Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP6287076B2 - Connection inspection system, power measurement / monitoring system, connection inspection device, and connection inspection method - Google Patents
[go: Go Back, main page]

JP6287076B2 - Connection inspection system, power measurement / monitoring system, connection inspection device, and connection inspection method - Google Patents

Connection inspection system, power measurement / monitoring system, connection inspection device, and connection inspection method Download PDF

Info

Publication number
JP6287076B2
JP6287076B2 JP2013228933A JP2013228933A JP6287076B2 JP 6287076 B2 JP6287076 B2 JP 6287076B2 JP 2013228933 A JP2013228933 A JP 2013228933A JP 2013228933 A JP2013228933 A JP 2013228933A JP 6287076 B2 JP6287076 B2 JP 6287076B2
Authority
JP
Japan
Prior art keywords
frequency signal
current value
breaker
branch
main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2013228933A
Other languages
Japanese (ja)
Other versions
JP2015090269A (en
Inventor
馨 遠藤
馨 遠藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NEC Corp
Original Assignee
NEC Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NEC Corp filed Critical NEC Corp
Priority to JP2013228933A priority Critical patent/JP6287076B2/en
Publication of JP2015090269A publication Critical patent/JP2015090269A/en
Application granted granted Critical
Publication of JP6287076B2 publication Critical patent/JP6287076B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)

Description

本発明は、分電盤の主幹線路及び分岐線路を流れる電流をモニターする電流値検出手段の接続位置を検査する接続検査システム、電力測定/監視システム、接続検査装置及び接続検査方法に関する。   The present invention relates to a connection inspection system, a power measurement / monitoring system, a connection inspection device, and a connection inspection method for inspecting a connection position of current value detection means for monitoring current flowing through a main line and a branch line of a distribution board.

近年、ビルやオフィス、店舗、データセンターなどにおいて、リアルタイムで消費電力を計測・管理する電力監視システムが導入されている。   In recent years, power monitoring systems that measure and manage power consumption in real time have been introduced in buildings, offices, stores, data centers, and the like.

消費電力をリアルタイムで測定する電力監視システムでは、変流器などのセンサ(電流値検出手段)を分電盤(配電盤)内に取り付けて消費電流や電圧を観測する。例えば、主幹ブレーカの2次側の端子には電圧測定低端子を取り付け、複数の分岐ブレーカに向けて分岐した線路には複数の変流器を取り付けて電圧及び電流を測定する。このように多数のセンサを多数の配線で接続するため、実際の取り付けにおいては接続間違いや接続忘れなどが発生しやすい。そのため、正しい相・位置にセンサを設置することが求められる。   In a power monitoring system that measures power consumption in real time, a sensor (current value detection means) such as a current transformer is mounted in a distribution board (distribution board) and current consumption and voltage are observed. For example, a voltage measurement low terminal is attached to the secondary side terminal of the main breaker, and a plurality of current transformers are attached to the line branched toward the plurality of branch breakers to measure the voltage and current. Since a large number of sensors are connected by a large number of wires in this way, connection errors or forgetting connections tend to occur in actual mounting. Therefore, it is required to install the sensor in the correct phase / position.

図19には、測定対象回路170に変流器330が接続されているか否かを確認する電力測定/監視装置590について示す。   FIG. 19 shows a power measurement / monitoring device 590 that confirms whether or not the current transformer 330 is connected to the measurement target circuit 170.

図19の電力測定/監視装置590は、測定対象回路170に接続された変流器330によって、測定対象部位を流れる電流値の測定・監視を行う。変流器330は、鉄心331と検出コイル332とを含み、検出コイル332から延長された2つの配線が、変流器接続端子589を介してコネクタ591に接続されている。検出コイル332から延長された2つの配線のうち一方は、AD変換回路594のいずれかとの接続を選択するスイッチ592又は電圧端Vに接続される。また、スイッチ592とAD変換回路594との間の配線は、接地するか否かを選択するスイッチ593に接続されるとともに、抵抗Rによって他方の配線に接続される。さらに、検出コイル332から延長された2つの配線のうち他方は、スイッチ等を介さずにAD変換回路594に接続される。   The power measurement / monitoring device 590 of FIG. 19 performs measurement / monitoring of the current value flowing through the measurement target portion by the current transformer 330 connected to the measurement target circuit 170. The current transformer 330 includes an iron core 331 and a detection coil 332, and two wires extended from the detection coil 332 are connected to a connector 591 via a current transformer connection terminal 589. One of the two wirings extended from the detection coil 332 is connected to the switch 592 or the voltage terminal V that selects connection with one of the AD conversion circuits 594. The wiring between the switch 592 and the AD conversion circuit 594 is connected to a switch 593 that selects whether to ground or not, and is connected to the other wiring by a resistor R. Further, the other of the two wires extended from the detection coil 332 is connected to the AD conversion circuit 594 without using a switch or the like.

図19の電力測定/監視装置590では、電流値を測定する装置に接続された測定対象回路170変流器接続端子589に直流電圧を印加し、電流が流れるか否かを測定する。   In the power measurement / monitoring device 590 of FIG. 19, a DC voltage is applied to the measurement target circuit 170 current transformer connection terminal 589 connected to the device for measuring the current value, and whether or not a current flows is measured.

図19のような電力測定/監視装置590を含む一般的な電力監視システムにおいては、変流器によって電流値をモニターすることによって、分岐ブレーカの消費電力を監視することができる。しかしながら、変流器を取り付ける際には、変流器が正しい相・位置に接続されているか否かを人手で確認する必要があるため、工数を取られているのが現状である。   In a general power monitoring system including a power measuring / monitoring device 590 as shown in FIG. 19, the power consumption of the branch breaker can be monitored by monitoring the current value with a current transformer. However, when attaching a current transformer, it is necessary to manually check whether or not the current transformer is connected to the correct phase / position.

特許文献1には、特定周波数の信号を利用して配線接続状況を確認する配線路識別装置について開示されている。また、特許文献2には、分岐ブレーカ毎に設置された電気計器と配線端末との対応付けを容易に設定できる配線端末設定システムについて開示されている。   Patent Document 1 discloses a wiring path identification device that checks a wiring connection status using a signal of a specific frequency. Patent Document 2 discloses a wiring terminal setting system that can easily set the correspondence between an electric meter installed for each branch breaker and a wiring terminal.

特許文献1の配線路識別装置は、電源側に、特定周波数の信号を発生する信号発生器と、特定周波数の信号電流を分岐ブレーカの2次側に注入する注入トランスと、特定周波数の信号電流を分岐ブレーカの1次側に通過させるフィルタと、を備える。さらに、特許文献1の配線路識別装置は、負荷側に、特定周波数を通過させるフィルタと、特定周波数の信号電流を検出する探査器と、を備える。特許文献1の配線路識別装置によれば、フィルタと分岐ブレーカの2次側配線等からなる閉回路に特定周波数の信号電流を流し、探査器で信号電流を検出することによって、負荷装置が分岐ブレーカに対応して配線されていることを負荷側で識別できる。   The wiring path identification device of Patent Document 1 includes a signal generator for generating a signal of a specific frequency on the power supply side, an injection transformer for injecting a signal current of a specific frequency to the secondary side of the branch breaker, and a signal current of a specific frequency. And a filter that passes the filter to the primary side of the branch breaker. Furthermore, the wiring path identification device of Patent Document 1 includes, on the load side, a filter that passes a specific frequency and a probe that detects a signal current of the specific frequency. According to the wiring path identification device of Patent Document 1, a load current is branched by causing a signal current of a specific frequency to flow in a closed circuit including a secondary wiring of a filter and a branch breaker and detecting the signal current with a probe. It can be identified on the load side that wiring is performed corresponding to the breaker.

特許文献2の配線端末設定システムは、複数の分岐ブレーカの各々に対応された複数の電気計器と、複数の電気計器とデータ通信可能に接続するシステムコントローラと、システムコントローラとデータ通信可能に接続する配線端末設定装置と、からなる。配線端末設定装置は、特定の識別番号を持つ配線端末(コンセント等)の配線に高周波電流を発生させる高周波電流発生手段を備える。また、電気計器(電力メータ等)は、対応する分岐ブレーカの配線に高周波電流が発生しているか否かを検出する高周波電流検出手段を備える。特許文献2の配線端末設定システムによれば、分岐ブレーカ毎に設置された電気計器と配線端末との対応付けを容易に設定することができる。   The wiring terminal setting system of Patent Document 2 is connected to a plurality of electric meters corresponding to each of a plurality of branch breakers, a system controller that is connected to the plurality of electric meters so that data communication is possible, and a system controller that is connected to be able to perform data communication. And a wiring terminal setting device. The wiring terminal setting device includes high-frequency current generating means for generating a high-frequency current in the wiring of a wiring terminal (such as an outlet) having a specific identification number. In addition, the electric meter (power meter or the like) includes high-frequency current detection means for detecting whether or not a high-frequency current is generated in the wiring of the corresponding branch breaker. According to the wiring terminal setting system of Patent Literature 2, it is possible to easily set the correspondence between the electric meter installed for each branch breaker and the wiring terminal.

特開平9−184867号公報JP-A-9-184867 特開2011−38978号公報JP 2011-38978 A

図19の電力測定/監視装置590では、変流器330が測定対象回路170に接続していることは確認できるが、変流器330が測定対象回路170の正しい位置に接続されているか否かまでは確認できない。変流器330が測定対象の正しい位置に接続されているか否かは、例えば、測定対象の測定位置に接続されている装置に実際に通電し、動作させれば確認できる。しかしながら、工事中の電気経路に通電して実機を動作させる必要があり、安全面や工程面の成約があるため、実際に行うことは難しいという問題がある。   In the power measurement / monitoring device 590 of FIG. 19, it can be confirmed that the current transformer 330 is connected to the measurement target circuit 170, but whether or not the current transformer 330 is connected to the correct position of the measurement target circuit 170. It cannot be confirmed until. Whether or not the current transformer 330 is connected to the correct position of the measurement target can be confirmed by, for example, actually energizing and operating the device connected to the measurement position of the measurement target. However, there is a problem that it is difficult to actually carry out because it is necessary to operate the actual machine by energizing the electric path under construction, and there is a safety and process contract.

特許文献1の配線路識別装置によれば、負荷装置が接続された分岐ブレーカを特定することができる。また、特許文献2の配線端末設定システムによれば、任意の配線端末に接続した配線端末設定装置から高周波電流を発生させると、対応する電気計器において高周波電流が検出され、分岐ブレーカと配線端末との接続状況を確認することができる。しかしながら、負荷装置を動作させて分岐ブレーカと負荷装置との接続状況を確認することになるため、分岐ブレーカや配線端末の数が多い場合、作業工数が増大してしまうという問題がある。   According to the wiring path identification device of Patent Document 1, it is possible to identify a branch breaker to which a load device is connected. Further, according to the wiring terminal setting system of Patent Document 2, when a high frequency current is generated from a wiring terminal setting device connected to an arbitrary wiring terminal, the high frequency current is detected in the corresponding electric meter, and the branch breaker, the wiring terminal, You can check the connection status. However, since the connection state between the branch breaker and the load device is confirmed by operating the load device, there is a problem that the number of work steps increases when the number of branch breakers and wiring terminals is large.

本発明は、分岐ブレ―カに接続される電流値検出手段が正しい位置に接続されているか否かを容易に確認することができる接続検査システムを提供することを目的とする。   An object of the present invention is to provide a connection inspection system capable of easily confirming whether or not a current value detecting means connected to a branch breaker is connected to a correct position.

本発明の接続検査システムは、外部から供給された電力の分岐元となる主幹ブレーカに接続される主幹線路、主幹線路から複数の分岐ブレーカに向けて分岐される複数の分岐線路、を含む分電盤回路を流れる電流を検出する主幹線路と分岐線路の少なくともいずれかに接続された複数の電流値検出手段の接続位置の正否を検査する接続検査システムであって、分電盤回路上の信号送出部から高周波信号を送出する高周波信号発生手段、分電盤回路に送出された高周波信号をいずれかの電流値検出手段経由で受信する高周波信号受信手段、を有する接続検査手段と、主幹ブレーカ及び分岐ブレーカが遮断された状態で、検査対象の電流値検出手段に対応する分岐ブレーカと検査対象の電流値検出手段との間に位置する分岐線路と、信号送出部と主幹ブレーカとの間に位置する主幹線路と、を短絡する高周波短絡手段と、を備える。   A connection inspection system according to the present invention includes a main line connected to a main breaker that is a branching source of electric power supplied from the outside, and a plurality of branch lines branched from the main line toward a plurality of branch breakers. A connection inspection system for inspecting the correctness of connection positions of a plurality of current value detecting means connected to at least one of a main line and a branch line for detecting a current flowing through a board circuit, and sending a signal on a distribution board circuit High frequency signal generating means for transmitting a high frequency signal from the section, high frequency signal receiving means for receiving the high frequency signal sent to the distribution board circuit via any current value detecting means, a main circuit breaker, and a branch A branch line located between the branch breaker corresponding to the current value detecting means to be inspected and the current value detecting means to be inspected, in a state where the breaker is cut off, and a signal sending unit; And a high-frequency short-circuit means for short-circuiting the main trunk line, a located between the stem breaker.

本発明の電力測定/監視システムは、外部から供給された電力の分岐元となる主幹ブレーカに接続される主幹線路、主幹線路から複数の分岐ブレーカに向けて分岐される複数の分岐線路、を含む分電盤回路と、主幹線路と分岐線路の少なくともいずれかに接続され、分電盤回路を流れる電流を検出する複数の電流値検出手段と、分電盤回路上の信号送出部から高周波信号を送出する高周波信号発生手段、分電盤回路に送出された高周波信号を電流値検出手段経由で受信する高周波信号受信手段、を有する接続検査手段と、主幹ブレーカ及び分岐ブレーカが遮断された状態で、検査対象の電流値検出手段に対応する分岐ブレーカと検査対象の電流値検出手段との間に位置する分岐線路と、信号送出部と主幹ブレーカとの間に位置する主幹線路と、を短絡する高周波短絡手段と、高周波信号発生手段を制御するとともに高周波信号受信手段をモニターして検査対象の電流値検出手段の接続位置の正否を判定する接続判定手段と、主幹線路の電圧値を測定するとともに電流値検出手段によって検出される電流値を測定する計測手段と、を備える。   A power measurement / monitoring system according to the present invention includes a main line connected to a main breaker that is a branching source of power supplied from the outside, and a plurality of branch lines that are branched from the main line toward a plurality of branch breakers. A high-frequency signal is received from a distribution board circuit, a plurality of current value detection means for detecting a current flowing through the distribution board circuit, connected to at least one of the main line and the branch line, and a signal sending unit on the distribution board circuit High frequency signal generating means for sending, high frequency signal receiving means for receiving the high frequency signal sent to the distribution board circuit via the current value detecting means, in a state where the main breaker and the branch breaker are shut off, A branch line located between the branch breaker corresponding to the current value detecting means to be inspected and the current value detecting means to be inspected, and a main line located between the signal sending part and the main breaker; A high-frequency short-circuit means for short-circuiting, a connection determining means for controlling the high-frequency signal generating means and monitoring the high-frequency signal receiving means to determine whether the current value detecting means to be inspected is correct or not, and the voltage value of the main line Measuring means for measuring and measuring a current value detected by the current value detecting means.

本発明の接続検査装置は、外部から供給された電力の分岐元となる主幹ブレーカに接続される主幹線路、主幹線路から複数の分岐ブレーカに向けて分岐される複数の分岐線路、を含む分電盤回路を流れる電流を検出する主幹線路と分岐線路の少なくともいずれかに接続された複数の電流値検出手段の接続位置を検査する接続検査装置であって、分電盤回路上の信号送出部から高周波信号を送出する高周波信号発生手段と、分電盤回路に送出された高周波信号を電流値検出手段経由で受信する高周波信号受信手段と、主幹ブレーカ及び分岐ブレーカが遮断された状態で、検査対象の電流値検出手段に対応する分岐ブレーカと検査対象の電流値検出手段との間に位置する分岐線路と、信号送出部と主幹ブレーカとの間に位置する主幹線路と、を短絡する高周波短絡手段と、高周波短絡手段によって短絡する主幹線路と分岐回路とを切り替える短絡切替手段と、短絡切替手段を制御する制御手段と、を備える。   A connection inspection device according to the present invention includes a main line connected to a main breaker that is a branching source of electric power supplied from the outside, and a plurality of branch lines that are branched from the main line toward a plurality of branch breakers. A connection inspection device for inspecting a connection position of a plurality of current value detecting means connected to at least one of a main line and a branch line for detecting a current flowing through a board circuit, from a signal sending unit on a distribution board circuit High-frequency signal generating means for sending a high-frequency signal, high-frequency signal receiving means for receiving a high-frequency signal sent to a distribution board circuit via a current value detecting means, a main breaker and a branch breaker are shut off, and the inspection object A branch line located between the branch breaker corresponding to the current value detecting means and the current value detecting means to be inspected, and the main line located between the signal sending unit and the main breaker are shortened. To include a high-frequency short-circuit device, a short-circuit switching means for switching the main trunk line and branch circuit for short-circuiting the high-frequency short-circuit means, and control means for controlling the short-circuit switching means.

本発明の接続検査方法は、外部から供給された電力の分岐元となる主幹ブレーカに接続される主幹線路、主幹線路から複数の分岐ブレーカに向けて分岐される複数の分岐線路、を含む分電盤回路を流れる電流を検出する主幹線路と分岐線路の少なくともいずれかに接続された複数の電流値検出手段の接続位置を検査する接続検査方法であって、主幹ブレーカ及び分岐ブレーカが遮断された状態で、検査対象の電流値検出手段に対応する分岐ブレーカと検査対象の電流値検出手段との間に位置する分岐線路と、分電盤回路に高周波信号を送出する信号送出部と主幹ブレーカとの間に位置する主幹線路と、を短絡し、信号送出部から分電盤回路に高周波信号を送出し、分電盤回路に送出された高周波信号を電流値検出手段経由で受信し、高周波信号によって電流値検出手段の接続位置の正否を検査する。   A connection inspection method according to the present invention includes a main line connected to a main breaker that is a branching source of electric power supplied from the outside, and a plurality of branch lines branched from the main line toward a plurality of branch breakers. A connection inspection method for inspecting a connection position of a plurality of current value detection means connected to at least one of a main line and a branch line for detecting a current flowing through a board circuit, wherein the main breaker and the branch breaker are shut off A branch line located between the branch breaker corresponding to the current value detection means to be inspected and the current value detection means to be inspected, a signal sending section for sending a high frequency signal to the distribution board circuit, and the main breaker The main line located between them is short-circuited, a high-frequency signal is sent from the signal sending unit to the distribution board circuit, and the high-frequency signal sent to the distribution board circuit is received via the current value detection means. Checking the correctness of the connection position of the current value detection means by.

本発明によれば、分岐ブレ―カに接続される電流値検出手段が正しい位置に接続されているか否かを容易に確認することが可能になる。   According to the present invention, it is possible to easily confirm whether or not the current value detection means connected to the branch breaker is connected to the correct position.

本発明の第1の実施形態に係る電力測定/監視システムのブロック図である。1 is a block diagram of a power measurement / monitoring system according to a first embodiment of the present invention. 本発明の第1の実施形態に係る接続検査装置の内部構成を示すブロック図である。It is a block diagram which shows the internal structure of the connection inspection apparatus which concerns on the 1st Embodiment of this invention. 本発明の第1の実施形態に係る電力測定/監視システムの動作に関するフローチャートである。It is a flowchart regarding operation | movement of the electric power measurement / monitoring system which concerns on the 1st Embodiment of this invention. 本発明の第2の実施形態に係る電力測定/監視システムのブロック図である。It is a block diagram of the electric power measurement / monitoring system which concerns on the 2nd Embodiment of this invention. 本発明の第2の実施形態に係る接続検査装置の内部構成を示すブロック図である。It is a block diagram which shows the internal structure of the connection inspection apparatus which concerns on the 2nd Embodiment of this invention. 本発明の第2の実施形態に係る電力測定/監視システムの動作に関するフローチャートである。It is a flowchart regarding operation | movement of the electric power measurement / monitoring system which concerns on the 2nd Embodiment of this invention. 本発明の第2の実施形態に係る電力測定/監視システムの動作に関するフローチャートである。It is a flowchart regarding operation | movement of the electric power measurement / monitoring system which concerns on the 2nd Embodiment of this invention. 本発明の実施例1に係る電力測定/監視システムのブロック図である。It is a block diagram of the electric power measurement / monitoring system which concerns on Example 1 of this invention. 本発明の実施例1に係る電力測定/監視システムのブロック図である。It is a block diagram of the electric power measurement / monitoring system which concerns on Example 1 of this invention. 本発明の実施例1に係る接続検査装置の内部構成を示すブロック図である。It is a block diagram which shows the internal structure of the connection inspection apparatus which concerns on Example 1 of this invention. 本発明の実施例1に係る接続検査装置の内部構成を示すブロック図である。It is a block diagram which shows the internal structure of the connection inspection apparatus which concerns on Example 1 of this invention. 本発明の実施例1に係る電力測定/監視システムの動作を示すフローチャートである。It is a flowchart which shows operation | movement of the electric power measurement / monitoring system which concerns on Example 1 of this invention. 本発明の実施例1に係る接続検査装置の内部構成を示すブロック図である。It is a block diagram which shows the internal structure of the connection inspection apparatus which concerns on Example 1 of this invention. 本発明の実施例1に係る電力測定/監視システムの動作を示すフローチャートである。It is a flowchart which shows operation | movement of the electric power measurement / monitoring system which concerns on Example 1 of this invention. 本発明の実施例2に係る電力測定/監視システムのブロック図である。It is a block diagram of the electric power measurement / monitoring system which concerns on Example 2 of this invention. 本発明の実施例2に係る接続検査装置の内部構成を示すブロック図である。It is a block diagram which shows the internal structure of the connection inspection apparatus which concerns on Example 2 of this invention. 本発明の実施例2に係る接続検査装置の短絡切替装置を示すブロック図である。It is a block diagram which shows the short circuit switching apparatus of the connection inspection apparatus which concerns on Example 2 of this invention. 本発明の実施例2に係る接続検査装置の短絡切替装置を示すブロック図である。It is a block diagram which shows the short circuit switching apparatus of the connection inspection apparatus which concerns on Example 2 of this invention. 一般的な電力測定/監視装置のブロック図である。It is a block diagram of a general power measurement / monitoring device.

以下に、本発明を実施するための形態について図面を用いて説明する。但し、以下に述べる実施形態及び実施例には、本発明を実施するために技術的に好ましい限定がされているが、発明の範囲を以下に限定するものではない。   EMBODIMENT OF THE INVENTION Below, the form for implementing this invention is demonstrated using drawing. However, the embodiments and examples described below are technically preferable for carrying out the present invention, but the scope of the invention is not limited to the following.

なお、以下の説明において、図面に示した符号の一部は、構成要素の名称に含まれる番号等との区別を明確にするために括弧内に示し、名称によって構成要素を分別可能なときには括弧内に示した符号を省略した場合もある。また、同様の機能を有する複数の構成要素については、符号の末尾に構成要素を区別するための番号を付したものもあるが、以下の説明において、符号の末尾の番号を省略する場合もある。   In the following description, some of the reference numerals shown in the drawings are shown in parentheses to clarify the distinction from the numbers included in the names of the components, and when the components can be distinguished by the names, In some cases, the reference numerals shown in FIG. In addition, as for a plurality of constituent elements having the same function, there are those in which a number for distinguishing the constituent elements is attached to the end of the reference numeral, but in the following description, the number at the end of the reference sign may be omitted. .

(第1の実施形態)
(構成)
まず、図1及び図2を用いて本発明の第1の実施形態に係る接続検査装置50を含む電力測定/監視システム1の構成について説明する。なお、図1及び図2において、ある配線が別の配線を跨ぐように図示した部位は電気的に接続されているわけではなく、黒丸で示した部位は電気的に接続されている。
(First embodiment)
(Constitution)
First, the configuration of the power measurement / monitoring system 1 including the connection inspection device 50 according to the first embodiment of the present invention will be described with reference to FIGS. 1 and 2. In FIGS. 1 and 2, a portion illustrated so that a certain wiring straddles another wiring is not electrically connected, and a portion indicated by a black circle is electrically connected.

図1に示したように、本実施形態に係る電力測定/監視システム1は、外部から分電盤(配電盤)に供給された電力の分岐元となる主幹ブレーカ11と、主幹ブレーカ11から分配される電力の分岐先となる複数の分岐ブレーカ21(21−1〜n)と、を備える(nは自然数)。主幹ブレーカ11と複数の分岐ブレ―カ21との間には、分電盤回路が形成される。分電盤回路には、主幹ブレーカ11に直接接続される主幹線路と、主幹線路から分岐ブレーカ21に向けて分岐される分岐線路と、が含まれる。なお、本実施形態においては、分電盤回路を測定対象回路15と呼ぶ。   As shown in FIG. 1, the power measurement / monitoring system 1 according to the present embodiment is distributed from a main breaker 11 serving as a branching source of power supplied from the outside to a distribution board (distribution board), and the main breaker 11. And a plurality of branch breakers 21 (21-1 to n) as power branch destinations (n is a natural number). A distribution board circuit is formed between the main breaker 11 and the plurality of branch breakers 21. The distribution board circuit includes a main line directly connected to the main breaker 11 and a branch line branched from the main line toward the branch breaker 21. In the present embodiment, the distribution board circuit is referred to as a measurement target circuit 15.

また、電測測定/監視システム1は、変流器31(電流値検出手段)と、電圧測定端子32と、複数の分岐ブレーカ21(21−1〜n)のそれぞれに対応する複数の変流器33(33−1〜n)(電流値検出手段)と、を備える。なお、変流器31及び33は、必要に応じて設置すればよく、全ての線路に設置しなくてもよい。   In addition, the electric measurement / monitoring system 1 includes a plurality of current transformers 31 corresponding to the current transformer 31 (current value detection means), the voltage measurement terminal 32, and the plurality of branch breakers 21 (21-1 to n). 33 (33-1 to n) (current value detection means). The current transformers 31 and 33 may be installed as necessary, and may not be installed on all lines.

また、図1及び図2においては、各変流器(31及び33)から接続検査装置50に延伸される配線を1本の線で描いているが、実際には1本ではなくてもよい。以下において、変流器(31及び33)は、リング状のコアと検出コイルとを含み、検出コイルから延長された2つの配線が接続検査装置50に接続される例について説明する。例えば、コアが形成するリングの内側に配置された線路に電流が流れると、電磁誘導によって検出コイルに電流が発生し、その電流を検出することによって線路を流れる電流値をモニターすることができる。なお、本発明の電流値検出手段の電流値検出原理はここで挙げてものに限定されず、電流値をモニターすることができさえすればよい。   Further, in FIGS. 1 and 2, the wiring extending from the current transformers (31 and 33) to the connection inspection device 50 is drawn by one line, but it may not actually be one. . Hereinafter, an example in which the current transformers (31 and 33) include a ring-shaped core and a detection coil, and two wires extended from the detection coil are connected to the connection inspection device 50 will be described. For example, when a current flows through a line arranged inside the ring formed by the core, a current is generated in the detection coil by electromagnetic induction, and the current value flowing through the line can be monitored by detecting the current. The current value detection principle of the current value detection means of the present invention is not limited to that described here, as long as the current value can be monitored.

さらに、電測測定/監視システム1は、接続検査装置50(接続検査手段)と、高周波短絡装置60(高周波短絡手段)と、接続判定装置70(接続判定手段)と、電力測定/監視装置80(計測手段)と、を備える。なお、接続検査装置50及び高周波短絡装置60は、接続検査システムを構成する。   Further, the telemetry measurement / monitoring system 1 includes a connection inspection device 50 (connection inspection means), a high-frequency short-circuit device 60 (high-frequency short-circuit means), a connection determination device 70 (connection determination means), and a power measurement / monitoring device 80. (Measuring means). In addition, the connection inspection apparatus 50 and the high frequency short circuit apparatus 60 comprise a connection inspection system.

また、図2に示したように、本実施形態に係る接続検査装置50は、高周波発生器51(高周波信号発生手段)と、高周波信号受信器52及び複数の高周波信号受信器53(53−1〜n)(高周波信号受信手段)と、を備える。さらに、接続検査装置50は、複数のスイッチ(54、55、56−1〜n)(接続切替手段)を備える。   As shown in FIG. 2, the connection inspection apparatus 50 according to the present embodiment includes a high frequency generator 51 (high frequency signal generating means), a high frequency signal receiver 52, and a plurality of high frequency signal receivers 53 (53-1). N) (high-frequency signal receiving means). Further, the connection inspection device 50 includes a plurality of switches (54, 55, 56-1 to n) (connection switching means).

主幹ブレーカ11は、外部から供給された電力の分岐元となる。主幹ブレーカ11をオンした状態では分岐ブレーカ21に分電され、主幹ブレーカ11をオフした状態では分岐ブレーカ21への通電は遮断される。   The main breaker 11 serves as a branching source of power supplied from the outside. When the main breaker 11 is turned on, power is distributed to the branch breaker 21, and when the main breaker 11 is turned off, power to the branch breaker 21 is cut off.

分岐ブレーカ21は、外部から供給された電力の分岐元となる主幹ブレーカ11から分岐された電力の分岐先となり、接続された配線端末(コンセント等)に電力を供給・遮断する。   The branch breaker 21 serves as a branch destination of the power branched from the main breaker 11 that is a branch source of the power supplied from the outside, and supplies and cuts off power to the connected wiring terminal (outlet or the like).

変流器31は、接続検査装置50を介して、電力測定/監視装置80の電流測定回路上に設置される。また、変流器31は、スイッチ55を介して高周波信号受信器52と接続される。   The current transformer 31 is installed on the current measurement circuit of the power measurement / monitoring device 80 via the connection inspection device 50. The current transformer 31 is connected to the high-frequency signal receiver 52 via the switch 55.

変流器31は、スイッチ55の切り替えによって、高周波信号発生器51が発生させた高周波信号を測定対象回路15に送出するための信号送出部となる。さらに、変流器31は、電圧測定端子32を経て測定対象回路15に送出された高周波信号を、スイッチ55の切り替えによって高周波信号受信器52に取り込むための信号受取部ともなる。   The current transformer 31 serves as a signal sending unit for sending the high-frequency signal generated by the high-frequency signal generator 51 to the measurement target circuit 15 by switching the switch 55. Further, the current transformer 31 also serves as a signal receiving unit for taking in the high frequency signal receiver 52 by switching the switch 55 the high frequency signal sent to the measurement target circuit 15 via the voltage measurement terminal 32.

電圧測定端子32は、主幹ブレーカ11の電圧を測定するための端子である。電圧測定端子32は、接続検査装置50を介して、電力測定/監視装置80の電圧測定回路に接続される。また、電圧測定端子32は、スイッチ54を介して高周波信号発生器51と接続される。電圧測定端子32は、スイッチ54の切り替えによって、高周波信号発生器51が発生させた高周波信号を測定対象回路15に送出するための信号送出部となる。   The voltage measurement terminal 32 is a terminal for measuring the voltage of the main breaker 11. The voltage measurement terminal 32 is connected to the voltage measurement circuit of the power measurement / monitoring device 80 via the connection inspection device 50. The voltage measurement terminal 32 is connected to the high frequency signal generator 51 via the switch 54. The voltage measurement terminal 32 serves as a signal sending unit for sending the high frequency signal generated by the high frequency signal generator 51 to the measurement target circuit 15 by switching the switch 54.

変流器33は、分岐ブレーカの1次側又は2次側のいずれかに設けられる。変流器33は、接続検査装置50を介して、電力測定/監視装置80の電流測定回路に接続される。また、変流器33は、高周波信号受信器53と接続される。   The current transformer 33 is provided on either the primary side or the secondary side of the branch breaker. The current transformer 33 is connected to the current measurement circuit of the power measurement / monitoring device 80 via the connection inspection device 50. The current transformer 33 is connected to the high-frequency signal receiver 53.

変流器33は、スイッチ56の切り替えによって、測定対象回路15に送出された高周波信号を高周波信号受信器53に取り込む信号受取部となる。なお、スイッチ56を高周波信号発生器51と接続し、変流器33が信号送出部となるように設定してもよい。   The current transformer 33 serves as a signal receiver that takes in the high-frequency signal receiver 53 the high-frequency signal sent to the measurement target circuit 15 by switching the switch 56. Note that the switch 56 may be connected to the high-frequency signal generator 51 so that the current transformer 33 serves as a signal transmission unit.

すなわち、複数のスイッチ(54、55、56−1〜n)は、高周波信号発生器51が発生させた高周波信号を送出する信号送出部を、電圧測定端子32、変流器31及び33のいずれにするかを切り替える接続切替手段となる。   In other words, the plurality of switches (54, 55, 56-1 to n) are provided as a signal sending unit for sending a high-frequency signal generated by the high-frequency signal generator 51, whichever of the voltage measuring terminal 32 and the current transformers 31 and 33. It becomes a connection switching means for switching whether or not.

スイッチ54は、電力測定/監視装置80と電圧測定端子32との接続と、高周波信号発生器51と電圧測定端子32との接続と、を切り替えるスイッチである。スイッチ54を切り替えることによって、高周波信号発生器51と電圧測定端子32とを接続するか、電力測定/監視装置80と電圧測定端子32とを接続するか、を選択可能である。   The switch 54 is a switch for switching the connection between the power measurement / monitoring device 80 and the voltage measurement terminal 32 and the connection between the high-frequency signal generator 51 and the voltage measurement terminal 32. By switching the switch 54, it is possible to select whether to connect the high-frequency signal generator 51 and the voltage measurement terminal 32 or to connect the power measurement / monitoring device 80 and the voltage measurement terminal 32.

スイッチ55は、電力測定/監視装置80と変流器31との接続と、高周波信号受信器52と変流器31との接続と、を切り替えるスイッチである。   The switch 55 is a switch for switching the connection between the power measurement / monitoring device 80 and the current transformer 31 and the connection between the high-frequency signal receiver 52 and the current transformer 31.

なお、スイッチ55は、変流器31の検出コイルから延長された2つの配線に接続される。ただし、2つの配線のいずれも、スイッチ55の動作に関わらず、高周波信号受信器52と変流器31との接続状況を維持する。   The switch 55 is connected to two wires extended from the detection coil of the current transformer 31. However, both of the two wires maintain the connection state between the high-frequency signal receiver 52 and the current transformer 31 regardless of the operation of the switch 55.

2つの配線のうち一方は、高周波信号発生器51と変流器31との接続と、電力測定/監視装置80と変流器31との接続と、を選択可能とするとともに、電力測定/監視装置80と変流器31との接続をON/OFFできるようにスイッチ55と接続される。   One of the two wirings allows selection between the connection between the high-frequency signal generator 51 and the current transformer 31 and the connection between the power measurement / monitoring device 80 and the current transformer 31 and the power measurement / monitoring. It connects with the switch 55 so that the connection of the apparatus 80 and the current transformer 31 can be turned ON / OFF.

2つの配線のうち他方は、電力測定/監視装置80と変流器31とを接続するか、変流器31を接地するか、を選択可能とするとともに、電力測定/監視装置80と変流器31との接続をON/OFFできるようにスイッチ55と接続される。   The other of the two wires can select whether the power measurement / monitoring device 80 and the current transformer 31 are connected or the current transformer 31 is grounded, and the power measurement / monitoring device 80 and the current transformation are selected. It is connected to the switch 55 so that the connection with the device 31 can be turned ON / OFF.

スイッチ56(56−1〜n)は、電力測定/監視装置80と変流器33との接続と、高周波信号受信器53と変流器33との接続と、を切り替えるスイッチである。なお、図2では省略されているが、スイッチ56は、複数の変流器33に対応するように配置される。また、スイッチ56は、高周波信号受信器53と変流器33との接続状況を常に維持するように構成してもよい。   The switches 56 (56-1 to n) are switches for switching between the connection between the power measurement / monitoring device 80 and the current transformer 33 and the connection between the high-frequency signal receiver 53 and the current transformer 33. Although omitted in FIG. 2, the switch 56 is disposed so as to correspond to the plurality of current transformers 33. The switch 56 may be configured to always maintain the connection state between the high-frequency signal receiver 53 and the current transformer 33.

例えば、スイッチ56は、変流器33の検出コイルから延長された2つの配線に接続されればよい。2つの配線は、変流器33と電力測定/監視装置80との接続をON/OFFするように構成される。ただし、2つの配線のいずれも、スイッチ55の動作に関わらず、高周波信号受信器53と変流器33との接続状況を維持することが好ましい。   For example, the switch 56 may be connected to two wires extended from the detection coil of the current transformer 33. The two wires are configured to turn on / off the connection between the current transformer 33 and the power measurement / monitoring device 80. However, it is preferable that the connection state between the high-frequency signal receiver 53 and the current transformer 33 is maintained regardless of the operation of the switch 55 in either of the two wirings.

以上のスイッチ54〜56の切り替え操作は、接続判定装置70の指示に応じて接続検査装置50に備えられた図示しない制御部によって制御されてもよいし、接続判定装置70が各スイッチを個別に制御するようにしてもよい。   The above switching operation of the switches 54 to 56 may be controlled by a control unit (not shown) provided in the connection inspection device 50 according to an instruction from the connection determination device 70, or the connection determination device 70 individually switches each switch. You may make it control.

高周波信号発生器51は、高周波信号を発生させ、信号送出部から測定対象回路15に高周波信号を送出する。なお、電灯線に流せる高周波信号は電波法で450KHz以下と定められているため、電波法の適用下においては、高周波信号発生器51が発生させる高周波信号の上限は450KHzとする。ただし、電波法が適用されない場合、必要に応じて任意の周波数の高周波信号を用いることができる。   The high-frequency signal generator 51 generates a high-frequency signal and sends the high-frequency signal from the signal sending unit to the measurement target circuit 15. In addition, since the high frequency signal that can be passed through the power line is determined to be 450 KHz or less by the radio wave method, the upper limit of the high frequency signal generated by the high frequency signal generator 51 is 450 KHz under the application of the radio wave method. However, when the radio wave law is not applied, a high-frequency signal having an arbitrary frequency can be used as necessary.

高周波信号発生回路51は、接続判定装置70によって制御される。なお、高周波信号発生回路51は、電力測定/監視装置80によって制御されてもよい。また、図2には、電圧測定端子32又は変流器31を経由して高周波信号を送出するように図示しているが、変流器33のいずれかを経由させて高周波信号を送出させるように構成してもよい。   The high frequency signal generation circuit 51 is controlled by the connection determination device 70. The high frequency signal generation circuit 51 may be controlled by the power measurement / monitoring device 80. 2 shows that a high frequency signal is transmitted via the voltage measurement terminal 32 or the current transformer 31, but the high frequency signal is transmitted via any one of the current transformers 33. You may comprise.

高周波信号発生器51が発生させる高周波信号は、雑音との分離を容易にするために、高周波信号と雑音とを判別するための信号で変調したり、周波数をいくつか切り替えたりしてもよい。   The high-frequency signal generated by the high-frequency signal generator 51 may be modulated with a signal for discriminating between the high-frequency signal and the noise, or several frequencies may be switched in order to facilitate separation from the noise.

雑音の多い環境では、高周波信号発生器51が送出した高周波信号と同じぐらいの雑音が入ってしまい、高周波信号と雑音とを判別できなくなり、変流器33の接続位置の判定ができなくなることも想定される。そのため、高周波信号発生器51が送信できる高周波信号の周波数を可変にしておいてもよい。例えば、検査を始める前に雑音の強度を各変流器で計測しておき、雑音の小さい周波数の高周波信号で検査をするようにすれば、雑音の妨害を軽減できる。この場合、各高周波信号受信器52又は53に関して、それぞれ異なった周波数の高周波信号に対して感度をもつように設定すればよい。   In a noisy environment, as much noise as the high-frequency signal sent out by the high-frequency signal generator 51 enters, so that the high-frequency signal and noise cannot be distinguished, and the connection position of the current transformer 33 cannot be judged. is assumed. Therefore, the frequency of the high frequency signal that can be transmitted by the high frequency signal generator 51 may be variable. For example, if the intensity of noise is measured with each current transformer before the inspection is started and the inspection is performed with a high-frequency signal having a low noise frequency, noise interference can be reduced. In this case, each high frequency signal receiver 52 or 53 may be set so as to have sensitivity to high frequency signals having different frequencies.

また、雑音の多い場合の対策として、高周波信号発生器51が送信する高周波信号の周波数は変えずに、送信する高周波信号を特定の信号で変調して送ることによっても、雑音の影響を軽減できる。変流器で受けた高周波信号を復調し、送信した特定の信号が受信できることを確認すれば、雑音ではなく送信した特定の信号が受信されていることを確認できる。例えば、変調に用いる特定の信号としてPNコード(疑似雑音コード)などのコードを使えば、雑音の影響を効果的に排除できる(PN:pseudorandom noise)。   Further, as a countermeasure when there is a lot of noise, the influence of noise can be reduced by modulating the high-frequency signal to be transmitted with a specific signal without changing the frequency of the high-frequency signal transmitted by the high-frequency signal generator 51. . By demodulating the high-frequency signal received by the current transformer and confirming that the transmitted specific signal can be received, it can be confirmed that the transmitted specific signal is received instead of noise. For example, if a code such as a PN code (pseudo-noise code) is used as a specific signal used for modulation, the influence of noise can be effectively eliminated (PN: pseudonoise).

さらに、雑音対策として、単一の周波数ではなく、複数の周波数からなる信号を高周波信号発生器から同時に送出させてもよい。その場合、数の周波数からなる信号うちのいずれかの周波数からなる高周波信号を変流器で受信できたら、変流器31又は33が正しく接続されていると判定すればよい。   Further, as a countermeasure against noise, a signal having a plurality of frequencies instead of a single frequency may be simultaneously transmitted from the high frequency signal generator. In that case, if a current transformer can receive a high-frequency signal having any one of a number of signals, it may be determined that the current transformer 31 or 33 is correctly connected.

高周波信号受信器52は、スイッチ55を介して測定対象回路15に接続され、状況に応じて、高周波信号発生器51から送出された高周波信号を受信する。高周波信号受信器52による高周波信号の受信状況は接続判定装置70によってモニターされる。   The high frequency signal receiver 52 is connected to the measurement target circuit 15 via the switch 55 and receives the high frequency signal sent from the high frequency signal generator 51 according to the situation. The reception status of the high frequency signal by the high frequency signal receiver 52 is monitored by the connection determination device 70.

高周波信号受信器53は、スイッチ56を介して測定対象回路15に接続され、状況に応じて、高周波信号発生器51から送出された高周波信号を受信する。高周波信号受信器53による高周波信号の受信状況は接続判定装置70によって監視される。高周波信号受信器53(53−1〜n)は、複数の変流器33に対応するように配置される。   The high frequency signal receiver 53 is connected to the measurement target circuit 15 via the switch 56, and receives a high frequency signal sent from the high frequency signal generator 51 depending on the situation. The reception status of the high frequency signal by the high frequency signal receiver 53 is monitored by the connection determination device 70. The high frequency signal receivers 53 (53-1 to n) are arranged so as to correspond to the plurality of current transformers 33.

高周波短絡装置60は、主幹ブレーカ11と電圧測定端子32と、分岐ブレーカ21と変流器31と、の間に任意に接続される。高周波短絡装置60は、例えばコンデンサなどによって実現される。   The high-frequency short-circuit device 60 is arbitrarily connected between the main breaker 11, the voltage measurement terminal 32, the branch breaker 21, and the current transformer 31. The high-frequency short-circuit device 60 is realized by, for example, a capacitor.

高周波短絡装置60は、2つのプローブを持ち、一方のプローブは主幹ブレーカ11と電圧測定端子32との間(主幹ブレーカの二次側)に接続され、他方のプローブは分岐ブレーカ21と検査対象の変流器31との間に接続される。この接続状態で高周波信号を測定対象回路15に送出すると、他の高周波信号受信器53と比較して、検査対象の変流器33に対応する高周波信号受信器53で受信される高周波信号の強度が最大となる。   The high-frequency short-circuit device 60 has two probes, one probe is connected between the main breaker 11 and the voltage measurement terminal 32 (secondary side of the main breaker), and the other probe is the branch breaker 21 and the inspection target. It is connected between the current transformer 31. When a high-frequency signal is sent to the measurement target circuit 15 in this connection state, the strength of the high-frequency signal received by the high-frequency signal receiver 53 corresponding to the current transformer 33 to be inspected is compared with other high-frequency signal receivers 53. Is the maximum.

言い換えると、高周波短絡装置60の一方のプローブを主幹ブレーカの二次側に接続し、他方のプローブを検査対象の変流器33と分岐ブレーカ21との間に接続する。その結果、他の高周波信号受信器53と比較して、検査対象の変流器33に対応する高周波受信器53で受信される高周波信号の強度が大きくなる。   In other words, one probe of the high-frequency short-circuit device 60 is connected to the secondary side of the main breaker, and the other probe is connected between the current transformer 33 to be inspected and the branch breaker 21. As a result, the intensity of the high-frequency signal received by the high-frequency receiver 53 corresponding to the current transformer 33 to be inspected is greater than that of the other high-frequency signal receivers 53.

接続判定装置70は、高周波信号発生器51を制御するとともに、高周波信号受信器52及び53の受信する高周波信号の受信状況を監視する。接続判定装置70は、コンピュータやサーバなどの情報処理装置によって実現される。接続判定装置70は、複数の高周波信号受信器53のうち、検査対象の変流器33に対応する高周波信号受信器53において高周波信号が最大強度となる場合、検査対象の変流器33が正しい接続位置にあると判定する。ただし、検査対象の変流器33が正しい接続位置の判定基準として、高周波信号の周波数や特徴的な周波数特性を用いてもよい。   The connection determination device 70 controls the high frequency signal generator 51 and monitors the reception status of the high frequency signals received by the high frequency signal receivers 52 and 53. The connection determination device 70 is realized by an information processing device such as a computer or a server. When the high-frequency signal has the maximum intensity in the high-frequency signal receiver 53 corresponding to the current transformer 33 to be inspected among the plurality of high-frequency signal receivers 53, the connection determination device 70 is correct. It is determined that it is in the connection position. However, the current transformer 33 to be inspected may use the frequency of a high-frequency signal or a characteristic frequency characteristic as a criterion for determining a correct connection position.

電力測定/監視装置80は、電圧測定端子32の電圧値、変流器31及び33の電流値をモニターする計測手段である。なお、電力測定/監視装置80は、それぞれの測定対象に対して個別に設けてもよいし、複数の測定対象を一括してモニターするように構成してもよい。例えば、電力測定/監視装置80は、電圧測定回路や電流測定回路として実現され、図19の電力測定/監視装置590のように構成することができる。   The power measuring / monitoring device 80 is a measuring unit that monitors the voltage value of the voltage measuring terminal 32 and the current values of the current transformers 31 and 33. The power measurement / monitoring device 80 may be provided individually for each measurement object, or may be configured to monitor a plurality of measurement objects at once. For example, the power measurement / monitoring device 80 is realized as a voltage measurement circuit or a current measurement circuit, and can be configured like the power measurement / monitoring device 590 of FIG.

接続判定装置70と電力測定/監視装置80とは、それぞれ個別の装置として構成してもよいし、単一の装置(情報処理装置等)に備えられた複数の機能として構成してもよい。また、接続判定装置70又は電力測定/監視装置80と接続検査装置50とは、ケーブルなどで直接接続されていてもよいし、インターネットやイントラネットなどのネットワークを介して接続されていてもよい。なお、接続判定装置70又は電力測定/監視装置80と接続検査装置50とは、それぞれ図示しない通信機能を有する。   The connection determination device 70 and the power measurement / monitoring device 80 may be configured as individual devices, or may be configured as a plurality of functions provided in a single device (information processing device or the like). The connection determination device 70 or the power measurement / monitoring device 80 and the connection inspection device 50 may be directly connected by a cable or the like, or may be connected via a network such as the Internet or an intranet. The connection determination device 70 or the power measurement / monitoring device 80 and the connection inspection device 50 each have a communication function (not shown).

以上が本発明の実施形態の構成に関する説明である。なお、上述の構成は一例であって、本発明の範囲を限定するものではない。   This completes the description of the configuration of the embodiment of the present invention. The above-described configuration is an example and does not limit the scope of the present invention.

(動作)
次に、図3のフローチャートを用いて、本発明の第1の実施形態に係る接続検査装置50を含む電力測定/監視システム1の動作について説明する。特に、本実施形態に係る接続検査装置50を中心として説明する。
(Operation)
Next, the operation of the power measurement / monitoring system 1 including the connection inspection device 50 according to the first embodiment of the present invention will be described using the flowchart of FIG. In particular, the description will focus on the connection inspection device 50 according to the present embodiment.

まず、変流器33−nが正しい位置に接続されているか否かを検証する。そのため、各スイッチを設定する(ステップS10)。以下に各スイッチに対応する動作について詳細に説明するが、図3のフローチャートにおいては図示しない。   First, it is verified whether or not the current transformer 33-n is connected to the correct position. Therefore, each switch is set (step S10). The operation corresponding to each switch will be described in detail below, but is not shown in the flowchart of FIG.

スイッチ55においては、変流器31から延長された2つの配線のうち、一方の配線は高周波信号発生器51と変流器31とを接続するように切り替え、他方の配線は接地するように切り替える(ステップS11)。   In the switch 55, one of the two wires extended from the current transformer 31 is switched so as to connect the high-frequency signal generator 51 and the current transformer 31, and the other wire is switched so as to be grounded. (Step S11).

また、スイッチ55及び56−nにおいては、変流器31及び33と電力測定/監視装置80との接続をOFFとする(ステップS12)。なお、ステップS11及びS12とは順番を入れ替えてもよく、並列して実行してもよい。   In addition, in the switches 55 and 56-n, the connection between the current transformers 31 and 33 and the power measurement / monitoring device 80 is turned off (step S12). Note that the order of steps S11 and S12 may be changed, or may be executed in parallel.

ここで、スイッチ54において、電圧測定端子32と電力測定/監視装置80とを接続するように切り替える(ステップS13)。   Here, the switch 54 is switched so as to connect the voltage measurement terminal 32 and the power measurement / monitoring device 80 (step S13).

そして、全てのブレーカ(主幹ブレーカ11、分岐ブレ―カ21〜n)をOFFにする(ステップS14)。   Then, all the breakers (main trunk breaker 11, branch breakers 21 to n) are turned off (step S14).

次に、図2のように、分岐ブレーカ21−nの一次側と主幹ブレーカ11の二次側との間に高周波短絡装置60を挿入する(ステップS20)。なお、分岐ブレーカ21−nの二次側に変流器33−nを設置した場合は、分岐ブレーカ21−nの二次側と主幹ブレーカ11の二次側との間に高周波短絡装置60を挿入すればよい。   Next, as shown in FIG. 2, the high-frequency short-circuit device 60 is inserted between the primary side of the branch breaker 21-n and the secondary side of the main breaker 11 (step S20). When the current transformer 33-n is installed on the secondary side of the branch breaker 21-n, the high-frequency short-circuit device 60 is provided between the secondary side of the branch breaker 21-n and the secondary side of the main breaker 11. Insert it.

以上のように、各スイッチの設定及び高周波短絡装置60の挿入が完了すると、高周波信号発生器51は高周波信号を発生させ、測定対象回路15に向けて高周波信号を送出する(ステップS30)。   As described above, when the setting of each switch and the insertion of the high-frequency short-circuit device 60 are completed, the high-frequency signal generator 51 generates a high-frequency signal and sends the high-frequency signal toward the measurement target circuit 15 (step S30).

高周波信号受信器52及び53は、高周波信号発生器51から送出された高周波信号を受信する(ステップS40)。   The high frequency signal receivers 52 and 53 receive the high frequency signal transmitted from the high frequency signal generator 51 (step S40).

接続判定装置70は、各高周波信号受信器52及び53が受信した高周波信号の強度をモニターし、検査対象となる変流器33が正しい位置に接続されているか否かを判断する(ステップS50)。なお、本実施形態においては、検査対象の変流器33に対応する高周波信号受信器53で受信される高周波信号の強度が最大となる。例えば、高周波短絡装置60のプローブが接触している分岐ブレーカのIDを設定し、高周波信号強度が最大となっている高周波信号受信器53のIDとを照合させるようにプログラムを設定しておけば、より確実に接続位置の正否を確認しやすい(ID:Identification)。   The connection determination device 70 monitors the strength of the high-frequency signal received by each of the high-frequency signal receivers 52 and 53, and determines whether or not the current transformer 33 to be inspected is connected to the correct position (step S50). . In the present embodiment, the intensity of the high frequency signal received by the high frequency signal receiver 53 corresponding to the current transformer 33 to be inspected is maximized. For example, if the ID of the branch breaker with which the probe of the high-frequency short-circuit device 60 is in contact is set, and the program is set so as to collate with the ID of the high-frequency signal receiver 53 having the maximum high-frequency signal intensity Therefore, it is easy to confirm whether the connection position is correct or not (ID: Identification).

以上のように、本発明の第1の実施形態に係る接続検査装置によれば、測定対象回路に変流器(又は電圧測定端子)から送信した高周波信号を、接続を確認する他の変流器(検査対象の変流器)で受信し、検査対象の変流器が接続されているか否かを確認できる。   As described above, according to the connection inspection device according to the first embodiment of the present invention, the high-frequency signal transmitted from the current transformer (or voltage measurement terminal) to the circuit to be measured is connected to the other current transformer for confirming the connection. The device (current transformer to be inspected) can receive and confirm whether or not the current transformer to be inspected is connected.

特に、高周波短絡装置によって主幹ブレーカの一次側と短絡された分岐ブレーカに接続された変流器をモニターする高周波信号受信器において、高周波信号の強度が最大となるため、変流器が正しい位置に接続されているか否かを容易に確認することができる。   Especially in high frequency signal receivers that monitor current transformers connected to branch breakers that have been shorted to the primary side of the main breaker by a high frequency short circuit device, the strength of the high frequency signal is maximized, so the current transformer is in the correct position. Whether it is connected or not can be easily confirmed.

(第2の実施形態)
次に、本発明の第2の実施形態に係る電力測定/監視システム2について図4及び図5を用いて説明する。なお、図4及び図5において、ある配線が別の配線を跨ぐように図示した部位は電気的に接続されているわけではなく、黒丸で示した部位は電気的に接続されている。
(Second Embodiment)
Next, a power measurement / monitoring system 2 according to a second embodiment of the present invention will be described with reference to FIGS. 4 and 5, the parts illustrated so that one wiring straddles another wiring are not electrically connected, and the parts indicated by black circles are electrically connected.

(構成)
第2の実施形態に係る電力測定/監視システム2は、主幹ブレーカが複数相(複数の線路)を扱う場合に関する。図4には、R・S・Tからなる三相方式を例として示すが、第2の実施形態に係る電力測定/監視システム2は、L1・L2・Nからなる単相3線式等にも適用することが可能であり、2相又は4相以上の方式にも適用することができる。
(Constitution)
The power measurement / monitoring system 2 according to the second embodiment relates to a case where the main breaker handles a plurality of phases (a plurality of lines). FIG. 4 shows a three-phase system composed of R, S, and T as an example, but the power measurement / monitoring system 2 according to the second embodiment is a single-phase three-wire system composed of L1, L2, and N. Can also be applied, and can be applied to a two-phase or four-phase or more system.

なお、以下の説明において、第1の実施形態と同様の構成については同様の符号を用い、説明を省略する場合もある。   In the following description, the same reference numerals are used for the same configurations as in the first embodiment, and the description may be omitted.

電流供給システム2は、主幹ブレーカ12と、複数の分岐ブレーカ22(22−1〜n)と、を備える。主幹ブレーカ12と複数の分岐ブレ―カ22との間には、分電盤回路が形成される。分電盤回路には、主幹ブレーカ12に直接接続される主幹線路と、主幹線路から分岐ブレーカ22に向けて分岐される分岐線路と、が含まれる。なお、本実施形態の分電盤回路は、測定対象回路16と呼ぶ。   The current supply system 2 includes a main breaker 12 and a plurality of branch breakers 22 (22-1 to n). A distribution board circuit is formed between the main breaker 12 and the plurality of branch breakers 22. The distribution board circuit includes a main line directly connected to the main breaker 12 and a branch line branched from the main line toward the branch breaker 22. In addition, the distribution board circuit of this embodiment is called the measurement object circuit 16.

また、電力測定/監視システム2は、複数の相(R、S、T)に対応する複数の電圧測定端子32(32−1〜3)と、複数の変流器31(31−1〜3)と、複数の相(R、S、T)に対応する複数の変流器33(33−n1〜n3)と、を備える。なお、図4では省略しているが、実際には、複数の分岐ブレーカ22−1〜nに対応するように、変流器33が所定の相の数だけ配置される。   The power measurement / monitoring system 2 includes a plurality of voltage measurement terminals 32 (32-1 to 3) corresponding to a plurality of phases (R, S, T) and a plurality of current transformers 31 (31-1 to 3). ) And a plurality of current transformers 33 (33-n1 to n3) corresponding to the plurality of phases (R, S, T). Although omitted in FIG. 4, in practice, the current transformers 33 are arranged in a predetermined number of phases so as to correspond to the plurality of branch breakers 22-1 to 2-n.

さらに、電測測定/監視システム2は、接続検査装置50Bと、高周波短絡装置60と、接続判定装置70と、電力測定/監視装置80と、を備える。   Furthermore, the telemetry measurement / monitoring system 2 includes a connection inspection device 50B, a high frequency short circuit device 60, a connection determination device 70, and a power measurement / monitoring device 80.

また、図5に示したように、本実施形態に係る接続検査装置50Bは、高周波発生器51Bと、複数の高周波信号受信器52(52−1〜3)と、複数の高周波信号受信器53(53−n1〜n3)と、を備える。さらに、接続検査装置50Bは、複数のスイッチ(54−1〜3、55−1〜3、56−n1〜n3)を備える。   As shown in FIG. 5, the connection inspection device 50 </ b> B according to the present embodiment includes a high frequency generator 51 </ b> B, a plurality of high frequency signal receivers 52 (5-1 to 3), and a plurality of high frequency signal receivers 53. (53-n1 to n3). Further, the connection inspection device 50B includes a plurality of switches (54-1 to 3; 55-1 to 3; 56-n1 to n3).

なお、図5においては高周波信号発生器51Bを一つのみ示しているが、接続検査装置50Bは、高周波信号発生器51Bを複数備えていてもよい。例えば、図5の高周波信号発生器51Bを3個用意し、それぞれの高周波信号発生器51Bから異なる周波数f1、f2、f3を送出するようにしておくと、R相、S相及びT相の3相の接続確認を同時にできる。   Although only one high-frequency signal generator 51B is shown in FIG. 5, the connection inspection device 50B may include a plurality of high-frequency signal generators 51B. For example, if three high-frequency signal generators 51B of FIG. 5 are prepared and different frequencies f1, f2, and f3 are sent from the respective high-frequency signal generators 51B, three of the R phase, S phase, and T phase are transmitted. Phase connection can be confirmed at the same time.

複数の高周波信号発生器51を用いる場合、R相に周波数f1の高周波信号を送出すると、変流器A及びRnにおいては周波数f1の高周波信号は受信されるように設定する。それに対し、変流器A及びRnにおいては、周波数f2及びf3の高周波信号は受信されない、あるいは周波数f1の高周波信号よりも受信強度が小さくなるように設定すればよい。同様に、他の変流器31又は33においても、受信される周波数を変流器ごとに異なるように設定しておけば、異なる周波数の高周波信号を同時に送出し、受信側で高周波信号を区別できることになる。   When a plurality of high-frequency signal generators 51 are used, when the high-frequency signal having the frequency f1 is transmitted to the R phase, the current transformers A and Rn are set to receive the high-frequency signal having the frequency f1. On the other hand, the current transformers A and Rn may be set so that the high frequency signals of the frequencies f2 and f3 are not received or the reception intensity is lower than the high frequency signal of the frequency f1. Similarly, in the other current transformers 31 and 33, if the received frequency is set to be different for each current transformer, high-frequency signals of different frequencies are simultaneously transmitted, and high-frequency signals are distinguished on the receiving side. It will be possible.

図4には、分岐ブレーカ22−nと変流器Rnとの間と、主幹ブレーカ12のR相の2次側と、の間に高周波短絡装置60を挿入しているように図示している。これは、変流器Rnが正しい位置に接されているか否かを検証するための接続である。変流器Snが正しい位置に接続されているか否かを検証する場合は、分岐ブレーカ22−nと変流器Snとの間と、主幹ブレーカ12のS相の2次側と、の間に高周波短絡装置60を挿入する。同様に、変流器Tnが正しい位置に接続しているか否かを検証する場合は、分岐ブレーカ22−nと変流器Tnとの間と、主幹ブレーカ12のT相の2次側と、の間に高周波短絡装置60を挿入する。   In FIG. 4, a high-frequency short-circuit device 60 is inserted between the branch breaker 22-n and the current transformer Rn and between the secondary side of the R phase of the main breaker 12. . This is a connection for verifying whether or not the current transformer Rn is in contact with the correct position. When verifying whether or not the current transformer Sn is connected to the correct position, it is between the branch breaker 22-n and the current transformer Sn and between the secondary side of the S phase of the main breaker 12. The high frequency short circuit device 60 is inserted. Similarly, when verifying whether the current transformer Tn is connected to the correct position, between the branch breaker 22-n and the current transformer Tn, the secondary side of the T phase of the main breaker 12, and The high-frequency short-circuit device 60 is inserted between the two.

第2の実施形態に係る接続検査装置50Bを含む電力測定/監視システム2は、複数の相に対応する以外は、第1の実施形態に係る電力測定/監視システム1と同様の構成を持つ。そのため、各構成要素の詳細についての説明は省略する。   The power measurement / monitoring system 2 including the connection inspection device 50B according to the second embodiment has the same configuration as the power measurement / monitoring system 1 according to the first embodiment, except that it corresponds to a plurality of phases. Therefore, the detailed description of each component is omitted.

(動作)
次に、第2の実施形態に係る電力測定/監視システム2の動作について説明する。なお、以下の説明で示した手順1及び2に関しては、それぞれ独立して実行してもよいし、連続して実行してもよい。また、手順1及び2を連続して実行する際には、いずれを先に実行しても構わない。
(Operation)
Next, the operation of the power measurement / monitoring system 2 according to the second embodiment will be described. Note that procedures 1 and 2 shown in the following description may be executed independently or may be executed continuously. In addition, when steps 1 and 2 are continuously executed, any of them may be executed first.

第2の実施形態に係る電力測定/監視システム2においては、第1の実施形態に係る電力測定/監視システム1が実行する変流器の接続位置の確認に加え、変流器が接続された相が適切であるか否かを検証する。なお、以下の説明においては、R相に接続される変流器Rn33−n1の接続位置について検査してから、他の相に接続される変流器33の接続位置を検査する例を示しているが、実際の各相の検査は任意の順番で行ってよい。   In the power measurement / monitoring system 2 according to the second embodiment, in addition to the confirmation of the connection position of the current transformer executed by the power measurement / monitoring system 1 according to the first embodiment, the current transformer is connected. Verify whether the phases are appropriate. In addition, in the following description, after inspecting the connection position of the current transformer Rn33-n1 connected to the R phase, an example of inspecting the connection position of the current transformer 33 connected to another phase is shown. However, the actual inspection of each phase may be performed in any order.

(手順1)
図6は、第2の実施形態に係る電力測定/監視システム2において、変流器が正しい相に接続されているか否かを検査する際のフローチャートである。
(Procedure 1)
FIG. 6 is a flowchart when inspecting whether or not the current transformer is connected to the correct phase in the power measurement / monitoring system 2 according to the second embodiment.

まず、各スイッチを設定する(ステップ110)。以下に各スイッチに対応する動作について説明するが、図6のフローチャートにおいては図示しない。   First, each switch is set (step 110). The operation corresponding to each switch will be described below, but is not shown in the flowchart of FIG.

スイッチ55−1においては、変流器31−1から接続された2つの配線のうち、一方の配線は電力測定/監視装置80と変流器31−1とを接続するように切り替え、他方の配線は接地するように切り替える(ステップS111)。   In the switch 55-1, one of the two wires connected from the current transformer 31-1 is switched so as to connect the power measuring / monitoring device 80 and the current transformer 31-1, and the other wire is connected. The wiring is switched so as to be grounded (step S111).

スイッチ54−1において、電力測定/監視装置80と電圧測定端子32とを接続するように切り替える(ステップS113)。   In the switch 54-1, the power measurement / monitoring device 80 is switched to be connected to the voltage measurement terminal 32 (step S113).

また、スイッチ55−1及び56−n1においては、変流器31−n1及び33−1と電力測定/監視装置80との接続をOFFとする(ステップS112)。なお、ステップS111〜S113とは順番を入れ替えてもよく、並列して実行してもよい。   Further, in the switches 55-1 and 56-n1, the connection between the current transformers 31-n1 and 33-1 and the power measurement / monitoring device 80 is turned OFF (step S112). Note that the order of steps S111 to S113 may be changed or executed in parallel.

そして、全てのブレーカ(主幹ブレーカ12、分岐ブレ―カ22〜n)をOFFにする(ステップS114)。   Then, all the breakers (main breaker 12, branch breakers 22 to n) are turned off (step S114).

次に、電圧測定端子R(32−1)に接続された高周波信号発生器51Bは、高周波信号を発生させる(ステップS120)。   Next, the high frequency signal generator 51B connected to the voltage measurement terminal R (32-1) generates a high frequency signal (step S120).

高周波信号発生器51Bは、発生させた高周波信号を電圧測定端子R経由で測定対象回路16に送出する(ステップS130)。   The high frequency signal generator 51B sends the generated high frequency signal to the measurement target circuit 16 via the voltage measurement terminal R (step S130).

ここで、接続判定装置70は、高周波信号発生器51Bが発生させた高周波信号を複数の高周波信号受信器52及び53で受信できるか否かを確認する。すなわち、接続判定装置70は、変流器A(31−1)及びRn(33−11、33−21、・・・、33−n1)が正しい相に接続されているか否かを検証する(ステップS140)。   Here, the connection determination device 70 confirms whether or not the plurality of high frequency signal receivers 52 and 53 can receive the high frequency signal generated by the high frequency signal generator 51B. That is, the connection determination device 70 verifies whether or not the current transformers A (31-1) and Rn (33-11, 33-21, ..., 33-n1) are connected to the correct phase ( Step S140).

ステップS140において、接続判定装置70は以下の2通りの検出結果を得る可能性がある。   In step S140, the connection determination device 70 may obtain the following two detection results.

(1)変流器A、変流器Rnは高周波信号を受信し、その他の変流器B(31−2)、C(31−3)Sn(33−n2)及びTn(33−n3)は高周波信号を受信しない。このとき、接続判定装置70は、高周波信号が受信できた変流器A及びRnは正しい相に接続されているものとして検出する。   (1) Current transformer A and current transformer Rn receive high frequency signals, and other current transformers B (31-2), C (31-3) Sn (33-n2) and Tn (33-n3) Does not receive high frequency signals. At this time, the connection determination device 70 detects that the current transformers A and Rn that have received the high-frequency signal are connected to the correct phase.

変流器A及びRnが正しい相に接続されている場合(ステップS140でYes)、ステップS150に進む。   If the current transformers A and Rn are connected to the correct phase (Yes in step S140), the process proceeds to step S150.

(2)上記の変流器A及びRn以外で高周波信号が受信されたとき、接続判定装置70は、変流器を接続する相が間違っているものとして検出する。   (2) When a high-frequency signal is received other than the current transformers A and Rn, the connection determination device 70 detects that the phase connecting the current transformer is incorrect.

変流器A及びRnが正しい相に接続されていない場合(ステップS140でNo)、接続判定装置70は接続エラーを通知し(ステップS170)、図6のフローを終了する。接続判定装置70によって接続エラーが通知された場合、作業者は、変流器A及びRnを正しい相に接続し直せばよい。   If the current transformers A and Rn are not connected to the correct phase (No in step S140), the connection determination device 70 notifies a connection error (step S170) and ends the flow of FIG. When a connection error is notified by the connection determination device 70, the operator may reconnect the current transformers A and Rn to the correct phase.

変流器A及びRnが正しい相に接続されていることが確認されると(ステップS140でYes)、接続判定装置70は、全ての相で検査が終了したか否かを検証する(ステップS150)。   When it is confirmed that the current transformers A and Rn are connected to the correct phase (Yes in step S140), the connection determination device 70 verifies whether or not the inspection has been completed for all phases (step S150). ).

全ての相で検査が終了している場合(ステップS150でYes)、接続判定装置70は、接続検査終了を通知し(ステップS160)、図6のフローを終了する。   If the inspection has been completed for all phases (Yes in step S150), the connection determination device 70 notifies the end of the connection inspection (step S160), and ends the flow of FIG.

全ての相で検査が終了していない場合(ステップS150でNo)、ステップS110に戻って、他の検査対象となる相の検査を継続させる。その結果、変流器B及びSn、変流器C及びTnを含めた全ての変流器31及び33について正しい相に接続されているか否かを検査することができる。   If the inspection has not been completed for all phases (No in step S150), the process returns to step S110 to continue the inspection of the phase to be inspected. As a result, it is possible to check whether or not all current transformers 31 and 33 including current transformers B and Sn and current transformers C and Tn are connected to the correct phase.

なお、変流器31及び33の接続検査の順番は、任意の順番で実行すればよい。また、上述の各相における変流器31及び33の接続検査は、各相で独立に実行させることができれば、各相の接続検査を並行して実行してもよい。さらに、各相で接続エラーが確認された際に、別の相の接続検査を継続して実行し、全ての相の接続検査が終了した後に図6のフローを終了するようにしてもよい。   In addition, what is necessary is just to perform the order of the connection inspection of the current transformers 31 and 33 in arbitrary orders. Moreover, if the above-mentioned connection inspection of the current transformers 31 and 33 in each phase can be executed independently in each phase, the connection inspection of each phase may be executed in parallel. Furthermore, when a connection error is confirmed in each phase, the connection inspection of another phase may be continuously performed, and the flow of FIG. 6 may be ended after the connection inspection of all phases is completed.

以上のように、本発明の実施形態に係る接続検査装置によれば、相毎に全ての変流器31及び33の配線状態を効率的に確認することができる。   As described above, according to the connection inspection apparatus according to the embodiment of the present invention, it is possible to efficiently check the wiring states of all the current transformers 31 and 33 for each phase.

(手順2)
図7は、第2の実施形態に係る電力測定/監視システム2において、変流器が正しい位置に接続されているか否かを検査する際のフローチャートである。
(Procedure 2)
FIG. 7 is a flowchart when inspecting whether or not the current transformer is connected to a correct position in the power measurement / monitoring system 2 according to the second embodiment.

なお、図7のフローチャートの内容は、図3に示したフローチャートと同様の内容である。また、以下の説明において、変流器Rn(33−n1)が正しい位置に接続されているか否かを検査することについての説明であるが、その他の変流器31及び33についても同様の手法によって接続検査することができる。   7 is the same as the flowchart shown in FIG. Moreover, in the following description, it is description about test | inspecting whether the current transformer Rn (33-n1) is connected to the correct position, but the same method is used also about the other current transformers 31 and 33. The connection can be inspected.

まず、各スイッチを設定する(ステップS210)。以下に各スイッチに対応する動作について説明するが、図7のフローチャートにおいては図示しない。   First, each switch is set (step S210). The operation corresponding to each switch will be described below, but is not shown in the flowchart of FIG.

スイッチ55−1においては、変流器A(31−1)から接続された2つの配線のうち、一方の配線は高周波信号発生器51Bと変流器Aとを接続するように切り替え、他方の配線は接地するように切り替える(ステップS211)。   In the switch 55-1, one of the two wirings connected from the current transformer A (31-1) is switched so as to connect the high-frequency signal generator 51B and the current transformer A, and the other wiring is connected. The wiring is switched to ground (step S211).

また、スイッチ55−1及び56−n1においては、変流器A及びRnと電力測定/監視装置80との接続をOFFとする(ステップS212)。なお、ステップS211及びS212とは順番を入れ替えてもよく、並列して実行してもよい。   Further, in the switches 55-1 and 56-n1, the connection between the current transformers A and Rn and the power measurement / monitoring device 80 is turned OFF (step S212). Note that the order of steps S211 and S212 may be reversed, or may be executed in parallel.

ここで、スイッチ54−1において、電圧測定端子R(32−1)と電力測定/監視装置80とを接続するように切り替える(ステップS213)。   Here, in the switch 54-1, the voltage measurement terminal R (32-1) and the power measurement / monitoring device 80 are switched so as to be connected (step S213).

そして、全てのブレーカ(主幹ブレーカ12、分岐ブレ―カ22〜n)をOFFにする(ステップS214)。   Then, all the breakers (main breaker 12, branch breakers 22 to n) are turned off (step S214).

次に、変流器Rn(33−n1)が正しい位置に接続されているか否かを検証するため、図5のように、主幹ブレーカ12の二次側と分岐ブレーカ22−nの一次側との間に高周波短絡装置60を挿入する(ステップS220)。   Next, in order to verify whether or not the current transformer Rn (33-n1) is connected to the correct position, as shown in FIG. 5, the secondary side of the main breaker 12 and the primary side of the branch breaker 22-n The high-frequency short-circuit device 60 is inserted between (step S220).

ここで、高周波信号発生器51Bは、高周波信号を発生させ、測定対象回路16に向けて高周波信号を送出する(ステップS230)。   Here, the high frequency signal generator 51B generates a high frequency signal and sends the high frequency signal toward the measurement target circuit 16 (step S230).

各高周波信号受信器52及び53は、高周波信号発生器51Bから送出された高周波信号を受信する(ステップS240)。   Each high frequency signal receiver 52 and 53 receives the high frequency signal sent from the high frequency signal generator 51B (step S240).

接続判定装置70は、各高周波信号受信器52−1及び53−n1が受信した高周波信号の強度をモニターし、検査対象となる変流器Rnが正しい位置に接続されているか否かを判断する(ステップS250)。   The connection determination device 70 monitors the strength of the high-frequency signal received by each of the high-frequency signal receivers 52-1 and 53-n1, and determines whether or not the current transformer Rn to be inspected is connected to the correct position. (Step S250).

以上の動作を全ての変流器について実行すれば、全ての変流器について接続位置の正否を検証できる。なお、変流器の接続位置に誤りが検出された場合には、間違った位置に接続された変流器を正しい位置に接続すればよい。   If the above operation is executed for all the current transformers, the correctness of the connection positions can be verified for all the current transformers. If an error is detected in the connection position of the current transformer, the current transformer connected to the wrong position may be connected to the correct position.

以上のように、本発明の第2の実施形態に係る接続検査装置を含む電力測定/監視システムは、手順1によって、高周波信号を送出する電圧測定端子や変流器の接続位置を適宜変更し、接続確認したい変流器が、送信した高周波信号が受信できるか否かを判別する。そして、接続確認したい変流器が正しい相に接続されているか否かを判別できる。なお、電圧測定端子や変流器の接続位置は、単相3線式であればL1、L2相、三相方式であればR、S、T相である。   As described above, the power measurement / monitoring system including the connection inspection apparatus according to the second embodiment of the present invention appropriately changes the connection positions of the voltage measurement terminal and the current transformer that transmit the high-frequency signal according to the procedure 1. The current transformer for which connection confirmation is desired determines whether or not the transmitted high-frequency signal can be received. Then, it can be determined whether or not the current transformer whose connection is to be confirmed is connected to the correct phase. The connection positions of the voltage measuring terminal and the current transformer are L1, L2 phase in the case of a single-phase three-wire system, and R, S, T phase in the case of a three-phase system.

さらに、本発明の第2の実施形態に係る接続検査装置を含む電力測定/監視システムは、手順2によって、接続確認したい変流器が正しい分岐に接続されているか否かを、高周波短絡装置を用いることで確認できる。   Furthermore, the power measurement / monitoring system including the connection inspection device according to the second embodiment of the present invention uses the high frequency short-circuit device to determine whether or not the current transformer to be connected is connected to the correct branch in step 2. It can be confirmed by using it.

第2の実施形態に係る接続検査装置を含む電力測定/監視システムによれば、複数の相(線)を有する主幹ブレーカに接続された分岐ブレーカに適切に変流器を接続することができる。第2の実施形態で示した手順による接続検査方法を用いれば、単層3線式や三相方式以外の複数の相(線)を含む測定対象回路においても、変流器の接続検査を効率的に実施することが可能となる。   According to the power measurement / monitoring system including the connection inspection device according to the second embodiment, the current transformer can be appropriately connected to the branch breaker connected to the main breaker having a plurality of phases (lines). If the connection inspection method according to the procedure shown in the second embodiment is used, the connection inspection of the current transformer can be efficiently performed even in a measurement target circuit including a plurality of phases (wires) other than the single-layer three-wire system or the three-phase system It becomes possible to carry out automatically.

(実施例1)
続いて、本発明の実施形態に係る接続検査装置について実施例を挙げて説明する。実施例1は、第2の実施形態に関する実施例である。なお、実施例1の図において、ある配線が別の配線を跨ぐように図示した部位は電気的に接続されているわけではなく、黒丸で示した部位は電気的に接続されている。
Example 1
Subsequently, the connection inspection apparatus according to the embodiment of the present invention will be described with examples. Example 1 is an example related to the second embodiment. In the diagram of the first embodiment, a portion illustrated so that a certain wiring straddles another wiring is not electrically connected, and a portion indicated by a black circle is electrically connected.

一般に、消費電力をリアルタイムで測定する電力測定/監視システムでは、分電盤に変流器などのセンサを取り付けて消費電流や電圧を観測する。具体的には、図8及び図9に示すように、ブレーカ1の2次側の端子に電圧測定端子(Vr、Vs、Vt)及び変流器(CTr、CTs、CTt)を設け、各ブレーカA〜D(220−1〜4)に分岐された線路に変流器CTra〜CTtdを設けて電圧及び電流を測定する。このように多数のセンサを多数の配線で接続するため、実際の取り付けにおいては接続間違いや接続忘れなどが発生しやすい。なお、変流器は各ブレーカA〜Dの2次側に設けてもよい。   Generally, in a power measurement / monitoring system that measures power consumption in real time, a sensor such as a current transformer is attached to a distribution board and current consumption and voltage are observed. Specifically, as shown in FIGS. 8 and 9, voltage measurement terminals (Vr, Vs, Vt) and current transformers (CTr, CTs, CTt) are provided on the secondary side terminals of the breaker 1, and each breaker is provided. Current transformers CTra to CTtd are provided on the lines branched to A to D (220-1 to 4), and the voltage and current are measured. Since a large number of sensors are connected by a large number of wires in this way, connection errors or forgetting connections tend to occur in actual mounting. In addition, you may provide a current transformer in the secondary side of each breaker AD.

そこで、本発明の実施例では、図10に示すように、電圧測定端子320につながる配線には高周波信号発生器510を、変流器310又は330には高周波信号受信機520又は530を、スイッチ切り替えで接続できるようにする。そして、全ての電圧測定端子320には、図10に一例を示すように、スイッチ切り替えで、高周波信号発生器510を接続できるようにする。さらに、全ての変流器310及び330にはスイッチ切り替えで、高周波信号受信機520又は530を接続できるようにする。   Therefore, in the embodiment of the present invention, as shown in FIG. 10, the high-frequency signal generator 510 is connected to the wiring connected to the voltage measurement terminal 320, the high-frequency signal receiver 520 or 530 is switched to the current transformer 310 or 330, and the switch Enable connection by switching. As shown in an example of FIG. 10, the high frequency signal generator 510 can be connected to all the voltage measurement terminals 320 by switching the switches. Furthermore, the high frequency signal receiver 520 or 530 can be connected to all the current transformers 310 and 330 by switching.

(構成)
図8及び図9は三相200Vの例であり、主幹ブレーカであるブレーカ1はR相、S相及びT相からなる3相を含む。ブレーカ1の2次側には、電圧測定端子Vr〜Vt及び変流器CTr〜CTtが設けられている。各相に接続された主幹線路からは、分岐ブレーカであるブレーカA〜Dに向けて分岐線路が分岐されている。ブレーカ1の2次側及び各ブレーカ(A〜D)には、それぞれ変流器CTが設けられている。
(Constitution)
8 and 9 are examples of a three-phase 200V, and the breaker 1 that is a main breaker includes three phases including an R phase, an S phase, and a T phase. On the secondary side of the breaker 1, voltage measurement terminals Vr to Vt and current transformers CTr to CTt are provided. A branch line is branched from the main line connected to each phase toward breakers A to D which are branch breakers. Current transformers CT are respectively provided on the secondary side of the breaker 1 and the breakers (A to D).

各電圧測定端子及び各変流器は、接続検査装置501に接続されている。各電圧測定端子における電圧値及び各変流器CTにおける電流値は、接続検査装置501を介して、図示しない接続判定装置によってモニターされている。   Each voltage measurement terminal and each current transformer are connected to a connection inspection device 501. The voltage value at each voltage measurement terminal and the current value at each current transformer CT are monitored by a connection determination device (not shown) via the connection inspection device 501.

検査対象となる変流器CTが配された配線には、図9のように、高周波短絡装置600が接続される。高周波短絡装置600の2つのプローブのうち、一方はブレーカ1の2次側に接続され、他方は検査対象の変流器CTとブレーカA〜Dとの間に接続される。高周波短絡装置600は、例えばコンデンサなどによって高周波信号を短絡する装置である。   A high-frequency short-circuit device 600 is connected to the wiring in which the current transformer CT to be inspected is arranged as shown in FIG. Of the two probes of the high-frequency short-circuit device 600, one is connected to the secondary side of the breaker 1, and the other is connected between the current transformer CT to be inspected and the breakers A to D. The high-frequency short-circuit device 600 is a device that short-circuits a high-frequency signal using, for example, a capacitor.

各相に変流器CTが正しく接続されているか否かを検査するとき、高周波短絡装置600は測定対象回路151に接続されない。変流器CTが正しい位置に接続されているか否かを検証するとき、高周波短絡装置600は、検査対象となる変流器CTと分岐ブレーカの1次側との間と、ブレーカ1の2次側と、の間に接続される。   When inspecting whether or not the current transformer CT is correctly connected to each phase, the high-frequency short-circuit device 600 is not connected to the measurement target circuit 151. When verifying whether or not the current transformer CT is connected to the correct position, the high-frequency short-circuit device 600 is connected between the current transformer CT to be inspected and the primary side of the branch breaker, and the secondary of the breaker 1. Connected to the side.

図10は、実施例1に係る接続検査装置501の内部構成を示す。なお、図10では、R相から分岐された配線に接続された変流器CTr及びCTraが正しい相・位置に接続されているか否かを検査する例の図である。変流器CTr及びCTra以外の変流器CTを検査するための構成も、図10に示した構成と同様である。   FIG. 10 illustrates an internal configuration of the connection inspection apparatus 501 according to the first embodiment. In addition, in FIG. 10, it is a figure of the example which test | inspects whether the current transformer CTr and CTra connected to the wiring branched from R phase are connected to the correct phase and position. The configuration for inspecting the current transformer CT other than the current transformers CTr and CTra is the same as the configuration shown in FIG.

接続検査装置501は、高周波信号発生器510と、高周波信号受信器520−1及び530−11と、高周波信号を増幅する増幅回路(512、522、532)と、を備える。さらに、接続検査装置501は、電圧測定端子Vr(320−1)、変流器CTr(310−1)及びCTra(330−11)からの信号電流を切り替える複数のスイッチ(SW1〜7)を備える。   The connection inspection device 501 includes a high-frequency signal generator 510, high-frequency signal receivers 520-1 and 530-11, and amplification circuits (512, 522, 532) that amplify the high-frequency signal. Further, the connection inspection device 501 includes a plurality of switches (SW1 to SW7) for switching signal currents from the voltage measurement terminal Vr (320-1), the current transformer CTr (310-1), and the CTra (330-11). .

高周波信号発生器510は、接続判定装置(図示しない)の制御によって高周波信号を発生する。高周波信号発生器510によって発生された高周波信号は、増幅回路512で増幅されて送出される。高周波信号発生器510で発生された高周波信号は、スイッチSW1(540−1)で送出先が切り替えられる。スイッチSW1がa側に切り替えられているとき、高周波信号はスイッチSW2(550−11)に向けて送出される。スイッチSW1がb側に切り替えられているとき、高周波信号は電圧測定端子Vrに向けて送出される。   The high frequency signal generator 510 generates a high frequency signal under the control of a connection determination device (not shown). The high frequency signal generated by the high frequency signal generator 510 is amplified by the amplifier circuit 512 and transmitted. The destination of the high-frequency signal generated by the high-frequency signal generator 510 is switched by the switch SW1 (540-1). When the switch SW1 is switched to the a side, the high-frequency signal is sent toward the switch SW2 (550-11). When the switch SW1 is switched to the b side, the high frequency signal is sent toward the voltage measurement terminal Vr.

スイッチSW2がa側に切り替えられ、かつスイッチSW4(552−11)が閉じているとき(ON)、変流器CTrの電流値は電流測定回路によって計測される。スイッチSW2がa側に切り替えられ、かつスイッチSW4が開いているとき(OFF)、変流器CTrの電流値は測定されない。   When the switch SW2 is switched to the a side and the switch SW4 (552-11) is closed (ON), the current value of the current transformer CTr is measured by the current measurement circuit. When the switch SW2 is switched to the a side and the switch SW4 is open (OFF), the current value of the current transformer CTr is not measured.

スイッチSW2がb側に切り替えられているとき、高周波信号はスイッチSW2を経て変流器CTrに向けて送信される。変流器CTrに向けて送信された高周波信号は、測定対象回路151に送出される。   When the switch SW2 is switched to the b side, the high frequency signal is transmitted to the current transformer CTr via the switch SW2. The high frequency signal transmitted toward the current transformer CTr is transmitted to the measurement target circuit 151.

スイッチSW1がb側、スイッチSW2がa側、スイッチSW3(550−12)がb側に切り替えられ、スイッチSW4〜7(552−11・12、560−11・12)が開かれ(OFF)、ブレーカA〜DがOFFとされたとき、R相に対応する高周波信号受信器520−1及び530−11は高周波信号を受信する。ここで、R相に接続された変流器CTに対応する高周波信号受信器520−1及び530−11が正しい相に接続されていれば、全ての高周波信号受信器520−1及び530−11で高周波信号が受信される。なお、変流器CTが正しい相に接続されているか否かを検証するときは、高周波短絡装置600は測定対象回路151に接続されない。   The switch SW1 is switched to the b side, the switch SW2 is switched to the a side, the switch SW3 (550-12) is switched to the b side, and the switches SW4 to 7 (552-11 · 12, 560-11 · 12) are opened (OFF), When the breakers A to D are turned off, the high-frequency signal receivers 520-1 and 530-11 corresponding to the R phase receive high-frequency signals. Here, if the high-frequency signal receivers 520-1 and 530-11 corresponding to the current transformer CT connected to the R-phase are connected to the correct phase, all the high-frequency signal receivers 520-1 and 530-11 are connected. A high frequency signal is received. When verifying whether the current transformer CT is connected to the correct phase, the high-frequency short-circuit device 600 is not connected to the measurement target circuit 151.

また、一例として、変流器CTraが正しい位置に接続されているか否かを検証するときは、検証対象とする変流器CTraとブレーカAとの間と、ブレーカ1と、の間に高周波短絡装置600を接続する。高周波短絡装置600を接続すると、高周波短絡装置600によってループが形成されるため、変流器CTrを経て送出された高周波信号電流の大部分は、変流器CTraに対応する高周波信号受信器530−11に流れる。   As an example, when verifying whether or not the current transformer CTra is connected to the correct position, a high-frequency short circuit is established between the current transformer CTra and the breaker A to be verified and between the breaker 1 and the current transformer CTra. Connect the device 600. When the high-frequency short-circuit device 600 is connected, a loop is formed by the high-frequency short-circuit device 600. Therefore, most of the high-frequency signal current sent through the current transformer CTr is a high-frequency signal receiver 530- corresponding to the current transformer CTra. 11 flows.

ここで、スイッチSW1がa側、スイッチSW2がb側、スイッチSW3(550−12)がb側に切り替えられ(接地)、スイッチSW4〜7が開かれ(OFF)、ブレーカA〜DがOFFとされれば、高周波信号受信器530−11が強い高周波信号を受信する。このとき、変流器CTra以外の変流器CTに対応する高周波信号受信器には弱い高周波信号しか検出されなければ、変流器CTraが正しい位置に接続されていることを確認できる。   Here, the switch SW1 is switched to the a side, the switch SW2 is switched to the b side, the switch SW3 (550-12) is switched to the b side (grounding), the switches SW4 to SW7 are opened (OFF), and the breakers A to D are turned OFF. Then, the high frequency signal receiver 530-11 receives a strong high frequency signal. At this time, if only a weak high-frequency signal is detected in the high-frequency signal receiver corresponding to the current transformer CT other than the current transformer CTra, it can be confirmed that the current transformer CTra is connected to the correct position.

(動作)
次に、実施例1に係る接続検査装置501の動作について、各スイッチの切り替えを示した図11及び図13と、フローチャートを示した図12及び図14と、を用いて説明する。なお、以下の説明においては、第2の実施形態と同様に、変流器CTが正しい相に接続されているか否かを検証する手順1と、変流器CTが正しい位置に接続されているか否かを検証する手順2と、を区別して説明する。
(Operation)
Next, the operation of the connection inspection apparatus 501 according to the first embodiment will be described with reference to FIGS. 11 and 13 showing switching of each switch and FIGS. 12 and 14 showing flowcharts. In the following description, as in the second embodiment, the procedure 1 for verifying whether the current transformer CT is connected to the correct phase and whether the current transformer CT is connected to the correct position. The procedure 2 for verifying whether or not will be described separately.

(手順1)
図12は、接続検査装置501の動作(手順1)を説明するためのフローチャートである。
(Procedure 1)
FIG. 12 is a flowchart for explaining the operation (procedure 1) of the connection inspection apparatus 501.

まず、手順1を検証する際には、図11のようにスイッチを切り替える(ステップS310)。すなわち、スイッチSW1及び3はb側に切り替え、スイッチSW4〜7はOFFにする。スイッチSW2はa側に切り替える。さらに、全てのブレーカ(ブレーカ1、ブレーカA〜D)をOFFにする。   First, when verifying the procedure 1, the switch is switched as shown in FIG. 11 (step S310). That is, the switches SW1 and SW3 are switched to the b side, and the switches SW4 to SW7 are turned off. The switch SW2 is switched to the a side. Further, all the breakers (breaker 1, breakers A to D) are turned OFF.

次に、電圧測定端子Vrに接続された高周波信号発生器510から高周波信号を発生させる(ステップS320)。   Next, a high frequency signal is generated from the high frequency signal generator 510 connected to the voltage measurement terminal Vr (step S320).

そして、高周波信号発生器510で発生させた高周波信号を電圧測定端子Vr経由で測定対象回路151に送出する(ステップS330)。   The high-frequency signal generated by the high-frequency signal generator 510 is sent to the measurement target circuit 151 via the voltage measurement terminal Vr (step S330).

ここで、図示しない接続判定装置は、検査対象となっている相(ここではR相)に設置された各変流器CTに接続された高周波信号受信機520及び530で、送信された高周波信号が受信されるかを確認する(ステップS340)。   Here, the connection determination device (not shown) is a high-frequency signal transmitted by the high-frequency signal receivers 520 and 530 connected to the current transformers CT installed in the phase to be inspected (here, the R-phase). Is received (step S340).

このとき、変流器CTr、CTra、CTrb、CTrc及びCTrd(以下、CTra〜dと略)では高周波信号が受信され、その他の変流器では受信されなければ、接続判定装置(図示しない)は、高周波信号が受信された変流器CTに対応する配線は正しく接続されていると判定する。   At this time, a high frequency signal is received by the current transformers CTr, CTra, CTrb, CTrc and CTrd (hereinafter abbreviated as CTra to d), and if not received by other current transformers, a connection determination device (not shown) Then, it is determined that the wiring corresponding to the current transformer CT that has received the high-frequency signal is correctly connected.

変流器CTr、CTra〜d以外の変流器CTに対応する高周波受信器520又は530で高周波信号が受信された場合(ステップS340でNo)、変流器を接続する相が間違っていることが検出されたことになる。この場合(ステップS340でNo)、接続判定装置は接続エラーを通知し(ステップS370)、図12のフローを終了して変流器CTを正しい相に接続すればよい。なお、ステップS370の後に、ステップS350に進むようにしてもよい。   When a high-frequency signal is received by the high-frequency receiver 520 or 530 corresponding to the current transformer CT other than the current transformers CTr and CTra-d (No in step S340), the phase connecting the current transformers is incorrect. Is detected. In this case (No in step S340), the connection determination device notifies the connection error (step S370), ends the flow of FIG. 12, and connects the current transformer CT to the correct phase. In addition, you may make it progress to step S350 after step S370.

変流器CTr、CTra〜dが正しい相に接続されていることが確認されると(ステップS340でYes)、接続判定装置は、全ての相で検査が終了したか否かを検証する(ステップS350)。   When it is confirmed that the current transformers CTr and CTra-d are connected to the correct phase (Yes in step S340), the connection determination device verifies whether or not the inspection is completed for all phases (step). S350).

全ての相で検査が終了している場合(ステップS350でYes)、接続判定装置は、接続検査終了を通知し(ステップS360)、図12のフローを終了する。   If the inspection has been completed for all phases (Yes in step S350), the connection determination device notifies the end of the connection inspection (step S360), and the flow in FIG. 12 ends.

全ての相で検査が終了していない場合(ステップS350でNo)、ステップS310に戻って、他の相の検査を継続させる。その結果、変流器CTs及びCTsa〜d、変流器CTt及びCTta〜dを含めた全ての変流器31及び33について正しい相に接続されているか否かを検査することができる。   If the inspection has not been completed for all phases (No in step S350), the process returns to step S310 to continue the inspection of other phases. As a result, it is possible to check whether or not all the current transformers 31 and 33 including the current transformers CTs and CTsa to d and the current transformers CTt and CTta to d are connected to the correct phase.

ただし、手順1では、各変流器CTR、CTRa〜d(CTSa〜d、CTta〜d)が、Vr(Vs、Vt)の配電線に接続されていることを確認することができるものの、正しい分岐ブレーカに対応して接続されているか否かまでは確認できない。   However, in procedure 1, although it can confirm that each current transformer CTR, CTRa-d (CTSa-d, CTta-d) is connected to the distribution line of Vr (Vs, Vt), it is correct It is not possible to confirm whether or not it is connected corresponding to the branch breaker.

(手順2)
図14は、接続検査装置501の動作(手順2)を説明するためのフローチャートである。
(Procedure 2)
FIG. 14 is a flowchart for explaining the operation (procedure 2) of the connection inspection apparatus 501.

まず、図13のようにスイッチを切り替える(ステップS410)。すなわち、スイッチSW2及び3はb側に切り替え、スイッチSW4〜7はOFFにする。スイッチSW1はa側に切り替える。さらに、全てのブレーカ(ブレーカ1、ブレーカA〜D)をOFFにする。   First, the switch is switched as shown in FIG. 13 (step S410). That is, the switches SW2 and SW3 are switched to the b side, and the switches SW4 to SW7 are turned off. The switch SW1 is switched to the a side. Further, all the breakers (breaker 1, breakers A to D) are turned OFF.

次に、変流器CTrとブレーカ1との間と、変流器CTraとブレーカAとの間に、高周波短絡装置600を挿入するように接続する(ステップS420)。なお、図13においては、変流器CTraの接続位置が適切であるか否かを検証するため、高周波短絡装置600が有する2つのプローブのうち一方を変流器CTraとブレーカAとの間に接続させる。その他の変流器CTを検証する際には、高周波短絡装置600が有する2つのプローブのうち、一方をそれぞれの変流器CTと対応する各分岐ブレーカ220との間に接続させ、他方を対応する相の電圧測定端子とブレーカ1との間に接続させればよい。   Next, it connects so that the high frequency short circuit apparatus 600 may be inserted between the current transformer CTr and the breaker 1, and between the current transformer CTra and the breaker A (step S420). In FIG. 13, in order to verify whether or not the connection position of the current transformer CTra is appropriate, one of the two probes of the high-frequency short-circuiting device 600 is placed between the current transformer CTra and the breaker A. Connect. When verifying the other current transformer CT, one of the two probes of the high-frequency short-circuit device 600 is connected between each current transformer CT and the corresponding branch breaker 220, and the other is supported. What is necessary is just to connect between the voltage measurement terminal of the phase to perform, and the breaker 1. FIG.

各スイッチの設定及び高周波短絡装置600の挿入が完了すると、高周波信号発生器510は、高周波信号を発生させ、測定対象回路152に向けて高周波信号を送出する(ステップS430)。   When the setting of each switch and the insertion of the high-frequency short-circuit device 600 are completed, the high-frequency signal generator 510 generates a high-frequency signal and sends the high-frequency signal toward the measurement target circuit 152 (step S430).

各高周波信号受信器520及び530は、高周波信号発生器510から送出された高周波信号を受信する(ステップS440)。   Each of the high frequency signal receivers 520 and 530 receives the high frequency signal sent from the high frequency signal generator 510 (step S440).

接続判定装置(図示しない)は、各高周波信号受信器520及び530が受信した高周波信号の強度をモニターし、検査対象となる変流器CTが正しい分岐ブレーカに接続されているか否かを判断する(ステップS450)。図13に示した例では、変流器CTraに対応する高周波信号受信器530−11が強い高周波信号を受信し、その他の変流器に対応する高周波信号受信器520及び530では弱い高周波信号を受信することになる。   A connection determination device (not shown) monitors the strength of the high-frequency signal received by each of the high-frequency signal receivers 520 and 530, and determines whether or not the current transformer CT to be inspected is connected to the correct branch breaker. (Step S450). In the example shown in FIG. 13, the high frequency signal receiver 530-11 corresponding to the current transformer CTra receives a strong high frequency signal, and the high frequency signal receivers 520 and 530 corresponding to the other current transformers receive weak high frequency signals. Will receive.

以下、検査対象とする変流器CTに対応させて高周波短絡プローブの接続位置を変更するとともに、高周波信号を送出する変流器CTを変更する。そして、対応する高周波受信器530の高周波信号の受信状況によって、各変流器CTが正しい分岐に接続されているか否かを確認する。変流器の接続位置に誤りが検出された場合には、間違った位置に接続された変流器を正しい位置に接続すればよい。   Hereinafter, the connection position of the high-frequency short-circuit probe is changed corresponding to the current transformer CT to be inspected, and the current transformer CT for sending a high-frequency signal is changed. Then, it is confirmed whether or not each current transformer CT is connected to the correct branch according to the reception status of the high frequency signal of the corresponding high frequency receiver 530. If an error is detected in the connection position of the current transformer, the current transformer connected to the wrong position may be connected to the correct position.

(実施例2)
次に、高周波信号の短絡箇所を自動的に切り替えて検査を実行することができる短絡切替装置(短絡切替手段)を備えた接続検査装置502を含む電力測定/監視システムについて、実施例を挙げて説明する。なお、実施例2において、ある配線が別の配線を跨ぐように図示した部位は電気的に接続されているわけではなく、黒丸で示した部位は電気的に接続されている。
(Example 2)
Next, a power measurement / monitoring system including a connection inspection device 502 provided with a short-circuit switching device (short-circuit switching means) capable of automatically switching a short-circuit portion of a high-frequency signal and executing an inspection will be described by way of an example. explain. In the second embodiment, a portion illustrated so that a certain wiring straddles another wiring is not electrically connected, and a portion indicated by a black circle is electrically connected.

図15は、実施例2に係る電力測定/監視システムの概念図である。また、図16は、実施例2に係る接続検査装置502の内部構成を示す概念図である。なお、図16の実施例2の構成において、図9の実施例1と同じ構成については同じ符号で示した。   FIG. 15 is a conceptual diagram of a power measurement / monitoring system according to the second embodiment. FIG. 16 is a conceptual diagram illustrating an internal configuration of the connection inspection apparatus 502 according to the second embodiment. In addition, in the structure of Example 2 of FIG. 16, about the same structure as Example 1 of FIG. 9, it showed with the same code | symbol.

図9に示した実施例1と図15に示した実施例2との違いは、実施例1の高周波短絡装置600が、実施例2の接続検査装置502の内部に構成されている点である。   The difference between the first embodiment shown in FIG. 9 and the second embodiment shown in FIG. 15 is that the high-frequency short-circuit device 600 of the first embodiment is configured inside the connection inspection device 502 of the second embodiment. .

図16に示したように、接続検査装置502は、短絡切替装置610を有している。短絡切替装置610は、高周波短絡装置620と、スイッチSW8(631)と、スイッチSW9(632)と、を含む。なお、図16においては、変流器330−11に対応する短絡切替装置610のみを図示しているが、実際には全ての変流器CTに対応するように短絡切替装置610を設けることが好ましい。   As shown in FIG. 16, the connection inspection device 502 includes a short circuit switching device 610. Short-circuit switching device 610 includes high-frequency short-circuit device 620, switch SW8 (631), and switch SW9 (632). In FIG. 16, only the short-circuit switching device 610 corresponding to the current transformer 330-11 is illustrated, but actually, the short-circuit switching device 610 may be provided so as to correspond to all the current transformers CT. preferable.

高周波短絡装置620はコンデンサなどの容量を含む。実施例2では、高周波短絡装置620はコンデンサを含み、コンデンサの一方の電極はスイッチSW8に接続され、他方の電極はスイッチSW9に接続される。   The high frequency short circuit device 620 includes a capacity such as a capacitor. In the second embodiment, the high-frequency short-circuit device 620 includes a capacitor, and one electrode of the capacitor is connected to the switch SW8, and the other electrode is connected to the switch SW9.

実施例2においては、主幹線路と分岐線路とが形成する分電盤回路を測定対象回路152と呼ぶ。スイッチSW8において、一端は測定対象回路152の電圧測定端子Vr(320−1)とブレーカ1(120)との間に接続され、他端は高周波短絡装置620の一方の電極に接続される。また、スイッチSW9において、一端は変流器330−11とブレーカA(220−1)との間に接続され、他端は高周波短絡装置620の他端に接続される。   In the second embodiment, the distribution board circuit formed by the main line and the branch line is referred to as a measurement target circuit 152. In the switch SW8, one end is connected between the voltage measurement terminal Vr (320-1) of the measurement target circuit 152 and the breaker 1 (120), and the other end is connected to one electrode of the high-frequency short-circuit device 620. Further, in the switch SW9, one end is connected between the current transformer 330-11 and the breaker A (220-1), and the other end is connected to the other end of the high frequency short circuit device 620.

実施例2に係る接続検査装置502において、短絡切替装置610以外の構成要素は実施例1に係る接続検査装置501と同様に動作するため、詳細な説明については省略する。   In the connection inspection apparatus 502 according to the second embodiment, components other than the short-circuit switching apparatus 610 operate in the same manner as the connection inspection apparatus 501 according to the first embodiment, and thus detailed description thereof is omitted.

実施例2の接続検査装置502は、実施例1と同様に、手順1と手順2の2つの手順で動作する。手順1においては、スイッチSW8及びSW9は開き(OFF)、実施例1と同様に動作する。手順2においては、検査対象となる変流器CTに対応する高周波短絡装置620に接続されたスイッチSW8及びSW9を閉じ(ON)、その他の高周波短絡装置620に接続されたスイッチSW8及びSW9は開く(OFF)。なお、実施例2において、短絡切替装置610以外の動作については実施例1と同様であるため、詳細な説明は省略する。   Similar to the first embodiment, the connection inspection apparatus 502 according to the second embodiment operates in two procedures, the procedure 1 and the procedure 2. In the procedure 1, the switches SW8 and SW9 are opened (OFF) and operate in the same manner as in the first embodiment. In the procedure 2, the switches SW8 and SW9 connected to the high frequency short circuit device 620 corresponding to the current transformer CT to be inspected are closed (ON), and the switches SW8 and SW9 connected to the other high frequency short circuit devices 620 are opened. (OFF). In the second embodiment, the operations other than the short circuit switching device 610 are the same as those in the first embodiment, and thus detailed description thereof is omitted.

実施例2によれば、高周波短絡装置を接続検査装置の内部に構成しているため、検査対象とする変流器を自動的に変更でき、より効率的に変流器の接続検査を実行することができる。また、分電盤の稼働後に変流器の状態を検査することもできる。さらに、作業者によって高周波短絡装置のプローブを挿入する位置を設定する必要がなくなるため、検査時の作業誤りを減らすことができる。   According to the second embodiment, since the high-frequency short-circuit device is configured in the connection inspection device, the current transformer to be inspected can be automatically changed, and the connection inspection of the current transformer is executed more efficiently. be able to. Moreover, the state of the current transformer can also be inspected after the distribution board is operated. Furthermore, since it is not necessary for the operator to set the position for inserting the probe of the high-frequency short-circuit device, it is possible to reduce work errors during inspection.

(変形例1)
図17は、実施例2の短絡切替装置610の変形例1の概念図である。図17の変形例1の短絡切替装置611は、ブレーカ1(110)の相の接続を切り替えるスイッチSW11(633)と、ブレーカA〜D(220−1〜4)の接続を切り替えるスイッチSW12(634)と、を備える。また、短絡切替装置611において、スイッチSW11とSW12との間には高周波短絡装置620が設置されている。さらに、短絡切替装置611は、図示しない接続判定装置の指示に従ってスイッチSW11およびSW12を制御する制御部630を備えている。
(Modification 1)
FIG. 17 is a conceptual diagram of Modification 1 of the short-circuit switching device 610 according to the second embodiment. The short-circuit switching device 611 of Modification 1 in FIG. 17 includes a switch SW11 (633) that switches the phase connection of the breaker 1 (110) and a switch SW12 (634) that switches the connections of the breakers A to D (220-1 to 4). And). In the short circuit switching device 611, a high frequency short circuit device 620 is installed between the switches SW11 and SW12. Furthermore, the short-circuit switching device 611 includes a control unit 630 that controls the switches SW11 and SW12 in accordance with an instruction from a connection determination device (not shown).

図17の例では、ブレーカ1のR相とブレーカAの端子Raを短絡する例を示しており、短絡された経路を太線で示している。図17のように短絡することによって、図16の実施例2と同様に、変流器CTra(330−11)の接続位置を検査することができる。同様に、スイッチSW11とスイッチSW12とを対応させて短絡させる部位を制御部630によって切り替え、全ての変流器CTの接続位置を検査することができる。   In the example of FIG. 17, the example which short-circuits the R phase of the breaker 1 and the terminal Ra of the breaker A is shown, and the short-circuited path is indicated by a bold line. By short-circuiting like FIG. 17, the connection position of current transformer CTra (330-11) can be test | inspected similarly to Example 2 of FIG. Similarly, the part which short-circuits corresponding to switch SW11 and switch SW12 is switched by the control part 630, and the connection position of all the current transformers CT can be test | inspected.

(変形例2)
図18は、実施例2の短絡切替装置610の変形例2の概念図である。図18の変形例2の短絡切替装置612において、ブレーカ1(110)の相の接続を切り替えるスイッチSW11(633)は変形例1と同様の構成・機能を有する。なお、図18の各ブレーカ220とスイッチSW13との間の配線が交差している部位においては、各配線が電気的に接続されているわけではない。
(Modification 2)
FIG. 18 is a conceptual diagram of a second modification of the short circuit switching device 610 according to the second embodiment. In the short-circuit switching device 612 of Modification 2 in FIG. 18, the switch SW11 (633) that switches the phase connection of the breaker 1 (110) has the same configuration and function as in Modification 1. In addition, in the site | part where the wiring between each breaker 220 of FIG. 18 and switch SW13 cross | intersect, each wiring is not necessarily electrically connected.

変形例2の短絡切替装置612は、ブレーカ1の各相を独立して検査することを可能とする。   The short-circuit switching device 612 according to the second modification can inspect each phase of the breaker 1 independently.

スイッチSW13−1(635)は、R相と接続するブレーカA〜D(220−1〜4)の端子(Ra〜Rd)を切り替える。スイッチSW13−2(636)は、S相と接続するブレーカA〜D(220−1〜4)の端子(Sa〜Sd)を切り替える。スイッチSW13−3(637)は、T相と接続するブレーカA〜D(220−1〜4)の端子(Ta〜Td)を切り替える。   Switch SW13-1 (635) switches terminals (Ra to Rd) of breakers A to D (220-1 to 4) connected to the R phase. Switch SW13-2 (636) switches terminals (Sa to Sd) of breakers A to D (220-1 to 4) connected to the S phase. The switch SW13-3 (637) switches the terminals (Ta to Td) of the breakers A to D (220-1 to 4) connected to the T phase.

高周波短絡装置621はブレーカA〜DのRx端子とR相とを短絡する(xはa、b、c、dのいずれか)。高周波短絡装置622はブレーカA〜DのSx端子とS相とを短絡する。高周波短絡装置623はブレーカA〜DのTx端子とT相とを短絡する。   The high-frequency short-circuit device 621 short-circuits the Rx terminal and the R-phase of the breakers A to D (x is any one of a, b, c, and d). The high-frequency short-circuit device 622 short-circuits the Sx terminals and the S phase of the breakers A to D. The high-frequency short-circuit device 623 short-circuits the Tx terminals of the breakers A to D and the T phase.

制御部630は、図示しない接続判定装置の指示に従って各スイッチの切り替えを制御する。   The control unit 630 controls switching of each switch in accordance with an instruction from a connection determination device (not shown).

図18の例では、ブレーカ1のR相とブレーカAの端子Raと、ブレーカ1のS相とブレーカBのSb端子と、ブレーカ1のT相とブレーカDのTd端子と、を同時に短絡する例を示している。図18のように短絡することによって、図15に示した変流器CTra、変流器CTsb及び変流器CTtdの接続位置を並列して検査することができる。同様に、スイッチSW11とスイッチSW13−1〜3とを対応させて短絡させる部位を切り替えることによって、全ての変流器CTの接続位置を検査することができる。   In the example of FIG. 18, the R phase of the breaker 1 and the terminal Ra of the breaker A, the S phase of the breaker 1 and the Sb terminal of the breaker B, and the T phase of the breaker 1 and the Td terminal of the breaker D are simultaneously short-circuited. Is shown. By short-circuiting as shown in FIG. 18, the connection positions of the current transformer CTra, current transformer CTsb, and current transformer CTtd shown in FIG. 15 can be inspected in parallel. Similarly, the connection positions of all the current transformers CT can be inspected by switching the parts to be short-circuited in correspondence with the switches SW11 and SW13-1 to SW13-1.

短絡切替装置612を用いれば、ブレーカ1の各相について独立して変流器CTの接続検査を実行することが可能となる。そのため、変形例1と比べると、作業効率がより改善される。   If the short circuit switching device 612 is used, the connection inspection of the current transformer CT can be executed independently for each phase of the breaker 1. Therefore, working efficiency is further improved as compared with the first modification.

以上、実施形態を参照して本発明を説明してきたが、本発明は上記実施形態に限定されるものではない。本発明の構成や詳細には、本発明のスコープ内で当業者が理解し得る様々な変更をすることができる。   Although the present invention has been described with reference to the embodiments, the present invention is not limited to the above embodiments. Various changes that can be understood by those skilled in the art can be made to the configuration and details of the present invention within the scope of the present invention.

本発明の接続検査装置を含む電力測定/監視システムは、多方面のエネルギー管理システム(xEMS)において、多数のセンサを接続するような場合に応用することができる(EMS:Energy Management System)。例えば、HEMSやBEMS、SEMS、FEMSなどといったシステムに、本発明の接続検査装置を含む電力測定/監視システムを適用できる(HEMS:Home EMS、BEMS:Building EMS、SEMS:Store EMS、FEMS:Factory EMS)。   The power measurement / monitoring system including the connection inspection device of the present invention can be applied to a case where a large number of sensors are connected in a multi-purpose energy management system (xEMS) (EMS: Energy Management System). For example, a power measurement / monitoring system including the connection inspection device of the present invention can be applied to a system such as HEMS, BEMS, SEMS, FEMS (HEMS: Home EMS, BEMS: Building EMS, SEMS: Store EMS, FEMS: Factory EMS). ).

本発明の接続検査装置を含む電力測定/監視システムは、分電盤のみならず、配電盤も含めた一般的な電力分岐機能を有する分電・配電システムを管理するシステムに適用することができる。   The power measurement / monitoring system including the connection inspection device of the present invention can be applied not only to a distribution board but also to a system that manages a distribution / distribution system having a general power branching function including a distribution board.

1、2 電力測定/監視システム
11、12 主幹ブレーカ
15、16、151、170 測定対象回路
21、22 分岐ブレーカ
31 変流器
32 電圧測定端子
33 変流器
50、501、502 接続検査装置
51、510 高周波信号発生器
52、520 高周波信号受信器
53、530 高周波信号受信器
54 スイッチ
55 スイッチ
56 スイッチ
60、620、621、622、623 高周波短絡装置
70 接続判定装置
80 電力測定/監視装置
331 鉄心
332 検出コイル
589 変流器接続端子
591 コネクタ
590 電力測定/監視装置
592、593 スイッチ
594 AD変換回路
610 短絡切替装置
630 制御部
631、632、633、634、635、636、637 スイッチ
1, 2 Electric power measurement / monitoring system 11, 12 Main breaker 15, 16, 151, 170 Measurement target circuit 21, 22 Branch breaker 31 Current transformer 32 Voltage measurement terminal 33 Current transformer 50, 501, 502 Connection inspection device 51, 510 High-frequency signal generator 52, 520 High-frequency signal receiver 53, 530 High-frequency signal receiver 54 Switch 55 Switch 56 Switch 60, 620, 621, 622, 623 High-frequency short-circuit device 70 Connection determination device 80 Power measurement / monitoring device 331 Iron core 332 Detection coil 589 Current transformer connection terminal 591 Connector 590 Power measurement / monitoring device 592, 593 Switch 594 AD conversion circuit 610 Short-circuit switching device 630 Control unit 631, 632, 633, 634, 635, 636, 637 switch

Claims (10)

外部から供給された電力の分岐元となる主幹ブレーカに接続される主幹線路、前記主幹線路から複数の分岐ブレーカに向けて分岐される複数の分岐線路、を含む分電盤回路を流れる電流を検出するために前記主幹線路と前記分岐線路の少なくともいずれかに接続された複数の電流値検出手段の接続位置の正否を検査する接続検査システムであって、
前記分電盤回路上の信号送出部から高周波信号を送出する高周波信号発生手段、前記分電盤回路に送出された前記高周波信号をいずれかの前記電流値検出手段経由で受信する高周波信号受信手段、を有する接続検査手段と、
前記主幹ブレーカ及び前記分岐ブレーカが遮断された状態で、検査対象の前記電流値検出手段に対応する前記分岐ブレーカと前記検査対象の電流値検出手段との間に位置する前記分岐線路と、前記信号送出部と前記主幹ブレーカとの間に位置する前記主幹線路と、を短絡する高周波短絡手段と、を備えることを特徴とする接続検査システム。
Detects a current flowing through a distribution board circuit including a main line connected to a main breaker that is a branching source of power supplied from the outside, and a plurality of branch lines branched from the main line toward a plurality of branch breakers. a the trunk line and connecting the inspection system for inspecting the correctness of the connection positions of the current value detection means connected to at least one of the branch lines in order to,
High-frequency signal generating means for sending a high-frequency signal from a signal sending section on the distribution board circuit; High-frequency signal receiving means for receiving the high-frequency signal sent to the distribution board circuit via any of the current value detection means A connection inspection means comprising:
The branch line located between the branch breaker corresponding to the current value detection means to be inspected and the current value detection means to be inspected, in a state where the main breaker and the branch breaker are cut off, and the signal A high-frequency short-circuit means for short-circuiting the main line located between a sending part and the main breaker, a connection inspection system comprising:
さらに、前記接続検査手段は、
前記主幹線路に接続された前記電流値検出手段よりも前記主幹ブレーカ側の前記主幹線路上に位置する端子と、前記複数の電流値検出手段のいずれかと、を前記信号送出部として切り替える接続切替手段を有することを特徴とする請求項1に記載の接続検査システム。
Further, the connection inspection means includes
Connection switching means for switching a terminal located on the main line closer to the main breaker than the current value detecting means connected to the main line and any one of the plurality of current value detecting means as the signal sending unit. The connection inspection system according to claim 1, further comprising:
外部から電力を供給する複数の線路に対応するように前記主幹ブレーカに接続された複数の主幹線路を含む分電盤回路において、
前記複数の主幹線路の各々に接続された複数の前記電流値検出手段に対応させた複数の前記高周波信号受信手段を備えることを特徴とする請求項1又は2に記載の接続検査システム。
In a distribution board circuit including a plurality of main lines connected to the main circuit breaker so as to correspond to a plurality of lines for supplying power from outside,
3. The connection inspection system according to claim 1, further comprising a plurality of the high-frequency signal receiving units corresponding to the plurality of current value detection units connected to each of the plurality of main lines. 4.
前記複数の主幹線路の各々に接続された前記複数の電流値検出手段に対応させた複数の前記高周波信号発生手段を備えることを特徴とする請求項3に記載の接続検査システム。 The connection inspection system according to claim 3, further comprising a plurality of the high-frequency signal generating means corresponding to the plurality of current value detecting means connected to each of the plurality of main lines. 前記高周波信号発生手段は、
異なる周波数からなる複数の高周波信号を送出し、
前記高周波信号受信手段は、
前記複数の高周波信号のうち少なくともいずれかに対して感度を持つことを特徴とする請求項1乃至4のいずれか一項に記載の接続検査システム。
The high-frequency signal generating means includes
Send multiple high frequency signals with different frequencies,
The high-frequency signal receiving means includes
5. The connection inspection system according to claim 1, wherein the connection inspection system has sensitivity to at least one of the plurality of high-frequency signals.
外部から供給された電力の分岐元となる主幹ブレーカに接続される主幹線路、前記主幹線路から複数の分岐ブレーカに向けて分岐される複数の分岐線路、を含む分電盤回路と、
前記主幹線路と前記分岐線路の少なくともいずれかに接続され、前記分電盤回路を流れる電流を検出する複数の電流値検出手段と、
前記分電盤回路上の信号送出部から高周波信号を送出する高周波信号発生手段、前記分電盤回路に送出された前記高周波信号を前記電流値検出手段経由で受信する高周波信号受信手段、を有する接続検査手段と、
前記主幹ブレーカ及び前記分岐ブレーカが遮断された状態で、検査対象の前記電流値検出手段に対応する前記分岐ブレーカと前記検査対象の電流値検出手段との間に位置する前記分岐線路と、前記信号送出部と前記主幹ブレーカとの間に位置する前記主幹線路と、を短絡する高周波短絡手段と、
前記高周波信号発生手段を制御するとともに前記高周波信号受信手段をモニターして前記検査対象の電流値検出手段の接続位置の正否を判定する接続判定手段と、
前記主幹線路の電圧値を測定するとともに前記電流値検出手段によって検出される電流値を測定する計測手段と、を備えることを特徴とする電力測定/監視システム。
A distribution board circuit including a main line connected to a main breaker that is a branching source of power supplied from the outside, and a plurality of branch lines branched from the main line toward a plurality of branch breakers;
A plurality of current value detecting means connected to at least one of the main line and the branch line and detecting a current flowing through the distribution board circuit;
High-frequency signal generating means for sending a high-frequency signal from a signal sending section on the distribution board circuit; and high-frequency signal receiving means for receiving the high-frequency signal sent to the distribution board circuit via the current value detection means. Connection inspection means;
The branch line located between the branch breaker corresponding to the current value detection means to be inspected and the current value detection means to be inspected, in a state where the main breaker and the branch breaker are cut off, and the signal High-frequency short-circuit means for short-circuiting the main line located between the sending part and the main breaker;
Connection determining means for controlling the high-frequency signal generating means and monitoring the high-frequency signal receiving means to determine whether the connection position of the current value detecting means to be inspected is correct or not;
A power measuring / monitoring system comprising: a measuring unit that measures a voltage value of the main line and a current value detected by the current value detecting unit.
前記接続判定手段は、
前記複数の高周波信号受信手段のうち、前記検査対象の電流値検出手段に対応する前記高周波信号受信手段において前記高周波信号が最大強度となる場合、前記検査対象の電流値検出手段が正しい接続位置に接続されていると判定することを特徴とする請求項6に記載の電力測定/監視システム。
The connection determination means includes
Among the plurality of high-frequency signal receiving means, when the high-frequency signal has a maximum intensity in the high-frequency signal receiving means corresponding to the current value detecting means to be inspected, the current value detecting means to be inspected is in a correct connection position. The power measurement / monitoring system according to claim 6, wherein the power measurement / monitoring system is determined to be connected.
外部から供給された電力の分岐元となる主幹ブレーカに接続される主幹線路、前記主幹線路から複数の分岐ブレーカに向けて分岐される複数の分岐線路、を含む分電盤回路を流れる電流を検出するために前記主幹線路と前記分岐線路の少なくともいずれかに接続された複数の電流値検出手段の接続位置を検査する接続検査装置であって、
前記分電盤回路上の信号送出部から高周波信号を送出する高周波信号発生手段と、
前記分電盤回路に送出された前記高周波信号を前記電流値検出手段経由で受信する高周波信号受信手段と、
前記主幹ブレーカ及び前記分岐ブレーカが遮断された状態で、検査対象の前記電流値検出手段に対応する前記分岐ブレーカと前記検査対象の電流値検出手段との間に位置する前記分岐線路と、前記信号送出部と前記主幹ブレーカとの間に位置する前記主幹線路と、を短絡する高周波短絡手段と、
前記高周波短絡手段によって短絡する前記主幹線路と前記分岐線路とを切り替える短絡切替手段と、
前記短絡切替手段を制御する制御手段と、を備えることを特徴とする接続検査装置。
Detects a current flowing through a distribution board circuit including a main line connected to a main breaker that is a branching source of power supplied from the outside, and a plurality of branch lines branched from the main line toward a plurality of branch breakers. a connecting inspection apparatus for inspecting the connection positions of a plurality of current value detection means connected to at least one of said main trunk line and the branch line to,
High-frequency signal generating means for transmitting a high-frequency signal from a signal transmission unit on the distribution board circuit;
High-frequency signal receiving means for receiving the high-frequency signal sent to the distribution board circuit via the current value detecting means;
The branch line located between the branch breaker corresponding to the current value detection means to be inspected and the current value detection means to be inspected, in a state where the main breaker and the branch breaker are cut off, and the signal High-frequency short-circuit means for short-circuiting the main line located between the sending part and the main breaker;
Short-circuit switching means for switching between the main line and the branch line that are short-circuited by the high-frequency short-circuit means,
And a control means for controlling the short circuit switching means.
外部から供給された電力の分岐元となる主幹ブレーカに接続される主幹線路、前記主幹線路から複数の分岐ブレーカに向けて分岐される複数の分岐線路、を含む分電盤回路を流れる電流を検出するために前記主幹線路と前記分岐線路の少なくともいずれかに接続された複数の電流値検出手段の接続位置を検査する接続検査方法であって、
前記主幹ブレーカ及び前記分岐ブレーカが遮断された状態で、検査対象の前記電流値検出手段に対応する前記分岐ブレーカと前記検査対象の電流値検出手段との間に位置する前記分岐線路と、前記分電盤回路に高周波信号を送出する信号送出部と前記主幹ブレーカとの間に位置する前記主幹線路と、を短絡し、
前記信号送出部から前記分電盤回路に前記高周波信号を送出し、
前記分電盤回路に送出された前記高周波信号を前記電流値検出手段経由で受信し、
前記高周波信号によって前記電流値検出手段の接続位置の正否を検査することを特徴とする接続検査方法。
Detects a current flowing through a distribution board circuit including a main line connected to a main breaker that is a branching source of power supplied from the outside, and a plurality of branch lines branched from the main line toward a plurality of branch breakers. a the trunk line and connection inspection method for inspecting the connection positions of a plurality of current value detection means connected to at least one of the branch lines in order to,
The branch line positioned between the branch breaker corresponding to the current value detection means to be inspected and the current value detection means to be inspected, with the main breaker and the branch breaker being cut off, Short-circuiting the main line located between the main circuit breaker and the signal transmission unit for transmitting a high-frequency signal to the circuit board circuit;
Sending the high-frequency signal from the signal sending unit to the distribution board circuit;
Receiving the high-frequency signal sent to the distribution board circuit via the current value detection means;
A connection inspection method for inspecting the correctness of the connection position of the current value detection means by the high-frequency signal.
前記主幹ブレーカに複数の主幹線路が接続された前記分電盤回路において前記電流値検出手段の接続位置を検査する接続検査方法であって、
前記主幹ブレーカ及び前記分岐ブレーカが遮断された状態で、前記信号送出部の位置を前記主幹線路に接続された前記電流値検出手段よりも前記主幹ブレーカ側に位置する端子に設定し、
前記端子から前記分電盤回路に前記高周波信号を送出し、
前記分電盤回路に送出された前記高周波信号を前記電流値検出手段経由で受信し、
前記電流値検出手段が前記複数の主幹線路のうち正しい前記主幹線路と電気的に接続されているか否かを検査した後に、
前記検査対象の電流値検出手段が接続された前記分岐線路と電気的に接続された主幹線路に接続された前記電流値検出手段を信号送出部として設定し、
前記検査対象の電流値検出手段に対応する前記分岐ブレーカと前記検査対象の電流値検出手段との間に位置する前記分岐線路と、前記信号送出部に設定された電流値検出手段と前記主幹ブレーカとの間に位置する前記主幹線路と、を短絡して前記電流値検出手段の接続位置の正否を検査することを特徴とする請求項9に記載の接続検査方法。
A connection inspection method for inspecting a connection position of the current value detection means in the distribution board circuit in which a plurality of main lines are connected to the main breaker,
With the main breaker and the branch breaker shut off, the position of the signal sending unit is set to a terminal located on the main breaker side than the current value detecting means connected to the main line,
Sending the high-frequency signal from the terminal to the distribution board circuit;
Receiving the high-frequency signal sent to the distribution board circuit via the current value detection means;
After inspecting whether the current value detection means is electrically connected to the correct main line among the plurality of main lines,
The current value detection means connected to the main line electrically connected to the branch line connected to the current value detection means to be inspected is set as a signal sending unit,
The branch line located between the branch breaker corresponding to the current value detecting means to be inspected and the current value detecting means to be inspected, the current value detecting means set in the signal sending unit, and the main breaker The connection inspection method according to claim 9, wherein the main line located between the two is short-circuited to check whether the connection position of the current value detection means is correct.
JP2013228933A 2013-11-05 2013-11-05 Connection inspection system, power measurement / monitoring system, connection inspection device, and connection inspection method Expired - Fee Related JP6287076B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013228933A JP6287076B2 (en) 2013-11-05 2013-11-05 Connection inspection system, power measurement / monitoring system, connection inspection device, and connection inspection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013228933A JP6287076B2 (en) 2013-11-05 2013-11-05 Connection inspection system, power measurement / monitoring system, connection inspection device, and connection inspection method

Publications (2)

Publication Number Publication Date
JP2015090269A JP2015090269A (en) 2015-05-11
JP6287076B2 true JP6287076B2 (en) 2018-03-07

Family

ID=53193878

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013228933A Expired - Fee Related JP6287076B2 (en) 2013-11-05 2013-11-05 Connection inspection system, power measurement / monitoring system, connection inspection device, and connection inspection method

Country Status (1)

Country Link
JP (1) JP6287076B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7228799B2 (en) * 2018-03-13 2023-02-27 パナソニックIpマネジメント株式会社 measurement system
JP7705338B2 (en) * 2021-12-06 2025-07-09 パナソニックホールディングス株式会社 Power measurement system and distribution board

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3178649B2 (en) * 1995-11-01 2001-06-25 株式会社戸上電機製作所 Wiring path identification device
JPH10227822A (en) * 1997-02-14 1998-08-25 East Japan Railway Co Core wire collation checker in hot-line state
US20080204953A1 (en) * 2007-02-26 2008-08-28 Elster Electricity Llc. System and method for detecting the presence of an unsafe line condition in a disconnected power meter

Also Published As

Publication number Publication date
JP2015090269A (en) 2015-05-11

Similar Documents

Publication Publication Date Title
US9239352B2 (en) Method of measuring earth ground resistance of a pylon
US8368337B2 (en) HVAC equipment phase and voltage monitor and control
US8648606B2 (en) Ground monitor
US10191101B2 (en) System and method for detecting ground fault in a dc system
US10859612B2 (en) Method and testing device for testing wiring of transformers
EP1898225A1 (en) System and method for detecting leak current
CN109155518A (en) System and method for locating ground faults in a power grid
US20210018540A1 (en) Device And Method For Detecting High-Voltage Power Distribution Line Path Having Improved Stability
CN109959816B (en) Current sensing device and method
JP6287076B2 (en) Connection inspection system, power measurement / monitoring system, connection inspection device, and connection inspection method
EP3864425A1 (en) Fault diagnosis in an electricity supply network
JP5455745B2 (en) Abnormal rail identification device
EP4019994A1 (en) Residential fault diagnostic tool
CN109387751B (en) A line fault monitoring device
US8351869B2 (en) Electric circuit tracer
WO2006100695A1 (en) Method and device for determination of the phases in a multi-phase electrical system
JP4416395B2 (en) Wiring test equipment
JP7270521B2 (en) Distribution board connection inspection device
JP2006038707A (en) Polarity checking device of plug socket with earth electrode
US8760150B1 (en) Electrical power transfer indicator system and method
JP2003090859A (en) Short circuit detector
CN109477866B (en) Method and system for detecting noise in a power grid
WO2016034229A1 (en) Cable identification in a power distribution network
JP2021004855A (en) Ground fault detection method and device
KR102355354B1 (en) Wire discrimination Apparatus and System for three-phase three-wire power line

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20161014

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20170621

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20170704

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20170728

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20180109

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20180122

R150 Certificate of patent or registration of utility model

Ref document number: 6287076

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees