Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP6376720B2 - Tower crane damping device and tower crane damping method - Google Patents
[go: Go Back, main page]

JP6376720B2 - Tower crane damping device and tower crane damping method - Google Patents

Tower crane damping device and tower crane damping method Download PDF

Info

Publication number
JP6376720B2
JP6376720B2 JP2012204529A JP2012204529A JP6376720B2 JP 6376720 B2 JP6376720 B2 JP 6376720B2 JP 2012204529 A JP2012204529 A JP 2012204529A JP 2012204529 A JP2012204529 A JP 2012204529A JP 6376720 B2 JP6376720 B2 JP 6376720B2
Authority
JP
Japan
Prior art keywords
stay
column
tower crane
damper
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2012204529A
Other languages
Japanese (ja)
Other versions
JP2014058378A (en
Inventor
昌宏 菅田
昌宏 菅田
光範 洗
光範 洗
誠一 竹内
誠一 竹内
和生 穐山
和生 穐山
正人 西口
正人 西口
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Corp
Original Assignee
Takenaka Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Corp filed Critical Takenaka Corp
Priority to JP2012204529A priority Critical patent/JP6376720B2/en
Publication of JP2014058378A publication Critical patent/JP2014058378A/en
Application granted granted Critical
Publication of JP6376720B2 publication Critical patent/JP6376720B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Control And Safety Of Cranes (AREA)
  • Jib Cranes (AREA)

Description

本発明は、タワークレーン制振装置及びタワークレーン制振方法に関する。   The present invention relates to a tower crane vibration damping device and a tower crane vibration damping method.

高層の建物を建設する場合には、タワークレーンが広く使用されている。タワークレーンは、細長く柔らかい構造であるために、比較的長周期で揺れやすい。このため、地震や強風等の外力、更には稼働時の重心位置の変化等によってタワークレーンの揺れが大きくならないように、タワークレーンの支柱を建物の躯体につなぎ梁(ステー)で連結し、タワークレーンの支柱と建物の躯体を固定している。
ここに、地震時に大きい変形量が予測される免震建物においては、タワークレーンの支柱の弾性変形のみでは建物の変形量を吸収しきれない場合が想定されるため、ダンパーを備えた水平控え装置で支柱を支持する構成が提案されている(特許文献1参照)。
Tower cranes are widely used when building high-rise buildings. Since the tower crane has a long and thin structure, it is likely to swing with a relatively long period. For this reason, the tower crane struts are connected to the building's frame with a stay (stay) so that the tower crane's shaking does not increase due to external forces such as earthquakes and strong winds, and changes in the center of gravity during operation. The crane column and the building frame are fixed.
Here, in a base-isolated building where a large amount of deformation is predicted during an earthquake, it is assumed that the amount of deformation of the building cannot be absorbed by only the elastic deformation of the tower crane's column. The structure which supports a support | pillar is proposed (refer patent document 1).

即ち、特許文献1のダンパーを備えた水平控え装置は、建物の躯体とタワークレーンの支柱を固定する従来のステーに代えて、建物の躯体とタワークレーンの支柱を、ダンパーを介して柔らかく連結している。これにより、建物の変形量が大きくても、ダンパーにより変形量が吸収される。   That is, the horizontal holding device provided with the damper of Patent Document 1 softly connects the building frame and the tower crane column via the damper instead of the conventional stay that fixes the building frame and the column column of the tower crane. ing. Thereby, even if the deformation amount of the building is large, the deformation amount is absorbed by the damper.

特開2006−16101号公報JP 2006-16101 A

しかし、建物の躯体とタワークレーンの支柱を固定するステーのすべてを、ダンパーを備えた水平控え装置で置き代えた場合、ダンパー部分が容易に変形する結果、連結部における変形量が大きくなり、十分な制振効果が得られなくなる可能性がある。また、大きな変形や荷重を許容し処理するには、大がかりなダンパーが必要となる。   However, if all the stays that fix the building frame and tower crane support are replaced with a horizontal support device equipped with a damper, the damper part easily deforms, resulting in a large amount of deformation at the connecting part, which is sufficient. May not be able to obtain a proper vibration control effect. Also, a large damper is required to allow and process large deformations and loads.

また、ダンパーを備えた水平控え装置に生じる変形量は、タワークレーンの状態(支柱の高さ)、入力地震波、及びダンパー特性によって定まる。即ち、これらの組合せ状況によって、変形量が大きく異なる。ここに、タワークレーンの支柱の高さは施工段階に応じて変化するため、支柱の変形量を算出するには、膨大な数の設計条件を満足させる必要があり、ダンパーの設計が非常に困難となる。   Further, the amount of deformation that occurs in the horizontal holding device provided with the damper is determined by the state of the tower crane (the height of the column), the input seismic wave, and the damper characteristics. That is, the amount of deformation varies greatly depending on the combination situation. Here, since the height of the column of the tower crane changes according to the construction stage, it is necessary to satisfy a huge number of design conditions in order to calculate the deformation amount of the column, and the design of the damper is very difficult It becomes.

また、上記の条件を網羅して設計したとしても、その結果は、当該施工条件に限定されたものであって、別の工事現場で利用できる可能性は低く、汎用性を持たせることは困難である。更に、ダンパー部分で大きな変形を許容させた場合、タワークレーンの耐荷重が低下するといった悪循環が生じ、実用的な設計に支障をきたしてしまう。   In addition, even if the design is designed to cover the above conditions, the results are limited to the construction conditions, and it is unlikely to be usable at another construction site, making it difficult to have versatility. It is. Furthermore, when a large deformation is allowed in the damper portion, a vicious cycle occurs in which the load resistance of the tower crane is reduced, which impedes practical design.

本発明は、上記事実に鑑み、汎用性を有してタワークレーンの振動を抑制するタワークレーンの制振装置、及びタワークレーンの制振方法を提供することを目的とする。   In view of the above-described facts, an object of the present invention is to provide a tower crane vibration damping device and a tower crane vibration damping method that have versatility and suppress vibrations of the tower crane.

請求項1に記載の発明に係るタワークレーン制振装置は、タワークレーンと、前記タワークレーンの支柱と建物を連結し、前記支柱の変位を拘束するステーと、前記支柱の下部を支柱固定用の支持部に固定する基礎部と、前記ステーと前記基礎部との間に設けられ、前記ステーで拘束された前記支柱の外乱が生じた際の変形が最も大きくなる位置で、前記支柱と前記建物を連結し、前記支柱の振動エネルギーを吸収するエネルギー吸収装置と、を有することを特徴としている。 The tower crane vibration control device according to the first aspect of the present invention is a tower crane, a stay for connecting a column of the tower crane and a building, restraining the displacement of the column, and a lower part of the column for fixing the column. A base portion fixed to a support portion; and provided between the stay and the base portion, at a position where deformation is greatest when a disturbance of the support column restrained by the stay occurs, the support column and the building And an energy absorbing device that absorbs vibration energy of the column.

請求項1に記載の発明によれば、タワークレーンの支柱と建物を連結するステーにより、タワークレーンの支柱の変位が拘束される。また、ステーで拘束された支柱の外乱が生じた際の変形が最も大きくなる位置で、タワークレーンの支柱と建物を連結するエネルギー吸収装置により、タワークレーンの支柱の振動エネルギーが吸収される。
即ち、ステーで建物に連結された支柱を、支柱の下部を支柱固定用の支持部に固定する基礎部とステーとの間に設けられたエネルギー吸収装置で連結することにより、タワークレーンの支柱の基礎部とステーとの間に生じる支柱の変形を、エネルギー吸収装置で抑制することができる。
According to the first aspect of the present invention, the displacement of the column of the tower crane is restrained by the stay that connects the column of the tower crane and the building. Further, the vibration energy of the tower crane column is absorbed by the energy absorbing device that connects the tower crane column and the building at the position where the deformation of the column restrained by the stay is greatest.
In other words, by connecting the column connected to the building with the stay with the energy absorbing device provided between the base and the stay that fixes the lower part of the column to the support for fixing the column, the column of the tower crane The deformation of the support column that occurs between the base portion and the stay can be suppressed by the energy absorbing device.

このとき、ステーにより支柱が建物に固定されるため、設計用入力地震波、ダンパー特性等の計算条件から、タワークレーンの支柱の変形量を求め、大きな変形が予測される位置にエネルギー吸収装置を取り付けることができる。
即ち、効果的にエネルギーを吸収することのできる取付け位置を容易に決定することができる。この結果、地震や強風等の外力、更には稼働時の重心位置の変化によって生じるタワークレーンの揺れを抑制することができる。
At this time, since the support is fixed to the building by the stay, the amount of deformation of the tower crane support is calculated from the calculation conditions such as the design input seismic wave and damper characteristics, and the energy absorber is installed at the position where large deformation is expected. be able to.
That is, it is possible to easily determine a mounting position that can effectively absorb energy. As a result, the tower crane can be prevented from shaking due to an external force such as an earthquake or a strong wind, and a change in the center of gravity during operation.

請求項2に記載の発明は、請求項1に記載のタワークレーン制振装置において、前記エネルギー吸収装置は、最上部の前記ステーより低い位置に設けられ、前記エネルギー吸収装置とは別のエネルギー吸収装置が、最上部の前記ステーより高い位置で、前記支柱に対し傾斜して取り付けられている。 According to a second aspect of the present invention, in the tower crane vibration damping device according to the first aspect, the energy absorbing device is provided at a position lower than the uppermost stay, and the energy absorbing device is different from the energy absorbing device. device, higher than the stay at the top position, that is attached inclined with respect to the previous SL strut.

請求項2に記載の発明によれば、最上部のステーより低い位置に設けられたエネルギー吸収装置により、最上部のステーの下においてタワークレーンの支柱の振動エネルギーが吸収され、支柱の変位(変形)が抑制される。
また、最上部のステーより高い位置に設けられた別のエネルギー吸収装置は、支柱側を高くして、支柱に対し傾斜して取り付けることで、エネルギー吸収装置の取り付け位置を確保することができる。
According to the invention described in claim 2, the energy absorbing device eclipsed set lower position than the uppermost portion of the stay, the vibration energy of the strut Oite tower crane under the top of the stay is absorbed, strut displacement (deformation) Ru is suppressed.
In addition, another energy absorbing device provided at a position higher than the uppermost stay can be attached to the column with the column side raised and inclined with respect to the column, thereby securing the mounting position of the energy absorbing device.

請求項3に記載の発明は、タワークレーンと、前記タワークレーンの支柱と建物を連結し、前記支柱の変位を拘束するステーと、前記ステーで拘束された前記支柱の外乱が生じた際の変形が最も大きくなる位置で、前記支柱と前記建物を連結し、前記支柱の振動エネルギーを吸収するエネルギー吸収装置と、を有し、前記エネルギー吸収装置は、最上部の前記ステーより低い位置に設けられていることを特徴としている。 Invention of Claim 3 connects a tower crane, the support | pillar of the said tower crane, and a building, restrains the displacement of the said support | pillar, and the deformation | transformation when the disturbance of the said support | pillar restrained by the stay arises There most larger position, to connect the building as said post has an energy absorbing device for absorbing vibration energy of the strut, before Symbol energy absorbing device, provided lower than the stay at the top position It is characterized by being.

請求項3に記載の発明によれば、タワークレーンの支柱と建物を連結するステーによりタワークレーンの支柱の変位が拘束される。また、最上部のステーより低い位置に設けられたエネルギー吸収装置により、タワークレーンの支柱の振動エネルギーが吸収される。
即ち、ステーにより支柱が建物に固定され、エネルギー吸収装置は、最上部のステーの下部であり、例えば支柱の基礎部とステーとの間、若しくは、ステーとステーとの間に設けられている。このため、設計用入力地震波、及びダンパー特性から、容易に支柱の変形量を算出し、最適なエネルギー吸収装置の取り付け位置を決定することができる。
According to the invention described in claim 3, the displacement of the tower crane column is restrained by the stay connecting the tower crane column and the building. Moreover, the vibration energy of the tower crane column is absorbed by the energy absorbing device provided at a position lower than the uppermost stay.
That is, the support post is fixed to the building by the stay, and the energy absorbing device is a lower part of the uppermost stay, for example, provided between the base of the support post and the stay or between the stay and the stay. For this reason, it is possible to easily calculate the amount of deformation of the support column from the design input seismic wave and the damper characteristic, and to determine the optimum mounting position of the energy absorbing device.

請求項4に記載の発明は、請求項2又は3に記載のタワークレーン制振装置において、最上部の前記ステーより低い位置に設けられた前記エネルギー吸収装置は、前記支柱の高さに対応して、前記支柱、及び前記建物との連結位置を変更することを特徴としている。   According to a fourth aspect of the present invention, in the tower crane vibration control device according to the second or third aspect, the energy absorbing device provided at a position lower than the uppermost stay corresponds to the height of the support column. And the connection position with the said support | pillar and the said building is changed, It is characterized by the above-mentioned.

請求項4に記載の発明によれば、エネルギー吸収装置の取付け位置はタワークレーンの支柱の高さに対応して決定される。即ち、タワークレーンの支柱の高さとステーによる支柱の連結位置が決定されれば、設計用入力地震波、及びダンパー特性から、容易にエネルギー吸収装置の取付け位置を決定することができる。
具体的には、工事の進行に伴い作業階が高くなったとき、タワークレーンの支柱高さも高くなる。このとき、ステーによる連結位置及びエネルギー吸収装置の取付け位置を、タワークレーンの支柱高さに対応して高くすることで、支柱の変形を効果的に抑制することができる。
この結果、地震や強風等の外力、更には稼働時の重心位置の変化によって生じるタワークレーンの揺れを、効果的に抑制することができる。
According to the fourth aspect of the present invention, the mounting position of the energy absorbing device is determined corresponding to the height of the tower crane column. That is, if the height of the column of the tower crane and the connecting position of the column by the stay are determined, the mounting position of the energy absorbing device can be easily determined from the design input seismic wave and the damper characteristics.
Specifically, when the work floor becomes higher as the construction progresses, the column height of the tower crane also becomes higher. At this time, deformation of the column can be effectively suppressed by increasing the connecting position by the stay and the mounting position of the energy absorbing device corresponding to the column height of the tower crane.
As a result, it is possible to effectively suppress the swing of the tower crane caused by an external force such as an earthquake or a strong wind, or a change in the center of gravity during operation.

請求項5に記載の発明は、請求項1〜4のいずれか1項に記載のタワークレーン制振装置において、前記エネルギー吸収装置は、外力を受けて変形し前記支柱の振動エネルギーを吸収するダンパーであり、前記ダンパーの一方の端部は前記支柱に固定されたステー枠にピン接合され、他方の端部は前記建物の躯体に固定されたブラケットにピン接合されていることを特徴としている。   According to a fifth aspect of the present invention, in the tower crane vibration damping device according to any one of the first to fourth aspects, the energy absorbing device is deformed by receiving an external force and absorbs vibration energy of the column. And one end of the damper is pin-joined to a stay frame fixed to the support column, and the other end is pin-joined to a bracket fixed to the housing of the building.

請求項5に記載の発明によれば、両端がピン接合されたダンパーによりタワークレーンの支柱の振動エネルギーが吸収される。
即ち、タワークレーンの支柱に固定されたステー枠にダンパーの一方の端部が接合され、ダンパーの他方の端部が建物の躯体に固定されたブラケットに接合される。これにより、タワークレーンの支柱の振動エネルギーが、ダンパーの変形により吸収され、タワークレーンの揺れが抑制される。また、ピンの着脱により、容易にダンパーの取付け、取外しができる。
According to invention of Claim 5, the vibration energy of the pillar of a tower crane is absorbed with the damper by which both ends were pin-joined.
That is, one end of the damper is joined to the stay frame fixed to the column of the tower crane, and the other end of the damper is joined to the bracket fixed to the building frame. Thereby, the vibration energy of the column of the tower crane is absorbed by the deformation of the damper, and the swing of the tower crane is suppressed. Also, the damper can be easily attached and removed by attaching and detaching the pin.

請求項6に記載の発明に係るタワークレーン制振方法は、タワークレーンの支柱を自立させ、前記支柱をクライミングする前記タワークレーンを稼働状態とする工程と、建物の躯体と前記支柱を、前記支柱の変位を拘束するステーで連結する工程と、前記建物の躯体と前記支柱を、前記支柱の下部を支柱固定用の支持部に固定する基礎部と前記ステーとの間において、前記ステーで拘束された前記支柱の外乱が生じた際の変形が最も大きくなる位置で、前記支柱の振動エネルギーを吸収するエネルギー吸収装置で連結する工程と、を有することを特徴としている。 The tower crane damping method according to the invention described in claim 6 is a step of causing the tower crane column to stand up and to make the tower crane climbing the column a working state, a building frame and the column, A stay that restrains the displacement of the building, and the stay of the building and the support are constrained by the stay between the base and the stay that fixes the lower part of the support to the support for fixing the support. And a step of connecting with an energy absorbing device that absorbs vibration energy of the support column at a position where the deformation at the time of disturbance of the support column is greatest.

請求項6に記載の発明のタワークレーン制振方法によれば、タワークレーンの支柱を自立可能な高さ以上に高くする場合には、先ず、自立して稼働状態とされたタワークレーンの支柱と建物がステーで連結される。更に、建物の躯体とタワークレーンの支柱が、ステーで拘束された支柱の外乱が生じた際の変形が最も大きくなる位置で、振動エネルギーを吸収するエネルギー吸収装置で連結される。続いて、ステーとエネルギー吸収装置で連結された支柱の上部に、タワークレーンが自ら継足し用支柱を継足して、継足した支柱をクライミングする。 According to the tower crane vibration damping method of the invention described in claim 6, when the tower crane column is made higher than the height at which it can stand on its own, first, Buildings are connected by stays. Further, the building frame and the tower crane column are connected by an energy absorbing device that absorbs vibration energy at a position where deformation is greatest when a disturbance of the column restrained by the stay occurs. Subsequently, the tower crane adds the supporting column by itself to the upper part of the column connected by the stay and the energy absorbing device, and climbs the extended column.

ここに、タワークレーンの支柱は建物の躯体にステーで固定されているため、設計用入力地震波、及びダンパー特性から、容易に、タワークレーンの支柱の基礎部とステーとの間、若しくはステーとステーとの間の変形量を求めることができ、最適なエネルギー吸収装置の取り付け位置を決定することができる。
この結果、地震や強風等の外力、更には稼働時の重心位置の変化によって生じるタワークレーンの揺れを抑制することができる。
Here, since the tower crane column is fixed to the building frame with a stay, it can be easily changed between the base of the tower crane column and the stay, or the stay and stay from the design input seismic wave and the damper characteristics. The amount of deformation between the two can be determined, and the optimum mounting position of the energy absorbing device can be determined.
As a result, the tower crane can be prevented from shaking due to an external force such as an earthquake or a strong wind, and a change in the center of gravity during operation.

本発明は、上記構成としてあるので、汎用性を有してタワークレーンの振動を抑制するタワークレーン制振装置、及びタワークレーン制振方法を提供することができる。   Since the present invention is configured as described above, it is possible to provide a tower crane vibration damping device and a tower crane vibration damping method that have versatility and suppress vibrations of the tower crane.

本発明の第1実施形態に係るタワークレーン制振装置の基本構成を示す側面図である。It is a side view showing the basic composition of the tower crane vibration damping device concerning a 1st embodiment of the present invention. (A)は、本発明の第1実施形態に係るタワークレーン制振装置のステーの接合部を示す図1のA−A線断面図であり、(B)は、柱とステーを接合するブラケットの部分拡大図である。(A) is the sectional view on the AA line of FIG. 1 which shows the junction part of the stay of the tower crane damping device which concerns on 1st Embodiment of this invention, (B) is the bracket which joins a pillar and a stay. FIG. (A)は、本発明の第1実施形態に係るタワークレーン制振装置のダンパーステーの接合部を示す図1のB−B線断面図であり、(B)は、柱とステーを接合するブラケットの部分拡大図である。(A) is a BB line sectional view of Drawing 1 showing a junction part of a damper stay of a tower crane damping device concerning a 1st embodiment of the present invention, and (B) joins a pillar and a stay. It is the elements on larger scale of a bracket. (A)〜(F)は、本発明のタワークレーン制振装置における支柱高さとステーの取付け位置とを模式的に示す側面図である。(A)-(F) are the side views which show typically the support | pillar height and the attachment position of a stay in the tower crane damping device of this invention. (A)〜(F)は、本発明のタワークレーン制振装置における支柱高さとダンパーステーの取付け位置とを模式的に示す側面図である。(A)-(F) are the side views which show typically the support | pillar height and the attachment position of a damper stay in the tower crane vibration damping device of this invention. 本発明の第1実施形態に係るタワークレーン制振装置における、ステーの取付け高さとダンパーステーの取付け高さにより決定される支柱の変形を模式的に示す側面図である。It is a side view which shows typically the deformation | transformation of the support | pillar determined by the attachment height of a stay and the attachment height of a damper stay in the tower crane damping device which concerns on 1st Embodiment of this invention. 本発明の第1実施形態に係るタワークレーン制振装置のステーの他の接合部を示す図1のA−A線断面図である。It is the sectional view on the AA line of FIG. 1 which shows the other junction part of the stay of the tower crane damping device which concerns on 1st Embodiment of this invention. 本発明の第1実施の形態に係るタワークレーン制振部のダンパーステーの他の接合構造を示す図1のB−B線断面図である。It is the BB sectional drawing of FIG. 1 which shows the other joining structure of the damper stay of the tower crane damping part which concerns on 1st Embodiment of this invention. 本発明の第2実施形態に係るタワークレーン制振装置の基本構成を示す側面図である。It is a side view which shows the basic composition of the tower crane vibration damping device which concerns on 2nd Embodiment of this invention. 本発明の第2実施の形態に係るタワークレーン制振装置における、2個のステーの取付け高さと2個のダンパーステーの取付け高さにより決定される、支柱の変形を模式的に示す側面図である。In the tower crane damping device concerning a 2nd embodiment of the present invention, it is a side view showing typically the modification of a support pillar decided by the attachment height of two stays, and the attachment height of two damper stays. is there. 本発明の第3実施の形態に係るタワークレーン制振装置の基本構成を示す側面図である。It is a side view which shows the basic composition of the tower crane vibration damping device which concerns on 3rd Embodiment of this invention.

(第1実施形態)
図1〜図7を用いて、第1実施形態に係るタワークレーン制振装置10について説明する。図1の側面図、図2、図3の断面図に示すように、第1実施形態に係るタワークレーン制振装置10は、タワークレーン12のマスト(支柱)14を建物16の躯体に接合するつなぎ梁(ステー)18、及びダンパーステー20を有している。また、図2、図3の断面図に示すように、ステー18及びダンパーステー20の位置は、支柱14の高さに対応して変更される。
(First embodiment)
The tower crane vibration damping device 10 according to the first embodiment will be described with reference to FIGS. As shown in the side view of FIG. 1 and the cross-sectional views of FIGS. 2 and 3, the tower crane vibration damping device 10 according to the first embodiment joins the mast (post) 14 of the tower crane 12 to the housing of the building 16. A connecting beam (stay) 18 and a damper stay 20 are provided. Further, as shown in the cross-sectional views of FIGS. 2 and 3, the positions of the stay 18 and the damper stay 20 are changed in accordance with the height of the column 14.

タワークレーン12は、建設中の建物16の躯体に沿って鉛直方向へ設けられ平面視が四角形の支柱14と、支柱14に昇降可能に取り付けられ、建物16へ建設資材類を持ち上げるクレーン部24と、支柱14の下部を支柱固定用の支持部23に固定する基礎部22と、を有している。
ここに、タワークレーン12は、マストクライミング方式のタワークレーンであり、基礎部22は最初に設置した位置のまま動かさず、クレーン部24を支持する支柱14に継足し用の支柱14を自ら上部に継ぎ足して、クレーン部24が、継ぎ足された支柱14をクライミングする構成である。
The tower crane 12 is provided in a vertical direction along the frame of the building 16 under construction, and has a square pillar 14 in plan view. The tower crane 12 is attached to the pillar 14 so as to be movable up and down, and lifts construction materials to the building 16. And a base portion 22 for fixing a lower portion of the support column 14 to a support portion 23 for fixing the support column.
Here, the tower crane 12 is a mast-climbing tower crane, and the base portion 22 does not move in the position where it was initially installed, and the supporting column 14 is added to the supporting column 14 that supports the crane portion 24. In addition, the crane unit 24 is configured to climb the added support column 14.

タワークレーン12の支柱14は、鉛直方向に細長い形状とされ、外力を受けたとき、ある程度柔軟に変形できる構成とされているために、比較的長周期で揺れ易い。
このため、タワークレーン12は、製品毎に予め定められている所定の高さ(自立高さ)の範囲内では、自立した状態で揚重作業が可能である。しかしながら、自立高さを超える範囲では、地震や強風等の外力、更には稼働時の重心位置の変化等によって揺れが大きくなり許容範囲を超えるため、支柱14を、建物の躯体にステー18で連結し、揺れを許容範囲に収めている。
なお、支柱14を固定する支持部23は地上面とは限らず、支柱14の基礎部22が固定可能であれば建物の中間階でもよいし、地中であってもよい。
The column 14 of the tower crane 12 has a shape that is elongated in the vertical direction and can be flexibly deformed to some extent when it receives an external force.
For this reason, the tower crane 12 can perform lifting work in a self-supporting state within a predetermined height (self-supporting height) predetermined for each product. However, in the range exceeding the self-supporting height, the swing will increase due to external forces such as earthquakes and strong winds, as well as changes in the center of gravity during operation, etc., exceeding the allowable range, so the column 14 is connected to the building frame with stays 18. However, the shaking is within an allowable range.
In addition, the support part 23 which fixes the support | pillar 14 is not restricted to a ground surface, The intermediate | middle floor of a building may be sufficient as long as the base part 22 of the support | pillar 14 can be fixed, and it may be underground.

ステー18は、図2(A)に示すように、両端部にピン接合部32が設けられた鋼製棒であり、ピン接合部32には、図示しないピン孔が設けられている。ステー18は、支柱14を囲むステー枠30と建物16の柱26の間に設けられ、それらを連結している。
ステー枠30は、図2(A)に示すように、平面視が四角形の支柱14の周囲を囲む鋼製のフレーム枠であり、四隅にはステー18と接合されるピン接合部33が2箇所ずつ設けられている。ステー枠30のピン接合部33にも、図示しないピン接合用のピン孔が設けられている。これにより、ステー枠30のピン接合部33にステー18のピン接合部32を重ね、ピン孔に図示しないピンを挿入してピン接合することができる。
なお、ステー枠30の構成は一例であり、ステー枠としての機能を果たすことができれば、本構成に限定されない。
As shown in FIG. 2A, the stay 18 is a steel rod having pin joints 32 provided at both ends, and the pin joints 32 are provided with pin holes (not shown). The stay 18 is provided between the stay frame 30 surrounding the support column 14 and the pillar 26 of the building 16, and connects them.
As shown in FIG. 2 (A), the stay frame 30 is a steel frame that surrounds the periphery of the column 14 having a square shape in plan view, and has two pin joint portions 33 that are joined to the stay 18 at the four corners. It is provided one by one. The pin joint portion 33 of the stay frame 30 is also provided with a pin joint pin hole (not shown). As a result, the pin joint portion 32 of the stay 18 can be overlapped with the pin joint portion 33 of the stay frame 30, and a pin (not shown) can be inserted into the pin hole for pin joining.
Note that the configuration of the stay frame 30 is an example, and is not limited to this configuration as long as the function of the stay frame can be achieved.

ブラケット28は、図2(B)の拡大図に示すように鋼製の平板又はフレーム枠で形成され、一方の端部が建物16の柱26に溶接やボルト等で接合され、柱26から突出た他方の端部には、2箇所にピン接合部34が設けられ、ピン接合部34にはそれぞれピン孔35が設けられている。これにより、ブラケット28のピン接合部34にステー18のピン接合部32を重ね、ピン孔35に図示しないピンを挿入してピン接合することができる。
なお、ブラケット28の構成は一例であり、ブラケットとしての機能を果たすことができれば、本構成に限定されない。
As shown in the enlarged view of FIG. 2B, the bracket 28 is formed of a steel flat plate or a frame frame, and one end thereof is joined to the column 26 of the building 16 by welding, bolts, or the like, and protrudes from the column 26. On the other end, pin joints 34 are provided at two locations, and pin joints 34 are provided with pin holes 35, respectively. As a result, the pin joint portion 32 of the stay 18 can be overlapped with the pin joint portion 34 of the bracket 28, and a pin (not shown) can be inserted into the pin hole 35 for pin joining.
Note that the configuration of the bracket 28 is merely an example, and is not limited to this configuration as long as it can function as a bracket.

ステー18は4本が1セットとして使用され、一方の端部のピン接合部32が、支柱14を囲むステー枠30の四隅のピン接合部32とピン接合され、他方の端部のピン接合部32が、建物16の2本の柱26に固定されたブラケット28と2本ずつピン接合されている。これにより、支柱14の水平方向の移動を拘束することができる。
なお、ステー18の接合方法は、両端をピン接合する方法について説明したが、これに限定されることはなく、両端を溶接等による固定接合としてもよいし、一端がピン接合、他端が溶接等による固定接合でもよい。
Four stays 18 are used as one set, and pin joints 32 at one end are pin-joined with pin joints 32 at the four corners of the stay frame 30 surrounding the column 14, and pin joints at the other end. 32 is pin-connected to the bracket 28 fixed to the two pillars 26 of the building 16 two by two. Thereby, the horizontal movement of the support | pillar 14 can be restrained.
In addition, although the joining method of the stay 18 demonstrated the method of pin-joining both ends, it is not limited to this, Both ends may be fixed joining by welding etc., one end is pin-joined, and the other end is welded For example, it may be a fixed joint.

ダンパーステー20は、高さ方向がステー18の下方(ステー18と基礎部22の間)に設けられ、タワークレーン12の支柱14と建物16の躯体を接合している。
図3(A)に示すように、ダンパーステー20は、鋼製棒38の一端に、軸線を一致させてエネルギー吸収装置としてのダンパー(オイルダンパー)36が接続された構成である。オイルダンパー36の一方の端部、及び鋼製棒38の一方の端部には、ステー18と同じ構成のピン接合部32が設けられている。
The damper stay 20 has a height direction below the stay 18 (between the stay 18 and the base portion 22), and joins the column 14 of the tower crane 12 and the frame of the building 16.
As shown in FIG. 3A, the damper stay 20 has a configuration in which a damper (oil damper) 36 serving as an energy absorbing device is connected to one end of a steel rod 38 so that the axes thereof coincide with each other. A pin joint portion 32 having the same configuration as that of the stay 18 is provided at one end portion of the oil damper 36 and one end portion of the steel rod 38.

ダンパーステー20は、ステー18と同じように4本が1セットとして使用され、一端が支柱14を囲むステー枠30の四隅のピン接合部33と、それぞれを重ね合わせてピン接合され、他端が建物16の2本の柱26に固定されたブラケット28のピン接合部33と、それぞれを重ね合わせてピン孔35を利用して2本ずつピン接合されている。
これにより、地震時等の支柱14の振動エネルギーがオイルダンパー36で吸収され、支柱14の振動(変形)が抑制される。
As with the stay 18, four damper stays 20 are used as one set, one end of which is pin-joined with the four corner pin joint portions 33 of the stay frame 30 surrounding the support column 14 and the other end is joined. The pin joint portions 33 of the brackets 28 fixed to the two pillars 26 of the building 16 are overlapped with each other, and two are pin-joined using the pin holes 35.
Thereby, the vibration energy of the column 14 at the time of an earthquake or the like is absorbed by the oil damper 36, and the vibration (deformation) of the column 14 is suppressed.

なお、エネルギー吸収装置として使用可能なダンパーは、オイルダンパー36に限定されることはなく、金属系履歴エネルギー吸収型ダンパー(鋼材系ダンパー)、粘弾性体を用いたダンパー、及び摩擦ダンパー、及び回転摩擦ダンパーなど、タワークレーン12の支柱14と建物16の躯体との変形差を利用してエネルギー吸収を行うことが出来るダンパーであれば、オイルダンパー36以外の方式のダンパーでも使用することが出来る。   The damper that can be used as the energy absorbing device is not limited to the oil damper 36, but a metal-based hysteresis energy absorbing damper (steel damper), a damper using a viscoelastic body, a friction damper, and a rotation. Any type of damper other than the oil damper 36 can be used as long as it is a damper capable of absorbing energy by utilizing the deformation difference between the column 14 of the tower crane 12 and the frame of the building 16 such as a friction damper.

また、建物16の躯体側の接合部は、柱26に固定されたブラケット28を利用する例で説明した。しかし、この例に限定されることはなく、躯体の梁等他の部材を利用してもよい。更に、ステー枠30が囲む支柱14の断面形状は、平面視で四角形でなく丸形等の他の形状であってもよい。   In addition, the joint portion on the frame side of the building 16 has been described as an example using the bracket 28 fixed to the column 26. However, the present invention is not limited to this example, and other members such as a frame beam may be used. Furthermore, the cross-sectional shape of the support column 14 surrounded by the stay frame 30 may be other shapes such as a round shape instead of a quadrangle in a plan view.

次に、ステー18及びダンパーステー20の取付け位置(高さ)について説明する。
図4の側面図の(A)〜(F)は、作業ステップ毎の支柱14の高さを示し、建物16の工事の進行(作業階の上昇)に対応して、支柱14の高さを高くしている。図4(B)〜(F)は、支柱14へのステー18の取付け位置を模式的に示している。ここに、実線の三角形はステー18を取付けている状態を、破線の三角形はステー18を取外している状態を示している。
図5の側面図の(A)〜(F)は、同じく作業ステップ毎の支柱14の高さを示し、図5(B)〜(F)は、支柱14へのダンパーステー20の取付け位置を模式的に示している。ここに、実黒塗りの三角形はダンパーステー20が取付けられている状態を、実線の三角形はステー18を取り付けている状態を、破線の三角形はステー18及びダンパーステー20のいずれも取り外している状態を示している。
Next, the attachment position (height) of the stay 18 and the damper stay 20 will be described.
(A) to (F) in the side view of FIG. 4 indicate the height of the column 14 at each work step, and the height of the column 14 is set corresponding to the progress of the construction of the building 16 (rising of the work floor). It is high. 4B to 4F schematically show the attachment position of the stay 18 to the support column 14. Here, a solid triangle indicates a state where the stay 18 is attached, and a broken triangle indicates a state where the stay 18 is removed.
5A to 5F show the height of the support 14 for each work step, and FIGS. 5B to 5F show the mounting position of the damper stay 20 on the support 14. This is shown schematically. Here, a solid black triangle indicates a state where the damper stay 20 is attached, a solid triangle indicates a state where the stay 18 is attached, and a broken triangle indicates a state where both the stay 18 and the damper stay 20 are removed. Is shown.

先ず、図4(A)及び図5(A)に示すように、タワークレーン12の支柱14の先端位置hA(支持部23からの高さL1)がタワークレーン12の製品として定められた自立可能な高さL1以下の場合においては、本実施形態で説明したステー18やダンパーステー20は使用しない。支柱14の高さがL1と低いため変形量が少なく、基礎部22の支持による自立で作業に支障がないためである。   First, as shown in FIGS. 4 (A) and 5 (A), the tip position hA (height L1 from the support portion 23) of the column 14 of the tower crane 12 is determined as a product of the tower crane 12. When the height is less than L1, the stay 18 and the damper stay 20 described in this embodiment are not used. This is because the height of the support column 14 is as low as L1, so that the amount of deformation is small, and the support by the base portion 22 is self-supporting and does not hinder the work.

次に、図4(B)及び図5(B)に示すように、支柱14の先端位置hBが、自立可能な高さL1を高さL2だけ超えたときには、ステー18、及びダンパーステー20を用いて支柱14を建物16の躯体に固定する。ここに、ステー18は連結位置S1(支持部23からの高さh1)に取付け、ダンパーステー20は、ステー18より下方、即ちステー18と基礎部22の間の連結位置S0(支持部23からの高さh0)に取り付ける。   Next, as shown in FIG. 4B and FIG. 5B, when the tip position hB of the support column 14 exceeds the height L1 at which it can stand independently by the height L2, the stay 18 and the damper stay 20 are moved. Used to fix the column 14 to the building 16 housing. Here, the stay 18 is attached at the connection position S1 (height h1 from the support portion 23), and the damper stay 20 is below the stay 18, that is, the connection position S0 (from the support portion 23 between the stay 18 and the base portion 22). To the height h0).

ここで、図6を用いて、ステー18及びダンパーステー20により支柱14の振動を抑制する仕組みについて説明する。
タワークレーン12に外力等が作用していないときは、支柱14は実線で示すように直線状に直立した状態で、図示しない建物の躯体と連結されている。ステー18の連結位置S1は、想定される地震時等における支柱14の変形時の許容量や、変形時に支柱14に発生する応力、タワークレーン12の設置高さ(基礎部22の地表面からの高さ)等を考慮して決定される。
Here, a mechanism for suppressing the vibration of the column 14 by the stay 18 and the damper stay 20 will be described with reference to FIG.
When an external force or the like is not acting on the tower crane 12, the support column 14 is connected to a building frame (not shown) in a straight upright state as shown by a solid line. The connecting position S1 of the stay 18 depends on the allowable amount at the time of deformation of the support column 14 at the time of an assumed earthquake, the stress generated in the support column 14 at the time of deformation, the installation height of the tower crane 12 (from the ground surface of the foundation 22). (Height) etc.

即ち、連結位置S1において、ステー18で支柱14を図示しない柱や梁等の躯体に連結した場合、地震等の外力や作業時の重心位置の移動などが作用したときには、支柱14の変形量は容易に計算で求めることができ、例えば破線14Aで示す形状に変形する。即ち、基礎部22とステー18の位置を固定することにより、基礎部22とステー18の間、及びステー18の上部の支柱の変形を容易に算出できる。ここに、破線14Aの形状は、説明のため誇張して描いている。   That is, when the support column 14 is connected to a frame (not shown) such as a pillar or beam at the connection position S1, when the external force such as an earthquake or the movement of the center of gravity during the operation is applied, the deformation amount of the support column 14 is It can be easily obtained by calculation, and for example, is deformed into a shape indicated by a broken line 14A. That is, by fixing the positions of the base portion 22 and the stay 18, it is possible to easily calculate the deformation of the support column between the base portion 22 and the stay 18 and the upper portion of the stay 18. Here, the shape of the broken line 14A is exaggerated for the sake of explanation.

次に、ステー18と基礎部22の間であり、破線14Aの撓みが最も大きくなる連結位置S0に、ダンパーステー20を連結させた状態の支柱14の変形量を計算で求める。ここに、ダンパーステー20のエネルギー吸収効果は、その変形が大きい程より大きな効果を発揮するので、基礎部22とステー18の間等の変形が大となる位置に設置するのが好ましい。
ダンパーステー20を連結位置S0に連結させ、支柱14の変形エネルギーをダンパーステー20に吸収させた支柱14の形状を、図6に重ねて一点鎖線14Bで示す。支柱14の撓み量が小さくなり、変形が抑制されているのが分かる。
Next, the deformation amount of the support column 14 in a state where the damper stay 20 is connected to the connection position S0 between the stay 18 and the base portion 22 where the bending of the broken line 14A is the largest is obtained by calculation. Here, since the energy absorption effect of the damper stay 20 exhibits a greater effect as the deformation thereof becomes larger, it is preferable to install the damper stay 20 at a position where the deformation is large between the base portion 22 and the stay 18.
The shape of the support column 14 in which the damper stay 20 is connected to the connection position S0 and the deformation energy of the support column 14 is absorbed by the damper stay 20 is shown by a one-dot chain line 14B in FIG. It can be seen that the amount of deflection of the column 14 is reduced and deformation is suppressed.

以上説明した位置にステー18及びダンパーステー20を連結した後、タワークレーン12は自分で継足し用の支柱14を上部に継足し、クレーン部24が支柱14を登る(クライミングする)。
ここに、1回当たりのクライミング高さL2の目安は、建物16の高さ方向の作業区切りとなる節(例えば3層分等)、若しくは節の倍数とするのが望ましい。
After connecting the stay 18 and the damper stay 20 to the positions described above, the tower crane 12 adds the supporting column 14 for the upper part by itself, and the crane unit 24 climbs (climbs) the supporting column 14.
Here, it is desirable that the criterion of the climbing height L2 per one time is a node (for example, three layers) serving as a work partition in the height direction of the building 16, or a multiple of the node.

なお、クレーン部24の支柱14のクライミングは、ステー18の取り付け前に一部前倒しで行ってもよい。即ち、支柱14の上部に、継足し用の支柱14を1本又は2本程度継足して、継足した分だけクレーン部24にクライミングさせておいてもよい。これにより、クレーン部24が上方へ移動するため、支柱へのステー18の取り付け作業が容易になる。後述する他の工程においても同様に、一部のクライミングを、ステー18及びダンパーステー20との連結前に行っておいてもよい。   In addition, you may perform the climbing of the support | pillar 14 of the crane part 24 partly forward before the stay 18 attachment. That is, about one or two additional support columns 14 may be added to the upper portion of the support column 14, and the crane portion 24 may be climbed by the added amount. Thereby, since the crane part 24 moves upwards, the attachment operation | work of the stay 18 to a support | pillar becomes easy. Similarly, in other processes described later, a part of climbing may be performed before the stay 18 and the damper stay 20 are connected.

これにより、タワークレーン12の支柱14と建物16を連結するステー18により、タワークレーン12の支柱14の変位が拘束される。また、ステー18より低い位置で、タワークレーン12の支柱14と建物16を連結するダンパーステー20により、タワークレーン12の支柱14の振動エネルギーが吸収される。
これにより、先端位置hBの支柱14の振動を効果的に抑制することができる。
Thereby, the displacement of the column 14 of the tower crane 12 is restrained by the stay 18 that connects the column 14 of the tower crane 12 and the building 16. Further, vibration energy of the column 14 of the tower crane 12 is absorbed by the damper stay 20 that connects the column 14 of the tower crane 12 and the building 16 at a position lower than the stay 18.
Thereby, the vibration of the support | pillar 14 of the front-end | tip position hB can be suppressed effectively.

続いて、タワークレーン12を更に高くする場合について説明する。
図4(C)及び図5(C)に示すように、タワークレーン12を更に高さL3だけ高くする場合には、ステー18の位置及びダンパーステー20の位置も、支柱14の高さに対応させて高くする。
Then, the case where the tower crane 12 is further raised is demonstrated.
As shown in FIGS. 4C and 5C, when the tower crane 12 is further increased by the height L3, the position of the stay 18 and the position of the damper stay 20 also correspond to the height of the column 14. Let it be high.

具体的には、ステー18を、連結位置S2(支持部23からの高さh1+h2)に移動させ、ダンパーステー20を連結位置S1(支持部23からの高さh1)に移動させる。
ステー18の連結位置S2やダンパーステー20の連結位置S1は、上述したように、想定される地震時等における支柱14の変形の許容量や、変形時に支柱14に発生する応力、作業高さ(基礎部22の地表面からの高さ)等を考慮して決定される。
Specifically, the stay 18 is moved to the connection position S2 (height h1 + h2 from the support portion 23), and the damper stay 20 is moved to the connection position S1 (height h1 from the support portion 23).
As described above, the connecting position S2 of the stay 18 and the connecting position S1 of the damper stay 20 are the allowable deformation amount of the column 14 at the time of an assumed earthquake, the stress generated in the column 14 at the time of deformation, the work height ( The height of the foundation portion 22 from the ground surface) is determined.

このとき、ステー18は、連結位置S1に取り付けたステー18を、連結位置S1から取り外し、連結位置S2に取付けてもよいし、別の新たなステー18を用いてもよい。別のステー18を用いる場合には、連結位置S1のステー18は、ピンを抜いてピン接合部を切り離しておく。これは、連結位置S1のステー18をそのまま残せば、建物16と支柱14の接合強度が高くなり過ぎて、支柱14の柔軟性が失われ、地震時に支柱14に発生する応力が大きくなり過ぎるためである。
また、ブラケット28及びステー枠30は、工事の終了までそのまま残しておく。
なお、本実施形態では、ブラケット28及びステー枠30は、工事の終了までそのまま残しておく方式で説明するが、これに限定されるものではなく、工事の状況に応じて随時撤去する方法でもよい。
At this time, the stay 18 may be attached to the connection position S2 by removing the stay 18 attached to the connection position S1 from the connection position S1, or another new stay 18 may be used. When another stay 18 is used, the stay 18 at the connection position S1 pulls out the pin and separates the pin joint portion. This is because if the stay 18 at the connection position S1 is left as it is, the strength of the connection between the building 16 and the support 14 becomes too high, the flexibility of the support 14 is lost, and the stress generated in the support 14 during an earthquake becomes too large. It is.
In addition, the bracket 28 and the stay frame 30 are left as they are until the completion of the construction.
In the present embodiment, the bracket 28 and the stay frame 30 are described as being left as they are until the end of the construction. However, the present invention is not limited to this, and may be removed at any time depending on the construction status. .

ダンパーステー20を連結位置S1に移動させるに際しては、ステー18が使用した連結位置S1のブラケット28及びステー枠30を、そのまま利用することができる。また、ダンパーステー20は、連結位置S0に取り付けたダンパーステー20を、連結位置S0から取り外し、連結位置S1に取付けてもよいし、別の新たなダンパーステー20を用いてもよい。別のダンパーステー20を用いる場合には、連結位置S0のダンパーステー20は、ピンを抜いてピン接合部を切り離しておくのが望ましい。これは、ステー18と同様に、連結位置S0のステー18をそのまま残せば、建物16と支柱14の接合強度が高くなり過ぎて、支柱14の柔軟性が失われ、地震時に支柱14に発生する応力が大きくなり過ぎるためである。なお、設置条件により柔軟性が失われない場合には、そのまま継続して使用してもよい。
これにより、先端位置hCの支柱14の振動を効果的に抑制することができる。
When the damper stay 20 is moved to the connection position S1, the bracket 28 and the stay frame 30 at the connection position S1 used by the stay 18 can be used as they are. Further, the damper stay 20 may be attached to the coupling position S1 by removing the damper stay 20 attached to the coupling position S0 from the coupling position S0, or another new damper stay 20 may be used. When another damper stay 20 is used, it is desirable that the damper stay 20 at the coupling position S0 is pulled out of the pin to separate the pin joint. As with the stay 18, if the stay 18 at the connection position S0 is left as it is, the joint strength between the building 16 and the column 14 becomes too high, and the flexibility of the column 14 is lost. This is because the stress becomes too large. In addition, when flexibility is not lost by installation conditions, you may use it as it is.
Thereby, the vibration of the support | pillar 14 of the front-end | tip position hC can be suppressed effectively.

続いて、タワークレーン12を更に高くする場合について説明する。
図4(D)及び図5(D)に示すように、タワークレーン12を更に高さL4だけ高くする場合には、ステー18の位置及びダンパーステー20の位置も、支柱14の高さに対応させて高くする。
Then, the case where the tower crane 12 is further raised is demonstrated.
As shown in FIGS. 4D and 5D, when the tower crane 12 is further increased by the height L4, the position of the stay 18 and the position of the damper stay 20 also correspond to the height of the column 14. Let it be high.

具体的には、ステー18を連結位置S3(支持部23からの高さh1+h2+h3)に移動させ、ダンパーステー20を連結位置S2(支持部23からの高さh1+h2)に移動させる。
ステー18の連結位置S3やダンパーステー20の連結位置S2は、上述したように、想定される地震時等における支柱14の変形の許容量や、変形時に支柱14に発生する応力、作業高さ(基礎部22の地表面からの高さ)等を考慮して決定される。
Specifically, the stay 18 is moved to the connection position S3 (height h1 + h2 + h3 from the support portion 23), and the damper stay 20 is moved to the connection position S2 (height h1 + h2 from the support portion 23).
As described above, the connecting position S3 of the stay 18 and the connecting position S2 of the damper stay 20 are the allowable deformation amount of the support column 14 at the time of an assumed earthquake, the stress generated in the support column 14 at the time of deformation, the working height ( The height of the foundation portion 22 from the ground surface) is determined.

このとき、ステー18は、連結位置S2に取り付けたステー18を、連結位置S2から取り外し、連結位置S3に取付けてもよいし、別の新たなステー18を用いてもよい。別のステー18を用いる場合には、上述したように、連結位置S2のステー18は、ピンを抜いてピン接合部を切り離しておく。   At this time, the stay 18 attached to the connection position S2 may be detached from the connection position S2 and attached to the connection position S3, or another new stay 18 may be used. When another stay 18 is used, as described above, the stay 18 at the connection position S2 removes the pin and separates the pin joint portion.

ダンパーステー20を連結位置S2に移動させるに際しては、ステー18が使用した連結位置S2のブラケット28及びステー枠30を、そのまま利用することができる。また、ダンパーステー20は、連結位置S1に取り付けたダンパーステー20を、連結位置S1から取り外し、連結位置S2に取付けてもよいし、別の新たなダンパーステー20を用いてもよい。別のダンパーステー20を用いる場合には、上述したように、連結位置S1のダンパーステー20は、ピンを抜いてピン接合部を切り離しておく。
これにより、先端位置hDの支柱14の振動を効果的に抑制することができる。
When the damper stay 20 is moved to the connection position S2, the bracket 28 and the stay frame 30 at the connection position S2 used by the stay 18 can be used as they are. Moreover, the damper stay 20 may remove the damper stay 20 attached to the connection position S1 from the connection position S1 and attach it to the connection position S2, or may use another new damper stay 20. When another damper stay 20 is used, as described above, the damper stay 20 at the connection position S1 removes the pin and separates the pin joint portion.
Thereby, the vibration of the support | pillar 14 of the front-end | tip position hD can be suppressed effectively.

次に、タワークレーン制振方法について説明する。
図1〜図5に示すように、タワークレーン制振方法は、先ず、最初の工程でタワークレーン12の支柱14を、支柱14の基礎部22を用いて支持部23に自立させ、継足し用の支柱14を自ら上部に継足してクライミングする機能を備えたタワークレーン12を稼働状態とする。
Next, a tower crane vibration suppression method will be described.
As shown in FIG. 1 to FIG. 5, in the tower crane vibration damping method, first, in the first step, the column 14 of the tower crane 12 is self-supported on the support portion 23 using the base portion 22 of the column 14, and is added. The tower crane 12 provided with a function of climbing by attaching the column 14 to the upper part is put into operation.

次の工程では、タワークレーン12が支柱14をクライミングする前に、建物16の躯体と支柱14を、支柱14の変位を拘束するステー18で連結する。ステー18の連結方法については既に説明済みであり、詳細な説明は省略する。これにより、自立して稼働状態とされたタワークレーン12の支柱14と建物16がステー18で連結される。   In the next step, before the tower crane 12 climbs the support column 14, the frame of the building 16 and the support column 14 are connected by a stay 18 that restrains the displacement of the support column 14. The connecting method of the stay 18 has already been described, and detailed description thereof will be omitted. As a result, the column 14 of the tower crane 12 and the building 16 that are independently operated are connected by the stay 18.

最後の工程では、ステー18の下方において、建物16の躯体と支柱14を、支柱14の振動エネルギーを吸収するダンパーステー20で連結する。ダンパーステー20の連結方法については既に説明済みであり、詳細な説明は省略する。これにより、支柱14の振動エネルギーがダンパーステー20で吸収され、支柱14の振動が抑制される。
なお、支柱14をステー18及びダンパーステー20で連結する前に、継足し用の支柱14の一部を上部に継足して、予めクレーン部24を所定高さだけクライミングさせておいてもよい。
In the last step, below the stay 18, the housing of the building 16 and the support 14 are connected by a damper stay 20 that absorbs vibration energy of the support 14. The method for connecting the damper stay 20 has already been described, and a detailed description thereof will be omitted. Thereby, the vibration energy of the support | pillar 14 is absorbed by the damper stay 20, and the vibration of the support | pillar 14 is suppressed.
In addition, before connecting the support | pillar 14 with the stay 18 and the damper stay 20, a part of the support | pillar 14 for extension may be added to upper part, and the crane part 24 may be climbed only by predetermined height beforehand.

以上説明したように、タワークレーン12の支柱14を、支柱14の高さに応じた適切な位置でステー18及びステー18の下方のダンパーステー20で連結することにより、地震や強風等の外力、更には稼働時の重心位置の変化によって支柱14に揺れが生じても、ステー18及びオイルダンパー36により、支柱14の揺れを効果的に抑制することができる。   As described above, by connecting the column 14 of the tower crane 12 with the stay 18 and the damper stay 20 below the stay 18 at an appropriate position according to the height of the column 14, external forces such as earthquakes and strong winds, Furthermore, even if the support column 14 is shaken due to a change in the center of gravity during operation, the stay 18 and the oil damper 36 can effectively suppress the shake of the support column 14.

なお、本実施形態では、ステー18及びダンパーステー20を、それぞれ4本を1セットとして使用しる構成について説明した。しかし、これに限定されることはなく、4本を超えて1セットとしても良いし、4本未満で1セットとしても良い。
図7、図8を用いて、ステー18及びダンパーステー20の3本を1セットとして使用した例について説明する。
In the present embodiment, a configuration has been described in which four stays 18 and four damper stays 20 are used as one set. However, the present invention is not limited to this, and it may be one set exceeding four, or one set less than four.
An example in which three of the stay 18 and the damper stay 20 are used as one set will be described with reference to FIGS.

図7のステー取付け図に示すように、ステー46は直状の鋼製棒(例えば中空の鋼管等)とされ、第1実施形態で説明したステー18と同じ構成である。
ステー枠44は、平面視が四角形の支柱14の周囲を囲む鋼製のフレーム枠であり、建物側の2つの角部には、ステー46と接合されるピン接合部33が設けられている。ステー枠44のピン接合部33にも、ピン接合用のピン孔が設けられている。これにより、ステー枠44のピン接合部33にステー46のピン接合部32を重ね、ピン孔に図示しないピンを挿入してピン接合することができる。
なお、ステー46の構成は一例であり、ステーとしての機能を果たすことができれば、本構成に限定されない。
As shown in the stay attachment diagram of FIG. 7, the stay 46 is a straight steel rod (for example, a hollow steel pipe) and has the same configuration as the stay 18 described in the first embodiment.
The stay frame 44 is a steel frame that surrounds the periphery of the column 14 in a plan view, and pin joints 33 that are joined to the stays 46 are provided at two corners on the building side. The pin joint portion 33 of the stay frame 44 is also provided with a pin hole for pin joining. Accordingly, the pin joint portion 32 of the stay 46 can be overlapped with the pin joint portion 33 of the stay frame 44, and a pin (not shown) can be inserted into the pin hole for pin joining.
Note that the configuration of the stay 46 is an example, and is not limited to this configuration as long as the function of the stay can be achieved.

ブラケット42は、第1実施形態で説明したブラケット28と同じ鋼製の平板又はフレーム枠であり、一方の端部が建物16の柱26に溶接やボルト等で接合され、柱26から突出た他方の端部には、2箇所にピン接合部34が設けられ、ピン接合部34にはそれぞれピン孔が設けられている。これにより、ブラケット42のピン接合部34にステー18のピン接合部32を重ね、ピン孔35に図示しないピンを挿入してピン接合することができる。
なお、ブラケット42の構成は一例であり、ブラケットとしての機能を果たすことができれば、本構成に限定されない。
The bracket 42 is the same flat plate or frame made of steel as the bracket 28 described in the first embodiment. One end of the bracket 42 is joined to the column 26 of the building 16 by welding or bolts, and the other protrudes from the column 26. The end portions of the pin joints 34 are provided at two locations, and the pin joint portions 34 are respectively provided with pin holes. Accordingly, the pin joint portion 32 of the stay 18 can be overlapped with the pin joint portion 34 of the bracket 42, and a pin (not shown) can be inserted into the pin hole 35 to be pin-joined.
In addition, the structure of the bracket 42 is an example, and if the function as a bracket can be fulfill | performed, it will not be limited to this structure.

3本のステー46は、一方の端部のピン接合部32が、支柱14を囲むステー枠44の2つの角部のピン接合部33とピン接合され、他方の端部のピン接合部32が、建物16の2本の柱26に固定されたブラケット42とピン接合されている。これにより、支柱14の移動を拘束することができる。   In the three stays 46, the pin joint portion 32 at one end is pin-joined with the pin joint portions 33 at the two corners of the stay frame 44 surrounding the column 14, and the pin joint portion 32 at the other end is The bracket 42 fixed to the two pillars 26 of the building 16 is pin-joined. Thereby, the movement of the support | pillar 14 can be restrained.

図8のダンパーステー取付け図に示すように、ダンパーステー48は、第1実施形態で説明したダンパーステー20と同じように、直状の鋼製棒38の一端に、軸線を一致させてオイルダンパー36が接続された構成である。ダンパーステー48の両端部にはピン接合部32が設けられている。   As shown in the attachment diagram of the damper stay in FIG. 8, the damper stay 48 is configured so that the axis line coincides with one end of the straight steel rod 38 in the same manner as the damper stay 20 described in the first embodiment. 36 is connected. Pin joints 32 are provided at both ends of the damper stay 48.

ダンパーステー48は、ステー46と同様に3本が1セットとして使用され、一端が支柱14を囲むステー枠44の2つの角部のピン接合部33と重ね合わせてピン接合され、他端が建物16の2本の柱26に固定されたブラケット42のピン接合部34と重ね合わせ、ピン孔を利用して2本と1本がピン接合されている。
これにより、支柱14の水平方向の移動を制限し、支柱14の振動を効果的に抑制することができる。
As with the stay 46, three damper stays 48 are used as one set, one end of which is overlapped with the pin joint 33 at the two corners of the stay frame 44 surrounding the support column 14, and the other end is a building. 16 and the two pillars 26 are overlapped with the pin joint portion 34 of the bracket 42 fixed to the two pillars 26, and the two and one are pin-joined using the pin holes.
Thereby, the movement of the support | pillar 14 in the horizontal direction can be restrict | limited and the vibration of the support | pillar 14 can be suppressed effectively.

(第2実施形態)
図4、図5、図9、図10を用いて、本発明の第2実施形態に係るタワークレーン制振装置50について説明する。タワークレーン制振装置50は、最上部のステー18の下方に別のステー52を設けた点において、第1実施形態に係るタワークレーン制振装置10と相違する。相違点を中心に説明する。
(Second Embodiment)
A tower crane vibration damping device 50 according to a second embodiment of the present invention will be described with reference to FIGS. 4, 5, 9, and 10. The tower crane vibration damping device 50 is different from the tower crane vibration damping device 10 according to the first embodiment in that another stay 52 is provided below the uppermost stay 18. The difference will be mainly described.

図4(E)、図5(E)及び図9に示すように、タワークレーン12の支柱14を更にL5だけ高くし、支柱14が1箇所のステー18で支持できる範囲を超えた場合には、ステーの数を増やす必要がある。
具体的には、ステー18を連結位置S4(支持部23からの高さh1+h2+h3+h4)に固定するのみでなく、ステー18の下方の連結位置S1(支持部23からの高さh1)にステー52を追加する。
ここに、連結位置S1及び連結位置S4は、上述したように、想定される地震時等における支柱14の変形(変位)の許容量や、変形時に支柱14に発生する応力、タワークレーン12の設置高さ(基礎部22の地表面からの高さ)等を考慮して決定される。
As shown in FIGS. 4 (E), 5 (E), and 9, when the column 14 of the tower crane 12 is further raised by L5 and the column 14 exceeds the range that can be supported by one stay 18. It is necessary to increase the number of stays.
Specifically, the stay 18 is not only fixed at the connection position S4 (height h1 + h2 + h3 + h4 from the support portion 23) but also at the connection position S1 below the stay 18 (height h1 from the support portion 23). to add.
Here, the connection position S1 and the connection position S4 are, as described above, the allowable amount of deformation (displacement) of the column 14 at the time of an assumed earthquake, the stress generated in the column 14 at the time of deformation, the installation of the tower crane 12 The height is determined in consideration of the height (height from the ground surface of the base portion 22) and the like.

このとき、ステー18は、連結位置S3に取付けたステー18を取り外して、連結位置S4で使用してもよいし、別の新たなステー18を連結位置S4に取付けてもよい。別のステー18を取付ける場合には、連結位置S3点のステー18は、上述したようにピンを抜いてピン接合部を切り離しておく。   At this time, the stay 18 may be used at the connection position S4 by removing the stay 18 attached to the connection position S3, or another new stay 18 may be attached to the connection position S4. When another stay 18 is attached, the stay 18 at the connection position S3 is pulled out of the pin as described above to separate the pin joint.

また、ステー52は、ステー18と同じ構成である。連結位置S1において当初使用したステー18がピンを抜いた状態で残してあれば、再度ピンを挿入してステー52として使用することができる。当初使用したステー18が残されていてない場合には、新たなステー52を、連結位置S1のブラケット28及びステー枠30を利用して取付ける。
これにより、支柱14の上下方向の2箇所が、ステー18とステー52で連結される。
The stay 52 has the same configuration as the stay 18. If the stay 18 initially used at the connecting position S1 is left in a state where the pin is removed, the pin can be inserted again and used as the stay 52. When the initially used stay 18 is not left, a new stay 52 is attached using the bracket 28 and the stay frame 30 at the connection position S1.
Thereby, two places in the vertical direction of the support column 14 are connected by the stay 18 and the stay 52.

次に、ダンパーステー20を、連結位置S3(支持部23からの高さh1+h2+h3)に取付ける。このとき、ダンパーステー20の高さ方向は、ステー18とステー52の間に設けられる。
連結位置S3のブラケット28及びステー枠30は、ステー18で使用したものを再使用することができる。このとき、ダンパーステー20は、連結位置S2に取付けたダンパーステー20を取り外して、連結位置S3に取付けてもよいし、別の新たなダンパーステー20を取付けてもよい。別のダンパーステー20を用いる場合には、連結位置S2のダンパーステー20は、上述したように、ピンを抜いてピン接合部を切り離しておく。
これにより、先端位置hEの支柱14の振動を効果的に抑制することができる。
Next, the damper stay 20 is attached to the connection position S3 (height h1 + h2 + h3 from the support portion 23). At this time, the height direction of the damper stay 20 is provided between the stay 18 and the stay 52.
The bracket 28 and the stay frame 30 at the connection position S3 can be reused from those used in the stay 18. At this time, the damper stay 20 may be attached to the connection position S3 by removing the damper stay 20 attached to the connection position S2, or another new damper stay 20 may be attached. When another damper stay 20 is used, the damper stay 20 at the connection position S2 pulls out the pin and separates the pin joint portion as described above.
Thereby, the vibration of the support | pillar 14 of the front-end | tip position hE can be suppressed effectively.

次に、図4(F)、図5(F)及び図10を用いて、タワークレーン12を更にL6だけ高くした場合について説明する。
支柱14の先端位置hFまでの高さを更に高くした場合には、2箇所のステー18、52の位置を変更するのみでなく、ダンパーステー20も2個に増やす必要がある。即ち、ダンパーステー20を連結位置S4(支持部23からの高さh1+h2+h3+h4)に固定するのみでなく、2個目のダンパーステー54を連結位置S4の下方向の連結位置S1に連結する。
Next, the case where the tower crane 12 is further raised by L6 will be described with reference to FIG. 4 (F), FIG. 5 (F) and FIG.
When the height of the support 14 to the tip position hF is further increased, it is necessary not only to change the positions of the two stays 18 and 52 but also to increase the number of damper stays 20 to two. That is, not only is the damper stay 20 fixed to the connection position S4 (height h1 + h2 + h3 + h4 from the support portion 23), but the second damper stay 54 is connected to the downward connection position S1 of the connection position S4.

2箇所のステー18、52の連結位置S5、S2、及び2箇所のダンパーステー20の連結位置S4、S1は、想定される地震時等における支柱14の変形の許容量や、変形時に支柱14に発生する応力、タワークレーン12の設置高さ(基礎部22の地表面からの高さ)等を考慮して決定される。   The connecting positions S5 and S2 of the two stays 18 and 52, and the connecting positions S4 and S1 of the two damper stays 20 are the allowable amount of deformation of the support column 14 in the event of an assumed earthquake, etc. It is determined in consideration of the generated stress, the installation height of the tower crane 12 (height from the ground surface of the foundation 22), and the like.

このとき、2箇所のステー18、52は、連結位置S4、S1のステー18、52を取り外して、連結位置S5、S2で使用してもよいし、別の新たなステー18、52を連結位置S5に使用してもよい。別のステー18、52を用いる場合には、連結位置S4、S1のステー18は、上述したように両端部のピンを抜いてピン接合部を切り離しておく。   At this time, the two stays 18 and 52 may be used at the connection positions S5 and S2 by removing the stays 18 and 52 at the connection positions S4 and S1, or another new stays 18 and 52 at the connection position. It may be used for S5. When the other stays 18 and 52 are used, the stays 18 at the coupling positions S4 and S1 remove the pins at both ends as described above to separate the pin joints.

次に、ダンパーステー20を、連結位置S4に連結させる。更に、ダンパーステー54を連結位置S1(高さh1)に連結させる。このとき、連結位置S4のブラケット28及びステー枠30は、ステー18を取外したものが使用できる。また、連結位置S4のダンパーステー20は、連結位置S3から取外して使用してもよいし、別の新たなダンパーステー20を使用してもよい。別のダンパーステー20を使用する場合には、連結位置S3のダンパーステー20はピンを抜いておけばよい。なお、設置条件により支柱14の柔軟性が失われない場合には、そのまま継続して使用してもよい。   Next, the damper stay 20 is coupled to the coupling position S4. Further, the damper stay 54 is connected to the connection position S1 (height h1). At this time, the bracket 28 and the stay frame 30 at the connection position S4 can be used with the stay 18 removed. Further, the damper stay 20 at the connection position S4 may be used after being removed from the connection position S3, or another new damper stay 20 may be used. When another damper stay 20 is used, the damper stay 20 at the connection position S3 may be pulled out of the pin. In addition, when the flexibility of the support | pillar 14 is not lost by installation conditions, you may use it as it is.

次に、図10を用いて、2箇所のステー18、52、及び2箇所のダンパーステー20、54により支柱14の振動を抑制する仕組みを説明する。
図10に示すように、支柱14がステー18、52で建物16の躯体に連結され、支柱14の振動エネルギーがダンパーステー20、54で吸収され、支柱14の変形が抑制される。
Next, a mechanism for suppressing vibration of the column 14 by the two stays 18 and 52 and the two damper stays 20 and 54 will be described with reference to FIG.
As shown in FIG. 10, the column 14 is connected to the housing of the building 16 by the stays 18 and 52, the vibration energy of the column 14 is absorbed by the damper stays 20 and 54, and the deformation of the column 14 is suppressed.

即ち、タワークレーン12に外力等が作用していないときは、支柱14は実線で示すように直線状に直立した状態で、図示しない建物の躯体と連結されている。支柱14が2箇所のステー18、52のみで連結され、ダンパーステー20、54が連結されていない場合には、地震等の外力を受けたとき、支柱14は実線で示す状態からから破線15Aで示すように変形する。この変形を抑制するため、ダンパーステー20、54を支柱14の変形が大きい連結位置S4、S1に連結する。これにより、支柱14の変形が、オイルダンパー36でエネルギーが吸収され、一点鎖線15Bで示すように、変形量を小さくすることができる。   That is, when an external force or the like is not acting on the tower crane 12, the support column 14 is connected to a building frame (not shown) in a straight upright state as shown by a solid line. When the support column 14 is connected only by the two stays 18 and 52 and the damper stays 20 and 54 are not connected, when the external force such as an earthquake is received, the support column 14 starts from the state shown by the solid line by the broken line 15A. Deform as shown. In order to suppress this deformation, the damper stays 20 and 54 are coupled to the coupling positions S4 and S1 where the column 14 is largely deformed. As a result, the deformation of the column 14 is absorbed by the oil damper 36, and the amount of deformation can be reduced as indicated by the alternate long and short dash line 15B.

即ち、基礎部22とステー52の間が極値となるように曲げられる連結位置S1点において、ダンパーステー54で支柱14を図示しない柱に連結した場合、円弧状に大きく撓んだ支柱15Aは、ダンパーステー54でエネルギーが吸収され、一点鎖線15Bで示すように、撓み量が小さくなり変形が抑制される。同様に、ステー18とステー52の間が極値となるように曲げられる連結位置S4点において、ダンパーステー20で支柱14を図示しない柱に連結した場合、円弧状に大きく撓んだ支柱15Aは、ダンパーステー20でエネルギーが吸収され、一点鎖線15Bで示すように、撓み量が小さくなり変形が抑制される。   That is, when the support column 14 is connected to a column (not shown) by the damper stay 54 at the connection position S1 where the gap between the base portion 22 and the stay 52 is bent to an extreme value, the support column 15A that is greatly bent in an arc shape is The energy is absorbed by the damper stay 54, and as shown by the alternate long and short dash line 15B, the amount of bending is reduced and the deformation is suppressed. Similarly, when the support column 14 is connected to a column (not shown) by the damper stay 20 at the connection position S4 where the stay 18 and the stay 52 are bent so as to have an extreme value, the support column 15A bent greatly in an arc shape is obtained. The energy is absorbed by the damper stay 20, and as shown by the alternate long and short dash line 15B, the amount of bending is reduced and the deformation is suppressed.

上述したように、ダンパーステー20、54は、支柱14の高さに対応して、支柱14、及び建物16との連結位置を変更する。このとき、タワークレーン12の支柱14の高さとステー18、52による固定点の位置が決定されれば、設計用入力地震波、及びダンパー特性から、容易に、エネルギー吸収装置の取付け位置を算出することができる。   As described above, the damper stays 20 and 54 change the connection positions of the support 14 and the building 16 according to the height of the support 14. At this time, if the height of the column 14 of the tower crane 12 and the position of the fixed point by the stays 18 and 52 are determined, the mounting position of the energy absorbing device can be easily calculated from the design input seismic wave and the damper characteristics. Can do.

具体的には、タワークレーン12の支柱高さとステー18、52による固定点の位置が高いときは、ダンパーステー20、54の取付け位置を高くし、タワークレーン12の支柱14の高さとステー18による固定点の位置が低いときは、ダンパーステー20、54の取付け位置を低くする。
この結果、地震や強風等の外力、更には稼働時の重心位置の変化によって生じるタワークレーン12の揺れを低減することができる。
Specifically, when the height of the column of the tower crane 12 and the position of the fixing point by the stays 18 and 52 are high, the mounting position of the damper stays 20 and 54 is increased, and the height of the column 14 of the tower crane 12 and the stay 18 are When the position of the fixing point is low, the mounting position of the damper stays 20 and 54 is lowered.
As a result, it is possible to reduce the shaking of the tower crane 12 caused by an external force such as an earthquake or a strong wind, and also a change in the center of gravity during operation.

また、ダンパーステー20、54は、外力を受けて変形し振動エネルギーを吸収するダンパーを有している。ダンパーステー20、54の一方の端部は支柱に固定されたステー枠にピン接合され、他方の端部は建物の躯体に固定されたブラケットにピン接合されている。これにより、タワークレーン12の支柱14の振動エネルギーが吸収される。
これにより、先端位置hFの支柱14の振動を効果的に抑制することができる。
Further, the damper stays 20, 54 have dampers that are deformed by external force and absorb vibration energy. One end of each of the damper stays 20 and 54 is pin-bonded to a stay frame fixed to the support column, and the other end is pin-bonded to a bracket fixed to the building frame. Thereby, the vibration energy of the column 14 of the tower crane 12 is absorbed.
Thereby, the vibration of the support | pillar 14 of the front-end | tip position hF can be suppressed effectively.

以上説明したように、ステー18、52とダンパーステー20、54を併用し、ステー18、52による適度な変形拘束効果を活用することで、ダンパーステー20、54に入力される変形が、どのような地震波に対しても、想定される範囲に納まるようにすることが出来る。よって、ダンパーステー20、54の設計条件を単純化することが可能となり、ダンパーステー20、54の実用的な設計が可能となる。更に、設計条件を単純化出来るため、他の種々の工事条件でも使用可能な汎用システムとすることが可能となる。   As described above, by using the stays 18 and 52 together with the damper stays 20 and 54 and utilizing the appropriate deformation restraining effect by the stays 18 and 52, how the deformation inputted to the damper stays 20 and 54 is changed. It is possible to make it fall within the expected range even for seismic waves. Accordingly, the design conditions of the damper stays 20 and 54 can be simplified, and the damper stays 20 and 54 can be practically designed. Furthermore, since the design conditions can be simplified, a general-purpose system that can be used under various other construction conditions can be obtained.

また、ステー18、52間の間隔を調整することで、その中間部に生じるタワークレーン12の支柱14の変形量をコントロールできる。エネルギー吸収を大きく取りたい場合は、複数のダンパーステーをステー18、52間に配置したり、ステー18、52の間隔を構造上許容できる範囲内で大きくして、その中間部に生じるタワークレーン12の支柱14の変形量を大きくすればよい。   Further, by adjusting the distance between the stays 18 and 52, the amount of deformation of the column 14 of the tower crane 12 that occurs in the intermediate portion can be controlled. When it is desired to increase energy absorption, a plurality of damper stays are arranged between the stays 18 and 52, or the distance between the stays 18 and 52 is increased within a structurally allowable range, and the tower crane 12 generated at the intermediate portion thereof. The amount of deformation of the column 14 may be increased.

なお、ステー18、52、及びダンパーステー20、54の数は、それぞれ2個までについて記載した。しかし、これに限定されることはなく、支柱14の高さ、支柱14の構成等により、それぞれの数を3個以上としてもよい。   Note that the numbers of stays 18 and 52 and damper stays 20 and 54 are each up to two. However, the present invention is not limited to this, and the number of each may be three or more depending on the height of the column 14, the configuration of the column 14, and the like.

(第3実施形態)
図11を用いて、本発明の第3実施形態に係るタワークレーン制振装置60ついて説明する。タワークレーン制振装置60は、最上部のステー18の上方に、ダンパーステー54を設けた点において、第1実施形態に係るタワークレーン制振装置10と相違する。相違点を中心に説明する。
(Third embodiment)
A tower crane vibration damping device 60 according to a third embodiment of the present invention will be described with reference to FIG. The tower crane vibration damping device 60 is different from the tower crane vibration damping device 10 according to the first embodiment in that a damper stay 54 is provided above the uppermost stay 18. The difference will be mainly described.

図11に示すように、ステー18の上方に設けられたダンパーステー62は、一端が建物16の躯体に取り付けられたブラケット56の接合部とピン接合され、他端が支柱14の上部でありクレーン部24の下方に取り付けられたステー枠58の接合部とピン接合されている。また、ステー18の下方には、ダンパーステー20が設けられている。ステー18とダンパーステー20は、いずれも第1実施形態で説明済みであり、詳細な説明は省略する。   As shown in FIG. 11, the damper stay 62 provided above the stay 18 is pin-joined at one end with a joint portion of a bracket 56 attached to the housing of the building 16, and the other end is an upper portion of the support column 14. It is pin-bonded to a joint portion of a stay frame 58 attached below the portion 24. A damper stay 20 is provided below the stay 18. Both the stay 18 and the damper stay 20 have been described in the first embodiment, and detailed description thereof will be omitted.

エネルギー吸収装置としてのダンパーステー62は、第1実施形態に係るダンパーステー20と同じ構成である。即ち、直状の鋼製棒の一端に外力を受けて変形し振動エネルギーを吸収するダンパーが接続され、両端部にピン接合部が設けられている。ダンパーステー62の一方の端部は支柱14に固定されたステー枠58にピン接合され、鋼製棒の他方の端部は建物16の躯体に固定されたブラケット56にピン接合されている。   The damper stay 62 as the energy absorbing device has the same configuration as the damper stay 20 according to the first embodiment. That is, a damper that receives an external force and deforms to absorb vibration energy is connected to one end of a straight steel rod, and pin joints are provided at both ends. One end of the damper stay 62 is pin-joined to a stay frame 58 fixed to the support column 14, and the other end of the steel rod is pin-joined to a bracket 56 fixed to the housing of the building 16.

ブラケット56とステー枠58は、いずれもダンパーステー62とピン接合する接合部が傾斜して設けられている点を除いて、第1実施形態で説明したブラケット28及びステー枠30と同じ構成であり、詳細な説明は省略する。   Each of the bracket 56 and the stay frame 58 has the same configuration as the bracket 28 and the stay frame 30 described in the first embodiment, except that a joint portion for pin-joining with the damper stay 62 is inclined. Detailed description will be omitted.

ダンパーステー62は、支柱14側を躯体側より高くして、支柱14に対して傾斜させ、端部をブラケット56とステー枠58に連結している。これにより、支柱14上部の変形を抑制することができる。この結果、クレーン部24の揺れが抑制される。ここに、支柱14上部の変形を効果的に抑制するには、支柱14に対するダンパーステー54の傾斜角度は45度程度とするのが望ましい。   The damper stay 62 has the column 14 side higher than the housing side and is inclined with respect to the column 14, and the end portion is connected to the bracket 56 and the stay frame 58. Thereby, a deformation | transformation of the support | pillar 14 upper part can be suppressed. As a result, the swing of the crane part 24 is suppressed. Here, in order to effectively suppress the deformation of the upper portion of the column 14, it is desirable that the inclination angle of the damper stay 54 with respect to the column 14 is about 45 degrees.

上述したように、最上部のステー18の上部にダンパーステー62を設けることで、支柱14上部の変形を効果的に抑制することができる。また、最上部のステー18の下方にはダンパーステー20が水平方向に取り付けられている。
これにより、タワークレーン12の変形(変位)を、ステー18を挟んで設けられたダンパーステー20、及びダンパーステー62で抑制することができる。
As described above, by providing the damper stay 62 on the upper part of the uppermost stay 18, deformation of the upper part of the support column 14 can be effectively suppressed. A damper stay 20 is attached in the horizontal direction below the uppermost stay 18.
Thereby, the deformation (displacement) of the tower crane 12 can be suppressed by the damper stay 20 and the damper stay 62 provided with the stay 18 interposed therebetween.

なお、本実施形態では、ダンパーステー62を第1実施形態に係るタワークレーン制振装置10に取付ける例について記載した。しかし、これに限定されることはなく、第2実施形態に係るタワークレーン制振装置50の最上部のステー18の上部に設けてもよい。   In the present embodiment, an example in which the damper stay 62 is attached to the tower crane vibration damping device 10 according to the first embodiment has been described. However, the present invention is not limited to this, and may be provided on the top of the uppermost stay 18 of the tower crane vibration damping device 50 according to the second embodiment.

10 タワークレーン制振装置
12 タワークレーン
14 支柱(タワークレーン)
16 建物
18 ステー
20 ダンパーステー(エネルギー吸収装置)
26 柱(建物の躯体)
28 ブラケット
30 ステー枠
36 オイルダンパー(ダンパー)
10 Tower crane damping device 12 Tower crane 14 Strut (tower crane)
16 Building 18 Stay 20 Damper stay (energy absorber)
26 Pillar (building frame)
28 Bracket 30 Stay frame 36 Oil damper (damper)

Claims (6)

タワークレーンと、
前記タワークレーンの支柱と建物を連結し、前記支柱の変位を拘束するステーと、
前記支柱の下部を支柱固定用の支持部に固定する基礎部と、
前記ステーと前記基礎部との間に設けられ、前記ステーで拘束された前記支柱の外乱が生じた際の変形が最も大きくなる位置で、前記支柱と前記建物を連結し、前記支柱の振動エネルギーを吸収するエネルギー吸収装置と、
を有するタワークレーン制振装置。
A tower crane,
A stay for connecting the tower crane column and the building, and restraining the displacement of the column;
A base for fixing the lower part of the support to a support for fixing the support; and
The strut and the building are connected at a position where the deformation when the disturbance of the strut, which is provided between the stay and the base portion and is restrained by the stay, is the largest, is connected to the vibration energy of the strut. An energy absorbing device that absorbs
A tower crane vibration control device.
前記エネルギー吸収装置は、最上部の前記ステーより低い位置に設けられ、
前記エネルギー吸収装置とは別のエネルギー吸収装置が、最上部の前記ステーより高い位置で、前記支柱に対し傾斜して取り付けられている、
請求項1に記載のタワークレーン制振装置。
The energy absorbing device is provided at a position lower than the uppermost stay.
The energy absorbing device further energy absorbing device and is, at a position higher than said stay the top, it is mounted inclined with respect to the previous SL strut,
The tower crane vibration damping device according to claim 1.
タワークレーンと、
前記タワークレーンの支柱と建物を連結し、前記支柱の変位を拘束するステーと、
前記ステーで拘束された前記支柱の外乱が生じた際の変形が最も大きくなる位置で、前記支柱と前記建物を連結し、前記支柱の振動エネルギーを吸収するエネルギー吸収装置と、
を有し、
前記エネルギー吸収装置は、最上部の前記ステーより低い位置に設けられている
タワークレーン制振装置。
A tower crane,
A stay for connecting the tower crane column and the building, and restraining the displacement of the column;
An energy absorbing device that couples the column and the building and absorbs vibration energy of the column at a position where deformation when the disturbance of the column restrained by the stay is greatest occurs;
Have
The energy absorbing device is provided at a position lower than the uppermost stay .
Tower crane vibration control device.
最上部の前記ステーより低い位置に設けられた前記エネルギー吸収装置は、前記支柱の高さに対応して、前記支柱、及び前記建物との連結位置を変更する請求項2又は3に記載のタワークレーン制振装置。   4. The tower according to claim 2, wherein the energy absorbing device provided at a position lower than the uppermost stay changes a connection position between the column and the building according to a height of the column. Crane damping device. 前記エネルギー吸収装置は、外力を受けて変形し前記支柱の振動エネルギーを吸収するダンパーであり、前記ダンパーの一方の端部は前記支柱に固定されたステー枠にピン接合され、他方の端部は前記建物の躯体に固定されたブラケットにピン接合されている請求項1〜4のいずれか1項に記載のタワークレーン制振装置。   The energy absorbing device is a damper that is deformed by external force and absorbs vibration energy of the support column, and one end portion of the damper is pin-bonded to a stay frame fixed to the support column, and the other end portion is The tower crane vibration damping device according to any one of claims 1 to 4, wherein the tower crane vibration damping device is pin-joined to a bracket fixed to the housing of the building. タワークレーンの支柱を自立させ、前記支柱をクライミングする前記タワークレーンを稼働状態とする工程と、
建物の躯体と前記支柱を、前記支柱の変位を拘束するステーで連結する工程と、
前記建物の躯体と前記支柱を、前記支柱の下部を支柱固定用の支持部に固定する基礎部と前記ステーとの間において、前記ステーで拘束された前記支柱の外乱が生じた際の変形が最も大きくなる位置で、前記支柱の振動エネルギーを吸収するエネルギー吸収装置で連結する工程と、
を有するタワークレーン制振方法。
Making the column of the tower crane self-supporting and setting the tower crane to climb the column to an operating state;
Connecting the building frame and the column with a stay that restrains the displacement of the column;
Deformation when disturbance of the strut restrained by the stay occurs between the stay and the base portion that fixes the building frame and the strut, and the lower portion of the strut to the support for fixing the strut. A step of connecting with an energy absorbing device that absorbs vibration energy of the struts at the largest position;
A tower crane vibration damping method.
JP2012204529A 2012-09-18 2012-09-18 Tower crane damping device and tower crane damping method Active JP6376720B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2012204529A JP6376720B2 (en) 2012-09-18 2012-09-18 Tower crane damping device and tower crane damping method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2012204529A JP6376720B2 (en) 2012-09-18 2012-09-18 Tower crane damping device and tower crane damping method

Publications (2)

Publication Number Publication Date
JP2014058378A JP2014058378A (en) 2014-04-03
JP6376720B2 true JP6376720B2 (en) 2018-08-22

Family

ID=50615234

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2012204529A Active JP6376720B2 (en) 2012-09-18 2012-09-18 Tower crane damping device and tower crane damping method

Country Status (1)

Country Link
JP (1) JP6376720B2 (en)

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05270787A (en) * 1992-03-25 1993-10-19 Hitachi Zosen Corp Mast support method with climbing device
JP2000303695A (en) * 1999-04-16 2000-10-31 Kumagai Gumi Co Ltd Tower crane for construction of base isolated building and method for installation thereof
JP3885919B2 (en) * 2000-01-13 2007-02-28 鹿島建設株式会社 Tower crane mast horizontal support device
JP2007308297A (en) * 2006-05-22 2007-11-29 Ohbayashi Corp Connecting device, temporary structure support method and temporary structure support structure

Also Published As

Publication number Publication date
JP2014058378A (en) 2014-04-03

Similar Documents

Publication Publication Date Title
JP6368522B2 (en) building
JP2016118008A (en) Structural vibration control device, method for removing residual displacement of superstructure using the same and bridge reinforcement method
JP3885919B2 (en) Tower crane mast horizontal support device
JP2017150179A (en) Column beam structure having vibration damping structure
JP2019007189A (en) Building structure with roof frame
JP5000139B2 (en) Tower crane mast holding device
JP6376720B2 (en) Tower crane damping device and tower crane damping method
JP4522091B2 (en) Tower crane mast horizontal support device
JP6346238B2 (en) Suspension stand for temporary scaffolding
JP6674240B2 (en) Structure with vibration isolation
JP2009114701A (en) Bending control type vibration control structure
JP3854606B2 (en) Vibration control mechanism
JP7202586B1 (en) protective fence
JP6879613B1 (en) Curing system at the time of building demolition and demolition method of the building to be demolished
JP2016216929A (en) Roof frame and construction method thereof
JP5316885B2 (en) Building seismic control structure
JP2014125343A (en) Vibration control device
JP2008297727A (en) Seismic reinforcing structure of existing building
CN115467436B (en) A damping shock-absorbing bracket for electric power support equipment
JP3972892B2 (en) Seismic retrofit method for existing buildings
JP2009191601A (en) Seismic reinforcement structure for roof frames
JP2014227693A (en) Guard fence
CN211817100U (en) Building shock-absorbing structure
JP4698184B2 (en) Climbing crane support method and support jig
JP5498321B2 (en) Load transmission structure, dismantling method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20150911

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A711

Effective date: 20150911

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20150911

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20160623

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20160628

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20160825

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20170207

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20170427

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20170428

A911 Transfer to examiner for re-examination before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20170511

A912 Re-examination (zenchi) completed and case transferred to appeal board

Free format text: JAPANESE INTERMEDIATE CODE: A912

Effective date: 20170630

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20180327

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20180724

R150 Certificate of patent or registration of utility model

Ref document number: 6376720

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250