JP6364293B2 - Power management system and power management method - Google Patents
[go: Go Back, main page]

JP6364293B2 - Power management system and power management method - Google Patents

Power management system and power management method Download PDF

Info

Publication number
JP6364293B2
JP6364293B2 JP2014188723A JP2014188723A JP6364293B2 JP 6364293 B2 JP6364293 B2 JP 6364293B2 JP 2014188723 A JP2014188723 A JP 2014188723A JP 2014188723 A JP2014188723 A JP 2014188723A JP 6364293 B2 JP6364293 B2 JP 6364293B2
Authority
JP
Japan
Prior art keywords
power
image
customer
surplus
house
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2014188723A
Other languages
Japanese (ja)
Other versions
JP2016063592A (en
Inventor
純一 松崎
純一 松崎
菅原 康博
康博 菅原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui Chemical Co Ltd
Original Assignee
Sekisui Chemical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui Chemical Co Ltd filed Critical Sekisui Chemical Co Ltd
Priority to JP2014188723A priority Critical patent/JP6364293B2/en
Publication of JP2016063592A publication Critical patent/JP2016063592A/en
Application granted granted Critical
Publication of JP6364293B2 publication Critical patent/JP6364293B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/12Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/40Display of information, e.g. of data or controls

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Description

本発明は、電力管理システム及び電力管理方法に関する。   The present invention relates to a power management system and a power management method.

近年、太陽光発電などの再生可能エネルギー(自然エネルギー)を利用した発電装置と蓄電池を蓄えた電力管理システムが知られている(例えば、特許文献1参照)。
また、電力管理システムとして、蓄電池の蓄電量を考慮しつつ、予測される発電電力と予測される消費電力とに基づいて、蓄電池に対する充電及び放電を制御し、エネルギーの有効活用が行われている(例えば、特許文献2参照)。
In recent years, a power management system that stores a power generation device and a storage battery using renewable energy (natural energy) such as solar power generation is known (see, for example, Patent Document 1).
In addition, the power management system controls the charging and discharging of the storage battery based on the predicted generated power and the predicted power consumption while taking into account the amount of power stored in the storage battery, and the energy is effectively used. (For example, refer to Patent Document 2).

また、電力管理システムとして、複数の需要家施設からなるコミュニティにおいて、コミュニティの需要家施設間において電力の相互融通を行う制御を行うシステムが知られている(例えば、特許文献3参照)。このように複数の需要家施設に対応する電力管理システムは、TEMS(Town Energy Management System)、あるいはCEMS(Community Energy Management System)などとも呼ばれる。   Further, as a power management system, a system that performs control for mutual interchange of power between community customer facilities in a community including a plurality of customer facilities is known (for example, see Patent Document 3). Thus, the power management system corresponding to a plurality of customer facilities is also referred to as TEMS (Town Energy Management System) or CEMS (Community Energy Management System).

特開2012−044733号公報JP 2012-044733 A 特開2013−215092号公報JP 2013-215092 A 特開2012−055078号公報JP 2012-055078 A

特許文献3における複数の需要家施設から構成されるコミュニティにおいては、ある需要家施設の発電電力が消費電力を超えた場合、この余剰電力を消費電力が発電電力を超える他の需要家施設に対して融通する処理が行われる。
上記コミュニティにおける電力の融通処理がどのように行われているかが判れば、電力の融通処理を行わない需要施設との比較が行われる。
しかしながら、従来は、コミュニティに参加している各需要家施設各々の購入電力量、売電電力量、発電装置の発電量、蓄電池への充電量、蓄電池からの放電量などが数値で表示されるのみである。
In a community composed of a plurality of customer facilities in Patent Document 3, when the generated power of a certain customer facility exceeds the power consumption, this surplus power is used for other customer facilities whose power consumption exceeds the generated power. The process is flexible.
Knowing if they were carried out how flexible processing of power in the community, compared with the consumer facility that does not perform the interchange processing of power is carried out.
However, conventionally, only the numerical value of the purchased power amount, the sold power amount, the power generation amount of the power generation device, the charge amount to the storage battery, the discharge amount from the storage battery, etc. of each customer facility participating in the community is displayed. It is.

このため、コミュニティの電力管理の管理者は、いずれの需要施設が他の需要施設に電力を融通し、いずれの需要施設が他の需要施設から電力を融通されているかの電力監視が十分に行えない。
このため、上記管理者は、需要施設の各々の融通する電力あるいは融通される電力の流れを直感的に認識することができず、TEMSやCEMSが適切に、需要施設間における電力の融通処理を行っているかの判定が困難であった。
For this reason, the administrator of the community of power management, one of the customers facility is flexible power to other customers facility, one of the customers facilities if they were flexible power from other customers facility power monitoring Is not enough.
Therefore, the administrator can not intuitively recognize the flow of electrical power to be power or flexibility to interchange each customer facility, the appropriate TEMS and CEMS, power interchange between consumer facility It was difficult to determine whether the process was being performed.

本発明は、このような事情に鑑みてなされたもので、電力を相互に融通し合うコミュニティにおける電力の融通状態を可視化し、需要施設間の電力の融通効果をビジュアルに監視できる電力管理システム及び電力管理方法を提供することを目的とする。 The present invention is a power management system capable of monitoring has been made in view of such circumstances, the power interchange state of the community mutual interchange power to each other to visualize, the flexibility effects of power between the consumer facility visually And to provide a power management method.

本発明の電力管理システムは、電力管理地域において、電気設備として蓄電池及び発電装置を備える需要家施設を含む複数の需要施設を共通の電源線に接続し、余剰電力を前記需要施設間において融通し合う電力管理システムにおいて、余剰電力である各邸売電電力を有する前記需要家施設を余剰需要家として抽出する余剰需要家抽出部と、不足電力である各邸購入電力を有する前記需要家施設を不足需要家として抽出する不足需要家抽出部と、前記余剰需要家の前記各邸売電電力を前記不足需要家の前記各邸購入電力に配分する余剰電力配分部と、前記余剰需要家の需要家画像から前記不足需要家の需要家画像に向かい、余剰電力配分部が配分した余剰電力が融通されていることを示す線形状の電力線画像を表示する融通電力線表示部と、円状棒グラフを形成する円状棒グラフ表示部とを備え、前記円状棒グラフ表示部が、前記円状棒グラフの中心円の円周の外周上に前記需要家施設の各々を示す前記需要家画像をそれぞれ所定の間隔で表示し、前記円状棒グラフを前記需要家施設の位置に前記中心円の円周を基底とし、前記中心円の直径方向に、前記中心円の外側に形成し、前記融通電力線表示部が、前記中心円の内部において、前記余剰需要家の前記需要家画像から前記不足需要家の前記需要家画像の電力の融通関係を示す前記電力線画像を描画することを特徴とする。 Power management system of the present invention, in the power management area, the plural customers facilities including customer facility comprising a storage battery and a power generator as electrical equipment connected to the common power supply line, the surplus power between the customer facility In a flexible power management system, a surplus consumer extraction unit that extracts the customer facility having each sold power as surplus power as a surplus consumer, and the consumer having each purchased power that is insufficient power and the lack of consumer extraction unit that extracts a facility as a lack of customers, and the surplus power distribution unit for distributing the power electricity each residence sale of the surplus demand at home in each of the residence purchase power of the lack of demand at home, before Symbol surplus demand directed from home demand Yoie images demand Yoie image of the missing customer, surplus power distribution unit displays a line-shaped power line image indicating that the surplus electric power distribution are interchange interchange power line display unit , E Bei a circular bar graph display unit which forms a ¥ shape bar, the circular bar graph display unit, the demand shows each of the customer facility on the outer circumference of the center circle of the circular bar house Each of the images is displayed at a predetermined interval, and the circular bar graph is formed on the outside of the central circle in the diameter direction of the central circle based on the circumference of the central circle at the position of the customer facility, interchange power line display unit, in the interior of the center circle, the feature that you draw the power line image indicating the power interchange relationship of the customer image of the missing customer from the customer image of the surplus customer To do.

本発明の電力管理システムは、前記各需要家施設を示す需要家施設画像を表示する画像制御部と、前記蓄電池に対する充電電力である各邸充電電力、前記蓄電池からの放電電力である各邸放電電力及び前記発電装置の発電電力である各邸発電電力の各々の棒グラフを表示する棒グラフ表示部とをさらに有し、前記棒グラフ表示部が、前記画像制御部が表示した前記需要家施設の各々の前記需要家画像の近傍に、前記各邸充電電力、前記各邸放電電力及び前記各邸発電電力の各々の前記棒グラフを画像表示することを特徴とする。 The power management system of the present invention includes an image control unit that displays a customer facility image indicating each customer facility, each house charging power that is charging power for the storage battery, and each house discharge that is discharging power from the storage battery. further comprising a bar graph display unit for displaying each of the bar graph of the residence generated power which is the power generated power and the power generating device, the bar graph display unit, of each of the customer facilities which the image control unit displays The bar graph of each of the mansion charging power, each mansion discharging power, and each mansion generated power is displayed in the vicinity of the customer image.

本発明の電力管理システムは、前記融通電力線表示部が、前記電力線画像の線の太さが融通される余剰電力の電力量に対応した太さまたは濃淡で表示することを特徴とする。   The power management system according to the present invention is characterized in that the interchangeable power line display unit displays the thickness of the power line image in a thickness or shade corresponding to the amount of surplus power that can be accommodated.

本発明の電力管理システムは、前記電力線画像に沿って移動する複数の第1球画像を表示する電力量球表示部をさらに有し、前記電力量球表示部が、前記余剰需要家の前記需要家画像と前記不足需要家の前記需要家画像とを接続する前記電力線画像に沿って、前記余剰需要家の前記需要家画像から前記不足需要家の前記需要家画像に向かって移動する前記第1球画像を表示することを特徴とする。 The power management system of the present invention further includes a power sphere display unit that displays a plurality of first sphere images that move along the power line image, and the power sphere display unit includes the demand of the surplus consumer. along the power line image that connects the customer image of the house image the missing customer, the first from the customer image before Symbol excess customer moves toward the customer image of the missing customer One sphere image is displayed.

本発明の電力管理システムは、前記電力量球表示部が、前記余剰需要家の前記需要家画像の周囲を前記余剰電力の電力量を示す第2球画像を表示することを特徴とする。   The power management system of the present invention is characterized in that the power sphere display unit displays a second sphere image indicating the power amount of the surplus power around the consumer image of the surplus consumer.

本発明の電力管理システムは、前記電力量球表示部が、前記第1球画像及び前記第2球画像の各々の速度、直径あるいは数を電力量に対応させて変化させることを特徴とする。   The power management system of the present invention is characterized in that the power sphere display unit changes the speed, diameter, or number of each of the first sphere image and the second sphere image in accordance with the power amount.

本発明の電力管理方法は、電力管理地域において、電気設備として蓄電池及び発電装置を備える需要家施設を含む複数の需要施設を共通の電源線に接続し、余剰電力を前記需要施設間において融通し合う電力管理方法において、余剰需要家抽出部が、余剰電力である各邸売電電力を有する前記需要家施設を余剰需要家として抽出する余剰需要家抽出過程と、不足電力である各邸購入電力を有する前記需要家施設を不足需要家として抽出する不足需要家抽出部と、不足需要家抽出部が、前記余剰需要家の前記各邸売電電力を前記不足需要家の前記各邸購入電力に配分する余剰電力配分過程と融通電力線表示部が、前記余剰需要家の需要家画像から前記不足需要家の需要家画像に向かい、余剰電力配分部が配分した余剰電力が融通されていることを示す線形状の電力線画像を表示する融通電力線表示過程とを有し、円状棒グラフ表示部が、円状棒グラフを形成する円状棒グラフ表示過程とを備え、前記円状棒グラフ表示部が、前記円状棒グラフの中心円の円周の外周上に前記需要家施設の各々を示す前記需要家画像をそれぞれ所定の間隔で表示し、前記円状棒グラフを前記需要家施設の位置に前記中心円の円周を基底とし、前記中心円の直径方向に、前記中心円の外側に形成し、前記融通電力線表示部が、前記中心円の内部において、前記余剰需要家の前記需要家画像から前記不足需要家の前記需要家画像の電力の融通関係を示す前記電力線画像を描画することを特徴とする。 Power management method of the present invention, in the power management area, the plural customers facilities including customer facility comprising a storage battery and a power generator as electrical equipment connected to the common power supply line, the surplus power between the customer facility In a flexible power management method, a surplus consumer extraction unit extracts a surplus consumer as a surplus consumer, and a surplus consumer extraction process in which each surplus power is a surplus power. A deficient customer extraction unit that extracts the customer facility having purchased power as a deficient customer, and a deficient customer extraction unit purchases the electric power sold by the surplus consumer for each residence purchased by the deficient consumer. and surplus power allocation process of allocating the power, interchange power line display unit, facing from the surplus consumers who demand Yoie images demand Yoie image of the missing customer, the surplus power is flexible surplus power allocation unit is allocated Have Possess the interchange power line display step of displaying a line-shaped power line image indicating that, circular bar graph display unit, e Bei a circular bar graph display process of forming a circular bar, the circular bar graph display unit The customer images showing each of the customer facilities are displayed at predetermined intervals on the outer periphery of the circumference of the center circle of the circular bar graph, and the circular bar graph is displayed at the center of the customer facility. The circumference of a circle is used as a base, formed in the diameter direction of the central circle, outside the central circle, and the interchangeable power line display unit is located in the central circle from the consumer image of the surplus consumer. the power line image indicating the power interchange relationship lack customer of the customer image features that you draw.

本発明によれば、電力を相互に融通し合うコミュニティにおける電力の融通状態を可視化し、需要施設間の電力の融通効果をビジュアルに監視できる電力管理システム及び電力管理方法を提供することができる。 According to the present invention, it is possible to provide a power interchange state of the community mutual interchange power to each other to visualize, the power management system and a power management method that can monitor interchange effect of power between the consumer facility visually .

本発明の一実施形態による電力管理システムの構成例を示す図である。It is a figure which shows the structural example of the power management system by one Embodiment of this invention. 第1の実施形態における融通エリア内電力管理部11の構成例を示す図である。It is a figure which shows the structural example of the power management part 11 in an accommodation area in 1st Embodiment. 第1の実施形態における融通エリア内電力管理部11の融通画面表示部113の構成例を示す図である。It is a figure which shows the structural example of the accommodation screen display part 113 of the power management part 11 in the accommodation area in 1st Embodiment. 電力管理地域1の各需要施設10における電力量の測定値を測定する測定箇所を説明する図である。Is a diagram illustrating the measurement points for measuring a measured value of electric energy in each consumer facility 10 of the power management area 1. 表示データ記憶部309に記憶されている測定値テーブルの構成例を示す図である。It is a figure which shows the structural example of the measured value table memorize | stored in the display data memory | storage part. 表示データ記憶部309に記憶されている余剰需要家テーブルの構成例を示す図である。It is a figure which shows the structural example of the surplus customer table memorize | stored in the display data storage part. 表示データ記憶部309に記憶されている不足需要家テーブルの構成例を示す図である。It is a figure which shows the structural example of the lack customer table memorize | stored in the display data memory | storage part. 表示データ記憶部309に記憶されている配分電力テーブルの構成例を示す図である。It is a figure which shows the structural example of the distribution electric power table memorize | stored in the display data storage part. 本実施形態の電力管理システムにおける各需要家施設10間の相互間の余剰電力の融通を示す表示装置の表示画面を示す図である。It is a figure which shows the display screen of the display apparatus which shows interchange of the surplus electric power between each customer facility 10 in the power management system of this embodiment. 本実施形態の電力管理システムにおける各需要家施設10間の相互間の余剰電力の融通を示す表示装置の表示画面を示す図である。It is a figure which shows the display screen of the display apparatus which shows interchange of the surplus electric power between each customer facility 10 in the power management system of this embodiment. 本実施形態の電力管理システムにおける各需要家施設10間の相互間の余剰電力の融通を示す表示装置の表示画面を示す図である。It is a figure which shows the display screen of the display apparatus which shows interchange of the surplus electric power between each customer facility 10 in the power management system of this embodiment. 本実施形態の電力管理システムにおける各需要家施設10間の相互間の余剰電力の融通を示す表示装置の表示画面を示す図である。It is a figure which shows the display screen of the display apparatus which shows interchange of the surplus electric power between each customer facility 10 in the power management system of this embodiment. 本実施形態による電力管理システムにおける需要家施設10間の電力の融通を示す図を生成する処理の一例を示すフローチャートである。It is a flowchart which shows an example of the process which produces | generates the figure which shows the interchange of the electric power between the customer facilities 10 in the electric power management system by this embodiment. 円状棒グラフ表示部308が表示装置の表示画面に表示する円状棒グラフの表示例を説明する図である。It is a figure explaining the example of a display of the circular bar graph which the circular bar graph display part 308 displays on the display screen of a display apparatus. 第1の実施形態における融通エリア内電力管理部11の自立率評価部112の構成例を示す図である。It is a figure which shows the structural example of the independence rate evaluation part 112 of the power management part 11 in the accommodation area in 1st Embodiment. データベース215に書き込まれて記憶されている計算値テーブルの構成例を示す図である。It is a figure which shows the structural example of the calculation value table written and memorize | stored in the database. データベース215に書き込まれて記憶されている電力量テーブルの構成例を示す図である。It is a figure which shows the structural example of the electric energy table written and memorize | stored in the database. 本実施形態による電力管理システムの自立率を求める計算の処理の一例を示すフローチャートである。It is a flowchart which shows an example of the process of the calculation which calculates | requires the independence rate of the power management system by this embodiment. データベース215に書き込まれて記憶されている各邸電力量テーブルの構成例を示す図である。It is a figure which shows the structural example of each residence electric energy table written and memorize | stored in the database. 本実施形態による電力管理システムが求めた自立率及び各邸自立率のグラフである。It is a graph of the independence rate calculated | required by the power management system by this embodiment, and each house independence rate. 本発明の他の実施形態による電力管理システムの構成例を示す図である。It is a figure which shows the structural example of the power management system by other embodiment of this invention. 他の実施形態における融通エリア内電力管理部11’の構成例を示す図である。It is a figure which shows the structural example of the power management part 11 'in accommodation area in other embodiment. 電力管理地域1の各需要施設10における電力量の測定値を測定する測定箇所を説明する図である。Is a diagram illustrating the measurement points for measuring a measured value of electric energy in each consumer facility 10 of the power management area 1.

以下、図面を参照して、本発明の一実施形態について説明する。図1は、本発明の一実施形態による電力管理システムの構成例を示す図である。本実施形態における電力管理システムは、例えば、所定の地域範囲である電力管理地域(コミュニティ)における複数の需要家に対応する住宅、商業施設、産業施設などの需要家施設における電力を一括して管理するものである。このような電力管理システムは、例えばTEMSやCEMSなどといわれるものに対応する。   Hereinafter, an embodiment of the present invention will be described with reference to the drawings. FIG. 1 is a diagram illustrating a configuration example of a power management system according to an embodiment of the present invention. The power management system according to the present embodiment collectively manages power in customer facilities such as houses, commercial facilities, and industrial facilities corresponding to a plurality of customers in a power management region (community) that is a predetermined region range, for example. To do. Such a power management system corresponds to what is called TEMS, CEMS, etc., for example.

本実施形態の電力管理システムは、図1において電力管理地域1として示す一定範囲の地域における複数の需要家施設10ごとに備えられる電気設備を対象として電力管理を行う。電力管理地域1には、需要家施設10、融通エリア内電力管理部11及び電力料金算出部12がある。各需要家施設10には、電力線13を介して商用電源(系統電源)から系統電力が供給される。   The power management system according to the present embodiment performs power management for an electrical facility provided for each of a plurality of customer facilities 10 in a certain range of areas shown as a power management area 1 in FIG. The power management area 1 includes a customer facility 10, a power management area power management unit 11, and a power rate calculation unit 12. System power is supplied to each customer facility 10 from a commercial power supply (system power supply) via a power line 13.

図1に示す電力管理地域1における複数の需要家施設10の各々は、太陽電池101、系統電力量計102、蓄電池103、蓄電池電力量計104及び蓄電池制御部105が備えられている。太陽電池101は、再生可能エネルギーを利用した発電装置の一例であり、風力発電など他の発電装置でも良い。また、電力管理地域1における複数の需要家施設10においては、図1に示すように太陽電池101及び蓄電池103の双方と備えず、太陽電池101と蓄電池103のいずれか一方を備える構成でもよい。   Each of the plurality of customer facilities 10 in the power management area 1 shown in FIG. 1 is provided with a solar battery 101, a grid watt hour meter 102, a storage battery 103, a storage battery watt hour meter 104, and a storage battery control unit 105. The solar cell 101 is an example of a power generation device using renewable energy, and may be another power generation device such as wind power generation. Moreover, in the some customer facility 10 in the power management area 1, as shown in FIG. 1, the structure provided with either the solar cell 101 or the storage battery 103 may not be provided with both the solar cell 101 and the storage battery 103.

系統電力量計102は、電力線13と需要家施設10内の電源線との間に設けられ、電力線13から供給される、あるいは電力線13に供給する電力量の計測を行う。
ここで、系統電力量計102から供給される電力量が、電力線13から需要家施設10に対して供給されている場合(すなわち電力量が正の場合)、この電力量は購入電力(後述する各邸購入電力K)となる。一方、需要家施設10から電力線13に対して供給されている場合(すなわち電力量が負の場合)、この電力量は売電電力(後述する各邸売電電力S)となる。
The system watt-hour meter 102 is provided between the power line 13 and the power source line in the customer facility 10 and measures the amount of power supplied from the power line 13 or supplied to the power line 13.
Here, when the amount of power supplied from the grid power meter 102 is supplied from the power line 13 to the customer facility 10 (that is, when the amount of power is positive), this amount of power is purchased power (described later). Each house purchase power K i ). On the other hand, when the power is supplied from the customer facility 10 to the power line 13 (that is, when the amount of power is negative), this amount of power becomes the selling power (each house selling power S i described later).

蓄電池103は、充電制御された場合、太陽電池101の発電した電力、あるいは電力線13から供給される電力の一部が充電される。一方、蓄電池103は、放電制御された場合、電力線13に対して電力を供給する。
蓄電池電力量計104は、需要家施設10における蓄電池103に対して充放電される電力量を計測する。
ここで、蓄電池電力量計104が測定して供給する電力量が正の場合、この電力量は充電電力(後述する各邸充電電力C)となり、一方、蓄電池電力量計104が測定して供給する電力量が負の場合、この電力量は放電電力(後述する各邸放電電力D)となる。
蓄電池制御部105は、需要家施設10における蓄電池103に対して充放電の制御を行う。
When the storage battery 103 is controlled to be charged, the power generated by the solar battery 101 or a part of the power supplied from the power line 13 is charged. On the other hand, the storage battery 103 supplies power to the power line 13 when discharge control is performed.
The storage battery watt-hour meter 104 measures the amount of power charged / discharged with respect to the storage battery 103 in the customer facility 10.
Here, when the amount of power measured and supplied by the storage battery watt-hour meter 104 is positive, this amount of power becomes charging power (each house charging power C i described later), while the storage battery watt-hour meter 104 measures When the amount of power to be supplied is negative, this amount of power becomes discharge power (each house discharge power D i to be described later).
The storage battery control unit 105 controls charging / discharging of the storage battery 103 in the customer facility 10.

また、需要家施設10は、例えば、住宅、商業施設、あるいは産業施設などに該当する。また、電力管理地域1が、例えば1つまたは複数の集合住宅に対応し、需要家施設10のそれぞれが集合住宅における各戸であるような態様でもよい。
また、需要家施設10は、電力管理システムが管理する電力管理地域1の所定の地域に限定されたものでなくても良い。すなわち、電力管理システムは、自身の管理下の需要家施設10として登録され、後述するネットワーク300を利用して管理する情報の送受信が行うことができれば、異なる地域(例えば、北海道、本州、九州、四国などの各地域)において登録された複数の需要家施設10の集合体でも良い。この場合、共通の系統電源3は、需要家施設10の各々に接続される地域における電源線の集合体となる。
The customer facility 10 corresponds to, for example, a house, a commercial facility, or an industrial facility. Further, the power management area 1 may correspond to, for example, one or a plurality of apartment houses, and each of the customer facilities 10 may be each house in the apartment house.
Further, the customer facility 10 may not be limited to a predetermined area of the power management area 1 managed by the power management system. That is, the power management system is registered as a customer facility 10 under its own management, and can transmit and receive information managed using the network 300 described later, for example, different regions (for example, Hokkaido, Honshu, Kyushu, It may be an aggregate of a plurality of customer facilities 10 registered in each region such as Shikoku. In this case, the common system power supply 3 is an aggregate of power supply lines in an area connected to each of the customer facilities 10.

融通エリア内電力管理部11は、電力管理地域1に属する各需要家施設10における電気設備である蓄電池103を対象とし、蓄電池制御部105を介して電力制御を実行する。このために、図1における融通エリア内電力管理部11は、ネットワーク300を介して需要家施設10の各々と相互通信可能なように接続される。これにより、融通エリア内電力管理部11は、各需要家施設10における電気設備を制御することができる。
電力料金算出部12は、電力管理地域1の各需要家施設10における系統電力量計102及び蓄電池電力量計104の各々の計測する電力量に基づき、各需要家施設10の電力料金を算出する。また、電力料金算出部12は、ネットワーク400により、電力管理地域1内の各需要施設10に設けられている系統電力量計102及び蓄電池電力量計104の各々の計測する電力量を、電力料金を算出するための電力量実績情報として収集する。
The in-accommodation area power management unit 11 targets the storage battery 103, which is an electrical facility in each customer facility 10 belonging to the power management area 1, and executes power control via the storage battery control unit 105. For this purpose, the power management unit 11 in the accommodation area in FIG. 1 is connected to the customer facility 10 via the network 300 so as to be able to communicate with each other. Thereby, the power management part 11 in the accommodation area can control the electrical equipment in each customer facility 10.
The power rate calculation unit 12 calculates the power rate of each customer facility 10 based on the amount of power measured by each of the grid energy meter 102 and the storage battery energy meter 104 in each customer facility 10 in the power management area 1. . Further, power rate calculation unit 12, by the network 400, the amount of power measurement of each of the system power meter 102 and the storage battery power meter 104 provided to the customers facilities 10 of the power in the management area 1, the power Collected as actual power consumption information for calculating charges.

図2は、第1の実施形態における融通エリア内電力管理部11の構成例を示す図である。融通エリア内電力管理部11は、電力管理部111と自立率評価部112と融通画面表示部113とを備えている。ここで、自立率評価部112は、電力管理地域1内の自立率を算出しない場合、設ける必要はない。この場合、融通エリア内電力管理部11は、電力管理部111及び融通画面表示部113を備える構成となる。
電力管理部111は、電力管理地域1に属する各需要家施設10の各々に対し、れぞれ余剰電力を他の需要家施設10に対して供給させたり、あるいは不足電力を他の需要施設10から受給させたりする制御を行う。ここで、余剰電力は、太陽電池101が発電した電力が、負荷が消費する電力と、蓄電池103に対して充電する電力との合計値を上回った差分の電力を示している。不足電力は、太陽電池101が発電した電力及び蓄電池103が放電電力を加算した電力を消費電力が上回った差分の電力を示している。
FIG. 2 is a diagram illustrating a configuration example of the interchange area power management unit 11 according to the first embodiment. The accommodation area power management unit 11 includes a power management unit 111, an independence rate evaluation unit 112, and an accommodation screen display unit 113. Here, the independence rate evaluation unit 112 does not need to be provided when the independence rate in the power management area 1 is not calculated. In this case, the accommodation area power management unit 11 includes a power management unit 111 and an accommodation screen display unit 113.
The power management unit 111, for each of the customers facility 10 belonging to the power management area 1, the their respective surplus power or is supplied to the other customer facility 10, or a power shortage of other consumers Control to receive from the facility 10 is performed. Here, the surplus power indicates the difference power in which the power generated by the solar cell 101 exceeds the total value of the power consumed by the load and the power charged in the storage battery 103. Insufficient power indicates the difference in power consumption that exceeds the power generated by the solar battery 101 and the power obtained by adding the discharge power to the storage battery 103.

各需要施設10には、図示しない電力管理部が設けられており、過去の実績から翌日に消費される消費電力、翌日に太陽電池101が発電する発電電力を推定し、電力管理計画を生成する。電力管理計画は、デマンド時限毎において、商用電源からの購入電力がデマンド値を超えないように、太陽電池101の発電電力に加えて、蓄電池103からの放電電力の電力量が設定されている。
また、上記電力管理部は、電力管理計画における翌日の消費電力と発電電力とに基づき、価格の安い夜間電力(夜間時間帯の系統電源からの購入電力)により、蓄電池103に対して翌日に必要となる電力を充電させておく。夜間時間帯以外は、系統電源の電力価格が夜間時間帯より高い中間時間帯となる。
Each customer facility 10, and the power management unit (not shown) is provided, power consumption from the past results is consumed the next day, it estimates the generated power solar cell 101 generates electric power on the next day, generating a power management plan To do. In the power management plan, the amount of discharged power from the storage battery 103 is set in addition to the generated power of the solar battery 101 so that the purchased power from the commercial power supply does not exceed the demand value for each demand time period.
In addition, the power management unit is necessary for the storage battery 103 on the next day using cheaper nighttime power (purchased power from the system power supply during the nighttime period) based on the power consumption and generated power the next day in the power management plan. Let the power to become charged. Other than the night time zone, the power price of the system power supply is an intermediate time zone higher than the night time zone.

しかしながら、翌日の天気による発電電力の推定値とのずれあるいは各需要施設10における消費電力の推定値とのずれにより、需要施設10の各々において余剰電力あるいは不足電力が発生する。
電力管理部111は、各需要施設10における余剰電力及び不足電力に基づき、余剰電力を有する需要施設10から、不足電力を有する他の需要施設10に対して、電力を融通する制御を行う。ここで、この電力を行う融通方式としては、いずれの方式を用いても良い。
However, the deviation between the estimated value of the power consumption in the displacement or each consumer facility 10 and the estimated value of the power generated by the next day's weather, excess power or insufficient power is generated in each of the customer facility 10.
The power management unit 111, based on the excess power and under power in the customers facility 10, from customer facilities 10 with surplus power, relative to other consumer facility 10 having a power shortage, the control of interchange power Do. Here, any method may be used as an accommodation method for performing this electric power.

例えば、各需要施設10の電力管理部が余剰電力あるいは不足電力の情報を電力管理部111に対して通知する。これにより、電力管理部111は、逐次制御により余剰電力を有する需要施設10から、不足電力を有する他の需要施設10に対して、電力を融通する制御を行う。
また、他の方式としては、各需要施設10の電力管理部が制御周期毎に次の制御周期における余剰電力あるいは不足電力を推定し、推定された余剰電力、不足電力の情報を電力管理部111に対して通知する。これにより、電力管理部111は、通知された推定された余剰電力及び不足電力の情報により、次の制御周期における余剰電力を有すると推定された需要施設10から、不足電力を有すると推定された他の需要施設10に対して、電力を融通する制御を行う。
For example, the power management unit of each customer facility 10 notifies the information of surplus power or insufficient power to the power management unit 111. Thus, the power management unit 111, a customer facility 10 with surplus power by sequential control, for other consumer facility 10 having a power shortage, control is performed to interchange power.
As another method, it estimates the surplus power or power shortage in the next control cycle power management unit in each control cycle of each customer facility 10, the estimated surplus power, the power management unit information power shortage 111 is notified. Thus, the power management unit 111, the notified estimated surplus power and information power shortage has been, from customer facilities 10 that are estimated to have a surplus power in the next control cycle, is estimated to have a power shortage for other consumer facility 10, control is performed to interchange power.

自立率評価部112は、複数の需要家施設10を備える電力管理地域1全体の自立の程度、すなわち電力管理地域1の電力に対する自立率を評価する。これにより、自立率評価部112は、電力の融通を行う方式の各々を、いずれがその電力管理地域1に対応して、効率のよい電力の融通を行っているかを評価することができる。   The independence rate evaluation unit 112 evaluates the degree of independence of the entire power management area 1 including the plurality of customer facilities 10, that is, the independence rate for the power in the power management area 1. As a result, the independence rate evaluation unit 112 can evaluate which of the methods for power accommodation corresponds to the power management area 1 and which is providing efficient power accommodation.

融通画面表示部113は、複数の需要家施設10を備える電力管理地域1全体において、需要家の各々の相互に融通する電力の流れを、需要家施設間を結ぶ電力線の画像である線形状の電力線画像を、表示装置(不図示)の表示画面に表示する。   The interchange screen display unit 113 is a linear shape that is an image of a power line that connects customer facilities with each other in the power management area 1 including the plurality of customer facilities 10. The power line image is displayed on a display screen of a display device (not shown).

図3は、第1の実施形態における融通エリア内電力管理部11の融通画面表示部113の構成例を示す図である。
融通画面表示部113は、画像制御部301、余剰需要家抽出部302、不足需要家抽出部303、余剰電力配分部304、棒グラフ表示部305、融通電力線表示部306、電力量球表示部307、円状棒グラフ表示部308及び表示データ記憶部309の各々を備えている。
FIG. 3 is a diagram illustrating a configuration example of the accommodation screen display unit 113 of the accommodation area power management unit 11 in the first embodiment.
The interchange screen display unit 113 includes an image control unit 301, a surplus consumer extraction unit 302, a short customer extraction unit 303, a surplus power distribution unit 304, a bar graph display unit 305, a flexible power line display unit 306, an electric energy bulb display unit 307, Each includes a circular bar graph display unit 308 and a display data storage unit 309.

上述した融通画面表示部113における各部の説明に対して、需要家施設10間の相互の電力の融通を示す画像を表示するために用いる測定値と、それぞれの測定値の測定箇所の説明を行う。
図4は、電力管理地域1の各需要家施設10における電力量の測定値を測定する測定箇所を説明する図である。以下、需要家施設10は、例えばn箇所あるとして説明する。図4(a)は、需要電力を各需要家施設10間において相互に融通し合う際の自立率を求めるための測定値を測定する測定箇所を示している。図4(b)は、後述する需要電力を各需要家施設10間において相互に融通しない際の自立率を求めるための測定値を測定する測定箇所を示している。
With respect to the description of each part in the above-described interchange screen display unit 113, the measurement values used for displaying an image indicating the mutual power exchange between the customer facilities 10 and the measurement locations of the respective measurement values will be described. .
FIG. 4 is a diagram for explaining measurement points at which the measurement value of the electric energy in each customer facility 10 in the power management area 1 is measured. In the following description, it is assumed that there are n customer facilities 10, for example. FIG. 4A shows a measurement location for measuring a measured value for obtaining an independence rate when demand power is interchanged between the customer facilities 10. FIG. 4 (b) shows a measurement location for measuring a measured value for obtaining an independence rate when demand power to be described later is not interchanged between customer facilities 10.

図4(a)において、融通エリア受電点Jは、電力管理地域1に系統電力から供給される、あるいは電力管理地域1から系統電力に逆流する電力量の基準となる測定点である。
融通エリア需要家出入点jt(1≦i≦n)は、各需要家施設10に対して電力線13供給される、あるいは各需要家施設10から電力線13に供給される電力量を測定する測定点である。本実施形態においては、融通エリア需要家出入点jtには系統電力量計102が設置されている。
In FIG. 4A, the interchange area power receiving point J is a measurement point that serves as a reference for the amount of power supplied from the grid power to the power management area 1 or flowing back from the power management area 1 to the grid power.
The interchange area customer entry / exit point jt i (1 ≦ i ≦ n) is a measurement for measuring the amount of power supplied to each customer facility 10 or supplied from each customer facility 10 to the power line 13. Is a point. In the present embodiment, the system power meter 102 is installed in the accommodation area consumer and out points jt i.

太陽光発電出入点P(1≦i≦n)は、太陽電池101が発電した電力量を測定する測定点である。
蓄電池出入点B(1≦i≦n)は、蓄電池103に対して行う充放電における電力量を測定する測定点である。本実施形態においては、蓄電池出入点Bには蓄電池電力量計104が設置されている。
各邸電力出入点L(1≦i≦n)は、電力線13及び太陽電池101から各邸に供給される電力量、すなわち需要家施設10が消費する消費電力を測定する測定点である。
The photovoltaic power generation entry / exit point P i (1 ≦ i ≦ n) is a measurement point for measuring the amount of power generated by the solar cell 101.
The storage battery entry / exit point B i (1 ≦ i ≦ n) is a measurement point for measuring the amount of power in charging / discharging performed on the storage battery 103. In the present embodiment, the storage battery power meter 104 is installed in the battery and out point B i.
Each residence power entry / exit point L i (1 ≦ i ≦ n) is a measurement point for measuring the amount of power supplied to each residence from the power line 13 and the solar cell 101, that is, the power consumption consumed by the customer facility 10.

次に、上記測定点各々において測定される本実施形態における測定値について説明する。
各邸購入電力K(1≦i≦n)は、系統電力量計102により測定された数値であり、電力線13から各需要家施設10に対して供給された電力を示している。
各邸売電電力S(1≦i≦n)は、各需要家施設10から電力線13に対して供給された電力を示している。
各邸発電電力P(1≦i≦n)は、太陽電池101の電力を出力する端子に設けられた発電電力電力計(不図示)により測定された数値であり、各需要家施設10から電力線13に対して供給された電力を示している。
Next, the measurement value in this embodiment measured at each measurement point will be described.
Each house purchase power K i (1 ≦ i ≦ n) is a numerical value measured by the grid watt hour meter 102 and indicates the power supplied from the power line 13 to each customer facility 10.
Each house electric power S i (1 ≦ i ≦ n) indicates the electric power supplied from each customer facility 10 to the power line 13.
Each residence power generation power P i (1 ≦ i ≦ n) is a numerical value measured by a generated power wattmeter (not shown) provided at a terminal that outputs the power of the solar cell 101, and from each customer facility 10. The electric power supplied with respect to the power line 13 is shown.

各邸充電電力C(1≦i≦n)は、蓄電池電力量計104により測定された数値であり、蓄電池103に対して充電された電力を示している。
各邸放電電力D(1≦i≦n)は、蓄電池電力量計104により測定された数値であり、蓄電池103から放電された電力を示している。
各邸消費電力L(1≦i≦n)は、系統電力量計102及び太陽電池101と需要家施設10の電力線との間に設けられた消費電力電力量計(不図示)により測定された数値であり、電力線13及び太陽電池101から各邸に供給される電力量、すなわち需要家施設10が消費する消費電力を示している。
Each residence charging power C i (1 ≦ i ≦ n) is a numerical value measured by the storage battery watt-hour meter 104 and indicates the power charged to the storage battery 103.
Each residence discharge power D i (1 ≦ i ≦ n) is a numerical value measured by the storage battery watt-hour meter 104 and indicates the power discharged from the storage battery 103.
Each residence power consumption L i (1 ≦ i ≦ n) is measured by a system energy meter 102 and a power consumption energy meter (not shown) provided between the solar cell 101 and the power line of the customer facility 10. It shows the amount of power supplied to each residence from the power line 13 and the solar battery 101, that is, the power consumption consumed by the customer facility 10.

図3に戻り、画像制御部301は、データの出入力の制御や、融通画面表示部113内の各部の動作の制御を行う。また、画像制御部301は、各需要家施設10から供給される各邸購入電力K、各邸売電電力S、各邸太陽光発電力P、各邸充電電力C、各邸放電電力D、各邸消費電力Lの各々の測定値を、供給した需要家施設10を識別する識別情報である邸番号とともに、表示データ記憶部309の測定値テーブルに書き込んで記憶させる。各邸購入電力K、各邸売電電力S、各邸太陽光発電電力P、各邸充電電力C、各邸放電電力D、各邸消費電力Lの各々は、1分毎に読み出される測定値であり、1分間の測定周期における積算電力である。ここで、画像制御部301は、各測定値テーブルに対して測定値を測定した時刻を示すタイムスタンプを付与して書き込んで記憶させる。 Returning to FIG. 3, the image control unit 301 controls the input / output of data and the operation of each unit in the flexible screen display unit 113. In addition, the image control unit 301 includes each house purchase power K i , each house sale power S i , each house solar power P i , each house charge power C i , and each house supplied from each customer facility 10. The measured values of the discharge power D i and the power consumption L i of each residence are written and stored in the measurement value table of the display data storage unit 309 together with the residence number which is identification information for identifying the supplied customer facility 10. Each residence purchase power K i , each residence sale power S i , each residence photovoltaic power generation P i , each residence charge power C i , each residence discharge power D i , and each residence consumption power L i are each 1 minute. It is a measurement value read out every time, and is an integrated power in a measurement cycle of 1 minute. Here, the image control unit 301 assigns and stores a time stamp indicating the time when the measurement value is measured in each measurement value table.

図5は、表示データ記憶部309に記憶されている測定値テーブルの構成例を示す図である。この図5において、測定値テーブルは、購入電力(各邸購入電力K)、売電電力(各邸売電電力S)、発電電力(各邸太陽光発電力P)、充電電力(各邸充電電力C)、放電電力(各邸放電電力D)、消費電力(各邸消費電力L)の各々は、各邸を識別する邸番号とともに書き込まれて記憶されている。 FIG. 5 is a diagram illustrating a configuration example of a measurement value table stored in the display data storage unit 309. In FIG. 5, the measured value table includes purchased power (each house purchased power K i ), sold power (each house sold power S i ), generated power (each house solar power P i ), and charged power ( Each residence charge power C i ), discharge power (each residence discharge power D i ), and power consumption (each residence consumption power L i ) are written and stored together with a residence number identifying each residence.

図3に戻り、余剰需要家抽出部302は、表示データ記憶部309の測定値テーブルを参照し、各邸売電電力Sが「0」でない、すなわち余剰電力を有している需要家施設10を抽出する。また、余剰需要家抽出部302は、抽出した需要家施設10を余剰需要家として、表示データ記憶部309の余剰需要家テーブルに、各邸の邸番号に対応させ、発電電力(各邸太陽光発電電力P)、売電電力(各邸売電電力S)、未融通電力、直接融通分電力、放電融通分電力、放電電力(各邸放電電力D)、充電電力(各邸充電電力C)の各々を対応付けて書き込んで記憶させる。ここで、余剰需要家抽出部302は、未融通電力の欄に売電電力を書き込む。また、未融通電力は、売電電力全体における融通先の需要家施設の決定していない余剰電力を示している。直接融通分電力は、売電電力からの融通分電力において、太陽電池101の発電電力から融通される電力を示している。放電融通分電力は、売電電力からの融通分電力において蓄電池103からの放電電力から融通される電力を示している。 Returning to FIG. 3, the surplus customer extraction unit 302 refers to the measurement value table of the display data storage unit 309, and each of the house powers Si is not “0”, that is, a customer facility having surplus power 10 is extracted. Further, the surplus consumer extraction unit 302 sets the extracted customer facility 10 as a surplus consumer, associates the surplus consumer table of the display data storage unit 309 with the house number of each residence, Generated power P i ), Selling power (Electricity selling power S i ), Unaccommodated power, Directly accommodating power, Discharge accommodating power, Discharging power (Every mansion discharging power Di ) Each of the powers C i ) is written and stored in association with each other. Here, the surplus customer extraction unit 302 writes the sold power in the unacquired power column. Further, unaccommodated power indicates surplus power that has not been determined by the customer facility as the accommodation destination in the entire sold power. Direct interchangeable power indicates power interchanged from the generated power of the solar battery 101 in the interchangeable power from the selling power. Discharge accommodation power indicates the power interchanged from the discharge power from the storage battery 103 in the accommodation power from the selling power.

図6は、表示データ記憶部309に記憶されている余剰需要家テーブルの構成例を示す図である。この図6において、余剰需要家テーブルは、発電電力(各邸太陽光発電力P)、売電電力(各邸売電電力S)、未融通電力、直接融通分電力、放電融通分電力、放電電力(各邸放電電力D)、充電電力(各邸充電電力C)の各々が、各邸を識別する邸番号とともに書き込まれて記憶されている。 FIG. 6 is a diagram illustrating a configuration example of a surplus customer table stored in the display data storage unit 309. In FIG. 6, the surplus consumer table includes generated power (each house solar power P i ), sold power (each house sold power S i ), unaccommodated power, direct accommodation power, and discharge accommodation power. The discharge power (each house discharge power D i ) and the charge power (each house charge power C i ) are written and stored together with a house number identifying each house.

図3に戻り、不足需要家抽出部303は、表示データ記憶部309の測定値テーブルを参照し、各低購入電力Kが「0」でない、すなわち電力において自立できずに不足電力を有している需要家施設10を抽出する。また、不足需要家抽出部303は、抽出した需要家施設10を不足需要家として、表示データ記憶部309の不足需要家テーブルに、各邸の邸番号に対応させ、発電電力(各邸太陽光発電電力P)、購入電力(各邸購入電力KZ)、不足電力、放電電力(各邸放電電力D)、充電電力(各邸充電電力C)の各々を対応付けて書き込んで記憶させる。ここで、不足需要家抽出部303は、不足電力の欄に購入電力を書き込む。また、不足電力は、購入電力全体における電力の融通元の需要家施設が決定していない電力、すなわち購入電力に対して不足している電力を示している。 Returning to FIG. 3, the short customer extracting unit 303 refers to the measurement value table of the display data storage unit 309, and each low purchased power Ki is not “0”, that is, the power cannot be independent and has insufficient power. The customer facility 10 is extracted. In addition, the shortage customer extraction unit 303 sets the extracted customer facility 10 as a shortage customer, causes the shortage customer table of the display data storage unit 309 to correspond to the house number of each house, and generates power (each house solar light). Each of the generated power P i ), purchased power (each house purchased power KZ i ), insufficient power, discharge power (each house discharge power D i ), and charge power (each house charge power C i ) is written and stored in association with each other. Let Here, the shortage customer extraction unit 303 writes the purchased power in the column of shortage power. In addition, the shortage power indicates the power that is not determined by the customer facility as the power interchange source in the entire purchased power, that is, the power shortage with respect to the purchased power.

図7は、表示データ記憶部309に記憶されている不足需要家テーブルの構成例を示す図である。この図7において、不足需要家テーブルは、発電電力(各邸太陽光発電電力P)、購入電力(各邸購入電力KZ)、不足電力、放電電力(各邸放電電力D)、充電電力(各邸充電電力C)の各々が、各邸を識別する邸番号とともに書き込まれて記憶されている。 FIG. 7 is a diagram illustrating a configuration example of a short customer table stored in the display data storage unit 309. In FIG. 7, the shortage consumer table includes generated power (each house photovoltaic power P i ), purchased power (each house purchased power KZ i ), insufficient power, discharge power (each house discharge power D i ), and charging. Each of the electric power (each house charging power C i ) is written and stored together with a house number for identifying each house.

図3に戻り、余剰電力配分部304は、表示データ記憶部309の余剰需要家テーブルを上から参照し、未融通電力が「0」でない需要家施設10を抽出する。また、余剰電力配分部304は、表示データ記憶部309の不足需要家テーブルを上から参照し、不足電力が「0」でない需要家施設10を抽出する。   Returning to FIG. 3, the surplus power distribution unit 304 refers to the surplus consumer table of the display data storage unit 309 from above, and extracts the customer facility 10 whose unacquired power is not “0”. Further, the surplus power distribution unit 304 refers to the shortage customer table of the display data storage unit 309 from above, and extracts the customer facility 10 whose shortage power is not “0”.

そして、余剰電力配分部304は、抽出した余剰需要家の需要家施設10の未融通電力から、不足需要家の需要家施設10の不足電力を減算する。ここで、余剰電力配分部304は、未融通電力から不足電力を減算し、未融通電力が負あるいは「0」となった場合、表示データ記憶部309の余剰需要家テーブルの未融通電力を「0」として書き込んで記憶させる。また、余剰電力配分部304は、減算結果の融通電力が負の場合、表示データ記憶部309の不足需要家テーブルの不足電力にこの負の分の融通電力の絶対値を書き込んで記憶させる。   Then, the surplus power distribution unit 304 subtracts the shortage power of the customer facility 10 of the short customer from the extracted unacquired power of the customer facility 10 of the surplus customer. Here, the surplus power distribution unit 304 subtracts the insufficient power from the unaccompanied power, and when the unaccommodated power becomes negative or “0”, the surplus power distribution unit 304 stores the unaccommodated power in the surplus consumer table “309”. "0" is written and stored. Further, when the subtracted result of the interchangeable power is negative, the surplus power distribution unit 304 writes and stores the absolute value of the negative interchangeable power in the insufficient power in the shortage consumer table of the display data storage unit 309.

一方、余剰電力配分部304は、未融通電力から不足電力を減算して、未融通電力が正となった場合に、不足電力を「0」として書き込んで記憶させる。また、余剰電力配分部304は、減算結果の融通電力が正の場合、表示データ記憶部309の余剰需要家テーブルの未融通電力にこの減算結果の未融通電力を書き込んで記憶させる。   On the other hand, the surplus power distribution unit 304 subtracts the insufficient power from the unaccompanied power, and writes and stores the insufficient power as “0” when the unaccommodated power becomes positive. In addition, when the interchange power of the subtraction result is positive, the surplus power distribution unit 304 writes and stores the unaccommodated power of the subtraction result in the unaccommodated power of the surplus consumer table of the display data storage unit 309.

また、余剰電力配分部304は、余剰需要家の各々において、余剰電力の配分先である需要家施設10の邸番号(後述する供給先邸番号)と、その需要家施設10に対して供給した配分電力(後述する供給配分電力)とを、自身の邸番号(後述する供給元邸番号)に対応付けて、余剰需要家の需要家施設10の余剰電力の全ての融通先が決定した際(融通電力が「0」となった際)、表示データ記憶部309の配分電力テーブルに対して書き込んで記憶させる。   In addition, the surplus power distribution unit 304 supplies the surplus power to each of the surplus customers with respect to the home number of the customer facility 10 to which surplus power is distributed (supplied house number described later) and the customer facility 10. When allocated power (supplied power supply to be described later) is associated with its own house number (supplier's house number to be described later) and all the surplus power destinations of the surplus consumer customer facility 10 have been determined ( When the interchanged power becomes “0”), it is written and stored in the distributed power table of the display data storage unit 309.

図8は、表示データ記憶部309に記憶されている配分電力テーブルの構成例を示す図である。配分電力テーブルは、余剰需要家の需要家施設10の各々に、需要家施設10の邸番号に対応して設けられている。この図8において、配分電力テーブルは、供給元邸番号と、売電電力(各邸売電電力S)、供給先邸番号、供給配分電力の各々が対応付けて書き込まれて記憶されている。
供給元邸番号は、余剰需要家である需要家施設10の邸番号が示している。売電電力は、供給元邸番号の示す需要家施設10の各邸売電電力Sを示している。供給先邸番号は、対応する供給元邸番号の需要家施設10が余剰電力を融通する融通先の不足需要家の需要家施設各々の邸番号を示している。供給配分電力は、対応する供給元邸番号の需要家施設10が融通先の不足需要家の需要家施設各々に配分して融通する電力を示している。
ここで、不足需要家における不足電力の量が大きく、複数の余剰需要家から電力を融通される場合、また、余剰需要家における余剰電力の量が大きく、複数の不足需要家に対して電力を融通する場合もある。
FIG. 8 is a diagram illustrating a configuration example of a distributed power table stored in the display data storage unit 309. The distributed power table is provided in each of the surplus consumer's customer facilities 10 corresponding to the house number of the customer facility 10. In FIG. 8, the distribution power table stores the supply source house number, the power sale power (each house sale power S i ), the supply house number, and the supply distribution power in association with each other. .
The house number of the supplier is the house number of the customer facility 10 that is a surplus consumer. Sale of electricity power, shows each mansion power purchase power S i of the consumer facility 10 indicated by the supplier House number. The supply house number indicates the house number of each customer facility of the shortage consumer of the accommodation destination where the customer facility 10 of the corresponding supply house number accommodates surplus power. The supply distribution power indicates the power that the customer facility 10 of the corresponding supply source house number allocates and distributes to each of the customer facilities of the shortage customers of the accommodation destination.
Here, when there is a large amount of power shortage among the shortage consumers and power is exchanged from a plurality of surplus consumers, the amount of surplus power at the surplus consumers is large, and power is supplied to a plurality of shortage consumers. Sometimes it is flexible.

図3に戻り、画像制御部301は、表示データ記憶部309の測定値テーブルを上から参照し、需要家施設10の邸番号を含む需要家施設10の需要家施設画像を表示装置(不図示)の表示画面に表示する。
棒グラフ表示部305は、表示データ記憶部309の測定値テーブルを上から参照し、需要家施設画像の各々の邸番号に対応した需要家施設10の発電量(各邸太陽光発電電力P)、充電量(各邸充電電力C)、放電量(各邸放電電力D)を読み出す。また、棒グラフ表示部305は、需要家施設画像の各々の近傍に、それぞれの需要家施設画像の邸番号の需要家施設10のに対応する発電量(各邸太陽光発電電力P)、充電量(各邸充電電力C)、放電量(各邸放電電力D)を画像表示する。
Returning to FIG. 3, the image control unit 301 refers to the measurement value table of the display data storage unit 309 from above, and displays the customer facility image of the customer facility 10 including the house number of the customer facility 10 (not shown). ) Is displayed on the display screen.
The bar graph display unit 305 refers to the measurement value table of the display data storage unit 309 from above, and the power generation amount of the customer facility 10 corresponding to each house number in the customer facility image (each house photovoltaic power generation P i ). The charge amount (recharge power C i for each residence) and the discharge amount (discharge power D i for each residence) are read out. In addition, the bar graph display unit 305 has, in the vicinity of each customer facility image, a power generation amount corresponding to the customer facility 10 having the house number of each customer facility image (each house photovoltaic power generation P i ), charging. The amount (each house charging power C i ) and the amount of discharge (each house discharging power D i ) are displayed as images.

融通電力線表示部306は、表示データ記憶部309の配分電力テーブルを参照し、邸番号の順番に、余剰需要家の需要家施設10が電力を供給する不足測需要家の各々の邸番号と、この邸番号の示す不足需要家に融通する供給配分電力とを読み出す。そして、融通電力線表示部306は、余剰需要家の需要家施設10の需要家施設画像から、不足需要家の需要家施設10の需要家施設画像に対して、電力を融通していることを示す電力線画像を画像表示する。融通電力線表示部306は、電力線画像に対して、余剰需要家の需要家施設10の需要家施設画像から、不足需要家の需要家施設10の需要家施設画像へ電力を融通していることを示す矢印を付加しても良い。   The flexible power line display unit 306 refers to the distribution power table of the display data storage unit 309, and in the order of the house number, each house number of the short-measured consumer to which the surplus consumer customer facility 10 supplies power, It reads out the supply distribution power that can be accommodated by the shortage customer indicated by the house number. Then, the interchangeable power line display unit 306 indicates that power is interchanged from the customer facility image of the customer facility 10 of the surplus consumer to the customer facility image of the customer facility 10 of the insufficient customer. Display power line image. The interchangeable power line display unit 306 indicates that power is interchanged from the customer facility image of the surplus consumer customer facility 10 to the customer facility image of the shortage customer facility 10 with respect to the power line image. An arrow may be added.

ここで、融通電力線表示部306は、複数の余剰需要家から供給配分電力が融通されている不足需要家の電力線画像を描画する場合、不足需要家の需要家施設画像に接続される電力線画像の終端部において、各余剰需要家を開始点とする電力線画像をまとめて1本の電力線画像として描画する。また、融通電力線表示部306は、電力線画像の電力線の太さ融通される供給配分電力の電力量に対応させる。すなわち、融通電力線表示部306は、電力量が大きくなるに従い、電力線画像の電力線の幅を太く、あるいは電力線画像の電力線を濃くして描画する。すなわち、電力線画像の幅あるいは電力線画像の濃淡により電力量を表現する。   Here, the interchangeable power line display unit 306, when drawing a power line image of a shortage customer whose supply distribution power is accommodated from a plurality of surplus consumers, displays the power line image connected to the customer facility image of the shortage consumer. In the terminal part, the power line images starting from the surplus consumers are collectively drawn as one power line image. In addition, the interchangeable power line display unit 306 corresponds to the amount of power of the supply distribution power accommodated in the thickness of the power line of the power line image. That is, the interchangeable power line display unit 306 draws the power line image with a wider power line width or a darker power line image as the amount of power increases. That is, the amount of power is expressed by the width of the power line image or the density of the power line image.

電力量球表示部307は、表示データ記憶部309の配分電力テーブルを参照し、邸番号の順番に、余剰需要家の需要家施設10が電力を供給する不足測需要家の各々の邸番号と、この邸番号の示す不足需要家に融通する供給配分電力とを読み出す。
電力量球表示部307は、需要家施設画像の周囲に円を描画し、この円に沿って移動する第1電力量球画像を描画する。この第1電力球は、需要家施設画像の需要家施設10が他の需要家施設10に融通する供給配分電力の電力量に対応した直径を有している。また、第1電力量球画像は、需要家施設画像の需要家施設10が他の需要家施設10に融通する供給配分電力の電力量に対応した速度で移動するように描画しても良い。さらに、第1電力量球画像は、球の数(例えば1kWにつき1個)により、需要家施設画像の需要家施設10が他の需要家施設10に融通する供給配分電力の電力量を表現しても良い。
The electric energy bulb display unit 307 refers to the distributed power table of the display data storage unit 309, and in the order of the house number, each house number of the short-measured consumer to which the surplus consumer customer facility 10 supplies power. Then, the supply distribution power that can be accommodated by the shortage customer indicated by the house number is read out.
The electric energy bulb display unit 307 draws a circle around the customer facility image, and draws a first electric energy bulb image that moves along the circle. This 1st electric power bulb has a diameter corresponding to the amount of electric power of the supply distribution power which the customer facility 10 of the customer facility image accommodates to another customer facility 10. In addition, the first power sphere image may be drawn so that the customer facility 10 in the customer facility image moves at a speed corresponding to the amount of power of the distributed power supply that can be accommodated in the other customer facility 10. Further, the first power amount sphere image represents the amount of power of supply distribution power that the customer facility 10 of the customer facility image accommodates to other customer facilities 10 by the number of spheres (for example, one per 1 kW). May be.

また、電力量球表示部307は、融通電力線表示部306が描画する電力線画像に沿って、余剰需要家の需要家施設10の需要家施設画像から、不足需要家の需要家施設10の需要家施設画像へ移動する第2電力量球画像を描画する。この第2電力量球画像は、余剰需要家の需要家施設10の需要家施設画像から、不足需要家の需要家施設10の需要家施設画像へ融通する電力量に対応した直径を有している。また、第2電力量球画像は、余剰需要家の需要家施設10の需要家施設画像から、不足需要家の需要家施設10の需要家施設画像へ融通する電力量に対応した速度で移動するように描画しても良い。さらに、第2電力量球画像は、球の数(例えば1kWにつき1個)により、余剰需要家の需要家施設10の需要家施設画像から、不足需要家の需要家施設10の需要家施設画像へ融通する電力量を表現しても良い。   Moreover, the electric energy bulb | ball display part 307 is the consumer of the customer facility 10 of a deficient consumer from the customer facility image of the customer facility 10 of a surplus consumer along the power line image which the interchangeable power line display part 306 draws. The second power sphere image that moves to the facility image is drawn. The second power sphere image has a diameter corresponding to the amount of power that can be accommodated from the customer facility image of the customer facility 10 of the surplus consumer to the customer facility image of the customer facility 10 of the insufficient customer. Yes. Further, the second electric energy bulb image moves at a speed corresponding to the amount of electric power that can be accommodated from the customer facility image of the customer facility 10 of the surplus consumer to the customer facility image of the customer facility 10 of the insufficient customer. You may draw as follows. Further, the second power sphere image is based on the number of spheres (for example, one per 1 kW), from the customer facility image of the customer facility 10 of the surplus consumer, and the customer facility image of the customer facility 10 of the insufficient customer. It is also possible to express the amount of power that can be accommodated.

図9は、本実施形態の電力管理システムにおける各需要家施設10間の相互間の余剰電力の融通を示す表示装置の表示画面を示す図である。この図9は、電力管理地域1の全ての需要施設10が不足需要家であり、受電端画像506(この受電端は図4の融通エリア受電点J)を介して系統電源から不足した電力を購入している場合を示している。
需要家施設画像500内には、需要家施設10の邸番号(例えば、「NO.108」)の文字が描画されている。需要家施設画像500の近傍(例えば、上部)には、充電量(各邸充電電力Ci)、放電量(各邸放電電力Di)及び発電量(各邸太陽光発電電力Pi)の各々の電力量を示す棒グラフ画像510が描画されている。
FIG. 9 is a diagram showing a display screen of a display device that indicates the interchange of surplus power between customer facilities 10 in the power management system of the present embodiment. FIG 9 are all customers facility 10 is insufficient consumer of power management area 1, the receiving end image 506 (This receiving end is flexible area receiving point J in FIG. 4) were missing from the system power supply via the power Shows if you have purchased.
In the customer facility image 500, characters of the house number (for example, “NO. 108”) of the customer facility 10 are drawn. In the vicinity (for example, the upper part) of the customer facility image 500, each power of the charge amount (each house charge power Ci), the discharge amount (each house discharge power Di), and the power generation amount (each house photovoltaic power generation Pi). A bar graph image 510 showing the amount is drawn.

ここで、需要家施設10の全てが受電端(受電端画像506の示す受電端)を介して電力を系統電源から購入しているため、電力線画像504は受電端(受電端画像506の示す受電端)から各需要家施設10に対して矢印が向く電力線の画像として、融通電力線表示部306により描画されている。
また、需要家施設画像500の外周に描画された円画像503において、円画像503に沿って移動している第1電力量球画像502が電力量球表示部307により描画される。この第1電力量球画像502は、受電端画像506の受電端から供給される電力量に応じて、第1電力球の直径、あるいは第1電力球の移動の速度が変化するように描画される。また、第1電力量球画像502は、受電端画像506の受電端から供給される電力量を、球の数(例えば1kWにつき1個)により表現しても良い。
Here, since all of the customer facilities 10 purchase power from the system power supply via the power receiving end (the power receiving end indicated by the power receiving end image 506), the power line image 504 is the power receiving end (the power receiving end indicated by the power receiving end image 506). The interchangeable power line display unit 306 is drawn as an image of a power line with an arrow pointing from each end to each customer facility 10.
In addition, in the circular image 503 drawn on the outer periphery of the customer facility image 500, the first electric energy bulb image 502 moving along the circular image 503 is drawn by the electric energy bulb display unit 307. The first power sphere image 502 is drawn so that the diameter of the first power sphere or the moving speed of the first power sphere changes according to the amount of power supplied from the power receiving end of the power receiving end image 506. The Further, the first power amount sphere image 502 may represent the amount of power supplied from the power receiving end of the power receiving end image 506 by the number of spheres (for example, one per kW).

同様に、電力線画像504に沿って、受電端画像506から需要家施設画像500に向かって移動する第2電力量球画像505が電力量球表示部307により描画される。この第2電力量球画像505は、受電端画像506の受電端から供給される電力量に応じて、第2電力球の直径、あるいは第2電力球の移動の速度が変化するように描画される。また、第2電力量球画像505は、受電端画像506の受電端から供給される電力量を、球の数(例えば1kWにつき1個)により表現しても良い。
円画像503、第1電力量球画像502及び第2電力量球画像505の各々は、不足電力が供給されているため、例えば「赤色」などで描画される。
他の「NO.109」から「NO.114」の各々の需要家施設画像においても、上述した需要家施設画像500と同様な電力線画像、第1電力量球画像及び第2電力量球画像の描画がなされている。
Similarly, a second power sphere image 505 that moves from the power receiving end image 506 toward the customer facility image 500 along the power line image 504 is drawn by the power sphere display unit 307. The second power sphere image 505 is drawn so that the diameter of the second power sphere or the moving speed of the second power sphere changes according to the amount of power supplied from the power receiving end of the power receiving end image 506. The The second power amount sphere image 505 may represent the amount of power supplied from the power receiving end of the power receiving end image 506 by the number of spheres (for example, one per 1 kW).
Each of the circle image 503, the first power amount sphere image 502, and the second power amount sphere image 505 is drawn with, for example, “red” because insufficient power is supplied.
In each of the other customer facility images from “NO. 109” to “NO. 114”, the same power line image, first power sphere image, and second power sphere image as the customer facility image 500 described above. Drawing is done.

図10は、本実施形態の電力管理システムにおける各需要家施設10間の相互間の余剰電力の融通を示す表示装置の表示画面を示す図である。この図10は、電力管理地域1の全ての需要施設10が余剰需要家であり、電力管理地域1内のいずれの需要家施設10に対しても余剰電力を融通できない。このため、受電端画像506(この受電端は図4の融通エリア受電点J)を介して系統電源に対し、余剰電力を売電(逆潮流)している場合を示している。
図9と同様に、需要家施設画像500内には、需要家施設10の邸番号(例えば、「NO.108」)の文字が描画されている。需要家施設画像500の近傍(例えば、上部)には、充電量(各邸充電電力Ci)、放電量(各邸放電電力Di)及び発電量(各邸太陽光発電電力Pi)の各々の電力量を示す棒グラフ画像510が描画されている。
FIG. 10 is a diagram showing a display screen of a display device that indicates the interchange of surplus power between customer facilities 10 in the power management system of the present embodiment. FIG. 10 is, are all of the customers facility 10 surplus consumer of power management area 1, it can not be flexible surplus power to any of the customers facility 10 of the power within the management area 1. For this reason, the case where surplus power is sold (reverse power flow) to the system power supply via the power receiving end image 506 (this power receiving end is the interchange area power receiving point J in FIG. 4) is shown.
Similarly to FIG. 9, characters of the house number (for example, “NO. 108”) of the customer facility 10 are drawn in the customer facility image 500. In the vicinity (for example, the upper part) of the customer facility image 500, each power of the charge amount (each house charge power Ci), the discharge amount (each house discharge power Di), and the power generation amount (each house photovoltaic power generation Pi). A bar graph image 510 showing the amount is drawn.

ここで、需要家施設10の全てが受電端(受電端画像506の示す受電端)を介して電力を系統電源に対して売電しているため、電力線画像514は各需要家施設10から受電端(受電端画像506の示す受電端)に対して矢印が向く電力線の画像として、融通電力線表示部306により描画されている。ここで、融通電力線表示部306は、電力量が大きくなるに従い、電力線画像の電力線の幅を太く、あるいは電力線画像の電力線を濃くして描画する。すなわち、電力線画像の幅あるいは電力線画像の濃淡により電力量を表現する。
また、需要家施設画像500の外周に描画された円画像513において、円画像513に沿って移動している第1電力量球画像512が電力量球表示部307により描画される。この第1電力量球画像512は、受電端画像506の受電端に対して逆潮流する電力量に応じて、第1電力球の直径、あるいは第1電力球の移動の速度が変化するように描画される。また、第1電力量球画像512は、受電端画像506の受電端に対して逆潮流する電力量を、球の数(例えば1kWにつき1個)により表現しても良い。
Here, since all of the customer facilities 10 sell power to the system power supply via the power receiving end (power receiving end indicated by the power receiving end image 506), the power line image 514 receives power from each customer facility 10. The interchanged power line display unit 306 is drawn as an image of the power line with the arrow pointing to the end (the power receiving end indicated by the power receiving end image 506). Here, the flexible power line display unit 306 renders the power line image with a wider power line width or a darker power line image as the amount of power increases. That is, the amount of power is expressed by the width of the power line image or the density of the power line image.
In addition, in the circular image 513 drawn on the outer periphery of the customer facility image 500, the first electric energy bulb image 512 moving along the circular image 513 is drawn by the electric energy bulb display unit 307. The first power sphere image 512 is such that the diameter of the first power sphere or the speed of movement of the first power sphere changes according to the amount of power flowing backward to the power receiving end of the power receiving end image 506. Drawn. The first power amount sphere image 512 may represent the amount of power that flows backward with respect to the power receiving end of the power receiving end image 506 by the number of spheres (for example, one per 1 kW).

同様に、電力線画像514に沿って、受電端画像506から需要家施設画像500に向かって移動する第2電力量球画像515が電力量球表示部307により描画される。この第2電力量球画像515は、受電端画像506の受電端から供給される電力量に応じて、第2電力球の直径、あるいは第2電力球の移動の速度が変化するように描画される。
円画像513、第1電力量球画像512及び第2電力量球画像515の各々は、余剰電力を売電しているため、例えば「青色」などで描画される。
他の「NO.109」から「NO.114」の各々の需要家施設画像においても、上述した需要家施設画像500と同様な電力線画像、第1電力量球画像及び第2電力量球画像の描画がなされている。
Similarly, a second power amount sphere image 515 moving from the power receiving end image 506 toward the customer facility image 500 is drawn by the power amount sphere display unit 307 along the power line image 514. The second power sphere image 515 is drawn so that the diameter of the second power sphere or the moving speed of the second power sphere changes according to the amount of power supplied from the power receiving end of the power receiving end image 506. The
Since each of the circle image 513, the first power amount sphere image 512, and the second power amount sphere image 515 sells surplus power, it is drawn in, for example, “blue”.
In each of the other customer facility images from “NO. 109” to “NO. 114”, the same power line image, first power sphere image, and second power sphere image as the customer facility image 500 described above. Drawing is done.

図11は、本実施形態の電力管理システムにおける各需要家施設10間の相互間の余剰電力の融通を示す表示装置の表示画面を示す図である。この図11は、電力管理地域1の需要家施設10のうち、邸番号「NO.108」の需要家施設10が不足需要家であり、邸番号「NO.109」、邸番号「NO.110」、邸番号「NO.112」及び邸番号「NO.113」の各々の需要家施設10が余剰需要家であり、邸番号「NO.111」及び邸番号「NO.114」の各々が自身の発電電力で消費電力を充足し、余剰需要家及び不足需要家のいずれでもない状態を示している。また、電力管理地域1の邸番号「NO.108」の需要家施設10における不足電力と、電力管理地域1の邸番号「NO.109」、邸番号「NO.110」、邸番号「NO.112」及び邸番号「NO.113」の各々の需要家施設10の余剰電力とが同様であるため、受電端画像506の受電端を介しての系統電源との電力のやり取りは無い。   FIG. 11 is a diagram showing a display screen of a display device showing interchange of surplus power between customer facilities 10 in the power management system of the present embodiment. In FIG. 11, among the customer facilities 10 in the power management area 1, the customer facility 10 with the house number “NO. 108” is a shortage consumer, and the house number “NO. 109” and the house number “NO. 110”. ", The customer facility 10 of the house number" NO.112 "and the house number" NO.113 "is a surplus consumer, and each of the house number" NO.111 "and the house number" NO.114 "is itself. The power consumption is satisfied with the generated power, and neither the surplus consumer nor the shortage consumer is shown. Further, the shortage of power in the customer facility 10 of the house number “NO. 108” in the power management area 1, the house number “NO. 109”, the house number “NO. 110”, and the house number “NO. 112 ”and the surplus power of each customer facility 10 of the house number“ NO.113 ”are the same, and therefore there is no exchange of power with the system power supply via the power receiving end of the power receiving end image 506.

図9と同様に、需要家施設画像500内には、需要家施設10の邸番号(例えば、「NO.108」)の文字が描画されている。また、需要家施設画像520内には、需要家施設10の邸番号(例えば、「NO.109」)の文字が描画されている。需要家施設画像530内には、需要家施設10の邸番号(例えば、「NO.111」)の文字が描画されている。
また、需要家施設画像500、需要家施設画像520及び需要家施設画像530の各々の近傍(例えば、上部)には、充電量(各邸充電電力C)、放電量(各邸放電電力D)及び発電量(各邸太陽光発電電力P)の各々の電力量を示す棒グラフ画像510、棒グラフ画像527、棒グラフ画像532それぞれが描画されている。
Similarly to FIG. 9, characters of the house number (for example, “NO. 108”) of the customer facility 10 are drawn in the customer facility image 500. Further, in the customer facility image 520, characters of the house number (for example, “NO. 109”) of the customer facility 10 are drawn. In the customer facility image 530, characters of the house number (for example, “NO.111”) of the customer facility 10 are drawn.
Further, in the vicinity (for example, the upper part) of each of the customer facility image 500, the customer facility image 520, and the customer facility image 530, there is a charge amount (each house charge power C i ) and a discharge amount (each house discharge power D). A bar graph image 510, a bar graph image 527, and a bar graph image 532 showing the respective power amounts of i ) and the power generation amount (each house photovoltaic power generation P i ) are drawn.

ここで、邸番号「NO.108」の需要家施設10が、邸番号「NO.109」、邸番号「NO.110」、邸番号「NO.112」及び邸番号「NO.113」の各々から、余剰電力の融通を受けている。このため、電力線画像524は、邸番号「NO.109」の需要家施設画像520から、邸番号「NO.108」の需要家施設画像500に対して矢印が向く電力線の画像として、融通電力線表示部306により描画されている。同様に、邸番号「NO.110」、邸番号「NO.112」及び邸番号「NO.113」の各々の需要家施設画像から、邸番号「NO.108」の需要家施設画像500に対して矢印が向く電力線画像が描画されている。ここで、融通電力線表示部306は、電力量が大きくなるに従い、電力線画像の電力線の幅を太く、あるいは電力線画像の電力線を濃くして描画する。すなわち、電力線画像の幅あるいは電力線画像の濃淡により電力量を表現する。   Here, the customer facility 10 with the house number “NO. 108” has the house number “NO. 109”, the house number “NO. 110”, the house number “NO. 112”, and the house number “NO. 113”. From the surplus power. Therefore, the power line image 524 is displayed as an interchangeable power line display as an image of a power line with an arrow pointing from the customer facility image 520 of the house number “NO. 109” to the customer facility image 500 of the house number “NO. 108”. This is drawn by the unit 306. Similarly, from the customer facility images of the house number “NO.110”, the house number “NO.112”, and the house number “NO.113”, the customer facility image 500 of the house number “NO.108” is obtained. A power line image with an arrow pointing is drawn. Here, the flexible power line display unit 306 renders the power line image with a wider power line width or a darker power line image as the amount of power increases. That is, the amount of power is expressed by the width of the power line image or the density of the power line image.

また、邸番号「NO.111」の需要家施設10は、発電電力と消費電力とが同様であるため、いずれからも電力の供給を受けず、かついずれにも電力を融通していない。このため、邸番号「NO.111」の需要家施設10の需要家施設画像からは、いずれの他の需要家施設画像に対して電力線画像が描画されない。邸番号「NO.114」の需要家施設10も、邸番号「NO.111」と同様に、いずれからも電力の供給を受けず、かついずれにも電力を融通していない。このため、邸番号「NO.114」の需要家施設10の需要家施設画像からは、いずれの他の需要家施設画像に対して電力線画像が描画されない。   Further, the customer facility 10 with the house number “NO. 111” has the same power generation and power consumption, and therefore does not receive power supply from any of them and does not allow power to be supplied to any of them. For this reason, a power line image is not drawn with respect to any other customer facility image from the customer facility image of the customer facility 10 of the house number “NO.111”. Similarly to the house number “NO. 111”, the customer facility 10 with the house number “NO. 114” is not supplied with power and does not accommodate any power. For this reason, a power line image is not drawn with respect to any other customer facility image from the customer facility image of the customer facility 10 of the house number “NO.114”.

また、邸番号「NO.108」の需要家施設画像500の外周に描画された円画像513において、円画像513に沿って移動している第1電力量球画像512が電力量球表示部307により描画される。この第1電力量球画像512は、邸番号「NO.109」、邸番号「NO.110」、邸番号「NO.112」及び邸番号「NO.113」の各々から融通される電力量に応じて、第1電力球の直径、あるいは第1電力球の移動の速度が変化するように描画される。また、第1電力量球画像512は、邸番号「NO.109」、邸番号「NO.110」、邸番号「NO.112」及び邸番号「NO.113」の各々から融通される電力量を、球の数(例えば1kWにつき1個)により表現しても良い。同様に、邸番号「NO.109」の外周に描画された円画像523において、円画像523に沿って移動している第1電力量球画像522が電力量球表示部307により描画される。   In addition, in the circular image 513 drawn on the outer periphery of the customer facility image 500 having the house number “NO. 108”, the first electric energy bulb image 512 moving along the circular image 513 is the electric energy bulb display unit 307. Is drawn. This first electric energy bulb image 512 shows the electric power accommodated from each of the house number “NO. 109”, the house number “NO. 110”, the house number “NO. 112”, and the house number “NO. 113”. Accordingly, the drawing is performed so that the diameter of the first power sphere or the moving speed of the first power sphere changes. In addition, the first electric energy bulb image 512 includes the electric energy accommodated from the house number “NO. 109”, the house number “NO. 110”, the house number “NO. 112”, and the house number “NO. 113”. May be expressed by the number of spheres (for example, one per kW). Similarly, in the circular image 523 drawn on the outer periphery of the house number “NO. 109”, the first electric energy ball image 522 moving along the circular image 523 is drawn by the electric energy bulb display unit 307.

この第1電力量球画像522は、邸番号「NO.108」の需要家施設10に対して融通する電力量に応じて、第1電力球の直径、あるいは第1電力球の移動の速度が変化するように描画される。他の邸番号「NO.110」、邸番号「NO.112」及び邸番号「NO.113」の各々における円画像及び第1電力量球画像についても同様である。また、邸番号「NO.108」の円画像513及び電力量球画像512は、邸番号「NO.108」の需要家施設10が電力の供給を受けているため、例えば「赤色」で描画され、一方、邸番号「NO.109」、邸番号「NO.110」、邸番号「NO.112」及び邸番号「NO.113」の各々の円画像及び電力量球画像は、邸番号「NO.108」の需要家施設10に対して電力を融通しているため、例えば「青色」で描画される。
邸番号「NO.111」の需要家施設画像530の周りに描画された円画像533には、いずれの需要家施設10との電力の融通のやり取りがないため、電力量球画像自体が描画されていない。同様に、邸番号「NO.114」も需要家施設画像の周りに描画された円画像には、いずれの需要家施設10との電力の融通のやり取りがないため、電力量球画像自体が描画されていない。
The first power sphere image 522 has a diameter of the first power sphere or a moving speed of the first power sphere according to the amount of power accommodated to the customer facility 10 having the house number “NO.108”. It is drawn to change. The same applies to the circle image and the first electric energy ball image in each of the other house number “NO.110”, house number “NO.112” and house number “NO.113”. Further, the circle image 513 and the power bulb image 512 of the house number “NO.108” are drawn in, for example, “red” because the customer facility 10 of the house number “NO.108” is supplied with power. On the other hand, the circle image and the power bulb image of the house number “NO. 109”, the house number “NO. 110”, the house number “NO. 112”, and the house number “NO. 113” are the house numbers “NO. .108 "is drawn in, for example," blue "because power is interchanged with the customer facility 10.
In the circular image 533 drawn around the customer facility image 530 of the house number “NO.111”, since there is no exchange of power with any of the customer facilities 10, the power sphere image itself is drawn. Not. Similarly, since the house number “NO.114” has no interchange of power with any of the customer facilities 10 in the circle image drawn around the customer facility image, the power bulb image itself is drawn. It has not been.

また、電力線画像524に沿って、邸番号「NO.109」の需要家施設10の需要家施設画像520から邸番号「NO.108」の需要家施設10の需要家施設画像500に向かって移動する第2電力量球画像525が電力量球表示部307により描画される。この第2電力量球画像525は、邸番号「NO.109」の需要家施設10から邸番号「NO.108」の需要家施設10に融通される電力量に応じて、第2電力球の直径、あるいは第2電力球の移動の速度が変化するように描画される。また、第2電力量球画像525は、邸番号「NO.109」、邸番号「NO.110」、邸番号「NO.109」の需要家施設10から邸番号「NO.108」の需要家施設10に融通される電力量を、球の数(例えば1kWにつき1個)により表現しても良い。邸番号「NO.110」、邸番号「NO.112」及び邸番号「NO.113」の各々の需要家施設画像と、邸番号「NO.108」の需要家施設画像500とを接続する電力線画像にも、邸番号「NO.109」から邸番号「NO.108」への電力線画像524における第2電力量球画像525と同様に電力量球画像が描画される。   In addition, it moves along the power line image 524 from the customer facility image 520 of the customer facility 10 having the house number “NO.109” toward the customer facility image 500 of the customer facility 10 having the house number “NO.108”. The second electric energy sphere image 525 is rendered by the electric energy sphere display unit 307. The second electric energy bulb image 525 is displayed on the second electric bulb according to the electric energy exchanged from the customer facility 10 having the house number “NO. 109” to the customer facility 10 having the house number “NO. 108”. Drawing is performed such that the diameter or the speed of movement of the second power sphere changes. In addition, the second electricity sphere image 525 is obtained from the customer facility 10 of the house number “NO. 109”, the house number “NO. 110”, and the house number “NO. The amount of power accommodated in the facility 10 may be expressed by the number of spheres (for example, one per kW). A power line connecting the customer facility images of the house number “NO.110”, the house number “NO.112” and the house number “NO.113” and the customer facility image 500 of the house number “NO.108” Similarly to the second power amount ball image 525 in the power line image 524 from the house number “NO. 109” to the house number “NO. 108”, the power amount ball image is also drawn on the image.

図12は、本実施形態の電力管理システムにおける各需要家施設10間の相互間の余剰電力の融通を示す表示装置の表示画面を示す図である。この図12は、電力管理地域1の需要家施設10のうち、邸番号「NO.108」の需要家施設10が不足需要家であり、邸番号「NO.109」、邸番号「NO.110」、邸番号「NO.111」、邸番号「NO.112」及び邸番号「NO.113」の各々の需要家施設10が余剰需要家であり、邸番号「NO.114」の需要家施設10が自身の発電電力で消費電力を充足し、余剰需要家及び不足需要家のいずれでもない状態を示している。   FIG. 12 is a diagram showing a display screen of a display device that indicates the interchange of surplus power between customer facilities 10 in the power management system of the present embodiment. In FIG. 12, among the customer facilities 10 in the power management area 1, the customer facility 10 with the house number “NO.108” is a shortage consumer, and the house number “NO.109” and the house number “NO.110”. ”, House number“ NO.111 ”, house number“ NO.112 ”, and house number“ NO.113 ”are surplus consumers, and the customer facility of house number“ NO.114 ” 10 shows a state where the power generated by itself is sufficient for power consumption and is neither a surplus consumer nor a short consumer.

図9と同様に、需要家施設画像500内には、需要家施設10の邸番号(例えば、「NO.108」)の文字が描画されている。また、需要家施設画像520内には、需要家施設10の邸番号(例えば、「NO.109」)の文字が描画されている。需要家施設画像540内には、需要家施設10の邸番号(例えば、「NO.110」)の文字が描画されている。需要家施設画像550内には、需要家施設10の邸番号(例えば、「NO.114」)の文字が描画されている。
また、需要家施設画像500、需要家施設画像520、需要家施設画像540及び需要家施設画像550の各々の近傍(例えば、上部)には、充電量(各邸充電電力C)、放電量(各邸放電電力D)及び発電量(各邸太陽光発電電力P)の各々の電力量を示す棒グラフ画像510、棒グラフ画像527、棒グラフ画像547、棒グラフ画像557それぞれが描画されている。他の邸番号「NO.111」から邸番号「NO.113」の各々の需要家施設画像上部に棒グラフ画像がそれぞれ描画されている。
Similarly to FIG. 9, characters of the house number (for example, “NO. 108”) of the customer facility 10 are drawn in the customer facility image 500. Further, in the customer facility image 520, characters of the house number (for example, “NO. 109”) of the customer facility 10 are drawn. In the customer facility image 540, characters of the house number (for example, “NO. 110”) of the customer facility 10 are drawn. In the customer facility image 550, characters of the house number (for example, “NO.114”) of the customer facility 10 are drawn.
Further, in the vicinity (for example, the upper part) of each of the customer facility image 500, the customer facility image 520, the customer facility image 540, and the customer facility image 550, there is a charge amount (recharge power C i for each residence), a discharge amount. A bar graph image 510, a bar graph image 527, a bar graph image 547, and a bar graph image 557 showing the electric power amounts of (the mansion discharge power D i ) and the power generation amount (each mansion photovoltaic power generation power P i ) are drawn. Bar graph images are respectively drawn on the upper part of the customer facility images of the house numbers “NO. 111” to “NO. 113”.

ここで、邸番号「NO.108」の需要家施設10が、邸番号「NO.109」及び邸番号「NO.112」の各々から、余剰電力の融通を受けている。このため、電力線画像524は、邸番号「NO.109」の需要家施設画像520から、邸番号「NO.108」の需要家施設画像500に対して矢印が向く電力線の画像として、融通電力線表示部306により描画されている。同様に、邸番号「NO.112」の需要家施設画像から、邸番号「NO.108」の需要家施設画像500に対して矢印が向く電力線画像が描画されている。ここで、融通電力線表示部306は、電力量が大きくなるに従い、電力線画像の電力線の幅を太く、あるいは電力線画像の電力線を濃くして描画する。すなわち、電力線画像の幅あるいは電力線画像の濃淡により電力量を表現する。
また、邸番号「NO.108」の需要家施設10は、系統電源に対して電力の逆潮流をしている。このため、邸番号「NO.108」の需要家施設10から受電端画像506に対して矢印が向いている電力線画像504が、融通電力線表示部306により描画されている。ここで、融通電力線表示部306は、電力量が大きくなるに従い、電力線画像の電力線の幅を太く、あるいは電力線画像の電力線を濃くして描画する。すなわち、電力線画像の幅あるいは電力線画像の濃淡により電力量を表現する。
Here, the customer facility 10 with the house number “NO. 108” receives the surplus power from each of the house number “NO. 109” and the house number “NO. 112”. For this reason, the power line image 524 is displayed as an interchangeable power line as an image of a power line with an arrow pointing from the customer facility image 520 of the house number “NO. This is drawn by the unit 306. Similarly, a power line image with an arrow pointing to the customer facility image 500 of the house number “NO. 108” is drawn from the customer facility image of the house number “NO. 112”. Here, the flexible power line display unit 306 renders the power line image with a wider power line width or a darker power line image as the amount of power increases. That is, the amount of power is expressed by the width of the power line image or the density of the power line image.
In addition, the customer facility 10 with the house number “NO. 108” has a reverse power flow with respect to the system power supply. For this reason, the power line image 504 in which the arrow is directed from the customer facility 10 of the house number “NO. Here, the flexible power line display unit 306 renders the power line image with a wider power line width or a darker power line image as the amount of power increases. That is, the amount of power is expressed by the width of the power line image or the density of the power line image.

また、邸番号「NO.110」、邸番号「NO.111」及び邸番号「NO.113」の需要家施設10も、系統電源に対して電力の逆潮流をしている。このため、邸番号「NO.110」の需要家施設10から受電端画像506に対して矢印が向いている電力線画像544が、融通電力線表示部306により描画されている。同様に、邸番号「NO.111」及び邸番号「NO.113」の各々の需要家施設10から受電端画像506に対して矢印が向いている電力線画像が、融通電力線表示部306により描画されている。ここで、融通電力線表示部306は、電力量が大きくなるに従い、電力線画像の電力線の幅を太く、あるいは電力線画像の電力線を濃くして描画する。すなわち、電力線画像の幅あるいは電力線画像の濃淡により電力量を表現する。
また、邸番号「NO.114」の需要家施設10は、発電電力と消費電力とが同様であるため、いずれからも電力の供給を受けず、かついずれにも電力を融通していない。このため、邸番号「NO.114」の需要家施設10の需要家施設画像からは、いずれの他の需要家施設画像に対して電力線画像が描画されない。
In addition, the customer facility 10 with the house number “NO.110”, the house number “NO.111”, and the house number “NO.113” also has a reverse power flow with respect to the system power supply. For this reason, the power line image 544 in which the arrow is directed from the customer facility 10 of the house number “NO. 110” to the power receiving end image 506 is drawn by the flexible power line display unit 306. Similarly, a power line image in which an arrow is directed from the customer facility 10 of each of the house number “NO. ing. Here, the flexible power line display unit 306 renders the power line image with a wider power line width or a darker power line image as the amount of power increases. That is, the amount of power is expressed by the width of the power line image or the density of the power line image.
Further, the customer facility 10 with the house number “NO. 114” has the same power generation and power consumption, and therefore does not receive power supply from any of them and does not allow power to be supplied to any of them. For this reason, a power line image is not drawn with respect to any other customer facility image from the customer facility image of the customer facility 10 of the house number “NO.114”.

また、邸番号「NO.108」の需要家施設画像500の外周に描画された円画像513において、円画像513に沿って移動している第1電力量球画像512が電力量球表示部307により描画される。この第1電力量球画像512は、邸番号「NO.109」及び邸番号「NO.112」の各々から融通される電力量に応じて、第1電力球の直径、あるいは第1電力球の移動の速度が変化するように描画される。また、第1電力量球画像512は、邸番号「NO.109」及び邸番号「NO.112」の各々から融通される電力量を、球の数(例えば1kWにつき1個)により表現しても良い。
また、邸番号「NO.109」の外周に描画された円画像523において、円画像523に沿って移動している第1電力量球画像522が電力量球表示部307により描画される。この第1電力量球画像512は、邸番号「NO.108」に対して融通する電力量に応じて、第1電力球の直径、あるいは第1電力球の移動の速度が変化するように描画される。邸番号「NO.112」の需要家施設10の需要家施設画像においても、邸番号「NO.109」の需要家施設10の需要家施設画像と同様の描画が行われる。
In addition, in the circular image 513 drawn on the outer periphery of the customer facility image 500 having the house number “NO. 108”, the first electric energy bulb image 512 moving along the circular image 513 is the electric energy bulb display unit 307. Is drawn. The first electric power sphere image 512 has a diameter of the first electric power sphere or the electric power sphere of the first electric power sphere according to the electric energy accommodated from the house number “NO. 109” and the house number “NO. 112”. It is drawn so that the speed of movement changes. In addition, the first electric energy sphere image 512 represents the electric energy accommodated from each of the house number “NO. 109” and the house number “NO. 112” by the number of spheres (for example, one per 1 kW). Also good.
In addition, in the circular image 523 drawn on the outer periphery of the house number “NO. 109”, the first electric energy bulb image 522 moving along the circular image 523 is drawn by the electric energy bulb display unit 307. The first power sphere image 512 is drawn such that the diameter of the first power sphere or the speed of movement of the first power sphere changes according to the amount of power accommodated for the house number “NO.108”. Is done. Also in the customer facility image of the customer facility 10 of the house number “NO.112”, the same drawing as the customer facility image of the customer facility 10 of the house number “NO.109” is performed.

邸番号「NO.110」の需要家施設画像540の外周に描画された円画像543において、円画像543に沿って移動している第1電力量球画像542が電力量球表示部307により描画される。この第1電力量球画像542は、受電端画像506の受電端を介して系統電源に対して逆潮流する電力量に応じて、第1電力球の直径、あるいは第1電力球の移動の速度が変化するように描画される。また、第1電力量球画像542は、受電端画像506の受電端を介して系統電源に対して逆潮流する電力量を、球の数(例えば1kWにつき1個)により表現しても良い。
同様に、邸番号「NO.111」及び邸番号「NO.113」の各々の外周に描画された円画像において、円画像に沿って移動している第1電力量球画像が電力量球表示部307により描画される。邸番号「NO.111」及び邸番号「NO.113」の各々の需要家施設10の需要家施設画像においても、邸番号「NO.110」の需要家施設10の需要家施設画像と同様の描画が行われる。
In the circle image 543 drawn on the outer periphery of the customer facility image 540 of the house number “NO.110”, the first electricity bulb image 542 moving along the circle image 543 is drawn by the electricity bulb display unit 307. Is done. The first power sphere image 542 has a diameter of the first power sphere or a moving speed of the first power sphere according to the amount of power that flows backward to the system power supply via the power receiving end of the power receiving end image 506. Is drawn to change. Further, the first power amount sphere image 542 may represent the amount of power that flows backward to the system power supply via the power receiving end of the power receiving end image 506 by the number of spheres (for example, one per kW).
Similarly, in the circular images drawn on the outer peripheries of the house number “NO.111” and the house number “NO.113”, the first electric energy bulb image moving along the circle image is displayed as the electric energy bulb display. Drawing is performed by the unit 307. The customer facility image of each customer facility 10 of the house number “NO.111” and the house number “NO.113” is the same as the customer facility image of the customer facility 10 of the house number “NO.110”. Drawing is performed.

また、邸番号「NO.108」の円画像513及び第1電力量球画像512は、邸番号「NO.1098」の需要家施設10がら電力の供給を受けているため、例えば「赤色」で描画され、一方、邸番号「NO.112」の各々の円画像及び第1電力量球画像は、邸番号「NO.108」の需要家施設10に対して電力を融通しているため、例えば「青色」で描画される。また、邸番号「NO.110」、邸番号「NO.111」及び邸番号「NO.113」の各々の円画像及び第1電力量球画像は、系統電源に電力を逆潮流しているため、例えば「青色」で描画される。
また、邸番号「NO.114」の需要家施設10は、発電電力と消費電力とが同様であるため、いずれからも電力の供給を受けず、かついずれにも電力を融通していない。このため、邸番号「NO.114」の需要家施設10の需要家施設画像に対応する円画像553には、第1電力球が描画されていない。
Further, the circle image 513 and the first electric energy bulb image 512 of the house number “NO.108” are supplied with power from the customer facility 10 of the house number “NO.1098”, and thus, for example, “red”. On the other hand, since each circle image and the first electric energy bulb image of the house number “NO.112” are interchanged with the customer facility 10 of the house number “NO.108”, for example, It is drawn in “blue”. In addition, the circular images and the first electricity sphere images of the house number “NO.110”, the house number “NO.111”, and the house number “NO.113” are in reverse power flow to the system power supply. For example, it is drawn in “blue”.
Further, the customer facility 10 with the house number “NO. 114” has the same power generation and power consumption, and therefore does not receive power supply from any of them and does not allow power to be supplied to any of them. For this reason, the first power ball is not drawn on the circle image 553 corresponding to the customer facility image of the customer facility 10 having the house number “NO.114”.

電力線画像504に沿って、需要家施設画像500から受電端画像506に向かって移動する第2電力量球画像505が電力量球表示部307により描画される。この第2電力量球画像505は、受電端画像506の受電端から供給される電力量に応じて、第2電力球の直径、あるいは第2電力球の移動の速度が変化するように描画される。また、第2電力量球画像525は、受電端画像506の受電端から供給される電力量を、球の数(例えば1kWにつき1個)により表現しても良い。
また、電力線画像524に沿って、邸番号「NO.109」の需要家施設10の需要家施設画像520から邸番号「NO.108」の需要家施設10の需要家施設画像500に向かって移動する第2電力量球画像525が電力量球表示部307により描画される。この第2電力量球画像525は、邸番号「NO.109」の需要家施設10から邸番号「NO.108」の需要家施設10に融通される電力量に応じて、第2電力球の直径、あるいは第2電力球の移動の速度が変化するように描画される。また、第2電力量球画像525は、邸番号「NO.109」の需要家施設10から邸番号「NO.108」の需要家施設10に融通される電力量を、球の数(例えば1kWにつき1個)により表現しても良い。
また、電力線画像544に沿って、需要家施設画像540から受電端画像506に向かって移動する第2電力量球画像545が電力量球表示部307により描画される。この第2電力量球画像545は、受電端画像506の受電端から供給される電力量に応じて、第2電力球の直径、あるいは第2電力球の移動の速度が変化するように描画される。また、第2電力量球画像545は、受電端画像506の受電端から供給される電力量を、球の数(例えば1kWにつき1個)により表現しても良い。
A second power sphere image 505 that moves from the customer facility image 500 toward the power receiving end image 506 along the power line image 504 is drawn by the power sphere display unit 307. The second power sphere image 505 is drawn so that the diameter of the second power sphere or the moving speed of the second power sphere changes according to the amount of power supplied from the power receiving end of the power receiving end image 506. The The second power amount sphere image 525 may represent the amount of power supplied from the power receiving end of the power receiving end image 506 by the number of spheres (for example, one per 1 kW).
In addition, it moves along the power line image 524 from the customer facility image 520 of the customer facility 10 having the house number “NO.109” toward the customer facility image 500 of the customer facility 10 having the house number “NO.108”. The second electric energy sphere image 525 is rendered by the electric energy sphere display unit 307. The second electric energy bulb image 525 is displayed on the second electric bulb according to the electric energy exchanged from the customer facility 10 having the house number “NO. 109” to the customer facility 10 having the house number “NO. 108”. Drawing is performed such that the diameter or the speed of movement of the second power sphere changes. Further, the second electric energy sphere image 525 indicates the amount of electric power accommodated from the customer facility 10 having the house number “NO. 109” to the customer facility 10 having the house number “NO. 1 piece per).
In addition, a second power sphere image 545 that moves from the customer facility image 540 toward the power receiving end image 506 along the power line image 544 is drawn by the power sphere display unit 307. The second power sphere image 545 is drawn so that the diameter of the second power sphere or the moving speed of the second power sphere changes according to the amount of power supplied from the power receiving end of the power receiving end image 506. The The second power amount sphere image 545 may represent the amount of power supplied from the power receiving end of the power receiving end image 506 by the number of spheres (for example, one per 1 kW).

図13は、本実施形態による電力管理システムにおける需要家施設10間の電力の融通を示す図を生成する処理の一例を示すフローチャートである。
ステップS10:
画像制御部301は、各需要家施設10から供給される各邸購入電力K(購入電力)、各邸売電電力S(売電電力)、各邸太陽光発電力P(発電電力)、各邸充電電力C(充電電力)、各邸放電電力D(放電電力)、各邸消費電力L(消費電力)の各々の測定値を、供給した需要家施設10を識別する識別情報である邸番号とともに、表示データ記憶部309の測定値テーブルに書き込んで記憶させる。
また、画像制御部301は、図示しない自身内部に設けられたタイマーを「0」にリセットし、新たにタイマーの計時処理を開始する。
FIG. 13 is a flowchart illustrating an example of a process for generating a diagram illustrating the interchange of power between the customer facilities 10 in the power management system according to the present embodiment.
Step S10:
The image control unit 301 supplies each house purchased power K i (purchased power), each house sold power S i (power sold power), and each house solar power P i (generated power) supplied from each customer facility 10. ), Each house charge power C i (charge power), each house discharge power D i (discharge power), each measured value of each house power consumption L i (power consumption) is identified to the consumer facility 10 that has been supplied. Along with the house number which is identification information, it is written and stored in the measurement value table of the display data storage unit 309.
In addition, the image control unit 301 resets a timer provided inside itself (not shown) to “0” and newly starts a timer timing process.

ステップS11:
余剰需要家抽出部302は、表示データ記憶部309の測定値テーブルを参照し、例えば、この測定値テーブルの一番上部から順番に需要家施設10を選択する。この需要家施設10の他の選択方法として、需要家施設10の邸番号の小さい方から大きい方へ、あるいは大きい方から小さい方へなど、評価対象の需要家施設10を順次選択する方法であれば、いずれの方法を用いてもよい。
Step S11:
The surplus consumer extraction unit 302 refers to the measurement value table of the display data storage unit 309 and selects, for example, the customer facility 10 in order from the top of the measurement value table. As another method for selecting the customer facility 10, a method for sequentially selecting the customer facility 10 to be evaluated, such as from the smaller house number of the customer facility 10 to the larger house number, or from the larger house to the smaller house number. Any method may be used.

ステップS12:
余剰需要家抽出部302は、選択した需要家施設10の売電電力が「0」を超えているか否かの判定を行う。そして、余剰需要家抽出部302は、需要家施設10の売電電力が「0」を超えている場合、すなわち需要家施設10が余剰電力を有している場合、処理をステップS13へ進める。一方、余剰需要家抽出部302は、需要家施設10の売電電力が「0」である場合、すなわち需要家施設10が余剰電力を有してない場合、処理をステップS11へ進める。
Step S12:
The surplus customer extraction unit 302 determines whether or not the power sales power of the selected customer facility 10 exceeds “0”. And the surplus consumer extraction part 302 advances a process to step S13, when the electric power sales power of the consumer facility 10 exceeds "0", ie, the consumer facility 10 has surplus electric power. On the other hand, if the sold power of the customer facility 10 is “0”, that is, if the customer facility 10 does not have surplus power, the surplus consumer extraction unit 302 advances the processing to step S11.

ステップS13:
次に、余剰需要家抽出部302は、抽出した需要家施設10を余剰需要家として、表示データ記憶部309の余剰需要家テーブルに、各邸の邸番号に対応させ、発電電力、売電電力、未融通電力、直接融通分電力、放電融通分電力、放電電力、充電電力の各々を対応付けて書き込んで記憶させる。ここで、余剰需要家抽出部302は、未融通電力の欄に売電電力を書き込む。また、未融通電力は、売電電力全体における融通先の需要家施設の決定していない余剰電力を示している。
また、余剰需要家抽出部302は、この抽出した需要家施設10の売電電力を、太陽電池101の発電電力から融通される直接融通分電力と、蓄電池103からの放電電力から融通される放電融通分電力とに分離する。このとき、余剰需要家抽出部302は、例えば、発電電力及び放電電力の比によって、需要家施設10の売電電力を、直接融通分電力及び放電融通分電力の各々に分離する。
Step S13:
Next, the surplus consumer extraction unit 302 sets the extracted customer facility 10 as a surplus consumer, and associates the surplus consumer table in the display data storage unit 309 with the house number of each residence to generate power and sell power. Each of unaccompanied power, direct accommodative power, discharge accommodative power, discharge power, and charging power is written and stored in association with each other. Here, the surplus customer extraction unit 302 writes the sold power in the unacquired power column. Further, unaccommodated power indicates surplus power that has not been determined by the customer facility as the accommodation destination in the entire sold power.
In addition, the surplus consumer extraction unit 302 uses the extracted electricity sales power of the customer facility 10 as direct accommodation power accommodated from the generated power of the solar battery 101 and discharge accommodated as discharge power from the storage battery 103. It is separated into the electricity for accommodation. At this time, the surplus consumer extraction unit 302 divides the sold power of the customer facility 10 into each of the direct accommodation power and the discharge accommodation power based on, for example, the ratio of the generated power and the discharge power.

ステップS14:
不足需要家抽出部303は、表示データ記憶部309の測定値テーブルを参照し、例えば、この測定値テーブルの一番上から順番に需要家施設10を検索し、購入電力が「0」でない、すなわち電力において自立できずに不足電力を有している需要家施設10を抽出する。
Step S14:
The shortage consumer extraction unit 303 refers to the measurement value table of the display data storage unit 309, for example, searches the customer facility 10 in order from the top of the measurement value table, and the purchased power is not “0”. That is, the customer facility 10 that has insufficient power and cannot stand on its own is extracted.

ステップS15:
次に、不足需要家抽出部303は、抽出した需要家施設10を不足需要家として、表示データ記憶部309の不足需要家テーブルに、各邸の邸番号に対応させ、発電電力、購入電力、不足電力、放電電力)、充電電力の各々を対応付けて書き込んで記憶させる。ここで、不足需要家抽出部303は、不足電力の欄に購入電力を書き込む。また、不足電力は、購入電力全体における電力の融通元の需要家施設が決定していない電力、すなわち購入電力に対して不足している電力を示している。
Step S15:
Next, the shortage customer extraction unit 303 sets the extracted customer facility 10 as a shortage customer, causes the shortage customer table of the display data storage unit 309 to correspond to the house number of each residence, and generates power, purchased power, (Under power, discharge power) and charging power are written and stored in association with each other. Here, the shortage customer extraction unit 303 writes the purchased power in the column of shortage power. In addition, the shortage power indicates the power that is not determined by the customer facility as the power interchange source in the entire purchased power, that is, the power shortage with respect to the purchased power.

ステップS15:
余剰電力配分部304は、表示データ記憶部309の余剰需要家テーブルを参照し、余剰需要家の需要家施設10の未融通電力を読み出す。
そして、余剰電力配分部304は、表示データ記憶部309の不足需要家テーブルから、順番に不足電力が「0」でない需要家施設10を選択する。
余剰電力配分部304は、余剰需要家の需要家施設10の未融通電力から、不足需要家の需要家施設10の不足電力を減算する。
Step S15:
The surplus power distribution unit 304 refers to the surplus consumer table in the display data storage unit 309 and reads out the unaccompanied power of the surplus consumer customer facility 10.
Then, the surplus power distribution unit 304 selects the customer facility 10 whose insufficient power is not “0” in order from the insufficient customer table of the display data storage unit 309.
The surplus power distribution unit 304 subtracts the insufficient power of the customer facility 10 of the short customer from the unaccepted power of the customer facility 10 of the surplus customer.

このとき、余剰電力配分部304は、未融通電力から不足電力の減算結果が正の場合、表示データ記憶部309の余剰需要家テーブルの余剰需要家の需要家施設10の未融通電力に減算結果を上書きする。また、余剰電力配分部304は、未融通電力から不足電力の減算結果が正の場合、表示データ記憶部309の不足需要家テーブルにおいて現在選択中の不足需要家の需要家施設10の不足通電力に「0」を書き込む。
一方、余剰電力配分部304は、未融通電力から不足電力の減算結果が負の場合、表示データ記憶部309の余剰需要家テーブルの余剰需要家の需要家施設10の未融通電力に「0」を書き込む。また、余剰電力配分部304は、表示データ記憶部309の不足需要家テーブルにおいて現在選択中の不足需要家の需要家施設の不足電力に減算結果の絶対値を上書きする。
At this time, if the subtraction result of the insufficient power from the unacquired power is positive, the surplus power distribution unit 304 subtracts the unacquired power from the surplus consumer customer facility 10 in the surplus consumer table of the display data storage unit 309. Is overwritten. In addition, when the result of subtracting the insufficient power from the unacquired power is positive, the surplus power distribution unit 304 has the insufficient power consumption of the customer facility 10 of the short customer currently selected in the short customer table of the display data storage unit 309. “0” is written to.
On the other hand, when the subtraction result of the insufficient power from the unacquired power is negative, the surplus power distribution unit 304 sets “0” to the unacquired power of the customer facility 10 of the surplus consumer in the surplus consumer table of the display data storage unit 309. Write. In addition, the surplus power distribution unit 304 overwrites the absolute value of the subtraction result on the shortage power of the customer facility of the short customer currently selected in the short customer table of the display data storage unit 309.

そして、余剰電力配分部304は、現在処理中の余剰需要家の需要家施設10の未融通電力が「0」となるまで、不足電力が「0」でない不足需要家の需要家施設10を選択し、上述した未融通電力から不足電力を減算し、未融通電力をの不足需要家の需要家施設10に配分する処理を行う。
また、余剰電力配分部304は、表示データ記憶部309の不足需要家テーブルにおいて、不足電力が「0」でない不足需要家の需要家施設10が無い場合、その時点の未融通電力を系統電源に逆潮流させる電力(系統電源に売電する電力)とする。
ここで、余剰電力配分部304は、表示データ記憶部309の配分電力テーブルに対して、現在処理中の需要家施設101の邸番号に対応させ、売電電力(融通電力)の融通先の需要家施設10の邸番号と融通した電力である供給配分電力とを書き込んで記憶させる。
Then, the surplus power distribution unit 304 selects the consumer facility 10 of the shortage consumer whose shortage power is not “0” until the unacquired power of the customer facility 10 of the surplus consumer currently being processed becomes “0”. Then, the process of subtracting the insufficient power from the above-mentioned unacquired power and allocating the unacquired power to the customer facility 10 of the insufficient customer is performed.
Further, if there is no customer facility 10 of a short customer whose shortage power is not “0” in the shortage customer table of the display data storage unit 309, the surplus power distribution unit 304 uses the unacquired power at that time as the system power supply. Use reverse power flow (power sold to system power supply).
Here, the surplus power distribution unit 304 associates the distribution power table of the display data storage unit 309 with the house number of the customer facility 101 currently being processed, and the demand of the power selling power (accommodated power) accommodation destination. The house number of the house facility 10 and the supply distribution power, which is a flexible power, are written and stored.

ステップS16:
余剰電力配分部304は、現在処理中の余剰需要家の需要家施設10の未融通電力が「0」となり、全ての未融通電力の融通先が決定した場合、現在処理中の余剰需要家の需要家施設10の余剰電力を、不足需要家の需要家施設10に対して配分する処理を終了し、処理をステップS17へ進める。
Step S16:
The surplus power allocating unit 304 determines that the surplus consumer currently being processed is in the case where the unaccompanied power of the customer facility 10 of the surplus consumer currently being processed becomes “0” and the accommodation destination of all unacquired power is determined. The process of allocating the surplus power of the customer facility 10 to the customer facility 10 of the insufficient customer is terminated, and the process proceeds to step S17.

ステップS17:
次に、余剰電力配分部304は、表示データ記憶部309の余剰需要家テーブルを参照して、現在処理中の余剰需要家の需要家施設10が、処理すべき最後の需要家施設10であるか否かの判定を行う。
このとき、余剰電力配分部304は、現在処理中の余剰需要家の需要家施設10が、処理すべき最後の需要家施設10である場合、処理をステップS18へ進める。一方、余剰電力配分部304は、現在処理中の余剰需要家の需要家施設10が、処理すべき最後の需要家施設10でない場合、次のの余剰需要家の需要家施設10に対する融通電力の配分の処理を行うため、処理をステップS11へ進める。
Step S17:
Next, the surplus power distribution unit 304 refers to the surplus consumer table in the display data storage unit 309, and the surplus consumer customer facility 10 currently being processed is the last consumer facility 10 to be processed. It is determined whether or not.
At this time, if the surplus consumer's customer facility 10 currently being processed is the last consumer facility 10 to be processed, the surplus power distribution unit 304 advances the process to step S18. On the other hand, if the surplus consumer customer facility 10 currently being processed is not the last consumer facility 10 to be processed, the surplus power distribution unit 304 determines the power consumption of the next surplus consumer customer facility 10. In order to perform the distribution process, the process proceeds to step S11.

ステップS18:
画像制御部301は、画像制御部301は、表示データ記憶部309の測定値テーブルを上から参照し、需要家施設10の邸番号を含む需要家施設10の需要家施設画像を表示装置の表示画面に表示する。
棒グラフ表示部305は、表示データ記憶部309における測定値テーブルを参照し、図9から図12の各々において説明した棒グラフ画像を、需要家施設10の需要家施設画像近傍に対して描画する。
また、融通電力線表示部306及び電力量球表示部307の各々は、表示データ記憶部309における配分電力テーブルの各々を参照し、需要家施設10の需要家施設画像に対し、図9から図12の各々において説明した電力線画像、円画像、電力量球画像のそれぞれを描画する。
Step S18:
The image control unit 301 refers to the measurement value table of the display data storage unit 309 from above, and displays the customer facility image of the customer facility 10 including the house number of the customer facility 10 on the display device. Display on the screen.
The bar graph display unit 305 refers to the measurement value table in the display data storage unit 309 and draws the bar graph image described in each of FIGS. 9 to 12 in the vicinity of the customer facility image of the customer facility 10.
Each of the interchangeable power line display unit 306 and the electric energy bulb display unit 307 refers to each of the distributed power tables in the display data storage unit 309, and the customer facility image of the customer facility 10 is shown in FIGS. Each of the power line image, the circle image, and the power sphere image described in each of the above is drawn.

ステップS19:
次に、画像制御部301は、自身内部に設けられたタイマーの計時している時間が予め設定された設定時間(例えば1分)以上となったか否かの判定を行う。
このとき、画像制御部301は、計時している時間が予め設定された設定時間以上の場合、処理をステップS10へ進める。一方、画像制御部301は、計時している時間が予め設定された設定時間未満の場合、ステップ19の処理を繰り返す。
Step S19:
Next, the image control unit 301 determines whether or not the time measured by a timer provided therein is equal to or longer than a preset setting time (for example, 1 minute).
At this time, the image control unit 301 advances the process to step S10 when the time being measured is equal to or longer than a preset set time. On the other hand, the image control unit 301 repeats the process of step 19 when the time being measured is less than a preset set time.

上述した本実施形態によれば、電力を相互に融通し合うコミュニティである電力管理地域1における需要家施設10間の融通電力の融通状態を可視化し、現在のTEMSあるいはCEMSの電力管理のアルゴリズムによる需要施設10間の電力の融通効果をビジュアルに監視することができる。 According to the above-described embodiment, the state of accommodation of the interchanged power between the customer facilities 10 in the power management area 1 which is a community that interchanges power with each other is visualized, and the current TEMS or CEMS power management algorithm is used. it is possible to monitor the power interchange effect of between customer facility 10 to the visual.

また、融通画面表示部113には、図3に示されるように、円状棒グラフ表示部308が設けられている。この円状棒グラフ表示部308は、電力管理地域1内の需要家施設10の各々の融通する電力等を表示する円状棒グラフを表示する。
図14は、円状棒グラフ表示部308が表示装置の表示画面に表示する円状棒グラフの表示例を説明する図である。
円画像600の外周には、系統電源に接続している受電端の画像である受電端画像601(図14においてはTEMS)、需要家施設10の需要家施設画像701から需要家施設画像707の各々が、円状棒グラフ表示部308により等間隔に配置されて描画されている。需要家施設画像701は、需要家施設10の邸番号を示す数字である「29」と描画された邸番号画像701a、需要家施設10に設けられている蓄電池103を示す画像である蓄電池画像701b、及び需要家施設10内の電力管理を行うhems(Home Energy Management System)を示す画像であるhems画像701cを備えて構成されている。
In addition, as shown in FIG. 3, the versatile screen display unit 113 is provided with a circular bar graph display unit 308. The circular bar graph display unit 308 displays a circular bar graph that displays the power and the like of each of the customer facilities 10 in the power management area 1.
FIG. 14 is a diagram for explaining a display example of a circular bar graph displayed on the display screen of the display device by the circular bar graph display unit 308.
On the outer periphery of the circle image 600, a power receiving end image 601 (TEMS in FIG. 14) that is an image of the power receiving end connected to the system power source, a customer facility image 701 of the customer facility 10, and a customer facility image 707 are displayed. Each is drawn at equal intervals by the circular bar graph display unit 308. The customer facility image 701 is a house number image 701 a drawn with “29” which is a number indicating the house number of the customer facility 10, and a storage battery image 701 b which is an image showing the storage battery 103 provided in the customer facility 10. , And a hems image 701c that is an image showing a hems (Home Energy Management System) that performs power management in the customer facility 10.

円画像600の外側には、円画像600の半径方向における円画像600の外周(この外周面が基底)からの距離が電力値を示すメモリとなる円画像群800が円状棒グラフ表示部308により描画されている。
受電端画像601上には、電力を示す棒グラフ画像810として、系統電源が電力管理地域1内の需要家施設10に対して供給している(売電している)電力の棒グラフと、電力管理地域1内の需要家施設10が系統電源に対して逆潮流する電力(購入している)の棒グラフとが円状棒グラフ表示部308により描画されている。
On the outside of the circle image 600, a circle image group 800 in which the distance from the outer periphery of the circle image 600 in the radial direction of the circle image 600 (this outer peripheral surface is a base) indicates a power value is displayed by the circular bar graph display unit 308. Has been drawn.
On the power receiving end image 601, as a bar graph image 810 indicating power, a bar graph of power that the system power supply supplies (sells power) to the customer facility 10 in the power management area 1, and power management A bar graph of power (purchased) in which the customer facility 10 in the region 1 flows backward with respect to the system power supply is drawn by the circular bar graph display unit 308.

また、需要家施設画像701において、hems画像701c上には売電電力、売電電力(購入電力)、消費電力及び発電電力の各々の電力量を示す棒グラフ画像が描画され、蓄電池画像701b上には、電池残量、放電電力、充電電力の電力量を示す棒グラフ画像が描画される。需要家施設10の需要家施設画像702から需要家施設画像707の各々も、需要家施設画像701と同様に各棒グラフ画像が円状棒グラフ表示部308により描画されている。ここで、円状棒グラフ表示部308は、表示データ記憶部309における測定値テーブルを参照して上述した棒グラフ画像の描画を行う。   Further, in the customer facility image 701, a bar graph image indicating the amount of electric power sold, electric power sold (purchased electric power), electric power consumption and generated electric power is drawn on the hems image 701c, and is displayed on the storage battery image 701b. Is drawn with a bar graph image indicating the remaining amount of battery, discharge power, and charge power. In each of the customer facility image 702 to the customer facility image 707 of the customer facility 10, each bar graph image is drawn by the circular bar graph display unit 308 similarly to the customer facility image 701. Here, the circular bar graph display unit 308 draws the bar graph image described above with reference to the measurement value table in the display data storage unit 309.

また、円画像600の内部には、電力の融通を示す電力線画像850が円状棒グラフ表示部308により描画されている。円状棒グラフ表示部308は、融通電力線表示部306と同様に、表示データ記憶部309における測定値テーブル及び配分電力テーブルの各々を参照し、受電端画像601及び需要家施設画像701から需要家施設画像707の各々の間における電力の融通の関係を示す電力線画像850を描画する。
また、円状棒グラフ表示部308は、電力量球表示部307と同様に、電力線画像850に沿って移動する電力量球の画像を描画しても良い。
In the circular image 600, a power line image 850 indicating power interchange is drawn by the circular bar graph display unit 308. The circular bar graph display unit 308 refers to each of the measurement value table and the distributed power table in the display data storage unit 309, similarly to the flexible power line display unit 306, and uses the customer facility from the power receiving end image 601 and the customer facility image 701. A power line image 850 showing the power interchange relationship between each of the images 707 is drawn.
Further, the circular bar graph display unit 308 may draw an image of a power sphere that moves along the power line image 850, similarly to the power sphere display unit 307.

上述した本実施形態によれば、円状棒グラフ表示部308の画像表示する円状棒グラフの画像により、電力を相互に融通し合うコミュニティである電力管理地域1における需要家施設10間の融通電力の融通状態を可視化し、現在のTEMSあるいはCEMSの電力管理のアルゴリズムによる需要施設10間の電力の融通効果をビジュアルに監視することができる。 According to the above-described embodiment, the power of the interchanged power between the customer facilities 10 in the power management area 1 which is a community where power is mutually shared by the image of the circular bar graph displayed on the circular bar graph display unit 308. flexibility state visualized, it is possible to monitor the interchange effect of power between the consumer facility 10 by the algorithm of the power management of the current TEMS or CEMS visually.

<自立率算出の説明>
図15は、第1の実施形態における融通エリア内電力管理部11の自立率評価部112の構成例を示す図である。
図15において、自立率評価部112は、制御部201、全邸購入電力算出部202、全邸売電電力算出部203、全邸発電電力算出部204、全邸充電電力算出部205、全邸放電電力算出部206、全邸消費電力算出部207、融通電力量算出部208、蓄電池系統充電分算出部209、蓄電池PV(photovoltaics)充電分算出部210、蓄電池誤差電力算出部211、エリア購入電力算出部212、エリア売電電力算出部213、自立率算出部214、及びデータベース215の各々を備えている。
<Explanation of independence rate calculation>
FIG. 15 is a diagram illustrating a configuration example of the independence rate evaluation unit 112 of the intra-compartment area power management unit 11 according to the first embodiment.
In FIG. 15, the independence rate evaluation unit 112 includes a control unit 201, a whole house purchase power calculation unit 202, a whole house sale power calculation unit 203, a whole house generation power calculation unit 204, a whole house charge power calculation unit 205, and a whole house. Discharge power calculation unit 206, condominium power consumption calculation unit 207, interchangeable power amount calculation unit 208, storage battery system charge calculation unit 209, storage battery PV (photovoltaics) charge calculation unit 210, storage battery error power calculation unit 211, area purchased power Each includes a calculation unit 212, an area power sales power calculation unit 213, an independence rate calculation unit 214, and a database 215.

制御部201は、データの出入力の制御や、融通エリア内電力管理部11内の各部の動作の制御を行う。また、制御部201は、各需要家施設10から供給される各邸購入電力K、各邸売電電力S、各邸太陽光発電力P、各邸充電電力C、各邸放電電力D、各邸消費電力Lの各々の測定値を、供給した需要家施設10を識別する識別情報である邸番号とともに、データベース215の測定値テーブルに書き込んで記憶させる。各邸購入電力K、各邸売電電力S、各邸太陽光発電力P、各邸充電電力C、各邸放電電力D、各邸消費電力Lの各々は、1分毎に読み出される測定値であり、1分間の測定周期における積算電力である。データベース215の測定値テーブルは、すでに説明した融通画面表示部113における表示データ記憶部309の図5に示した測定値テーブルと同様の構成をしている。 The control unit 201 performs control of data input / output and operation of each unit in the interchange area power management unit 11. In addition, the control unit 201 controls each house purchase power K i , each house sale power S i , each house solar power P i , each house charge power C i , each house discharge supplied from each customer facility 10. The measured values of the power D i and the power consumption L i of each residence are written and stored in the measurement value table of the database 215 together with the residence number which is identification information for identifying the supplied customer facility 10. Each residence purchase power K i , each residence sale power S i , each residence solar power P i , each residence charge power C i , each residence discharge power D i , and each residence consumption power L i is 1 minute. It is a measurement value read out every time, and is an integrated power in a measurement cycle of 1 minute. The measurement value table of the database 215 has the same configuration as the measurement value table shown in FIG. 5 of the display data storage unit 309 in the flexible screen display unit 113 already described.

全邸購入電力算出部202は、各需要家施設10の系統電力量計102から供給される各邸購入電力Kを積算し、すなわち各邸購入電力Kから各邸購入電力Kの各々を積算し、積算結果として全邸購入電力SUM(K)を算出する。全邸購入電力算出部202は、算出した全邸購入電力SUM(K)をデータベース215の計算値テーブルに、測定値を測定した時刻を示すタイムスタンプを付与して書き込んで記憶させる。
全邸売電電力算出部203は、各需要家施設10の系統電力量計102から供給される各邸売電電力Sを積算し、すなわち各邸売電電力Sから各邸売電電力Sの各々を積算し、積算結果として全邸売電電力SUM(S)を算出する。全邸売電電力算出部203は、算出した全邸売電電力SUM(S)をデータベース215の計算値テーブルに、測定値を測定した時刻を示すタイムスタンプを付与して書き込んで記憶させる。
The whole house purchased power calculation unit 202 integrates each house purchased power K i supplied from the system watt hour meter 102 of each customer facility 10, that is, each house purchased power K 1 is calculated from each house purchased power K 1 . And the house purchase power SUM (K i ) is calculated as the integration result. The whole house purchased power calculation unit 202 stores the calculated whole house purchased power SUM (K i ) in a calculated value table of the database 215 with a time stamp indicating the time when the measured value was measured.
All premises power selling power calculation unit 203 integrates each premises power purchase power S i supplied from the system power meter 102 for each customer facility 10, i.e. each premises power selling power from the premises power selling power S 1 integrating the respective S n, to calculate the total residence power purchase power SUM (S i) as the integration result. The entire house sale power calculation unit 203 writes and stores the calculated all house sale power SUM (S i ) in the calculation value table of the database 215 with a time stamp indicating the time when the measurement value is measured.

ここで、系統電力量計102から供給される電力量が、電力線13から需要家施設10に対して供給されている場合(すなわち電力量が正の場合)、この電力量は各邸購入電力Kとなる。一方、需要家施設10から電力線13に対して供給されている場合(すなわち電力量が負の場合)、この電力量は各邸売電電力Sとなる。 Here, when the amount of power supplied from the system watt-hour meter 102 is supplied from the power line 13 to the customer facility 10 (that is, when the amount of power is positive), this amount of power is calculated for each house purchased power K. i . On the other hand, (ie, when electric energy is negative) if they are supplied to the power line 13 from the customer facility 10, the power amount is the residence power selling power S i.

全邸発電電力算出部204は、各需要家施設10の太陽電池101の出力端に備えられている電力計から供給される各邸発電電力Pを積算し、すなわち各邸発電電力Pから各邸売電電力Pの各々を積算し、積算結果として全邸発電電力SUM(P)を算出する。全邸発電電力算出部204は、算出した全邸発電電力SUM(P)をデータベース215の計算値テーブルに、測定値を測定した時刻を示すタイムスタンプを付与して書き込んで記憶させる。 All premises generated power calculation section 204 integrates the respective premises generated power P i supplied from the power meter is provided on the output end of the solar cell 101 of each customer facility 10, i.e. from the premises generated power P 1 Each of the electric power sales power P n is integrated, and the total electric power generation SUM (P i ) is calculated as an integration result. The whole house generated power calculation unit 204 stores the calculated whole house generated power SUM (P i ) in a calculated value table of the database 215 with a time stamp indicating the time when the measured value is measured.

全邸充電電力算出部205は、各需要家施設10の蓄電池電力量計104から供給される各邸充電電力Cを積算し、すなわち各邸充電電力Cから各邸充電電力Cの各々を積算し、積算結果として全邸充電電力SUM(C)を算出する。全邸充電電力算出部205は、算出した全邸充電電力SUM(C)をデータベース215の計算値テーブルに、測定値を測定した時刻を示すタイムスタンプを付与して書き込んで記憶させる。
全邸放電電力算出部206は、各需要家施設10の蓄電池電力量計104から供給される各邸放電電力Dを積算し、すなわち各邸放電電力Dから各邸放電電力Dの各々を積算し、積算結果として全邸放電電力SUM(D)を算出する。全邸放電電力算出部206は、算出した全邸放電電力SUM(D)をデータベース215の計算値テーブルに、測定値を測定した時刻を示すタイムスタンプを付与して書き込んで記憶させる。
All premises charging power calculation unit 205 integrates the respective premises charging power C i supplied from the storage battery power meter 104 for each customer facility 10, i.e., each of the residence charging power C n from the premises charging power C 1 And the residence charge power SUM (C i ) is calculated as the integration result. The whole house charge power calculation unit 205 stores the calculated whole house charge power SUM (C i ) in a calculated value table of the database 215 with a time stamp indicating the time when the measured value is measured.
All premises discharge power calculation unit 206 integrates the respective premises discharge power D i supplied from the storage battery power meter 104 for each customer facility 10, i.e., each of the residence discharge power D n from the premises discharge power D 1 And the total house discharge power SUM (D i ) is calculated as an integration result. The whole house discharge power calculation unit 206 stores the calculated whole house discharge power SUM (D i ) in the calculated value table of the database 215 with a time stamp indicating the time when the measured value is measured.

ここで、系統電力量計102から供給される電力量が、蓄電池103に対して充電されている場合(すなわち電力量が正の場合)、この電力量は各邸充電電力Cとなる。一方、蓄電池103から電力が放電されている場合(すなわち電力量が負の場合)、この電力量は各邸放電電力Dとなる。 Here, the amount of power supplied from the grid power meter 102, (ie, when electric energy is positive) when it is charged against the battery 103, the power amount is the residence charging power C i. On the other hand, (ie, when electric energy is negative) when the power from the battery 103 is discharged, the power amount is the residence discharge power D i.

全邸消費電力算出部207は、各需要家施設10の系統電力量計102及び太陽電池101と需要家施設10の電力線との間に設けられた電力量計から供給される各邸消費電力Lを積算し、すなわち各邸消費電力Lから各邸消費電力Lの各々を積算し、積算結果として全邸消費電力SUM(L)を算出する。全邸消費電力算出部207は、算出した全邸消費電力SUM(L)をデータベース215の計算値テーブルに、測定値を測定した時刻を示すタイムスタンプを付与して書き込んで記憶させる。 The whole house power consumption calculation unit 207 is configured such that each house power consumption L supplied from the grid electricity meter 102 of each customer facility 10 and the electricity meter provided between the solar cell 101 and the power line of the customer facility 10. integrating the i, i.e. by integrating the respective individual residence power L n from each premises power L 1, it calculates the total residence power SUM (L i) as the integration result. The whole house power consumption calculation unit 207 stores the calculated whole house power consumption SUM (L i ) in a calculated value table of the database 215 with a time stamp indicating the time when the measured value is measured.

図16は、データベース215に書き込まれて記憶されている計算値テーブルの構成例を示す図である。
この計算値テーブルには、全邸購入電力算出部202、全邸売電電力算出部203、全邸発電電力算出部204、全邸充電電力算出部205、全邸放電電力算出部206、全邸消費電力算出部207の各々が算出した、全邸購入電力(SUM(K))、全邸売電電力(SUM(S))、全邸発電電力(SUM(P))、全邸充電電力(SUM(C))、全邸充電電力(SUM(D))、全邸消費電力(SUM(L))のそれぞれが書き込まれて記憶されている。また、この計算値テーブルは、1分毎にタイムスタンプが付与されて設けられており、1日分(1分毎なのでテーブル数は1440個)が生成される。
FIG. 16 is a diagram illustrating a configuration example of a calculation value table written and stored in the database 215.
The calculated value table includes a whole house purchase power calculation unit 202, a whole house sale power calculation unit 203, a whole house generation power calculation unit 204, a whole house charge power calculation unit 205, a whole house discharge power calculation unit 206, a whole house Whole house purchase power (SUM (K i )), whole house sale power (SUM (S i )), whole house power generation (SUM (P i )), whole house calculated by each of the power consumption calculation units 207 The charging power (SUM (C i )), the whole house charging power (SUM (D i )), and the whole house power consumption (SUM (L i )) are written and stored. This calculated value table is provided with a time stamp added every minute, and one day's worth (because it is every minute, the number of tables is 1440) is generated.

<余剰電力を融通する場合の電力管理地域1における自立率の算出>
図15に戻り、TEMSまたはCEMSを用いて、電力管理地域1の各需要家施設10が余剰電力の融通を行った場合における融通電力量算出部208から自立率算出部214の各々の処理の説明を行う。融通電力量算出部208から自立率算出部214の各々は、予め設定された時間帯と、処理に用いる測定値とを用いた計算処理の場合分けにより、それぞれの場合分けに対応したルール及び算出式によって電力量の算出を行う。また、融通電力量算出部208からエリア売電電力算出部213の各々は、1分毎の測定周期において、それぞれの電力量の計算の処理を行う。自立率算出部214は、1日(例えば、22:00から次の日の21:59までの時間)の単位で電力管理地域1の自立率の算出を行う。
<Calculation of independence rate in power management area 1 when surplus power is accommodated>
Returning to FIG. 15, description of each processing from the interchangeable power amount calculation unit 208 to the independence rate calculation unit 214 when each customer facility 10 in the power management area 1 performs surplus power interchange using TEMS or CEMS. I do. Each of the power consumption calculation unit 208 to the independence rate calculation unit 214 determines the rules and calculations corresponding to the respective case classifications according to the calculation processing using the preset time zone and the measurement values used for the processing. The amount of power is calculated according to the formula. In addition, each of the interchangeable power amount calculation unit 208 to the area power sale power calculation unit 213 performs a process of calculating each power amount in a measurement cycle of one minute. The independence rate calculation unit 214 calculates the independence rate of the power management area 1 in units of one day (for example, the time from 22:00 to 21:59 on the next day).

融通電力量算出部208は、発電直接融通分電力量と、発電充電融通分電力量と、放電融通分電力量とを加算して融通電力量を算出する。この融通電力量は、電力管理地域1の各需要施設10において融通された全ての電力量を示している。
ここで、融通電力量算出部208は、発電直接融通分電力量と、発電充電融通分電力量と、放電融通分電力量との各々の電力量を以下のように求める。
融通電力量算出部208は、全邸購入電力SUM(Ki)が全邸売電電力SUM(Si)未満である場合、全邸購入電力SUM(Ki)を発電直接融通分電力量とする。一方、融通電力量算出部208は、全邸購入電力SUM(Ki)が全邸売電電力SUM(Si)を超える場合、全邸売電電力SUM(Si)を発電直接融通分電力量とする。
The accommodation power amount calculation unit 208 calculates the accommodation power amount by adding the power generation direct accommodation power amount, the power generation charging accommodation power amount, and the discharge accommodation power amount. This flexibility amount of power, which shows all of the amount of power that is flexible in each customer facility 10 of the power management area 1.
Here, the interchangeable power amount calculation unit 208 obtains the respective power amounts of the power generation direct interchange power amount, the power generation charge interchange power amount, and the discharge interchange power amount as follows.
When the total house purchase power SUM (Ki) is less than the total house sale power SUM (Si), the accommodation power amount calculation unit 208 sets the whole house purchase power SUM (Ki) as the generated direct accommodation power amount. On the other hand, when the rent purchase power SUM (Ki) exceeds the rent power sale power SUM (Si), the wattage power consumption calculation unit 208 sets the rent power sale power SUM (Si) as the generated direct accommodation power amount. .

また、融通電力量算出部208は、全邸売電電力SUM(S)から発電直接融通分電力量を減算した結果が全邸充電電力SUM(C)を超える場合、全邸充電電力SUM(C)を発電充電融通分電力量とする。一方、融通電力量算出部208は、全邸売電電力SUM(S)から発電直接融通分電力量を減算した結果が全邸充電電力SUM(C)未満の場合、全邸売電電力SUM(S)から発電直接融通分電力量を減算した結果を発電充電融通分電力量とする。 In addition, when the result obtained by subtracting the generated direct accommodation power amount from the total house selling power SUM (S i ) exceeds the whole house charging power SUM (C i ), the accommodating power amount calculation unit 208 determines the whole house charging power SUM. Let (C i ) be the amount of electricity generated and charged for accommodation. On the other hand, if the result obtained by subtracting the generated direct accommodation power amount from the whole house power sale SUM (S i ) is less than the whole house charge power SUM (C i ), the accommodation power amount calculation unit 208 is the whole house sale power electricity. The result obtained by subtracting the power generation direct accommodation power amount from SUM (S i ) is defined as the power generation charge accommodation power amount.

また、融通電力量算出部208は、全邸購入電力SUM(K)から発電直接融通分電力量を減算した結果が全邸放電電力SUM(D)を超える場合、全邸放電電力SUM(D)を放電融通分電力量とする。一方、融通電力量算出部208は、全邸購入電力SUM(K)から発電直接融通分電力量を減算した結果が全邸放電電力SUM(D)未満の場合、全邸購入電力SUM(K)から発電直接融通分電力量を減算した結果を放電融通分電力量とする。
融通電力量算出部208は、算出した放電融通分電力量をデータベース215の電力量テーブルに、算出に用いた測定値を測定した時刻を示すタイムスタンプを付与して書き込んで記憶させる。
In addition, when the result obtained by subtracting the generated direct accommodation power amount from the whole house purchased power SUM (K i ) exceeds the whole house discharge power SUM (D i ), the accommodation power amount calculating unit 208 is configured to use the whole house discharge power SUM ( Let D i ) be the electric energy for discharge accommodation. On the other hand, if the result obtained by subtracting the generated direct accommodation power amount from the whole house purchase power SUM (K i ) is less than the whole house discharge power SUM (D i ), the accommodation power amount calculation unit 208 has The result obtained by subtracting the power generation direct accommodation power amount from K i ) is defined as the discharge accommodation power amount.
The accommodation power amount calculation unit 208 stores the calculated amount of discharge accommodation energy in a power amount table of the database 215 with a time stamp indicating the time when the measurement value used for the calculation is measured.

蓄電池系統充電分算出部209は、予め設定された時間帯に応じて、蓄電池蓄電池系統充電分電力量を算出する。ここで、蓄電池系統充電分電力量は、電力管理地域1の各需要施設10の蓄電池103の充電において、蓄電池103に系統電力から融通された充電のための電力量を示している。
ここで、蓄電池系統充電分算出部209は、蓄電池系統充電分電力量を以下のように求める。
蓄電池系統充電分算出部209は、予め設定された夜間時間帯(例えば、22:00〜7:59)の場合、全邸充電電力SUM(Ci)を蓄電池系統充電分電力量とする。
The storage battery system charge amount calculation unit 209 calculates the storage battery storage battery system charge power amount according to a preset time zone. Here, the storage battery system charged minute amount of power, the charging of the storage battery 103 of each customer facility 10 of the power management area 1 shows the amount of electric power for charging that is flexible from the system power to the battery 103.
Here, the storage battery system charge calculation part 209 calculates | requires the storage battery system charge power amount as follows.
In the case of a preset night time zone (for example, 22: 00 to 7: 59), the storage battery system charge amount calculation unit 209 sets the whole house charge power SUM (Ci) as the storage battery system charge power amount.

また、蓄電池系統充電分算出部209は、予め設定された日中時間帯(例えば、8:0〜21:59)の場合であり、かつ全邸充電電力SUM(C)が全邸売電電力SUM(Si)を超える場合、全邸充電電力SUM(C)から全邸売電電力SUM(S)を減算した結果を蓄電池系統充電分電力量とする。
また、蓄電池系統充電分算出部209は、予め設定された日中時間帯の場合であり、かつ全邸充電電力SUM(C)が全邸売電電力SUM(S)未満の場合、「0」を蓄電池系統充電分電力量とする。
蓄電池系統充電分算出部209は、算出した蓄電池系統充電分電力量をデータベース215の電力量テーブルに、算出に用いた測定値を測定した時刻を示すタイムスタンプを付与して書き込んで記憶させる。
Further, the storage battery system charge calculation unit 209 is a case of a daytime time zone (for example, 8: 0 to 21:59) set in advance, and the whole house charging power SUM (C i ) When the power SUM (Si) is exceeded, the result obtained by subtracting the total house sale power SUM (S i ) from the total house charge power SUM (C i ) is defined as the storage battery system charge energy amount.
In addition, the storage battery system charge calculation unit 209 is in the case of a preset daytime time zone, and when the whole house charging power SUM (C i ) is less than the whole house selling power SUM (S i ), “ “0” is defined as a storage battery system charge energy amount.
The storage battery system charge calculation unit 209 assigns and stores the calculated storage battery system charge power amount in the power amount table of the database 215 with a time stamp indicating the time when the measurement value used for the calculation is measured.

蓄電池PV充電分算出部210は、予め設定された時間帯に応じて、蓄電池PV充電分電力量を算出する。ここで、蓄電池PV充電分電力量は、電力管理地域1の各需要施設10の蓄電池103の充電において、蓄電池103に太陽電池101の発電電力から融通された充電のための電力量を示している。
ここで、蓄電池PV充電分算出部210は、蓄電池PV充電分電力量を以下のように求める。
蓄電池PV充電分算出部210は、予め設定された夜間時間帯の場合、「0」を蓄電池PV充電分電力量とする。
The storage battery PV charge calculation unit 210 calculates the storage battery PV charge power according to a preset time zone. Here, battery PV charge amount electric energy, in charging of the storage battery 103 of each customer facility 10 of the power management area 1, shows the amount of electric power for charging that is flexible from the electric power generated by the solar battery 101 to the battery 103 Yes.
Here, the storage battery PV charge calculation part 210 calculates | requires the storage battery PV charge power amount as follows.
The storage battery PV charge calculation unit 210 sets “0” as the storage battery PV charge power in the case of a preset night time zone.

また、蓄電池PV充電分算出部210は、予め設定された日中時間帯の場合であり、かつ全邸売電電力SUM(S)が全邸充電電力SUM(C)を超える場合、全邸充電電力SUM(C)を蓄電池PV充電分電力量とする。
また、蓄電池PV充電分算出部210は、予め設定された日中時間帯の場合であり、かつ全邸売電電力SUM(S)が全邸充電電力SUM(C)未満の場合、全邸売電電力SUM(S)を蓄電池PV充電分電力量とする。
蓄電池PV充電分算出部210は、算出した蓄電池PV充電分電力量をデータベース215の電力量テーブルに、算出に用いた測定値を測定した時刻を示すタイムスタンプを付与して書き込んで記憶させる。
Further, the storage battery PV charge calculation unit 210 is in the case of a preset daytime time zone, and when the whole house selling power SUM (S i ) exceeds the whole house charging power SUM (C i ), The residence charge power SUM (C i ) is defined as the storage battery PV charge power amount.
Further, the storage battery PV charge calculation unit 210 is in the case of a preset daytime time zone, and when the whole house selling power SUM (S i ) is less than the whole house charging power SUM (C i ), The house sales power SUM (S i ) is defined as the amount of power stored in the battery PV.
The storage battery PV charge calculation unit 210 writes and stores the calculated storage battery PV charge power amount in the power amount table of the database 215 with a time stamp indicating the time when the measurement value used for calculation is measured.

蓄電池誤差電力算出部211は、予め設定された時間帯に応じて、系統電源から蓄電池103に対して充電される誤差受電量、あるいは蓄電池103から系統電源に逆流される放電誤差電力量を算出する。ここで、充電誤差電力量は、電力管理地域1の各需要施設10の蓄電池103の充電において、無駄に系統電源の系統電力が充電に用いられて充電された電力量を示している。逆潮流誤差電力量は、電力管理地域1の各需要施設10の蓄電池103の放電において、無駄に蓄電池103からの放電が系統電源に逆流した電力量を示している。 The storage battery error power calculation unit 211 calculates an error power reception amount charged from the system power supply to the storage battery 103 or a discharge error power amount backflowed from the storage battery 103 to the system power supply according to a preset time zone. . Here, the charge error power amount, the charging of the storage battery 103 of each customer facility 10 of the power management area 1, the system power of wasted system power supply indicates the amount of power charged is used in charging. Reverse power flow error amount of power, in the discharge of the battery 103 of each customer facility 10 of the power management area 1, waste discharge from the battery 103 indicates the amount of power flowing back to the system power supply.

ここで、蓄電池誤差電力算出部211は、充電誤差電力量及び放電誤差電力量の各々を以下のように求める。蓄電池誤差電力算出部211は、充電誤差電力量を予め設定された時間帯に応じて求める。
蓄電池誤差電力算出部211は、予め設定された夜間時間帯の場合、「0」を充電誤差電力量とする。
蓄電池誤差電力算出部211は、予め設定された日中時間帯の場合、蓄電池系統充電分電力量を充電誤差電力量とする。
Here, the storage battery error power calculation unit 211 calculates each of the charge error power amount and the discharge error power amount as follows. The storage battery error power calculation unit 211 calculates the charge error power according to a preset time zone.
The storage battery error power calculation unit 211 sets “0” as the charge error power amount in the case of a preset night time zone.
In the case of a preset daytime time zone, the storage battery error power calculation unit 211 sets the storage battery system charge power amount as the charge error power amount.

蓄電池誤差電力算出部211は、全邸購入電力SUM(K)が全邸売電電力SUM(S)を超えており、かつ全邸購入電力SUM(Ki)から全邸売電電力SUM(S)を減算した結果が全邸放電電力SUM(D)を超えている場合、「0」を逆潮流誤差電力量とする。
また、蓄電池誤差電力算出部211は、全邸購入電力SUM(K)が全邸売電電力SUM(S)を超えており、かつ全邸購入電力SUM(K)から全邸売電電力SUM(S)を減算した結果が全邸放電電力SUM(D)未満の場合、「全邸放電電力SUM(D)から、全邸売電電力SUM(S)を減算した結果」を全邸購入電力SUM(K)から減算した結果を逆潮流誤差電力量とする。
The storage battery error power calculation unit 211 has the villa purchase power SUM (K i ) exceeding the villa sale power SUM (S i ), and the villa purchase power SUM (Ki) When the result of subtracting S i ) exceeds the total house discharge power SUM (D i ), “0” is set as the reverse flow error power amount.
Further, the storage battery error power calculation unit 211 indicates that the villa purchase power SUM (K i ) exceeds the villa purchase power SUM (S i ), and the villa purchase power SUM (K i ) If the result of subtracting the power SUM (S i) is smaller than the total residence discharge power SUM (D i), "results from the total residence discharge power SUM (D i), obtained by subtracting the total residence power purchase power SUM (S i) ”Is subtracted from the entire house purchased power SUM (K i ) as the reverse power error electric energy.

また、蓄電池誤差電力算出部211は、全邸購入電力SUM(K)が全邸売電電力SUM(S)未満であり、かつ全邸購入電力SUM(K)から全邸売電電力SUM(S)を減算した結果が全邸放電電力SUM(D)未満の場合、全邸放電電力SUM(D)を逆潮流誤差電力量とする。
蓄電池誤差電力算出部211は、算出した逆潮流誤差電力量をデータベース215の電力量テーブルに、算出に用いた測定値を測定した時刻を示すタイムスタンプを付与して書き込んで記憶させる。
Also, the storage battery error power calculating unit 211, the total residence purchased power SUM (K i) is less than the total residence power selling power SUM (S i), and Zentei purchased power SUM (K i) from all the premises power sale power SUM (S i) the result of subtracting the case of less than the total residence discharge power SUM (D i), the total residence discharge power SUM (D i) the backward flow error power.
The storage battery error power calculation unit 211 stores the calculated reverse flow error power amount in a power amount table of the database 215 with a time stamp indicating the time when the measurement value used for calculation is measured.

エリア購入電力算出部212は、全邸購入電力SUM(Ki)と蓄電池系統充電分電力量を加算し、この加算結果から発電直接融通分電力量と放電融通分電力量とを減算してエリア購入電力を求める。このエリア購入電力は、実際に電力管理地域1の各需要施設10が、系統電源から系統電力を受給した電力である。
また、エリア購入電力算出部212は、求めたエリア購入電力から充電誤差電力量を減算し、融通制御が理想的に行われて、余分に系統電力を需給しなかった場合の理想エリア購入電力を求める。
The area purchase power calculation unit 212 adds the whole house purchase power SUM (Ki) and the storage battery system charge power amount, and subtracts the power generation direct power consumption amount and the discharge accommodation power amount from the addition result to purchase the area. Ask for power. This area purchase power, actually is each customer facility 10 of the power management area 1, is a power that was receiving the system power from the system power supply.
In addition, the area purchase power calculation unit 212 subtracts the charge error power amount from the obtained area purchase power, and the ideal area purchase power in the case where the accommodation control is ideally performed and the grid power is not supplied and supplied extra. Ask.

また、エリア購入電力算出部212は、求めたエリア購入電力に対して放電融通分電力量を加算し、この加算結果から蓄電池系統充電分電力量を減算し、電力管理地域1の需要家施設10の各々に蓄電池103が設けられていない場合のエリア購入電力である蓄電池無しエリア購入電力を求める。
このエリア購入電力の計算において、蓄電池系統充電分電力量、発電直接融通分電力量、放電融通分電力量及び充電誤差電力量の各々は、すでに述べた場合分けされた演算結果の数値が使用される。
エリア購入電力算出部212は、算出したエリア購入電力、理想エリア購入電力及び蓄電池無しエリア購入電力をデータベース215の電力量テーブルに、算出に用いた測定値を測定した時刻を示すタイムスタンプを付与して書き込んで記憶させる。
Further, the area purchased power calculation unit 212 adds the amount of electric power for discharge accommodation to the obtained area purchased power, and subtracts the amount of electric power for charging the storage battery system from the addition result, so that the customer facility 10 in the power management area 1 The storage battery-free area purchase power, which is the area purchase power when the storage battery 103 is not provided in each of these, is obtained.
In the calculation of the area purchase power, each of the storage system power charge amount, the direct power generation power amount, the discharge power amount, and the charge error power amount uses the numerical values of the calculation results divided as described above. The
The area purchase power calculation unit 212 assigns the calculated area purchase power, ideal area purchase power, and storage battery-free area purchase power to the power amount table of the database 215 with a time stamp indicating the time when the measurement value used for the calculation was measured. To write and memorize.

エリア売電電力算出部213は、全邸売電電力SUM(Si)と放電融通分電力量を加算し、この加算結果から融通電力量を減算し、エリア売電電力を求める。このエリア売電電力は、実際に電力管理地域1の各需要施設10が、系統電源に対して発電電力を逆潮流させた電力である。
また、エリア売電電力算出部213は、求めたエリア売電電力から逆潮流誤差電力量を減算し、融通制御が理想的に行われて、余分に系統電力に対して逆潮流を行わなかった場合の理想エリア売電電力を求める。
The area selling power calculation unit 213 adds the whole house selling power SUM (Si) and the electric power for discharge accommodation, and subtracts the electricity consumption from the addition result to obtain area electricity selling power. This area power selling power actually each customer facilities 10 of the power management area 1, a power obtained by the backward flow of the generated power with respect to the system power source.
In addition, the area power selling power calculation unit 213 subtracts the reverse power flow error power amount from the obtained area power selling power, and the accommodation control is ideally performed, and the power flow is not excessively reversed. Find the ideal area power sales power.

また、エリア購入電力算出部212は、求めたエリア売電電力に対して蓄電池PV充電分電力量を加算し、電力管理地域1の需要家施設10の各々に蓄電池103が設けられていない場合のエリア売電電力である蓄電池無しエリア売電電力を求める。
このエリア購入電力の計算において、融通電力量、放電融通分電力量、逆潮流誤差電力量及び蓄電池PV充電分電力量の各々は、すでに述べた場合分けされた演算結果の数値が使用される。
エリア購入電力算出部212は、算出したエリア売電電力、理想エリア売電電力及び蓄電池無しエリア売電電力をデータベース215の電力量テーブルに、算出に用いた測定値を測定した時刻を示すタイムスタンプを付与して書き込んで記憶させる。
Moreover, the area purchase power calculation part 212 adds the amount of electric power for storage battery PV charge with respect to the calculated area sale electric power, and when the storage battery 103 is not provided in each of the customer facilities 10 of the power management area 1 The area selling power without storage battery, which is the area selling power, is obtained.
In the calculation of the area purchase power, each of the accommodative power amount, the discharge accommodative power amount, the reverse flow error power amount, and the storage battery PV charge power amount uses the numerical value of the calculation result divided as described above.
The area purchased power calculation unit 212 stores the calculated area sold power, ideal area sold power, and storage battery-less area sold power in the power amount table of the database 215 and indicates a time stamp indicating the time when the measured value used for the calculation was measured. Is written and stored.

図17は、データベース215に書き込まれて記憶されている電力量テーブルの構成例を示す図である。
この電力量テーブルには、融通電力量算出部208、蓄電池系統充電分算出部209、蓄電池PV充電分算出部210、蓄電池誤差電力算出部211、エリア購入電力算出部212、エリア売電電力算出部213の各々が算出した、融通電力量、放電融通分電力量、蓄電池系統充電分電力量、蓄電池PV充電分電力量、充電誤差電力量、逆潮流誤差電力量、エリア購入電力量、理想エリア購入電力量、蓄電池無しエリア購入電力、エリア売電電力、理想エリア売電電力、及び蓄電池無しエリア売電電力のそれぞれが書き込まれて記憶されている。また、この電力量テーブルは、1分毎にタイムスタンプが付与されて設けられており、1日分(1分毎なのでテーブル数は1440個)が生成される。
FIG. 17 is a diagram illustrating a configuration example of an electric energy table written and stored in the database 215.
The power amount table includes a flexible power amount calculation unit 208, a storage battery system charge calculation unit 209, a storage battery PV charge calculation unit 210, a storage battery error power calculation unit 211, an area purchase power calculation unit 212, and an area power sale power calculation unit. 213 calculated by each of 213, the amount of electric power for discharge, the amount of electric power for charging the storage battery system, the amount of electric power for charging the storage battery PV, the amount of electric power for charging the storage battery, the amount of charging error power, the amount of reverse power flow error, the amount of purchased power Each of the amount of electric power, area purchased power without storage battery, area sold power, ideal area sold power, and area sold power without storage battery is written and stored. This power amount table is provided with a time stamp added every minute, and one day's worth (because it is every minute, the number of tables is 1440) is generated.

図15に戻り、自立率算出部214は、1分毎の電力の積算値であるエリア購入電力を、測定した測定周期の1日分を積算し、積算結果を1日エリア購入電力とする。また、自立率算出部214は、1分毎の電力の積算値である全邸消費電力SUM(L)を、測定した測定周期に対応して1日分積算し、積算結果を1日全邸消費電力とする。
そして、自立率算出部214は、1日エリア購入電力を1日全邸消費電力で除算し、この除算結果を「1」から減算することにより、電力管理地域1の自立率を算出する。
Returning to FIG. 15, the independence rate calculation unit 214 integrates the area purchase power, which is an integrated value of power per minute, for one day of the measured measurement period, and sets the integration result as the one-day area purchase power. In addition, the independence rate calculation unit 214 integrates the whole house power consumption SUM (L i ), which is an integrated value of power per minute, for one day corresponding to the measured measurement cycle, and the integrated result is calculated for the entire day. The power consumption of the residence.
Then, the independence rate calculation unit 214 calculates the independence rate of the power management area 1 by dividing the daily area purchased power by the daily whole house power consumption and subtracting the division result from “1”.

また、自立率算出部214は、1分毎の電力の積算値である蓄電池無しエリア購入電力を、測定した測定周期の1日分を積算し、積算結果を1日蓄電池無しエリア購入電力とする。自立率算出部214は、1日蓄電池無しエリア購入電力を1日全邸消費電力で除算し、この除算結果を「1」から減算することにより、電力管理地域1の需要家施設10の各々に蓄電池103が設けられていない場合の電力管理地域1の自立率である蓄電池無し自立率を算出する。   Further, the self-sustained rate calculation unit 214 integrates storage battery-free area purchased power, which is an integrated value of power per minute, for one day of the measured measurement cycle, and sets the integrated result as daily storage battery-free area purchased power. . The independence rate calculating unit 214 divides the daily purchased battery-free area purchased power by the daily whole house power consumption, and subtracts this division result from “1” to each customer facility 10 in the power management area 1. An independence rate without a storage battery, which is an independence rate of the power management area 1 when the storage battery 103 is not provided, is calculated.

また、自立率算出部214は、自立率から蓄電池無し自立率を減算し、自立率と蓄電池無し自立率との差分である蓄電池自立率差分を求める。この蓄電池自立率差分は、蓄電池103がない場合に自立率が低下する指標として用いられる。
また、自立率算出部214は、1分毎の電力の積算値である全邸発電電力SUM(P)を、測定した測定周期の1日分を積算し、積算結果を1日全邸発電電力とする。自立率算出部214は、1分毎の電力の積算値である全邸売電電力SUM(S)を、測定した測定周期の1日分を積算し、積算結果を1日全邸売電電力とする。
また、自立率算出部214は、1日全邸発電電力から1日全邸売電電力を減算し、この減算結果を1日全邸消費電力で除算し、電力管理地域1の需要家施設10の各々が剰余電力の融通をしない場合の融通無し自立率を求める。
Moreover, the independence rate calculation unit 214 subtracts the independence rate without a storage battery from the independence rate, and obtains a storage battery independence rate difference that is a difference between the independence rate and the independence rate without a storage battery. This storage battery self-sustained rate difference is used as an index for decreasing the self-supporting rate when there is no storage battery 103.
Further, the self-sustained rate calculation unit 214 integrates the entire house power generation SUM (P i ), which is an integrated value of power per minute, for one day of the measured measurement cycle, and the integration result is calculated for one day. Use electricity. The independence rate calculating unit 214 integrates the entire house selling power SUM (S i ), which is an integrated value of power per minute, for one day of the measured measurement cycle, and the accumulated result is used for the entire house selling power for one day. Use electricity.
Further, the self-sustained rate calculation unit 214 subtracts the daily house power sale power from the daily house power generation power, divides the subtraction result by the day house power consumption, and the customer facility 10 in the power management area 1 The independence rate without interchange is obtained when each of the above does not allow surplus power.

図18は、本実施形態による電力管理システムの自立率を求める計算の処理の一例を示すフローチャートである。
ステップS0:
制御部201は、自立率の計算を開始する際、図示しないタイマーを「22:00(22時00分)」にセットをして時刻設定、すなわちタイマーの初期化を行う。そして、制御部201は、上記タイマーに対して計時の稼働を開始させる。
FIG. 18 is a flowchart illustrating an example of a calculation process for obtaining the independence rate of the power management system according to the present embodiment.
Step S0:
When starting the calculation of the independence rate, the control unit 201 sets a timer (not shown) to “22:00 (22:00)” and sets the time, that is, initializes the timer. And the control part 201 starts the operation | movement of time measurement with respect to the said timer.

ステップS1:
制御部201は、タイマーの計時が1分経過したか否かの判定を行う。このとき、制御部201は、タイマーの計時が1分経過した場合、処理をステップS2へ進める。一方、制御部201は、タイマーの計時が1分経過していない場合、1分経過経過するまでステップS1の処理を繰り返す。
Step S1:
The control unit 201 determines whether or not 1 minute has elapsed from the timer. At this time, if the timer counts 1 minute, the control unit 201 advances the process to step S2. On the other hand, when the timer has not counted 1 minute, the control unit 201 repeats the process of step S1 until 1 minute has elapsed.

ステップS2:
制御部201は、電力管理地域1の各需要家施設10の各々の電力計から供給される各邸購入電力K、各邸売電電力S、各邸太陽光発電力P、各邸充電電力C、各邸放電電力D、各邸消費電力Lの各々の測定値を、供給した需要家施設10を識別する識別情報である邸番号とともに、データベース215の測定値テーブルに書き込んで記憶させる。このときに取得される測定値の各々は、各電力計が測定した1分間の積算値である。
Step S2:
The control unit 201 is configured to purchase each house purchased power K i , each house sold power S i , each house solar power P i , each house supplied from each power meter of each customer facility 10 in the power management area 1. The measured values of the charging power C i , the discharge power D i of each residence, and the consumption power L i of each residence are written in the measurement value table of the database 215 together with the residence number that is identification information for identifying the supplied customer facility 10. Let me remember. Each of the measured values acquired at this time is an integrated value for one minute measured by each wattmeter.

ステップS3:
制御部201は、融通エリア内電力管理部11の各部に対して、処理の開始を示す制御信号を出力する。
全邸購入電力算出部202は、データベース215の測定値テーブルから、全ての需要家施設10の各邸購入電力Kを読み出す。
そして、全邸購入電力算出部202は、各邸購入電力K0から各邸購入電力Knを積算して全邸購入電力SUM(K)を求める。全邸購入電力算出部202は、求めた邸購入電力SUM(K)を、データベース215における測定値を測定した時間を示すタイムスタンプを付与された計算値テーブルに対して書き込んで記憶させる。
Step S3:
The control unit 201 outputs a control signal indicating the start of processing to each unit of the in-compartment-area power management unit 11.
The whole house purchase power calculation unit 202 reads out the house purchase power K i of all the customer facilities 10 from the measurement value table of the database 215.
Then, the house purchase power calculation unit 202 calculates the house purchase power SUM (K i ) by integrating the house purchase power Kn from the house purchase power K0. The whole house purchase power calculation unit 202 writes and stores the obtained house purchase power SUM (K i ) in a calculation value table to which a time stamp indicating the measurement time in the database 215 is given.

また、全邸売電電力算出部203から全邸消費電力算出部207の各々も、上述した全邸購入電力算出部202の処理と同様に、それぞれ計算に必要な測定値をデータベース215の測定値テーブルから読み出して積算し、全邸売電電力SUM(S)、全邸発電電力SUM(P)、全邸充電電力SUM(C)、全邸放電電力SUM(D)、全邸消費電力SUM(L)それぞれを算出する。
そして、全邸売電電力算出部203から全邸消費電力算出部207の各々は、求めた全邸売電電力SUM(S)、全邸発電電力SUM(P)、全邸充電電力SUM(C)、全邸放電電力SUM(D)、全邸消費電力SUM(L)それぞれを、データベース215における測定値を測定した時間を示すタイムスタンプを付与された計算値テーブルに対して書き込んで記憶させる。
In addition, each of the whole house sales power calculation unit 203 to the whole house power consumption calculation unit 207 also sets the measurement values necessary for the calculation to the measurement values in the database 215 in the same manner as the processing of the whole house purchase power calculation unit 202 described above. It is read from the table and added up, and the whole house sale power SUM (S i ), the whole house generation power SUM (P i ), the whole house charge power SUM (C i ), the whole house discharge power SUM (D i ), and the whole house Each of the power consumptions SUM (L i ) is calculated.
Then, each of the whole house sales power calculation section 203 to the whole house power consumption calculation section 207 calculates the whole house sale power SUM (S i ), the whole house power generation power SUM (P i ), and the whole house charge power SUM. (C i ), whole house discharge power SUM (D i ), whole house power consumption SUM (L i ), respectively, with respect to the calculated value table to which the time stamp indicating the measurement time in the database 215 is given Write and store.

次に、融通電力量算出部208は、全邸購入電力SUM(K)、全邸売電電力SUM(S)、全邸充電電力SUM(C)、全邸放電電力SUM(D)の各々の計算値を、データベース215の計算値テーブルから読み出す。
そして、融通電力量算出部208は、すでに述べたように、所定のルールの場合分けにより、発電直接融通分電力量と、発電充電融通分電力量と、放電融通分電力量との各々を求める。融通電力量算出部208は、求めた発電直接融通分電力量と、発電充電融通分電力量と、放電融通分電力量とを加算して融通電力量を算出する。融通電力量算出部208は、求めた融通電力量を、データベース215における測定値を測定した時間を示すタイムスタンプを付与された電力量テーブルに対して書き込んで記憶させる。
Next, the accommodation power amount calculation unit 208 includes the villa purchase power SUM (K i ), the villa sale power SUM (S i ), the villa charge power SUM (C i ), and the villa discharge power SUM (D i). ) Is read from the calculation value table of the database 215.
Then, as described above, the accommodation power amount calculation unit 208 obtains each of the power generation direct accommodation power amount, the power generation charging accommodation power amount, and the discharge accommodation power amount according to the case of the predetermined rule. . The accommodation power amount calculation unit 208 calculates the accommodation power amount by adding the calculated power generation direct accommodation power amount, the power generation charging accommodation power amount, and the discharge accommodation power amount. The accommodation power amount calculation unit 208 writes and stores the obtained accommodation power amount in the energy amount table provided with a time stamp indicating the time when the measured value in the database 215 is measured.

また、蓄電池系統充電分算出部209からエリア売電電力算出部213の各々も、上述した融通電力量算出部208の処理と同様に、それぞれ計算に必要な計算値をデータベース215の計算値テーブルから読み出す。そして、蓄電池系統充電分算出部209からエリア売電電力算出部213の各々は、読み出した計算値を用いて所定のルールの場合分けにより得られた電力量に基づき、放電融通分電力量、蓄電池系統充電分電力量、蓄電池PV充電分電力量、充電誤差電力量、逆潮流誤差電力量、エリア購入電力量、理想エリア購入電力量、蓄電池無しエリア購入電力、エリア売電電力、理想エリア売電電力、及び蓄電池無しエリア売電電力のそれぞれを求めるための数値を算出する。   In addition, each of the storage battery system charge amount calculation unit 209 to the area power sale power calculation unit 213 also calculates a calculation value necessary for calculation from the calculation value table of the database 215 in the same manner as the processing of the accommodation power amount calculation unit 208 described above. read out. Then, each of the storage battery system charge amount calculation unit 209 to the area power sale power calculation unit 213 uses the read calculated value and the electric energy obtained by dividing the case according to a predetermined rule, the discharge accommodation power amount, the storage battery Grid charge energy, battery PV charge energy, charge error energy, reverse power error energy, area purchase power, ideal area purchase power, no battery purchase area power, area power sale, ideal area power sale A numerical value for calculating each of the electric power and the area selling power without the storage battery is calculated.

蓄電池系統充電分算出部209からエリア売電電力算出部213の各々は、求めた放電融通分電力量、蓄電池系統充電分電力量、蓄電池PV充電分電力量、充電誤差電力量、逆潮流誤差電力量、エリア購入電力量、理想エリア購入電力量、蓄電池無しエリア購入電力、エリア売電電力、理想エリア売電電力、及び蓄電池無しエリア売電電力のそれぞれを、データベース215における測定値を測定した時間を示すタイムスタンプを付与された電力量テーブルに対して書き込んで記憶させる。   Each of the storage battery system charge amount calculation unit 209 to the area power sale power calculation unit 213 calculates the discharge interchangeable power amount, the storage battery system charge power amount, the storage battery PV charge power amount, the charge error power amount, and the reverse power error power. Time when the measured value in the database 215 is measured for each of the amount, area purchased power amount, ideal area purchased power amount, area purchased power without storage battery, area sold power, ideal area sold power, and area sold power without battery Is written and stored in the power amount table to which the time stamp indicating is given.

ステップS4:
制御部201は、全邸購入電力算出部202からエリア売電電力算出部213の各々がそれぞれの計算値を求めると、タイマーを参照して計時を始めてから一日が経過したか否かの判定を行う。すなわち、制御部201は、タイマーの計時している時間が予め設定されている時間(例えば、21:59)となったか否かの判定を行う。
そして、制御部201は、タイマーが計時を開始してから一日経過している場合、処置をステップS5へ進める。一方、制御部201は、タイマーが計時を開始してから一日経過していない場合、処理をステップS1へ進める。
Step S4:
When each of the area power sale power calculation units 213 obtains the respective calculated values from the whole house purchased power calculation unit 202, the control unit 201 determines whether one day has passed since the timer was started with reference to the timer. I do. That is, the control unit 201 determines whether or not the time measured by the timer has reached a preset time (for example, 21:59).
And control part 201 advances treatment to Step S5, when one day has passed since the timer started timing. On the other hand, control part 201 advances processing to Step S1, when one day has not passed since a timer started time-measurement.

ステップS5:
自立率算出部214は、データベース215の1日分の電力量テーブルから、エリア購入電力及び蓄電池無しエリア購入電力を読み出す。自立率算出部214は、データベース215の計算値テーブルの各々から、1日分のエリア購入電力、蓄電池無しエリア購入電力を読み出し、それぞれを積算することにより、1日エリア購入電力、1日蓄電池無しエリア購入電力それぞれを算出する。
同様に、自立率算出部214は、データベース215の計算値テーブルの各々から、1日分の全邸消費電力SUM(L)、全邸発電電力SUM(P)及び全邸売電電力SUM(S)を読み出し、それぞれを積算することにより、1日全邸消費電力、1日全邸発電電力及び1日全邸売電電力を算出する。
Step S5:
The independence rate calculating unit 214 reads area purchased power and area purchased power without storage battery from the daily power amount table of the database 215. The independence rate calculation unit 214 reads the area purchased power for one day and the area purchased power without a storage battery for each day from each of the calculated value tables of the database 215, and integrates them to obtain the daily area purchased power and no daily storage battery. Each area purchase power is calculated.
Similarly, the self-sustained rate calculation unit 214 extracts the entire house power consumption SUM (L i ), the whole house power generation power SUM (P i ), and the whole house power sale SUM from each of the calculation value tables of the database 215. By reading out (S i ) and accumulating each of them, the daily power consumption of the whole residence, the power generation power of the whole day residence, and the power sales power of the whole day residence are calculated.

そして、自立率算出部214は、1日エリア購入電力、1日蓄電池無しエリア購入電力、1日全邸消費電力、1日全邸発電電力及び1日全邸売電電力の各々を用い、自立率、蓄電池無し自立率、蓄電池自立率差分、融通無し自立率のそれぞれを算出し、処理をステップS0へ戻す。
このとき、制御部201は、例えば、全邸購入電力算出部202から自立率算出部214の各々の算出した算出値を、図示しない表示部の表示画面に対して表示し、ユーザに対して通知する。
Then, the independence rate calculation unit 214 uses the daily area purchased power, the daily purchased battery-free area purchased power, the daily whole house power consumption, the daily whole house generated power, and the daily whole house sold power. Each of the rate, the independence rate without storage battery, the difference in independence rate of storage battery, and the independence rate without interchange is calculated, and the process returns to step S0.
At this time, for example, the control unit 201 displays the calculated values calculated by the independence rate calculation unit 214 from the whole house purchased power calculation unit 202 on a display screen of a display unit (not shown), and notifies the user. To do.

<余剰電力を融通しない場合の電力管理地域1における自立率の算出>
次に、TEMS及びCEMSのいずれも用いず、電力管理地域1の各需要家施設10が余剰電力の融通を行わない場合における融通電力量算出部208から自立率算出部214の各々の処理の説明を行う。以下、余剰電力を融通する場合と異なる自立率を算出するために用いる測定値と、それぞれの測定値の測定箇所の説明を行う。
<Calculation of independence rate in power management area 1 when surplus power is not available>
Next, description will be given of each processing from the interchanged power amount calculation unit 208 to the independence rate calculation unit 214 when neither the TEMS nor the CEMS is used and each customer facility 10 in the power management area 1 does not interchange surplus power. I do. Hereinafter, the measurement value used for calculating the independence rate different from the case where the surplus power is accommodated and the measurement location of each measurement value will be described.

図4は、すでに説明したが電力管理地域1の各需要施設10における電力量の測定値を測定する測定箇所を説明する図である。以下、需要家施設10は、例えばn個あるとして説明する。図4(b)は、後述する需要電力を各需要施設10間において相互に融通しない際の自立率を求めるための測定値を測定する測定箇所を示している。
図4(b)において、融通エリア受電点Jは、電力管理地域1に系統電力から供給される、あるいは電力管理地域1から系統電力に逆流する電力量の基準となる測定点である。ji(0≦i≦n)は、各需要施設10における需要家受電点である。ここには、系統電力量計102が設置されている。他の測定点及び測定値については、図4(a)の場合と同様である。
4 is a diagram has been already described for explaining the measuring points for measuring the measurement of electric energy in each consumer facility 10 of the power management area 1. In the following description, it is assumed that there are n customer facilities 10, for example. FIG. 4 (b) shows a measurement point for measuring a measurement value for determining the self rate when no flexibility with each other in between the power demand of the customers facility 10 to be described later.
In FIG. 4B, the interchange area power receiving point J is a measurement point that serves as a reference for the amount of power supplied from the grid power to the power management area 1 or flowing back from the power management area 1 to the grid power. ji (0 ≦ i ≦ n) is a consumer receiving point in each consumer facility 10. Here, a system watt-hour meter 102 is installed. Other measurement points and measurement values are the same as those in FIG.

図3に戻り、融通電力量算出部208から自立率算出部214の各々は、予め設定された時間帯と、処理に用いる測定値とを用いた計算処理の場合分けにより、それぞれの場合分けに対応したルール及び算出式によって電力量の算出を行う。また、融通電力量算出部208からエリア売電電力算出部213の各々は、1分毎の測定周期において、それぞれの電力量の計算の処理を行う。自立率算出部214は、1日(例えば、22:00から次の日の21:59までの時間)の単位で電力管理地域1の自立率の算出を行う。   Returning to FIG. 3, each of the interchangeable power amount calculation unit 208 to the independence rate calculation unit 214 divides each case according to a calculation process using a preset time zone and a measurement value used for the process. The amount of power is calculated according to the corresponding rule and calculation formula. In addition, each of the interchangeable power amount calculation unit 208 to the area power sale power calculation unit 213 performs a process of calculating each power amount in a measurement cycle of one minute. The independence rate calculation unit 214 calculates the independence rate of the power management area 1 in units of one day (for example, the time from 22:00 to 21:59 on the next day).

蓄電池系統充電分算出部209は、予め設定された時間帯に応じて、各需要家施設10の各邸蓄電池系統充電分電力量を算出する。ここで、各邸蓄電池系統充電分電力量は、電力管理地域1の各需要施設10の蓄電池103の充電において、蓄電池103に系統電力から融通された充電のための電力量を示している。
ここで、蓄電池系統充電分算出部209は、各需要家施設10の各邸蓄電池系統充電分電力量を以下のように求める。
蓄電池系統充電分算出部209は、予め設定された夜間時間帯(例えば、22:00〜7:59)の場合、各邸充電電力Ciを各邸蓄電池系統充電分電力量とする。
The storage battery system charge amount calculation unit 209 calculates the power amount of each house storage battery system charge amount of each customer facility 10 according to a preset time zone. Here, each residence battery system charged minute amount of power, the charging of the storage battery 103 of each customer facility 10 of the power management area 1 shows the amount of electric power for charging that is flexible from the system power to the battery 103.
Here, the storage battery system charge calculation part 209 calculates | requires each residence storage battery system charge electric energy of each customer facility 10 as follows.
In the case of a preset night time zone (for example, 22: 00 to 7: 59), the storage battery system charge amount calculation unit 209 sets each house charge power Ci as each house battery system charge energy amount.

また、蓄電池系統充電分算出部209は、予め設定された日中時間帯(例えば、8:0〜21:59)の場合であり、かつ各邸充電電力Cが各邸売電電力Sを超える場合、各邸充電電力Cから各邸売電電力Sを減算した結果を各邸蓄電池系統充電分電力量とする。
また、蓄電池系統充電分算出部209は、予め設定された日中時間帯の場合であり、かつ各邸充電電力Cが各売電電力S未満の場合、「0」を各邸蓄電池系統充電分電力量とする。
蓄電池系統充電分算出部209は、算出した各邸蓄電池系統充電分電力量をデータベース215の各邸電力量テーブルに、邸番号及び算出に用いた測定値を測定した時刻を示すタイムスタンプを付与して書き込んで記憶させる。
In addition, the storage battery system charge calculation unit 209 is in the case of a preset daytime time zone (for example, 8: 0 to 21:59), and each house charging power C i is converted to each house selling power S i. If exceeding, the result of subtracting the premises power purchase power S i from each premises charging power C i and the residence battery system charged minute amount of power.
Also, the storage battery system charging component calculation unit 209 is the case of the time zone during the day that is set in advance, and if the residence charging power C i is less than the power sale power S i, each residence accumulator line to "0" It is assumed that the amount of power is charged.
The storage battery system charge amount calculation unit 209 assigns each calculated residence energy value of the storage battery system charge to each house power amount table of the database 215 with a time stamp indicating the house number and the time when the measurement value used for the calculation was measured. To write and memorize.

蓄電池PV充電分算出部210は、予め設定された時間帯に応じて、各需要家施設10の各邸蓄電池PV充電分電力量を算出する。ここで、蓄電池PV充電分電力量は、電力管理地域1の各需要施設10の蓄電池103の充電において、蓄電池103に太陽電池101の発電電力から融通された充電のための電力量を示している。
ここで、蓄電池PV充電分算出部210は、各需要家施設10の各邸蓄電池PV充電分電力量を以下のように求める。
蓄電池PV充電分算出部210は、予め設定された夜間時間帯の場合、「0」を各邸蓄電池PV充電分電力量とする。
The storage battery PV charge calculation unit 210 calculates the amount of electric power for each residence battery PV charge of each customer facility 10 according to a preset time zone. Here, battery PV charge amount electric energy, in charging of the storage battery 103 of each customer facility 10 of the power management area 1, shows the amount of electric power for charging that is flexible from the electric power generated by the solar battery 101 to the battery 103 Yes.
Here, the storage battery PV charge calculation part 210 calculates | requires the electric energy for each house storage battery PV charge of each consumer facility 10 as follows.
The storage battery PV charge calculation unit 210 sets “0” as the amount of electric charge for each residence battery PV charge in the case of a preset night time zone.

また、蓄電池PV充電分算出部210は、予め設定された日中時間帯の場合であり、かつ各邸売電電力Sが各邸充電電力Cを超える場合、各邸充電電力Cを各需要家施設10の蓄電池PV充電分電力量とする。
また、蓄電池PV充電分算出部210は、予め設定された日中時間帯の場合であり、かつ各邸売電電力Sが各邸充電電力C未満の場合、各邸売電電力Sを各邸蓄電池PV充電分電力量とする。
蓄電池PV充電分算出部210は、算出した各邸蓄電池PV充電分電力量をデータベース215の各邸電力量テーブルに、邸番号及び算出に用いた測定値を測定した時刻を示すタイムスタンプを付与して書き込んで記憶させる。
In addition, the storage battery PV charge calculation unit 210 is in the case of a preset daytime time zone, and when each house sales power S i exceeds each house charge power C i , each house charge power C i is calculated. It is set as the amount of electric power for charging the storage battery PV of each customer facility 10.
Also, the storage battery PV charging component calculation unit 210 is the case of the time zone during the day that is set in advance, and when the premises power selling power S i is less than the residence charging power C i, each premises power selling power S i Is the amount of electric energy for charging each residence battery PV.
The storage battery PV charge calculation unit 210 assigns each calculated residence battery PV charge energy to each house power table of the database 215 with a time stamp indicating the house number and the time when the measurement value used for the calculation was measured. To write and memorize.

エリア購入電力算出部212は、各邸購入電力Kと各邸放電電力Dとを加算し、この加算結果から各邸蓄電池系統充電分電力量を減算して、各邸蓄電池無し購入電力を求める。この各邸蓄電池無し購入電力は、電力管理地域1の需要家施設10の各々に蓄電池103が設けられていない場合の各邸単位の系統電源から購入する電力である。
また、エリア購入電力算出部212は、各邸売電電力S)に対して各邸蓄電池PV充電分電力量を加算し、各邸蓄電池無し売電電力を求める。各邸蓄電池無し売電電力は、電力管理地域1の需要家施設10の各々に蓄電池103が設けられていない場合の各邸単位の系統電源に対して逆潮流する電力である。
The area purchase power calculation unit 212 adds each house purchase power K i and each house discharge power D i , subtracts each house battery system charge amount from this addition result, and obtains the purchase power without each house battery. Ask. The purchased power without each storage battery is power purchased from the system power supply of each residence when the storage battery 103 is not provided in each of the customer facilities 10 in the power management area 1.
In addition, the area purchase power calculation unit 212 adds the amount of power charged for each residence battery PV to each residence sale power S i ) to obtain the sale power without each residence battery. The selling power without each storage battery is power that flows backward to the system power supply of each residence when the storage battery 103 is not provided in each of the customer facilities 10 in the power management area 1.

図19は、データベース215に書き込まれて記憶されている各邸電力量テーブルの構成例を示す図である。
この各邸電力量テーブルには、蓄電池系統充電分算出部209及びエリア購入電力算出部212の各々が算出した、各邸蓄電池系統充電分電力量、各邸蓄電池PV充電分電力量のそれぞれが需要家施設10の邸番号に対応付けられて書き込まれて記憶されている。また、この各邸電力量テーブルは、1分毎にタイムスタンプが付与されて設けられており、1日分(1分毎なので各邸テーブル数は1440個)が生成される。
FIG. 19 is a diagram illustrating a configuration example of each house power amount table written and stored in the database 215.
In each house power amount table, each of the storage battery system charge amount calculated by each of the storage battery system charge amount calculation unit 209 and the area purchase power calculation unit 212, each of the mansion storage battery PV charge energy amount is a demand. It is written and stored in association with the house number of the house facility 10. Each residence power amount table is provided with a time stamp added every minute, and one day's worth (each residence table has 1440 tables) is generated.

図15に戻り、自立率算出部214は、1分毎の電力の積算値である各邸購入電力Kiを、測定した測定周期の1日分を積算し、積算結果を1日各邸購入電力とする。また、自立率算出部214は、1分毎の電力の積算値である各邸消費電力Liを、測定した測定周期に対応して1日分積算し、積算結果を1日各邸消費電力とする。
そして、自立率算出部214は、1日各邸購入電力を1日各邸消費電力で除算し、この除算結果を「1」から減算することにより、電力管理地域1の各々の需要家施設10の自立率を算出する。自立率算出部214は、求めた各需要施設10の自立率を、電力管理地域1の需要施設10にて平均し、平均した自立率を電力管理地域1の需要施設10の各邸自立率とする。
Returning to FIG. 15, the independence rate calculating unit 214 integrates each house purchase power Ki, which is an integrated value of power per minute, for one day of the measured measurement period, and the integration result is calculated for each day. And In addition, the independence rate calculation unit 214 integrates each house power consumption Li, which is an integrated value of power per minute, corresponding to the measured measurement period for one day, and the integrated result is calculated as each house power consumption for one day. To do.
Then, the independence rate calculation unit 214 divides the power purchased by each residence per day by the power consumed by each residence per day, and subtracts the division result from “1” to thereby obtain each customer facility 10 in the power management area 1. Calculate the independence rate. Independence rate calculation unit 214, a self-supporting rate of each customer facility 10 obtained, and average at the customer facility 10 of the power management area 1, each residence of the customer facility 10 of the power management area 1 the average free-standing rate Independence rate.

また、自立率算出部214は、1分毎の電力の積算値である各邸蓄電池無し購入電力を、測定した測定周期の1日分を積算し、積算結果を1日各邸蓄電池無購入電力とする。自立率算出部214は、1日各邸蓄電池無し購入電力を1日各邸消費電力で除算し、この除算結果を「1」から減算することにより、電力管理地域1の需要家施設10の各々に蓄電池103が設けられていない場合の電力管理地域1の需要家施設10それぞれの自立率である蓄電池無し自立率を算出する。   In addition, the independence rate calculating unit 214 integrates the purchased power without each storage battery, which is an integrated value of power per minute, for one day of the measured measurement cycle, and the integrated result is the non-purchased power for each daily storage battery. And The independence rate calculation unit 214 divides the purchased power with no storage battery for one day by the power consumption for each house for one day, and subtracts the division result from “1”, thereby each of the customer facilities 10 in the power management area 1. The storage battery-free independence rate, which is the independence rate of each customer facility 10 in the power management area 1 when the storage battery 103 is not provided, is calculated.

自立率算出部214は、求めた各需要施設10の蓄電池無し自立率を、電力管理地域1の需要施設10にて平均し、平均した自立率を電力管理地域1の需要施設10の各邸蓄電池無し自立率とする。
また、自立率算出部214は、各邸自立率から各邸蓄電池無し自立率を減算し、各邸自立率と各邸蓄電池無し自立率との差分である各邸蓄電池自立率差分を求める。この各邸蓄電池自立率差分は、蓄電池103がない場合に各邸自立率が低下する指標として用いられる。
Independence rate calculation unit 214, the storage battery without independence rate of each customer facility 10 obtained, and average at the customer facility 10 of the power management area 1, the average self-supporting rate of the power management area 1 of the consumer facility 10 The independence rate without each storage battery.
In addition, the independence rate calculation unit 214 subtracts the independence rate without each residence battery from the independence rate of each residence, and obtains each residence battery independence rate difference that is the difference between the independence rate of each residence and the independence rate without each residence battery. Each residence battery independent rate difference is used as an index for lowering each residence independent rate when there is no storage battery 103.

上述したように、本実施形態によれば、電力管理地域1における各需要家施設10で余剰電力の融通を行うTEMSまたはCEMSのシステムの評価を行う指標である自立率を、自立率の測定を行う電力計を新たに設けることなく、すでにある電力計の測定値により容易に求めることができる。これにより、TEMSまたはCEMSのシステムの開発を行う際、融通のアルゴリズムにおける余剰電力の各需要施設10間における分配の精度を容易に行うことが可能となる。 As described above, according to the present embodiment, the independence rate, which is an index for evaluating the TEMS or CEMS system that performs surplus power interchange in each customer facility 10 in the power management area 1, is measured. Without providing a new wattmeter, it can be easily obtained from the measured value of the existing wattmeter. Thus, when the development of TEMS or CEMS system, it is possible to easily perform the precision of the distribution between each consumer facility 10 of the surplus power in the algorithm flexibility.

また、本実施形態によれば、TEMSまたはCEMSを用いて余剰電力を融通した場合における電力管理地域1の自立率と、TEMS及びCEMSのいずれも用いず余剰電力を融通しない場合における電力管理地域1の需要施設10の平均値である各邸自立率とを算出するため、自立率及び各邸自立率の各々を比較することにより、TEMSまたはCEMSを用いることでの自立率の変化を容易に比較することができる。 In addition, according to the present embodiment, the power management area 1 in the case where surplus power is accommodated using TEMS or CEMS, and the power management area 1 in which surplus power is not accommodated without using either TEMS or CEMS. for calculating the respective premises autonomous rate is an average value of the customer facility 10, by comparing each of the autonomous rate and the residence self rate, it facilitates a change in the self-supporting rate by using TEMS or CEMS Can be compared.

図20は、本実施形態による電力管理システムが求めた自立率及び各邸自立率のグラフである。図20において、横軸が自立率及び各邸自立率を求めた日付を示し、縦軸が自立率及び各邸自立率に対して100を乗じたパーセント表示が示されている。ここで、新たに2014年1月に形成したTEMSを用いた電力管理地域1において、自立率をフィードバックしてTEMSのアルゴリズムを調整していくことにより、徐々に自立率が向上、すなわちTEMSによる余剰電力の融通処理の効率が向上していることが判る。この図10のグラフから、良くチューニングされたTEMSを用いることにより、電力管理地域1の電力の自立率が向上し、需要施設10を個別に自立させる場合に比較して、省エネルギーの観点から優位であることが判る。 FIG. 20 is a graph of the independence rate and each house independence rate obtained by the power management system according to the present embodiment. In FIG. 20, the horizontal axis indicates the date when the independence rate and the independence rate of each residence are obtained, and the vertical axis indicates a percentage display obtained by multiplying the independence rate and each independence rate by 100. Here, by the power management area 1 using the newly TEMS formed in January 2014, by going to adjust the algorithm TEMS by feeding back the autonomous rate, self-standing rate increase gradually, i.e. TEMS It can be seen that the efficiency of surplus power accommodation processing is improved. From the graph of FIG. 10, by using a well-tuned TEMS, improved power independence rate of the power management area 1, as compared to the case of self-supporting a customer facility 10 individually, superior from the viewpoint of energy saving It turns out that it is.

このように、本実施形態は、TEMSやCEMSにおける余剰電力の融通を行うアルゴリズムのチューニングの結果を、自立率により評価することができ、容易に余剰電力の融通の効率を向上に寄与できる。
また、本実施形態は、TEMSやCEMSが省エネルギーの観点から、各需要施設10単体で電力制御を行うより優位であることを示すことができるため、各需要施設10における電力消費のより省エネルギー化を促進することに寄与できる。
図9から図12の各々に、自立率を表示させることにより、需要家施設10間において融通している電力の可視化を行うと共に、よりTEMSやCEMSにおける余剰電力の融通を行うアルゴリズムのチューニングの結果を容易に確認することができる。
As described above, the present embodiment can evaluate the tuning result of the algorithm that performs surplus power accommodation in TEMS and CEMS based on the self-sustaining rate, and can easily contribute to the efficiency of surplus power accommodation.
Further, the present embodiment, it is possible to show that in terms TEMS and CEMS is energy-saving, it is superior to perform power control on each customer facility 10 alone, more energy saving of power consumption in each consumer facility 10 It can contribute to promoting the conversion.
As a result of tuning the algorithm for visualizing the power interchanged between the customer facilities 10 by displaying the independence rate in each of FIG. 9 to FIG. 12, and further accommodating the surplus power in TEMS and CEMS Can be easily confirmed.

<自立率算出の他の実施形態>
以下、図面を参照して、本発明の他の実施形態について説明する。図21は、本発明の他の実施形態による電力管理システムの構成例を示す図である。本実施形態における電力管理システムは、すでに説明した実施形態と同様に、所定の地域範囲である電力管理地域における複数の需要家に対応する住宅、商業施設、産業施設などの需要家施設における電力を、TEMSやCEMSなどにより一括して管理するものである。図21において、第1の実施形態と同様の構成には同一の符号を付し、説明を省略する。以下、第1の実施形態と異なる構成及び動作についてのみ説明する。
<Another embodiment of calculating the independence rate>
Hereinafter, other embodiments of the present invention will be described with reference to the drawings. FIG. 21 is a diagram illustrating a configuration example of a power management system according to another embodiment of the present invention. The power management system in the present embodiment, as in the embodiment described above, generates power in customer facilities such as houses, commercial facilities, and industrial facilities corresponding to a plurality of customers in a power management region that is a predetermined region range. , TEMS, CEMS, etc. collectively manage. In FIG. 21, the same components as those in the first embodiment are denoted by the same reference numerals, and description thereof is omitted. Only the configuration and operation different from the first embodiment will be described below.

本実施形態の電力管理システムは、図21において電力管理地域1’として示す一定範囲の地域における複数の需要家施設10’ごとに備えられる電気設備を対象として電力管理を行う。電力管理地域1’には、需要家施設10、融通エリア内電力管理部11’及び電力料金算出部12がある。各需要家施設10’には、電力線13を介して商用電源から系統電力が供給される。
他の実施形態における電力管理システムが第1の実施形態と異なる点は、各需要施設10’における蓄電池103が電力線13と対して直接に電力の供給及び逆潮流を行う構成である。
The power management system of the present embodiment performs power management for the electrical equipment provided for each of a plurality of customer facilities 10 'in a certain range of regions shown as power management region 1' in FIG. The power management area 1 ′ includes a customer facility 10, a power management area power management unit 11 ′, and a power rate calculation unit 12. System power is supplied from a commercial power source to each customer facility 10 ′ via the power line 13.
Power management system according to another embodiment is different from the first embodiment in the construction of the storage battery 103 in each consumer facility 10 'to supply power and reverse power flow directly against the power line 13.

この第2の実施形態の場合、各需要施設10の各々は、自身に配設されている蓄電池103の電力を直接に使用することはできない。すなわち、電力管理地域1’において、各需要施設10’の蓄電池103は、電力管理地域1’内にて共有化されている。
図22は、他の実施形態における融通エリア内電力管理部11’の構成例を示す図である。
この図22において、融通エリア内電力管理部11’における電力管理部111’は、各需要施設10’に設けられた蓄電池103を、あたかも電力管理地域1’内に設けられた一つの蓄電池として制御する点が第1の実施形態と異なる。
また、この電力管理地域1’における自立率の算出は、自立率評価部112が第1の実施形態と同様に行う。
In this second embodiment, each of the customer facility 10 can not be used directly to power of the storage battery 103 is disposed to itself. In other words, 'in, each customer facility 10' power management area 1-acid battery 103 is shared by the power management area 1 'within.
FIG. 22 is a diagram illustrating a configuration example of the interchange area power management unit 11 ′ according to another embodiment.
In FIG. 22, 'the power management unit 111 in the' interchange area the power management unit 11, 'a battery 103 provided, as if the power management area 1' each customer facility 10 as a storage battery provided in the The point to be controlled is different from the first embodiment.
Further, the independence rate calculation unit 112 calculates the independence rate in the power management area 1 ′ in the same manner as in the first embodiment.

図23は、電力管理地域1の各需要施設10における電力量の測定値を測定する測定箇所を説明する図である。以下、需要家施設10は、例えばn箇所あるとして説明する。図23は、需要電力を各需要施設10間において相互に融通し合う際の自立率を求めるための測定値を測定する測定箇所を示している。
この図13における測定箇所、この測定箇所に設置される各電力計及びこの電力計にて測定される測定値については、第1の実施形態と同様のため、説明を省略する。
Figure 23 is a diagram illustrating the measurement points for measuring a measured value of electric energy in each consumer facility 10 of the power management area 1. In the following description, it is assumed that there are n customer facilities 10, for example. Figure 23 shows a measurement point for measuring a measurement value for determining the self rate in mutually flexible to each other at between the power demand the customers facility 10.
The measurement points in FIG. 13, the wattmeters installed at the measurement points, and the measurement values measured by the wattmeters are the same as in the first embodiment, and thus the description thereof is omitted.

図22に戻り、自立率評価部112は、第1の実施形態の電力管理ステムにおける電力管理地域1の構成と、第2の実施形態における電力管理ステムにおける電力管理地域1’の構成とのいずれにも共通に用いることができる。
上述したように、本実施形態によれば、電力管理地域1’における各需要家施設10’で余剰電力の融通を行うTEMSまたはCEMSのシステムの評価を行う指標である自立率を、自立率の測定を行う電力計を新たに設けることなく、すでにある電力計の測定値により容易に求めることができる。これにより、TEMSまたはCEMSのシステムの開発を行う際、融通のアルゴリズムにおける余剰電力の各需要施設10間における分配の精度を容易に行うことが可能となる。
Returning to Figure 22, self-supporting rate evaluation unit 112, the configuration of the power management area 1 in the power management system of the first embodiment, the configuration of the power management area 1 'in the power management system in the second embodiment Any of these can be used in common.
As described above, according to the present embodiment, the independence rate, which is an index for evaluating the TEMS or CEMS system that performs surplus power interchange in each customer facility 10 ′ in the power management area 1 ′, Without providing a new wattmeter for measurement, it can be easily obtained from the measured value of the existing wattmeter. Thus, when the development of TEMS or CEMS system, it is possible to easily perform the precision of the distribution between each consumer facility 10 of the surplus power in the algorithm flexibility.

また、図2における融通エリア内電力管理部11及び図22における融通エリア内電力管理部11’における自立率の算出を実現するためのプログラムをコンピュータ読み取り可能な記録媒体に記録して、この記録媒体に記録されたプログラムをコンピュータシステムに読み込ませ、実行することにより需要施設10あるいは需要施設10’における自立率の評価処理を行ってもよい。なお、ここでいう「コンピュータシステム」とは、OSや周辺機器等のハードウェアを含むものとする。 Further, a program for realizing the calculation of the self-sustaining rate in the accommodation area power management unit 11 in FIG. 2 and the accommodation area power management unit 11 ′ in FIG. 22 is recorded on a computer-readable recording medium. the recorded program read into the computer system, may be evaluated treatment of autonomous rate in consumer facility 10 or the customer facility 10 'by executing the. Here, the “computer system” includes an OS and hardware such as peripheral devices.

上述したように、複数の需要家施設から構成されるコミュニティにおいては、ある需要家施設の発電電力が消費電力を超えた場合、この余剰電力を消費電力が発電電力を超える他の需要家施設に対して融通する処理が行われる。
上記コミュニティにおける電力の融通処理が適切に行われていれば、コミュニティにおける電力の自立率が向上する。
しかしながら、通常において、需要家施設毎の自立率は計算できるが、コミュニティ全体における電力の融通を行った場合の需要家施設10間における電力の融通の可視化を行うこと、あるいはコミュニティである電力管理地域1における自立率を求めることができない。コミュニティにおける融通電力の可視化のための表示装置に対する融通監視の図の表示及び自立率を算出することは、電力の融通処理の効率化を向上させるための指標として重要であり、すでに説明したように本実施形態により実現することができる。
As described above, in a community composed of a plurality of customer facilities, when the generated power of one customer facility exceeds the power consumption, this surplus power is transferred to other customer facilities whose power consumption exceeds the generated power. On the other hand, flexible processing is performed.
If the power interchange process in the community is appropriately performed, the power independence rate in the community is improved.
However, in general, the independence rate for each customer facility can be calculated, but visualization of the power interchange between the customer facilities 10 when power is interchanged in the entire community, or the power management area that is the community The independence rate in 1 cannot be obtained. It is important to display the diagram of the interchange monitoring for the display device for visualization of the interchange power in the community and calculate the independence rate as an index for improving the efficiency of the interchange processing of the power, as already explained. This embodiment can be realized.

また、「コンピュータシステム」は、WWWシステムを利用している場合であれば、ホームページ提供環境(あるいは表示環境)も含むものとする。
また、「コンピュータ読み取り可能な記録媒体」とは、フレキシブルディスク、光磁気ディスク、ROM、CD−ROM等の可搬媒体、コンピュータシステムに内蔵されるハードディスク等の記憶装置のことをいう。さらに「コンピュータ読み取り可能な記録媒体」とは、インターネット等のネットワークや電話回線等の通信回線を介してプログラムを送信する場合の通信線のように、短時間の間、動的にプログラムを保持するもの、その場合のサーバやクライアントとなるコンピュータシステム内部の揮発性メモリのように、一定時間プログラムを保持しているものも含むものとする。また上記プログラムは、前述した機能の一部を実現するためのものであっても良く、さらに前述した機能をコンピュータシステムにすでに記録されているプログラムとの組み合わせで実現できるものであっても良い。
Further, the “computer system” includes a homepage providing environment (or display environment) if a WWW system is used.
The “computer-readable recording medium” refers to a storage device such as a flexible medium, a magneto-optical disk, a portable medium such as a ROM and a CD-ROM, and a hard disk incorporated in a computer system. Furthermore, the “computer-readable recording medium” dynamically holds a program for a short time like a communication line when transmitting a program via a network such as the Internet or a communication line such as a telephone line. In this case, a volatile memory in a computer system serving as a server or a client in that case, and a program that holds a program for a certain period of time are also included. The program may be a program for realizing a part of the functions described above, and may be a program capable of realizing the functions described above in combination with a program already recorded in a computer system.

以上、この発明の実施形態を図面を参照して詳述してきたが、具体的な構成はこの実施形態に限られるものではなく、この発明の要旨を逸脱しない範囲の設計等も含まれる。   The embodiment of the present invention has been described in detail with reference to the drawings. However, the specific configuration is not limited to this embodiment, and includes design and the like within a scope not departing from the gist of the present invention.

1…電力管理地域
10…需要施設
11,11’…融通エリア内電力管理部
12…電力料金算出部
13…電力線
101…太陽電池
102…系統電力量計
103…蓄電池
104…蓄電池電力量計
105…蓄電池制御部
111,111’…電力管理部
112…自立率評価部
113…融通画面表示部
201…制御部
202…全邸購入電力算出部
203…全邸売電電力算出部
204…全邸発電電力算出部
205…全邸充電電力算出部
206…全邸放電電力算出部
207…全邸消費電力算出部
208…融通電力量算出部
209…蓄電池系統充電分算出部
210…蓄電池PV充電分算出部
211…蓄電池誤差電力算出部
212…エリア購入電力算出部
213…エリア売電電力算出部
214…自立率算出部
215…データベース
300,400…ネットワーク
301…画像制御部
302…余剰需要抽出部
303…不足需要抽出部
304…余剰電力配分部
305…円状棒グラフ表示部
306…融通電力線表示部
307…電力量球表示部
308…円状棒グラフ表示部
309…表示データ記憶部
1 ... Power management area 10 ... customer facility 11, 11 '... interchange area power management unit 12 ... power rate calculation unit 13 ... power line 101 ... solar cell 102 ... system power meter 103 ... battery 104 ... battery power meter 105 ... Storage battery control unit 111, 111 '... Power management unit 112 ... Independence rate evaluation unit 113 ... Interchange screen display unit 201 ... Control unit 202 ... Whole house purchase power calculation unit 203 ... Whole house sales power calculation unit 204 ... Whole house power generation Electric power calculation unit 205 ... Whole house charge power calculation part 206 ... Whole house discharge power calculation part 207 ... Whole house power consumption calculation part 208 ... Flexible power amount calculation part 209 ... Storage battery system charge part calculation part 210 ... Storage battery PV charge part calculation part 211 ... Storage battery error power calculation unit 212 ... Area purchase power calculation unit 213 ... Area power sale power calculation unit 214 ... Independence rate calculation unit 215 ... Database 300, 4 0 ... network 301 ... image control unit 302 ... excess customer extraction unit 303 ... insufficient customer extraction unit 304 ... surplus power distribution unit 305 ... circular bar graph display 306 ... power interchanged line display unit 307 ... electric energy ball display unit 308 ... Circular bar graph display unit 309 ... display data storage unit

Claims (7)

電力管理地域において、電気設備として蓄電池及び発電装置を備える需要家施設を含む複数の需要施設を共通の電源線に接続し、余剰電力を前記需要施設間において融通し合う電力管理システムにおいて、
余剰電力である各邸売電電力を有する前記需要家施設を余剰需要家として抽出する余剰需要家抽出部と、
不足電力である各邸購入電力を有する前記需要家施設を不足需要家として抽出する不足需要家抽出部と、
前記余剰需要家の前記各邸売電電力を前記不足需要家の前記各邸購入電力に配分する余剰電力配分部と
記余剰需要家の需要家画像から前記不足需要家の需要家画像に向かい、余剰電力配分部が配分した余剰電力が融通されていることを示す線形状の電力線画像を表示する融通電力線表示部と
円状棒グラフを形成する円状棒グラフ表示部と
を備え、
前記円状棒グラフ表示部が、前記円状棒グラフの中心円の円周の外周上に前記需要家施設の各々を示す前記需要家画像をそれぞれ所定の間隔で表示し、前記円状棒グラフを前記需要家施設の位置に前記中心円の円周を基底とし、前記中心円の直径方向に、前記中心円の外側に形成し、
前記融通電力線表示部が、前記中心円の内部において、前記余剰需要家の前記需要家画像から前記不足需要家の前記需要家画像の電力の融通関係を示す前記電力線画像を描画する
とを特徴とする電力管理システム。
In power management area, the plural customers facilities including customer facility comprising a storage battery and a power generator as electrical equipment connected to the common power supply line, the power management system with surplus power mutual interchange between the customer facility,
A surplus consumer extraction unit that extracts the customer facility having surplus power as surplus power,
A short customer extraction unit that extracts the customer facility having the power purchased by each residence as a shortage power as a short customer;
A surplus power distribution unit that distributes the electric power sold by the surplus consumer to the power purchased by the deficient consumer ;
Before SL directed from excess consumers who demand Yoie images demand Yoie image of the missing customer, interchange power line surplus power to display a line-shaped power line image indicating that it is flexible that the surplus power allocation unit is allocated A display unit ;
For example Bei and the circular bar graph display unit to form a circular bar graph,
The circular bar graph display unit displays the customer images indicating each of the customer facilities on a circumference of a circumference of a central circle of the circular bar graph at predetermined intervals, and displays the circular bar graph as the demand Based on the circumference of the central circle at the position of the house facility, in the diameter direction of the central circle, formed outside the central circle,
The interchangeable power line display unit draws the power line image indicating the interchange relationship of power of the consumer image of the shortage consumer from the consumer image of the surplus consumer within the central circle.
Power management system which is characterized a call.
前記各需要家施設を示す需要家施設画像を表示する画像制御部と、
前記蓄電池に対する充電電力である各邸充電電力、前記蓄電池からの放電電力である各邸放電電力及び前記発電装置の発電電力である各邸発電電力の各々の棒グラフを表示する棒グラフ表示部
さらに有し、
前記棒グラフ表示部が、前記画像制御部が表示した前記需要家施設の各々の前記需要家画像の近傍に、前記各邸充電電力、前記各邸放電電力及び前記各邸発電電力の各々の前記棒グラフを画像表示する
ことを特徴とする請求項1に記載の電力管理システム。
An image control unit for displaying a customer facility image indicating each customer facility;
A bar graph display unit for displaying each bar graph of each residence charging power that is the charging power for the storage battery, each residence discharge power that is the discharge power from the storage battery, and each residence generation power that is the generated power of the power generation device ;
Further comprising a,
In the vicinity of the customer image of each of the customer facilities displayed by the image control unit , the bar graph display unit displays the bar graph of each of the mansion charge power, each mansion discharge power, and each mansion generated power. The power management system according to claim 1, wherein an image is displayed.
前記融通電力線表示部が、
前記電力線画像の線の太さまたは濃淡が融通される余剰電力の電力量に対応した太さで表示する
ことを特徴とする請求項1または請求項2に記載の電力管理システム。
The flexible power line display unit is
3. The power management system according to claim 1, wherein the power line image is displayed with a thickness corresponding to a power amount of surplus power in which a line thickness or shading of the power line image is accommodated.
前記電力線画像に沿って移動する複数の第1球画像を表示する電力量球表示部をさらに有し、
前記電力量球表示部が、
前記余剰需要家の前記需要家画像と前記不足需要家の前記需要家画像とを接続する前記電力線画像に沿って、前記余剰需要家の前記需要家画像から前記不足需要家の前記需要家画像に向かって移動する前記第1球画像を表示する
ことを特徴とする請求項1から請求項3のいずれか一項に記載の電力管理システム。
An electric energy sphere display unit that displays a plurality of first sphere images that move along the power line image;
The power sphere display unit is
The excess customer said along said power line image that connects the customer image and said customer image of the lack of demand house, before Symbol excess over - customer of the customer the lack of demand from the image house the customer The power management system according to any one of claims 1 to 3, wherein the first sphere image moving toward the image is displayed.
前記電力量球表示部が、
前記余剰需要家の前記需要家画像の周囲に前記余剰電力の電力量を示す第2球画像を表示する
ことを特徴とする請求項4のいずれか一項に記載の電力管理システム。
The power sphere display unit is
The excess customer the customer image power management system according to the excess power any one of Motomeko 4 and displaying the second ball image indicating the amount of power around the.
前記電力量球表示部が、
前記第1球画像及び前記第2球画像の各々の速度、直径あるいは数を電力量に対応させて変化させることを特徴とする請求項5に記載の電力管理システム。
The power sphere display unit is
The power management system according to Motomeko 5 you and changing each of the speed of the first ball image and the second ball image, the diameter or number in correspondence with the amount of power.
電力管理地域において、電気設備として蓄電池及び発電装置を備える需要家施設を含む複数の需要施設を共通の電源線に接続し、余剰電力を前記需要施設間において融通し合う電力管理方法において、
余剰需要家抽出部が、余剰電力である各邸売電電力を有する前記需要家施設を余剰需要家として抽出する余剰需要家抽出過程と、
不足電力である各邸購入電力を有する前記需要家施設を不足需要家として抽出する不足需要家抽出部と、
不足需要家抽出部が、前記余剰需要家の前記各邸売電電力を前記不足需要家の前記各邸購入電力に配分する余剰電力配分過程と
融通電力線表示部が、前記余剰需要家の需要家画像から前記不足需要家の需要家画像に向かい、余剰電力配分部が配分した余剰電力が融通されていることを示す線形状の電力線画像を表示する融通電力線表示過程と
を有し、
円状棒グラフ表示部が、円状棒グラフを形成する円状棒グラフ表示過程と
を備え、
前記円状棒グラフ表示部が、前記円状棒グラフの中心円の円周の外周上に前記需要家施設の各々を示す前記需要家画像をそれぞれ所定の間隔で表示し、前記円状棒グラフを前記需要家施設の位置に前記中心円の円周を基底とし、前記中心円の直径方向に、前記中心円の外側に形成し、
前記融通電力線表示部が、前記中心円の内部において、前記余剰需要家の前記需要家画像から前記不足需要家の前記需要家画像の電力の融通関係を示す前記電力線画像を描画する
とを特徴とする電力管理方法。
In power management area, the plural customers facilities including customer facility comprising a storage battery and a power generator as electrical equipment connected to the common power supply line, the power management method mutual flexibility between the customer facility surplus power,
A surplus customer extraction unit extracts the customer facility having each power for sale power that is surplus power as a surplus consumer,
A short customer extraction unit that extracts the customer facility having the power purchased by each residence as a shortage power as a short customer;
A surplus consumer extraction unit distributes the power sold by each surplus consumer to the power purchased by each surplus consumer .
Interchange power line display unit, the opposite from surplus consumers who demand Yoie images demand Yoie image of the missing customer, line-shaped power line image indicating that the surplus power surplus power distribution unit is allocated is flexible possess the flexibility power line display process that displays,
Circular bar graph display unit, e Bei a circular bar graph display process of forming a circular bar,
The circular bar graph display unit displays the customer images indicating each of the customer facilities on a circumference of a circumference of a central circle of the circular bar graph at predetermined intervals, and displays the circular bar graph as the demand Based on the circumference of the central circle at the position of the house facility, in the diameter direction of the central circle, formed outside the central circle,
The interchangeable power line display unit draws the power line image indicating the interchange relationship of power of the consumer image of the shortage consumer from the consumer image of the surplus consumer within the central circle.
Power management wherein a call.
JP2014188723A 2014-09-17 2014-09-17 Power management system and power management method Active JP6364293B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014188723A JP6364293B2 (en) 2014-09-17 2014-09-17 Power management system and power management method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014188723A JP6364293B2 (en) 2014-09-17 2014-09-17 Power management system and power management method

Publications (2)

Publication Number Publication Date
JP2016063592A JP2016063592A (en) 2016-04-25
JP6364293B2 true JP6364293B2 (en) 2018-07-25

Family

ID=55798452

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014188723A Active JP6364293B2 (en) 2014-09-17 2014-09-17 Power management system and power management method

Country Status (1)

Country Link
JP (1) JP6364293B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6345055B2 (en) * 2014-09-17 2018-06-20 積水化学工業株式会社 Power management system and power management method
JP6172345B1 (en) * 2016-06-17 2017-08-02 積水ハウス株式会社 Energy management system
JP7249166B2 (en) * 2019-02-21 2023-03-30 積水化学工業株式会社 Power management device, power management method and program
JP2022180197A (en) * 2021-05-24 2022-12-06 株式会社Jera Storage system data platform, service provision method and program

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6115698A (en) * 1995-08-18 2000-09-05 Continental Power Exchange, Inc. Apparatus and method for trading electric energy
JP5481080B2 (en) * 2009-03-18 2014-04-23 トヨタホーム株式会社 Power interchange system
JP5695848B2 (en) * 2010-06-25 2015-04-08 株式会社日立製作所 Simultaneous equal amount apparatus, control method thereof and program thereof
JP2012044733A (en) * 2010-08-12 2012-03-01 Daiwa House Industry Co Ltd Storage battery system using photovoltaic power generation
JP5204819B2 (en) * 2010-08-31 2013-06-05 株式会社日立製作所 Energy management system and energy management method
JP2012080601A (en) * 2010-09-30 2012-04-19 Sanyo Electric Co Ltd Data processing apparatus for display system
JP5319644B2 (en) * 2010-11-01 2013-10-16 三菱電機株式会社 Energy management system and program
JP2012110170A (en) * 2010-11-19 2012-06-07 Hitachi Ltd Controller for power storage device, power storage device, charging/discharging method of power storage device
JP5924120B2 (en) * 2012-05-21 2016-05-25 ソニー株式会社 Control device, control method and program
JP2013255394A (en) * 2012-06-08 2013-12-19 Toyota Home Kk Energy management control system
JP2014054084A (en) * 2012-09-07 2014-03-20 Sharp Corp Control device and photovoltaic power generation system comprising the same
JP2014128166A (en) * 2012-12-27 2014-07-07 Hitachi Ltd Power management system and method for the same
JP6345055B2 (en) * 2014-09-17 2018-06-20 積水化学工業株式会社 Power management system and power management method

Also Published As

Publication number Publication date
JP2016063592A (en) 2016-04-25

Similar Documents

Publication Publication Date Title
JP5958921B2 (en) Energy planning system
JP7416663B2 (en) System and program
JPWO2020079725A1 (en) Energy display system, display device and energy display method
JP6364293B2 (en) Power management system and power management method
JP6403875B2 (en) Device management apparatus, device management system, device management method and program
JP7117591B2 (en) CHARGE MANAGEMENT SYSTEM, CHARGE MANAGEMENT METHOD, AND PROGRAM
JP6345055B2 (en) Power management system and power management method
JP2020198696A (en) Power supply system and power management method
JP2016174486A (en) Power management system, power management method and program
WO2017195537A1 (en) Charge/discharge planning system, planning method, and program
EP3693917A1 (en) Distributed energy resource management device, management method, and management system
JP6264695B2 (en) Power management apparatus and information presentation method
JP2012092579A (en) Intermediate water utilization management system
JP6626359B2 (en) Power related information presenting apparatus, electric related information presenting method and program
JP6644162B2 (en) Power management system, control device, and power management method
JP6698371B2 (en) Electric charge management device, electric charge management method and program
JP5947675B2 (en) Power control device and power supply system using the same
JP2007295650A (en) Power management system for each dwelling of collective housing employing virtual power storage secondary battery, and power fee charging method
JP6590910B2 (en) Controller, electricity bill display method, and program
JP6472235B2 (en) Power generation facility management system, power generation facility management method, and residential terminal
JP6148119B2 (en) Energy management apparatus, energy management method, and energy management system
JP2020052549A (en) Power receiving point power prediction device, power receiving point power prediction method, and program
WO2023171144A1 (en) Power management method, information processing device and program
JP2017102572A (en) Difference distribution device, difference distribution method, and difference distribution program
JP2021071810A (en) Evaluation method, program, and evaluation system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20170510

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20180209

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20180320

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20180426

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20180605

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20180702

R151 Written notification of patent or utility model registration

Ref document number: 6364293

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250