Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP6425625B2 - Distributed power supply - Google Patents
[go: Go Back, main page]

JP6425625B2 - Distributed power supply - Google Patents

Distributed power supply Download PDF

Info

Publication number
JP6425625B2
JP6425625B2 JP2015129615A JP2015129615A JP6425625B2 JP 6425625 B2 JP6425625 B2 JP 6425625B2 JP 2015129615 A JP2015129615 A JP 2015129615A JP 2015129615 A JP2015129615 A JP 2015129615A JP 6425625 B2 JP6425625 B2 JP 6425625B2
Authority
JP
Japan
Prior art keywords
power
value
peak cut
power supply
distributed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2015129615A
Other languages
Japanese (ja)
Other versions
JP2017017792A (en
Inventor
啓生 東
啓生 東
純平 早川
純平 早川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shindengen Electric Manufacturing Co Ltd
Original Assignee
Shindengen Electric Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shindengen Electric Manufacturing Co Ltd filed Critical Shindengen Electric Manufacturing Co Ltd
Priority to JP2015129615A priority Critical patent/JP6425625B2/en
Publication of JP2017017792A publication Critical patent/JP2017017792A/en
Application granted granted Critical
Publication of JP6425625B2 publication Critical patent/JP6425625B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Inverter Devices (AREA)

Description

本発明は、電力変換装置であるパワーコンディショナ(以下「PCS」という。)が複数台並列に接続されて並列運転を行う分散型電源装置に関するものである。   The present invention relates to a distributed power supply apparatus in which a plurality of power conditioners (hereinafter referred to as "PCS"), which are power conversion apparatuses, are connected in parallel to perform parallel operation.

従来のPCSは、特許文献1〜5等に記載されているように、受電点の系統電力のピークカット制御を実現するため、系統電力センサ及びPCSと、設定値としてのピークカット電力指令値等と、で構成されている。   As described in the patent documents 1 to 5 etc., the conventional PCS realizes peak cut control of the grid power at the power receiving point, so the grid power sensor and PCS, peak cut power command value as a set value, etc. And consists of.

具体的には、系統電力センサで測定(検出)される系統電力値をPCSに入力し、ピークカット電力指令値との比較を行い、系統電力値がピークカット電力指令値を超えないように、PCSが不足分の電力を負荷へ供給する。これにより、系統電力の最大値(上限値)が抑えられ、電力系統の平準化を行うことができる。   Specifically, the system power value measured (detected) by the system power sensor is input to the PCS and compared with the peak cut power command value so that the system power value does not exceed the peak cut power command value, The PCS supplies the power for the shortage to the load. As a result, the maximum value (upper limit value) of the system power can be suppressed, and the power system can be leveled.

このような従来の方式で、複数台のPCSによる分散型電源装置を構成した場合、例えば、図2のような回路構成になる。   In the case where a distributed power supply apparatus is configured with a plurality of PCSs by such a conventional method, for example, a circuit configuration as shown in FIG. 2 is obtained.

図2は、従来の分散型電源装置を示す概略の構成図である。
この分散型電源装置は、複数の直流電源1(=1−1〜1−n)にそれぞれ接続された複数台のPCS10(=10−1〜10−n)を備えている。各PCS10は、各直流電源1から供給される直流電力を交流電力にそれぞれ変換する装置であり、電力系統17から系統電力を受電する受電点16と、負荷14と、の間の配線13に並列に接続されている。受電点16には、系統電力値poutを検出する系統電力センサ15が設けられている。系統電力値poutは、各PCS10へ与えられる。
FIG. 2 is a schematic block diagram showing a conventional distributed power supply device.
The distributed power supply apparatus includes a plurality of PCSs 10 (= 10-1 to 10-n) connected to a plurality of DC power supplies 1 (= 1-1 to 1-n). Each PCS 10 is a device for converting DC power supplied from each DC power source 1 into AC power, and is parallel to the wire 13 between the load 14 and the power receiving point 16 for receiving system power from the power system 17. It is connected to the. The power reception point 16 is provided with a grid power sensor 15 that detects a grid power value pout. The grid power value pout is given to each PCS 10.

各PCS10は、各直流電源1から供給される直流電力を交流電力に変換する装置であり、電力変換部11及び制御部12を有している。電力変換部11は、制御部12から与えられる制御信号に基づいて、直流電源1から供給される直流電力を交流電力に変換するものである。制御部12は、系統電力値poutと、系統電力の上限のピークカット電力指令値pcut1と、に基づいて、出力電力目標値を求め、各PCS10の出力電力から検出された出力電力値と、出力電力目標値と、の誤差が減少するような制御信号を生成して電力変換部11へ与えるものである。   Each PCS 10 is a device that converts DC power supplied from each DC power supply 1 into AC power, and includes a power conversion unit 11 and a control unit 12. The power conversion unit 11 converts direct current power supplied from the direct current power supply 1 into alternating current power based on a control signal supplied from the control unit 12. The control unit 12 obtains an output power target value based on the system power value pout and the peak cut power command value pcut1 of the upper limit of the system power, and the output power value detected from the output power of each PCS 10 and the output A control signal is generated and supplied to the power conversion unit 11 so that an error between the power target value and the power target value is reduced.

この種の分散型電源装置では、電力系統17から負荷14へ供給される負荷電力Pzが、その電力系統17から受電する系統電力の上限のピークカット電力指令値pcut1(例えば、50kW)を超えたとき、複数台のPCS10から負荷14へ出力電力Pc(=Pc1〜Pcn)を供給する。これにより、系統電力の上限値が抑えられ、電力系統17の平準化(即ち、安定化)を図ることができる。   In this type of distributed power supply device, the load power Pz supplied from the power system 17 to the load 14 exceeds the peak cut power command value pcut1 (for example, 50 kW) of the upper limit of the system power received from the power system 17 When the plurality of PCSs 10 supply the output power Pc (= Pc1 to Pcn) to the load 14. As a result, the upper limit value of the system power can be suppressed, and equalization (ie, stabilization) of the power system 17 can be achieved.

特開平8−223816号公報JP-A-8-223816 特開2005−295707号公報JP 2005-295707 A 特開2008−43184号公報JP, 2008-43184, A 特開2010−55974号公報Unexamined-Japanese-Patent No. 2010-55974 特開2012−33547号公報JP 2012-33547 A

しかしながら、従来の分散型電源装置では、次のような課題があった。
従来の分散型電源装置では、電力系統17の受電点16に設けた系統電力センサ15により、系統電力値poutを検出し、この系統電力値poutを複数台のPCS10へ与えている。各PCS10では、1つの系統電力値poutを共用し、同一のピークカット電力指令値pcut1に系統電力値poutを制御しようとするため、個々のPCS10が持つ検出誤差や制御応答の差により、系統電力の振動といった制御不能に陥ったり、負荷分担の管理ができなくなったりする。
However, the conventional distributed power supply device has the following problems.
In the conventional distributed power supply apparatus, the grid power value pout is detected by the grid power sensor 15 provided at the power receiving point 16 of the power grid 17, and this grid power value pout is given to a plurality of PCSs 10. Each PCS 10 shares one system power value pout and tries to control the system power value pout to the same peak cut power command value pcut 1, so the difference between the detection error and the control response that each PCS 10 has causes the system power And control of load sharing become impossible.

本発明の分散型電源装置は、電力系統から系統電力を受電する受電点と負荷との間の配線に並列に接続され、直流電力を交流電力にそれぞれ変換する複数台のPCSを備え、前記電力系統から前記負荷へ供給される負荷電力が、前記電力系統から受電する前記系統電力の上限の第1ピークカット電力指令値を超えないように、前記複数台のPCSから前記負荷へ電力を供給する装置である。 The distributed power supply device according to the present invention includes a plurality of PCSs connected in parallel to a wire between a load and a power receiving point for receiving system power from the power system and converting DC power into AC power, respectively, Power is supplied from the plurality of PCSs to the load such that load power supplied from the grid to the load does not exceed the first peak cut power command value of the upper limit of the grid power received from the power grid. It is an apparatus.

前記各PCSは、前記第1ピークカット電力指令値を演算して前記各PCS毎に分担する第2ピークカット電力指令値を求める演算部と、前記演算部で求められた前記第2ピークカット電力指令値と、前記系統電力から検出された系統電力値と、に基づいて出力電力目標値を求め、前記各PCSの出力電力から検出された出力電力値と、前記出力電力目標値と、の誤差が減少するような制御信号を生成する制御部と、前記制御信号に基づいて、前記直流電力を前記交流電力に変換する電力変換部と、を有している。   Each of the PCS calculates the first peak cut power command value to obtain a second peak cut power command value to be shared for each PCS, and the second peak cut power obtained by the calculation unit An output power target value is obtained based on the command value and the grid power value detected from the grid power, and an error between the output power value detected from the output power of each PCS and the output power target value And a power conversion unit that converts the DC power to the AC power based on the control signal.

前記演算部は、前記負荷へ供給する前記電力における負荷分担の順位を設定する順位設定値と、前記複数台のPCSを全て駆動させるために前記負荷分担の順位を変更する順位変更要素と、所定の負荷分担電力と、に基づいて調整値を求め、前記第1ピークカット電力指令値から、前記調整値を減算して、前記第2ピークカット電力指令値を算出することを特徴とする。   The calculation unit may set a rank setting value for setting a rank of load sharing in the power supplied to the load, a rank change element for changing the rank of the load sharing to drive all the plurality of PCSs, and And calculating the second peak cut power command value by subtracting the adjustment value from the first peak cut power command value.

本発明の分散型電源装置によれば、各PCSに演算部を設け、この演算部により、順位設定値、順位変更要素、及び負荷分担電力に基づいて調整値を求め、第1ピークカット電力指令値からその調整値を減算して、第2ピークカット電力指令値を算出しているので、各PCSの制御目標値である第2ピークカット電力指令値に差が生まれる。この差により、個々のPCSが持つ検出誤差や制御応答のばらつきの影響を受けなくなるため、系統電力の上限値が的確に抑えられ、電力系統の平準化(即ち、安定化)を図ることができる。   According to the distributed power supply device of the present invention, each PCS is provided with a computing unit, and the computing unit obtains an adjustment value based on the rank setting value, the rank change element, and the load sharing power, and performs the first peak cut power command Since the second peak cut power command value is calculated by subtracting the adjustment value from the value, a difference is generated in the second peak cut power command value which is the control target value of each PCS. By this difference, the upper limit value of the grid power can be properly suppressed and leveling (ie, stabilization) of the grid can be achieved because the difference is not affected by the detection error and the variation of control response that each PCS has. .

図1は本発明の実施例1における分散型電源装置を示す概略の構成図である。FIG. 1 is a schematic block diagram showing a distributed power supply device according to a first embodiment of the present invention. 図2は従来の分散型電源装置を示す概略の構成図である。FIG. 2 is a schematic block diagram showing a conventional distributed power supply. 図3は図1中のPCS21の構成を示す概略の機能ブロック図である。FIG. 3 is a schematic functional block diagram showing the configuration of the PCS 21 in FIG. 図4は図1の動作を示す説明図である。FIG. 4 is an explanatory view showing the operation of FIG.

本発明を実施するための形態は、以下の好ましい実施例の説明を添付図面と照らし合わせて読むと、明らかになるであろう。但し、図面はもっぱら解説のためのものであって、本発明の範囲を限定するものではない。   The mode for carrying out the present invention will be apparent from the following description of the preferred embodiment, when read in conjunction with the attached drawings. However, the drawings are for the purpose of illustration only and do not limit the scope of the present invention.

従来の図2に示すように、複数台のPCS10(=10−1〜10−n)を同一の電力系統17に並列に接続して並列運転を行う場合、系統電力の受電点16に設けた系統電力センサ15により系統電力値poutを検出し、この系統電力値poutを基に制御を行うため、検出誤差によって負荷分担がまちまちになって管理不能に陥ってしまう。この状況を改善するため、本実施例1の分散型電源装置では、以下のような構成になっている。   When parallel operation is performed by connecting a plurality of PCS's 10 (= 10-1 to 10-n) in parallel to the same power system 17 as shown in FIG. Since the grid power value pout is detected by the grid power sensor 15 and control is performed on the basis of the grid power value pout, the load sharing varies and becomes unmanageable due to the detection error. In order to improve this situation, the distributed power supply apparatus according to the first embodiment has the following configuration.

(実施例1の構成)
図1は、本発明の実施例1における分散型電源装置を示す概略の構成図である。
(Configuration of Example 1)
FIG. 1 is a schematic block diagram showing a distributed power supply device according to a first embodiment of the present invention.

この分散型電源装置は、複数の直流電源20(=20−1〜20−n、例えば、n=5)にそれぞれ接続された複数台のPCS21(=21−1〜21−n、例えば、n=5)を備えている。各直流電源20は、蓄電池、太陽電池、燃料電池等の分散型直流電源である。複数台のPCS21は、各直流電源20から供給される直流電力を交流電力にそれぞれ変換する装置であり、電力系統58から系統電力を受電する受電点57と、負荷55と、の間の配線54に並列に接続されている。受電点57には、系統電力値poutを検出する系統電力センサ56が設けられている。   The distributed power supply apparatus includes a plurality of PCSs 21 (= 21-1 to 21-n, for example, n) connected to a plurality of DC power supplies 20 (= 20-1 to 20-n, for example, n = 5). Equipped with = 5). Each DC power supply 20 is a distributed DC power supply such as a storage battery, a solar cell, or a fuel cell. The plurality of PCSs 21 are devices that respectively convert DC power supplied from each DC power supply 20 into AC power, and the wiring 54 between the power receiving point 57 that receives system power from the power system 58 and the load 55 Connected in parallel. The power reception point 57 is provided with a grid power sensor 56 that detects a grid power value pout.

系統電力センサ56は、電力計により構成、或いは、電流計及び電圧計により構成されている。この系統電力センサ56で検出された系統電力値poutは、第1PCS21−1へ送られ、この第1PCS21−1から次の第2PCS21−2、第3PCS21−3、・・・へ順次分配される。   The grid power sensor 56 is configured by a power meter, or is configured by an ammeter and a voltmeter. The system power value pout detected by the system power sensor 56 is sent to the first PCS 21-1, and sequentially distributed from the first PCS 21-1 to the next second PCS 21-2, third PCS 21-3, and so on.

各PCS21は、電力変換部30と、電力センサ36と、演算部40と、制御部50と、を有している。   Each PCS 21 includes a power conversion unit 30, a power sensor 36, an arithmetic unit 40, and a control unit 50.

電力変換部30は、制御部50から与えられる複数の制御信号s1,s2に基づいて、直流電源20から供給される直流電力を交流電力に変換するものである。電力センサ36は、電力変換部30の出力電力Pc(=Pc1〜Pcn)を検出し、この出力電力値poを制御部50に与えるものであり、電力計により構成、或いは、電流計及び電圧計により構成されている。   The power conversion unit 30 converts the direct current power supplied from the direct current power supply 20 into alternating current power based on the plurality of control signals s1 and s2 supplied from the control unit 50. The power sensor 36 detects the output power Pc (= Pc1 to Pcn) of the power conversion unit 30, and provides the output power value po to the control unit 50. The power sensor 36 may be a power meter or an ammeter and a voltmeter It is composed of

演算部40は、外部から与えられる第1ピークカット電力指令値pcut1(例えば、50kW)を演算して各PCS21毎に分担する第2ピークカット電力指令値pcut2を求め、この第2ピークカット電力指令値pcut2を制御部50へ与える機能を有している。制御部50は、演算部40から与えられる第2ピークカット電力指令値pcut2と、系統電力から検出された系統電力値poutと、に基づいて複数の制御信号s1,s2を生成し、電力変換部30へ与える機能を有している。
なお、図1中のPzは、負荷55へ供給される系統負荷電力である。
The calculation unit 40 calculates a first peak cut power command value pcut1 (for example, 50 kW) given from the outside to obtain a second peak cut power command value pcut2 to be shared for each PCS 21, and this second peak cut power command It has a function of giving the value pcut2 to the control unit 50. The control unit 50 generates a plurality of control signals s1 and s2 based on the second peak cut power command value pcut2 supplied from the calculation unit 40 and the system power value pout detected from the system power, and the power conversion unit Has a function to give 30.
Pz in FIG. 1 is system load power supplied to the load 55.

図3は、図1中のPCS21の構成を示す概略の機能ブロック図である。
各PCS21において、電力変換部30は、例えば、入力用のスイッチング回路31、変圧器(以下「トランス」という。)、整流回路33、フィルタ回路34、及び出力用のスイッチング回路35を有している。
FIG. 3 is a schematic functional block diagram showing the configuration of the PCS 21 in FIG.
In each PCS 21, the power conversion unit 30 includes, for example, a switching circuit 31 for input, a transformer (hereinafter referred to as “transformer”), a rectifier circuit 33, a filter circuit 34, and a switching circuit 35 for output. .

入力用のスイッチング回路31は、直流電源20から出力される直流電力を入力し、入力された直流電力をスイッチングして高周波の交流電力に変換し、この交流電力をトランス32へ出力する回路であり、複数の制御信号s1によりオン/オフ動作する複数のスイッチング素子により構成されている。トランス32は、電力変換部30の入力側と出力側とを絶縁するものであり、このトランス32の出力側に、整流回路33が接続されている。   The input switching circuit 31 is a circuit which receives DC power output from the DC power supply 20, switches the input DC power to convert it into high frequency AC power, and outputs the AC power to the transformer 32. And a plurality of switching elements that are turned on / off by a plurality of control signals s1. The transformer 32 isolates the input side and the output side of the power conversion unit 30, and the rectifier circuit 33 is connected to the output side of the transformer 32.

整流回路33は、トランス32から出力される交流電力を直流電力に変換する回路であり、ダイオードブリッジ回路等により構成され、この出力側に、フィルタ回路34が接続されている。フィルタ回路34は、整流回路33の出力電圧に含まれる高周波成分の除去と平滑を行う回路であり、LC回路等により構成され、この出力側に、出力用のスイッチング回路35が接続されている。   The rectifier circuit 33 is a circuit that converts AC power output from the transformer 32 into DC power, and is configured of a diode bridge circuit or the like, and the filter circuit 34 is connected to the output side. The filter circuit 34 is a circuit that removes and smoothes high frequency components included in the output voltage of the rectifier circuit 33. The filter circuit 34 is formed of an LC circuit or the like, and the output switching circuit 35 is connected to the output side.

スイッチング回路35は、フィルタ回路34から出力される直流電力を、電力系統58と同一の周波数を有する低周波の交流電力に変換する回路であり、複数の制御信号s2によりオン/オフ動作する複数のスイッチング素子により構成され、この出力側が、配線54に接続されている。配線54には、電力センサ36が設けられている。   The switching circuit 35 is a circuit that converts the DC power output from the filter circuit 34 into low frequency AC power having the same frequency as that of the power system 58, and performs a plurality of on / off operations by the plurality of control signals s2. The output side is connected to the wiring 54. The wire 54 is provided with a power sensor 36.

演算部40は、負荷55へ供給する電力における負荷分担の順位を設定する順位設定値と、複数台のPCS21を全て駆動させるために負荷分担の順位を変更する順位変更要素と、所定の負荷分担電力dと、に基づいて調整値AVを求め、第1ピークカット電力指令値pcut1から、調整値AVを減算して、第2ピークカット電力指令値pcut2を算出する機能を有している。   Arithmetic unit 40 sets a rank of load sharing in power supplied to load 55, a rank change element of changing the rank of load sharing to drive all the plurality of PCSs 21, and predetermined load sharing The adjustment value AV is obtained based on the electric power d, and the adjustment value AV is subtracted from the first peak cut power command value pcut1 to calculate a second peak cut power command value pcut2.

演算部40において、前記順位設定値は、複数台のPCS21にそれぞれ対応する号機番号aと、複数台のPCS21の運転台数bと、に基づいて設定される値である。前記順位変更要素は、系統電力検出時の年、月、日、時、分、秒のいずれか1つ、又は、それらの複数の組み合わせからなる時計情報cである。更に、前記所定の負荷分担電力dは、各PCS21が持つ検出誤差を吸収して第1ピークカット電力指令値pcut1に差を設けるための電力値である。   In the calculation unit 40, the rank setting value is a value set based on the machine number a corresponding to each of the plurality of PCSs 21 and the number of operation b of the plurality of PCSs 21. The rank change element is clock information c consisting of any one of year, month, day, hour, minute, and second at the time of system power detection, or a plurality of combinations thereof. Further, the predetermined load sharing power d is a power value for absorbing the detection error of each PCS 21 to provide a difference to the first peak cut power command value pcut1.

前記調整値AVは、例えば、次式(1)に従って求められる。
調整値AV={(号機番号a+時計情報c)%運転台数b}×負荷分担電力d
但し、「%」は、剰余を求めることを意味する。
・・・(1)
The adjustment value AV is determined, for example, according to the following equation (1).
Adjustment value AV = {(# machine number a + clock information c)% operation number b} x load sharing power d
However, “%” means to obtain a remainder.
... (1)

このように、本実施例1では、設定値として号機番号a、運転台数b、及び負荷分担電力dを設け、時計情報cである現在時刻を利用し、前記(1)式で、各PCS21の第2ピークカット電力指令値pcut2に差を設ける。つまり、前記(1)式の計算により、各PCS21毎の第2ピークカット電力指令値pcut2は、負荷分担電力dの差を持ち、全てが異なる値となる。   As described above, in the first embodiment, the machine number a, the operating number b, and the load sharing power d are provided as set values, and the current time that is the clock information c is used. A difference is provided to the second peak cut power command value pcut2. That is, according to the calculation of the equation (1), the second peak cut power command value pcut2 for each PCS 21 has a difference of the load sharing power d, and all become different values.

本実施例1の演算部40は、例えば、時計41、剰余算出手段42、乗算手段43、及び減算手段44により構成されている。   The calculation unit 40 of the first embodiment is configured of, for example, a clock 41, a remainder calculation unit 42, a multiplication unit 43, and a subtraction unit 44.

時計41は、時計情報cを計測するものであり、この出力側に、剰余算出手段42が接続されている。剰余算出手段42は、号機番号aと時計情報cとを加算し、該加算値に対して運転台数bを除算して除算結果の剰余を算出するものであり、この出力側に、乗算手段43が接続されている。乗算手段43は、剰余算出手段42で算出された剰余と、負荷分担電力dと、を乗算して調整値AVを算出するものであり、この出力側に、減算手段44が接続されている。減算手段44は、第1ピークカット電力指令値pcut1から調整値AVを減算して第2ピークカット電力指令値pcut2を算出するものであり、この出力側に、制御部50が接続されている。   The clock 41 measures clock information c, and the remainder calculating means 42 is connected to the output side. The remainder calculation means 42 adds the machine number a and the clock information c, divides the number of operation b by the sum to calculate the remainder of the division result, and on the output side, the multiplication means 43 Is connected. The multiplying means 43 calculates the adjustment value AV by multiplying the remainder calculated by the remainder calculating means 42 and the load sharing electric power d, and the subtracting means 44 is connected to this output side. The subtraction means 44 subtracts the adjustment value AV from the first peak cut power command value pcut1 to calculate a second peak cut power command value pcut2, and the control unit 50 is connected to this output side.

制御部50は、目標値算出手段51、誤差演算手段52、及び制御信号生成手段53により構成されている。   The control unit 50 is configured of a target value calculation unit 51, an error calculation unit 52, and a control signal generation unit 53.

目標値算出手段51は、第2ピークカット電力指令値pcut2から系統電力値poutを減算して出力電力目標値eを算出するものであり、この出力側に、誤差演算手段52が接続されている。誤差演算手段52は、演算により、出力電力値poと出力電力目標値eとの誤差fを算出するものであり、この出力側に、制御信号生成手段53が接続されている。制御信号生成手段53は、誤差fが減少するようなデューティ比の複数の制御信号s1,s2を生成し、これらの複数の制御信号s1,s2を電力変換部30内のスイッチング回路31、35へ与えるものであり、例えば、パルス幅変調手段(PWM手段)及び駆動手段等により構成されている。   The target value calculation unit 51 subtracts the grid power value pout from the second peak cut power command value pcut2 to calculate the output power target value e, and the error calculation unit 52 is connected to this output side. . The error calculating means 52 calculates the error f between the output power value po and the output power target value e by calculation, and the control signal generating means 53 is connected to this output side. The control signal generation unit 53 generates a plurality of control signals s1 and s2 having a duty ratio such that the error f decreases, and transmits the plurality of control signals s1 and s2 to the switching circuits 31 and 35 in the power conversion unit 30. For example, it comprises pulse width modulation means (PWM means) and drive means.

これらの演算部40及び制御部50は、プロセッサ又は個別回路等により構成されている。   The arithmetic unit 40 and the control unit 50 are configured by a processor or an individual circuit or the like.

(実施例1の全体の動作)
図1及び図3に示す分散型電源装置において、外部から系統電力の上限の第1ピークカット電力指令値pcut1が供給されると、この第1ピークカット電力指令値pcut1が、各PCS21内の演算部40へ与えられる。電力系統58の系統電力は、受電点57及び配線54を経由して負荷55へ供給される。
(Overall operation of the first embodiment)
In the distributed power supply apparatus shown in FIGS. 1 and 3, when the first peak cut power command value pcut1 of the upper limit of the grid power is externally supplied, the first peak cut power command value pcut1 is calculated in each PCS 21. It is given to the part 40. The grid power of the power grid 58 is supplied to the load 55 via the power receiving point 57 and the wiring 54.

系統電力センサ56で検出された系統電力値poutは、各PCS21へ与えられる。図1の例では、第1PCS21−1を経由して順に第2PCS21−2、第3PCS21−3、第4PCS21−4、及び第5PCS21−5へ同一値として分配される。   The grid power value pout detected by the grid power sensor 56 is given to each PCS 21. In the example of FIG. 1, the same value is distributed to the second PCS 21-2, the third PCS 21-3, the fourth PCS 21-4, and the fifth PCS 21-5 in order via the first PCS 21-1.

負荷55へ供給される系統負荷電力Pzの変動により、系統電力センサ56で検出された系統電力値poutが増加し、この系統電力値poutが第1ピークカット電力指令値pcut1を超えようとすると、複数台のPCS21が、以下のように動作する。   If fluctuations in the system load power Pz supplied to the load 55 cause the system power value pout detected by the system power sensor 56 to increase, and if this system power value pout tries to exceed the first peak cut power command value pcut1, The plurality of PCSs 21 operate as follows.

各PCS21内の演算部40において、剰余算出手段42は、号機番号aと時計情報cとを加算し、該加算値に対して運転台数bを除算して除算結果の剰余を算出し、この算出結果を乗算手段43へ与える。乗算手段43は、剰余算出手段42で算出された剰余と、負荷分担電力dと、を乗算して前記(1)式の調整値AVを求め、減算手段44へ与える。減算手段44は、第1ピークカット電力指令値pcut1から調整値AVを減算して第2ピークカット電力指令値pcut2を算出し、各制御部50内の目標値算出手段51へ与える。   In the calculation unit 40 in each PCS 21, the remainder calculation means 42 adds the machine number a and the clock information c, divides the addition value by the number b of operations to calculate the remainder of the division result, and calculates this The result is given to the multiplying means 43. The multiplying means 43 multiplies the remainder calculated by the remainder calculating means 42 and the load sharing electric power d to obtain the adjustment value AV of the equation (1), and gives it to the subtracting means 44. The subtracting means 44 subtracts the adjustment value AV from the first peak cut power command value pcut 1 to calculate a second peak cut power command value pcut 2, and supplies the second peak cut power command value pcut 2 to the target value calculation means 51 in each control unit 50.

各制御部50内の目標値算出手段51は、演算部40から与えられた第2ピークカット電力指令値pcut2から、系統電力センサ56で検出された系統電力値poutを減算して、出力電力目標値eを算出し、誤差演算手段52へ与える。誤差演算手段52は、電力センサ36で検出された出力電力値poと、出力電力目標値eと、の誤差fを算出し、制御信号生成手段53へ与える。これにより、制御信号生成手段53は、誤差fが減少するようなデューティ比の複数の制御信号s1,s2を生成し、電力変換部30へ与える。   The target value calculation unit 51 in each control unit 50 subtracts the grid power value pout detected by the grid power sensor 56 from the second peak cut power command value pcut2 given from the calculation unit 40 to obtain an output power target The value e is calculated and given to the error calculation means 52. The error calculating means 52 calculates an error f between the output power value po detected by the power sensor 36 and the output power target value e, and supplies the error f to the control signal generating means 53. Thus, the control signal generation unit 53 generates a plurality of control signals s1 and s2 having a duty ratio such that the error f decreases, and supplies the control signals s1 and s2 to the power conversion unit 30.

各電力変換部30において、入力用のスイッチング回路31は、制御部50から与えられた複数の制御信号s1に基づき、直流電源20から出力された直流電力をスイッチングして高周波の交流電力に変換する。変換された交流電力は、トランス32を介して、整流回路33で直流電力に変換され、フィルタ回路34にて、高周波成分の除去と平滑が行われ、出力用のスイッチング回路35へ送られる。   In each power conversion unit 30, the input switching circuit 31 switches DC power output from the DC power supply 20 based on the plurality of control signals s1 supplied from the control unit 50 and converts it into high frequency AC power. . The converted AC power is converted to DC power by the rectifier circuit 33 through the transformer 32, the high frequency component is removed and smoothed by the filter circuit 34, and the resulting signal is sent to the output switching circuit 35.

スイッチング回路35は、制御部50から与えられた複数の制御信号s2に基づき、フィルタ回路34から出力された直流電力を、電力系統58と同一の周波数を有する低周波の交流電力に変換する。変換された出力電力Pcは、電力センサ36で検出され、この出力電力値poが制御部50へ与えられる。   The switching circuit 35 converts the DC power output from the filter circuit 34 into low frequency AC power having the same frequency as that of the power system 58 based on the plurality of control signals s2 supplied from the control unit 50. The converted output power Pc is detected by the power sensor 36, and the output power value po is applied to the control unit 50.

制御部50において、系統電力センサ56で検出された系統電力値poutが第2ピークカット電力指令値pcut2を超えないように制御され、この制御信号s1,s2に基づき、複数台のPCS21が動作して不足分の電力が負荷55へ供給される。これにより、系統電力の上限値が抑えられ、電力系統58が平準化される。   The control unit 50 controls the system power value pout detected by the system power sensor 56 so as not to exceed the second peak cut power command value pcut2, and a plurality of PCSs 21 operate based on the control signals s1 and s2. Insufficient power is supplied to the load 55. Thereby, the upper limit value of the system power is suppressed, and the power system 58 is leveled.

(実施例1のPCSの負荷分担動作)
図4(a)〜(c)は、図1の分散型電源装置における動作を示す説明図である。
(Load sharing operation of the PCS of the first embodiment)
4 (a) to 4 (c) are explanatory diagrams showing the operation of the distributed power supply device of FIG.

図4(a)〜(c)において、同図(a)は、並列運転機能無しの従来のPCS10の負荷分担特性図、同図(b)は、並列運転機能有りの本実施例1のPCS21の負荷分担特性図、及び、同図(c)は、並列運転機能有りの本実施例1のPCS21毎の第2ピークカット電力指令値pcut2の算出例を示す図である。   4 (a) to 4 (c), FIG. 4 (a) is a load sharing characteristic diagram of the conventional PCS 10 without the parallel operation function, and FIG. 4 (b) is the PCS 21 of the first embodiment with the parallel operation function. FIG. 6C is a diagram showing a calculation example of the second peak cut power command value pcut2 for each PCS 21 of the first embodiment with the parallel operation function, and FIG.

図4(a)に示す従来のように、各PCS10(=10−1〜10−5)の出力電力Pc(=Pc1〜Pc5)が同一の目標値になるよう個別に電力制御を行うと、検出誤差のばらつきにより、何れかのPCS10が負荷電力Pzを全て背負い込む動作を行う。誤差ではなく、的確に負荷分担を管理するため、本実施例1では、各PCS21における号機番号a、運転台数b及び負荷分担電力dと、現在時刻と、による制御を行っている。   If power control is individually performed so that the output power Pc (= Pc1 to Pc5) of each PCS 10 (= 10-1 to 10-5) becomes the same target value as in the conventional case shown in FIG. Due to the variation of the detection error, any one of the PCSs 10 performs an operation to bear all the load power Pz. In order to manage load sharing properly, not error, in the first embodiment, control is performed based on the machine number a, the operating number b and the load sharing power d in each PCS 21 and the current time.

本実施例1において、ピークカット供給運転時の動作イメージが、図4(b)に示されている。例えば、複数台のPCS21(=21−1〜21−5)において、これらの複数の出力電力Pc(=Pc1〜Pc5)により、系統負荷電力Pzが順に分担される。   In the first embodiment, an operation image at the time of peak cut supply operation is shown in FIG. For example, in a plurality of PCSs 21 (= 21-1 to 21-5), the system load power Pz is sequentially shared by the plurality of output powers Pc (= Pc1 to Pc5).

図4(b)の動作を実現するため、前記(1)式に基づき、各PCS21毎の第2ピークカット電力指令値pcut2が演算部40で求められる。この結果、各PCS21の第2ピークカット電力指令値pcut2が差を持つため、負荷分担が順に制御されることになる。   In order to realize the operation of FIG. 4B, the second peak cut power command value pcut2 for each PCS 21 is determined by the calculation unit 40 based on the equation (1). As a result, since the second peak cut power command value pcut2 of each PCS 21 has a difference, the load sharing is controlled in order.

図4(c)には、例えば、第1ピークカット電力指令値pcut1を50kW、運転台数bを5台、負荷分担電力dを0.3kW、現在時刻として日を採用した場合の計算例が示されている。   FIG. 4C shows, for example, a calculation example when the first peak cut power command value pcut1 is 50 kW, the number of operating units b is five, the load sharing power d is 0.3 kW, and the day is adopted as the current time. It is done.

図4(c)において、○月4日の場合、系統電力の負荷55が増大して系統入力電力である系統電力値poutが48.8kWを超えると、PCS21−5が出力を開始する。PCS定格の10kWを超える場合、PCS21−5だけでは制御しきれなくなり、系統電力値poutが48.8kWを超える。その後、49.1kWに到達してPCS21−4が出力を行う。以降同様に、PCS21−3,21−2,21−1が順に出力を行う。   In (c) of FIG. 4, when the load 55 of the grid power increases and the grid power value pout, which is grid input power, exceeds 48.8 kW, the PCS 21-5 starts to output when the load of the grid power increases. If the PCS rating exceeds 10 kW, the PCS 21-5 alone can not control and the grid power value pout exceeds 48.8 kW. After that, it reaches 49.1 kW and the PCS 21-4 performs output. Similarly, the PCS 21-3, 21-2, 21-1 sequentially outputs.

なお、計算式に日付があるため、翌5日には、PCS21−4の計算結果が最も低い48.8kWになり、最初に負荷電力Pzを受け持つ。以降同様に、PCS21−3,21−2,21−1,21−5が順に負荷電力Pzを受け持つことになる。
このような動作により、負荷分担が管理される。
In addition, since there is a date in the calculation formula, the calculation result of the PCS 21-4 is the lowest 48.8 kW on the next 5th, and is initially responsible for the load power Pz. Similarly, the PCSs 21-3, 21-2, 21-1 and 21-5 sequentially receive the load power Pz.
Load sharing is managed by such an operation.

一方で、各直流電源20に蓄電池や太陽電池の他、風力発電や水力発電を起源とした電力を組み合わせた場合においても、本方式により系統電力の制御が可能である。図4(c)の○月4日の場合において、直流電源20−1と直流電源20−2、20−3に蓄電池、直流電源20−4と直流電源20−5に太陽電池を接続した場合、系統電力の負荷55が増大して系統電力値poutが48.8kWを超えると、PCS21−5が出力を開始しようとするが、天候不良等の要因により太陽電池の発電電力が不足すると、十分な電力が供給できずに系統電力値poutが48.8kWを超える。その後、49.1kWに到達してPCS21−4が出力を行うが、同様の理由により太陽電池の供給電力が不足して系統電力値poutが49.4kWを超えるとPCS21−3が出力を開始し、系統電力値poutの制御が行われる。   On the other hand, even when each DC power supply 20 is combined with electric power originating from wind power generation or hydroelectric power generation in addition to storage batteries and solar cells, control of grid power by this method is possible. When the storage battery is connected to the DC power supply 20-1 and the DC power supplies 20-2 and 20-3 and the solar battery is connected to the DC power supply 20-4 and the DC power supply 20-5 in the case of ○ month 4 in FIG. If the load 55 of the system power increases and the system power value pout exceeds 48.8 kW, the PCS 21-5 tries to start the output, but if the power generated by the solar cell is insufficient due to a defect such as weather, sufficient System power value pout exceeds 48.8 kW. After that, when it reaches 49.1 kW and the PCS 21-4 performs output, the PCS 21-3 starts output when the power supply of the solar cell is insufficient for the same reason and the grid power value pout exceeds 49.4 kW. The control of the grid power value pout is performed.

(実施例1の効果)
本実施例1の分散型電源装置によれば、各PCS21に演算部40を設け、この演算部40により、号機番号a及び運転台数bからなる負荷分担の順位設定値と、時計情報cからなる負荷分担の順位変更要素と、負荷分担電力dと、に基づいて調整値AVを求め、第1ピークカット電力指令値pcut1からその調整値AVを減算して、第2ピークカット電力指令値pcut2を算出しているので、各PCS21の制御目標値である第2ピークカット電力指令値pcut2に差が生まれる。この差により、個々のPCS21が持つ検出誤差や制御応答のばらつきの影響を受けなくなるため、系統電力が、この上限である第1ピークカット電力指令値pcut1以下に的確に抑えられ、電力系統58の平準化を図ることができる。
(Effect of Example 1)
According to the distributed power supply apparatus of the first embodiment, each PCS 21 is provided with the operation unit 40, and the operation unit 40 comprises the order setting value of load sharing consisting of the machine number a and the number b of operations and clock information c. The adjustment value AV is obtained based on the load sharing order change element and the load distribution power d, and the adjustment value AV is subtracted from the first peak cut power command value pcut1 to obtain the second peak cut power command value pcut2 Since the calculation is performed, a difference is generated in the second peak cut power command value pcut2 that is the control target value of each PCS 21. By this difference, the system power is not affected by the detection error and the control response variation of the individual PCSs 21. Therefore, the system power is properly suppressed to the upper limit or lower than the first peak cut power command value pcut1. Leveling can be achieved.

(変形例)
本発明は、上記実施例1に限定されず、種々の利用形態や変形が可能である。この利用形態や変形例としては、例えば、次の(I)、(II)のようなものがある。
(Modification)
The present invention is not limited to the above-described first embodiment, and various usage modes and modifications are possible. For example, the following (I) and (II) can be used as this form of use or modification.

(I) 図3に示すPCS21は、図示の構成に限定されない。例えば、演算部40は、前記(1)式以外の他の数式により、調整値AVを求めても良い。演算部40は、制御部50内に設けても良い。又、各演算部40内に設けられた時計41に代えて、複数の演算部40に共用できる1つの時計を設け、この時計の時計情報cを各演算部40へ与える構成にしても良く、これにより、構成を簡素化できる。   (I) The PCS 21 shown in FIG. 3 is not limited to the illustrated configuration. For example, the calculation unit 40 may obtain the adjustment value AV using another equation other than the equation (1). The calculation unit 40 may be provided in the control unit 50. Further, instead of the clock 41 provided in each arithmetic unit 40, a single timepiece that can be shared by a plurality of arithmetic units 40 may be provided, and clock information c of the timepiece may be provided to each arithmetic unit 40. This can simplify the configuration.

(II) 図1及び図3に示す分散型電源装置は、図示の構成に限定されない。例えば、電力変換部30は、図示以外の他の回路で構成しても良い。   (II) The distributed power supply shown in FIG. 1 and FIG. 3 is not limited to the illustrated configuration. For example, the power conversion unit 30 may be configured by another circuit other than illustrated.

20,20−1〜20−n 直流電源
21,21−1〜21−n PCS(電力変換装置)
30 電力変換部
36 電力センサ
40 演算部
41 時計
42 剰余算出手段
43 乗算手段
44 減算手段
50 制御部
51 目標値算出手段
52 誤差演算手段
53 制御信号生成手段
55 負荷
56 系統電力センサ
57 系統電力の受電点
58 電力系統
20, 20-1 to 20-n DC power supply 21, 21-1 to 21-n PCS (power converter)
Reference Signs List 30 power conversion unit 36 power sensor 40 calculation unit 41 clock 42 remainder calculation unit 43 multiplication unit 44 subtraction unit 50 control unit 51 target value calculation unit 52 error calculation unit 53 control signal generation unit 55 load 56 grid power sensor 57 reception of grid power Point 58 Power System

Claims (9)

電力系統から系統電力を受電する受電点と負荷との間の配線に並列に接続され、直流電力を交流電力にそれぞれ変換する複数台の電力変換装置を備え、
前記電力系統から前記負荷へ供給される負荷電力が、前記電力系統から受電する前記系統電力の上限の第1ピークカット電力指令値を超えないように、前記複数台の電力変換装置から前記負荷へ電力を供給する分散型電源装置であって、
前記各電力変換装置は、
前記第1ピークカット電力指令値を演算して前記各電力変換装置毎に分担する第2ピークカット電力指令値を求める演算部と、
前記演算部で求められた前記第2ピークカット電力指令値と、前記系統電力から検出された系統電力値と、に基づいて出力電力目標値を求め、前記各電力変換装置の出力電力から検出された出力電力値と、前記出力電力目標値と、の誤差が減少するような制御信号を生成する制御部と、
前記制御信号に基づいて、前記直流電力を前記交流電力に変換する電力変換部と、
を有し、
前記演算部は、
前記負荷へ供給する前記電力における負荷分担の順位を設定する順位設定値と、前記複数台の電力変換装置を全て駆動させるために前記負荷分担の順位を変更する順位変更要素と、所定の負荷分担電力と、に基づいて調整値を求め、前記第1ピークカット電力指令値から、前記調整値を減算して、前記第2ピークカット電力指令値を算出することを特徴とする分散型電源装置。
A plurality of power conversion devices connected in parallel to a wire between a load and a power receiving point for receiving system power from the power system, and converting DC power into AC power;
The plurality of power conversion devices are connected to the load such that the load power supplied from the power system to the load does not exceed the first peak cut power command value of the upper limit of the system power received from the power system. A distributed power supply for supplying power,
Each of the power converters
A calculation unit that calculates the first peak cut power command value to obtain a second peak cut power command value to be shared for each of the power conversion devices;
An output power target value is determined based on the second peak cut power command value determined by the calculation unit and the grid power value detected from the grid power, and is detected from the output power of each of the power conversion devices A control unit that generates a control signal that reduces an error between the output power value and the output power target value;
A power conversion unit that converts the DC power to the AC power based on the control signal;
Have
The arithmetic unit is
An order setting value for setting the order of load sharing in the electric power supplied to the load, an order changing element for changing the order of load sharing to drive all of the plurality of power conversion devices, and predetermined load sharing A distributed power supply apparatus, wherein an adjustment value is obtained based on electric power, and the adjustment value is subtracted from the first peak cut power command value to calculate the second peak cut power command value.
前記順位設定値は、前記複数台の電力変換装置にそれぞれ対応する号機番号と、前記複数台の電力変換装置の運転台数と、に基づき設定される値であり、
前記順位変更要素は、系統電力検出時の年、月、日、時、分、秒のいずれか1つ、又は、それらの複数の組み合わせからなる時計情報であり、
前記所定の負荷分担電力は、前記各電力変換装置が持つ検出誤差を吸収して前記第ピークカット電力指令値に差を設けるための電力値である、
ことを特徴とする請求項1記載の分散型電源装置。
The rank setting value is a value set based on a machine number corresponding to each of the plurality of power conversion devices, and the number of operating the plurality of power conversion devices,
The rank change element is clock information consisting of any one of year, month, day, hour, minute, second, or a combination thereof in grid power detection time,
The predetermined load sharing power is a power value for absorbing a detection error of each of the power conversion devices to provide a difference to the second peak cut power command value.
The distributed power supply according to claim 1, wherein
前記調整値は、
下記の式に従って求めることを特徴とする請求項2記載の分散型電源装置。
調整値={(号機番号+時計情報)%運転台数}×負荷分担電力
但し、「%」は、剰余を求めることを意味する。
The adjustment value is
The distributed power supply according to claim 2, wherein the distributed power supply is determined according to the following equation.
Adjustment value = {(machine number + clock information)% number of units operating} × load sharing power
However, “%” means to obtain a remainder.
前記演算部は、
前記号機番号と前記時計情報とを加算し、該加算値に対して前記運転台数を除算して除算結果の剰余を算出する剰余算出手段と、
前記剰余算出手段で算出された前記剰余と、前記負荷分担電力と、を乗算して前記調整値を算出する乗算手段と、
前記第1ピークカット電力指令値から前記調整値を減算して前記第2ピークカット電力指令値を算出する減算手段と、
を有することを特徴とする請求項3記載の分散型電源装置。
The arithmetic unit is
Remainder calculating means for adding the machine number and the clock information and dividing the number of operation with respect to the added value to calculate the remainder of the division result;
Multiplication means for calculating the adjustment value by multiplying the remainder calculated by the remainder calculation means and the load sharing power;
Subtracting means for calculating the second peak cut power command value by subtracting the adjustment value from the first peak cut power command value;
The distributed power supply according to claim 3, characterized in that:
前記系統電力値及び前記出力電力値は、2つの電力センサによりそれぞれ検出されることを特徴とする請求項1〜4のいずれか1項記載の分散型電源装置。   The distributed power supply device according to any one of claims 1 to 4, wherein the grid power value and the output power value are respectively detected by two power sensors. 前記時計情報は、時計により計測されることを特徴とする請求項2〜のいずれか1項記載の分散型電源装置。 The distributed power supply device according to any one of claims 2 to 4 , wherein the clock information is measured by a clock. 前記制御部は、
前記第2ピークカット電力指令値から前記系統電力値を減算して前記出力電力目標値を算出する目標値算出手段と、
前記出力電力値と前記出力電力目標値との誤差を演算により算出する誤差演算手段と、
前記誤差が減少するようなデューティ比の前記制御信号を生成する制御信号生成手段と、
を有することを特徴とする請求項1〜6のいずれか1項記載の分散型電源装置。
The control unit
Target value calculation means for calculating the output power target value by subtracting the grid power value from the second peak cut power command value;
Error calculation means for calculating an error between the output power value and the output power target value by calculation;
Control signal generating means for generating the control signal having a duty ratio such that the error decreases;
The distributed power supply device according to any one of claims 1 to 6, characterized in that
前記演算部及び前記制御部は、プロセッサ又は個別回路により構成されていることを特徴とする請求項1〜7のいずれか1項記載の分散型電源装置。   The distributed power supply according to any one of claims 1 to 7, wherein the calculation unit and the control unit are configured by a processor or an individual circuit. 前記各電力変換装置に入力される前記直流電力は、
蓄電池、太陽電池及び燃料電池を含む分散型直流電源から供給されることを特徴とする請求項1〜8のいずれか1項記載の分散型電源装置。
The DC power input to each of the power conversion devices is
The distributed power supply according to any one of claims 1 to 8, which is supplied from a distributed DC power supply including a storage battery, a solar cell and a fuel cell.
JP2015129615A 2015-06-29 2015-06-29 Distributed power supply Active JP6425625B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015129615A JP6425625B2 (en) 2015-06-29 2015-06-29 Distributed power supply

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015129615A JP6425625B2 (en) 2015-06-29 2015-06-29 Distributed power supply

Publications (2)

Publication Number Publication Date
JP2017017792A JP2017017792A (en) 2017-01-19
JP6425625B2 true JP6425625B2 (en) 2018-11-21

Family

ID=57831193

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015129615A Active JP6425625B2 (en) 2015-06-29 2015-06-29 Distributed power supply

Country Status (1)

Country Link
JP (1) JP6425625B2 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11495970B2 (en) * 2017-09-19 2022-11-08 Toshiba Mitsubishi-Electric Industrial Systems Corporation Photovoltaic power generation system and photovoltaic power generation method
WO2020218191A1 (en) 2019-04-26 2020-10-29 株式会社Gsユアサ Power control device, method of controlling power control device, and distributed power generation system
CN110417004B (en) * 2019-07-12 2022-08-05 国网甘肃省电力公司经济技术研究院 Extra-high voltage alternating current-direct current sending end power grid multi-source coordination peak shaving potential calculation model
JP7404751B2 (en) * 2019-10-08 2023-12-26 株式会社Gsユアサ Energy management device, energy management method
CN113364114A (en) * 2020-03-04 2021-09-07 台达电子工业股份有限公司 Smart power grid system and power management method thereof

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002218654A (en) * 2001-01-24 2002-08-02 Furukawa Electric Co Ltd:The Solar power system
JP6011845B2 (en) * 2012-05-28 2016-10-19 清水建設株式会社 Self-sustained operation system for distributed power supply
KR20140041089A (en) * 2012-09-27 2014-04-04 엘에스산전 주식회사 Distributed power control device

Also Published As

Publication number Publication date
JP2017017792A (en) 2017-01-19

Similar Documents

Publication Publication Date Title
CN111095008B (en) Electrical Architecture for Electrochemical Impedance Spectroscopy
JP6425625B2 (en) Distributed power supply
US7476987B2 (en) Stand-alone wind turbine system, apparatus, and method suitable for operating the same
US9054601B2 (en) Maximum power point tracker, power conversion controller, power conversion device having insulating structure, and method for tracking maximum power point thereof
KR102308628B1 (en) Hybrid Power Conversion System and Method for Determining Maximum Efficiency Using the Same
JP2011182503A (en) Energy storage system
WO2012081575A1 (en) Electric power control device and electric power control system using same
US10063090B2 (en) Solar power generation device and control method of solar power generation device
JP2010088150A (en) Charger
JP2013042627A (en) Dc power supply control device and dc power supply control method
JP6522901B2 (en) DC distribution system
WO2013099401A1 (en) Storage battery system
WO2021095645A1 (en) Calculation device and calculation method
JP5085260B2 (en) PWM signal generation circuit, grid-connected inverter system provided with the PWM signal generation circuit, and program for realizing the PWM signal generation circuit
JP2003116225A (en) Distributed power system
WO2017038787A1 (en) Power supply device
JP2021168555A (en) Power converter
JP6851030B2 (en) Controllers, power storage systems and programs
KR101813060B1 (en) Switched-mode power supply
JP5530009B1 (en) Power supply
JP5915201B2 (en) Electric power leveling device
JP2008072774A (en) Natural energy generated output equalization arrangement
JP6735507B2 (en) Power conversion system, power supply system, power management system
JP2021027616A (en) Power system
JP2015008561A (en) Low-loss power converter and control method thereof

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20171220

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20180926

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20181003

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20181011

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20181023

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20181023

R150 Certificate of patent or registration of utility model

Ref document number: 6425625

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150