Reactor removal method Download PDF

Info

Publication number
JP6424437B2
JP6424437B2 JP2014025424A JP2014025424A JP6424437B2 JP 6424437 B2 JP6424437 B2 JP 6424437B2 JP 2014025424 A JP2014025424 A JP 2014025424A JP 2014025424 A JP2014025424 A JP 2014025424A JP 6424437 B2 JP6424437 B2 JP 6424437B2
Authority
JP
Japan
Prior art keywords
chamber
dismantling
torus
housing
reactor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2014025424A
Other languages
Japanese (ja)
Other versions
JP2015152387A (en
Inventor
豊 大村
豊 大村
佐藤 誠一
誠一 佐藤
岩田 圭司
圭司 岩田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IHI Corp
Original Assignee
IHI Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IHI Corp filed Critical IHI Corp
Priority to JP2014025424A priority Critical patent/JP6424437B2/en
Publication of JP2015152387A publication Critical patent/JP2015152387A/en
Application granted granted Critical
Publication of JP6424437B2 publication Critical patent/JP6424437B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Description

本発明は、原子炉の撤去工法に関するものである。   The present invention relates to a removal method of a nuclear reactor.

原子力発電所等の原子炉設備では、運転の使命を終了すると廃止措置がとられる。このため、原子炉の廃止措置に伴う原子炉圧力容器の安全かつ合理的な解体撤去工法の確立が急務とされている。原子炉圧力容器を解体撤去するには、原子炉圧力容器を細分化して逐次撤去、処分する工法が現実的であると考えられている。特許文献1には、沸騰水(Boiling Water Reactor)型原子力発電所設備の原子炉建屋から原子炉圧力容器を撤去するための工法が開示されている。   In nuclear reactor facilities such as nuclear power plants, decommissioning will be taken once the operation mission is completed. Therefore, it is urgently needed to establish a safe and reasonable dismantling and removal method for reactor pressure vessels accompanying the decommissioning of reactors. In order to dismantle and remove the reactor pressure vessel, it is considered realistic that the reactor pressure vessel is subdivided, sequentially removed, and disposed of. Patent Document 1 discloses a method for removing a reactor pressure vessel from a reactor building of a boiling water reactor type nuclear power plant facility.

特許文献1にあるように、この廃止措置は系統除染、安全貯蔵、解体撤去の順で行われる。安全貯蔵では、設備の放射線レベルが所定の値に減衰するまで(約5年〜10年)貯蔵され、この後、配管や機器類を解体するとともに、重量物である原子炉圧力容器を解体しこれを細分化して原子炉建屋から撤去する解体撤去作業が行われる。解体物の撤去作業においては、原子炉建屋内で解体物を放射線遮蔽容器に収納し、これを例えば、タービン建屋、又は放射線管理建屋等の保管設備に移送して一時保管する。この後、放射線遮蔽容器を、船舶により所定の場所に運搬して地中に埋設処理する。   As described in Patent Document 1, this decommissioning is performed in the order of system decontamination, safe storage, and dismantling and removal. In safe storage, the equipment is stored until the radiation level of the equipment decreases to a predetermined value (about 5 to 10 years), and then dismantling piping and equipment and dismantling heavy reactor pressure vessels. Dismantling and removal work is carried out to subdivide this and remove it from the reactor building. In the removal work of the dismantling material, the dismantling material is stored in the radiation shielding container in the reactor building, transferred to a storage facility such as a turbine building or a radiation control building, and temporarily stored. Thereafter, the radiation shielding container is transported to a predetermined place by a ship and buried in the ground.

特許文献1においては、原子炉建屋内で解体された解体物を、原子炉建屋から保管施設に効率よく移送するべく、原子力発電所設備に建設された原子炉建屋とタービン建屋とを直結するトンネル(メインスチームトンネル)を、原子炉建屋に格納された原子炉圧力容器の解体時の搬出用通路として利用し、当該トンネルを介して解体物をタービン建屋に移送して保管する原子炉撤去工法が開示されている。   In Patent Document 1, in order to efficiently transfer dismantling products disassembled in the reactor building from the reactor building to the storage facility, a tunnel connecting the reactor building and the turbine building directly connected to the nuclear power plant facilities A reactor removal method that uses (main steam tunnel) as a passage for unloading reactor pressure vessels stored in the reactor building and transfers the dismantled material to the turbine building via the tunnel for storage. It is disclosed.

特許第4898567号公報Patent No. 4898567

上記従来技術では、タービン建屋に解体物を保管するスペースを確保するために、タービン建屋を先行して解体しなければならないため、タービン建屋を先行解体する数年の間は、原子炉建屋内から解体物を搬出する動線(メインスチームトンネル)を確保することができない。
そこで、タービン建屋の解体を待つことなく、原子炉建屋内の解体作業を行うために、原子炉格納容器とベント管を介して連通するサプレッションチェンバが収容されたトーラス室内を先行解体し、そのトーラス室に付設された既存設備のアペンテージを用いて地上にアクセスし、原子炉建屋とタービン建屋とが直結しない別の動線を確保することが考えられる。
In the above-mentioned prior art, the turbine building must be dismantled in advance in order to secure a space for storing dismantling materials in the turbine building. It is not possible to secure a flow line (main steam tunnel) for carrying out the dismantling material.
Therefore, in order to dismantle the reactor building without waiting for the dismantling of the turbine building, the torus chamber in which the suppression chamber, which communicates with the reactor containment vessel and the vent pipe, is accommodated in advance is disassembled, and the torus It is conceivable to access the ground using the appendage of the existing equipment attached to the room and to secure another flow line in which the reactor building and the turbine building are not directly connected.

トーラス室内を先行解体する場合、トーラス室内の構造物の解体作業、解体物の細断作業、細断した解体物の容器への収納作業、収納済み容器の保管作業が必要であり、各作業に必要な作業スペースが求められる。なお、保管された収納済み容器は、上記動線を介して外部に搬出するが、その解体物の最終処分地が決定するまでの間は、トーラス室内に保管しなければならない。このような場合、トーラス室内の構造物を完全に解体すると、トーラス室内の床面スペースが解体物で圧迫されてしまう。これでは、作業スペースや動線スペースを確保することができず、トーラス室内の先行解体及び動線の確保が困難になるという問題がある。   In the case of dismantling the torus room in advance, dismantling work of the structure in the torus room, shredding work of dismantling objects, storing work of shredded dismantling objects in the container, storage work of the stored container is required. The required work space is required. In addition, although the stored container stored is taken out via the said flow line, it must be stored in a torus chamber until the final disposal site of the dismantling thing is decided. In such a case, when the structure in the torus chamber is completely dismantled, the floor space in the torus chamber is compressed by the dismantling material. In this case, the working space and the flow line space can not be secured, and there is a problem that it becomes difficult to secure the previous disassembly and the flow line in the torus room.

本発明は、上記問題点に鑑みてなされたものであり、解体物によるトーラス室内の床面スペースの圧迫を低減できる原子炉の撤去工法の提供を目的とする。   This invention is made in view of the said problem, and aims at provision of the removal method of the reactor which can reduce the pressure of the floor surface space in a torus room by a demolition thing.

上記の課題を解決するために、本発明は、原子炉格納容器とベント管を介して連通するサプレッションチェンバが収容されたトーラス室を有する原子炉の撤去工法であって、前記サプレッションチェンバを含んだ前記トーラス室内の構造物を部分的に解体する第1工程と、前記解体により生じた解体物を、前記トーラス室において前記サプレッションチェンバの筐体によって囲まれた空間若しくは筐体によって囲まれていた空間の少なくとも一部を用いて保管する第2工程と、を有する、という手法を採用する。
この手法を採用することによって、本発明では、サプレッションチェンバを含んだトーラス室内の構造物を一括で解体するのではなく部分的に解体することで、解体により生じる解体物を削減し、トーラス室内の床面スペースの圧迫を低減する。また、本発明では、トーラス室内の最大の構造物であるサプレッションチェンバの筐体によって囲まれた空間若しくは筐体によって囲まれていた空間に解体物を保管することで、トーラス室内における解体物の充填率を高め、トーラス室内の床面スペースの圧迫を低減する。
In order to solve the above-mentioned problems, the present invention is a removal method of a nuclear reactor having a torus chamber in which a suppression chamber in communication with a reactor containment vessel and a vent pipe is accommodated, the method comprising the suppression chamber A first step of partially disassembling the structure in the torus chamber, and a space surrounded by a space or a casing surrounded by the casing of the suppression chamber in the torus chamber, and a dissembled product produced by the dissection And a second step of storing using at least a part of
By adopting this method, according to the present invention, the structure in the torus chamber including the suppression chamber is partially disassembled instead of being disassembled collectively, thereby reducing the amount of disassembly products resulting from the disassembly. Reduce pressure on floor space. Further, in the present invention, by storing the dismantled material in the space surrounded by the space surrounded by the housing of the suppression chamber which is the largest structure in the torus chamber or the case, the filling of the dismantled materials in the torus chamber Increase the rate and reduce the pressure on the floor space in the torus room.

また、本発明においては、前記サプレッションチェンバは、前記トーラス室において支持脚を介して自立しており、前記第1工程は、前記サプレッションチェンバの下部を部分的に解体する工程を含み、前記第2工程は、前記解体物を、前記解体により前記支持脚を介してルーフ状になって自立する前記サプレッションチェンバの下方の空間に保管する工程を含む、という手法を採用する。
この手法を採用することによって、本発明では、支持脚によって自立機能を維持しながらサプレッションチェンバの下部を解体し、ルーフ状になったサプレッションチェンバの下方の空間に解体物を保管する。これにより、本発明では、サプレッションチェンバの上部を解体しないで解体物を削減しつつ、また、トーラス室内における解体物の充填率を高め、トーラス室内の床面スペースの圧迫を低減する。
Further, in the present invention, the suppression chamber is self-supporting in the torus chamber via the support leg, and the first step includes the step of partially disassembling the lower portion of the suppression chamber, the second step The process adopts a method of storing the dismantled material in a space below the suppression chamber which becomes roof-like by the dismantling via the support legs and is self-supporting.
By adopting this method, in the present invention, the lower part of the suppression chamber is disassembled while maintaining the self-supporting function by the support legs, and the fragments are stored in the space below the roof-shaped suppression chamber. Thus, in the present invention, while the amount of dismantling material is reduced without dismantling the upper portion of the suppression chamber, the filling rate of dismantling material in the torus chamber is increased, and the pressure on the floor space in the torus chamber is reduced.

また、本発明においては、前記支持脚は、前記サプレッションチェンバの幅方向において対向するように対となって設けられており、前記第1工程は、前記対となって設けられた前記支持脚の少なくともいずれか一方を部分的に解体し、前記幅方向における前記支持脚の間隔を大きくする工程を含む、という手法を採用する。
この手法を採用することによって、本発明では、サプレッションチェンバを支持する対となった支持脚を部分的に解体し、支持脚の間隔を大きくすることで、ルーフ状になったサプレッションチェンバの下方の空間を活用し易くする。例えば、支持脚の間隔を大きくすることで、フォークリフト等を進入し易くし、ルーフ状になったサプレッションチェンバの下方の空間における解体物の充填作業の効率化を図る。
Further, in the present invention, the support legs are provided in a pair so as to face each other in the width direction of the suppression chamber, and in the first step, the support legs are provided in the pair. The method of dismantling at least any one part partially and increasing the distance between the support legs in the width direction is adopted.
By adopting this method, in the present invention, the pair of support legs supporting the suppression chamber is partially disassembled, and the distance between the support legs is increased, whereby the lower portion of the roof-shaped suppression chamber is formed. Make space easy to use. For example, by increasing the distance between the support legs, a forklift or the like can be easily made to enter, and the efficiency of the filling work of the dismantled material in the space below the roof-shaped suppression chamber is improved.

また、本発明においては、前記サプレッションチェンバは、前記筐体によって囲まれた空間にプール水を保持しており、前記第2工程は、前記解体物を、前記プール水に水没させて保管する工程を含む、という手法を採用する。
この手法を採用することによって、本発明では、サプレッションチェンバのプール水に解体物を水没させ、サプレッションチェンバの筐体によって囲まれた空間に解体物を保管することで、トーラス室内における解体物の充填率を高め、トーラス室内の床面スペースの圧迫を低減する。
Further, in the present invention, the suppression chamber holds pool water in a space surrounded by the housing, and the second step is a step of storing the dismantled material submerged in the pool water. Adopt a method that
By adopting this method, in the present invention, the debris is submerged in the pool water of the suppression chamber, and the debris is stored in the space surrounded by the casing of the suppression chamber, thereby filling the debris in the torus chamber. Increase the rate and reduce the pressure on the floor space in the torus room.

また、本発明においては、前記第1工程は、前記プール水を保持する前記サプレッションチェンバの上部を部分的に解体する工程と、前記サプレッションチェンバの上部の部分的な解体により前記プール水の重量によって前記筐体が座屈しないように補強する工程と、を含む、という手法を採用する。
この手法を採用することによって、本発明では、サプレッションチェンバの下部を残してプール水の保持機能を維持しながらサプレッションチェンバの上部を解体する。また、サプレッションチェンバの上部を解体すると構造強度が低下することがあるため、座屈しないように筐体を補強する。これにより、本発明では、サプレッションチェンバの下部を解体しないで解体物を削減してトーラス室内の床面スペースの圧迫を低減し、また、プール水の保持機能があるため、プール水の廃棄のための前処理を、トーラス室内の構造物の解体と平行して行える。
Further, in the present invention, the first step is a step of partially dismantling the upper portion of the suppression chamber for holding the pool water, and partially dismantling the upper portion of the suppression chamber by the weight of the pool water. And a step of reinforcing the case so as not to be buckled.
By adopting this method, in the present invention, the upper part of the suppression chamber is disassembled while leaving the lower part of the suppression chamber and maintaining the retention function of the pool water. In addition, disassembling the upper portion of the suppression chamber may reduce the structural strength, so the case is reinforced so as not to buckle. Thus, according to the present invention, dismantling materials are reduced without dismantling the lower part of the suppression chamber to reduce the pressure on the floor space in the torus chamber, and since the pool water retention function is provided, the pool water is discarded. Pre-treatment can be performed in parallel with disassembly of the structure in the torus chamber.

また、本発明においては、前記サプレッションチェンバは、前記トーラス室において支持脚を介して自立しており、前記第1工程は、前記サプレッションチェンバの上部を部分的に解体する工程を含み、前記第2工程は、前記解体物を、前記解体により前記支持脚を介して椀状になって自立する前記サプレッションチェンバの上に保管する工程を含む、という手法を採用する。
この手法を採用することによって、本発明では、支持脚によって自立機能を維持しながらサプレッションチェンバの上部を解体し、椀状になったサプレッションチェンバの上に解体物を保管する。これにより、本発明では、サプレッションチェンバの下部を解体しないで解体物を削減しつつ、また、トーラス室内における解体物の充填率を高め、トーラス室内の床面スペースの圧迫を低減する。
Further, in the present invention, the suppression chamber is self-supporting in the torus chamber via a support leg, and the first step includes a step of partially disassembling the upper portion of the suppression chamber, the second step The process employs a method of storing the dismantled material on the suppression chamber which is self-supporting in a bowl shape by the dismantling via the support leg.
By adopting this method, in the present invention, the upper part of the suppression chamber is disassembled while maintaining the self-supporting function by the support legs, and the fragments are stored above the bowl-shaped suppression chamber. Thus, according to the present invention, while the amount of dismantling material is reduced without dismantling the lower part of the suppression chamber, the filling rate of dismantling material in the torus chamber is increased, and the pressure on the floor space in the torus chamber is reduced.

また、本発明においては、前記トーラス室は、前記サプレッションチェンバを収容する環状エリアを有しており、前記第1工程は、前記環状エリアにおける一部のエリアの前記構造物を解体する工程を含み、前記第2工程は、前記一部のエリアの前記解体物を他のエリアに仮置きする工程と、前記一部のエリアに、前記解体物を保管するためのスクラップヤードを設ける工程と、を含む、という手法を採用する。
この手法を採用することによって、本発明では、トーラス室の環状エリアの一部のエリアの構造物を解体し、その解体物を他のエリアに仮置きし、解体したエリアにスクラップヤードを設ける。スクラップヤードを設けることで、解体物を容器に収納する収納作業を先送りにして、その後に解体物を搬出する搬出作業とジャストインタイム化させる。これにより、トーラス室内の解体物保管数を削減して、トーラス室内の床面スペースの圧迫を低減する。
Further, in the present invention, the torus chamber has an annular area for accommodating the suppression chamber, and the first step includes the step of disassembling the structure of a part of the annular area. The second step includes a step of temporarily placing the scrap in the partial area in another area, and a step of providing a scrap yard for storing the scrap in the partial area. Adopt the method of including.
By adopting this method, in the present invention, the structure in a part of the annular area of the torus chamber is disassembled, the disassembled object is temporarily placed in another area, and a scrap yard is provided in the disassembled area. By providing the scrap yard, the storage operation for storing the dismantled material in the container is advanced, and then the unloading operation for discharging the dismantled material and the just-in-time operation are performed. This reduces the number of stored debris in the torus room and reduces the pressure on the floor space in the torus room.

本発明によれば、解体物によるトーラス室内の床面スペースの圧迫を低減して、トーラス室内の先行解体及び動線の確保を確実に行うことができる。   According to the present invention, it is possible to reduce the pressure on the floor surface space in the torus room by the dismantling material, and to reliably perform the prior disassembly and the flow line in the torus room.

本発明の第1実施形態における原子炉の概略構成を示す断面図である。BRIEF DESCRIPTION OF THE DRAWINGS It is sectional drawing which shows schematic structure of the nuclear reactor in 1st Embodiment of this invention. 図1における矢視A−A図である。It is an arrow AA figure in FIG. 本発明の第1実施形態における原子炉の撤去工法のアペンテージを利用した解体物の搬出を説明するための図である。It is a figure for demonstrating the carrying out of the demolished thing using an appendage of the removal method of the reactor in 1st Embodiment of this invention. 本発明の第1実施形態における不完全解体工法の作業フローを示す図である。It is a figure which shows the work flow of the incomplete dismantling method in 1st Embodiment of this invention. 本発明の第1実施形態における不完全解体工法の作業工程を説明するための模式図である。It is a schematic diagram for demonstrating the working process of the incomplete dismantling construction method in 1st Embodiment of this invention. 本発明の第1実施形態における不完全解体工法の作業工程を説明するための模式図である。It is a schematic diagram for demonstrating the working process of the incomplete dismantling construction method in 1st Embodiment of this invention. 本発明の第2実施形態における不完全解体工法の作業フローを示す図である。It is a figure which shows the operation flow of the incomplete dismantling method in 2nd Embodiment of this invention. 本発明の第2実施形態における不完全解体工法の作業工程を説明するための模式図である。It is a schematic diagram for demonstrating the operation process of the incomplete dismantling construction method in 2nd Embodiment of this invention. 本発明の第2実施形態における不完全解体工法の作業工程を説明するための模式図である。It is a schematic diagram for demonstrating the operation process of the incomplete dismantling construction method in 2nd Embodiment of this invention. 本発明の第3実施形態における不完全解体工法の作業フローを示す図である。It is a figure which shows the operation flow of the incomplete dismantling method in 3rd Embodiment of this invention. 本発明の第3実施形態における不完全解体工法の作業工程を説明するための模式図である。It is a schematic diagram for demonstrating the working process of the incomplete dismantling construction method in 3rd Embodiment of this invention. 本発明の第3実施形態における不完全解体工法の作業工程を説明するための模式図である。It is a schematic diagram for demonstrating the working process of the incomplete dismantling construction method in 3rd Embodiment of this invention. 本発明の第3実施形態における不完全解体工法の作業工程を説明するための模式図である。It is a schematic diagram for demonstrating the working process of the incomplete dismantling construction method in 3rd Embodiment of this invention. 本発明の第3実施形態における不完全解体工法の作業工程を説明するための模式図である。It is a schematic diagram for demonstrating the working process of the incomplete dismantling construction method in 3rd Embodiment of this invention. 本発明の第3実施形態における不完全解体工法の作業工程を説明するための模式図である。It is a schematic diagram for demonstrating the working process of the incomplete dismantling construction method in 3rd Embodiment of this invention. 本発明の第3実施形態における不完全解体工法の作業工程を説明するための模式図である。It is a schematic diagram for demonstrating the working process of the incomplete dismantling construction method in 3rd Embodiment of this invention. 本発明の第3実施形態における不完全解体工法の作業工程を説明するための模式図である。It is a schematic diagram for demonstrating the working process of the incomplete dismantling construction method in 3rd Embodiment of this invention. 本発明の第3実施形態における不完全解体工法の作業工程を説明するための模式図である。It is a schematic diagram for demonstrating the working process of the incomplete dismantling construction method in 3rd Embodiment of this invention. 本発明の第3実施形態における不完全解体工法の作業工程を説明するための模式図である。It is a schematic diagram for demonstrating the working process of the incomplete dismantling construction method in 3rd Embodiment of this invention. 本発明の第3実施形態における不完全解体工法の作業工程を説明するための模式図である。It is a schematic diagram for demonstrating the working process of the incomplete dismantling construction method in 3rd Embodiment of this invention. 本発明の第3実施形態における不完全解体工法の作業工程を説明するための模式図である。It is a schematic diagram for demonstrating the working process of the incomplete dismantling construction method in 3rd Embodiment of this invention. 本発明の第3実施形態における不完全解体工法と従来工法との作業フローを比較するための図である。It is a figure for comparing the work flow of the incomplete dismantling method and conventional construction method in a 3rd embodiment of the present invention.

以下、本発明の実施形態について図面を参照して説明する。   Hereinafter, embodiments of the present invention will be described with reference to the drawings.

(第1実施形態)
図1は、本発明の第1実施形態における原子炉の概略構成を示す断面図である。図2は、図1における矢視A−A図である。
本実施形態の原子炉は、沸騰水型原子力発電設備にかかるものであり、周囲には不図示のタービン建屋が設けられている。
First Embodiment
FIG. 1 is a cross-sectional view showing a schematic configuration of a nuclear reactor in a first embodiment of the present invention. FIG. 2 is a view on arrow AA in FIG.
The nuclear reactor of this embodiment relates to a boiling water nuclear power plant, and a turbine building (not shown) is provided around the reactor.

この原子炉は、図1に示すように、原子炉圧力容器1(RPV)と、この原子炉圧力容器1を囲繞して設けられた鋼製の原子炉格納容器2(PCV)とを備える。原子炉格納容器2は、原子炉圧力容器1を一次格納するものであり、冷却材喪失時等に圧力障壁および放射性物質の放散に対する障壁を形成する。原子炉格納容器2は、その基部が原子炉建屋基礎で支持される鋼製自立型格納容器である。   As shown in FIG. 1, the nuclear reactor includes a reactor pressure vessel 1 (RPV) and a steel nuclear reactor containment vessel 2 (PCV) provided surrounding the reactor pressure vessel 1. The reactor containment vessel 2 primarily accommodates the reactor pressure vessel 1 and forms a pressure barrier and a barrier to the release of radioactive materials upon loss of coolant and the like. The reactor containment vessel 2 is a steel self-contained containment vessel whose base is supported by the reactor building foundation.

原子炉格納容器2は、放射能遮蔽体としてのコンクリート製の原子炉建屋3(R/B)内に設けられている。原子炉格納容器2の周囲は、原子炉建屋3の一部をなす生体遮蔽壁3aにて厚く覆われており、この生体遮蔽壁3aにより放射能汚染領域とクリーン領域とが隔離されている。原子炉格納容器2は、ドライウェル4(D/W)と、サプレッションチェンバ5(S/C)と、ベント管6とからなる圧力抑制系を備える。   The reactor containment vessel 2 is provided in a concrete reactor building 3 (R / B) as a radiation shield. The periphery of the reactor containment vessel 2 is thickly covered with a living body shielding wall 3a which forms a part of the reactor building 3. The living body shielding wall 3a isolates a radioactive contamination area and a clean area. The reactor containment vessel 2 includes a pressure suppression system including a dry well 4 (D / W), a suppression chamber 5 (S / C), and a vent pipe 6.

サプレッションチェンバ5は、図2に示すように、原子炉格納容器2の周囲に円環状に配設された鋼管からなる。サプレッションチェンバ5は、複数のベント管6(図2において不図示、図1参照)を介して原子炉格納容器2のドライウェル4に連通している。
ベント管6は、内径が約2m前後の大口径の鋼管からなる。ベント管6は、ドライウェル4の空間とサプレッションチェンバ5の水中とを接続するものである。
As shown in FIG. 2, the suppression chamber 5 is formed of a steel pipe annularly disposed around the reactor containment vessel 2. The suppression chamber 5 is in communication with the dry well 4 of the reactor containment vessel 2 via a plurality of vent pipes 6 (not shown in FIG. 2, see FIG. 1).
The vent pipe 6 is made of a large diameter steel pipe having an inner diameter of about 2 m. The vent pipe 6 connects the space of the dry well 4 and the water of the suppression chamber 5.

ベント管6は、ベントヘッダ7と、ダウンカマー8とを有する。ベントヘッダ7は、サプレッションチェンバ5内で円環状に設けられ、複数のベント管6に接続されている。ダウンカマー8は、ベントヘッダ7より分岐してサプレッションチェンバ5のプール水Pの中に開口するように設けられている。このダウンカマー8は、隣り合うベント管6の間において複数設けられている。   The vent pipe 6 has a vent header 7 and a downcomer 8. The vent header 7 is annularly provided in the suppression chamber 5 and connected to the plurality of vent pipes 6. The downcomer 8 is branched from the vent header 7 and opened in the pool water P of the suppression chamber 5. A plurality of downcomers 8 are provided between adjacent vent pipes 6.

サプレッションチェンバ5内には、内部回廊13が設けられている。内部回廊13は、プール水Pの上方において、サプレッションチェンバ5の内部を周回できるように設けられている。一方、サプレッションチェンバ5外には、外部回廊14が設けられている。外部回廊14は、サプレッションチェンバ5の上方において、サプレッションチェンバ5の外部を周回できるように設けられている。このサプレッションチェンバ5は、トーラス室9において支持脚19を介して自立している。   An internal corridor 13 is provided in the suppression chamber 5. The internal corridor 13 is provided above the pool water P so as to be able to circulate inside the suppression chamber 5. On the other hand, an external corridor 14 is provided outside the suppression chamber 5. The outer corridor 14 is provided above the suppression chamber 5 so as to be able to go around the outside of the suppression chamber 5. The suppression chamber 5 is self-supporting in the torus chamber 9 via the support legs 19.

原子炉建屋3内の地下には、原子炉格納容器2の下部周囲に位置して、その内部にサプレッションチェンバ5が収容されたトーラス室9が円環状に設けられている。トーラス室9は、例えば高さ8m×横幅8m程度の空間断面積を有し、原子炉格納容器2の周囲に直径30m〜40mのトーラス形状の空間を形成している。トーラス室9は、放射能遮蔽体としてのコンクリート製の原子炉建屋3の一部をなす地下構造物として形成される。   A torus chamber 9 which is located around the lower part of the reactor containment vessel 2 and in which a suppression chamber 5 is accommodated is provided in a ring shape in the basement in the reactor building 3. The torus chamber 9 has a space cross-sectional area of, for example, about 8 m in height × about 8 m in width, and forms a torus-shaped space of 30 m to 40 m in diameter around the reactor containment vessel 2. The torus chamber 9 is formed as an underground structure which forms a part of a concrete reactor building 3 as a radiation shield.

原子炉建屋3には、トーラス室9の傍らに付設されると共に原子炉建屋3外の地上に連通するアペンテージ10(付設室)が設けられている。アペンテージ10は、トーラス室9の外側に突出するようにして付設された地下構造物である。このアペンテージ10は、非常用炉心冷却系(ECCS)の一部を構成するコアスプレーポンプ11を収容するためのコアスプレーポンプ室である。   The reactor building 3 is provided with an appendage 10 (attached chamber) which is attached to the side of the torus chamber 9 and which communicates with the ground outside the reactor building 3. The appendage 10 is an underground structure attached to the outside of the torus chamber 9 so as to protrude therefrom. The appendage 10 is a core spray pump chamber for housing a core spray pump 11 that constitutes a part of an emergency core cooling system (ECCS).

アペンテージ10内には、コアスプレーポンプ11の他に、同じく非常用炉心冷却系を構成する熱交換器、ドレインタンク、ドレインポンプ等(いずれも不図示)が収容されている。このアペンテージ10には、地下上部フロアー10aと、地下下部フロアー10bとがあり、不図示の梯子で行き来できるようになっている。地下下部フロアー10bには、コアスプレーポンプ11が配置されている。   In the appendage 10, in addition to the core spray pump 11, a heat exchanger, a drain tank, a drain pump, etc. (all not shown) that similarly constitute an emergency core cooling system are accommodated. The appendage 10 has an underground upper floor 10a and an underground lower floor 10b, and can be returned and received by a ladder (not shown). The core spray pump 11 is arrange | positioned at the underground lower floor 10b.

地下上部フロアー10aの側部には、トーラス室9に連通できる連通口16が形成されている。また、地下上部フロアー10aの天部には、原子炉建屋3外の地上に連通できるハッチ17aが設けられている。ハッチ17aは、コアスプレーポンプ11等を移送できる大きさ、例えば2m×2m程度の大きさで開口できるようになっている。このアペンテージ10は、図2に示すように、トーラス室9の傍らに2つ設けられている。また、トーラス室9には、タービン建屋に接続されたメインスチームトンネル(不図示)と連通する連通口18が設けられている。   A communication port 16 communicating with the torus chamber 9 is formed on the side of the underground upper floor 10a. Further, a hatch 17a that can communicate with the ground outside the reactor building 3 is provided at the top of the underground upper floor 10a. The hatch 17a can be opened to a size that can transfer the core spray pump 11 or the like, for example, a size of about 2 m × 2 m. As shown in FIG. 2, two appendages 10 are provided beside the torus chamber 9. Further, the torus chamber 9 is provided with a communication port 18 communicating with a main steam tunnel (not shown) connected to the turbine building.

続いて、上記構成の原子炉の撤去工法について説明する。
図3は、本発明の第1実施形態における原子炉の撤去工法のアペンテージ10を利用した解体物Xの搬出を説明するための図である。
本手法では、先ず、炉内除染、系統除染、サプレッションチェンバ5内の水処理を行った後、図3に示すように、サプレッションチェンバ5を先行解体する。サプレッションチェンバ5を先行解体すると、ベント管6、トーラス室9、アペンテージ10を連通させることができる。これにより、原子炉格納容器2内から原子炉建屋3外の地上に繋がる搬出入用の動線20を確保することができる。
Then, the removal method of the reactor of the said structure is demonstrated.
FIG. 3 is a view for explaining the carrying-out of the disassembled object X using the appendage 10 of the removal method of the nuclear reactor in the first embodiment of the present invention.
In the present method, first, in-furnace decontamination, systematic decontamination, and water treatment in the suppression chamber 5 are performed, and then, as shown in FIG. 3, the suppression chamber 5 is disassembled in advance. When the suppression chamber 5 is disassembled in advance, the vent pipe 6, the torus chamber 9, and the appendage 10 can be communicated. Thus, it is possible to secure a flow line 20 for transfer from / into the reactor containment vessel 2 to the ground outside the reactor building 3.

動線20は、既設の構造物であるベント管6、トーラス室9、アペンテージ10を利用して形成される。なお、動線20における空間断面積の確保のために、ベントヘッダ7及びダウンカマー8は、サプレッションチェンバ5の解体と共に切除等して撤去することが好ましい。また、必要であれば、トーラス室9とアペンテージ10との連通口16を拡大させてもよい。アペンテージ10は、コアスプレーポンプ室であり、搬出口である大型のハッチ17aが設けられ、動線として利用するのに好適である。   The flow line 20 is formed using the existing structure, the vent pipe 6, the torus chamber 9, and the appendage 10. In addition, in order to secure the space cross-sectional area in the flow line 20, it is preferable that the vent header 7 and the downcomer 8 be removed along with the disassembly of the suppression chamber 5 and removed. Further, the communication port 16 between the torus chamber 9 and the appendage 10 may be enlarged if necessary. The appendage 10 is a core spray pump chamber, is provided with a large hatch 17a serving as an outlet, and is suitable for use as a flow line.

このように、既設の構造物を利用して、原子炉建屋3とタービン建屋とが直結しない別の動線を確保することにより、タービン建屋の解体を待つことなく、原子炉建屋3内の解体作業を行うことができる。このため、タービン建屋側と並行して解体作業を行うことが可能となる。
原子炉圧力容器1を解体すると、解体時に生じる放射性浮遊物が動線20を介して原子炉建屋3内から地上に漏出するようになるため、本手法では解体の前に、ハッチ17aを囲うようにガレージ21を仮設する。ガレージ21は、解体物Xを外部に搬送する搬送車両Tのためのものであり、アペンテージ10と連通するように地上に設ける。ガレージ21には、シャッター22が設けられており、搬送車両Tが荷受けする際にはシャッター22が閉められる。
Thus, dismantling of the reactor building 3 without waiting for dismantling of the turbine building by securing another flow line in which the reactor building 3 and the turbine building are not directly connected using the existing structure. Work can be done. For this reason, it becomes possible to perform disassembly work in parallel with the turbine building side.
When dismantling the reactor pressure vessel 1, radioactive floats produced during dismantling leak from the inside of the reactor building 3 to the ground through the flow line 20. Therefore, in the present method, the hatch 17a is enclosed before dismantling. The garage 21 will be set up temporarily. The garage 21 is for the transport vehicle T that transports the disassembled object X to the outside, and is provided on the ground so as to communicate with the appendage 10. A shutter 22 is provided in the garage 21 and is closed when the transport vehicle T receives a load.

原子炉格納容器2内で細分化された原子炉圧力容器1の解体物Xの搬出は、動線20の適所に揚重機24を設けることにより行う。具体的には、原子炉格納容器2とトーラス室9との間においてベント管6を通すように架設したレール25に揚重機24を設置して、解体物Xをトーラス室9に搬出する。また、トーラス室9とアペンテージ10との間において連通口16を通すように架設したレール26に揚重機24を設置して、トーラス室9で解体物Xを収納したコンテナをアペンテージ10に搬出する。そして、ガレージ21に架設したレール27に揚重機24を設置して、解体物Xを地上に引き上げて搬送車両Tの荷台に載置することにより搬出を行う。   The dismantling product X of the reactor pressure vessel 1 subdivided in the reactor containment vessel 2 is carried out by providing a lifting machine 24 at an appropriate position of the flow line 20. Specifically, a lifting machine 24 is installed on a rail 25 constructed so as to pass the vent pipe 6 between the reactor containment vessel 2 and the torus chamber 9, and the dismantled object X is carried out to the torus chamber 9. Further, a lifting machine 24 is installed on a rail 26 erected so as to pass the communication port 16 between the torus chamber 9 and the appendage 10, and the container storing the object X is taken out to the appendage 10 in the torus chamber 9. Then, the hoisting machine 24 is installed on the rail 27 erected in the garage 21, and the to-be-removed object X is pulled up to the ground and placed on the loading platform of the transport vehicle T to carry it out.

このように、本手法では、トーラス室9内を先行解体し、原子炉建屋3とタービン建屋とが直結しない別の独立した動線20を確保することにより、タービン建屋の解体を待つことなく、原子炉建屋3内の解体作業を行うことができる。また、トーラス室9の大きな空間を利用できるため、最終処分地が決定するまでの間においても、廃材処理を行うことができ、また、廃材処理した解体物Xを原子炉建屋3内に保管することができる。   Thus, in the present method, the inside of the torus chamber 9 is disassembled in advance, and another independent flow line 20 in which the reactor building 3 and the turbine building are not directly connected is secured without waiting for the dismantling of the turbine building. The dismantling work in the reactor building 3 can be performed. In addition, since the large space of the torus chamber 9 can be used, waste materials can be treated even before the final disposal site is determined, and the scrapped material X treated with waste materials is stored in the reactor building 3 be able to.

ところで、トーラス室9内の構造物には、作業スペースや動線スペースの確保に有効でない構造物がある。このような構造物としては、例えば、トーラス室9内の高所部等であってその状態で床面スペースを圧迫しない部分や、バルブ等であって多数の部材に解体しなければならず減容比が確保できない部品等がある。このような構造物を解体してしまうと、トーラス室9内の床面スペースを圧迫してしまい、作業スペースや動線スペースを確保することができず、トーラス室内の先行解体及び動線20の確保が困難になる。   By the way, the structures in the torus chamber 9 include structures that are not effective for securing work space and flow line space. Such a structure is, for example, a high part in the torus chamber 9 or the like which does not press the floor space in that state, or a valve or the like, which must be disassembled into a large number of members. There is a part etc which can not secure the ratio. Disassembling such a structure squeezes the floor space in the torus chamber 9 and can not secure a work space and a flow line space, and the prior disassembly of the torus chamber and the flow line 20 It becomes difficult to secure.

そこで、本手法では、トーラス室9内の構造物を部分的に解体する不完全解体工法を採用する。なお、以下、図4〜図6を用いて説明する不完全解体工法は、サプレッションチェンバ5のプール水Pを移送後のものである。
図4は、本発明の第1実施形態における不完全解体工法の作業フローを示す図である。図5及び図6は、本発明の第1実施形態における不完全解体工法の作業工程を説明するための模式図である。
So, in this method, the incomplete dismantling method of dismantling the structure in the torus chamber 9 partially is employ | adopted. The incomplete dismantling method described below with reference to FIGS. 4 to 6 is the one after the pool water P of the suppression chamber 5 has been transferred.
FIG. 4 is a diagram showing a work flow of the incomplete dismantling method in the first embodiment of the present invention. FIG.5 and FIG.6 is a schematic diagram for demonstrating the working process of the incomplete dismantling method in 1st Embodiment of this invention.

この手法では、先ず、トーラス室9内の作業スペースの整備と、解体資機材の搬入を行う(ステップS1)。解体資機材の搬入は、アペンテージ10を介して行うことができる。この解体資機材には、図5(a)に示すレール30及び揚重機31が含まれており、これらをサプレッションチェンバ5の上部5aの内側に設置する。レール30は、サプレッションチェンバ5の長手方向(リング周方向)に延在するものである。揚重機31は、レールに沿ってサプレッションチェンバ5の長手方向(図5(a)において紙面垂直方向)に移動可能であると共に、吊り点をサプレッションチェンバ5の幅方向(図5(a)において紙面左右方向)に移動可能なものである。   In this method, first, maintenance of the work space in the torus room 9 and loading of dismantling equipment are performed (step S1). The delivery of dismantling equipment can be performed via the appendage 10. The dismantling equipment includes the rail 30 and the lifting machine 31 shown in FIG. 5A, which are installed inside the upper portion 5 a of the suppression chamber 5. The rails 30 extend in the longitudinal direction (ring circumferential direction) of the suppression chamber 5. The lifting machine 31 is movable along the rail in the longitudinal direction of the suppression chamber 5 (in the direction perpendicular to the sheet of FIG. 5A) and the suspension point is in the width direction of the suppression chamber 5 (in FIG. 5A). Movable in the left and right direction).

次に、サプレッションチェンバ5の支持脚19スリム化と、トーラス室9の床面の段差の撤去を行う(ステップS2:第1工程)。このステップS2は、後の工程でフォークリフト等を走行可能とするものである。本実施形態において、支持脚19は、図5(b)に示すように、サプレッションチェンバ5の幅方向において対向するように対となって設けられている。このステップS2では、対となって設けられた支持脚19の少なくともいずれか一方(本実施形態では両方)を部分的に解体し、幅方向における支持脚19の間隔を大きくする。これにより、サプレッションチェンバ5の下方の空間を活用し易くする。   Next, the support legs 19 of the suppression chamber 5 are made slim and the steps on the floor of the torus chamber 9 are removed (step S2: first step). This step S2 enables the forklift and the like to travel in a later step. In the present embodiment, as shown in FIG. 5B, the support legs 19 are provided in a pair so as to face each other in the width direction of the suppression chamber 5. In this step S2, at least one of the pair of support legs 19 (both in the present embodiment) is partially disassembled to increase the distance between the support legs 19 in the width direction. This makes it easy to utilize the space below the suppression chamber 5.

次に、解体予定部分の補強を行う(ステップS3)。このステップS3は、後の工程でサプレッションチェンバ5の自重を支える機能を維持するために、必要に応じて構造物の補強をするものである。例えば、スリム化した支持脚19の外側にサポートを施工して、支持脚19を補強する。また、例えば、ベント管6、ベントヘッダ7等にも必要に応じてサポートを施工して補強する。   Next, reinforcement of the part to be disassembled is performed (step S3). This step S3 is to reinforce the structure as necessary in order to maintain the function of supporting the dead weight of the suppression chamber 5 in a later step. For example, a support is applied to the outside of the slimmed support leg 19 to reinforce the support leg 19. Further, for example, a support is applied to the vent pipe 6, the vent header 7 and the like as needed, and the support is reinforced.

次に、サプレッションチェンバ5の下部5bの解体と、ダウンカマー8等の切断を行う(ステップS4:第1工程)。このステップS3は、サプレッションチェンバ5を含んだトーラス室9内の構造物を部分的に解体するものである。サプレッションチェンバ5の下部5bを解体すると、図6(a)に示すように、サプレッションチェンバ5の上部5aが残り、支持脚19によって支えられたサプレッションチェンバ5がルーフ状になって自立する。これにより、サプレッションチェンバ5の筐体(シェル)によって囲まれていた空間s1が開放され、ルーフ状になったサプレッションチェンバ5の下方に大きな空間が形成される。   Next, dismantling of the lower portion 5b of the suppression chamber 5 and cutting of the downcomer 8 and the like are performed (step S4: first step). This step S3 is for partially disassembling the structure in the torus chamber 9 including the suppression chamber 5. When the lower portion 5b of the suppression chamber 5 is disassembled, as shown in FIG. 6A, the upper portion 5a of the suppression chamber 5 remains, and the suppression chamber 5 supported by the support legs 19 becomes a roof and becomes independent. As a result, the space s1 enclosed by the casing (shell) of the suppression chamber 5 is opened, and a large space is formed below the roof-shaped suppression chamber 5.

次に、コンテナ搬出入における干渉物の撤去を行う(ステップS5)。このステップS5は、トーラス室9の天井やアペンテージ10から、コンテナの搬出入の際に干渉する構造物を撤去するものである。このコンテナは、ステップS2やステップS4等で生じた解体物Xを収容するものである。   Next, the interfering substance in the container loading and unloading is removed (step S5). This step S5 is for removing a structure that interferes with the loading and unloading of the container from the ceiling of the torus chamber 9 and the appendage 10. This container accommodates the dismantling object X produced in step S2, step S4, and the like.

最後に、ルーフ状になったサプレッションチェンバ5の下方の空間を仮置き場として整備し、コンテナに収容した解体物Xを保管する(ステップS6:第2工程)。このステップS6は、図6(b)に示すように、トーラス室9においてサプレッションチェンバ5の筐体によって囲まれていた空間s1の少なくとも一部を用いて、解体物Xを保管するものである。コンテナに収容された解体物Xは、ルーフ状になったサプレッションチェンバ5の下方の空間に、揚重機31やフォークリフト等を用いて多段積みで保管する。なお、このように多段積みしたコンテナは足場として用いることができ、後工程のサプレッションチェンバ5の上部5aの解体等の本格解体に利用できる。   Finally, the space under the roof-shaped suppression chamber 5 is maintained as a temporary storage space, and the dismantling object X accommodated in the container is stored (step S6: second process). In this step S6, as shown in FIG. 6B, the to-be-discarded article X is stored using at least a part of the space s1 enclosed by the casing of the suppression chamber 5 in the torus chamber 9. The dismantling object X accommodated in the container is stored in multi-tiered stacking using a lifting machine 31, a forklift and the like in the space below the roof-shaped suppression chamber 5. The containers stacked in multiple stages can be used as a scaffold and can be used for full-scale dismantling such as dismantling of the upper portion 5a of the suppression chamber 5 in the post process.

以上のように、この不完全解体工法によれば、サプレッションチェンバ5を含んだトーラス室9内の構造物を一括で解体するのではなく部分的に解体することで、解体により生じる解体物Xを削減し、トーラス室9内の床面スペースの圧迫を低減することができる。また、トーラス室9内の最大の構造物であるサプレッションチェンバ5の筐体によって囲まれていた空間s1に解体物Xを保管することで、トーラス室9内における解体物Xの充填率を高め、トーラス室9内の床面スペースの圧迫を低減することができる。   As described above, according to this incomplete dismantling method, the structure in the torus chamber 9 including the suppression chamber 5 is not dismantled together but dismantled partially, so that the dismantling object X produced by dismantling is The pressure on the floor space in the torus chamber 9 can be reduced. In addition, by storing the disassembly X in the space s1 surrounded by the casing of the suppression chamber 5, which is the largest structure in the torus chamber 9, the filling rate of the disassembly X in the torus chamber 9 is increased, The pressure on the floor space in the torus chamber 9 can be reduced.

具体的には、図6(b)に示すように、支持脚19によって自立機能を維持しながらサプレッションチェンバ5の下部5bを解体し、ルーフ状になったサプレッションチェンバ5の下方の空間に解体物Xを保管する。これにより、作業スペースや動線スペースの確保に有効でないサプレッションチェンバ5の上部5aを解体しないで解体物Xを削減しつつ、また、トーラス室9内における解体物Xの充填率を高め、トーラス室9内の床面スペースの圧迫を低減することができる。   Specifically, as shown in FIG. 6 (b), the lower part 5b of the suppression chamber 5 is disassembled while maintaining the self-supporting function by the support legs 19, and the disassembly is carried out in the space below the roof-shaped suppression chamber 5. Store X As a result, while the dismantling object X is reduced without dismantling the upper portion 5a of the suppression chamber 5 which is not effective for securing the work space and flow line space, the filling rate of the dismantling object X in the torus chamber 9 is increased, The pressure on the floor space in 9 can be reduced.

さらに、この不完全解体工法では、サプレッションチェンバ5を支持する対となった支持脚19を部分的に解体し、支持脚19の間隔を大きくすることで、ルーフ状になったサプレッションチェンバ5の下方の空間を活用し易くする。図6(a)に示すように、支持脚19の間隔を大きくすることで、フォークリフト等が進入し易くなり、ルーフ状になったサプレッションチェンバ5の下方の空間における解体物Xの充填作業の効率化を図ることができる。   Furthermore, in this incomplete dismantling method, the pair of support legs 19 supporting the suppression chamber 5 is partially disassembled, and the distance between the support legs 19 is increased, so that the lower part of the roof-shaped suppression chamber 5 is formed. Make it easy to use the As shown in FIG. 6A, by increasing the distance between the support legs 19, it becomes easy for a forklift or the like to enter, and the efficiency of the filling operation of the object X in the space below the roof-shaped suppression chamber 5 Can be implemented.

このように、上述の本実施形態によれば、原子炉格納容器2とベント管6を介して連通するサプレッションチェンバ5が収容されたトーラス室9を有する原子炉の撤去工法であって、サプレッションチェンバ5を含んだトーラス室9内の構造物を部分的に解体する第1工程と、解体により生じた解体物Xを、トーラス室9においてサプレッションチェンバ5の筐体によって囲まれていた空間s1の少なくとも一部を用いて保管する第2工程と、を有する、という手法を採用することによって、解体により生じる解体物Xを削減し、トーラス室9内における解体物Xの充填率を高め、トーラス室9内の床面スペースの圧迫を低減することができる。
このため、本実施形態によれば、解体物Xによるトーラス室9内の床面スペースの圧迫を低減して、トーラス室9内の先行解体及び動線20の確保を確実に行うことができる。
As described above, according to the above-described embodiment, a removal method of a reactor having a torus chamber 9 in which the suppression chamber 5 communicated with the reactor containment vessel 2 and the vent pipe 6 is accommodated, which is a suppression chamber The first step of partially disassembling the structure in the torus chamber 9 including 5 and at least the space s1 enclosed in the torus chamber 9 by the casing of the suppression chamber 5 in the torus chamber 9 By adopting the method of having the second step of storing using a part, the scrap X generated by the demolition is reduced, the filling rate of the scrap X in the torus chamber 9 is increased, and the torus chamber 9 The pressure on the floor space inside can be reduced.
For this reason, according to the present embodiment, it is possible to reduce the pressure of the floor space in the torus chamber 9 by the dismantling object X, and to reliably perform the prior disassembly and the flow line 20 in the torus chamber 9.

(第2実施形態)
次に、本発明の第2実施形態について説明する。以下の説明において、上述の実施形態と同一又は同等の構成については同一の符号を付し、その説明を簡略若しくは省略する。
Second Embodiment
Next, a second embodiment of the present invention will be described. In the following description, the same or equivalent components as or to those of the embodiment described above are designated by the same reference numerals, any explanation of which will be simplified or omitted.

図7は、本発明の第2実施形態における不完全解体工法の作業フローを示す図である。図8及び図9は、本発明の第2実施形態における不完全解体工法の作業工程を説明するための模式図である。なお、図9(b)は、図9(a)に示すトーラス室9の側面図である。
第2実施形態の不完全解体工法は、サプレッションチェンバ5のプール水Pを移送前のものである。この手法においても、先ずは上述の実施形態と同様に、トーラス室9内の作業スペースの整備と、解体資機材の搬入を行う(ステップS11)。このステップS11によって、トーラス室9内が図8(a)に示すように整備される。
FIG. 7 is a diagram showing a work flow of the incomplete dismantling method according to the second embodiment of the present invention. FIG.8 and FIG.9 is a schematic diagram for demonstrating the working process of the incomplete dismantling method in 2nd Embodiment of this invention. FIG. 9 (b) is a side view of the torus chamber 9 shown in FIG. 9 (a).
In the incomplete dismantling method of the second embodiment, the pool water P of the suppression chamber 5 is not transferred. Also in this method, first, as in the above-described embodiment, maintenance of the work space in the torus chamber 9 and loading of dismantling equipment are performed (step S11). By this step S11, the inside of the torus chamber 9 is maintained as shown in FIG. 8 (a).

本手法では、次に、ダウンカマー8とベントヘッダ7の部分解体を行う(ステップS12)。このステップS12は、トーラス室9内の構造物を部分的に解体するものであり(第1工程)、また、解体により生じた解体物Xを、トーラス室9においてサプレッションチェンバ5の筐体によって囲まれた空間s2の少なくとも一部を用いて保管するものである(第2工程)。図8(b)に示すように、サプレッションチェンバ5は、筐体によって囲まれた空間s2にプール水Pを保持しており、ここで部分解体した解体物Xは、プール水Pに水没させて一時保管する。   Next, in the present method, the downcomer 8 and the vent header 7 are partially disassembled (step S12). This step S12 is for partially disassembling the structure in the torus chamber 9 (first step), and the disassembled object X produced by the disassembly is surrounded by the casing of the suppression chamber 5 in the torus chamber 9 Is stored using at least a part of the space s2 (second step). As shown in FIG. 8 (b), the suppression chamber 5 holds the pool water P in the space s2 surrounded by the housing, and the partially disassembled disassembly X is submerged in the pool water P. Temporary storage.

次に、サプレッションチェンバ5の切断予定部分の補強を行う(ステップS13)。このステップS13は、後の工程でサプレッションチェンバ5の上部5aを解体すると構造強度が低下することがあるため、プール水Pの重量によって座屈しないように必要に応じて筐体を補強するものである。例えば、図9(a)に示すように、サプレッションチェンバ5の内側を支えるように補強材32aをトラス状に組み立てて補強する。また、図9(b)に示すように、サプレッションチェンバ5の開口を開くようにトーラス室9の天井に補強材32bをワイヤー状に張設して補強する。   Next, reinforcement of the portion to be cut of the suppression chamber 5 is reinforced (step S13). In this step S13, the structural strength may be reduced if the upper portion 5a of the suppression chamber 5 is disassembled in a later step, so the case is reinforced if necessary so as not to be buckled by the weight of the pool water P. is there. For example, as shown in FIG. 9A, the reinforcing member 32a is assembled in a truss shape so as to support the inner side of the suppression chamber 5, and is reinforced. Further, as shown in FIG. 9 (b), a reinforcing member 32b is stretched in a wire shape and reinforced on the ceiling of the torus chamber 9 so as to open the opening of the suppression chamber 5.

次に、サプレッションチェンバ5の上部5aの部分切断と、その切断片の床等への仮置きを行う(ステップS14)。サプレッションチェンバ5の上部5aを解体すると、図9(a)に示すように、サプレッションチェンバ5の下部5bが残り、支持脚19によって支えられたサプレッションチェンバ5が椀状になって自立する。このように、サプレッションチェンバ5の下部5bを残すことで、プール水Pを保持する機能を維持しつつ解体を行うことができる。なお、切断片である解体物Xは、図9(a)に示すように、サプレッションチェンバ5の下部5bの下に仮置きする。   Next, partial cutting of the upper portion 5a of the suppression chamber 5 and temporary placement of the cut piece on the floor or the like are performed (step S14). When the upper portion 5a of the suppression chamber 5 is disassembled, as shown in FIG. 9A, the lower portion 5b of the suppression chamber 5 remains, and the suppression chamber 5 supported by the support legs 19 becomes bowl-like and becomes independent. Thus, by leaving the lower part 5b of the suppression chamber 5, disassembly can be performed while maintaining the function of holding the pool water P. In addition, as shown to Fig.9 (a), the disassembly thing X which is a cutting piece is temporarily placed under the lower part 5b of the suppression chamber 5. As shown in FIG.

次に、サプレッションチェンバ5の撤去部分に床板33を設置し、その床面を補強する(ステップS15)。このステップS15は、図9(b)に示すように、プール水Pを処理するための水処理設備や、脱塩用イオン交換樹脂等を仮置きするため資機材仮置きスペースRを形成する床板33を設置するものである。床板33の重量及びその床面に設置する資機材の床荷重は、必要に応じてトーラス室9内の床面から支柱を立てて支える。   Next, the floor plate 33 is installed on the removed portion of the suppression chamber 5, and the floor surface is reinforced (step S15). In this step S15, as shown in FIG. 9 (b), a water treatment facility for treating pool water P, a floor board for forming equipment temporary storage space R for temporarily placing a deionizing ion exchange resin etc. 33 will be installed. The weight of the floor plate 33 and the floor load of the equipment installed on the floor surface support the column from the floor surface of the torus chamber 9 as needed.

最後に、プール水Pが波立った場合の防波堤としてガイド34等を設置して、仮置き場所として整備し、資機材等を保管する(ステップS16)。サプレッションチェンバ5の解体のためにはプール水Pを廃棄しなければならないが、プール水Pには六価クロム等の防錆剤が含まれており、環境基準レベルまで無害化する必要がある。このステップS16では、この水処理をする資機材を設置する場所を整備し、プール水Pを循環させながら無害化処理を行う。   Finally, the guide 34 or the like is installed as a breakwater when the pool water P waves up, and is maintained as a temporary storage place, and materials and the like are stored (step S16). Although it is necessary to discard the pool water P for disassembling the suppression chamber 5, the pool water P contains a rust inhibitor such as hexavalent chromium, and it is necessary to render it harmless to the environmental standard level. In this step S16, the place where the equipment for the water treatment is installed is maintained, and the pool water P is circulated to perform the detoxification treatment.

以上のように、この不完全解体工法によれば、サプレッションチェンバ5を含んだトーラス室9内の構造物を一括で解体するのではなく部分的に解体することで、解体により生じる解体物Xを削減し、トーラス室9内の床面スペースの圧迫を低減することができる。また、トーラス室9内の最大の構造物であるサプレッションチェンバ5の筐体によって囲まれた空間s2に解体物Xを保管することで、トーラス室9内における解体物Xの充填率を高め、トーラス室9内の床面スペースの圧迫を低減することができる。   As described above, according to this incomplete dismantling method, the structure in the torus chamber 9 including the suppression chamber 5 is not dismantled together but dismantled partially, so that the dismantling object X produced by dismantling is The pressure on the floor space in the torus chamber 9 can be reduced. In addition, by storing the disassembly X in the space s2 surrounded by the casing of the suppression chamber 5, which is the largest structure in the torus chamber 9, the filling rate of the disassembly X in the torus chamber 9 is increased, and the torus The pressure on the floor space in the chamber 9 can be reduced.

具体的には、図8(b)に示すように、サプレッションチェンバ5のプール水Pに解体物Xを水没させ、サプレッションチェンバ5の筐体によって囲まれた空間に解体物Xを保管することで、トーラス室9内における解体物Xの充填率を高め、トーラス室9内の床面スペースの圧迫を低減することができる。   Specifically, as shown in FIG. 8 (b), the scrap water X is submerged in the pool water P of the suppression chamber 5, and the scrap water X is stored in the space surrounded by the housing of the suppression chamber 5. The filling rate of the to-be-discarded object X in the torus chamber 9 can be increased, and the pressure on the floor space in the torus chamber 9 can be reduced.

また、この不完全解体工法では、サプレッションチェンバ5の下部5bを残してプール水Pの保持機能を維持しながらサプレッションチェンバ5の上部5aを解体する。サプレッションチェンバ5の上部5aを解体すると構造強度が低下することがあるため、図9に示すように、座屈しないように筐体を補強する。これにより、サプレッションチェンバ5の下部5bを解体しないで解体物Xを削減してトーラス室9内の床面スペースの圧迫を低減し、また、プール水Pの保持機能があるため、プール水Pの廃棄のための前処理を、トーラス室9内の構造物の解体と平行して行うことができる。   Moreover, in this incomplete dismantling method, the upper part 5a of the suppression chamber 5 is dismantled while maintaining the pool water P holding function while leaving the lower part 5b of the suppression chamber 5. Since disassembling the upper portion 5a of the suppression chamber 5 may reduce the structural strength, as shown in FIG. 9, the housing is reinforced so as not to be buckled. As a result, the disassembly X is reduced without dismantling the lower portion 5b of the suppression chamber 5 to reduce the pressure on the floor space in the torus chamber 9, and the pool water P is retained. Pretreatment for disposal can be performed in parallel with disassembly of the structures in the torus chamber 9.

(第3実施形態)
次に、本発明の第3実施形態について説明する。以下の説明において、上述の実施形態と同一又は同等の構成については同一の符号を付し、その説明を簡略若しくは省略する。
Third Embodiment
Next, a third embodiment of the present invention will be described. In the following description, the same or equivalent components as or to those of the embodiment described above are designated by the same reference numerals, any explanation of which will be simplified or omitted.

図10は、本発明の第3実施形態における不完全解体工法の作業フローを示す図である。図11〜図21は、本発明の第3実施形態における不完全解体工法の作業工程を説明するための模式図である。
第3実施形態は、上述の実施形態と異なり、工程的な不完全解体工法であり、解体により生じた解体物Xをコンテナに収納しないで保管するスクラップヤード方式を採用する。
FIG. 10 is a diagram showing a work flow of the incomplete dismantling method in the third embodiment of the present invention. FIG. 11 to FIG. 21 are schematic views for explaining the working process of the incomplete dismantling method according to the third embodiment of the present invention.
The third embodiment is different from the above-described embodiment, and is a process incomplete dismantling method, and adopts a scrap yard method for storing the dismantling object X generated by dismantling without storing it in a container.

本手法では、先ず、サプレッションチェンバ5の上部5a、ベント管6、ベントヘッダ7等の解体と仮置きを行う(ステップS21)。図11に示すように、トーラス室9は、サプレッションチェンバ5を収容する環状エリアKを有しており、ステップS21は、符号K2で示すエリア(一部のエリア)で生じた解体物Xを、符号K1に示すエリア(他のエリア)に仮置きするものである。符号K1で示すエリアには、図12(a)に示すように、レール40及び揚重機41が設けられており、そのエリアで生じた解体物Xだけでなく、符号K2で示すエリアで生じた解体物Xもサプレッションチェンバ5の上に保管(仮置き)する。これにより、符号K2で示すエリアは、図12(b)に示すように、解体物Xによって圧迫されず、スペースが確保される。   In the present method, first, the upper portion 5a of the suppression chamber 5, the vent pipe 6, the vent header 7 and the like are disassembled and temporarily placed (step S21). As shown in FIG. 11, the torus chamber 9 has an annular area K that accommodates the suppression chamber 5, and the step S 21 includes the scrap X generated in the area (a part of the area) indicated by the symbol K 2. It is temporarily placed in the area (another area) indicated by reference numeral K1. As shown in FIG. 12 (a), a rail 40 and a lifting machine 41 are provided in the area indicated by the reference symbol K1, and not only the dismantled material X generated in the area but also the area indicated by the reference symbol K2 The dismantling object X is also stored (temporarily placed) on the suppression chamber 5. As a result, as shown in FIG. 12 (b), the area indicated by the reference symbol K2 is not compressed by the disassembled object X, and a space is secured.

次に、サプレッションチェンバ5の下部5bの解体と仮置きを行う(ステップS22)。ステップS22は、図13に示すように、符号K4で示すエリア(一部のエリア)で生じた解体物Xを、符号K3に示すエリア(他のエリア)に仮置きするものである。サプレッションチェンバ5の下部5bの解体は、符号K4で示すエリアで行う。符号K3で示すエリアには、図14(a)に示すように、符号K4で示すエリアで生じた解体物Xがサプレッションチェンバ5の上に保管(仮置き)される。これにより、符号K4で示すエリアは、図14(b)に示すように、サプレッションチェンバ5の上部5a及び下部5bが解体され、スペースが確保される。   Next, the lower part 5b of the suppression chamber 5 is disassembled and temporarily placed (step S22). In step S22, as shown in FIG. 13, the dismantled object X produced in the area (a part of the area) indicated by the code K4 is temporarily placed in the area (the other area) indicated by the code K3. Dismantling of the lower portion 5b of the suppression chamber 5 is performed in the area indicated by reference numeral K4. In the area indicated by the reference sign K3, as shown in FIG. 14A, the dismantled object X produced in the area indicated by the reference sign K4 is stored (temporarily placed) on the suppression chamber 5. Thereby, as shown in FIG. 14B, in the area indicated by reference numeral K4, the upper portion 5a and the lower portion 5b of the suppression chamber 5 are disassembled to secure a space.

次に、スクラップヤードYの片側の隔壁Y1を設置する(ステップS23)。ステップS23は、図15に示すように、サプレッションチェンバ5の上部5a及び下部5bが解体された符号K4で示すエリアと、サプレッションチェンバ5の下部5b及び解体物Xが残る符号K1で示すエリアとの境界(メインスチームトンネルと連通する連通口18の傍)に、スクラップヤードYの片側の隔壁Y1を設置するものである。スクラップヤードYの隔壁Y1は、図16に示すように、板部材50の両側を支持部材51で支持しながら、板部材50を所定高さ(充填率を上げるため少なくともサプレッションチェンバ5が設けられていた高さ)まで積み上げることで構築する。   Next, the dividing wall Y1 on one side of the scrap yard Y is installed (step S23). In step S23, as shown in FIG. 15, an area indicated by reference numeral K4 in which the upper part 5a and the lower part 5b of the suppression chamber 5 are disassembled and an area indicated by reference numeral K1 in which the lower part 5b of the suppression chamber 5 and the object X remains. The partition Y1 on one side of the scrap yard Y is installed at the boundary (side of the communication port 18 communicating with the main steam tunnel). In the partition Y1 of the scrap yard Y, as shown in FIG. 16, while supporting both sides of the plate member 50 by the support member 51, at least the suppression chamber 5 is provided to increase the filling ratio to the plate member 50 by a predetermined height. Height) to build up.

次に、サプレッションチェンバ5の下部5bの解体物XのスクラップヤードYへの移動と細断とを行う(ステップS24)。ステップS24は、図17に示すように、符号K3で示すエリア(一部のエリア)で生じた解体物X及び保管していた解体物Xを、符号K5で示すエリアを介して符号K6で示すエリア(他のエリア)に移動するものである。符号K5で示すエリアは、解体物Xを細断するエリアである。このエリアでは、符号K3で示すエリアで保管していた解体物Xを細断・移動した後、図18(a)に示すように残存するサプレッションチェンバ5の下部5bを解体・細断する作業が行われる。符号K6で示すエリアは、図18(b)に示すように、符号K5で示すエリアや他のエリアで発生した解体物Xを保管するエリアであり、隔壁Y1側から解体物Xを仮置きしていく。   Next, movement and shredding of the disassembly X of the lower part 5b of the suppression chamber 5 to the scrap yard Y is performed (step S24). In step S24, as shown in FIG. 17, the scrap X generated in the area (a part of the area) indicated by the code K3 and the demolished goods X stored are indicated by the sign K6 via the area indicated by the sign K5. It moves to the area (other area). An area indicated by reference sign K5 is an area for shredding the object X. In this area, after shredding and moving the dismantling object X stored in the area indicated by the code K3, the work of dismantling and shredding the lower portion 5b of the suppression chamber 5 remaining as shown in FIG. To be done. The area indicated by the reference symbol K6 is an area for storing the dismantled objects X generated in the area indicated by the reference symbol K5 and other areas as shown in FIG. 18 (b). To go.

次に、サプレッションチェンバ5の下部5bの解体と、スクラップヤードYへの仮置きを順次行う(ステップS25)。ステップS25は、図19に示すように、スクラップヤードYのもう片側の隔壁Y2を設置し、隔壁Y1及び隔壁Y2に囲まれた符号K6に示すエリアに解体物Xを移動し、他のエリアのサプレッションチェンバ5の下部5bの解体を順次進めていくものである。先ず、符号K1で示すエリアからサプレッションチェンバ5の下部5bの上に保管した解体物Xを移動する(図20(a)参照)。次に、符号K7で示すエリアにおいて、そのサプレッションチェンバ5の下部5bを解体し、解体物Xを符号K5に示すエリアに移動する(図20(b)参照)。解体物Xは、符号K5で示すエリアで細断し、符号K6で示すエリアに収容する。   Next, dismantling of the lower portion 5b of the suppression chamber 5 and temporary placement in the scrap yard Y are sequentially performed (step S25). In step S25, as shown in FIG. 19, the bulkhead Y2 on the other side of the scrap yard Y is installed, and the disassembly X is moved to the area indicated by the code K6 surrounded by the bulkhead Y1 and the bulkhead Y2; Disassembly of the lower part 5b of the suppression chamber 5 is sequentially advanced. First, the object X stored on the lower portion 5b of the suppression chamber 5 is moved from the area indicated by the symbol K1 (see FIG. 20A). Next, the lower portion 5b of the suppression chamber 5 is disassembled in the area indicated by the reference sign K7, and the object X is moved to the area indicated by the reference sign K5 (see FIG. 20 (b)). The to-be-discarded object X is shredded in the area shown by code K5, and is accommodated in the area shown by code K6.

最後に、コンテナの搬入と解体物Xの収納・搬出を行う(ステップS26)。ステップS26は、図21に示すように、符号K8に示すエリアにコンテナを1バッチ分搬入し、そのコンテナにスクラップヤードYの解体物Xを収納し、そのコンテナに収納した解体物Xを搬出するものである。なお、この搬入・収納・搬出は、バッチ処理であり、順次繰り返される。コンテナの搬入及びコンテナに収納した解体物Xの搬出は、連通口16を介してアペンテージ10から、若しくは、連通口18を介してメインスチームトンネルから行うことができる。   Finally, the loading of the container and the storage and unloading of the object X are performed (step S26). In step S26, as shown in FIG. 21, one batch of container is carried into the area indicated by symbol K8, the scrap X of the scrap yard Y is stored in the container, and the scrap X stored in the container is unloaded. It is a thing. The loading, storage, and unloading are batch processes, and are sequentially repeated. Loading of the container and unloading of the dismantled object X stored in the container can be performed from the appendage 10 through the communication port 16 or from the main steam tunnel through the communication port 18.

以上のように、この不完全解体工法によれば、トーラス室9の環状エリアKの一部のエリアの構造物を解体し、その解体物Xを他のエリアに仮置きし、解体したエリアにスクラップヤードYを設け、解体物Xをコンテナに収納する収納作業を先送りにして、その後に解体物Xを搬出する搬出作業とジャストインタイム化させる。これにより、トーラス室9内の解体物Xの保管数(コンテナ保管数)を削減して、トーラス室9内の床面スペースの圧迫を低減することができる。
また、この不完全解体工法では、支持脚19によって自立機能を維持しながらサプレッションチェンバ5の上部5aを解体し、椀状になったサプレッションチェンバ5の上に解体物Xを保管する。これにより、サプレッションチェンバ5の下部5bを解体しないで解体物Xを削減しつつ、また、トーラス室9内における解体物Xの充填率を高め、トーラス室9内の床面スペースの圧迫を低減することができる。
As described above, according to this incomplete dismantling method, the structure in a part of the annular area K of the torus chamber 9 is dismantled, and the dismantling object X is temporarily placed in another area and dismantled in the dismantled area A scrap yard Y is provided, and the storage operation for storing the disassembled object X in the container is advanced, and thereafter, the unloading operation for discharging the disassembled object X and the just-in-time operation are performed. As a result, the number of stored items of dismantling material X in the torus chamber 9 (the number of stored containers) can be reduced, and the pressure on the floor space in the torus chamber 9 can be reduced.
Further, in this incomplete dismantling method, the upper part 5a of the suppression chamber 5 is dismantled while maintaining the self-supporting function by the support legs 19, and the dismantling object X is stored on the wedge-shaped suppression chamber 5. Thereby, while reducing the dismantling object X without dismantling the lower part 5b of the suppression chamber 5, the filling rate of the dismantling object X in the torus chamber 9 is increased, and the pressure on the floor space in the torus chamber 9 is reduced. be able to.

図22は、本発明の第3実施形態における不完全解体工法と従来工法との作業フローを比較するための図である。なお、図22(a)は、第3実施形態の不完全解体工法を示し、図22(b)は、従来工法を示す。
図22(b)に示すように、従来工法では、トーラス室9内を粗解体し、その解体物Xを細断し、細断した解体物Xをコンテナに収納し、それを仮保管する。そして、このサイクルを繰り返し、解体物Xの最終処分地が決まったら、仮保管していたコンテナを搬出する。したがって、解体物Xを搬出する時期が遅れた場合、トーラス室9の床面スペースがコンテナで圧迫されることがある。
FIG. 22 is a diagram for comparing the work flow of the incomplete dismantling method and the conventional method according to the third embodiment of the present invention. Fig. 22 (a) shows the incomplete dismantling method of the third embodiment, and Fig. 22 (b) shows the conventional method.
As shown in FIG. 22 (b), in the conventional construction method, the inside of the torus chamber 9 is roughly disassembled, the disassembled object X is shredded, and the shredded disassembled object X is stored in a container and temporarily stored. Then, this cycle is repeated, and when the final disposal site of the dismantling object X is determined, the container temporarily stored is unloaded. Therefore, when the time to take out the dismantling object X is delayed, the floor space of the torus chamber 9 may be compressed by the container.

一方、図22(a)に示すように、本手法(スクラップヤード方式)では、トーラス室9内を粗解体し、その解体物Xを細断し、細断した解体物XをスクラップヤードYに仮保管する。そして、解体物Xの最終処分地が決まったら、仮保管していた解体物Xをコンテナに収納し、搬出する。このように、本手法では、スクラップヤードYを設けることで、コンテナに解体物Xを収納する作業を、解体物Xの搬出する作業にジャストインタイム化させることができ、解体物Xの保管数(コンテナ保管数)を削減しスペースを確保することができる。したがって、解体物Xを搬出する時期が遅れた場合であっても、トーラス室9内の床面スペースが圧迫されることはない。   On the other hand, as shown in FIG. 22 (a), in the present method (scrap yard method), the inside of the torus chamber 9 is roughly disassembled, the demolished article X is shredded, and the shredded demolished article X is put into a scrap yard Y. Temporary storage. Then, when the final disposal site of the dismantling object X is determined, the dismantling object X that has been temporarily stored is stored in a container and carried out. As described above, in the present method, by providing the scrap yard Y, the work of storing the dismantling object X in the container can be made just-in-time for the work of unloading the dismantling object X. (The number of stored containers) can be reduced to secure space. Therefore, even if the time to take out the dismantling object X is delayed, the floor space in the torus chamber 9 is not compressed.

また、この手法によれば、スクラップヤードYを設けることで、上述したようにトーラス室9内に空きスペースが確保し易くなる。このため、作業スペースを、解体とコンテナ収納で容易に分けることが可能となり、作業をトーラス室9内でクローズすることができる。また、スクラップヤードYを設けることで、解体物Xの仕分け保管ができるため、空コンテナ及びその置場の削減が可能となる。また、解体物Xの収納作業においては、すでに細断された解体物Xを扱うことから、コンテナの充填率を上げることができ、また、解体物Xの汚染度に応じた収納がし易くなる。また、多段積みのための特注コンテナの使用を不要とすることが可能となる。   Further, according to this method, by providing the scrap yard Y, it becomes easy to secure an empty space in the torus chamber 9 as described above. Therefore, the work space can be easily divided into disassembly and container storage, and the work can be closed in the torus chamber 9. Further, by providing the scrap yard Y, since the dismantling objects X can be sorted and stored, it is possible to reduce empty containers and their storage places. Further, in the storage operation of the dismantling object X, the handling rate of the container can be increased because the dismantling object X which has already been shredded can be handled, and the storage according to the degree of contamination of the dismantling object X becomes easy . In addition, it is possible to eliminate the use of custom-made containers for multi-stage stacking.

以上、図面を参照しながら本発明の好適な実施形態について説明したが、本発明は上記実施形態に限定されるものではない。上述した実施形態において示した各構成部材の諸形状や組み合わせ等は一例であって、本発明の主旨から逸脱しない範囲において設計要求等に基づき種々変更可能である。   As mentioned above, although the suitable embodiment of the present invention was described referring to drawings, the present invention is not limited to the above-mentioned embodiment. The shapes, combinations, and the like of the constituent members shown in the above-described embodiment are merely examples, and various changes can be made based on design requirements and the like without departing from the spirit of the present invention.

2…原子炉格納容器、5…サプレッションチェンバ、5a…上部、5b…下部、6…ベント管、9…トーラス室、10…アペンテージ、19…支持脚、20…動線、32a…補強材、32b…補強材、K…環状エリア、P…プール水、s1…空間、s2…空間、X…解体物、Y…スクラップヤード   DESCRIPTION OF SYMBOLS 2 ... Reactor containment vessel, 5 ... Suppression chamber, 5a ... Upper part, 5b ... Lower part 6 ... Vent pipe, 9 ... Torus room, 10 ... Appendage, 19 ... Supporting leg, 20 ... Flow line, 32a ... Reinforcement material, 32b ... Reinforcement, K ... Annular area, P ... Pool water, s 1 ... Space, s 2 ... Space, X ... Demolition, Y ... Scrap yard

Claims (8)

原子炉格納容器とベント管を介して連通するサプレッションチェンバが収容されたトーラス室を有する原子炉の撤去工法であって、
前記トーラス室内の構造物のうち、少なくとも前記サプレッションチェンバを部分的に解体する第1工程と、
前記解体により生じた解体物を、前記トーラス室において前記サプレッションチェンバの筐体によって囲まれた空間若しくは筐体によって囲まれていた空間の少なくとも一部を用いて保管する第2工程と、を有し、
前記筐体は、前記トーラス室において支持脚を介して自立しており、
前記第1工程は、前記筐体の下部を部分的に解体する工程を含み、
前記第2工程は、前記解体物を、前記解体により前記支持脚を介してルーフ状になって自立する前記筐体の下方の空間に保管する工程を含む、ことを特徴とする原子炉の撤去工法。
A removal method of a reactor having a torus chamber in which a suppression chamber communicating with a reactor containment vessel and a vent pipe is accommodated,
A first step of partially disassembling at least the suppression chamber among the structures in the torus chamber;
And d) storing the dismantling products produced by the dismantling using at least a part of the space surrounded by the housing of the suppression chamber or the space surrounded by the housing in the torus chamber. ,
The housing is self-supporting through the support legs in the torus chamber,
The first step includes the step of partially disassembling the lower portion of the housing,
The second step includes the step of storing the dismantled material in a space below the casing which becomes self-supporting in a roof shape by the dismantling via the support legs. Construction method.
前記支持脚は、前記筐体の幅方向において対向するように対となって設けられており、
前記第1工程は、前記対となって設けられた前記支持脚の少なくともいずれか一方を部分的に解体し、前記幅方向における前記支持脚の間隔を大きくする工程を含む、ことを特徴とする請求項1に記載の原子炉の撤去工法。
The support legs are provided in pairs so as to face each other in the width direction of the housing,
The first step includes a step of partially disassembling at least one of the pair of support legs to increase a distance between the support legs in the width direction. The removal method of the reactor according to claim 1.
原子炉格納容器とベント管を介して連通するサプレッションチェンバが収容されたトーラス室を有する原子炉の撤去工法であって、
前記トーラス室内の構造物のうち、少なくとも前記サプレッションチェンバを部分的に解体する第1工程と、
前記解体により生じた解体物を、前記トーラス室において前記サプレッションチェンバの筐体によって囲まれた空間若しくは筐体によって囲まれていた空間の少なくとも一部を用いて保管する第2工程と、を有し、
前記サプレッションチェンバは、前記筐体によって囲まれた空間にプール水を保持しており、
前記第2工程は、前記解体物を、前記プール水に水没させて保管する工程を含む、ことを特徴とする原子炉の撤去工法。
A removal method of a reactor having a torus chamber in which a suppression chamber communicating with a reactor containment vessel and a vent pipe is accommodated,
A first step of partially disassembling at least the suppression chamber among the structures in the torus chamber;
And d) storing the dismantling products produced by the dismantling using at least a part of the space surrounded by the housing of the suppression chamber or the space surrounded by the housing in the torus chamber. ,
The suppression chamber holds pool water in a space enclosed by the housing,
The removal method of a nuclear reactor, wherein the second step includes a step of storing the dismantled material submerged in the pool water for storage.
前記第1工程は、
前記プール水を保持する前記筐体の上部を部分的に解体する工程と、
前記筐体の上部の部分的な解体により前記プール水の重量によって前記筐体が座屈しないように補強する工程と、を含む、ことを特徴とする請求項3に記載の原子炉の撤去工法。
The first step is
Partially dismantling the upper part of the case holding the pool water;
4. The nuclear reactor removing method according to claim 3 , further comprising the step of reinforcing the housing so as not to be buckled by the weight of the pool water by partial dismantling of the upper part of the housing. .
前記筐体は、前記トーラス室において支持脚を介して自立しており、
前記第1工程は、前記筐体の上部を部分的に解体する工程を含み、
前記第2工程は、前記解体物を、前記解体により前記支持脚を介して椀状になって自立する前記筐体の上に保管する工程を含む、ことを特徴とする請求項3または4に記載の原子炉の撤去工法。
The housing is self-supporting through the support legs in the torus chamber,
The first step includes the step of partially disassembling the upper portion of the housing,
5. The method according to claim 3, wherein the second step includes the step of storing the dismantled material on the casing which is self-supporting in a bowl shape by the dismantling via the support leg. Reactor removal method as described.
原子炉格納容器とベント管を介して連通するサプレッションチェンバが収容されたトーラス室を有する原子炉の撤去工法であって、
前記トーラス室内の構造物のうち、少なくとも前記サプレッションチェンバを部分的に解体する第1工程と、
前記解体により生じた解体物を、前記トーラス室において前記サプレッションチェンバの筐体によって囲まれた空間若しくは筐体によって囲まれていた空間の少なくとも一部を用いて保管する第2工程と、を有し、
前記筐体は、前記トーラス室において支持脚を介して自立しており、
前記第1工程は、前記筐体の上部を部分的に解体する工程を含み、
前記第2工程は、前記解体物を、前記解体により前記支持脚を介して椀状になって自立する前記筐体の上に保管する工程を含む、ことを特徴とする原子炉の撤去工法。
A removal method of a reactor having a torus chamber in which a suppression chamber communicating with a reactor containment vessel and a vent pipe is accommodated,
A first step of partially disassembling at least the suppression chamber among the structures in the torus chamber;
And d) storing the dismantling products produced by the dismantling using at least a part of the space surrounded by the housing of the suppression chamber or the space surrounded by the housing in the torus chamber. ,
The housing is self-supporting through the support legs in the torus chamber,
The first step includes the step of partially disassembling the upper portion of the housing,
The removal method of a nuclear reactor, wherein the second step includes a step of storing the dismantled product on the casing which is self-supporting in a bowl shape by the dismantling through the support leg.
前記トーラス室は、前記サプレッションチェンバを収容する環状エリアを有しており、
前記第1工程は、前記環状エリアにおける一部のエリアの前記構造物を解体する工程を含み、
前記第2工程は、
前記一部のエリアの前記解体物を他のエリアに仮置きする工程と、
前記一部のエリアに、前記解体物を保管するためのスクラップヤードを設ける工程と、を含む、ことを特徴とする請求項1〜6のいずれか一項に記載の原子炉の撤去工法。
The torus chamber has an annular area for receiving the suppression chamber;
The first step includes disassembling the structure in a part of the annular area,
The second step is
Temporarily placing the scraps of the part of the area in another area;
The process of providing a scrap yard for storing the said demolition thing in the said one part area, The removal method of the reactor as described in any one of Claims 1-6 characterized by the above-mentioned.
原子炉格納容器とベント管を介して連通するサプレッションチェンバが収容されたトーラス室を有する原子炉の撤去工法であって、
前記トーラス室内の構造物のうち、少なくとも前記サプレッションチェンバを部分的に解体する第1工程と、
前記解体により生じた解体物を、前記トーラス室において前記サプレッションチェンバの筐体によって囲まれた空間若しくは筐体によって囲まれていた空間の少なくとも一部を用いて保管する第2工程と、を有し、
前記トーラス室は、前記サプレッションチェンバを収容する環状エリアを有しており、
前記第1工程は、前記環状エリアにおける一部のエリアの前記構造物を解体する工程を含み、
前記第2工程は、
前記一部のエリアの前記解体物を他のエリアに仮置きする工程と、
前記一部のエリアに、前記解体物を保管するためのスクラップヤードを設ける工程と、を含む、ことを特徴とする原子炉の撤去工法。
A removal method of a reactor having a torus chamber in which a suppression chamber communicating with a reactor containment vessel and a vent pipe is accommodated,
A first step of partially disassembling at least the suppression chamber among the structures in the torus chamber;
And d) storing the dismantling products produced by the dismantling using at least a part of the space surrounded by the housing of the suppression chamber or the space surrounded by the housing in the torus chamber. ,
The torus chamber has an annular area for receiving the suppression chamber;
The first step includes disassembling the structure in a part of the annular area,
The second step is
Temporarily placing the scraps of the part of the area in another area;
And a step of providing a scrap yard for storing the dismantled material in the part of the area.
JP2014025424A 2014-02-13 2014-02-13 Reactor removal method Active JP6424437B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014025424A JP6424437B2 (en) 2014-02-13 2014-02-13 Reactor removal method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014025424A JP6424437B2 (en) 2014-02-13 2014-02-13 Reactor removal method

Publications (2)

Publication Number Publication Date
JP2015152387A JP2015152387A (en) 2015-08-24
JP6424437B2 true JP6424437B2 (en) 2018-11-21

Family

ID=53894813

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014025424A Active JP6424437B2 (en) 2014-02-13 2014-02-13 Reactor removal method

Country Status (1)

Country Link
JP (1) JP6424437B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6350957B1 (en) * 2017-09-27 2018-07-04 株式会社日立プラントコンストラクション Demolition method for torus indoor equipment
JP6369791B1 (en) * 2017-09-29 2018-08-08 株式会社日立プラントコンストラクション Demolition method for torus indoor equipment
KR102092373B1 (en) * 2018-04-19 2020-03-23 한국수력원자력 주식회사 Method for decommissioning nuclear facilities

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5910885A (en) * 1982-07-10 1984-01-20 石川島播磨重工業株式会社 How to install a suppression chamber
JPH0769475B2 (en) * 1986-05-20 1995-07-31 清水建設株式会社 Nuclear reactor decommissioning method
EP0529886B1 (en) * 1991-08-26 1996-02-07 Kabushiki Kaisha Dymosha Method of dismanteling a nuclear reactor
JP4080651B2 (en) * 1999-10-18 2008-04-23 株式会社東芝 Reactor building structure
JP4280921B2 (en) * 2004-02-27 2009-06-17 株式会社Ihi Nuclear reactor dismantling method
JP4049149B2 (en) * 2004-11-18 2008-02-20 株式会社Ihi How to replace vent tube bellows in reactor containment

Also Published As

Publication number Publication date
JP2015152387A (en) 2015-08-24

Similar Documents

Publication Publication Date Title
RU2063072C1 (en) Method of and device for removing tubular irradiated components from nuclear reactor
CN108597633B (en) Shielded transfer method and equipment for spent fuel
JP4850214B2 (en) Carrying out the reactor internals
TWI616894B (en) Demolition method of nuclear power plant
JP6424437B2 (en) Reactor removal method
RU2264669C2 (en) Method for nuclear fuel storage and system for manufacturing nuclear fuel storage container
CN109887628A (en) An integrated device for spent pool and refueling pool in pressurized water reactor nuclear power plant
JP6056284B2 (en) Reactor removal method
JP4432112B2 (en) Reactor pressure vessel dismantling method
US20120201340A1 (en) System and Method for Integration of Wet and Dry Nuclear Fuel Storage
JP4898567B2 (en) Reactor removal method
JP4088796B2 (en) Reactor pressure vessel dismantling method
JP2519896B2 (en) Reactor dismantling method
RU2097848C1 (en) Method for dry disposal of used fuel assemblies
JP6788570B2 (en) How to dismantle the reactor pressure vessel
JP4080651B2 (en) Reactor building structure
RU71467U1 (en) PROTECTIVE CONTAINER FOR TRANSPORTATION AND STORAGE OF SOLID RADIOACTIVE WASTE
JP7467250B2 (en) Method and device for dismantling nuclear reactor equipment
JPH0192696A (en) Method for cutting and disassembling cylindrical structure
JP7353065B2 (en) shielding equipment
JP6288598B1 (en) Reactor pressure vessel dismantling method
JPH0768776B2 (en) Cutting and demolition equipment for cylindrical structures
JP6369791B1 (en) Demolition method for torus indoor equipment
KR102874026B1 (en) Dismantling Radioactive Waste Carrying Container
KR102873803B1 (en) Dismantling Radioactive Waste Carrying Container

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20161221

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20170921

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20171003

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20171204

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20171205

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20180313

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20180514

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20180515

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20180925

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20181008

R151 Written notification of patent or utility model registration

Ref document number: 6424437

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151