Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP6362870B2 - Floating artificial ground - Google Patents
[go: Go Back, main page]

JP6362870B2 - Floating artificial ground - Google Patents

Floating artificial ground Download PDF

Info

Publication number
JP6362870B2
JP6362870B2 JP2014023682A JP2014023682A JP6362870B2 JP 6362870 B2 JP6362870 B2 JP 6362870B2 JP 2014023682 A JP2014023682 A JP 2014023682A JP 2014023682 A JP2014023682 A JP 2014023682A JP 6362870 B2 JP6362870 B2 JP 6362870B2
Authority
JP
Japan
Prior art keywords
floating body
floating
building
blocks
artificial ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2014023682A
Other languages
Japanese (ja)
Other versions
JP2015151684A (en
Inventor
涼 青木
涼 青木
宏涛 劉
宏涛 劉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Aizawa Koatsu Concrete KK
Original Assignee
Aizawa Koatsu Concrete KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Aizawa Koatsu Concrete KK filed Critical Aizawa Koatsu Concrete KK
Priority to JP2014023682A priority Critical patent/JP6362870B2/en
Publication of JP2015151684A publication Critical patent/JP2015151684A/en
Application granted granted Critical
Publication of JP6362870B2 publication Critical patent/JP6362870B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Description

本発明は、人工的に形成された地盤に関するものであり、通常の地盤と同様にその上に基礎を設けて住宅等の建築物を建築できるようになっている人工地盤に関するものである。   The present invention relates to an artificially formed ground, and relates to an artificial ground in which a foundation such as a house can be built and a building such as a house can be constructed in the same manner as a normal ground.

住宅等の建築物は地盤に設けられた基礎の上に建築されている。基礎には色々な種類があるが、建築基準法によると、地盤に対して長期に生じる力に対する許容応力度によって、つまり地盤の強さによって使用できる種類が定められている。具体的には、許容応力度が20kN/m2未満の軟弱な地盤においては基礎杭の適用が義務づけられ、20〜30kN/m2の場合には基礎杭とベタ基礎のいずれかが適用でき、30kN/m2以上の強い地盤においては基礎杭、ベタ基礎、布基礎のいずれでも適用できる。法令に則って建築されると、住宅の強度は高く安全性は十分に確保される。ところで、住宅においては、台風による河川の氾濫、洪水、または高潮によって床下浸水、床上浸水の被害が発生する問題もある。このような被害は、比較的標高のある土地を選択して住宅を建てたり、低地の場合には盛り土をする等の対策を採れば、ある程度は防ぐことができる。地盤が高いので浸水の危険が低下するからである。しかしながら、土地によってはこのような対策を採ることができない場合もあるし、対策を採ったとしても完全に浸水を防げない場合もある。具体的には、想定を超える大雨の発生をあげることができる。近年、大雨時に雨水の排水能力を超えてマンホールから雨水が逆流して噴き出すことがあり、比較的高台の住宅であっても浸水被害が発生するケースが多発している。震災に伴う津波によっても浸水被害が発生する。東日本大震災においては十分に標高がある土地に建てられた住宅の多くにおいても、津波によって浸水被害や水没事故が発生している。   Buildings such as houses are built on the foundation provided on the ground. There are various types of foundations. According to the Building Standard Law, the types that can be used are determined according to the allowable stress level for the force generated over a long period of time on the ground, that is, the strength of the ground. Specifically, foundations are required to be applied to soft ground with an allowable stress level of less than 20 kN / m2, and in the case of 20 to 30 kN / m2, either a foundation pile or a solid foundation can be applied. For strong ground of m2 or more, any of foundation pile, solid foundation and cloth foundation can be applied. When constructed according to the law, the strength of the house is high and safety is sufficiently secured. By the way, in a house, there is also a problem that underfloor inundation or underfloor inundation occurs due to river flooding, flooding, or storm surge caused by a typhoon. Such damage can be prevented to some extent by taking measures such as selecting a land with relatively high altitude and building a house, or in the case of low land, embedding. This is because the ground is high and the risk of flooding is reduced. However, there are cases where such measures cannot be taken depending on the land, and even if such measures are taken, it is not possible to completely prevent flooding. Specifically, the occurrence of heavy rain that exceeds expectations can be raised. In recent years, rainwater sometimes flows back and spouts out of manholes exceeding the drainage capacity of rainwater during heavy rain, and inundation damage occurs frequently even in relatively high-rise houses. Inundation damage also occurs due to the tsunami caused by the earthquake. In the Great East Japan Earthquake, in many of the houses built on land with sufficient elevation, flood damage and submergence accidents have occurred due to the tsunami.

特開2006−249915号公報JP 2006-249915 A

特許文献1には、津波や高潮に対応できる建築物が記載されている。特許文献1に記載の建築物は、その下方に建築物と一体的に台船型浮体が設けられている。台船型浮体は、鉄板から溶接によって、あるいはFRPから中空の方形になるように形成され、建築物の底部が全体的に支持される台状を呈している。台船型浮体は中空に形成されているので浮力を有しているが、この台船型浮体は、地面に設けられている所定のプールに入れられている。従って津波や高潮によってプール内に水が浸入すると、台船型浮体は浮力によって上昇する。従って、台船型浮体と一体的に建築されている建築物も上昇し、浸水被害を免れる。ところで特許文献1に記載の台船型浮体は、その下部に所定のアンカーポールが設けられている。このアンカーポールの先端はプールの底部に固定されており伸縮自在になっている。プール内に水が浸入して台船型浮体が浮き上がっても、このアンカーポールが伸びて台船型浮体をプールに留めるので、建築物が漂流することを防止することができる。   Patent Document 1 describes a building that can cope with tsunami and storm surge. The building described in Patent Document 1 is provided with a base boat type floating body integrally with the building below. The carrier type floating body is formed by welding from an iron plate or a hollow square from an FRP, and has a trapezoid shape in which the bottom of the building is supported as a whole. The trolley type floating body has a buoyancy because it is formed in a hollow shape, but this trolley type floating body is put in a predetermined pool provided on the ground. Therefore, when water enters the pool due to tsunami or storm surge, the trolley type floating body rises by buoyancy. Therefore, the building constructed integrally with the trolley type floating body also rises and avoids inundation damage. Incidentally, the base boat type floating body described in Patent Document 1 is provided with a predetermined anchor pole at the lower part thereof. The tip of this anchor pole is fixed to the bottom of the pool and is telescopic. Even if water enters the pool and the trolley type floating body floats up, the anchor pole extends and the trolley type floating body is retained in the pool, so that the building can be prevented from drifting.

特許文献1に記載の台船型浮体を備えた建築物は、河川の氾濫や高潮、あるいは津波が発生しても浮力によって上昇するので浸水被害や水没被害を防ぐことはできる。しかしながら解決すべき問題も見受けられる。まず、台船型浮体は製造コストあるいは建築コストが高いという問題がある。台船型浮体は、建築物の形状に合わせて一品生産され、鉄板から溶接によって製造されている。あるいはFRPから製造されている。そうすると、建築現場において溶接やFRPに精通した専門の技術者が作業しなければならずコストが嵩む。次に、特許文献1に記載の台船型浮体は、対応できる水位に上限がある点に問題が見受けられる。この台船型浮体はアンカーポールによってプール底面に接続されているが、アンカーポールが伸びきってしまうとそれ以上は浮上できない。そうすると津波のように高い水位で水が押し寄せると建築物が水没してしまう。特許文献1に記載の建築物は法令上の問題も見受けられる。この台船型浮体は中空の構造物であり建築物と一体的に形成されていて建築物の一部を構成している。現在の法令においては、建築物は地盤に設けられている所定の基礎の上に建築される必要があるが、そのような構成にはなっていないので、住宅用に適用することができない。さらには、台船型浮体がバランスよく水平に浮上できない可能性も考えられる。この台船型浮体が入れられているプールは、台船型浮体と所定の隙間が確保されるようにわずかに大きく形成されている。水がプール内に浸入して台船型浮体が浮きはじめるとき、もし台船型浮体が斜めに浮上してしまうと、台船型浮体の一部がプールの壁面に引っかかる。そうすると、それ以上浮上できないことになり建築物の浸水被害は免れない。   A building provided with a trolley type floating body described in Patent Document 1 can be prevented from being flooded or submerged because it rises by buoyancy even if a river overflows, storm surges, or tsunamis occur. However, there are also problems to be solved. First, the carrier type floating body has a problem of high manufacturing cost or construction cost. A trolley type floating body is produced according to the shape of a building, and is manufactured from an iron plate by welding. Or it is manufactured from FRP. If it does so, the expert engineer familiar with welding and FRP will have to work in a construction site, and cost will increase. Next, the base boat type floating body described in Patent Document 1 has a problem in that there is an upper limit in the water level that can be handled. This carrier type floating body is connected to the bottom of the pool by an anchor pole, but if the anchor pole is fully extended, it cannot rise any further. If this happens, the building will be submerged if the water rushes at a high water level like a tsunami. The building described in Patent Document 1 also has legal problems. This carrier type floating body is a hollow structure and is formed integrally with the building and constitutes a part of the building. According to the current law, a building needs to be built on a predetermined foundation provided on the ground. However, since it does not have such a structure, it cannot be applied to a house. Furthermore, there is a possibility that the trolley type floating body cannot float horizontally with good balance. The pool in which the carrier type floating body is placed is formed to be slightly larger so as to ensure a predetermined gap from the carrier type floating body. When water enters the pool and the trolley type floating body starts to float, if the trolley type floating body rises obliquely, a part of the trolley type floating body is caught on the wall surface of the pool. If it does so, it will not be able to rise any further and the flood damage to the building will not be avoided.

本発明は、上記したような問題点に鑑みてなされたもので、具体的には、コストが小さく容易に建築することができ、河川の氾濫、洪水、高潮または津波によって水位が高い水が押し寄せても確実に浮上して浸水被害を防ぐことができ、法令上の問題もない、人工地盤を提供することを目的としている。   The present invention has been made in view of the above-described problems. Specifically, it can be easily constructed at a low cost, and water with a high water level rushes due to river flooding, flooding, storm surge or tsunami. However, it aims to provide an artificial ground that can rise reliably and prevent flooding damage, and has no legal problems.

本発明は、上記目的を達成するために、その上面にベタ基礎、布基礎、独立基礎が設けられて建築物が建築される人工地盤として構成される。人工地盤は、水平な底面と壁面とからなるドックと、該ドックの壁面と所定の隙間を空けた状態で該ドックの底面に置かれるフロート体とから構成する。フロート体は、上面形状が正方形で直方体状の複数個のプレキャスト製コンクリートの浮体ブロックから構成する。浮体ブロックは、発泡プラスチックからなる直方体状のコアと、この外周部を所定肉厚で被覆する鉄筋コンクリートからなるシェルとから構成する。フロート体は、建築物の重量や重心位置に基づいて複数個の浮体ブロックが敷き詰められ、このような複数個の浮体ブロック同士は連結用金具と係止具とで連結されていると共に固定用金具で固定されるようにして形成する。 In order to achieve the above object, the present invention is configured as an artificial ground on which a solid building, a fabric foundation, and an independent foundation are provided to build a building. The artificial ground is composed of a dock composed of a horizontal bottom surface and a wall surface, and a float body placed on the bottom surface of the dock with a predetermined gap from the wall surface of the dock. The float body is composed of a plurality of precast concrete floating blocks each having a square top surface and a rectangular parallelepiped shape . The floating block is composed of a rectangular parallelepiped core made of foamed plastic and a shell made of reinforced concrete covering the outer peripheral portion with a predetermined thickness. The float body, a plurality of floating blocks are laid on the basis of the weight and center of gravity of the building, fixing clasp with such plurality of floating blocks each other are connected by the connecting brackets and the locking device It is formed to be fixed with.

すなわち請求項1に記載の発明は、上面にベタ基礎、布基礎、独立基礎等の基礎が設けられるようになっており、該基礎の上に建築物が建築される人工地盤であって、人工地盤は、水平な底面と壁面とからなり地面に設けられているドックと、該ドックの壁面と所定の隙間を空けた状態で該ドックの底面に離間可能に載置されているフロート体とから構成され、前記フロート体は、発泡プラスチックの直方体状のコアと該コアの外周部を所定肉厚で被覆する鉄筋コンクリートのシェルとからなる上面形状が正方形の直方体状の複数個のプレキャスト製コンクリートの浮体ブロックから形成され、そして建築物の重量に基づいて前記浮体ブロックの個数が決定され、建築物の重心位置に基づいて前記複数個の前記浮体ブロックが敷き詰められて形成されており、前記浮体ブロックは、その下方位置において連結用金具、もしくは係止具が固定され、前記連結用金具を備えた浮体ブロックと前記係止具を備えた浮体ブロックを上下の高さをずらして互いの側面を接触させ、そしてスライドして上下の高さを整合させて前記連結用金具と前記係止具が連結され、それによって隣接する2個の浮体ブロックが連結されており、該連結された隣接する前記浮体ブロック同士は、その上面において固定用金具によって互いに固定されていることを特徴とする人工地盤として構成される。
請求項2に記載の発明は、請求項1に記載の人工地盤において、前記フロート体の側面と前記ドックの壁面との隙間には、滑り部材またはローラが設けられていることを特徴とする人工地盤として構成される。
請求項3に記載の発明は、請求項1または2に記載の人工地盤において、前記浮体ブロックは、底面に複数の浅い溝が形成されていることを特徴とする人工地盤として構成される。
That is, the invention described in claim 1 is an artificial ground in which a foundation such as a solid foundation, a cloth foundation, and an independent foundation is provided on the upper surface, and a building is built on the foundation, The ground is composed of a dock formed on the ground, which is composed of a horizontal bottom surface and a wall surface, and a float body which is detachably mounted on the bottom surface of the dock with a predetermined clearance from the wall surface of the dock. The float body is composed of a plurality of precast concrete floats having a rectangular parallelepiped shape whose upper surface shape is formed of a rectangular parallelepiped core of foamed plastic and a shell of reinforced concrete covering the outer peripheral portion of the core with a predetermined thickness. And the number of the floating blocks is determined based on the weight of the building, and the plurality of floating blocks are laid out based on the center of gravity of the building. The floating body block is configured such that a connecting metal fitting or a locking tool is fixed at a lower position of the floating body block, and the floating body block provided with the connecting metal fitting and the floating body block provided with the locking tool are arranged at an upper and lower height. And the sliding brackets are connected to each other so that the heights of the upper and lower sides are aligned with each other, and the connecting bracket and the locking tool are connected to each other. The connected adjacent floating body blocks are configured as an artificial ground characterized in that their upper surfaces are fixed to each other by fixing metal fittings .
According to a second aspect of the present invention, in the artificial ground according to the first aspect, a sliding member or a roller is provided in a gap between a side surface of the float body and a wall surface of the dock. Configured as ground.
According to a third aspect of the present invention, in the artificial ground according to the first or second aspect, the floating block is configured as an artificial ground in which a plurality of shallow grooves are formed on a bottom surface.

以上のように、本発明は、ベタ基礎、布基礎、独立基礎等の基礎が設けられるようになっており、該基礎の上に建築物が建築される人工地盤として構成されているので、法令に則って建築物を建築することができる。そして人工地盤は、水平な底面と壁面とからなり地面に設けられているドックと、該ドックの壁面と所定の隙間を空けた状態で該ドックの底面に離間可能に載置されているフロート体とから構成されているので、河川の氾濫、洪水、高潮、津波等によって水が押し寄せてきたら水はドック内に浸入してフロート体が浮上する。これによって建築物は浸水被害を防止することができる。またフロート体は離間可能に載置されているので、フロート体の浮上には制限がなく、押し寄せる水の水位が高くても建築物は浸水したり水没することがない。また本発明によると、フロート体は、上面形状が正方形で直方体状の浮体ブロックから、複数個が敷き詰められると共に隣り合う浮体ブロックが互いに結合されるようにして形成され、浮体ブロックは、発泡プラスチックからなる直方体状のコアと、該コアと一体的にかつ該コアの外周部を所定肉厚で被覆する鉄筋コンクリートからなるシェルとから構成されたプレキャスト製コンクリートである。浮体ブロックは工場内で製造でき、これを建築現場に搬入して現場で敷き詰めて結合すればフロート体を製造できるので、製造コストもしくは建築コストが小さく済む。さらには、色々な形状や色々な大きさのフロート体が1種類の浮体ブロックから構成できるので、浮体ブロックは大量生産することができコストを低下させることができる。 As described above, the present invention is provided with a foundation such as a solid foundation, a cloth foundation, and an independent foundation, and is configured as an artificial ground on which a building is constructed. You can build a building according to The artificial ground is composed of a horizontal bottom surface and a wall surface, a dock provided on the ground, and a float body that is detachably mounted on the bottom surface of the dock with a predetermined gap from the wall surface of the dock. Therefore, when the water comes in due to river flooding, flooding, storm surge, tsunami, etc., the water enters the dock and the float body rises. This can prevent the building from being damaged by water. In addition, since the float body is placed so as to be separable, there is no restriction on the floating of the float body, and the building will not be submerged or submerged even if the level of water to be pushed is high. Further, according to the present invention, the float body is formed from a rectangular parallelepiped floating body block having a plurality of top surfaces , and a plurality of floating bodies are spread and adjacent floating body blocks are joined together. A precast concrete comprising a rectangular parallelepiped core and a shell made of reinforced concrete that is integral with the core and covers the outer periphery of the core with a predetermined thickness. The floating body block can be manufactured in the factory, and the float body can be manufactured by carrying it to the construction site, laying it down on the site, and connecting it, so that the manufacturing cost or the construction cost can be reduced. Furthermore, since float bodies of various shapes and various sizes can be configured from one type of floating body block, the floating body block can be mass-produced and the cost can be reduced.

そして本発明によると、フロート体は、建築物の重量に基づいて浮体ブロックの個数が決定され、建築物の重心位置に基づいて複数個の浮体ブロックが配置され、それによって任意の建築物に対応できるようになっている。つまり自由にフロート体を設計できるので、どのような建物でも対応でき、洪水時等にこのような建物を水平にバランスよく浮上させることが可能になる。さらに浮体ブロックは、その下方位置において連結用金具、もしくは係止具が固定され、連結用金具を備えた浮体ブロックと係止具を備えた浮体ブロックを上下の高さをずらして互いの側面を接触させ、そしてスライドして上下の高さを整合させて連結用金具と係止具が連結され、それによって隣接する2個の浮体ブロックが連結されており、該連結された隣接する浮体ブロック同士は、その上面において固定用金具によって互いに固定されている。つまり隣接する2個の浮体ブロックを簡単に連結することができ、フロート体の製造が容易になるし、互いに連結された浮体ブロックを固定することができる。また他の発明によるとフロート体の側面と前記ドックの壁面との隙間には、滑り部材またはローラが設けられている。ドック内に水が浸水してフロート体が浮上するとき、フロート体が一時的に斜めになってフロート体の一部がドックの壁面に引っかかる可能性があるが、滑り部材またはローラが設けられているので、フロート体はドックに対して滑ることが保証され浮上が妨げられることがない。そして他の発明によると、浮体ブロックは、底面に複数の浅い溝が形成されている。そうするとフロート体も底面に複数の浅い溝が形成されることになる。ドック内に水が浸水するときに浅い溝によって水がフロート体の底面に均一に浸入するので、フロート体の一部がドックの底面に貼り付くこともなく、フロート体は抵抗なく浮上することが保証できる。 And according to the present invention, the number of floating blocks is determined based on the weight of the building, and a plurality of floating blocks are arranged based on the position of the center of gravity of the building, thereby corresponding to any building It can be done. In other words, since a float body can be designed freely, any building can be used, and such a building can be floated horizontally and in a balanced manner during a flood. Further, the floating body block has a connecting metal fitting or a locking tool fixed at the lower position thereof, and the floating body block provided with the connecting metal fitting and the floating body block provided with the locking tool are shifted from each other in the vertical direction. The connecting metal fitting and the locking tool are connected by contacting and sliding to align the upper and lower heights, whereby two adjacent floating body blocks are connected, and the adjacent adjacent floating body blocks are connected to each other. Are fixed to each other by fixing metal fittings on the upper surface. That is, two adjacent floating body blocks can be easily connected, and the float body can be easily manufactured , and the floating body blocks connected to each other can be fixed. According to another invention, a sliding member or a roller is provided in the gap between the side surface of the float body and the wall surface of the dock. When water floats in the dock and the float body rises, there is a possibility that the float body may be temporarily inclined and a part of the float body may be caught on the dock wall surface. As a result, the float body is guaranteed to slide against the dock and is not hindered from rising. According to another invention, the floating block has a plurality of shallow grooves formed on the bottom surface. Then, a plurality of shallow grooves are formed on the bottom surface of the float body. When water is immersed in the dock, the shallow grooves allow water to uniformly enter the bottom surface of the float body, so that part of the float body does not stick to the bottom surface of the dock, and the float body can float without resistance. Can be guaranteed.

本発明の実施の形態に係る人工地盤と、この人工地盤に建設された建築物を示す正面断面図である。It is front sectional drawing which shows the artificial ground which concerns on embodiment of this invention, and the building constructed in this artificial ground. 本発明の実施の形態に係る浮体ブロックを示す斜視図である。It is a perspective view which shows the floating body block which concerns on embodiment of this invention. 本発明の実施の形態に係る浮体ブロックの結合方法を示す図で、その(ア)、(イ)、(ウ)は、連結用金具によって2個の浮体ブロックを連結する様子を示す、斜視図と正面図であり、その(エ)は固定用金具によって4個の浮体ブロックを固定する様子を示す上面図、その(オ)は固定用金具によって2個の浮体ブロックを固定する様子を示す上面図である。BRIEF DESCRIPTION OF THE DRAWINGS It is a figure which shows the joining method of the floating body block which concerns on embodiment of this invention, The (a), (b), (c) is a perspective view which shows a mode that two floating body blocks are connected with the metal fitting for connection. (D) is a top view showing a state where four floating body blocks are fixed by a fixing bracket, and (E) is an upper surface showing a state where two floating body blocks are fixed by a fixing bracket. FIG. 本発明の実施の形態に係る人工地盤を施工する方法を示す図で、その(ア)、(イ)は施工の各段階における人工地盤の斜視図である。BRIEF DESCRIPTION OF THE DRAWINGS It is a figure which shows the method of constructing the artificial ground which concerns on embodiment of this invention, The (a), (b) is a perspective view of the artificial ground in each step of construction. 本発明の実施の形態に係る人工地盤の一部を示す図で、その(ア)、(イ)は、第1の実施の形態に係る人工地盤の一部を示す正面断面図と上面図、その(ウ)、(エ)は第2の実施の形態に係る人工地盤の一部を示す正面断面図と上面図である。BRIEF DESCRIPTION OF THE DRAWINGS It is a figure which shows a part of artificial ground which concerns on embodiment of this invention, The (a) and (b) are front sectional views and top views which show a part of artificial ground which concerns on 1st Embodiment, The (c) and (d) are a front sectional view and a top view showing a part of the artificial ground according to the second embodiment. 本発明の実施の形態に係る人工地盤の作用を説明する図で、その(ア)、(イ)は、それぞれ洪水や津波の規模に応じて浮上する人工地盤と建築物を示す正面断面図である。BRIEF DESCRIPTION OF THE DRAWINGS It is a figure explaining the effect | action of the artificial ground which concerns on embodiment of this invention, The (a), (b) is front sectional drawing which shows the artificial ground and building which float according to the magnitude | size of a flood and a tsunami, respectively. is there.

以下、本発明の実施の形態を説明する。本実施の形態に係る人工地盤1は、図1に示されているように、従来の地盤と同様に建築物Kが建築できる地盤として構成されている。つまり人工地盤1はその上面に図1に示されているようにベタ基礎Bを設けることもできるし、布基礎を設けることができる。また独立基礎を設けることもでき、設けることができる基礎はその種類を問わない。本実施の形態に係る人工地盤1は、このような基礎Bの上に従来と同様に建築物Kを建築することができる。   Embodiments of the present invention will be described below. As shown in FIG. 1, the artificial ground 1 according to the present embodiment is configured as a ground on which a building K can be constructed in the same manner as a conventional ground. That is, the artificial ground 1 can be provided with a solid foundation B on its upper surface as shown in FIG. 1 or a cloth foundation. An independent foundation can also be provided, and the type of foundation that can be provided is not limited. The artificial ground 1 according to the present embodiment can build the building K on the foundation B as in the conventional case.

本実施の形態に係る人工地盤1は、後で施工方法において詳しく説明するが、地面Jに所定深さで形成されているドック3と、このドック3内に入れられているフロート体4とから構成されている。ドッグ3は、水平な底面5と壁面6、6とからなり、洪水、津波等において押し寄せた水が浸水するプールになっている。フロート体4は、建築物Kの床面の形状を考慮して、そして建築物Kと浮力との関係を考慮して、その形状と大きさが決定される。そしてフロート体4は、このような形状と大きさになるように、次に説明する複数個の浮体ブロック8、8、…から構成され、これらが敷き詰められ、隣接する浮体ブロック8、8、同士が結合されて一体的に形成されている。こようなフロート体4は、ドック3の壁面6と所定の隙間が確保された状態で、ドック3内に入れられている。というより、ドッグ3の形状および大きさは、フロート体4の形状と大きさを考慮して設計され、フロート体4の側面とドッグ3の壁面6が所定の隙間が確保されるように決定されている。ドッグ3内に入れられているフロート体4は、ドッグ3の底面5に設けられ、ドッグ3には拘束されていない。すなわち離間可能にドッグ3の底面5に載置されている。従って洪水、津波等によってドッグ3に水が浸入すると、フロート体4とこの上に建築されている建築物Kは浮上することになる。   The artificial ground 1 according to the present embodiment will be described in detail later in the construction method. From the dock 3 formed on the ground J at a predetermined depth and the float body 4 placed in the dock 3. It is configured. The dog 3 is composed of a horizontal bottom surface 5 and wall surfaces 6, 6, and is a pool in which water rushed in due to flood, tsunami, etc. is submerged. The shape and size of the float body 4 are determined in consideration of the shape of the floor surface of the building K and the relationship between the building K and buoyancy. The float body 4 is composed of a plurality of floating body blocks 8, 8,... Described below so as to have such a shape and size. Are integrally formed. Such a float body 4 is put in the dock 3 in a state where a predetermined gap is secured from the wall surface 6 of the dock 3. Rather, the shape and size of the dog 3 are designed in consideration of the shape and size of the float body 4, and are determined so that a predetermined gap is secured between the side surface of the float body 4 and the wall surface 6 of the dog 3. ing. The float body 4 placed in the dog 3 is provided on the bottom surface 5 of the dog 3 and is not restrained by the dog 3. That is, it is placed on the bottom surface 5 of the dog 3 so as to be separated. Therefore, when water enters the dog 3 due to flood, tsunami, etc., the float body 4 and the building K built on it float up.

フロート体4を構成する、本実施の形態に係る浮体ブロック8は、図2に示されているように、上面形状が正方形の直方体状を呈しており、工場において製造されるプレキャスト製コンクリートからなる。浮体ブロック8は、発泡プラスチックからなる直方体状のコア10と、このコア10と一体的に成形されてコア10の4面の側面を所定の肉厚で被覆している鉄筋コンクリートのシェル11とから構成されている。本実施の形態において、コア10の材料は発泡プラスチックとして発泡スチロールが選定されているが、他の種類の発泡プラスチックでもよい。ただし浮体ブロック8は、建築基準法に定める、地盤に対して長期に生じる力に対する許容応力度について30kN/m2の強さが必要であり、そのような強度を備えるよう発泡プラスチックの種類が選定される必要がある。発泡スチロールはこのような要求を満たす材料であるし、耐久性も高く人工地盤1の材料として最適である。   As shown in FIG. 2, the floating body block 8 constituting the float body 4 according to the present embodiment has a rectangular parallelepiped shape whose upper surface shape is made of precast concrete manufactured in a factory. . The floating block 8 includes a rectangular parallelepiped core 10 made of foamed plastic and a reinforced concrete shell 11 which is integrally formed with the core 10 and covers the four side surfaces of the core 10 with a predetermined thickness. Has been. In the present embodiment, foamed polystyrene is selected as the material of the core 10 as foamed plastic, but other types of foamed plastic may be used. However, the floating block 8 is required to have a strength of 30 kN / m2 with respect to the allowable stress level for the force generated in the long term against the ground as stipulated in the Building Standards Act, and the type of foam plastic is selected so as to have such strength. It is necessary to Styrofoam is a material that satisfies these requirements, and has high durability and is optimal as a material for the artificial ground 1.

本実施の形態に係る浮体ブロック8は、シェル11によって4面の側面が所定肉厚で被覆されているが、2面の側面が接合しているコーナー部分13、13、…はコア10が面取りされているので、それによってシェル11は肉厚に形成され、全体として強度が高くなっている。このようなコーナー部分13、13、…の上面には、ナット14、14、…が埋め込まれ、後で説明するように所定の固定用金具によって隣接する複数個の浮体ブロック8を固定できるようになっている。これらのナット14、14は、浮体ブロック8を吊り下げるための吊下用フックを取付けることもできる。このようなナット14、14、…と同様に、コーナー部分13、13、…の下方にも複数個のナット15、15、…が埋め込まれている。正確に説明すると、それぞれのコーナー部分13、13、…毎に、その稜線に対して右側の側面には2個のナット15、15が埋め込まれ、左側の側面には1個のナット15が埋め込まれている。後で説明するように、右側の側面には連結用金具を取付けることができ、左側の側面には係止具を取付けられるようになっている。   In the floating block 8 according to the present embodiment, the four sides are covered with a predetermined thickness by the shell 11, but the corners 13, 13,... Where the two sides are joined are chamfered by the core 10. Therefore, the shell 11 is thereby formed thick, and the strength is increased as a whole. .. Are embedded in the upper surfaces of the corner portions 13, 13,... So that a plurality of adjacent floating blocks 8 can be fixed by a predetermined fixing bracket as will be described later. It has become. These nuts 14 and 14 can also be attached with hanging hooks for hanging the floating body block 8. Like the nuts 14, 14,..., A plurality of nuts 15, 15,. To be precise, for each corner portion 13, 13,..., Two nuts 15 and 15 are embedded on the right side with respect to the ridgeline, and one nut 15 is embedded on the left side. It is. As will be described later, a connecting bracket can be attached to the right side surface, and a locking tool can be attached to the left side surface.

本実施の形態に係る浮体ブロック8は、その底面に複数本の浅い溝16、16、…が形成されている。従って複数個の浮体ブロック8から形成されているフロート体4にもその底部に複数の浅い溝16、16、…が形成されることになる。水がドッグ3内に浸水すると、水はこれらの浅い溝16、16、…を伝ってフロート体4の底部に一様に分散する。従って、フロート体14はドッグ3の底面5に貼り付かずにバランスよく浮上することができる。   The floating block 8 according to the present embodiment has a plurality of shallow grooves 16, 16,. Therefore, a plurality of shallow grooves 16, 16,... Are also formed at the bottom of the float body 4 formed from a plurality of floating body blocks 8. When water is immersed in the dog 3, the water is uniformly distributed on the bottom of the float body 4 through the shallow grooves 16, 16,. Therefore, the float body 14 can float with good balance without sticking to the bottom surface 5 of the dog 3.

本実施の形態に係る浮体ブロック8は、図3の(ア)に示されている連結用金具18と係止具21とによって、2個の浮体ブロック8が連結できるようになっている。連結用金具18は長方形の金属板からなり、2個のボルト孔が空けられ、1個の係止用切欠19が形成されている。連結用金具18は、この2個のボルト孔に挿通した2本のボルト20、20によって浮体ブロック8の下方部分に固定できるようになっている。係止用切欠19は、連結用金具18の下方の長辺から板幅の中央部まで切り取られており、切欠の中央部は半円状に形成されている。この半円状に形成された部分に、ボルトからなる係止具21が係止されるようになっている。係止具21も浮体ブロック8の下方に取付けられるようになっている。連結用金具18が取付けられた浮体ブロック8と、係止具21が取付けられた浮体ブロック8は次のようにして連結することができる。すなわち図3の(イ)に示されているように、係止具21が取付けられた浮体ブロック8を設置する。次いで連結用金具18が取付けられた浮体ブロック8を吊り下げて若干高い位置にし、その側面が係止具21を備えた浮体ブロック8の側面に当接するようにする。互いの側面が当接した状態で浮体ブロック8を下ろす。そうすると、図3の(ウ)に示されているように連結用金具18の係止用切欠19にボルト、つまり係止具21が係止される。これによって2個の浮体ブロック8が、それぞれの下方部分によって連結される。本実施の形態に係る浮体ブロック8は、予め連結用金具18や係止具21を取付けておくだけで、このように容易に浮体ブロック8、8を連結することができる。フロート体4は、複数個の浮体ブロック8、8、…から組立てる必要があるが、空間的に余裕がないドッグ3内で組立てなければならないので、このように容易に連結できるようになっている。   The floating body block 8 according to the present embodiment is configured such that two floating body blocks 8 can be connected by the connecting metal fitting 18 and the locking tool 21 shown in FIG. The connecting metal fitting 18 is made of a rectangular metal plate, two bolt holes are formed, and one locking notch 19 is formed. The connecting metal fitting 18 can be fixed to the lower portion of the floating block 8 by two bolts 20 and 20 inserted through the two bolt holes. The locking notch 19 is cut from the long side below the coupling metal 18 to the center of the plate width, and the center of the notch is formed in a semicircular shape. A locking tool 21 made of a bolt is locked to the semicircular portion. The locking tool 21 is also attached below the floating body block 8. The floating body block 8 to which the connecting metal fitting 18 is attached and the floating body block 8 to which the locking member 21 is attached can be connected as follows. That is, as shown in FIG. 3A, the floating body block 8 to which the locking tool 21 is attached is installed. Next, the floating body block 8 to which the coupling metal fitting 18 is attached is hung to a slightly higher position so that the side surface of the floating body block 8 abuts on the side surface of the floating body block 8 provided with the locking member 21. The floating body block 8 is lowered with the side surfaces in contact with each other. Then, as shown in FIG. 3C, the bolt, that is, the locking tool 21 is locked in the locking notch 19 of the connecting metal fitting 18. Thereby, the two floating body blocks 8 are connected by the respective lower portions. The floating body block 8 according to the present embodiment can easily connect the floating body blocks 8 and 8 simply by attaching the connecting bracket 18 and the locking tool 21 in advance. The float body 4 needs to be assembled from a plurality of floating body blocks 8, 8,..., But it must be assembled in the dog 3 having no space so that it can be easily connected in this way. .

本実施の形態において、4個の浮体ブロック8、8、…は、図3の(エ)に示されているように、第1の固定用金型23によって、その上面において互いに固定できるようになっている。また2個の浮体ブロック8、8は、図3の(オ)に示されているように第2の固定用金型24によって、その上面において互いに固定できるようになっている。上記で説明したように、隣り合う2個の浮体ブロック8、8は、その下部において連結用金型18によって連結されるが、隣り合う浮体ブロック8、8が相対的に上下の高さがずれると連結が解除されてしまう。しかしながら、第1、2の固定用金型23、24によって浮体ブロック8、8、…の上面が固定されていると、浮体ブロック8、8の高さがずれないので、連結は解除されない。   In the present embodiment, the four floating blocks 8, 8,... Can be fixed to each other on the upper surface by the first fixing mold 23 as shown in FIG. It has become. The two floating blocks 8, 8 can be fixed to each other on the upper surface by the second fixing mold 24 as shown in FIG. As described above, the two adjacent floating body blocks 8 and 8 are connected to each other by the connecting mold 18 at the lower portion thereof, but the adjacent floating body blocks 8 and 8 are relatively displaced in the vertical height. And the connection will be released. However, if the upper surfaces of the floating blocks 8, 8,... Are fixed by the first and second fixing molds 23, 24, the height of the floating blocks 8, 8 is not shifted, so that the connection is not released.

本実施の形態に係る人工地盤1を施工する施工方法を説明する。人工地盤1は、建築する建築物の床面の形状と、建築物の重量と浮力とを考慮してフロート体4の形状および大きさを決定し、次いでフロート体4が所定の隙間を確保して入れられるように、ドッグ3の形状と大きさが決定される。このようにして決定されたドッグ3を最初に施工する。図4の(ア)に示されているように、施工しようとしているドッグ3の輪郭に合わせて、くい打ち機を用いて地面Jに複数本のH形鋼28、28、…を所定の間隔で打ち込む。打ち込み深さは、ドッグ3の深さより深くなるようにし、H形鋼28、28、…の端面が地面の高さから出ないように完全に打ち込む。次いでバックフォーにより、ドッグ3の形状に合わせて地面を掘削する。掘削する深さは、ドッグ3の深さより若干深くなるようにする。所定幅で所定厚の鉄筋コンクリート板29、29、…をH形鋼28、28、のレールにガイドさせるようにして、隣り合うH形鋼28、28、…の間に挿入する。鉄筋コンクリート板29、29、…も、その上方の端面が地面の高さと等しくなるようにする。これらのH形鋼28、28、…と鉄筋コンクリート板29、29、…とから、ドッグ3の壁面6、6が形成されることになる。掘削した地面に水平に整地して砕石を敷き転圧する。この状態でドッグ3の施工を完了してもよく、この場合には転圧された砕石の面が底面5になる。しかしながら、必要に応じて砕石の上に均しコンクリート30を打設し、底面5とする。この状態が図4の(ア)に示されている。ドッグ3が完成する。   A construction method for constructing the artificial ground 1 according to the present embodiment will be described. The artificial ground 1 determines the shape and size of the float body 4 in consideration of the shape of the floor surface of the building to be constructed, the weight and buoyancy of the building, and then the float body 4 secures a predetermined gap. The shape and size of the dog 3 are determined so that they can be inserted. The dog 3 determined in this way is first constructed. As shown in FIG. 4A, in accordance with the contour of the dog 3 to be constructed, a plurality of H-section steels 28, 28,... Type in. The driving depth is set to be deeper than the depth of the dog 3, and driving is completely performed so that the end faces of the H-shaped steels 28, 28,... Do not come out from the height of the ground. Next, the ground is excavated by back fore to the shape of the dog 3. The depth of excavation should be slightly deeper than the depth of the dog 3. The reinforced concrete plates 29, 29,... Having a predetermined width and a predetermined thickness are inserted between the adjacent H-section steels 28, 28,. The reinforced concrete plates 29, 29,... Are also made such that their upper end faces are equal to the height of the ground. The wall surfaces 6, 6 of the dog 3 are formed from these H-shaped steels 28, 28,... And the reinforced concrete plates 29, 29,. The ground is leveled on the excavated ground, and crushed stones are laid and rolled. In this state, the construction of the dog 3 may be completed. In this case, the surface of the crushed crushed stone becomes the bottom surface 5. However, if necessary, leveled concrete 30 is placed on the crushed stone to form the bottom surface 5. This state is shown in FIG. Dog 3 is completed.

次にフロート体4を組立てる。フロート体4を組立てるのに必要な個数の浮体ブロック8、8、…を用意する。それぞれの浮体ブロック8、8、…について、配置を決めておき、決定された配置に適合するように、予めそれぞれの浮体ブロック8、8、…に連結用金具18、係止具21を必要個数だけ取付けておく。浮体ブロック8、8、…の上面に吊下フックを取付ける等して吊り下げ、決定された配置に従って順次ドッグ3内の底面30に載置する。そうすると、前記したように連結用金具18と係止具21が連結され、隣接する浮体ブロック8、8同士が連結される。全ての浮体ブロック8、8、…をドッグ3内に載置し、連結したら、浮体ブロック8、8、…の上面を、第1、2の固定用金具23、24によって固定する。フロート体4の組立てが完了する。この状態が図4の(イ)に示されている。   Next, the float body 4 is assembled. The number of floating body blocks 8, 8,... Necessary for assembling the float body 4 is prepared. The arrangement of the respective floating body blocks 8, 8,... Is determined, and the necessary number of connecting metal fittings 18 and locking tools 21 are previously attached to the respective floating body blocks 8, 8,. Just install it. .. Are suspended by attaching suspension hooks or the like to the upper surfaces of the floating blocks 8, 8..., And are sequentially placed on the bottom surface 30 in the dog 3 according to the determined arrangement. If it does so, as mentioned above, the metal fitting 18 for connection and the latching tool 21 will be connected, and the adjacent floating body blocks 8 and 8 will be connected. When all the floating blocks 8, 8,... Are placed in the dog 3 and connected, the upper surfaces of the floating blocks 8, 8,... Are fixed by the first and second fixing brackets 23, 24. The assembly of the float body 4 is completed. This state is shown in FIG.

本実施の形態に係る人工地盤1は、ドッグ3内に水が浸水すると、フロート体4が浮上するようになっているが、フロート体4がドッグ3の壁面に引っかかって浮上が妨げられないように、滑りを確保するための所定の部材が設けられている。第1の実施の形態においては、図5の(ア)、(イ)に示されているように、所定長さのゴム製滑り部材32、32、…が複数本設けられている。滑り部材32、32、…は断面形状が所定肉厚の半円の円弧状を呈し、外部から押されると半円が押しつぶされて変形するようになっている。このような滑り部材32、32、…がフロート体4の側面、つまり外側の浮体ブロック8の側面と、ドッグ3の壁面6の間に設けられている。従って、フロート体4が浮上するときにフロート体4が一時的に斜めになっても、フロート体4は滑り部材32、32、…に当たってドッグ3の壁面6に直接接触することはなく、フロート体4は引っかからずに滑らかに浮上できる。なお、滑り部材32、32、…は、フロート体4側に設けられていてもよいし、ドッグ3側に設けられていてもよい。またゴム製ではなく、可撓性を備えた他の樹脂材から形成されていてもよい。   In the artificial ground 1 according to the present embodiment, when the water is immersed in the dog 3, the float body 4 floats, but the float body 4 is caught on the wall surface of the dog 3 so that the float is not hindered. In addition, a predetermined member for ensuring slippage is provided. In the first embodiment, as shown in FIGS. 5A and 5B, a plurality of rubber sliding members 32, 32,... Having a predetermined length are provided. The sliding members 32, 32,... Have a semicircular arc shape with a predetermined thickness, and when pressed from the outside, the semicircle is crushed and deformed. These sliding members 32, 32,... Are provided between the side surface of the float body 4, that is, the side surface of the outer floating body block 8 and the wall surface 6 of the dog 3. Therefore, even if the float body 4 is temporarily inclined when the float body 4 floats, the float body 4 does not directly contact the wall surface 6 of the dog 3 by hitting the sliding members 32, 32,. 4 can float smoothly without being caught. The sliding members 32, 32,... May be provided on the float body 4 side or may be provided on the dog 3 side. Moreover, you may form from the resin material which was not rubber and was provided with flexibility.

図5の(ウ)、(エ)には、第2の実施の形態が示されているが、滑り部材の代わりに、フロート体4とドッグ3の間に複数のローラ33、33、…が設けられている。ローラ33、33、…によって、フロート体4はドッグ3内に引っかかることなく滑らかに浮上することができる。このローラ33、33、…も、フロータ体4側に設けられていてもよいし、ドッグ3側に設けられていてもよい。   5 (c) and 5 (d) show the second embodiment, but instead of the sliding member, a plurality of rollers 33, 33,... Are provided between the float body 4 and the dog 3. Is provided. The float body 4 can float smoothly without being caught in the dog 3 by the rollers 33, 33,. These rollers 33, 33,... May also be provided on the floater body 4 side, or may be provided on the dog 3 side.

本実施の形態に係る人工地盤1は、ドッグ3の壁面6とフロート体4の側面との間に所定の隙間が形成される。この隙間にゴミ等の異物が入り込まないように、この隙間の上に透水性を備えた素材からなるカバー35がかぶせられている。カバー35が設けられている様子は、図1、図5の(ア)、(ウ)に示されている。   In the artificial ground 1 according to the present embodiment, a predetermined gap is formed between the wall surface 6 of the dog 3 and the side surface of the float body 4. A cover 35 made of a material having water permeability is placed on the gap so that foreign matter such as dust does not enter the gap. The manner in which the cover 35 is provided is shown in FIGS. 1 and 5 (A) and (C).

本実施の形態に係る人工地盤1の作用を説明する。人工地盤1には、図1に示されているように建築物Kが建築されている。大雨による河川の氾濫、洪水等が発生すると、水が押し寄せて、ドッグ3内に入る。そうするとフロート体4には浮力が生じる。ドッグ3内に浸水する水の水位が低いときには建築物Kの重量によってフロート体4は浮上しない。しかしながら、ドッグ3内に水が満たされ、そして水位が地面Jの高さを超えたら、建築物Kの重量に抗してフロート体4が浮上して、フロート体4の底面がドッグ3の底面5から離間する。この状態が図6の(ア)に示されている。なお、水位が地面Jの高さに達するまでは浮上せず、地面Jの高さを超えたら確実に浮上が開始するように、建築時に建築物Kの重量が計算され、この重量に適した浮体ブロック8、8、…の個数が決定され、フロート体4の形状が設計されている。河川の氾濫や洪水が収まって水が引くと、浮上していたフロート体4はドッグ3の底面5に着地し、図1に示されている状態に戻る。   The operation of the artificial ground 1 according to the present embodiment will be described. On the artificial ground 1, a building K is constructed as shown in FIG. When a river overflows or floods due to heavy rain, the water is pushed into the dog 3. Then, buoyancy is generated in the float body 4. When the water level of the water immersed in the dog 3 is low, the float body 4 does not float due to the weight of the building K. However, when the dog 3 is filled with water and the water level exceeds the height of the ground J, the float body 4 rises against the weight of the building K, and the bottom surface of the float body 4 is the bottom surface of the dog 3. 5 apart. This state is shown in FIG. The weight of the building K is calculated at the time of construction so that the water level does not rise until the water level reaches the level of the ground J, and the rising of the ground level J starts reliably. The number of the floating body blocks 8, 8,... Is determined, and the shape of the float body 4 is designed. When the river overflows or floods are settled and the water is drawn, the float body 4 that has surfaced lands on the bottom surface 5 of the dog 3 and returns to the state shown in FIG.

大津波等により、非常に高い水位の水が押し寄せた場合には、建築物Kおよびフロート体4はさらに浮上し、図6の(イ)に示されているように、完全にドッグ3内から離れる。そうすると水の流れに従って建築物Kは漂流するが建築物Kの浸水や水没は免れ、居住者の人命は守られる。   When water of a very high water level rushes due to a large tsunami or the like, the building K and the float body 4 rise further, and as shown in FIG. Leave. Then, the building K drifts according to the flow of water, but the inundation and submergence of the building K are avoided, and the lives of residents are protected.

本実施の形態に係る人工地盤1は色々な変形が可能である。例えば、浮体ブロック8は上面形状が正方形であるように説明したが、長方形であってもよい。またシェル11はコア10を側面だけ被覆しているように説明したが、上面や底面も被覆していてもよい。   The artificial ground 1 according to the present embodiment can be variously modified. For example, although the floating block 8 has been described as having a square top surface, it may be rectangular. Moreover, although the shell 11 demonstrated covering the core 10 only on the side surface, you may coat | cover also the upper surface and the bottom face.

1 人工地盤 3 ドッグ
4 フロート体 5 底面
6 壁面 8 浮体ブロック
10 コア 11 シェル
16 浅い溝 18 連結用金具
19 係止用切欠 21 係止具
23 第1の固定用金具 24 第2の固定用金具
28 H形鋼 29 鉄筋コンクリート板
32 滑り部材 33 ローラ
35 カバー
K 建築物 B 基礎
J 地面
DESCRIPTION OF SYMBOLS 1 Artificial ground 3 Dog 4 Float body 5 Bottom surface 6 Wall surface 8 Floating body block 10 Core 11 Shell 16 Shallow groove 18 Connecting metal fitting 19 Locking notch 21 Locking tool 23 First fixing metal fitting 24 Second fixing metal fitting 28 H-shaped steel 29 Reinforced concrete plate 32 Sliding member 33 Roller 35 Cover K Building B Foundation J Ground

Claims (3)

上面にベタ基礎、布基礎、独立基礎等の基礎が設けられるようになっており、該基礎の上に建築物が建築される人工地盤であって、
人工地盤は、水平な底面と壁面とからなり地面に設けられているドックと、該ドックの壁面と所定の隙間を空けた状態で該ドックの底面に離間可能に載置されているフロート体とから構成され、
前記フロート体は、発泡プラスチックの直方体状のコアと該コアの外周部を所定肉厚で被覆する鉄筋コンクリートのシェルとからなる上面形状が正方形の直方体状の複数個のプレキャスト製コンクリートの浮体ブロックから形成され、そして建築物の重量に基づいて前記浮体ブロックの個数が決定され、建築物の重心位置に基づいて前記複数個の前記浮体ブロックが敷き詰められて形成されており、
前記浮体ブロックは、その下方位置において連結用金具、もしくは係止具が固定され、前記連結用金具を備えた前記浮体ブロックと前記係止具を備えた前記浮体ブロックを上下の高さをずらして互いの側面を接触させ、そしてスライドして上下の高さを整合させて前記連結用金具と前記係止具が連結され、それによって隣接する2個の前記浮体ブロックが連結されており、該連結された隣接する前記浮体ブロック同士は、その上面において固定用金具によって互いに固定されていることを特徴とする人工地盤。
A foundation such as a solid foundation, a cloth foundation, and an independent foundation is provided on the upper surface, and an artificial ground on which a building is built,
The artificial ground is composed of a horizontal bottom surface and a wall surface, a dock provided on the ground, and a float body that is detachably mounted on the bottom surface of the dock with a predetermined gap from the dock wall surface; Consisting of
The float body is formed of a plurality of precast concrete floating blocks having a rectangular parallelepiped shape having a rectangular top surface formed of a rectangular parallelepiped core of foamed plastic and a shell of reinforced concrete covering the outer periphery of the core with a predetermined thickness. And the number of the floating body blocks is determined based on the weight of the building, and the plurality of floating body blocks are spread and formed based on the center of gravity of the building,
In the floating block, a connecting metal fitting or a locking tool is fixed at a lower position thereof, and the floating block provided with the connecting metal fitting and the floating body block provided with the locking tool are shifted in the vertical height. The connecting metal fitting and the locking tool are connected by sliding the side surfaces of each other and sliding to align the upper and lower heights, thereby connecting the two adjacent floating body blocks. The artificial ground , wherein the adjacent floating body blocks that are adjacent to each other are fixed to each other by a fixing bracket on the upper surface thereof .
請求項1に記載の人工地盤において、前記フロート体の側面と前記ドックの壁面との隙間には、滑り部材またはローラが設けられていることを特徴とする人工地盤。 2. The artificial ground according to claim 1 , wherein a sliding member or a roller is provided in a gap between a side surface of the float body and a wall surface of the dock. 請求項1または2に記載の人工地盤において、前記浮体ブロックは、底面に複数の浅い溝が形成されていることを特徴とする人工地盤。 The artificial ground according to claim 1 or 2 , wherein the floating body block has a plurality of shallow grooves formed on a bottom surface.
JP2014023682A 2014-02-10 2014-02-10 Floating artificial ground Active JP6362870B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014023682A JP6362870B2 (en) 2014-02-10 2014-02-10 Floating artificial ground

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014023682A JP6362870B2 (en) 2014-02-10 2014-02-10 Floating artificial ground

Publications (2)

Publication Number Publication Date
JP2015151684A JP2015151684A (en) 2015-08-24
JP6362870B2 true JP6362870B2 (en) 2018-07-25

Family

ID=53894247

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014023682A Active JP6362870B2 (en) 2014-02-10 2014-02-10 Floating artificial ground

Country Status (1)

Country Link
JP (1) JP6362870B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3273215B2 (en) 1993-07-23 2002-04-08 日本特殊陶業株式会社 Method of manufacturing spark plug for internal combustion engine

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7178690B2 (en) * 2018-07-12 2022-11-28 株式会社ナイスカンパニー acoustic building
RU2702469C1 (en) * 2018-09-25 2019-10-08 Василий Юрьевич Чистяков Floating house
JP7352510B2 (en) * 2020-04-16 2023-09-28 三井住友建設株式会社 Floating body positioning structure
JP7472009B2 (en) 2020-12-18 2024-04-22 清水建設株式会社 Floating Structure
JP7602452B2 (en) * 2021-12-27 2024-12-18 株式会社栗本鐵工所 Fixing structure for hollow resin molded products

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0749197Y2 (en) * 1990-07-13 1995-11-13 株式会社竹中工務店 Floor with floating foundation
JPH07207679A (en) * 1994-01-24 1995-08-08 Tsuyoshi Matsumoto Dry-casting method of cloth foundation by precast cast reinforced concrete block and block assembly for it.
JP2003082749A (en) * 2001-09-10 2003-03-19 Matsuoka Concrete Industry Co Ltd Concrete block for gutter and connecting method of concrete block for gutter
JP3110611U (en) * 2005-02-08 2005-06-30 林 武 Floating building
JP2007192007A (en) * 2005-03-29 2007-08-02 Takeshi Hayashi Tidal wave resistant building and method for constructing the same
FR2886956B1 (en) * 2005-06-10 2008-12-19 Vab Sarl RETRACTABLE BUILDING
JP2007120012A (en) * 2005-10-25 2007-05-17 Shigeru Yaguchi Artificial ground for preventing flooding
US8066451B2 (en) * 2009-01-22 2011-11-29 Ewers James J Flood/wind resistant building

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3273215B2 (en) 1993-07-23 2002-04-08 日本特殊陶業株式会社 Method of manufacturing spark plug for internal combustion engine

Also Published As

Publication number Publication date
JP2015151684A (en) 2015-08-24

Similar Documents

Publication Publication Date Title
JP6362870B2 (en) Floating artificial ground
JP6619204B2 (en) Deadline method and water barrier structure
US20150121778A1 (en) Method and system of raising an existing house in a flood or storm surge
CA2763877A1 (en) A tire assembly and a method of building a support structure in a marine environment using used tires
KR20130037383A (en) Fiber reinforced plastic suction foundation and construction method
JP2020070539A (en) Banking structure
KR101851933B1 (en) Concrete floating body
KR101262865B1 (en) Construction method for cofferdam
KR20110107888A (en) Underwater pier construction method to omit temporary barrier construction.
JP2013047093A (en) Evacuation float
JP4886596B2 (en) Assembly type manhole composed of bottom plate for ascent prevention manhole and bottom plate for ascent prevention manhole
JP6176534B2 (en) Flood water stop device
JP6854479B2 (en) Liquefaction countermeasure structure for underground structures
KR100995667B1 (en) System-block and construction method using the same
JP6337798B2 (en) Water structure and construction method of water structure
KR101747235B1 (en) Support structure of offshore wind turbines and structure method thereof
JP5092047B1 (en) Evacuation float
KR101291098B1 (en) collecting well connector for eternal drainage construction technique
JP6053330B2 (en) house
JP2015161065A (en) Liquefaction prevention structure for housing ground
CN111350205B (en) A construction method suitable for anti-scour pit device for group pile foundation in water
JP2007120012A (en) Artificial ground for preventing flooding
JP4958064B2 (en) Seismic reinforcement structure of quay
JP5396196B2 (en) building
KR20160082156A (en) Hydrophilic Permeable Breakwater And Seawall Using Prefabricated Blocks

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20161104

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20170803

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20170905

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20171011

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20180227

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20180626

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20180627

R150 Certificate of patent or registration of utility model

Ref document number: 6362870

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250