JP6444912B2 - Steel structure reinforcement and repair structure and method - Google Patents
Steel structure reinforcement and repair structure and method Download PDFInfo
- Publication number
- JP6444912B2 JP6444912B2 JP2016036502A JP2016036502A JP6444912B2 JP 6444912 B2 JP6444912 B2 JP 6444912B2 JP 2016036502 A JP2016036502 A JP 2016036502A JP 2016036502 A JP2016036502 A JP 2016036502A JP 6444912 B2 JP6444912 B2 JP 6444912B2
- Authority
- JP
- Japan
- Prior art keywords
- insertion hole
- main girder
- upper flange
- bolt
- support portion
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
- Working Measures On Existing Buildindgs (AREA)
- Connection Of Plates (AREA)
Description
本発明は、鋼橋などの鋼構造物において、主桁の上フランジ(以下、「主桁上フランジ」と略称する場合がある。)とウェブギャップ板あるいは垂直補剛材との接合部の補修などに好適に実施することができる鋼構造物の補強・補修構造および方法に関する。 The present invention relates to repairing the joint of a main girder upper flange (hereinafter sometimes referred to as "main girder upper flange") and a web gap plate or a vertical stiffener in a steel structure such as a steel bridge. The present invention relates to a steel structure reinforcement / repair structure and method that can be suitably implemented.
鋼構造物である、たとえば鋼橋の主桁上フランジと横桁上フランジとの間のウェブギャップ部とも呼ばれる取合い部には、ウェブギャップ板が設けられている。主桁は、橋軸に平行に配設され、横桁は橋軸に垂直に配設される。ウェブギャップ板は、主桁上フランジと分配横桁の横桁上フランジとに溶接によって接合されている。 A web gap plate is provided in an engagement portion, which is also called a web gap portion between a main girder upper flange and a cross girder upper flange of a steel bridge, for example. The main girder is arranged in parallel to the bridge axis, and the horizontal girder is arranged perpendicular to the bridge axis. The web gap plate is joined by welding to the main girder upper flange and the cross girder upper flange.
ウェブギャップ板と主桁上フランジとの溶接部、ウェブギャップ板と主桁ウェブとの溶接部、ウェブギャップ板と横桁の上フランジ(以下、「横桁上フランジ」と略称する場合がある。)との溶接部、およびウェブギャップ板の母材には、長年の繰返し荷重の作用によって、亀裂が発生する場合があり、これらの亀裂発生箇所に対して、適切な補強・補修が求められる。 A welded portion between the web gap plate and the main girder upper flange, a welded portion between the web gap plate and the main girder web, a web gap plate and a top girder upper flange (hereinafter, abbreviated as “horizontal girder upper flange”). ) And the base material of the web gap plate, cracks may occur due to the effects of repeated loading over many years. Appropriate reinforcement and repair are required for these cracks.
このような亀裂発生箇所は、主桁と分配横桁あるいは対傾構とが交差する狭隘な場所であるため、従来では、亀裂発生箇所の補強・補修作業を行うために、主桁上フランジに支持されているコンクリート床版およびコンクリート床版上の舗装工を、できるだけ狭い範囲で撤去し、この撤去によって形成された開口から、亀裂発生箇所の補強・補修工事を行っている(たとえば、特許文献1参照)。 Since these cracks are narrow places where the main girder and the distribution girder or anti-tilt cross, they are conventionally supported by the upper flange of the main girder in order to reinforce and repair the cracked part. The concrete floor slab and the pavement work on the concrete floor slab are removed as narrow as possible, and the cracks are reinforced and repaired from the opening formed by the removal (for example, Patent Document 1). reference).
上記の従来技術では、亀裂発生箇所の補強・補修作業を行うために、コンクリート床版および舗装などを撤去するので、補強・補修工事が完了した後に、撤去した部分を復旧する必要があるとともに、工事期間に通行を制限または停止しなければならないという問題がある。 In the above prior art, concrete floor slabs and pavements are removed in order to reinforce and repair cracked parts, so it is necessary to restore the removed part after reinforcement and repair work is completed. There is a problem that traffic must be restricted or stopped during the construction period.
本発明の目的は、亀裂発生箇所の補強・補修作業を、コンクリート床版および舗装などを撤去せず、通行を制限または停止せずに、簡便に行うことができる鋼構造物の補強・補修構造および方法を提供することである。 An object of the present invention is to provide a steel structure reinforcement / repair structure that can easily perform reinforcement / repair work at a crack occurrence location without removing concrete floor slabs and pavements, without restricting or stopping traffic. And to provide a method.
本発明は、
(a)鋼橋の橋床構造1は、
繰返し荷重が作用する第1部材21と、
第1部材21に接合部で接合されて第1部材21を支持する第2部材10とを有し、
(b)第2部材10の厚さ方向(図9の左右方向)の両側に設けられる一対の補強部材26と、
押付け装置30と、
固定部材17、17a、19、19aとを準備し、
(b1)各補強部材26は、
第1部材21の第2部材10に臨む面27に配置される当接支持部28と、
当接支持部28に連なり、前記面27から第2部材10に沿って遠ざかる方向(図9の下方向)に、第2部材10の途中(図9の上下方向の途中)まで延び、前記面27から異なる距離に(図9の上下に)形成される第1挿通孔39b、および第2挿通孔39a、39cを有する取付け部29とを有し、
第2挿通孔39a、39cには、固定部材17、17a、19、19aが挿通可能であり、
(b2)押付け装置30は、
一対の細長い第1および第2連結部41、46と、
第2部材10の厚さ方向の一方側(図7〜9の左方)で、第1連結部41の一端部と第2連結部46の一端部とにわたって延び、軸線まわりに回転駆動されて第1連結部41の一端部と第2連結部46の一端部とを相互に離間方向(図7〜9の上下方向)に変位駆動する第1ねじ棒44aと、
第2部材10の厚さ方向の他方側(図7〜9の右方)で、第1連結部41の他端部と第2連結部46の他端部とにわたって延び、軸線まわりに回転駆動されて第1連結部41の他端部と第2連結部46の他端部とを相互に離間方向(図7〜9の上下方向)に変位駆動する第2ねじ棒44bとを有し、
第1連結部41は、第1挿通孔39bに挿通可能であり、
(c)第2部材10に、
第1挿通孔39bに対応する位置で、第1連結部41が挿通可能な第3挿通孔37bを形成し、
第2挿通孔39a、39cに対応する位置で、固定部材17、17a、19、19aが挿通可能な第4挿通孔37a、37cを形成するとともに、
前記面27から第2部材10に沿って取付け部29よりも遠ざかった(すなわち、図9の下方の)位置で、第2連結部46が挿通可能な第5挿通孔35を形成し、
前記面27に補強部材26の当接支持部28が当接している状態では、補強部材26の第1挿通孔39bを規定する内周面の、第1部材21の第2部材10に臨む前記面27に最も近い部分(図9の最上部)39b1は、第2部材10の第3挿通孔37bを規定する内周面の前記面27に最も近い部分(図9の最上部)よりも、第1部材21の第2部材10に臨む前記面27から遠ざかって(すなわち、図9の下方に)突出するように取り付けられ、
(d)押付け装置30の第1連結部41を、第1挿通孔37bおよび第3挿通孔39bに挿通し、
第2連結部46を、第5挿通孔35に挿通し、
第1および第2ねじ棒42a、42bを前記回転駆動して、第1および第2連結部41、46を相互に離間方向(図9の上下方向)に変位駆動することによって、第2連結部46を、第2部材10の第5挿通孔35を規定する内周面の前記面27から最も遠い部分(図9の最下部)に支持して、第1連結部41によって、取付け部29の第1挿通孔39bを規定する内周面の前記面27に最も近い部分(図9の最上部)39b1を、前記面27に向けて押して(図9では、押上げて)、第1部材21の前記面27に補強部材26の当接支持部28を押付けて当接させた状態とし、
(e)前記面27に当接支持部28を押付けて当接させた状態で、第2挿通孔39a、39cと第4挿通孔37a、37cとに、固定部材17、17a、19、19aを挿通して、第2部材10に取付け部29を固定することを特徴とする鋼橋の補強・補修方法である。
The present invention
(A) Steel
A
The
(B) a pair of reinforcing
A
Preparing
(B1) Each reinforcing
A
The surface is connected to the
The
(B2) The
A pair of elongated first and second connecting
On one side of the
On the other side in the thickness direction of the second member 10 (to the right in FIGS. 7 to 9), it extends across the other end of the first connecting
The first connecting
(C) In the
Forming a
At the positions corresponding to the
A
In a state where the
(D) The first connecting
The second connecting
The first and
(E) With the
本発明は、
第1部材21は、主桁上フランジ21であり、
第2部材10は、主桁上フランジ21と、主桁ウェブ23と、主桁下フランジ22とに取付けられる垂直補剛材10であることを特徴とする請求項1に記載の鋼構造物の補強・補修方法である。
The present invention
The
2. The steel structure according to
本発明は、
(a)鋼橋の橋床構造は、
主桁上フランジ21、主桁ウェブ23、および横桁上フランジ31にウェブギャップ板9が溶接によって接合されて構成され、
(b)ウェブギャップ板9の厚さ方向の両側に設けられる一対の補強部材26a、タッピングボルト54、および固定部材17、17a、18、18aを準備し、
(b1)各補強部材26aは、
主桁上フランジ21のウェブギャップ板9に臨む下面27に沿って配置され、タッピングボルト54が挿通する遊通孔51が形成される当接支持部28a、および
当接支持部28aに連なり、ウェブギャップ板9に沿って配置され、固定部材17、17a、18、18aが挿通可能な第1挿通孔39a、39bが形成される取付け部29aを備え、
当接支持部28aおよび取付け部29aが屈曲してL字状に形成され、
(b2)タッピングボルト54は、ボルト頭部、およびそのボルト頭部に連なるボルト軸部を有し、
(c)ウェブギャップ板9に、第1挿通孔39a、39bに対応する位置で、固定部材17、17a、19、19aが挿通可能な第2挿通孔37a、37bを形成し、
(d)主桁上フランジ21に、当接支持部28aの遊通孔51に対応する位置で、タッピングボルト54をねじ込むためのめねじ加工が施されていない下穴50を形成し、
(e)タッピングボルト54のボルト軸部を、遊通孔51を挿通して、下穴50にねじ込むことによって、自らねじ切りをしつつ進み、めねじを塑性変形によって形成し、
タッピングボルト54を締付けることによって、主桁上フランジ21に補強部材26aの当接支持部28aがねじ接合され、これによって、補強部材26aの当接支持部28aを主桁上フランジ21のウェブギャップ板9に臨む面27に押付けて当接させた状態とし、ボルト軸部の端部は、主桁上フランジ21の上面と面一(図12、図13)であり、
(f)第1挿通孔39a、39b、および第2挿通孔37a、37bに、固定部材17、17a、19、19aを挿通して、ウェブギャップ板9に取付け部29aを固定することを特徴とする鋼橋の補強・補修方法である。
The present invention
(A) The bridge deck structure of the steel bridge is
The
(B) A pair of reinforcing
(B1) Each reinforcing
The main girder
The
(B2) The tapping
(C) The
(D) The main girder
(E) The bolt shaft portion of the tapping
By tightening the tapping
(F) The fixing
また本発明は、
(a)鋼橋の橋床構造は、
主桁上フランジ21、主桁ウェブ23、および横桁上フランジ31にウェブギャップ板9が溶接によって接合されて構成され、
(b)ウェブギャップ板の厚さ方向の両側に設けられる一対の補強部材26aを有し、
(b1)各補強部材26aは、
主桁上フランジ21のウェブギャップ板9に臨む下面27に沿って配置され、タッピングボルト54が挿通する遊通孔51が形成される当接支持部28a、および
当接支持部28aに連なり、ウェブギャップ板9に沿って配置され、固定部材17、17a、18、18aが挿通可能な第1挿通孔39a、39bが形成される取付け部29aを備え、
当接支持部28aおよび取付け部29aが屈曲してL字状に形成され、
(b2)タッピングボルト54は、ボルト頭部、およびそのボルト頭部に連なるボルト軸部を有し、
(c)ウェブギャップ板9に、第1挿通孔39a、39bに対応する位置で、固定部材17、17a、19、19aが挿通可能な第2挿通孔37a、37bが形成され、
(d)主桁上フランジ21に、当接支持部28aの遊通孔51に対応する位置で、タッピングボルト54をねじ込むためのめねじ加工が施されていない下穴51が形成され、
タッピングボルト54のボルト軸部を、遊通孔51に挿入して、下穴50にねじ込むことによって、自らねじ切りをしつつ進み、めねじを塑性変形によって形成し、
タッピングボルト54を締付けることによって、主桁上フランジ21に補強部材26aの当接支持部28aがねじ接合され、これによって、補強部材26aの当接支持部28aを主桁上フランジ21のウェブギャップ板9に臨む面27に押付けて当接させた状態とし、ボルト軸部の端部は、主桁上フランジ21の上面と面一(図12、図13)であり、
(e)第1挿通孔39a、39b、および第2挿通孔37a、37bに、固定部材17、17a、19、19aを挿通して、ウェブギャップ板9に取付け部29aを固定することを特徴とする鋼橋の補強・補修構造である。
The present invention also provides
(A) The bridge deck structure of the steel bridge is
The
(B) having a pair of reinforcing
(B1) Each reinforcing
The main girder
The
(B2) The tapping
(C) The
(D) The main girder
By inserting the bolt shaft portion of the tapping
By tightening the tapping
(E) The fixing
本発明の鋼構造物の補強・補修方法によれば、一対の補強部材26は、たとえば主桁上フランジ21である第1部材の、たとえば垂直補剛材10である第2部材に臨む面27に配置される当接支持部28と、当接支持部28に連なり、第2部材に沿って延びる取付け部29とを有する。この補強部材は、固定部材17、17a、19、19aによって、当接支持部が第1部材の第2部材に臨む面27に押付けられて当接し、この状態で、取付け部29が第2部材に固定され、第1部材と第2部材との接合部に作用する繰返し荷重の少なくとも一部を補強部材が負荷するように構成されるので、補強部材を第1部材および第2部材に固定部材を用いて容易に取付け、接合部の亀裂の進展を防ぎ、亀裂発生箇所を補強および補修することができる。
According to steel structures reinforcement and repair method of the present invention, a pair of reinforcing
このような補強部材の取付け作業は、押付け装置30によって、補強部材の当接支持部を第1部材の前記面27に押付けて当接させた状態とし、取付け部を固定部材によって第2部材に固定すればよいので、第1部材および第2部材に対して補強部材を取付ける側から行なうことができ、前記従来技術のように、第1部材を主桁上フランジとし、第2部材を垂直補剛材やウェブギャップ板としたとき、コンクリート床版などの床組や舗装を撤去する必要がなく、床組の下方の空間で補強部材の取付け作業を行なうことができる。したがって、亀裂発生箇所の補強・補修作業を、車両や歩行者の通行を制限または停止せずに、実施することができる。
The reinforcing member is attached by pressing the reinforcing member abutting support portion against the
また本発明によれば、補強部材26aは、当接支持部28aと取付け部29aとが屈曲してL字状に連なった構成であり、当接支持部28aには遊通孔51が穿設され、主桁上フランジ21である第1部材には下穴50が形成されるので、遊通孔51が下穴50上に配置されるように、補強部材26aを主桁上フランジ21である第1部材に位置決めした状態で、タッピングボルト54のボルト軸部を遊通孔51に挿入して、下穴50にねじ込むことによって、自らねじ切りをしつつ進み、めねじを塑性変形によって形成し、タッピングボルト54を締付けることによって、主桁上フランジ21である第1部材に補強部材26aの当接支持部28aがねじ接合される。これによって、補強部材26aの当接支持部28aを主桁上フランジ21である第1部材の、ウエブギャップ板9である第2部材に臨む面27に押付けて当接させた状態とすることができ、図12、図13に明らかに示されるとおり、ボルト軸部の端部は、主桁上フランジ21の上面と面一であり、補強部材26aの主桁上フランジ21である第1部材への取付け作業を簡素化および容易化し、取付け作業の効率を向上することができる。
Further, according to the present invention, the reinforcing
図1は本発明の一実地形態の鋼構造物の補強・補修構造を示す斜視図であり、図2は鋼桁橋の橋床構造1の一部の斜視図である。図1は、図2のセクションIを拡大して示し、図2は図解を容易にするため、部分的に切欠いて示されている。本実施形態の鋼構造物の補強・補修構造は、本発明の構造物の補強・補修方法を実施することによって構築されるものとして、以下に説明する。鋼構造物である鋼桁橋の橋床構造1は、橋軸L1方向に延びる複数の主桁2と、各主桁2に垂直に延び、橋軸L1方向に互いに間隔をあけて配設される複数の分配横桁(以下、「横桁」と略記する)3と、各横桁3間に橋軸L1方向に互いに間隔をあけて配設される複数の対傾構4とを有する。各主桁2上には、コンクリート床版5が敷設され、コンクリート床版5の上方に臨む表面には、防水シート6が敷設され、防水シート6上にはアスファルトなどによって舗装7が敷設される。
FIG. 1 is a perspective view showing a steel structure reinforcement / repair structure according to one embodiment of the present invention, and FIG. 2 is a perspective view of a part of a
主桁2は、第1部材としての主桁上フランジ21と、主桁下フランジ22と、主桁上フランジ21および主桁下フランジ22を連結する主桁ウェブ23とを有する。主桁2は、たとえば断面がI字状の構造用鋼材から成る。横桁3は、横桁上フランジ31と、横桁下フランジ32と、横桁上フランジ31および横桁下フランジ32を連結する横桁ウェブ33とを有する。横桁3は、前述の主桁2と同様な、断面I字状の構造用鋼材から成る。
The
主桁上フランジ21と横桁上フランジ31との間には、第2部材としてのウェブギャップ板9が設けられ、主桁上フランジ21と主桁下フランジ22との間には、第2部材としての垂直補剛材10が設けられる。ウェブギャップ板9の上端部と主桁上フランジ21とは、溶接金属から成るビード11を形成する溶接によって接合され、ウェブギャップ板9の下端部と横桁上フランジ31とはビード12を形成する溶接によって接合され、ウェブギャップ板9の一側端部と主桁ウェブ23とはビード13を形成する溶接によって接合される。
A
図3は、主桁上フランジ21付近を橋軸L1方向に見た拡大断面図であり、図4は垂直補剛材10付近の拡大斜視図である。垂直補剛材10の上端部と主桁上フランジ21とは、溶接金属から成るビード14を形成する溶接によって接合され、垂直補剛材10の下端部と主桁下フランジ22とは、ビード15を形成する溶接によって接合され、垂直補剛材10の一側端部と主桁ウェブ23とは、ビード16を形成する溶接によって接合される。
3 is an enlarged cross-sectional view of the vicinity of the main girder
垂直補剛材10の上端部には、固定部材としての第1〜第3ボルト17〜19および第1〜第3ボルト17〜19に螺着される第1〜第3ナット17a〜19aによって、ガセット20が固定され、ガセット20には対傾構25が溶接によって接合される。第1〜第3ボルト17〜19は高張力ボルトが用いられ、第1〜第3ナット17a〜19aは高張力ナットが用いられる。
At the upper end of the
図5は、垂直補剛材10の上端部と主桁上フランジ21との接合部に疲労亀裂が発生した場合の補強・補修手順を示すフローチャートであり、図6は補強部材26が垂直補剛材10の上端部に取付けられた状態を示す断面図である。まず、ステップs0で補強・補修作業が開始され、1つの補強箇所に2枚の補強部材26が用いられ、補強箇所数分の補強部材26が準備される。補強部材26は、第1部材である主桁上フランジ21の、第2部材である主桁ウェブ23に臨む面である下面27に当接させた状態で配置される当接支持部28と、当接支持部28に連なり、主桁ウェブ23に沿って延びる取付け部29とを有する。本実施形態において、補強部材26は、図6の紙面に垂直な方向である正面視において、台形状の構造用鋼板から成り、斜辺を上方にして、先端部が主桁ウェブ23から離れた側に配設される。このような先端部およびその近傍によって、上記の当接支持部28が構成される。主桁ウェブ23およびガセット20に両側には、フィラープレート36を介して補強部材26がそれぞれ配設され、第1〜第3ボルト17〜19に第1〜第3ナット17a〜19aを螺着して締付けることによって、各補強部材26の取付け部29間で、主桁ウェブ23、ガセット20および各フィラープレート36が摩擦接合される。
FIG. 5 is a flowchart showing a reinforcing / repairing procedure when a fatigue crack occurs at the joint between the upper end portion of the
このような補強部材26がステップs0で準備されると、ステップs1で垂直補剛材10に、後述の図7および図8に示す押付け装置30を取付けるための第5挿通孔である下穴35を穿設する。下穴35が形成されると、ステップs2へ移り、垂直補剛材10とガセット20とを固定している既存のボルトを取外す。
When such a reinforcing
図7は、押付け装置30を垂直補剛材10に取付けた状態を示す断面図であり、図8は押付け装置30の拡大断面図である。図9は、垂直補剛材10およびガセット20に形成された既存のボルト挿通孔37a,37b,37c;38a,38b,38c付近の拡大断面図である。垂直補剛材10およびガセット20には、3本の既存ボルトのボルト軸部が挿通するボルト挿通孔37a、37b、37c;38a,38b,38cが形成される。垂直補剛材10のボルト挿通孔37a〜37cのうち、ボルト挿通孔37bを第3挿通孔とし、ボルト挿通孔37a、39cを第4挿通孔とする。これらの既存のボルト挿通孔37a,37b,37c;38a,38b,38cの内径D1は、たとえばφ24.5mmである。
FIG. 7 is a cross-sectional view showing a state in which the
次にステップs3で、補強部材26およびフィラープレート36を上段の第1ボルト17およびナット17a、下段の第3ボルト19およびナット19aによって、垂直補剛材10およびガセット20に取付け、仮固定する。
Next, in step s3, the reinforcing
補強部材26およびフィラープレート36には、上記既存のボルト挿通孔37a,37b,37c;38a,38b,38cに対応した同一の間隔で、第1〜第3ボルト17〜19のボルト軸部が挿通するボルト挿通孔39a〜39c,40a〜40cがそれぞれ形成される。補強部材26の取付け部29のボルト挿通孔39a〜39cのうち、ボルト挿通孔39bを第1挿通孔とし、ボルト挿通孔39a、39cを第2挿通孔とする。これらのボルト挿通孔39a〜39cの内径D2は、既存のボルト挿通孔37a〜37c,38a〜38cの内径D1よりも大きい値、たとえばS2=26.5mmに選ばれる。また、フィラープレート36のボルト挿通孔40a〜40cの内径D3は、既存のボルト挿通孔37a〜37c,38a〜38cの内径D1と同一(D3=D1)に選ばれる。
Bolt shaft portions of the first to
補強部材26は、フィラープレート36とともに垂直補剛材10およびガセット20に、これらを挟持するように装着された状態では、ボルト挿通孔39a〜39cを規定する内周面の最上部39a1〜39c1が、垂直補剛材10のボルト挿通孔37a〜37cを規定する内周面の最上部およびガセット20のボルト挿通孔38a〜38cを規定する内周面の最上部およびフィラープレート36のボルト挿通孔40a〜40cを規定する内周面の最上部よりも下方に突出するように取付けられる。
When the reinforcing
ステップs4に移り、補強部材26が上段および下段のボルト17,19およびナット17a,19aによって垂直補剛材10およびガセット20に取付けられた状態で、中段のボルト挿通孔37b,38b,39b,40bおよび下穴35を利用して、押付け装置30が取付けられる。
Proceeding to step s4, the reinforcing
前述のとおり、前記下面27に補強部材26の当接支持部28が当接している状態では、補強部材26のボルト挿通孔39bを規定する内周面の前記面27に最も近い部分である図9の最上部39b1は、垂直補剛材10のボルト挿通孔37bを規定する内周面の前記面27に最も近い部分である図9の最上部よりも、前記面27から遠ざかって(すなわち、図9の下方に)突出している。
押付け装置30は、細長い第1連結部としての連結ボルト41の外ねじが刻設された軸線方向両端部に幅調整用保持体42a,42bが装着され、各一対のナット43a,43bによって固定して位置決めされる。各幅調整用保持体42a,42bには、ねじ棒44a,44bの軸線方向一端部のそれぞれが回転自在に保持される。ねじ棒44a,44bには、可動部材45a,45bが螺着され、各可動部材45a,45bには、連結ボルト41と対を成す細長い第2連結部としてのもう1つの連結ボルト46の軸線方向両端部が螺着され、互いに連結される。各ねじ棒44a,44bの軸線方向他端部には、一直径線方向に貫通した貫通孔47a,47bが形成され、これらの貫通孔47a,47bにレバーなどの操作工具を挿入して回転操作することによって、各可動部材45a,45bはねじ棒44a,44bの軸線方向に移動し、下段の連結ボルト46が垂直補剛材10の下穴35を挿通して該下穴35を規定する内周面の前記面27から最も遠い部分である最下部に支持された状態で、上段の連結ボルト41によって各補強部材26の第1挿通孔としてのボルト挿通孔39bを規定する内周面の前記面27に最も近い部分である最上部39b1を押上げる。ステップs5で、各補強部材26の上端部である当接支持部28を主桁上フランジ21の下面27に向けて押して当接させて押上げ状態にして、垂直補剛材10が主桁上フランジ21から下方へ離反する方向へ反力を与え、これによって垂直補剛材10にプレストレスを付与する。
As described above, in a state where the abutting
The
その後、ステップs6で、上段および下段の第1、第3ボルト17,19およびナット17a,19aを本締めし、ステップs7で押付け装置30を取外し、ステップs8で中段の第2ボルト18およびナット18aを取付けて本締めする。
Thereafter, in step s6, the upper and lower first and
このようにして図10の断面図および図11の斜視図に示されるように、垂直補剛材10と主桁上フランジ21ととの交差部付近の溶接部から発生した亀裂48,49の進展を抑えるように、垂直補剛材10にプレストレスを付与し、ステップs9で補強・補修作業が終了する。このような補強・補修方法を実施することによって、本発明に従う鋼構造体の補強・補修構造が実現されて、垂直補剛材10に付与されたプレストレスと上載荷重による応力とが相殺し、亀裂48,49が発生している部位の応力を低減し、亀裂48,49の進展を阻止するとともに、新たな亀裂の発生を防止し、亀裂48,49が発生した部位およびその近傍を補強することができる。
Thus, as shown in the cross-sectional view of FIG. 10 and the perspective view of FIG. 11, the development of
図12は、本発明の他の実施形態の鋼構造物の補強・補修構造を示す断面図であり、図13は図12の右側から見た断面図である。本実施形態では、ウェブギャップ板9の補強・補修構造および方法について説明する。なお、前述の実施形態と対応する部分には、同一の参照符を付す。
FIG. 12 is a cross-sectional view showing a steel structure reinforcement / repair structure according to another embodiment of the present invention, and FIG. 13 is a cross-sectional view seen from the right side of FIG. In the present embodiment, a reinforcing and repairing structure and method for the
本実施形態の補強部材26aは、主桁上フランジ21のウェブギャップ板9に臨む下面27に配置される当接支持部28aと、当接支持部28aに連なり、ウェブギャップ板9に沿って延びる取付け部29aとを有する。補強部材26aの取付け部29aは、当接支持部28aに連なり、ウェブギャップ板9に沿って配置され、第1挿通孔としてのボルト挿通孔39a、39bを有する。ウェブギャップ板9は、ボルト挿通孔39a、39bに対応する位置で、第2挿通孔としてのボルト挿通孔37a、37bを有する。
この補強部材26aは、断面がL字状の山型鋼から成る短尺材であり、固定部材としての第1および第2ボルト17、18、ナット17a、18aによって、当接支持部28aが主桁上フランジ21のウェブギャップ板9に臨む下面27にタッピングボルト54で押付けられて当接し、この状態で、取付け部29aがウェブギャップ板9に摩擦接合によって固定され、主桁上フランジ21とウェブギャップ板9との接合部に作用する繰返し荷重の少なくとも一部を補強部材26aが負荷するように構成される。これによって、補強部材26aを主桁上フランジ21およびウェブギャップ板9にボルト17、18、ナット17a、18aを用いて容易に取付け、接合部の亀裂の進展を防ぎ、亀裂発生箇所を補強および補修することができる。
タッピングボルト54のボルト軸部を、遊通孔51を挿通して、下穴50にねじ込むことによって、自らねじ切りをしつつ進み、めねじを塑性変形によって形成し、タッピングボルト54を締付けることによって、主桁上フランジ21に補強部材26aの当接支持部28aがねじ接合され、これによって、補強部材26aの当接支持部28aを主桁上フランジ21のウェブギャップ板9に臨む面27に押付けて当接させた状態とし、図12、図13に明らかに示されるとおり、ボルト軸部の端部は、主桁上フランジ21の上面と面一である。
The reinforcing
The reinforcing
By screwing the bolt shaft portion of the tapping
このような補強部材26aの取付け作業は、補強部材26aの当接支持部28aを主桁上フランジ21の前記下面27に押付けて当接させた状態とし、取付け部29aをボルト17,18によってウェブギャップ板9に固定すればよいので、主桁上フランジ21および垂直補剛材10に対して補強部材26を取付ける側から行うことができ、前記従来技術のように、コンクリート床版などの床組や舗装を撤去する必要がなく、床組の下方の空間で補強部材26aの取付け作業を行うことができる。したがって、亀裂発生箇所の補強・補修作業を、車両や歩行者の通行を制限または停止せずに、実施することができる。
Such a mounting operation of the reinforcing
また、補強部材26aは、当接支持部28aと取付け部29aとが屈曲してL字状に連なった構成であり、当接支持部28aには遊通孔である下穴51が穿設され、主桁上フランジ21には下穴51よりも小径の下穴50が形成されるので、主桁上フランジ21の下穴50が当接支持部28aの下穴51上に配置されるように、補強部材26aを主桁上フランジ21に位置決めし、タッピングボルト54のボルト軸部を下穴51に挿入して、タッピングボルト54を下穴50にねじ込んで自らねじ切りをしつつ進んで締付けることによって、主桁上フランジ21に補強部材26aの当接支持部28aが支圧接合され、その後、取付け部29aをボルト17,18によってフィラープレート36を介してウェブギャップ板9に摩擦接合させる。これによって、補強部材26aの当接支持部28aを主桁上フランジ21の下面27に押付けて当接させた状態とし、前述の実施形態と同様に、当接支持部28aをタッピングボルト54を締め込むことによって、ウェブギャップ板9にプレストレスを付与することができ、補強部材26aの主桁上フランジ21への取付け作業を簡素化および容易化し、取付け作業の効率を向上することができる。
Further, the reinforcing
上記のタッピングボルトとしては、スレッドローリングスクリュ(略称;TRS(登録商標))を好適に用いることができる。このスレッドローリングスクリュは、接合される複数の部材の少なくとも一方における、めねじ加工が施されていない下穴に、直接にねじ込むことによって、自らねじを切りつつ進み、めねじを母材の塑性変形によって形成して、ねじ接合するボルトまたはねじであり、また、自らねじを切りつつ進み、めねじを母材の弾性変形によって、または切削加工して形成して、ねじ接合するボルトまたはねじを含み、さらにまた、いわゆるスレッドフォーミングスクリュ、タッピンねじおよびタップボルトなどを含む。 As the tapping bolt, a thread rolling screw (abbreviation: TRS (registered trademark)) can be preferably used. This thread rolling screw is screwed directly into a pilot hole that is not subjected to female threading in at least one of a plurality of members to be joined. Including a bolt or a screw to be screw-bonded, and a bolt or screw to be screw-bonded and advanced by cutting the screw by itself and formed by elastic deformation of the base material or by cutting. Furthermore, a so-called thread forming screw, a tapping screw and a tap bolt are included.
また、ウェブギャップ板9と補強部材26の取付け部29aとをリベット接合するように構成されてもよい。この場合においても、当接支持部28aが主桁上フランジ21の下面27に押付けられて当接した補強部材26aの取付け部29aを、ウェブギャップ板0に容易にかつ迅速に接合することができ、補強部材26aのウェブギャップ板9への取付け作業の効率を向上することができる。
Further, the
このような補強部材26aの取付け作業は、補強部材26aの当接支持部28aを主桁上フランジ21の下面27に押付けて当接させた状態とし、取付け部29aをボルト17,18によってウェブギャップ板9に固定すればよいので、主桁上フランジ21およびウェブギャップ板9に対して補強部材26aを取付ける側から作業を行うことができ、前記従来技術のように、コンクリート床版などの床組や舗装を撤去する必要がなく、床組の下方の空間で補強部材26aの取付け作業を行うことができる。したがって、亀裂発生箇所の補強・補修作業を、車両や歩行者の通行を制限または停止せずに、実施することができる。
The mounting operation of the reinforcing
図14は、ウェブギャップ板9の上端部に疲労亀裂が発生した場合の補強・補修手順を示すフローチャートである。ステップs20で、ウェブギャップ板9の接合部に生じた亀裂発生箇所の補強・補修作業が開始され、ステップs21で、既存の上段および中段のボルト17,18およびナット17a,18aが取外される。
FIG. 14 is a flowchart showing a reinforcement / repair procedure when a fatigue crack occurs at the upper end of the
ステップs22に移り、主桁上フランジ21および補強部材26aの当接支持部28aに下穴50,51を形成し、ステップs23で、補強部材26aを、フィラープレート36とともにウェブギャップ板9に、上段および中段の第1、第2ボルト17,18およびナット17a,18bによって仮固定する。
Proceeding to step s22,
次にステップs24に移り、タッピングボルト54を締込み、補強部材26aの当接支持部28aを主桁上フランジ21に固定する。次にステップs25で、上段および中段の第1,第2ボルト17,18およびナット17a,18aを本締めする。
Next, in step s24, the tapping
このようにして図15の断面図および図16の斜視図に示されるように、ウェブギャップ板9の主桁上フランジ21との接合部および主桁ウェブ23との接合部の交差部分付近から発生した亀裂52,53の進展を抑えるように、ウェブギャップ板9にプレストレスを付与し、ステップs26で補強・補修作業が終了する。
Thus, as shown in the cross-sectional view of FIG. 15 and the perspective view of FIG. 16, the
また本実施形態によれば、鋼橋の主桁上フランジ21とウェブギャップ板9とに補強部材26aが接合され、これによってウェブギャップ板9にプレストレスが付与されるので、ウェブギャップ板9に付与されたプレストレスと上載荷重による応力とが相殺し、亀裂52,53が発生している部位の応力を低減し、亀裂52,53の進展を阻止するとともに、新たな亀裂の発生を防止し、亀裂52,53が発生した部位およびその近傍を、補強および補修することができる。
本発明は、次の実施の形態が可能である。
(1)鋼構造物の補強・補修構造は、(a)繰返し荷重が作用する第1部材と、(b)第1部材に接合部で接合されて第1部材を支持する第2部材と(c)補強部材であって、第1部材の第2部材に臨む面に配置される当接支持部と、当接支持部に連なり、第2部材に沿って延びる取付け部とを有する補強部材と、(d)当接支持部を第1部材の前記面に押付けて当接した状態を保ったままで、第2部材に補強部材の取付け部を固定し、これによって、前記接合部に作用する繰返し荷重の少なくとも一部を補強部材で受ける固定部材とを含むことを特徴とする鋼構造物の補強・補修構造である。
(2)本発明補強部材は、当接支持部と取付け部とが屈曲して連なって構成され、ボルト頭部とそのボルト頭部に連なるボルト軸部とを有するタッピングボルトを有し、このタッピングボルトは、ボルト軸部が補強部材の当接支持部に穿設された遊通孔を挿通して第1部材のめねじ加工が施されていない下穴に、直接にねじ込むことによって、自らねじ切りをしつつ進み、めねじを塑性変形によって形成して、第1部材と当接支持部とを締付けて当接してねじ接合する。
(3)補強部材は、当接支持部と第2部材とが屈曲して連なって構成され、ボルト頭部とそのボルト頭部に連なるボルト軸部とを有するボルトを有し、このボルトは、ボルト軸部が補強部材の当接支持部に穿設された遊通孔を挿通して第1部材のめねじ加工が施されているねじ孔に螺合して、第1部材と当接支持部とを締付けて当接してねじ接合する。
(4)固定部材は、第2部材と取付け部とをボルト接合またはリベット接合によって、固定する。
(5)鋼構造物は、鋼橋であり、第1部材は、主桁上フランジであり、第2部材は、主桁上フランジと、主桁ウェブと、横桁上フランジとに取付けられるウェブギャップ板である。
(6)鋼構造物は、鋼橋であり、第1部材は、主桁上フランジであり、第2部材は、主桁上フランジと、主桁ウェブと、主桁下フランジとに取付けられる垂直補剛材である。
(7)垂直補剛材には、ガセットを介して対傾構が接合される。
(8)鋼構造物の補強・補修方法は、繰返し荷重が作用する第1部材と、第1部材に接合部で接合されて第1部材を支持する第2部材とを有する鋼構造物の補強・補修方法において、(a)補強部材を準備する準備ステップであって、補強部材は、第1部材の第2部材に臨む面に配置される当接支持部と、当接支持部に連なり、第2部材に沿って延びる取付け部とを有する、補強部材の準備ステップと、(b)当接支持部を、第1部材の前記面に押付けて当接する押付けステップと、(c)押付けステップの押付けて当接した状態を保ったままで、第2部材に補強部材の取付け部を固定し、これによって、前記接合部に作用する繰返し荷重の少なくとも一部を補強部材で受ける固定ステップとを含むことを特徴とする鋼構造物の補強・補修方法である。
(9)補強部材は、当接支持部と取付け部とが屈曲して連なって構成され、ボルト頭部とそのボルト頭部に連なるボルト軸部とを有するタッピングボルトを準備するタッピングボルトの準備ステップを含み、押付けステップでは、タッピングボルトのボルト軸部が補強部材の当接支持部に穿設された遊通孔を挿通して第1部材のめねじ加工が施されていない下穴に、直接にねじ込むことによって、自らねじ切りをしつつ進み、めねじを塑性変形によって形成して、第1部材と当接支持部とを締付けて当接してねじ接合する。
(10)補強部材は、当接支持部と取付け部とが屈曲して連なって構成され、ボルト頭部とそのボルト頭部に連なるボルト軸部とを有するボルトを準備するボルトの準備ステップを含み、押付けステップでは、ボルト軸部が補強部材の当接支持部に穿設された遊通孔を挿通して第1部材のめねじ加工が施されているねじ孔に螺合して、第1部材と当接支持部とを締付けて当接してねじ接合する。
(11)当接支持部を、第1部材の前記面に押付けて当接し、その反力を第2部材で受ける押付け装置を準備する押付け装置の準備ステップを含み、
押付けステップでは、押付け装置によって、当接支持部を、第1部材の前記面に押付けて当接する。
(12)補強部材は、当接支持部と第2部材とが屈曲して連なった構成であり、当接支持部には遊通孔が穿設され、第1部材にはねじ孔が形成されるので、遊通孔がねじ孔上に配置されるように、補強部材を第1部材に位置決めした状態で、ボルトのボルト軸部を遊通孔に挿入してボルトを締付けることによって、第1部材に補強部材の当接支持部がねじ接合される。これによって、補強部材の当接支持部を第1部材の第2部材に臨む面に押付けて当接させた状態とすることができ、補強部材の第1部材への取付け作業を簡素化および容易化し、取付け作業の効率を向上することができる。
(13)固定部材は、第2部材と補強部材の取付け部とをボルト接合またはリベット接合するように構成されるので、当接支持部が第1部材の第2部材に臨む面に押付けられて当接した補強部材の取付け部を、第2部材に容易にかつ迅速に接合することができ、補強部材の第2部材への取付け作業の効率を向上することができる。
(14)鋼橋の主桁上フランジとウェブギャップ板とに補強部材が接合されるので、主桁上フランジとウェブギャップ板との接合部を、補強および補修することができる。
(15)鋼橋の主桁上フランジと垂直補剛材とに補強部材が接合されるので、主桁上フランジと垂直補剛材との接合部を、補強および補修することができる。
(16)垂直補剛材にガセットを介して対傾構が接合されるので、主桁上フランジから垂直補剛材やウェブギャップ板に作用する荷重の少なくとも一部をも、補強部材によって負荷することができ、これによって確実な荷重分配を行ない、過大な応力の発生を防止することができる。
(17)鋼構造物の補強・補修方法によれば、準備ステップで、第1部材の第2部材に臨む面に配置される当接支持部と、当接支持部に連なり、第2部材に沿って延びる取付け部とを有する補強部材が準備される。準備された補強部材は、押付けステップにおいて、当接支持部が第1部材の第2部材に臨む面に押付けられて当接し、次の固定ステップに移ると、当接支持部が第1部材の前記面に押付けられて当接した状態を保ったままで、取付け部が第2部材に固定され、第1部材と第2部材との接合部に作用する繰返し荷重の少なくとも一部が負荷されるように、第1部材および第2部材に補強部材が取付けられ、接合部の亀裂の進展を防ぎ、亀裂発生箇所を補強および補修することができる。
(18)補強部材の取付け作業は、補強部材の当接支持部を第1部材の前記面に押付けて当接させた状態とし、取付け部を固定部材によって第2部材に固定すればよいので、第1部材および第2部材に対して補強部材を取付ける側から行うことができ、前記従来技術のように、第1部材を主桁とし、第2部材を垂直補剛材やウェブギャップ板としたとき、コンクリート床版などの床組や舗装を撤去する必要がなく、床組の下方の空間で補強部材の取付け作業を行うことができる。したがって、亀裂発生箇所の補強・補修作業を、車両や歩行者の通行を制限または停止せずに、実施することができる。
(19)準備ステップにおいて、タッピングボルトが準備され、押付けステップにおいて、遊通孔が下穴上に配置されるように、補強部材を第1部材に位置決めした状態で、タッピングボルトのボルト軸部を遊通孔に挿入して、タッピングボルトを締付けることによって、第1部材に補強部材の当接支持部がねじ接合される。これによって、補強部材の当接支持部を第1部材の第2部材に臨む面に押付けて当接させた状態とすることができ、補強部材の第1部材への取付け作業を簡素化および容易化し、取付け作業の効率を向上することができる。
(20)準備ステップにおいて、ボルトが準備され、押付けステップにおいて、遊通孔がねじ孔上に配置されるように、補強部材を第1部材に位置決めした状態で、ボルトのボルト軸部を遊通孔に挿入してボルトを締付けることによって、第1部材に補強部材の当接支持部がねじ接合される。これによって、補強部材の当接支持部を第1部材の第2部材に臨む面に押付けて当接させた状態とすることができ、補強部材の第1部材への取付け作業を簡素化および容易化し、取付け作業の効率を向上することができる。
(21)準備ステップにおいて、押付け装置が準備され、押付けステップにおいて、当接支持部が第1部材の第2部材に臨む面に押付けられて当接した補強部材の取付け部を、第2部材に容易にかつ迅速に接合することができ、補強部材の第2部材への取付け作業の効率を向上することができる。
Further, according to the present embodiment, the reinforcing
The following embodiments are possible for the present invention.
(1) A steel structure reinforcement / repair structure includes: (a) a first member on which a repeated load acts; and (b) a second member that is joined to the first member at a joint and supports the first member ( c) a reinforcing member, the reinforcing member having a contact support portion disposed on a surface of the first member facing the second member, and an attachment portion connected to the contact support portion and extending along the second member; (D) While the state where the abutting support portion is pressed against the surface of the first member and keeping the abutting state is maintained, the attachment portion of the reinforcing member is fixed to the second member, thereby repeatedly acting on the joining portion. A steel structure reinforcement / repair structure including a fixing member that receives at least a part of a load with a reinforcement member.
(2) The reinforcing member of the present invention includes a tapping bolt having a bolt head portion and a bolt shaft portion connected to the bolt head portion. Bolts are threaded by themselves by screwing directly into the pilot holes of the first member that have not been subjected to female threading, with the bolt shafts inserted through the through holes drilled in the abutment support of the reinforcing member. The female screw is formed by plastic deformation, and the first member and the contact support portion are tightened and brought into contact with each other to be screw-joined.
(3) The reinforcing member is configured such that the abutting support portion and the second member are bent and connected, and includes a bolt head and a bolt shaft portion connected to the bolt head. The bolt shaft portion is inserted into a through hole formed in the abutting support portion of the reinforcing member, and is screwed into the screw hole in which the female thread processing of the first member is performed, thereby abutting and supporting the first member. The parts are tightened and abutted and screwed together.
(4) The fixing member fixes the second member and the attachment portion by bolt joining or rivet joining.
(5) The steel structure is a steel bridge, the first member is a main girder upper flange, and the second member is a web attached to the main girder upper flange, the main girder web, and the cross girder upper flange. It is a gap plate.
(6) The steel structure is a steel bridge, the first member is a main girder upper flange, and the second member is attached to a main girder upper flange, a main girder web, and a main girder lower flange. It is a stiffener.
(7) An anti-tilt structure is joined to the vertical stiffener via a gusset.
(8) A method for reinforcing / repairing a steel structure is a method of reinforcing a steel structure having a first member on which a repeated load acts and a second member that is joined to the first member at a joint portion and supports the first member. In the repair method, (a) a preparation step for preparing a reinforcing member, the reinforcing member being connected to a contact support portion disposed on a surface of the first member facing the second member, and the contact support portion; A reinforcing member preparation step having an attachment portion extending along the second member; (b) a pressing step for pressing the contact support portion against the surface of the first member; and (c) a pressing step. A fixing step of fixing the mounting portion of the reinforcing member to the second member while maintaining the pressed and abutted state, and thereby receiving at least a part of a repetitive load acting on the joint portion by the reinforcing member. Reinforcement and repair of steel structures characterized by It is.
(9) The reinforcing member is a tapping bolt preparation step for preparing a tapping bolt having a bolt head portion and a bolt shaft portion connected to the bolt head portion, wherein the contact support portion and the attachment portion are bent and connected. In the pressing step, the bolt shaft portion of the tapping bolt is inserted through the free hole drilled in the abutting support portion of the reinforcing member and directly into the pilot hole not subjected to female threading of the first member. By screwing into the screw, it advances while threading itself, and a female screw is formed by plastic deformation, and the first member and the contact support portion are tightened and contacted to be screw-joined.
(10) The reinforcing member includes a bolt preparation step in which a contact support portion and a mounting portion are bent and connected to each other, and a bolt having a bolt head portion and a bolt shaft portion connected to the bolt head portion is prepared. In the pressing step, the bolt shaft portion is inserted into the through hole formed in the contact support portion of the reinforcing member and screwed into the screw hole in which the female thread processing of the first member is performed. The member and the abutting support portion are tightened and abutted to be screwed.
(11) including a pressing device preparation step of preparing a pressing device that presses and contacts the contact support portion against the surface of the first member and receives the reaction force by the second member;
In the pressing step, the contact support portion is pressed against the surface of the first member by the pressing device.
(12) The reinforcing member has a configuration in which the abutting support portion and the second member are bent and connected. The abutting support portion is provided with a through hole, and the first member is provided with a screw hole. Accordingly, the bolt shaft portion of the bolt is inserted into the through hole and the bolt is tightened with the reinforcing member positioned on the first member so that the through hole is disposed on the screw hole. The contact support portion of the reinforcing member is screwed to the member. Accordingly, the contact support portion of the reinforcement member can be pressed against the surface of the first member facing the second member, and the attachment work of the reinforcement member to the first member can be simplified and easy. And the efficiency of the installation work can be improved.
(13) Since the fixing member is configured such that the second member and the attachment portion of the reinforcing member are bolt-bonded or rivet-bonded, the contact support portion is pressed against the surface of the first member facing the second member. The attaching portion of the reinforcing member that has come into contact can be easily and quickly joined to the second member, and the efficiency of attaching the reinforcing member to the second member can be improved.
(14) Since the reinforcing member is joined to the main girder upper flange and the web gap plate of the steel bridge, the joint portion between the main girder upper flange and the web gap plate can be reinforced and repaired.
(15) Since the reinforcing member is joined to the main girder upper flange and the vertical stiffener of the steel bridge, the joint between the main girder upper flange and the vertical stiffener can be reinforced and repaired.
(16) Since the anti-tilt structure is joined to the vertical stiffener via the gusset, at least part of the load acting on the vertical stiffener and the web gap plate from the main girder upper flange is also loaded by the reinforcing member. Thus, reliable load distribution can be performed, and excessive stress can be prevented from being generated.
(17) According to the steel structure reinforcement / repair method, in the preparation step, the contact support portion disposed on the surface of the first member facing the second member and the contact support portion are connected to the second member. A reinforcing member having a mounting portion extending along the surface is prepared. In the pressing step, the prepared reinforcing member is pressed against the surface of the first member facing the second member of the first member, and comes into contact with the first supporting member. The attachment portion is fixed to the second member while maintaining the state of being pressed against and contacted with the surface, so that at least a part of the repetitive load acting on the joint portion between the first member and the second member is loaded. In addition, a reinforcing member is attached to the first member and the second member, so that the progress of cracks in the joint portion can be prevented, and the crack occurrence location can be reinforced and repaired.
(18) The reinforcing member is attached by pressing the reinforcing member abutting support portion against the surface of the first member so that the attaching portion is fixed to the second member by the fixing member. It can be performed from the side where the reinforcing member is attached to the first member and the second member. As in the prior art, the first member is a main beam and the second member is a vertical stiffener or a web gap plate. Sometimes, it is not necessary to remove a floor set such as a concrete floor slab or a pavement, and the reinforcing member can be attached in a space below the floor set. Therefore, the reinforcement / repair work of the crack occurrence location can be performed without restricting or stopping the traffic of the vehicle or the pedestrian.
(19) In the preparation step, a tapping bolt is prepared, and in the pressing step, the bolt shaft portion of the tapping bolt is placed in a state where the reinforcing member is positioned on the first member so that the through hole is disposed on the prepared hole. The abutting support portion of the reinforcing member is screwed to the first member by inserting into the through hole and tightening the tapping bolt. Accordingly, the contact support portion of the reinforcement member can be pressed against the surface of the first member facing the second member, and the attachment work of the reinforcement member to the first member can be simplified and easy. And the efficiency of the installation work can be improved.
(20) In the preparation step, the bolt is prepared, and in the pressing step, the bolt shaft portion of the bolt is passed through in a state where the reinforcing member is positioned on the first member so that the through hole is arranged on the screw hole. By inserting the bolt into the hole and tightening the bolt, the contact support portion of the reinforcing member is screwed to the first member. Accordingly, the contact support portion of the reinforcement member can be pressed against the surface of the first member facing the second member, and the attachment work of the reinforcement member to the first member can be simplified and easy. And the efficiency of the installation work can be improved.
(21) In the preparation step, the pressing device is prepared, and in the pressing step, the attachment portion of the reinforcing member that is in contact with the contact support portion pressed against the surface of the first member facing the second member is attached to the second member. It can be easily and quickly joined, and the efficiency of attaching the reinforcing member to the second member can be improved.
1 橋床構造
2 主桁
3 横桁
4 対傾構
5 コンクリート床版
9 ウェブギャップ板
10 垂直補剛材
17 第1ボルト
17a,17b ナット
18 第2ボルト
19 第3ボルト
20 ガセット
21 主桁上フランジ
22 主桁下フランジ
23 主桁ウェブ
25 対傾構
26,26a 補強部材
27 下面
28,28a 当接支持部
29,29a 取付け部
30 押付け装置
31 横桁上フランジ
35,50,51 下穴
36 フィラープレート
DESCRIPTION OF
17a,
Claims (4)
繰返し荷重が作用する第1部材と、
第1部材に接合部で接合されて第1部材を支持する第2部材とを有し、
(b)第2部材の厚さ方向の両側に設けられる一対の補強部材と、
押付け装置と、
固定部材とを準備し、
(b1)各補強部材は、
第1部材の第2部材に臨む面に配置される当接支持部と、
当接支持部に連なり、前記面から第2部材に沿って遠ざかる方向に、第2部材の途中まで延び、前記面から異なる距離に形成される第1挿通孔、および第2挿通孔を有する取付け部とを有し、
第2挿通孔には、固定部材が挿通可能であり、
(b2)押付け装置は、
一対の細長い第1および第2連結部と、
第2部材の厚さ方向の一方側で、第1連結部の一端部と第2連結部の一端部とにわたって延び、軸線まわりに回転駆動されて第1連結部の一端部と第2連結部の一端部とを相互に離間方向に変位駆動する第1ねじ棒と、
第2部材の厚さ方向の他方側で、第1連結部の他端部と第2連結部の他端部とにわたって延び、軸線まわりに回転駆動されて第1連結部の他端部と第2連結部の他端部とを相互に離間方向に変位駆動する第2ねじ棒とを有し、
第1連結部は、第1挿通孔に挿通可能であり、
(c)第2部材に、
第1挿通孔に対応する位置で、第1連結部が挿通可能な第3挿通孔を形成し、
第2挿通孔に対応する位置で、固定部材が挿通可能な第4挿通孔を形成するとともに、
前記面から第2部材に沿って取付け部よりも遠ざかった位置で、第2連結部が挿通可能な第5挿通孔を形成し、
前記面に補強部材の当接支持部が当接している状態では、補強部材の第1挿通孔を規定する内周面の、第1部材の第2部材に臨む前記面に最も近い部分は、第2部材の第3挿通孔を規定する内周面の前記面に最も近い部分よりも、第1部材の第2部材に臨む前記面から遠ざかって突出するように取り付けられ、
(d)押付け装置の第1連結部を、第1挿通孔および第3挿通孔に挿通し、
第2連結部を、第5挿通孔に挿通し、
第1および第2ねじ棒を前記回転駆動して、第1および第2連結部を相互に離間方向に変位駆動することによって、第2連結部を、第2部材の第5挿通孔を規定する内周面の前記面から最も遠い部分に支持して、第1連結部によって、取付け部の第1挿通孔を規定する内周面の前記面に最も近い部分を、前記面に向けて押して、第1部材の前記面に補強部材の当接支持部を押付けて当接させた状態とし、
(e)前記面に当接支持部を押付けて当接させた状態で、第2挿通孔と第4挿通孔とに、固定部材を挿通して、第2部材に取付け部を固定することを特徴とする鋼橋の補強・補修方法。 (A) The bridge deck structure of the steel bridge is
A first member on which a repeated load acts;
A second member that is joined to the first member at the joint and supports the first member;
(B) a pair of reinforcing members provided on both sides in the thickness direction of the second member ;
A pressing device;
Preparing a fixing member,
(B1) Each reinforcing member is
A contact support portion disposed on a surface of the first member facing the second member;
An attachment having a first insertion hole and a second insertion hole that are connected to the abutment support portion and extend in the direction away from the surface along the second member to the middle of the second member and formed at different distances from the surface. And
A fixing member can be inserted into the second insertion hole,
(B2) The pressing device is
A pair of elongated first and second coupling portions;
On one side of the second member in the thickness direction, it extends over one end portion of the first connecting portion and one end portion of the second connecting portion, and is driven to rotate about the axis so that the one end portion of the first connecting portion and the second connecting portion A first threaded rod that drives displacement of the one end of each in a direction away from each other ;
On the other side in the thickness direction of the second member, it extends across the other end of the first connecting portion and the other end of the second connecting portion, and is driven to rotate around the axis to be connected to the other end of the first connecting portion and the second end. A second screw rod that drives the other end of the two connecting portions to move away from each other ;
The first connecting portion can be inserted into the first insertion hole,
(C) In the second member,
Forming a third insertion hole through which the first connecting portion can be inserted at a position corresponding to the first insertion hole;
While forming a fourth insertion hole through which the fixing member can be inserted at a position corresponding to the second insertion hole,
Forming a fifth insertion hole through which the second connecting portion can be inserted at a position away from the attachment portion along the second member from the surface;
In a state where the contact support portion of the reinforcing member is in contact with the surface, the portion of the inner peripheral surface that defines the first insertion hole of the reinforcing member that is closest to the surface facing the second member of the first member is: It is attached so as to protrude away from the surface facing the second member of the first member, rather than the portion closest to the surface of the inner peripheral surface defining the third insertion hole of the second member,
(D) The first connecting portion of the pressing device is inserted through the first insertion hole and the third insertion hole,
Insert the second connecting part through the fifth insertion hole,
The first and second screw rods are rotationally driven, and the first and second connecting portions are driven to move away from each other, thereby defining the second connecting portion as the fifth insertion hole of the second member. Supporting the portion of the inner peripheral surface farthest from the surface, the first connecting portion pushes the portion closest to the surface of the inner peripheral surface defining the first insertion hole of the mounting portion toward the surface, A state in which the abutting support portion of the reinforcing member is pressed against the surface of the first member and brought into contact with the surface,
(E) Inserting a fixing member into the second insertion hole and the fourth insertion hole in a state in which the contact support portion is pressed against the surface and contacting the surface, and fixing the attachment portion to the second member. Characteristic steel bridge reinforcement / repair method.
第2部材は、主桁上フランジと、主桁ウェブと、主桁下フランジとに取付けられる垂直補剛材であることを特徴とする請求項1に記載の鋼構造物の補強・補修方法。 The first member is a main girder upper flange,
The method for reinforcing and repairing a steel structure according to claim 1, wherein the second member is a vertical stiffener attached to the main girder upper flange, the main girder web, and the main girder lower flange.
主桁上フランジ、主桁ウェブ、および横桁上フランジにウェブギャップ板が溶接によって接合されて構成され、
(b)ウェブギャップ板の厚さ方向の両側に設けられる一対の補強部材、タッピングボルト、および固定部材を準備し、
(b1)各補強部材は、
主桁上フランジのウェブギャップ板に臨む下面に沿って配置され、タッピングボルトが挿通する遊通孔が形成される当接支持部、および
当接支持部に連なり、ウェブギャップ板に沿って配置され、固定部材が挿通可能な第1挿通孔が形成される取付け部を備え、
当接支持部および取付け部が屈曲してL字状に形成され、
(b2)タッピングボルトは、ボルト頭部、およびそのボルト頭部に連なるボルト軸部を有し、
(c)ウェブギャップ板に、第1挿通孔に対応する位置で、固定部材が挿通可能な第2挿通孔を形成し、
(d)主桁上フランジに、当接支持部の遊通孔に対応する位置で、タッピングボルトをねじ込むためのめねじ加工が施されていない下穴を形成し、
(e)タッピングボルトのボルト軸部を、遊通孔を挿通して、下穴にねじ込むことによって、自らねじ切りをしつつ進み、めねじを塑性変形によって形成し、
タッピングボルトを締付けることによって、主桁上フランジに補強部材の当接支持部がねじ接合され、これによって、補強部材の当接支持部を主桁上フランジのウェブギャップ板に臨む面に押付けて当接させた状態とし、ボルト軸部の端部は、主桁上フランジの上面と面一であり、
(f)第1挿通孔、および第2挿通孔に、固定部材を挿通して、ウェブギャップ板に取付け部を固定することを特徴とする鋼橋の補強・補修方法。 (A) The bridge deck structure of the steel bridge is
A web gap plate is joined to the main girder upper flange, main girder web, and cross girder upper flange by welding,
(B) preparing a pair of reinforcing members, tapping bolts, and fixing members provided on both sides of the web gap plate in the thickness direction ;
(B1) Each reinforcing member is
Arranged along the lower surface of the main girder upper flange facing the web gap plate, a contact support portion in which a through hole through which the tapping bolt is inserted is formed , and connected to the contact support portion and disposed along the web gap plate. The mounting portion is formed with a first insertion hole through which the fixing member can be inserted ,
The contact support portion and the attachment portion are bent and formed in an L shape,
(B2) The tapping bolt has a bolt head portion and a bolt shaft portion connected to the bolt head portion,
(C) forming a second insertion hole through which the fixing member can be inserted at a position corresponding to the first insertion hole in the web gap plate;
(D) forming a pilot hole not subjected to female threading for screwing the tapping bolt at a position corresponding to the free hole of the abutment support portion on the upper flange of the main beam;
(E) The bolt shaft portion of the tapping bolt is inserted into the through hole and screwed into the prepared hole, thereby proceeding while threading, and the female screw is formed by plastic deformation,
By tightening the tapping bolt, the abutment support portion of the reinforcing member is screwed to the main girder upper flange, thereby pressing the abutment support portion of the reinforcement member against the surface of the main girder upper flange facing the web gap plate. The bolt shaft end is flush with the top surface of the main girder upper flange,
(F) A method for reinforcing and repairing a steel bridge, wherein a fixing member is inserted into the first insertion hole and the second insertion hole, and the attachment portion is fixed to the web gap plate.
主桁上フランジ、主桁ウェブ、および横桁上フランジにウェブギャップ板9が溶接によって接合されて構成され、
(b)ウェブギャップ板の厚さ方向の両側に設けられる一対の補強部材を有し、
(b1)各補強部材は、
主桁上フランジのウェブギャップ板に臨む下面に沿って配置され、タッピングボルトが挿通する遊通孔が形成される当接支持部、および
当接支持部に連なり、ウェブギャップ板に沿って配置され、固定部材が挿通可能な第1挿通孔が形成される取付け部を備え、
当接支持部および取付け部が屈曲してL字状に形成され、
(b2)タッピングボルトは、ボルト頭部、およびそのボルト頭部に連なるボルト軸部を有し、
(c)ウェブギャップ板に、第1挿通孔に対応する位置で、固定部材が挿通可能な第2挿通孔が形成され、
(d)主桁上フランジに、当接支持部の遊通孔に対応する位置で、タッピングボルトをねじ込むためのめねじ加工が施されていない下穴が形成され、
タッピングボルトのボルト軸部を、遊通孔を挿通して、下穴にねじ込むことによって、自らねじ切りをしつつ進み、めねじを塑性変形によって形成し、
タッピングボルトを締付けることによって、主桁上フランジに補強部材の当接支持部がねじ接合され、これによって、補強部材の当接支持部を主桁上フランジのウェブギャップ板に臨む面に押付けて当接させた状態とし、ボルト軸部の端部は、主桁上フランジの上面と面一であり、
(e)第1挿通孔、および第2挿通孔に、固定部材を挿通して、ウェブギャップ板に取付け部を固定することを特徴とする鋼橋の補強・補修構造。 (A) The bridge deck structure of the steel bridge is
The web gap plate 9 is joined to the main girder upper flange, main girder web, and cross girder upper flange by welding,
(B) having a pair of reinforcing members provided on both sides in the thickness direction of the web gap plate ;
(B1) Each reinforcing member is
Arranged along the lower surface of the main girder upper flange facing the web gap plate, a contact support portion in which a through hole through which the tapping bolt is inserted is formed , and connected to the contact support portion and disposed along the web gap plate. The mounting portion is formed with a first insertion hole through which the fixing member can be inserted ,
The contact support portion and the attachment portion are bent and formed in an L shape,
(B2) The tapping bolt has a bolt head portion and a bolt shaft portion connected to the bolt head portion,
(C) The web gap plate is formed with a second insertion hole through which the fixing member can be inserted at a position corresponding to the first insertion hole.
(D) A pilot hole that is not subjected to female threading for screwing the tapping bolt is formed in the main girder upper flange at a position corresponding to the free hole of the contact support portion,
The bolt shaft part of the tapping bolt is inserted through the free hole and screwed into the pilot hole, so that the screw thread advances by itself, the female thread is formed by plastic deformation,
By tightening the tapping bolt, the abutment support portion of the reinforcing member is screwed to the main girder upper flange, thereby pressing the abutment support portion of the reinforcement member against the surface of the main girder upper flange facing the web gap plate. The bolt shaft end is flush with the top surface of the main girder upper flange,
(E) A steel bridge reinforcement / repair structure, wherein a fixing member is inserted into the first insertion hole and the second insertion hole, and the attachment portion is fixed to the web gap plate.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2016036502A JP6444912B2 (en) | 2016-02-28 | 2016-02-28 | Steel structure reinforcement and repair structure and method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2016036502A JP6444912B2 (en) | 2016-02-28 | 2016-02-28 | Steel structure reinforcement and repair structure and method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2017150289A JP2017150289A (en) | 2017-08-31 |
| JP6444912B2 true JP6444912B2 (en) | 2018-12-26 |
Family
ID=59740496
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2016036502A Active JP6444912B2 (en) | 2016-02-28 | 2016-02-28 | Steel structure reinforcement and repair structure and method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP6444912B2 (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107869113A (en) * | 2017-10-31 | 2018-04-03 | 南京林业大学 | A kind of box beam that strengthens is encorbelmented the method for flange structural rigidity |
| JP6908542B2 (en) * | 2018-02-21 | 2021-07-28 | 公益財団法人鉄道総合技術研究所 | Reinforcement method around the bearing of the steel girder |
| JP2019196583A (en) * | 2018-05-07 | 2019-11-14 | 日本製鉄株式会社 | Repair structure of bridge |
Family Cites Families (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH08338007A (en) * | 1995-06-14 | 1996-12-24 | Mitsubishi Heavy Ind Ltd | Stacked h-steel bridge |
| JP3909445B2 (en) * | 1996-08-28 | 2007-04-25 | 株式会社ビーエムシー | Method for reinforcing plate |
| JP2000226814A (en) * | 1999-02-08 | 2000-08-15 | Nkk Corp | Stiffening plate of bridge steel girder |
| JP2006231338A (en) * | 2005-02-22 | 2006-09-07 | Ishikawajima Harima Heavy Ind Co Ltd | Rivet joint repair method, repair structure |
| JP2008050774A (en) * | 2006-08-22 | 2008-03-06 | Univ Kansai | Steel floor plate repair method |
| KR100722809B1 (en) * | 2007-03-14 | 2007-05-30 | 주식회사 스틸코리아 | Bridge installation structure and bridge construction method using beam reinforced with section stiffness, beam reinforced with sectional stiffness |
| JP4555883B2 (en) * | 2009-01-06 | 2010-10-06 | 新日本製鐵株式会社 | Friction bonding member and friction bonding structure |
| JP4607245B1 (en) * | 2010-07-23 | 2011-01-05 | 株式会社Ihi | Reinforcement structure and reinforcement method for welded part of vertical stiffener for steel deck |
| JP6026458B2 (en) * | 2014-03-31 | 2016-11-16 | 阪神高速道路株式会社 | Steel slab and reinforcement method of steel slab |
| CN104452604B (en) * | 2014-12-03 | 2016-04-20 | 中铁大桥局武汉桥梁特种技术有限公司 | A kind of method of reinforcing rib-lifting section in steel work arch bridge |
-
2016
- 2016-02-28 JP JP2016036502A patent/JP6444912B2/en active Active
Also Published As
| Publication number | Publication date |
|---|---|
| JP2017150289A (en) | 2017-08-31 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2023085814A (en) | Floor slab erection structure and floor slab erection method | |
| JP6655746B2 (en) | Bridge structure and floor slab replacement method | |
| JP6444912B2 (en) | Steel structure reinforcement and repair structure and method | |
| JP2002513877A (en) | Fixing method and device of tip support type for external prestress reinforcement method | |
| JP2002188120A (en) | Joint structure of corrugated steel web girder | |
| JP2001220712A (en) | Prefabricated steel plate slab and prefabricated steel plate slab connection structure | |
| JP3867149B2 (en) | Steel slab structure of bridge and steel slab reinforcement method | |
| JP4625763B2 (en) | Composite structure of main girder and precast slab | |
| JP4365640B2 (en) | Plate material joining bolt and method for joining plate material using the same | |
| JP2002266503A (en) | Method for repairing and reinforcing steel structural material for existing building structure and structure | |
| JP4413765B2 (en) | Pre-tension hollow girder horizontal fastening PC steel temporary fixing device and fixing method | |
| JP3909445B2 (en) | Method for reinforcing plate | |
| JP4347158B2 (en) | Steel bridge, steel bridge reinforcement method and repair method | |
| WO2015108103A1 (en) | Metal slab for overpass | |
| JP7272918B2 (en) | Existing floor slab replacement method | |
| JP6969909B2 (en) | How to reinforce steel synthetic girders | |
| JP2008050774A (en) | Steel floor plate repair method | |
| JP6432786B2 (en) | Beam material load bearing structure and beam material repair method | |
| JP7499735B2 (en) | Deck installation structure and deck installation method | |
| JP2009280980A (en) | Bridge repairing method and axial force application device for repairing bridge | |
| JP2019007134A (en) | Reinforcing existing footing | |
| JP7186670B2 (en) | Concrete floor slab repair method | |
| JP7656477B2 (en) | Tensioning method for precast PC members | |
| JP6944789B2 (en) | Lateral stiffening structure of steel beam and beam slab connection method of building | |
| KR100344236B1 (en) | Method for establishing and repairing a bridge bearing device using anchorbolt which is composed of a lower anchorbolt and a upper anchorbolt |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20180228 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20180403 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20180604 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20181030 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20181128 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 6444912 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |