JP6444725B2 - Suspension scaffold for falling object protection device and installation method of suspension scaffold on slope - Google Patents
[go: Go Back, main page]

JP6444725B2 - Suspension scaffold for falling object protection device and installation method of suspension scaffold on slope - Google Patents

Suspension scaffold for falling object protection device and installation method of suspension scaffold on slope Download PDF

Info

Publication number
JP6444725B2
JP6444725B2 JP2014260004A JP2014260004A JP6444725B2 JP 6444725 B2 JP6444725 B2 JP 6444725B2 JP 2014260004 A JP2014260004 A JP 2014260004A JP 2014260004 A JP2014260004 A JP 2014260004A JP 6444725 B2 JP6444725 B2 JP 6444725B2
Authority
JP
Japan
Prior art keywords
scaffold
support
slope
column
scaffolding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2014260004A
Other languages
Japanese (ja)
Other versions
JP2016121434A (en
JP2016121434A5 (en
Inventor
寛史 橋口
寛史 橋口
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyo Rope Manufacturing Co Ltd
Original Assignee
Tokyo Rope Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyo Rope Manufacturing Co Ltd filed Critical Tokyo Rope Manufacturing Co Ltd
Priority to JP2014260004A priority Critical patent/JP6444725B2/en
Publication of JP2016121434A publication Critical patent/JP2016121434A/en
Publication of JP2016121434A5 publication Critical patent/JP2016121434A5/ja
Application granted granted Critical
Publication of JP6444725B2 publication Critical patent/JP6444725B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Description

本発明は、斜面からの落石や雪崩を防護する落下物防護装置の施工技術に関し、詳細には、その施工に用いる吊り足場、並びに斜面における吊り足場の設置方法に関する。   The present invention relates to a construction technique of a fallen object protection device that protects falling rocks and avalanches from a slope, and particularly relates to a suspension scaffold used for the construction and a method of installing a suspension scaffold on a slope.

落下物防護装置として、例えば、山間を走る道路を落石や雪崩から防ぐ落石防護柵やポケット式の落石防護網などが従来から知られている。   As fallen object protection devices, for example, rockfall protection fences and pocket type rockfall protection nets that prevent roads running between mountains from falling rocks and avalanches are conventionally known.

図9に、これら落下物防護装置の一例として落石防護柵100を示す。
図9の落石防護柵100は、斜面幅方向に間隔をあけて立設される複数本の支柱101と、各支柱101の上部若しくは下部を経由して斜面幅方向に張り渡されるサポートロープ103,104と、これらサポートロープ103,104及び各支柱101によって斜面幅方向に展開・支持される防護網105を備えて構成されている。
なお、図9中103a及び104aはサポートロープ103,104に設けられる衝撃吸収用のブレーキ装置であり、ブレーキ装置は、衝撃作用時に一定のブレーキ力をかけながらサポートロープ103,104を繰り出して衝撃を和らげる。
FIG. 9 shows a rock fall protection fence 100 as an example of these fallen object protection devices.
A rock fall protection fence 100 in FIG. 9 includes a plurality of columns 101 that are erected at intervals in the slope width direction, and support ropes 103 that are stretched in the slope width direction via the upper or lower portion of each column 101. 104 and a protective net 105 that is developed and supported in the slope width direction by the support ropes 103 and 104 and the respective columns 101.
In FIG. 9, reference numerals 103a and 104a denote shock absorbing brake devices provided on the support ropes 103 and 104. The brake device extends the support ropes 103 and 104 while applying a constant braking force during the impact action, and applies an impact. relieve.

また、防護網の敷設方法として、下記の手法が知られている。
1つ目は、ポケット式の落石防護網に適用される手法である。
ポケット式の落石防護網は、斜面前方に張り出す支柱を有し、作業者は、斜面の立木またはアンカーに固定された親綱を使って宙づりになり、斜面山側を向いた状態で防護網を下から上へと手繰り上げて最上段横ロープに防護網を括り付ける。
In addition, the following methods are known as a method for laying a protective net.
The first is a method applied to a pocket-type rockfall protection net.
The pocket-type rockfall protection net has a support column that projects to the front of the slope. Raise the guard from the bottom to the top and tie the protective net to the top horizontal rope.

2つ目は、斜面直角型の支柱を有する落石防護柵に適用される手法である。
ここで斜面直角型の支柱とは、支柱を立てた状態で斜面と支柱とのなす角度が直角になる支柱であり、支柱の上部は、ポケット式の落下物防護網同様、作業者の手の届かない高い位置に支持される。
このため支柱上部での高所作業を可能にすべく、支柱と支柱との間に足場となるワイヤロープを複数段に亘りきつく張り渡し、作業者は支柱間に張り渡されたワイヤロープを伝い歩きながら防護網を設置する。
The second method is a method applied to a rockfall guard fence having a right-angled sloped support.
Here, the right-angle sloped column is a column with a right angle between the ramp and the column with the column upright, and the upper part of the column is the hand of the operator like the pocket-type falling object protection net. It is supported at a high position that does not reach.
For this reason, in order to enable high-altitude work at the top of the column, the wire rope that serves as a scaffold is tightly stretched across the steps between the column and the column, and the operator passes along the wire rope that is stretched between the columns. Install a protective net while walking.

3つ目は、比較的緩斜面で適用される手法である。
この例では、支柱の斜面谷側において、単管パイプや足場板などの仮設資材を用いて足場を構築し、作業者はこの足場に載って作業を行う。また、足場は、作業終了後に解体して撤去・搬出する。
The third is a method applied on a relatively gentle slope.
In this example, a scaffold is constructed using temporary materials such as a single pipe and a scaffold plate on the sloped valley side of the support column, and the worker works on the scaffold. The scaffold will be dismantled and removed and removed after the work is completed.

特開2009−024378号公報JP 2009-024378 A

ところで、防護網の敷設に係る上述の手法は、以下の点で改良の余地がある。
1つ目の手法は、作業者が常に宙づりになって作業を行うため、身体への負担が重く、作業効率も悪い。また、防護網の敷設作業は、通常2人ペアで行うが、安全規則上の問題から、作業者の上下作業(頭上で別の作業者が宙づりで作業すること)が禁止されており、この点でも作業上の制約がある。
By the way, the above-mentioned method for laying a protective net has room for improvement in the following points.
In the first method, since the worker always hangs up and works, the burden on the body is heavy and the work efficiency is poor. In addition, the protective net laying work is usually done by two people, but due to safety rules, the worker's up and down work (the work of another worker working overhead) is prohibited. There are also limitations in terms of work.

2つ目の手法は、支柱間に張り渡したワイヤロープを足場代わりに利用するものの、支柱が斜面谷側に傾いているため、立ち位置に対して手元が斜面谷側に遠くなる。よって、作業者は、斜面谷側に身を乗り出すような無理な姿勢で作業を行わなければならない。また、ワイヤロープは締め器によってきつく締め付けられているものの、あくまでも可撓性を有するワイヤロープ上での作業になるため、足場板等に較べて不安定である。   The second method uses a wire rope stretched between struts as a scaffold, but since the struts are tilted toward the slope valley side, the hand is farther to the slope valley side than the standing position. Therefore, the worker must work in an unreasonable posture so as to lean on the sloped valley side. In addition, although the wire rope is tightly tightened by a tightening device, the work is only performed on a flexible wire rope, which is unstable compared to a scaffold plate or the like.

3つ目の手法は、仮設資材を用いて安定した足場を斜面上に組むため、作業性は良いが、仮設資材の搬入・組立、また,作業終了後の解体、撤去搬出等、足場の設置に伴う付帯作業が増える。とりわけ、防護網を広範囲に設置する場合には、多数の仮設資材を要するためコストや工期短縮の面でも不利である。さらには、不意の落石に対する足場の被災や、被災後の復旧作業等をも考慮する必要がある。   The third method uses a temporary material to assemble a stable scaffold on the slope, so workability is good. However, the temporary material can be carried in and assembled, and dismantled after the work is completed, removed and carried out. Incidental work accompanying the increase. In particular, when a protective net is installed over a wide area, many temporary materials are required, which is disadvantageous in terms of cost and shortening the construction period. Furthermore, it is necessary to consider the damage of the scaffolding against unexpected rockfalls and the recovery work after the disaster.

本発明は、このような事情を考慮してなされたもので、斜面において作業性の良い足場をシンプルな構造で確保できる吊り足場の提供を課題とする。また、その設置方法を提供する。   The present invention has been made in view of such circumstances, and an object of the present invention is to provide a suspended scaffold that can secure a scaffold with good workability on a slope with a simple structure. Moreover, the installation method is provided.

上記した技術的課題を解決するため本発明は、
斜面からの落下物を防護すべく、斜面幅方向に間隔を開けて立設される複数の支柱と、前記複数の支柱によって斜面幅方向に支持される落下物の防護体と、を有する落下物防護装置の吊り足場であって、
前記各支柱の上部から吊り下げられる足場支持材と、この足場支持材によって支持され、斜面幅方向に延設される足場材と、を有することを特徴とする。
In order to solve the above technical problem, the present invention provides:
Falling objects having a plurality of support columns standing at intervals in the width direction of the slope and protecting the falling objects supported in the slope width direction by the plurality of support columns in order to protect falling objects from the slope surface A suspension scaffold for a protective device,
It has the scaffold support material suspended from the upper part of each said support | pillar, and the scaffold material supported by this scaffold support material and extended in the slope width direction.

本発明によれば、斜面幅方向に足場材を延設すると共に、この足場材を各支柱の上部から吊り下げて空中に支持する。従って、作業者は複数の支柱によって支えられた足場材に載って作業を行える。ここで、斜面幅方向とは、斜面の傾斜方向(山谷方向)と交差する方向である。
前記支柱は、谷側方向に傾斜して設けられ、かつ、前記落下物の防護体は、前記支柱の上部に支持することが可能である。
このようにすれば、支柱の上部(高所)に向かうほど作業者の手元が作業者の立ち位置に寄るため、作業者は、無理な姿勢にならずに支柱上部付近の作業を行える。とりわけ、斜面前方に傾く支柱を有する落下物防護装置の施工時には、常に斜面山側を向いて作業できるため、防護体の引き上げ作業等、効率良く行える。また、本発明の吊り足場は、構成部材も少なく、設置・解体・復旧等の維持管理、並びにコスト面でも有利である。
According to the present invention, the scaffolding material is extended in the slope width direction, and the scaffolding material is suspended from the upper part of each column and supported in the air. Therefore, the worker can work on the scaffolding material supported by the plurality of columns. Here, the slope width direction is a direction that intersects the slope direction (mountain valley direction) of the slope.
The support column is provided so as to be inclined in the valley side direction, and the fallen object protection body can be supported on an upper portion of the support column.
In this way, the operator's hand is closer to the worker's standing position toward the upper part (high place) of the support column, so that the operator can perform work near the support column without taking an unreasonable posture. In particular, when constructing a fallen object protection apparatus having a column inclined forward of the slope, the work can always be directed to the slope mountain side, so that the work of lifting the protective body can be performed efficiently. In addition, the suspension scaffold of the present invention has few components and is advantageous in terms of maintenance and management such as installation, dismantling and restoration, and cost.

また、前記足場材には、吊り下げ前後において、その初期の形状を維持し得る剛性が確保されていることを特徴とする。   In addition, the scaffold material is secured with rigidity capable of maintaining its initial shape before and after suspension.

本構成では、足場材に剛性を確保することで、足場材における作業者の横移動を容易にする。なお、上記で「初期の形状を維持し得る」とは、吊り下げ前後において足場材が原型を留めていれば足り、自重に起因した撓み等の変形、並びに作業者が載ることで生じる軽微な曲がりや捻れは除外する。   In this configuration, by ensuring the rigidity of the scaffold material, the lateral movement of the worker on the scaffold material is facilitated. In the above, “the initial shape can be maintained” means that it is sufficient that the scaffolding material retains the original shape before and after the suspension, a slight deformation caused by the deformation of the bending due to its own weight and the placement of the operator. Bending and twisting are excluded.

また、前記足場材、および前記足場支持材が、鋼製パイプで構成されていることを特徴とする。   Moreover, the said scaffold material and the said scaffold support material are comprised with the steel pipes, It is characterized by the above-mentioned.

本構成によれば、足場材及び足場支持材として鋼製パイプを使用するため、曲げや捻れに対して高い耐力及び剛性が得られる。また、汎用の単管パイプも適用できるため、吊り足場の導入時、並びに不意の被災時等において資材の調達コストを下げることができる。また、単管パイプ用の汎用クランプを用いることで各部の組み上げが容易になり、吊り足場の設置・解体に要する時間も短縮できる。   According to this structure, since steel pipe is used as a scaffolding material and a scaffolding support material, high yield strength and rigidity against bending and twisting can be obtained. In addition, since a general-purpose single pipe can be applied, the procurement cost of materials can be reduced at the time of introduction of a suspended scaffolding or at the time of unexpected damage. In addition, by using a general-purpose clamp for a single pipe, it is easy to assemble each part, and the time required for installing and dismantling the suspension scaffold can be shortened.

また、前記足場支持材は、前記支柱に対して着脱自在に吊り下げられている構成でもよい。   Further, the scaffold support member may be detachably suspended from the support column.

この構成によれば、吊り足場の設置時、並びに吊り足場の撤去時等、足場支持材の着脱によって、吊り足場全体を短時間且つ容易に設置・撤去することができる。   According to this configuration, the entire suspended scaffold can be easily installed and removed in a short time by attaching and detaching the scaffold support material when the suspended scaffold is installed and when the suspended scaffold is removed.

また、前記支柱と前記足場支持材とのなす角度を所望の角度に設定するための角度設定部材をさらに有することを特徴とする。   Moreover, it has further an angle setting member for setting the angle which the said support | pillar and the said scaffold support material make to a desired angle.

これらの構成では、支柱と足場支持材とのなす角度、言い換えれば、支柱と足場材との間隔を角度設定部材によって設定変更できる。つまり、作業者の立ち位置と手元の間隔を角度設定部材によって好みの位置に設定変更できるため、作業効率のさらなる向上が図られる。   In these configurations, the angle between the support column and the scaffold support member, in other words, the interval between the support column and the scaffold member can be set and changed by the angle setting member. That is, since the worker's standing position and the distance between the hands can be set and changed to a desired position by the angle setting member, the work efficiency can be further improved.

また、前記角度設定部材は、前記支柱と前記足場支持材との間に介在して支持されると共に、前記支柱を支点にして前記足場支持材を支持することを特徴とする。   The angle setting member is supported by being interposed between the support column and the scaffold support material, and supports the scaffold support material with the support column as a fulcrum.

本構成では、支柱を支点にして足場支持材を所望の角度で支持するため、斜面等に角度設定用のワイヤロープ等を張らずとも、簡単に足場支持材の角度を設定できる。つまり、吊り足場単体で作業者の立ち位置を設定できる。   In this configuration, since the scaffolding support member is supported at a desired angle with the support as a fulcrum, the angle of the scaffolding support member can be easily set without using an angle setting wire rope or the like on the slope or the like. That is, the operator's standing position can be set with the suspension scaffold alone.

また、前記足場支持材に対して、その上下複数段に前記足場材が連結されている構成でもよい。   Moreover, the structure by which the said scaffold material is connected with the upper and lower multistage with respect to the said scaffold support material may be sufficient.

本構成では、上下複数段にわたり足場材を設けるため、吊り足場の高さ方向における作業性が良好になる他、足場が独立して確保されるため作業員の上下作業も可能になる。また、吊り足場全体の曲げ剛性や捻り剛性も高めることができる。   In this configuration, since the scaffolding material is provided in a plurality of upper and lower stages, the workability in the height direction of the suspended scaffolding is improved, and the scaffolding can be secured independently, so that the worker can also work up and down. Moreover, the bending rigidity and torsional rigidity of the entire suspended scaffold can be increased.

また,本発明は、斜面における吊り足場の設置方法であって、
斜面幅方向に間隔を開けて複数の支柱を立設すると共に、この斜面上に吊り足場を展開すべく前記斜面幅方向に足場材を延設し、さらに、前記支柱の上部より前記足場材を吊り下げてなる吊り足場の設置方法。
The present invention is also a method for installing a suspended scaffold on a slope,
A plurality of struts are erected at intervals in the slope width direction, and a scaffold material is extended in the slope width direction to deploy a suspended scaffold on the slope, and the scaffold material is further extended from the top of the pillar. How to install a suspended scaffolding.

この方法によれば、斜面に吊り足場を設置する際、斜面幅方向に間隔を開けて設けられた支柱から足場材を吊り下げて足場を確保する。従って、作業者は複数の支柱によって空中に支えられた足場に載って作業を行える。また、支柱の上部(高所)に向かうほど作業者の手元が作業者の立ち位置に寄るため、作業者は、無理な姿勢にならずに支柱上部付近の作業を行える。とりわけ、斜面前方に傾く支柱を有する落下物防護装置の施工時には、常に斜面山側を向いて作業できるため、防護体の引き上げ作業等、効率良く行える。また、足場材を支柱上部より吊り下げるだけの簡単な施工で済むため、設置・解体・復旧等の維持管理、並びにコスト面でも有利である。   According to this method, when the suspension scaffold is installed on the slope, the scaffold is secured by suspending the scaffold material from the columns provided at intervals in the slope width direction. Therefore, the worker can work on a scaffold supported in the air by a plurality of support columns. In addition, since the operator's hand is closer to the worker's standing position toward the upper part (high place) of the column, the worker can perform work near the column upper part without taking an unreasonable posture. In particular, when constructing a fallen object protection apparatus having a column inclined forward of the slope, the work can always be directed to the slope mountain side, so that the work of lifting the protective body can be performed efficiently. In addition, since it is only necessary to suspend the scaffolding material from the upper part of the support column, it is advantageous in terms of maintenance, such as installation, dismantling, and restoration, and cost.

また、前記足場材と前記支柱の上部とを連結する足場支持材を前記支柱の立て込みに先立って支柱の上部に連結し、
さらに前記足場支持材を、前記支柱の立て込みに伴って支柱上部より吊り下げることを特徴とする。
In addition, the scaffold support material for connecting the scaffold material and the upper portion of the support column is connected to the upper portion of the support column before the support column is stood up,
Furthermore, the scaffold support material is suspended from the upper part of the support as the support is raised.

この方法では、支柱と足場材とを連結する足場支持材を支柱の上部に予め組み付けた状態で支柱を立て込む。このため支柱の立て込みと同時に足場支持材が支柱の上部より吊り下ろされるため、本来、支柱に登って行うべき足場支持材の組み付け作業を地上で済ませることができる。   In this method, the support is stood in a state in which a scaffold support member for connecting the support and the scaffold is assembled in advance on the upper part of the support. For this reason, since the scaffold support member is suspended from the upper part of the support column at the same time when the support column is stood up, the assembly work of the scaffold support material that should originally be performed on the support column can be completed on the ground.

また、斜面幅方向に間隔を開けて複数の支柱を有すると共に、この支柱によって斜面幅方向に落下物の防護体を展開支持する落下物防護装置を斜面に設置する際、前記足場材を吊り下げるための支柱として前記落下物防護装置用の支柱を用いることを特徴とする。   In addition, the scaffolding material is suspended when a falling object protection device is installed on the slope, which has a plurality of pillars spaced apart in the slope width direction, and deploys and supports the protection body of the fallen object in the slope width direction by the pillars. The falling object protective device support is used as a support for the falling object.

この方法では、落下物防護装置の施工にあたり、その落下物防護装置に用いる支柱を利用して足場材を斜面下方に吊り下げる。このため吊り足場専用に別途支柱を設けずとも吊り足場を設置できる。   In this method, when constructing the fallen object protection apparatus, the scaffolding material is suspended below the slope by using the column used for the fallen object protection apparatus. For this reason, it is possible to install a suspension scaffold without providing a separate support for the suspension scaffold.

また、前記足場材の位置を、前記支柱を支点にして設定変更することを特徴とする。   In addition, the position of the scaffold is set and changed using the support as a fulcrum.

この方法では、支柱を支点にして足場材の位置を設定変更するため、斜面等に角度設定用のワイヤロープ等を別途張らずとも、簡単に足場材の位置を変更できる。つまり、吊り足場単体で作業者の立ち位置を設定できる。   In this method, since the position of the scaffolding is changed using the support as a fulcrum, the position of the scaffolding can be easily changed without separately attaching an angle setting wire rope or the like to the slope or the like. That is, the operator's standing position can be set with the suspension scaffold alone.

以上、本発明によれば、斜面において作業性の良い足場をシンプルな構造で確保できる。また、その設置方法を提供できる。とりわけ、落下物防護装置の施工に本発明を適用すれば、支柱高所における防護網の敷設作業を容易に行える他、吊り足場の設置から撤去に至る全体を通しての工期短縮、並びにコスト削減も図れる。   As described above, according to the present invention, a scaffold with good workability on a slope can be secured with a simple structure. Moreover, the installation method can be provided. In particular, if the present invention is applied to the construction of a fallen object protection device, it is possible to easily lay a protective net at the height of the column, and to shorten the work period and cost from the installation to the removal of the suspension scaffold. .

本実施の形態に示す吊り足場の概略構成図。The schematic block diagram of the suspension scaffold shown to this Embodiment. 図1に係る吊り足場の側面図。The side view of the suspension scaffold which concerns on FIG. 支柱と足場支持材との連結状態を示す要部拡大図。The principal part enlarged view which shows the connection state of a support | pillar and a scaffold support material. 脱落防止ストッパーの拡大図。Enlarged view of the stopper to prevent dropout. 足場支持材と足場材との連結状態を示す要部拡大図。The principal part enlarged view which shows the connection state of a scaffold support material and a scaffold material. 本実施の形態に係る落石防護柵の正面図。The front view of the rock fall protection fence which concerns on this Embodiment. 本実施の形態に係る落石防護柵の平面図。The top view of the rockfall protection fence which concerns on this Embodiment. 図6の落石防護柵に適用される支柱の側面図。The side view of the support | pillar applied to the rock fall protection fence of FIG. 従来の落下物防護装置(落石防護柵)を示す斜視図。The perspective view which shows the conventional fallen object protection apparatus (fall rock protection fence).

以下、本発明に係る吊り足場を落石防護柵の施工に適用した実施の形態を説明する。
はじめに、吊り足場の説明に先立って、落石防護柵の一般的な構造並びにその施工例を説明する。
図6〜図8のように落石防護柵50は、斜面幅方向(左右方向)に間隔を開けて立設される複数本の支柱51,51と、各支柱51,51を斜面山側に引きつけて固定するための支柱控えロープ58(図8参照)と、各支柱51,51を斜面谷側に引きつけて固定するためのステーロープ59(図1参照)と、支柱51に対してその上下方向に配索される支柱補強ロープ53と、各支柱51に支持されて斜面幅方向に延びる上部横ロープ54及び下部横ロープ55と、これら上部横ロープ54及び下部横ロープ55間に設けられる高張力防護網(以下、防護網56と称する)と、を備えている。
Hereinafter, an embodiment in which the suspension scaffold according to the present invention is applied to construction of a rockfall protection fence will be described.
First, prior to the description of the suspension scaffold, a general structure of a rockfall protection fence and an example of its construction will be described.
As shown in FIGS. 6 to 8, the rock fall protection fence 50 has a plurality of columns 51, 51 erected at intervals in the slope width direction (left-right direction) and attracts each column 51, 51 to the slope mountain side. A supporting rope 58 (see FIG. 8) for fixing, a stay rope 59 (see FIG. 1) for attracting and fixing each supporting column 51, 51 to the sloped valley side, and a vertical direction with respect to the supporting column 51. The strut reinforcement rope 53 to be routed, the upper lateral rope 54 and the lower lateral rope 55 that are supported by the respective struts 51 and extend in the slope width direction, and the high tension protection provided between the upper lateral rope 54 and the lower lateral rope 55. And a net (hereinafter referred to as a protective net 56).

支柱51は、肉厚の鋼管製で、その根本部分には斜面に設けられたコンクリート基礎(ベースプレート)に支柱を繋ぎ止めるフランジ57(図8参照)が設けられている。
また、支柱51の上下2箇所には、各種ロープを繋ぎ止めるためのブラケット52,52が設けられている。また、各ブラケット52,52は支柱51を立てた状態で斜面山側を向くように支柱51に溶接されている。
また、図8のように各ブラケット52,52の山側先端部分には支柱補強ロープ53を結索するためのU字ボルト53c,53dが組み付けられ、両ブラケット52,52は支柱補強ロープ53によって相互に連結されている。
The support column 51 is made of a thick steel pipe, and a flange 57 (see FIG. 8) for connecting the support column to a concrete foundation (base plate) provided on an inclined surface is provided at the base portion.
In addition, brackets 52 and 52 for securing various ropes are provided at two positions above and below the column 51. Further, each bracket 52, 52 is welded to the column 51 so as to face the slope mountain side with the column 51 standing.
Further, as shown in FIG. 8, U-shaped bolts 53 c and 53 d for connecting the column reinforcing rope 53 are assembled to the mountain side tip portions of the brackets 52 and 52, and both the brackets 52 and 52 are mutually connected by the column reinforcing rope 53. It is connected to.

また、ブラケット52,52に組み付けられた支柱補強ロープ53のアイ加工部分(リング状端部53a,53b)の輪を通すように各上部横ロープ54および下部横ロープ55が配索されている。すなわち、上部横ロープ54及び下部横ロープ55は支柱51の山側においてブラケット52,52にその動きを拘束されることなく斜面幅方向に配索されている。   Further, the upper lateral ropes 54 and the lower lateral ropes 55 are routed so as to pass the loops of the eye-processed portions (ring-shaped end portions 53a, 53b) of the column reinforcing ropes 53 assembled to the brackets 52, 52. That is, the upper horizontal rope 54 and the lower horizontal rope 55 are routed in the slope width direction on the mountain side of the support column 51 without being restrained by the brackets 52, 52.

また、支柱51の上部には、支柱控えロープ結索用のU字ボルト58a(図8参照)が設けられ、支柱控えロープ58の一端はU字ボルト58aに結索され、他端は斜面山側に張り付けられている。また、隣合う支柱51,51の上部同士を繋ぎ止める上弦ロープ60(図7参照)が各支柱51の上部ブラケット52a,52a間に張り渡されている。   In addition, a U-shaped bolt 58a (see FIG. 8) for connecting a support strut rope is provided on the upper portion of the support 51. One end of the support strut rope 58 is connected to the U-bolt 58a, and the other end is connected to the slope mountain side. It is attached to. Further, an upper chord rope 60 (see FIG. 7) that connects the upper portions of the adjacent columns 51 and 51 is stretched between the upper brackets 52 a and 52 a of the columns 51.

また、防護網56は、支柱51の山側に配索された下部横ロープ55及び上部横ロープ54間に敷設される。具体的には、防護網56の上縁を支柱下部から手繰り上げて上部横ロープ54に引っ掛け、さらに、上部横ロープ54を抱き込むように防護網56の上縁を折り返して結合コイル61で固定する。また、下部横ロープ55側でも同様の端部処理を行う。   The protective net 56 is laid between the lower horizontal rope 55 and the upper horizontal rope 54 that are routed on the mountain side of the column 51. Specifically, the upper edge of the protective mesh 56 is raised from the lower part of the support and hooked on the upper horizontal rope 54, and the upper edge of the protective mesh 56 is folded back so as to embrace the upper horizontal rope 54 and fixed by the coupling coil 61. To do. Moreover, the same edge part process is performed also in the lower horizontal rope 55 side.

なお、これら防護網56の敷設作業、並びに支柱上部における配索作業の一部は、本発明に係る吊り足場を用いて行っている。以下、本発明に係る吊り足場の構造並びに設置方法を説明する。   In addition, the installation work of these protection net | networks 56 and a part of wiring work in the upper part of a support | pillar are performed using the suspension scaffold which concerns on this invention. Hereinafter, the structure and installation method of the suspension scaffold according to the present invention will be described.

吊り足場1は、図1及び図2のように斜面幅方向に延設される足場材2と、この足場材2を落石防護柵50の支柱上部から吊り下ろす足場支持材3と、足場支持材3の角度を設定するための角度設定用ターンバックル4とを備えている。   As shown in FIGS. 1 and 2, the suspension scaffold 1 includes a scaffold member 2 that extends in the slope width direction, a scaffold support member 3 that suspends the scaffold member 2 from an upper part of a support of the rockfall protection fence 50, and a scaffold support member. And an angle setting turnbuckle 4 for setting the angle 3.

足場支持材3から説明すると、足場支持材3は、支柱51よりも若干長く、φ48,6の汎用単管パイプを加工して製作されている。また、図3のように、その上部開口端には、円形のプレート3aが上部開口端に対して立った状態で溶接されている。また、プレート3aには、シャックルやフック等の吊り具Cを留め置くためのピン孔3bが形成されている。   If it demonstrates from the scaffold support material 3, the scaffold support material 3 is a little longer than the support | pillar 51, and is manufactured by processing the general purpose single pipe of (phi) 48,6. Further, as shown in FIG. 3, a circular plate 3a is welded to the upper opening end in a state of standing with respect to the upper opening end. The plate 3a has a pin hole 3b for holding a hanging tool C such as a shackle or a hook.

また、足場支持材3における長手方向の中間部分(図5参照)には、上下2段にわけて丸棒5aが溶接されている。この丸棒5aは、足場材2の脱落防止ストッパー5として用いられ、図5のように足場支持材3を支柱上部より吊り下げた状態で、斜面谷側から斜面山側に貫くように設けられている。また、脱落防止ストッパー5の上方には、角度設定用ターンバックル4を組み付けるためのターンバックル用ステー3dが溶接されている。   In addition, a round bar 5a is welded to an intermediate portion (see FIG. 5) in the longitudinal direction of the scaffold support member 3 in two upper and lower stages. This round bar 5a is used as a stopper 5 for preventing the scaffold 2 from falling off, and is provided so as to penetrate from the slope valley side to the slope mountain side in a state where the scaffold support material 3 is suspended from the upper part of the column as shown in FIG. Yes. Further, a turnbuckle stay 3 d for assembling the angle setting turnbuckle 4 is welded above the dropout prevention stopper 5.

足場材2は、足場支持材3と同様、汎用の単管パイプからなる。具体的には、φ48,6の単管パイプからなり、直交クランプや自在クランプ等(以下、単にクランプ6と称する)を用いて足場支持材3に締結される。なお、足場支持材3の長さは、支柱51の立て込みスパン(支柱間距離)に基づいて選定されている。   The scaffolding material 2 is composed of a general-purpose single pipe as with the scaffolding support material 3. Specifically, it consists of a single pipe of φ48, 6, and is fastened to the scaffold support 3 using an orthogonal clamp, a universal clamp or the like (hereinafter simply referred to as clamp 6). In addition, the length of the scaffold support material 3 is selected based on the standing span (distance between the columns) of the column 51.

角度設定用ターンバックル4は、足場支持材3を支柱上部より吊り下げた状態で、支柱51と足場支持材3との間に介在・支持される部材であり、本実施の形態では、両端部にクレビスジョイント4a,4bを有する汎用のターンバックルを使用している。また、このように構成される角度設定用ターンバックル4の一端は、足場支持材3のターンバックル用ステー3dに連結され、他端は、支柱51の中間部分に予め溶接しておいた支柱側ターンバックル用ステー51a(図8参照)に連結される。   The angle setting turnbuckle 4 is a member that is interposed and supported between the support column 51 and the scaffold support member 3 in a state in which the scaffold support member 3 is suspended from the upper part of the support column. A general-purpose turnbuckle having clevis joints 4a and 4b is used. In addition, one end of the angle setting turnbuckle 4 configured in this way is connected to the turnbuckle stay 3d of the scaffold support member 3, and the other end is a column side welded in advance to an intermediate portion of the column 51. It is connected to a turnbuckle stay 51a (see FIG. 8).

続いて、上記構成を有する吊り足場1の設置方法を説明する。
はじめに設置作業の概要を説明すると、吊り足場1の設置作業は支柱51の立て込み作業と合わせて実施される。具体的には、支柱51に足場支持材3、および角度設定用ターンバックル4を組み付けた後、支柱51の立ち上げに伴って足場支持材3を支柱51の上部より吊り下げる。また、吊り下げた状態の足場支持材3に足場材2を組み付けた後、角度設定用ターンバックル4を締め込んで足場材2の位置を調整する。
Then, the installation method of the suspension scaffold 1 which has the said structure is demonstrated.
First, the outline of the installation work will be described. The installation work of the suspension scaffold 1 is performed together with the upright work of the support column 51. Specifically, after the scaffold support member 3 and the angle setting turnbuckle 4 are assembled to the support column 51, the scaffold support material 3 is suspended from the upper part of the support column 51 as the support column 51 is started up. After assembling the scaffolding material 2 to the suspended scaffolding support material 3, the angle setting turnbuckle 4 is tightened to adjust the position of the scaffolding material 2.

以下、各工程を詳細に説明する。
支柱51に足場支持材3を組み付ける作業は、上述の如く支柱51の立ち上げ前に行われる。具体的には、吊り具C(シャックル)を使用して支柱51の上部に足場支持材3の上端部を連結する。なお、支柱51の上部ブラケット52aには、吊り具Cに対応すべく斜面谷側に突設して吊り具の係止部52dが設けられている。なお。図3中では支柱上部に設けられる半円形リング状部材が、吊り具の係止部52dになる。
Hereinafter, each process will be described in detail.
The work of assembling the scaffold support material 3 to the support column 51 is performed before the support column 51 is started up as described above. Specifically, the upper end portion of the scaffold support member 3 is connected to the upper portion of the support column 51 by using a hanging tool C (shackle). In addition, the upper bracket 52a of the support column 51 is provided with a locking part 52d for the lifting tool so as to protrude from the sloped valley side so as to correspond to the lifting tool C. Note that. In FIG. 3, the semicircular ring-shaped member provided on the upper part of the support column becomes the locking part 52 d of the lifting tool.

続いて、支柱51と足場支持材3との間に角度設定用ターンバックル4を組み付ける。本実施の形態では、上述の如く支柱51側のターンバックル用ステー51aと足場支持材3側のターンバックル用ステー3dとの間に角度設定用ターンバックル4を組み付ける。なお、角度設定用ターンバックル4は、足場支持材3の吊り下げに先立って、足場支持材3若しくは支柱51の何れかに予め組み付けておいても良い。また、角度設定用ターンバックル4に用いるターンバックルのサイズは、支柱51の設置角度、並びに支柱51及び足場支持材3の長さ等を考慮しながら、余裕を持って選定する。   Subsequently, the angle setting turnbuckle 4 is assembled between the support column 51 and the scaffold support 3. In the present embodiment, as described above, the angle setting turnbuckle 4 is assembled between the turnbuckle stay 51a on the support column 51 side and the turnbuckle stay 3d on the scaffold support member 3 side. The angle setting turnbuckle 4 may be assembled in advance to either the scaffolding support member 3 or the column 51 prior to the suspension of the scaffolding support member 3. Further, the size of the turnbuckle used for the angle setting turnbuckle 4 is selected with a margin while taking into consideration the installation angle of the column 51 and the lengths of the column 51 and the scaffold support 3.

そして、足場支持材3及び角度設定用ターンバックル4を組み付けた状態で支柱51を引き起こし、支柱51を斜面に立設させる。また、これらの作業を支柱51の個々で行う。   And the support | pillar 51 is raised in the state which assembled | attached the scaffold support material 3 and the angle setting turnbuckle 4, and the support | pillar 51 is made to stand on a slope. Also, these operations are performed individually for each column 51.

続いて、各支柱51の上部同士を繋ぎ止めるように上弦ロープ60を配索すると共に、この上弦ロープ60に滑車を組み付ける。また、滑車から親綱を引き下ろして作業者が宙づりになり、続く足場材2の組み付け作業並びに角度設定用ターンバックル4の調整作業に備える。   Subsequently, the upper chord rope 60 is routed so as to connect the upper portions of the respective columns 51, and a pulley is assembled to the upper chord rope 60. Further, the master rope is pulled down from the pulley, and the operator hangs up, and prepares for the subsequent assembly work of the scaffolding material 2 and the adjustment work of the angle setting turnbuckle 4.

なお、足場材2の組み付け作業、及び角度設定用ターンバックル4の調整作業を地上側で行える場合には、地上側で行う。また、手が届かない時には上記のように作業員が宙づりの状態で作業する。なお、宙づりの作業は、足場支持材3の軸線上で行われるため、作業者は、足場支持材3に設けられた脱落防止ストッパー5を足がかりにして作業を行えるため、実質、脱落防止ストッパー5を足場として作業を行うことになる。   In addition, when the assembly work of the scaffold 2 and the adjustment work of the angle setting turnbuckle 4 can be performed on the ground side, they are performed on the ground side. In addition, when the hand cannot reach, the worker works in a suspended state as described above. Since the hanging work is performed on the axis of the scaffolding support member 3, the operator can work using the dropout prevention stopper 5 provided on the scaffolding support member 3 as a foothold. Will be used as a scaffold.

続いて、足場材2の組み付け作業を行う。
本実施の形態では、足場材2並びに足場支持材3として汎用の単管パイプを用いるため、足場材2と足場支持材3との連結には上述のように単管パイプ用のクランプ6を使用する。
Subsequently, the assembly work of the scaffolding material 2 is performed.
In this embodiment, since a general-purpose single pipe is used as the scaffold member 2 and the scaffold support member 3, the clamp 6 for the single pipe is used for the connection between the scaffold member 2 and the scaffold support member 3 as described above. To do.

また、足場材2の組み付け位置は、足場支持材3の中央部分に設けられた脱落防止ストッパー5の直上であり、本実施の形態では、上下2箇所に設けられた脱落防止ストッパー5の直上に足場材2を各々組み付ける。   Further, the assembly position of the scaffold member 2 is directly above the drop-off prevention stopper 5 provided at the center portion of the scaffold support member 3, and in this embodiment, directly above the drop-off prevention stoppers 5 provided at the two upper and lower positions. Assemble each scaffold material 2.

また、足場材2と足場支持材3とを連結する際、足場材2が極力水平となるようにクランプの止め位置を調節する。また、足場材2を組み付ける際、本実施の形態では、図1のように最寄りの足場支持材3(図1中A)に対して、上段の足場材2(2a)を左側に延ばした場合には、下段の足場材2(2b)は足場支持材3に対して右側に延ばすようにする。すなわち、最寄りに足場支持材3(A)に対して左右両方向にそれぞれ足場材2を延ばして足場を展開する。なお、これらの作業は、隣合う足場支持材3の双方で行われ、各部の締結作業終了後には、図2のように上下2段に亘る略水平な足場が確保される。   Moreover, when connecting the scaffolding material 2 and the scaffolding support material 3, the clamp stop position is adjusted so that the scaffolding material 2 is as horizontal as possible. In addition, when the scaffold 2 is assembled, in the present embodiment, the upper scaffold 2 (2a) is extended to the left side with respect to the nearest scaffold support 3 (A in FIG. 1) as shown in FIG. The lower scaffolding material 2 (2b) extends to the right side with respect to the scaffolding support material 3. That is, the scaffold is unfolded by extending the scaffold 2 in the left and right directions with respect to the scaffold support 3 (A). These operations are performed on both of the adjacent scaffold supporting members 3, and after the fastening operation of each part is completed, a substantially horizontal scaffold over two upper and lower stages is secured as shown in FIG.

続いて、足場材2と作業者の手元が適切な位置関係となるように角度設定用ターンバックル4を調節する。すなわち、支柱51と足場支持材3とのなす角度(図2中θ参照)を角度設定用ターンバックル4の締め込みによって所望の角度に設定し、これを以て作業者の立ち位置を変更する。
なお、角度設定用ターンバックル4は、立ち位置の調整に加え、吊り足場の補強部材としても機能する。すなわち、斜面に固定された支柱51と足場支持材3とを角度設定用ターンバックル4で繋ぎ止めることで、足場材2における前後左右の振れが無くなり、非常に安定した足場が得られる。
そして、このように設置された吊り足場1に作業者Mが乗り込み(図1参照)、支柱51の下部より防護網56を手繰り上げて支柱上部の最上段横ロープ54に防護網56を括り付ける。
なお、図1及び図2は吊り足場1を主体とした図示の都合上、支柱51に連結される各種ロープは、仮想線若しくはその図示を省略している。
Subsequently, the angle setting turnbuckle 4 is adjusted so that the scaffold 2 and the operator's hand have an appropriate positional relationship. That is, the angle (see θ in FIG. 2) formed between the support column 51 and the scaffold support member 3 is set to a desired angle by tightening the angle setting turnbuckle 4, thereby changing the standing position of the operator.
The angle setting turnbuckle 4 functions as a reinforcing member for the suspension scaffold in addition to the adjustment of the standing position. That is, by connecting the support column 51 fixed to the slope and the scaffold support member 3 with the angle setting turnbuckle 4, the scaffold member 2 can be prevented from swinging back and forth and left and right, and a very stable scaffold can be obtained.
Then, the worker M gets on the suspension scaffold 1 installed in this way (see FIG. 1), and the protective net 56 is lifted from the lower part of the support column 51 and is tied to the uppermost horizontal rope 54 at the upper part of the support column. .
1 and 2, the various ropes connected to the column 51 are omitted from the imaginary lines or the illustration thereof for the convenience of illustration mainly of the suspension scaffold 1.

このように本実施の形態によれば、支柱上部より吊り下げた足場材2に立って作業を行うため、落石防護柵に適用される斜面直角型の支柱や斜面前方に張り出すポケット式落石防護網の支柱等において、支柱の谷側に安定した足場を確保できる。また、支柱51の上部に向かうにつれて作業者の手元が作業者の立ち位置に寄るため、この点でも作業性が良い。
また、足場材2を支柱51の上部より吊り下ろすだけのシンプルな構造のため設置、解体撤去、並びに被災時の復旧も容易である。さらに吊り足場1の設置から解体・撤去に至る落石防護柵の施工全体を通じて工期短縮、並びに各種コストの削減を図れる。
As described above, according to the present embodiment, since the work is performed while standing on the scaffolding material 2 suspended from the upper part of the support column, the right-angle inclined support column applied to the falling rock protection fence and the pocket type rock fall protection projecting forward of the slope A stable scaffold can be secured on the trough side of the strut of the net strut. In addition, since the operator's hand approaches the worker's standing position toward the upper part of the support column 51, workability is also good in this respect.
Moreover, since the scaffold 2 is simply suspended from the upper part of the column 51, installation, dismantling, and recovery from a disaster are easy. Furthermore, the construction period can be shortened and various costs can be reduced throughout the construction of the rockfall protection fence from the installation of the suspension scaffold 1 to the dismantling and removal.

なお、上記した実施の形態はあくまでも一例であり、その詳細は、各種仕様に応じて変更可能である。
例えば、本実施の形態では、コスト及び取り扱いの容易さから足場材2並びに足場支持材3をφ48,6の汎用単管パイプで構成しているが、より高強度の肉厚パイプを用いてもよい。また、単管パイプに限らず、他の素材及び構造材を用いて吊り足場を製作してもよい。すなわち、足場材2及び足場支持材3の好ましい形態としては、その吊り下げ前後において、初期の形状を維持し得る剛性が確保されていれば足りる。
The above-described embodiment is merely an example, and details thereof can be changed according to various specifications.
For example, in the present embodiment, the scaffolding material 2 and the scaffolding support material 3 are constituted by general-purpose single pipes of φ48, 6 from the viewpoint of cost and ease of handling, but even if a thicker pipe with higher strength is used. Good. Moreover, you may manufacture a suspension scaffold not only using a single pipe pipe but using another raw material and a structural material. That is, as a preferable form of the scaffolding material 2 and the scaffolding support material 3, it is sufficient if rigidity capable of maintaining the initial shape is ensured before and after the suspension.

また、本実施の形態では、支柱51と足場支持材3との間に角度設定用ターンバックル4を組み付け、支柱51を支点にして足場支持材3の位置を調整しているが、角度設定用ターンバックル4に代えて、単管パイプと自在クランプを用いて支柱51と足場支持材3を接続してもよい。この場合、支柱51側、若しくは単管パイプ側に、単管パイプと支柱の連結に伴う連結プレート等の溶接加工を行っておくと良い。   In the present embodiment, the angle setting turnbuckle 4 is assembled between the support column 51 and the scaffold support member 3 and the position of the scaffold support member 3 is adjusted with the support column 51 as a fulcrum. Instead of the turnbuckle 4, the column 51 and the scaffold support 3 may be connected using a single pipe and a universal clamp. In this case, it is preferable to weld the connection plate or the like accompanying the connection between the single pipe and the support on the support 51 side or the single pipe side.

また、本実施の形態では、脱落防止ストッパー5として丸棒を溶接しているが、丸棒に代えてガゼットプレート等を溶接してもよい。また、上下2段に限られず、作業員の人数等に応じて段数を増やしても良い   Moreover, in this Embodiment, although the round bar is welded as the drop-off prevention stopper 5, it may replace with a round bar and may weld a gusset plate. Moreover, the number of stages is not limited to the upper and lower stages, and the number of stages may be increased according to the number of workers.

また、本実施の形態では、支柱51を支点にして足場支持材3の角度を設定しているが、足場支持材3若しくは足場材2をワイヤロープ等で直接斜面に張り付けて固定してもよい。また、本実施の形態では長さ調節を可能にすべくターンバックルを用いているが、ターンバックルに代えて、長さの異なる棒状部材を入れ替えて作業者の立ち位置を調整してもよい。また、ターンバックルに代えて締め器等で足場支持材を支柱側に寄せることもできる。   In the present embodiment, the angle of the scaffold support member 3 is set with the column 51 as a fulcrum. However, the scaffold support member 3 or the scaffold member 2 may be directly attached to the slope with a wire rope or the like. . Further, in this embodiment, the turnbuckle is used so that the length can be adjusted, but instead of the turnbuckle, a rod-like member having a different length may be replaced to adjust the standing position of the operator. Moreover, it can replace with a turnbuckle, and can also bring a scaffold support material to the support | pillar side with a clamp.

また、単管パイプからなる足場材2に代えて足場材をワイヤロープで構成してもよい。この場合、ワイヤロープが撓むため、締め器等で張力を与えるとよい。また、ワイヤロープは可撓性を有するため単管パイプに較べると不安定であるが、支柱の上部から吊り下げることで、作業者の立ち位置が常に斜面谷側となる。よって、この点において作業性の向上が望める。また、足場支持材3に代えてワイヤロープやクサリ等の索体を用いることもできる。   Moreover, it may replace with the scaffolding material 2 which consists of a single pipe pipe, and may comprise a scaffolding material with a wire rope. In this case, since the wire rope bends, it is preferable to apply tension with a fastener or the like. In addition, the wire rope is flexible and unstable compared to a single pipe, but by hanging from the top of the column, the operator's standing position is always on the sloped valley side. Therefore, improvement in workability can be expected in this respect. Moreover, it can replace with the scaffold support material 3 and can use ropes, such as a wire rope and a chain.

1 吊り足場
2 足場材
3 足場支持材
3a プレート
3b ピン孔
3d ターンバックル用ステー
4 角度設定用ターンバックル
4a クレビスジョイント
4b クレビスジョイント
5 脱落防止ストッパー
5a 丸棒
6 クランプ
50 落石防護柵(落下物防護装置)
51 支柱
51a 支柱側ターンバックル用ステー
52 ブラケット
52d 係止部
52a 上部ブラケット
53 支柱補強ロープ
53a リング状端部
53b リング状端部
53c U字ボルト
53d U字ボルト
54 上部横ロープ(最上段横ロープ)
55 下部横ロープ
56 防護網
57 フランジ
58 支柱控えロープ
58a U字ボルト
59 ステーロープ
60 上弦ロープ
61 結合コイル
DESCRIPTION OF SYMBOLS 1 Suspended scaffold 2 Scaffold material 3 Scaffold support material 3a Plate 3b Pin hole 3d Turn buckle stay 4 Angle setting turn buckle 4a Clevis joint 4b Clevis joint 5 Fall-off prevention stopper 5a Round bar 6 Clamp 50 Falling stone protection fence (falling object protection device )
51 Column 51a Column-side turnbuckle stay 52 Bracket 52d Locking portion 52a Upper bracket 53 Column reinforcement rope 53a Ring-shaped end 53b Ring-shaped end 53c U-shaped bolt 53d U-shaped bolt 54 Upper horizontal rope (top horizontal rope)
55 Lower horizontal rope 56 Protective net 57 Flange 58 Strut retainer rope 58a U-bolt 59 Stay rope 60 Upper string rope 61 Coupling coil

Claims (4)

斜面における吊り足場の設置方法であって、
斜面幅方向に間隔を開けて複数の支柱を立設すると共に、この斜面上に吊り足場を展開すべく前記斜面幅方向に足場材を延設し、さらに、前記支柱の上部より前記足場材を吊り下げてなる吊り足場の設置方法。
A method for installing a suspension scaffold on a slope,
A plurality of struts are erected at intervals in the slope width direction, and a scaffold material is extended in the slope width direction to deploy a suspended scaffold on the slope, and the scaffold material is further extended from the top of the pillar. How to install a suspended scaffolding.
前記足場材と前記支柱の上部とを連結する足場支持材を前記支柱の立て込みに先立って支柱の上部に連結し、
さらに前記足場支持材を、前記支柱の立て込みに伴って支柱上部より吊り下げることを特徴とする請求項に記載の吊り足場の設置方法。
Prior to the standing of the support pillar, the scaffold support material for connecting the scaffold material and the upper part of the support pillar is connected to the upper part of the support pillar,
The suspension scaffold installation method according to claim 1 , wherein the scaffold support member is suspended from an upper portion of the column as the column is stood up.
斜面幅方向に間隔を開けて複数の支柱を有すると共に、この支柱によって斜面幅方向に落下物の防護体を展開支持する落下物防護装置を斜面に設置する際、前記足場材を吊り下げるための支柱として前記落下物防護装置用の支柱を用いることを特徴とする請求項又はに記載の吊り足場の設置方法。 In order to suspend the scaffolding material when installing a fall object protection device on a slope with a plurality of pillars spaced apart in the slope width direction and deploying and supporting a fall object protection body in the slope width direction by the pillars The suspension scaffold installation method according to claim 1 or 2 , wherein a support for the falling object protection device is used as the support. 前記足場材の位置を、前記支柱を支点にして設定変更することを特徴とする請求項からの何れかに記載の吊り足場の設置方法。 The method for installing a suspended scaffold according to any one of claims 1 to 3 , wherein the position of the scaffold is changed by setting the column as a fulcrum.
JP2014260004A 2014-12-24 2014-12-24 Suspension scaffold for falling object protection device and installation method of suspension scaffold on slope Active JP6444725B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014260004A JP6444725B2 (en) 2014-12-24 2014-12-24 Suspension scaffold for falling object protection device and installation method of suspension scaffold on slope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014260004A JP6444725B2 (en) 2014-12-24 2014-12-24 Suspension scaffold for falling object protection device and installation method of suspension scaffold on slope

Publications (3)

Publication Number Publication Date
JP2016121434A JP2016121434A (en) 2016-07-07
JP2016121434A5 JP2016121434A5 (en) 2017-10-26
JP6444725B2 true JP6444725B2 (en) 2018-12-26

Family

ID=56327229

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014260004A Active JP6444725B2 (en) 2014-12-24 2014-12-24 Suspension scaffold for falling object protection device and installation method of suspension scaffold on slope

Country Status (1)

Country Link
JP (1) JP6444725B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6172830B1 (en) * 2017-02-22 2017-08-02 義英 土橋 Acting underwater wall
JP7688353B2 (en) * 2021-07-08 2025-06-04 ケイコン株式会社 protective fence

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5498028U (en) * 1977-12-22 1979-07-11
FR2576047B1 (en) * 1985-01-14 1987-02-13 Mecanroc PROTECTIVE BARRIER AGAINST FALLING STONES WITH MOORING CABLES LIKELY TO SLIDE IN SHOCK ABSORBERS
JP2004308342A (en) * 2003-04-10 2004-11-04 Nippon Steel Metal Prod Co Ltd Snow protection fence
JP4174438B2 (en) * 2004-03-04 2008-10-29 東急建設株式会社 Suspended scaffolding
JP5235816B2 (en) * 2009-08-05 2013-07-10 日本ゼニスパイプ株式会社 Guard fence with tilting column
JP6073614B2 (en) * 2012-09-19 2017-02-01 神鋼建材工業株式会社 Debris flow prevention fence

Also Published As

Publication number Publication date
JP2016121434A (en) 2016-07-07

Similar Documents

Publication Publication Date Title
US10125507B2 (en) Fall protection system
KR101556968B1 (en) Suspension pedestrian bridge integrated with parapet using parapet cable and constructing method thereof
JP6312109B1 (en) Safety device for temporary scaffold
US20050098381A1 (en) Roofing safety cable system and method
KR20110110494A (en) Support bracket and fall prevention safety net support device using same
JP2016089445A (en) Device for supporting safety net and scaffolding
JP6444725B2 (en) Suspension scaffold for falling object protection device and installation method of suspension scaffold on slope
JP2009108473A (en) Hanging scaffold erection method for elevated structure
US20170028232A1 (en) Lifeline device for temporary scaffold and lifeline support device
JP2020084477A (en) Equipment for the installation of protective nets on suspended scaffolds
CN104797766A (en) Scaffolding equipment for aggregate smokestack dismantling and dismantling method for aggregate smokestack using same equipment
JP3164853U (en) Falling object protection net installation device
KR101181453B1 (en) Apparatus for protection net and method for installing and demounting protection net using the same
JP6145362B2 (en) Intermediate work floor forming apparatus and intermediate work floor forming method
JP6984864B2 (en) Master rope support and its installation method
KR100808291B1 (en) Girder Type Bridge Safety Device
JP6929078B2 (en) Scaffolding device
KR100530011B1 (en) Structure of safe net using pier
KR20080045595A (en) Fall prevention net fixing member
JP5816536B2 (en) Master rope support device and slope working method using master rope support device
KR200495121Y1 (en) apparatus
KR20090051796A (en) Distance control drop prevention system
JP6070037B2 (en) Reinforcement structure of existing rockfall protection net
JP2013144873A (en) Lead rope laying system for fixing life rope on roof
JP5887209B2 (en) Mobile safety belt mounting device for bridge construction

Legal Events

Date Code Title Description
A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20170915

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20170915

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20180612

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20180619

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20180817

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20181030

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20181128

R150 Certificate of patent or registration of utility model

Ref document number: 6444725

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150