Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP6401530B2 - Revetment block installation method and installation jig - Google Patents
[go: Go Back, main page]

JP6401530B2 - Revetment block installation method and installation jig - Google Patents

Revetment block installation method and installation jig Download PDF

Info

Publication number
JP6401530B2
JP6401530B2 JP2014146344A JP2014146344A JP6401530B2 JP 6401530 B2 JP6401530 B2 JP 6401530B2 JP 2014146344 A JP2014146344 A JP 2014146344A JP 2014146344 A JP2014146344 A JP 2014146344A JP 6401530 B2 JP6401530 B2 JP 6401530B2
Authority
JP
Japan
Prior art keywords
revetment block
hole
revetment
plate member
block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2014146344A
Other languages
Japanese (ja)
Other versions
JP2016023421A (en
Inventor
修介 玉石
修介 玉石
廣志 片岡
廣志 片岡
勇治 山口
勇治 山口
Original Assignee
玉石重機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 玉石重機株式会社 filed Critical 玉石重機株式会社
Priority to JP2014146344A priority Critical patent/JP6401530B2/en
Publication of JP2016023421A publication Critical patent/JP2016023421A/en
Application granted granted Critical
Publication of JP6401530B2 publication Critical patent/JP6401530B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Description

本発明は、高波、高潮、増水、津波などの被害を未然防止するための、護岸ブロックの設置方法および設置治具に関する。   The present invention relates to an installation method and an installation jig for a revetment block for preventing damages such as high waves, storm surges, water increases, and tsunamis.

我が国は、島国であり国土を海岸線に囲まれている。また、河川や湖沼も多く、河岸や湖岸などの水と陸地との境界部分が非常に多い。ここで、我が国の海岸線は、リアス式海岸などに代表されるように複雑な形状を有していることが多い。加えて、我が国は山岳地帯が多くの割合を占めており、平野部は海岸付近に集中している。このため、市街地が発達して人口が集中する都市部の多くは海岸付近に集中する傾向がある。   Japan is an island country and the country is surrounded by a coastline. In addition, there are many rivers and lakes, and there are very many boundaries between water and land such as riverbanks and lakeshores. Here, Japan's coastline often has a complex shape, as represented by the Rias coastline. In addition, in Japan, mountainous areas occupy a large proportion, and the plains are concentrated near the coast. For this reason, many urban areas where urban areas are developed and the population is concentrated tend to concentrate near the coast.

一方、山岳地帯が多いことで、河川や湖沼は、大陸に比べて小型あるいは複雑な形態を有するものが多く、河岸や湖岸も、複雑な形状となりやすい。河岸や湖岸も、少ない平野部を形成することが多いので、都市部は、河岸や湖岸付近に集中する傾向がある。   On the other hand, because there are many mountainous areas, rivers and lakes often have smaller or more complex forms than continents, and river and lake shores tend to be complex shapes. Rivers and lake shores often form few plains, so urban areas tend to concentrate near rivers and lakes.

ここで、我が国の海岸線の特徴として上述のようにその形状が複雑であることがある。湾の形態をとることもあったり、多くの島々が近接したりすることもある。また、世界的にも台風や低気圧による暴風雨を受けやすい気候を有しており、海岸線において高波、高潮などが発生しやすい特性を有している。   Here, as described above, the shape of the Japanese coastline may be complicated. It may take the form of a bay or many islands may be in close proximity. In addition, it has a climate that is susceptible to storms caused by typhoons and low pressures worldwide, and has characteristics that high waves and storm surges are likely to occur on the coastline.

加えて、2011年の東日本大震災のように、地震多発地域であり、津波の大きな被害を受ける可能性も高い特性を有している。   In addition, like the 2011 Great East Japan Earthquake, it is an earthquake-prone area and has a high possibility of being greatly damaged by a tsunami.

これと同様に、河川の増水や湖沼の増水も生じやすく、河川や湖沼での増水や氾濫などの被害も生じやすい特性がある。   Similarly, rivers and lakes are likely to increase, and rivers and lakes are also susceptible to damage such as floods and flooding.

このように、我が国は海岸、河岸、湖岸などを多く有すると共に、海岸、河岸、湖岸での高波、高潮、増水、津波などの被害を生じさせやすい特性を有している。上述の通り2011年の東日本大震災では、東北地方の太平洋岸の海岸において甚大な津波の被害が生じた。   As described above, Japan has many beaches, riverbanks, lake shores, and the like, and has characteristics that are liable to cause damage such as high waves, storm surges, increased water, and tsunamis on the beaches, riverbanks, and lakeshores. As described above, the Great East Japan Earthquake in 2011 caused a massive tsunami damage on the Pacific coast of the Tohoku region.

以上のような状況において、海岸、河岸、湖岸における高波、高潮、増水、津波などの被害を未然防止するための、海岸線などの嵩上げ工事が行われる。この嵩上げ工事は、従来より防潮堤や防波堤などによって行われてきたが、2011年の東日本大震災の津波の被害を考慮して、海岸線そのものの高さ(海抜)を底上げする嵩上げを行いつつ、嵩上げされた海岸線の強度を確保する護岸ブロックの設置が行われている。護岸ブロックは、嵩上げされている海岸線の表面もしくは、嵩上げされていないが津波等の被害で海岸線が破壊されることを防ぎたい海岸線の表面に、カバーのように設置される。   Under the circumstances as described above, the construction of raising the coastline and the like is performed in order to prevent damages such as high waves, storm surges, flooding, and tsunamis on the coast, riverside, and lake shore. This raising work has been carried out by using seawalls and breakwaters, but taking into account the tsunami damage caused by the Great East Japan Earthquake in 2011, raising the height of the coastline itself (above sea level) was raised while raising the height. A revetment block has been installed to ensure the strength of the coastline. The revetment block is installed like a cover on the surface of the coastline that is raised, or on the surface of the coastline that is not raised but wants to prevent destruction of the coastline due to damage such as a tsunami.

このような護岸ブロックは、海岸線の所定の範囲に渡ってその表面に設置、固定される。結果的に、海岸線の所定範囲が、カバーリングされる状態となる。この護岸ブロックは様々な素材で形成されればよいが、多くの場合には、コンクリート製である。製造の容易性、製造コストの低減、製造可能な企業が各地に存在すること、重量が十分であり、設置後の耐久性が維持されることなどのメリットがあるからである。   Such a revetment block is installed and fixed on the surface over a predetermined range of the coastline. As a result, a predetermined range of the coastline is covered. The revetment block may be made of various materials, but in many cases is made of concrete. This is because there are advantages such as ease of manufacturing, reduction of manufacturing cost, existence of companies that can be manufactured in various places, sufficient weight, and durability after installation.

このような護岸ブロックは、海岸だけなく、河岸や湖岸などにも同様に使用される。例えば、護岸ブロックとして海岸線の所定範囲を面上に覆うことのできるような技術が提案されている(例えば、特許文献1参照)。   Such a revetment block is used not only on the coast but also on the river and lake shores. For example, a technique has been proposed that can cover a predetermined range of a coastline on the surface as a revetment block (see, for example, Patent Document 1).

特許文献1に開示されるような護岸ブロックは、海岸、河岸、湖岸などの高波、高潮、増水、津波被害の未然防止のために、所定範囲に渡って設置される。設置にあたっては、複数の護岸ブロックが、隙間をあまり生じさせずに整然と並んで設置されることが好ましい。全体としての強度を高め、津波等の巨大な力にも対抗できる耐久性を有するからである。   The revetment block as disclosed in Patent Document 1 is installed over a predetermined range in order to prevent damage to high waves, storm surges, water increases, and tsunamis on the coast, river bank, lake shore and the like. In installation, it is preferable that a plurality of revetment blocks be installed in an orderly manner without causing much gaps. This is because the strength as a whole is enhanced, and it has durability capable of resisting a huge force such as a tsunami.

一方で、護岸ブロックは上記の通りコンクリート製や鉄筋コンクリート製であることが多い。このため個々の護岸ブロックは極めて重い。このような重量物を、整然と設置することは非常に難しい作業である。また、危険な作業でもある。   On the other hand, the revetment block is often made of concrete or reinforced concrete as described above. For this reason, each revetment block is extremely heavy. It is very difficult to order such heavy objects in an orderly manner. It is also a dangerous task.

このような状況で、護岸ブロックを設置する設置方法に関する技術も提案されている(例えば、特許文献2、3参照)。   In such a situation, a technique related to an installation method for installing a revetment block has also been proposed (see, for example, Patent Documents 2 and 3).

特開2004−35366号公報JP 2004-35366 A 特開2014−40727号公報JP 2014-40727 A 特開2010−196271号公報JP 2010-196271 A

特許文献1は、淡水域、海域または汽水域の岸辺や海岸、床面に設置されるコンクリート成形体3であって、多数の空隙を有する微細骨格構造体を含み、ポーラス状に形成されたことを特徴とする。また、微細骨格構造体として、徐冷スラグが用いられている。また、このコンクリート成形体3が埋設されたブロック1であって、コンクリート成形体3を別個に形成し、コンクリート成形体3を半ば埋設して表面を露出させたことを特徴とするコンクリート成形体を開示する。   Patent Document 1 is a concrete molded body 3 installed on a shore, a coast, or a floor of a freshwater area, a sea area, or a brackish water area, and includes a fine skeleton structure having a large number of voids, and is formed in a porous shape. It is characterized by. In addition, slow cooling slag is used as the fine skeleton structure. Moreover, the concrete molded body is a block 1 in which the concrete molded body 3 is embedded, wherein the concrete molded body 3 is formed separately, and the concrete molded body 3 is partially embedded to expose the surface. Disclose.

特許文献1は、海岸、河岸、湖岸などの護岸ブロックとして適用できる。複数のコンクリート成形体を整然と配置することで、海岸、河岸、湖岸などでの、増水や津波被害に対応できる可能性がある。しかしながら、個々のコンクリート成形体は、非常に重く、クレーンなどを使って設置する際の手間、むずかしさ、コスト、危険性、作業時間の長大化などの問題を有している。   Patent Document 1 can be applied as a revetment block such as a coast, a river bank, a lake shore and the like. By arranging multiple concrete compacts in an orderly manner, there is a possibility of responding to flooding and tsunami damage on the coast, riverbank, lake shore, etc. However, each concrete molded body is very heavy, and has problems such as labor, difficulty, cost, danger, and lengthening of working time when installing using a crane or the like.

特許文献2は、第1の治具11は、本体部の延びる方向に対して直角に延びる方向に突出部13が突出する構造を有している。この施工方法では、分割式フレア護岸の前壁ブロック3を地面Gの上で横倒しにした状態で、第1の治具11の本体部を前壁ブロック3の前後方向に沿って延びるように前壁ブロック3の脚部3fの底面3f1のうち地面Gに近い側の部分に取り付け、これにより、突出部13を前壁ブロック3の側面から突出させて配置する。ついで、前壁ブロック3の頭部3gをワイヤWによって吊り上げることによってこの突出部13を接地させて接地部分13a1を支点として当該支点を外側面13aに沿って移動させながら前壁ブロック3を立て起こす護岸の施工方法を開示する。   In Patent Document 2, the first jig 11 has a structure in which the protruding portion 13 protrudes in a direction extending at a right angle to the extending direction of the main body portion. In this construction method, with the front wall block 3 of the split type flare revetment lying on the ground G, the main body portion of the first jig 11 extends forward along the front-rear direction of the front wall block 3. The bottom surface 3f1 of the leg portion 3f of the wall block 3 is attached to a portion close to the ground G, whereby the protruding portion 13 is arranged to protrude from the side surface of the front wall block 3. Then, the head portion 3g of the front wall block 3 is lifted by the wire W so that the protruding portion 13 is grounded, and the front wall block 3 is raised while the fulcrum is moved along the outer surface 13a with the ground portion 13a1 as a fulcrum. Disclose the revetment construction method.

特許文献2の施工方法は、護岸ブロックをクレーンでつりさげることで、海岸、河岸、湖岸の所定の範囲に並べつつ設置することができる。   The construction method of Patent Document 2 can be installed while being arranged in a predetermined range on the coast, river bank, and lake shore by suspending the revetment block with a crane.

しかし、護岸ブロックの上部に突き出た取付け部に、クレーンのワイヤーをひっかけて、クレーンが、護岸ブロックを海岸などに設置する技術である。このため、護岸ブロックの位置、設置場所への傾きなどの調整や制御がクレーンの制御に依存することになり、設置作業が難しい。設置作業の中心となるクレーン操作に、熟練度が求められる問題がある。これらの問題が相まって、護岸ブロックへの設置(施工)作業の時間が長大化する問題がある。   However, this is a technology in which the crane installs the revetment block on the beach, etc., by hooking the wire of the crane to the mounting part protruding above the revetment block. For this reason, adjustment and control, such as the position of the revetment block and the inclination to the installation place, depend on the control of the crane, and the installation work is difficult. There is a problem that skill is required for crane operation which is the center of installation work. Combined with these problems, there is a problem that the installation (construction) work time on the revetment block becomes longer.

また、護岸ブロックの上部に突き出た取付け部に、クレーンのワイヤーをひっかけて、護岸ブロックを上からつりさげる態様で設置するために、その護岸ブロックの位置合わせ、角度合わせ(傾き合わせ)などにクレーン操縦者以外の地上での人的作業を必要とする問題もある。このような地上での人的作業は、危険も伴う問題がある。   Also, in order to install the revetment block in a manner that hangs the revetment block from above by hooking the crane wire to the mounting part protruding from the top of the revetment block, the crane can be used for positioning, angle alignment (tilting), etc. There is also a problem that requires human work on the ground other than the pilot. Such human work on the ground has a problem with danger.

これらクレーン操作の熟練度、人的作業などが相まって、護岸ブロックの施工時間が更に長くなり、施工コストが増大する問題がある。東日本大震災での津波で破壊された海岸の護岸ブロック工事は、非常に大規模な工事であり、施工時間、施工コスト、危険性が高まることは好ましくない。これは、他の場所での工事でも同じである。   Due to the skill level of crane operation and human work, there is a problem that the construction time of the revetment block becomes further longer and the construction cost increases. The revetment block construction on the coast destroyed by the tsunami caused by the Great East Japan Earthquake is a very large scale construction, and it is not preferable that construction time, construction cost and risk increase. This is the same for construction in other locations.

また、特許文献2のクレーン依存の施工では、複数の護岸ブロックの設置精度が悪くなるとの問題も有している。   In addition, the crane-dependent construction of Patent Document 2 also has a problem that the installation accuracy of a plurality of revetment blocks is deteriorated.

特許文献3は、河川岸において連続した鋼矢板11を水底地盤12に支持させた土留め壁と、該鋼矢板11上部をコンクリートで被覆した上部工13とを備えた既設護岸を補強する方法であって、補強を要する該既設護岸10前方の水底地盤12を掘り下げ、掘り下げた該水底地盤12にコンクリート等による水平なブロック設置基礎17を打設し、該ブロック設置基礎17上にL型擁壁ブロック20をクレーン18により吊り下げ、前記既設護岸10に沿うよう並列に配置し、L型擁壁ブロック20と前記既設護岸10との隙間を裏込めして擁壁30とし、L型擁壁ブロック20の周囲を土砂もしくはコンクリート等で打設して新たな水底地盤31とし、擁壁30を新規護岸とすることとした既存護岸の補強方法を開示する。   Patent Document 3 is a method of reinforcing an existing revetment provided with a retaining wall in which a steel sheet pile 11 that is continuous on a riverbank is supported by a waterbed ground 12 and an upper work 13 in which the steel sheet pile 11 is covered with concrete. Then, the water bottom ground 12 in front of the existing revetment 10 requiring reinforcement is dug down, and a horizontal block installation foundation 17 made of concrete or the like is placed on the dug down water bottom ground 12, and an L-shaped retaining wall is placed on the block installation foundation 17. The block 20 is suspended by a crane 18 and arranged in parallel along the existing revetment 10, and the L-type retaining wall block 20 is provided as a retaining wall 30 with the gap between the L-type retaining wall block 20 and the existing revetment 10 being backed up. Disclosed is a method for reinforcing an existing revetment in which the periphery of 20 is cast with earth or sand or concrete to form a new water bottom ground 31 and the retaining wall 30 is a new revetment.

しかしながら、特許文献3は、護岸ブロックを複数配列して設置していく技術に直接関連がない。   However, Patent Document 3 is not directly related to a technique of arranging and installing a plurality of revetment blocks.

以上のように、特許文献1〜3などに代表される従来技術では、次のような問題を有していた。   As described above, the conventional techniques represented by Patent Documents 1 to 3 have the following problems.

(問題1)護岸ブロックの上部の取付け部に、クレーンのワイヤーを取り付けて海岸などに設置するので、クレーン操作に設置作業を大きく依存してしまう。   (Problem 1) Since the crane wire is attached to the attachment part at the upper part of the revetment block and installed on the beach or the like, the installation work greatly depends on the crane operation.

(問題2)クレーン操作において、護岸ブロックの上部のみをつりさげるので、護岸ブロックがワイヤーから外れて落ちてしまうなどの危険性がある。   (Problem 2) In crane operation, since only the upper part of the revetment block is suspended, there is a risk that the revetment block will fall off the wire.

(問題3)護岸ブロックを設置する海岸等は、場所の特性や傾きの特性があるが、これらの場所の位置決めや傾き調整をクレーン操作と地上作業員の操作で行わなければならない。   (Problem 3) The coasts where the revetment blocks are installed have site characteristics and tilt characteristics, but positioning and tilt adjustment of these locations must be performed by crane operations and ground operator operations.

(問題4)問題2、3においては、さらなる危険性を生じさせる。   (Problem 4) In problems 2 and 3, there is a further danger.

(問題5)問題3に関連して、複数の護岸ブロックを、所定の隙間以内と配置間隔で設置しなければならない場合に、十分な精度で対応できない。   (Problem 5) In relation to Problem 3, when a plurality of revetment blocks must be installed within a predetermined gap and at an arrangement interval, it cannot be handled with sufficient accuracy.

(問題6)問題1〜5に基づいて、設置に要する作業期間が長くなってしまう問題がある。   (Problem 6) On the basis of problems 1 to 5, there is a problem that the work period required for installation becomes long.

(問題7)問題6に起因して、工事コストが高まってしまう。   (Problem 7) Due to problem 6, the construction cost increases.

本発明は、上記問題に鑑み、工事期間を短縮できる護岸ブロックの設置方法と設置治具を提供することを目的とする。   An object of this invention is to provide the installation method and installation jig | tool of a revetment block which can shorten a construction period in view of the said problem.

上記課題に鑑み、本発明の護岸ブロックの設置方法は、護岸領域に護岸ブロックを設置する護岸ブロックの設置方法であって、
立体形状を有すると共に貫通孔を有する護岸ブロックの貫通孔に、対向する第1板部材と第2板部材と、第1板部材と第2板部材を接続する接続部と、を有する貫通部材を通す、貫通工程と、
第1板部材の下方に設けられる第1下方孔と、第2板部材の下方に設けられる第2下方孔とを連通して固定する連通部材を通す連通工程と、
接続部の上方に設けられる上方孔にワイヤーの一方を通す、第1ワイヤー挿通工程と、
連通部材の一方に設けられる固定孔に、ワイヤーの他方を通す、第2ワイヤー挿通工程と、
第1ワイヤー挿通工程と第2ワイヤー挿通工程とを経たワイヤーを、クレーンで吊り上げる吊り上げ工程と、
吊り上げ工程で吊り上げられた護岸ブロックを、護岸領域の所定位置に設置する設置工程と、を備え、
貫通部材は、第1板部材と第2板部材が、貫通孔の上下からはみ出る、形状および大きさを有している。
In view of the above problems, the installation method of the revetment block of the present invention is a revetment block installation method for installing a revetment block in a revetment area,
A penetrating member having a three-dimensional shape and a through-hole in a revetment block having a through-hole, having a first plate member and a second plate member facing each other, and a connecting portion connecting the first plate member and the second plate member. Through, through process,
A communication step of passing a communication member that communicates and fixes a first lower hole provided below the first plate member and a second lower hole provided below the second plate member;
A first wire insertion step of passing one of the wires through an upper hole provided above the connecting portion;
A second wire insertion step of passing the other of the wires through a fixing hole provided in one of the communication members;
A lifting step of lifting the wire through the first wire insertion step and the second wire insertion step with a crane;
An installation process for installing the revetment block lifted in the lifting process at a predetermined position in the revetment area,
The penetrating member has a shape and a size such that the first plate member and the second plate member protrude from above and below the through hole.

本発明の護岸ブロックの設置方法は、高い精度で、その位置および設置場所への傾きに調整して設置できる。特に、このとき、クレーン操作の高い熟練度を要せず、一般的なレベルの作業者で作業できる。   The method of installing the revetment block according to the present invention can be adjusted with high accuracy and adjusted to the position and the inclination to the installation location. In particular, at this time, a high level of skill in crane operation is not required, and a general level operator can work.

加えて、クレーン操作者以外の地上作業者の作業量が減少して、作業場の危険性も低下できる。また、護岸ブロックを、上下で斜め方向かつ立体方向につりさげることができるので、落下などの危険性も少ない。   In addition, the work amount of ground workers other than the crane operator is reduced, and the danger of the workplace can be reduced. Moreover, since the revetment block can be suspended diagonally and three-dimensionally up and down, there is little risk of falling.

これらが相まって、設置における工事期間を短縮できる。工事期間が短縮できれば、大規模な護岸補修工事を短期に終えることができて、国土の安全性確保を早期に実現できる。加えて、設置コストを低減でき、様々な場所への予算配分も可能となる。   Together, these can shorten the construction period for installation. If the construction period can be shortened, large-scale revetment repair work can be completed in a short period of time, and the national land can be secured at an early stage. In addition, installation costs can be reduced and budgets can be allocated to various locations.

本発明の実施の形態1における護岸が必要な海岸の斜視図である。It is a perspective view of the shore where revetment is required in Embodiment 1 of the present invention. 本発明の実施の形態1における護岸ブロックの設置工事を示す斜視図である。It is a perspective view which shows the installation work of the revetment block in Embodiment 1 of this invention. 本発明の実施の形態1におけるクレーンを用いた護岸ブロックの設置工事の状況を示す写真である。It is a photograph which shows the condition of the installation construction of the revetment block using the crane in Embodiment 1 of this invention. 本発明の実施の形態1における護岸ブロックの模式図である。It is a schematic diagram of the revetment block in Embodiment 1 of this invention. 実施の形態1における設置治具の上面図である。4 is a top view of the installation jig in Embodiment 1. FIG. 本発明の実施の形態1における貫通部材の第1板部材21Aからみた正面図である。It is the front view seen from 21 A of 1st board members of the penetration member in Embodiment 1 of this invention. 本発明の実施の形態1における貫通部材の接続部側から見た正面図である。It is the front view seen from the connection part side of the penetration member in Embodiment 1 of this invention. 本発明の実施の形態1における連通部材の側面図である。It is a side view of the communicating member in Embodiment 1 of the present invention. 本発明の実施の形態1における貫通部材に連通部材が挿入された状態を示す正面図である。It is a front view which shows the state by which the communicating member was inserted in the penetration member in Embodiment 1 of this invention. 本発明の実施の形態1における貫通工程を示す模式図である。It is a schematic diagram which shows the penetration process in Embodiment 1 of this invention. 本発明の実施の形態1における連通工程後の状態を示す模式図である。It is a schematic diagram which shows the state after the communication process in Embodiment 1 of this invention. 本発明の実施の形態1における第1ワイヤー挿通工程を示す模式図である。It is a schematic diagram which shows the 1st wire penetration process in Embodiment 1 of this invention. 本発明の実施の形態1における吊り上げ工程を示す模式図である。It is a schematic diagram which shows the lifting process in Embodiment 1 of this invention. 本発明の実施の形態2における設置治具の写真である。It is a photograph of the installation jig in Embodiment 2 of the present invention. 本発明の実施の形態2における設置治具の写真である。It is a photograph of the installation jig in Embodiment 2 of the present invention. 本発明の実施の形態2における設置治具がクレーンでつりさげられた状態を示す写真である。It is a photograph which shows the state by which the installation jig in Embodiment 2 of this invention was suspended with the crane. 本発明の実施の形態2における護岸ブロックに設置治具を取り付けてクレーンでつりさげている状態を示す写真である。It is a photograph which shows the state which attached the installation jig to the revetment block in Embodiment 2 of this invention, and was suspended with the crane. 本発明の実施の形態2における護岸ブロックの設置工程を示す写真である。It is a photograph which shows the installation process of the revetment block in Embodiment 2 of this invention. 本発明の実施の形態2における護岸ブロックの着地工程の写真である。It is a photograph of the landing process of the revetment block in Embodiment 2 of the present invention. 本発明の実施の形態2における護岸ブロックの設置工事の進捗が進んだ状態を示す写真である。It is a photograph which shows the state which progress of the installation construction of the revetment block in Embodiment 2 of this invention advanced.

本発明の第1の発明に係る護岸ブロックの設置方法は、護岸領域に護岸ブロックを設置する護岸ブロックの設置方法であって、
立体形状を有すると共に貫通孔を有する護岸ブロックの貫通孔に、対向する第1板部材と第2板部材と、第1板部材と第2板部材を接続する接続部と、を有する貫通部材を通す、貫通工程と、
第1板部材の下方に設けられる第1下方孔と、第2板部材の下方に設けられる第2下方孔とを連通して固定する連通部材を通す連通工程と、
接続部の上方に設けられる上方孔にワイヤーの一方を通す、第1ワイヤー挿通工程と、
連通部材の一方に設けられる固定孔に、ワイヤーの他方を通す、第2ワイヤー挿通工程と、
第1ワイヤー挿通工程と第2ワイヤー挿通工程とを経たワイヤーを、クレーンで吊り上げる吊り上げ工程と、
吊り上げ工程で吊り上げられた護岸ブロックを、護岸領域の所定位置に設置する設置工程と、を備え、
貫通部材は、第1板部材と第2板部材が、貫通孔の上下からはみ出る、形状および大きさを有している。
この構成により、短い工期でかつ人的作業を極力減らして、護岸ブロックを設置する工事を行うことができる。
The installation method of the bank protection block which concerns on 1st invention of this invention is the installation method of the bank protection block which installs a bank protection block in a bank protection area,
A penetrating member having a three-dimensional shape and a through-hole in a revetment block having a through-hole, having a first plate member and a second plate member facing each other, and a connecting portion connecting the first plate member and the second plate member. Through, through process,
A communication step of passing a communication member that communicates and fixes a first lower hole provided below the first plate member and a second lower hole provided below the second plate member;
A first wire insertion step of passing one of the wires through an upper hole provided above the connecting portion;
A second wire insertion step of passing the other of the wires through a fixing hole provided in one of the communication members;
A lifting step of lifting the wire through the first wire insertion step and the second wire insertion step with a crane;
An installation process for installing the revetment block lifted in the lifting process at a predetermined position in the revetment area,
The penetrating member has a shape and a size such that the first plate member and the second plate member protrude from above and below the through hole.
With this configuration, it is possible to perform a construction for installing a revetment block in a short construction period and with minimal human work.

本発明の第2の発明に係る護岸ブロックの設置方法では、第1の発明に加えて、護岸ブロックは、平面方向の幅よりも薄い厚みを有し、
貫通孔は、護岸ブロックの厚み方向を貫通しており、
平面方向の形状は、護岸ブロックが他の護岸ブロックと平面方向で配置される場合に、整列可能である。
In the revetment block installation method according to the second invention of the present invention, in addition to the first invention, the revetment block has a thickness thinner than the width in the plane direction,
The through hole penetrates the thickness direction of the revetment block,
The shape in the planar direction can be aligned when the revetment block is arranged in a planar direction with other revetment blocks.

この構成により、護岸領域に、整然かつ欠落などの心配なく、高い耐久性を持って、護岸ブロックが敷き詰められる。   With this configuration, the revetment block is laid in the revetment area with high durability without orderly worries about missing.

本発明の第3の発明に係る護岸ブロックの設置方法では、第2の発明に加えて、護岸ブロックは、貫通孔であって護岸領域に接する部位に、連通部材を通すことのできる凹みを有する。   In the revetment block installation method according to the third invention of the present invention, in addition to the second invention, the revetment block has a dent that allows the communication member to pass through a portion that is a through hole and is in contact with the revetment area. .

この構成により、連通部材によって、貫通部材を固定して護岸ブロックを固定できると共に、設置後においては、連通部材を容易に地面から取り外して、設置治具を何度でも再使用できる。   With this configuration, the piercing member can be fixed by the communication member to fix the revetment block, and after installation, the communication member can be easily detached from the ground and the installation jig can be reused any number of times.

本発明の第4の発明に係る護岸ブロックの設置方法では、第1から第3のいずれかの発明に加えて、貫通部材は、相互に対向する第1板部材と第2板部材と、第1板部材と第2板部材とをH型に接続する接続部と、を有し、貫通工程は、貫通部材を、H型を貫通孔に対して縦方向となるように通す。   In the revetment block installation method according to the fourth invention of the present invention, in addition to any of the first to third inventions, the penetrating member includes a first plate member and a second plate member facing each other, A connecting portion that connects the first plate member and the second plate member to the H shape, and in the penetrating step, the penetrating member is passed through the H shape in the vertical direction with respect to the through hole.

この構成により、貫通部材が、護岸ブロックの貫通孔に適切に挿入されて、護岸ブロックの吊り下げを容易に実現できる。   With this configuration, the penetrating member is appropriately inserted into the through-hole of the revetment block, and the suspension of the revetment block can be easily realized.

本発明の第5の発明に係る護岸ブロックの設置方法では、第1から第4のいずれかの発明に加えて、上方孔は、複数である。   In the revetment block installation method according to the fifth aspect of the present invention, in addition to any one of the first to fourth aspects, the upper hole is plural.

この構成により、護岸ブロックの傾き角度を容易かつさまざまに調整できる。   With this configuration, the inclination angle of the revetment block can be easily and variously adjusted.

本発明の第6の発明に係る護岸ブロックの設置方法では、第1から第5のいずれかの発明に加えて、連通部材は、一方に第1下方孔および第2下方孔とを貫通できない凸部を有し、固定孔は、凸部に設けられる。   In the revetment block installation method according to the sixth invention of the present invention, in addition to any one of the first to fifth inventions, the communication member is a convex that cannot penetrate the first lower hole and the second lower hole on one side. The fixing hole is provided in the convex portion.

この構成により、連通部材は、下方孔を連通した状態で、一方に傾く限りは、下方孔から外れてしまうことがなく、貫通部材との組み合わせ固定を実現できる。   With this configuration, the communication member can be combined and fixed with the penetrating member without being detached from the lower hole as long as the communication member is inclined to one side in a state where the lower hole is communicated.

本発明の第7の発明に係る護岸ブロックの設置方法では、第6の発明に加えて、固定孔は、第1ワイヤー挿通工程でワイヤーが通される第1上方孔もしくは第2上方孔と、護岸ブロックの平面方向において対角位置となる。   In the revetment block installation method according to the seventh invention of the present invention, in addition to the sixth invention, the fixing hole is a first upper hole or a second upper hole through which the wire is passed in the first wire insertion step, and It is a diagonal position in the plane direction of the revetment block.

この構成により、一方にしかない凸部にも関わらず、護岸ブロックを傾かせて吊り下げて設置できる。加えて、設置が終われば、連通部材も貫通部材も簡単に取り外せる。   With this configuration, the revetment block can be tilted and suspended despite the fact that it has only one convex portion. In addition, when the installation is completed, the communicating member and the penetrating member can be easily removed.

本発明の第8の発明に係る護岸ブロックの設置方法では、第1から第7のいずれかの発明に加えて、第1ワイヤー挿通工程および第2ワイヤー挿通工程の前もしくは後で、ワイヤーは、クレーンの吊り下げ部に周回して固定される固定工程を更に備える。   In the revetment block installation method according to the eighth invention of the present invention, in addition to any of the first to seventh inventions, before or after the first wire insertion step and the second wire insertion step, the wire is: It further includes a fixing step of rotating around and fixing to the hanging part of the crane.

この構成により、クレーンによって、設置治具を介して、護岸ブロックをななめ状態で吊り下げることができる。   With this configuration, the revetment block can be suspended in a licked state by the crane via the installation jig.

本発明の第9の発明に係る護岸ブロックの設置方法では、第7または第8のいずれかの発明に加えて、吊り下げ工程において、護岸ブロックは、連通部材の凸部が、水平方向において下方となるように、連通部材が傾く。   In the revetment block installation method according to the ninth aspect of the present invention, in addition to the seventh or eighth aspect of the invention, in the suspending step, the revetment block has a convex portion of the communicating member that is downward in the horizontal direction. The communication member is inclined so that

この構成により、設置治具が外れて護岸ブロックが落ちることはない。加えて、護岸ブロックの設置後には、連通部材と貫通部材は、すぐに取り外して再使用できる。   With this configuration, the installation jig does not come off and the revetment block does not fall. In addition, the communication member and the penetrating member can be immediately removed and reused after the revetment block is installed.

本発明の第10の発明に係る護岸ブロックの設置方法では、第9の発明に加えて、連通部材の傾きは、護岸ブロックの傾きと略一致する。   In the revetment block installation method according to the tenth aspect of the present invention, in addition to the ninth aspect, the inclination of the communication member substantially coincides with the inclination of the revetment block.

この構成により、設置における設置場所との傾きへ、護岸ブロックを合わせる調整の作業の手間が大幅に低減できる。   With this configuration, it is possible to greatly reduce the labor of adjustment work for aligning the revetment block to the inclination with respect to the installation location.

本発明の第11の発明に係る護岸ブロックの設置方法では、第10の発明に加えて、クレーンは、第1挿通工程および第2挿通工程を経て接続されているワイヤーの位置を、吊り下げ工程において調整することで、連通部材の傾きを調整する傾き調整工程を更に備える。   In the revetment block installation method according to the eleventh aspect of the present invention, in addition to the tenth aspect, the crane suspends the position of the wire connected through the first insertion step and the second insertion step. By adjusting in step, an inclination adjustment step of adjusting the inclination of the communication member is further provided.

この構成により、護岸ブロックの傾き調整を容易に行える。   With this configuration, the inclination of the revetment block can be easily adjusted.

本発明の第12の発明に係る護岸ブロックの設置方法では、第11の発明に加えて、護岸ブロックの傾きは、護岸領域の傾きに合せて調整される。   In the revetment block installation method according to the twelfth aspect of the present invention, in addition to the eleventh aspect, the inclination of the revetment block is adjusted in accordance with the inclination of the revetment area.

この構成により、設置する際には、傾き調整が終わっている。   With this configuration, the tilt adjustment is finished when installing.

本発明の第13の発明に係る護岸ブロックの設置方法では、第11または第12の発明に加えて、第1ワイヤー挿通工程において、複数の第1上方孔および複数の第2上方孔のいずれかに、ワイヤーが挿通されることで、傾き調整でのさらなる調整がなされる。   In the revetment block installation method according to the thirteenth aspect of the present invention, in addition to the eleventh or twelfth aspect, in the first wire insertion step, one of the plurality of first upper holes and the plurality of second upper holes. Further, the wire is inserted, and further adjustment by tilt adjustment is made.

この構成により、護岸ブロックの調整幅を更に大きくでき、微調整を容易にできる。   With this configuration, the adjustment width of the revetment block can be further increased, and fine adjustment can be facilitated.

本発明の第14の発明に係る護岸ブロックの設置方法では、第1から第13の発明に加えて、傾き調整工程によって、護岸領域の傾きに対応する傾きに調整された護岸ブロックを、護岸領域に着地させる着地工程を、更に備える。   In the revetment block installation method according to the fourteenth aspect of the present invention, in addition to the first to thirteenth aspects, the revetment block adjusted to the inclination corresponding to the inclination of the revetment area by the inclination adjustment step is added to the revetment area. And a landing process for landing on the vehicle.

この構成により、護岸ブロックが護岸領域に設置される。   With this configuration, the revetment block is installed in the revetment area.

本発明の第15の発明に係る護岸ブロックの設置方法では、第14の発明に加えて、着地工程の後で、連通部材が第1下方孔および第2下方孔から引き抜かれる引き抜き工程を更に備える。   The revetment block installation method according to the fifteenth aspect of the present invention, in addition to the fourteenth aspect, further includes a drawing step in which the communication member is pulled out from the first lower hole and the second lower hole after the landing step. .

この構成により、連通部材はすぐに外して、設置後の処理ができる。   With this configuration, the communication member can be removed immediately and processing after installation can be performed.

本発明の第16の発明に係る護岸ブロックの設置方法では、第15の発明に加えて、引き抜き工程の後で、貫通孔から貫通部材が取り外される、取り外し工程を更に備える。   In addition to the fifteenth invention, the method for installing a revetment block according to the sixteenth invention of the present invention further includes a removing step in which the penetrating member is removed from the through hole after the drawing step.

この構成により、設置治具は、再使用可能となる。   With this configuration, the installation jig can be reused.

以下、図面を参照しながら、本発明の実施の形態を説明する。   Hereinafter, embodiments of the present invention will be described with reference to the drawings.

(実施の形態1)   (Embodiment 1)

(護岸ブロックを必要とする状況)
まず、図1、図2を用いて、護岸ブロックを設置する設置工事が必要な環境や状況について説明する。図1は、本発明の実施の形態1における護岸が必要な海岸の斜視図である。図1での海岸1は、海面に近い海抜の低い低地部分2と、津波や高波に対応するために高さを盛り上げた高地部分3とを有している。このような低地部分2と高地部分3とがあることで、これらをつなぐ斜めの法面4が形成される。このような高地部分3や法面4は、本来の自然の地形で生じていることもある。あるいは、津波、高潮、高波、河川氾濫などに対応するために、人工的に形成されることもある。
(Situation requiring a revetment block)
First, with reference to FIGS. 1 and 2, an environment and situation where installation work for installing a revetment block is required will be described. FIG. 1 is a perspective view of a coast where revetment is required in Embodiment 1 of the present invention. The coast 1 in FIG. 1 has a low-lying part 2 above sea level and close to the sea surface, and a high-altitude part 3 that is raised to cope with tsunami and high waves. By having such a lowland portion 2 and a highland portion 3, an oblique slope 4 connecting them is formed. Such high altitude parts 3 and slopes 4 may occur in the natural natural topography. Alternatively, it may be artificially formed to cope with tsunamis, storm surges, high waves, river flooding, and the like.

特に、2011年の東日本大震災では、東北地方の太平洋側においては津波対策のために、海岸1を高地化する工事が進められている。   In particular, in the Great East Japan Earthquake in 2011, construction to raise coast 1 is being promoted on the Pacific side of the Tohoku region as a countermeasure against tsunami.

もちろん、図1に示される地形は、海岸1に限られず、湖岸や河岸であってもよい。   Of course, the topography shown in FIG. 1 is not limited to the coast 1 but may be a lake or a river.

このように海岸1などを高地化するために、高地部分3を形成することで、当然ながら法面4が生じてしまう。法面4は、図1,2に示されるように高地部分3から低地部分2にかけて斜めの態様を有する。この法面4は、例えば津波、高潮、高波などが押し寄せてきてしまうと、これらの圧力によって法面4が破壊されてしまうことがある。法面4が構築されながら高地部分3が形成される。このため、法面4が生じる。この法面4の土壌が露出している。このため、津波などの圧力で破壊されやすい。   In this way, the slope 4 is naturally formed by forming the highland portion 3 in order to raise the coast 1 and the like. As shown in FIGS. 1 and 2, the slope 4 has an oblique aspect from the highland portion 3 to the lowland portion 2. For example, when a tsunami, a storm surge, a high wave, or the like is approached, the slope 4 may be destroyed by these pressures. The highland part 3 is formed while the slope 4 is constructed. For this reason, the slope 4 is generated. This slope 4 soil is exposed. For this reason, it is easily destroyed by pressure such as tsunami.

法面4が破壊されてしまえば、当然ながら高地部分3が損傷してしまい、高地化工事での利益が得られないことにもなってしまう。このため、高地化工事などに伴って生じる図1のような法面4を保護する工事が必要になる。   If the slope 4 is destroyed, the high altitude portion 3 is naturally damaged, and the profit in the high altitude construction cannot be obtained. For this reason, a construction for protecting the slope 4 as shown in FIG.

図2は、本発明の実施の形態1における護岸ブロックの設置工事を示す斜視図である。図1で形成される法面4の保護のために、コンクリートなどの強度、硬度、重量があって大量生産の可能な護岸ブロック10が、法面4に敷き詰められるように設置される工事が実施される。これが図2に示される状態である。   FIG. 2 is a perspective view showing installation work of a revetment block in Embodiment 1 of the present invention. In order to protect the slope 4 formed in FIG. 1, a construction is carried out in which a revetment block 10 having strength, hardness and weight such as concrete and capable of mass production is laid on the slope 4. Is done. This is the state shown in FIG.

図2に示されるように、法面4に護岸ブロック10が敷き詰められるように配置される。この護岸ブロック10の設置工事によって、法面4の土壌の露出が防止され、津波、高潮、高波などの災害時の圧力によって法面4の破壊が防止される。法面4の破壊が防止されれば、高地部分3の破壊も防止され、高地化工事が無に帰することが防止される。   As shown in FIG. 2, the revetment block 10 is arranged on the slope 4 so as to be spread. By the installation work of the revetment block 10, the exposure of the soil on the slope 4 is prevented, and the destruction of the slope 4 is prevented by the pressure at the time of disaster such as tsunami, storm surge, and high wave. If the destruction of the slope 4 is prevented, the destruction of the highland portion 3 is also prevented, and it is possible to prevent the highland construction from returning to nothing.

図2に示されるように、水に関した災害の多い我が国においては、海岸1や湖岸、河岸での法面4への護岸ブロック10を設置する設置工事が急務であり、将来的にも継続されていく。   As shown in Fig. 2, in Japan, where there are many water-related disasters, installation work to install the revetment block 10 on the coast 1 and lakeside and riverside slopes 4 is urgent and will continue in the future. To go.

このような護岸ブロック10の設置工事においては、当然ながら重量物である護岸ブロック10を、法面4に正確に設置するためにクレーンなどの重機が用いられる。図3は、本発明の実施の形態1におけるクレーンを用いた護岸ブロックの設置工事の状況を示す写真である。   In such installation work of the revetment block 10, naturally, a heavy machine such as a crane is used to accurately install the revetment block 10, which is a heavy object, on the slope 4. FIG. 3 is a photograph showing the state of the revetment block installation work using the crane according to Embodiment 1 of the present invention.

図3の写真から分かるとおり、かなりの重量物である護岸ブロックが、重機であるクレーンによって引き揚げ、吊り下げ、移動、下降、設置などの手順の繰り返しによって、法面4に設置されている。従来技術においては、これらのクレーンを用いた護岸ブロックの設置作業は、クレーン操作の熟練度や、クレーン操作以外の人的作業の多さによる作業時間の長さや困難性、あるいは危険性を有していた。   As can be seen from the photograph in FIG. 3, the revetment block, which is a heavy object, is installed on the slope 4 by repeating a procedure such as lifting, hanging, moving, descending, and setting by a crane that is a heavy machine. In the prior art, the installation work of revetment blocks using these cranes has a long working time, difficulty, or danger due to the skill level of crane operation and the large amount of human work other than crane operation. It was.

図3の写真からもわかるように、法面は、低地部分と高地部分とをつなぐ面であるが、高地化工事の状況や、もともとの地形、地質、安定性によって法面の角度、幅、広さなどがさまざまである。もちろん、法面の地質なども様々であり、必要とする護岸ブロックの数もさまざまである。この点でも、護岸ブロックの設置工事の困難性や危険性が生じていた。結果として、護岸ブロックの設置工事の工期やコストが高くなってしまい、急ぐ必要のある工事がなかなか進まない問題もあった。   As can be seen from the photograph in Fig. 3, the slope is a plane that connects the lowland area and the highland area. However, depending on the situation of the highland construction, the original topography, geology, and stability, the slope angle, width, There are various sizes. Of course, the geology of the slopes varies, and the number of revetment blocks required varies. In this respect as well, there were difficulties and dangers in the construction of revetment blocks. As a result, the construction period and cost of the revetment block installation work became high, and there was a problem that the work that needed to be rushed did not proceed easily.

本発明の護岸ブロックの設置方法は、これらの困難性、危険性を減少し、工期やコストを低減できるものである。   The installation method of the revetment block of this invention can reduce these difficulties and dangers, and can reduce a construction period and cost.

(全体概要)
まず、実施の形態1における護岸ブロックの設置方法の全体概要を説明する。
(Overview)
First, an overall outline of the method for installing a revetment block in the first embodiment will be described.

護岸ブロック10の設置される海岸1は、図1、2に示されるような地形であり、図1、図2に示されるような法面4が形成されている。   The coast 1 where the revetment block 10 is installed has a terrain as shown in FIGS. 1 and 2, and a slope 4 as shown in FIGS. 1 and 2 is formed.

(護岸ブロック)
まず、実施の形態1における護岸ブロックの設置方法に用いられる護岸ブロック10を説明する。図4は、本発明の実施の形態1における護岸ブロックの模式図である。図4は、護岸ブロック10を上面、正面、側面のそれぞれから見た状態を示している。
(Revetment block)
First, the revetment block 10 used for the installation method of the revetment block in Embodiment 1 is demonstrated. FIG. 4 is a schematic diagram of a revetment block according to Embodiment 1 of the present invention. FIG. 4 shows a state where the revetment block 10 is viewed from the top, front, and side surfaces.

図4の左上は、護岸ブロック10の上面を示しており、左下は正面を示しており、右側は側面を示している。それぞれ、同じ護岸ブロック10を、異なる方向から見た状態を示しており、護岸ブロック10の構造をわかりやすく示している。   The upper left of FIG. 4 has shown the upper surface of the revetment block 10, the lower left has shown the front, and the right side has shown the side. The state where the same revetment block 10 was seen from a different direction is shown, respectively, and the structure of the revetment block 10 is shown in an easy-to-understand manner.

なお、図4に示される護岸ブロック10は、一例であり、この形状、構造に限定されるものではない。   In addition, the revetment block 10 shown by FIG. 4 is an example, and is not limited to this shape and structure.

護岸ブロック10は、その外周に凹部12、13を有している。凹部12、13を有することで、隣接する護岸ブロック同士を組み合わせて設置後の組み合わせ強度を上げることができる。もちろん、単体での護岸ブロック10の強度や耐久性も上げることができる。このため、凹部12、13は、複数の護岸ブロック10のそれぞれで同様の位置に同様の形状を有し、平面方向で複数の護岸ブロック10が二次元配列される場合に、凹部12、13同士が組み合わさって、整列可能である。   The revetment block 10 has the recessed parts 12 and 13 in the outer periphery. By having the recesses 12 and 13, it is possible to increase the combined strength after installation by combining adjacent revetment blocks. Of course, the strength and durability of the seawall block 10 as a single unit can be increased. Therefore, the recesses 12 and 13 have the same shape at the same position in each of the plurality of revetment blocks 10, and when the plurality of revetment blocks 10 are two-dimensionally arranged in the plane direction, the recesses 12 and 13 Can be combined and aligned.

また、護岸ブロック10は、平面方向の幅よりも薄い厚みを有している。加えて、護岸ブロック10は、その中央付近に厚み方向を貫通する貫通孔15を備えている。更に、この貫通孔15の底部であって、護岸ブロック10の底面(すなわち、護岸領域である法面4)に接する部位に、後述する連通部材を通すことのできる凹み16を有する。   Moreover, the revetment block 10 has thickness thinner than the width | variety of a plane direction. In addition, the revetment block 10 includes a through hole 15 penetrating in the thickness direction near the center thereof. Furthermore, it has the dent 16 which can let the communicating member mentioned later pass in the site | part which contact | connects the bottom face of this through-hole 15, and the bottom face of the revetment block 10 (namely, slope 4 which is a revetment area).

護岸ブロック10は、重量を考えてコンクリートや鉄筋コンクリートで製造されることが好ましいが、これ以外の素材であってもよい。   The revetment block 10 is preferably made of concrete or reinforced concrete in consideration of weight, but other materials may be used.

(貫通部材)
護岸ブロック10は、クレーンによって吊り上げられて、護岸領域である法面4に設置される。クレーンで吊り上げるための設置治具が必要となる。図5は、実施の形態1における設置治具の上面図である。設置治具50は、H型の部材である。図5のように上方から見た場合に、H型の形状を有している。もちろん、H型に限られるものではなく、その他の外観であってもよい。
(Penetrating member)
The revetment block 10 is lifted by a crane and installed on the slope 4 which is a revetment area. An installation jig for lifting with a crane is required. FIG. 5 is a top view of the installation jig in the first embodiment. The installation jig 50 is an H-shaped member. When viewed from above as shown in FIG. 5, it has an H-shape. Of course, it is not limited to the H type, and may have other appearances.

設置治具50は、護岸ブロック10の貫通孔15に挿入するように対応した、第1板部材21Aとこれに対向する第2板部材21Bを備える。この第1板部材21Aと第2板部材21Bが、対向する状態で、側面から見た場合にH型となるように接続する接続部22を有している。これらの第1板部材21A、第2板部材21Bと、これらを対向するように接続する接続部22が、H型の設置治具50の外形を形成して、貫通孔15に挿入される貫通部材20となる。   The installation jig 50 includes a first plate member 21 </ b> A and a second plate member 21 </ b> B facing the first plate member 21 </ b> A corresponding to be inserted into the through hole 15 of the revetment block 10. The first plate member 21 </ b> A and the second plate member 21 </ b> B have connection portions 22 that are connected so as to be H-shaped when viewed from the side in a state of facing each other. The first plate member 21A, the second plate member 21B, and the connecting portion 22 that connects them so as to face each other form the outer shape of the H-shaped installation jig 50 and are inserted into the through hole 15. Member 20 is formed.

図5やその他の図では、第1板部材21A、第2板部材21B、接続部22に孔が設けられているが、これは、貫通部材20の軽量化のためである。   In FIG. 5 and other drawings, holes are provided in the first plate member 21 </ b> A, the second plate member 21 </ b> B, and the connection portion 22, but this is for reducing the weight of the penetrating member 20.

また、第1板部材21Aおよび第2板部材21Bのそれぞれの上部にはストッパー23が設けられている。ストッパー23は、貫通部材20が貫通孔15の上方から挿入される場合に、貫通部材20が、貫通孔15の下方に抜けてしまわないためのストッパーである。貫通孔15の縁に、ストッパー23が引っ掛かることで、貫通孔15の上方から貫通部材20を挿入する際に、ストッパー23が貫通孔15の縁に引っかかって、抜け落ちることがない。   Moreover, the stopper 23 is provided in each upper part of 21 A of 1st board members, and the 2nd board member 21B. The stopper 23 is a stopper for preventing the penetrating member 20 from coming out below the through hole 15 when the penetrating member 20 is inserted from above the through hole 15. Since the stopper 23 is hooked on the edge of the through hole 15, when the penetrating member 20 is inserted from above the through hole 15, the stopper 23 is caught on the edge of the through hole 15 and does not fall off.

図6は、本発明の実施の形態1における貫通部材の第1板部材21Aからみた正面図である。貫通部材20は、第1板部材21Aから見た場合には、対向する第2板部材21Bを向こう側とするような板状に見える。第2板部材21Bから見た場合も同様である。   FIG. 6 is a front view of the penetrating member as viewed from the first plate member 21A according to the first embodiment of the present invention. When viewed from the first plate member 21A, the penetrating member 20 looks like a plate having the opposite second plate member 21B as the far side. The same applies to the second plate member 21B.

ここで、第1板部材21Aおよび第2板部材21Bのそれぞれの下方には、第1下方孔26Aと第2下方孔26Bとが設けられている。図7に示されるように、接続部22を正面とするように貫通部材20を正面から見た場合には、左右のそれぞれにある第1板部材21Aの下方に第1下方孔26Aが設けられ、第2板部材21Bの下方に第2下方孔26Bが設けられている状態である。   Here, a first lower hole 26A and a second lower hole 26B are provided below each of the first plate member 21A and the second plate member 21B. As shown in FIG. 7, when the penetrating member 20 is viewed from the front so that the connection portion 22 is the front, the first lower hole 26A is provided below the first plate member 21A on each of the left and right. The second lower hole 26B is provided below the second plate member 21B.

第1下方孔26Aと第2下方孔26Bとは、後述する連通部材30を連通させるために使用される。なお、図6に示される第1下方孔26A以外の孔は、上述の通り、第1板部材21Aの軽量化のためである。これは、第2板部材21Bであっても同様である。   The first lower hole 26A and the second lower hole 26B are used for communicating a communication member 30 described later. Note that holes other than the first lower hole 26A shown in FIG. 6 are for reducing the weight of the first plate member 21A as described above. The same applies to the second plate member 21B.

接続部22は、第1板部材21Aと第2板部材21Bとを、対向させるように接続する板部材である。図7は、本発明の実施の形態1における貫通部材の接続部側から見た正面図である。   The connecting portion 22 is a plate member that connects the first plate member 21A and the second plate member 21B so as to face each other. FIG. 7 is a front view seen from the connecting portion side of the penetrating member in Embodiment 1 of the present invention.

接続部22は、第1板部材21Aと第2板部材21Bとを接続することで、全体をH型にできる。接続部22は、その上部に延長板28を備える。延長板28は、貫通部材20において、第1板部材21A、第2板部材21Bよりも、その高さが高い状態である。   The connecting portion 22 can be entirely H-shaped by connecting the first plate member 21A and the second plate member 21B. The connecting portion 22 includes an extension plate 28 at the top thereof. The extension plate 28 is higher in the penetrating member 20 than the first plate member 21A and the second plate member 21B.

延長板28、接続部22に溶接や接着で別部材が取り付けられてもよいし、板部材である接続部22と一体形成で成形されてもよい。   Another member may be attached to the extension plate 28 and the connection portion 22 by welding or adhesion, or may be formed integrally with the connection portion 22 that is a plate member.

延長板28は、後述するクレーンでの吊り上げの際に必要となるワイヤーを通す上方孔27を有する。上方孔27は、連通部材30が備える固定孔と対になって、ワイヤーが通されて、ワイヤーによる吊り下げを可能とする。   The extension plate 28 has an upper hole 27 through which a wire necessary for lifting with a crane described later is passed. The upper hole 27 is paired with a fixed hole provided in the communication member 30 to allow the wire to pass therethrough and to be suspended by the wire.

上方孔27は、図7に示されるように、延長板28に複数設けられてもよい。図7では、上方孔27A,27B、27Cの3つの上方孔27が設けられている。もちろん、上方孔27は、一つであってもよいし、3つ以外の数であってもよい。ただし、上方孔27が、図7のように、上方孔27A,27B,27Cの3つのように複数設けられることで、ワイヤーを通す上方孔27の位置を変えることができる。この位置替えによって、固定孔と対になって通されるワイヤーの角度を変化させることができ、護岸ブロック10の吊り上げ角度や吊り上げ位置などを、調整できるようになる。   As shown in FIG. 7, a plurality of upper holes 27 may be provided in the extension plate 28. In FIG. 7, three upper holes 27, upper holes 27A, 27B, and 27C, are provided. Of course, the upper hole 27 may be one or a number other than three. However, by providing a plurality of upper holes 27 such as three upper holes 27A, 27B, and 27C as shown in FIG. 7, the position of the upper hole 27 through which the wire passes can be changed. By this position change, the angle of the wire passing through the fixed hole can be changed, and the lifting angle and the lifting position of the revetment block 10 can be adjusted.

なお、貫通部材20は、鉄などの金属や合金で形成されればよい。重量物である護岸ブロック10を吊り上げてさらには、法面4に設置するので、強度および耐久性を必要とするからである。もちろん、後述するが、貫通部材20は、連通部材30と合せて護岸ブロック10を吊り上げおよび設置することができる。貫通部材20と連通部材30の組み合わせによって、護岸ブロック10を設置できることで、貫通部材20と連通部材30とを取り外せば、これらによって構成される設置治具50は、再使用が可能となる。   The penetrating member 20 may be formed of a metal such as iron or an alloy. This is because the revetment block 10 which is a heavy object is lifted and further installed on the slope 4 so that strength and durability are required. Of course, as will be described later, the penetrating member 20 can lift and install the revetment block 10 together with the communication member 30. Since the revetment block 10 can be installed by a combination of the penetrating member 20 and the communication member 30, if the penetrating member 20 and the communication member 30 are removed, the installation jig 50 constituted by these can be reused.

このような再使用が可能であることも、設置工事のコストを低減できる。   Such re-use is also possible to reduce the cost of installation work.

(連通部材)
図8は、本発明の実施の形態1における連通部材の側面図である。連通部材30は、貫通孔15に挿入された貫通部材20が、貫通孔15の上方から抜けてしまわないように、固定する。すなわち、連通部材30によって、挿入された貫通部材20は、護岸ブロック10の下方から抜け出ないようになる。
(Communication member)
FIG. 8 is a side view of the communication member according to Embodiment 1 of the present invention. The communicating member 30 is fixed so that the penetrating member 20 inserted into the through hole 15 does not come out from above the through hole 15. In other words, the penetrating member 20 inserted by the communication member 30 does not come out from below the revetment block 10.

連通部材30は、本体31と、凸部32と、凸部32に設けられる固定孔33を有する。図8は、この構造を示している。   The communication member 30 includes a main body 31, a convex portion 32, and a fixing hole 33 provided in the convex portion 32. FIG. 8 shows this structure.

連通部材30は、貫通孔15に挿入された貫通部材20の第1下方孔26Aと第2下方孔26Bとをつなぐようにして挿入される。このとき、当然に凸部32が存在していない方向から、下方孔26に挿入され、挿入された後で、凸部32が、第1下方孔26Aもしくは第2下方孔26Bのいずれかの外側に引っかかるようになる。   The communication member 30 is inserted so as to connect the first lower hole 26 </ b> A and the second lower hole 26 </ b> B of the through member 20 inserted into the through hole 15. At this time, it is naturally inserted into the lower hole 26 from the direction in which the convex portion 32 does not exist, and after the insertion, the convex portion 32 is outside either the first lower hole 26A or the second lower hole 26B. Get caught.

このような状態となって、連通部材30は、第1下方孔26Aと第2下方孔26Bとを連通する。加えて、連通部材30の本体部31は、護岸ブロック10の凹16の長さよりも長い長さを有している。この結果、挿入された連通部材30は、護岸ブロック10の凹16の下方に必ず引っかかるような状態を作り上げることができる。   In this state, the communication member 30 communicates the first lower hole 26A and the second lower hole 26B. In addition, the main body 31 of the communication member 30 has a length longer than the length of the recess 16 of the revetment block 10. As a result, the inserted communication member 30 can be made to be surely caught under the recess 16 of the revetment block 10.

連通部材30は、貫通部材20が、貫通孔15の上方から挿入されたところで、護岸ブロック10の凹部16のスペースに現れる第1下方孔26Aと第2下方孔26Bとに、挿入される。この挿入によって連通される。   The communication member 30 is inserted into the first lower hole 26 </ b> A and the second lower hole 26 </ b> B that appear in the space of the recess 16 of the revetment block 10 when the penetrating member 20 is inserted from above the through hole 15. It is communicated by this insertion.

連通されれば、連通部材30は、貫通部材20を貫通孔15の下方で固定できる。特に、護岸ブロック10の凹部16に連通部材30が設置された状態となるので、連通部材30は、凹部16(護岸ブロック10の下方において直線的に伸びている)に沿って設置されて固定状態となる。   If communicated, the communicating member 30 can fix the penetrating member 20 below the through hole 15. In particular, since the communication member 30 is installed in the recess 16 of the revetment block 10, the communication member 30 is installed along the recess 16 (extending linearly below the revetment block 10) and fixed. It becomes.

図9は、本発明の実施の形態1における貫通部材に連通部材が挿入された状態を示す正面図である。   FIG. 9 is a front view showing a state where the communication member is inserted into the penetrating member according to the first embodiment of the present invention.

連通部材30は、上述の通り、貫通部材20の第1板部材21Aの第1下方孔26Aおよび第2板部材21Bの第2下方孔26Bのそれぞれを通す。   As described above, the communication member 30 passes the first lower hole 26A of the first plate member 21A of the penetrating member 20 and the second lower hole 26B of the second plate member 21B.

すなわち、連通部材30は、第1下方孔26Aから差し込まれて、第2下方孔26Bを貫いて挿入が完了する。さらには、連通部材30は、第1下方孔26Aにおいて、凸部32が引っ掛かる状態となって、第2貫通孔26Bから、連通部材30が抜け出てしまう状態が防止される。   That is, the communication member 30 is inserted from the first lower hole 26A, and the insertion is completed through the second lower hole 26B. Furthermore, the communication member 30 is in a state in which the convex portion 32 is caught in the first lower hole 26A, and the state in which the communication member 30 is pulled out from the second through hole 26B is prevented.

図9に示される状態となることで、貫通部材20と連通部材30とが組み合わされて、設置治具50が構成される。この設置治具50が、護岸ブロック10の貫通孔10に挿入された上で、クレーンによる吊り上げ、吊り下げで、護岸領域である法面4に設置される。   By being in the state shown in FIG. 9, the penetrating member 20 and the communication member 30 are combined to form the installation jig 50. The installation jig 50 is inserted into the through-hole 10 of the revetment block 10 and then installed on the slope 4 which is a revetment area by lifting and suspending with a crane.

図9に示される設置治具50が、このような状態を縦方向として、護岸ブロック10の貫通孔10に挿入される。このため、上方孔27Aなどは、貫通孔10の上方から露出しており、連通部材30は、貫通孔10の下方において、護岸ブロック10の凹部16に沿って、下から護岸ブロック10を支える役割を果たす。   The installation jig 50 shown in FIG. 9 is inserted into the through hole 10 of the revetment block 10 with such a state as the vertical direction. Therefore, the upper hole 27A and the like are exposed from above the through hole 10, and the communication member 30 supports the revetment block 10 from below along the recess 16 of the revetment block 10 below the through hole 10. Fulfill.

(設置工法)
以上説明した設置治具50によって、護岸領域である法面4に複数の護岸ブロック10が、整然と並ぶように設置される。このとき、図3に示されるようにクレーンが用いられる。もちろん、クレーンは、物体である護岸ブロック10を吊り上げるための重機の一般的名称であり、総称である。重機の種類や呼び方の特殊性によってクレーンと称されないものを除外する意図ではない。
(Installation method)
With the installation jig 50 described above, a plurality of revetment blocks 10 are installed in an orderly manner on the slope 4 which is a revetment area. At this time, a crane is used as shown in FIG. Of course, the crane is a general name of a heavy machine for lifting the revetment block 10 as an object, and is a generic name. It is not intended to exclude things that are not called cranes due to the type of heavy machinery or the particularity of the name.

以下に、護岸ブロック10の設置方法について説明する。   Below, the installation method of the revetment block 10 is demonstrated.

(貫通工程)
まず、貫通工程が実行される。
(Penetration process)
First, a penetration process is performed.

図10は、本発明の実施の形態1における貫通工程を示す模式図である。図5などを用いて説明した貫通部材20が、護岸ブロック10の貫通孔15に挿入される。挿入される際には、護岸ブロック10が保管場所におかれているので、貫通部材20は、貫通孔15の上方から挿入されればよい。   FIG. 10 is a schematic diagram showing a penetration step in the first embodiment of the present invention. The penetrating member 20 described with reference to FIG. 5 and the like is inserted into the through hole 15 of the revetment block 10. When inserted, since the revetment block 10 is placed in the storage location, the penetrating member 20 may be inserted from above the through hole 15.

図10では、貫通孔15に上方から貫通部材20が挿入された後の状態が示されている。ここでは、第1板部材21Aが正面側に来ている位置関係である。このため、第1板部材21Aの下方にある第1下方孔26Aは、護岸ブロック10の凹部16に露出している。図10の裏側においては、第2板部材21Bの下方にある第2下方孔26Bが、同様に護岸ブロック10の凹部16に露出している。   FIG. 10 shows a state after the penetrating member 20 is inserted into the through hole 15 from above. Here, the positional relationship is such that the first plate member 21A comes to the front side. For this reason, the first lower hole 26 </ b> A below the first plate member 21 </ b> A is exposed in the recess 16 of the revetment block 10. On the back side of FIG. 10, the second lower hole 26 </ b> B below the second plate member 21 </ b> B is similarly exposed in the recess 16 of the revetment block 10.

加えて、貫通部材20は、貫通孔15の上方から挿入されている。このため、第1板部材21Aおよび第2板部材21Bのそれぞれに設けられているストッパー23は、貫通孔15の縁に引っかかるようになって、貫通部材20が、貫通孔15の下方から抜け落ちないようになっている。   In addition, the penetrating member 20 is inserted from above the through hole 15. For this reason, the stopper 23 provided in each of the first plate member 21 </ b> A and the second plate member 21 </ b> B is caught by the edge of the through hole 15, and the through member 20 does not fall out from below the through hole 15. It is like that.

このようにして、まず貫通部材20が、貫通孔15の内部に装入される貫通工程が実行される。もちろん、第1板部材などで構成されるH型の全体は、貫通孔15より小さく、貫通孔15に貫通部材20は挿入できる。   In this way, a penetrating process in which the penetrating member 20 is first inserted into the through hole 15 is performed. Of course, the entire H-type formed of the first plate member or the like is smaller than the through hole 15, and the through member 20 can be inserted into the through hole 15.

貫通工程は、人的作業で行われてもよいし、クレーンなどの重機で貫通部材20をつりさげて作業されてもよい。   The penetrating process may be performed manually or by penetrating the penetrating member 20 with a heavy machine such as a crane.

この貫通工程が実施されることで、護岸ブロック10を吊り上げるための第一歩の作業が完了する。   By performing this penetrating process, the first step for lifting the revetment block 10 is completed.

(連通工程)
図11は、本発明の実施の形態1における連通工程後の状態を示す模式図である。
(Communication process)
FIG. 11 is a schematic diagram showing a state after the communication step in the first embodiment of the present invention.

貫通部材20が貫通孔15に貫通された貫通工程の後で、貫通部材20が貫通孔15から抜け出ないように固定する必要がある。ここで、護岸ブロック10の凹部16には、第1下方孔26Aと第2下方孔26Bとが露出している。連通部材30が、この第1下方孔26Aもしくは第2下方孔26Bのいずれかから挿入される。   It is necessary to fix the penetrating member 20 so that the penetrating member 20 does not come out of the through hole 15 after the penetrating process in which the penetrating member 20 is penetrated through the through hole 15. Here, the first lower hole 26 </ b> A and the second lower hole 26 </ b> B are exposed in the recess 16 of the revetment block 10. The communication member 30 is inserted from either the first lower hole 26A or the second lower hole 26B.

この挿入によって、第1下方孔26Aと第2下方孔26Bとが、連通部材30によって連通される。これが連通工程である。   By this insertion, the first lower hole 26 </ b> A and the second lower hole 26 </ b> B are communicated by the communication member 30. This is a communication process.

連通工程によって、第1下方孔26Aもしくは第2下方孔26Bのいずれかの側の外側には、連通部材30の凸部32が引っ掛かる。このため、連通部材30は、第1貫通孔26Aもしくは第2貫通孔26Bのいずれか一方からしか引き抜けない状態となる。   Due to the communication step, the convex portion 32 of the communication member 30 is caught on the outer side of either the first lower hole 26A or the second lower hole 26B. For this reason, the communication member 30 will be in the state which can be pulled out only from either the 1st through-hole 26A or the 2nd through-hole 26B.

後述するワイヤーの固定によって、護岸ブロック10がななめ状態となって運搬される。このとき、連通部材30は、後述する図13のように、凸部32が水平面での上側になる。連通部材30は、第1下方孔26Aと第2下方孔26Bとを連通しているが、このとき連通部材30の本体部31と、第1下方孔26Aと第2下方孔26Bとの間は、ゴムのような弾性体で外れないように密着している。
このため、凸部32が水平面で上側になっても、連通部材30が、通っている第1下方孔26Aと第2下方孔26Bとから抜け落ちることはない。逆に、護岸ブロック10を設置した後で、凸部が法面4の上側(後述する図19)に位置するようになるので、連通部材30を簡単に引き抜いて作業を終えることができる。
The revetment block 10 is licked and transported by fixing the wire described later. At this time, as for the communicating member 30, the convex part 32 becomes an upper side in a horizontal surface like FIG. 13 mentioned later. The communication member 30 communicates the first lower hole 26A and the second lower hole 26B. At this time, the space between the main body 31 of the communication member 30 and the first lower hole 26A and the second lower hole 26B. It is in close contact with an elastic body like rubber.
For this reason, even if the convex part 32 becomes an upper side with a horizontal surface, the communication member 30 does not fall out from the 1st lower hole 26A and the 2nd lower hole 26B which have passed. On the contrary, after the revetment block 10 is installed, the convex portion is positioned above the slope 4 (FIG. 19 described later), so that the communication member 30 can be easily pulled out to finish the work.

連通工程によって、貫通部材20を含めた設置治具50が、貫通孔15内部において、固定された状態となる。   Through the communication process, the installation jig 50 including the penetrating member 20 is fixed inside the through hole 15.

(第1ワイヤー挿通工程)
図12は、本発明の実施の形態1における第1ワイヤー挿通工程を示す模式図である。図11で示される連通工程によって、貫通部材20と連通部材30とが組み合わされて設置治具50が貫通孔15に固定される。
(First wire insertion process)
FIG. 12 is a schematic diagram showing a first wire insertion step in the first embodiment of the present invention. In the communication step shown in FIG. 11, the installation member 50 is fixed to the through hole 15 by combining the through member 20 and the communication member 30.

この設置治具50が、クレーンで吊り上げられることで、護岸ブロック10が、吊り上げられて、法面4の所定位置に設置される設置作業が行われるようになる。   When the installation jig 50 is lifted by a crane, the revetment block 10 is lifted and an installation operation is performed in which it is installed at a predetermined position on the slope 4.

まず、クレーンにつながる第1ワイヤー61が、貫通部材20の接続部22の上方に設けられている上方孔27A,27B、27Cのいずれかに通される。図12では、上方孔27Aに第1ワイヤー61が通されている。第1ワイヤー61の通され方は、一般的なワイヤーの孔への通し方および固定と同様である。   First, the first wire 61 connected to the crane is passed through any one of the upper holes 27A, 27B, and 27C provided above the connecting portion 22 of the penetrating member 20. In FIG. 12, the first wire 61 is passed through the upper hole 27A. The way of passing the first wire 61 is the same as the way of passing through and fixing a general wire.

第1ワイヤー挿通工程によって、クレーンにつながる第1ワイヤー61が、まず貫通部材20の上方を引き上げる状態が整う。   The state where the first wire 61 connected to the crane first pulls up the penetrating member 20 is prepared by the first wire insertion step.

なお、後述する第2ワイヤー62とのバランスによって、第1ワイヤー61は、上方孔27Aではなく、別の上方孔27B,27Cのいずれかに通されてもよい。   Note that the first wire 61 may be passed through one of the upper holes 27B and 27C instead of the upper hole 27A depending on the balance with the second wire 62 described later.

(第2ワイヤー挿通工程)
次に、連通部材30の固定孔33に第2ワイヤー62が通される。これが第2ワイヤー挿通工程である。第2ワイヤー62も、第1ワイヤー61と同様にクレーンに接続されるワイヤーである。
(Second wire insertion process)
Next, the second wire 62 is passed through the fixing hole 33 of the communication member 30. This is the second wire insertion step. Similarly to the first wire 61, the second wire 62 is a wire connected to the crane.

第2ワイヤー62は、固定孔33に挿通されるので、図12に示されるように、設置治具50の下方(護岸ブロック10の下方)に挿通されて支点を有するワイヤーとなる。   Since the 2nd wire 62 is penetrated by the fixing hole 33, as FIG. 12 shows, it will be penetrated below the installation jig 50 (below the seawall block 10), and will become a wire which has a fulcrum.

これに対して、第1ワイヤー挿通工程で挿通された第1ワイヤー61は、上方孔27に挿通されるので、設置治具50の上方(護岸ブロック10の上方)に支点を有するワイヤーとなる。   On the other hand, since the first wire 61 inserted in the first wire insertion step is inserted into the upper hole 27, the first wire 61 has a fulcrum above the installation jig 50 (above the revetment block 10).

図12から明らかなとおり、第1ワイヤー61と第2ワイヤー62とが組み合わさって、護岸ブロック10の上下に支点が形成された状態が成立する。   As is clear from FIG. 12, the first wire 61 and the second wire 62 are combined to form a state where fulcrum points are formed above and below the revetment block 10.

(固定工程)
第1ワイヤー61および第2ワイヤー62のそれぞれは、その先がクレーンに接続されている。このとき、クレーンの有する吊り下げ部に、第1ワイヤー61と第2ワイヤー62の一端が取り付けられる。この取付けによって、第1ワイヤー挿通工程と第2ワイヤー挿通工程とで取り付けられた第1ワイヤー61と第2ワイヤー62とが、クレーンに固定される。加えて、クレーンの吊り下げ部を基点として、第1ワイヤー61と第2ワイヤー62との長さバランスも決定される。これが、固定工程である。
(Fixing process)
Each of the first wire 61 and the second wire 62 has its tip connected to a crane. At this time, one end of the 1st wire 61 and the 2nd wire 62 is attached to the hanging part which a crane has. By this attachment, the first wire 61 and the second wire 62 attached in the first wire insertion step and the second wire insertion step are fixed to the crane. In addition, the length balance between the first wire 61 and the second wire 62 is determined based on the suspended portion of the crane. This is the fixing process.

(吊り上げ工程)
次に、第1ワイヤー61と第2ワイヤー62とが接続されるクレーンによって、第1ワイヤー61と第2ワイヤー62とが吊り上げられる。これが吊り上げ工程である。
(Lifting process)
Next, the first wire 61 and the second wire 62 are lifted by a crane to which the first wire 61 and the second wire 62 are connected. This is the lifting process.

図13は、本発明の実施の形態1における吊り上げ工程を示す模式図である。第1ワイヤー61も第2ワイヤー62もクレーンに接続されており、これらを接続した上方の連結点を、クレーンが持ち上げることで、第1ワイヤー61と第2ワイヤー62とが持ち上げられる。   FIG. 13 is a schematic diagram showing a lifting process in the first embodiment of the present invention. Both the 1st wire 61 and the 2nd wire 62 are connected to the crane, and the 1st wire 61 and the 2nd wire 62 are lifted when the crane lifts the upper connection point which connected these.

図12でも説明したが、図13のように、護岸ブロック10が持ち上げられる場合には、連通部材30の凸部32が、水平面において上方に位置するように持ち上げられる。   As described in FIG. 12, when the revetment block 10 is lifted as shown in FIG. 13, the convex portion 32 of the communication member 30 is lifted so as to be positioned upward in the horizontal plane.

既述した通り、護岸ブロック10そのものは、貫通孔15に通された貫通部材20で固定されて引っかかる。この結果、ワイヤー61、62で吊り下げても落ちることはない。ストッパー23の固定もこれを助ける。   As described above, the revetment block 10 itself is fixed and caught by the penetrating member 20 passed through the through hole 15. As a result, even if it is suspended by the wires 61 and 62, it does not fall. Fixing the stopper 23 also helps with this.

一方、連通部材30は、第1下方孔26Aと第2下方孔26Bとをつないで、貫通部材20を護岸ブロック10に固定する役割を担う。このとき、連通部材30の本体部31は、第1下方孔26Aおよび第2下方孔26Bの内周のゴムなどの弾性体によって、孔の内部に密着している。このため、一種のストッパーのようにも見える、凸部32が上側でも、連通部材30が抜け落ちることはない。   On the other hand, the communication member 30 connects the first lower hole 26 </ b> A and the second lower hole 26 </ b> B and plays a role of fixing the penetrating member 20 to the revetment block 10. At this time, the main body 31 of the communication member 30 is in close contact with the inside of the hole by an elastic body such as rubber on the inner periphery of the first lower hole 26A and the second lower hole 26B. For this reason, even if the convex part 32 which looks like a kind of stopper is the upper side, the communication member 30 does not fall off.

要は、連通部材30の有する固定孔33がワイヤー62を通し、加えて、ワイヤー61との関係でクレーンによって、図13のように適切に斜め角度で吊り下げられることになる。この結果、法面4の傾きに合せて、移動および設置がなされる。   In short, the fixing hole 33 of the communication member 30 passes the wire 62 and, in addition, the crane is suspended at an appropriate oblique angle as shown in FIG. As a result, movement and installation are performed in accordance with the inclination of the slope 4.

このとき、第1ワイヤー61は、上方孔27に通されており、第2ワイヤー62は、固定孔33に通されている。設置治具50の上部と下部のそれぞれに異なって通されている第1ワイヤー61と第2ワイヤー62とが同時に吊り上げられる。加えて、固定孔33は、連通部材30の片方である。すなわち、護岸ブロック10が斜めになるようなアンバランスなぶら下がり方となる。   At this time, the first wire 61 is passed through the upper hole 27, and the second wire 62 is passed through the fixing hole 33. The first wire 61 and the second wire 62 that are differently passed through the upper and lower portions of the installation jig 50 are lifted simultaneously. In addition, the fixing hole 33 is one side of the communication member 30. That is, it becomes the unbalanced hanging method that the revetment block 10 becomes diagonal.

図13は、このアンバランスな状態を示している。このアンバランス状態の結果、護岸ブロック10も斜めの状態となっている。このアンバランスな状態でも、上述したように、連通部材30の凸部32は、水平面の上方を向いている。この状態でも、貫通部材20、ストッパー23、連通部材30の第1下方孔26Aと第2下方孔26B内部での密着とによって、護岸ブロック10は、落ちることはない。   FIG. 13 shows this unbalanced state. As a result of this unbalanced state, the revetment block 10 is also in an oblique state. Even in this unbalanced state, as described above, the convex portion 32 of the communication member 30 faces upward in the horizontal plane. Even in this state, the revetment block 10 does not fall due to the close contact between the first lower hole 26A and the second lower hole 26B of the penetrating member 20, the stopper 23, and the communication member 30.

この状態で、法面4の傾きに合わせた角度のななめ状態で、クレーンは、護岸ブロック10を法面4に運搬する。この法面4に運搬された後で、その傾きの角度のままで、法面4に着地させられて設置される。   In this state, the crane transports the revetment block 10 to the slope 4 in a slanted state according to the inclination of the slope 4. After being transported to the slope 4, it is landed and installed on the slope 4 while maintaining the inclination angle.

ここで、連通部材30の凸部32が上方となった状態であれば、図19に示されるように、法面4に設置された後で、凸部32が上側となる。この結果、連通部材30を、簡単に抜くことができ、設置治具50の護岸ブロック10からの取り外しと解体が容易に行える。すなわち、再使用にすぐ取り掛かれる。   Here, if the convex portion 32 of the communication member 30 is in an upward state, the convex portion 32 is on the upper side after being installed on the slope 4 as shown in FIG. As a result, the communication member 30 can be easily removed, and the installation jig 50 can be easily detached from the revetment block 10 and disassembled. That is, it is immediately started to reuse.

クレーンは、この斜めの状態で、落ちることのない護岸ブロック10を目標とする法面4の設置位置まで移動させる。第1ワイヤー61と第2ワイヤー62との接続でクレーンは、設置治具50を介して護岸ブロック10を吊り上げて吊り下げているので、安定した状態で、その位置を調整できる。   In this oblique state, the crane moves the revetment block 10 that does not fall to the target position of the slope 4. Since the crane lifts the revetment block 10 via the installation jig 50 and hangs by connecting the first wire 61 and the second wire 62, the position of the crane can be adjusted in a stable state.

繰り返しであるが、この吊り下げ工程によって、護岸ブロック10は、連通部材30の凸部32が、水平方向における上方となるように連通部材30が傾いているが、護岸ブロック10が吊り下げ状態で落下することはない。   Again, by this suspension process, the revetment block 10 is tilted so that the convex portion 32 of the communication member 30 is upward in the horizontal direction, but the revetment block 10 is in a suspended state. It will not fall.

(設置工程)
クレーンは、吊り下げて位置を調整した護岸ブロック10を、法面4に移動させて下していく。このとき、図13に示されるように、護岸ブロック13は、斜めになる。この斜めの角度は、第1ワイヤー61と第2ワイヤー62との角度(それぞれの長さで決定される)、第1ワイヤー61が挿通される上方孔27の選択、クレーンによる吊り上げ方などの様々な手段で変更可能である。
(Installation process)
The crane moves the revetment block 10 that is suspended and adjusted in position to the slope 4 and moves it down. At this time, as shown in FIG. 13, the revetment block 13 is inclined. This oblique angle is various such as the angle between the first wire 61 and the second wire 62 (determined by the respective lengths), selection of the upper hole 27 through which the first wire 61 is inserted, and how to lift the crane with a crane. It can be changed by various means.

しかも、容易に変更できる。この角度変更に際しては、作業員による手作業があってもよいが、第1ワイヤー61と第2ワイヤー62との角度(それぞれの長さで決定される)、第1ワイヤー61が挿通される上方孔27の選択、クレーンによる吊り上げ方などの、機械的な作業のみでも作業できる。   Moreover, it can be easily changed. When changing the angle, there may be manual work by an operator, but the angle between the first wire 61 and the second wire 62 (determined by the respective lengths), the upper direction through which the first wire 61 is inserted. Only mechanical work such as selection of the holes 27 and lifting with a crane can be performed.

特に、第1ワイヤー61が挿通される上方孔27と、第2ワイヤー62が挿通される固定孔33は、護岸ブロック10の平面方向において対角位置となる。これは図13から明らかである。このため、第1ワイヤー61と第2ワイヤー62との関係も、護岸ブロック10において対角性を有する。この対角性によって、クレーンがワイヤーを取り付ける吊り下げ部を基準とする、第1ワイヤー61の長さと第2ワイヤー62の長さとのそれぞれを変化させることで、護岸ブロック10の斜めの角度を変化させることができる。これは、2次元だけでの斜めの角度だけでなく、3次元での斜めの角度も変化させることができる。   In particular, the upper hole 27 through which the first wire 61 is inserted and the fixing hole 33 through which the second wire 62 is inserted are diagonal positions in the planar direction of the revetment block 10. This is apparent from FIG. For this reason, the relationship between the first wire 61 and the second wire 62 is also diagonal in the revetment block 10. The diagonal angle of the revetment block 10 is changed by changing the length of the first wire 61 and the length of the second wire 62 with reference to the hanging portion to which the crane attaches the wire. Can be made. This can change not only an oblique angle in two dimensions but also an oblique angle in three dimensions.

ここで、法面4は、法面4によってさまざまな傾きを有している。図1などに示される法面4の種類でも傾きは異なるし、同じ法面4においても、場所によって傾きが異なることもある。   Here, the slope 4 has various inclinations depending on the slope 4. The slope is different depending on the type of slope 4 shown in FIG. 1 and the like, and the slope may be different depending on the location on the same slope 4.

上述のようにクレーンによる第1ワイヤー61と第2ワイヤー62の長さバランスによって、護岸ブロック10の傾きを調整できる。護岸ブロック10の傾き(角度)の調整は、この法面4の設置場所の傾きに合わせることができる。これも、第1ワイヤー61と第2ワイヤー62との長さバランスで生じる連通部材30の傾きが、護岸ブロック10の傾きと一致するからである。   As described above, the inclination of the revetment block 10 can be adjusted by the length balance between the first wire 61 and the second wire 62 by the crane. The inclination (angle) of the revetment block 10 can be adjusted to the inclination of the installation place of the slope 4. This is also because the inclination of the communication member 30 caused by the length balance between the first wire 61 and the second wire 62 coincides with the inclination of the revetment block 10.

なお、クレーンは、第1ワイヤー61と第2ワイヤー62との長さバランスだけでなく、吊り下げ部での位置関係などによっても、連通部材30(護岸ブロック10)の傾きを調整できる。   In addition, the crane can adjust the inclination of the communication member 30 (the revetment block 10) not only by the length balance between the first wire 61 and the second wire 62 but also by the positional relationship at the hanging portion.

以上の連通部材30すなわち護岸ブロック10の傾き調整によって、護岸ブロック10が設置される法面4との傾きとの略一致が、容易にはかられる。   By adjusting the inclination of the communication member 30, that is, the revetment block 10, it is possible to easily match the inclination with the slope 4 where the revetment block 10 is installed.

また、第1ワイヤー挿通工程において、上方孔27A〜27Cのいずれに第1ワイヤー61を挿通するかを選択することで、護岸ブロック10の傾き調整でのさらなる細かな調整を可能とすることもできる。   Moreover, in the 1st wire insertion process, the further fine adjustment in the inclination adjustment of the revetment block 10 can also be enabled by selecting which of the upper holes 27A to 27C the first wire 61 is inserted. .

(設置)
設置工程によって、実際にクレーンが護岸ブロックを下していきながら、目的とする場所に、護岸ブロック10を設置する。このとき、護岸ブロック10の傾きが、法面4の傾きに合わせられているので、設置の際に、法面4へ落下してしまうような破壊的な設置とはならない。結果として、法面4の破損が生じにくいうえ、地上作業員の安全も図られる。もちろん、乱暴な落下設置ではないので、目的の場所からずれた場所に設置されてしまうといった問題も減少する。
(Installation)
The revetment block 10 is installed at a target location while the crane actually lowers the revetment block through the installation process. At this time, since the inclination of the revetment block 10 is adjusted to the inclination of the slope 4, it does not become a destructive installation that falls to the slope 4 at the time of installation. As a result, the slope 4 is not easily damaged, and the safety of ground workers is also achieved. Of course, since it is not a violent drop installation, the problem of installation in a location deviating from the target location is reduced.

これらの工程が繰り返されて、次々と護岸ブロック10が最後の設置工程によって法面4に設置されることで、図2のように、護岸領域全体に必要な数の護岸ブロック10が設置される。   These steps are repeated, and the revetment blocks 10 are successively installed on the slope 4 by the last installation step, so that the necessary number of revetment blocks 10 are installed in the entire revetment area as shown in FIG. .

この実際の法面4への設置は、着地工程として把握されてもよい。着地工程後には、法面4の上側を向いている連通部材30の凸部32を用いて、連通部材30をすぐに取り出して、貫通部材20も取り外すことが簡単かつすぐにできる。   This actual installation on the slope 4 may be grasped as a landing process. After the landing process, it is possible to easily and immediately remove the communicating member 30 and remove the penetrating member 20 by using the convex portion 32 of the communicating member 30 facing the upper side of the slope 4.

(連通部材の取り外し)
法面4に護岸ブロック10が設置されると、第1ワイヤー61と第2ワイヤー62が、それぞれの孔から取り外される。また、護岸ブロック10は、地面側に接触しているが、護岸ブロック10の底面の凹部16は、地面から離隔した状態であるので、連通部材30も地面に押し付けられていない。
(Removal of communication member)
When the revetment block 10 is installed on the slope 4, the first wire 61 and the second wire 62 are removed from the respective holes. Moreover, although the revetment block 10 is contacting the ground side, since the recessed part 16 of the bottom face of the revetment block 10 is in the state separated from the ground, the communication member 30 is not pressed against the ground.

このとき、連通部材30の凸部32が上から取り外される。連通部材30は、上述の通り、一方のみに凸部32があるので、そちら側から外せば、下方孔から簡単に取り外せる。   At this time, the convex portion 32 of the communication member 30 is removed from above. As described above, since the communication member 30 has the convex portion 32 only on one side, it can be easily removed from the lower hole if it is removed from that side.

これは、連通部材30の引き抜き工程として把握されてもよい。   This may be grasped as a drawing process of the communication member 30.

(貫通部材の取り外し)
連通部材30が取り外されれば、貫通部材20の固定組み合わせが解除される。この解除によって、貫通部材20は、貫通孔15の上方から取り外し可能となる。このとき、手作業で取り外してもよいし、第1ワイヤー61がまだ上方孔27に挿通されていれば、クレーンで貫通部材20を引き上げて取り外してもよい。なお、同じことであるが、貫通部材20の貫通孔15への挿入も、最初に第1ワイヤー61が挿通されてから、クレーンによって実現されてもよい。
(Removal of penetrating member)
If the communication member 30 is removed, the fixed combination of the penetrating member 20 is released. By this release, the penetrating member 20 can be removed from above the through hole 15. At this time, it may be removed manually, or if the first wire 61 is still inserted through the upper hole 27, the penetrating member 20 may be pulled up and removed by a crane. In addition, although it is the same, insertion into the through-hole 15 of the penetration member 20 may be implement | achieved by the crane after the 1st wire 61 is first penetrated.

以上により、連通部材30および貫通部材20のそれぞれは、再使用が可能となり、次の護岸ブロック10の設置に用いられる。   As described above, each of the communication member 30 and the penetrating member 20 can be reused and used for installing the next revetment block 10.

これは、貫通部材20の取り外し工程として把握されてもよい。   This may be grasped as a removal process of the penetrating member 20.

(工期、コストなど)
上述のように、貫通部材20と連通部材30の組み合わせだけで、護岸ブロック10を吊り上げ、移動、吊り下げ、設置ができるので、容易かつ単純作業で行える。特に、地上作業員などの必要性が少なく、作業時間が短縮できる。また、法面4の傾きに合わせた状態にてクレーンでつりさげてそのまま設置できるので、設置の際の角度調整といったデリケートで面倒な作業が少ない設置が終わった設置治具50は、すぐに取り外されて再使用に回せるので、連続的に複数の護岸ブロック10を設置するのに要する準備時間が少なくて済む。
(Construction period, cost, etc.)
As described above, the revetment block 10 can be lifted, moved, suspended, and installed only by the combination of the penetrating member 20 and the communication member 30, so that it can be easily and simply performed. In particular, there is little need for ground workers and the work time can be shortened. In addition, since it can be installed as it is with a crane in accordance with the inclination of the slope 4, the installation jig 50 that has been installed with less delicate and cumbersome work such as angle adjustment at the time of installation is immediately removed. Since it can be reused, the preparation time required to continuously install a plurality of revetment blocks 10 can be reduced.

以上より、護岸ブロック10の設置工事の工期が、従来技術に比較して極めて短くて済む。   From the above, the construction period of the installation work of the revetment block 10 can be extremely short as compared with the prior art.

また、人的作業の削減、危険性の削減、工期の削減、設置角度の調整の容易性などによって、護岸ブロック10の設置工事のコストも低減できる。   Moreover, the cost of the installation work of the revetment block 10 can also be reduced by the reduction of human work, the reduction of danger, the reduction of construction period, the ease of adjustment of the installation angle, and the like.

以上によって、広い範囲を短期間で行わなければならないような護岸領域での護岸ブロックの設置工事の工期、コストを低減できる。結果として、作業全体の効率を上げて、護岸工事や高地化工事全体の効率化も向上させることができる。   As described above, it is possible to reduce the construction period and cost of the revetment block installation work in the revetment area where a wide range must be performed in a short period of time. As a result, the efficiency of the entire work can be increased, and the efficiency of the overall revetment work and the elevation work can be improved.

(実施の形態2)   (Embodiment 2)

実施の形態2では、実際の工事の状態を写真等を用いて説明する。   In the second embodiment, the actual construction state will be described using photographs and the like.

図14は、本発明の実施の形態2における設置治具の写真である。実施の形態1で説明したように、貫通部材と連通部材とからなる。   FIG. 14 is a photograph of the installation jig in Embodiment 2 of the present invention. As explained in the first embodiment, it consists of a penetrating member and a communicating member.

図15は、本発明の実施の形態2における設置治具の写真である。貫通部材に連通部材が連結された状態が示されている。この連結によって、設置治具としての機能を発揮できる。図15の写真では、設置治具の構造をわかりやすくするために、護岸ブロックが嵌められてない状態で示されている。   FIG. 15 is a photograph of the installation jig in the second embodiment of the present invention. The state where the communicating member is connected to the penetrating member is shown. By this connection, the function as an installation jig can be exhibited. In the photograph of FIG. 15, in order to make the structure of the installation jig easy to understand, the revetment block is not fitted.

図15の写真のように、貫通部材と連通部材とが組み合わされることが、本発明の設置治具の基本である。   As shown in the photograph of FIG. 15, the combination of the penetrating member and the communicating member is the basis of the installation jig of the present invention.

図16は、本発明の実施の形態2における設置治具がクレーンでつりさげられた状態を示す写真である。クレーンでつりさげられており、護岸ブロックを斜めにすることができるように、設置治具がななめとなっている状態を示している。実施の形態1で説明した、設置治具の傾きによって、護岸ブロックを法面の傾きに合せて傾かせることは、このような状況で生じさせることができる。   FIG. 16 is a photograph showing a state where the installation jig in Embodiment 2 of the present invention is suspended by a crane. It is suspended by a crane, and the installation jig is slanted so that the revetment block can be tilted. In such a situation, the revetment block can be inclined in accordance with the slope of the slope by the inclination of the installation jig described in the first embodiment.

図17は、本発明の実施の形態2における護岸ブロックに設置治具を取り付けてクレーンでつりさげている状態を示す写真である。実施の形態1で説明したように、設置治具が護岸ブロックを固定する。この固定した状態で、クレーンは、護岸ブロックをつりさげることができる。この吊り下げ工程が、設置へのスタートとなる。   FIG. 17 is a photograph showing a state where an installation jig is attached to the revetment block according to the second embodiment of the present invention and suspended by a crane. As described in the first embodiment, the installation jig fixes the revetment block. In this fixed state, the crane can suspend the revetment block. This suspension process is the start of installation.

図18は、本発明の実施の形態2における護岸ブロックの設置工程を示す写真である。図17に続いて、実際の法面に護岸ブロックを設置するために、その位置を合せている状態が示されている。ここで、写真から明らかなとおり、法面の角度に、護岸ブロックの角度が合わされている。このため、設置工程および着地工程での作業が短縮できる。   FIG. 18 is a photograph showing a revetment block installation process in the second embodiment of the present invention. Following FIG. 17, in order to install the revetment block on the actual slope, the state where the position is aligned is shown. Here, as is clear from the photo, the angle of the revetment block is adjusted to the angle of the slope. For this reason, the work in an installation process and a landing process can be shortened.

図19は、本発明の実施の形態2における護岸ブロックの着地工程の写真である。法面の角度に合された状態にてクレーンで吊り下げられてくるので、法面にそのまま護岸ブロックを着地させればよい。この着地によって、実際に法面をはじめとした護岸領域に、護岸ブロックが設置される。図19では、着地工程後が示されているが、連通部材30の凸部32が法面の上を向いている。ここから連通部材30を取り出す。これで貫通部材20が自由になり、貫通部材20が、貫通孔15から取り外せるようになる。   FIG. 19 is a photograph of the landing process of the revetment block according to Embodiment 2 of the present invention. Since it is hung with a crane in a state adjusted to the angle of the slope, the revetment block should be landed on the slope as it is. Due to this landing, the revetment block is actually installed in the revetment area including the slope. In FIG. 19, after the landing process is shown, the convex portion 32 of the communication member 30 faces the slope. The communication member 30 is taken out from here. Thus, the penetrating member 20 becomes free, and the penetrating member 20 can be removed from the through hole 15.

図20は、本発明の実施の形態2における護岸ブロックの設置工事の進捗が進んだ状態を示す写真である。護岸領域の多くの場所に、複数の護岸ブロックが整然と並べられている。この状態によって、護岸領域の護岸ブロックによる保護の工事が完了に向かう。   FIG. 20 is a photograph showing a state in which the progress of the revetment block installation work in the second embodiment of the present invention has progressed. Several revetment blocks are neatly arranged in many places in the revetment area. Under this condition, the protection work by the revetment block in the revetment area will be completed.

以上のように、実施の形態2では、実際の設置工事を写真を用いて説明した。これらの写真での作業状態からも明らかなとおり、本発明の護岸ブロックの設置方法は、工期およびコストを短縮でき、危険性も低減できるメリットを有している。   As described above, in the second embodiment, the actual installation work has been described using photographs. As is clear from the working state in these photographs, the revetment block installation method of the present invention has the merit that the construction period and cost can be shortened and the danger can be reduced.

なお、実施の形態1〜2で説明された護岸ブロックの設置方法は、本発明の趣旨を説明する一例であり、本発明の趣旨を逸脱しない範囲での変形や改造を含む。   In addition, the installation method of the revetment block demonstrated in Embodiment 1-2 is an example explaining the meaning of this invention, and includes the deformation | transformation and remodeling in the range which does not deviate from the meaning of this invention.

1 海岸
2 低地部分
3 高地部分
4 法面
10 護岸ブロック
15 貫通孔
16 凹部
20 貫通部材
21A 第1板部材
21B 第2板部材
22 接続部
23 ストッパー
28 延長部
27 上方孔
30 連通部材
31 本体部
32 凸部
33 固定孔
50 設置治具
61 第1ワイヤー
62 第2ワイヤー
DESCRIPTION OF SYMBOLS 1 Coast 2 Low-altitude part 3 High-altitude part 4 Slope 10 Revetment block 15 Through-hole 16 Recess 20 Perforation member 21A 1st board member 21B 2nd board member 22 Connection part 23 Stopper 28 Extension part 27 Upper hole 30 Communication member 31 Main-body part 32 Convex part 33 Fixing hole 50 Installation jig 61 First wire 62 Second wire

Claims (16)

護岸領域に護岸ブロックを設置する護岸ブロックの設置方法であって、
立体形状を有すると共に貫通孔を有する護岸ブロックの前記貫通孔に、対向する第1板部材と第2板部材と、前記第1板部材と前記第2板部材を接続する接続部と、を有する貫通部材を通す、貫通工程と、
前記第1板部材の下方に設けられる第1下方孔と、前記第2板部材の下方に設けられる第2下方孔とを連通して固定する連通部材を通す連通工程と、
前記接続部の上方に設けられる上方孔にワイヤーの一方を通す、第1ワイヤー挿通工程と、
前記連通部材の一方に設けられる固定孔に、前記ワイヤーの他方を通す、第2ワイヤー挿通工程と、
前記第1ワイヤー挿通工程と前記第2ワイヤー挿通工程とを経た前記ワイヤーを、クレーンで吊り上げる吊り上げ工程と、
前記吊り上げ工程で吊り上げられた前記護岸ブロックを、前記護岸領域の所定位置に設置する設置工程と、を備え、
前記貫通部材は、前記第1板部材と前記第2板部材が、前記貫通孔の上下からはみ出る、形状および大きさを有している、護岸ブロックの設置方法。
A revetment block installation method for installing a revetment block in a revetment area,
The through-hole of the revetment block having a three-dimensional shape and having a through-hole has a first plate member and a second plate member facing each other, and a connection portion for connecting the first plate member and the second plate member. Passing through the penetrating member,
A communicating step of passing a communicating member that communicates and fixes a first lower hole provided below the first plate member and a second lower hole provided below the second plate member;
A first wire insertion step of passing one of the wires through an upper hole provided above the connecting portion;
A second wire insertion step of passing the other of the wires through a fixing hole provided in one of the communication members;
A lifting step of lifting the wire that has undergone the first wire insertion step and the second wire insertion step with a crane;
An installation step of installing the revetment block lifted in the lifting step at a predetermined position in the revetment region, and
The penetrating member has a shape and size such that the first plate member and the second plate member protrude from above and below the through hole.
前記護岸ブロックは、平面方向の幅よりも薄い厚みを有し、
前記貫通孔は、前記護岸ブロックの厚み方向を貫通しており、
前記平面方向の形状は、前記護岸ブロックが他の前記護岸ブロックと平面方向で配置される場合に、整列可能である、請求項1記載の護岸ブロックの設置方法。
The revetment block has a thickness thinner than the width in the plane direction,
The through hole passes through the thickness direction of the revetment block,
2. The method of installing a revetment block according to claim 1, wherein the shape in the planar direction can be aligned when the revetment block is arranged in a planar direction with another revetment block.
前記護岸ブロックは、前記貫通孔であって前記護岸領域に接する部位に、前記連通部材を通すことのできる凹みを有する、請求項1または2記載の護岸ブロックの設置方法。   The said revetment block is the installation method of the revetment block of Claim 1 or 2 which has a dent which can let the said connection member pass in the site | part which is the said through-hole and contact | connects the said revetment area | region. 前記貫通部材は、相互に対向する前記第1板部材と前記第2板部材と、前記第1板部材と前記第2板部材とをH型に接続する接続部と、を有し、
前記貫通工程は、前記貫通部材を、前記H型を前記貫通孔に対して縦方向となるように通す、請求項1から3のいずれか記載の護岸ブロックの設置方法。
The penetrating member includes the first plate member and the second plate member that face each other, and a connection portion that connects the first plate member and the second plate member to an H shape,
The said penetration process is the installation method of the revetment block in any one of Claim 1 to 3 which passes the said penetration member so that it may become the vertical direction with respect to the said through-hole.
前記上方孔は、複数である、請求項1から4のいずれか記載の護岸ブロックの設置方法。   The revetment block installation method according to any one of claims 1 to 4, wherein the upper hole is plural. 前記連通部材は、一方に前記第1下方孔および前記第2下方孔とを貫通できない凸部を有し、
前記固定孔は、前記凸部に設けられる、請求項1から5のいずれか記載の護岸ブロックの設置方法。
The communication member has a convex portion that cannot pass through the first lower hole and the second lower hole on one side,
The said fixing hole is the installation method of the revetment block in any one of Claim 1 to 5 provided in the said convex part.
前記第1ワイヤー挿通工程および前記第2ワイヤー挿通工程の前もしくは後で、前記ワイヤーは、前記クレーンの吊り下げ部に周回して固定される固定工程を更に備える、請求項1からのいずれか記載の護岸ブロックの設置方法。 Before or after the first wire insertion step and the second wire insertion step, the wire further comprises a fixing step which is fixed orbiting hanging portion of the crane, to any one of claims 1 to 6, How to install the revetment block. 前記吊り上げ工程において、前記護岸ブロックは、前記連通部材の前記凸部が、水平方向において上方となるように、前記連通部材が傾く、請求項記載の護岸ブロックの設置方法。 The said bank protection block is the installation method of the bank protection block of Claim 6 in which the said communication member inclines so that the said convex part of the said communication member may become upper in a horizontal direction in the said lifting process. 前記連通部材の傾きは、前記護岸ブロックの傾きと略一致する、請求項記載の護岸ブロックの設置方法。 The revetment block installation method according to claim 8 , wherein an inclination of the communication member substantially coincides with an inclination of the revetment block. 前記クレーンは、前記第1挿通工程および前記第2挿通工程を経て接続されている前記ワイヤーの位置を、前記吊り上げ工程において調整することで、前記連通部材の傾きを調整する傾き調整工程を更に備える、請求項記載の護岸ブロックの設置方法。 The crane further includes an inclination adjustment step of adjusting an inclination of the communication member by adjusting a position of the wire connected through the first insertion step and the second insertion step in the lifting step . The installation method of the revetment block of Claim 9 . 前記護岸ブロックの傾きは、前記護岸領域の傾きに合せて調整される、請求項10記載の護岸ブロックの設置方法。 The installation method of the bank protection block of Claim 10 with which the inclination of the said bank protection block is adjusted according to the inclination of the said bank protection area. 前記上方孔は複数であり、前記第1ワイヤー挿通工程において、複数の前記上方孔のいずれかに、前記ワイヤーが挿通されることで、前記傾き調整工程でのさらなる調整がなされる、請求項10または11記載の護岸ブロックの設置方法。 The upper hole is more, in the first wire insertion step, to one of a plurality of said upper hole, that the wire is inserted, a further adjustment in the tilt adjustment step is performed, according to claim 10 Or the installation method of the bank protection block of 11 . 前記傾き調整工程によって、前記護岸領域の傾きに対応する傾きに調整された前記護岸ブロックを、前記護岸領域に着地させる着地工程を、更に備える、請求項10から12のいずれか記載の護岸ブロックの設置方法。 The revetment block according to any one of claims 10 to 12 , further comprising a landing step of landing on the revetment area the revetment block adjusted to an inclination corresponding to the inclination of the revetment area by the inclination adjustment step. Installation method. 前記着地工程の後で、前記連通部材が前記第1下方孔および前記第2下方孔から引き抜かれる引き抜き工程を更に備える、請求項13記載の護岸ブロックの設置方法。 The method of installing a revetment block according to claim 13 , further comprising a drawing step in which the communication member is pulled out from the first lower hole and the second lower hole after the landing step. 前記引き抜き工程の後で、前記貫通孔から前記貫通部材が取り外される、取り外し工程を更に備える、請求項14記載の護岸ブロックの設置方法。 The revetment block installation method according to claim 14 , further comprising a removal step in which the penetrating member is removed from the through hole after the drawing step. 立体形状を有すると共に貫通孔を有する護岸ブロックを、護岸領域に設置するのに用いられる設置治具であって、
前記貫通孔に挿入される相互に対向する第1板部材と第2板部材と、
前記第1板部材と前記第2板部材を、上方から見た状態でH型とするように接続する接続部と、
前記第1板部材の下方に設けられる第1下方孔と、
前記第2板部材の下方に設けられる第2下方孔と、
前記接続部の上方に設けられる上方孔と、
前記第1下方孔と、前記第2下方孔とを連通可能とする連通部材と、を備え、
前記連通部材の一方は、前記第1下方孔および前記第2下方孔とを抜けない凸部を有し、
前記凸部は、固定孔を有し、
前記上方孔と、前記固定孔との間は、ワイヤーを挿通可能である、護岸ブロックの設置治具。


An installation jig used to install a revetment block having a three-dimensional shape and a through hole in a revetment area,
A first plate member and a second plate member which are inserted into the through hole and face each other;
A connecting portion for connecting the first plate member and the second plate member so as to be H-shaped when viewed from above ;
A first lower hole provided below the first plate member;
A second lower hole provided below the second plate member;
An upper hole provided above the connecting portion;
A communication member that enables communication between the first lower hole and the second lower hole;
One of the communication members has a convex portion that does not pass through the first lower hole and the second lower hole,
The convex portion has a fixing hole,
A revetment block installation jig in which a wire can be inserted between the upper hole and the fixed hole.


JP2014146344A 2014-07-16 2014-07-16 Revetment block installation method and installation jig Active JP6401530B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014146344A JP6401530B2 (en) 2014-07-16 2014-07-16 Revetment block installation method and installation jig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014146344A JP6401530B2 (en) 2014-07-16 2014-07-16 Revetment block installation method and installation jig

Publications (2)

Publication Number Publication Date
JP2016023421A JP2016023421A (en) 2016-02-08
JP6401530B2 true JP6401530B2 (en) 2018-10-10

Family

ID=55270456

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014146344A Active JP6401530B2 (en) 2014-07-16 2014-07-16 Revetment block installation method and installation jig

Country Status (1)

Country Link
JP (1) JP6401530B2 (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5658781U (en) * 1979-10-09 1981-05-20
JPH01150691A (en) * 1987-12-04 1989-06-13 Sankyo Trading:Kk Method of laying slope-face block
JPH0243890U (en) * 1988-09-16 1990-03-27
JPH07109719A (en) * 1993-10-13 1995-04-25 Daito Kogyo Kk Lifting device of concrete block
KR100973592B1 (en) * 2010-02-10 2010-08-03 주식회사 항도엔지니어링 Covering block mold

Also Published As

Publication number Publication date
JP2016023421A (en) 2016-02-08

Similar Documents

Publication Publication Date Title
CN104775446B (en) Cylinder pier for fixing water structure and its installation and construction method
JP4793634B2 (en) Temporary deadline construction method
JPS6053138B2 (en) Marine wall and how to establish it
CN205822279U (en) An anti-scouring system for marine structures
CN209741877U (en) Cofferdam structure with concrete ring beam water stop additionally arranged at root of steel sheet pile
JP6454674B2 (en) Construction method of water stop working space
KR20160057198A (en) Apparatus and Method of Scouring of Foundation
JP4819835B2 (en) Offshore structure and construction method of offshore structure
JP6401530B2 (en) Revetment block installation method and installation jig
JP7712126B2 (en) Scour prevention construction unit and scour prevention construction method
US3526096A (en) Method of making rockfill foundations
JP5572540B2 (en) Temporary deadline structure of the final deadline in the impermeable wall and its deadline method
CN109056763A (en) Combined type cofferdam structure and underwater work platform
JP2006161402A (en) Construction method for improving water breaking structure
JP6881916B2 (en) How to install the structure
KR20150061712A (en) Water proof structure of Bank
JP2004108078A (en) Construction method of underwater shaft, underwater shaft, connection method of shaft and side shaft, shaft structure
KR100621410B1 (en) Dry construction method of underwater structures using water sealing
KR100704460B1 (en) Harbor Restoration and Auxiliary Construction Equipment
CN208949903U (en) Combined cofferdam structure and underwater working platform
JP6886356B2 (en) Suspension device and packing method
JP7469608B2 (en) Support structure, gravity breakwater and construction method of gravity breakwater
JP5850545B2 (en) Improved ground structure near the pole and ground improvement method
JP5804908B2 (en) Caisson foundation for restoration of caisson breakwater and restoration method
JP4699320B2 (en) Construction method of pedestal concrete

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20170331

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20180117

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20180214

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20180222

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20180307

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20180904

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20180907

R150 Certificate of patent or registration of utility model

Ref document number: 6401530

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250