Concrete floor slab replacement method Download PDF

Info

Publication number
JP6365555B2
JP6365555B2 JP2016006733A JP2016006733A JP6365555B2 JP 6365555 B2 JP6365555 B2 JP 6365555B2 JP 2016006733 A JP2016006733 A JP 2016006733A JP 2016006733 A JP2016006733 A JP 2016006733A JP 6365555 B2 JP6365555 B2 JP 6365555B2
Authority
JP
Japan
Prior art keywords
existing
steel
floor slab
slab
concrete floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2016006733A
Other languages
Japanese (ja)
Other versions
JP2017128841A (en
Inventor
栗原 康行
康行 栗原
岡田 淳
淳 岡田
克佳 中西
克佳 中西
遼一 佐藤
遼一 佐藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Steel Corp
Original Assignee
JFE Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JFE Steel Corp filed Critical JFE Steel Corp
Priority to JP2016006733A priority Critical patent/JP6365555B2/en
Publication of JP2017128841A publication Critical patent/JP2017128841A/en
Application granted granted Critical
Publication of JP6365555B2 publication Critical patent/JP6365555B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Description

本発明は、橋梁分野において、老朽化などにより更新が必要になったコンクリート床版の取替え工法に関する。   The present invention relates to a concrete floor slab replacement method that needs to be renewed due to aging in the bridge field.

橋梁分野において、老朽化などにより更新が必要になった既設のコンクリート床版を新設の鋼床版に取り替える工法としては、特許文献1に記載の技術などが知られている。   In the bridge field, as a method of replacing an existing concrete floor slab that has been renewed due to aging or the like with a new steel floor slab, a technique described in Patent Document 1 is known.

特許文献1に記載の技術を用いれば、ほとんどの既設のコンクリート部分を除去することなく、既設の鋼製桁と新設の鋼床版を一体化することができる。   If the technique described in Patent Document 1 is used, an existing steel girder and a new steel deck can be integrated without removing most of the existing concrete portions.

特開昭62−45804号公報JP-A-62-45804

しかしながら、特許文献1に記載の技術では、新設の鋼床版を既設の鋼製主桁にボルトで接合するので、既設の鋼製主桁にボルトで接合する個所の既設のコンクリートおよびスタッドを除去し、精度良くボルト孔を明ける必要がある。そのため、ボルト孔を明けることに伴う、既設の鋼製主桁の強度低下や疲労の問題が懸念される上、新設の鋼床版に取り付けた補強板と既設の鋼製主桁のボルト孔の位置との精度管理が煩雑で、施工に時間を要するなどの問題があった。   However, in the technique described in Patent Document 1, a new steel floor slab is joined to an existing steel main girder with bolts, so that existing concrete and studs that are joined to the existing steel main girder with bolts are removed. However, it is necessary to drill the bolt holes with high accuracy. For this reason, there are concerns about the strength reduction and fatigue problems of the existing steel main girder due to the drilling of the bolt holes, as well as the reinforcement plate attached to the new steel deck and the bolt holes of the existing steel main girder. There was a problem that the accuracy control with the position was complicated and construction took time.

本発明は、上記のような事情に鑑みてなされたものであり、既設のコンクリート床版を新設の鋼床版に取り替える際に、迅速に新設の鋼床版の設置が可能で、ある程度の精度誤差の吸収も可能であり、施工性を大幅に向上させることができるコンクリート床版の取替え工法を提供することを目的としている。   The present invention has been made in view of the above circumstances, and when replacing an existing concrete slab with a new steel slab, it is possible to quickly install a new steel slab with a certain degree of accuracy. The object is to provide a concrete slab replacement method that can absorb errors and greatly improve the workability.

上記課題を解決するために、本発明は以下の特徴を有している。   In order to solve the above problems, the present invention has the following features.

[1]既設の鋼製主桁上に設置された既設のコンクリート床版を新設の鋼床版に取替える際に、既設のコンクリート床版を既設の鋼製主桁の上フランジ幅以下の幅で切断して鋼製主桁上部のコンクリート床板の一部残存させておくとともに、新設の鋼床版の下面に設置する横桁を既設の鋼製主桁の上フランジ幅に合わせ断続的に間隔を開けて設置し、新設の鋼床版の横桁と既設の鋼製主桁の上フランジとを溶接により接合することによって、新設の鋼床版と既設の鋼製主桁とを一体化することを特徴とするコンクリート床版の取替え工法。   [1] When replacing an existing concrete floor slab installed on an existing steel main girder with a new steel floor slab, the existing concrete slab should be less than the upper flange width of the existing steel main girder. Cut and leave a part of the concrete floor slab above the steel main girder, and the horizontal girder installed on the lower surface of the new steel slab is intermittently spaced according to the upper flange width of the existing steel main girder. Open and install and integrate the new steel deck and the existing steel main girder by welding the horizontal girder of the new steel deck and the upper flange of the existing steel main girder by welding A replacement method for concrete floor slabs.

[2]残存させた既設のコンクリート床版と新設の鋼床版との空隙に緩衝材を設置することを特徴とする前記[1]に記載のコンクリート床版の取替え工法。   [2] The method for replacing a concrete floor slab according to [1], wherein a buffer material is installed in a gap between the remaining existing concrete floor slab and the newly installed steel floor slab.

本発明においては、既設のコンクリート床版を新設の鋼床版に取り替える際に、迅速に新設の鋼床版の設置が可能で、ある程度の精度誤差の吸収も可能であり、施工性を大幅に向上させることができる。   In the present invention, when replacing an existing concrete slab with a new steel slab, it is possible to quickly install a new steel slab, absorb a certain degree of accuracy error, and greatly improve workability. Can be improved.

本発明の実施形態1を示す図である。It is a figure which shows Embodiment 1 of this invention. 本発明の実施形態1を示す図である。It is a figure which shows Embodiment 1 of this invention. 本発明の実施形態1を示す図である。It is a figure which shows Embodiment 1 of this invention. 本発明の実施形態1を示す図である。It is a figure which shows Embodiment 1 of this invention. 本発明の実施形態2を示す図である。It is a figure which shows Embodiment 2 of this invention.

本発明の実施形態を図面に基づいて説明する。   Embodiments of the present invention will be described with reference to the drawings.

[実施形態1]
図1は、本発明の実施形態1に係るコンクリート床版の取替え工法によって、既設のコンクリート床版が新設の鋼床版に取り替えられた後の構造(コンクリート床版の取替え構造)を示す断面図である。
[Embodiment 1]
FIG. 1 is a cross-sectional view showing a structure (replacement structure of a concrete floor slab) after an existing concrete floor slab is replaced with a new steel floor slab by a concrete floor slab replacement method according to Embodiment 1 of the present invention. It is.

図1に示すように、この実施形態1におけるコンクリート床版の取替え構造においては、既設のコンクリート床版14が既設の鋼製主桁10(上フランジ11、下フランジ12を有する)における上フランジ11幅以下の幅(ここでは、上フランジ11幅と同じ幅)で切断し、鋼製主桁10の上部側を残存させる。また、残存した既設のコンクリート床版14の位置に合わせた切れ目(ここでは、上フランジ11幅と同じ幅)を有して断続的に橋幅方向(橋軸直角方向)に延びる横桁24(下フランジ25を有する)が、新設の鋼床版21(デッキプレート22、縦リブ23(Uリブ、Vリブ、Iリブ等))の下面に設置されている。そして、残存した既設のコンクリート床版14と横桁24の切れ目とが嵌合していて、新設の鋼床版21の下面に設置された横桁24の下フランジ25と既設の鋼製主桁10の上フランジ11とが現場溶接により接合されて(現場溶接部30)、新設の鋼床版21と既設の鋼製主桁10とが一体化している。   As shown in FIG. 1, in the concrete floor slab replacement structure according to the first embodiment, the existing concrete floor slab 14 has an upper flange 11 in an existing steel main girder 10 (having an upper flange 11 and a lower flange 12). Cut with a width equal to or smaller than the width (here, the same width as the width of the upper flange 11), and the upper side of the steel main girder 10 is left. Moreover, the cross beam 24 (it has the same width as upper flange 11 width | variety here) matched with the position of the existing existing concrete floor slab 14 extended intermittently in a bridge width direction (bridge axis perpendicular direction) ( (Having a lower flange 25) is installed on the lower surface of a newly installed steel deck 21 (deck plate 22, vertical rib 23 (U rib, V rib, I rib, etc.)). And the remaining existing concrete floor slab 14 and the cut | interruption of the cross beam 24 fit, the lower flange 25 of the cross beam 24 installed in the lower surface of the newly installed steel floor plate 21, and the existing steel main girder Ten upper flanges 11 are joined by on-site welding (on-site welded portion 30), and the newly installed steel deck 21 and the existing steel main girder 10 are integrated.

なお、残存させた既設のコンクリート床版14と新設の鋼床版21(デッキプレート22)との間隙には緩衝材(ゴム、繊維、モルタル等)26が設置されている。   A buffer material (rubber, fiber, mortar, etc.) 26 is installed in the gap between the remaining existing concrete floor slab 14 and the newly installed steel floor slab 21 (deck plate 22).

次に、本発明の実施形態1に係るコンクリート床版の取替え工法によって、上述したコンクリート床版の取替え構造を得るための施工手順について述べる。   Next, the construction procedure for obtaining the above-described concrete floor slab replacement structure by the concrete floor slab replacement method according to the first embodiment of the present invention will be described.

まず、鋼床版は、通常、横断方向の剛性確保のため、横桁が橋長手方向(橋軸方向)に所定の間隔(例えば、2m程度の間隔)で設置されているので、図2(a)に縦断面図、図2(b)に下面図を示すように、この新設の鋼床版21では、横桁24を、既設の鋼製主桁10の上フランジ11の位置に合わせた切れ目を有して断続的に橋幅方向に延びる構造として製作する。   First, in order to ensure the rigidity in the transverse direction, the steel deck is usually installed with a predetermined interval (for example, an interval of about 2 m) in the longitudinal direction of the bridge (bridge axis direction). As shown in a longitudinal sectional view in a) and a bottom view in FIG. 2 (b), in this new steel deck 21, the cross beam 24 is aligned with the position of the upper flange 11 of the existing steel main beam 10. It is manufactured as a structure having cuts and extending intermittently in the bridge width direction.

一方で、図3(a)に示すように、既設のコンクリート床版13を既設の鋼製主桁10の上フランジ11幅で切断し、鋼製主桁10間の既設のコンクリート床版13を除去する。これによって、図3(b)に示すように、既設の鋼製主桁10の上フランジ11上のコンクリート床版14のみが残存することになる。なお、図3(a)中の15はスタッドである。   On the other hand, as shown in FIG. 3 (a), the existing concrete floor slab 13 is cut at the upper flange 11 width of the existing steel main girder 10, and the existing concrete floor slab 13 between the steel main girders 10 is cut. Remove. As a result, as shown in FIG. 3B, only the concrete slab 14 on the upper flange 11 of the existing steel main girder 10 remains. In addition, 15 in Fig.3 (a) is a stud.

そして、図4に示すように、残存したコンクリート床版14の位置に新設の鋼床版21における横桁24の切れ目が嵌合するように、新設の鋼床版21を設置する。   Then, as shown in FIG. 4, the new steel slab 21 is installed so that the cut of the cross beam 24 in the new steel slab 21 is fitted to the position of the remaining concrete slab 14.

最後に、新設の鋼床版21の下面に設置された横桁24の下フランジ25と既設の鋼製主桁10の上フランジ11とを現場溶接により接合して、新設の鋼床版21と既設の鋼製主桁10とを一体化する。   Finally, the lower flange 25 of the cross girder 24 installed on the lower surface of the newly installed steel deck 21 and the upper flange 11 of the existing steel main girder 10 are joined by field welding, The existing steel main girder 10 is integrated.

なお、残存したコンクリート床版14は、長期供用したコンクリート床板であるため、重荷重の影響などで不陸が生じていて、高さ調整が必要になる場合が多い。   In addition, since the remaining concrete floor slab 14 is a concrete floor board used for a long period of time, unevenness has arisen by the influence of heavy load etc., and height adjustment is often needed.

そこで、残存したコンクリート床版14の高さを実測し、新設の鋼床版21における切れ目の高さに合わせて、残存させた既設のコンクリート床版14と新設の鋼床版21(デッキプレート22)との間隙に、高さ調整材を兼ねて、鋼床版に加わる車両による重荷重の圧縮力のスムースな伝達のための緩衝材(硬質ゴム、繊維、モルタル等)26を設置するようにすると良い。なお、緩衝材26は、長期使用に適し、衝撃を吸収し、アスファルト舗装時の高熱にも耐えられる、素材が望ましい。   Therefore, the height of the remaining concrete floor slab 14 is measured, and the remaining existing concrete floor slab 14 and the newly installed steel floor slab 21 (deck plate 22 are matched to the height of the cut in the new steel floor slab 21. ) And a cushioning material (hard rubber, fiber, mortar, etc.) 26 for smooth transmission of heavy load compression force applied to the steel deck by means of a vehicle that also serves as a height adjusting material. Good. The buffer material 26 is preferably a material that is suitable for long-term use, absorbs impact, and can withstand high heat during asphalt paving.

このようにして、この実施形態1においては、既設のコンクリート床版13を新設の鋼床版21に取り替える際に、迅速に新設の鋼床版21の設置が可能で、新設の鋼床版21の断続的な横桁24の下フランジ25と既設の鋼製主桁10の上フランジ11とを溶接で接合するため、施工現地での切断などによる調整も可能で、既設構造の合わせの精度誤差の吸収も可能であり、施工性を大幅に向上させることができる。   Thus, in this Embodiment 1, when replacing the existing concrete floor slab 13 with the new steel floor slab 21, the new steel floor slab 21 can be quickly installed, and the new steel floor slab 21 can be installed. Because the lower flange 25 of the intermittent cross girder 24 and the upper flange 11 of the existing steel main girder 10 are joined by welding, adjustment by cutting at the construction site is also possible, and there is an accuracy error in the alignment of the existing structure Can be absorbed, and the workability can be greatly improved.

[実施形態2]
図5は、本発明の実施形態2を示す縦断面図である。図5(a)は本発明の実施形態1における図2(a)に対応し、図5(b)は本発明の実施形態1における図1に対応し、図5(c)は本発明の実施形態1における図2(c)に対応している。
[Embodiment 2]
FIG. 5 is a longitudinal sectional view showing Embodiment 2 of the present invention. 5 (a) corresponds to FIG. 2 (a) in the first embodiment of the present invention, FIG. 5 (b) corresponds to FIG. 1 in the first embodiment of the present invention, and FIG. 5 (c) corresponds to FIG. This corresponds to FIG. 2C in the first embodiment.

図5に示すように、本発明の実施形態2は、基本的には、上記の本発明の実施形態1と同様であるが、この実施形態2においては、大きな荷重が掛かる頻度が多い場合や、何らかの事情により、新設の鋼床版21の横桁24の下フランジ25と既設の鋼製主桁10の上フランジ11との現場溶接だけでは、荷重を支えられない場合などに対応するために、橋長手方向に所定の間隔で設置されている横桁24のそれぞれの橋幅方向端部同士を結ぶようにして橋長手方向に延びる押え鋼板31を設置し、押え鋼板31に設けておいた孔32を用いて、接着系アンカー(商品名:ケミカルアンカー)33などで一体化するようにしている。   As shown in FIG. 5, the second embodiment of the present invention is basically the same as the first embodiment of the present invention described above, but in this second embodiment, a case where a large load is frequently applied or To cope with a case where the load cannot be supported only by field welding between the lower flange 25 of the cross girder 24 of the newly installed steel deck 21 and the upper flange 11 of the existing steel main girder 10 for some reason. The presser steel plate 31 extending in the bridge longitudinal direction is installed so as to connect the respective ends in the bridge width direction of the cross beams 24 installed at predetermined intervals in the bridge longitudinal direction, and the presser steel plate 31 is provided. The holes 32 are used for integration with an adhesive anchor (trade name: chemical anchor) 33 or the like.

なお、押え鋼板31は、デッキプレート22の下面において、横桁24が存在する個所を除いて橋長手方向全長にわたり設けられるものであり、予め押え鋼板31に孔32を空けておくことが好ましい。   The presser steel plate 31 is provided over the entire length in the longitudinal direction of the bridge except for the portion where the cross beam 24 exists on the lower surface of the deck plate 22, and it is preferable that the presser steel plate 31 has a hole 32 in advance.

また、接着系アンカー33は、新設の鋼床版21の横桁24で負担が足りない場合に、施工性と費用を考慮し、必要最小限の施工とすれば、施工性が向上する。   Moreover, when the burden is not enough in the cross girder 24 of the newly installed steel deck 21, the workability of the adhesive anchor 33 can be improved by considering the workability and cost and performing the minimum necessary work.

鋼床版の新設構造についても、本発明を応用した橋梁の適用が考えられる。   The application of the bridge to which the present invention is applied can also be considered for the new structure of the steel deck.

10 既設の鋼製主桁
11 既設の鋼製主桁の上フランジ
12 既設の鋼製主桁の下フランジ
13 既設のコンクリート床版
14 残存する既設のコンクリート床版
15 スタッド
21 鋼床版21
22 デッキプレート
23 縦リブ
24 横桁
25 横桁の下フランジ
26 緩衝材
30 現場溶接部
31 押え鋼板
32 孔
33 接着系アンカー(ケミカルアンカー)
DESCRIPTION OF SYMBOLS 10 Existing steel main girder 11 Upper flange of existing steel main girder 12 Lower flange of existing steel main girder 13 Existing concrete slab 14 Remaining existing concrete slab 15 Stud 21 Steel slab 21
22 Deck plate 23 Vertical rib 24 Horizontal girder 25 Lower flange of horizontal girder 26 Cushioning material 30 On-site welded part 31 Steel plate 32 Hole 33 Adhesive anchor (chemical anchor)

Claims (2)

既設の鋼製主桁上に設置された既設のコンクリート床版を新設の鋼床版に取替える際に、既設のコンクリート床版を既設の鋼製主桁の上フランジ幅以下の幅で切断して鋼製主桁上部のコンクリート床板の一部残存させておくとともに、新設の鋼床版の下面に設置する横桁を既設の鋼製主桁の上フランジ幅に合わせ断続的に間隔を開けて設置し、新設の鋼床版の横桁と既設の鋼製主桁の上フランジとを溶接により接合することによって、新設の鋼床版と既設の鋼製主桁とを一体化することを特徴とするコンクリート床版の取替え工法。   When replacing an existing concrete slab installed on an existing steel main girder with a new steel slab, cut the existing concrete slab with a width less than the upper flange width of the existing steel main girder. A part of the concrete floor slab above the steel main girder is allowed to remain, and the horizontal girder installed on the lower surface of the new steel slab is installed at intervals according to the upper flange width of the existing steel main girder. The new steel deck and the existing steel main girder are integrated by welding the cross girder of the new steel deck and the upper flange of the existing steel main girder by welding. To replace concrete floor slabs. 残存させた既設のコンクリート床版と新設の鋼床版との空隙に緩衝材を設置することを特徴とする請求項1に記載のコンクリート床版の取替え工法。   2. The method for replacing a concrete floor slab according to claim 1, wherein a cushioning material is installed in a gap between the existing concrete floor slab that remains and a new steel floor slab.
JP2016006733A 2016-01-18 2016-01-18 Concrete floor slab replacement method Active JP6365555B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016006733A JP6365555B2 (en) 2016-01-18 2016-01-18 Concrete floor slab replacement method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016006733A JP6365555B2 (en) 2016-01-18 2016-01-18 Concrete floor slab replacement method

Publications (2)

Publication Number Publication Date
JP2017128841A JP2017128841A (en) 2017-07-27
JP6365555B2 true JP6365555B2 (en) 2018-08-01

Family

ID=59395977

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016006733A Active JP6365555B2 (en) 2016-01-18 2016-01-18 Concrete floor slab replacement method

Country Status (1)

Country Link
JP (1) JP6365555B2 (en)

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6059209A (en) * 1983-09-08 1985-04-05 石川島播磨重工業株式会社 Replacing method of bridge reinforced concrete floor panel
JPH0651961B2 (en) * 1985-08-23 1994-07-06 石川島播磨重工業株式会社 Bridge rebar concrete floor slab replacement method
JPH022737Y2 (en) * 1985-08-23 1990-01-23
JPH022738Y2 (en) * 1985-08-23 1990-01-23
US5978997A (en) * 1997-07-22 1999-11-09 Grossman; Stanley J. Composite structural member with thin deck portion and method of fabricating the same
JP2008063803A (en) * 2006-09-07 2008-03-21 Jfe Engineering Kk Synthetic floor slabs, synthetic floor slab bridges, or composite girder bridges with inner ribbed shaped steel

Also Published As

Publication number Publication date
JP2017128841A (en) 2017-07-27

Similar Documents

Publication Publication Date Title
JP6180376B2 (en) Main girder provision method in composite girder floor slab replacement method, composite girder floor slab replacement method, and main girder provision structure in composite girder floor slab replacement method
WO2006038620A1 (en) Joined part structure of pedestal and method of joining pedestal
JP3867149B2 (en) Steel slab structure of bridge and steel slab reinforcement method
KR20160148416A (en) Steel-Concrete Composite Rahmen Bridge
JP6365551B2 (en) Replacement method and structure of concrete floor slab
JP6365555B2 (en) Concrete floor slab replacement method
JP2021025228A (en) Floor slab structure and floor slab replacement method
KR101439947B1 (en) Bridge using girder with ring plate and bracket and bridge construction method therefor
JP2016108812A (en) Connection structure for bridge using reinforced concrete floor slab, and connection method for existing bridge using reinforced concrete floor slab
JP7272918B2 (en) Existing floor slab replacement method
JP2014148815A (en) Reinforcement method
JP7003377B2 (en) Beam joint structure
JP2001164504A (en) Repair execution method of joint section for viaduct
JP4143935B2 (en) Vertical rib composite floor slab
JP2008231688A (en) Bridge structure using composite floor slab, its construction method, and form for composite floor slab
JP6286737B2 (en) Fixed structure of floor slab panel
JP4650255B2 (en) Steel slab reinforcement structure and existing steel slab reinforcement method
JP6740846B2 (en) Floor slab replacement structure and floor slab replacement construction method
JP4739072B2 (en) Girder structure and construction method when multiple simple girder bridges are used as one simple girder bridge
JP2017203298A (en) Floor slab joint structure and floor slab renewal method
JP7129168B2 (en) Bridge reinforcement structure and method
JP5841786B2 (en) Steel concrete composite slab construction panel and steel concrete composite slab
JP2018059313A (en) Paved steel floor slab unit and floor slab structure
JP5827588B2 (en) Floor slab reinforcement structure and reinforcement method
JP7849188B2 (en) Strut connection structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20170824

RD03 Notification of appointment of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7423

Effective date: 20180502

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20180509

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20180528

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20180605

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20180618

R150 Certificate of patent or registration of utility model

Ref document number: 6365555

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: R3D04

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250