Tank construction method and tank Download PDF

Info

Publication number
JP6371182B2
JP6371182B2 JP2014198222A JP2014198222A JP6371182B2 JP 6371182 B2 JP6371182 B2 JP 6371182B2 JP 2014198222 A JP2014198222 A JP 2014198222A JP 2014198222 A JP2014198222 A JP 2014198222A JP 6371182 B2 JP6371182 B2 JP 6371182B2
Authority
JP
Japan
Prior art keywords
opening
side wall
tank
prestress
breakwater
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2014198222A
Other languages
Japanese (ja)
Other versions
JP2016069851A (en
Inventor
松浦 正典
正典 松浦
安永 正道
正道 安永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP2014198222A priority Critical patent/JP6371182B2/en
Publication of JP2016069851A publication Critical patent/JP2016069851A/en
Application granted granted Critical
Publication of JP6371182B2 publication Critical patent/JP6371182B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Description

本発明は、タンクの構築方法、及びタンクに関する。   The present invention relates to a tank construction method and a tank.

LNG(液化天然ガス)、LPG(液化石油ガス)などの液体を貯留する設備として、PC(プレストレストコンクリート)タンクがある。図9は、PCタンクとして、LNGを貯留するLNGタンク100の例を示したものである。図9のLNGタンク100は、地盤7中の杭4で支持された底版5上に防液堤2を設け、その内側に鋼板等による内槽3aと外槽3bを設置したものである。外槽3bの屋根部は鋼製または鉄筋コンクリート製であり、側部はライナープレート(薄鉄板)を防液堤2に貼り付けた形となっている。LNGは内槽3aにて貯留し、内槽3aと外槽3bの間に断熱材を配置して保冷を行う。   A PC (prestressed concrete) tank is a facility for storing liquids such as LNG (liquefied natural gas) and LPG (liquefied petroleum gas). FIG. 9 shows an example of an LNG tank 100 that stores LNG as a PC tank. The LNG tank 100 of FIG. 9 is provided with a liquid breakwater 2 on a bottom slab 5 supported by a pile 4 in the ground 7 and an inner tank 3a and an outer tank 3b made of steel plates or the like inside. The roof portion of the outer tub 3b is made of steel or reinforced concrete, and the side portion has a shape in which a liner plate (thin iron plate) is attached to the liquid barrier 2. LNG is stored in the inner tank 3a, and a heat insulating material is disposed between the inner tank 3a and the outer tank 3b to perform cold insulation.

防液堤2はプレストレストコンクリートによる側壁であり、通常円筒状である。防液堤2は、内槽3aが破損した場合にLNGの外部への液漏れを防ぐために設けられる。防液堤2はLNGの液圧に耐え得る構造とする必要があり、そのために周方向および鉛直方向の緊張材(不図示)によるプレストレスが導入される。また、液圧に対する耐力向上のため、防液堤2の底部は底版5に固定され、一体化されるのが一般的である。   The breakwater 2 is a side wall made of prestressed concrete and is usually cylindrical. The breakwater 2 is provided to prevent leakage of LNG to the outside when the inner tank 3a is damaged. The breakwater 2 is required to have a structure capable of withstanding the hydraulic pressure of LNG, and prestress due to a tension material (not shown) in the circumferential direction and the vertical direction is introduced for this purpose. Further, in order to improve the proof strength against the hydraulic pressure, the bottom of the liquid breakwater 2 is generally fixed to the bottom plate 5 and integrated.

防液堤2の構築方法としては、防液堤2が底版5に対し移動可能な状態で、防液堤2に周方向のプレストレスを導入する例が知られている(例えば特許文献1参照)。この場合、周方向のプレストレス導入時に防液堤2が内側に移動するので、その後防液堤2を底版5に固定し、鉛直方向のプレストレスを導入する。これにより、底版5による拘束が無い状態で防液堤2に周方向のプレストレスを効果的に導入でき、緊張材の量を低減できる等の点で有利である。   As a construction method of the breakwater 2, an example is known in which circumferential prestress is introduced into the breakwater 2 in a state where the breakwater 2 is movable with respect to the bottom slab 5 (see, for example, Patent Document 1). ). In this case, since the breakwater 2 moves inward when the prestress in the circumferential direction is introduced, the breakwater 2 is then fixed to the bottom plate 5 and the prestress in the vertical direction is introduced. Thereby, it is advantageous in that the circumferential prestress can be effectively introduced into the liquid breakwater 2 without being restricted by the bottom plate 5 and the amount of tension material can be reduced.

この作業では、例えば図10(a)に示すように、底版5にスライド部21を設け、防液堤2をその上に構築する。スライド部21は、周方向のプレストレス導入時に防液堤2を内側にスライド可能とするものであり、例えば敷砂等の除去式型枠である。   In this operation, for example, as shown in FIG. 10A, the bottom plate 5 is provided with the slide portion 21, and the liquid barrier 2 is constructed thereon. The slide portion 21 enables the liquid breakwater 2 to be slid inward when prestressing in the circumferential direction is introduced, and is a removable formwork such as laid sand.

防液堤2や底版5には、緊張材を挿通するためのシース管(不図示)や補強用の鉄筋(不図示)が埋設される。防液堤2内では、シース管や鉄筋が防液堤2の周方向及び鉛直方向に埋設される。なお、底版5には緊張材を定着するための定着体170も埋設される。   A sheath tube (not shown) for inserting a tension material and a reinforcing steel bar (not shown) are embedded in the breakwater 2 and the bottom plate 5. Inside the breakwater 2, sheath tubes and reinforcing bars are embedded in the circumferential direction and the vertical direction of the breakwater 2. A fixing body 170 for fixing the tendon material is also embedded in the bottom plate 5.

防液堤2は、工事用の開口部20を設けた状態で構築される。開口部20は、側壁鋼板など内槽構築用の資材搬入、その他の工事用の小型資機材の搬入、作業員の出入り等に用いられる。これにより、内槽3aの構築等を防液堤2の構築と並行して効率良く行うことができる。   The breakwater 2 is constructed in a state in which an opening 20 for construction is provided. The opening 20 is used for carrying in materials for constructing an inner tank such as a side wall steel plate, carrying in other small materials and equipment for construction, and entering and leaving workers. Thereby, the construction of the inner tub 3a and the like can be efficiently performed in parallel with the construction of the breakwater 2.

図の例では、定着体170に、緊張材である鉛直方向PC鋼材17bの下端部が取り付けられており、防液堤2内の開口部20の上方を除く部分では、この下端部から連続して防液堤2の頂部あるいは開口部20の下縁部まで鉛直方向PC鋼材17bが通されている。開口部20の上方では、開口部20の上縁部から防液堤2の頂部まで鉛直方向PC鋼材17bが通される。鉛直方向PC鋼材17bは、シース管内に通して配置される。   In the example of the figure, the lower end portion of the vertical PC steel material 17b, which is a tension material, is attached to the fixing body 170, and the portion other than the upper portion of the opening 20 in the liquid barrier 2 is continuous from the lower end portion. The vertical PC steel material 17 b is passed to the top of the liquid breakwater 2 or the lower edge of the opening 20. Above the opening 20, the vertical PC steel material 17 b is passed from the upper edge of the opening 20 to the top of the liquid barrier 2. The vertical PC steel material 17b is disposed through the sheath tube.

開口部20は内槽3aの工事が概ね終わった段階で閉塞され、その後緊張材の緊張が行われる。開口部20の閉塞及び緊張材の緊張は、例えば以下の手順で行われる。すなわち、開口部20に周方向及び鉛直方向のシース管と鉄筋(不図示)を配置して防液堤2内のシース管、鉄筋とそれぞれ接続する。また、別の鉛直方向PC鋼材をシース管に通して開口部20に配置し、開口部20の上下の鉛直方向PC鋼材17bにつなぎ込み、これらを連続させて一本の鉛直方向PC鋼材17bとする。そして、図10(b)に示すように開口部20にコンクリート22を打設する。   The opening 20 is closed at the stage when the construction of the inner tub 3a is almost completed, and then the tension material is tensioned. The closing of the opening 20 and the tension of the tendon are performed by the following procedure, for example. That is, a sheath tube and a reinforcing bar (not shown) in the circumferential direction and the vertical direction are arranged in the opening 20 and connected to the sheath tube and the reinforcing bar in the liquid barrier 2 respectively. Further, another vertical PC steel material is placed in the opening 20 through the sheath tube, connected to the vertical PC steel material 17b above and below the opening 20, and these are continuously connected to a single vertical PC steel material 17b. To do. Then, concrete 22 is placed in the opening 20 as shown in FIG.

その後、図11(a)に示すように、周方向PC鋼材17aをシース管に通して防液堤2内に設け、矢印aに示すように緊張して両端をピラスター(不図示)に定着し、防液堤2に周方向のプレストレスを導入する。ピラスターは、PC鋼材の定着用に設けられた防液堤2の突出部である。   Thereafter, as shown in FIG. 11 (a), the circumferential PC steel material 17a is passed through the sheath tube and provided in the liquid breakwater 2, and is tensioned as shown by the arrow a to fix both ends to a pilaster (not shown). The circumferential prestress is introduced into the breakwater 2. The pilaster is a protruding portion of the breakwater 2 provided for fixing the PC steel material.

周方向のプレストレスを導入すると円筒状の防液堤2全体が内側に移動するので、その後、図11(b)に示すように防液堤2の底部をグラウト等の充填材23によって底版5に固定する。以下、鉛直方向PC鋼材17bを矢印bに示すように緊張し、防液堤2に鉛直方向のプレストレスを導入する。この時、鉛直方向PC鋼材17bの上端は定着体171によって防液堤2の頂部に定着される。   When the circumferential prestress is introduced, the entire cylindrical breakwater 2 moves inward, and thereafter, the bottom of the breakwater 2 is filled with a filler 23 such as grout as shown in FIG. 11 (b). Secure to. Hereinafter, the vertical PC steel material 17b is tensioned as indicated by an arrow b, and a vertical prestress is introduced into the breakwater 2. At this time, the upper end of the vertical PC steel material 17 b is fixed to the top of the liquid barrier 2 by the fixing body 171.

この例では防液堤2を底版5に対しスライド可能としたが、防液堤2を底版5にピン結合しておく場合もある。また、特許文献2には、前記と同様、タンクの側壁内に設けた緊張材に、側壁の開口部で別の緊張材をつなぎ込み、コンクリートによる開口部の閉塞後、緊張材の緊張により側壁にプレストレスを導入することが記載されている。特許文献3には、小寸法の開口部をタンクの側壁の緊張材を避けた位置に残した状態で、緊張材の緊張によるプレストレスを側壁に導入することが記載されている。   In this example, the breakwater 2 is slidable with respect to the bottom slab 5, but the breakwater 2 may be pin-coupled to the bottom slab 5. Further, in Patent Document 2, as described above, another tension material is connected to the tension material provided in the side wall of the tank at the opening of the side wall, and after closing the opening with concrete, the side wall is caused by tension of the tension material. Describes the introduction of prestress. Patent Document 3 describes that prestress due to tension of a tension material is introduced into the side wall in a state where a small-sized opening is left at a position avoiding the tension material on the side wall of the tank.

特開2009-203787号公報JP 2009-203787 特開昭63-31634号公報JP 63-31634 A 特許第4964346号Patent No. 4964346

前記した従来の方法では、内槽3aの構築等を終えた後、開口部20を閉塞し、防液堤2に緊張材を配置して周方向の緊張を行い、防液堤2の底部を固定し、鉛直方向の緊張を行う流れがクリティカルとなり、内槽3aの構築等を終えた後の作業期間が長く、全体工程が長くなりがちであった。   In the above-described conventional method, after the construction of the inner tub 3a is finished, the opening 20 is closed, a tension material is placed on the liquid breakwater 2 to perform circumferential tension, and the bottom of the liquid breakwater 2 is removed. The flow of fixing and tensioning in the vertical direction became critical, and the work period after the construction of the inner tank 3a and the like was long, and the entire process tended to be long.

これに対し、特許文献3の方法では、開口部を残した状態で側壁のプレストレスを早期に導入できる。ただし、開口部は緊張材を避けた位置とするので小さくならざるを得ない。そのため、例えば内槽3aの側壁鋼板をタンク内に搬入するような作業はできず、開口部を利用して行える工種には制限があり、より効率性の高い手法が求められる。   On the other hand, in the method of Patent Document 3, the prestress of the sidewall can be introduced at an early stage while leaving the opening. However, since the opening is positioned away from the tendon, it must be small. For this reason, for example, the work of carrying the side wall steel plate of the inner tub 3a into the tank cannot be performed, and there is a limit to the type of work that can be performed using the opening, and a more efficient method is required.

本発明は、効率性が高く、工期も短縮可能なタンクの構築方法等を提供することを目的とする。   An object of the present invention is to provide a tank construction method and the like that are highly efficient and can shorten the construction period.

前述した課題を解決するための第1の発明は、プレストレストコンクリートによる側壁を有するタンクの構築方法であって、工事用の開口部を残した状態で前記側壁を構築し、前記側壁の前記開口部を除く部分に通された緊張材を緊張して前記側壁にプレストレスを導入する工程(a)と、前記開口部を閉塞する工程(b)と、を具備し、前記緊張材の少なくとも一部は、前記開口部の縁部に一端を有し、前記緊張材によるプレストレスの導入時、前記一端が前記開口部の縁部で定着され、前記工程(b)において、前記開口部にコンクリートを打設し、当該コンクリートに、追加緊張材の緊張によるプレストレスを導入し、前記追加緊張材は、鉛直方向の緊張材を含むことを特徴とするタンクの構築方法である。 1st invention for solving the subject mentioned above is the construction method of the tank which has the side wall by prestressed concrete, Comprising: The said side wall is constructed in the state which left the opening part for construction, The said opening part of the said side wall At least a part of the tendon comprising: a step (a) of introducing a prestress into the side wall by tensioning a tendon passed through a portion excluding the step; and a step (b) of closing the opening. Has one end at the edge of the opening, and when the prestress by the tension material is introduced, the one end is fixed at the edge of the opening. In the step (b), concrete is applied to the opening. The tank construction method is characterized in that the concrete is placed and prestress due to the tension of the additional tension material is introduced into the concrete, and the additional tension material includes a vertical tension material .

前記タンクの内槽を構築した後、前記工程(b)において前記開口部を閉塞することが望ましい。   After constructing the inner tank of the tank, it is desirable to close the opening in the step (b).

記追加緊張材の一端は、前記開口部の縁部に一端を有する緊張材の当該一端に接続され、前記追加緊張材の他端は、前記追加緊張材によるプレストレスの導入時、前記開口部の近傍で前記側壁に定着されることが望ましい。あるいは、前記追加緊張材の両端が、前記追加緊張材によるプレストレスの導入時、前記開口部の近傍で前記側壁に定着されることも望ましい。 One end of the previous SL additional tendons is connected to the one end of the tension member having one end at the edge of the opening, the other end of said additional tendon, upon introduction of the pre-stress by the additional tendons, the opening It is desirable to be fixed to the side wall in the vicinity of the portion. Alternatively, it is also desirable that both ends of the additional tendon are fixed to the side wall in the vicinity of the opening when prestress is introduced by the additional tendon.

また、前記工程(a)においてプレストレスを導入する際、前記側壁の周方向の緊張材を緊張して前記側壁に周方向のプレストレスを導入し、前記側壁が内側に移動した後、前記側壁を底版に固定し、その後、鉛直方向の緊張材を緊張して前記側壁に鉛直方向のプレストレスを導入することが望ましい。   Further, when prestress is introduced in the step (a), the circumferential tension material of the side wall is tensioned to introduce circumferential prestress to the side wall, and the side wall moves inward, and then the side wall Is fixed to the bottom plate, and then the vertical tension material is tensioned to introduce vertical prestress to the side wall.

第2の発明は、プレストレストコンクリートによる側壁を有するタンクであって、前記側壁の所定領域を除く部分に通された緊張材の緊張によって前記側壁にプレストレスが導入され、前記緊張材の少なくとも一部は、前記所定領域の縁部に一端を有し、前記一端が前記所定領域の縁部で定着され、前記所定領域に追加緊張材が設けられ、前記所定領域に、前記追加緊張材の緊張によるプレストレスが導入され、前記追加緊張材は、鉛直方向の緊張材を含むことを特徴とするタンクである 2nd invention is a tank which has a side wall by the prestressed concrete, Comprising: The prestress is introduce | transduced into the said side wall by tension | tensile_strength of the tension material passed through the part except the predetermined area | region of the said side wall, At least one part of the said tension material Has one end at the edge of the predetermined area, the one end is fixed at the edge of the predetermined area, an additional tension material is provided in the predetermined area, and the tension of the additional tension material is provided in the predetermined area. Prestress is introduced, and the additional tendon includes a vertical tendon .

本発明によれば、開口部を残した状態で早期に側壁のプレストレスを導入でき、内槽の構築等を終えた後は、開口部を閉じれば側壁の構築を完了できる。この手順では、内槽の構築等を終えた後の作業に時間もかからず全体工程の短縮を図ることができる。   According to the present invention, the prestress of the side wall can be introduced at an early stage while leaving the opening, and the construction of the side wall can be completed if the opening is closed after the construction of the inner tub is completed. In this procedure, the work after the construction of the inner tank is completed, and the entire process can be shortened without taking time.

加えて、本発明では緊張材を避けて開口部を設けるのではなく、開口部に緊張材を定着する。従って、比較的大きな開口部を側壁に残すことができ、開口部を介して内槽の側壁鋼板の搬入等も可能で、開口部を利用して様々な工種を行うことができる。また、開口部の側方や上方、下方にも緊張材を配置できるので、側壁のプレストレスをムラなく均等に導入でき、側壁を好適に構築できる。これにより、本発明の手法では、効率良く好適にタンクを構築でき、工期短縮が可能になる。   In addition, in the present invention, the tension material is fixed to the opening portion instead of providing the opening portion avoiding the tension material. Accordingly, a relatively large opening can be left on the side wall, and the side wall steel plate of the inner tank can be carried in through the opening, and various types of work can be performed using the opening. Moreover, since a tension material can be arrange | positioned also to the side of the opening part, upper direction, and the downward direction, the prestress of a side wall can be introduce | transduced uniformly and a side wall can be constructed | assembled suitably. Thereby, in the method of the present invention, a tank can be constructed efficiently and suitably, and the construction period can be shortened.

また本発明では、コンクリートによって閉塞した開口部の領域に、追加緊張材を用いてプレストレスを導入することで、当該領域の補強が好適に行われる。この時、追加緊張材の一端を緊張材に接続して他端を開口部の近傍で定着したり、あるいは追加緊張材の両端を開口部の近傍で定着することで、追加緊張材を適切に配置できる。   Moreover, in this invention, reinforcement | strengthening of the said area | region is suitably performed by introduce | transducing prestress into the area | region of the opening part obstruct | occluded with concrete using an additional tension material. At this time, connect one end of the additional tendon to the tendon and fix the other end in the vicinity of the opening, or fix both ends of the additional tendon in the vicinity of the opening so that the additional tendon is appropriately Can be placed.

さらに本発明では、側壁を底版に対して移動可能に配置し、周方向のプレストレス導入によって側壁が内側に移動した後、側壁を底版に固定して鉛直方向のプレストレスを導入する。これにより、底版による拘束が無い状態で側壁に周方向のプレストレスを効果的に導入でき、且つ完成時には側壁が底版に固定され、液圧に対する耐力に優れたタンクが構築できる。   Further, in the present invention, the side wall is arranged so as to be movable with respect to the bottom plate, and after the side wall is moved inward by introduction of circumferential prestress, the side wall is fixed to the bottom plate and vertical prestress is introduced. Accordingly, circumferential prestress can be effectively introduced into the side wall in a state where there is no restraint by the bottom plate, and the tank is fixed to the bottom plate at the time of completion, and a tank excellent in resistance to hydraulic pressure can be constructed.

本発明により、効率性が高く、工期も短縮可能なタンクの構築方法等を提供することができる。   According to the present invention, it is possible to provide a tank construction method or the like that has high efficiency and can shorten the construction period.

タンクの構築方法を示す図Diagram showing how to build a tank タンクの構築方法を示す図Diagram showing how to build a tank タンクの構築方法を示す図Diagram showing how to build a tank タンクの構築方法を示す図Diagram showing how to build a tank タンクの構築方法を示す図Diagram showing how to build a tank タンクの構築方法を示す図Diagram showing how to build a tank 追加PC鋼材19aの配置を示す図The figure which shows arrangement of additional PC steel 19a 補強用鋼材25を示す図The figure which shows the steel material 25 for reinforcement LNGタンク100を示す図Diagram showing LNG tank 100 タンクの構築方法を示す図Diagram showing how to build a tank タンクの構築方法を示す図Diagram showing how to build a tank

以下、図面に基づいて本発明の好適な実施形態について詳細に説明する。   Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the drawings.

図1〜図6は、本発明の実施形態に係るタンクの構築方法を示す図である。本実施形態は、図9で説明したLNGタンク100の防液堤2(側壁)等を構築する例を挙げて説明する。   1-6 is a figure which shows the construction method of the tank which concerns on embodiment of this invention. In the present embodiment, an example of constructing the liquid breakwater 2 (side wall) of the LNG tank 100 described with reference to FIG. 9 will be described.

図1(a)に示すように、本実施形態では、図10(a)の例と同様、底版5にスライド部21を設け、防液堤2をその上に構築する。ここでは、防液堤2のコンクリートを、3.5-4.0m程度の高さごとの数ロットに分けて下から順に打設し、防液堤2を全高さ分構築する。   As shown in FIG. 1 (a), in this embodiment, as in the example of FIG. 10 (a), the bottom plate 5 is provided with a slide portion 21, and the liquid barrier 2 is constructed thereon. Here, the concrete of the breakwater 2 is divided into several lots with a height of about 3.5-4.0m and placed in order from the bottom, and the breakwater 2 is constructed for the entire height.

スライド部21は、前記と同様、後述する周方向のプレストレス導入時に防液堤2を径方向の内側(中心方向)にスライド可能とするものであり、例えば敷砂等の除去式型枠を用いることができる。ただし、これに限ることはない。   Similarly to the above, the slide portion 21 enables the breakwater 2 to be slid inward in the radial direction (center direction) when introducing a prestress in the circumferential direction, which will be described later. Can be used. However, it is not limited to this.

防液堤2や底版5には、前記と同様のシース管や鉄筋が埋設される。底版5には前記した定着体170も埋設される。なお、図1(a)ではシース管や鉄筋の図示を省略している。他の図も同様である。   In the breakwater 2 and the bottom slab 5, the same sheath tube and rebar as described above are embedded. The fixing body 170 described above is also embedded in the bottom plate 5. In addition, illustration of a sheath tube and a reinforcing bar is abbreviate | omitted in Fig.1 (a). The same applies to the other figures.

防液堤2は、工事用の開口部20を下部に設けた状態で構築される。開口部20は底版5から所定高さ上方に形成される。例えば、開口部20は下から2、3ロット部分のコンクリートの位置で形成され、開口部20の下端が、1ロットのコンクリートの高さ分(例えば4.0m程度)、底版5の上方に位置する。図1(b)はこの開口部20の水平方向断面を示す図である。後述する図2(b)、図5(b)、図6(b)、図7も同様である。   The breakwater 2 is constructed with the opening 20 for construction provided in the lower part. The opening 20 is formed above the bottom plate 5 by a predetermined height. For example, the opening 20 is formed at the position of a few lots of concrete from the bottom, and the lower end of the opening 20 is positioned above the bottom plate 5 by the height of the concrete of one lot (for example, about 4.0 m). . FIG. 1B is a view showing a horizontal section of the opening 20. The same applies to FIGS. 2B, 5B, 6B, and 7 described later.

防液堤2の開口部20を除く部分には、緊張材として鉛直方向PC鋼材17b(以下、PC鋼材17bという)が前記と同様に通される。PC鋼材17bは防液堤2の周方向に間隔を空けて複数設けられ、防液堤2の全周に渡って配置される。PC鋼材17bは鉛直方向のシース管内に通される。   A vertical direction PC steel material 17b (hereinafter referred to as a PC steel material 17b) is passed through the portion of the breakwater 2 excluding the opening 20 as described above. A plurality of PC steel materials 17b are provided at intervals in the circumferential direction of the liquid barrier 2 and arranged over the entire circumference of the liquid barrier 2. The PC steel material 17b is passed through the sheath tube in the vertical direction.

図1(a)に示すように、少なくとも一部のPC鋼材17b(開口部20の上方及び下方のPC鋼材17b)は、開口部20の縁部に一端を有する。また、開口部20の上方のPC鋼材17bを除いて、PC鋼材17bの下端部は底版5内の定着体170に取り付けられる。   As shown in FIG. 1A, at least a part of the PC steel material 17 b (the PC steel material 17 b above and below the opening 20) has one end at the edge of the opening 20. Further, the lower end portion of the PC steel material 17 b is attached to the fixing body 170 in the bottom plate 5 except for the PC steel material 17 b above the opening 20.

本実施形態では、定着体170にPC鋼材17bの下端部を先行して取り付けておき、その後防液堤2を構築するとよい。例えば、底版5は、定着体170及び定着体170に取り付けたPC鋼材17bの下端部を埋め込んだ状態で構築し、PC鋼材17bの残りの部分は仮置きしておく。そして、防液堤2の構築に先立ってPC鋼材17bの残りの部分を所定位置に移動させ、鉛直方向に設置した状態でコンクリートの打設を行う。   In the present embodiment, the lower end portion of the PC steel material 17b is attached to the fixing body 170 in advance, and then the liquid breakwater 2 is constructed. For example, the bottom plate 5 is constructed in a state in which the fixing body 170 and the lower end portion of the PC steel material 17b attached to the fixing body 170 are embedded, and the remaining portion of the PC steel material 17b is temporarily placed. Then, prior to the construction of the breakwater 2, the remaining portion of the PC steel material 17b is moved to a predetermined position, and concrete is placed in a state where it is installed in the vertical direction.

なお、開口部20の上方では、開口部20の上縁部から防液堤2の頂部までPC鋼材17bが通されるが、このPC鋼材17bは、例えば、防液堤2を構築した後、防液堤2内のシース管に通して配置することができる。   In addition, in the upper part of the opening 20, the PC steel material 17b is passed from the upper edge of the opening 20 to the top of the breakwater 2. The PC steel 17b is formed after, for example, building the breakwater 2, It can be arranged through a sheath tube in the breakwater 2.

図1(b)に示すように、開口部20の右側近傍では、防液堤2に定着用突起2aが設けられる。定着用突起2aは、防液堤2から外側へと突出する。定着用突起2aは、後述する追加PC鋼材を定着するために用いられる。なお、本実施形態では開口部20の下側近傍にも同様の定着用突起2aを設ける。   As shown in FIG. 1B, a fixing protrusion 2 a is provided on the liquid barrier 2 near the right side of the opening 20. The fixing protrusion 2 a protrudes outward from the liquid barrier 2. The fixing protrusion 2a is used for fixing an additional PC steel material to be described later. In the present embodiment, a similar fixing protrusion 2 a is also provided near the lower side of the opening 20.

こうして防液堤2を構築した後、防液堤2の開口部20を除く部分に周方向PC鋼材(緊張材)を通して配置し、周方向PC鋼材を緊張して防液堤2に周方向のプレストレスを導入する。図2(a)、(b)はこの状態を示す図である。   After constructing the breakwater 2 in this way, the circumferential PC steel material (tensile material) is placed through the portion other than the opening 20 of the breakwater 2 and the circumferential PC steel material is tensioned to the breakwater 2 in the circumferential direction. Introduce pre-stress. 2A and 2B are diagrams showing this state.

ここでは、周方向PC鋼材17a(以下、PC鋼材17aという)が鉛直方向に間隔を空けて複数設けられ、防液堤2の全高さに渡って配置される。PC鋼材17aは周方向のシース管内に通される。図2(a)、(b)に示すように、少なくとも一部のPC鋼材17a(開口部20の側方のPC鋼材17a)は、開口部20の縁部に一端を有する。   Here, a plurality of circumferential PC steel materials 17a (hereinafter referred to as PC steel materials 17a) are provided at intervals in the vertical direction, and are arranged over the entire height of the liquid barrier 2. The PC steel material 17a is passed through the circumferential sheath tube. As shown in FIGS. 2A and 2B, at least a part of the PC steel material 17 a (the PC steel material 17 a on the side of the opening 20) has one end at the edge of the opening 20.

各PC鋼材17aは図2(a)の矢印A1、A2に示すように緊張され、定着した端部から防液堤2に周方向のプレストレスが導入される。PC鋼材17aは例えば両引きにより緊張されるが、片引きでもよい。   Each PC steel material 17a is tensioned as indicated by arrows A1 and A2 in FIG. 2A, and circumferential prestress is introduced into the liquid barrier 2 from the fixed end. The PC steel material 17a is tensioned by, for example, double drawing, but may be single drawing.

この時、上記した一部のPC鋼材17aの一端は、定着体172を用いて開口部20の縁部に定着する。他端は例えば防液堤2のピラスターに定着する。その他のPC鋼材17aは、例えば、両端をピラスターに定着する。   At this time, one end of the part of the PC steel material 17 a is fixed to the edge of the opening 20 using the fixing body 172. For example, the other end is fixed to the pilaster of the breakwater 2. The other PC steel material 17a is fixed to, for example, pilasters at both ends.

こうして周方向のプレストレスを導入すると、円筒状の防液堤2全体が、図3(a)の矢印に示すように防液堤2の径方向の内側(中心方向)へ向かって移動する。移動量は防液堤2の全周に渡って均等であり、例えば10-30mm程度である。防液堤2の移動後、スライド部21を除去し、図3(b)に示すように、防液堤2の底部をグラウト等の充填材23によって底版5に剛結し固定する。   When the circumferential prestress is thus introduced, the entire cylindrical breakwater 2 moves toward the inner side (center direction) in the radial direction of the breakwater 2 as shown by the arrow in FIG. The amount of movement is uniform over the entire circumference of the breakwater 2 and is, for example, about 10-30 mm. After the movement of the breakwater 2, the slide portion 21 is removed, and as shown in FIG. 3B, the bottom of the breakwater 2 is rigidly fixed to the bottom slab 5 with a filler 23 such as grout.

その後、鉛直方向のPC鋼材17bを緊張して防液堤2に鉛直方向のプレストレスを導入する流れとなる。図4はこの状態を示す図である。   Thereafter, the PC steel material 17b in the vertical direction is tensioned and the prestress in the vertical direction is introduced into the liquid breakwater 2. FIG. 4 is a diagram showing this state.

各PC鋼材17bは図4の矢印B1、B2に示すように緊張され、定着した端部から防液堤2に鉛直方向のプレストレスが導入される。PC鋼材17bは、例えば上部を引いて片引きにより緊張するが、開口部20の上方のPC鋼材17bは、両引きで緊張してもよい。   Each PC steel material 17b is tensioned as shown by arrows B1 and B2 in FIG. 4, and vertical prestress is introduced into the liquid breakwater 2 from the fixed end. The PC steel material 17b is tensioned by pulling, for example, by pulling the upper part, but the PC steel material 17b above the opening 20 may be tensioned by double pulling.

この時、開口部20の縁部に一端を有するPC鋼材17bの当該一端は、定着体172を用いて開口部20の縁部に定着する。他端は、防液堤2の頂部に定着体171で定着する(開口部20の上方のPC鋼材17bの場合)か、底版5内で定着体170によって定着される(開口部20の下方のPC鋼材17bの場合)。   At this time, the one end of the PC steel material 17 b having one end at the edge of the opening 20 is fixed to the edge of the opening 20 using the fixing body 172. The other end is fixed to the top of the breakwater 2 by the fixing body 171 (in the case of the PC steel material 17b above the opening 20) or fixed by the fixing body 170 in the bottom plate 5 (below the opening 20). PC steel material 17b).

その他のPC鋼材17bは、定着体171によって一端を防液堤2の頂部に定着する。他端は定着体170によって底版5内に定着される。   The other PC steel material 17 b is fixed at one end to the top of the breakwater 2 by the fixing body 171. The other end is fixed in the bottom plate 5 by the fixing body 170.

このように、本実施形態では、防液堤2が開口部20を設けた状態で構築されるので、防液堤2の構築と並行して、開口部20を利用して内槽3aの構築等を行うことができる。また開口部20を残した状態で、PC鋼材17a、17bにより防液堤2に早期にプレストレスを導入できる。   Thus, in this embodiment, since the liquid breakwater 2 is constructed in a state where the opening 20 is provided, the inner tank 3a is constructed using the opening 20 in parallel with the construction of the liquid breakwater 2. Etc. can be performed. In addition, prestress can be introduced into the breakwater 2 early by the PC steel materials 17a and 17b with the opening 20 left.

さらに、PC鋼材17a、17bを避けて開口部20を設けるのではなく、開口部20にPC鋼材17a、17bを定着するので、防液堤2に比較的大きな開口部20を残すことができる。従って、側壁鋼板など内槽構築用の資材搬入、その他の工事用の小型資機材の搬入、作業員の出入り等に開口部20を用い、内槽3aの構築等を効率良く行うことができる。   Furthermore, rather than avoiding the PC steel materials 17a and 17b, the openings 20 are not provided, but the PC steel materials 17a and 17b are fixed in the openings 20, so that a relatively large opening 20 can be left in the liquid barrier 2. Therefore, it is possible to efficiently construct the inner tub 3a by using the opening 20 for carrying in materials for constructing the inner tub such as side wall steel plates, carrying in other small materials and equipment for construction, and entering and leaving the workers.

本実施形態では、内槽3aの構築等を終えた後、開口部20の閉塞を行う。開口部20を閉塞する際は、開口部20に周方向及び鉛直方向のシース管や鉄筋(不図示)を配置する。これらのシース管や鉄筋は、防液堤2内のシース管や鉄筋に接続される。   In the present embodiment, after the construction of the inner tank 3a is completed, the opening 20 is closed. When closing the opening 20, a sheath tube and a reinforcing bar (not shown) in the circumferential direction and the vertical direction are arranged in the opening 20. These sheath tubes and reinforcing bars are connected to the sheath tubes and reinforcing bars in the liquid barrier 2.

また、図5(a)、(b)に示すように、追加緊張材として、周方向追加PC鋼材19a(以下、追加PC鋼材19aという)と鉛直方向追加PC鋼材19b(以下、追加PC鋼材19bという)を開口部20に配置する。追加PC鋼材19a、19bは開口部20のシース管(不図示)内に通される。ただし、追加PC鋼材19a、19bにアンボンドケーブルを用いる場合、上記のシース管は省略可能である。   Further, as shown in FIGS. 5 (a) and 5 (b), as additional tension members, circumferential direction additional PC steel material 19a (hereinafter referred to as additional PC steel material 19a) and vertical direction additional PC steel material 19b (hereinafter referred to as additional PC steel material 19b). Is disposed in the opening 20. The additional PC steel materials 19 a and 19 b are passed through a sheath tube (not shown) of the opening 20. However, when an unbonded cable is used for the additional PC steel materials 19a and 19b, the above-described sheath tube can be omitted.

前記したように、少なくとも一部のPC鋼材17a、17bは開口部20の縁部に一端を有するが、この一端に、追加PC鋼材19a、19bの一端がカプラ等の接続治具191を用いて接続される。図の例では、追加PC鋼材19aの一端が、開口部20の左縁部でPC鋼材17aの一端に接続され、追加PC鋼材19bの一端が、開口部20の上縁部でPC鋼材17bの一端に接続される。   As described above, at least some of the PC steel materials 17a and 17b have one end at the edge of the opening 20, and one end of the additional PC steel materials 19a and 19b is connected to the one end using a connecting jig 191 such as a coupler. Connected. In the illustrated example, one end of the additional PC steel material 19a is connected to one end of the PC steel material 17a at the left edge portion of the opening 20, and one end of the additional PC steel material 19b is connected to the PC steel material 17b at the upper edge portion of the opening portion 20. Connected to one end.

図5(b)に示すように、追加PC鋼材19aの他端は開口部20の右側近傍の定着用突起2aの位置にある。同様に、追加PC鋼材19bの他端は開口部20の下側近傍の定着用突起2aの位置にある。防液堤2では、追加PC鋼材19a、19bの他端を通すため、開口部20から定着用突起2aの位置に至るシース管(不図示)も予め埋設されている。   As shown in FIG. 5B, the other end of the additional PC steel material 19 a is located at the position of the fixing protrusion 2 a in the vicinity of the right side of the opening 20. Similarly, the other end of the additional PC steel material 19b is at the position of the fixing protrusion 2a near the lower side of the opening 20. In the liquid breakwater 2, a sheath tube (not shown) extending from the opening 20 to the position of the fixing protrusion 2a is embedded in advance so as to pass the other ends of the additional PC steel materials 19a and 19b.

こうして開口部20に追加PC鋼材19a、19b等を配置した後、図6(a)、(b)に示すように開口部20にコンクリート22を打設し、追加PC鋼材19a、19bを緊張して開口部20の領域(所定領域)のコンクリート22にプレストレスを導入する。   After the additional PC steel materials 19a and 19b are arranged in the opening 20 in this way, concrete 22 is placed in the opening 20 as shown in FIGS. 6A and 6B, and the additional PC steel materials 19a and 19b are tensioned. Then, prestress is introduced into the concrete 22 in the region of the opening 20 (predetermined region).

ここでは、コンクリート22の硬化後、追加PC鋼材19a、19bを図6(a)の矢印C、Dに示すように緊張して他端を定着用突起2aの位置で定着し、コンクリート22に防液堤2の周方向及び鉛直方向のプレストレスを導入する。追加PC鋼材19a、19bの定着は定着体192を用いて行われる。   Here, after the concrete 22 is hardened, the additional PC steel materials 19a and 19b are tensioned as shown by arrows C and D in FIG. 6A, and the other end is fixed at the position of the fixing protrusion 2a. Prestress in the circumferential direction and vertical direction of the liquid bank 2 is introduced. The additional PC steel materials 19a and 19b are fixed using a fixing body 192.

こうして防液堤2の開口部20が閉塞される。その他必要な工事を行うことで、図9に示したLNGタンク100が構築される。   Thus, the opening 20 of the breakwater 2 is closed. By performing other necessary work, the LNG tank 100 shown in FIG. 9 is constructed.

以上説明したように、本実施形態によれば、開口部20を残した状態で早期に防液堤2のプレストレスを導入でき、内槽3aの構築等を終えた後は、開口部20を閉じれば防液堤2の構築を完了できる。この手順では、内槽3aの構築後の作業に時間もかからず全体工程の短縮を図ることができる。   As described above, according to this embodiment, the prestress of the breakwater 2 can be introduced at an early stage with the opening 20 left, and after the construction of the inner tank 3a is finished, the opening 20 is If closed, construction of the breakwater 2 can be completed. In this procedure, the work after the construction of the inner tank 3a does not take time, and the entire process can be shortened.

加えて、本実施形態ではPC鋼材17a、17bを避けて開口部20を設けるのではなく、開口部20にPC鋼材17a、17bを定着する。従って、比較的大きな開口部20を防液堤2に残すことができ、開口部20を介して内槽3aの側壁鋼板の搬入等も可能で、開口部20を利用して様々な工種を行うことができる。また、開口部20の側方や上方、下方にもPC鋼材17a、17bを配置できるので、防液堤2のプレストレスをムラなく均等に導入でき、防液堤2を好適に構築できる。これにより、本実施形態の手法では、効率良く好適にタンクを構築でき、工期短縮が可能になる。   In addition, in this embodiment, the PC steel materials 17a and 17b are fixed to the opening 20 instead of providing the openings 20 avoiding the PC steel materials 17a and 17b. Accordingly, a relatively large opening 20 can be left in the breakwater 2, and the side wall steel plate of the inner tub 3 a can be carried in through the opening 20, and various types of work are performed using the opening 20. be able to. Moreover, since PC steel material 17a, 17b can be arrange | positioned also to the side of the opening part 20, the upper direction, and the downward direction, the prestress of the liquid barrier 2 can be introduce | transduced evenly and the liquid barrier 2 can be constructed | assembled suitably. Thereby, in the method of this embodiment, a tank can be constructed efficiently and suitably, and the construction period can be shortened.

また、コンクリート22によって閉塞した開口部20の領域には、追加PC鋼材19a、19bを用いてプレストレスを導入するので、当該領域の補強が好適に行われる。この時、追加PC鋼材19a、19bの一端を、開口部20の縁部にあるPC鋼材17a、17bの一端に接続し、他端を開口部20の近傍の定着用突起2aに定着することで、追加PC鋼材19a、19bを適切かつ容易に配置できる。   Further, since prestress is introduced into the region of the opening 20 closed by the concrete 22 using the additional PC steel materials 19a and 19b, the region is preferably reinforced. At this time, one end of the additional PC steel material 19a, 19b is connected to one end of the PC steel material 17a, 17b at the edge of the opening 20, and the other end is fixed to the fixing protrusion 2a in the vicinity of the opening 20. The additional PC steel materials 19a and 19b can be arranged appropriately and easily.

また本実施形態では、防液堤2を底版5に対して移動可能に配置し、周方向のプレストレス導入によって防液堤2が内側に移動した後、防液堤2を底版5に固定して鉛直方向のプレストレスを導入するので、底版5による拘束が無い状態で防液堤2に周方向のプレストレスを効果的に導入でき、且つ完成時には防液堤2が底版5に固定され、液圧に対する耐力に優れたタンクが構築できる。   Further, in this embodiment, the liquid breakwater 2 is arranged so as to be movable with respect to the bottom slab 5, and after the liquid breakwater 2 is moved inward by introduction of circumferential prestress, the liquid breakwater 2 is fixed to the bottom plate 5. Since vertical pre-stress is introduced, circumferential pre-stress can be effectively introduced into the breakwater 2 without being restrained by the bottom plate 5, and the breakwater 2 is fixed to the bottom plate 5 when completed. Tanks with excellent resistance to hydraulic pressure can be constructed.

しかしながら、本発明はこれに限らない。例えば、本実施形態では防液堤2を全高さ分構築した後、周方向のプレストレスを導入したが、施工時の防液堤2の安定性などの問題から、防液堤2の途中の高さまで構築した段階で周方向のプレストレスを導入することも可能である。例えば、コンクリートの数ロット分(例えば、4ロット分)の高さまで防液堤2を構築した後、その高さ分に対応するPC鋼材17aを緊張する。その他、PC鋼材17a、17bの配置なども本実施形態で説明したものに限らない。例えば、鉛直方向のPC鋼材17bは、底版5内で定着するのに代えて、底版5内でU字状に折り曲げるように配置し、両端を防液堤2の頂部や開口部20の下縁部に定着することも可能である。   However, the present invention is not limited to this. For example, in the present embodiment, the pre-stress in the circumferential direction is introduced after the construction of the breakwater 2 for the entire height, but due to problems such as the stability of the breakwater 2 during construction, It is also possible to introduce circumferential prestress at the stage of construction to the height. For example, after the breakwater 2 is constructed to a height of several lots of concrete (for example, 4 lots), the PC steel material 17a corresponding to the height is tensioned. In addition, the arrangement of the PC steel materials 17a and 17b is not limited to that described in the present embodiment. For example, instead of fixing in the bottom plate 5, the PC steel material 17 b in the vertical direction is arranged so as to be bent in a U shape in the bottom plate 5, and both ends are the top edge of the liquid barrier 2 and the lower edge of the opening 20. It is also possible to fix to the part.

さらに、本実施形態では開口部20のコンクリート22にプレストレスを導入したが、開口部20の幅、高さが例えば2m以下と比較的小さい場合には、開口部20の上下左右の近傍で防液堤2のPC鋼材17a、17bの量を増やして、開口部20にはPC鋼材を配置せず鉄筋とコンクリート22によるRC構造とすることもある。   Furthermore, in the present embodiment, prestress is introduced into the concrete 22 of the opening 20. However, when the width and height of the opening 20 are relatively small, for example, 2 m or less, they are prevented near the top, bottom, left, and right of the opening 20. The amount of the PC steel materials 17a and 17b in the liquid bank 2 may be increased, and an RC structure composed of reinforcing bars and concrete 22 may be used without arranging the PC steel material in the opening 20.

また本実施形態では、防液堤2を底版5に対しスライド可能として周方向のプレストレスを導入したが、防液堤2をピン構造にて底版5と連結して周方向のプレストレスを導入し、その後防液堤2を底版5に剛結して固定してもよい。あるいは最初から防液堤2を底版5に固定した状態で周方向のプレストレスを導入することも可能である。   Moreover, in this embodiment, the circumferential prestress was introduced by allowing the liquid breakwater 2 to be slidable with respect to the bottom plate 5, but the circumferential prestress was introduced by connecting the liquid breakwater 2 to the bottom plate 5 with a pin structure. Thereafter, the liquid breakwater 2 may be rigidly fixed to the bottom plate 5. Alternatively, it is also possible to introduce circumferential prestress in a state where the breakwater 2 is fixed to the bottom plate 5 from the beginning.

また、本実施形態では防液堤2の開口部20の右側近傍と下側近傍に定着用突起2aを設けたが、その位置はこれに限らない。さらに、図7に示すように、周方向の追加PC鋼材19aの両端を、開口部20の左右近傍に設けた定着用突起2aに定着することも可能である。鉛直方向の追加PC鋼材19bについても同様、開口部20の上下近傍に設けた定着用突起2aに両端を定着することが可能である。これによっても追加PC鋼材19a、19bを適切に配置できる。   In the present embodiment, the fixing protrusions 2a are provided in the vicinity of the right side and the lower side of the opening 20 of the liquid barrier 2. However, the positions thereof are not limited thereto. Further, as shown in FIG. 7, both ends of the additional PC steel material 19 a in the circumferential direction can be fixed to fixing protrusions 2 a provided in the vicinity of the left and right of the opening 20. Similarly, both ends of the additional PC steel material 19b in the vertical direction can be fixed to the fixing protrusion 2a provided near the top and bottom of the opening 20. This also makes it possible to appropriately arrange the additional PC steel materials 19a and 19b.

また、図8に示すように、開口部20近傍の防液堤2内に補強用鋼材25を埋設し、これにより開口部20近傍の補強を行うことも可能である。図の例では開口部20の四隅の近傍に孔開き板等のL字型鋼材を埋設するが、補強用鋼材25の位置や形状はこれに限らない。   Further, as shown in FIG. 8, it is possible to embed a reinforcing steel material 25 in the liquid barrier 2 near the opening 20, thereby reinforcing the vicinity of the opening 20. In the illustrated example, L-shaped steel materials such as perforated plates are embedded in the vicinity of the four corners of the opening 20, but the position and shape of the reinforcing steel material 25 are not limited thereto.

さらに、以上の実施形態はタンクとしてLNGタンク100の防液堤2等を構築する例を挙げて説明したが、本発明は、LPGを貯留するLPGタンクを始め、その他のタンクにも適用可能である。   Furthermore, although the above embodiment gave and demonstrated the example which constructs the breakwater 2 etc. of the LNG tank 100 as a tank, this invention is applicable also to other tanks including the LPG tank which stores LPG. is there.

以上、添付図面を参照して、本発明の好適な実施形態について説明したが、本発明は係る例に限定されない。当業者であれば、本願で開示した技術的思想の範疇内において、各種の変更例または修正例に想到し得ることは明らかであり、それらについても当然に本発明の技術的範囲に属するものと了解される。   The preferred embodiments of the present invention have been described above with reference to the accompanying drawings, but the present invention is not limited to such examples. It will be apparent to those skilled in the art that various changes or modifications can be conceived within the scope of the technical idea disclosed in the present application, and these are naturally within the technical scope of the present invention. Understood.

2;防液堤
2a;定着用突起
3a;内槽
3b;外槽
4;杭
5;底版
7;地盤
17a;周方向PC鋼材
17b;鉛直方向PC鋼材
19a;周方向追加PC鋼材
19b;鉛直方向追加PC鋼材
20;開口部
21;スライド部
22;コンクリート
23;充填材
25;補強用鋼材
100;LNGタンク
170、171、172、192;定着体
191;接続治具
2; breakwater 2a; fixing protrusion 3a; inner tub 3b; outer tub 4; pile 5; bottom slab 7; ground 17a; circumferential PC steel 17b; vertical PC steel 19a; Additional PC steel 20; opening 21; slide 22; concrete 23; filler 25; reinforcing steel 100; LNG tanks 170, 171, 172, 192; fixing body 191;

Claims (6)

プレストレストコンクリートによる側壁を有するタンクの構築方法であって、
工事用の開口部を残した状態で前記側壁を構築し、前記側壁の前記開口部を除く部分に通された緊張材を緊張して前記側壁にプレストレスを導入する工程(a)と、
前記開口部を閉塞する工程(b)と、
を具備し、
前記緊張材の少なくとも一部は、前記開口部の縁部に一端を有し、前記緊張材によるプレストレスの導入時、前記一端が前記開口部の縁部で定着され
前記工程(b)において、
前記開口部にコンクリートを打設し、当該コンクリートに、追加緊張材の緊張によるプレストレスを導入し、
前記追加緊張材は、鉛直方向の緊張材を含むことを特徴とするタンクの構築方法。
A method for constructing a tank having a side wall made of prestressed concrete,
(A) introducing the prestress into the side wall by constructing the side wall in a state of leaving an opening for construction, tensioning a tension material passed through a portion of the side wall excluding the opening, and
A step (b) of closing the opening;
Comprising
At least a part of the tendon has one end at the edge of the opening, and when the prestress is introduced by the tendon, the one end is fixed at the edge of the opening ,
In the step (b),
Concrete is placed in the opening, and prestress due to the tension of the additional tension material is introduced into the concrete,
The method of constructing a tank, wherein the additional tendon includes a tendon in a vertical direction .
前記タンクの内槽を構築した後、
前記工程(b)において前記開口部を閉塞することを特徴とする請求項1記載のタンクの構築方法。
After constructing the inner tank of the tank,
The tank construction method according to claim 1, wherein the opening is closed in the step (b).
前記追加緊張材の一端は、前記開口部の縁部に一端を有する緊張材の当該一端に接続され、
前記追加緊張材の他端は、前記追加緊張材によるプレストレスの導入時、前記開口部の近傍で前記側壁に定着されることを特徴とする請求項1または請求項2に記載のタンクの構築方法。
One end of the additional tendon is connected to the one end of the tendon having one end at the edge of the opening,
The construction of the tank according to claim 1 or 2 , wherein the other end of the additional tendon is fixed to the side wall in the vicinity of the opening when prestress is introduced by the additional tendon. Method.
前記追加緊張材の両端は、前記追加緊張材によるプレストレスの導入時、前記開口部の近傍で前記側壁に定着されることを特徴とする請求項1または請求項2に記載のタンクの構築方法。 3. The tank construction method according to claim 1, wherein both ends of the additional tendon are fixed to the side wall in the vicinity of the opening when prestress is introduced by the additional tendon. . 前記工程(a)においてプレストレスを導入する際、
前記側壁の周方向の緊張材を緊張して前記側壁に周方向のプレストレスを導入し、前記側壁が内側に移動した後、前記側壁を底版に固定し、その後、鉛直方向の緊張材を緊張して前記側壁に鉛直方向のプレストレスを導入することを特徴とする請求項1から請求項のいずれかに記載のタンクの構築方法。
When introducing prestress in the step (a),
Tension the circumferential tension material of the side wall to introduce circumferential prestress to the side wall, and after the side wall has moved inward, the side wall is fixed to the bottom plate, and then the tension material in the vertical direction is tensioned method for constructing a tank according to any one of claims 1 to claim 4, wherein the introduction of vertical prestress the side wall and.
プレストレストコンクリートによる側壁を有するタンクであって、
前記側壁の所定領域を除く部分に通された緊張材の緊張によって前記側壁にプレストレスが導入され、
前記緊張材の少なくとも一部は、前記所定領域の縁部に一端を有し、前記一端が前記所定領域の縁部で定着され
前記所定領域に追加緊張材が設けられ、前記所定領域に、前記追加緊張材の緊張によるプレストレスが導入され
前記追加緊張材は、鉛直方向の緊張材を含むことを特徴とするタンク。
A tank having a side wall made of prestressed concrete,
Prestress is introduced into the side wall by the tension of the tension material passed through the portion excluding the predetermined region of the side wall,
At least a portion of the tendon has one end at the edge of the predetermined area, and the one end is fixed at the edge of the predetermined area ,
An additional tendon is provided in the predetermined region, and prestress due to the tension of the additional tendon is introduced into the predetermined region ,
The additional tendon includes a vertical tendon .
JP2014198222A 2014-09-29 2014-09-29 Tank construction method and tank Active JP6371182B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014198222A JP6371182B2 (en) 2014-09-29 2014-09-29 Tank construction method and tank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014198222A JP6371182B2 (en) 2014-09-29 2014-09-29 Tank construction method and tank

Publications (2)

Publication Number Publication Date
JP2016069851A JP2016069851A (en) 2016-05-09
JP6371182B2 true JP6371182B2 (en) 2018-08-08

Family

ID=55864153

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014198222A Active JP6371182B2 (en) 2014-09-29 2014-09-29 Tank construction method and tank

Country Status (1)

Country Link
JP (1) JP6371182B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6971165B2 (en) * 2018-02-14 2021-11-24 鹿島建設株式会社 Wall construction method and wall
JP7508393B2 (en) 2021-03-23 2024-07-01 大成建設株式会社 How to install PC tanks

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5256410A (en) * 1975-10-31 1977-05-09 Genzaburou Abe Tightening method of p* c* tanks
JPS6191193U (en) * 1984-11-20 1986-06-13
JPH10102488A (en) * 1996-10-01 1998-04-21 Ohbayashi Corp Method of introducing prestress into diaphragm wall
JP2006112189A (en) * 2004-10-18 2006-04-27 Kazuo Kazama Tensional material anchoring tool
US20100154320A1 (en) * 2008-12-23 2010-06-24 Chevron U.S.A. Inc. Composite concrete roof for an outer lng containment tank and method of making the same
JP5732262B2 (en) * 2011-01-18 2015-06-10 株式会社Ihi Construction method of cylindrical tank

Also Published As

Publication number Publication date
JP2016069851A (en) 2016-05-09

Similar Documents

Publication Publication Date Title
JP5896936B2 (en) Ground tank and ground tank construction method
JP2011122389A (en) Ground type low-temperature tank and construction method of the same
JP5837118B2 (en) Construction method of tank and breakwater
JP6371182B2 (en) Tank construction method and tank
JP6487727B2 (en) Wall body construction method and wall body
JP4181087B2 (en) Prestressed concrete structure
JP6971165B2 (en) Wall construction method and wall
JP6143073B2 (en) Tank construction method and outer tank liner plate
JP6484036B2 (en) Wall body construction method, wall body
JP2019100092A (en) Device for forming/reinforcing opening in floor slab
JP6136606B2 (en) Storage tank construction method
JP6531008B2 (en) Wall construction method and wall
JP5375511B2 (en) Storage tank
JP6548506B2 (en) Wall and wall construction method
JP5966032B1 (en) Tank, how to build a tank
JP6172499B2 (en) PC tank and its construction method
JP2022170978A (en) Precast member, dike, and construction method of dike
JP6930208B2 (en) Prestressed concrete structure
JP6339902B2 (en) How to build a wall
JP6339901B2 (en) How to build a wall
JP4847994B2 (en) Construction method for prestressed concrete structures
JP2021080728A (en) Construction method of wall body
JP6035836B2 (en) Construction method for reinforced concrete structures
JP2008155999A (en) Prestressed concrete structure
JP6345547B2 (en) Construction method of PC / metal double shell tank

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20170215

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20171221

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20180130

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20180315

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20180703

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20180712

R150 Certificate of patent or registration of utility model

Ref document number: 6371182

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250