JP6412797B2 - How to test the breathing tank - Google Patents
[go: Go Back, main page]

JP6412797B2 - How to test the breathing tank - Google Patents

How to test the breathing tank Download PDF

Info

Publication number
JP6412797B2
JP6412797B2 JP2014264003A JP2014264003A JP6412797B2 JP 6412797 B2 JP6412797 B2 JP 6412797B2 JP 2014264003 A JP2014264003 A JP 2014264003A JP 2014264003 A JP2014264003 A JP 2014264003A JP 6412797 B2 JP6412797 B2 JP 6412797B2
Authority
JP
Japan
Prior art keywords
nitrogen gas
tank
breathing tank
gas storage
breathing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2014264003A
Other languages
Japanese (ja)
Other versions
JP2016125508A (en
Inventor
光 細川
光 細川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kawasaki Motors Ltd
Original Assignee
Kawasaki Jukogyo KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kawasaki Jukogyo KK filed Critical Kawasaki Jukogyo KK
Priority to JP2014264003A priority Critical patent/JP6412797B2/en
Publication of JP2016125508A publication Critical patent/JP2016125508A/en
Application granted granted Critical
Publication of JP6412797B2 publication Critical patent/JP6412797B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Description

本発明は、低温貯槽の内槽外槽間の窒素ガスの体積変化を吸収する為のブリージングタンクの試運転方法に関する。   The present invention relates to a trial operation method of a breathing tank for absorbing a change in volume of nitrogen gas between an inner tank and an outer tank of a low-temperature storage tank.

低温貯槽であるLNGタンクでは、内槽と外槽の間にパーライト等の断熱材が充填されており、パーライトが充填された内槽と外槽間の空間には窒素ガスを充填して不活性雰囲気に保持し、外気温や気圧の変化による圧力変動があっても前記窒素ガスの封入圧を常に大気圧程度の一定圧に保持する為のブリージングタンクに接続されている。   In the LNG tank, which is a low-temperature storage tank, a heat insulating material such as pearlite is filled between the inner tank and the outer tank, and the space between the inner tank and the outer tank filled with pearlite is filled with nitrogen gas to be inert. It is connected to a breathing tank for maintaining the atmosphere and always maintaining the nitrogen gas sealing pressure at a constant pressure of about atmospheric pressure even if there is a pressure fluctuation due to changes in the outside air temperature or atmospheric pressure.

特許文献1にも記載されているように、ブリージングタンクは、鋼製のタンク本体と、タンク本体の内部を窒素ガス収容部と大気開放室とに区画するカウンタウエイト付きのダイヤフラムバルーンとを有する。タンク本体は、下半部を形成する円筒部と、上半部を形成する半球状のドーム部とで構成され、ドーム部には大気開放室を大気開放する複数の開放口が形成されている。   As described in Patent Document 1, the breathing tank includes a steel tank main body and a diaphragm balloon with a counterweight that divides the inside of the tank main body into a nitrogen gas storage portion and an atmosphere release chamber. The tank body is composed of a cylindrical part that forms the lower half part and a hemispherical dome part that forms the upper half part, and the dome part has a plurality of open ports that open the atmosphere opening chamber to the atmosphere. .

ダイヤフラムバルーンは、ゴム製の膜部材でその中央部に金属製のカウンタウエイトが付設され、ダイヤフラムバルーンの外周縁がタンク本体の内部の中段部に気密状に固定されている。タンク本体内においてダイヤフラムバルーンの下側に窒素ガス収容部が形成され、ダイヤフラムバルーンの上側に大気開放室が形成されている。窒素ガス収容部は、配管により低温貯槽の内槽外槽間の空間に接続されている。カウンタウエイト付きダイヤフラムバルーンの自重によって窒素ガス収容部内の窒素ガスをほぼ一定圧に保持する。   The diaphragm balloon is a rubber membrane member, and a metal counterweight is attached to the center thereof, and the outer peripheral edge of the diaphragm balloon is airtightly fixed to the middle step inside the tank body. In the tank body, a nitrogen gas storage portion is formed below the diaphragm balloon, and an air release chamber is formed above the diaphragm balloon. The nitrogen gas storage unit is connected to a space between the inner and outer tanks of the low-temperature storage tank by a pipe. The nitrogen gas in the nitrogen gas storage unit is held at a substantially constant pressure by the dead weight of the diaphragm balloon with a counterweight.

特開平11−270791号公報JP-A-11-270791

ところで、ブリージングタンクを通常運転させる前に、試運転作業として、窒素ガス収容部に窒素を充填してダイヤフラムバルーンを最高高さまで上昇させながら所定高さ上昇する毎に圧力測定を行ってブリージングタンクの性能を点検する作業を行なうと共に、窒素ガス収容部に窒素ガスを充填してダイヤフラムバルーンを上昇させた後、窒素ガス収容部を大気開放してダイヤフラムバルーンを最低高さに降下させることを繰り返し行うことで窒素ガス収容部内の酸素濃度を所定値以下にする作業も行っている。
上記試運転作業では、ダイヤフラムバルーンを上昇、低下させる際には安全弁を開閉操作させる必要がある。しかしながら、安全弁は大型であり上昇・下降を行うのに長時間を要する。そのため、この作業を短時間で行う方法を確立することが求められていた。
By the way, before the breathing tank is normally operated, as a test operation, the nitrogen gas containing part is filled with nitrogen and the diaphragm balloon is raised to the maximum height, and the pressure measurement is performed every time the predetermined height is raised. In addition to performing the inspection work, filling the nitrogen gas storage part with nitrogen gas and raising the diaphragm balloon, then repeatedly opening the nitrogen gas storage part to the atmosphere and lowering the diaphragm balloon to the minimum height In addition, an operation of setting the oxygen concentration in the nitrogen gas storage portion to a predetermined value or less is also performed.
In the trial operation, the safety valve needs to be opened and closed when the diaphragm balloon is raised and lowered. However, the safety valve is large and takes a long time to move up and down. Therefore, it has been required to establish a method for performing this work in a short time.

本発明の目的は、上記作業を効率的に行うことが出来るブリージングタンクの試運転方法を提供することである。   An object of the present invention is to provide a test method for a breathing tank that can efficiently perform the above-described operation.

請求項1のブリージングタンクの試運転方法は、低温貯槽の内槽外槽間の窒素ガスの体積変化を吸収する為の窒素ガス収容部と、この窒素ガス収容部の上端を区画するダイヤフラムバルーンと、このダイヤフラムバルーンの上側の大気開放室を備えたブリージングタンクの試運転方法において、前記窒素ガス収容部に窒素ガスを充填して前記ダイヤフラムバルーンをブリージングタンクの全高の半分以下の所定高さまで上昇させた後、前記窒素ガス収容部を大気開放して該ダイヤフラムバルーンを最低位置まで下降させる昇降動作を複数回繰り返す酸素ガス排出促進工程と、前記酸素ガス排出促進工程の後で前記窒素ガス収容部に窒素ガスを充填してダイヤフラムバルーンを最高高さまで上昇させながらブリージングタンクの性能を点検するブリージングタンク点検工程とを備えている。   The test operation method of the breathing tank according to claim 1 includes a nitrogen gas storage part for absorbing a change in volume of nitrogen gas between the inner and outer tanks of the low temperature storage tank, a diaphragm balloon that partitions the upper end of the nitrogen gas storage part, In a test operation method of a breathing tank provided with an air release chamber on the upper side of the diaphragm balloon, after filling the nitrogen gas storage portion with nitrogen gas and raising the diaphragm balloon to a predetermined height that is half or less of the total height of the breathing tank , An oxygen gas discharge promotion step that repeats a plurality of lifting and lowering operations that release the nitrogen gas storage portion to the atmosphere and lower the diaphragm balloon to the lowest position, and a nitrogen gas in the nitrogen gas storage portion after the oxygen gas discharge promotion step Check the performance of the breathing tank while filling the diaphragm and raising the diaphragm balloon to the maximum height And a Lee Managing tank inspection process.

請求項2のブリージングタンクの試運転方法は、前記酸素ガス排出促進工程と前記ブリージングタンク点検工程の前に、予め設定した目標時間よりも短い時間で前記酸素ガス排出促進工程を実行可能な前記所定高さと昇降動作の回数を、前記ブリージングタンクの諸元を用いて算出する準備工程を備えている。   According to a second aspect of the present invention, there is provided a trial running method for a breathing tank, wherein the oxygen gas discharge promotion step can be executed in a time shorter than a preset target time before the oxygen gas discharge promotion step and the breathing tank inspection step. And a preparation step of calculating the number of times of lifting and lowering using the specifications of the breathing tank.

請求項1の発明によれば、酸素ガス排出促進工程において、窒素ガス収容部に窒素ガスを充填してダイヤフラムバルーンをブリージングタンクの全高の半分以下の所定高さまで上昇させた後、前記窒素ガス収容部を大気開放してダイヤフラムバルーンを最低高さまで下降させる昇降動作を複数回行うため、従来技術のようにダイヤフラムバルーンを最高高さまで上昇させた後、前記窒素ガスの収容部を大気開放してダイヤフラムバルーンを最低高さまで下降させる昇降動作を行うよりも作業時間が短くなる。ダイヤフラムバルーンが前記所定高さに上昇した後の窒素ガス収容部の酸素濃度は高く維持され、この酸素濃度の高い空気・窒素ガスの混合ガスの一部を、ダイヤフラムバルーンの下降時に大気中へ排出することで、大気中への酸素の排出が促進される。この昇降動作を複数回繰り返すことで、従来技術のようにカウンタウエイトを最高高さまで上昇させた後、前記窒素ガス収容部を大気開放してカウンタウエイトを最低高さまで下降させる昇降動作を行うよりも、窒素ガス収容部内の酸素を効率的に大気中へ排出できる。   According to the invention of claim 1, in the oxygen gas discharge promoting step, the nitrogen gas storage portion is filled with nitrogen gas and the diaphragm balloon is raised to a predetermined height that is not more than half of the overall height of the breathing tank, and then the nitrogen gas storage To raise and lower the diaphragm balloon to the minimum height and to raise and lower the diaphragm balloon to the minimum height, the diaphragm balloon is raised to the maximum height as in the prior art, and then the nitrogen gas storage part is opened to the atmosphere and the diaphragm is opened. The working time is shorter than when the lifting / lowering operation is performed to lower the balloon to the minimum height. After the diaphragm balloon is raised to the predetermined height, the oxygen concentration in the nitrogen gas container is kept high, and a part of the mixed gas of air / nitrogen gas having a high oxygen concentration is discharged into the atmosphere when the diaphragm balloon is lowered. By doing so, the discharge of oxygen into the atmosphere is promoted. By repeating this elevating operation a plurality of times, the counterweight is raised to the maximum height as in the prior art, and then the nitrogen gas storage part is opened to the atmosphere and the elevating operation is performed to lower the counterweight to the minimum height. In addition, oxygen in the nitrogen gas storage unit can be efficiently discharged into the atmosphere.

また、ブリージングタンク点検工程において、前記窒素ガス収容部に窒素ガスを充填してカウンタウエイトを最高高さまで上昇させながらブリージングタンクの性能を確認できる。また、本工程の前に酸素ガス排出促進工程を行うことで、窒素ガス収容部内の酸素を効率的に大気中に排出できる。   Further, in the breathing tank check step, the performance of the breathing tank can be confirmed while filling the nitrogen gas storage portion with nitrogen gas and raising the counterweight to the maximum height. Further, by performing the oxygen gas discharge promotion step before this step, oxygen in the nitrogen gas storage portion can be efficiently discharged into the atmosphere.

請求項2の発明によれば、準備工程において、予め設定した目標時間よりも短い時間で前記酸素ガス排出促進工程を実行可能な前記所定高さと昇降動作の回数を、前記酸素ガス排出促進工程と前記ブリージングタンク点検工程の前に前記ブリージングタンクの諸元を用いて算出するため、試運転作業に要する時間を十分に短くすることができる。   According to the invention of claim 2, in the preparatory step, the predetermined height and the number of times of the lifting operation that can be executed in a time shorter than a preset target time are set as the oxygen gas discharge promotion step. Since the calculation is performed using the specifications of the breathing tank before the breathing tank inspection step, the time required for the trial operation can be sufficiently shortened.

本発明の実施例の地上式LNGタンクとブリージングタンクの構成図である。It is a block diagram of the ground type LNG tank and breathing tank of the Example of this invention. ダイヤフラムバルーンを最低位置にしたブリージングタンクの断面図である。It is sectional drawing of the breathing tank which made the diaphragm balloon into the lowest position. ダイヤフラムバルーンを中段位置にしたブリージングタンクの断面図である。It is sectional drawing of the breathing tank which made the diaphragm balloon into the middle position. ダイヤフラムバルーンを最高位置にしたブリージングタンクの断面図である。It is sectional drawing of the breathing tank which made the diaphragm balloon into the highest position. ブリージングタンクの拡大断面図である。It is an expanded sectional view of a breathing tank.

以下、本発明を実施するための形態について実施形態に基づいて説明する。   DESCRIPTION OF EMBODIMENTS Hereinafter, modes for carrying out the present invention will be described based on the embodiments.

図1は、低温貯槽であるLNGタンク1と、このLNGタンク1に接続されたブリージングタンク10と、配管系統などを示す図である。LNGタンク1は、内槽2と、外槽3と、外槽3の外側を包囲する円筒状のPCコンクリート製の防液堤4と、内槽2と外槽3間の空間に充填されたパーライト5等の断熱材とを有し、内槽2と外槽3間の空間には、パーライト5の他に窒素ガスが充填されている。   FIG. 1 is a diagram showing an LNG tank 1 which is a low temperature storage tank, a breathing tank 10 connected to the LNG tank 1, a piping system, and the like. The LNG tank 1 is filled in a space between the inner tank 2 and the outer tank 3, an inner tank 2, an outer tank 3, a cylindrical PC concrete liquid barrier 4 surrounding the outside of the outer tank 3. The space between the inner tub 2 and the outer tub 3 is filled with nitrogen gas in addition to the pearlite 5.

図1、図5に示すように、ブリージングタンク10の内部空間は、カウンタウエイト11a付きのダイヤフラムバルーン11で上下に仕切られ、ダイヤフラムバルーン11の下側には窒素ガス収容部12が形成され、ダイヤフラムバルーン11の上側には大気開放室13が形成されている。窒素ガス収容部12は、連通管14によりLNGタンク1の内槽外槽間の空間に接続されており、この連通管14には窒素ガス供給管15が接続されている。   As shown in FIGS. 1 and 5, the internal space of the breathing tank 10 is divided up and down by a diaphragm balloon 11 with a counterweight 11 a, and a nitrogen gas containing portion 12 is formed below the diaphragm balloon 11, and the diaphragm An air release chamber 13 is formed above the balloon 11. The nitrogen gas storage unit 12 is connected to a space between the inner tank and the outer tank of the LNG tank 1 by a communication pipe 14, and a nitrogen gas supply pipe 15 is connected to the communication pipe 14.

ブリージングタンク10には、窒素ガス収容部12に連通する、大型で手動式の安全弁16が装備され、ダイヤフラムバルーン11の高さ位置を検知する高さセンサ17も設けられている。窒素ガス供給管15は窒素ガス供給源(図示略)に接続され、窒素ガス供給管15の電磁弁18は、高さセンサ17からの信号で開閉操作される。   The breathing tank 10 is equipped with a large, manual safety valve 16 that communicates with the nitrogen gas storage unit 12, and a height sensor 17 that detects the height position of the diaphragm balloon 11. The nitrogen gas supply pipe 15 is connected to a nitrogen gas supply source (not shown), and the electromagnetic valve 18 of the nitrogen gas supply pipe 15 is opened / closed by a signal from the height sensor 17.

図2は、ダイヤフラムバルーンが最低位置まで低下した状態を示すブリージングタンクの断面図、図3は通常の運転状態のときのブリージングタンクの断面図、図4はダイヤフラムバルーンが最高位置まで上昇した状態を示すブリージングタンクの断面図である。   2 is a sectional view of the breathing tank showing a state where the diaphragm balloon is lowered to the lowest position, FIG. 3 is a sectional view of the breathing tank in a normal operation state, and FIG. 4 is a state where the diaphragm balloon is raised to the highest position. It is sectional drawing of the breathing tank shown.

ブリージングタンクの構造について図5に基づいて説明する。
ブリージングタンク10は、鋼製のタンク本体10aと、タンク本体10aの内部を窒素ガス収容部12と大気開放室13とに区画するダイヤフラムバルーン11とを有する。タンク本体10aには大気開放室13を大気開放する複数の開放口10bが設けられている。
The structure of the breathing tank will be described with reference to FIG.
The breathing tank 10 includes a steel tank main body 10 a and a diaphragm balloon 11 that partitions the inside of the tank main body 10 a into a nitrogen gas storage portion 12 and an air release chamber 13. The tank body 10a is provided with a plurality of open ports 10b that open the atmosphere release chamber 13 to the atmosphere.

ダイヤフラムバルーン11は、ゴム製の膜部材でその中央部に金属製のカウンタウエイト11aが付設され、ダイヤフラムバルーン11の外周縁がタンク本体10aの内周部の中段部に気密状に固定されている。タンク本体10a内においてダイヤフラムバルーン11の下側に窒素ガス収容部12が形成され、ダイヤフラムバルーン11の上側に大気開放室13が形成されている。窒素ガス収容部12は、前記の連通管14によりLNGタンク1の内槽外槽間の空間に接続されている。ダイヤフラムバルーン11の自重によって窒素ガス収容部12内の窒素ガスを大気圧程度に維持するようになっている。   The diaphragm balloon 11 is a rubber membrane member, and a metal counterweight 11a is attached to the center thereof, and the outer peripheral edge of the diaphragm balloon 11 is fixed in an airtight manner to the middle step of the inner peripheral portion of the tank body 10a. . In the tank body 10 a, a nitrogen gas storage portion 12 is formed below the diaphragm balloon 11, and an air release chamber 13 is formed above the diaphragm balloon 11. The nitrogen gas storage unit 12 is connected to the space between the inner tank and the outer tank of the LNG tank 1 by the communication pipe 14. The nitrogen gas in the nitrogen gas storage unit 12 is maintained at about atmospheric pressure by the dead weight of the diaphragm balloon 11.

外気温が上昇した時や気圧が低下した時などに、窒素ガス収容部12内の窒素ガスの体積が著しく増大してダイヤフラムバルーン11が最高高さまで上昇すると、安全弁16から窒素ガスが大気中へ放出されて、圧力上昇が回避される。
また、外気温が低下した時や気圧が上昇した時などに、窒素ガス収容部12内の窒素ガスの体積が著しく減少してダイヤフラムバルーン11が最低位置まで下降すると、高さセンサ17からの信号で電磁弁18が開弁されて、窒素ガス供給源から窒素ガスが窒素ガス収容部12に充填され、圧力低下が回避される。
When the outside air temperature rises or the pressure decreases, the volume of nitrogen gas in the nitrogen gas storage unit 12 increases remarkably and the diaphragm balloon 11 rises to the maximum height, so that the nitrogen gas enters the atmosphere from the safety valve 16. Is released and pressure rise is avoided.
Further, when the outside air temperature decreases or when the atmospheric pressure increases, the volume of the nitrogen gas in the nitrogen gas storage unit 12 is significantly reduced and the diaphragm balloon 11 is lowered to the lowest position. Thus, the solenoid valve 18 is opened, and nitrogen gas is filled into the nitrogen gas storage unit 12 from the nitrogen gas supply source, so that a pressure drop is avoided.

ところで、LNGタンク1を建造した状態では、ダイヤフラムバルーン11は最低高さに位置し、窒素ガス収容部12内には空気が充填されている。   By the way, in the state where the LNG tank 1 is constructed, the diaphragm balloon 11 is positioned at the lowest height, and the nitrogen gas storage portion 12 is filled with air.

この状態からブリージングタンク10を通常運転させる前に、前記窒素ガス収容部12に窒素ガスを充填して前記ダイヤフラムバルーン11をブリージングタンク10の全高の半分以下の所定高さまで上昇させた後、前記窒素ガス収容部12を大気開放して該ダイヤフラムバルーン11を最低位置まで下降させる昇降動作を複数回繰り返す酸素ガス排出促進工程と、前記酸素ガス排出促進工程の後で前記窒素ガス収容部12に窒素ガスを充填してダイヤフラムバルーン11を最高高さまで上昇させながらブリージングタンク10の性能を点検するブリージングタンク点検工程とを含む試運転を行う。
以下、本実施例に係るブリージングタンク10の試運転方法について説明する。
Before normal operation of the breathing tank 10 from this state, the nitrogen gas storage unit 12 is filled with nitrogen gas, and the diaphragm balloon 11 is raised to a predetermined height that is not more than half of the total height of the breathing tank 10, and then the nitrogen gas An oxygen gas discharge promotion step that repeats a plurality of times of raising and lowering operations for releasing the gas storage portion 12 to the atmosphere and lowering the diaphragm balloon 11 to the lowest position, and nitrogen gas in the nitrogen gas storage portion 12 after the oxygen gas discharge promotion step. And a breathing tank check process for checking the performance of the breathing tank 10 while raising the diaphragm balloon 11 to the maximum height.
Hereinafter, a test operation method of the breathing tank 10 according to the present embodiment will be described.

本実施形態に係る試運転方法は、窒素ガス収容部12内の酸素ガスの排出を促進する酸素ガス排出促進工程S2と、酸素ガス排出促進工程S2の後で、ブリージングタンク10の性能の点検を行いながら窒素ガス収容部12から酸素ガスを排出させるブリージングタンク点検工程S3と、ブリージングタンクの諸元から酸素ガス排出促進工程S2の条件を設定する準備工程S1(これは酸素ガス排出促進工程S2とブリージングタンク点検工程S3の前に行う)を含んでいる。   In the test operation method according to the present embodiment, the performance of the breathing tank 10 is checked after the oxygen gas discharge promotion step S2 for promoting the discharge of oxygen gas in the nitrogen gas storage unit 12 and the oxygen gas discharge promotion step S2. However, the breathing tank inspection step S3 for discharging oxygen gas from the nitrogen gas storage unit 12 and the preparation step S1 for setting the conditions of the oxygen gas discharge promotion step S2 from the specifications of the breathing tank (this is the oxygen gas discharge promotion step S2 and breathing). Performed before the tank inspection step S3).

前記酸素ガス排出促進工程S2は、安全弁16を非開放状態とし、窒素ガス収容部12に窒素ガス供給管15から窒素ガスを充填してダイヤフラムバルーン11をブリージングタンクの全高Hの半分以下の所定高さまで上昇させた後、安全弁16を開放状態として窒素ガス収容部12を大気開放し、ダイヤフラムバルーン11を最低高さまで下降させる昇降動作を複数回繰り返すものである。   In the oxygen gas discharge promotion step S2, the safety valve 16 is not opened, the nitrogen gas storage unit 12 is filled with nitrogen gas from the nitrogen gas supply pipe 15, and the diaphragm balloon 11 is set to a predetermined height less than half the total height H of the breathing tank. After raising, the safety valve 16 is opened, the nitrogen gas storage unit 12 is opened to the atmosphere, and the raising / lowering operation of lowering the diaphragm balloon 11 to the minimum height is repeated a plurality of times.

酸素ガス排出促進工程S2において、窒素ガス収容部12に窒素ガスを充填してカダイヤフラムバルーン11を前記所定高さまで上昇させた後、前記窒素ガス収容部12を大気開放してダイヤフラムバルーン11を最低高さまで下降させる昇降動作を複数回行うため、従来技術のようにダイヤフラムバルーン11を最高高さまで上昇させた後、前記窒素ガス収容部12を大気開放してダイヤフラムバルーン11を最低高さまで下降させる昇降動作を行うよりも作業時間が短くなる。   In the oxygen gas discharge promoting step S2, the nitrogen gas storage unit 12 is filled with nitrogen gas and the diaphragm balloon 11 is raised to the predetermined height, and then the nitrogen gas storage unit 12 is opened to the atmosphere to bring the diaphragm balloon 11 to the lowest position. Since the raising and lowering operation is performed a plurality of times to lower the height, the diaphragm balloon 11 is raised to the maximum height as in the prior art, and then the nitrogen gas storage portion 12 is opened to the atmosphere to raise and lower the diaphragm balloon 11 to the lowest height. The working time is shorter than the operation.

ダイヤフラムバルーン11が前記所定高さに上昇した後の窒素ガス収容部12の酸素濃度は高く維持され、この酸素濃度の高い空気・窒素ガスの混合ガスの一部を、ダイヤフラムバルーン11の下降時に大気中へ排出することで大気中への酸素の排出が促進される。 この昇降動作を複数回繰り返すことで、従来技術のように窒素ガス収容部12に窒素ガスを充填してカダイヤフラムバルーン11を最高高さまで上昇させた後、前記窒素ガス収容部12を大気開放してダイヤフラムバルーン11を最低高さまで下降させる昇降動作を行うよりも、窒素ガス収容部12内の酸素ガスを効率的に大気中へ排出できる。   After the diaphragm balloon 11 is raised to the predetermined height, the oxygen concentration in the nitrogen gas storage portion 12 is maintained high, and a part of the mixed gas of air / nitrogen gas having a high oxygen concentration is allowed to pass through the atmosphere when the diaphragm balloon 11 is lowered. Emission of oxygen into the atmosphere is promoted by discharging into the atmosphere. By repeating this up and down operation a plurality of times, the nitrogen gas storage unit 12 is filled with nitrogen gas as in the prior art to raise the caliber balloon 11 to the maximum height, and then the nitrogen gas storage unit 12 is opened to the atmosphere. Thus, it is possible to efficiently discharge the oxygen gas in the nitrogen gas storage unit 12 to the atmosphere rather than performing an elevating operation for lowering the diaphragm balloon 11 to the minimum height.

ブリージングタンク点検工程S3は、酸素ガス排出促進工程の後で行うものである。このブリージングタンク点検工程S3は、安全弁16を非開放状態とし、窒素ガス供給管15から窒素ガス収容部12に窒素ガスを充填してダイヤフラムバルーン11を最高高さ(図5に2点鎖線で図示の位置)まで上昇させながらブリージングタンク10の性能を点検する共に、その安全弁16を開放状態とすることで窒素ガス収容部12を大気開放し、ダイヤフラムバルーン11を最低高さまで下降させる昇降動作を1回だけ行うものである。
また、本工程の前に酸素ガス排出促進工程を行うことで、窒素ガス収容部内の酸素を効率的に大気中に排出できる。
The breathing tank inspection step S3 is performed after the oxygen gas discharge promotion step. In this breathing tank inspection step S3, the safety valve 16 is not opened, and the nitrogen gas storage unit 12 is filled with nitrogen gas from the nitrogen gas supply pipe 15 to raise the diaphragm balloon 11 to the maximum height (illustrated by a two-dot chain line in FIG. 5). The performance of the breathing tank 10 is inspected while being lifted up to the position 1), and the raising / lowering operation of opening the safety valve 16 to the atmosphere by opening the safety valve 16 to the atmosphere and lowering the diaphragm balloon 11 to the lowest height is performed. It is done only once.
Further, by performing the oxygen gas discharge promotion step before this step, oxygen in the nitrogen gas storage portion can be efficiently discharged into the atmosphere.

準備工程S1は、酸素ガス排出促進工程S2とブリージングタンク点検工程S3の前に行うものである。この準備作業S1は、試運転作業終了時の酸素ガス濃度の目標値と、試運転作業を完了するまでの目標時間を予め設定しておき、目標時間内に酸素ガス濃度よりも低い濃度となるような酸素ガス排出促進工程S2の条件を決定する工程である。
酸素ガス排出促進工程S2の条件とは、同工程におけるダイヤフラムバルーン11の昇降動作の回数と上昇させる前記所定高さのことであり、これらはブリージングタンク10の諸元(窒素ガス収容部12の容積と各工程S1、S2に要する作業時間)に基づいて幾何学的若しくは数学的に算出する。準備工程S1を備えることで試運転作業に要する時間を十分に短くすることができる。
The preparation step S1 is performed before the oxygen gas discharge promotion step S2 and the breathing tank inspection step S3. In this preparatory work S1, the target value of the oxygen gas concentration at the end of the trial operation and the target time until the trial operation is completed are set in advance, and the concentration becomes lower than the oxygen gas concentration within the target time. This is a step of determining the conditions of the oxygen gas discharge promoting step S2.
The conditions of the oxygen gas discharge promotion step S2 are the number of times the diaphragm balloon 11 is moved up and down in the same step and the predetermined height to be raised. And the working time required for each step S1, S2) is calculated geometrically or mathematically. By providing the preparation step S1, the time required for the trial operation can be sufficiently shortened.

その他、当業者であれば、前記実施例に種々の変更を付加した形態で実施可能であり、本発明はその種の変更形態を包含するものである。   In addition, those skilled in the art can implement the present invention by adding various modifications to the above-described embodiments, and the present invention includes such modifications.

1 LNGタンク
2 内槽
3 外槽
10 ブリージングタンク
11a カウンタウエイト
11 ダイヤフラムバルーン
12 窒素ガス収容部
13 大気開放室
DESCRIPTION OF SYMBOLS 1 LNG tank 2 Inner tank 3 Outer tank 10 Breathing tank 11a Counterweight 11 Diaphragm balloon 12 Nitrogen gas accommodating part 13 Atmospheric release chamber

Claims (2)

低温貯槽の内槽外槽間の窒素ガスの体積変化を吸収する為の窒素ガス収容部と、この窒素ガス収容部の上端を区画するダイヤフラムバルーンと、このダイヤフラムバルーンの上側の大気開放室を備えるブリージングタンクの試運転方法において、
前記窒素ガス収容部に窒素ガスを充填して前記ダイヤフラムバルーンをブリージングタンクの全高の半分以下の所定高さまで上昇させた後、前記窒素ガス収容部を大気開放して該ダイヤフラムバルーンを最低位置まで下降させる昇降動作を複数回繰り返す酸素ガス排出促進工程と、
前記酸素ガス排出促進工程の後で前記窒素ガス収容部に窒素ガスを充填してダイヤフラムバルーンを最高高さまで上昇させながらブリージングタンクの性能を点検するブリージングタンク点検工程とを備えたことを特徴とするブリージングタンクの試運転方法。
A nitrogen gas storage unit for absorbing a change in the volume of nitrogen gas between the inner and outer tanks of the low-temperature storage tank, a diaphragm balloon that partitions the upper end of the nitrogen gas storage unit, and an air release chamber above the diaphragm balloon are provided. In the trial running method of the breathing tank,
After filling the nitrogen gas storage part with nitrogen gas and raising the diaphragm balloon to a predetermined height that is less than half of the total height of the breathing tank, the nitrogen gas storage part is opened to the atmosphere and the diaphragm balloon is lowered to the lowest position. An oxygen gas discharge promotion step that repeats the raising and lowering operation multiple times,
A breathing tank inspection step for inspecting the performance of the breathing tank while filling the nitrogen gas storage portion with the nitrogen gas and raising the diaphragm balloon to the maximum height after the oxygen gas discharge promotion step. How to test the breathing tank.
前記酸素ガス排出促進工程と前記ブリージングタンク点検工程の前に、予め設定した目標時間よりも短い時間で前記酸素ガス排出促進工程を実行可能な前記所定高さと昇降動作の回数を、前記ブリージングタンクの諸元を用いて算出する準備工程を備えたことを特徴とする請求項1に記載のブリージングタンクの試運転方法。   Prior to the oxygen gas discharge promotion step and the breathing tank check step, the predetermined height and the number of lifting operations that can be performed in a time shorter than a preset target time are set as the number of times of the breathing tank. The trial operation method for a breathing tank according to claim 1, further comprising a preparation step of calculating using specifications.
JP2014264003A 2014-12-26 2014-12-26 How to test the breathing tank Active JP6412797B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014264003A JP6412797B2 (en) 2014-12-26 2014-12-26 How to test the breathing tank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014264003A JP6412797B2 (en) 2014-12-26 2014-12-26 How to test the breathing tank

Publications (2)

Publication Number Publication Date
JP2016125508A JP2016125508A (en) 2016-07-11
JP6412797B2 true JP6412797B2 (en) 2018-10-24

Family

ID=56358995

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014264003A Active JP6412797B2 (en) 2014-12-26 2014-12-26 How to test the breathing tank

Country Status (1)

Country Link
JP (1) JP6412797B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106322099B (en) * 2016-08-26 2019-04-05 上海林海生态技术股份有限公司 Combined type gas-holder system
JP6909635B2 (en) * 2017-05-19 2021-07-28 川崎重工業株式会社 Cryogenic gas storage tank
JP2023180541A (en) 2022-06-09 2023-12-21 川崎重工業株式会社 Multi-shell tanks and insulation material supply methods for multi-shell tanks

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59166798A (en) * 1983-03-11 1984-09-20 Ishikawajima Tank Kensetsu Kk Substitution with inert gas in tank
JPH10122492A (en) * 1996-10-23 1998-05-15 Nittetsu Drum Kk Method and device for replacing gas in drum can
JPH11270791A (en) * 1998-03-19 1999-10-05 Ishikawajima Harima Heavy Ind Co Ltd Breathing tank
JP2000297900A (en) * 1999-04-14 2000-10-24 Ishikawajima Harima Heavy Ind Co Ltd Inspection device for breathing tank

Also Published As

Publication number Publication date
JP2016125508A (en) 2016-07-11

Similar Documents

Publication Publication Date Title
JP6412797B2 (en) How to test the breathing tank
CN103234890A (en) Low-permeability coal high-pressure gas cycle pulse fracturing anti-reflection experimental device
CN104235382B (en) The linkage structure of a kind of heat sink container and lift platform
CN110987646A (en) A kind of thin-walled double cavity common bottom structure tank pressure test equipment and method
JP7190275B2 (en) Tank gas replacement method and device
WO2018203005A3 (en) Method for the handling of liquefied gas cargo and a storage facility
CN211505029U (en) Thin-wall double-cavity common-bottom structure storage tank pressure-bearing test equipment
US20110315687A1 (en) Method and system for reducing and preventing emissions from liquid storage tanks
KR20120126996A (en) Press tank module of ship for carbon dioxide shipping and control method of this
KR102251679B1 (en) Pin jig for the hull block suppporting
CN104389824A (en) Leather bag type energy accumulator
CN104196568A (en) A gas pressure regulating system and method for coal and gas outburst experiments
CN112304536A (en) Decompression valve detection equipment and detection method
JP2018028445A (en) Airtightness inspection device for tank
CN108061702A (en) Carbon dioxide erosion test device and analogy method
CN206095527U (en) A gas tightness check out test set for silencer, catalyst converter
CN108570991B (en) Self-pressure-maintaining building supporting device and self-pressure-maintaining building supporting system
CN206450564U (en) Actual triaxial testing apparatus and system
JP2020100435A (en) Perlite filling method
CN104075923A (en) High-temperature and high-pressure hollow microsphere inflation system
CN104266547B (en) An inflatable screen support device
CN203510722U (en) Safe and efficient film smelting equipment employing soft polyurethane foam coil
KR101340276B1 (en) Tank Lorry's Storage Tank Apparatus
US20230175356A1 (en) Method for Evacuating Hydrocarbon from a Subsea Process Module
JP2017106738A (en) Tank airtightness inspection method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20171115

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20180912

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20180919

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20181001

R150 Certificate of patent or registration of utility model

Ref document number: 6412797

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250