JP6429810B2 - Train line selection device, operation plan creation system, operation management system, and train line selection method - Google Patents
[go: Go Back, main page]

JP6429810B2 - Train line selection device, operation plan creation system, operation management system, and train line selection method - Google Patents

Train line selection device, operation plan creation system, operation management system, and train line selection method Download PDF

Info

Publication number
JP6429810B2
JP6429810B2 JP2016000148A JP2016000148A JP6429810B2 JP 6429810 B2 JP6429810 B2 JP 6429810B2 JP 2016000148 A JP2016000148 A JP 2016000148A JP 2016000148 A JP2016000148 A JP 2016000148A JP 6429810 B2 JP6429810 B2 JP 6429810B2
Authority
JP
Japan
Prior art keywords
train
evaluation
selection
train line
selection unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2016000148A
Other languages
Japanese (ja)
Other versions
JP2017121817A (en
Inventor
雅 萩原
雅 萩原
剛生 吉本
剛生 吉本
祐作 長▲崎▼
祐作 長▲崎▼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP2016000148A priority Critical patent/JP6429810B2/en
Publication of JP2017121817A publication Critical patent/JP2017121817A/en
Application granted granted Critical
Publication of JP6429810B2 publication Critical patent/JP6429810B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Train Traffic Observation, Control, And Security (AREA)

Description

本発明は、画面に表示された複数の列車スジから所望の列車スジを選択する列車スジ選択装置、運行計画作成システム、運行管理システムおよび列車スジ選択方法に関するものである。   The present invention relates to a train line selection device, an operation plan creation system, an operation management system, and a train line selection method for selecting a desired train line from a plurality of train lines displayed on a screen.

列車の運行を司る指令員は、運行計画作成システムまたは運行管理システムにおいて、画面上に表示される列車スジをマウスなどのポインティングデバイスまたは画面タッチで選択し、選択した列車スジの列車のダイヤについて変更などの操作を行う。従来、運行計画作成システムまたは運行管理システムでは、クリック時のポインタの位置またはタッチされた位置と、列車スジとの距離に基づいて、どの列車スジが選択されたかを判定している。列車スジは、上り、下りが交差し、また高密度でダイヤが設定されていると、画面上で非常に過密になる。そのため、指令員が所望した列車スジを正確に選択することが難しいという問題がある。すなわち、運行計画作成システムまたは運行管理システムにおいて、指令員が所望した列車スジと異なる列車スジが選択されてしまうことがある。   The commander who manages the train operation selects the train stripe displayed on the screen with a pointing device such as a mouse or screen touch in the operation planning system or the operation management system, and changes the train schedule of the selected train stripe Perform operations such as. Conventionally, in an operation plan creation system or an operation management system, which train line is selected is determined based on the distance between the position of the pointer at the time of clicking or the touched position and the train line. A train streak becomes extremely congested on the screen when the ups and downs intersect, and when the diamonds are set at high density. Therefore, there is a problem that it is difficult for the commander to accurately select the desired train line. That is, in the operation plan creation system or the operation management system, a train line different from the train line desired by the commander may be selected.

所望した列車スジを選択するため、特許文献1では、画面上で指令員が異なる2点を指定し、指定された2点を結ぶ線分と交わる列車スジを選択する技術が開示されている。また、特許文献2では、ある点をクリックすると最も近い列車スジを選択し、移動せずに再度クリックすると2番目に近い列車スジを選択するように、同じ場所でクリックを繰り返すごとに選択する列車を距離に応じて切り替える技術が開示されている。   In order to select a desired train line, Patent Document 1 discloses a technique for specifying two train points that are different from each other on the screen and selecting a train line that intersects a line segment that connects the two specified points. Moreover, in Patent Document 2, a train that is selected every time a click is repeated at the same place, such as clicking on a certain point selects the nearest train streak and clicking again without moving selects the second closest train streak. A technique for switching between the two according to the distance is disclosed.

特開2001−206225号公報JP 2001-206225 A 特開2004−230959号公報JP 2004-230959 A

しかしながら、上記従来の技術によれば、所望の列車スジを選択するためには、指令員が複数回操作する可能性が高く手間がかかる、という問題があった。また、指令員が所望の列車スジを選択する際に直感的な操作と乖離が生じる、という問題があった。   However, according to the above-described conventional technique, there is a problem in that it is highly likely that the commander operates a plurality of times in order to select a desired train line. In addition, when the commander selects a desired train line, there is a problem that an intuitive operation and a deviation occur.

本発明は、上記に鑑みてなされたものであって、1回の操作で所望の列車スジを選択する確率を向上できる列車スジ選択装置を得ることを目的とする。   This invention is made | formed in view of the above, Comprising: It aims at obtaining the train stripe selection apparatus which can improve the probability of selecting a desired train stripe by one operation.

上述した課題を解決し、目的を達成するために、本発明の列車スジ選択装置は、複数の列車スジが表示されている画面において指定された指定位置の情報を取得する操作情報取得部を備える。また、列車スジ選択装置は、画面に表示されている列車スジの情報を記憶する表示列車スジ記憶部を備える。また、列車スジ選択装置は、複数の列車スジについての過去の操作履歴を記憶する操作履歴記憶部を備える。また、列車スジ選択装置は、指定位置と複数の列車スジとの距離、および操作履歴に基づいて、1つの列車スジを選択する選択部を備える。選択部は、指定位置と複数の列車スジとの距離について列車スジ毎に評価を行って評価値を求め、操作履歴について列車スジ毎に評価を行って評価値を求め、各評価項目の評価値を合算した合計値に基づいて、1つの列車スジを選択することを特徴とする。 In order to solve the above-described problems and achieve the object, the train line selection device of the present invention includes an operation information acquisition unit that acquires information on a specified position specified on a screen on which a plurality of train lines are displayed. . In addition, the train line selection device includes a display train line storage unit that stores information on the train lines displayed on the screen. In addition, the train line selection device includes an operation history storage unit that stores past operation histories for a plurality of train lines. In addition, the train line selection device includes a selection unit that selects one train line based on the distance between the designated position and the plurality of train lines and the operation history . The selection unit evaluates each train line for the distance between the specified position and a plurality of train lines, obtains an evaluation value, evaluates the operation history for each train line, obtains an evaluation value, and evaluates each evaluation item. One train streak is selected on the basis of the total value obtained by adding up the two .

本発明によれば、1回の操作で所望の列車スジを選択する確率を向上できる、という効果を奏する。   According to the present invention, it is possible to improve the probability of selecting a desired train line by a single operation.

実施の形態1にかかる列車スジ選択装置の構成例を示すブロック図FIG. 1 is a block diagram illustrating a configuration example of a train line selection device according to a first embodiment. 実施の形態1にかかる表示列車スジDBに記憶されている列車スジの例を示す図The figure which shows the example of the train stripe memorize | stored in the display train stripe DB concerning Embodiment 1 実施の形態1にかかる列車スジ選択装置の列車スジ選択処理を示すフローチャートThe flowchart which shows the train stripe selection process of the train stripe selection apparatus concerning Embodiment 1. FIG. 実施の形態1にかかる列車スジ選択装置において、指令員がマウスをクリックした位置を示す図The figure which shows the position where the commander clicked the mouse | mouth in the train stripe selection apparatus concerning Embodiment 1. FIG. 実施の形態1にかかる選択部が行う各列車スジの評価処理を示すフローチャートThe flowchart which shows the evaluation process of each train streak which the selection part concerning Embodiment 1 performs. 実施の形態1にかかる選択部において直前に列車スジを操作した列車番号2002の列車と各列車との相関関係についての評価結果である評価値を示す図The figure which shows the evaluation value which is an evaluation result about the correlation with the train of the train number 2002 which operated the train line immediately before in the selection part concerning Embodiment 1, and each train. 実施の形態1にかかる選択部においてクリック位置と列車スジとの距離の関係についての評価結果である評価値を示す図The figure which shows the evaluation value which is an evaluation result about the relationship of the distance of a click position and a train stripe in the selection part concerning Embodiment 1. FIG. 実施の形態1にかかる選択部において各列車番号の列車スジについての評価値を合算した評価値の合計値を示す図The figure which shows the total value of the evaluation value which totaled the evaluation value about the train stripe of each train number in the selection part concerning Embodiment 1. FIG. 実施の形態1にかかる列車スジ選択装置を含む運行計画作成システムまたは運行管理システムで表示される列車スジの例を示す図The figure which shows the example of the train stripe displayed by the operation plan creation system or the operation management system containing the train stripe selection apparatus concerning Embodiment 1 実施の形態1にかかる選択部を専用のハードウェアで構成する場合の例を示す図The figure which shows the example in the case of comprising the selection part concerning Embodiment 1 with exclusive hardware. 実施の形態1にかかる選択部をCPUおよびメモリで構成する場合の例を示す図The figure which shows the example in the case of comprising the selection part concerning Embodiment 1 with CPU and memory. 実施の形態2にかかる選択部が行う各列車スジの評価処理を示すフローチャートThe flowchart which shows the evaluation process of each train streak which the selection part concerning Embodiment 2 performs. 実施の形態4にかかる運行計画作成システムの構成例を示すブロック図A block diagram showing a configuration example of an operation plan creation system according to the fourth embodiment. 実施の形態4にかかる運行管理システムの構成例を示すブロック図Block diagram showing a configuration example of an operation management system according to the fourth embodiment.

以下に、本発明の実施の形態にかかる列車スジ選択装置、運行計画作成システム、運行管理システムおよび列車スジ選択方法を図面に基づいて詳細に説明する。なお、この実施の形態によりこの発明が限定されるものではない。   Hereinafter, a train line selection device, an operation plan creation system, an operation management system, and a train line selection method according to an embodiment of the present invention will be described in detail with reference to the drawings. Note that the present invention is not limited to the embodiments.

実施の形態1.
図1は、本発明の実施の形態1にかかる列車スジ選択装置10の構成例を示すブロック図である。列車スジ選択装置10は、操作情報取得部1と、表示列車スジデータベース(以下、表示列車スジDBとする)2と、操作履歴データベース(以下、操作履歴DBとする)3と、選択部4と、を備える。列車スジ選択装置10は、運行計画作成システムまたは運行管理システムにおいて使用される装置である。列車スジ選択装置10を備える運行計画作成システムおよび運行管理システムの構成については、後述する実施の形態4で説明する。
Embodiment 1 FIG.
FIG. 1 is a block diagram illustrating a configuration example of a train stripe selection device 10 according to the first exemplary embodiment of the present invention. The train line selection device 10 includes an operation information acquisition unit 1, a display train line database (hereinafter referred to as a display train line DB) 2, an operation history database (hereinafter referred to as an operation history DB) 3, and a selection unit 4. . The train line selection device 10 is a device used in an operation plan creation system or an operation management system. The configuration of the operation plan creation system and the operation management system including the train line selection device 10 will be described in a fourth embodiment to be described later.

操作情報取得部1は、運行計画作成システムまたは運行管理システムに接続される図示しない表示ディスプレイの画面において、列車の運行を司る指令員がマウスなどのポインティングデバイスの操作により指定した位置である指定位置の情報を取得し、指定位置の情報を選択部4へ出力する。ポインティングデバイスについては、マウス以外のものを用いてもよい。操作情報取得部1は、表示ディスプレイがタッチパネルの場合、指令員がタッチ操作により指定した位置である指定位置の情報を取り込み、指定位置の情報を選択部4へ出力する。以降の説明では、ポインティングデバイスとしてマウスを使用し、指令員がマウスをクリックして列車スジを選択する場合を例にして説明する。なお、操作情報取得部1は運行計画作成システムまたは運行管理システムで必要な構成のため、操作情報取得部1については運行計画作成システムまたは運行管理システムと共用してもよい。   The operation information acquisition unit 1 is a designated position that is designated by a commander who operates a train by operating a pointing device such as a mouse on a display screen (not shown) connected to the operation plan creation system or the operation management system. The information on the designated position is output to the selection unit 4. A pointing device other than a mouse may be used. When the display is a touch panel, the operation information acquisition unit 1 takes in information on a designated position that is a position designated by a commander by a touch operation, and outputs the information on the designated position to the selection unit 4. In the following description, a case where a mouse is used as a pointing device and the commander clicks the mouse to select a train line will be described as an example. In addition, since the operation information acquisition part 1 is a structure required by an operation plan preparation system or an operation management system, you may share the operation information acquisition part 1 with an operation plan preparation system or an operation management system.

表示列車スジDB2は、表示ディスプレイの画面に表示される複数の列車スジの情報を記憶する表示列車スジ記憶部である。表示列車スジDB2に記憶されている列車スジの情報は、列車スジが表示ディスプレイの画面のどこに描かれているか、列車スジについての列車番号、各列車の支障状態、各列車の折り返し関係の有無、などの情報を含む。列車スジについては、運行計画作成システムまたは運行管理システムが、各列車の計画上の実施ダイヤ情報、各列車について走行予測をした結果に基づく予測ダイヤ情報、実際の運行情報に基づく実績ダイヤ情報、駅の位置および線路構造などの路線情報、などを用いて生成する。なお、表示列車スジDB2は運行計画作成システムまたは運行管理システムで必要な構成のため、表示列車スジDB2については運行計画作成システムまたは運行管理システムと共用してもよい。   The display train line DB 2 is a display train line storage unit that stores information on a plurality of train lines displayed on the screen of the display. The train line information stored in the displayed train line DB2 includes the train line where the train line is drawn, the train number for the train line, the trouble state of each train, the presence / absence of the return relationship of each train, Information. For train streaks, the operation plan creation system or the operation management system performs schedule information on each train's plan, prediction diagram information based on the results of running prediction for each train, actual schedule information based on actual operation information, station It is generated using the route information such as the position and the track structure. In addition, since the display train line DB2 is a configuration necessary for the operation plan creation system or the operation management system, the display train line DB2 may be shared with the operation plan creation system or the operation management system.

図2は、実施の形態1にかかる表示列車スジDB2に記憶されている列車スジの例を示す図である。図2に示す列車スジは、表示列車スジDB2に記憶されている列車スジ全体の一部であり、時間帯として13:00から13:20までの間の範囲、区間としてA駅からC駅までの間の範囲を含む部分を示すものである。ここでは、急行列車として列車番号2001,2002,2003,2004の4つの列車についての列車スジが表示され、各駅に停車する各停列車として列車番号1001,1003,1004,1005,1006の5つについての列車スジが表示されている。   FIG. 2 is a diagram illustrating an example of train lines stored in the display train line DB 2 according to the first embodiment. The train line shown in FIG. 2 is a part of the entire train line stored in the displayed train line DB2, and ranges from 13:00 to 13:20 as a time zone, from A station to C station as a section. The part including the range between is shown. Here, train stripes for four trains with train numbers 2001, 2002, 2003, and 2004 are displayed as express trains, and five train numbers 1001, 1003, 1004, 1005, and 1006 are stopped at each station. Train streaks are displayed.

操作履歴DB3は、過去に指令員が操作した列車スジについての情報、具体的には、指令員が操作した列車スジに対応する列車番号の情報を記憶する操作履歴記憶部である。   The operation history DB 3 is an operation history storage unit that stores information on train lines that have been operated by the commander in the past, specifically, information on train numbers corresponding to train lines that have been operated by the commander.

選択部4は、指令員がマウスをクリックして表示ディスプレイの画面上で列車スジを選択し、クリックされた指定位置から複数の列車スジが指令員の所望する列車スジとして想定される場合に、各列車スジについて評価を行い、最も評価の高いものを指令員が所望している列車スジとして選択する。選択部4は、選択した列車スジの情報を、前述の運行計画作成システムまたは運行管理システムへ出力する。運行計画作成システムまたは運行管理システムは、接続する表示ディスプレイの画面に、選択された列車スジを他の列車スジとは異なるように強調表示などにより表示する。   When the commander clicks the mouse to select a train line on the screen of the display display, and the plurality of train lines are assumed as the train line desired by the commander, Each train line is evaluated, and the train line having the highest evaluation is selected as the train line desired by the commander. The selection unit 4 outputs information on the selected train line to the above-described operation plan creation system or operation management system. The operation plan creation system or the operation management system displays the selected train streak on the screen of the connected display display by highlighting so as to be different from other train streaks.

つづいて、列車スジ選択装置10において、複数の列車スジが指令員の所望する列車スジとして想定される場合に、各列車スジについて評価を行って列車スジを選択する処理について説明する。   Next, in the train line selection device 10, when a plurality of train lines are assumed as train lines desired by the instructor, a process for evaluating each train line and selecting a train line will be described.

図3は、実施の形態1にかかる列車スジ選択装置10の列車スジ選択処理を示すフローチャートである。まず、列車スジ選択装置10では、操作情報取得部1において、指令員によるマウスの操作情報、具体的には、表示ディスプレイの画面において指令員がマウスをクリックした指定位置であるクリック位置の情報を取得する(ステップS1)。図4は、実施の形態1にかかる列車スジ選択装置10において、指令員がマウスをクリックした位置を示す図である。各列車スジは図2と同様であり、列車スジがまだ選択されていない未選択の状態である。ここでは、指令員は、図4の「×」印で示す位置でクリックしたものとする。   FIG. 3 is a flowchart illustrating a train stripe selection process of the train stripe selection apparatus 10 according to the first embodiment. First, in the train line selection device 10, the operation information acquisition unit 1 obtains mouse operation information by the commander, specifically, information on the click position that is the designated position where the commander clicked the mouse on the display screen. Obtain (step S1). FIG. 4 is a diagram illustrating a position where the commander clicks the mouse in the train stripe selection device 10 according to the first exemplary embodiment. Each train streak is the same as that in FIG. 2, and the train streak is not yet selected. Here, it is assumed that the commander clicks at a position indicated by “x” in FIG.

選択部4は、操作情報取得部1から図4に示すクリック位置の情報が入力されると、クリック位置から指令員が所望する列車スジとして、クリック位置と列車スジとの距離が規定された閾値以内の列車スジについての評価を行う(ステップS2)。閾値については、列車スジの過密状態によって、指令員が選択部4に設定できるようにしてもよい。図5は、実施の形態1にかかる選択部4が行う各列車スジの評価処理を示すフローチャートである。   When the information on the click position shown in FIG. 4 is input from the operation information acquisition unit 1, the selection unit 4 is a threshold value that defines the distance between the click position and the train line as the train line desired by the commander from the click position. The train streak within is evaluated (step S2). The threshold may be set in the selection unit 4 by the train line overcrowded state. FIG. 5 is a flowchart illustrating the evaluation process of each train streak performed by the selection unit 4 according to the first embodiment.

選択部4は、操作履歴DB3を確認し、各列車について、指令員によって直前に操作された列車スジに対応する列車との相関関係を評価する(ステップS11)。ここでは、指令員によって直前に操作された列車スジが列車番号2002の場合を例にして説明する。列車番号2003の列車は、列車番号2002の列車に対して、A駅で折り返し運転される「折り返し」の関係にある。また、列車番号1004の列車は、列車番号2002の列車に対して、C駅で追い越される「追い越し」の関係にある。また、列車番号1003の列車は、列車番号2002の列車に対して、A駅において列車番号2002の到着前に発車する「発着支障」の関係にある。ここで、「折り返し」の評価値を「4」、「追い越し」の評価値を「2」、「発着支障」の評価値を「3」とする。この場合、列車番号2002の列車と各列車との相関関係は図6に示すようになる。   The selection unit 4 confirms the operation history DB 3 and evaluates the correlation between each train and the train corresponding to the train streak operated immediately before by the commander (step S11). Here, a case where the train line operated immediately before by the commander is the train number 2002 will be described as an example. The train with the train number 2003 has a “turnback” relationship in which the train with the train number 2002 is turned back at the station A. In addition, the train with the train number 1004 has a “passing” relationship overtaken at the station C with respect to the train with the train number 2002. In addition, the train with the train number 1003 has a relationship of “departure and arrival trouble” that departs before the arrival of the train number 2002 at the station A with respect to the train with the train number 2002. Here, the evaluation value of “turnback” is “4”, the evaluation value of “passing” is “2”, and the evaluation value of “departure / arrival trouble” is “3”. In this case, the correlation between the train with the train number 2002 and each train is as shown in FIG.

図6は、実施の形態1にかかる選択部4において直前に列車スジを操作した列車番号2002の列車と各列車との相関関係についての評価結果である評価値を示す図である。上記のように、列車番号2003の列車は、列車番号2002の列車とは「折り返し」の関係にあるので評価結果である評価値x1は「4」となる。また、列車番号1004の列車は、列車番号2002の列車とは「追い越し」の関係にあるので評価値x1は「2」となる。また、列車番号1003の列車は、列車番号2002の列車とは「発着支障」の関係にあるので評価値x1は「3」となる。なお、選択部4において、直前に列車スジを操作した列車のみを対象にして各列車との相関関係についての評価値を求める方法について説明したが、複数の列車を対象にしてもよい。選択部4は、直近に列車スジを操作した2以上の列車を対象にして各列車との相関関係についての評価値を求め、評価値が求められた同一の列車番号の列車毎に評価値を加算して相関関係を判断してもよい。この場合、選択部4では、例えば、直前に列車スジを操作した列車について求めた評価値はそのまま使用し、2つ前に列車スジを操作した列車について求めた評価値には「0.8」の係数を乗算し、3つ前に列車スジを操作した列車について求めた評価値には「0.6」の係数を乗算し、操作の古い列車程重み付けを小さくして評価値の重みを変えてもよい。   FIG. 6 is a diagram illustrating an evaluation value that is an evaluation result of the correlation between the train with the train number 2002 that has operated the train line immediately before in the selection unit 4 according to the first embodiment and each train. As described above, since the train with the train number 2003 has a “turnback” relationship with the train with the train number 2002, the evaluation value x1 as the evaluation result is “4”. Further, since the train with the train number 1004 is in a “passing” relationship with the train with the train number 2002, the evaluation value x1 is “2”. In addition, since the train with the train number 1003 is in a “departure / arrival trouble” relationship with the train with the train number 2002, the evaluation value x1 is “3”. In addition, although the selection part 4 demonstrated the method of calculating | requiring the evaluation value about the correlation with each train only for the train which operated the train line immediately before, you may make it object to a some train. The selection unit 4 obtains an evaluation value for the correlation with each train for two or more trains that have recently operated a train line, and obtains an evaluation value for each train of the same train number for which the evaluation value is obtained. The correlation may be determined by addition. In this case, in the selection unit 4, for example, the evaluation value obtained for the train that operated the train line just before is used as it is, and the evaluation value obtained for the train that operated the train line two times before is “0.8”. The evaluation value obtained for the train that operated the train line three times before is multiplied by a coefficient of “0.6”, and the weight of the evaluation value is changed by decreasing the weight of the old train that was operated. May be.

選択部4は、つぎに、操作情報取得部1から入力されたクリック位置の情報に基づいて、表示列車スジDB2を確認し、クリック位置と周辺の列車スジとの距離関係を評価する(ステップS12)。選択部4が評価する列車スジの対象については、例えば、クリック位置から規定された範囲内にある列車スジとする。選択部4は、クリック位置の情報および表示列車スジDB2に記憶されている情報を用いて、クリック位置から各列車番号の列車スジとの距離を求める。距離については、クリック位置から各列車番号の列車スジまでの相対的な距離が分かればよいので、ミリメートルなどの単位はなくてもよい。ここでは、クリック位置と列車番号2003の列車スジとの距離は「20」、クリック位置と列車番号2004の列車スジとの距離は「18」、クリック位置と列車番号1003の列車スジとの距離は「21」、クリック位置と列車番号1006の列車スジとの距離は「35」とする。この結果、クリック位置から、列車番号2004の列車スジ、列車番号2003の列車スジ、列車番号1003の列車スジ、列車番号1006の列車スジの順に近いことになる。ここで、クリック位置から一番近い順に「4」、「3」、「2」、「1」の評価値を与えることとする。この場合、クリック位置と各列車スジとの距離の関係は図7に示すようになる。   Next, the selection unit 4 confirms the displayed train streak DB 2 based on the information on the click position input from the operation information acquisition unit 1, and evaluates the distance relationship between the click position and the surrounding train streak (step S12). ). The train line target evaluated by the selection unit 4 is, for example, a train line within a range defined from the click position. The selection part 4 calculates | requires the distance with the train stripe of each train number from a click position using the information memorize | stored in the information of a click position and display train stripe DB2. About distance, since the relative distance from a click position to the train stripe of each train number should just be known, there may not be units, such as millimeter. Here, the distance between the click position and the train line with the train number 2003 is “20”, the distance between the click position and the train line with the train number 2004 is “18”, and the distance between the click position and the train line with the train number 1003 is “21”, and the distance between the click position and the train line with the train number 1006 is “35”. As a result, the train line of the train number 2004, the train line of the train number 2003, the train line of the train number 1003, and the train line of the train number 1006 are closer to the click position. Here, evaluation values “4”, “3”, “2”, and “1” are given in the order closest to the click position. In this case, the relationship between the click position and the distance between each train streak is as shown in FIG.

図7は、実施の形態1にかかる選択部4においてクリック位置と列車スジとの距離の関係についての評価結果である評価値を示す図である。上記のように、クリック位置と列車番号2003の列車スジとの距離は2番目に近いので評価結果である評価値x2は「3」となる。また、クリック位置と列車番号2004の列車スジとの距離は1番目に近いので評価値x2は「4」となる。また、クリック位置と列車番号1003の列車スジとの距離は3番目に近いので評価値x2は「2」となる。また、クリック位置と列車番号1006の列車スジとの距離は4番目に近いので評価値x2は「1」となる。なお、ステップS11およびステップS12の処理は独立しているため、順番を入れ替えてもよいし、並行して処理してもよい。   FIG. 7 is a diagram illustrating an evaluation value that is an evaluation result of the relationship between the click position and the distance between train lines in the selection unit 4 according to the first embodiment. As described above, since the distance between the click position and the train line having the train number 2003 is the second closest, the evaluation value x2 that is the evaluation result is “3”. Further, since the distance between the click position and the train line having the train number 2004 is the first, the evaluation value x2 is “4”. In addition, since the distance between the click position and the train line having the train number 1003 is the third closest, the evaluation value x2 is “2”. Further, since the distance between the click position and the train line having the train number 1006 is the fourth closest, the evaluation value x2 is “1”. In addition, since the process of step S11 and step S12 is independent, you may change order and may process in parallel.

選択部4は、各列車スジについて、ステップS11およびステップS12の各評価項目で評価された評価値を合算して評価値の合計値を求める(ステップS13)。ここで、評価値の合計値を求める式を下記の式(1)とする。   The selection unit 4 adds up the evaluation values evaluated in the evaluation items in step S11 and step S12 for each train line to obtain a total value of the evaluation values (step S13). Here, the equation for obtaining the total value of the evaluation values is defined as the following equation (1).

評価値の合計値=w1×x1+w2×x2 …(1)     Total value of evaluation values = w1 × x1 + w2 × x2 (1)

x1およびx2は前述のとおり、各評価項目での評価値である。w1は、直前に列車スジを操作した列車番号2002の列車との相関関係の評価項目の評価値x1についての重み付け係数である。また、w2は、クリック位置と列車スジとの距離関係の評価項目の評価値x2についての重み付け係数である。いずれかの評価項目の評価値を重視したい場合に、重視したい評価値に対する重み付け係数の値を、他の評価値に対する重み付け係数よりも大きい値にする。ここでは、w1およびw2をともに「1」とする。なお、選択部4では、w1およびw2を用いないで、x1およびx2の値を合算した値を評価値の合計値としてもよい。   As described above, x1 and x2 are evaluation values for each evaluation item. w1 is a weighting coefficient for the evaluation value x1 of the evaluation item of the correlation with the train with the train number 2002 that operated the train line immediately before. Further, w2 is a weighting coefficient for the evaluation value x2 of the evaluation item of the distance relationship between the click position and the train stripe. When the evaluation value of any evaluation item is to be emphasized, the value of the weighting coefficient for the evaluation value to be emphasized is set larger than the weighting coefficient for the other evaluation values. Here, both w1 and w2 are set to “1”. In addition, in the selection part 4, it is good also considering the value which added the value of x1 and x2 as a total value of an evaluation value, without using w1 and w2.

図8は、実施の形態1にかかる選択部4において各列車番号の列車スジについての評価値を合算した評価値の合計値を示す図である。前述の式(1)および各評価値より、列車番号2003の列車スジについての評価値の合計値は「1×4+1×3=7」となる。また、列車番号1004の列車スジについての評価値の合計値は「1×2+1×0=2」となる。また、列車番号1003の列車スジについての評価値の合計値は「1×3+1×2=5」となる。また、列車番号2004の列車スジについての評価値の合計値は「1×0+1×4=4」となる。また、列車番号1006の列車スジについての評価値の合計値は「1×0+1×1=1」となる。   FIG. 8 is a diagram illustrating the total value of the evaluation values obtained by adding the evaluation values for the train lines of each train number in the selection unit 4 according to the first embodiment. From the above-described equation (1) and each evaluation value, the total value of the evaluation values for the train line having the train number 2003 is “1 × 4 + 1 × 3 = 7”. Further, the total value of the evaluation values for the train line having the train number 1004 is “1 × 2 + 1 × 0 = 2”. The total value of the evaluation values for the train line with the train number 1003 is “1 × 3 + 1 × 2 = 5”. Further, the total value of the evaluation values for the train line having the train number 2004 is “1 × 0 + 1 × 4 = 4”. Further, the total value of the evaluation values for the train line having the train number 1006 is “1 × 0 + 1 × 1 = 1”.

図3のフローチャートに戻って、選択部4は、各列車スジについての評価結果、すなわち算出した評価値の合計値に基づいて、指令員が所望している列車スジを選択する(ステップS3)。ここで、図8の評価結果から、評価値の合計値が一番大きい列車スジは列車番号2003のものである。そのため、選択部4は、評価値の合計値が一番大きい列車番号2003の列車スジを、指令員が所望している列車スジとして選択する。選択部4は、選択した列車番号2003の列車スジの情報を、前述の運行計画作成システムまたは運行管理システムへ出力する。 Returning to the flowchart of FIG. 3, the selection unit 4 selects a train line desired by the commander based on the evaluation result for each train line, that is, the total value of the calculated evaluation values (step S <b> 3). Here, from the evaluation result of FIG. 8, the train line having the largest total evaluation value is that of the train number 2003. Therefore, the selection part 4 selects the train line of the train number 2003 with the largest total value of evaluation values as the train line desired by the commander. The selection part 4 outputs the information of the train line of the selected train number 2003 to the above-mentioned operation plan creation system or operation management system.

そして、運行計画作成システムまたは運行管理システムでは、列車スジ選択装置10で選択された列車番号2003の列車スジを強調表示する。図9は、実施の形態1にかかる列車スジ選択装置10を含む運行計画作成システムまたは運行管理システムで表示される列車スジの例を示す図である。図4に対して、列車スジが選択された状態を示すものである。列車スジ選択装置10は、指令員によって図4に示す位置がクリックされた場合、指令員によって直前に操作された列車スジが列車番号2002のものであることを考慮して、指令員が所望している列車スジとして列車番号2003の列車スジを選択する。図9では、他の列車スジと異なり、列車番号2003の列車スジが強調表示されている。   In the operation plan creation system or the operation management system, the train line of the train number 2003 selected by the train line selection device 10 is highlighted. FIG. 9 is a diagram illustrating an example of a train line displayed on an operation plan creation system or an operation management system including the train line selection device 10 according to the first embodiment. FIG. 4 shows a state where a train line is selected. When the position shown in FIG. 4 is clicked by the commander, the train stripe selection device 10 takes into account that the train line operated immediately before by the commander is that of the train number 2002, and the commander wants The train line with the train number 2003 is selected as the train line that is being used. In FIG. 9, unlike other train lines, the train line of the train number 2003 is highlighted.

列車スジ選択装置10において、直前に操作した列車スジが列車番号2002のものであった場合、つぎに選択および操作される列車スジは列車番号2002と相関のある列車番号のものである確率が高いと予想される。そのため、列車スジ選択装置10は、列車スジを選択する際、指令員の操作によるクリック位置の情報の他に、直前に操作した列車スジに対応する列車番号の情報を利用する。これにより、列車スジ選択装置10は、直前に操作した列車スジに対応する列車番号の情報を利用することで、列車スジが表示された表示ディスプレイにおいて指令員がクリックした1回のクリック位置の情報から、指令員が所望している列車スジを選択する確率を従来よりも向上することができる。   In the train line selection device 10, when the train line operated immediately before is the train number 2002, the train line to be selected and operated next has a high probability that the train line has a correlation with the train number 2002. It is expected to be. Therefore, when selecting a train stripe, the train stripe selection device 10 uses information on the train number corresponding to the train stripe operated immediately before, in addition to the information on the click position by the operation of the commander. Thereby, the train line selection device 10 uses the information on the train number corresponding to the train line operated immediately before, so that the information on one click position clicked by the commander on the display display on which the train line is displayed. Therefore, the probability of selecting the train line desired by the commander can be improved as compared with the conventional case.

つづいて、列車スジ選択装置10のハードウェア構成について説明する。列車スジ選択装置10において、表示列車スジDB2および操作履歴DB3はメモリにより実現される。操作情報取得部1は、マウスなどのポインティングデバイスからの操作情報を取得するインターフェース回路により実現される。選択部4は、処理回路により実現される。すなわち、列車スジ選択装置10は、複数の列車スジを評価し、評価結果から1つの列車スジを選択するための処理回路を備える。処理回路は、専用のハードウェアであってもよいし、メモリに格納されるプログラムを実行するCPU(Central Processing Unit)およびメモリであってもよい。   It continues and the hardware constitutions of the train stripe selection apparatus 10 are demonstrated. In the train line selection device 10, the display train line DB 2 and the operation history DB 3 are realized by a memory. The operation information acquisition unit 1 is realized by an interface circuit that acquires operation information from a pointing device such as a mouse. The selection unit 4 is realized by a processing circuit. That is, the train line selection device 10 includes a processing circuit for evaluating a plurality of train lines and selecting one train line from the evaluation result. The processing circuit may be dedicated hardware, or a CPU (Central Processing Unit) that executes a program stored in the memory and a memory.

図10は、実施の形態1にかかる選択部4を専用のハードウェアで構成する場合の例を示す図である。処理回路が専用のハードウェアである場合、図10に示す処理回路91は、例えば、単一回路、複合回路、プログラム化したプロセッサ、並列プログラム化したプロセッサ、ASIC(Application Specific Integrated Circuit)、FPGA(Field Programmable Gate Array)、またはこれらを組み合わせたものが該当する。選択部4の各機能を機能別に処理回路91で実現してもよいし、各機能をまとめて処理回路91で実現してもよい。   FIG. 10 is a diagram illustrating an example in which the selection unit 4 according to the first embodiment is configured with dedicated hardware. When the processing circuit is dedicated hardware, the processing circuit 91 illustrated in FIG. 10 includes, for example, a single circuit, a composite circuit, a programmed processor, a parallel programmed processor, an ASIC (Application Specific Integrated Circuit), and an FPGA (FPGA). Field Programmable Gate Array) or a combination of these. Each function of the selection unit 4 may be realized by the processing circuit 91 for each function, or each function may be realized by the processing circuit 91 collectively.

図11は、実施の形態1にかかる選択部4をCPUおよびメモリで構成する場合の例を示す図である。処理回路がCPU92およびメモリ93で構成される場合、選択部4の機能は、ソフトウェア、ファームウェア、またはソフトウェアとファームウェアとの組み合わせにより実現される。ソフトウェアまたはファームウェアはプログラムとして記述され、メモリ93に格納される。処理回路では、メモリ93に記憶されたプログラムをCPU92が読み出して実行することにより、各機能を実現する。すなわち、列車スジ選択装置10は、選択部4が処理回路により実行されるときに、複数の列車スジを評価するステップ、評価結果から1つの列車スジを選択するステップが結果的に実行されることになるプログラムを格納するためのメモリ93を備える。また、これらのプログラムは、選択部4の手順および方法をコンピュータに実行させるものであるともいえる。ここで、CPU92は、処理装置、演算装置、マイクロプロセッサ、マイクロコンピュータ、プロセッサ、またはDSP(Digital Signal Processor)などであってもよい。また、メモリ93とは、例えば、RAM(Random Access Memory)、ROM(Read Only Memory)、フラッシュメモリ、EPROM(Erasable Programmable ROM)、EEPROM(Electrically EPROM)などの、不揮発性または揮発性の半導体メモリ、磁気ディスク、フレキシブルディスク、光ディスク、コンパクトディスク、ミニディスク、またはDVD(Digital Versatile Disc)などが該当する。   FIG. 11 is a diagram illustrating an example in which the selection unit 4 according to the first embodiment is configured by a CPU and a memory. When the processing circuit includes the CPU 92 and the memory 93, the function of the selection unit 4 is realized by software, firmware, or a combination of software and firmware. Software or firmware is described as a program and stored in the memory 93. In the processing circuit, each function is realized by the CPU 92 reading and executing the program stored in the memory 93. That is, when the selection unit 4 is executed by the processing circuit, the train line selection device 10 results in the step of evaluating a plurality of train lines and the step of selecting one train line from the evaluation result as a result. A memory 93 is provided for storing the program to be. It can also be said that these programs cause the computer to execute the procedure and method of the selection unit 4. Here, the CPU 92 may be a processing device, an arithmetic device, a microprocessor, a microcomputer, a processor, a DSP (Digital Signal Processor), or the like. The memory 93 is, for example, a nonvolatile or volatile semiconductor memory such as a RAM (Random Access Memory), a ROM (Read Only Memory), a flash memory, an EPROM (Erasable Programmable ROM), an EEPROM (Electrically EPROM), A magnetic disk, a flexible disk, an optical disk, a compact disk, a mini disk, a DVD (Digital Versatile Disc), or the like is applicable.

なお、選択部4の各機能について、一部を専用のハードウェアで実現し、一部をソフトウェアまたはファームウェアで実現するようにしてもよい。例えば、複数の列車スジを評価する機能については専用のハードウェアとしての処理回路91でその機能を実現し、評価結果から1つの列車スジを選択する機能についてはCPU92がメモリ93に格納されたプログラムを読み出して実行することによってその機能を実現することが可能である。   In addition, about each function of the selection part 4, a part is implement | achieved by exclusive hardware and a part may be implement | achieved by software or firmware. For example, the function for evaluating a plurality of train lines is realized by the processing circuit 91 as dedicated hardware, and the function for selecting one train line from the evaluation result is a program stored in the memory 93 by the CPU 92. The function can be realized by reading out and executing.

このように、処理回路は、専用のハードウェア、ソフトウェア、ファームウェア、またはこれらの組み合わせによって、上述の各機能を実現することができる。   As described above, the processing circuit can realize the above-described functions by dedicated hardware, software, firmware, or a combination thereof.

以上説明したように、本実施の形態によれば、列車スジ選択装置10では、複数の列車スジが表示されている画面上において指令員によって指定されたクリック位置と複数の列車スジとの距離関係を評価し、さらに、指令員によって直前に操作された列車スジと複数の列車スジとの相関関係を評価し、各評価項目の評価値を合算した合計値の大きいものを、指令員が所望する列車スジとして選択することとした。これにより、列車スジ選択装置10は、指令員によりポインティングデバイスが1回操作された場合において、指令員が所望している列車スジを選択する確率を従来よりも向上することができる。   As described above, according to the present embodiment, in the train line selection device 10, the distance relationship between the click position designated by the commander and the plurality of train lines on the screen on which the plurality of train lines are displayed. In addition, the correlation between the train stripes operated immediately before by the commander and a plurality of train stripes is evaluated, and the commander desires a larger total sum of the evaluation values of each evaluation item. It was decided to select it as a train streak. Thereby, when the pointing device is operated once by the commander, the train line selection device 10 can improve the probability that the commander selects the train line desired by the commander.

実施の形態2.
実施の形態1では、列車スジ選択装置10の選択部4は、2つの評価項目の評価結果に基づいて指令員が所望する列車スジを選択した。実施の形態2では、列車スジ選択装置10の選択部4が、さらに他の評価項目を用いて指令員が所望する列車スジを選択する処理について説明する。
Embodiment 2. FIG.
In Embodiment 1, the selection part 4 of the train stripe selection apparatus 10 selected the train stripe which a commander desires based on the evaluation result of two evaluation items. In the second embodiment, a process in which the selection unit 4 of the train line selection device 10 selects a train line desired by the instructor using other evaluation items will be described.

実施の形態2にかかる列車スジ選択装置10の構成は、図1に示す実施の形態1の構成と同様である。実施の形態1では、選択部4は、直前に操作された列車スジに対応する列車との相関関係、および指令員によってクリックされたクリック位置と列車スジとの距離関係の2つの評価項目を用いて各列車スジを評価し、評価結果から列車スジを選択していた。しかしながら、列車スジを評価する評価項目については、これらに限定されるものではなく、つぎのような項目も対象にすることが可能である。   The configuration of the train stripe selection device 10 according to the second embodiment is the same as the configuration of the first embodiment shown in FIG. In the first embodiment, the selection unit 4 uses two evaluation items of the correlation with the train corresponding to the train line that has been operated immediately before, and the distance relationship between the click position clicked by the commander and the train line. Each train streak was evaluated and a train streak was selected from the evaluation result. However, the evaluation items for evaluating train lines are not limited to these, and the following items can also be targeted.

制約違反についての評価項目。指令員が列車スジを選択する際、その時点で制約違反の多い列車番号の列車スジを選択する可能性が高いと考えられる。制約違反とは、例えば、他の列車などとの関係で、先行列車と接近しすぎてダイヤ通り走れない、他の列車を追い越しするのに十分な時間が無い、などである。そのため、選択部4は、制約違反の多い列車ほど評価値を大きくする、または、制約違反の内容が重大なほど評価値を大きくする、などの評価を行う。制約違反の情報については、選択部4が、運行計画作成システムまたは運行管理システムから直接取得してもよいし、表示列車スジDB2経由で取得してもよい。   Evaluation item for constraint violation. When a commander selects a train line, it is highly likely that a train line having a train number with many violations of constraints will be selected at that time. The violation of the constraint is, for example, that the vehicle is too close to the preceding train due to a relationship with another train or the like, and that there is not enough time to pass another train. Therefore, the selection unit 4 performs an evaluation such as increasing the evaluation value as the train has more constraint violations, or increasing the evaluation value as the content of the constraint violation becomes more serious. About the information on constraint violation, the selection part 4 may acquire directly from an operation plan creation system or an operation management system, and may acquire via display train line DB2.

列車の乗車率についての評価項目。列車スジ選択装置10を備える運行管理システムでは、列車の遅延が発生したときの運転整理などにおいて、各列車の実際の乗車率を用いて、乗車率の低い列車ほど優先的に列車スジを選択して修正することが予想される。そのため、選択部4は、乗車率の低い列車の列車スジの評価値を大きくする。なお、列車スジ選択装置10を備える運行計画作成システムでは、各列車スジに対応する列車の推定乗車率を演算により求める。選択部4は、推定乗車率の低い列車の列車スジの評価値を大きくする。推定乗車率または乗車率の情報については、選択部4が、運行計画作成システムまたは運行管理システムから直接取得してもよいし、表示列車スジDB2経由で取得してもよい。   Evaluation items for train occupancy rate. In the operation management system provided with the train line selection device 10, in the operation arrangement when a train delay occurs, the train line having a lower boarding rate is preferentially selected using the actual boarding rate of each train. Is expected to be corrected. Therefore, the selection part 4 enlarges the evaluation value of the train stripe of a train with a low boarding rate. In addition, in an operation plan creation system provided with the train stripe selection apparatus 10, the estimated boarding rate of the train corresponding to each train stripe is calculated | required. The selection part 4 enlarges the evaluation value of the train stripe of a train with a low estimated boarding rate. About the estimated boarding rate or the information on the boarding rate, the selection unit 4 may acquire directly from the operation plan creation system or the operation management system, or may acquire it via the display train line DB2.

列車ダイヤの乱れについての評価項目。指令員が列車スジを選択する際、現時点で遅れが大きい列車、または今後の走行予測をした時に遅れが大きくなると予想される列車の列車番号の列車スジを選択する可能性が高いと考えられる。そのため、選択部4は、列車ダイヤの乱れ、すなわち遅れの大きい列車ほど評価値を大きくする。列車ダイヤの乱れの情報については、選択部4が、運行計画作成システムまたは運行管理システムから直接取得してもよいし、表示列車スジDB2経由で取得してもよい。   Evaluation items for disturbance of train schedules. When the commander selects a train line, it is highly likely that a train having a large delay at the present time or a train line having a train number of a train that is expected to have a large delay when a future travel is predicted. For this reason, the selection unit 4 increases the evaluation value as the train schedule is disturbed, that is, the train has a longer delay. About the information of disturbance of a train schedule, the selection part 4 may acquire directly from an operation plan creation system or an operation management system, and may acquire via display train line DB2.

列車種別についての評価項目。一般的に、列車種別には、特急列車、急行列車、各駅に停車する各停列車などがある。前述のように列車ダイヤの乱れなどにより遅延が発生した場合、指令員は特急列車などの優等列車ほど早急に遅延を解消する対応をとることが想定されるため、優等列車の列車スジが優先的に選択されることが予想される。そのため、選択部4は、優等列車ほど評価値を大きくする。なお、どの列車種別の評価値を大きくするのかについては鉄道会社によって異なることも考えられるため、指令員が選択部4に対して列車種別毎に評価値を設定できるようにしてもよい。各列車の列車種別については、ダイヤ作成時に列車番号と列車種別の関係が決定されるため、表示列車スジDB2に記憶させておいてもよい。   Evaluation items for train types. In general, train types include limited express trains, express trains, and each stop train that stops at each station. As described above, if a delay occurs due to disturbance of the train schedule, etc., it is assumed that the commander will take measures to eliminate the delay as soon as an excellent train such as an express train. Is expected to be selected. For this reason, the selection unit 4 increases the evaluation value for the honor train. In addition, since it may be considered that the evaluation value of which train type is increased depending on the railway company, the commander may be able to set an evaluation value for each train type with respect to the selection unit 4. About the train type of each train, since the relationship between the train number and the train type is determined at the time of creating a diagram, it may be stored in the display train line DB2.

ここで、制約違反についての評価値をx3、x3に対する重み付け係数をw3とし、列車の乗車率についての評価値をx4、x4に対する重み付け係数をw4とし、列車ダイヤの乱れについての評価値をx5、x5に対する重み付け係数をw5とし、列車種別についての評価値をx6、x6に対する重み付け係数をw6とする。選択部4は、実施の形態1の2つの評価項目と合わせて、評価値の合計値を式(2)より求めることができる。   Here, the evaluation value for the constraint violation is x3, the weighting coefficient for x3 is w3, the evaluation value for the train boarding rate is x4, the weighting coefficient for x4 is w4, and the evaluation value for disturbance of the train diagram is x5, The weighting coefficient for x5 is w5, the evaluation value for the train type is x6, and the weighting coefficient for x6 is w6. The selection unit 4 can obtain the total value of the evaluation values from the equation (2) together with the two evaluation items of the first embodiment.

評価値合計値=w1×x1+w2×x2+w3×x3+w4×x4+w5×x5+w6×x6 …(2)     Evaluation value total value = w1 × x1 + w2 × x2 + w3 × x3 + w4 × x4 + w5 × x5 + w6 × x6 (2)

選択部4は、評価値x3,x4,x5,x6について、図6および図7と同様の表を作成し、各評価値に重み付け係数を乗算した値を合算した評価値の合計値から、評価値の合計値が一番大きい列車番号の列車スジを、指令員が所望している列車スジとして選択する。なお、選択部4では、w1からw6を用いないで、x1からx6の値を合算した値を評価値の合計値としてもよい。実施の形態2における列車スジ選択装置10の動作は、実施の形態1の図3に示すフローチャートと同様である。図12は、実施の形態2にかかる選択部4が行う各列車スジの評価処理を示すフローチャートである。ステップS11およびステップS12の処理は実施の形態1と同様である。選択部4は、表示列車スジDB2を確認し、各列車の制約違反について評価する(ステップS21)。また、選択部4は、運行管理システムで管理されている各列車の乗車率の情報を用いて、各列車の乗車率について評価する(ステップS22)。また、選択部4は、各列車の列車ダイヤの乱れを評価する(ステップS23)。また、選択部4は、各列車の列車種別を評価する(ステップS24)。そして、選択部4は、実施の形態1と同様、各列車スジについて、各評価項目で評価された評価値を合算して評価値の合計値を求める(ステップS13)。実施の形態2では、選択部4は、式(2)を用いて評価値の合計値を求める。   For the evaluation values x3, x4, x5, and x6, the selection unit 4 creates a table similar to that in FIGS. 6 and 7 and evaluates the evaluation value from the total value of the evaluation values obtained by adding the values obtained by multiplying the evaluation values by the weighting coefficients. The train line of the train number having the largest total value is selected as the train line desired by the commander. In addition, in the selection part 4, it is good also considering the value which added the value of x1 to x6 as a total value of an evaluation value, without using w1 to w6. The operation of the train stripe selection device 10 in the second embodiment is the same as the flowchart shown in FIG. 3 of the first embodiment. FIG. 12 is a flowchart illustrating the evaluation process of each train streak performed by the selection unit 4 according to the second embodiment. Steps S11 and S12 are the same as those in the first embodiment. The selection unit 4 confirms the displayed train line DB2 and evaluates the constraint violation of each train (step S21). Moreover, the selection part 4 evaluates about the boarding rate of each train using the information of the boarding rate of each train managed by the operation management system (step S22). Moreover, the selection part 4 evaluates the disturbance of the train schedule of each train (step S23). Moreover, the selection part 4 evaluates the train classification of each train (step S24). And the selection part 4 calculates | requires the total value of an evaluation value by adding the evaluation value evaluated by each evaluation item about each train streak similarly to Embodiment 1 (step S13). In the second embodiment, the selection unit 4 obtains the total value of the evaluation values using Expression (2).

なお、選択部4は、前述の6つの評価項目全てを用いる必要はなく、いくつかの項目のみを用いて各列車スジを評価してもよい。この場合、使用しない評価項目に対応する評価値の重み係数を「0」にしてもよい。   In addition, the selection part 4 does not need to use all the above-mentioned six evaluation items, and may evaluate each train streak using only some items. In this case, the weight coefficient of the evaluation value corresponding to the evaluation item that is not used may be set to “0”.

以上説明したように、本実施の形態によれば、列車スジ選択装置10では、複数の評価項目を用いて、各評価項目の評価値を合算した評価値の合計値の大きいものを、指令員が所望する列車スジとして選択することとした。これにより、列車スジ選択装置10は、いくつかの評価項目を選択して用いることで、実施の形態1と比較して、より指令員が所望する列車スジを選択する確率を向上することができる。   As described above, according to the present embodiment, the train streak selection device 10 uses a plurality of evaluation items, and assigns a command having a large total value of the evaluation values obtained by summing up the evaluation values of the respective evaluation items. Was selected as the desired train line. Thereby, the train stripe selection device 10 can improve the probability of selecting the train stripe desired by the instructor by selecting and using several evaluation items as compared with the first embodiment. .

実施の形態3.
実施の形態1および2において、列車スジ選択装置10は、従来よりも指令員が所望する列車スジを選択する確率を向上することができるが、一方で、指令員が所望する列車スジを選択できない場合も予想される。
Embodiment 3 FIG.
In Embodiments 1 and 2, the train streak selection device 10 can improve the probability of selecting a train streak desired by the commander, but cannot select the train streak desired by the commander. Cases are also expected.

指令員が所望する列車スジを選択できなかった場合、列車スジ選択装置10の選択部4では、指令員がポインティングデバイスとしてマウスを使用しているとき、クリックした位置すなわち指定位置を変更せずに、指令員がマウスのホイールを回転させる、またはホイール部分をクリック、または右クリックなどの操作をすると、次に評価値の合計値の大きい列車番号の列車スジを選択してもよい。列車スジ選択装置10の選択部4では、さらに、クリックした位置すなわち指定位置を変更せずに、指令員がマウスのホイールを回転させる、またはホイール部分をクリック、または右クリックなどの操作をした場合、順次、評価値の合計値の大きい順に列車スジを切り替えて選択してもよい。   If the commander cannot select the desired train stripe, the selection unit 4 of the train stripe selection device 10 does not change the clicked position, that is, the designated position when the commander uses the mouse as the pointing device. When the commander rotates the wheel of the mouse, or performs an operation such as clicking or right-clicking the wheel portion, the train line having the next highest train number may be selected. Further, in the selection unit 4 of the train stripe selection device 10, the commander rotates the wheel of the mouse, or clicks the wheel part or performs an operation such as right-clicking without changing the clicked position, that is, the designated position. Alternatively, the train stripes may be switched and selected in descending order of the total evaluation value.

また、指令員が所望する列車スジを選択できなかった場合、列車スジ選択装置10の選択部4では、指令員がポインティングデバイスとしてマウスを使用しているとき、クリックした位置すなわち指定位置を変更せずに、指令員がマウスのホイールを回転させる、またはホイール部分をクリック、または右クリックなどの操作をすると、各評価項目の評価値に対する重み付け係数を変更して、評価値の合計値を再計算してもよい。   In addition, when the commander cannot select a desired train line, the selection unit 4 of the train line selection device 10 can change the clicked position, that is, the designated position when the commander uses the mouse as a pointing device. If the commander rotates the mouse wheel or clicks or right-clicks the wheel, the weighting coefficient for the evaluation value of each evaluation item is changed and the total value of the evaluation values is recalculated. May be.

これにより、列車スジ選択装置10の選択部4では、いつまでも指令員が所望する列車スジを選択できない事態を回避することができる。   Thereby, in the selection part 4 of the train stripe selection apparatus 10, the situation which cannot select the train stripe which a commander desires forever can be avoided.

実施の形態4.
実施の形態1から3の列車スジ選択装置10は、前述のように、実際には運行計画作成システムまたは運行管理システムに組み込まれて使用される。ここでは、運行計画作成システムおよび運行管理システムの具体的な構成の一例について説明する。
Embodiment 4 FIG.
As described above, the train line selection device 10 according to the first to third embodiments is actually used by being incorporated in an operation plan creation system or an operation management system. Here, an example of a specific configuration of the operation plan creation system and the operation management system will be described.

図13は、実施の形態4にかかる運行計画作成システム20の構成例を示すブロック図である。運行計画作成システム20は、列車スジ選択装置10と、操作情報取得部21と、操作処理部22と、生成ダイヤデータベース(以下、生成ダイヤDBとする)23と、路線データベース(以下、路線DBとする)24と、列車スジ生成部25と、表示列車スジデータベース(以下、表示路線スジDBとする)26と、表示処理部27と、を備える。運行計画作成システム20は、ポインティングデバイス30、キーボード40、および表示ディスプレイ50と接続している。   FIG. 13 is a block diagram of a configuration example of the operation plan creation system 20 according to the fourth embodiment. The operation plan creation system 20 includes a train line selection device 10, an operation information acquisition unit 21, an operation processing unit 22, a generation diagram database (hereinafter referred to as generation diagram DB) 23, a route database (hereinafter referred to as route DB). 24), a train line generation unit 25, a display train line database (hereinafter referred to as a display route line DB) 26, and a display processing unit 27. The operation plan creation system 20 is connected to a pointing device 30, a keyboard 40, and a display display 50.

列車スジ選択装置10は、実施の形態1から3に記載の列車スジ選択装置10と同様である。ただし、前述のように、列車スジ選択装置10の操作情報取得部1および表示列車スジDB2は運行計画作成システム20と共用してもよいため、運行計画作成システム20側に操作情報取得部21および表示列車スジDB26がある場合、列車スジ選択装置10側の操作情報取得部1および表示列車スジDB2を省略してもよい。   The train stripe selection device 10 is the same as the train stripe selection device 10 described in the first to third embodiments. However, as described above, since the operation information acquisition unit 1 and the display train line DB 2 of the train line selection device 10 may be shared with the operation plan creation system 20, the operation information acquisition unit 21 and When there is the display train line DB 26, the operation information acquisition unit 1 and the display train line DB 2 on the train line selection device 10 side may be omitted.

操作情報取得部21は、表示ディスプレイ50において、指令員がマウスなどのポインティングデバイス30およびキーボード40を操作して入力した情報を取得し、列車スジ選択装置10および操作処理部22へ出力する。ポインティングデバイス30については、マウス以外のものを用いてもよい。操作情報取得部21は、表示ディスプレイ50がタッチパネルの場合、指令員がタッチ操作により入力した情報を取得し、列車スジ選択装置10および操作処理部22へ出力する。以降の説明では、ポインティングデバイス30としてマウスを使用する場合を例にして説明する。   The operation information acquisition unit 21 acquires information input by the commander operating the pointing device 30 such as a mouse and the keyboard 40 on the display 50 and outputs the information to the train stripe selection device 10 and the operation processing unit 22. As the pointing device 30, a device other than a mouse may be used. When the display 50 is a touch panel, the operation information acquisition unit 21 acquires information input by the commander through a touch operation, and outputs the information to the train stripe selection device 10 and the operation processing unit 22. In the following description, a case where a mouse is used as the pointing device 30 will be described as an example.

操作処理部22は、列車スジ選択装置10で選択された列車スジに対して、指令員の操作を受け付けて列車ダイヤの変更などの変更処理、GUI(Graphical User Interface)処理などを行う。   The operation processing unit 22 receives a commander's operation on the train line selected by the train line selection device 10 and performs a change process such as a change of a train diagram, a GUI (Graphical User Interface) process, and the like.

生成ダイヤDB23は、操作処理部22において指令員の操作により生成または変更された列車スジについての列車ダイヤの情報を記憶する記憶部である。生成ダイヤDB23は、指令員が複数の列車スジについての列車ダイヤを生成または変更する場合、編集過程の状態の列車ダイヤについても記憶する。   The generation diagram DB 23 is a storage unit that stores train diagram information about train lines generated or changed by the operation of the commander in the operation processing unit 22. The generation diagram DB 23 also stores the train diagrams in the editing process when the commander generates or changes train diagrams for a plurality of train lines.

路線DB24は、列車が走行する路線の駅の位置情報、追い越し有無または信号配置の線路構造などの情報を記憶する記憶部である。   The route DB 24 is a storage unit that stores information such as position information of a station on a route on which the train travels, overtaking presence / absence, or a signal arrangement line structure.

列車スジ生成部25は、生成ダイヤDB23に記憶されている列車ダイヤの情報、および路線DB24に記憶されている駅および線路構造などの情報を用いて、列車スジの情報を演算により求める。列車スジ生成部25が演算により求める列車スジの情報とは、例えば、図2に示すような列車スジである。列車スジ生成部25は、また、図2に示すような列車スジを生成した場合、各列車についての支障判定、および走行予測などを行う。   The train line generation unit 25 obtains the information of the train line by calculation using the information of the train diagram stored in the generation diagram DB 23 and the information such as the station and the track structure stored in the route DB 24. The train stripe information obtained by the train stripe generation unit 25 by calculation is, for example, a train stripe as shown in FIG. When the train streak generating unit 25 generates a train streak as shown in FIG. 2, the train streak generating unit 25 performs trouble determination and travel prediction for each train.

表示列車スジDB26は、列車スジ生成部25で生成された列車スジの情報を記憶する表示列車スジ記憶部である。また、表示列車スジDB26は、列車スジ生成部25での支障判定および走行予測などの結果を格納する。   The display train line DB 26 is a display train line storage unit that stores information on the train lines generated by the train line generation unit 25. The display train line DB 26 stores results such as trouble determination and travel prediction in the train line generation unit 25.

表示処理部27は、表示列車スジDB26に記憶されている列車スジを、表示ディスプレイ50の画面に、図2のように表示するための表示処理を行う。また、表示処理部27は、列車スジ選択装置10において選択された列車スジを強調表示する表示処理を行う。   The display processing unit 27 performs display processing for displaying the train lines stored in the display train line DB 26 on the screen of the display display 50 as shown in FIG. In addition, the display processing unit 27 performs display processing for highlighting the train stripe selected in the train stripe selection device 10.

運行計画作成システム20では、指令員が運行計画を作成する際に作成または編集対象の列車スジを選択するときに、列車スジ選択装置10が使用される。   In the operation plan creation system 20, the train line selection device 10 is used when the trainer selects a train line to be created or edited when creating an operation plan.

図14は、実施の形態4にかかる運行管理システム60の構成例を示すブロック図である。運行管理システム60は、列車スジ選択装置10と、操作情報取得部21と、操作処理部22と、変更ダイヤデータベース(以下、変更ダイヤDBとする)61と、変更内容出力部62と、運行情報受信部63と、実績ダイヤデータベース(以下、実績ダイヤDBとする)64と、実施ダイヤデータベース(以下、実施ダイヤDBとする)65と、路線DB24と、列車スジ生成部66と、表示列車スジDB26と、表示処理部27と、を備える。運行管理システム60は、ポインティングデバイス30、キーボード40、および表示ディスプレイ50と接続している。   FIG. 14 is a block diagram of a configuration example of the operation management system 60 according to the fourth embodiment. The operation management system 60 includes a train line selection device 10, an operation information acquisition unit 21, an operation processing unit 22, a change diagram database (hereinafter referred to as a change diagram DB) 61, a change content output unit 62, and operation information. Receiving unit 63, track record database (hereinafter referred to as track diagram DB) 64, implementation diagram database (hereinafter referred to as track diagram DB) 65, route DB 24, train line generation unit 66, and display train line DB 26 And a display processing unit 27. The operation management system 60 is connected to the pointing device 30, the keyboard 40, and the display display 50.

変更ダイヤDB61は、操作処理部22において指令員の操作により変更された列車スジについての変更ダイヤの情報を記憶する記憶部である。   The change diagram DB 61 is a storage unit that stores information of a change diagram for a train line that has been changed by the operation of the commander in the operation processing unit 22.

変更内容出力部62は、変更ダイヤDB61に記憶されている変更後の列車ダイヤなどの変更内容の情報を関係部署へ通知する。   The change content output unit 62 notifies the related department of information on the change content such as the train schedule after the change stored in the change diagram DB 61.

運行情報受信部63は、各列車から実際の運行情報を受信する。実際の運行情報は、列車が遅延した状態で運転されている場合は、計画上の実施ダイヤとは異なる内容となる。   The operation information receiving unit 63 receives actual operation information from each train. The actual operation information is different from the planned schedule when the train is operated in a delayed state.

実績ダイヤDB64は、運行情報受信部63で受信された各列車の実際の運行情報に基づく実績ダイヤの情報を記憶する記憶部である。   The record diagram DB 64 is a storage unit that stores record diagram information based on the actual operation information of each train received by the operation information receiving unit 63.

実施ダイヤDB65は、事前に生成された各列車の計画上の実施ダイヤの情報を記憶する記憶部である。   The implementation diagram DB 65 is a storage unit that stores information on implementation schedules for each train generated in advance.

列車スジ生成部66は、変更ダイヤDB61に記憶されている変更ダイヤの情報、実績ダイヤDB64に記憶されている各列車の実際の運行情報に基づく実績ダイヤの情報、実施ダイヤDB65に記憶されている各列車の計画上の実施ダイヤの情報、および路線DB24に記憶されている駅および線路構造の情報を用いて、列車スジの情報を演算により求める。また、列車スジ生成部66は、図2に示すような列車スジを生成した場合、各列車についての支障判定、および走行予測などを行う。   The train line generation unit 66 is stored in the change diagram DB 61, the information of the changed schedule stored in the change diagram DB 61, the information of the actual schedule based on the actual operation information of each train stored in the result diamond DB 64, and the execution diagram DB 65. Train streak information is obtained by calculation using the schedule information on the schedule of each train and the station and track structure information stored in the route DB 24. Moreover, when the train streak generation part 66 produces | generates a train streak as shown in FIG. 2, it performs trouble determination about each train, traveling prediction, etc.

表示列車スジDB26は、列車スジ生成部66で生成された列車スジの情報を記憶する表示列車スジ記憶部である。また、表示列車スジDB26は、列車スジ生成部66での支障判定および走行予測などの結果を格納する。   The display train line DB 26 is a display train line storage unit that stores information on the train lines generated by the train line generation unit 66. The display train line DB 26 stores results such as trouble determination and travel prediction in the train line generation unit 66.

運行管理システム60では、指令員が各列車のダイヤを変更などする際に対象の列車スジを選択するときに、列車スジ選択装置10が使用される。   In the operation management system 60, the train line selection device 10 is used when the trainer selects a target train line when changing the schedule of each train.

このように、列車スジ選択装置10は、具体的に、運行計画作成システム20、または運行管理システム60において、指令員が対象の列車スジを選択する際に使用される装置である。これにより、列車スジ選択装置10を備えた運行計画作成システム20および運行管理システム60では、列車スジが表示された表示ディスプレイ50において指令員がクリックした1回のクリック位置の情報から、指令員が所望している列車スジを選択する確率を従来よりも向上することができる。   As described above, the train line selection device 10 is specifically a device used when the commander selects a target train line in the operation plan creation system 20 or the operation management system 60. As a result, in the operation plan creation system 20 and the operation management system 60 provided with the train line selection device 10, the instruction person is determined from the information of the single click position where the instruction person clicks on the display 50 on which the train line is displayed. The probability of selecting a desired train line can be improved as compared with the conventional case.

以上の実施の形態に示した構成は、本発明の内容の一例を示すものであり、別の公知の技術と組み合わせることも可能であるし、本発明の要旨を逸脱しない範囲で、構成の一部を省略、変更することも可能である。   The configuration described in the above embodiment shows an example of the contents of the present invention, and can be combined with another known technique, and can be combined with other configurations without departing from the gist of the present invention. It is also possible to omit or change the part.

1,21 操作情報取得部、2,26 表示列車スジDB、3 操作履歴DB、4 選択部、10 列車スジ選択装置、20 運行計画作成システム、22 操作処理部、23 生成ダイヤDB、24 路線DB、25,66 列車スジ生成部、27 表示処理部、30 ポインティングデバイス、40 キーボード、50 表示ディスプレイ、60 運行管理システム、61 変更ダイヤDB、62 変更内容出力部、63 運行情報受信部、64 実績ダイヤDB、65 実施ダイヤDB。   1,21 operation information acquisition unit, 2,26 display train line DB, 3 operation history DB, 4 selection unit, 10 train line selection device, 20 operation plan creation system, 22 operation processing unit, 23 generation diagram DB, 24 route DB , 25, 66 Train line generation unit, 27 display processing unit, 30 pointing device, 40 keyboard, 50 display display, 60 operation management system, 61 change diagram DB, 62 change content output unit, 63 operation information reception unit, 64 results diagram DB, 65 Implementation diamond DB.

Claims (18)

複数の列車スジが表示されている画面において指定された指定位置の情報を取得する操作情報取得部と、
前記画面に表示されている列車スジの情報を記憶する表示列車スジ記憶部と、
前記複数の列車スジについての過去の操作履歴を記憶する操作履歴記憶部と、
前記指定位置と前記複数の列車スジとの距離、および前記操作履歴に基づいて、1つの列車スジを選択する選択部と、
を備え
前記選択部は、前記指定位置と前記複数の列車スジとの距離について列車スジ毎に評価を行って評価値を求め、前記操作履歴について列車スジ毎に評価を行って評価値を求め、各評価項目の評価値を合算した合計値に基づいて、1つの列車スジを選択する、
ことを特徴とする列車スジ選択装置。
An operation information acquisition unit for acquiring information of a specified position specified on a screen on which a plurality of train lines are displayed;
A display train streak storage unit for storing information of train streaks displayed on the screen;
An operation history storage unit for storing past operation histories for the plurality of train lines;
A selection unit that selects one train line based on the distance between the designated position and the plurality of train lines, and the operation history;
Equipped with a,
The selection unit evaluates the distance between the designated position and the plurality of train lines for each train line to obtain an evaluation value, evaluates the operation history for each train line, obtains an evaluation value, and evaluates each evaluation value. Select one train streak based on the total sum of the evaluation values of the items.
A train streak selection device characterized by that.
前記選択部は、さらに、各列車スジについて制約違反の評価を行って評価値を求め、各評価項目の評価値を合算した合計値に基づいて、1つの列車スジを選択する、
ことを特徴とする請求項に記載の列車スジ選択装置。
The selection unit further evaluates the constraint violation for each train line to obtain an evaluation value, and selects one train line based on the total value obtained by adding the evaluation values of each evaluation item.
The train streak selection device according to claim 1 , wherein:
前記選択部は、さらに、各列車スジについて対応する列車の乗車率の評価を行って評価値を求め、各評価項目の評価値を合算した合計値に基づいて、1つの列車スジを選択する、
ことを特徴とする請求項またはに記載の列車スジ選択装置。
The selection unit further evaluates the boarding rate of the corresponding train for each train line, obtains an evaluation value, and selects one train line based on the total value obtained by adding the evaluation values of the evaluation items.
The train streak selection device according to claim 1 or 2 , wherein
前記選択部は、さらに、各列車スジについて対応する列車のダイヤの乱れ度の評価を行って評価値を求め、各評価項目の評価値を合算した合計値に基づいて、1つの列車スジを選択する、
ことを特徴とする請求項からのいずれか1つに記載の列車スジ選択装置。
The selection unit further evaluates the degree of turbulence of the corresponding train diagram for each train line, obtains an evaluation value, and selects one train line based on the total value obtained by adding the evaluation values of each evaluation item To
The train streak selection device according to any one of claims 1 to 3 , wherein
前記選択部は、さらに、各列車スジについて対応する列車の列車種別の評価を行って評価値を求め、各評価項目の評価値を合算した合計値に基づいて、1つの列車スジを選択する、
ことを特徴とする請求項からのいずれか1つに記載の列車スジ選択装置。
The selection unit further evaluates the train type of the corresponding train for each train line to obtain an evaluation value, and selects one train line based on a total value obtained by adding the evaluation values of the evaluation items.
The train streak selecting device according to any one of claims 1 to 4 , wherein the train streak selecting device is provided.
前記選択部は、各評価項目の評価値に、評価項目毎に規定された重み付け係数を乗じた値を合算した合計値に基づいて、1つの列車スジを選択する、
ことを特徴とする請求項からのいずれか1つに記載の列車スジ選択装置。
The selection unit selects one train line based on a total value obtained by adding a value obtained by multiplying an evaluation value of each evaluation item by a weighting coefficient defined for each evaluation item.
The train streak selection device according to any one of claims 1 to 5 , wherein
前記選択部は、前記操作情報取得部において指定された前記指定位置と同じ位置で新たな操作が受け付けられた場合、前記重み付け係数を変更する、
ことを特徴とする請求項に記載の列車スジ選択装置。
The selection unit changes the weighting coefficient when a new operation is received at the same position as the specified position specified in the operation information acquisition unit.
The train streak selection device according to claim 6 .
前記選択部は、前記操作情報取得部において指定された前記指定位置と同じ位置で新たな操作が受け付けられた場合、前記合計値の大きい列車スジを選択していたときは、つぎに合計値の大きい列車スジを選択する、
ことを特徴とする請求項からのいずれか1つに記載の列車スジ選択装置。
When a new operation is received at the same position as the specified position specified in the operation information acquisition unit, the selection unit selects a train streak having a large total value, and then selects the total value. Choose a large train streak,
The train streak selection device according to any one of claims 1 to 6 , wherein
請求項1からのいずれか1つに記載の列車スジ選択装置を備えることを特徴とする運行計画作成システム。 An operation plan creation system comprising the train line selection device according to any one of claims 1 to 8 . 請求項1からのいずれか1つに記載の列車スジ選択装置を備えることを特徴とする運行管理システム。 An operation management system comprising the train line selection device according to any one of claims 1 to 8 . 列車スジ選択装置における列車スジ選択方法であって、
操作情報取得部が、複数の列車スジが表示されている画面において指定された指定位置の情報を取得する操作情報取得ステップと、
選択部が、前記指定位置と前記複数の列車スジとの距離について列車スジ毎に評価を行って評価値を求め、操作履歴について列車スジ毎に評価を行って評価値を求め、各評価項目の評価値を合算した合計値を求める評価ステップと、
前記選択部が、前記合計値に基づいて、1つの列車スジを選択する選択ステップと、
を含むことを特徴とする列車スジ選択方法。
A train stripe selection method in a train stripe selection device,
An operation information acquisition step in which an operation information acquisition unit acquires information on a specified position specified on a screen on which a plurality of train lines are displayed;
The selection unit evaluates for each train line about the distance between the designated position and the plurality of train lines, obtains an evaluation value, evaluates the operation history for each train line, obtains an evaluation value, An evaluation step for obtaining a total value obtained by adding the evaluation values;
A selection step in which the selection unit selects one train line based on the total value;
A train streak selection method comprising:
前記評価ステップでは、前記選択部が、さらに、各列車スジについて制約違反の評価を行って評価値を求め、各評価項目の評価値を合算した合計値を求め、
前記選択ステップでは、前記選択部が、前記合計値に基づいて、1つの列車スジを選択する、
ことを特徴とする請求項1に記載の列車スジ選択方法。
In the evaluation step, the selection unit further evaluates the constraint violation for each train streak to obtain an evaluation value, and obtains a total value obtained by adding the evaluation values of the respective evaluation items,
In the selection step, the selection unit selects one train line based on the total value.
Train line selection method of claim 1 1, wherein the.
前記評価ステップでは、前記選択部が、さらに、各列車スジについて対応する列車の乗車率の評価を行って評価値を求め、各評価項目の評価値を合算した合計値を求め、
前記選択ステップでは、前記選択部が、前記合計値に基づいて、1つの列車スジを選択する、
ことを特徴とする請求項1または1に記載の列車スジ選択方法。
In the evaluation step, the selection unit further evaluates the boarding rate of the corresponding train for each train line to obtain an evaluation value, and obtains a total value obtained by adding the evaluation values of the respective evaluation items,
In the selection step, the selection unit selects one train line based on the total value.
Train line selection method according to claim 1 1 or 1 2, characterized in that.
前記評価ステップでは、前記選択部が、さらに、各列車スジについて対応する列車のダイヤの乱れ度の評価を行って評価値を求め、各評価項目の評価値を合算した合計値を求め、
前記選択ステップでは、前記選択部が、前記合計値に基づいて、1つの列車スジを選択する、
ことを特徴とする請求項1から1のいずれか1つに記載の列車スジ選択方法。
In the evaluation step, the selection unit further evaluates the degree of disturbance of the corresponding train diagram for each train line to obtain an evaluation value, and obtains a total value obtained by adding the evaluation values of the respective evaluation items,
In the selection step, the selection unit selects one train line based on the total value.
Train line selection method according to any one of claims 1 1 to 1 3, characterized in that.
前記評価ステップでは、前記選択部が、さらに、各列車スジについて対応する列車の列車種別の評価を行って評価値を求め、各評価項目の評価値を合算した合計値を求め、
前記選択ステップでは、前記選択部が、前記合計値に基づいて、1つの列車スジを選択する、
ことを特徴とする請求項1から1のいずれか1つに記載の列車スジ選択方法。
In the evaluation step, the selection unit further evaluates the train type of the corresponding train for each train line to obtain an evaluation value, and obtains a total value obtained by adding the evaluation values of the respective evaluation items,
In the selection step, the selection unit selects one train line based on the total value.
Train line selection method according to any one of claims 1 1 to 1 4, characterized in that.
前記評価ステップでは、前記選択部が、各評価項目の評価値に、評価項目毎に規定された重み付け係数を乗じた値を合算した合計値を求め、
前記選択ステップでは、前記選択部が、前記合計値に基づいて、1つの列車スジを選択する、
ことを特徴とする請求項1から1のいずれか1つに記載の列車スジ選択方法。
In the evaluation step, the selection unit obtains a total value obtained by adding a value obtained by multiplying an evaluation value of each evaluation item by a weighting coefficient defined for each evaluation item,
In the selection step, the selection unit selects one train line based on the total value.
The train stripe selection method according to any one of claims 11 to 15 , wherein the train stripe selection method is provided.
前記評価ステップでは、前記選択部が、前記操作情報取得ステップにおいて指定された前記指定位置と同じ位置で新たな操作が受け付けられた場合、前記重み付け係数を変更する、
ことを特徴とする請求項1に記載の列車スジ選択方法。
In the evaluation step, when the selection unit receives a new operation at the same position as the specified position specified in the operation information acquisition step, the weighting coefficient is changed.
The train stripe selection method according to claim 16 , wherein:
前記選択ステップでは、前記選択部が、前記操作情報取得ステップにおいて指定された前記指定位置と同じ位置で新たな操作が受け付けられた場合、前記合計値の大きい列車スジを選択していたときは、つぎに合計値の大きい列車スジを選択する、
ことを特徴とする請求項1から1のいずれか1つに記載の列車スジ選択方法。
In the selection step, when a new operation is received at the same position as the specified position specified in the operation information acquisition step, the selection unit has selected a train line having a large total value, Next, select a train streak with a large total value.
The train streak selection method according to any one of claims 11 to 16 , characterized by:
JP2016000148A 2016-01-04 2016-01-04 Train line selection device, operation plan creation system, operation management system, and train line selection method Active JP6429810B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016000148A JP6429810B2 (en) 2016-01-04 2016-01-04 Train line selection device, operation plan creation system, operation management system, and train line selection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016000148A JP6429810B2 (en) 2016-01-04 2016-01-04 Train line selection device, operation plan creation system, operation management system, and train line selection method

Publications (2)

Publication Number Publication Date
JP2017121817A JP2017121817A (en) 2017-07-13
JP6429810B2 true JP6429810B2 (en) 2018-11-28

Family

ID=59305205

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016000148A Active JP6429810B2 (en) 2016-01-04 2016-01-04 Train line selection device, operation plan creation system, operation management system, and train line selection method

Country Status (1)

Country Link
JP (1) JP6429810B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7493689B1 (en) * 2023-05-18 2024-05-31 三菱電機株式会社 Command operation support device, command operation support method, command operation support program, and command operation support system

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000052992A (en) * 1998-08-05 2000-02-22 Nippon Signal Co Ltd:The Train diagram correcting device
JP4180932B2 (en) * 2003-01-29 2008-11-12 株式会社日立製作所 Train stripe selection method and train stripe selection device
US9073562B2 (en) * 2007-10-12 2015-07-07 General Electric Company System and method for a simulation based movement planner
JP4990222B2 (en) * 2008-05-28 2012-08-01 三菱電機株式会社 Train operation plan creation system
JP2013161208A (en) * 2012-02-03 2013-08-19 Sony Corp Information processing apparatus, information processing method, and program
JP2015052819A (en) * 2013-09-05 2015-03-19 シャープ株式会社 Electronics

Also Published As

Publication number Publication date
JP2017121817A (en) 2017-07-13

Similar Documents

Publication Publication Date Title
Sathish et al. Exponential smoothing method against the gradient boosting machine learning algorithm-based model for materials forecasting to minimize inventory
Herroelen et al. Robust and reactive project scheduling: a review and classification of procedures
Kominers et al. Matching with slot‐specific priorities: Theory
Leyman et al. A new scheduling technique for the resource–constrained project scheduling problem with discounted cash flows
Soroor et al. Theoretical and practical study of supply chain coordination
US11308246B2 (en) Generative design for architecture
RU2690206C2 (en) Interactive prediction in real time
Haferkamp et al. Effectiveness of demand and fulfillment control in dynamic fleet management of ride‐sharing systems
Shretta et al. Malaria elimination transmission and costing in the Asia-Pacific: Developing an investment case
Moon et al. Predicting project cost overrun levels in bidding stage using ensemble learning
Gordon et al. So if we like the idea of peer workers, why aren’t we seeing more?
WO2020026351A1 (en) Train operation scheduling assist system and data structure of data about train operation scheduling
Durga Prasad et al. Multi-objective optimization approach for cost management during product design at the conceptual phase
JP2020203549A (en) Information processing device, information processing method, and computer program
Gandhinathan et al. QFD‐and VE‐enabled target costing: a fuzzy approach
JP6429810B2 (en) Train line selection device, operation plan creation system, operation management system, and train line selection method
Xu et al. Optimization of reliable vehicle routing problem for medical waste collection with time windows in stochastic transportation networks
Pourrahimian et al. Integrating expert insights and data analytics for enhanced construction productivity monitoring and control: a machine learning approach
US20110131078A1 (en) System and method to model and forecast technology adoption
JP2014040161A (en) Device and method for operation arrangement task support
Upasani et al. Integrating a decomposition procedure with problem reduction for factory scheduling with disruptions: a simulation study
US20100125804A1 (en) Object positioning in a graphical user interface
Austin et al. Integrating design in the project process
Musaraganyi et al. Integration of user’s preferences into the home healthcare routing and scheduling multi-objective problem: A hierarchical approach with Pareto-optimal alternative solutions
Song et al. Extraboard transit operator scheduling considering driver absenteeism

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20171228

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20180809

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20180814

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20180918

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20181002

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20181030

R150 Certificate of patent or registration of utility model

Ref document number: 6429810

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250