JP6314739B2 - Signal control parameter calculation device - Google Patents
Signal control parameter calculation device Download PDFInfo
- Publication number
- JP6314739B2 JP6314739B2 JP2014163338A JP2014163338A JP6314739B2 JP 6314739 B2 JP6314739 B2 JP 6314739B2 JP 2014163338 A JP2014163338 A JP 2014163338A JP 2014163338 A JP2014163338 A JP 2014163338A JP 6314739 B2 JP6314739 B2 JP 6314739B2
- Authority
- JP
- Japan
- Prior art keywords
- target
- control parameter
- delay time
- signal
- lane
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Traffic Control Systems (AREA)
Description
本発明は、信号制御パラメータ演算装置に関する。 The present invention relates to a signal control parameter calculation device.
従来、信号制御パラメータ演算装置としては、例えば、特許文献1に記載の技術がある。特許文献1に記載の技術では、道路上方に設置された車両感知器から得られる道路の交通量や占有率(交通調査の結果)を用いて、信号機の点灯状態の制御パラメータ(以下、「信号制御パラメータ」とも呼ぶ)を演算する。そして、演算した信号制御パラメータに従って、信号機の点灯状態を制御する。これにより、円滑な交通流を実現できる。 Conventionally, as a signal control parameter calculation device, for example, there is a technique described in Patent Document 1. In the technique described in Patent Document 1, the traffic volume and occupancy rate (result of traffic survey) obtained from a vehicle detector installed above the road is used to control the lighting parameters of the traffic light (hereinafter referred to as “signal”). Control parameter "). Then, the lighting state of the traffic light is controlled according to the calculated signal control parameter. Thereby, smooth traffic flow is realizable.
しかしながら、上記特許文献1に記載の技術では、演算した信号制御パラメータと実際の交通流とが合致しない場合には、制御パラメータを見直すために、再度交通量調査を行う必要があった。それゆえ、多くの手間(コスト、時間)がかかる可能性があった。
本発明は、上記のような点に着目し、信号機の点灯状態の制御パラメータの演算に要する手間を低減可能な信号制御パラメータ演算装置を提供することを課題とする。
However, in the technique described in Patent Document 1, when the calculated signal control parameter does not match the actual traffic flow, it is necessary to conduct a traffic volume survey again in order to review the control parameter. Therefore, it may take a lot of labor (cost, time).
This invention pays attention to the above points, and makes it a subject to provide the signal control parameter calculating device which can reduce the effort required for the calculation of the control parameter of the lighting state of a traffic light.
上記課題を解決するため、本発明の一態様では、車載装置から車両の走行状態を表す走行状態情報を取得する。続いて、取得した走行状態情報を用いて、選択した対象信号機と該対象信号機に隣接する交通流上流側の信号機との間の道路区間である対象区間を、実際に走行した場合にかかる時間から予め定めた設定速度で走行する場合にかかると推定される時間を減算した減算結果である遅れ時間を算出する。続いて、算出した遅れ時間を用いて、対象信号機の点灯状態の制御パラメータを演算する。 In order to solve the above problem, in one aspect of the present invention, traveling state information representing a traveling state of a vehicle is acquired from an in-vehicle device. Subsequently, using the acquired traveling state information, from the time required for actually traveling the target section that is a road section between the selected target traffic signal and the traffic signal upstream of the traffic signal adjacent to the target traffic signal. A delay time, which is a subtraction result obtained by subtracting a time estimated to be required when traveling at a predetermined set speed, is calculated. Subsequently, the control parameter of the lighting state of the target traffic light is calculated using the calculated delay time.
本発明の一態様では、車載装置から取得される走行状態情報をもとに遅れ時間を算出し、算出した遅れ時間をもとに対象信号機の点灯状態の制御パラメータの演算を行う。そのため、例えば、交通量調査をもとに信号機の点灯状態の制御パラメータを演算する方法に比べ、信号機の点灯状態の制御パラメータの演算に要する手間を低減できる。 In one aspect of the present invention, the delay time is calculated based on the traveling state information acquired from the in-vehicle device, and the control parameter of the lighting state of the target traffic light is calculated based on the calculated delay time. Therefore, for example, compared with the method of calculating the control parameter of the lighting state of the traffic light based on the traffic volume survey, it is possible to reduce the labor required for calculating the control parameter of the lighting state of the traffic light.
次に、本発明の実施形態について、図面を参照しつつ説明する。
本実施形態は、本発明を、信号制御パラメータ演算システム1に適用したものである。
(構成)
図1に示すように、信号制御パラメータ演算システム1は、複数台の車両2が搭載する車載装置3と、交通管制センタ4が有する信号制御パラメータ演算装置5とを備える。車載装置3と信号制御パラメータ演算装置5とは、通信路を介して情報の送受信を行う。
Next, embodiments of the present invention will be described with reference to the drawings.
In the present embodiment, the present invention is applied to a signal control parameter calculation system 1.
(Constitution)
As shown in FIG. 1, the signal control parameter calculation system 1 includes an in-
(車載装置3の構成)
車載装置3は、走行状態情報検出部6と、記憶部7と、送信部8とを備える。
走行状態情報検出部6は、車両2が備える各種のセンサ(不図示)で検出した、車両2の走行状態を表す情報(以下、「走行状態情報」とも呼ぶ)を取得する。走行状態情報としては、例えば、車両2の現在位置、車速がある。走行状態情報の取得は、例えば、予め定めた設定時間間隔(例えば、6秒間隔)で行う。そして、走行状態情報検出部6は、取得した走行状態情報を記憶部7に出力する。
(Configuration of in-vehicle device 3)
The in-
The traveling state
記憶部7は、走行状態情報検出部6から走行状態情報を取得する。そして、記憶部7は、取得した走行状態情報に車両2の車両IDを関連づけて記憶する。車両IDとしては、例えば、車両2を一意に特定可能とする識別符号がある。
送信部8は、記憶部7が記憶している走行状態情報を取得する。そして、送信部8は、取得した走行状態情報を信号制御パラメータ演算装置5に送信する。走行状態情報の送信は、例えば、光ビーコンとこの光ビーコンの周辺装置とを通信路として用いる場合には、車両Cが光ビーコンの投光器の通信ゾーンに進入するたびに行う構成とする。
The storage unit 7 acquires travel state information from the travel state
The
(信号制御パラメータ演算装置5の構成)
信号制御パラメータ演算装置5は、走行状態情報取得部9と、走行状態情報記憶部10と、地図情報記憶部11と、遅れ時間算出部12と、交差道路側遅れ時間算出部13と、第2車線側遅れ時間算出部14と、制御パラメータ演算部15と、制御パラメータ提示部16とを備える。
(Configuration of Signal Control Parameter Calculation Device 5)
The signal control parameter calculation device 5 includes a traveling state
走行状態情報取得部9は、複数台の車両2の車載装置3それぞれから走行状態情報(車両2の現在位置、車速、車両ID)を取得(受信)する。そして、走行状態情報取得部9は、取得した走行状態情報を走行状態情報記憶部10に出力する。
走行状態情報記憶部10は、走行状態情報取得部9から走行状態情報を取得する。そして、走行状態情報記憶部10は、取得した走行状態情報を記憶する。これにより、走行状態情報記憶部10は、複数台の車両2の走行状態情報を蓄積する。
地図情報記憶部11は、予め定めた地図情報を記憶している。地図情報としては、例えば、図2に示すように、複数の信号機17の位置、隣接する2つの信号機17で挟まれた小区間(以下、「道路区間」とも呼ぶ)の位置、各道路区間の法定速度がある。
The traveling state
The traveling state
The map
遅れ時間算出部12は、複数の信号機17のうちから、信号制御パラメータの設定を行う信号機(以下、「対象信号機」とも呼ぶ)18を選択する。信号制御パラメータとしては、例えば、サイクル、スプリット、オフセットがある。ここで、サイクルとしては、対象信号機18の信号灯の点灯状態(青色→黄色→赤色)が一巡する時間がある。また、スプリットとしては、例えば、対象信号機18のサイクルに対して、対象信号機18が青信号と黄信号とを点灯する合計時間の比率(合計時間/サイクル)がある。さらに、オフセットとしては、例えば、対象信号機18に隣接する信号機17のうち第1車線(後述)の交通流上流側の信号機17における青信号の点灯が開始されてから、対象信号機18における青信号の点灯が開始されるまでの時間がある。またその際、遅れ時間算出部12は、信号制御パラメータの設定を行う曜日・時間(以下、「対象日時」とも呼ぶ)も併せて選択する。
The delay
続いて、遅れ時間算出部12は、走行状態情報記憶部10が記憶している走行状態情報を用いて、選択した対象信号機18とこの対象信号機18に隣接する交通流上流側の信号機17との間の道路区間(以下、「対象区間」とも呼ぶ)を実際に走行した場合にかかる時間(以下、「対象区間実走行時間」とも呼ぶ)を算出する。なお、遅れ時間算出部12は、対象日時の対象区間実走行時間を算出する。また、遅れ時間算出部12は、対象区間を走行した車両Cの走行状態情報群が複数存在する場合には、車両Cが対象区間を実際に走行した場合にかかる時間の平均値を対象区間実走行時間として算出する。
Subsequently, the delay
通常は、対象区間に、対象信号機18に向かう車線(以下、「第1車線」とも呼ぶ)に加え、この第1車線と反対方向に向かう車線(以下、「第2車線」とも呼ぶ)がある場合が多いから、第1車線を実際に走行した場合にかかる時間を対象区間実走行時間とする。
続いて、遅れ時間算出部12は、地図情報記憶部11が記憶している地図情報を用いて、対象区間を予め定めた設定速度(例えば、法定速度。40[km/h])で走行する場合にかかると推定される時間(以下、「対象区間推定走行時間」とも呼ぶ)を算出する。
Usually, in the target section, there is a lane (hereinafter also referred to as “second lane”) in the direction opposite to the first lane in addition to a lane (hereinafter also referred to as “first lane”) toward the target traffic light 18. Since there are many cases, the time required for actually traveling in the first lane is defined as the actual traveling time of the target section.
Subsequently, using the map information stored in the map
通常は、対象区間に、対象信号機18に向かう車線(第1車線)に加え、この第1車線と反対方向に向かう車線(第2車線)がある場合が多いから、第1車線を設定速度(法定速度)で走行する場合にかかると推定される時間を対象区間推定走行時間とする。
続いて、遅れ時間算出部12は、算出した対象区間実走行時間から、算出した対象区間推定走行時間を減算した減算結果(以下、「対象区間遅れ時間」とも呼ぶ)を算出する。
Usually, there are many lanes (second lane) in the direction opposite to the first lane in addition to the lane (first lane) toward the target traffic light 18 in the target section. The time estimated to be taken when traveling at the legal speed) is set as the target section estimated traveling time.
Subsequently, the delay
交差道路側遅れ時間算出部13は、地図情報記憶部11が記憶している地図情報を用いて、対象区間が交差点に流入する道路区間であるか否かを判定する。そして、交差道路側遅れ時間算出部13は、交差点に流入する道路区間であると判定した場合、走行状態情報記憶部10が記憶している走行状態情報を用いて、この交差点で対象区間と交差する道路(以下、「交差道路」とも呼ぶ)のうち対象信号機18近傍に設置された信号機17とこの信号機17に隣接する交通流上流側(交差道路の交通流上流側)の信号機17との間の道路区間(以下、「交差道路区間」とも呼ぶ)を実際に走行した場合にかかる時間(以下、「交差道路実走行時間」とも呼ぶ)を算出する。なお、交差道路側遅れ時間算出部13は、対象日時の交差道路実走行時間を算出する。
The intersection road side delay
続いて、交差道路側遅れ時間算出部13は、地図情報記憶部11が記憶している地図情報を用いて、交差道路区間を予め定めた設定速度(法定速度)で走行する場合にかかると推定される時間(以下、「交差道路推定走行時間」とも呼ぶ)を算出する。続いて、交差点側遅れ時間算出部14は、算出した交差道路実走行時間から、算出した交差道路推定走行時間を減算した減算結果(以下、「交差道路側遅れ時間」とも呼ぶ)を算出する。
Subsequently, the cross road side delay
第2車線側遅れ時間算出部14は、対象区間に第1車線に加え、この第1車線と反対方向に向かう車線(第2車線)があるか否かを判定する。そして、第2車線側遅れ時間算出部14は、第1車線に加え第2車線があると判定した場合、走行状態情報記憶部10が記憶している走行状態情報を用いて、第2車線を実際に走行した場合にかかる時間(以下、「第2車線実走行時間」とも呼ぶ)を算出する。なお、第2車線側遅れ時間算出部14は、対象日時の第2車線実走行時間を算出する。なお、第2車線側遅れ時間算出部14は、第2車線を走行した車両Cの走行状態情報群が複数存在する場合には、車両Cが第2車線を実際に走行した場合にかかる時間の平均値を第2車線実走行時間として算出する。
The second lane side delay
続いて、第2車線側遅れ時間算出部14は、地図情報記憶部11が記憶している地図情報を用いて、第2車線を予め定めた設定速度(法定速度)で走行する場合にかかると推定される時間(以下、「第2車線推定走行時間」とも呼ぶ)を算出する。続いて、第2車線側遅れ時間算出部14は、算出した第2車線実走行時間から、算出した第2車線推定走行時間を減算した減算結果(以下、「第2車線側遅れ時間」とも呼ぶ)を算出する。
制御パラメータ演算部15は、遅れ時間算出部12で算出した対象区間遅れ時間を用いて、遅れ時間算出部12で選択した対象信号機18の信号制御パラメータを演算する。
Subsequently, when the second lane side delay
The control
具体的には、制御パラメータ演算部15は、対象区間が重要交差点に流入する道路区間であるか否かを判定する。重要交差点としては、例えば、大きい幹線道路が相互に交差する交差点がある。そして、制御パラメータ演算部15は、重要交差点に流入する道路区間であると判定した場合、遅れ時間算出部12で算出した対象区間遅れ時間が長いほど、対象信号機18のサイクルを長くする。具体的には、制御パラメータ演算部15は、図3に示すように、対象区間区遅れ時間が0以上で且つ第1設定値T1(>0)未満である場合にはサイクルパターンC1が表すサイクルTC1(>0)を対象信号機18のサイクルとする。以下同様に、制御パラメータ演算部15は、対象区間区遅れ時間が第1設定値T1以上で且つ第2設定値T2(>T1)未満である場合にはサイクルパターンC2が表すサイクルTC2(>TC1)を対象信号機18のサイクルとし、対象区間区遅れ時間が第2設定値T2以上で且つ第3設定値T3(>T2)未満である場合にはサイクルパターンC3が表すサイクルTC3(>TC2)を対象信号機18のサイクルとする。
Specifically, the control
また、制御パラメータ演算部15は、対象区間区遅れ時間が第3設定値T3以上で且つ第4設定値T4(>T3)未満である場合にはサイクルパターンC4が表すサイクルTC4(>TC3)を対象信号機18のサイクルとし、対象区間区遅れ時間が第4設定値T4以上で且つ第5設定値T5(>T4)未満である場合にはサイクルパターンC5が表すサイクルTC5(>TC4)を対象信号機18のサイクルとする。さらに、制御パラメータ演算部15は、対象区間区遅れ時間が第5設定値T5以上で且つ第6設定値T6(>T5)未満である場合にはサイクルパラメータC6が表すサイクルTC6(>TC5)を対象信号機18のサイクルとし、対象区間区遅れ時間が第6設定値T6以上で且つ第7設定値T7(>T6)未満である場合にはサイクルパターンC7が表すサイクルTC7(>TC6)を対象信号機18のサイクルとし、対象区間区遅れ時間が第7設定値T7以上で且つ第8設定値T8(>T7)未満である場合にはサイクルパターンC8が表すサイクルTC8(>TC7)を対象信号機18のサイクルとする。
In addition, when the target section section delay time is not less than the third set value T3 and less than the fourth set value T4 (> T3), the control
また、制御パラメータ演算部15は、対象区間が交差点に流入する道路区間である場合に、遅れ時間算出部12で算出した対象区間遅れ時間が、交差道路側遅れ時間算出部13で算出した交差道路側遅れ時間より長いほど、対象信号機18のスプリットを大きくする。具体的には、制御パラメータ演算部15は、図4に示すように、対象区間遅れ時間と交差道路側遅れ時間との合計値に対し対象区間遅れ時間の比率が第1設定値(例えば、30%)未満である場合にはスプリットSaを対象信号機18のスプリットとする。
In addition, when the target section is a road section flowing into the intersection, the control
以下同様に、制御パラメータ演算部15は、対象区間遅れ時間の比率が第1設定値以上で且つ第2設定値(>第1設定値。例えば、60%)未満である場合にはスプリットSb(>Sa)を対象信号機18のスプリットとする。また、制御パラメータ演算部15は、対象区間遅れ時間の比率が第2設定値(60%)以上である場合にはスプリットSc(>Sb)を対象信号機18のスプリットとする。
Similarly, when the ratio of the target section delay time is equal to or greater than the first set value and less than the second set value (> first set value, for example, 60%), the control
さらに、制御パラメータ演算部15は、対象区間に第1車線に加え第2車線があると判定した場合に、遅れ時間算出部12で算出した対象区間遅れ時間が、第2車線側遅れ時間算出部14で算出した第2車線側遅れ時間より長いほど、対象信号機18のオフセットを長くする。具体的には、制御パラメータ演算部15は、図5に示すように、対象区間遅れ時間と第2車線側遅れ時間との合計値に対し対象区間遅れ時間の比率が第1設定値(例えば、30%)未満である場合にはオフセットOaを対象信号機18のオフセットとする。
Furthermore, when the control
以下同様に、制御パラメータ演算部15は、対象区間遅れ時間の比率が第1設定値以上で且つ第2設定値(>第1設定値。例えば、60%)未満である場合にはオフセットOb(>Oa)を対象信号機18のオフセットとする。また、制御パラメータ演算部15は、対象区間遅れ時間の比率が第2設定値(60%)以上である場合にはオフセットOc(>Ob)を対象信号機18のオフセットとする。
Similarly, when the ratio of the target section delay time is equal to or greater than the first set value and less than the second set value (> first set value, for example, 60%), the control
制御パラメータ提示部16は、制御パラメータ演算部15で設定したサイクル、スプリット、オフセットをディスプレイに表示する。なお、制御パラメータ提示部16は、対象区間が重要交差点に流入する道路区間ではない場合には、対象区間が属しているサブエリアの核となる重要交差点の信号機17のサイクルを対象信号機18のサイクルとしてディスプレイに表示する構成としてもよい。これにより、制御パラメータ提示部16は、対象日時における対象信号機18の信号制御パラメータをオペレータに提示する。
The control
(演算処理)
次に、本実施形態の信号制御パラメータ演算装置5が実行する演算処理(以下、「信号制御パラメータ演算処理」とも呼ぶ)について説明する。信号制御パラメータ演算処理は、オペレータが、信号制御パラメータ演算装置5を操作し、信号制御パラメータの設定を行う信号機(対象信号機)18と対象日時とを選択するたびに実行される。
図6に示すように、ステップS101では、信号制御パラメータ演算装置5(遅れ時間算出部12)は、オペレータによる対象信号機18の選択結果に従い、複数の信号機17のうちから、信号制御パラメータの設定を行う対象信号機18を選択する。続いて、信号制御パラメータ演算装置5(遅れ時間算出部12)は、オペレータによる対象日時の選択結果に従い、信号制御パラメータの設定を行う対象日時を選択する。
(Calculation processing)
Next, calculation processing (hereinafter also referred to as “signal control parameter calculation processing”) executed by the signal control parameter calculation device 5 of the present embodiment will be described. The signal control parameter calculation process is executed each time the operator operates the signal control parameter calculation device 5 and selects a signal device (target signal device) 18 for setting signal control parameters and a target date and time.
As shown in FIG. 6, in step S <b> 101, the signal control parameter calculation device 5 (delay time calculation unit 12) sets a signal control parameter from among the plurality of traffic lights 17 according to the selection result of the target traffic light 18 by the operator. The target signal 18 to be selected is selected. Subsequently, the signal control parameter calculation device 5 (delay time calculation unit 12) selects the target date and time for setting the signal control parameter according to the selection result of the target date and time by the operator.
続いてステップS102に移行して、信号制御パラメータ演算装置5(遅れ時間算出部12)は、走行状態情報記憶部10が記憶している走行状態情報を用いて、ステップS101で選択した対象信号機18とこの対象信号機18に隣接する交通流上流側の信号機17との間の道路区間(対象区間)を実際に走行した場合にかかる時間(対象区間実走行時間)を算出する。なお、遅れ時間算出部12は、対象日時の対象区間実走行時間を算出する。通常、対象区間に、対象信号機18に向かう第1車線に加え、この第1車線と反対方向に向かう第2車線がある場合が多いから、第1車線を実際に走行した場合にかかる時間を対象区間実走行時間とする。
Subsequently, the process proceeds to step S102, where the signal control parameter calculation device 5 (delay time calculation unit 12) uses the traveling state information stored in the traveling state
続いて、信号制御パラメータ演算装置5(遅れ時間算出部12)は、地図情報記憶部11が記憶している地図情報を用いて、対象区間を予め定めた設定速度(法定速度)で走行する場合にかかると推定される時間(対象区間推定走行時間)を算出する。通常、対象区間に、対象信号機18に向かう第1車線に加え、この第1車線と反対方向に向かう第2車線がある場合が多いから、第1車線を設定速度(法定速度)で走行する場合にかかると推定される時間を対象区間推定走行時間とする。
続いて、信号制御パラメータ演算装置5(遅れ時間算出部12)は、算出した対象区間実走行時間から、算出した対象区間推定走行時間を減算した減算結果である対象区間遅れ時間を算出する。
Subsequently, the signal control parameter calculation device 5 (delay time calculation unit 12) uses the map information stored in the map
Subsequently, the signal control parameter calculation device 5 (delay time calculation unit 12) calculates a target section delay time that is a subtraction result obtained by subtracting the calculated target section estimated travel time from the calculated target section actual travel time.
続いてステップS103に移行して、信号制御パラメータ演算装置5(制御パラメータ演算部15)は、ステップS102で算出した対象区間遅れ時間が予め定めた設定時間(例えば、30秒)以上であるか否かを判定する。そして、信号制御パラメータ演算装置5(制御パラメータ演算部15)は、対象区間遅れ時間が設定時間(30秒)以上であると判定した場合には(Yes)、ステップS104に移行する。一方、信号制御パラメータ演算装置5(制御パラメータ演算部15)は、対象区間遅れ時間が設定時間(30秒)未満であると判定した場合には(No)、この信号制御パラメータ演算処理を終了する。 Subsequently, the process proceeds to step S103, and the signal control parameter calculation device 5 (control parameter calculation unit 15) determines whether or not the target section delay time calculated in step S102 is equal to or longer than a predetermined set time (for example, 30 seconds). Determine whether. If the signal control parameter calculation device 5 (control parameter calculation unit 15) determines that the target section delay time is equal to or longer than the set time (30 seconds) (Yes), the process proceeds to step S104. On the other hand, when the signal control parameter calculation device 5 (control parameter calculation unit 15) determines that the target section delay time is less than the set time (30 seconds) (No), the signal control parameter calculation processing is ended. .
ステップS104では、信号制御パラメータ演算装置5(制御パラメータ演算部15)は、ステップS102で選択した対象区間が重要交差点に流入する道路区間であるか否かを判定する。そして、信号制御パラメータ演算装置5(制御パラメータ演算部15)は、対象区間が重要交差点に流入する道路区間であると判定した場合には(Yes)、ステップS105に移行する。一方、信号制御パラメータ演算装置5(制御パラメータ演算部15)は、重要交差点に流入する道路区間でないと判定した場合には(No)、ステップS106に移行する。
ステップS105では、信号制御パラメータ演算装置5(制御パラメータ演算部15)は、図3に示すように、ステップS102で算出した対象区間遅れ時間が長いほど、対象信号機18のサイクルを長くした後、ステップS106に移行する。
In step S104, the signal control parameter calculation device 5 (control parameter calculation unit 15) determines whether or not the target section selected in step S102 is a road section flowing into an important intersection. If the signal control parameter calculation device 5 (control parameter calculation unit 15) determines that the target section is a road section flowing into the important intersection (Yes), the process proceeds to step S105. On the other hand, if the signal control parameter calculation device 5 (control parameter calculation unit 15) determines that the road section does not flow into the important intersection (No), the process proceeds to step S106.
In step S105, the signal control parameter calculation device 5 (control parameter calculation unit 15) increases the cycle of the target signal device 18 as the target section delay time calculated in step S102 is longer, as shown in FIG. The process proceeds to S106.
ステップS106では、信号制御パラメータ演算装置5(交差道路側遅れ時間算出部13)は、ステップS102で選択した対象区間が交差点に流入する道路区間であるか否かを判定する。そして、信号制御パラメータ演算装置5(交差道路側遅れ時間算出部13)は、対象区間が交差点に流入する道路区間であると判定した場合、走行状態情報記憶部10が記憶している走行状態情報を用いて、この交差点で対象区間と交差する道路(交差道路)のうち対象信号機18近傍に設置された信号機17とこの信号機17に隣接する交通流上流側の信号機17との間の道路区間(交差道路区間)を実際に走行した場合にかかる時間(交差道路実走行時間)を算出する。なお、交差道路側遅れ時間算出部13は、対象日時の交差道路実走行時間を算出する。
In step S106, the signal control parameter calculation device 5 (intersection road side delay time calculation unit 13) determines whether or not the target section selected in step S102 is a road section flowing into the intersection. When the signal control parameter calculation device 5 (intersection road side delay time calculation unit 13) determines that the target section is a road section flowing into the intersection, the traveling condition information stored in the traveling condition
続いて、信号制御パラメータ演算装置5(交差道路側遅れ時間算出部13)は、地図情報記憶部11が記憶している地図情報を用いて、交差道路区間を予め定めた設定速度(法定速度)で走行する場合にかかると推定される時間(交差道路推定走行時間)を算出する。続いて、信号制御パラメータ演算装置5(交差道路側遅れ時間算出部13)は、算出した交差道路実走行時間から、算出した交差道路推定走行時間を減算した減算結果である交差道路側遅れ時間を算出する。続いて、信号制御パラメータ演算装置5(制御パラメータ演算部15)は、ステップS102で選択した対象区間が交差点に流入する道路区間である場合に、図4に示すように、ステップS102で算出した対象区間遅れ時間が、算出した交差道路側遅れ時間より長いほど、対象信号機18のスプリットを大きくする。
Subsequently, the signal control parameter calculation device 5 (intersection road side delay time calculation section 13) uses the map information stored in the map
続いてステップS107に移行して、信号制御パラメータ演算装置5(第2車線側遅れ時間算出部14)は、対象区間に、対象信号機18に向かう第1車線に加え、この第1車線と反対方向に向かう第2車線があるか否かを判定する。そして、信号制御パラメータ演算装置5(第2車線側遅れ時間算出部14)は、第1車線に加え第2車線があると判定した場合に、走行状態情報記憶部10が記憶している走行状態情報を用いて、第2車線を実際に走行した場合にかかる時間(第2車線実走行時間)を算出する。なお、第2車線側遅れ時間算出部14は、対象日時の第2車線実走行時間を算出する。
Subsequently, the process proceeds to step S107, and the signal control parameter calculation device 5 (second lane side delay time calculation unit 14) adds the first lane toward the target traffic light 18 to the target section, and the direction opposite to the first lane. It is determined whether or not there is a second lane heading for. When the signal control parameter calculation device 5 (second lane side delay time calculation unit 14) determines that there is a second lane in addition to the first lane, the driving state stored in the driving state
続いて、信号制御パラメータ演算装置5(第2車線側遅れ時間算出部14)は、地図情報記憶部11が記憶している地図情報を用いて、第2車線を予め定めた設定速度(法定速度)で走行する場合にかかると推定される時間(第2車線推定走行時間)を算出する。続いて、信号制御パラメータ演算装置5(第2車線側遅れ時間算出部14)は、算出した第2車線実走行時間から、算出した第2車線推定走行時間を減算した減算結果である第2車線側遅れ時間を算出する。続いて、信号制御パラメータ演算装置5(制御パラメータ演算部15)は、ステップS102で選択した対象区間に第1車線に加え第2車線があると判定した場合に、図5に示すように、ステップS102で算出した対象区間遅れ時間が、算出した第2車線側遅れ時間より長いほど、対象信号機18のオフセットを長くする。
続いてステップS108に移行して、信号制御パラメータ演算装置5(制御パラメータ
提示部16)は、ステップS105で設定したサイクル、ステップS106で設定したスプリット、ステップS107で設定したオフセット等、対象日時における対象信号機18の信号制御パラメータをディスプレイに表示した後、この演算処理を終了する。
Subsequently, the signal control parameter calculation device 5 (second lane side delay time calculation unit 14) uses the map information stored in the map
Subsequently, the process proceeds to step S108, and the signal control parameter computing device 5 (control parameter presenting unit 16) determines the target at the target date and time, such as the cycle set in step S105, the split set in step S106, and the offset set in step S107. After the signal control parameter of the traffic light 18 is displayed on the display, this calculation process is terminated.
(動作)
次に、本実施形態の信号制御パラメータ演算システム1の動作を説明する。
まず、オペレータが、信号制御パラメータ演算装置5を操作し、信号制御パラメータの設定を行う信号機(対象信号機)18と対象日時とを選択したとする。すると、信号制御パラメータ演算装置5が、信号制御パラメータ演算処理を実行し、選択結果に従い、信号制御パラメータの設定を行う対象信号機18と対象日時とを選択する(図6のステップS101)。続いて、信号制御パラメータ演算装置5が、走行状態情報記憶部10が記憶している走行状態情報を用いて、選択した対象信号機18とこの対象信号機18に隣接する交通流上流側の信号機17との間の道路区間(対象区間)を実際に走行した場合にかかる時間(対象区間実走行時間)を算出する(図6のステップS102)。なお、信号制御パラメータ演算装置5は、対象日時の対象区間実走行時間を算出する。
(Operation)
Next, the operation of the signal control parameter calculation system 1 of the present embodiment will be described.
First, it is assumed that the operator operates the signal control parameter calculation device 5 to select a signal device (target signal device) 18 for setting signal control parameters and a target date and time. Then, the signal control parameter calculation device 5 executes the signal control parameter calculation process, and selects the target signal device 18 and the target date and time for setting the signal control parameter according to the selection result (step S101 in FIG. 6). Subsequently, the signal control parameter computing device 5 uses the traveling state information stored in the traveling state
続いて、信号制御パラメータ演算装置5が、地図情報記憶部11が記憶している地図情報を用いて、対象区間を設定速度(法定速度)で走行する場合にかかると推定される時間(対象区間推定走行時間)を算出する(図6のステップS102)。続いて、信号制御パラメータ演算装置5が、算出した対象区間実走行時間から、算出した対象区間推定走行時間を減算した減算結果である対象区間遅れ時間を算出する(図6のステップS102)。 Subsequently, it is estimated that the signal control parameter calculation device 5 takes when the target section is traveled at a set speed (legal speed) using the map information stored in the map information storage unit 11 (target section). (Estimated travel time) is calculated (step S102 in FIG. 6). Subsequently, the signal control parameter calculation device 5 calculates a target section delay time that is a subtraction result obtained by subtracting the calculated target section estimated travel time from the calculated target section actual travel time (step S102 in FIG. 6).
ここで、対象区間遅れ時間が設定時間(30秒)以上であり、対象区間が重要交差点に流入する道路区間であったとする。すると、信号制御パラメータ演算装置5が、対象区間遅れ時間が設定時間(30秒)以上であり、対象区間が重要交差点に流入する道路区間であると判定する(図6のステップS103「Yes」、ステップS104「Yes」)。続いて、信号制御パラメータ演算装置5が、図3に示すように、算出した対象区間遅れ時間が長いほど、対象信号機18のサイクルを長くする(図6のステップS105)。 Here, it is assumed that the target section delay time is equal to or longer than the set time (30 seconds), and the target section is a road section flowing into the important intersection. Then, the signal control parameter calculation device 5 determines that the target section delay time is equal to or longer than the set time (30 seconds) and the target section is a road section flowing into the important intersection (step S103 “Yes” in FIG. 6). Step S104 “Yes”). Subsequently, as shown in FIG. 3, the signal control parameter calculation device 5 lengthens the cycle of the target signal 18 as the calculated target section delay time is longer (step S105 in FIG. 6).
このように、本実施形態では、対象区間遅れ時間が長いほどサイクル、つまり、対象信号機18の信号灯の点灯状態(青色→黄色→赤色)が一巡する時間を長くする。それゆえ、対象区間遅れ時間が長いほど、対象信号機18の青信号の点灯時間を増大できる。そのため、対象区間を走行する車両2の信号待ちの時間をより適切に短縮することができる。
また、本実施形態では、対象区間が重要交差点に流入する道路区間であると判定した場合に、対象区間遅れ時間が長いほどサイクルを長くする。それゆえ、重要交差点に流入する道路区間の対象信号機18の青信号の点灯時間を増大できる。そのため、重要交差点に流入する対象区間を走行する車両2の信号待ちの時間をより短縮することができる。
As described above, in this embodiment, the longer the target section delay time is, the longer the cycle, that is, the time required for one cycle of the lighting state (blue → yellow → red) of the signal lamp of the target traffic light 18 is lengthened. Therefore, as the target section delay time is longer, the lighting time of the blue light of the target traffic light 18 can be increased. Therefore, the signal waiting time of the vehicle 2 traveling in the target section can be shortened more appropriately.
Moreover, in this embodiment, when it is determined that the target section is a road section flowing into the important intersection, the cycle is lengthened as the target section delay time is longer. Therefore, the lighting time of the green light of the target traffic light 18 in the road section flowing into the important intersection can be increased. Therefore, the signal waiting time of the vehicle 2 traveling in the target section flowing into the important intersection can be further shortened.
続いて、信号制御パラメータ演算装置5が、対象区間が交差点に流入する道路区間であると判定し、走行状態情報記憶部10が記憶している走行状態情報を用いて、この交差点で対象区間と交差する道路のうち対象信号機18近傍に設置された信号機17とこの信号機17に隣接する交通流上流側の信号機17との間の道路区間(交差道路区間)を実際に走行した場合にかかる時間(交差道路実走行時間)を算出する(図6のステップS106)。なお、信号制御パラメータ演算装置5は対象日時の交差道路実走行時間を算出する。
Subsequently, the signal control parameter calculation device 5 determines that the target section is a road section flowing into the intersection, and uses the traveling state information stored in the traveling state
続いて、信号制御パラメータ演算装置5が、地図情報記憶部11が記憶している地図情報を用いて、交差道路区間を設定速度(法定速度)で走行する場合にかかると推定される時間(交差道路推定走行時間)を算出する(図6のステップS106)。続いて、信号制御パラメータ演算装置5が、算出した交差道路実走行時間から、算出した交差道路推定走行時間を減算した減算結果である交差道路側遅れ時間を算出する(図6のステップS106)。続いて、信号制御パラメータ演算装置5が、図4に示すように、算出した対象区間遅れ時間が、算出した交差道路側遅れ時間より長いほど、対象信号機18のスプリットを大きくする(図6のステップS106)。 Subsequently, it is estimated that the signal control parameter calculation device 5 takes time when the vehicle travels at the set speed (legal speed) using the map information stored in the map information storage unit 11 (intersection). (Estimated road travel time) is calculated (step S106 in FIG. 6). Subsequently, the signal control parameter calculation device 5 calculates a cross road side delay time which is a subtraction result obtained by subtracting the calculated cross road estimated travel time from the calculated cross road actual travel time (step S106 in FIG. 6). Subsequently, as shown in FIG. 4, the signal control parameter computing device 5 increases the split of the target traffic light 18 as the calculated target section delay time is longer than the calculated cross road side delay time (step of FIG. 6). S106).
このように、本実施形態では、対象区間が交差点に流入する道路区間である場合に、対象区間遅れ時間が交差道路側遅れ時間より長いほどスプリット、つまり、対象信号機18の信号灯の点灯状態(青色→黄色→赤色)が一巡する時間(サイクル)に対し、対象信号機18が青信号と黄信号とを点灯する合計時間の比率を大きくする。それゆえ、対象区間遅れ時間が長いほど、対象信号機18の青信号の点灯時間を増大できる。そのため、対象区間を走行する車両2の信号待ちの時間をより適切に短縮することができる。 Thus, in the present embodiment, when the target section is a road section flowing into the intersection, the longer the target section delay time is, the longer the target section delay time is than the cross road side delay time, that is, the lighting state of the signal lamp of the target traffic light 18 (blue) The ratio of the total time during which the target traffic light 18 lights up the blue signal and the yellow signal is increased with respect to the time (cycle) in which the yellow → red) cycle. Therefore, as the target section delay time is longer, the lighting time of the blue light of the target traffic light 18 can be increased. Therefore, the signal waiting time of the vehicle 2 traveling in the target section can be shortened more appropriately.
ここで、対象区間に、対象信号機18に向かう第1車線に加え、この第1車線と反対方向に向かう第2車線があったとする。すると、信号制御パラメータ演算装置5が、走行状態情報記憶部10が記憶している走行状態情報を用いて、第2車線を実際に走行した場合にかかる時間(第2車線実走行時間)を算出する(図6のステップS107)。なお、信号制御パラメータ演算装置5は、対象日時の第2車線実走行時間を算出する。
Here, it is assumed that there is a second lane that goes in the opposite direction to the first lane in addition to the first lane that goes to the target traffic light 18 in the target section. Then, the signal control parameter calculation device 5 calculates the time (second lane actual travel time) required when actually traveling in the second lane, using the travel state information stored in the travel state
続いて、信号制御パラメータ演算装置5が、地図情報記憶部11が記憶している地図情報を用いて、第2車線を設定速度(法定速度)で走行する場合にかかると推定される時間(第2車線推定走行時間)を算出する(図6のステップS107)。続いて、信号制御パラメータ演算装置5が、算出した第2車線実走行時間から、算出した第2車線推定走行時間を減算した減算結果である第2車線側遅れ時間を算出する(図6のステップS107)。続いて、信号制御パラメータ演算装置5が、図5に示すように、算出した対象区間遅れ時間が、算出した第2車線側遅れ時間より長いほど、対象信号機18のオフセットを短くする(図6のステップS107)。
Subsequently, it is estimated that the signal control parameter calculation device 5 is estimated to take when the second lane is traveled at a set speed (legal speed) using the map information stored in the map
このように、本実施形態では、対象区間に第1車線に加え第2車線があると判定した場合に、対象区間遅れ時間が第2車線側遅れ時間より長いほど、対象信号機18のオフセットを長くする。それゆえ、青信号の点灯開始時を遅らせることができる。そのため、第1車線を走行する車両2の信号待ちの時間をより適切に短縮することができる。
続いて、信号制御パラメータ演算装置5が、設定したサイクル、設定したスプリット、設定したオフセット等、対象日時における対象信号機18の信号制御パラメータをディスプレイに表示する(図6のステップS108)。これにより、オペレータが、表示された信号制御パラメータに従い、対象信号機18の信号制御パラメータを設定する。
Thus, in this embodiment, when it is determined that there is a second lane in addition to the first lane in the target section, the offset of the target traffic light 18 is increased as the target section delay time is longer than the second lane side delay time. To do. Therefore, it is possible to delay the start of lighting of the green light. Therefore, the signal waiting time of the vehicle 2 traveling in the first lane can be shortened more appropriately.
Subsequently, the signal control parameter calculation device 5 displays the signal control parameters of the target traffic light 18 at the target date and time, such as the set cycle, the set split, and the set offset (step S108 in FIG. 6). Thereby, the operator sets the signal control parameter of the target traffic light 18 in accordance with the displayed signal control parameter.
このように、本実施形態では、車載装置3から車両2の走行状態を表す走行状態情報を取得する。続いて、取得した走行状態情報を用いて、選択した対象信号機18とこの対象信号機18に隣接する交通流上流側の信号機17との間の道路区間である対象区間を、実際に走行した場合にかかる時間(対象区間実走行時間)から設定速度(法定速度)で走行する場合にかかると推定される時間(対象区間推定走行時間)を減算した減算結果である遅れ時間(対象区間遅れ時間)を算出する。続いて、算出した対象区間遅れ時間を用いて、対象信号機18の点灯状態の制御パラメータを演算する。それゆえ、例えば、交通量調査をもとに信号機17の点灯状態の制御パラメータを演算する方法に比べ、信号機17の点灯状態の制御パラメータの演算に要する手間(コスト、時間)を低減できる。
As described above, in this embodiment, traveling state information representing the traveling state of the vehicle 2 is acquired from the in-
本実施形態では、図1の走行状態情報取得部9が走行状態情報取得部を構成する。以下同様に、図1の遅れ時間算出部12が遅れ時間算出部を構成する。また、図1の制御パラメータ演算部15が制御パラメータ演算部を構成する。さらに、図1の交差道路側遅れ時間算出部13が交差道路側遅れ時間算出部を構成する。また、図1の第2車線側遅れ時間算出部14が第2車線側遅れ時間を構成する。さらに、対象車線遅れ時間が第1車線側遅れ時間を構成する。
In the present embodiment, the traveling state
(本実施形態の効果)
本実施形態に係る信号制御パラメータ演算システム1は、以下の効果を奏する。
(1)本実施形態に係る信号制御パラメータ演算システム1によれば、信号制御パラメータ演算装置5が、車載装置3から車両2の走行状態を表す走行状態情報を取得する。続いて、信号制御パラメータ演算装置5が、取得した走行状態情報を用いて、選択した対象信号機18とこの対象信号機18に隣接する交通流上流側の信号機17との間の道路区間である対象区間を、実際に走行した場合にかかる時間(対象区間実走行時間)から設定速度(法定速度)で走行する場合にかかると推定される時間(対象区間推定走行時間)を減算した減算結果である遅れ時間(対象区間遅れ時間)を算出する。続いて、信号制御パラメータ演算装置5が、算出した対象区間遅れ時間を用いて、対象信号機18の点灯状態の制御パラメータを演算する。
(Effect of this embodiment)
The signal control parameter calculation system 1 according to the present embodiment has the following effects.
(1) According to the signal control parameter calculation system 1 according to the present embodiment, the signal control parameter calculation device 5 acquires travel state information representing the travel state of the vehicle 2 from the in-
このような構成によれば、車載装置3から取得される走行状態情報をもとに遅れ時間(対象区間遅れ時間)を算出し、算出した対象区間遅れ時間をもとに対象信号機18の点灯状態の制御パラメータ(サイクル、スプリット、オフセット)の演算を行う。そのため、例えば、交通量調査をもとに信号機17の点灯状態の制御パラメータを演算する方法に比べ、信号機17の点灯状態の制御パラメータの演算に要する手間を低減できる。
According to such a configuration, the delay time (target section delay time) is calculated based on the traveling state information acquired from the in-
(2)本実施形態に係る信号制御パラメータ演算システム1によれば、制御パラメータは、対象信号機18の信号灯の点灯状態が一巡する時間であるサイクルを含む。そして、信号制御パラメータ演算装置5が、対象区間遅れ時間が長いほどサイクルを長くする。
このような構成によれば、対象区間遅れ時間が長いほどサイクル、つまり、対象信号機18の信号灯の点灯状態(青色→黄色→赤色)が一巡する時間を長くする。それゆえ、対象区間遅れ時間が長いほど、対象信号機18の青信号の点灯時間を増大できる。そのため、対象区間を走行する車両2の信号待ちの時間をより適切に短縮することができる。
(2) According to the signal control parameter calculation system 1 according to the present embodiment, the control parameter includes a cycle that is a time during which the lighting state of the signal lamp of the target traffic light 18 takes a round. And the signal control parameter calculating device 5 lengthens the cycle as the target section delay time is longer.
According to such a configuration, the longer the target section delay time is, the longer the cycle, that is, the time for the signal lamp lighting state (blue → yellow → red) to go round. Therefore, as the target section delay time is longer, the lighting time of the blue light of the target traffic light 18 can be increased. Therefore, the signal waiting time of the vehicle 2 traveling in the target section can be shortened more appropriately.
(3)本実施形態に係る信号制御パラメータ演算システム1によれば、信号制御パラメータ演算装置5が、対象区間が重要交差点に流入する道路区間であると判定した場合に、対象区間遅れ時間が長いほどサイクルを長くする。
このような構成によれば、重要交差点に流入する道路区間の対象信号機18の青信号の点灯時間を増大できる。そのため、重要交差点に流入する対象区間を走行する車両2の信号待ちの時間をより短縮することができる。
(3) According to the signal control parameter calculation system 1 according to the present embodiment, when the signal control parameter calculation device 5 determines that the target section is a road section flowing into an important intersection, the target section delay time is long. Make the cycle longer.
According to such a configuration, it is possible to increase the lighting time of the green light of the target traffic light 18 in the road section flowing into the important intersection. Therefore, the signal waiting time of the vehicle 2 traveling in the target section flowing into the important intersection can be further shortened.
(4)本実施形態に係る信号制御パラメータ演算システム1によれば、制御パラメータは、対象信号機18の信号灯の点灯状態が一巡する時間であるサイクルに対して、対象信号機18が青信号と黄信号とを点灯する合計時間の比率であるスプリットを含む。そして、信号制御パラメータ演算装置5が、対象区間が交差点に流入する道路区間である場合に、対象区間遅れ時間が交差道路側遅れ時間より長いほどスプリットを大きくする。 (4) According to the signal control parameter calculation system 1 according to the present embodiment, the control signal includes the blue signal and the yellow signal for the cycle in which the lighting state of the signal lamp of the target signal 18 is one cycle. Including the split, which is the ratio of the total time to light up. Then, when the target section is a road section flowing into the intersection, the signal control parameter calculation device 5 increases the split as the target section delay time is longer than the cross road side delay time.
このような構成によれば、対象区間が交差点に流入する道路区間である場合に、対象区間遅れ時間が交差道路側遅れ時間より長いほどスプリット、つまり、対象信号機18の信号灯の点灯状態(青色→黄色→赤色)が一巡する時間(サイクル)に対し、対象信号機18が青信号と黄信号とを点灯する合計時間の比率を大きくする。それゆえ、対象区間遅れ時間が長いほど、対象信号機18の青信号の点灯時間を増大できる。そのため、対象区間を走行する車両2の信号待ちの時間をより適切に短縮することができる。 According to such a configuration, when the target section is a road section flowing into the intersection, the longer the target section delay time is longer than the cross road side delay time, the split, that is, the lighting state of the signal light of the target traffic light 18 (blue → The ratio of the total time during which the target traffic light 18 lights the blue signal and the yellow signal is increased with respect to the time (cycle) in which the yellow → red) cycle. Therefore, as the target section delay time is longer, the lighting time of the blue light of the target traffic light 18 can be increased. Therefore, the signal waiting time of the vehicle 2 traveling in the target section can be shortened more appropriately.
(5)本実施形態に係る信号制御パラメータ演算システム1によれば、制御パラメータは、対象信号機18に隣接する第1車線の交通流上流側の信号機における青信号の点灯が開
始されてから、対象信号機18における青信号の点灯が開始されるまでの時間であるオフセットを含む。そして、信号制御パラメータ演算装置5が、対象区間に、対象信号機18に向かう第1車線に加え、この第1車線と反対方向に向かう第2車線があると判定した場合に、第1車線側遅れ時間が第2車線側遅れ時間より長いほどオフセットを長くする。
このような構成によれば、対象区間に第1車線に加え第2車線があると判定した場合に、対象区間遅れ時間が第2車線側遅れ時間より長いほど、対象信号機18のオフセットを長くする。それゆえ、青信号の点灯開始時を遅らせることができる。そのため、第1車線を走行する車両2の信号待ちの時間をより適切に短縮することができる。
(5) According to the signal control parameter calculation system 1 according to the present embodiment, the control parameter is the target signal after the start of lighting of the blue signal in the traffic signal upstream of the traffic flow in the first lane adjacent to the target signal 18. 18 includes an offset which is a time until the lighting of the green light at 18 starts. When the signal control parameter calculation device 5 determines that there is a second lane in the direction opposite to the first lane in addition to the first lane toward the target traffic light 18 in the target section, the first lane side delay time is longer offset longer than the second lane side delay time.
According to such a configuration, when it is determined that there is a second lane in addition to the first lane in the target section, the offset of the target traffic light 18 is increased as the target section delay time is longer than the second lane side delay time. . Therefore, it is possible to delay the start of lighting of the green light. Therefore, the signal waiting time of the vehicle 2 traveling in the first lane can be shortened more appropriately.
9 走行状態情報取得部
12 遅れ時間算出部
13 交差道路側遅れ時間算出部
14 第2車線側遅れ時間算出部
15 制御パラメータ演算部
9 Travel condition
Claims (5)
取得した前記走行状態情報を用いて、選択した対象信号機と該対象信号機に隣接する交通流上流側の信号機との間の道路区間である対象区間を、実際に走行した場合にかかる時間から予め定めた設定速度で走行する場合にかかると推定される時間を減算した減算結果である遅れ時間を算出する遅れ時間算出部と、
算出した前記遅れ時間を用いて、前記対象信号機の点灯状態の制御パラメータを演算する制御パラメータ演算部と、を備えたことを特徴とする信号制御パラメータ演算装置。 A traveling state information acquisition unit that acquires traveling state information representing the traveling state of the vehicle from the in-vehicle device;
Using the acquired travel state information, the target section, which is a road section between the selected target traffic signal and the traffic signal upstream on the traffic flow adjacent to the target traffic signal, is determined in advance from the time required for actual travel. A delay time calculation unit that calculates a delay time that is a subtraction result obtained by subtracting a time estimated to be required when traveling at a set speed;
And a control parameter calculation unit that calculates a control parameter of the lighting state of the target traffic light using the calculated delay time.
前記制御パラメータ演算部は、前記遅れ時間が長いほど前記サイクルを長くすることを特徴とする請求項1に記載の信号制御パラメータ演算装置。 The control parameter includes a cycle that is a time during which the lighting state of the signal lamp of the target traffic light makes a round,
The signal control parameter calculation device according to claim 1, wherein the control parameter calculation unit lengthens the cycle as the delay time increases.
前記制御パラメータは、前記対象信号機の信号灯の点灯状態が一巡する時間であるサイクルに対して、前記対象信号機が青信号と黄信号とを点灯する合計時間の比率であるスプリットを含み、
前記制御パラメータ演算部は、前記対象区間が前記交差点に流入する道路区間である場合に、前記遅れ時間が前記交差道路側遅れ時間より長いほど前記スプリットを大きくすることを特徴とする請求項1から3の何れか1項に記載の信号制御パラメータ演算装置。 When the target section is a road section flowing into an intersection, using the traveling state information, a traffic signal installed in the vicinity of the target traffic signal on a road that intersects the target section at the intersection and adjacent to the traffic signal Cross road side delay, which is a subtraction result obtained by subtracting the time estimated to be required when traveling at a preset speed from the time required when actually traveling on the road section with the traffic signal upstream of the traffic flow It has a cross road side delay time calculation unit that calculates time,
The control parameter includes a split that is a ratio of a total time during which the target signal lights a green signal and a yellow signal with respect to a cycle in which the lighting state of the signal lamp of the target signal completes,
The control parameter calculation unit, when the target section is a road section flowing into the intersection, increases the split as the delay time is longer than the delay time on the intersection road side. 4. The signal control parameter calculation device according to any one of items 3.
前記遅れ時間算出部が算出する前記遅れ時間を第1車線側遅れ時間とし、
前記制御パラメータは、前記対象信号機に隣接する前記第1車線の交通流上流側の信号機における青信号の点灯が開始されてから、前記対象信号機における青信号の点灯が開始されるまでの時間であるオフセットを含み、
前記制御パラメータ演算部は、前記対象区間に前記第1車線に加え前記第2車線があると判定した場合に、前記第1車線側遅れ時間が前記第2車線側遅れ時間より長いほど前記オフセットを長くすることを特徴とする請求項1から4の何れか1項に記載の信号制御パラメータ演算装置。 In the target section, in addition to the first lane heading for the target traffic signal, and the second lane heading in the opposite direction to the first lane, the second lane is calculated from the time taken when actually traveling in the second lane. A second lane-side delay time calculating unit that calculates a second lane-side delay time that is a subtraction result obtained by subtracting a time estimated to be taken when traveling at a predetermined speed in a lane;
The delay time calculated by the delay time calculation unit is the first lane side delay time,
The control parameter is an offset that is a time period from when the blue signal lighting starts at the traffic signal upstream of the traffic flow in the first lane adjacent to the target traffic signal until the blue signal lighting starts at the target traffic signal. Including
When the control parameter calculation unit determines that the second lane is included in the target section in addition to the first lane, the offset increases as the first lane delay time is longer than the second lane delay time. The signal control parameter calculation device according to claim 1, wherein the signal control parameter calculation device is lengthened .
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2014163338A JP6314739B2 (en) | 2014-08-11 | 2014-08-11 | Signal control parameter calculation device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2014163338A JP6314739B2 (en) | 2014-08-11 | 2014-08-11 | Signal control parameter calculation device |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2016038826A JP2016038826A (en) | 2016-03-22 |
| JP6314739B2 true JP6314739B2 (en) | 2018-04-25 |
Family
ID=55529811
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2014163338A Active JP6314739B2 (en) | 2014-08-11 | 2014-08-11 | Signal control parameter calculation device |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP6314739B2 (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR101943198B1 (en) * | 2017-05-01 | 2019-04-17 | 목원대학교 산학협력단 | Method for estimation of link travel time and signal delay |
| CN111179613A (en) * | 2020-02-20 | 2020-05-19 | 李迎 | Traffic signal lamp-based driving method for vehicle |
| CN113506438B (en) * | 2021-06-18 | 2022-07-05 | 同济大学 | Dynamic control method, system, device and medium for network connection automatic driving hybrid vehicle |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3412779B2 (en) * | 1995-02-15 | 2003-06-03 | 日本信号株式会社 | Traffic signal control method |
| JP3984372B2 (en) * | 1998-07-21 | 2007-10-03 | 松下電器産業株式会社 | Traffic control method and apparatus |
| JP2001109988A (en) * | 1999-10-04 | 2001-04-20 | Matsushita Electric Ind Co Ltd | Signal control method |
| JP2005004425A (en) * | 2003-06-11 | 2005-01-06 | Omron Corp | Air pollutant emission estimation device and traffic pollution reduction device |
| JP4357983B2 (en) * | 2004-02-17 | 2009-11-04 | パナソニック株式会社 | DELAY TIME ESTIMATION DEVICE, DELAY TIME ESTIMATION METHOD, DELAY TIME ESTIMATION SYSTEM, AND DELAY TIME ESTIMATION PROGRAM |
| JP5282741B2 (en) * | 2010-01-08 | 2013-09-04 | トヨタ自動車株式会社 | vehicle |
-
2014
- 2014-08-11 JP JP2014163338A patent/JP6314739B2/en active Active
Also Published As
| Publication number | Publication date |
|---|---|
| JP2016038826A (en) | 2016-03-22 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP3602513B1 (en) | Method, apparatus and computer program product for comprehensive management of signal phase and timing of traffic lights | |
| CN107851372B (en) | Driving planning device, driving support device, and driving planning method | |
| US8666646B2 (en) | Vehicle guidance device, vehicle guidance method, and vehicle guidance program | |
| US10964217B2 (en) | Travel control method and travel control apparatus | |
| WO2017013750A1 (en) | Driving plan device, travel support device, and driving plan method | |
| WO2017013748A1 (en) | Scene evaluation device, travel support device, and scene evaluation method | |
| WO2015166876A1 (en) | Traffic signal control device, traffic signal control method, and computer program | |
| JP2014135061A (en) | Drive evaluating device, drive evaluating method, and drive support system | |
| JP6314739B2 (en) | Signal control parameter calculation device | |
| CN105987703A (en) | Navigation method for providing information of parking lot near destination | |
| CN104760592A (en) | Decision control method of motor vehicle | |
| CN113390424A (en) | Intelligent travel navigation method, system, equipment and medium | |
| JP5530000B2 (en) | Cross-person support notification system and cross-person support method | |
| JP5703834B2 (en) | Signal control determination apparatus, computer program, and signal control suitability determination method | |
| JP2011113503A (en) | Driving support device | |
| JP6372753B2 (en) | Traffic signal control device and traffic signal control method | |
| CN116137097A (en) | Method and apparatus for controlling a mobility system | |
| US20180180432A1 (en) | Vehicular traffic pattern application | |
| CA2993141A1 (en) | Scene determination device, travel assistance appratus, and scene determination method | |
| JP6023527B2 (en) | Traffic signal control system | |
| CN112550301A (en) | Parallel tree decision scheme for autonomous vehicles | |
| JP2018190026A (en) | Automatic driving vehicle control system and control method | |
| JP6899528B2 (en) | Traffic management equipment, traffic management system and traffic management method | |
| JP2020166475A (en) | Vehicle behavior prediction method, vehicle behavior prediction device, and vehicle control device | |
| JP6331371B2 (en) | Driving evaluation apparatus and driving evaluation method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20170330 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20171219 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20171220 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20180214 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20180227 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20180312 |
|
| R151 | Written notification of patent or utility model registration |
Ref document number: 6314739 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R151 |