な状態でボディ管部材20の直管部26の両端部に配置される。各貫通孔40には、対応する鞘管部材22が軸方向にスライド(摺動)可能に挿通される。   As shown in FIGS. 3 and 4, the alignment member 24 holds the sheath tube members 22 in the body tube member 20 in a state of being aligned in a predetermined arrangement manner. The alignment member 22 is formed in a disk shape having a plurality of through holes 40 with a soft material such as sponge, and is arranged at both ends of the straight tube portion 26 of the body tube member 20 in a state of being movable in the axial direction and rotatable about the axis. Placed in the section. The corresponding sheath tube member 22 is inserted into each through hole 40 so as to be slidable (slidable) in the axial direction.

図7に示すように、ボディ管やりとり継手(スライド管)12は、ボディ管104(ボディ管部材20)をやりとり接続するために用いられてボディ管104の一部を構成する直管状の部材であり、ボディ管部材20と同様に、土圧などの外力に耐え得る強度を有する。具体的には、ボディ管やりとり継手12は、ポリエチレン、ポリ塩化ビニルおよびABS等の合成樹脂によって、ボディ管部材20の外径よりも若干大きい内径を有する円筒状に形成される。ボディ管やりとり継手12の両端部の内周面には、ゴム輪溝が形成されており、このゴム輪溝には止水用のゴム輪42が装着される。ボディ管やりとり継手12の長さは、たとえば1000mmである。   As shown in FIG. 7, the body tube exchange joint (slide tube) 12 is a straight tubular member that is used to exchange and connect the body tube 104 (body tube member 20) and constitutes a part of the body tube 104. In the same manner as the body tube member 20, it has a strength that can withstand external forces such as earth pressure. Specifically, the body tube exchange joint 12 is formed of a synthetic resin such as polyethylene, polyvinyl chloride, and ABS into a cylindrical shape having an inner diameter slightly larger than the outer diameter of the body tube member 20. Rubber ring grooves are formed on the inner peripheral surfaces of both ends of the body tube exchange joint 12, and a rubber ring 42 for water stop is attached to the rubber ring grooves. The length of the body tube exchange joint 12 is, for example, 1000 mm.

ボディ管やりとり継手12には、図8に示すように、その一方端部または両端部から長さ調整用のボディ管部材44が差し込まれ、これによってボディ管やりとりユニット46が形成される。ボディ管部材44は、両端部が差口となっており、ボディ管やりとり継手12に対して軸方向にスライド可能とされる。つまり、ボディ管やりとりユニット46は、ボディ管部材44をスライドさせることによって、その軸方向長さを自由に変化させることができる。なお、長さ調整用のボディ管部材44としては、一方端部にゴム輪受口44aを有するものを用いることもできる(図22参照)。   As shown in FIG. 8, a body tube member 44 for adjusting the length is inserted into the body tube exchange joint 12 from one or both ends thereof, thereby forming a body tube exchange unit 46. The body tube member 44 has an opening at both ends, and can slide in the axial direction with respect to the body tube exchange joint 12. That is, the body tube exchange unit 46 can freely change its axial length by sliding the body tube member 44. As the body tube member 44 for length adjustment, one having a rubber ring receiving port 44a at one end can also be used (see FIG. 22).

また、図9に示すように、鞘管やりとり継手14は、鞘管102(鞘管部材22)をやりとり接続するために用いられて鞘管102の一部を構成する直管状の部材であり、ポリエチレン、ポリ塩化ビニルおよびABS等の合成樹脂によって形成される。鞘管やりとり継手14は、一方端部に形成されるスライド受口48と他端部に形成される差口50とを有し、スライド受口48の奥部にはテーパ状の当たり部52が形成される。スライド受口48の内径は、対応する鞘管部材22の外径よりも若干大きめに設定され、差口50の外径は、対応する鞘管部材22の直管部34の外径と同じまたはほぼ同じ大きさに設定される。この実施例では、径の異なる2種類の鞘管部材22が用いられるので、鞘管やりとり継手14も径の異なる2種類のものが用いられる。また、スライド受口48の軸方向長さ(奥行)は、鞘管部材22の移動、熱伸縮、施工誤差、施工上必要な長さ、および押込み代などを考慮して、最悪条件となった場合でも長さ調整用の鞘管部材54が抜け出ない長さに設定され、たとえば1500mmである。差口50の軸方向長さは、たとえば110mmである。   Moreover, as shown in FIG. 9, the sheath tube exchange joint 14 is a straight tubular member that is used to exchange and connect the sheath tube 102 (sheath tube member 22) and constitutes a part of the sheath tube 102. It is formed of a synthetic resin such as polyethylene, polyvinyl chloride and ABS. The sheath tube exchange joint 14 has a slide receiving port 48 formed at one end and a differential port 50 formed at the other end, and a tapered contact portion 52 is provided at the back of the slide receiving port 48. It is formed. The inner diameter of the slide receiving port 48 is set slightly larger than the outer diameter of the corresponding sheath tube member 22, and the outer diameter of the difference port 50 is the same as the outer diameter of the straight pipe portion 34 of the corresponding sheath tube member 22 or Set to approximately the same size. In this embodiment, since two types of sheath tube members 22 having different diameters are used, two types of sheath tube exchange joints 14 having different diameters are also used. Further, the axial length (depth) of the slide receiving port 48 became the worst condition in consideration of the movement of the sheath tube member 22, thermal expansion and contraction, construction error, length necessary for construction, push-in allowance, and the like. Even in this case, the length is set such that the sheath tube member 54 for adjusting the length does not come out, for example, 1500 mm. The axial length of the difference port 50 is, for example, 110 mm.

鞘管やりとり継手14のスライド受口48には、図10に示すように、長さ調整用の鞘管部材54が差し込まれ、これによって鞘管やりとりユニット56が形成される。鞘管部材54は、その一方端部が鞘管やりとり継手14のスライド受口48に対して軸方向にスライド可能に挿通される。つまり、鞘管やりとりユニット56は、鞘管部材54をスライドさせることによって、その軸方向長さを自由に変化させることができる。鞘管部材54としては、他端部に接着受口54aが形成されているもの(図10(A)参照)と、他端部が差口54bなっているもの(図10(B)参照)がある。   As shown in FIG. 10, a length adjustment sheath tube member 54 is inserted into the slide receptacle 48 of the sheath tube exchange joint 14, thereby forming a sheath tube exchange unit 56. One end of the sheath tube member 54 is inserted into the slide receiving port 48 of the sheath tube exchange joint 14 so as to be slidable in the axial direction. That is, the sheath tube exchange unit 56 can freely change its axial length by sliding the sheath tube member 54. As the sheath tube member 54, one having an adhesive receiving port 54a formed at the other end (see FIG. 10A) and one having the other end formed as a differential port 54b (see FIG. 10B). There is.

なお、図示は省略するが、複数の鞘管やりとり継手14(鞘管やりとりユニット56)を個別に識別できるように、鞘管やりとり継手14のそれぞれに対して識別情報を付与しておくとよい。識別情報の付与方法は、たとえば、鞘管やりとり継手14をカラー化して色分けすることであってもよいし、色分けしたり個別の番号を記載したりしたテープやキャップ等を鞘管やりとり継手14に取り付けることであってもよい。   In addition, although illustration is abbreviate | omitted, it is good to give identification information with respect to each of the sheath pipe exchange coupling 14 so that the some sheath pipe exchange joint 14 (sheath pipe exchange unit 56) can be identified separately. The method for giving the identification information may be, for example, colorizing the sheath tube exchange joint 14 by color, or tape or a cap or the like that is color-coded or described with an individual number is attached to the sheath tube exchange joint 14. It may be attached.

以下、図11−図19を参照して、ケーブル保護管部材10、ボディ管やりとり継手12および鞘管やりとり継手14などを用いて、所定の施工区間に対してケーブル保護管路100を施工する施工方法について説明する。なお、図11および図13−図19、ならびに後述する図22−図25では、図面の簡素化のため、代表して1つの鞘管部材22(鞘管102)を示し、他の鞘管部材22の図示を省略している。   Hereinafter, referring to FIGS. 11 to 19, the construction for constructing the cable protection pipe line 100 for a predetermined construction section using the cable protection pipe member 10, the body pipe exchange joint 12, the sheath pipe exchange joint 14, and the like. A method will be described. 11 and 13 to 19 and FIGS. 22 to 25 to be described later, for the sake of simplification of the drawings, one sheath tube member 22 (sheath tube 102) is shown as a representative, and other sheath tube members are shown. Illustration of 22 is omitted.

この実施例のケーブル保護管路の施工方法では、先ず、図11に示すように、ハンドホール106a,106bを設置する場所(設置予定場所)から離れた場所を起点として、つまりハンドホール106a,106bの有無に関係なく施工区間の途中からケーブル保護管部材10を順次接続し、ハンドホール106a,106bとは独立したケーブル保護管路100を施工区間の中間部分に施工する。この際、中間部分に施工するケーブル保護管路100の前後には、やりとり接続を行うための任意の直線区間108a,108b(たとえば2500−6000mmの間隔)を残せるように施工する。なお、第1ハンドホール106aと施工区間の中間部分に施工するケーブル保護管路100の起点側との距離、および第2ハンドホール106bと施工区間の中間部分に施工するケーブル保護管路100の終点側との距離は任意であり、施工現場に応じて適宜設定される。   In the construction method of the cable protection conduit of this embodiment, as shown in FIG. 11, first, as a starting point, a place away from the place where the handholes 106a and 106b are installed (planned installation place), that is, the handholes 106a and 106b. The cable protection pipe members 10 are sequentially connected from the middle of the construction section regardless of the presence or absence of the cable, and the cable protection pipe line 100 independent of the hand holes 106a and 106b is constructed in the middle part of the construction section. At this time, it is constructed so that arbitrary straight sections 108a and 108b (for example, an interval of 2500 to 6000 mm) for performing the exchange connection can be left before and after the cable protection conduit 100 to be constructed in the intermediate portion. It should be noted that the distance between the first hand hole 106a and the starting point side of the cable protection conduit 100 constructed in the middle portion of the construction section, and the end point of the cable protection conduit 100 constructed in the middle portion of the second hand hole 106b and the construction section. The distance to the side is arbitrary and is set as appropriate according to the construction site.

具体的には、先ず、一方の直線区間108aの直後に、起点となる1番目のケーブル保護管部材10を置き、それに後続するケーブル保護管部材10を順次接続していく。そして、他方の直線区間108b(図19参照)の手前までケーブル保護管路100を順次施工する。   Specifically, first, the first cable protection tube member 10 as a starting point is placed immediately after one of the straight sections 108a, and the subsequent cable protection tube members 10 are sequentially connected. Then, the cable protection conduit 100 is sequentially constructed up to the front of the other straight section 108b (see FIG. 19).

ケーブル保護管部材10同士を接続する際には、先行するケーブル保護管部材10の鞘管部材22の接着受口36に対し、それと配置位置が対応する続くケーブル保護管部材10の鞘管部材22の差口38を挿入して、それらを接着接合する。この際には、後続するケーブル保護管部材10の鞘管部材22をボディ管部材20から外側に引き出して、引き出した鞘管部材22の差口38の外面に塩化ビニル樹脂系やエポキシ樹脂系などの接着剤を塗布し、先行する鞘管部材22の接着受口36に挿入するとよい。この作業を1本ずつ繰り返して、複数の鞘管部材22の全ての接続作業が終了すると、先行するケーブル保護管部材10のボディ管部材20のゴム輪受口28に対し、後続するケーブル保護管部材10のボディ管部材20の差口30を挿入して、それらをゴム輪接合する。なお、上述のような構成のケーブル保護管部材10を用いることにより、ボディ管部材20内で所定の配置位置に整列保持された鞘管部材22を順次引き出して接続作業を行うことができるので、鞘管部材22を他の鞘管部材22と混同することなく、正確かつ簡単に接続することができる。   When the cable protection tube members 10 are connected to each other, the sheath tube member 22 of the cable protection tube member 10 continues to correspond to the position of the bonding receiving port 36 of the sheath tube member 22 of the preceding cable protection tube member 10. Are inserted and adhesively bonded to each other. At this time, the sheath tube member 22 of the subsequent cable protection tube member 10 is pulled out from the body tube member 20, and a vinyl chloride resin system, an epoxy resin system, or the like is formed on the outer surface of the outlet 38 of the pulled out sheath tube member 22. The adhesive may be applied and inserted into the adhesive receiving port 36 of the preceding sheath tube member 22. When this operation is repeated one by one and all the connection operations of the plurality of sheath tube members 22 are completed, the subsequent cable protection tube is inserted into the rubber ring receiving port 28 of the body tube member 20 of the preceding cable protection tube member 10. The insertion port 30 of the body tube member 20 of the member 10 is inserted, and they are joined by a rubber ring. In addition, by using the cable protection tube member 10 having the above-described configuration, the sheath tube member 22 aligned and held in a predetermined arrangement position in the body tube member 20 can be sequentially pulled out, so that connection work can be performed. The sheath tube member 22 can be accurately and easily connected without being confused with other sheath tube members 22.

なお、ケーブル保護管部材10を順次接続していくと、最終番目の鞘管部材22がボディ管部材20からはみ出す状態となる場合がある(図19参照)が、そのはみ出し長さが所定値(たとえば200mm)を超える場合には、所定範囲(たとえば100−200mmの範囲)内となるように鞘管部材22の接着受口36部分を切断するようにするとよい。このことは、後述の第1ハンドホール106aを起点として施工されるケーブル保護管路100の終点側、および第2ハンドホール106bを起点として施工されるケーブル保護管路100の終点側においても同様である。これによって、続くやりとり接続の工程を行い易くなる。   When the cable protection tube members 10 are sequentially connected, the final sheath tube member 22 may protrude from the body tube member 20 (see FIG. 19), but the protrusion length is a predetermined value (see FIG. 19). For example, when it exceeds 200 mm, it is preferable to cut the adhesion receiving port 36 portion of the sheath tube member 22 so as to be within a predetermined range (for example, a range of 100-200 mm). The same applies to the end point side of the cable protection conduit 100 constructed from the first hand hole 106a described later and the end point side of the cable protection conduit 100 constructed from the second hand hole 106b. is there. This facilitates the subsequent exchange connection process.

一方、中央部分に施工したケーブル保護管路100の1番目(起点側)の鞘管部材22の差口38には、一方端部に接着受口62aを有する短尺の受口付鞘管62を接続して、鞘管102の先端部がボディ管104から100−200mm程度突出するようにするとよい(図14参照)。これによって、続くやりとり接続の工程を行い易くなる。なお、図示は省略するが、受口付鞘管62を用いる代わりに、両端部に接着受口が形成された鞘管ソケットを用いて、ボディ管104から鞘管102を突出させるようにしてもよい。この場合には、後述する図15および図17に示す鞘管102のやりとり接続において、図10(A)に示す鞘管やりとりユニット56が用いられる代わりに、図10(B)に示す鞘管やりとりユニット56が用いられる。   On the other hand, a short receiving end sheathed pipe 62 having an adhesive receiving opening 62a at one end is provided at the outlet 38 of the first (starting side) sheath pipe member 22 of the cable protection conduit 100 constructed in the central portion. It is good to connect, and it is good for the front-end | tip part of the sheath pipe | tube 102 to protrude about 100-200 mm from the body pipe | tube 104 (refer FIG. 14). This facilitates the subsequent exchange connection process. Although illustration is omitted, the sheath tube 102 may be protruded from the body tube 104 by using a sheath tube socket in which adhesive receptacles are formed at both ends instead of using the sheath tube 62 with the receptacle. Good. In this case, in the exchange connection of the sheath tube 102 shown in FIG. 15 and FIG. 17 described later, the sheath tube exchange unit 56 shown in FIG. 10 (B) is used instead of the sheath tube exchange unit 56 shown in FIG. 10 (A). A unit 56 is used.

施工区間の中間部分にケーブル保護管路100を施工すると、続いて、図12−図19に示すように、施工区間の両端に第1ハンドホール106aおよび第2ハンドホール106bを設け、中間部分に形成したケーブル保護管路100の起点側および終点側のそれぞれと、第1ハンドホール106aおよび第2ハンドホール106bのそれぞれとを連結するケーブル保護管路100を施工し、一連のケーブル保護管路100を形成する。   When the cable protection conduit 100 is constructed in the middle part of the construction section, subsequently, as shown in FIGS. 12-19, the first hand hole 106a and the second hand hole 106b are provided at both ends of the construction section, and the middle part is provided. A cable protection pipeline 100 that connects each of the start side and the end point of the formed cable protection pipeline 100 and each of the first hand hole 106a and the second hand hole 106b is constructed, and a series of cable protection pipelines 100 are formed. Form.

具体的には、先ず、図12に示すように、施工区間の一方端に第1ハンドホール106aを設ける。そして、第1ハンドホール106aが備えるダクトスリーブ110に対して、複数の鞘管ダクトスリーブ112を備えるボルト固定式ロータス管114を取り付ける。ダクトスリーブ110およびボルト固定式ロータス管114は、ハンドホール106a,106bに対してボディ管104(ボディ管部材20)および鞘管102(鞘管部材22)を接続するための部材であり、複数の鞘管ダクトスリーブ110は、ケーブル保護管路100が備える鞘管102の本数や配列などに応じて設けられる。なお、ダクトスリーブ110およびボルト固定式ロータス管114については、公知技術であるので、この技術に関する詳しい説明および図示は省略する。   Specifically, first, as shown in FIG. 12, the first hand hole 106a is provided at one end of the construction section. Then, a bolt-fixed lotus tube 114 including a plurality of sheath tube duct sleeves 112 is attached to the duct sleeve 110 included in the first hand hole 106a. The duct sleeve 110 and the bolt-fixed lotus tube 114 are members for connecting the body tube 104 (the body tube member 20) and the sheath tube 102 (the sheath tube member 22) to the hand holes 106a and 106b. The sheath tube duct sleeve 110 is provided according to the number and arrangement of the sheath tubes 102 included in the cable protection conduit 100. Note that the duct sleeve 110 and the bolt-fixed lotus pipe 114 are well-known techniques, and thus detailed description and illustration thereof will be omitted.

続いて、図13に示すように、鞘管ダクトスリーブ112のそれぞれに端末用の鞘管部材58を差し込んで接続すると共に、ダクトスリーブ110に端末用のボディ管部材60を差し込んで接続する。ここで、端末用の鞘管部材58としては、たとえば2本の鞘管部材22を連結および切断する等して、その先端部が端末用のボディ管部材60から100−200mm程度突出するように長さが調整されたものを用いる。これは、次の鞘管部材22との接合を容易にするためである。   Next, as shown in FIG. 13, the terminal sheath tube member 58 is inserted and connected to each of the sheath tube duct sleeves 112, and the terminal body tube member 60 is inserted and connected to the duct sleeve 110. Here, as the terminal tube member 58 for the terminal, for example, by connecting and cutting two sheath tube members 22, the tip portion protrudes from the body tube member 60 for the terminal by about 100 to 200 mm. Use one whose length is adjusted. This is for facilitating the joining with the next sheath tube member 22.

なお、ハンドホール106a,106bに対してボディ管104および鞘管102を接続するための部材ないし構造は、上述のものに限定されず、公知技術を適宜採用し得る。たとえば、ボルト固定式ロータス管114を用いる代わりに、ボディ管用のロータス管と鞘管用の鞘管ダクトスリーブとが予めユニット化されたロータス管ユニットを用いるようにしてもよい。   In addition, the member thru | or structure for connecting the body pipe | tube 104 and the sheath pipe | tube 102 with respect to the handholes 106a and 106b are not limited to the above-mentioned thing, A well-known technique can be employ | adopted suitably. For example, instead of using the bolt-fixed lotus tube 114, a lotus tube unit in which a lotus tube for a body tube and a sheath tube duct sleeve for a sheath tube are previously unitized may be used.

図13に戻って、ハンドホール106aに対して端末用の鞘管部材58およびボディ管部材60を接続すると、続いて、ケーブル保護管部材10(つまり鞘管部材22およびボディ管部材20のそれぞれ)を順次接続して、直線区間108aの手前、つまりやりとり接続を行う場所までケーブル保護管路100を施工する。端末用の鞘管部材58およびボディ管部材60に対してケーブル保護管部材10を順次接続する作業は、上述のケーブル保護管部材10同士を接続する作業と同様に行うとよい。   Returning to FIG. 13, when the terminal sheath tube member 58 and the body tube member 60 are connected to the hand hole 106 a, the cable protection tube member 10 (that is, the sheath tube member 22 and the body tube member 20), respectively. Are sequentially connected, and the cable protection conduit 100 is constructed before the straight section 108a, that is, up to the place where the exchange connection is performed. The operation of sequentially connecting the cable protection tube members 10 to the terminal sheath member 58 and the body tube member 60 may be performed in the same manner as the operation of connecting the cable protection tube members 10 described above.

上述の施工作業によって、施工区間の中間部分に形成したケーブル保護管路100の起点側において、図14に示すような、直線区間108aを残してケーブル保護管路100が施工された状態になると、続いて、やりとり接続を行う。すなわち、図15−図18に示すように、中央部分に形成したケーブル保護管路100の1番目の鞘管部材22およびボディ管部材20のそれぞれと、第1ハンドホール106aを起点として形成したケーブル保護管路100の最終番目の鞘管部材22およびボディ管部材20のそれぞれとを、鞘管やりとり継手14およびボディ管やりとり継手12を用いてやりとり接続する。   As shown in FIG. 14, on the starting side of the cable protection conduit 100 formed in the middle part of the construction section, the cable protection conduit 100 is constructed with the straight section 108a left, as shown in FIG. Then, exchange connection is performed. That is, as shown in FIGS. 15 to 18, a cable formed with the first sheath hole member 22 and the body tube member 20 of the cable protection conduit 100 formed at the center portion and the first hand hole 106 a as a starting point. The final sheath tube member 22 and the body tube member 20 of the protection pipe line 100 are exchanged and connected using the sheath tube exchange joint 14 and the body tube exchange joint 12.

具体的には、先ず、残った直線区間108aの長さを測定し、それに応じた長さを有する長さ調整用の鞘管部材54とボディ管部材44とを製作する。そして、長さ調整用の鞘管部材54と鞘管やりとり継手14とを接続した鞘管やりとりユニット56(図10(a)参照)を鞘管部材22(鞘管102)の本数分用意すると共に、ボディ管やりとり継手12の一方端部に長さ調整用のボディ管部材44を接続したボディ管やりとりユニット46(図8(a)参照)を用意する。なお、長さ調整用の鞘管部材54およびボディ管部材44は、鞘管部材22およびボディ管部材20を適宜切断する等して製作するとよい。   Specifically, first, the length of the remaining straight section 108a is measured, and the length adjusting sheath tube member 54 and the body tube member 44 having the corresponding length are manufactured. Then, as many as the number of the sheath tube members 22 (sheath tubes 102) are prepared for the sheath tube exchange units 56 (see FIG. 10A) in which the length adjusting sheath tube members 54 and the sheath tube exchange joints 14 are connected. A body tube exchange unit 46 (see FIG. 8A) in which a body tube member 44 for length adjustment is connected to one end of the body tube exchange joint 12 is prepared. The length-adjusting sheath tube member 54 and body tube member 44 may be manufactured by appropriately cutting the sheath tube member 22 and the body tube member 20.

次に、図15に示すように、鞘管やりとりユニット56の一方端を一方の鞘管部材22に接続する。すなわち、長さ調整用の鞘管部材54を鞘管やりとり継手14のスライド受口48の奥まで差し込んだ状態(つまり鞘管やりとりユニット56を縮めた状態)で、接着剤を塗布した受口付鞘管62の差口を長さ調整用の鞘管部材54の接着受口54aに挿入して接着接合する。この作業を1本ずつ繰り返して、複数の鞘管部材22(受口付鞘管62)の全てに鞘管やりとりユニット56の一方端を接続する。   Next, as shown in FIG. 15, one end of the sheath tube exchange unit 56 is connected to one sheath tube member 22. That is, with the receptacle coated with adhesive in a state in which the length-adjusting sheath tube member 54 is inserted to the back of the slide receptacle 48 of the sheath tube exchange joint 14 (that is, the sheath tube exchange unit 56 is contracted). The opening of the sheath tube 62 is inserted into the adhesive receiving port 54a of the sheath tube member 54 for adjusting the length to be bonded. This operation is repeated one by one, and one end of the sheath tube exchange unit 56 is connected to all of the plurality of sheath tube members 22 (the sheathed tube 62 with the opening).

続いて、ボディ管やりとりユニット46の一方端を一方のボディ管部材20に接続する。すなわち、図16に示すように、長さ調整用のボディ管部材44をボディ管やりとり継手12の奥側まで差し込んだ状態(ボディ管やりとりユニット46を縮めた状態)で、鞘管やりとりユニット56の他端を持ち上げるようにして、ボディ管やりとりユニット46内に複数の鞘管やりとりユニット56全体を挿通していく。そして、ボディ管やりとり継手12の端部(ゴム輪受口)にボディ管部材20の差口30を挿入して、それらをゴム輪接合する。   Subsequently, one end of the body tube exchange unit 46 is connected to one body tube member 20. That is, as shown in FIG. 16, in a state in which the body tube member 44 for length adjustment is inserted to the back side of the body tube exchange joint 12 (a state in which the body tube exchange unit 46 is contracted), The whole of the plurality of sheath tube exchange units 56 is inserted into the body tube exchange unit 46 so as to lift the other end. Then, the outlet 30 of the body tube member 20 is inserted into the end portion (rubber ring receiving port) of the body tube exchange joint 12, and these are joined to the rubber ring.

続いて、図17に示すように、鞘管やりとりユニット56の他端を他方の鞘管部材22に接続する。すなわち、長さ調整用の鞘管部材54を外側にスライドさせて鞘管やりとりユニット56を伸ばし、接着剤を塗布した鞘管やりとり継手14の差口50を鞘管部材22の接着受口36に挿入して接着接合する。なお、鞘管部材22のやりとり接続を行う際には、鞘管やりとり継手14の差口50を先に接続し、その後に長さ調整用の鞘管部材54の接着受口54aを接続するようにしてもよい。   Subsequently, as shown in FIG. 17, the other end of the sheath tube exchange unit 56 is connected to the other sheath tube member 22. That is, the sheath tube member 54 for adjusting the length is slid outward to extend the sheath tube exchange unit 56, and the outlet 50 of the sheath tube exchange joint 14 to which the adhesive is applied is used as the adhesion receiving port 36 of the sheath tube member 22. Insert and bond. When the exchange connection of the sheath tube member 22 is performed, the connection port 50 of the sheath tube exchange joint 14 is connected first, and then the adhesion receiving port 54a of the length adjustment sheath tube member 54 is connected. It may be.

そして最後に、図18に示すように、ボディ管やりとりユニット46の他端を他方のボディ管部材20に接続する。すなわち、長さ調整用のボディ管部材44を外側にスライドさせてボディ管やりとりユニット46を伸ばし、ボディ管部材20のゴム輪受口28に対して長さ調整用のボディ管部材44の差口を挿入して、それらをゴム輪接合する。   Finally, as shown in FIG. 18, the other end of the body tube exchange unit 46 is connected to the other body tube member 20. That is, the body tube exchange unit 46 is extended by sliding the body tube member 44 for adjusting the length outward, and the outlet of the body tube member 44 for adjusting the length with respect to the rubber ring receiving port 28 of the body tube member 20. Insert them and join them together.

一方、第2ハンドホール106b側においても、第1ハンドホール106a側と同様にして、第2ハンドホール106bが備えるダクトスリーブ110に対してボルト固定式ロータス管114を装着して、端末用の鞘管部材58およびボディ管部材60を接続する。その後、ケーブル保護管部材10を順次接続して、直線区間108bの手前、つまりやりとり接続を行う場所までケーブル保護管路100を施工する。   On the other hand, on the second hand hole 106b side, similarly to the first hand hole 106a side, a bolt-fixed lotus tube 114 is attached to the duct sleeve 110 provided in the second hand hole 106b, and a sheath for the terminal is provided. The tube member 58 and the body tube member 60 are connected. Thereafter, the cable protection pipe members 10 are sequentially connected, and the cable protection pipe line 100 is constructed before the straight section 108b, that is, the place where the exchange connection is performed.

そして、施工区間の中間部分に形成したケーブル保護管路100の終点側において、直線区間108bを残してケーブル保護管路100が施工された状態になると、続いて、やりとり接続を行う。すなわち、図19に示すように、中央部分に形成したケーブル保護管路100の最終番目の鞘管部材22およびボディ管部材20のそれぞれと、第2ハンドホール106bを起点として形成したケーブル保護管路100の最終番目の鞘管部材22およびボディ管部材20のそれぞれとを、鞘管やりとり継手14およびボディ管やりとり継手12を用いてやりとり接続する。このやりとり接続の際には、鞘管やりとり継手14のスライド受口48に対して他端部が差口60なっている長さ調整用の鞘管部材54を差し込んだ鞘管やりとりユニット56と、ボディ管やりとり継手12の両端部から長さ調整用のボディ管部材44を差し込んだボディ管やりとりユニット46とを用いるとよい。   Then, when the cable protection conduit 100 is constructed on the end point side of the cable protection conduit 100 formed in the middle portion of the construction section, leaving the straight section 108b, the exchange connection is subsequently performed. That is, as shown in FIG. 19, each of the last sheath tube member 22 and the body tube member 20 of the cable protection conduit 100 formed at the center portion and the cable protection conduit formed from the second hand hole 106b as a starting point. The 100th final sheath tube member 22 and the body tube member 20 are connected to each other using the sheath tube exchange joint 14 and the body tube exchange joint 12. At the time of this exchange connection, a sheath tube exchange unit 56 in which a length adjustment sheath tube member 54 having the other end 60 is inserted into the slide receiving port 48 of the sheath tube exchange joint 14 is inserted, A body tube exchange unit 46 in which a body tube member 44 for adjusting the length is inserted from both ends of the body tube exchange joint 12 may be used.

以上の施工作業によって、図1および図2に示すような、2つのハンドホール106a,106bを連結する一連のケーブル保護管路100が形成される。その後、ケーブル保護管路100の各鞘管102の内部(ケーブル収容スペース)には、適宜ケーブルが挿通される。   Through the above construction work, a series of cable protection conduits 100 connecting the two handholes 106a and 106b as shown in FIGS. 1 and 2 are formed. Thereafter, a cable is appropriately inserted into each sheath tube 102 (cable housing space) of the cable protection conduit 100.

この実施例によれば、施工区間の途中からケーブル保護管路100を施工するので、ハンドホール106a,106bの製作に左右されることなく、つまりハンドホール106a,106bがない状態でもケーブル保護管路100を施工でき、工期短縮を図ることができる。   According to this embodiment, since the cable protection conduit 100 is constructed in the middle of the construction section, the cable protection conduit is not affected by the manufacture of the hand holes 106a and 106b, that is, even in the state where the hand holes 106a and 106b are not present. 100 can be constructed, and the construction period can be shortened.

また、鞘管やりとり継手14およびボディ管やりとり継手12を用いてやりとり接続を行うため、施工区間のいずれかに直線区間108a,108bがあればやりとり接続が可能となり、施工の自由度が高まる。つまり、施工区間の中間地点においてもやりとり接続を行うことができるので、ハンドホール106a,106bの近傍が曲管区間となっている場合にも適切に対応できる。   Further, since the exchange connection is performed using the sheath tube exchange joint 14 and the body tube exchange joint 12, if any of the construction sections has the straight sections 108a and 108b, the exchange connection is possible, and the degree of freedom of construction is increased. That is, since the exchange connection can be performed at the intermediate point of the construction section, it is possible to appropriately cope with the case where the vicinity of the hand holes 106a and 106b is a curved pipe section.

なお、上述の実施例では、ボディ管部材20と鞘管部材22とが整列部材24を介して一体化されたケーブル保護管部材10を用いたが、ケーブル保護管部材の態様はこれに限定されず、公知のケーブル保護管部材(鞘管部材およびボディ管部材)を適宜利用できる。たとえば、鞘管部材とボディ管部材とは一体化されていなくてもよい。また、たとえば、複数の鞘管部材を個別に識別できるように、鞘管部材のそれぞれに対して識別情報を付与しておくこともできる。識別情報の付与方法は、たとえば、鞘管部材をカラー化して色分けすることであってもよいし、色分けしたり個別の番号を記載したりしたテープやキャップ等を鞘管部材に取り付けることであってもよい。   In the above-described embodiment, the cable protection tube member 10 in which the body tube member 20 and the sheath tube member 22 are integrated via the alignment member 24 is used. However, the aspect of the cable protection tube member is limited to this. In other words, known cable protection tube members (sheath tube members and body tube members) can be used as appropriate. For example, the sheath tube member and the body tube member may not be integrated. Further, for example, identification information can be given to each of the sheath tube members so that the plurality of sheath tube members can be individually identified. The method of giving the identification information may be, for example, colorizing the sheath tube member by color, or attaching a tape or cap that is color-coded or described with individual numbers to the sheath tube member. May be.

また、上述の実施例では、鞘管やりとり継手14として他端部に差口50を有するものを用いたが、鞘管やりとり継手14の構成は、これに限定されない。たとえば、図20に示すような鞘管やりとり継手14を用いることもできる。図20に示す鞘管やりとり継手14は、図9に示す鞘管やりとり継手14とほぼ同じであるが、他端部に差口50の代わりに接着受口76を有する点が異なる。すなわち、図20に示す鞘管やりとり継手14は、一方端部に形成されるスライド受口48と他端部に形成される接着受口76とを有する。また、スライド受口48の奥部にはテーパ状の当たり部52が形成され、接着受口76の奥部にはテーパ状の当たり部78が形成される。なお、接着受口76は、鞘管やりとり継手14に予め一体成形されていてもよいし、両端部に接着受口を有する鞘管ソケット(図示せず)を差口50に対して接着接合することにより形成してもよい。   Moreover, in the above-mentioned Example, what has the difference port 50 in the other end part was used as the sheath pipe exchange joint 14, However, The structure of the sheath pipe exchange joint 14 is not limited to this. For example, a sheath tube exchange joint 14 as shown in FIG. 20 can be used. The sheath pipe exchange joint 14 shown in FIG. 20 is substantially the same as the sheath pipe exchange joint 14 shown in FIG. 9 except that an adhesive receiving port 76 is provided instead of the port 50 at the other end. That is, the sheath tube exchange joint 14 shown in FIG. 20 has a slide receiving port 48 formed at one end and an adhesive receiving port 76 formed at the other end. Further, a tapered contact portion 52 is formed at the back of the slide receiving port 48, and a tapered contact portion 78 is formed at the back of the adhesive receiving port 76. The adhesive receiving port 76 may be integrally formed with the sheath tube exchange joint 14 in advance, or a sheath tube socket (not shown) having an adhesive receiving port at both ends is adhesively bonded to the differential port 50. May be formed.

図20に示す鞘管やりとり継手14のスライド受口48には、図21に示すように、一方端部が接着受口54aとなっている長さ調整用の鞘管部材54、または一方端部が差口54bとなっている鞘管部材54がスライド可能に差し込まれ、これによって鞘管やりとりユニット56が形成される。なお、図21(A)に示す鞘管やりとりユニット56は、ボディ管部材20からのはみ出し長さを調整するために鞘管部材22の接着受口36部分を切断したこと等によって、鞘管部材22の差口同士をやりとり接続することになった場合に用いられる。   As shown in FIG. 21, the slide receiving port 48 of the sheath tube exchange joint 14 shown in FIG. 20 has a length-adjusting sheath tube member 54 having one end portion serving as an adhesive receiving port 54a, or one end portion. The sheath tube member 54 having a gap 54b is slidably inserted, whereby a sheath tube exchange unit 56 is formed. Note that the sheath tube exchange unit 56 shown in FIG. 21 (A) has a sheath tube member formed by cutting the adhesion receiving port 36 portion of the sheath tube member 22 in order to adjust the protruding length from the body tube member 20. This is used when the 22 gaps are exchanged and connected.

さらに、上述の実施例では、施工区間の中間部分にケーブル保護管路100を施工した後に、施工区間の両端にハンドホール106a,106bを設置し、これらを接続するケーブル保護管路100を施工するようにしたが、これらの施工作業の順序または開始するタイミングは適宜変更可能であり、これらの施工作業を同時並行的に行うこともできる。これは、後述する他の実施例においても同様である。   Furthermore, in the above-described embodiment, after constructing the cable protection conduit 100 in the middle part of the construction section, the hand holes 106a and 106b are installed at both ends of the construction section, and the cable protection conduit 100 that connects them is constructed. However, the order of these construction works or the timing to start can be changed as appropriate, and these construction works can be performed in parallel. The same applies to other embodiments described later.

たとえば、施工区間の中間部分にケーブル保護管路100を施工している途中で、ハンドホール106a,106bの製作が完了した場合には、中間部分へのケーブル保護管路100の施工と並行して(たとえば、中間部分へのケーブル保護管路100の施工を一旦中断して、或いは継続しながら)、施工区間の一方端に第1ハンドホール106aを設置する工程、および施工区間の中間部分に形成したケーブル保護管路100の起点側と第1ハンドホール106aとを接続するケーブル保護管路100を施工する工程を行うようにしてもよい。また、施工区間の他端側においても、中間部分へのケーブル保護管路100の施工と並行して、施工区間の他端に第2ハンドホール106bを設置する工程、および施工区間の中間部分に形成したケーブル保護管路100の終点側と第2ハンドホール106bとを接続するケーブル保護管路100を施工する工程を行ってもよい(ただし、やりとり接続する工程は中間部分へのケーブル保護管路100の施工が完了した後となる)。   For example, when the production of the hand holes 106a and 106b is completed while the cable protection pipeline 100 is being constructed in the middle portion of the construction section, the construction of the cable protection pipeline 100 is performed in parallel with the middle portion. (For example, temporarily suspending or continuing the construction of the cable protection conduit 100 to the intermediate portion), forming the first hand hole 106a at one end of the construction section, and forming the intermediate section of the construction section You may make it perform the process of constructing the cable protection conduit 100 which connects the origin side of the cable protection conduit 100 and the 1st handhole 106a. Also, on the other end side of the construction section, in parallel with the construction of the cable protection conduit 100 to the intermediate section, the process of installing the second hand hole 106b at the other end of the construction section, and the intermediate section of the construction section You may perform the process of constructing the cable protection pipe line 100 which connects the end point side of the formed cable protection pipe line 100 and the 2nd handhole 106b (however, the process of exchange connection is the cable protection pipe line to an intermediate part) After 100 constructions are complete).

また、たとえば、施工開始時に既にハンドホール106a,106bの製作が完了している場合には、施工区間の中間部分へのケーブル保護管路100の施工と、施工区間の両端へのハンドホール106a,106bの設置とを並行して行うこともできる。もちろん、施工区間の中間部分に形成したケーブル保護管路100の起点側と第1ハンドホール106aとを接続するケーブル保護管路100を施工する工程、および施工区間の中間部分に形成したケーブル保護管路100の終点側と第2ハンドホール106bとを接続するケーブル保護管路100の施工する工程も、施工区間の中間部分へのケーブル保護管路100の施工と並行して行うこともできる。   In addition, for example, when the manufacture of the hand holes 106a and 106b has already been completed at the start of the construction, the construction of the cable protection conduit 100 in the middle part of the construction section and the hand holes 106a, The installation of 106b can also be performed in parallel. Of course, the process of constructing the cable protection conduit 100 connecting the starting side of the cable protection conduit 100 formed in the middle part of the construction section and the first hand hole 106a, and the cable protection pipe formed in the middle part of the construction section The step of constructing the cable protection conduit 100 that connects the end point side of the route 100 and the second hand hole 106b can also be performed in parallel with the construction of the cable protection conduit 100 to the intermediate portion of the construction section.

このように、複数の工程を同時並行的に行うようにすれば、施工作業をより効率化でき、工期をより短縮をすることができる。なお、ハンドホール106a,106bの設置作業などは、施工区間の中間部分へのケーブル保護管路100の施工を開始する前に行うこともできる。   Thus, if a plurality of processes are performed simultaneously, the construction work can be made more efficient and the construction period can be further shortened. It should be noted that the installation work of the hand holes 106a and 106b can be performed before the construction of the cable protection conduit 100 to the middle part of the construction section is started.

続いて、図22−図25を参照して、この発明のケーブル保護管路の施工方法の他の実施例について説明する。この実施例は、ケーブル保護管路100のハンドホール106a,106b近傍の部分が直線区間108a,108bである場合に用いられる施工方法であって、鞘管やりとり継手14を用いるのではなく、ロータス管(実施例ではボルト固定式ロータス管114)のやりとり機構を用いて鞘管102のやりとり接続を行う点が上述の実施例と異なる。以下、図22−図25を参照して具体的に説明するが、やりとり接続の工程以外は上述の実施例とほぼ同様であるので、共通する部分についてはその説明を省略或いは簡略化する。   Then, with reference to FIGS. 22-25, the other Example of the construction method of the cable protection pipeline of this invention is described. This embodiment is a construction method used when the portions near the hand holes 106a and 106b of the cable protection pipe line 100 are straight sections 108a and 108b, and is not a sheath pipe exchange joint 14 but a lotus pipe. The point which performs the exchange connection of the sheath pipe | tube 102 using the exchange mechanism of the (bolt fixation type | mold lotus pipe 114 in an Example) differs from the above-mentioned Example. Hereinafter, a specific description will be given with reference to FIGS. 22 to 25. However, since the steps other than the exchange connection process are substantially the same as those in the above-described embodiment, the description of the common parts is omitted or simplified.

この実施例では、先ず、第1ハンドホール106aの設置予定場所から3000mmほど離れた地点を起点として、つまり第1ハンドホール106aの近傍にやりとり接続するための直線区間108aを残した状態で、ケーブル保護管部材10を順次接続していく。そして、その先頭部分が第2ハンドホール106bの設置予定場所から2500−6000mmほど離れた地点に達するまで、つまり第2ハンドホール106bの近傍にやりとり接続するための直線区間108bを残した状態となるまで、ケーブル保護管路100を施工していく。また、施工区間の一方端には第1ハンドホール106aを設置し、施工区間の他端には第2ハンドホール106bを設置する。   In this embodiment, first, the cable is started with a point about 3000 mm away from the planned installation location of the first hand hole 106a, that is, with the straight section 108a for exchanging and connecting in the vicinity of the first hand hole 106a remaining. The protective tube members 10 are sequentially connected. Then, until the leading portion reaches a point about 2500 to 6000 mm away from the planned installation location of the second handhole 106b, that is, the straight section 108b for exchanging and connecting in the vicinity of the second handhole 106b remains. Until then, the cable protection conduit 100 is constructed. The first hand hole 106a is installed at one end of the construction section, and the second hand hole 106b is installed at the other end of the construction section.

上述の施工作業によって、施工区間の中間部分に形成したケーブル保護管路100の起点側および終点側において、図22および図24に示すような、直線区間108a,108bを残してケーブル保護管路100が施工された状態になると、続いて、やりとり接続を行う。つまり、施工区間の中間部分に形成したケーブル保護管路100の起点側と第1ハンドホール106aとを接続するケーブル保護管路100を施工する工程、および施工区間の中間部分に形成したケーブル保護管路100の終点側と第2ハンドホール106bとを接続するケーブル保護管路100を施工する工程を行う。   As shown in FIGS. 22 and 24, the cable protection conduit 100 leaves the straight sections 108 a and 108 b on the start side and end point side of the cable protection conduit 100 formed in the intermediate portion of the construction section by the above construction work. Then, the exchange connection is made. That is, the process of constructing the cable protection conduit 100 connecting the starting side of the cable protection conduit 100 formed in the middle part of the construction section and the first hand hole 106a, and the cable protection pipe formed in the middle part of the construction section A step of constructing the cable protection conduit 100 connecting the end point side of the route 100 and the second handhole 106b is performed.

具体的には、第1ハンドホール106a側では、図22に示すように、ダクトスリーブ110に取り付けたボルト固定式ロータス管114の各鞘管ダクトスリーブ112に対して、鞘管短管80をスライド可能に挿通すると共に、ダクトスリーブ110のゴム輪受口に長さ調整用のボディ管部材84の差口を挿入してそれらをゴム輪接合する。また、ボディ管やりとり継手12の一方端部から長さ調整用のボディ管部材44を挿入したボディ管やりとりユニット46と、一方端に接着受口82aを有する長さ調整用の鞘管82とを用意する。なお、長さ調整用の鞘管82は、ボディ管やりとりユニット46内に予め挿入しておいてもよい。   Specifically, on the first hand hole 106 a side, as shown in FIG. 22, the sheath tube short tube 80 is slid with respect to each sheath tube duct sleeve 112 of the bolt fixing type Lotus tube 114 attached to the duct sleeve 110. In addition to being inserted into the rubber sleeve, the insertion hole of the body tube member 84 for adjusting the length is inserted into the rubber ring receiving port of the duct sleeve 110, and these are joined to the rubber ring. Further, a body tube exchange unit 46 in which a body tube member 44 for length adjustment is inserted from one end portion of the body tube exchange joint 12 and a sheath tube 82 for length adjustment having an adhesive receiving port 82a at one end. prepare. The length-adjusting sheath tube 82 may be inserted into the body tube exchange unit 46 in advance.

次に、図23に示すように、受口付鞘管62の差口を長さ調整用の鞘管部材82の接着受口82aに挿入してそれらを接着接合すると共に、長さ調整用のボディ管部材44のゴム輪受口44aにボディ管部材20の差口30を挿入してそれらをゴム輪接合する。そして、鞘管短管80を外側にスライドさせて、鞘管短管80の接着受口80aに長さ調整用の鞘管部材82の差口82bを挿入してそれらを接着接合した後、ボディ管やりとり継手12を外側にスライドさせて、ボディ管やりとり継手12の端部(ゴム輪受口)に長さ調整用のボディ管部材84の差口を挿入してそれらをゴム輪接合する。   Next, as shown in FIG. 23, the outlet of the sheathed tube 62 with the receptacle is inserted into the adhesive receptacle 82a of the sheath tube member 82 for length adjustment, and they are bonded and joined together. The insertion port 30 of the body tube member 20 is inserted into the rubber ring receiving port 44a of the body tube member 44, and they are bonded to the rubber ring. Then, the short sleeve 80 is slid outward, the gap 82b of the length adjusting sheath 82 is inserted into the adhesive receiving port 80a of the short sleeve 80, and they are bonded and bonded. The pipe exchange joint 12 is slid outward, and the end of the body pipe member 84 for length adjustment is inserted into the end portion (rubber ring receiving opening) of the body pipe exchange joint 12 so that they are joined to the rubber ring.

一方、第2ハンドホール106b側では、図24に示すように、ダクトスリーブ110に取り付けたボルト固定式ロータス管114の各鞘管ダクトスリーブ112に対して、鞘管短管80をスライド可能に挿通すると共に、ダクトスリーブ110のゴム輪受口に長さ調整用のボディ管部材84の差口を挿入してそれらをゴム輪接合する。また、ボディ管やりとり継手12の一方端部から長さ調整用のボディ管部材44を挿入したボディ管やりとりユニット46と、両端が差口82bの長さ調整用の鞘管82とを用意する。なお、長さ調整用の鞘管82は、ボディ管やりとりユニット46内に予め挿入しておいてもよい。   On the other hand, on the second hand hole 106b side, as shown in FIG. 24, the sheath tube short tube 80 is slidably inserted into each sheath tube duct sleeve 112 of the bolt fixing type Lotus tube 114 attached to the duct sleeve 110. At the same time, the outlet of the body tube member 84 for adjusting the length is inserted into the rubber ring receiving port of the duct sleeve 110 to join them together. In addition, a body tube exchange unit 46 in which a body tube member 44 for length adjustment is inserted from one end of the body tube exchange joint 12 and a sheath tube 82 for length adjustment having both ends 82b are prepared. The length-adjusting sheath tube 82 may be inserted into the body tube exchange unit 46 in advance.

次に、図25に示すように、鞘管部材22の接着受口36に長さ調整用の鞘管部材82の差口82bを挿入してそれらを接着接合すると共に、ボディ管部材20のゴム輪受口28に長さ調整用のボディ管部材44の差口を挿入してそれらをゴム輪接合する。そして、鞘管短管80を外側にスライドさせて、鞘管短管80の接着受口80aに長さ調整用の鞘管部材82の差口82bを挿入してそれらを接着接合した後、ボディ管やりとり継手12を外側にスライドさせて、ボディ管やりとり継手12の端部に長さ調整用のボディ管部材84の差口を挿入してそれらをゴム輪接合する。   Next, as shown in FIG. 25, the insertion port 82 b of the length-adjusting sheath tube member 82 is inserted into the adhesion receiving port 36 of the sheath tube member 22 to bond them together, and the rubber of the body tube member 20. A gap of the body pipe member 44 for adjusting the length is inserted into the ring receiving port 28 and joined to the rubber ring. Then, the short sleeve 80 is slid outward, the gap 82b of the length adjusting sheath 82 is inserted into the adhesive receiving port 80a of the short sleeve 80, and they are bonded and bonded. The pipe exchange joint 12 is slid to the outside, and the end of the body pipe member 84 for adjusting the length is inserted into the end portion of the body pipe exchange joint 12 so as to join the rubber rings.

図22−図25に示す実施例においても、図11−図19に示す実施例と同様に、施工区間の途中からケーブル保護管路100を施工するので、ハンドホール106a,106bの製作に左右されることなくケーブル保護管路100を施工でき、工期短縮を図ることができる。   Also in the embodiment shown in FIGS. 22 to 25, the cable protection conduit 100 is constructed from the middle of the construction section in the same manner as the embodiments shown in FIGS. 11 to 19, and therefore depends on the production of the hand holes 106a and 106b. Therefore, the cable protection conduit 100 can be constructed without shortening the construction period.

なお、第1ハンドホール106a側および第2ハンドホール106b側のどちらか一方において、ロータス管のやりとり機構を用いて鞘管102のやりとり接続を行い、他方において、鞘管やりとり継手14を用いて鞘管102のやりとり接続を行うこともできる。   In either one of the first hand hole 106a side and the second hand hole 106b side, the exchange connection of the sheath tube 102 is performed using the exchange mechanism of the lotus tube, and on the other hand, the sheath tube exchange joint 14 is used to connect the sheath. The exchange connection of the tube 102 can also be performed.

また、上述の実施例では、ボディ管部材20をやりとり接続するためのボディ管やりとり継手12として、その内周面両端部にゴム輪42を装着したゴム輪タイプの継手(図7参照)を用いたが、これに限定されない。たとえば、図26に示すようなバンド固定タイプのボディ管やりとり継手(スライド管)12を用いることもできる。図26に示すように、このボディ管やりとり継手12は、継手本体88、ゴムジョイント90および締めバンド92を備える。   Further, in the above-described embodiment, as the body tube exchange joint 12 for exchanging and connecting the body tube member 20, a rubber ring type joint (see FIG. 7) in which the rubber rings 42 are attached to both ends of the inner peripheral surface thereof is used. However, it is not limited to this. For example, a band fixing type body tube exchange joint (slide tube) 12 as shown in FIG. 26 can be used. As shown in FIG. 26, the body tube exchange joint 12 includes a joint body 88, a rubber joint 90, and a fastening band 92.

具体的に説明すると、継手本体88は、ポリエチレン、ポリ塩化ビニルおよびABS等の合成樹脂によって円筒状に形成される所謂プレーン管である。継手本体88の長さは、たとえば1000mmである。また、継手本体88の内径は、長さ調整用のボディ管部材44(ボディ管部材20)の外径よりも若干大きくなるように設定され、後述のように継手本体88に長さ調整用のボディ管部材44を差し込んだ際には、継手本体88の内周面とボディ管部材44の外周面との間には、若干の隙間が形成される。これにより、継手本体88とボディ管部材44との接続部分で可撓性が生じ、この部分で角度を付けることが可能になる。たとえば、継手本体88とボディ管部材44との接続部分で0−6°程度の角度を付けることができるように、継手本体88の内周面とボディ管部材44の外周面との間の隙間の大きさが設定される。ただし、継手本体88の内周面とボディ管部材44の外周面との間には必ずしも隙間が形成される必要はない。   More specifically, the joint body 88 is a so-called plain pipe formed in a cylindrical shape from a synthetic resin such as polyethylene, polyvinyl chloride, and ABS. The length of the joint body 88 is, for example, 1000 mm. Further, the inner diameter of the joint main body 88 is set to be slightly larger than the outer diameter of the body pipe member 44 (body pipe member 20) for adjusting the length. When the body tube member 44 is inserted, a slight gap is formed between the inner peripheral surface of the joint body 88 and the outer peripheral surface of the body tube member 44. Thereby, flexibility arises in the connection part of the joint main body 88 and the body pipe member 44, and it becomes possible to give an angle in this part. For example, the gap between the inner peripheral surface of the joint main body 88 and the outer peripheral surface of the body pipe member 44 so that an angle of about 0-6 ° can be given at the connection portion between the joint main body 88 and the body pipe member 44. Is set. However, a gap is not necessarily formed between the inner peripheral surface of the joint body 88 and the outer peripheral surface of the body tube member 44.

また、継手本体88の両端部には、EPDMなどのゴムによって円筒状に形成されるゴムジョイント90が設けられる。ゴムジョイント90の一方端部90aは、継手本体88の外径と略同じ大きさの内径を有し、継手本体88の端部に外嵌めされる。一方、ゴムジョイント90の他端部90bは、ボディ管部材44の外径と略同じ大きさを有し、継手本体88の管端から軸方向外側に延びる。ゴムジョイント90の長さは、たとえば150mmであり、その厚みは、たとえば7mmである。   Further, rubber joints 90 formed in a cylindrical shape with rubber such as EPDM are provided at both ends of the joint body 88. One end 90 a of the rubber joint 90 has an inner diameter that is substantially the same as the outer diameter of the joint body 88 and is fitted on the end of the joint body 88. On the other hand, the other end portion 90 b of the rubber joint 90 has substantially the same size as the outer diameter of the body tube member 44 and extends axially outward from the tube end of the joint body 88. The length of the rubber joint 90 is, for example, 150 mm, and the thickness thereof is, for example, 7 mm.

また、ゴムジョイント90の一方端部90aおよび他端部90bの外周面のそれぞれには、ステンレス製などの締めバンド92が設けられる。締めバンド92は、ボルト締め付け機構またはインシュロック機構(図示せず)などを有し、その内径を任意に調整できるバンドである。ゴムジョイント90の一方端部90aに装着される締めバンド92は、ゴムジョイント90の一方端部90aと継手本体88の端部との接合時に締め込まれる。一方、ゴムジョイント90の他端部90bに装着される締めバンド92は、ボディ管部材44をスライド(挿入)するときには緩めたままの状態とされ、やりとり接続が終わってボディ管部材44の位置を固定するときに締め込まれる。締めバンド92を締め付けることによって、ゴムジョイント90の内周面と継手本体88またはボディ管部材44の外周面とが密着してこの間が止水される。   Further, a fastening band 92 made of stainless steel or the like is provided on each of the outer peripheral surfaces of the one end 90a and the other end 90b of the rubber joint 90. The fastening band 92 has a bolt fastening mechanism or an insulation lock mechanism (not shown) and the like, and can adjust the inner diameter arbitrarily. The fastening band 92 attached to the one end 90 a of the rubber joint 90 is tightened when the one end 90 a of the rubber joint 90 and the end of the joint body 88 are joined. On the other hand, the fastening band 92 attached to the other end portion 90b of the rubber joint 90 is kept loose when the body tube member 44 is slid (inserted), and the exchange connection is completed and the position of the body tube member 44 is changed. It is tightened when fixing. By tightening the fastening band 92, the inner peripheral surface of the rubber joint 90 and the outer peripheral surface of the joint body 88 or the body tube member 44 are brought into close contact with each other, and the water is stopped between them.

このようなボディ管やりとり継手12には、図27に示すように、その一方端部または両端部から長さ調整用のボディ管部材44が差し込まれ、これによってボディ管やりとりユニット46が形成される。ボディ管部材44は、両端部が差口となっており、ボディ管やりとり継手12に対して軸方向にスライド可能とされる。つまり、ボディ管やりとりユニット46は、ボディ管部材44をスライドさせることによって、その軸方向長さを自由に変化させることができる。   As shown in FIG. 27, a body tube member 44 for adjusting the length is inserted into the body tube exchange joint 12 from one or both ends thereof, thereby forming a body tube exchange unit 46. . The body tube member 44 has an opening at both ends, and can slide in the axial direction with respect to the body tube exchange joint 12. That is, the body tube exchange unit 46 can freely change its axial length by sliding the body tube member 44.

ここで、上述の図7に示すボディ管やりとり継手12では、その内周面とボディ管部材44の外周面との間でゴム輪42を圧縮する必要があるので、ボディ管やりとり継手12の内周面から内方に突出するようにゴム輪42が装着される。つまり、ゴム輪42の内径はボディ管部材44の外径より小さい。このため、ボディ管やりとり継手12に対してボディ管部材44を接続するときには、ボディ管部材44の管端がゴム輪42を適切に乗り越えることができるように、ディスグラインダ等を用いてボディ管部材44の管端外周面に対して面取り加工を行うが、この面取り加工には大きな手間および時間がかかる。また、ボディ管部材44をスライド(または挿入)するときには、ゴム輪42の抵抗が大きいので、ボディ管部材44を手作業でスライドさせることが難しい。このため、図7に示すボディ管やりとり継手12では、荷締め機などを用いてボディ管部材44をスライドさせる必要があるが、これには手間および時間がかかる。特に、ボディ管やりとり継手12の管軸とボディ管部材44の管軸とがずれた状態(角度ずれまたは芯ずれの状態)においては、ゴム輪42の抵抗がより大きくなって、施工が困難となる。   Here, in the body tube exchange joint 12 shown in FIG. 7 described above, it is necessary to compress the rubber ring 42 between the inner peripheral surface thereof and the outer peripheral surface of the body tube member 44. A rubber ring 42 is mounted so as to protrude inward from the peripheral surface. That is, the inner diameter of the rubber ring 42 is smaller than the outer diameter of the body tube member 44. For this reason, when connecting the body pipe member 44 to the body pipe exchange joint 12, the body pipe member is used by using a disc grinder or the like so that the pipe end of the body pipe member 44 can properly get over the rubber ring 42. Although the chamfering process is performed on the outer peripheral surface of the tube end 44, the chamfering process requires a lot of labor and time. Further, when sliding (or inserting) the body tube member 44, it is difficult to manually slide the body tube member 44 because the resistance of the rubber ring 42 is large. For this reason, in the body tube exchange joint 12 shown in FIG. 7, it is necessary to slide the body tube member 44 by using a packing machine or the like, but this takes time and effort. In particular, in a state where the tube axis of the body tube exchange joint 12 and the tube axis of the body tube member 44 are deviated (angle misalignment or misalignment), the resistance of the rubber ring 42 becomes larger and the construction is difficult. Become.

これに対して、図26に示すボディ管やりとり継手12では、ゴムジョイント90の内径とボディ管部材44の外径とは略同一であるため、ボディ管やりとり継手12に接続するボディ管部材44の管端に対して面取り加工を行う必要がない。また、ゴムジョイント90の他端部90bに装着される締めバンド92を緩めた状態では、ボディ管部材44に作用するゴムジョイント90の抵抗は小さいので、ボディ管部材44を手作業で簡単にスライドさせることができ、荷締め機などを用いてボディ管部材44をスライドさせる必要がない。さらに、ボディ管やりとり継手12の管軸とボディ管部材44の管軸とがずれた状態においても、ボディ管部材44をスライド(または挿入)することが可能である。   On the other hand, in the body tube exchange joint 12 shown in FIG. 26, the inner diameter of the rubber joint 90 and the outer diameter of the body tube member 44 are substantially the same, so that the body tube member 44 connected to the body tube exchange joint 12 There is no need to chamfer the pipe end. Further, when the fastening band 92 attached to the other end portion 90b of the rubber joint 90 is loosened, the resistance of the rubber joint 90 acting on the body tube member 44 is small, so that the body tube member 44 can be easily slid by hand. Therefore, it is not necessary to slide the body tube member 44 using a packing machine or the like. Further, the body tube member 44 can be slid (or inserted) even when the tube axis of the body tube exchange joint 12 and the tube axis of the body tube member 44 are shifted.

したがって、図26に示すボディ管やりとり継手12を用いてボディ管部材20をやり取り接続することによって、施工が容易となり、施工時間を大幅に短縮することができる。   Therefore, by exchanging and connecting the body pipe member 20 using the body pipe exchange joint 12 shown in FIG. 26, the construction becomes easy and the construction time can be greatly shortened.

なお、図26に示すボディ管やりとり継手12において、締めバンド92を締め込んだ施工後の状態では、ボディ管やりとり継手12(継手本体88)に対するボディ管部材44の軸方向位置は固定されるが、地震時などに大きな力が作用したときには、ボディ管部材44はスライドしてその揺れ(伸縮)を吸収することができる。   In the body tube exchange joint 12 shown in FIG. 26, the axial position of the body tube member 44 relative to the body tube exchange joint 12 (joint body 88) is fixed in a state after the tightening band 92 is tightened. When a large force is applied during an earthquake or the like, the body tube member 44 can slide to absorb the shaking (expansion / contraction).

また、上で挙げた寸法などの具体的数値はいずれも単なる一例であり、製品の仕様などの必要に応じて適宜変更可能である。   In addition, the specific numerical values such as the dimensions given above are merely examples, and can be appropriately changed according to necessity such as product specifications.

10 …ケーブル保護管部材
12 …ボディ管やりとり継手
14 …鞘管やりとり継手
20,44,60,84 …ボディ管部材
22,54,58,80,82 …鞘管部材
46 …ボディ管やりとりユニット
48 …スライド受口
56 …鞘管やりとりユニット
100 …ケーブル保護管路
102 …鞘管
104 …ボディ管
106a,106b …ハンドホール
110 …ダクトスリーブ
112 …鞘管ダクトスリーブ
114 …ボルト固定式ロータス管
DESCRIPTION OF SYMBOLS 10 ... Cable protection pipe member 12 ... Body pipe exchange coupling 14 ... Sheath pipe exchange coupling 20, 44, 60, 84 ... Body pipe member 22, 54, 58, 80, 82 ... Sheath pipe member 46 ... Body pipe exchange unit 48 ... Slide receiving port 56 ... Sheath tube exchange unit 100 ... Cable protection conduit 102 ... Sheath tube 104 ... Body tube 106a, 106b ... Hand hole 110 ... Duct sleeve 112 ... Sheath tube duct sleeve 114 ... Bolt-fixed type Lotus tube

Claims (2)

内部にケーブルが挿通される鞘管と前記鞘管を収容するボディ管とを備えるケーブル保護管路を所定の施工区間に対して施工するケーブル保護管路の施工方法であって、
(a)ハンドホールを設置する場所から離れた場所を起点として、鞘管部材およびボディ管部材のそれぞれを順次接続して前記施工区間の一部にケーブル保護管路を施工するステップ、
(b)前記施工区間の一方端に第1ハンドホールを設けるステップ、
(c)前記施工区間の他端に第2ハンドホールを設けるステップ、
(d)前記ステップ(a)で形成したケーブル保護管路の起点側と前記ステップ(b)で設けた第1ハンドホールとを接続するケーブル保護管路を施工するステップ、および
(e)前記ステップ(a)で形成したケーブル保護管路の終点側と前記ステップ(c)で設けた第2ハンドホールとを接続するケーブル保護管路を施工するステップを含む、ケーブル保護管路の施工方法。
A cable protection conduit construction method for constructing a cable protection conduit comprising a sheath tube into which a cable is inserted and a body tube containing the sheath tube, with respect to a predetermined construction section,
(A) starting from a place away from the place where the handhole is installed, and starting the cable protection pipeline in a part of the construction section by sequentially connecting each of the sheath pipe member and the body pipe member;
(B) providing a first hand hole at one end of the construction section;
(C) providing a second hand hole at the other end of the construction section;
(D) constructing a cable protection conduit for connecting the starting side of the cable protection conduit formed in step (a) and the first hand hole provided in step (b); and (e) the step A construction method of a cable protection pipeline, including a step of constructing a cable protection pipeline connecting the end point side of the cable protection pipeline formed in (a) and the second handhole provided in the step (c).
前記ステップ(d)および前記ステップ(e)の少なくとも一方において、前記ケーブル保護管路を施工する際に鞘管やりとり継手およびボディ管やりとり継手を用いてやりとり接続するステップを含む、請求項1記載のケーブル保護管路の施工方法。   The step (d) or the step (e) includes a step of performing exchange connection using a sheath tube exchange joint and a body tube exchange joint when constructing the cable protection conduit. Construction method of cable protection pipeline.
JP2014024414A 2013-02-28 2014-02-12 Cable protection conduit construction method and sheath tube exchange joint used therefor Active JP6283525B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014024414A JP6283525B2 (en) 2013-02-28 2014-02-12 Cable protection conduit construction method and sheath tube exchange joint used therefor

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2013038173 2013-02-28
JP2013038173 2013-02-28
JP2014024414A JP6283525B2 (en) 2013-02-28 2014-02-12 Cable protection conduit construction method and sheath tube exchange joint used therefor

Publications (2)

Publication Number Publication Date
JP2014195393A JP2014195393A (en) 2014-10-09
JP6283525B2 true JP6283525B2 (en) 2018-02-21

Family

ID=51840249

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014024414A Active JP6283525B2 (en) 2013-02-28 2014-02-12 Cable protection conduit construction method and sheath tube exchange joint used therefor

Country Status (1)

Country Link
JP (1) JP6283525B2 (en)

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1061836A (en) * 1996-08-23 1998-03-06 Nippon Steel Corp Multiple tubes
JP6283524B2 (en) * 2013-02-19 2018-02-21 株式会社クボタケミックス Cable protection conduit construction method and sheath tube exchange joint used therefor

Also Published As

Publication number Publication date
JP2014195393A (en) 2014-10-09

Similar Documents

Publication Publication Date Title
CN103201551B (en) There is the promotion connecting tube joint of sleeve pipe
US20100133804A1 (en) Method of replacing pipe couplings
US9188269B2 (en) Cured in place liner system and installation methods
US9651181B2 (en) Hydraulic hose guide
CN201323414Y (en) Plug-type pipe joint
JP6875883B2 (en) Construction method of body pipe exchange joint, pipe end sealer and cable protection pipeline
US9664324B2 (en) Containment pipe fittings and methods
JP6283524B2 (en) Cable protection conduit construction method and sheath tube exchange joint used therefor
JP6283525B2 (en) Cable protection conduit construction method and sheath tube exchange joint used therefor
CN106662280A (en) Modular pipe systems and components
JP2015165738A (en) Body tube exchange joint and body tube exchange connection method using the same
BR112018010191B1 (en) METHOD FOR CONNECTING AN IN-LINE SUBSEA STRUCTURE TO PIPE-IN-TUBE (PIP), TUBE-IN-TUBE (PIP) PIPE, AND TUBE-IN-TUBE (PIP) TYPE CONNECTOR
JP6029399B2 (en) Cable protection tube forming method and cable protection tube member transport unit
EP2096347B1 (en) Method for joining together steel pipes for conveying fluids under pressure
JP6944181B2 (en) Connecting pipe and laying method of connecting pipe
JP4681339B2 (en) Connection structure between communication line and hand hole
JP7668732B2 (en) Cable protection pipe joint and cable protection pipe installation method
JP6655141B2 (en) Duct sleeve and handhole
JPH0338549Y2 (en)
EP3875822A1 (en) A coupler for coupling to a pipe and methods of forming the coupler
JPH112370A (en) Cable laying pipe, and its connecting structure
RU2776833C1 (en) Guide sleeve for aligning borehole pipes
JPH03288094A (en) Converter joint
JP6820722B2 (en) Piping structure and construction method of piping structure
JP2005273773A (en) Executing method for laying service water pipes using pipes made of different materials

Legal Events

Date Code Title Description
A625 Written request for application examination (by other person)

Free format text: JAPANESE INTERMEDIATE CODE: A625

Effective date: 20161221

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20171114

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20171128

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20171226

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20180123

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20180129

R150 Certificate of patent or registration of utility model

Ref document number: 6283525

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150