JP6324916B2 - Measures to improve long-term maintenance performance by reducing earthquake resistance and residual deformation of double-wall reinforced embankment method with large slenderness ratio - Google Patents
Measures to improve long-term maintenance performance by reducing earthquake resistance and residual deformation of double-wall reinforced embankment method with large slenderness ratio Download PDFInfo
- Publication number
- JP6324916B2 JP6324916B2 JP2015033119A JP2015033119A JP6324916B2 JP 6324916 B2 JP6324916 B2 JP 6324916B2 JP 2015033119 A JP2015033119 A JP 2015033119A JP 2015033119 A JP2015033119 A JP 2015033119A JP 6324916 B2 JP6324916 B2 JP 6324916B2
- Authority
- JP
- Japan
- Prior art keywords
- embankment
- wall
- double
- slenderness ratio
- term maintenance
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims description 63
- 238000012423 maintenance Methods 0.000 title claims description 49
- 230000007774 longterm Effects 0.000 title claims description 45
- 238000010276 construction Methods 0.000 claims description 38
- 239000000463 material Substances 0.000 claims description 32
- 238000006243 chemical reaction Methods 0.000 claims description 20
- 238000007906 compression Methods 0.000 claims description 18
- 230000006835 compression Effects 0.000 claims description 18
- 230000003014 reinforcing effect Effects 0.000 claims description 16
- 230000002787 reinforcement Effects 0.000 claims description 15
- 230000036316 preload Effects 0.000 claims description 11
- 230000006872 improvement Effects 0.000 claims description 8
- 230000009467 reduction Effects 0.000 claims description 7
- 239000002689 soil Substances 0.000 claims description 7
- 230000001629 suppression Effects 0.000 claims description 6
- 238000007726 management method Methods 0.000 claims 4
- 230000000149 penetrating effect Effects 0.000 claims 1
- 238000005452 bending Methods 0.000 description 32
- 238000010586 diagram Methods 0.000 description 14
- 239000004746 geotextile Substances 0.000 description 10
- 230000033001 locomotion Effects 0.000 description 10
- 230000035515 penetration Effects 0.000 description 7
- 239000012779 reinforcing material Substances 0.000 description 5
- BZHJMEDXRYGGRV-UHFFFAOYSA-N Vinyl chloride Chemical compound ClC=C BZHJMEDXRYGGRV-UHFFFAOYSA-N 0.000 description 4
- 238000007796 conventional method Methods 0.000 description 4
- 238000006073 displacement reaction Methods 0.000 description 4
- 230000004044 response Effects 0.000 description 4
- 206010012411 Derailment Diseases 0.000 description 2
- 230000001133 acceleration Effects 0.000 description 2
- 239000004568 cement Substances 0.000 description 2
- 230000006378 damage Effects 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 239000005038 ethylene vinyl acetate Substances 0.000 description 2
- 230000001771 impaired effect Effects 0.000 description 2
- 229920001200 poly(ethylene-vinyl acetate) Polymers 0.000 description 2
- 229920005989 resin Polymers 0.000 description 2
- 239000011347 resin Substances 0.000 description 2
- 238000005096 rolling process Methods 0.000 description 2
- 239000004575 stone Substances 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 1
- 239000004927 clay Substances 0.000 description 1
- 238000005056 compaction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000001747 exhibiting effect Effects 0.000 description 1
- 239000004088 foaming agent Substances 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 230000000116 mitigating effect Effects 0.000 description 1
- 230000000452 restraining effect Effects 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 230000000087 stabilizing effect Effects 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Images
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Description
本発明は、鉄道・道路などで構築される補強盛土壁工法の内、細長比の大きい両端補強盛土壁の耐震性と残留変形の軽減による長期維持管理性能を大幅に高めるための盛土体構築工法に関するものである。 The present invention is a embankment construction method for greatly improving long-term maintenance management performance by reducing earthquake resistance and residual deformation of both ends reinforced embankment walls with a large slenderness ratio among reinforced embankment walls constructed in railways, roads, etc. It is about.
近年、鉄道盛土や道路盛土構造物において補強盛土の施工が増えてきている。補強盛土における補強材には、ジオテキスタイル(面状補強材)を用いる場合が多いが、法面勾配が急になると壁面工が必要となる。土のうや溶接金網をジオテキスタイルで巻込む形式の壁面工や、ジオテキスタイルと接続したL型エキスパンドメタルのような形式の剛性が小さい壁面工も多く見られる。あるいは、ブロックや分割パネルを積み上げた分割された形式の壁面工も見られる。これらの壁面工は分割壁面と呼ばれている。 In recent years, construction of reinforced embankments has been increasing in railway embankments and road embankment structures. In many cases, a geotextile (planar reinforcing material) is used as the reinforcing material in the reinforced embankment, but if the slope is steep, a wall work is required. There are many wall works in the form of wrapping sandbags and welded wire mesh with geotextiles, and wall works with small rigidity such as L-shaped expanded metal connected to geotextiles. Alternatively, there is also a divided type wall work in which blocks and divided panels are stacked. These wall surfaces are called divided wall surfaces.
一方、前述の土のうや溶接金網をジオテキスタイルで巻込む形式の壁面工を一次壁面とし、補強盛土の変形が収束してから、二次壁面として構築する「ジオテキスタイルと一体化した剛性の高い場所打ちコンクリート壁面」を有するRRR工法がある。他の条件が同じであれば一般的に壁面工の剛性が高いほど補強盛土の耐力が向上することが、明らかになっている。 On the other hand, the wall surface in the form of wrapping the earthen wall or welded wire mesh with geotextile is used as the primary wall surface, and after the deformation of the reinforcing embankment has converged, it is constructed as the secondary wall surface. There is an RRR method having a “wall surface”. It has been clarified that the strength of the reinforced embankment is generally improved as the rigidity of the wall construction is higher if other conditions are the same.
RRR工法は、曲げ剛性を有する一体の壁面工と面状補強材を用いて急勾配あるいは鉛直なのり面を有する剛壁面補強盛土を構築する工法であり、開発以来補強土擁壁として実績を積み重ねている。 The RRR method is a method of constructing a rigid wall reinforced embankment with a steep or vertical slope using an integral wall surface with bending rigidity and a planar reinforcing material. Yes.
このような展開の中で、用地制約の多い都市部などでも経済性の観点から、あるいは、トンネル掘削土砂(トンネルズリ)の有効活用の観点から高架橋の替わりに補強盛土壁工法が採用される場合が多くなってきている。このような目的に使われる補強盛土壁工法は、いわゆる細長比が大きく延長距離が長い両端補強盛土壁の形式で用いられる場合が多い。この場合、盛土幅が比較的小さくて盛土高の大きい短柱状の構造形式となるために、壁高が10m程度を超えるような場合に耐震性と残留変形の軽減による長期維持管理性能を向上させる技術の開発が急務となっている。すなわち、両端補強盛土壁の幅に対する高さの比(細長比)が大きいほど、延長方向に直交する断面内での転倒・曲げ変形が卓越して耐震性が低下する。それに対して、剛な一体壁面工をもつジオシンセティックス補強土壁構造は有効に抵抗する。しかし、1995年阪神淡路地震や2011年東日本大震災で経験したようなレベル2地震動に対しても安定性を確保するためには、安定性をより向上させることが必要である。同時に壁高が大きくなると問題となり易い長期にわたる残留変形を抑制することによって長期維持管理性能もより向上させることが必要である。
In such a development, when the reinforced embankment wall method is adopted instead of the viaduct from the viewpoint of economic efficiency or from the viewpoint of effective use of tunnel excavated sand (tunnel), even in urban areas where there are many land restrictions There are many more. The reinforced embankment wall method used for such a purpose is often used in the form of a reinforced embankment wall with a so-called slenderness ratio and a long extension distance. In this case, because the embankment width is relatively small and the embankment height is a short columnar structure, when the wall height exceeds about 10 m, the long-term maintenance performance is improved by reducing earthquake resistance and residual deformation. Technology development is an urgent need. That is, as the ratio of the height to the width of the embankment-reinforced embankment wall (elongation ratio) is larger, the overturning / bending deformation in the cross section perpendicular to the extending direction becomes more prominent and the earthquake resistance is lowered. On the other hand, geosynthetic reinforced earth wall structure with rigid integral wall construction resists effectively. However, it is necessary to further improve stability in order to ensure stability against the
しかしながら、L2地震動等の大地震が両端補強盛土壁に作用すると、過大なせん断変形、あるいは転倒破壊によって機能が損なわれる恐れがある。つまり、この時に、両端補強盛土の一方の鉛直壁面工と盛土には過大な引張り力が、また、他方の鉛直壁面工と盛土には過大な圧縮力が作用し、それぞれ、壁面工と盛土には引張り破壊、および壁面工での座屈破壊と盛土の圧縮破壊が生じる恐れがある。 However, when a large earthquake such as L2 ground motion acts on both ends of the reinforced embankment wall, the function may be impaired due to excessive shear deformation or overturning failure. In other words, at this time, an excessive tensile force is applied to one vertical wall work and embankment of both ends reinforced embankment, and an excessive compressive force is applied to the other vertical wall work and embankment, respectively. May cause tensile failure, buckling failure in wall construction and compression failure of embankment.
本発明は、上記状況に鑑みて、L2地震動等の大地震が両端補強盛土壁に作用しても、細長比の大きい両端補強盛土壁の構造物全体の剛性を高めかつ長期残留変形を抑制してそれらを保つことができる、細長比の大きい両端補強盛土壁工法の耐震性および残留変形軽減による長期維持管理性能の向上対策工法を提供することを目的とする。 In view of the above situation, the present invention increases the rigidity of the structure of both ends reinforced embankment wall having a large slenderness ratio and suppresses long-term residual deformation even if a large earthquake such as L2 ground motion acts on both ends reinforced embankment walls. It is an object of the present invention to provide a method for improving the long-term maintenance performance by reducing the earthquake resistance and residual deformation of the double-walled reinforced embankment method with a large slenderness ratio that can maintain them.
本発明は、上記目的を達成するために、
〔1〕細長比の大きい両端補強盛土壁工法の耐震性および残留変形軽減による長期維持管理性能の向上対策工法において、両端補強盛土壁の天端全体を覆っている天端面工と両端補強盛土壁の長さ方向に配置される梁を鉛直緊張材によって、両端壁面工を貫通していて壁面工下端にアンカーされているタイロッドに連結することによって、両端壁面工下端で鉛直反力を取って前記鉛直緊張材を締めつけ、補強盛土に鉛直にプレロードとプレストレスを掛けることを特徴とする。
In order to achieve the above object, the present invention provides
[1] In the measures for improving long-term maintenance performance by reducing the seismic resistance and residual deformation of the double-walled reinforced embankment method with a large slenderness ratio, the top- face work and the double-sided reinforced embankment covering the entire top edge of the double-walled reinforced wall By connecting the beam arranged in the length direction of the wall to the tie rod that penetrates the wall work at both ends and is anchored at the wall work work bottom end with the vertical tension material, The vertical tension material is fastened, and preload and prestress are vertically applied to the reinforcing embankment.
〔2〕上記〔1〕記載の細長比の大きい両端補強盛土壁工法の耐震性および残留変形軽減による長期維持管理性能の向上対策工法において、前記両端補強盛土壁の長さ方向に配置される梁は所定間隔を取って配置することを特徴とする。 [2] A beam disposed in the length direction of the both-end reinforced embankment wall in the method for improving long-term maintenance performance by reducing earthquake resistance and residual deformation of the both-end reinforced embankment wall method having a large slenderness ratio as described in [1] Are arranged with a predetermined interval.
〔3〕上記〔2〕記載の細長比の大きい両端補強盛土壁工法の耐震性および残留変形軽減による長期維持管理性能の向上対策工法において、前記両端補強盛土壁の長さ方向に配置される梁は所定間隔は5mであることを特徴とする。 [3] In the measures for improving long-term maintenance performance by reducing the earthquake resistance and residual deformation of the double-end reinforced embankment wall method having a large slenderness ratio as described in [2] above, a beam disposed in the length direction of the double-wall reinforced embankment wall Has a predetermined interval of 5 m.
〔4〕上記〔2〕記載の細長比の大きい両端補強盛土壁工法の耐震性および残留変形軽減による長期維持管理性能の向上対策工法において、前記両端補強盛土壁の長さ方向に配置される梁の両端には盛土プレストレス用鉛直緊張材と壁面工プレストレス用鉛直緊張材とを交互に配置することを特徴とする。 [4] A beam arranged in the length direction of the both-end reinforced embankment wall in the method for improving long-term maintenance performance by reducing earthquake resistance and residual deformation of the both-end reinforced embankment wall method having a large slenderness ratio as described in [2] above The vertical tension material for embankment prestress and the vertical tension material for wall construction prestress are alternately arranged at both ends of the wall.
〔5〕上記〔1〕記載の細長比の大きい両端補強盛土壁工法の耐震性および残留変形軽減による長期維持管理性能の向上対策工法において、(a)壁面工の基礎を構築し、(b)土層の撤き出しと締め固めを行い、(c)順次高い層を構築し、(d)最上層上に両端補強盛土壁の長さ方向に梁を配置して鉛直緊張材を締めつけて盛土を構築し、(e)擁壁躯体のコンクリート打設を行い、盛土を完成させることを特徴とする。 [5] In the construction method for improving long-term maintenance performance by reducing the seismic resistance and residual deformation of the double-wall reinforced embankment method with a large slenderness ratio as described in [1] above, (a) constructing the foundation of the wall construction, (b) Remove and compact the soil layer, (c) build higher layers sequentially, (d) place the beams in the length direction of the embossed embankment wall on the top layer and tighten the vertical tension material to fill the embankment And (e) performing concrete placement on the retaining wall frame to complete the embankment.
〔6〕上記〔1〕記載の細長比の大きい両端補強盛土壁工法の耐震性および残留変形軽減による長期維持管理性能の向上対策工法において、前記両端補強盛土壁の天端にスラブ軌道下のコンクリート路盤を配置することを特徴とする。 [6] In the method for improving long-term maintenance performance by reducing the seismic resistance and residual deformation of the double-end reinforced embankment method with a large slenderness ratio as described in [1] above, It is characterized by arranging a roadbed.
〔7〕上記〔1〕記載の細長比の大きい両端補強盛土壁工法の耐震性および残留変形軽減による長期維持管理性能の向上対策工法において、転倒破壊を防ぐために基礎部の根入れ深さおよび幅を大きくすることを特徴とする。 [7] In the construction method for improving long-term maintenance performance by reducing the seismic resistance and residual deformation of the double-walled reinforced embankment method with a large slenderness ratio as described in [1] above, the depth and width of the foundation in order to prevent overturning failure It is characterized by increasing.
〔8〕上記〔1〕記載の細長比の大きい両端補強盛土壁工法の耐震性および残留変形軽減による長期維持管理性能の向上対策工法において、盛土圧縮時における拘束圧維持機能と盛土膨張時の抑制機能をそれぞれ別個のロッドで発揮させるラチェット装置を具備することを特徴とする。 [8] In the measures for improving long-term maintenance performance by reducing the seismic resistance and residual deformation of the double-wall reinforced embankment method with a large slenderness ratio as described in [1] above, the restraint pressure maintenance function during embankment compression and the suppression during embankment expansion It comprises a ratchet device that performs its function with a separate rod.
〔9〕上記〔1〕記載の細長比の大きい両端補強盛土壁工法の耐震性および残留変形軽減による長期維持管理性能の向上対策工法において、盛土圧縮時におけるプレストレスの維持機能装置を具備することを特徴とする。 [9] The prestress maintenance function device at the time of embankment compression is provided in the measures for improving long-term maintenance performance by reducing the earthquake resistance and residual deformation of the double-wall reinforced embankment wall construction method having a large slenderness ratio as described in [1] above. It is characterized by.
〔10〕上記〔1〕記載の細長比の大きい両端補強盛土壁工法の耐震性および残留変形軽減による長期維持管理性能の向上対策工法において、盛土圧縮時における反力梁の上昇抑制機能装置を具備することを特徴とする。 [10] In the above-mentioned construction method for improving the long-term maintenance performance by reducing the seismic resistance and residual deformation of the double-walled reinforced embankment method with a large slenderness ratio as described in [1] above, a function device for suppressing the rise of the reaction beam during embankment compression is provided. It is characterized by doing.
本発明によれば、次のような効果を奏することができる。
(1)細長比の大きい両端補強盛土壁の構造体全体として曲げ振動に対する固有振動数f0 を大きくして曲げ剛性を高めることによって曲げ振動の応答が下がるとともに、盛土の剛性の増加によって構造体の曲げ変形とせん断変形が抑制され、壁面工と盛土の引張り耐力および盛土の圧縮耐力を向上させることによって構造体の転倒・曲げ破壊に対する耐力を高くなる。これらの効果によって、構造体としての耐震性と長期維持管理性能が格段に向上する。
(2)両端補強盛土擁壁の壁面工と連結した梁(5mに1か所程度)、あるいはスラブ軌道下のコンクリート路盤を用いて、これらと両端壁面工とを連結することによって両端壁面工で鉛直反力を取って、ナットを締めつける等の簡単な方法で補強盛土体に鉛直にプレロードとプレストレスを掛けて補強盛土体を高剛性化することができる。このことによって、構造体の曲げ振動に対する固有振動数f0 を大きくし、それを保ち、同時に盛土の残留変形を小さくすることができる。
(3)補強盛土全体をスラブ軌道下のコンクリート路盤で覆い、両端壁面工で鉛直反力を取って、ナットを締めつける等の簡単な方法で補強盛土体に鉛直にプレロードとプレストレスを掛けることによって、外側の剛壁面に緊結された高強度ジオシンセティックス補強材に引張り力が発揮されて盛土の剛性が効率的に向上する。このことによって、補強盛土全体の曲げ変形に対する固有振動数f0 が向上するとともにせん断変形が大幅に抑制される。同時に盛土の残留変形を小さくすることができる。盛土がジオシンセティックス補強されていることによって、構造体が曲げ変形をする場合に盛土に生じる圧縮荷重による耐力が向上し、残留変形が抑制される。
(4)壁面工に圧縮プレストレスを導入されることによって壁面工の引張り荷重に対する耐力が向上することによって壁面工の基礎コンクリート部の鉛直引張り対する抵抗力を有効に活用できるようになり、構造体の転倒・曲げ破壊に対する安定性が向上し、残留変形が抑制される。
(5)以上の結果、延長距離の長い両端補強盛土壁の壁高を盛土幅と比較して大幅に高くすることが可能となる。
(6)両端補強盛土壁の盛土高さを高くすることができるようになると、トンネル掘削ずり等を盛土材として有効に活用することが可能となる。特に、自然由来によって土壌汚染されている材料等も別途汚染対策を実施することによって盛土材として有効に活用することが可能となる。
According to the present invention, the following effects can be achieved.
(1) The overall structure of the embossed embankment wall having a large slenderness ratio increases the bending frequency by increasing the natural frequency f 0 with respect to the bending vibration, and the bending vibration response is lowered, and the structure is increased by increasing the rigidity of the embankment. Bending deformation and shear deformation are suppressed, and the tensile strength of the wall construction and embankment and the compressive strength of the embankment are improved, so that the strength of the structure against overturning and bending failure is increased. With these effects, the seismic resistance and long-term maintenance performance as a structure are significantly improved.
(2) By using a beam (about 1 place in 5m) connected to the wall work of the embankment retaining wall on both ends, or using a concrete roadbed under a slab track, connect these to the wall work on both ends. It is possible to increase the rigidity of the reinforced embankment by preloading and prestressing the reinforced embankment vertically by a simple method such as taking a vertical reaction force and tightening a nut. As a result, the natural frequency f 0 with respect to the bending vibration of the structure can be increased and maintained, and at the same time, the residual deformation of the embankment can be reduced.
(3) Cover the entire reinforced embankment with a concrete roadbed under the slab track, take vertical reaction force at both end wall works, and apply preload and prestress vertically to the reinforced embankment by simple methods such as tightening nuts. The tensile strength is exerted on the high-strength geosynthetic reinforcement material tightly bound to the outer rigid wall surface, so that the rigidity of the embankment is efficiently improved. As a result, the natural frequency f 0 with respect to the bending deformation of the entire reinforced embankment is improved and the shear deformation is greatly suppressed. At the same time, the residual deformation of the embankment can be reduced. Since the embankment is reinforced with geosynthetics, the yield strength due to the compressive load generated in the embankment when the structure undergoes bending deformation is improved, and residual deformation is suppressed.
(4) By introducing compressive pre-stress into the wall work, the strength against the tensile load of the wall work is improved, so that the resistance force against the vertical tension of the foundation concrete part of the wall work can be used effectively, and the structure The stability against overturning and bending fracture is improved, and residual deformation is suppressed.
(5) As a result of the above, it becomes possible to make the wall height of the both-ends reinforced embankment wall having a long extension distance significantly higher than the embankment width.
(6) When the embankment height of the both-ends reinforced embankment wall can be increased, it becomes possible to effectively utilize tunnel excavation shears and the like as a embankment material. In particular, it is possible to effectively utilize materials that are soil-contaminated by natural sources as embankment materials by separately taking measures against pollution.
本発明の細長比の大きい両端補強盛土壁工法の耐震性および残留変形軽減による長期維持管理性能の向上対策工法は、両端補強盛土壁の天端全体を覆っている天端面工と両端補強盛土壁の長さ方向に配置される梁を鉛直緊張材によって、両端壁面工を貫通していて壁面工下端にアンカーされているタイロッドに連結することによって、両端壁面工下端で鉛直反力を取って前記鉛直緊張材を締めつけ、補強盛土に鉛直にプレロードとプレストレスを掛ける。 The improvement method of long-term maintenance and management performance by seismic resistance and residual deformation reduction of the double-sided reinforced embankment method with a large slenderness ratio of the present invention is a top-end surface method that covers the entire top end of the double-sided reinforced embankment wall and a double-sided reinforced embankment By connecting the beam arranged in the length direction of the wall to the tie rod that penetrates the wall work at both ends and is anchored at the wall work work bottom end with the vertical tension material, The vertical tension material is fastened and preloaded and prestressed vertically on the reinforced embankment.
以下、本発明の実施の形態について詳細に説明する。 Hereinafter, embodiments of the present invention will be described in detail.
図1は本発明に係る両端補強盛土壁の大地震時の破壊モードの模式図である。 FIG. 1 is a schematic view of a failure mode in a large earthquake of a double-sided reinforced embankment according to the present invention.
この図に示すように、L2地震動等の大地震が両端補強盛土壁に作用すると、過大なせん断変形、あるいは転倒破壊によって機能が損なわれる。この時に、両端補強盛土の一方の鉛直壁面工(鉛直壁面工)101と盛土102には過大な引張り力103が、また、他方の鉛直壁面工(鉛直壁面工)104と盛土105には過大な圧縮力106が作用し、それぞれ、壁面工と盛土には引張り破壊、および壁面工での座屈破壊と盛土の圧縮破壊が生じる。ここで、107は天端面工、Bは両端補強盛土壁の盛土幅、Hは両端補強盛土の高さである。
As shown in this figure, when a large earthquake such as L2 ground motion acts on both-end reinforced embankment walls, the function is impaired due to excessive shear deformation or overturning failure. At this time, an excessive
また、盛土が高くなると盛土の長期に亘る沈下などの残留変形が大きくなり、盛土の使用性が著しく低下する恐れが出てくる。 In addition, when the embankment becomes higher, residual deformation such as settlement of the embankment over a long period of time becomes larger, and the usability of the embankment may be significantly reduced.
これらの対策として、以下の方法が有効に機能する。
(1)細長比の大きい構造物は、大地震時には転倒・曲げ破壊あるいは過大なせん断変形によって構造物としての機能が失われる虞がある。そのため、構造体全体として曲げ・せん断振動に対する固有振動数f0 を大きく保ち地震動に対する応答を小さく保つとともに曲げ・せん断変形を抑制し、また転倒と曲げせん断破壊に対する耐力を増大することによって耐震安定性を向上する。同時に、盛土の剛性が向上して残留変形が低減することにより、盛土の長期維持管理性能が向上する。
(2)両端補強盛土擁壁の壁面工と連結した梁(5mに1か所程度)を設置し、さらに両端壁面工で鉛直反力を取って、ナットを締めつける等の簡単な方法で補強盛土体に鉛直にプレロードを加えて弾性化してからプレストレスを掛けることによって補強盛土体を高剛性化し、残留変形性を低減する。
(3)壁面工と連結された高強度ジオシンセティックス補強材に引張り抵抗を効率的に発揮させることによって、盛土を破壊することなく大きな鉛直荷重が加えられ、プレロードによる盛土の弾性化及びプレストレスによる盛土の高剛性化を効率的に実現させる。このことによって、補強盛土全体の曲げ変形に対する固有振動数f0 が大幅に向上するとともに、強震動による剛性の低下に伴うf0 の低下を抑制できる。同時に、曲げ変形とせん断変形を大幅に抑制させる。盛土がジオシンセティックス補強されていることによって、同時に曲げ変形時に増加する鉛直荷重によって圧縮破壊が生じることを防ぎ、残留変形性を抑制する。
(4)同時に鉛直引張り力による引張り破壊が生じにくくする。また、壁面工に鉛直方向に圧縮プレストレスが加わることによって、壁面工の引張り破壊に対する耐力を向上させる。このことと、上記(2)、(3)の機能によって、両端補強盛土擁壁の転倒・曲げ破壊に対する耐力を向上させる。
(5)最大地表水平加速度が1g(地球の加速度)に近くまで大きくなるL2地震動では、細長比H/B>1/3になるような両端補強盛土体では端部の浮き上がりによる転倒変位が、H/B>1になると転倒破壊が問題となる。そのため、壁面工と盛土の引張り破壊に対する耐力を向上させるとともに、壁面工の基礎コンクリート部にアンカー機能を付加するために基礎コンクリート部の根入れを深くし、さらに必要に応じて幅も大きくする。
(6)補強盛土全体にプレロードとプレストレスを掛け壁面工に圧縮プレストレスを加えるために、スラブ軌道下のコンクリート路盤を両端補強盛土擁壁の壁面工と連結する方法を採用する。そうすることによって、補強盛土体の曲げ変形とせん断変形に対して高剛性にし、転倒・曲げ破壊に対する耐力が高まる。
(7)上記、プレストレスを維持する装置として、盛土圧縮時における拘束圧の維持機能と盛土膨張時の抑制機能をそれぞれ別の2つのロッドを用いて発揮させるラチェット装置を用いることによって盛土の安定化を図る。
(8)すなわち、タイロッド張力を盛土に対する鉛直拘束力に変換するための反力梁は、盛土の圧縮変形と共に沈下するが、盛土の膨張に対しては上昇はしないという構造にすることによって、タイロッドの張力は増加して、その結果、盛土に加わる鉛直力は増加することになる。すなわち、盛土に作用する拘束圧が増大して盛土の安定を保つことが可能となる。
(9)盛土沈下(圧縮)時におけるプレストレス(拘束圧)の維持機能装置はストロークがある程度あり、またある程度剛性のあるバネを用いて盛土に鉛直圧縮力を加える装置であり、盛土膨張時の反力梁の上昇抑制装置は、ネジ切されているロッドにゼンマイなどで常に回転しようとしているボルトを装着したものであり、盛土が沈下すると回転して反力梁が自由に上昇できないようにした装置である。
(10)補強盛土体を高剛性化するためには、必要によって補強盛土体を構築する盛土材としてセメント改良礫土をサンドイッチ状、もしくは全層撒き出し・転圧する。
As these countermeasures, the following methods function effectively.
(1) A structure with a large slenderness ratio may lose its function as a structure due to overturning, bending fracture, or excessive shear deformation during a large earthquake. Therefore, seismic stability is improved by keeping the natural frequency f 0 for bending and shear vibrations large as a whole structure, keeping the response to earthquake motion small and suppressing bending and shear deformation, and increasing the resistance to overturn and bending shear failure. To improve. At the same time, the long-term maintenance performance of the embankment is improved by improving the rigidity of the embankment and reducing the residual deformation.
(2) Reinforced embankment with a simple method such as installing beams (about 1 place in 5m) connected to the wall work of both-ends reinforced embankment retaining wall, taking vertical reaction force at both wall works, and tightening nuts. Applying pre-load vertically to the body to make it elastic and then applying pre-stress makes the reinforced embankment more rigid and reduces residual deformability.
(3) By making the high-strength geosynthetic reinforcement connected to the wall surface work efficiently and exhibiting tensile resistance, a large vertical load is applied without destroying the embankment. Efficiently realize high rigidity of embankment. As a result, the natural frequency f 0 with respect to the bending deformation of the entire reinforced embankment is greatly improved, and a decrease in f 0 due to a decrease in rigidity due to strong ground motion can be suppressed. At the same time, bending deformation and shear deformation are greatly suppressed. The embankment is reinforced with geosynthetics, and at the same time, it prevents the occurrence of compressive failure due to the vertical load that increases during bending deformation, and suppresses residual deformability.
(4) At the same time, the tensile failure due to the vertical tensile force is less likely to occur. Moreover, the compressive prestress is applied to the wall surface work in the vertical direction, thereby improving the strength of the wall work against tensile fracture. With this and the functions (2) and (3) above, the yield strength against overturning and bending breakage of the double-sided reinforced embankment retaining wall is improved.
(5) In the L2 ground motion where the maximum horizontal acceleration is close to 1 g (Earth's acceleration), in the double-sided reinforced embankment where the slenderness ratio H / B> 1/3, the fall displacement due to the lifting of the edge is When H / B> 1, tipping destruction becomes a problem. Therefore, in addition to improving the resistance to tensile failure of the wall work and embankment, in order to add an anchor function to the foundation concrete part of the wall work, the foundation concrete part is deepened, and the width is increased as necessary.
(6) In order to preload and prestress the entire reinforced embankment and apply compressive prestress to the wall work, a method of connecting the concrete roadbed under the slab track with the wall work of the reinforced embankment retaining wall on both ends is adopted. By doing so, it becomes high rigidity with respect to the bending deformation and shear deformation of the reinforced embankment, and the proof strength against overturning and bending failure is increased.
(7) As a device for maintaining the pre-stress, the stability of the embankment is achieved by using a ratchet device that exerts a restraining pressure maintaining function at the time of embankment compression and a suppression function at the time of embankment expansion using two different rods. Plan
(8) That is, the reaction beam for converting the tie rod tension into the vertical restraint force on the embankment sinks with the compressive deformation of the embankment, but does not rise with respect to the expansion of the embankment. As a result, the vertical force applied to the embankment increases. That is, the restraint pressure acting on the embankment is increased, and the embankment can be kept stable.
(9) Prestress (restraint pressure) maintenance function device at the time of embankment settlement (compression) is a device that applies a vertical compression force to the embankment with a certain amount of stroke and using a spring with a certain degree of rigidity. The reaction beam rise restraint device is a threaded rod with a bolt that is always going to rotate with a spring, etc., so that when the embankment sinks, the reaction beam will not rise freely. Device.
(10) In order to increase the rigidity of the reinforced embankment, cement-impregnated gravel soil is sandwiched or rolled out and rolled as necessary for constructing the reinforced embankment.
図2は本発明の第1実施例を示す細長比の大きい両端補強盛土体の梁形式の断面模式図、図3その両端補強盛土壁体の梁形式の平面模式図である。 FIG. 2 is a schematic cross-sectional view of a beam form of a double-end reinforced embankment having a large slenderness ratio according to the first embodiment of the present invention, and FIG. 3 is a schematic plan view of a beam form of the double-end reinforced embankment wall body.
これらの図において、1は地盤、2は補強盛土体、3はジオテキスタイル、 4は高強度ジオテキスタイル、5は擁壁躯体(両端補強盛土壁)、6は梁、7は鉛直緊張材(盛土プレストレス用)、7´は鉛直緊張材(壁面工プレストレス用)、8はセメント改良礫土層(サンドイッチ状、もしくは全層)、9は土のう、もしくは溶接金網、10は基礎コンクリート、11は固定治具、12は塩化ビニールパイプ等、15は圧縮性部材、16は天端面工である。 In these figures, 1 is the ground, 2 is a reinforced embankment, 3 is a geotextile, 4 is a high-strength geotextile, 5 is a retaining wall frame (both ends reinforced embankment wall) , 6 is a beam, 7 is a vertical tension material (embankment prestress ), 7 'is a vertical tension material (for pre-stressing on the wall surface), 8 is a cement-improved gravel layer (sandwich or all layers), 9 is a sandbag or welded wire mesh, 10 is foundation concrete, 11 is a fixture , 12 is a vinyl chloride pipe, 15 is a compressible member , and 16 is a top face work .
ここでは、盛土プレストレス用鉛直緊張材7と壁面工プレストレス用鉛直緊張材7´は構造物の長手方向(Y方向)に交互に配置する。(盛土プレストレス用鉛直緊張材7の構造形式については図10〜図12参照)
このように、本発明の細長比の大きい両端補強盛土体の構築方法を梁形式で実施した。
Here, the
Thus, the construction method of the both-ends reinforced embankment with a large slenderness ratio of the present invention was carried out in a beam form.
以下、具体的な施工手順を説明する。 Hereinafter, a specific construction procedure will be described.
図4は本発明の細長比の大きい両端補強盛土体の構築方法を、梁形式で実施した具体的な施工手順を示す図である。 FIG. 4 is a diagram showing a specific construction procedure in which the method for constructing a double-end reinforced embankment with a large slenderness ratio according to the present invention is implemented in a beam form.
まず、図4(a)に示すように、壁面工の基礎を構築する。この基礎コンクリ壁躯体鉄筋を通常の補強土擁壁で採用するものから所定の引張り強度を有する太径の鉄筋に変更し、これを兼用しても良い。鉛直緊張材7は、所定の引張り強度を有するものを使用する。
First, as shown in FIG. 4A, the foundation of the wall surface construction is constructed. The basic concrete wall frame reinforcing bar may be changed from the one used for a normal reinforcing earth retaining wall to a large-diameter reinforcing bar having a predetermined tensile strength, and this may also be used. As the
次に、図4(b)〜図4(c)に示すように、地盤1上に補強盛土体2を1層づつ構築する。その際に、補強盛土体2の下部には、通常強度のジオテキスタイル等の水平引張り補強材3を、また、補強盛土体2の上部には高強度ジオテキスタイル4等の水平引張り補強材を盛土の撒きだし・転圧に合わせて設置し、その両端には壁面の仮抑えとして、砕石を充填した土のう、もしくは溶接金網9内に充填した砕石層に巻き返す。
Next, as shown in FIG. 4 (b) ~ FIG 4 (c), build one layer at a time of reinforcing
この補強盛土体の構築の際には、補強盛土体を高剛性化するためには、必要によって補強盛土体を構築する盛土材としてセメント改良礫土層8をサンドイッチ状、もしくは全層を対象に撒き出し・転圧する。
When constructing this reinforced embankment body, in order to increase the rigidity of the reinforced embankment body, a cement improved
この作業を繰り返し、図4(d)に示すように、所定の盛土高さまで補強盛土体を施工し、その上に梁6(凸状)を施工する。梁6には、鉛直緊張材7が貫通できるように予め塩化ビニールパイプ等で孔抜きする。ここでは片サイドのみを示しているが、両サイドは同様の施工となる。
This operation is repeated, and as shown in FIG. 4D, a reinforced embankment body is constructed to a predetermined embankment height, and a beam 6 (convex shape) is constructed thereon. The
補強盛土体は、盛土全体を高剛性化するために、セメント改良礫土8をサンドイッチ状、もしくは全層に用いる。
In order to increase the rigidity of the entire embankment, the reinforced embankment uses a cement-modified
梁6を施工した後に、ナット等で鉛直緊張材7に引張り力を与え、補強盛土体2に、一定期間プレロードを加える。プレロードによる盛土のクリープ変形の進行が収まった定常状態になった後、プレロード荷重の一部を開放して一定の荷重をプレストレスとして設定する。なお、鉛直緊張材7に引張り力を与える固定治具11には、プレストレスの管理用にロードセルを予め設置しておく。このロードセルは交換可能にしておく。
After constructing the
最後に、図4(e)に示すように、基礎地盤1、ならびに補強盛土体2の沈下・変形が終了するのを待って、擁壁躯体5のコンクリートを原位置で打設する。その際、梁6の下面と壁面工の上端の間には将来の盛土の圧縮により梁が壁面工上端に支持される状態になることによって盛土に加わるプレストレスが減少しないように圧縮性が高いが耐久性のある圧縮性部材15を挿入しておく。
Finally, as shown in FIG. 4 (e), after the settlement and deformation of the
圧縮性部材15としては、3 層構造の特殊EVA(エチレン酢酸ビニル共重合体)樹脂等で構成されているシート等を用いればよい。
As the
なお、盛土にプレストレスを加える鉛直緊張材7については、後述する両端補強盛土体の長期にわたるクリープ変形と地震時の曲げ・せん断変形に対してプレロード・プレストレスを維持するためのラチェット装置による方法を参照されたい。
In addition, about the
次に、本発明の第2実施例を示す細長比の大きい両端補強盛土体のスラブ軌道下のコンクリート路盤に適用した例について説明する。 Next, an example in which the second embodiment of the present invention is applied to a concrete roadbed under a slab track of a double-end reinforced embankment with a large slenderness ratio will be described.
図5は本発明の第2実施例を示す細長比の大きい両端補強盛土体のスラブ軌道下のコンクリート路盤に適用した例を示す図である。 FIG. 5 is a diagram showing an example in which the second embodiment of the present invention is applied to a concrete roadbed under a slab track of a double-end reinforced embankment with a large slenderness ratio.
既に、前述したような施工手順で構築された補強盛土を完成後、その上にスラブ軌道下のコンクリート路盤(凸状)13を施工する。コンクリート路盤13には、鉛直緊張材7、もしくは、両端擁壁の躯体鉄筋(太径に変更したもの)が貫通できるように予め塩化ビニールパイプ等で孔抜きする。なお、14は鉛直壁、15は圧縮性部材である。
After completing the reinforced embankment constructed by the construction procedure as described above, the concrete roadbed (convex shape) 13 under the slab track is constructed thereon. The
その後、前述した梁の場合と同様に、ナット等で鉛直緊張材7に引張り力を与え、補強盛土体2に、一定期間プレロードを加える。プレロードによる盛土のクリープ変形の進行が収まった定常状態になった後、プレロード荷重の一部を開放して一定の荷重をプレストレスとして加える。
Thereafter, as in the case of the beam described above, a tensile force is applied to the
最後に、基礎地盤1、ならびに補強盛土体2の沈下・変形が終了するのを待って、擁壁躯体5のコンクリートを原位置で打設し、さらにコンクリート路盤上に鉛直壁14を施工する。
Finally, after the settlement and deformation of the
その際、梁6の下面と壁面工の上端の間には将来の盛土の圧縮によるプレストレスの減少率を小さく保つために圧縮性が高いが耐久性のある圧縮性部材15を挿入しておく。
At that time, a highly compressible but durable
最後に壁面工に壁面工プレストレス用鉛直緊張材7´を用いて、通常の方法によって壁面工に鉛直プレストレスを導入する。 Finally, vertical prestress is introduced into the wall surface by a normal method using the vertical tension member 7 'for wall surface prestressing as the wall surface.
なお、盛土にプレストレスを加える鉛直緊張材7については、図2〜図3に示す方法と同様に、盛土プレストレス用鉛直緊張材と壁面工プレストレス用鉛直緊張材は構造物の長手方向に交互に配置する。また、構造形式については、後述する図10〜図12とそれらの説明を参照をされたい。
In addition, about the
次に、本発明の第3実施例を示す細長比H/B>1になるような両端補強盛土体の対策方法について説明する。 Next, a description will be given of a countermeasure method for the double-sided reinforced embankment so that the elongated ratio H / B> 1 according to the third embodiment of the present invention.
前述したように、両端補強盛土壁の耐震対策として、大地震時に発生する過大なせん断変形に対しては、補強盛土体全体を高剛性化して応答変位を小さくするために、
(1)補強盛土全体にプレロード・プレストレスを作用させる。
(2)必要に応じて、セメント改良礫土を盛土材として用いる。
(3)梁、もしくはコンクリート路盤と鉛直壁を一体化する。
As mentioned above, as an earthquake resistance measure for both-end reinforced embankment walls, in order to increase the rigidity of the entire reinforced embankment and reduce the response displacement against excessive shear deformation that occurs during a large earthquake,
(1) Preload / stress is applied to the entire reinforced embankment.
(2) If necessary, use cement-improved gravel as embankment material.
(3) Integrate beams or concrete roadbed and vertical wall.
また、鉛直壁面工に作用する引張り力に対しては、壁面工に鉛直方向に圧縮プレストレスを加えておくことによって、壁面工の引張り破壊に対する耐力を向上させる等の対策工を採用した。 In addition, for the tensile force acting on the vertical wall surface work, measures such as improving the resistance to tensile failure of the wall surface work by applying a compression prestress in the vertical direction to the wall surface work were adopted.
しかしながら、盛土幅Bに対して、盛土高Hを増大させたいような場合には、細長比(H/B)がさらに大きくなり、更なる転倒防止対策が必要となる。概ねの目安としては、H/B>1になるような構造体になる場合には、さらに、基礎コンクリート部10にアンカー機能を付加するために、根入れ深さ、および幅を大きくすることによって、更なる耐震性能の向上を図る必要がある。
However, when it is desired to increase the bank height H with respect to the bank width B, the slenderness ratio (H / B) is further increased, and further measures for preventing overturning are required. As a general guideline, in the case of a structure that satisfies H / B> 1, in order to add an anchor function to the foundation
細長比H/B>1になるような構造体に大地震が作用すると、過大な引張り力(壁面工と盛土の引張り破壊と構造物全体の浮き上がり)、過大な曲げ・せん断変形が発生し、転倒破壊の可能性が大きくなる。また、過大な圧縮力(壁面工には座屈が、盛土には圧縮破壊が発生)が作用する。 When a large earthquake acts on a structure with a slenderness ratio H / B> 1, excessive tensile force (wall construction and embankment tensile failure and lifting of the entire structure), excessive bending / shear deformation occurs, The possibility of overturning is increased. In addition, an excessive compressive force (buckling occurs on the wall work and compressive fracture occurs on the embankment) acts.
図6は両端補強盛土壁の地震時の変形・応力状況の模式図であり、図7は従来の壁面工根入れ状況を示す図、図8は図7に示す従来の方法よりも基礎部の根入れ深さ、および幅を大きくした例を示す図である。 Fig. 6 is a schematic diagram of the deformation and stress status of the embankment-reinforced wall at the time of an earthquake. Fig. 7 is a diagram showing the conventional wall installation condition. Fig. 8 is a diagram of the foundation part than the conventional method shown in Fig. 7. It is a figure which shows the example which enlarged the penetration depth and width | variety.
図6において、21は過大な引張り力(壁面工と盛土の引張り破壊と構造物全体の浮き上がり)、22は過大な曲げ・せん断変形、この曲げ・せん断変形の発生により、転倒破壊の可能性が大きくなる。23は過大な圧縮力(壁面工には座屈破壊が発生〉、24は地盤面、25は天端面工、Dは根入れ深さ(通常の場合の必要の根入れ深さはDは40cm以下)である。 In FIG. 6, 21 is an excessive tensile force (tension breakage of wall construction and embankment and lifting of the whole structure), 22 is an excessive bending / shear deformation, and the occurrence of this bending / shear deformation may cause a rollover failure. growing. 23 is an excessive compressive force (buckling failure occurs in the wall work), 24 is the ground surface, 25 is the top end face work, D is the depth of penetration (the necessary depth for normal use is 40 cm for D The following).
このように、盛土の引張り破壊と構造物全体の浮き上がりが発生する。 As described above, the tensile failure of the embankment and the lifting of the entire structure occur.
図7において、30は地盤面、31は壁面工根入部、32は均しコンクリート、33は基礎材、34は盛土、必要根入れ深さD=De+Doで40cm以下である。 In FIG. 7, 30 is a ground surface, 31 is a wall construction intrusion part, 32 is leveled concrete, 33 is a base material, 34 is embankment, and a required penetration depth D = De + Do is 40 cm or less.
通常の場合の必要根入れ深さはD≧40cmであり、基礎部の根入れ深さおよび幅を大きくすることによって、根入れ部の受動抵抗およびアンカー機能が大幅に増大し、L2地震動のような大地震時に予測される両端補強盛土体の転倒破壊に対して有効性が発揮される。 The required penetration depth in the normal case is D ≧ 40 cm, and by increasing the penetration depth and width of the foundation, the passive resistance and anchor function of the penetration are greatly increased, as in L2 ground motion. Effectiveness against overturning failure of both-ends reinforced embankment predicted during a major earthquake.
図9は典型的な両端補強盛土上のスラブ軌道の場合の従来の方法を示す図である。補強盛土壁の上に樹脂発泡剤、もしくは目地材を設置し、その上にコンクリート路盤41をただ単に載せているだけの構造であり、細長比が大きい両端補強盛土壁の場合には、大地震時の安定性に問題があった。
FIG. 9 is a diagram showing a conventional method in the case of a slab track on a typical both-end reinforced embankment. A resin foaming agent or joint material is installed on the reinforced embankment wall, and the
次に、両端補強盛土体の長期にわたるクリ−プ変形と地震時の曲げ・せん断変形に対してプレロード・プレストレスを維持するためのラチェット装置による方法について説明する。 Next, a method using a ratchet device for maintaining preload / prestress against long-term creep deformation and bending / shear deformation at the time of earthquake will be described.
補強盛土体は長期にわたりクリープ変形や交通荷重によって沈下する。加えて、締固めが緩い場合などには地震荷重によって沈下する。その場合でもタイロッドに作用する張力を維持する必要がある。 The reinforced embankment sinks due to creep deformation and traffic load over a long period of time. In addition, when the compaction is loose, it will sink due to seismic load. Even in such a case, it is necessary to maintain the tension acting on the tie rod.
一方、大規模地震時には図6に示すように、細長比の大きい両端補強盛土体には、せん断変形と曲げ変形が同時に発生する。せん断変形が生じるとダイレイタンシーによって補強盛土体は膨張しようとする。また、曲げ変形を受けると両端補強盛土体の片方は鉛直方向に延びようとする。これらの盛土の膨張を効果的に拘束できれば、盛土が膨張しようとするとタイロッドの張力は増加して盛土に加わる鉛直力は増加する。 On the other hand, during a large-scale earthquake, as shown in FIG. 6, shear deformation and bending deformation occur simultaneously in the double-end reinforced embankment with a large slenderness ratio. When shear deformation occurs, the reinforced embankment tends to expand due to dilatancy. Further, when subjected to bending deformation, one of the both-end reinforcing embankments tends to extend in the vertical direction. If the expansion of these embankments can be effectively constrained, the tension of the tie rods will increase and the vertical force applied to the embankments will increase when the embankments try to expand.
この2つの機能を有効に活用することによって、大地震時の両端補強盛土体の安定を保つことができる。 By effectively utilizing these two functions, it is possible to maintain the stability of the both-end reinforced embankment during a large earthquake.
図10は盛土圧縮時における鉛直拘束圧の維持機能と盛土膨張時の反力梁の上昇抑制機能をそれぞれ別の2本のロッドを用いて発揮させるためのラチェット装置の模式図である。この図において、51は補強盛土、52は反力梁、53は盛土圧縮時における拘束圧の維持機能(図11)、54は盛土膨張時の反力梁の上昇抑制機能(図12)である。 FIG. 10 is a schematic diagram of a ratchet device for demonstrating the function of maintaining the vertical restraint pressure at the time of embankment compression and the function of suppressing the rise of the reaction beam at the time of embankment expansion using two different rods. In this figure, 51 is a reinforcing embankment, 52 is a reaction force beam, 53 is a function of maintaining restraint pressure when embankment is compressed (FIG. 11), and 54 is a function of suppressing the rise of reaction force beam when the embankment is expanded (FIG. 12). .
同様に、図11は盛土沈下(収縮)時におけるプレストレス(拘束圧)の維持機能装置を示す図であり、図12は盛土膨張時の反力梁の上昇抑制機能装置を示す図である。 Similarly, FIG. 11 is a diagram showing a prestress (restraint pressure) maintenance function device at the time of embankment settlement (shrinkage), and FIG. 12 is a diagram showing a reaction beam rise suppression function device at the time of embankment expansion.
図11において、61は盛土、62はタイロッド張力を盛土に対する鉛直拘束力に変換する反力梁、63はロッド、64はワッシャ、65はロッドに対してねじ込みされている反力版、66はストロークがある程度あり、ある程度剛性があり、盛土に鉛直圧縮力を加えるバネである。 In FIG. 11, 61 is embankment, 62 is a reaction beam that converts tie rod tension into vertical restraint force on the embankment, 63 is a rod, 64 is washer, 65 is a reaction force plate screwed to the rod, and 66 is a stroke. There is a certain amount of rigidity, a certain degree of rigidity, and a spring that applies a vertical compressive force to the embankment.
盛土沈下(収縮)時におけるプレストレス(拘束圧)の維持機能装置は、ストロークがある程度あり、また、ある程度剛性のあるバネを用いて盛土に鉛直圧縮力を加える装置である。 The prestress (restraint pressure) maintenance function device at the time of settlement (shrinkage) of the embankment is a device that applies a vertical compression force to the embankment by using a spring having a certain amount of stroke and a certain degree of rigidity.
図12において、71は盛土、72は反力梁、73はロッド、74はワッシャ、75は回転変位用ボールベアリング、76はゼンマイ等により回転力が加わっており常に回転しようとするボルトであり、盛土が沈下すると回転して、反力梁が自由に上昇できないようにする。77はボルトに回転力を加えるゼンマイ等の装置、78はねじ切りされているロッドである。 In FIG. 12, 71 is embankment, 72 is a reaction beam, 73 is a rod, 74 is a washer, 75 is a ball bearing for rotational displacement, 76 is a bolt to which rotation force is constantly applied by a spring or the like, When the embankment sinks, it rotates so that the reaction beam cannot rise freely. 77 is a spring or other device that applies a rotational force to the bolt, and 78 is a threaded rod.
盛土膨張時の反力梁の上昇抑制装置は、図12に示すように、ネジ切されているロッド78にゼンマイ77などで常に回転しようとしているボルト76を装着し、盛土71が沈下すると回転して反力梁72が自由に上昇できないようにした装置である。
As shown in FIG. 12, the device for suppressing the rise of the reaction beam during expansion of the embankment is equipped with a
上記したように、本発明によれば、
(1)細長比の大きい両端補強盛土壁の構造物全体の剛性を高めてそれを保つことによって固有振動数f0 の減小を抑制すれば、大地震時(強地震動)の卓越振動数fp に接近せずに共振することがない。その結果、細長比の大きい両端補強盛土壁の耐震性を格段に向上させることができる。
As mentioned above, according to the present invention,
(1) if increasing the rigidity of the entire structure of the slenderness ratio of the larger ends reinforcing embankments walls suppressed small decrease in the natural frequency f 0 by keeping it, predominant frequency f during large earthquakes (strong ground motion) There is no resonance without approaching p . As a result, the earthquake resistance of the both-ends reinforced embankment wall with a large slenderness ratio can be remarkably improved.
(2)細長比が大きい両端補強盛土壁の構造物全体の固有振動数f0 が小さくなると応答変位が大きくなり、鉄道では脱線の危険性が高くなる。反対に、構造物全体の固有振動数f0 を高い値に保てれば、新幹線車両等の脱線の危険性を少なくすることができる。 (2) When the natural frequency f 0 of the entire structure of the double-walled reinforced embankment wall having a large slenderness ratio is reduced, the response displacement increases, and the risk of derailment increases in railways. On the other hand, if the natural frequency f 0 of the entire structure can be maintained at a high value, the risk of derailment of a Shinkansen vehicle or the like can be reduced.
(3)両端補強盛土壁は細長比が大きくなると転倒と曲げ・せん断変形が卓越してきて、両脇の壁面工に作用する鉛直圧縮力と鉛直引張り力が増大する。壁面工の相対的に小さい鉛直引張り力に対する耐力を向上させることによって、転倒と曲げ・せん断破壊に対する抵抗性能を格段に向上させることができる。 (3) When the slenderness ratio of the double-sided reinforcement embankment increases, the overturning, bending, and shear deformation become prominent, and the vertical compressive force and the vertical tensile force acting on the wall work on both sides increase. By improving the proof strength against relatively small vertical tensile force of wall work, the resistance performance against overturning and bending / shear failure can be remarkably improved.
(4)水平に配置されたジオシンセティックス補強材と両脇の鉛直壁面工は、両端補強盛土壁構造体のせん断変形に対して直接には抵抗しない。壁面工に連結された高強度ジオシンセティックス補強材に高い張力を発揮させることによって盛土を安定化することによって、補強盛土全体に鉛直方向に高いプレロードを加えて弾性化するとともに高いプレストレスを維持して盛土内の拘束圧を高めて盛土の剛性を格段に高めることができる。このことによって、構造体のせん断変形を効果的に抑制できる。 (4) The horizontally disposed geosynthetic reinforcement and the vertical wall surfaces on both sides do not directly resist the shear deformation of the double-sided reinforced embankment wall structure. By stabilizing the embankment by exerting high tension on the high-strength geosynthetic reinforcement connected to the wall work, the entire embankment is elasticized by applying a high preload in the vertical direction and maintaining high prestress. Then, the restraint pressure in the embankment can be increased, and the rigidity of the embankment can be significantly increased. Thereby, the shear deformation of the structure can be effectively suppressed.
(5)構造物が曲げ変形を受けて、片方で鉛直圧縮力を、反対側で鉛直引張り力を受ける。盛土はジオシンセティックス補強材によって補強されていることによって鉛直圧縮力に対する抵抗力が増加し、鉛直方向にプレストレスを受けていることと、盛土の鉛直方向への膨張を拘束することによって、鉛直方向の伸び変形に対する抵抗力が増加する。これらの機能によって構造体の曲げ変形を効果的に抑制できる。 (5) The structure is subjected to bending deformation and receives a vertical compressive force on one side and a vertical tensile force on the other side. The embankment is reinforced with geosynthetics reinforcement, which increases the resistance to vertical compression force, prestresses in the vertical direction, and restrains the expansion of the embankment in the vertical direction. Increases resistance to stretching in the direction. These functions can effectively suppress bending deformation of the structure.
(6)耐震性を格段に向上させた結果、延長距離がある両端補強盛土壁の壁高を盛土幅と比較して大幅に増大することが可能となる。 (6) As a result of greatly improving the earthquake resistance, it becomes possible to significantly increase the wall height of the double-sided reinforced embankment wall with an extended distance compared to the embankment width.
なお、本発明は上記実施例に限定されるものではなく、本発明の趣旨に基づき種々の変形が可能であり、これらを本発明の範囲から排除するものではない。 In addition, this invention is not limited to the said Example, Based on the meaning of this invention, a various deformation | transformation is possible and these are not excluded from the scope of the present invention.
本発明の細長比の大きい両端補強盛土壁工法の耐震性および残留変形軽減による長期維持管理性能の向上対策工法は、L2地震動等の大地震時が両端補強盛土壁に作用しても、細長比の大きい両端補強盛土壁の構造物全体の剛性を高めてそれを保つことができ、長期に亘る残留変形を抑制することができて、細長比の大きい両端補強盛土壁工法の耐震性および残留変形軽減による長期維持管理性能の向上対策工法として利用することができる。 The measures for improving long-term maintenance performance by reducing the seismic resistance and residual deformation of the double-end reinforced embankment method with a large slenderness ratio of the present invention is the slender ratio even if a large earthquake such as L2 earthquake motion acts on both-end reinforced embankment walls. Can increase the rigidity of the entire structure of the reinforced embankment wall with large both ends and maintain it, can suppress the long-term residual deformation, and the seismic resistance and residual deformation of the reinforced embankment wall method with large slenderness ratio It can be used as a countermeasure for improving long-term maintenance performance by mitigation.
1 地盤
2 補強盛土体
3 ジオテキスタイル
4 高強度ジオテキスタイル
5 擁壁躯体(両端補強盛土壁)
6 梁
7 鉛直緊張材(盛土プレストレス用)
7´ 鉛直緊張材(壁面工プレストレス用)
8 セメント改良礫土層(サンドイッチ状、もしくは全層)
9 土のう、もしくは溶接金網
10 基礎コンクリート
11 固定治具
12 塩化ビニールパイプ等
13 コンクリート路盤
14 鉛直壁
15 圧縮性部材
16、25、107 天端面工
101 一方の鉛直壁面工(鉛直壁面工)
102、105 盛土
103 過大な引張り力
104 他方の鉛直壁面工(鉛直壁面工)
106 過大な圧縮力
B 両端補強盛土壁の盛土幅
H 両端補強盛土の高さ
1
6
7 'Vertical tension material (for wall construction prestress)
8 Cement improved gravel layer (sandwich or all layers)
9 Clay or welded
16, 25, 107
102, 105
106 Excessive compressive force B Embankment width H of both-ends reinforced embankment wall Height of both-ends reinforced embankment
Claims (10)
(a)壁面工の基礎を構築し、
(b)土層の撤き出しと締め固めを行い、
(c)順次高い層を構築し、
(d)最上層上に両端補強盛土壁の長さ方向に梁を配置して鉛直緊張材を締めつけて盛土を構築し、
(e)擁壁躯体のコンクリート打設を行い、盛土を完成させることを特徴とする細長比の大きい両端補強盛土壁工法の耐震性および残留変形軽減による長期維持管理性能の向上対策工法。 In the measures for improving long-term maintenance performance by reducing earthquake resistance and residual deformation of both ends reinforced embankment wall construction method with a large slenderness ratio according to claim 1,
(A) Build the foundation of wall work,
(B) Remove and compact the soil layer,
(C) Build higher layers sequentially,
(D) A beam is arranged on the uppermost layer in the length direction of the embossed embankment wall, and a vertical tension member is fastened to construct the embankment.
(E) A method for improving long-term maintenance performance by reducing earthquake resistance and residual deformation of the double-walled reinforced embankment method with a large slenderness ratio, characterized in that concrete is placed in the retaining wall frame to complete the embankment.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2015033119A JP6324916B2 (en) | 2015-02-23 | 2015-02-23 | Measures to improve long-term maintenance performance by reducing earthquake resistance and residual deformation of double-wall reinforced embankment method with large slenderness ratio |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2015033119A JP6324916B2 (en) | 2015-02-23 | 2015-02-23 | Measures to improve long-term maintenance performance by reducing earthquake resistance and residual deformation of double-wall reinforced embankment method with large slenderness ratio |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2016156148A JP2016156148A (en) | 2016-09-01 |
| JP6324916B2 true JP6324916B2 (en) | 2018-05-16 |
Family
ID=56825327
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2015033119A Active JP6324916B2 (en) | 2015-02-23 | 2015-02-23 | Measures to improve long-term maintenance performance by reducing earthquake resistance and residual deformation of double-wall reinforced embankment method with large slenderness ratio |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP6324916B2 (en) |
Family Cites Families (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4051570A (en) * | 1976-12-27 | 1977-10-04 | Hilfiker Pipe Co. | Road bridge construction with precast concrete modules |
| JP2597116B2 (en) * | 1987-12-01 | 1997-04-02 | 株式会社新井組 | Embankment foundation and its construction method |
| JPH0665910A (en) * | 1991-02-08 | 1994-03-08 | Mitsui Constr Co Ltd | Construction of structure and slant repair method |
| JP2895401B2 (en) * | 1994-08-11 | 1999-05-24 | 財団法人鉄道総合技術研究所 | Construction method of reinforced earth body and its structure |
| JPH11152736A (en) * | 1997-11-19 | 1999-06-08 | Sumitomo Metal Ind Ltd | Consolidation settlement promotion method |
| JP3931420B2 (en) * | 1998-03-11 | 2007-06-13 | 株式会社大林組 | Reinforced embankment structure and construction method thereof |
| JP4219746B2 (en) * | 2003-06-23 | 2009-02-04 | 積水化成品工業株式会社 | Lightweight embankment structure and construction method thereof |
| JP4252860B2 (en) * | 2003-08-11 | 2009-04-08 | 株式会社新井組 | Ground reinforcement method |
| JP4107429B2 (en) * | 2003-10-20 | 2008-06-25 | 財団法人鉄道総合技術研究所 | Embankment structure with vertical compressive force applied by tendon and its construction method |
| JP4409982B2 (en) * | 2004-02-13 | 2010-02-03 | タキロン株式会社 | Renewal structure of final disposal site |
-
2015
- 2015-02-23 JP JP2015033119A patent/JP6324916B2/en active Active
Also Published As
| Publication number | Publication date |
|---|---|
| JP2016156148A (en) | 2016-09-01 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Tatsuoka et al. | Performance of reinforced soil structures during the 1995 Hyogo-ken Nanbu Earthquake | |
| Lee et al. | A synthesis of case histories on GRS bridge-supporting structures with flexible facing | |
| CN207376492U (en) | A kind of highway hangar tunnel safeguard structure suitable under precipitous cliff | |
| JP2007321452A (en) | Bridge construction method and its bridge structure | |
| US9869070B2 (en) | Soil reinforcement system including angled soil reinforcement elements to resist seismic shear forces and methods of making same | |
| CN115455528B (en) | A slope protection chair type anchor pile combination structure and its calculation method | |
| JP2014224444A (en) | Method for suppressing level difference in roadbed material laid so as to straddle concrete structure and soil structure | |
| JP7149919B2 (en) | Improvement structure and improvement method of existing wharf | |
| JP6511671B2 (en) | Construction method of coastal soil structure against huge tsunami by high-rigidity geosynthetic reinforced soil retaining wall with rigid integrated wall work | |
| CN113123325B (en) | A kind of underground continuous wall and its construction method | |
| CN113322986A (en) | Pile-anchor-beam composite energy dissipation and shock absorption structure system and construction method | |
| KR100603888B1 (en) | Alternating Construction Method of Reinforced Soil by Post Tension | |
| Smith et al. | Ground Improvement Reinforcement Mechanisms Determined for the Mw7. 8 Muisne, Ecuador, Earthquake | |
| CN114197514A (en) | Existing pile foundation shock insulation reinforcing device and construction method thereof | |
| JP6324916B2 (en) | Measures to improve long-term maintenance performance by reducing earthquake resistance and residual deformation of double-wall reinforced embankment method with large slenderness ratio | |
| JPH09177094A (en) | Base isolating foundation structure | |
| JP3333993B2 (en) | Construction method of reinforced embankment for dynamic load absorption and reinforced embankment for dynamic load absorption | |
| US20190218742A1 (en) | Soil Reinforcement System Including Angled Soil Reinforcement Elements To Resist Seismic Shear Forces And Methods Of Making Same | |
| CN213143090U (en) | Energy dissipation drainage retaining structure | |
| KR20200008914A (en) | Backfill load reduction method with multilayer lightweight block and the structure thereby | |
| Surjandari et al. | Geofoam Materials Utilization for Bridge Abutment Embankment of the Trans Sumatra Toll Road: a Case Study | |
| CN206346220U (en) | A kind of pile foundation barricade antidetonation retaining structure of the cushion containing EPS | |
| CN218713214U (en) | A shock-absorbing and isolating device, a limit device, and a pile-raft foundation device for foundation reinforcement | |
| CN117051814B (en) | Method for reinforcing liquefied lateral large-deformation foundation by combining reinforced gravel piles and grouting and dividing areas | |
| Tatsuoka et al. | Geosynthetic-Reinforced Soil Structures for Railways: Twenty Five Year Experiences in Japan |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20170306 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20180115 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20180213 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20180315 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20180410 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20180411 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 6324916 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |