JP6440543B2 - Electric power demand prediction apparatus and electric power demand prediction method - Google Patents
Electric power demand prediction apparatus and electric power demand prediction method Download PDFInfo
- Publication number
- JP6440543B2 JP6440543B2 JP2015055470A JP2015055470A JP6440543B2 JP 6440543 B2 JP6440543 B2 JP 6440543B2 JP 2015055470 A JP2015055470 A JP 2015055470A JP 2015055470 A JP2015055470 A JP 2015055470A JP 6440543 B2 JP6440543 B2 JP 6440543B2
- Authority
- JP
- Japan
- Prior art keywords
- value
- target time
- precipitation
- time
- prediction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Sewage (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
この発明は、雨水および排水を合流式にて処理する下水道ポンプ場または水再生センタなどの下水処理を行う施設の電力需要量を予測する電力需要予測装置および電力需要予測方法に関し、特に施設における雨水による電力需要量の変動を正確に予測することができるものである。 The present invention relates to a power demand prediction apparatus and a power demand prediction method for predicting a power demand amount of a facility that performs sewage treatment such as a sewer pump station or a water reclamation center that treats rainwater and wastewater in a combined manner. It is possible to accurately predict fluctuations in the amount of power demand due to the above.
近年、蓄電池または発電機などの分散型電源の導入が進み、それらを連携制御するためのエネルギーマネジメントシステムが開発されている。分散型電源を最適に連携制御するには、需要家施設内の電力需要を正確に把握する必要があり、これまで、気象情報と電力需要との関係をモデル化した予測モデルを構築し、電力需要量を予測する方法が提案されてきた。 In recent years, the introduction of distributed power sources such as storage batteries or generators has progressed, and energy management systems for controlling them in cooperation have been developed. In order to optimally control distributed power sources in a coordinated manner, it is necessary to accurately grasp the power demand in customer facilities. So far, we have built a prediction model that models the relationship between weather information and power demand. Methods for predicting demand have been proposed.
例えば、特許文献1に記載されている電力需要予測方法では、各時刻の気温と電力量との関係から予測モデルを構築し、予測モデルを用いて電力需要量を予測している。また、特許文献2に記載されている電力需要予測方法では、天気および雨量等の気象データを用いて予測モデルを構築し、電力需要を予測している。
For example, in the power demand prediction method described in
しかしながら、下水処理施設は、排水処理だけでなく雨水を処理する役割を有している。通常、雨水は下水道幹線を経由して、雨水排出ポンプから海または河川へ放水される。そのため、下水処理施設の電力需要は気温との関係があまりなく、特許文献1の電力需要予測方法では、正確に予測できないという問題点があった。
However, the sewage treatment facility has a role of treating rainwater as well as wastewater treatment. Normally, rainwater is discharged from a rainwater discharge pump to the sea or river via a sewer main line. For this reason, the power demand at the sewage treatment facility has little relationship with the air temperature, and the power demand prediction method disclosed in
また、特許文献2のように、雨量降水量を用いることで電力需要をある程度予測することができるが、下水処理施設では、一般的な施設に備わっている照明および空調などの設備に加えて、ポンプおよび貯蔵槽などの雨を処理するための設備を備えている。そして、ポンプは貯蔵槽に流れ込んできた雨水をくみ上げる際に電力を消費する。
In addition, as in
そのため、施設全体の電力需要は、ポンプ等の水処理設備の運転状況の影響も受けて変化する。ポンプ等の水処理設備は、これまでの数時間でどのくらいの雨が降ったのか、これから数時間でどのくらいの雨が降るのかなどの累積値によって運転状況が変化し、また、過去にいつポンプ等の水処理設備を運転したのかによって今後の運転状況が変わる。そのため、単純に雨量および電力需要量の関係に基づいた電力需要予測では正確な予測ができないという問題点があった。 Therefore, the power demand of the entire facility changes due to the influence of the operation status of water treatment facilities such as pumps. The operation status of water treatment facilities such as pumps changes depending on the cumulative value such as how much rain has fallen in the past few hours and how much rain will fall in the next few hours. The future operating situation will change depending on whether the water treatment facility is operated. For this reason, there is a problem in that accurate prediction cannot be made by simply predicting power demand based on the relationship between rainfall and power demand.
この発明は上記のような課題を解決するためになされたものであり、下水処理を行う施設における雨水による電力需要量の変動を正確に予測する電力需要予測装置および電力需要予測方法を提供することを目的とする。 The present invention has been made to solve the above-described problems, and provides a power demand prediction apparatus and a power demand prediction method that accurately predict fluctuations in power demand due to rainwater in a facility that performs sewage treatment. With the goal.
この発明の電力需要予測装置は、
下水および雨水処理を行う施設における予測対象時刻の電力量予測値の予測を行う電力需要予測装置において、
前記施設の各時刻の電力需要実績値を取得し、前記電力需要実績値に対して対象時刻の第一所定時間前から前記対象時刻までの最大の前記電力需要実績値を検出して前記対象時刻の最大電力量値として抽出する実績データ取得部と、
前記施設に関係する実績値および予報値の降水量値を含む気象情報を取得し、前記気象情報に対して、前記対象時刻の第二所定時間前から前記対象時刻までの各時刻の各前記降水量値の累積降水量を算出して前記対象時刻の過去降水量として抽出し、かつ、前記対象時刻から前記対象時刻の第三所定時間後までの各時刻の各前記降水量値の累積降水量を算出して前記対象時刻の将来降水量として抽出する気象情報取得部と、
前記対象時刻の最大電力量値を蓄積する最大電力量値データベースと、
前記対象時刻の過去降水量を蓄積する過去降水量データベースと、
前記対象時刻の将来降水量を蓄積する将来降水量データベースと、
前記最大電力量値、前記過去降水量、および前記将来降水量の関係と前記電力需要実績値から前記予測対象時刻の前記電力量予測値を予測する需要予測部とを備えたものである。
The power demand prediction apparatus of the present invention is
In the power demand forecasting device that predicts the predicted amount of power at the forecast target time in a facility that performs sewage and rainwater treatment,
The actual power demand value at each time of the facility is acquired, the maximum actual power demand value from the first predetermined time before the target time to the target time is detected with respect to the actual power demand value, and the target time An actual data acquisition unit that extracts the maximum electric energy value of
The weather information including the precipitation value of the actual value and the forecast value related to the facility is acquired, and each precipitation at each time from the second predetermined time before the target time to the target time is obtained with respect to the weather information. The cumulative precipitation of each precipitation value at each time from the target time to the third predetermined time after the target time is calculated by calculating the cumulative precipitation of the quantity value and extracting it as the past precipitation at the target time. A meteorological information acquisition unit that calculates and extracts as future precipitation at the target time;
A maximum power amount value database for storing the maximum power amount value at the target time;
A past precipitation database for accumulating past precipitation at the target time;
A future precipitation database for accumulating future precipitation at the target time;
A demand prediction unit that predicts the predicted power amount at the prediction target time from the relationship between the maximum power amount value, the past precipitation amount, and the future precipitation amount and the actual power demand value.
また、この発明の電力需要予測装置は、
ポンプを有し下水および雨水処理を行う施設における予測対象時刻の電力量予測値の予測を行う電力需要予測装置において、
前記施設の各時刻の電力需要実績値を取得する実績データ取得部と、
対象時刻の第四所定時間前から前記対象時刻までの前記ポンプの運転状態を対象運転状態として抽出するポンプデータ取得部と、
前記施設に関係する実績値および予報値の降水量値を含む気象情報を取得し、前記気象情報に対して、前記対象時刻の第二所定時間前から前記対象時刻までの各時刻の各前記降水量の累積降水量を算出して前記対象時刻の過去降水量として抽出し、かつ、前記対象時刻から前記対象時刻の第三所定時間後までの各時刻の各前記降水量の累積降水量を算出して前記対象時刻の将来降水量として抽出する気象情報取得部と、
前記対象時刻の前記対象運転状態を蓄積するポンプ運転状態データベースと、
前記対象時刻の過去降水量を蓄積する過去降水量データベースと、
前記対象時刻の将来降水量を蓄積する将来降水量データベースと、
前記対象運転状態、前記過去降水量、および前記将来降水量の関係と前記電力需要実績値から前記予測対象時刻の前記電力量予測値を予測する需要予測部とを備えたものである。
Moreover, the power demand prediction apparatus of this invention is
In the power demand prediction device that predicts the predicted amount of power at the prediction target time in a facility that has a pump and performs sewage and rainwater treatment,
A record data acquisition unit that acquires a power demand record value at each time of the facility;
A pump data acquisition unit that extracts the operation state of the pump from the fourth predetermined time before the target time to the target time as the target operation state;
The weather information including the precipitation value of the actual value and the forecast value related to the facility is acquired, and each precipitation at each time from the second predetermined time before the target time to the target time is obtained with respect to the weather information. A cumulative amount of precipitation is calculated and extracted as past precipitation at the target time, and the cumulative precipitation amount at each time from the target time to the third predetermined time after the target time is calculated. A meteorological information acquisition unit for extracting as future precipitation at the target time;
A pump operating state database for accumulating the target operating state at the target time;
A past precipitation database for accumulating past precipitation at the target time;
A future precipitation database for accumulating future precipitation at the target time;
The apparatus includes a demand prediction unit that predicts the predicted electric energy amount at the prediction target time from the relationship between the target operation state, the past precipitation amount, and the future precipitation amount, and the actual power demand value.
また、この発明の電力需要予測装置は、
ポンプを有し下水および雨水処理を行う施設における予測対象時刻の電力量予測値の予測を行う電力需要予測装置において、
前記ポンプの第一電力需要実績値と、前記施設の前記ポンプ以外の第二電力需要実績値とを取得し、
前記第一電力需要実績値に対して対象時刻の第五所定時間前から前記対象時刻までの最大の前記第一電力需要実績値を検出して前記対象時刻のポンプ最大電力量値として抽出する実績データ取得部と、
前記施設に関係する実績値および予報値の降水量値と気温値とを含む気象情報を取得し、前記気象情報に対して、前記対象時刻の気温値を抽出し、かつ、前記対象時刻の第二所定時間前から前記対象時刻までの各時刻の各前記降水量値の累積降水量を算出して前記対象時刻の過去降水量として抽出し、かつ、前記対象時刻から前記対象時刻の第三所定時間後までの各時刻の各前記降水量値の累積降水量を算出して前記対象時刻の将来降水量として抽出する気象情報取得部と、
前記対象時刻のポンプ最大電力量値を蓄積するポンプ最大電力量値データベースと、
前記対象時刻の気温値を蓄積する気温値データベースと、
前記対象時刻の過去降水量を蓄積する過去降水量データベースと、
前記対象時刻の将来降水量を蓄積する将来降水量データベースと、
前記ポンプ最大電力量値、前記過去降水量、および前記将来降水量の関係と前記第一電力需要実績値とから前記予測対象時刻の前記ポンプの第一電力量予測値を予測し、前記気温値と前記第二電力需要実績値との関係から前記予測対象時刻の前記ポンプ以外の第二電力量予測値を予測して前記第一電力量予測値と前記第二電力量予測値との合計を値前記電力量予測値として予測する需要予測部とを備えたものである。
Moreover, the power demand prediction apparatus of this invention is
In the power demand prediction device that predicts the predicted amount of power at the prediction target time in a facility that has a pump and performs sewage and rainwater treatment,
Obtain the first power demand actual value of the pump and the second power demand actual value other than the pump of the facility,
A record of detecting the maximum first power demand record value from the fifth predetermined time before the target time to the target time with respect to the first power demand record value and extracting it as the pump maximum power amount value at the target time A data acquisition unit;
Obtaining weather information including precipitation values and temperature values of actual values and forecast values related to the facility, extracting a temperature value of the target time for the weather information, and a first value of the target time (2) calculating a cumulative precipitation of each precipitation value at each time from a predetermined time before to the target time and extracting it as a past precipitation at the target time; and a third predetermined time from the target time to the target time A meteorological information acquisition unit that calculates a cumulative precipitation of each precipitation value at each time until a time later and extracts it as a future precipitation at the target time;
A pump maximum electric energy value database for storing the pump maximum electric energy value at the target time;
A temperature value database for accumulating temperature values at the target time; and
A past precipitation database for accumulating past precipitation at the target time;
A future precipitation database for accumulating future precipitation at the target time;
Predicting the first electric power prediction value of the pump at the prediction target time from the relationship between the pump maximum electric energy value, the past precipitation, and the future precipitation, and the first electric power demand actual value, and the temperature value And predicting the second power amount predicted value other than the pump at the prediction target time from the relationship between the second power demand actual value and the total of the first power amount predicted value and the second power amount predicted value. A demand prediction unit that predicts the value as the electric energy prediction value.
また、この発明の電力需要予測方法は、
下水および雨水処理を行う施設における予測対象時刻の電力量予測値の予測を行う電力需要予測方法において、
前記施設の各時刻の電力需要実績値を取得し、前記電力需要実績値に対して対象時刻の第一所定時間前から前記対象時刻までの最大の前記電力需要実績値を検出して前記対象時刻の最大電力量値として抽出し、
前記施設に関係する実績値および予報値の降水量値を含む気象情報を取得し、前記気象情報に対して、前記対象時刻の第二所定時間前から前記対象時刻までの各時刻の各前記降水量値の累積降水量を算出して前記対象時刻の過去降水量として抽出し、かつ、前記対象時刻から前記対象時刻の第三所定時間後までの各時刻の各前記降水量値の累積降水量を算出して前記対象時刻の将来降水量として抽出し、
前記最大電力量値、前記過去降水量、および前記将来降水量の関係と前記電力需要実績値から前記予測対象時刻の前記電力量予測値を予測するものである。
The power demand prediction method of the present invention is
In the power demand prediction method for predicting the predicted amount of electric power at the prediction target time in a facility that performs sewage and rainwater treatment,
The actual power demand value at each time of the facility is acquired, the maximum actual power demand value from the first predetermined time before the target time to the target time is detected with respect to the actual power demand value, and the target time Extracted as the maximum power value of
The weather information including the precipitation value of the actual value and the forecast value related to the facility is acquired, and each precipitation at each time from the second predetermined time before the target time to the target time is obtained with respect to the weather information. The cumulative precipitation of each precipitation value at each time from the target time to the third predetermined time after the target time is calculated by calculating the cumulative precipitation of the quantity value and extracting it as the past precipitation at the target time. Is calculated and extracted as future precipitation at the target time,
The power amount prediction value at the prediction target time is predicted from the relationship between the maximum power amount value, the past precipitation amount, and the future precipitation amount and the actual power demand actual value.
また、この発明の電力需要予測方法は、
ポンプを有し下水および雨水処理を行う施設における予測対象時刻の電力量予測値の予測を行う電力需要予測方法において、
前記施設の各時刻の電力需要実績値を取得する実績データ取得部と、
対象時刻の第四所定時間前から前記対象時刻までの前記ポンプの運転状態を対象運転状態として抽出し、
前記施設に関係する実績値および予報値の降水量値を含む気象情報を取得し、前記気象情報に対して、前記対象時刻の第二所定時間前から前記対象時刻までの各時刻の各前記降水量の累積降水量を算出して前記対象時刻の過去降水量として抽出し、かつ、前記対象時刻から前記対象時刻の第三所定時間後までの各時刻の各前記降水量の累積降水量を算出して前記対象時刻の将来降水量として抽出し、
前記対象運転状態、前記過去降水量、および前記将来降水量の関係と前記電力需要実績値から前記予測対象時刻の前記電力量予測値を予測するものである。
The power demand prediction method of the present invention is
In the power demand prediction method for predicting the predicted amount of power at the prediction target time in a facility that has a pump and performs sewage and rainwater treatment,
A record data acquisition unit that acquires a power demand record value at each time of the facility;
The operation state of the pump from the fourth predetermined time before the target time to the target time is extracted as the target operation state,
The weather information including the precipitation value of the actual value and the forecast value related to the facility is acquired, and each precipitation at each time from the second predetermined time before the target time to the target time is obtained with respect to the weather information. A cumulative amount of precipitation is calculated and extracted as past precipitation at the target time, and the cumulative precipitation amount at each time from the target time to the third predetermined time after the target time is calculated. And extract it as future precipitation at the target time,
The predicted power amount at the prediction target time is predicted from the relationship between the target operating state, the past precipitation amount, and the future precipitation amount and the actual power demand value.
また、この発明の電力需要予測方法は、
ポンプを有し下水および雨水処理を行う施設における予測対象時刻の電力量予測値の予測を行う電力需要予測方法において、
前記ポンプの第一電力需要実績値と、前記施設の前記ポンプ以外の第二電力需要実績値とを取得し、前記第一電力需要実績値に対して対象時刻の第五所定時間前から前記対象時刻までの最大の前記第一電力需要実績値を検出して前記対象時刻のポンプ最大電力量値として抽出し、
前記施設に関係する実績値および予報値の降水量値と気温値とを含む気象情報を取得し、前記気象情報に対して、前記対象時刻の気温値を抽出し、かつ、前記対象時刻の第二所定時間前から前記対象時刻までの各時刻の各前記降水量値の累積降水量を算出して前記対象時刻の過去降水量として抽出し、かつ、前記対象時刻から前記対象時刻の第三所定時間後までの各時刻の各前記降水量値の累積降水量を算出して前記対象時刻の将来降水量として抽出し、
前記ポンプ最大電力量値、前記過去降水量、および前記将来降水量の関係と前記第一電力需要実績値とから前記予測対象時刻の前記ポンプの第一電力量予測値を予測し、前記気温値と前記第二電力需要実績値との関係から前記予測対象時刻の前記ポンプ以外の第二電力量予測値を予測して前記第一電力量予測値と前記第二電力量予測値との合計を値前記電力量予測値として予測するものである。
The power demand prediction method of the present invention is
In the power demand prediction method for predicting the predicted amount of power at the prediction target time in a facility that has a pump and performs sewage and rainwater treatment,
The first power demand record value of the pump and the second power demand record value other than the pump of the facility are acquired, and the target from the fifth predetermined time before the target time with respect to the first power demand record value The maximum first power demand actual value until the time is detected and extracted as the pump maximum power amount value at the target time,
Obtaining weather information including precipitation values and temperature values of actual values and forecast values related to the facility, extracting a temperature value of the target time for the weather information, and a first value of the target time (2) calculating a cumulative precipitation of each precipitation value at each time from a predetermined time before to the target time and extracting it as a past precipitation at the target time; and a third predetermined time from the target time to the target time Calculate the cumulative precipitation of each precipitation value at each time until time later and extract it as future precipitation at the target time,
Predicting the first electric power prediction value of the pump at the prediction target time from the relationship between the pump maximum electric energy value, the past precipitation, and the future precipitation, and the first electric power demand actual value, and the temperature value And predicting the second power amount predicted value other than the pump at the prediction target time from the relationship between the second power demand actual value and the total of the first power amount predicted value and the second power amount predicted value. Value The value is predicted as the power amount prediction value.
この発明の電力需要予測装置および電力需要予測方法によれば、雨水による電力需要量の変動を正確に予測することができる。 According to the power demand prediction device and the power demand prediction method of the present invention, it is possible to accurately predict fluctuations in the power demand due to rainwater.
実施の形態1.
以下、本願発明の実施の形態について説明する。図1はこの発明の実施の形態1における電力需要予測装置の構成を示すブロック図である。
図2は図1に示した電力需要予測装置における対象時刻の最大電力量値を説明するための図である。
図3は図1に示した電力需要予測装置における対象時刻の過去降水量を説明するための図である。
図4は図1に示した電力需要予測装置における対象時刻の将来降水量を説明するための図である。
Embodiments of the present invention will be described below. 1 is a block diagram showing a configuration of a power demand prediction apparatus according to
FIG. 2 is a diagram for explaining the maximum power amount value at the target time in the power demand prediction apparatus shown in FIG.
FIG. 3 is a diagram for explaining the past precipitation amount at the target time in the power demand prediction apparatus shown in FIG.
FIG. 4 is a diagram for explaining the future precipitation amount at the target time in the power demand prediction apparatus shown in FIG.
図5は図1に示した電力需要予測装置の需要予測部におけるニューラルネットワークの予測モデルを説明するための図である。
図6は図1に示した電力需要予測装置の需要予測部の動作を説明するためのフローチャートである。
図7は図1に示した電力需要予測装置における予測開始時刻の最大電力量値を説明するための図である。
図8は図1に示した電力需要予測装置における予測対象時刻の最大電力量値を説明するための図である。
FIG. 5 is a diagram for explaining a neural network prediction model in the demand prediction unit of the power demand prediction apparatus shown in FIG.
FIG. 6 is a flowchart for explaining the operation of the demand prediction unit of the power demand prediction apparatus shown in FIG.
FIG. 7 is a diagram for explaining the maximum power amount value at the prediction start time in the power demand prediction apparatus shown in FIG.
FIG. 8 is a diagram for explaining the maximum power amount value at the prediction target time in the power demand prediction apparatus shown in FIG.
図9は図1に示した電力需要予測装置における予測開始時刻の過去降水量を説明するための図である。
図10は図1に示した電力需要予測装置における予測対象時刻の過去降水量を説明するための図である。
図11は図1に示した電力需要予測装置における予測開始時刻の将来降水量を説明するための図である。
図12は図1に示した電力需要予測装置における予測対象時刻の将来降水量を説明するための図である。
FIG. 9 is a diagram for explaining the past precipitation amount at the prediction start time in the power demand prediction apparatus shown in FIG.
FIG. 10 is a diagram for explaining the past precipitation amount at the prediction target time in the power demand prediction apparatus shown in FIG.
FIG. 11 is a diagram for explaining the future precipitation amount at the prediction start time in the power demand prediction apparatus shown in FIG.
FIG. 12 is a diagram for explaining the future precipitation amount at the prediction target time in the power demand prediction apparatus shown in FIG.
図1において、電力需要予測装置1は、雨水および排水を合流式にて処理する下水道ポンプ場または水再生センタなどの下水処理を行う施設2の電力需要量を予測するものである。施設2には、例えば、ポンプ、ブロア、照明、および空調などの電力を使用する設備が存在する。よって、施設2の電力需要量は、これら各設備の使用量に応じて変動するものである。
In FIG. 1, a power
電力需要予測装置1は、実績データ取得部50と、気象情報取得部30と、需要予測部40と、電力需要実績値データベース(以下、データベースはDBと略して示す)11と、最大電力量値DB12と、降水量DB13と、過去降水量DB14と、将来降水量DB15とを備えている。
The power
実績データ取得部50は、施設2にて使用した電力の実績値を電力需要実績値ENとして取得し、時刻毎の電力需要実績値ENを電力需要実績値DB11に格納する。尚、ここでは時刻毎として、1時間毎のデータを取得するものとする。さらに、実績データ取得部50は、電力需要実績値DB11の電力需要実績値ENから、対象時刻TNの第一所定時間M1前から対象時刻TNまでの各時刻の電力需要実績値ENの内、最大の電力需要実績値ENを検出して、対象時刻TNの最大電力量値GNとして抽出する。そして、実績データ取得部50は、対象時刻TNの最大電力量値GNとして最大電力量値DB12に格納する。
The actual
気象情報取得部30は、降水量の実績値および降水量の予報値を含む気象情報3を外部から取得し、時刻毎の降水量値SNを降水量DB13に格納する。尚、施設2に関係する気象情報3としては、外部の気象情報を提供する会社から取得してもよいし、施設2内に設置したセンサから取得してもよい。また、施設2に関係する気象情報3とは、施設2に対して雨水として流れ込むと考えられる範囲の気象情報3をさすものである。その範囲は、施設2の規模および予測の実績などにより適宜設定されるものである。また、ここでの時刻毎とは、先の電力需要実績値ENと同一の時刻毎であり、1時間毎のデータを取得するものとする。
The meteorological
さらに、気象情報取得部30は、降水量DB13の各時刻の降水量値SNから、対象時刻TNの第二所定時間M2前から対象時刻TNまでの各時刻の各降水量値SNの累積降水量を算出し、対象時刻TNの過去降水量RNとして抽出する。そして、気象情報取得部30は、対象時刻TNの過去降水量RNとして過去降水量DB14に格納する。
Further, the meteorological
さらに、気象情報取得部30は、降水量DB13の各時刻の降水量値SNから、対象時刻TNから対象時刻TNの第三所定時間M3後までの各時刻の各降水量値SNの累積降水量を算出し、対象時刻TNの将来降水量QNとして抽出する。そして、気象情報取得部30は、対象時刻TNの将来降水量QNとして将来降水量DB15に格納する。
Furthermore, the meteorological
需要予測部40は、電力需要実績値DB11、最大電力量値DB12、過去降水量DB14、および、将来降水量DB15に蓄積されている対象時刻TNの最大電力量値GN、過去降水量RN、および将来降水量QNの関係性および電力需要実績値ENから予測対象時刻TXの電力量予測値FXを予測するものである。
The
上記のように構成された実施の形態1の電力需要予測装置1の予測対象時刻TXの電力量予測値FXを予測する方法について説明する。まず、当該予測を行う前に、例えば、過去数年に渡る施設2および気象情報3のデータを用いて、各対象時刻TNの最大電力量値GN、過去降水量RN、および、将来降水量QNを抽出または算出して関係性を得る。尚、数年に渡るデータが存在すれば、季節毎の変化の関係性を得ることができるため適当であるものの、これに限られることなく、数日間または数ヶ月間のデータを用いて算出しても当該予測を行うことは可能である。尚、このことは以下の実施の形態においても同様のため、その説明は適宜省略する。
A method for predicting the predicted power amount FX at the prediction target time TX of the power
次に、実績データ取得部50は、施設2にて使用した電力の実績値を1時間毎に電力需要実績値ENとして取得して、時刻毎の電力需要実績値ENを電力需要実績値DB11に格納する。そして、実績データ取得部50は、電力需要実績値DB11の電力需要実績値ENから、図2に示すように、対象時刻TNの第一所定時間M1前、ここでは例えば4時間(4H)前の対象時刻TN−M1から対象時刻TNまでの各時刻の電力需要実績値ENをそれぞれ抽出する。そして各電力需要実績値EN内、最大の電力需要実績値ENを検出して、対象時刻TNの最大電力量値GNとして抽出する。
Next, the performance
そして、実績データ取得部50は、対象時刻TNの最大電力量値GNとして最大電力量値DB12に格納する。このように各時刻をそれぞれ対象時刻TNとして、各時刻(対象時刻TN)の最大電力量値GNを検出して、それぞれ対象時刻TNに関連付けて格納しておく。
And the performance
次に、気象情報取得部30は、1時間毎の降水量の実績値および降水量の予報値を含む気象情報3を外部から取得し、1時間毎の降水量値SNを降水量DB13に格納する。
そして、気象情報取得部30は、降水量DB13の各時刻の降水量値SNから、図3に示すように、対象時刻TNの第二所定時間M2前、ここでは例えば7時間(7H)前の対象時刻TN−M2から対象時刻TN(但し、対象時刻TNを含まない)までの各時刻の各降水量値SNの累積降水量を算出する。そして、対象時刻TNの過去降水量RNとして抽出する。
Next, the weather
Then, as shown in FIG. 3, the meteorological
ここで、過去降水量RNを算出する場合、各時刻に対する降水量値SNに重み付けを行わない場合、または、各時刻に対する降水量値SNに重み付けを行うために重みαLを乗算して算出する場合が考えられる。 Here, when calculating the precipitation amount RN in the past, when the precipitation value SN for each time is not weighted, or when multiplying the weight value αL to weight the precipitation value SN for each time Can be considered.
各時刻に重み付けを行わない場合は、ここでは第二所定時間M2が7時間であるため、重みαLは、
{α0、α1、α2、α3、α4、α5、α6}={1.0、1.0、1.0、1.0、1.0、1.0、1.0}
と、全て1.0同じ値を取り、各時刻の重み付けを行わない場合が考えられる。
尚、重みαLの添え字Lは、対象時刻TNから1時間前の時刻T1から対象時刻TN−M2にかけて、0、1、2、3、4、5、6と値を取るものである。
When weighting is not performed at each time, since the second predetermined time M2 is 7 hours here, the weight αL is
{Α0, α1, α2, α3, α4, α5, α6} = {1.0, 1.0, 1.0, 1.0, 1.0, 1.0, 1.0}
It is conceivable that all take the same value of 1.0 and do not weight each time.
The subscript L of the weight αL takes values of 0, 1, 2, 3, 4, 5, 6 from the time T1 one hour before the target time TN to the target time TN-M2.
また、各時刻の降水量値SNに重み付けを行う場合は、重みαLは、0.0から1.0までの実数値を取り、
{α0、α1、α2、α3、α4、α5、α6}={0.0、1.0、0.75、0.5、0.25、0.125、0.0625}
このように、各時刻によって異なる重み付け値の重みαLを取ることが考えられる。よって、以下に示す(式1)にて過去降水量RNを求めることができる。
In addition, when the precipitation value SN at each time is weighted, the weight αL takes a real value from 0.0 to 1.0,
{Α0, α1, α2, α3, α4, α5, α6} = {0.0, 1.0, 0.75, 0.5, 0.25, 0.125, 0.0625}
In this way, it is conceivable to take a weight αL of a different weight value depending on each time. Therefore, the past precipitation amount RN can be obtained by (Equation 1) shown below.
尚、この重み付け値は、各施設2と、降水量との関係により適宜変更され設定されるものであり、一般的には、対象時刻TNに近い時刻に対して重みαLの値が大きくなると考えられる。但し、ここでは、対象時刻TNに一番近い1時間前の過去の時刻T1の降水量は、施設2に流れ込むまでに達していないと考え、重みα0=0として過去降水量RNに対して実施的に積算しない考えを示している。
This weighting value is appropriately changed and set according to the relationship between each
そして、気象情報取得部30は、対象時刻TNの過去降水量RNとして過去降水量DB14に格納する。このように各時刻をそれぞれ対象時刻TNとして、各時刻(対象時刻TN)の過去降水量RNを算出して、それぞれ対象時刻TNに関連付けて格納しておく。
And the weather
さらに、気象情報取得部30は、降水量DB13の各時刻の降水量値SNから、図4に示すように、対象時刻TNから対象時刻TNの第三所定時間M3後前、ここでは例えば6時間(6H)後の対象時刻TN+M3までの各時刻の各降水量値SNの累積降水量を算出する。そして、対象時刻TNの将来降水量QNとして抽出する。
Further, as shown in FIG. 4, the meteorological
ここで、将来降水量QNを算出する場合、各時刻に対する降水量値SNに重み付けを行わない場合、または、各時刻に対する降水量値SNに重み付けを行うために重みβKを乗算して算出する場合が考えられる。 Here, when calculating the precipitation QN in the future, when the precipitation value SN for each time is not weighted, or when multiplying the weight βK to weight the precipitation value SN for each time Can be considered.
各時刻に重み付けを行わない場合は、ここでは第三所定時間M3が6時間であるため、重みβKは、
{β0、β1、β2、β3、β4、β5}={1.0、1.0、1.0、1.0、1.0、1.0}
と、全て1.0と同じ値を取り、各時刻の重み付けを行わない場合が考えられる。
尚、重みβKの添え字Kは、対象時刻TNから対象時刻TN+M3にかけて、0、1、2、3、4、5と値を取るものである。
When weighting is not performed at each time, since the third predetermined time M3 is 6 hours here, the weight βK is
{Β0, β1, β2, β3, β4, β5} = {1.0, 1.0, 1.0, 1.0, 1.0, 1.0}
It is conceivable that all take the same value as 1.0 and do not weight each time.
The subscript K of the weight βK takes
また、各時刻の降水量値SNに重み付けを行う場合は、重みβKは、0.0から1.0までの実数値を取り、
{β0、β1、β2、β3、β4、β5}={1.0、0.75、0.5、0.25、0.125、0.0625}
このように、各時刻によって異なる重み付け値の重みβKを取ることが考えられる。よって、以下に示す(式2)にて将来降水量QNを求めることができる。
In addition, when weighting the precipitation value SN at each time, the weight βK takes a real value from 0.0 to 1.0,
{Β0, β1, β2, β3, β4, β5} = {1.0, 0.75, 0.5, 0.25, 0.125, 0.0625}
In this way, it is conceivable to take a weight βK having a different weight value depending on each time. Therefore, the future precipitation QN can be obtained by (Equation 2) shown below.
尚、この重み付け値は、各施設2と、降水量との関係により適宜変更され設定されるものであり、一般的には、対象時刻TNに近い時刻に対して重みβKの値が大きくなると考えられる。
This weighting value is appropriately changed and set according to the relationship between each
そして、気象情報取得部30は、対象時刻TNの将来降水量QNとして将来降水量DB15に格納する。このように各時刻をそれぞれ対象時刻TNとして、各時刻(対象時刻TN)の将来降水量QNを算出して、それぞれ対象時刻TNに関連付けて格納しておく。
And the weather
尚、ここで示した例においては、対象時刻TNの降水量値SNは、過去降水量RNに積算せず、将来降水量QNに積算する方法を示したが、これに限られることはなく、過去降水量RNに積算して、将来降水量QNに積算しない方法も考えられる。 In the example shown here, the precipitation value SN at the target time TN is not accumulated in the past precipitation RN, but is accumulated in the future precipitation QN. However, the present invention is not limited to this. A method is also conceivable in which the past precipitation RN is added but not the future precipitation QN.
次に、需要予測部40について説明する。
上記に示したように求められた、過去の各対象時刻TNに対する過去降水量DB14、将来降水量DB15、最大電力量値DB12、電力需要実績値DB11の各値を用いて、対象時刻TN毎の予測モデルを構築する。そして、予測対象時刻TXの過去降水量RX、将来降水量QX、最大電力量値GXから予測対象時刻TXの電力量予測値FXを算出する。
Next, the
Using each value of the
尚、電力量予測値FXの算出方法としては、重回帰分析、または、ニューラルネットワークによる予測モデルを用いて算出する方法が考えられる。また、パターンマッチングによる手法を用いる方法が考えられる。 In addition, as a calculation method of the electric energy prediction value FX, the method of calculating using the prediction model by a multiple regression analysis or a neural network can be considered. A method using a pattern matching method is also conceivable.
まず、具体例として、重回帰分析による予測モデルを用いた電力量予測値の算出方法について説明する。
予測モデルを用いた予測対象時刻TXの電力量予測値FXの算出式を、(式3)にて次に示す。
First, as a specific example, a method for calculating an electric energy prediction value using a prediction model based on multiple regression analysis will be described.
A formula for calculating the predicted electric energy FX at the prediction target time TX using the prediction model is shown below as (Formula 3).
電力量予測値(FX)=PP・過去降水量(RN)+PF・将来降水量(QN)+MAX・最大電力量値(GN)+intercept ・・・(式3) Predicted electric energy (FX) = PP · Past precipitation (RN) + PF · Future precipitation (QN) + MAX · Maximum electric energy (GN) + intercept (Equation 3)
ここで、PP、PF、MAXとは偏回帰係数であり、interceptとは切片をそれぞれ表している。尚、各編回帰係数と切片とは最小二乗法を用いて、以下に示す(式4)の誤差の平方和が最小となるような定数項を求める。 Here, PP, PF, and MAX are partial regression coefficients, and intercept represents an intercept. The constant regression coefficient and the intercept are obtained by using the least square method so that a constant term that minimizes the sum of squares of errors in (Equation 4) shown below is obtained.
次に、具体例として、ニューラルネットワークによる予測モデルを用いた電力量予測値の算出方法について説明する。
ニューラルネットワークの予測モデルの例を図5に示す。
図5に示すように、予測対象時刻TXの過去降水量RX、将来降水量QX、最大電力量値GXを入力値とし、予測モデルを用いて予測対象時刻TXの電力量予測値FXを算出する。電力量予測値FXの算出式を、(式5)にて次に示す。
Next, as a specific example, a method for calculating a predicted electric energy value using a prediction model based on a neural network will be described.
An example of a neural network prediction model is shown in FIG.
As illustrated in FIG. 5, the predicted power amount FX at the prediction target time TX is calculated using the prediction model with the past precipitation RX at the prediction target time TX, the future precipitation QX, and the maximum power amount GX as input values. . The formula for calculating the electric energy predicted value FX is shown below as (Formula 5).
ここで、Xjは入力値である、過去降水量RX、将来降水量QX、最大電力量値GXを表し、wiは中間層から出力層を結ぶ各ユニットの結合係数、wijは入力層と中間層を結ぶ各ユニットの結合係数、fは出力層における出力関数、fjは中間層における出力関数を表す。尚、各ユニットの結合係数wi、wijについては、過去の各時刻の過去降水量RN、将来降水量QN、最大電力量値GNと、電力需要実績値ENとの関係から最小二乗法により算出する。 Here, Xj represents an input value, ie, past precipitation RX, future precipitation QX, and maximum power value GX, wi is a coupling coefficient of each unit connecting the output layer to the intermediate layer, and wij is an input layer and an intermediate layer , F represents an output function in the output layer, and fj represents an output function in the intermediate layer. The coupling coefficients wi and wij of each unit are calculated by the least square method from the relationship between the past precipitation RN, the future precipitation QN, the maximum power amount value GN, and the actual power demand value EN at each past time. .
次に、具体例として、パターンマッチングによる手法を用いた電力量予測値FXの算出方法について説明する。図6は需要予測部40における電力需要予測の処理手順を示すフローチャートである。
Next, as a specific example, a method for calculating the predicted electric energy FX using a pattern matching method will be described. FIG. 6 is a flowchart showing a processing procedure of power demand prediction in the
まず、電力需要予測に使用する電力需要実績値ENを過去の電力需要実績値DB11から取得するための絞り込み条件を取得する(図6のステップST1)。
例えば、絞り込み条件とは、過去降水量RN、将来降水量QN、最大電力量値GNの3つを使用した、以下の例が考えられる。
First, a narrowing-down condition for acquiring the power demand actual value EN used for power demand prediction from the past power demand
For example, as the narrowing-down conditions, the following examples using the past precipitation amount RN, the future precipitation amount QN, and the maximum power amount value GN can be considered.
|予測対象時刻TXの過去降水量RX−比較する対象時刻TNの過去降水量RN|≦A1=1mm
|予測対象時刻TXの将来降水量QX−比較する対象時刻TNの将来降水量QN|≦A2=2mm
|予測対象時刻TXの最大電力量値GX−比較する対象時刻TNの最大電力量値GN|≦A3=500kW
以上、各式を絞り込み条件とする。
| Past precipitation RX at the prediction target time TX−Past precipitation RN at the target time TN to be compared | ≦ A1 = 1 mm
| Future precipitation QX at forecast time TX-Future precipitation QN at time TN to be compared | ≦ A2 = 2 mm
| Maximum electric energy value GX at prediction target time TX−Maximum electric energy value GN at target time TN to be compared | ≦ A3 = 500 kW
As described above, each expression is used as a narrowing condition.
尚、予測対象時刻TXとは、現在時刻を含む将来の電力需要を予測する任意の時刻のことである。また、比較の対象時刻TNとは、現在時刻を含まない過去の任意の時刻のことである。また、A1、A2、A3は、ここでは1mm、5mm、500kWをそれぞれ設定したが、これに限られることはなく、0以上の値を取り、施設2の設備構成および排水処理の可能量などによって異なるため、システム導入時に過去データを使用して精度評価を実施し、最もよい値を設定する。
The prediction target time TX is an arbitrary time at which future power demand including the current time is predicted. The comparison target time TN is an arbitrary past time that does not include the current time. In addition, A1, A2, and A3 are set to 1 mm, 5 mm, and 500 kW, respectively. However, it is not limited to this, and takes a value of 0 or more depending on the facility configuration of the
次に、絞り込み条件に基づいて、電力需要実績値DB11から絞り込み条件に該当する比較の対象時刻TNの電力需要実績値ENを取得する(図6のステップST2)。
次に、取得した電力需要実績値ENの平均値を算出し、この値を予測対象時刻TXの電力量予測値FXとする(図6のステップST3)。
Next, the actual power demand value EN at the comparison target time TN corresponding to the narrowing condition is acquired from the actual power
Next, an average value of the acquired power demand actual value EN is calculated, and this value is set as the predicted power amount FX at the prediction target time TX (step ST3 in FIG. 6).
以上に示したように、需要予測部40にて各方法を用いて予測された予測対象時刻TXの電力量予測値FXは、予測対象時刻TXの電力需要実績値EXとして電力需要実績値DB11に格納する。尚、予測対象時刻TXの時刻の予測に基づいて保存された電力需要実績値EXは、実際の時刻が予測対象時刻TXに到達して、実際の電力需要実績値EXを得ることができた際には、実際の電力需要実績値EXを置き換えて保存するものである。
As described above, the power amount predicted value FX at the prediction target time TX predicted by the
以下、実際に予測を行う場合について更に説明する。予測を行う時刻である予測開始時刻TYにおいて、予測を行うべき時刻である予測対象時刻TXまでの電力需要実績値ENは、図7に示すように、予測開始時刻TYも含めて予測対象時刻TXまで存在しない。 Hereinafter, a case where prediction is actually performed will be further described. As shown in FIG. 7, the actual power demand value EN up to the prediction target time TX, which is the time at which prediction is to be performed, at the prediction start time TY, which is the time at which prediction is performed, includes the prediction start time TY, including the prediction start time TY. Does not exist until.
よって、上記に示した方法により、まず、予測開始時刻TYの電力量予測値FYを算出する。そして、図8に示すように、この電力量予測値FYを、予測開始時刻TYの電力量予測値FYとして、電力需要実績値DB11に登録する。そして、この予測開始時刻TYから予測対象時刻TXまでの各対象時刻TNに対応する電力量予測値FXを順次求める。 Therefore, first, the electric energy prediction value FY at the prediction start time TY is calculated by the method described above. And as shown in FIG. 8, this electric energy predicted value FY is registered into electric power demand actual value DB11 as the electric energy predicted value FY of prediction start time TY. Then, the predicted electric energy value FX corresponding to each target time TN from the prediction start time TY to the prediction target time TX is sequentially obtained.
またこの場合における、予測対象時刻TXにおける過去降水量RXについて説明する。図9に示すように、予測開始時刻TYにおいては、実績値の降水量値SNのみにて、過去降水量RYは求められる。しかしながら、図10に示すように、予測対象時刻TXの第二所定時間M2時間前から予測対象時刻TXまでの各時刻の降水量値SNは実績値が存在しないため、予報値を用いて算出することとなる。 In this case, the past precipitation RX at the prediction target time TX will be described. As shown in FIG. 9, at the prediction start time TY, the past precipitation amount RY is obtained only from the precipitation value SN as the actual value. However, as shown in FIG. 10, the precipitation value SN at each time from the second predetermined time M2 hours before the prediction target time TX to the prediction target time TX has no actual value, and is calculated using the prediction value. It will be.
また、予測対象時刻TXにおける将来降水量QXについて説明する。図11および図12に示すように、予測開始時刻TY、予測対象時刻TXのいずれの場合も、降水量の実績値は存在しないため、各時刻の降水量値SNの予報値を用いて、将来降水量QY、将来降水量QXとしてそれぞれ算出することとなる。 Further, the future precipitation QX at the prediction target time TX will be described. As shown in FIG. 11 and FIG. 12, since there is no actual precipitation value at any of the prediction start time TY and the prediction target time TX, the predicted value of the precipitation value SN at each time is used to determine the future. It is calculated as precipitation QY and future precipitation QX.
上記のように構成された実施の形態1の電力需要予測装置によれば、
所定時間前から予測対象時刻までの累積降水量、予測対象時刻から所定時間先までの累積降水量と、所定時間前から予測対象時刻までの最大電力量値と、電力需要実績値との関係を用いて、予測対象時刻の電力量予測値の予測を行っているので、施設における雨水の変動を加味した電力需要を精度よく予測することができる。
According to the power demand prediction apparatus of
The relationship between the cumulative rainfall from the predetermined time before the forecast target time, the cumulative precipitation from the forecast target time to the predetermined time ahead, the maximum power value from the predetermined time to the forecast target time, and the actual power demand value Since the prediction of the predicted power amount at the prediction target time is performed, it is possible to accurately predict the power demand taking into account the fluctuation of rainwater in the facility.
また、需要予測部は、予測対象時刻の電力量予測値を、予測対象時刻の電力需要実績値として電力需要実績値DBに格納し、実績データ取得部が予測対象時刻の電力需要実績値として設定できるため、順々に予測対象時刻の電力量予測値を行うことができる。 In addition, the demand prediction unit stores the power amount prediction value at the prediction target time in the power demand actual value DB as the power demand actual value at the prediction target time, and the actual data acquisition unit sets as the power demand actual value at the prediction target time. Therefore, the electric energy prediction value at the prediction target time can be sequentially performed.
また、過去降水量および将来降水量を、各対象時刻の降水量値に重み付けして算出しているため、施設の状況に応じて、雨水の変動を加味した電力需要をさらに精度よく予測することができる。 In addition, since the past precipitation and future precipitation are calculated by weighting the precipitation values at each target time, it is possible to more accurately predict the electricity demand taking into account the fluctuation of rainwater according to the facility situation. Can do.
尚、上記実施の形態1において示した、各パラメータ(所定時間、時間毎、重みなどの値)は、施設の設備構成および排水処理の可能量などによって異なる。このため、各パラメータは過去データを使用して精度評価を実施し、適切であると考えられる値を設定するものである。
In addition, each parameter (value, such as predetermined time, every time, a weight) shown in the said
また、各パラメータは始めに設定したものに限定されるものではなく、電力量の予測の評価に応じて、適宜変更することが考えられる。
また、このことは以下の実施の形態においても同様であるため、その説明は適宜省略する。
Further, each parameter is not limited to the one set at the beginning, but may be appropriately changed according to the evaluation of the prediction of the electric energy.
This also applies to the following embodiments, and the description thereof will be omitted as appropriate.
実施の形態2.
図13はこの発明の実施の形態2における電力需要予測装置の構成を示すブロック図である。
図14は図13に示した電力需要予測装置の対象時刻におけるポンプの対象運転状態を説明するための図である。
図15は図13に示した電力需要予測装置の需要予測部におけるニューラルネットワークの予測モデルを説明するための図である。
FIG. 13 is a block diagram showing the configuration of the power demand prediction apparatus according to
FIG. 14 is a diagram for explaining the target operation state of the pump at the target time of the power demand prediction apparatus shown in FIG.
FIG. 15 is a diagram for explaining a neural network prediction model in the demand prediction unit of the power demand prediction apparatus shown in FIG.
図16は図13に示した電力需要予測装置の需要予測部の動作を説明するためのフローチャートである。
図17は図13に示した電力需要予測装置の予測開始時刻におけるポンプの対象運転状態を説明するための図である。
図18は図13に示した電力需要予測装置の予測対象時刻におけるポンプの対象運転状態を説明するための図である。
尚、上記実施の形態1と同様の部分は同一符号を付して説明を省略する。
FIG. 16 is a flowchart for explaining the operation of the demand prediction unit of the power demand prediction apparatus shown in FIG.
FIG. 17 is a diagram for explaining the target operation state of the pump at the prediction start time of the power demand prediction apparatus shown in FIG.
FIG. 18 is a diagram for explaining the target operation state of the pump at the prediction target time of the power demand prediction apparatus shown in FIG.
The same parts as those in the first embodiment are denoted by the same reference numerals and the description thereof is omitted.
図13において、電力需要予測装置1は、ポンプデータ取得部60と、ポンプ運転状態DB16とを備える。ポンプデータ取得部60は、施設2のポンプの運転状態を取得し、時刻毎のポンプの運転状態をポンプ運転状態DB16に格納する。尚、ここでは時刻毎として、上記実施の形態1と同様に1時間毎のデータを取得するものとする。
さらに、ポンプデータ取得部60は、ポンプ運転状態DB16のポンプの運転状態から、対象時刻TNの第四所定時間M4前から対象時刻TNまでのポンプの運転状態を対象時刻TNの対象運転状態として抽出してポンプ運転状態DB16に格納する。
In FIG. 13, the power
Further, the pump
次に上記のように構成された実施の形態2の電力需要予測装置1の動作について説明する。尚、上記実施の形態1と同様の動作の部分は適宜省略する。
まず、ポンプデータ取得部60は、施設2のポンプの運転状態として、ポンプのONまたはOFFの1時間毎のポンプのONの台数の運転情報を、例えば図14に示すように取得する。
Next, operation | movement of the electric power
First, the pump
そして、ポンプデータ取得部60は、対象時刻TNの第四所定時間M4前、ここでは例えば7時間(7H)前の対象時刻TN−7Hから対象時刻TNまでの各時刻のポンプの運転状態をそれぞれ抽出する。そして、ここでは、各ポンプの運転状態の内、最大起動数VNを対象運転状態として検出して、対象時刻TNの最大起動数VNとして抽出する。
And the pump
そして、ポンプデータ取得部60は、対象時刻TNの対象運転状態を最大起動数VNとしてポンプ運転状態DB16に格納する。このように、各時刻をそれぞれ対象時刻TNとして、各時刻(対象時刻TN)の最大起動数VNを検出して、それぞれ対象時刻TNに関連付けて格納しておく。
Then, the pump
尚、対象時刻TNの対象運転状態として、対象時刻TNの第四所定時間M4時間前から対象時刻TNまでの各時刻のポンプの起動数の内の最大起動数VNを設定する場合を示したが、これに限られることはなく、例えば、対象時刻TNのM4時間前から対象時刻TNまでの各時刻のポンプの起動数の延べ起動数を設定してもよい。 In addition, although the case where the maximum starting number VN of the pump starting numbers at each time from the fourth predetermined time M4 hours before the target time TN to the target time TN is set as the target operation state at the target time TN is shown. However, the present invention is not limited to this. For example, the total number of pump activations at each time from M4 hours before the target time TN to the target time TN may be set.
次に、需要予測部40について説明する。尚、対象時刻TNにおける、過去降水量RNおよび将来降水量QNは、上記実施の形態1と同様に算出するため、その説明は省略する。上記のようにして求められた、過去の各対象時刻TNに対する過去降水量DB14、将来降水量DB15、ポンプ運転状態DB16、電力需要実績値DB11の各値を用いて、対象時刻TN毎の予測モデルを構築する。そして、予測対象時刻TXの過去降水量RX、将来降水量QX、最大起動数VXから予測対象時刻TXの電力量予測値FXを算出する。
Next, the
尚、電力量予測値FXの算出方法としては、上記実施の形態1と同様に、重回帰分析、または、ニューラルネットワークによる予測モデルを用いて算出する方法が考えられる。また、パターンマッチングによる手法を用いる方法が考えられる。 As a method for calculating the electric energy predicted value FX, a method of calculating using a regression model or a prediction model by a neural network is conceivable as in the first embodiment. A method using a pattern matching method is also conceivable.
まず、具体例として、重回帰分析による予測モデルを用いた電力量予測値の算出方法について説明する。予測モデルを用いた予測対象時刻TXの電力量予測値FXの算出式を、(式6)にて次に示す。 First, as a specific example, a method for calculating an electric energy prediction value using a prediction model based on multiple regression analysis will be described. A formula for calculating the predicted electric energy FX at the prediction target time TX using the prediction model is shown below as (Formula 6).
電力量予測値(FX)=PP・過去降水量(RN)+PF・将来降水量(QN)+pomp・ポンプ起動状態(VN)+intercept ・・・(式6) Predicted electric energy (FX) = PP, past precipitation (RN) + PF, future precipitation (QN) + pump, pump activation state (VN) + intercept (Equation 6)
ここで、PP、PF、pompとは偏回帰係数であり、interceptとは切片をそれぞれ表している。尚、各編回帰係数と切片とは最小二乗法を用いて、以下に示す(式7)の誤差の平方和が最小となるような定数項を求める。 Here, PP, PF, and pomp are partial regression coefficients, and intercept represents an intercept. The constant regression coefficient and the intercept are obtained by using the least square method so that a constant term that minimizes the sum of squares of errors in (Equation 7) shown below is obtained.
次に、具体例として、ニューラルネットワークによる予測モデルを用いた電力量予測値の算出方法について説明する。ニューラルネットワークの予測モデルの例を図15示す。図15に示すように、予測対象時刻TXの過去降水量RX、将来降水量QX、最大起動数VXを入力値とし、予測モデルを用いて予測対象時刻TXの電力量予測値FXを算出する。電力量予測値FXの算出式を、(式8)にて次に示す。 Next, as a specific example, a method for calculating a predicted electric energy value using a prediction model based on a neural network will be described. An example of a neural network prediction model is shown in FIG. As illustrated in FIG. 15, the power amount prediction value FX at the prediction target time TX is calculated using the prediction model with the past precipitation RX at the prediction target time TX, the future precipitation QX, and the maximum activation number VX as input values. A formula for calculating the electric energy prediction value FX is shown below as (Formula 8).
ここで、Xjは入力値である、過去降水量RX、将来降水量QX、最大起動数VXを表し、wiは中間層から出力層を結ぶ各ユニットの結合係数、wijは入力層と中間層を結ぶ各ユニットの結合係数、fは出力層における出力関数、fjは中間層における出力関数を表す。尚、各ユニットの結合係数wi、wijについては、過去の各時刻の過去降水量RN、将来降水量QN、最大起動数VNと、電力需要実績値ENとの関係から最小二乗法により算出する。 Here, Xj represents the input value, the past precipitation RX, the future precipitation QX, and the maximum activation number VX, wi is a coupling coefficient of each unit connecting the intermediate layer to the output layer, and wij is the input layer and the intermediate layer. The coupling coefficient of each unit to be connected, f is an output function in the output layer, and fj is an output function in the intermediate layer. The coupling coefficients wi and wij of each unit are calculated by the least square method from the relationship between the past precipitation RN, the future precipitation QN, the maximum startup number VN, and the actual power demand value EN at each past time.
次に、具体例として、パターンマッチングによる手法を用いた電力量予測値の算出方法について説明する。図16は需要予測部40における電力需要予測の処理手順を示すフローチャートである。
Next, as a specific example, a method for calculating a predicted electric energy using a pattern matching method will be described. FIG. 16 is a flowchart showing a processing procedure of power demand prediction in the
まず、電力需要予測に使用する電力需要実績値ENを過去の電力需要実績値DB11から取得するための絞り込み条件を取得する(図16のステップST11)。
例えば、絞り込み条件とは、過去降水量RN、将来降水量QN、最大起動数VNの3つを使用した、以下の例が考えられる。
First, a narrowing-down condition for acquiring the power demand actual value EN used for power demand prediction from the past power demand
For example, as the narrowing-down conditions, the following examples using the past precipitation RN, the future precipitation QN, and the maximum activation number VN can be considered.
|予測対象時刻TXの過去降水量RX−比較する対象時刻TNの過去降水量RN|≦A4=1mm
|予測対象時刻TXの将来降水量QX−比較する対象時刻TNの将来降水量QN|≦A2=5mm
予測対象時刻TXの最大起動数VX=比較する対象時刻TNの最大起動数VN
以上、各式を絞り込み条件とする。
| Past precipitation RX at the prediction target time TX−Past precipitation RN at the target time TN to be compared | ≦ A4 = 1 mm
| Future precipitation QX at forecast time TX-Future precipitation QN at time TN to be compared | ≦ A2 = 5 mm
Maximum number of activations VX at prediction target time TX = Maximum number of activations VN at target time TN to be compared
As described above, each expression is used as a narrowing condition.
尚、予測対象時刻TXとは、現在時刻を含む将来の電力需要を予測する任意の時刻のことである。また、比較する対象時刻TNとは、現在時刻を含まない過去の任意の時刻のことである。また、A4、A5は、ここでは1mm、5mmをそれぞれ設定したが、これに限られることはなく、0以上の値を取り、施設2の設備構成および排水処理の可能量などによって異なるため、システム導入時に過去データを使用して精度評価を実施し、最もよい値を設定する。
The prediction target time TX is an arbitrary time at which future power demand including the current time is predicted. The target time TN to be compared is an arbitrary past time that does not include the current time. In addition, A4 and A5 are set to 1 mm and 5 mm, respectively. However, the present invention is not limited to this, and takes a value of 0 or more and varies depending on the equipment configuration of the
次に、絞り込み条件に基づいて、電力需要実績値DB11から絞り込み条件に該当する比較の対象時刻TNの電力需要実績値ENを取得する(図16ステップST12)。
次に、取得した電力需要実績値ENの平均値を算出し、この値を予測対象時刻TXの電力量予測値FXとする(図16のステップST13)。
Next, the actual power demand value EN at the comparison target time TN corresponding to the narrowing condition is acquired from the actual power
Next, an average value of the acquired power demand actual value EN is calculated, and this value is set as the predicted power amount FX at the prediction target time TX (step ST13 in FIG. 16).
以上に示したように、需要予測部40にて各方法を用いて予測された予測対象時刻TXの電力量予測値FXは、予測対象時刻TXの電力需要実績値EXとして電力需要実績値DB11に格納する。尚、予測対象時刻TXの時刻の予測に基づいて保存された電力需要実績値EXは、実際の時刻が予測対象時刻TXに到達して、実際の電力需要実績値EXを得ることができた際には、実際の電力需要実績値EXを置き換えて保存するものである。
As described above, the power amount predicted value FX at the prediction target time TX predicted by the
以下、実際に予測を行う場合について更に説明する。予測を行う時刻である予測開始時刻TYにおいて、予測を行うべき時刻である予測対象時刻TXまでの最大起動数VNは、図17に示すように、予測開始時刻TYから予測対象時刻TXまで、ポンプの運転状態の情報が存在しないため、検出することができない。尚、予測開始時刻TYの最大起動数VYは、”2”として抽出できる。よって、それ以後の予測対象時刻TXまで最大起動数VXを、簡便に予測するために、図18に示すように、予測開始時刻TYも含めて予測対象時刻TXまで、最大起動数VNからVXをそれぞれ0として設定して行うことも考えられる。 Hereinafter, a case where prediction is actually performed will be further described. As shown in FIG. 17, the maximum number of activations VN from the prediction start time TY to the prediction target time TX at the prediction start time TY that is the time to perform prediction is the pump from the prediction start time TY to the prediction target time TX. Since there is no information on the driving state of, it cannot be detected. Note that the maximum activation number VY at the predicted start time TY can be extracted as “2”. Therefore, in order to simply predict the maximum number of activations VX until the prediction target time TX thereafter, as shown in FIG. 18, the maximum number of activations VN to VX is calculated from the maximum number of activations VN to the prediction target time TX including the prediction start time TY. It is also conceivable to set each to 0.
また、予測開始時刻TYから予測対象時刻TXまでの、最大起動数VNを求める方法として、まず、上記に示した方法により、予測開始時刻TYの電力量予測値FYを算出する。そして、この電力量予測値FYを、予測開始時刻TYの電力需要実績値EYとして、電力需要実績値DB11に登録する。 In addition, as a method for obtaining the maximum activation number VN from the prediction start time TY to the prediction target time TX, first, the predicted electric energy value FY at the prediction start time TY is calculated by the method described above. And this electric energy prediction value FY is registered into power demand track record value DB11 as power demand track record value EY of prediction start time TY.
そして、ポンプデータ取得部60が、この予測開始時刻TYの電力量予測値FY(=電力需要実績値EY)から、予測開始時刻TYのポンプの運転状態、すなわち、ポンプの運転台数を予測する。その際例えば、次のような条件式に基づいて予測することができる。
Then, the pump
ポンプ0台:0≦電力量予測値FY≦閾値γ1
ポンプ1台:閾値γ1≦電力量予測値FY≦閾値γ2
ポンプ2台:閾値γ2≦電力量予測値FY≦閾値γ3
・・・
ポンプn台:閾値γn≦電力量予測値FY
尚、閾値γnは施設2のポンプの台数分存在し、この閾値については、過去の電力需要実績値ENとポンプの運転台数とから推定した値を設定する。
0 pumps: 0 ≦ predicted electric energy FY ≦ threshold γ1
One pump: threshold γ1 ≦ predicted electric energy FY ≦ threshold γ2
Two pumps: threshold γ2 ≦ predicted electric energy FY ≦ threshold γ3
...
Pump n units: threshold value γn ≦ predicted electric energy FY
Note that the threshold value γn exists for the number of pumps of the
具体的は、施設2にポンプが3台、第一ポンプ、第二ポンプ、および、第三ポンプが存在し、各ポンプ起動時の電力量が以下に示す場合について説明する。
第一ポンプ起動時=1000kW
第二ポンプ起動時=1500kW
第三ポンプ起動時=800kW
Specifically, a case will be described in which three pumps, a first pump, a second pump, and a third pump exist in the
When starting the first pump = 1000kW
When starting the second pump = 1500 kW
When the third pump is started = 800 kW
よって、上記に示した条件式は以下に示すように設定される。
ポンプ0台:0≦電力量予測値FY<800kW
ポンプ1台:800kW≦電力量予測値FY<1800kW
ポンプ2台:1800kW≦電力量予測値FY<2500kW
ポンプ3台:2500kW≦電力量予測値FY
Therefore, the conditional expressions shown above are set as shown below.
0 pumps: 0 ≦ predicted electric energy FY <800 kW
One pump: 800 kW ≦ power predicted value FY <1800 kW
Two pumps: 1800 kW ≦ predicted electric energy FY <2500 kW
3 pumps: 2500 kW ≤ predicted electric energy FY
よって、例えば、電力量予測値FYが1000kWであれば、ポンプの起動台数は1台と推定される。そして、算出した予測開始時刻TYのポンプの運転状態をポンプ運転状態DB16に格納する。このようにして、予測対象時刻TXまでの各対象時刻TNに対応するポンプの運転状態である順次求め、これに基づいて、予測対象時刻TXまでの各対象時刻TNに対応する電力量予測値FXを順次求める。
Therefore, for example, if the electric energy prediction value FY is 1000 kW, the number of pumps started is estimated to be one. Then, the calculated operation state of the pump at the predicted start time TY is stored in the pump
上記のように構成された実施の形態2の電力需要予測装置によれば、上記実施の形態1と同様の効果を奏するのはもちろんのこと、所定時間前から予測対象時刻までの累積降水量、予測対象時刻から所定時間先までの累積降水量と、所定時間前から予測対象時刻までのポンプの対象運転状態と、電力需要実績値との関係を用いて、予測対象時刻の電力量予測値の予測を行っているので、施設の雨水の変動を加味した電力需要を精度よく予測することができる。 According to the power demand prediction apparatus of the second embodiment configured as described above, the accumulated precipitation from the predetermined time before the prediction target time, as well as the same effect as the first embodiment, Using the relationship between the accumulated precipitation from the prediction target time to the predetermined time ahead, the target operation state of the pump from the predetermined time before the prediction target time, and the actual power demand value, Since the prediction is performed, it is possible to accurately predict the power demand in consideration of the rainwater fluctuation of the facility.
また、ポンプデータ取得部は、対象運転状態を、ポンプの最大起動数またはポンプの延べ起動数として抽出して設定できるため、対象運転状態の設定を簡便に行うことができる。 Moreover, since the pump data acquisition unit can extract and set the target operation state as the maximum number of pump activations or the total number of pump activations, the target operation state can be easily set.
さらに、電力量予測値を用いてポンプの運転状態を予測することができるため、電力量予測値をより精度の高く予測することが可能になる。 Furthermore, since the operation state of the pump can be predicted using the predicted electric energy value, the predicted electric energy value can be predicted with higher accuracy.
実施の形態3.
図19はこの発明の実施の形態3における電力需要予測装置の構成を示すブロック図である。
図20は図19に示した電力需要予測装置の需要予測部における第一電力量予測値を求めるためのニューラルネットワークの予測モデルを説明するための図である。
図21は図19に示した電力需要予測装置の需要予測部における第二電力量予測値を求めるためのニューラルネットワークの予測モデルを説明するための図である。
図22は図19に示した電力需要予測装置の需要予測部の動作を説明するためのフローチャートである。
尚、上記各実施の形態と同様の部分は同一符号を付して説明を省略する。
FIG. 19 is a block diagram showing the configuration of the power demand prediction apparatus according to
FIG. 20 is a diagram for explaining a neural network prediction model for obtaining a first power amount prediction value in the demand prediction unit of the power demand prediction apparatus shown in FIG.
FIG. 21 is a diagram for explaining a neural network prediction model for obtaining a second power amount prediction value in the demand prediction unit of the power demand prediction apparatus shown in FIG.
FIG. 22 is a flowchart for explaining the operation of the demand prediction unit of the power demand prediction apparatus shown in FIG.
The same parts as those in the above embodiments are given the same reference numerals, and the description thereof is omitted.
図19において、電力需要予測装置1は、第一電力需要実績値DB17と、ポンプ最大電力量値DB18と、第二電力需要実績値DB19と、気温値DB20とを備える。
そして、実績データ取得部50は、施設2のポンプのみの時刻毎の第一電力需要実績値EPNを第一電力需要実績値DB17に格納する。
さらに、実績データ取得部50は、施設2のポンプ以外の時刻毎の第二電力需要実績値EENを第二電力需要実績値DB19に格納する。
尚、ここでは時刻毎として、上記各実施の形態と同様に1時間毎のデータを取得するものとする。
In FIG. 19, the power
And the performance
Furthermore, the performance
Here, for each time, data for every hour is acquired as in the above embodiments.
さらに、実績データ取得部50は、第一電力需要実績値DB17の第一電力需要実績値EPNから、対象時刻TNの第五所定時間M5前から対象時刻TNまでの各時刻の第一電力需要実績値EPNの内、最大の第一電力需要実績値EPNを検出して、対象時刻TNのポンプ最大電力量値GPNとして抽出する。
そして、実績データ取得部50は、対象時刻TNのポンプ最大電力量値GPNとしてポンプ最大電力量値DB18に格納する。
Furthermore, the performance
And the performance
気象情報取得部30は、気温値の実績値および気温値の予測値を含む気象情報3を外部から取得し、時刻毎の気温値UNを気温値DB20に格納する。
また、ここでの時刻毎とは、各電力需要実績値EPN、EENと同一の時刻毎であり、1時間毎のデータを取得するものとする。
尚、気象情報取得部30の降水量に関しては、上記実施の形態1と同様に取得し、さらに、対象時刻TNにおける、過去降水量RNおよび将来降水量QNについては、上記実施の形態1と同様に算出するため、その説明は適宜省略する。
The weather
In addition, every time here is every time that is the same as the actual power demand values EPN and EEN, and data for every hour is acquired.
The precipitation of the weather
次に上記のように構成された実施の形態3の電力需要予測装置1の動作について説明する。尚、上記各実施の形態と同様の動作の部分は適宜省略する。
まず、実績データ取得部50は、施設2に設置されているポンプ、ブロア、照明、空調、等のそれぞれの設備の時刻毎の電力需要実績値を取得する。そして、取得したデータをポンプのみの第一電力需要実績値EPNと、ポンプ以外の第二電力需要実績値EENとに分けて算出する。そして、第一電力需要実績値EPNを第一電力需要実績値DB17に、また、第二電力需要実績値EENを第二電力需要実績値DB19にそれぞれ格納する。
Next, operation | movement of the electric power
First, the actual
そして、実績データ取得部50は、第一電力需要実績値DB17の第一電力需要実績値EPNから、対象時刻TNの第五所定時間M5前、ここでは例えば4時間(4H)前の対象時刻TN−M5から対象時刻TNまでの各時刻の第一電力需要実績値EPNをそれぞれ抽出する。そして各第一電力需要実績値EPNの内、最大の第一電力需要実績値EPNを検出して、対象時刻TNのポンプ最大電力量値GPNとして抽出する。
And the performance
そして、実績データ取得部50は、対象時刻TNのポンプ最大電力量値GPNとしてポンプ最大電力量値DB18に格納する。このように各時刻をそれぞれ対象時刻TNとして、各時刻(対象時刻TN)のポンプ最大電力量値GPNを検出して、それぞれ対象時刻TNに関連付けて格納しておく。
尚、この方法は、上記実施の形態1にて示した、最大電力量値GNと同様に行うことができるため、その詳細の説明は省略する。
And the performance
Since this method can be performed in the same manner as the maximum power amount value GN shown in the first embodiment, detailed description thereof is omitted.
次に、気象情報取得部30は、1時間毎の気温値の実績値および気温値の予報値を含む気象情報3を外部から取得し、1時間毎の気温値UNを気温値DB20に格納する。
尚、気象情報取得部30の降水量に関しては、上記実施の形態1と同様に取得し、さらに、対象時刻TNにおける、過去降水量RNおよび将来降水量QNについては、上記実施の形態1と同様に算出するため、その説明は適宜省略する。
Next, the weather
The precipitation of the weather
次に、需要予測部40について説明する。
本実施の形態3においては、電力需要予測を、施設2のポンプと、施設2のポンプ以外とに分けて予測する。
上記に示したように求められた、過去の各対象時刻TNに対する過去降水量DB14、将来降水量DB15、ポンプ最大電力量値DB18、第一電力需要実績値DB17の各値を用いて、対象時刻TN毎の予測モデルを構築する。
Next, the
In the third embodiment, the power demand prediction is predicted separately for the pump of the
Using the values of the
そして、予測対象時刻TXの過去降水量RX、将来降水量QX、ポンプ最大電力量値GPXから予測対象時刻TXの第一電力量予測値FPXを算出する。さらに、第二電力需要実績値DB19、気温値DB20の各値を用いて、対象時刻TN毎の予測モデルを構築する。そして、予測対象時刻TXの気温値UXから予測対象時刻TXの第二電力量予測値FFXを算出する。そして、これら第一電力量予測値FPXと第二電力量予測値FFXとを合計して、予測対象時刻TXの電力量予測値FXを予測する。 Then, the first electric energy prediction value FPX at the prediction target time TX is calculated from the past precipitation RX at the prediction target time TX, the future precipitation QX, and the pump maximum electric energy value GPX. Furthermore, the prediction model for every object time TN is constructed | assembled using each value of 2nd electric power demand performance value DB19 and temperature value DB20. Then, the second electric energy prediction value FFX at the prediction target time TX is calculated from the temperature value UX at the prediction target time TX. Then, the first power amount prediction value FPX and the second power amount prediction value FFX are summed to predict the power amount prediction value FX at the prediction target time TX.
尚、電力量予測値FXの算出方法としては、上記各実施の形態と同様に、重回帰分析、または、ニューラルネットワークによる予測モデルを用いて算出する方法が考えられる。また、パターンマッチングによる手法を用いる方法が考えられる。 In addition, as a calculation method of the electric energy prediction value FX, the method of calculating using the prediction model by a multiple regression analysis or a neural network similarly to said each embodiment can be considered. A method using a pattern matching method is also conceivable.
まず、具体例として、重回帰分析による予測モデルを用いたポンプの第一電力量予測値FPXの算出方法について説明する。
予測モデルを用いた予測対象時刻TXのポンプの第一電力量予測値FPXの算出式を、(式9)にて次に示す。
First, as a specific example, a method for calculating the pump first electric energy prediction value FPX using a prediction model based on multiple regression analysis will be described.
A formula for calculating the first predicted electric power value FPX of the pump at the prediction target time TX using the prediction model is shown below as (Formula 9).
第一電力量予測値(FPX)=PP・過去降水量(RN)+PF・将来降水量(QN)+MAX・ポンプ最大電力量値(GPN)+intercept ・・・(式9) First electric energy prediction value (FPX) = PP · Past precipitation (RN) + PF · Future precipitation (QN) + MAX · Pump maximum electric energy value (GPN) + intercept (Equation 9)
ここで、PP、PF、MAXとは偏回帰係数であり、interceptとは切片をそれぞれ表している。尚、各編回帰係数と切片とは最小二乗法を用いて、以下に示す(式10)の誤差の平方和が最小となるような定数項を求める。 Here, PP, PF, and MAX are partial regression coefficients, and intercept represents an intercept. The constant regression coefficient and the intercept are obtained by using a least square method so that a constant term that minimizes the sum of squares of errors in (Equation 10) shown below is obtained.
次に、重回帰分析による予測モデルを用いたポンプ以外の第二電力量予測値FFXの算出方法について説明する。
予測モデルを用いた予測対象時刻TXのポンプ以外の第二電力量予測値FFXの算出式を、(式11)にて次に示す。
Next, a method of calculating the second electric energy prediction value FFX other than the pump using the prediction model based on multiple regression analysis will be described.
An equation for calculating the second electric energy prediction value FFX other than the pump at the prediction target time TX using the prediction model is shown below as (Equation 11).
第二電力量予測値(FFX)=temp・気温値(U)+intercept
・・・(式11)
Second electric energy prediction value (FFX) = temp · temperature value (U) + intercept
... (Formula 11)
ここで、tempは回帰係数であり、interceptとは切片をそれぞれ表している。尚、回帰係数と切片とは最小二乗法を用いて、以下に示す(式12)の誤差の平方和が最小となるような定数項を求める。 Here, temp is a regression coefficient, and intercept represents an intercept. For the regression coefficient and the intercept, a constant term that minimizes the sum of squares of errors in (Equation 12) shown below is obtained using the least square method.
そして、このようにして求められた、第一電力量予測値FPXおよび第二電力量予測値FFXを合計して、施設2の予測対象時刻TXの電力量予測値FXを算出する。
And the 1st electric energy prediction value FPX and the 2nd electric energy prediction value FFX which were calculated | required in this way are totaled, and the electric energy prediction value FX of the prediction object time TX of the
次に、具体例として、ニューラルネットワークによる予測モデルを用いた電力量予測値の算出方法について説明する。
ポンプの第一電力量予測値FPXを算出するためのニューラルネットワークの予測モデルの例を図20に示す。
Next, as a specific example, a method for calculating a predicted electric energy value using a prediction model based on a neural network will be described.
FIG. 20 shows an example of a neural network prediction model for calculating the pump first electric energy prediction value FPX.
図20に示すように、予測対象時刻TXの過去降水量RX、将来降水量QX、ポンプ最大電力量値GPNを入力値とし、予測モデルを用いて予測対象時刻TXの第一電力量予測値FPXを算出する。第一電力量予測値FPXの算出式を、(式13)にて次に示す。 As shown in FIG. 20, the first precipitation amount predicted value FPX at the prediction target time TX using the prediction model with the past precipitation RX at the prediction target time TX, the future precipitation QX, and the maximum pump power value GPN as input values. Is calculated. A formula for calculating the first electric energy prediction value FPX is shown below as (Formula 13).
ここで、Xjは入力値である、過去降水量RX、将来降水量QX、ポンプ最大電力量値GPNを表し、wiは中間層から出力層を結ぶ各ユニットの結合係数、wijは入力層と中間層を結ぶ各ユニットの結合係数、fは出力層における出力関数、fjは中間層における出力関数を表す。尚、各ユニットの結合係数wi、wijについては、過去の各時刻の過去降水量RN、将来降水量QN、最大起動数VNと、第一電力需要実績値EPNとの関係から最小二乗法により算出する。 Here, Xj represents the input value, the past precipitation RX, the future precipitation QX, and the pump maximum power value GPN, wi is a coupling coefficient of each unit connecting the output layer to the intermediate layer, and wij is an intermediate value between the input layer and the output layer. The coupling coefficient of each unit connecting the layers, f is an output function in the output layer, and fj is an output function in the intermediate layer. Note that the coupling coefficients wi and wij of each unit are calculated by the method of least squares from the relationship between the past precipitation RN, the future precipitation QN, the maximum startup number VN, and the first power demand actual value EPN at each past time. To do.
ポンプ以外の第二電力量予測値FFXを算出するためのニューラルネットワークの予測モデルの例を図21に示す。
図21に示すように、予測対象時刻TXの気温値、同一日の最高気温値、同一日の最低気温値を入力値とし、予測モデルを用いて予測対象時刻TXの第二電力量予測値FFXを算出する。第二電力量予測値FFXの算出式を、(式14)にて次に示す。
FIG. 21 shows an example of a neural network prediction model for calculating the second electric energy prediction value FFX other than the pump.
As shown in FIG. 21, the second electric energy predicted value FFX at the prediction target time TX using the prediction model using the temperature value at the prediction target time TX, the highest temperature value on the same day, and the lowest temperature value on the same day as input values. Is calculated. A formula for calculating the second power amount prediction value FFX is shown below as (Formula 14).
ここで、Xjは入力値である、気温、同一日の最高気温、同一日の最低気温を表し、wiは中間層から出力層を結ぶ各ユニットの結合係数、wijは入力層と中間層を結ぶ各ユニットの結合係数、fは出力層における出力関数、fjは中間層における出力関数を表す。尚、各ユニットの結合係数wi、wijについては、過去の各時刻の気温、同一日の最高気温、同一日の最低気温、第二電力需要実績値EENとの関係から最小二乗法により算出する。 Here, Xj represents an input value, that is, an air temperature, a maximum temperature on the same day, and a minimum temperature on the same day, wi is a coupling coefficient of each unit connecting the intermediate layer to the output layer, and wii connects the input layer and the intermediate layer. The coupling coefficient of each unit, f represents an output function in the output layer, and fj represents an output function in the intermediate layer. The coupling coefficients wi and wij of each unit are calculated by the least square method from the relationship between the temperature at each past time, the highest temperature on the same day, the lowest temperature on the same day, and the second actual power demand value EEN.
そして、このようにして求められた、第一電力量予測値FPXおよび第二電力量予測値FFXを合計して、施設2の予測対象時刻TXの電力量予測値FNを算出する。
Then, the first power amount predicted value FPX and the second power amount predicted value FFX obtained in this way are summed to calculate the power amount predicted value FN at the prediction target time TX of the
次に、具体例として、パターンマッチングによる手法を用いた電力量予測値の算出方法について説明する。図22は需要予測部40における電力需要予測の処理手順を示すフローチャートである。
Next, as a specific example, a method for calculating a predicted electric energy using a pattern matching method will be described. FIG. 22 is a flowchart showing a processing procedure of power demand prediction in the
まず、電力需要予測に使用する第二電力需要実績値EENを過去の第二電力需要実績値DB19から取得するための絞り込み条件を取得する(図22のステップST21)。
例えば、絞り込み条件とは、気温値UNを使用した、以下の例が考えられる。
First, a narrowing condition for acquiring the second power demand actual value EEN used for power demand prediction from the past second power demand
For example, as the narrowing-down condition, the following example using the temperature value UN can be considered.
|予測対象時刻TXの気温値UX(予測値)−比較の対象時刻TNの気温値UN(実測値)|≦A7
上記、式を絞り込み条件とする。
尚、A7は、0以上の値を取り、施設2の設備構成および排水処理の可能量などによって異なるため、システム導入時に過去データを使用して精度評価を実施し、最もよい値を設定する。
| Temperature value UX (predicted value) at prediction target time TX-Air temperature value UN (actual value) at comparison target time TN | ≦ A7
The above formula is used as a narrowing condition.
A7 takes a value of 0 or more and differs depending on the facility configuration of
次に、絞り込み条件に基づいて、第二電力需要実績値DB19から絞り込み条件に該当する比較の対象時刻TNの第二電力需要実績値EENを取得する(図22のステップST22)。
次に、取得した第二電力需要実績値EENの平均値を算出し、この値を予測対象時刻TXの第二電力量予測値FFXとする(図22のステップST23)。
Next, based on the narrowing condition, the second power demand actual value EEN at the comparison target time TN corresponding to the narrowing condition is acquired from the second power demand actual value DB 19 (step ST22 in FIG. 22).
Next, an average value of the acquired second power demand actual value EEN is calculated, and this value is set as the second power amount predicted value FFX at the prediction target time TX (step ST23 in FIG. 22).
次に、電力需要予測に使用する第一電力需要実績値EPNを過去の第一電力需要実績値DB17から取得するための絞り込み条件を取得する(図22のステップST24)。
例えば、絞り込み条件とは、上記実施の形態1と同様に行う。このため、その説明は適宜省略する。但し、本実施の形態3においては、最大電力量値GNに変えて、ポンプ最大電力量値GPNを用いるものである。
Next, a narrowing condition for acquiring the first power demand actual value EPN used for power demand prediction from the past first power demand
For example, the narrowing-down condition is performed in the same manner as in the first embodiment. Therefore, the description is omitted as appropriate. However, in the third embodiment, the pump maximum power amount value GPN is used instead of the maximum power amount value GN.
次に、絞り込み条件に基づいて、第一電力需要実績値DB17から絞り込み条件に該当する比較の対象時刻TNの第一電力需要実績値EPNを取得する(図22のステップST25)。
次に、取得した第一電力需要実績値EPNの平均値を算出し、この値を予測対象時刻TXの第一電力量予測値FPXとする(図22のステップST26)。
次に、先のステップST23にて算出した第二電力量予測値FFXと、第一電力量予測値FPXとを合計して、施設2の予測対象時刻TXの電力量予測値FXとして算出する(図22のステップST27)。
Next, based on the narrowing condition, the first power demand actual value EPN at the comparison target time TN corresponding to the narrowing condition is acquired from the first power demand actual value DB 17 (step ST25 in FIG. 22).
Next, an average value of the acquired first power demand actual value EPN is calculated, and this value is set as the first power amount predicted value FPX at the prediction target time TX (step ST26 in FIG. 22).
Next, the second power amount predicted value FFX calculated in the previous step ST23 and the first power amount predicted value FPX are summed to calculate a power amount predicted value FX at the prediction target time TX of the facility 2 ( Step ST27 in FIG.
以上に示したように、需要予測部40にて各方法を用いて予測された予測対象時刻TXの第一電力量予測値FPXおよび第二電力量予測値FFXは、予測対象時刻TXの第一電力需要実績値EPXとして第一電力需要実績値DB17に、また、予測対象時刻TXの第二電力需要実績値EEXとして第二電力需要実績値DB19にそれぞれ格納される。尚、予測対象時刻TXの時刻の予測に基づいて保存された各電力需要実績値EPX、EEXは、実際の時刻が予測対象時刻TXに到達して、実際の各電力需要実績値EPX、EEXを得ることができた際には、実際の各電力需要実績値EPX、EEXを置き換えて保存するものである。
As described above, the first power amount predicted value FPX and the second power amount predicted value FFX at the prediction target time TX predicted by the
上記のように構成された実施の形態3の電力需要予測装置によれば、上記各実施の形態と同様の効果を奏するのはもちろんのこと、降水量およびポンプの運転状態の影響を大きく受けて変化すると考えられるポンプの電力量予測値と気温の影響を大きく受けて変化すると考えられるポンプ以外の電力量予測値とを別々に算出することで、施設の雨水を加味した電力需要を精度よく予測することができる。 According to the power demand prediction apparatus of the third embodiment configured as described above, the effects similar to those of the above-described embodiments can be obtained, as well as being greatly affected by precipitation and the operating state of the pump. By accurately calculating the predicted electric power amount of the pump that is expected to change and the predicted electric energy amount of the pump other than the pump that is expected to change due to the influence of temperature, the power demand that takes into account the rainwater of the facility is accurately predicted. can do.
尚、本発明は、その発明の範囲内において、各実施の形態を自由に組み合わせたり、各実施の形態を適宜、変形、省略することが可能である。 It should be noted that the present invention can be freely combined with each other within the scope of the invention, and each embodiment can be appropriately modified or omitted.
1 電力需要予測装置、2 施設、3 気象情報、11 電力需要実績値DB、
12 最大電力量値DB、13 降水量DB、14 過去降水量DB、
15 将来降水量DB、16 ポンプ運転状態DB、17 第一電力需要実績値DB、
18 ポンプ最大電力量値DB、19 第二外電力需要実績値DB、20 気温値DB、30 気象情報取得部、40 需要予測部、50 実績データ取得部、
60 ポンプデータ取得部、GN 最大電力量値(対象時刻TNにおける)、
GY 最大電力量値(予測開始時刻TYにおける)、
GX 最大電力量値(予測対象時刻TXにおける)、
EN 電力需要実績値(対象時刻TNにおける)、
EX 電力需要実績値(予測対象時刻TXにおける)、
EY 電力需要実績値(予測開始時刻TYにおける)、
FY 電力量予測値(予測開始時刻TYにおける)、
FX 電力量予測値(予測対象時刻TXにおける)、TN 対象時刻、T1 時刻、
TY 予測開始時刻、TX 予測対象時刻、M1 第一所定時間、M2 第二所定時間、M3 第三所定時間、M4 第四所定時間、
RN 過去降水量(対象時刻TNにおける)、
RY 過去降水量(予測開始時刻TYにおける)、
RX 過去降水量(予測対象時刻TXにおける)、
QN 将来降水量(対象時刻TNにおける)、
QY 将来降水量(予測開始時刻TYにおける)、
QX 将来降水量(予測対象時刻TXにおける)、SN 降水量値、UN 気温値、
UX 気温値(予測対象時刻TXにおける)、VN 最大起動数、VY 最大起動数、
VX 最大起動数、αL 重み、βL 重み、γL 重み、αK 重み、βK 重み、
γK 重み。
1 power demand forecasting device, 2 facilities, 3 weather information, 11 power demand record DB,
12 Maximum power value DB, 13 Precipitation DB, 14 Past precipitation DB,
15 Future precipitation DB, 16 Pump operation state DB, 17 First power demand record DB,
18 pump maximum electric energy value DB, 19 second external power demand actual value DB, 20 temperature value DB, 30 weather information acquisition unit, 40 demand prediction unit, 50 actual data acquisition unit,
60 Pump data acquisition unit, GN maximum energy value (at target time TN),
GY maximum electric energy value (at the prediction start time TY),
GX maximum energy value (at prediction target time TX),
EN Actual power demand (at target time TN),
EX Actual power demand value (at forecast target time TX),
EY Actual power demand value (at forecast start time TY),
FY Electric energy prediction value (at prediction start time TY),
FX power amount prediction value (at prediction target time TX), TN target time, T1 time,
TY prediction start time, TX prediction target time, M1 first predetermined time, M2 second predetermined time, M3 third predetermined time, M4 fourth predetermined time,
RN Past precipitation (at target time TN),
RY Past precipitation (at forecast start time TY),
RX Past precipitation (at forecast target time TX),
QN Future precipitation (at target time TN),
QY Future precipitation (at forecast start time TY),
QX Future precipitation (at forecast time TX), SN precipitation value, UN temperature value,
UX temperature value (at forecast target time TX), VN maximum number of starts, VY maximum number of starts,
VX maximum activation number, αL weight, βL weight, γL weight, αK weight, βK weight,
γK weight.
Claims (11)
前記施設の各時刻の電力需要実績値を取得し、前記電力需要実績値に対して対象時刻の第一所定時間前から前記対象時刻までの最大の前記電力需要実績値を検出して前記対象時刻の最大電力量値として抽出する実績データ取得部と、
前記施設に関係する実績値および予報値の降水量値を含む気象情報を取得し、前記気象情報に対して、前記対象時刻の第二所定時間前から前記対象時刻までの各時刻の各前記降水量値の累積降水量を算出して前記対象時刻の過去降水量として抽出し、かつ、前記対象時刻から前記対象時刻の第三所定時間後までの各時刻の各前記降水量値の累積降水量を算出して前記対象時刻の将来降水量として抽出する気象情報取得部と、
前記対象時刻の最大電力量値を蓄積する最大電力量値データベースと、
前記対象時刻の過去降水量を蓄積する過去降水量データベースと、
前記対象時刻の将来降水量を蓄積する将来降水量データベースと、
前記最大電力量値、前記過去降水量、および前記将来降水量の関係と前記電力需要実績値から前記予測対象時刻の前記電力量予測値を予測する需要予測部とを備えた電力需要予測装置。 In the power demand forecasting device that predicts the predicted amount of power at the forecast target time in a facility that performs sewage and rainwater treatment,
The actual power demand value at each time of the facility is acquired, the maximum actual power demand value from the first predetermined time before the target time to the target time is detected with respect to the actual power demand value, and the target time An actual data acquisition unit that extracts the maximum electric energy value of
The weather information including the precipitation value of the actual value and the forecast value related to the facility is acquired, and each precipitation at each time from the second predetermined time before the target time to the target time is obtained with respect to the weather information. The cumulative precipitation of each precipitation value at each time from the target time to the third predetermined time after the target time is calculated by calculating the cumulative precipitation of the quantity value and extracting it as the past precipitation at the target time. A meteorological information acquisition unit that calculates and extracts as future precipitation at the target time;
A maximum power amount value database for storing the maximum power amount value at the target time;
A past precipitation database for accumulating past precipitation at the target time;
A future precipitation database for accumulating future precipitation at the target time;
A power demand prediction device comprising: a demand prediction unit that predicts the predicted power amount at the prediction target time from the relationship between the maximum power amount value, the past precipitation amount, and the future precipitation amount, and the actual power demand value.
前記施設の各時刻の電力需要実績値を取得する実績データ取得部と、
対象時刻の第四所定時間前から前記対象時刻までの前記ポンプの運転状態を対象運転状態として抽出するポンプデータ取得部と、
前記施設に関係する実績値および予報値の降水量値を含む気象情報を取得し、前記気象情報に対して、前記対象時刻の第二所定時間前から前記対象時刻までの各時刻の各前記降水量の累積降水量を算出して前記対象時刻の過去降水量として抽出し、かつ、前記対象時刻から前記対象時刻の第三所定時間後までの各時刻の各前記降水量の累積降水量を算出して前記対象時刻の将来降水量として抽出する気象情報取得部と、
前記対象時刻の前記対象運転状態を蓄積するポンプ運転状態データベースと、
前記対象時刻の過去降水量を蓄積する過去降水量データベースと、
前記対象時刻の将来降水量を蓄積する将来降水量データベースと、
前記対象運転状態、前記過去降水量、および前記将来降水量の関係と前記電力需要実績値から前記予測対象時刻の前記電力量予測値を予測する需要予測部とを備えた電力需要予測装置。 In the power demand prediction device that predicts the predicted amount of power at the prediction target time in a facility that has a pump and performs sewage and rainwater treatment,
A record data acquisition unit that acquires a power demand record value at each time of the facility;
A pump data acquisition unit that extracts the operation state of the pump from the fourth predetermined time before the target time to the target time as the target operation state;
The weather information including the precipitation value of the actual value and the forecast value related to the facility is acquired, and each precipitation at each time from the second predetermined time before the target time to the target time is obtained with respect to the weather information. A cumulative amount of precipitation is calculated and extracted as past precipitation at the target time, and the cumulative precipitation amount at each time from the target time to the third predetermined time after the target time is calculated. A meteorological information acquisition unit for extracting as future precipitation at the target time;
A pump operating state database for accumulating the target operating state at the target time;
A past precipitation database for accumulating past precipitation at the target time;
A future precipitation database for accumulating future precipitation at the target time;
A power demand prediction apparatus comprising: a demand prediction unit that predicts the predicted power amount at the prediction target time from the relationship between the target operating state, the past precipitation amount, and the future precipitation amount and the actual power demand value.
前記ポンプの第一電力需要実績値と、前記施設の前記ポンプ以外の第二電力需要実績値とを取得し、
前記第一電力需要実績値に対して対象時刻の第五所定時間前から前記対象時刻までの最大の前記第一電力需要実績値を検出して前記対象時刻のポンプ最大電力量値として抽出する実績データ取得部と、
前記施設に関係する実績値および予報値の降水量値と気温値とを含む気象情報を取得し、前記気象情報に対して、前記対象時刻の気温値を抽出し、かつ、前記対象時刻の第二所定時間前から前記対象時刻までの各時刻の各前記降水量値の累積降水量を算出して前記対象時刻の過去降水量として抽出し、かつ、前記対象時刻から前記対象時刻の第三所定時間後までの各時刻の各前記降水量値の累積降水量を算出して前記対象時刻の将来降水量として抽出する気象情報取得部と、
前記対象時刻のポンプ最大電力量値を蓄積するポンプ最大電力量値データベースと、
前記対象時刻の気温値を蓄積する気温値データベースと、
前記対象時刻の過去降水量を蓄積する過去降水量データベースと、
前記対象時刻の将来降水量を蓄積する将来降水量データベースと、
前記ポンプ最大電力量値、前記過去降水量、および前記将来降水量の関係と前記第一電力需要実績値とから前記予測対象時刻の前記ポンプの第一電力量予測値を予測し、前記気温値と前記第二電力需要実績値との関係から前記予測対象時刻の前記ポンプ以外の第二電力量予測値を予測して前記第一電力量予測値と前記第二電力量予測値との合計値を前記電力量予測値として予測する需要予測部とを備えた電力需要予測装置。 In the power demand prediction device that predicts the predicted amount of power at the prediction target time in a facility that has a pump and performs sewage and rainwater treatment,
Obtain the first power demand actual value of the pump and the second power demand actual value other than the pump of the facility,
A record of detecting the maximum first power demand record value from the fifth predetermined time before the target time to the target time with respect to the first power demand record value and extracting it as the pump maximum power amount value at the target time A data acquisition unit;
Obtaining weather information including precipitation values and temperature values of actual values and forecast values related to the facility, extracting a temperature value of the target time for the weather information, and a first value of the target time (2) calculating a cumulative precipitation of each precipitation value at each time from a predetermined time before to the target time and extracting it as a past precipitation at the target time; and a third predetermined time from the target time to the target time A meteorological information acquisition unit that calculates a cumulative precipitation of each precipitation value at each time until a time later and extracts it as a future precipitation at the target time;
A pump maximum electric energy value database for storing the pump maximum electric energy value at the target time;
A temperature value database for accumulating temperature values at the target time; and
A past precipitation database for accumulating past precipitation at the target time;
A future precipitation database for accumulating future precipitation at the target time;
Predicting the first electric power prediction value of the pump at the prediction target time from the relationship between the pump maximum electric energy value, the past precipitation, and the future precipitation, and the first electric power demand actual value, and the temperature value And a predicted value of the second power amount other than the pump at the prediction target time from the relationship between the second power demand actual value and the total value of the first power amount predicted value and the second power amount predicted value power demand prediction apparatus and a demand prediction unit configured to predict as the power amount prediction value.
前記過去降水量を、前記対象時刻の第二所定時間前から前記対象時刻までの各時刻の前記降水量値に重み付けして算出し、
前記将来降水量を、前記対象時刻から前記対象時刻の第三所定時間後までの各時刻の前記降水量値に重み付けして算出する請求項1から請求項7のいずれか1項に記載の電力需要予測装置。 The weather information acquisition unit
The past precipitation is calculated by weighting the precipitation value at each time from the second predetermined time before the target time to the target time,
The electric power according to any one of claims 1 to 7, wherein the future precipitation is calculated by weighting the precipitation value at each time from the target time to a third predetermined time after the target time. Demand forecasting device.
前記施設の各時刻の電力需要実績値を取得し、前記電力需要実績値に対して対象時刻の第一所定時間前から前記対象時刻までの最大の前記電力需要実績値を検出して前記対象時刻の最大電力量値として抽出し、
前記施設に関係する実績値および予報値の降水量値を含む気象情報を取得し、前記気象情報に対して、前記対象時刻の第二所定時間前から前記対象時刻までの各時刻の各前記降水量値の累積降水量を算出して前記対象時刻の過去降水量として抽出し、かつ、前記対象時刻から前記対象時刻の第三所定時間後までの各時刻の各前記降水量値の累積降水量を算出して前記対象時刻の将来降水量として抽出し、
前記最大電力量値、前記過去降水量、および前記将来降水量の関係と前記電力需要実績値から前記予測対象時刻の前記電力量予測値を予測する電力需要予測方法。 In the power demand prediction method for predicting the predicted amount of electric power at the prediction target time in a facility that performs sewage and rainwater treatment,
The actual power demand value at each time of the facility is acquired, the maximum actual power demand value from the first predetermined time before the target time to the target time is detected with respect to the actual power demand value, and the target time Extracted as the maximum power value of
The weather information including the precipitation value of the actual value and the forecast value related to the facility is acquired, and each precipitation at each time from the second predetermined time before the target time to the target time is obtained with respect to the weather information. The cumulative precipitation of each precipitation value at each time from the target time to the third predetermined time after the target time is calculated by calculating the cumulative precipitation of the quantity value and extracting it as the past precipitation at the target time. Is calculated and extracted as future precipitation at the target time,
A power demand prediction method for predicting the predicted power amount at the prediction target time from the relationship between the maximum power amount value, the past precipitation amount, and the future precipitation amount and the actual power demand value.
前記施設の各時刻の電力需要実績値を取得し、
対象時刻の第四所定時間前から前記対象時刻までの前記ポンプの運転状態を対象運転状態として抽出し、
前記施設に関係する実績値および予報値の降水量値を含む気象情報を取得し、前記気象情報に対して、前記対象時刻の第二所定時間前から前記対象時刻までの各時刻の各前記降水量の累積降水量を算出して前記対象時刻の過去降水量として抽出し、かつ、前記対象時刻から前記対象時刻の第三所定時間後までの各時刻の各前記降水量の累積降水量を算出して前記対象時刻の将来降水量として抽出し、
前記対象運転状態、前記過去降水量、および前記将来降水量の関係と前記電力需要実績値から前記予測対象時刻の前記電力量予測値を予測する電力需要予測方法。 In the power demand prediction method for predicting the predicted amount of power at the prediction target time in a facility that has a pump and performs sewage and rainwater treatment,
Obtain the power demand actual value at each time of the facility,
The operation state of the pump from the fourth predetermined time before the target time to the target time is extracted as the target operation state,
The weather information including the precipitation value of the actual value and the forecast value related to the facility is acquired, and each precipitation at each time from the second predetermined time before the target time to the target time is obtained with respect to the weather information. A cumulative amount of precipitation is calculated and extracted as past precipitation at the target time, and the cumulative precipitation amount at each time from the target time to the third predetermined time after the target time is calculated. And extract it as future precipitation at the target time,
A power demand prediction method for predicting the predicted power amount at the prediction target time from the relationship between the target operating state, the past precipitation amount, and the future precipitation amount and the actual power demand value.
前記ポンプの第一電力需要実績値と、前記施設の前記ポンプ以外の第二電力需要実績値とを取得し、前記第一電力需要実績値に対して対象時刻の第五所定時間前から前記対象時刻までの最大の前記第一電力需要実績値を検出して前記対象時刻のポンプ最大電力量値として抽出し、
前記施設に関係する実績値および予報値の降水量値と気温値とを含む気象情報を取得し、前記気象情報に対して、前記対象時刻の気温値を抽出し、かつ、前記対象時刻の第二所定時間前から前記対象時刻までの各時刻の各前記降水量値の累積降水量を算出して前記対象時刻の過去降水量として抽出し、かつ、前記対象時刻から前記対象時刻の第三所定時間後までの各時刻の各前記降水量値の累積降水量を算出して前記対象時刻の将来降水量として抽出し、
前記ポンプ最大電力量値、前記過去降水量、および前記将来降水量の関係と前記第一電力需要実績値とから前記予測対象時刻の前記ポンプの第一電力量予測値を予測し、前記気温値と前記第二電力需要実績値との関係から前記予測対象時刻の前記ポンプ以外の第二電力量予測値を予測して前記第一電力量予測値と前記第二電力量予測値との合計値を前記電力量予測値として予測する電力需要予測方法。 In the power demand prediction method for predicting the predicted amount of power at the prediction target time in a facility that has a pump and performs sewage and rainwater treatment,
The first power demand record value of the pump and the second power demand record value other than the pump of the facility are acquired, and the target from the fifth predetermined time before the target time with respect to the first power demand record value The maximum first power demand actual value until the time is detected and extracted as the pump maximum power amount value at the target time,
Obtaining weather information including precipitation values and temperature values of actual values and forecast values related to the facility, extracting a temperature value of the target time for the weather information, and a first value of the target time (2) calculating a cumulative precipitation of each precipitation value at each time from a predetermined time before to the target time and extracting it as a past precipitation at the target time; and a third predetermined time from the target time to the target time Calculate the cumulative precipitation of each precipitation value at each time until time later and extract it as future precipitation at the target time,
Predicting the first electric power prediction value of the pump at the prediction target time from the relationship between the pump maximum electric energy value, the past precipitation, and the future precipitation, and the first electric power demand actual value, and the temperature value And a predicted value of the second power amount other than the pump at the prediction target time from the relationship between the second power demand actual value and the total value of the first power amount predicted value and the second power amount predicted value power demand prediction method for predicting as the power amount prediction value.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2015055470A JP6440543B2 (en) | 2015-03-19 | 2015-03-19 | Electric power demand prediction apparatus and electric power demand prediction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2015055470A JP6440543B2 (en) | 2015-03-19 | 2015-03-19 | Electric power demand prediction apparatus and electric power demand prediction method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2016178738A JP2016178738A (en) | 2016-10-06 |
| JP6440543B2 true JP6440543B2 (en) | 2018-12-19 |
Family
ID=57069394
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2015055470A Active JP6440543B2 (en) | 2015-03-19 | 2015-03-19 | Electric power demand prediction apparatus and electric power demand prediction method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP6440543B2 (en) |
Family Cites Families (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4405413B2 (en) * | 2005-03-04 | 2010-01-27 | 株式会社東芝 | Rainwater drainage operation preparation support system |
| JP5859866B2 (en) * | 2012-02-07 | 2016-02-16 | メタウォーター株式会社 | Monitoring target amount prediction method and monitoring target amount prediction apparatus |
| JP5918672B2 (en) * | 2012-09-24 | 2016-05-18 | 株式会社日立製作所 | Water and sewage management system and method |
-
2015
- 2015-03-19 JP JP2015055470A patent/JP6440543B2/en active Active
Also Published As
| Publication number | Publication date |
|---|---|
| JP2016178738A (en) | 2016-10-06 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3795775B2 (en) | Sewage inflow amount prediction apparatus and method, server apparatus | |
| El-Din et al. | A neural network model to predict the wastewater inflow incorporating rainfall events | |
| CN109978222B (en) | A method and system for probabilistic prediction of wind power ramping events based on Bayesian network | |
| CN107145645B (en) | Remaining life prediction method for non-stationary degradation process with uncertain shock | |
| Farajzadeh et al. | Modeling of monthly rainfall and runoff of Urmia lake basin using “feed-forward neural network” and “time series analysis” model | |
| Alfares et al. | Electric load forecasting: literature survey and classification of methods | |
| CN108959778B (en) | A Remaining Life Prediction Method of Aero-engine Based on Consistency of Degradation Modes | |
| Yan et al. | Fault prognosis of HVAC air handling unit and its components using hidden-semi Markov model and statistical process control | |
| CN112733307B (en) | Urban natural gas load prediction method and device in heating season | |
| CN110288046A (en) | A kind of failure prediction method based on wavelet neural network and Hidden Markov Model | |
| Khan et al. | Short-Term Peak Flow Rate Prediction and Flood Risk Assessment Using Fuzzy Linear Regression. | |
| CN107293118B (en) | A short-term prediction method for traffic speed dynamic interval | |
| CN110110890A (en) | Day wastewater quantity prediction method based on ELMAN neural network | |
| JP7795450B2 (en) | Inflow prediction system | |
| CN113177857B (en) | Resource elastic allocation method based on typhoon disaster estimation | |
| CN114462688A (en) | Tube explosion detection method based on LSTM model and dynamic threshold determination algorithm | |
| KR101119983B1 (en) | Method for predicting water demand using Group Method of Data Handling algorithm | |
| JP4399318B2 (en) | Pump control device | |
| CN115542427A (en) | A method and system for predicting rainfall based on an improved neural network model | |
| CN114548567A (en) | Load prediction method, device, equipment and readable storage medium | |
| CN109858681B (en) | Traffic short-time passenger flow prediction method and related device based on IC card | |
| JP6440543B2 (en) | Electric power demand prediction apparatus and electric power demand prediction method | |
| JP7201969B2 (en) | Learning device and sewage inflow prediction device | |
| CN102912760A (en) | Lowest navigable water level generating method of downstream river of reservoir | |
| JPH0887303A (en) | Plant predictive control device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20171206 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20180920 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20181002 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20181009 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20181023 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20181120 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 6440543 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |