Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP6375689B2 - Water supply amount prediction device, water supply amount prediction system, water supply amount prediction method, and water supply amount prediction program - Google Patents
[go: Go Back, main page]

JP6375689B2 - Water supply amount prediction device, water supply amount prediction system, water supply amount prediction method, and water supply amount prediction program - Google Patents

Water supply amount prediction device, water supply amount prediction system, water supply amount prediction method, and water supply amount prediction program Download PDF

Info

Publication number
JP6375689B2
JP6375689B2 JP2014100137A JP2014100137A JP6375689B2 JP 6375689 B2 JP6375689 B2 JP 6375689B2 JP 2014100137 A JP2014100137 A JP 2014100137A JP 2014100137 A JP2014100137 A JP 2014100137A JP 6375689 B2 JP6375689 B2 JP 6375689B2
Authority
JP
Japan
Prior art keywords
water supply
period
water
prediction
target area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2014100137A
Other languages
Japanese (ja)
Other versions
JP2015216848A (en
Inventor
真希 遠藤
真希 遠藤
徹 藤井
徹 藤井
徹 上野山
徹 上野山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Omron Corp
Original Assignee
Omron Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Omron Corp filed Critical Omron Corp
Priority to JP2014100137A priority Critical patent/JP6375689B2/en
Publication of JP2015216848A publication Critical patent/JP2015216848A/en
Application granted granted Critical
Publication of JP6375689B2 publication Critical patent/JP6375689B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

この発明は、農地等に対して送水する用水の送水量を予測する技術に関する。   The present invention relates to a technique for predicting the amount of water supplied to agricultural land or the like.

従来、農地に対する用水の送水を管理する技術としては、以下に示す特許文献1、2に示されたものがある。   Conventionally, as a technique for managing water supply for farmland, there are those shown in Patent Documents 1 and 2 shown below.

特許文献1には、複数の圃場から構成された圃場地域において、圃場地域で利用可能な灌漑用水が不足する場合に、各圃場に対して適正に水配分する技術が記載されている。   Patent Document 1 describes a technique for appropriately distributing water to each field when the irrigation water available in the field area is insufficient in a field area composed of a plurality of fields.

また、特許文献2には、現地に行かずに用水路から農地への引水の管理が行える技術が記載されている。   Patent Document 2 describes a technique capable of managing the drawing of water from an irrigation channel to farmland without going to the site.

特許4301691号公報Japanese Patent No. 4301691 特許5020343号公報Japanese Patent No. 5020343

しかしながら、上述の特許文献1は、圃場地域で利用可能な灌漑用水が不足していない場合に、灌漑用水をこの圃場地域に無駄なく送水する制御を考慮したものではなかった。すなわち、特許文献1は、圃場地域で利用可能な灌漑用水が不足していない場合に、各圃場地域に送水する灌漑用水の送水量を適切に制御するものではなかった。   However, the above-described Patent Document 1 does not consider the control for supplying irrigation water to the field area without waste when there is not a shortage of irrigation water available in the field area. That is, Patent Document 1 does not appropriately control the amount of irrigation water supplied to each field area when there is not enough irrigation water available in the field area.

また、上述の特許文献2は、農地運用者が用水路から農地への引水を予約し、その予約に応じて用水路から農地への引水を実行するものであり、上述の特許文献1と同様に、農地に送水する用水の送水量を適切に制御するものではなかった。   In addition, in the above-mentioned Patent Document 2, the farmland operator reserves water from the irrigation channel to the farmland, and performs watering from the irrigation channel to the farmland in accordance with the reservation. It did not properly control the amount of water used to feed the farmland.

この発明の目的は、耕作地域に送水する用水の送水量を適切に制御する技術を提供することにある。   An object of the present invention is to provide a technique for appropriately controlling the amount of water supplied to the cultivated area.

この発明の送水量予測装置は、上記目的を達するために以下のように構成している。   In order to achieve the above object, the water supply amount prediction apparatus of the present invention is configured as follows.

この送水量予測装置は、耕作面積記憶部が対象地域における耕作面積の履歴を記憶し、送水量履歴記憶部が対象地域に対する用水の送水量の履歴を記憶する。対象地域は、野菜や穀物等の農産物を栽培する農地等である。   In this water supply amount prediction device, the cultivation area storage unit stores the history of the cultivation area in the target region, and the water supply amount history storage unit stores the history of the water supply amount of water for the target region. The target area is farmland where agricultural products such as vegetables and grains are cultivated.

予測部は、以下に示す処理を行い、対象地域に対して、指定された予測期間に送水する用水の送水量を予測する。予測部は、まず予測期間に対応する実績期間を決定する。予測期間に対して、栽培されている農産物の生育状況がほぼ同じである期間を実績期間に決定すればよい。例えば、実績期間は、過去年における、予測期間に対応する週で且つ同じ曜日としてもよいし、過去年における同じ月日にしてもよい。すなわち、予測期間に対して、栽培されている農産物の生育状況がほぼ同じである期間を実績期間に設定すればよい。また、この場合、複数年にわたって、実績期間を決定してもよい。   A prediction part performs the process shown below and predicts the amount of water to be supplied to the target area during the designated prediction period. The prediction unit first determines a performance period corresponding to the prediction period. What is necessary is just to determine the period when the growth condition of the agricultural product currently cultivated is substantially the same as a performance period with respect to a prediction period. For example, the performance period may be the week corresponding to the prediction period and the same day of the week in the past year, or may be the same month and day in the past year. That is, a period in which the growth status of the cultivated agricultural product is substantially the same as the prediction period may be set as the performance period. In this case, the performance period may be determined over a plurality of years.

また、予測部は、実績期間、および予測期間における対象地域の耕作面積を、耕作面積記憶部から読み出すとともに、実績期間に対象地域に送水した用水の送水量を送水量履歴記憶部から読み出す。そして、予測部は、耕作面積記憶部から読み出した実績期間、および予測期間における対象地域の耕作面積と、送水量履歴記憶部から読み出した実績期間に対象地域に送水した用水の送水量とを用いて、対象地域に対して予測期間に送水する用水の送水量を予測する。例えば、実績期間について、対象地域における単位耕作面積[1ha]当たりの用水の送水量を算出し、これに予測期間の耕作面積を乗じた値を、当該予測期間に対象地域に送水する用水の送水量とする。   The prediction unit reads the actual period and the cultivation area of the target area in the prediction period from the cultivation area storage unit, and reads the amount of water supplied to the target area during the actual period from the water supply history storage unit. And the prediction unit uses the actual period read from the cultivation area storage unit, the cultivation area of the target area in the prediction period, and the amount of water supplied to the target area during the actual period read from the water supply history storage unit Thus, the amount of water supplied to the target area during the forecast period is predicted. For example, for the performance period, the amount of water supply per unit cultivated area [1 ha] in the target area is calculated and multiplied by the cultivated area in the prediction period. Use water.

これにより、予測期間に対象地域に送水する用水の送水量を、耕作面積の変化や、対象地域で栽培されている農産物の成育状況に応じて予測することができる。したがって、耕作地域に送水する用水の送水量を適切に制御することができる。
さらに、比較部が、対象地域に対する用水の送水量と、予測部が予測した前記対象地域に対する用水の予測送水量と、を比較する。そして、出力部が、比較部における比較結果をポンプ駆動制御部に出力する。これにより、予測結果に基づいてポンプを効率的に運転することができるので、ランニングコストの増加を抑え、且つ水源から用水を無駄に汲み上げることにより生じる自然破壊を抑制することができる。
Thus, the water supply amount of water that water in the target area in the prediction period, changes in the area under cultivation, it is possible to predict depending on the growth conditions of agricultural cultivated in the target area. Therefore, it is possible to appropriately control the amount of water supplied to the cultivated area.
Further, the comparison unit compares the amount of water supplied to the target area with the predicted amount of water supplied to the target area predicted by the prediction unit. And an output part outputs the comparison result in a comparison part to a pump drive control part. As a result, the pump can be efficiently operated based on the prediction result, so that an increase in running cost can be suppressed and natural destruction caused by unnecessarily pumping water from the water source can be suppressed.

また、予測期間を年月日で指定する場合、この予測期間を30分、1時間、2時間等の時間幅で複数に分割し、分割した区分期間毎に用水の送水量を予測してもよい。この場合、区分期間毎に、対象地域内で用水を使用する地域の面積を用いて割当率を定め、この割当率に基づいて用水の送水量を予測すればよい。   In addition, when the forecast period is specified by date, even if the forecast period is divided into a plurality of time intervals of 30 minutes, 1 hour, 2 hours, etc., and the water supply amount is predicted for each divided segment period Good. In this case, the allocation rate may be determined using the area of the area where the water is used in the target area for each division period, and the water supply amount may be predicted based on this allocation rate.

このようにすれば、耕作地域に送水する用水の送水量の制御が、きめ細かく行える。   In this way, the amount of water supplied to the cultivated area can be finely controlled.

また、予測部を、対象地域に対して予測期間に送水する用水の送水量を予測する際に、現在の時点を基準にして補正期間を決定し、この補正期間に対する用水の予測送水量と、補正期間における実際の用水の送水量と、を用いる構成としてもよい。補正期間は、例えば、この予測を行う直前の期間(直近の1週間頭)にすればよい。このようにすれば、予測期間と、実績期間との間における環境変化等も考慮して用水の送水量を予測することができる。   Further, when predicting the water supply amount of water to be supplied to the target area during the prediction period, the prediction unit determines a correction period based on the current time point, and the predicted water supply amount of water for this correction period, The actual water supply amount during the correction period may be used. The correction period may be, for example, a period immediately before performing this prediction (the most recent one week). If it does in this way, the amount of water supply can be estimated in consideration of an environmental change etc. between a prediction period and a performance period.

この発明によれば、耕作地域に送水する用水の送水量を適切に制御することができる。   According to this invention, it is possible to appropriately control the amount of water supplied to the cultivated area.

送水量予測管理システムの構成を示す概略図である。It is the schematic which shows the structure of a water supply prediction management system. 送水量予測装置の主要部の構成を示すブロック図である。It is a block diagram which shows the structure of the principal part of a water supply amount prediction apparatus. 耕作面積DBの構成を示す図である。It is a figure which shows the structure of cultivation area DB. 送水量履歴DBの構成を示す図である。It is a figure which shows the structure of water supply amount log | history DB. タイムスケジュール記憶部が記憶する時間帯毎の用水の送水量の割当率を示す図である。It is a figure which shows the allocation rate of the amount of water supply for every time slot | zone which a time schedule memory | storage part memorize | stores. 時間帯別送水量記憶部が記憶する時間帯毎の用水の流量を示す図である。It is a figure which shows the flow volume of the water for every time slot | zone memorize | stored in the amount-of-time supply water amount memory | storage part. 演算処理部の機能構成を示す機能ブロック図である。It is a functional block diagram which shows the function structure of an arithmetic processing part. 耕作地域Aにおける、用水の総送水量の実績値と、予測値とを示す図である。It is a figure which shows the actual value of the total amount of water supply in the cultivation area A, and a predicted value. ポンプ制御装置の主要部の構成を示すブロック図である。It is a block diagram which shows the structure of the principal part of a pump control apparatus. 予測処理を示すフローチャートである。It is a flowchart which shows a prediction process. 予測した用水の総送水量と、実際に送水した用水の総送水量との関係を示す図である。It is a figure which shows the relationship between the predicted total water supply amount of water and the total water supply amount of water actually supplied. 予測した用水の送水量と、実際に送水した用水の送水量と、の関係を示す図である。It is a figure which shows the relationship between the amount of water supply which estimated water supply, and the amount of water supply of water actually supplied. 時間帯別の単位割当率当たりの実際の送水量の変化を示す図である。It is a figure which shows the change of the actual water supply amount per unit allocation rate according to time zone.

以下、この発明の実施形態について説明する。   Embodiments of the present invention will be described below.

図1は、この例にかかる送水量予測管理システムの構成を示す概略図である。この送水量予測管理システムは、送水量予測装置1と、ポンプ制御装置2と、ポンプ3(3a、3b、3c)と、流量計4(4a、4b、4c、4d)と、を備えている。この例にかかる送水量予測管理システムは、図1に示す3つの耕作地域A、B、Cに対する用水の送水量を個別に予測する。また、この予測に基づき、3つの耕作地域A、B、Cに対する用水の送水や、送水状況の監視等を行う。耕作地域A、B、Cが、この発明で言う対象地域に相当する。   FIG. 1 is a schematic diagram illustrating a configuration of a water supply amount prediction management system according to this example. This water supply amount prediction management system includes a water supply amount prediction device 1, a pump control device 2, a pump 3 (3a, 3b, 3c), and a flow meter 4 (4a, 4b, 4c, 4d). . The water supply amount prediction management system according to this example individually predicts water supply amounts for the three cultivation areas A, B, and C shown in FIG. Moreover, based on this prediction, the water supply with respect to the three cultivation areas A, B, and C, the monitoring of the water supply condition, etc. are performed. Cultivated areas A, B, and C correspond to the target areas referred to in the present invention.

送水量予測装置1は、3つの耕作地域A、B、Cに対する用水の送水量を個別に予測する。ポンプ制御装置2は、3つの耕作地域A、B、Cのそれぞれに対して用水を送水するポンプ3(3a、3b、3c)の駆動を制御する。ポンプ3は、河川等の水源から用水を用水路に汲み上げる。この用水路は、図1に示すように、各耕作地域A、B、Cにつながっている。ポンプ制御装置2は、送水量予測装置1が予測した用水の送水量に応じて、駆動するポンプ3の台数や、ポンプ3の回転数を制御する。ポンプの回転数制御は、例えばインバータ制御で行う。   The water supply amount prediction device 1 individually predicts the amount of water supply for the three cultivated areas A, B, and C. The pump control device 2 controls the drive of the pumps 3 (3a, 3b, 3c) that supply water to each of the three cultivation areas A, B, and C. The pump 3 draws water from a water source such as a river into the water channel. As shown in FIG. 1, this irrigation channel is connected to each cultivation area A, B, C. The pump control device 2 controls the number of pumps 3 to be driven and the number of rotations of the pumps 3 in accordance with the water supply amount predicted by the water supply amount prediction device 1. The rotation speed control of the pump is performed by inverter control, for example.

なお、図1では、ポンプ制御装置2が制御するポンプ(3a、3b、3c)を3つ例示したが、このポンプ3の台数は、3つの耕作地域A、B、Cに対して送水する量の用水を水源から用水路に汲み上げることができれば、何台であってもよい。   In FIG. 1, three pumps (3a, 3b, 3c) controlled by the pump control device 2 are illustrated, but the number of the pumps 3 is the amount of water supplied to the three cultivation areas A, B, C. Any number of water can be used as long as the water can be pumped from the water source to the water channel.

流量計4aは、耕作地域Aに送水されている用水の流量[m3/s]を検出し、流量計4bは、耕作地域Bに送水されている用水の流量[m3/s]を検出し、流量計4cは、耕作地域Dに送水されている用水の流量[m3/s]を検出する。また、流量計4dは、ポンプ3(3a、3b、3c)が水源から用水路に汲み上げている用水の流量[m3/s]を検出する。各流量計4(4a、4b、4c、4d)は、ポンプ制御装置2に接続されており、用水の流量の検出値をポンプ制御装置2に入力する。 Flowmeter 4a detects the flow rate of water that is water in the cultivation area A [m 3 / s], the flow meter. 4b detects the flow rate of water that is water in the cultivated area B [m 3 / s] The flow meter 4c detects the flow rate [m 3 / s] of the irrigation water supplied to the cultivation area D. In addition, the flow meter 4d detects the flow rate [m 3 / s] of the irrigation water pumped up from the water source to the irrigation channel by the pump 3 (3a, 3b, 3c). Each flow meter 4 (4a, 4b, 4c, 4d) is connected to the pump control device 2 and inputs a detected value of the flow rate of the water to the pump control device 2.

また、送水量予測装置1と、ポンプ制御装置2とは、データ通信可能に接続されている。この例では、送水量予測装置1は、インターネット上のクラウドサーバであるとして説明する。送水量予測装置1とポンプ制御装置2とは、インターネット等のネットワークを介してデータ通信可能に接続される。   Moreover, the water supply amount prediction apparatus 1 and the pump control apparatus 2 are connected so that data communication is possible. In this example, the water supply amount prediction device 1 will be described as a cloud server on the Internet. The water supply amount prediction device 1 and the pump control device 2 are connected so as to be capable of data communication via a network such as the Internet.

なお、送水量予測装置1は、LAN等でポンプ制御装置2とデータ通信可能に接続した構成であってもよい。また、送水量予測装置1、およびポンプ制御装置2を1つの筐体に収納し、この筐体内部でデータ通信可能に接続した構成であってもよい。   In addition, the structure connected to the pump control apparatus 2 so that data communication was possible via LAN etc. may be sufficient as the water supply amount prediction apparatus 1. FIG. Moreover, the structure which accommodated the water supply amount prediction apparatus 1 and the pump control apparatus 2 in one housing | casing, and was connected so that data communication was possible inside this housing | casing may be sufficient.

図2は、この例にかかる送水量予測装置の主要部の構成を示すブロック図である。送水量予測装置1は、演算処理部11と、耕作面積データベース12(以下、耕作面積DB12と言う。)と、送水量履歴データベース13(以下、送水量履歴DB13と言う。)、タイムスケジュール記憶部14と、時間帯別送水量記憶部15と、通信部16と、を備えている。   FIG. 2 is a block diagram showing a configuration of a main part of the water supply amount prediction apparatus according to this example. The water supply amount prediction apparatus 1 includes an arithmetic processing unit 11, a cultivation area database 12 (hereinafter referred to as a cultivation area DB12), a water supply history database 13 (hereinafter referred to as a water supply history DB13), and a time schedule storage unit. 14, a water supply amount storage unit 15 according to time zone, and a communication unit 16.

演算処理部11は、耕作地域A、B、Cに対する用水の送水量を個別に予測する予測処理を行う。また、演算処理部11は、耕作地域A、B、Cのそれぞれに対する用水の送水状況の監視処理を行う。演算処理部11が、この発明で言う予測部に相当する。   The arithmetic processing unit 11 performs a prediction process for individually predicting the amount of water supplied to the cultivation areas A, B, and C. Moreover, the arithmetic processing part 11 performs the monitoring process of the water supply condition of the irrigation water with respect to each of the cultivation areas A, B, and C. The arithmetic processing unit 11 corresponds to the prediction unit referred to in the present invention.

この例では、演算処理部11は、1日単位で、耕作地域A、B、Cに対する用水の送水量を予測する予測処理を行う。具体的には、演算処理部11は、年月日が指定された日を予測日とし、この予測日における用水の送水量を耕作地域A、B、Cのそれぞれについて個別に予測する。この指定された年月日が、この発明で言う予測期間に相当する。   In this example, the arithmetic processing unit 11 performs a prediction process for predicting the water supply amount for the cultivation areas A, B, and C in units of one day. Specifically, the arithmetic processing unit 11 sets the date on which the date is designated as the prediction date, and individually predicts the amount of water supplied on the prediction date for each of the cultivation areas A, B, and C. The designated date corresponds to the prediction period referred to in the present invention.

予測処理、および監視処理の詳細については後述する。演算処理部11が、この発明にかかる送水量予測方法を実行する。また、演算処理部11は、コンピュータを有し、インストールされた、この発明にかかる送水量予測プログラムを実行する。   Details of the prediction process and the monitoring process will be described later. The arithmetic processing unit 11 executes the water supply amount prediction method according to the present invention. The arithmetic processing unit 11 has a computer and executes the installed water supply amount prediction program according to the present invention.

図3は、耕作面積DBの構成を示す図である。耕作面積DB12は、各耕作地域A、B、Cにおける耕作面積の履歴を記憶する。具体的には、耕作面積DB12は、年毎に、各耕作地域A、B、Cの耕作面積を対応付けて記憶する。図3に示す例では、2010年は、耕作地域Aの耕作面積がA1[ha]であり、耕作地域Bの耕作面積がB1[ha]であり、耕作地域Cの耕作面積がC1[ha]である。また、2011年は、耕作地域Aの耕作面積がA2[ha]であり、耕作地域Bの耕作面積がB2[ha]であり、耕作地域Cの耕作面積がC2[ha]である。耕作面積DB12が、この発明で言う耕作面積記憶部に相当する。   FIG. 3 is a diagram illustrating the configuration of the cultivation area DB. The cultivation area DB 12 stores a history of cultivation areas in the cultivation areas A, B, and C. Specifically, the cultivation area DB 12 stores the cultivation areas of the cultivation areas A, B, and C in association with each other for each year. In the example shown in FIG. 3, in 2010, the cultivation area of the cultivation area A is A1 [ha], the cultivation area of the cultivation area B is B1 [ha], and the cultivation area of the cultivation area C is C1 [ha]. It is. In 2011, the cultivation area of the cultivation area A is A2 [ha], the cultivation area of the cultivation area B is B2 [ha], and the cultivation area of the cultivation area C is C2 [ha]. The cultivated area DB 12 corresponds to the cultivated area storage unit referred to in the present invention.

なお、この例では、耕作面積DB12が各耕作地域A、B、Cの耕作面積を対応付けて記憶する期間を1年にしているが、この期間については、3ヶ月や6ヶ月等の期間にしてもよい。   In this example, the period in which the cultivation area DB 12 stores the cultivation areas of the cultivation areas A, B, and C in association with each other is set to one year, but this period is set to a period such as three months or six months. May be.

図4は、送水量履歴DBの構成を示す図である。送水量履歴DB13は、各耕作地域A、B、Cに対する用水の送水量(実績値)、および予測総送水量の履歴を記憶する。具体的には、送水量履歴DB13は、日毎に、各耕作地域A、B、Cに対して実際に送水した用水の送水量[m3](実績値)、および後述する予測処理で予測した予測総送水量[m3]を対応付けて記憶する。図4に示す例では、2011年3月15日は、耕作地域Aに対する用水の送水量の実績値がAV1[m3]であり、耕作地域Bに対する用水の送水量の実績値がBV1[m3]であり、耕作地域Cに対する用水の送水量の実績値がCV1[m3]である。また、2011年3月15日は、耕作地域Aに対する用水の予測総送水量がA’V1[m3]であり、耕作地域Bに対する用水の予測総送水量がB’V1[m3]であり、耕作地域Cに対する用水の予測総送水量の実績値がC’V1[m3]である。 FIG. 4 is a diagram showing the configuration of the water supply history DB. The water supply amount history DB 13 stores the water supply amount (actual value) for each cultivation area A, B, C, and the history of the predicted total water supply amount. Specifically, the water supply amount history DB 13 is predicted by the water supply amount [m 3 ] (actual value) of water actually supplied to each cultivation area A, B, and C, and a prediction process described later, every day. The predicted total amount of water [m 3 ] is stored in association with it. In the example shown in FIG. 4, on March 15, 2011, the actual value of the water supply amount for the cultivation area A is AV1 [m 3 ], and the actual value of the supply water amount for the cultivation area B is BV1 [m 3 ], and the actual value of the amount of water supplied to the cultivation area C is CV1 [m 3 ]. On March 15, 2011, the predicted total water supply for the cultivated area A is A'V1 [m 3 ], and the predicted total water supply for the cultivated area B is B'V1 [m 3 ]. Yes, the actual value of the predicted total water supply for the cultivated area C is C′V1 [m 3 ].

また、2011年10月21日は、耕作地域Aに対する用水の送水量の実績値がAV2[m3]であり、耕作地域Bに対する用水の送水量の実績値がBV2[m3]であり、耕作地域Cに対する用水の送水量の実績値がCV2[m3]である。また、2011年10月21日は、耕作地域Aに対する用水の予測総送水量がA’V2[m3]であり、耕作地域Bに対する用水の予測総送水量がB’V2[m3]であり、耕作地域Cに対する用水の予測総送水量の実績値がC’V2[m3]である。 Moreover, on October 21, 2011, the actual value of the amount of water supplied to the cultivation area A is AV2 [m 3 ], and the actual value of the amount of water supplied to the cultivation area B is BV2 [m 3 ], The actual value of the amount of water supplied to the cultivation area C is CV2 [m 3 ]. In addition, on October 21, 2011, the predicted total water supply for the cultivated area A is A'V2 [m 3 ], and the predicted total water supply for the cultivated area B is B'V2 [m 3 ]. Yes, the actual value of the predicted total water supply for the cultivated area C is C′V2 [m 3 ].

なお、図4において、2014年5月20日は、予測総送水量が予想されているが、現時点が2014年5月21日以降でないため、各耕作地域A、B、Cに対する用水の送水量(実績値)が計測されておらず、各耕作地域A、B、Cに対する用水の送水量(実績値)が登録されていない状態を示している。送水量履歴DB13が、この発明で言う送水量履歴記憶部に相当する。   In addition, in FIG. 4, the predicted total water volume is predicted on May 20, 2014, but since the current time is not after May 21, 2014, the water volume of water supplied to each cultivated area A, B, C The (actual value) is not measured, and the water supply amount (actual value) for each cultivation area A, B, C is not registered. The water supply amount history DB 13 corresponds to the water supply amount history storage unit referred to in the present invention.

タイムスケジュール記憶部14は、予測日における、時間帯毎の用水の送水量の割当率を記憶する。ここで言う時間帯は、この例では1時間であり、その開始が正時である。すなわち、1日を24の時間帯に分割している。この分割した時間帯が、この発明で言う区分期間に相当する。   The time schedule memory | storage part 14 memorize | stores the allocation rate of the water supply amount of the water for every time slot | zone in an estimated day. The time zone mentioned here is one hour in this example, and its start is on the hour. That is, one day is divided into 24 time zones. This divided time zone corresponds to the division period referred to in the present invention.

図5は、タイムスケジュール記憶部に記憶されている、時間帯毎の用水の送水量の割当率を示す時間帯別送水量の割当率データである。図5は、2014年5月20日(予測日)の時間帯毎の用水の送水量の割当率である。各耕作地域A、B、Cは、各時間帯の割当率の総和が100%になる。タイムスケジュール記憶部14は、少なくとも、演算処理部11が後述する予測処理で用水の送水量を予測する予測日における時間帯別送水量の割当率データを記憶する。   FIG. 5 is allocation rate data of the water supply amount by time zone indicating the allocation rate of the water supply amount for each time zone, which is stored in the time schedule storage unit. FIG. 5 shows an allocation rate of the water supply amount for each time zone on May 20, 2014 (predicted date). In each cultivation area A, B, C, the total sum of the allocation rate in each time zone is 100%. The time schedule storage unit 14 stores at least allocation data of the water supply amount by time zone on the prediction date when the arithmetic processing unit 11 predicts the water supply amount of the irrigation water in the prediction process described later.

任意の日における時間帯毎の用水の送水量の割当率は、その日の各時間帯で用水を使用する田畑の面積を用いて算出される。各時間帯で用水を使用する田畑の面積は、耕作地域A、B、Cに田畑を所有する農家の作業予定から得られる。言い換えれば、耕作地域A、B、Cに田畑を所有する農家に作業予定を確認することで、各時間帯で用水を使用する田畑の面積が得られる。時間帯毎の用水の送水量の割当率は、その時間帯に用水を使用する田畑の面積を、その日の各時間帯で用水を使用する田畑の面積の総和である累積面積で除した100分率の値である。例えば、時間帯毎の用水の送水量の割当率は、以下のようにして算出する。   The allocation rate of the water supply amount for each time zone on an arbitrary day is calculated using the area of the field where the water is used in each time zone on that day. The area of the field that uses water in each time zone is obtained from the work schedule of the farmer who owns the field in the cultivated areas A, B, and C. In other words, by confirming the work schedule with a farmer who owns the fields in the cultivated areas A, B, and C, the area of the fields that use the water in each time zone can be obtained. The allocation rate of the amount of water used for each time period is 100 minutes divided by the cumulative area that is the sum of the areas of the fields that use water in each time zone of the day. Rate value. For example, the allocation rate of the water supply amount for each time zone is calculated as follows.

耕作地域Aを例にして具体的に説明すると、耕作地域Aの任意の日における、各時間帯の用水を使用する田畑の面積がAx0(0時台)、Ax1(1時台)、Ax2(2時台)、Ax3(3時台)、Ax4(4時台)、Ax5(5時台)、Ax6(6時台)、Ax7(7時台)、Ax8(8時台)、Ax9(9時台)、Ax10(10時台)、Ax11(11時台)、Ax12(12時台)、Ax13(13時台)、Ax14(14時台)、Ax15(15時台)、Ax16(16時台)、Ax17(17時台)、Ax18(18時台)、Ax19(19時台)、Ax20(20時台)、Ax21(21時台)、Ax22(22時台)、およびAx23(23時台)であるとする。この場合、この任意の日における累積面積SAxは、
SAx=Ax0+Ax1+Ax2+Ax3+Ax4+Ax5+Ax6+Ax7+Ax8
+Ax9+Ax10+Ax11+Ax12+Ax13+Ax14+Ax15+Ax16
+Ax17+Ax18+Ax19+Ax20+Ax21+Ax22+Ax23
になる。
Specifically, using the cultivation area A as an example, the area of the field using the water for each time zone on any day in the cultivation area A is Ax0 (0 o'clock), Ax1 (1 o'clock), Ax2 ( 2 o'clock), Ax3 (3 o'clock), Ax4 (4 o'clock), Ax5 (5 o'clock), Ax6 (6 o'clock), Ax7 (7 o'clock), Ax8 (8 o'clock), Ax9 (9 ), Ax10 (10 o'clock), Ax11 (11 o'clock), Ax12 (12 o'clock), Ax13 (13 o'clock), Ax14 (14 o'clock), Ax15 (15 o'clock), Ax16 (16:00) Stand), Ax17 (17 o'clock), Ax18 (18 o'clock), Ax19 (19 o'clock), Ax20 (20 o'clock), Ax21 (21 o'clock), Ax22 (22 o'clock), and Ax23 (23:00) Stand). In this case, the cumulative area SAx on this arbitrary day is
SAx = Ax0 + Ax1 + Ax2 + Ax3 + Ax4 + Ax5 + Ax6 + Ax7 + Ax8
+ Ax9 + Ax10 + Ax11 + Ax12 + Ax13 + Ax14 + Ax15 + Ax16
+ Ax17 + Ax18 + Ax19 + Ax20 + Ax21 + Ax22 + Ax23
become.

各間帯の用水の送水量の割当率anは、
an=Axn/SAx×Aαn×100
になる。但し、Aαnは、後述する時間帯別送水量パターン学習機能部58において検出された時間帯別の補正係数である。また、nは時間帯を示し、0〜23である。このタイムスケジュール記憶部14が、この発明で言う区分期間別送水量記憶部に相当する。
The quota rate an for the amount of water used for each interzone is
an = Axn / SAx × Aαn × 100
become. However, Aαn is a correction coefficient for each time zone detected by the water supply amount pattern learning function unit 58 for each time zone described later. Moreover, n shows a time zone and is 0-23. This time schedule memory | storage part 14 is corresponded to the water storage amount memory | storage part classified by division period said by this invention.

図6は、時間帯別送水量記憶部に記憶される、時間帯毎の用水の送水量を示す時間帯別送水量のデータである。図6は、2014年5月20日の時間帯毎の用水の送水量であり、後述する予測処理による予測結果である。ここでは、送水量として単位時間[sec]当たりの用水の流量を記憶している。図6において、avnは、時間帯毎に、耕作地域Aに送水する用水の流量を示す。bvnは、時間帯毎に、耕作地域Bに送水する用水の流量を示す。cvnは、時間帯毎に、耕作地域Cに送水する用水の流量を示す。但し、nは時間帯を示し、0〜23である。また、送水量として記憶する流量の単位時間は、上述の[sec]に限らず、[min]や[hour]等としてもよい。   FIG. 6 is data on the amount of water supplied by time zone indicating the amount of water supplied for each time zone, which is stored in the water amount storage unit by time zone. FIG. 6 shows the water supply amount for each time zone on May 20, 2014, and is a prediction result by a prediction process described later. Here, the flow volume of the water per unit time [sec] is memorize | stored as a water supply amount. In FIG. 6, avn shows the flow volume of the water supplied to the cultivation area A for every time slot | zone. bvn shows the flow volume of the water supplied to the cultivation area B for every time slot | zone. cvn shows the flow volume of the water supplied to the cultivation area C for every time slot | zone. However, n shows a time zone and is 0-23. In addition, the unit time of the flow rate stored as the water supply amount is not limited to the above [sec], and may be [min], [hour], or the like.

通信部16は、送水量を予測した予測日毎に、その予測結果をポンプ制御装置2に送信する。また、通信部16は、ポンプ制御装置2から送信されてきたデータを受信する。ポンプ制御装置2から送信されてくるデータは、例えば各流量計4(4a、4b、4c、4d)で検出された用水の流量である。この通信部16が、この発明で言う出力部に相当する。   The communication unit 16 transmits the prediction result to the pump control device 2 for each prediction day in which the water supply amount is predicted. Further, the communication unit 16 receives data transmitted from the pump control device 2. The data transmitted from the pump control device 2 is, for example, the flow rate of irrigation water detected by each flow meter 4 (4a, 4b, 4c, 4d). The communication unit 16 corresponds to the output unit referred to in the present invention.

図7は、演算処理部の機能構成を示す機能ブロック図である。演算処理部11は、実績期間決定機能部51と、実績期間データ読出機能部52と、予測総送水量算出機能部53と、補正期間データ読出機能部54と、予測総送水量補正機能部55と、時間帯別送水量算出機能部56と、時間帯別ポンプ操作量算出機能部57と、時間帯別送水量パターン学習機能部58と、比較機能部59と、を有している。   FIG. 7 is a functional block diagram illustrating a functional configuration of the arithmetic processing unit. The arithmetic processing unit 11 includes an actual period determining function unit 51, an actual period data reading function unit 52, a predicted total water supply amount calculating function unit 53, a correction period data reading function unit 54, and a predicted total water supply amount correcting function unit 55. A time-dependent water supply amount calculation function unit 56, a time-specific pump operation amount calculation function unit 57, a time-specific water supply amount pattern learning function unit 58, and a comparison function unit 59.

実績期間決定機能部51は、指定された予測日に対応する実績期間を決定する。この例では、1月1日から12月31日までの1年を53週で管理し、指定された予測日と同じ週で、且つ同じ曜日を実績期間に決定する。例えば、予測日が、2014年5月20日(21週目の火曜日)であれば、最近数年(3〜5年)における、21週目の火曜日を実績期間に決定する。すなわち、2013年5月21日(21週目の火曜日)、2012年5月22日(21週目の火曜日)、2011年5月23(21週目の火曜日)日等が実績期間に決定される。実績期間は、1日であってもよいが、複数日であるほうが好ましい。   The performance period determination function unit 51 determines the performance period corresponding to the designated prediction date. In this example, one year from January 1 to December 31 is managed in 53 weeks, and the same week as the designated prediction date and the same day of the week are determined as the actual period. For example, if the predicted date is May 20, 2014 (21st week Tuesday), the 21st week of Tuesday in the last few years (3-5 years) is determined as the performance period. That is, May 21, 2013 (Tuesday, 21st week), May 22, 2012 (Tuesday, 21st week), May 23, 2011 (Tuesday, 21st week), etc. are determined as the performance period. The The actual period may be one day, but is preferably a plurality of days.

なお、実績期間は、各年の同じ月日にしてもよいし、各年において同じ月日を基準にした前後数日の期間にしてもよい。   The actual period may be the same month and day in each year, or may be a period of several days before and after the same month and day in each year.

実績期間データ読出機能部52は、各耕作地域A、B、Cについて、耕作面積DB12から決定した実績期間が属する年の耕作面積を読み出すとともに、予測日が属する年の耕作面積を読み出す。また、実績期間データ読出機能部52は、各耕作地域A、B、Cについて、送水量履歴DB13から決定した実績期間の送水量を読み出す。   The actual period data reading function unit 52 reads, for each cultivation area A, B, C, the cultivation area of the year to which the actual period determined from the cultivation area DB 12 belongs, and the cultivation area of the year to which the prediction date belongs. Moreover, the performance period data reading function part 52 reads the water supply amount of the performance period determined from the water supply amount history DB 13 for each cultivation area A, B, C.

予測総送水量算出機能部53は、決定した実績期間毎に、単位面積当たりの用水の送水量を算出し、これらの平均に予測日が属する年の耕作面積を乗じた値を予測総送水量として算出する。予測総送水量算出機能部53は、耕作地域A、B、C毎に、予測総送水量を算出する。   The predicted total water supply calculation function unit 53 calculates the water supply amount per unit area for each determined performance period, and multiplies the average of these by the cultivation area of the year to which the prediction date belongs. Calculate as The predicted total water supply amount calculation function unit 53 calculates the predicted total water supply amount for each of the cultivation areas A, B, and C.

補正期間データ読出機能部54は、予測日に対して決定される補正期間に属する日毎に、用水の総送水量の実績値と、予測値と、を読み出す。補正期間は、現在の時点を基準にして定めればよい。この例では、予測日の直近の過去1週間を補正期間に決定する。図4に示したように、送水量履歴DB13が、用水の総送水量の実績値と、予測値とを耕作地域A、B、C毎に記憶している。図8は、耕作地域Aにおける、用水の総送水量の実績値と、予測値とを示す図である。   The correction period data reading function unit 54 reads the actual value of the total water supply amount and the predicted value for each day belonging to the correction period determined for the predicted date. The correction period may be determined based on the current time point. In this example, the past one week immediately before the prediction date is determined as the correction period. As shown in FIG. 4, the water supply history DB 13 stores the actual value and the predicted value of the total water supply for each cultivated area A, B, and C. FIG. 8 is a diagram showing the actual value and the predicted value of the total water supply amount in the cultivation area A.

予測総送水量補正機能部55は、予測総送水量算出機能部53が算出した予測総送水量を、補正期間に属する各日の用水の総送水量の実績値と予測値とを用いて補正する。具体的には、予測総送水量補正機能部55は、補正期間に属する日毎に、(実績値/予測値)を日単位補正係数として算出し、これらの日単位補正係数の平均を補正係数とする。そして、予測総送水量補正機能部55は、予測総送水量算出機能部53が算出した予測総送水量と、補正係数とを乗じた値を、補正した予測総送水量として算出する。予測総送水量補正機能部55は、耕作地域A、B、C毎に、補正した予測総送水量を算出する。   The predicted total water supply correction function unit 55 corrects the predicted total water supply amount calculated by the predicted total water supply amount calculation function unit 53 using the actual value and the predicted value of the total water supply amount for each day belonging to the correction period. To do. Specifically, the predicted total water supply correction function unit 55 calculates (actual value / predicted value) as a daily correction coefficient for each day belonging to the correction period, and uses the average of these daily correction coefficients as the correction coefficient. To do. Then, the predicted total water supply correction function unit 55 calculates a value obtained by multiplying the predicted total water supply amount calculated by the predicted total water supply amount calculation function unit 53 and the correction coefficient as a corrected predicted total water supply amount. The predicted total water supply correction function unit 55 calculates a corrected predicted total water supply amount for each of the cultivation areas A, B, and C.

時間帯別送水量算出機能部56は、図5に示した予測日における各時間帯の送水量の割当率を用い、各時間帯の用水の流量を算出し、図6に示した予測日の時間帯別送水量データを作成する。各時間帯の用水の流量avn、bvn、cvnは、
(予測総送水量補正機能部55が補正した予測総送水量)×(対応する時間帯の送水量の割当率)/3600
により算出される。時間帯別送水量記憶部15は、この時間帯別送水量算出機能部56が作成した、予測日の時間帯別送水量データを記憶する。
The water supply amount calculation function unit 56 for each time zone calculates the flow rate of water for each time zone using the allocation rate of the water supply amount for each time zone on the prediction date shown in FIG. 5, and the time of the prediction date shown in FIG. Create water volume data for each band. The water flow rates avn, bvn, cvn for each time zone are as follows:
(Predicted total water supply amount corrected by predicted total water supply correction function unit 55) × (Allocation rate of water supply amount in corresponding time zone) / 3600
Is calculated by The hourly water supply amount storage unit 15 stores the hourly water supply amount data created by the hourly water supply amount calculation function unit 56.

時間帯別ポンプ操作量算出機能部57は、耕作地域A、B、Cに対する用水の送水量に応じて、駆動するポンプ3の台数や、各ポンプ3の駆動パラメータを算出する。駆動パラメータは、例えばポンプの回転数を制御する駆動周波数である。   The pump operation amount calculation function unit 57 for each time zone calculates the number of pumps 3 to be driven and the drive parameters of each pump 3 according to the amount of water supplied to the cultivation areas A, B, and C. The drive parameter is, for example, a drive frequency that controls the rotation speed of the pump.

また、時間帯別送水量パターン学習機能部58は、図5に示した時間帯別送水量の割当率データの算出において用いる時間帯別の補正係数を算出する。この補正係数の算出については後述する。   Further, the time period water volume pattern learning function unit 58 calculates a correction coefficient for each time period used in the calculation of the allocation rate data of the time period water volume shown in FIG. The calculation of the correction coefficient will be described later.

比較機能部59は、流量計4で計測されている用水の流量と、予測した用水の流量と、を比較し、用水の送水が適正に行えているかどうかを監視するとともに、用水の送水が不適正である耕作地域A、B、Cがあれば、その旨を示すメッセージや、警告画像にかかるデータを出力する。この比較機能部59が、この発明で言う比較部に相当する。   The comparison function unit 59 compares the flow rate of the water measured by the flow meter 4 with the predicted flow rate of the water to monitor whether or not the water supply is properly performed, and the water supply is not possible. If there are proper cultivation areas A, B, and C, a message indicating that fact and data related to the warning image are output. The comparison function unit 59 corresponds to the comparison unit referred to in the present invention.

図9は、ポンプ制御装置の構成を示す図である。ポンプ制御装置2は、制御部21と、ポンプ駆動部22と、流量計測部23と、表示・操作部24と、通信部25とを備えている。   FIG. 9 is a diagram illustrating a configuration of the pump control device. The pump control device 2 includes a control unit 21, a pump drive unit 22, a flow rate measurement unit 23, a display / operation unit 24, and a communication unit 25.

制御部21は、ポンプ制御装置2本体各部の動作を制御する。   The control unit 21 controls the operation of each part of the main body of the pump control device 2.

ポンプ駆動部22は、接続されているポンプ3(3a、3b、3c)の駆動制御を行う。   The pump drive unit 22 performs drive control of the connected pump 3 (3a, 3b, 3c).

流量計測部23は、接続されている流量計4(4a、4b、4c、4d)で計測されている用水の流量の入力を受け付ける。   The flow rate measuring unit 23 receives an input of the flow rate of the water measured by the connected flow meter 4 (4a, 4b, 4c, 4d).

表示・操作部24は、マウスやキーボード等の入力デバイスを有し、ポンプ制御装置2本体に対するオペレータの入力操作を受け付ける。また、表示・操作部24は、表示器を有し、この表示器における画面表示を制御する。   The display / operation unit 24 includes an input device such as a mouse or a keyboard, and accepts an operator's input operation on the pump control device 2 main body. The display / operation unit 24 includes a display and controls screen display on the display.

通信部25は、送水量を予測した予測日毎に、その予測結果をポンプ制御装置2に送信する。また、通信部25は、送水量予測装置1から送信されてきたデータを受信する。送水量予測装置1から送信されてくるデータは、例えば時間帯別のポンプ操作量にかかるデータである。   The communication unit 25 transmits the prediction result to the pump control device 2 for each prediction day in which the water supply amount is predicted. The communication unit 25 receives the data transmitted from the water supply amount prediction device 1. The data transmitted from the water supply amount prediction device 1 is data related to the pump operation amount for each time zone, for example.

以下、この例にかかる送水量予測管理システムの動作について説明する。   Hereinafter, the operation of the water supply amount prediction management system according to this example will be described.

まず、耕作地域A、B、Cに対する用水の送水量を予測する予測処理について説明する。図10は、予測処理を示すフローチャートである。この例にかかる送水量予測装置1は、毎日午前0時になると(日付が変わると)、この予測処理を自動実行する。予測日は、当日である。また、この時点までに、予測日における時間帯別の送水量の割当率がタイムスケジュール記憶部14に記憶されている。   First, prediction processing for predicting the amount of water supplied to the cultivation areas A, B, and C will be described. FIG. 10 is a flowchart showing the prediction process. The water supply amount prediction device 1 according to this example automatically executes this prediction process at midnight every day (when the date changes). The forecast date is the current day. In addition, by this time, the allocation rate of the water supply amount for each time zone on the prediction date is stored in the time schedule storage unit 14.

送水量予測装置1は、耕作地域A、B、Cに対して送水する用水の送水量を予測する予測日を当日に決定する(s1)。   The water supply amount prediction device 1 determines a prediction date for predicting the water supply amount of water to be supplied to the cultivation areas A, B, and C (s1).

なお、オペレータが、予測処理の実行にかかる入力操作を行う構成としてもよい。この場合、オペレータが、送水量予測装置1に設けた操作部(不図示)において予測日の指定にかかる入力操作を行う構成であってもよいし、ポンプ制御装置2に設けた表示・操作部24において予測日の指定にかかる入力操作を行い、通信部25を利用して入力した予測日等を送水量予測装置1に送信する構成であってもよい。また、予測日を、オペレータが任意に指定できる構成としてもよい。   In addition, it is good also as a structure where an operator performs input operation concerning execution of a prediction process. In this case, the operator may be configured to perform an input operation for specifying a prediction date in an operation unit (not shown) provided in the water supply amount prediction device 1, or a display / operation unit provided in the pump control device 2 24 may be configured to perform an input operation related to the specification of the predicted date in 24 and transmit the predicted date and the like input using the communication unit 25 to the water supply amount prediction device 1. Moreover, it is good also as a structure which can specify an estimated date arbitrarily by an operator.

演算処理部11は、指定された予測日に対応する実績期間を決定する(s2)。実績期間決定機能部51が、s2にかかる処理を行う。実績期間は、最近数年(3〜5年程度)における、予測日と同じ週で、且つ同じ曜日を実績期間に決定する。この例では、兼業農家が増加していることから、実績期間を曜日で合わせるようにしている。実績期間は、1日であってもよいが、複数日であるほうが好ましい。   The arithmetic processing part 11 determines the performance period corresponding to the designated prediction date (s2). The performance period determination function unit 51 performs the process related to s2. The actual period is determined to be the same week as the predicted date and the same day of the week in the recent several years (about 3 to 5 years). In this example, since the number of part-time farmers is increasing, the performance period is adjusted to the day of the week. The actual period may be one day, but is preferably a plurality of days.

演算処理部11は、耕作地域A、B、Cのそれぞれについて、送水量履歴DB13から、s2で決定した実績期間毎に、用水の送水量(実績値)を読み出す(s3)。また、演算処理部11は、耕作地域A、B、Cのそれぞれについて、耕作面積DB12から、s2で決定した実績期間毎に、その実績期間が属する年の耕作面積を読み出す(s4)。s4では、耕作面積DB12から、耕作地域A、B、Cのそれぞれについて、予測日が属する年の耕作面積も読み出す。実績期間データ読出機能部52が、s3、およびs4にかかる処理を行う。   For each of the cultivation areas A, B, and C, the arithmetic processing unit 11 reads the water supply amount (actual value) from the water supply amount history DB 13 for each result period determined in s2 (s3). Moreover, the arithmetic processing part 11 reads the cultivation area of the year to which the performance period belongs for every performance period determined by s2 from cultivation area DB12 about each of cultivation area A, B, and C (s4). In s4, the cultivation area of the year to which the prediction date belongs is also read out from the cultivation area DB 12 for each of the cultivation areas A, B, and C. The actual period data reading function unit 52 performs the processes related to s3 and s4.

演算処理部11は、耕作地域A、B、Cのそれぞれについて、予測日に送水する用水の予測総送水量を個別に算出する(s5)。具体的には、演算処理部11は、耕作地域Aについてs2で決定した実績期間毎に、単位耕作面積[1ha]当たりの用水の送水量を算出する。単位耕作面積[1ha]当たりの用水の送水量は、s3で読み出した用水の送水量(実績値)を、s4で読み出した耕作面積で除することにより算出できる。   The arithmetic processing unit 11 individually calculates the predicted total water supply amount of water to be supplied on the prediction date for each of the cultivation areas A, B, and C (s5). Specifically, the arithmetic processing unit 11 calculates the water supply amount per unit cultivation area [1 ha] for each performance period determined in s2 for the cultivation area A. The water supply amount per unit cultivation area [1 ha] can be calculated by dividing the water supply amount (actual value) read in s3 by the cultivation area read in s4.

演算処理部11は、耕作地域Aについて、実績期間毎に算出した、単位耕作面積[1ha]当たりの用水の送水量の平均を、実績期間における単位耕作面積[1ha]当たりの用水の送水量として算出する。さらに、演算処理部11は、耕作地域Aについて、実績期間における単位耕作面積[1ha]当たりの用水の送水量(実績期間毎に算出した、単位耕作面積[1ha]当たりの用水の送水量の平均)と、s4で読み出した予測日が属する耕作地域Aの耕作面積と、を乗じた値を、予測日に送水する用水の予測総送水量として算出する。   The arithmetic processing unit 11 calculates the average water supply amount per unit cultivation area [1 ha] for the cultivation area A as the amount of water supply per unit cultivation area [1 ha] calculated for each performance period. calculate. Further, for the cultivation area A, the arithmetic processing unit 11 supplies the amount of irrigation water per unit cultivated area [1 ha] in the actual period (the average amount of irrigated water per unit cultivated area [1 ha] calculated for each actual period). ) And the cultivation area of the cultivation area A to which the prediction date read in s4 belongs is calculated as the predicted total water supply amount of water to be supplied on the prediction date.

また、演算処理部11は、耕作地域B、Cについても同様の演算を行い、予測日に送水する用水の予測総送水量を算出する。予測総送水量算出機能部53が、s5にかかる処理を行う。   Moreover, the arithmetic processing part 11 performs the same calculation also about the cultivation areas B and C, and calculates the estimated total water supply amount of the water to be supplied on the prediction date. The predicted total water supply amount calculation function unit 53 performs the process related to s5.

なお、演算処理部11は、s2で決定した実績期間における用水の送水量(実績値)の総和を、s2で決定した実績期間における耕作面積の総和で除した値を、実績期間における単位耕作面積[1ha]当たりの用水の送水量として算出する構成としてもよい。   In addition, the arithmetic processing unit 11 divides the sum of the water supply amount (actual value) in the actual period determined in s2 by the total cultivation area in the actual period determined in s2, and the unit cultivation area in the actual period. It is good also as a structure calculated as the amount of water supply of water for [1ha].

演算処理部11は、予測日に対応する補正期間が属する日毎に、耕作地域A、B、Cのそれぞれについて、予測した用水の総送水量と、実際に送水した用水の総送水量と、を補正期間データとして読み出す(s6)。この例では、補正期間は、現時点を基準にした直近の7日間(1週間)である。耕作地域A、B、Cのそれぞれの補正期間に対して予測した用水の総送水量(予測総送水量)は、送水量履歴DB13に記憶されている。また、耕作地域A、B、Cのそれぞれの補正期間に実際に送水した用水の送水量(実績値)も、送水量履歴DB13に記憶されている。補正期間データ読出機能部54が、s6にかかる処理を行う。   For each day to which the correction period corresponding to the prediction date belongs, the arithmetic processing unit 11 calculates the total water supply amount predicted for each of the cultivation areas A, B, and C, and the total water supply amount actually supplied. Read out as correction period data (s6). In this example, the correction period is the last seven days (one week) based on the current time. The total water supply amount (predicted total water supply amount) predicted for each correction period of the cultivation areas A, B, and C is stored in the water supply amount history DB 13. In addition, the water supply amount (actual value) of water actually supplied during the correction periods of the cultivation areas A, B, and C is also stored in the water supply history DB 13. The correction period data reading function unit 54 performs the process related to s6.

演算処理部11は、予測日に対する補正係数を算出する(s7)。s7では、補正期間に属する各日について、日単位補正係数を算出する。日単位補正係数は、
日単位補正係数=(実際に送水した用水の総送水量)/(予測した用水の総送水量)
により算出する(図8参照)。そして、補正期間の各日について算出した日単位補正係数の平均を補正係数として算出する。
The arithmetic processing unit 11 calculates a correction coefficient for the predicted date (s7). In s7, a daily correction coefficient is calculated for each day belonging to the correction period. The daily correction factor is
Daily correction factor = (Total amount of water actually supplied) / (Predicted total amount of water supplied)
(See FIG. 8). And the average of the daily unit correction coefficient calculated about each day of the correction period is calculated as a correction coefficient.

演算処理部11は、s7で算出した補正係数を用いて、s5で算出した予測総送水量を補正する(s8)。s8では、s5で算出した予測総送水量と、s7で算出した補正係数とを乗じた値を、補正した予測総送水量として算出する。予測総送水量補正機能部55が、s7、およびs8にかかる処理を行う。また、演算処理部11は、s8で補正した予測総送水量を送水量履歴DB13に登録する。   The arithmetic processing unit 11 corrects the predicted total water supply amount calculated in s5 using the correction coefficient calculated in s7 (s8). In s8, a value obtained by multiplying the predicted total water volume calculated in s5 by the correction coefficient calculated in s7 is calculated as a corrected predicted total water volume. The predicted total water supply amount correction function unit 55 performs the processes related to s7 and s8. In addition, the arithmetic processing unit 11 registers the predicted total water supply amount corrected in s8 in the water supply amount history DB13.

演算処理部11は、予測日の時間帯別の用水の送水量を算出する(s9)。具体的には、s8において補正した予測総送水量と、タイムスケジュール記憶部14に記憶している時間帯毎の送水量の割当率とを乗じた値を、その時間帯における送水量として算出する。そして、各時間帯について算出した用水の送水量を単位時間[sec]当たりの送水量(すなわち流量)に換算し、これをタイムスケジュール記憶部14に記憶する(s10)。s9にかかる処理は、時間帯別送水量算出機能部56が行う。   The arithmetic processing unit 11 calculates the amount of water supplied for each predicted time zone (s9). Specifically, a value obtained by multiplying the predicted total water volume corrected in s8 by the allocation rate of the water volume for each time zone stored in the time schedule storage unit 14 is calculated as the water volume in that time zone. . Then, the water supply amount calculated for each time zone is converted into a water supply amount (that is, a flow rate) per unit time [sec] and stored in the time schedule storage unit 14 (s10). The processing related to s9 is performed by the hourly water supply amount calculation function unit 56.

上述したように、予測日に耕作地域A、B、Cに送水する用水の送水量を、過去数年における同時期の単位面積当たりの用水の送水量を用いて予測する。したがって、耕作面積の変化や、対象地域で栽培されている農産物の成育状況に応じて、送水する用水の送水量を精度よく予測することができる。   As described above, the water supply amount to be supplied to the cultivation areas A, B, and C on the prediction day is predicted using the water supply amount per unit area in the same period in the past several years. Therefore, the amount of water to be supplied can be accurately predicted according to the change in the cultivation area and the growth situation of the agricultural products cultivated in the target area.

次に、用水の送水量の監視処理について説明する。送水量予測装置1は、当日の時間帯別のポンプ3(3a、3b、3c)の操作量を算出し、これをポンプ制御装置2に送信する。ポンプ制御装置2は、ポンプ駆動部22において、ポンプ3(3a、3b、3c)を駆動する。   Next, the monitoring process of the water supply amount will be described. The water supply amount prediction device 1 calculates the operation amount of the pump 3 (3a, 3b, 3c) for each time zone of the day, and transmits this to the pump control device 2. The pump control device 2 drives the pump 3 (3a, 3b, 3c) in the pump drive unit 22.

各流量計4(4a、4b、4c、4d)で計測された用水の流量は、ポンプ制御装置2の流量計測部23に入力される。ポンプ制御装置2は、流量計測部23に入力された各流量計4(4a、4b、4c、4d)で計測された用水の流量を、通信部25において送水量予測装置1に送信する。   The flow rate of the irrigation water measured by each flow meter 4 (4a, 4b, 4c, 4d) is input to the flow rate measurement unit 23 of the pump control device 2. The pump control device 2 transmits the water flow rate measured by each flow meter 4 (4a, 4b, 4c, 4d) input to the flow rate measurement unit 23 to the water supply amount prediction device 1 in the communication unit 25.

図11は、監視処理を示すフローチャートである。送水量予測装置1は、演算処理部11において、各耕作地域A、B、Cに対する用水の送水状況を判定する(s21)。具体的には、ポンプ制御装置2から送信されてきた各流量計4(4a、4b、4c)で計測された用水の流量と、時間帯別送水量記憶部15に記憶している流量と、を対比し、耕作地域A、B、Cに対する用水の送水が適正であるかどうかを判定する。比較機能部59が、このs21にかかる処理を行う。   FIG. 11 is a flowchart showing the monitoring process. In the arithmetic processing unit 11, the water supply amount prediction device 1 determines the water supply status of the irrigation water for each cultivation area A, B, C (s21). Specifically, the flow rate of the water measured by each flow meter 4 (4a, 4b, 4c) transmitted from the pump control device 2 and the flow rate stored in the hourly water supply amount storage unit 15 are In contrast, it is determined whether the water supply for the cultivation areas A, B, and C is appropriate. The comparison function unit 59 performs the process related to s21.

s21では、耕作地域Aについては、流量計4aが計測している用水の流量と、時間帯別送水量記憶部15に記憶している耕作地域Aに対する流量と、を比較する。また、耕作地域Bについては、流量計4bが計測している用水の流量と、時間帯別送水量記憶部15に記憶している耕作地域Bに対する流量と、を比較する。さらに、耕作地域Cについては、流量計4cが計測している用水の流量と、時間帯別送水量記憶部15に記憶している耕作地域Cに対する流量と、を比較する。   In s21, for the cultivation area A, the flow rate of the irrigation water measured by the flow meter 4a is compared with the flow rate for the cultivation area A stored in the hourly water supply storage unit 15. Further, for the cultivation area B, the flow rate of the water measured by the flow meter 4b is compared with the flow rate for the cultivation area B stored in the hourly water supply storage unit 15. Further, for the cultivation area C, the flow rate of the irrigation water measured by the flow meter 4c is compared with the flow rate for the cultivation area C stored in the hourly water supply storage unit 15.

上記比較において、流量計4で計測された用水の流量が、時間帯別送水量記憶部15に記憶している流量よりも所定量(例えば、10%)以上多ければ、その対象地域に対する用水の送水量が適正でないと判定する。   In the above comparison, if the flow rate of the water measured by the flow meter 4 is more than a predetermined amount (for example, 10%) more than the flow rate stored in the hourly water volume storage unit 15, the supply of water to the target area is performed. It is determined that the amount of water is not appropriate.

送水量予測装置1は、s21における判定結果をポンプ制御装置2に送信する(s22)。送水量予測装置1は、s21、s22にかかる処理を繰り返す。   The water supply amount prediction device 1 transmits the determination result in s21 to the pump control device 2 (s22). The water supply amount prediction device 1 repeats the processes related to s21 and s22.

また、ポンプ制御装置2は、耕作地域A、B、C毎に、予測した用水の流量と、流量計4で計測された実際の用水の流量と、を対比して表示・操作部24に設けた表示器に表示してもよい。例えば、図12に示すように、予測した用水の流量と、流量計4で計測された実際の用水の流量と、を横軸が時間軸で、縦軸が用水の送水量であるグラフで表示する。これにより、予測した用水の送水量(流量)と、流量計4で計測されている実際の用水の送水量(流量)と、の差をオペレータに視覚的に確認させることができる。   In addition, the pump control device 2 is provided in the display / operation unit 24 for each of the cultivation areas A, B, and C in comparison with the predicted water flow rate and the actual water flow rate measured by the flow meter 4. You may display on the display. For example, as shown in FIG. 12, the predicted flow rate of water and the actual flow rate of water measured by the flow meter 4 are displayed in a graph in which the horizontal axis is the time axis and the vertical axis is the water supply amount. To do. As a result, the operator can visually check the difference between the predicted water supply amount (flow rate) of the service water and the actual water supply amount (flow rate) measured by the flow meter 4.

また、ポンプ制御装置2は、ポンプ3の操作量のフィードバック制御を行ってもよい。例えば、ポンプ制御装置2は、ある耕作地域に対する用水の送水量が増加し、他の耕作地域に対して用水を十分に送水できなくなる場合等に、ポンプ3の操作量を制御し、他の耕作地域に対して用水を十分に送水できるように制御してもよい。   Further, the pump control device 2 may perform feedback control of the operation amount of the pump 3. For example, the pump control device 2 controls the operation amount of the pump 3 when the amount of water supplied to a certain cultivated area increases and cannot supply enough water to another cultivated area. You may control so that water can fully be supplied with respect to an area.

また、送水量予測装置1は、流量計4aで計測された用水の流量を、時間積分することにより、耕作地域Aに対して送水した用水の送水量を得る。同様に、耕作地域Bに対して送水した用水の送水量は、流量計4bで計測された用水の流量を時間積分することにより算出でき、耕作地域Cに対して送水した用水の送水量は、流量計4cで計測された用水の流量を時間積分することにより算出できる。送水量予測装置1は、各耕作地域A、B、Cに送水した用水の送水量を送水量履歴DB13に記憶する。   Moreover, the water supply amount prediction apparatus 1 obtains the amount of water supplied to the cultivated area A by integrating the flow rate of the water measured by the flow meter 4a over time. Similarly, the amount of water supplied to the cultivation area B can be calculated by time-integrating the flow rate of the water measured by the flow meter 4b, and the amount of water supplied to the cultivation area C is: It can be calculated by time integration of the flow rate of the water measured by the flow meter 4c. The water supply amount prediction device 1 stores the water supply amount of water supplied to each cultivation area A, B, C in the water supply amount history DB 13.

このように、送水量予測装置1が、耕作面積の変化や、対象地域で栽培されている農産物の成育状況に応じて、送水する用水の送水量を予測することができる。すなわち、各耕作地域A、B、Cに送水する用水の送水量を適切に制御することができる。   Thus, the water supply amount prediction apparatus 1 can predict the water supply amount of the water to be supplied according to the change in the cultivation area and the growth situation of the agricultural products cultivated in the target area. That is, it is possible to appropriately control the amount of water supplied to each cultivation area A, B, C.

また、この予測結果に基づいてポンプ3(3a、3b、3c)を制御するので、ポンプ3(3a、3b、3c)を効率的に運転することができる。したがって、ランニングコストの増加を抑え、且つ水源から用水を無駄に汲み上げることにより生じる自然破壊を抑制することができる。   Moreover, since the pump 3 (3a, 3b, 3c) is controlled based on this prediction result, the pump 3 (3a, 3b, 3c) can be operated efficiently. Therefore, it is possible to suppress an increase in running cost and to suppress natural destruction caused by unnecessarily pumping water from a water source.

また、演算処理部11は、上述の例における、補正期間データ読出機能部54、および予測総送水量補正機能部55を備えていない構成としてもよい。この場合、時間帯別送水量算出機能部56は、予測総送水量算出機能部53が算出した予測総送水量を用いて、時間帯別送水量を算出する構成にすればよい。   Further, the arithmetic processing unit 11 may be configured not to include the correction period data reading function unit 54 and the predicted total water supply amount correction function unit 55 in the above example. In this case, the hourly water supply amount calculation function unit 56 may be configured to calculate the hourly water supply amount using the predicted total water supply amount calculated by the predicted total water supply amount calculation function unit 53.

また、上述の例における、時間帯別ポンプ操作量算出機能部57、および比較機能部59は、ポンプ制御装置2側に設けてもよい。このようにすれば、上述の監視処理おいて、送水量予測装置1と、ポンプ制御装置2との間で通信されるデータ量(流量計4による用水の流量の計測値にかかるデータ)を抑えることができる。   In addition, the time-dependent pump operation amount calculation function unit 57 and the comparison function unit 59 in the above example may be provided on the pump control device 2 side. If it does in this way, in the above-mentioned monitoring process, the amount of data (data concerning the measured value of the flow rate of the water by flow meter 4) communicated between water supply amount prediction device 1 and pump control device 2 is suppressed. be able to.

ここで、時間帯別送水量パターン学習機能部58が、時間帯別の補正係数を学習する処理について説明する。上述したように、早朝や、夕方における用水の使用量に比べて、日中における用水の使用量が多くなる傾向がある。   Here, a process in which the hourly water supply amount pattern learning function unit 58 learns the correction coefficient for each time zone will be described. As described above, the amount of water used during the day tends to increase compared to the amount of water used in the early morning and evening.

時間帯別送水量パターン学習機能部58は、時間帯毎に、その時間帯の用水の実際の送水量を、その時間帯の割当率で除した値を算出する。ここで算出される値は、単位割当率当たりの実際の送水量である。図13は、時間帯別の単位割当率当たりの実際の送水量の変化を示す図である。時間帯別送水量パターン学習機能部58は、例えば、予測日の直近1週間のデータを用いて、時間帯毎に変動計数を算出する。この変動計数は、時間帯毎に、(その時間帯における単位割当率当たりの実際の送水量)を(単位割当率当たりの実際の送水量の平均)で除することにより算出する。この変動計数が、上述した、時間帯別の補正係数である。これにより、タイムスケジュール記憶部14が記憶する送水量の割当率は、時間帯による用水の使用量の変動の影響が抑えられる。   For each time zone, the hourly water amount pattern learning function unit 58 calculates a value obtained by dividing the actual water supply amount of water for that time zone by the allocation rate for that time zone. The value calculated here is the actual water supply amount per unit allocation rate. FIG. 13 is a diagram showing a change in the actual water supply amount per unit allocation rate for each time zone. For example, the hourly water supply amount pattern learning function unit 58 calculates a variation count for each time zone using data for the most recent one week on the predicted date. This variation count is calculated by dividing (actual water supply amount per unit allocation rate in that time zone) by (average of actual water supply amount per unit allocation rate) for each time zone. This variation count is the correction coefficient for each time zone described above. Thereby, the influence of the fluctuation | variation of the usage-amount of the water supply by a time slot | zone is suppressed for the allocation rate of the water supply amount which the time schedule memory | storage part 14 memorize | stores.

1…送水量予測装置
2…ポンプ制御装置
3(3a〜3c)…ポンプ
4(4a〜4d)…流量計
11…演算処理部
12…耕作面積データベース(耕作面積DB)
13…送水量履歴データベース(送水量履歴DB)
14…タイムスケジュール記憶部
15…時間帯別送水量記憶部
16…通信部
21…制御部
22…ポンプ駆動部
23…流量計測部
24…操作部
25…通信部
51…実績期間決定機能部
52…実績期間データ読出機能部
53…予測総送水量算出機能部
54…補正期間データ読出機能部
55…予測総送水量補正機能部
56…時間帯別送水量算出機能部
57…時間帯別ポンプ操作量算出機能部
58…時間帯別送水量パターン学習機能部
59…比較機能部
DESCRIPTION OF SYMBOLS 1 ... Water supply amount prediction apparatus 2 ... Pump control apparatus 3 (3a-3c) ... Pump 4 (4a-4d) ... Flowmeter 11 ... Arithmetic processing part 12 ... Cultivated area database (cultivated area DB)
13 ... Water supply history database (Water supply history DB)
14 ... Time schedule storage unit 15 ... Time-based water supply storage unit 16 ... Communication unit 21 ... Control unit 22 ... Pump drive unit 23 ... Flow rate measurement unit 24 ... Operation unit 25 ... Communication unit 51 ... Result period determination function unit 52 ... Result Period data reading function unit 53 ... Predicted total water volume calculating function unit 54 ... Correction period data reading function unit 55 ... Predicted total water volume correcting function unit 56 ... Time zone water volume calculating function unit 57 ... Time zone pump operation amount calculating function Unit 58 ... Water volume pattern learning function by time zone 59 ... Comparison function unit

Claims (9)

対象地域における耕作面積の履歴を記憶する耕作面積記憶部と、
前記対象地域に対する用水の送水量の履歴を記憶する送水量履歴記憶部と、
前記対象地域に対して、指定された予測期間に送水する用水の送水量を予測する予測部と、を備え、
前記予測部は、前記予測期間に対応する実績期間を決定し、前記実績期間、および前記予測期間における前記対象地域の耕作面積を前記耕作面積記憶部から読み出すとともに、前記実績期間に前記対象地域に送水した用水の送水量を前記送水量履歴記憶部から読み出し、さらに、前記耕作面積記憶部から読み出した前記実績期間、および前記予測期間における前記対象地域の耕作面積と、前記送水量履歴記憶部から読み出した前記実績期間に前記対象地域に送水した用水の送水量とを用いて、前記対象地域に対して前記予測期間に送水する用水の送水量を予測し、
さらに、前記対象地域に対する用水の送水量と、前記予測部が予測した前記対象地域に対する用水の予測送水量と、を比較する比較部と、
前記比較部における比較結果を、対象地域に対して用水を送水するポンプの駆動を制御するポンプ駆動制御装置に出力する出力部と、を備えた送水量予測装置。
A cultivated area storage unit for storing a history of cultivated area in the target area;
A water supply amount history storage unit for storing a history of the amount of water supply for the target area;
A prediction unit that predicts the amount of water to be supplied to the target area during a designated prediction period, and
The prediction unit determines an actual period corresponding to the prediction period, reads the actual period and the cultivation area of the target area in the prediction period from the cultivation area storage unit, and sets the target area in the actual period. From the water supply history storage unit, the amount of water supplied is read from the water supply history storage unit, and further from the farming area of the target area in the actual period and the prediction period read from the cultivation area storage unit, from the water supply history storage unit Using the amount of water supplied to the target area during the read performance period, predicting the amount of water to be supplied to the target area during the prediction period ,
Furthermore, a comparison unit that compares the amount of water supplied to the target area with the predicted amount of water supplied to the target area predicted by the prediction unit;
An output unit that outputs a comparison result in the comparison unit to a pump drive control device that controls driving of a pump that supplies water to a target area .
前記予測期間を複数に分割した区分期間毎に、前記対象地域に送水する用水の割当率を記憶する区分期間別送水量記憶部を備え、
前記予測部は、前記区分期間別送水量記憶部が前記区分期間毎に記憶している割当率を用いて、前記対象地域に対して送水する用水の送水量を前記区分期間毎に予測する、請求項1に記載の送水量予測装置。
For each of the division periods divided into a plurality of the prediction periods, a water storage amount storage unit for each division period that stores an allocation rate of water to be supplied to the target area,
The prediction unit predicts the amount of water to be supplied to the target area for each segment period using the allocation rate stored for each segment period by the segment-specific water amount storage unit. Item 2. A water supply amount prediction apparatus according to item 1.
前記区分期間別送水量記憶部は、前記区分期間毎に、その区分期間に前記対象地域内で用水を使用する地域の面積を用いて定めた割当率を記憶する、請求項2に記載の送水量予測装置。   The amount of water supply according to claim 2, wherein the amount-of-water-transfer storage unit according to the division period stores, for each of the division periods, an allocation rate determined using an area of the area where water is used in the target area during the division period. Prediction device. 前記予測部は、過去年における、前記予測期間に対応する週で且つ同じ曜日を前記実績期間に決定する、請求項1〜3のいずれかに記載の送水量予測装置。   The said prediction part is the week corresponding to the said prediction period and the same day of the week in the past year, The water supply amount prediction apparatus in any one of Claims 1-3 which determines the said performance period. 前記予測部は、前記実績期間における、前記対象地域の単位耕作面積当たりの用水の送水量と、前記予測期間における前記対象地域の耕作面積と、に基づいて、前記対象地域に対して前記予測期間に送水する用水の送水量を予測する、請求項1〜4のいずれかに記載の送水量予測装置。   The prediction unit is configured to calculate the prediction period for the target area based on a water supply amount per unit cultivation area of the target area in the actual period and a cultivation area of the target area in the prediction period. The water supply amount prediction apparatus according to any one of claims 1 to 4, wherein the water supply amount is predicted to be supplied to the water. 前記予測部は、前記対象地域に対して前記予測期間に送水する用水の送水量を予測する際に、現在の時点を基準にして補正期間を決定し、前記補正期間に対する用水の予測送水量と、前記補正期間における実際の用水の送水量と、を用いる、請求項1〜4のいずれかに記載の送水量予測装置。   The prediction unit determines a correction period based on a current time point when predicting a water supply amount of water to be supplied to the target area in the prediction period, and an estimated water supply amount for the correction period The water supply amount prediction apparatus according to any one of claims 1 to 4, wherein an actual water supply amount of water during the correction period is used. 対象地域における耕作面積の履歴を記憶する耕作面積記憶部と、
前記対象地域に対する用水の送水量の履歴を記憶する送水量履歴記憶部と、
前記対象地域に対して、指定された予測期間に送水する用水の送水量を予測する予測部と、
前記予測部の予測結果に基づき、対象地域に対して用水を送水するポンプの駆動を制御するポンプ駆動制御部と、を備え、
前記予測部は、前記予測期間に対応する実績期間を決定し、前記実績期間、および前記予測期間における前記対象地域の耕作面積を前記耕作面積記憶部から読み出すとともに、前記実績期間に前記対象地域に送水した用水の送水量を前記送水量履歴記憶部から読み出し、さらに、前記耕作面積記憶部から読み出した前記実績期間、および前記予測期間における前記対象地域の耕作面積と、前記送水量履歴記憶部から読み出した前記実績期間に前記対象地域に送水した用水の送水量とを用いて、前記対象地域に対して前記予測期間に送水する用水の送水量を予測し、
さらに、前記対象地域に対する用水の送水量と、前記予測部が予測した前記対象地域に対する用水の予測送水量と、を比較する比較部と、
前記比較部における比較結果を前記ポンプ駆動制御部に出力する出力部と、を備えた送水量予測システム。
A cultivated area storage unit for storing a history of cultivated area in the target area;
A water supply amount history storage unit for storing a history of the amount of water supply for the target area;
For the target area, a prediction unit that predicts the amount of water to be supplied during a designated prediction period;
A pump drive control unit that controls driving of a pump that supplies water to the target area based on a prediction result of the prediction unit;
The prediction unit determines an actual period corresponding to the prediction period, reads the actual period and the cultivation area of the target area in the prediction period from the cultivation area storage unit, and sets the target area in the actual period. From the water supply history storage unit, the amount of water supplied is read from the water supply history storage unit, and further from the farming area of the target area in the actual period and the prediction period read from the cultivation area storage unit, from the water supply history storage unit Using the amount of water supplied to the target area during the read performance period, predicting the amount of water to be supplied to the target area during the prediction period ,
Furthermore, a comparison unit that compares the amount of water supplied to the target area with the predicted amount of water supplied to the target area predicted by the prediction unit;
A water supply amount prediction system comprising: an output unit that outputs a comparison result in the comparison unit to the pump drive control unit .
対象地域に対して、指定された予測期間に送水する用水の送水量を予測する送水量予測方法であって、
前記予測期間に対応する実績期間を決定する実績期間決定ステップと、
前記実績期間、および前記予測期間における前記対象地域の耕作面積を、前記対象地域における耕作面積の履歴を記憶する耕作面積記憶部から読み出す耕作面積読出ステップと、
前記実績期間に前記対象地域に送水した用水の送水量を前記対象地域に対する用水の送水量の履歴を記憶する送水量履歴記憶部から読み出す送水量読出ステップと、
前記耕作面積記憶部から読み出した前記実績期間、および前記予測期間における前記対象地域の耕作面積と、前記送水量履歴記憶部から読み出した前記実績期間に前記対象地域に送水した用水の送水量とを用いて、前記対象地域に対して前記予測期間に送水する用水の送水量を予測する予測ステップと、
前記対象地域に対する用水の送水量と、前記予測ステップで予測した前記対象地域に対する用水の予測送水量と、を比較する比較ステップと、
前記比較ステップにおける比較結果を、対象地域に対して用水を送水するポンプの駆動を制御するポンプ駆動制御装置に出力する出力ステップと、を備える送水量予測方法。
A water supply amount prediction method for predicting the amount of water to be supplied to a target area during a designated prediction period,
An actual period determining step for determining an actual period corresponding to the forecast period;
The cultivation area reading step of reading the cultivation area of the target area in the actual period and the prediction period from the cultivation area storage unit that stores the history of the cultivation area in the target area;
A water supply amount reading step for reading out a water supply amount of water supplied to the target area during the performance period from a water supply history storage unit that stores a history of the water supply amount for the target area;
The actual period read from the cultivation area storage unit, the cultivation area of the target area in the prediction period, and the amount of water supplied to the target area during the actual period read from the water supply history storage unit Using the prediction step of predicting the amount of water to be supplied to the target area during the prediction period;
A comparison step of comparing the water supply amount for the target area with the predicted water supply amount for the target area predicted in the prediction step;
An output step of outputting a comparison result in the comparison step to a pump drive control device that controls driving of a pump that supplies water to the target area .
対象地域に対して、指定された予測期間に送水する用水の送水量をコンピュータに予測させる送水量予測プログラムであって、
前記予測期間に対応する実績期間を決定する実績期間決定ステップと、
前記実績期間、および前記予測期間における前記対象地域の耕作面積を、前記対象地域における耕作面積の履歴を記憶する耕作面積記憶部から読み出す耕作面積読出ステップと、
前記実績期間に前記対象地域に送水した用水の送水量を前記対象地域に対する用水の送水量の履歴を記憶する送水量履歴記憶部から読み出す送水量読出ステップと、
前記耕作面積記憶部から読み出した前記実績期間、および前記予測期間における前記対象地域の耕作面積と、前記送水量履歴記憶部から読み出した前記実績期間に前記対象地域に送水した用水の送水量とを用いて、前記対象地域に対して前記予測期間に送水する用水の送水量を予測する予測ステップと、
前記対象地域に対する用水の送水量と、前記予測ステップで予測した前記対象地域に対する用水の予測送水量と、を比較する比較ステップと、
前記比較ステップにおける比較結果を、対象地域に対して用水を送水するポンプの駆動を制御するポンプ駆動制御装置に出力する出力ステップと、をコンピュータに実行させる送水量予測プログラム。
A water supply amount prediction program for causing a computer to predict the amount of water to be supplied to a target area during a specified prediction period,
An actual period determining step for determining an actual period corresponding to the forecast period;
The cultivation area reading step of reading the cultivation area of the target area in the actual period and the prediction period from the cultivation area storage unit that stores the history of the cultivation area in the target area;
A water supply amount reading step for reading out a water supply amount of water supplied to the target area during the performance period from a water supply history storage unit that stores a history of the water supply amount for the target area;
The actual period read from the cultivation area storage unit, the cultivation area of the target area in the prediction period, and the amount of water supplied to the target area during the actual period read from the water supply history storage unit Using the prediction step of predicting the amount of water to be supplied to the target area during the prediction period;
A comparison step of comparing the water supply amount for the target area with the predicted water supply amount for the target area predicted in the prediction step;
A water supply amount prediction program that causes a computer to execute an output step of outputting a comparison result in the comparison step to a pump drive control device that controls driving of a pump that supplies water to a target area .
JP2014100137A 2014-05-14 2014-05-14 Water supply amount prediction device, water supply amount prediction system, water supply amount prediction method, and water supply amount prediction program Expired - Fee Related JP6375689B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014100137A JP6375689B2 (en) 2014-05-14 2014-05-14 Water supply amount prediction device, water supply amount prediction system, water supply amount prediction method, and water supply amount prediction program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014100137A JP6375689B2 (en) 2014-05-14 2014-05-14 Water supply amount prediction device, water supply amount prediction system, water supply amount prediction method, and water supply amount prediction program

Publications (2)

Publication Number Publication Date
JP2015216848A JP2015216848A (en) 2015-12-07
JP6375689B2 true JP6375689B2 (en) 2018-08-22

Family

ID=54776854

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014100137A Expired - Fee Related JP6375689B2 (en) 2014-05-14 2014-05-14 Water supply amount prediction device, water supply amount prediction system, water supply amount prediction method, and water supply amount prediction program

Country Status (1)

Country Link
JP (1) JP6375689B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7102152B2 (en) * 2018-01-15 2022-07-19 株式会社東芝 Water management system, water management device and water management method
JP7418288B2 (en) * 2020-06-05 2024-01-19 株式会社クボタ Water supply and distribution management systems, field water management equipment, and irrigation water management equipment
JP6854957B2 (en) * 2020-08-12 2021-04-07 積水化学工業株式会社 Water management device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4301691B2 (en) * 2000-03-31 2009-07-22 株式会社日立製作所 Rice field irrigation system

Also Published As

Publication number Publication date
JP2015216848A (en) 2015-12-07

Similar Documents

Publication Publication Date Title
US10206341B2 (en) Rainfall prediction and compensation in irrigation control
US8024075B2 (en) System and method for wireless irrigation utilizing a centralized control server and field module matrix
US20220075739A1 (en) Minimizing energy consumption by peripheral machines
CN106713029B (en) A method and device for determining resource monitoring threshold
US7711454B2 (en) Water savings system
KR101484265B1 (en) Optimization of Pumping Schedule Based on Water Demand Forecasting Using Combinated Model of ARIMA and Exponential Smoothing
US9756797B2 (en) System and method for optimizing evapotranspiration based irrigation control using a moisture sensor
Pardo et al. Energy audit of irrigation networks
JP6375689B2 (en) Water supply amount prediction device, water supply amount prediction system, water supply amount prediction method, and water supply amount prediction program
WO2019181808A1 (en) Irrigation water amount measurement device, irrigation water amount measurement method, and computer-readable recording medium
JP5703965B2 (en) Water operation system and water operation method
JP5851259B2 (en) Water distribution operation control device
KR20130049666A (en) Chemical injection automatic control apparatus and method for managing water quality
JP5476275B2 (en) Water distribution plan prediction system, prediction method thereof, and program thereof
US20140261196A1 (en) System for Managing Livestock Flow
JP5701919B2 (en) Reservoir water level setting device, distribution reservoir water level setting method and distribution reservoir water level setting system
JP7705644B1 (en) Control table creation method, control table creation program, and water quality control method
JP4511435B2 (en) Water supply operation planning device
JP6576215B2 (en) Monitoring control device for water transmission facility plant and water level management method for distribution reservoir using monitoring control device
JP5242084B2 (en) Received flow rate calculation method and apparatus
JP7013325B2 (en) Operation plan planning equipment and operation plan planning method
JPWO2017073012A1 (en) Water distribution planning system, water distribution planning method, and program recording medium
US20250255233A1 (en) Methods and systems for controlled soil-less plant growing
US20260078033A1 (en) Method of operation for in-field antimicrobial regulation and validation system for irrigation system
PH12015000070A1 (en) System, controller and method for controlling supply of fluid in a fluid distribution network

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20170209

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20171013

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20171205

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20180129

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20180626

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20180709

R150 Certificate of patent or registration of utility model

Ref document number: 6375689

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees