JP6458930B2 - Sludge incinerator repair method - Google Patents
[go: Go Back, main page]

JP6458930B2 - Sludge incinerator repair method - Google Patents

Sludge incinerator repair method Download PDF

Info

Publication number
JP6458930B2
JP6458930B2 JP2014242318A JP2014242318A JP6458930B2 JP 6458930 B2 JP6458930 B2 JP 6458930B2 JP 2014242318 A JP2014242318 A JP 2014242318A JP 2014242318 A JP2014242318 A JP 2014242318A JP 6458930 B2 JP6458930 B2 JP 6458930B2
Authority
JP
Japan
Prior art keywords
furnace body
saddle
replacement
flange
jack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2014242318A
Other languages
Japanese (ja)
Other versions
JP2016102633A (en
Inventor
中村 武志
武志 中村
英理 下村
英理 下村
松下 崇
崇 松下
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Heavy Industries Environmental and Chemical Engineering Co Ltd
Original Assignee
Mitsubishi Heavy Industries Environmental and Chemical Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Heavy Industries Environmental and Chemical Engineering Co Ltd filed Critical Mitsubishi Heavy Industries Environmental and Chemical Engineering Co Ltd
Priority to JP2014242318A priority Critical patent/JP6458930B2/en
Publication of JP2016102633A publication Critical patent/JP2016102633A/en
Application granted granted Critical
Publication of JP6458930B2 publication Critical patent/JP6458930B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Description

本発明は、汚泥焼却炉の補修方法に関する。   The present invention relates to a method for repairing a sludge incinerator.

例えば、下水処理場においては、下水汚泥を燃やすために流動床焼却炉などの汚泥焼却炉を設けて汚泥を有効利用するなどしている。流動床焼却炉は、流動媒体として砂を使用した流動層部と、燃焼室(フリーボード部)とを有する円筒状の炉本体を備えている。流動床焼却炉は、脱水ケーキ(乾燥ケーキを含む)を流動層部に供給して、脱水ケーキを高温(例えば800℃)で瞬間的に焼却する焼却炉である。   For example, in a sewage treatment plant, in order to burn sewage sludge, a sludge incinerator such as a fluidized bed incinerator is provided to effectively use the sludge. The fluidized bed incinerator includes a cylindrical furnace body having a fluidized bed portion using sand as a fluidized medium and a combustion chamber (freeboard portion). The fluidized bed incinerator is an incinerator that supplies dehydrated cake (including dried cake) to the fluidized bed portion and instantaneously incinerate the dehydrated cake at a high temperature (for example, 800 ° C.).

流動層部は、脱水ケーキを流動媒体と接触させてガス化燃焼を行なう(一次燃焼)部位であり、燃焼室は、未燃焼分を含むガスを燃焼する(二次燃焼)部位である。
炉本体は、鋼製ケーシングによって形成されており、鋼製ケーシングの内周面は炉内ライニングである耐火材及び断熱材で内張りされている。
The fluidized bed portion is a portion that performs gasification combustion by bringing the dehydrated cake into contact with a fluid medium (primary combustion), and the combustion chamber is a portion that burns a gas containing unburned components (secondary combustion).
The furnace body is formed of a steel casing, and the inner peripheral surface of the steel casing is lined with a refractory material and a heat insulating material that are linings in the furnace.

鋼製ケーシングは、経年使用により排ガスが耐火材の裏側に回ることで鋼製ケーシングを腐食させるため、10年程度で補修を行うことが一般的である。従来の補修方法としては、炉本体の全体を交換する方法や、腐食した鋼製ケーシングに外側から当て板を溶接して強度維持を図る方法などが知られている。   Since a steel casing corrodes a steel casing by exhaust gas turning to the back side of a refractory material by use over time, it is common to repair in about 10 years. As a conventional repair method, a method of exchanging the entire furnace main body, a method of maintaining a strength by welding a contact plate from the outside to a corroded steel casing, and the like are known.

ガスタービンの燃焼器のライナーの補修方法として、特許文献1には、ライナーを軸方向へ円筒からなる複数部材に分割し、各々の部材を接合することでライナーを形成し、ライナーに損傷が生じた部分のみを交換する補修方法が記載されている。   As a method for repairing a liner of a gas turbine combustor, Patent Document 1 discloses that a liner is divided into a plurality of members made of a cylinder in an axial direction, and each member is joined to form a liner. A repair method is described in which only the damaged part is replaced.

特許第3915423号公報Japanese Patent No. 3915423

ところで、上記従来の補修方法のうち、炉本体の全体を交換する方法では、解体後に基礎工事を行ったうえで新規の焼却炉を設置する必要があるため、長工期、高コストとなるという課題がある。
また、腐食した鋼製ケーシングに外側から当て板を溶接して強度維持を図る方法は、鋼製ケーシングの座屈防止処置は出来るものの、既設ケーシングの肉厚腐食は進行してしまう。また、耐火物を支持しているキャスターアンカーやレンガの荷重を支持しているレンガ受け金物などの強度は保持することができないため、恒久的な対策とはならない。
By the way, among the conventional repair methods described above, the method of exchanging the entire furnace body requires the installation of a new incinerator after performing foundation work after dismantling, which leads to a long construction period and high costs. There is.
In addition, the method of maintaining the strength by welding a contact plate to the corroded steel casing from the outside can prevent buckling of the steel casing, but the thickness corrosion of the existing casing proceeds. Moreover, since the intensity | strength of the caster anchor which supports a refractory material, the brick receiving metal object which supports the load of a brick, etc. cannot be hold | maintained, it is not a permanent measure.

また、特許文献1に記載の補修方法は、燃焼器のライナーは、複数の円筒からなる部材に分割されるため、作業空間が制限される場合に補修作業に支障をきたすという課題がある。   Moreover, since the liner of a combustor is divided | segmented into the member which consists of a some cylinder, the repair method described in patent document 1 has the subject that repair work will be obstructed when work space is restrict | limited.

この発明は、短工期、低コストで補修を行うことができるとともに、作業空間に限りがある場合においても補修を行うことができる汚泥焼却炉の補修方法を提供することを目的とする。   It is an object of the present invention to provide a method for repairing a sludge incinerator that can be repaired in a short construction period and at low cost, and that can be repaired even when the work space is limited.

本発明の第一の態様によれば、汚泥焼却炉の補修方法は、筒状の炉本体に複数のサドル部を形成するサドル部形成工程と、前記サドル部を梁に設置されたジャッキで支持する支持工程と、前記サドル部より下方で、前記炉本体を軸方向の複数個所で輪切り状に切断して切断箇所を除去する除去工程と、全体として、前記切断箇所に対応する筒状をなし、周方向に複数に分割された交換用炉体を形成する交換用炉体形成工程と、前記サドル部を前記ジャッキで支持しながら、前記切断箇所を除去することによって形成された前記炉本体の縁部に、前記縁部より径方向外周側に鍔状に突出し、且つ、前記径方向の長さが前記サドル部より短く前記ジャッキに接しない第一フランジ部を形成するフランジ部形成工程と、前記交換用炉体を前記炉本体の前記切断箇所にそれぞれ搬入して一体の筒状に組立てる組立工程と、前記サドル部を前記ジャッキで支持しながら、前記交換用炉体の縁部より径方向外周側に鍔状に突出し、前記径方向の長さが前記第一フランジ部と同様の第二フランジ部と前記第一フランジ部とを接合する接合工程と、を有することを特徴とする。 According to the first aspect of the present invention, a method for repairing a sludge incinerator includes a saddle part forming step of forming a plurality of saddle parts in a cylindrical furnace body, and the saddle part is supported by a jack installed on a beam. And a removing step of removing the cut portion by cutting the furnace body into a plurality of portions in the axial direction below the saddle portion, and removing the cut portion as a whole, forming a cylindrical shape corresponding to the cut portion. A replacement furnace body forming step for forming a replacement furnace body divided into a plurality in the circumferential direction, and the furnace body formed by removing the cutting portion while supporting the saddle portion with the jack. A flange portion forming step of forming a first flange portion that protrudes in a flange shape from the edge portion toward the outer peripheral side in the radial direction and has a length in the radial direction that is shorter than the saddle portion and does not contact the jack at the edge portion; The replacement furnace body is the furnace body. Wherein the assembling step of assembling together the cylindrical and carried respectively to the cutting position, while supporting the saddle portion by the jack, projecting like a flange in the radial direction outer peripheral side of the edge of the replacement furnace body, the radial And a joining step of joining the first flange part and the second flange part having a length in the direction similar to the first flange part .

このような構成によれば、経年使用により炉本体が腐食された場合においても、短工期、低コストで、炉本体を補修することができる。また、炉本体が変形した場合においても、フランジ部同士を接合することにより、炉本体の変形を吸収することができる。また、交換用炉体が周方向に分割されていることによって、作業空間に限りがある場合においても、交換用炉体の搬入、組み立てを行うことができる。
また、サドル部を梁に設置されたジャッキで支持する支持工程を有することによって、除去工程をより安全に行うことができる。
また、筒状の炉本体に複数のサドル部を形成することによって、第一フランジ部を設けた場合でも支持工程にて切断箇所より上方位置の炉本体を支持することができる。即ち、例えばジャッキを用いて炉本体を支持する際に、ジャッキをフランジ部よりも径方向外周側に設置した場合においても、支持部材を支持することができる。
According to such a configuration, even when the furnace body is corroded due to aging, the furnace body can be repaired at a short construction period and at low cost. Even when the furnace body is deformed, the deformation of the furnace body can be absorbed by joining the flange portions. Further, since the replacement furnace body is divided in the circumferential direction, the replacement furnace body can be carried in and assembled even when the work space is limited.
Moreover, a removal process can be performed more safely by having the support process which supports a saddle part with the jack installed in the beam.
In addition, by forming a plurality of saddle portions on the cylindrical furnace body, the furnace body at a position above the cutting location can be supported in the supporting step even when the first flange portion is provided. That is, for example, when the furnace body is supported using a jack, the support member can be supported even when the jack is installed on the radially outer side of the flange portion.

上記汚泥焼却炉の補修方法において、前記交換用炉体は、縦断方向の断面を縁取りする側面フランジ部により互いに接合されてよい。   In the above-described method for repairing a sludge incinerator, the replacement furnace bodies may be joined to each other by side flange portions that border a cross section in the longitudinal direction.

このような構成によれば、分割された交換用炉体の組み立てを容易に行うことができる。即ち、交換用炉体が変形した場合においても、側面フランジ部同士を接合することにより、交換用炉体の変形を吸収することができる。また、交換用炉体の強度を向上させることができる。   According to such a configuration, it is possible to easily assemble the divided replacement furnace body. That is, even when the replacement furnace body is deformed, the deformation of the replacement furnace body can be absorbed by joining the side flange portions. Further, the strength of the replacement furnace body can be improved.

本発明によれば、短工期、低コストで補修を行うことができるとともに、作業空間に限りがある場合においても補修を行うことができる。   According to the present invention, repair can be performed at a short construction period and at low cost, and repair can be performed even when the work space is limited.

本発明の実施形態の汚泥焼却炉の補修方法が適用される流動床焼却炉の概略を説明する側断面図である。It is a sectional side view explaining the outline of the fluidized-bed incinerator to which the repair method of the sludge incinerator of embodiment of this invention is applied. 図1のA部の拡大図であって、炉本体の詳細を説明する断面図である。It is an enlarged view of the A section of Drawing 1, and is a sectional view explaining details of a furnace body. 本発明の実施形態の汚泥焼却炉の補修方法のサドル部形成工程と、支持工程と、除去工程と、を説明する概略図である。It is the schematic explaining the saddle part formation process of the repair method of the sludge incinerator of embodiment of this invention, a support process, and a removal process. 本発明の実施形態の汚泥焼却炉の補修方法のフランジ部形成工程を説明する概略図である。It is the schematic explaining the flange part formation process of the repair method of the sludge incinerator of embodiment of this invention. 本発明の実施形態の交換用炉体の斜視図である。It is a perspective view of the furnace for exchange of the embodiment of the present invention. 本発明の実施形態の分割された交換用炉体の斜視図である。It is a perspective view of the division | segmentation furnace body divided | segmented of embodiment of this invention. 本発明の実施形態の汚泥焼却炉の補修方法の接合工程を説明する概略図である。It is the schematic explaining the joining process of the repair method of the sludge incinerator of embodiment of this invention.

以下、本発明の実施形態の汚泥焼却炉の補修方法について図面を参照して詳細に説明する。
図1は、本発明の実施形態の汚泥焼却炉の補修方法が適用される流動床焼却炉1の概略を説明する側断面図である。流動床焼却炉1は、下水処理場などの施設において汚泥を濃縮して脱水した脱水ケーキを燃やすための汚泥焼却炉である。図1に示すように、流動床焼却炉1は、下方に風箱3を備えた円筒形状の炉本体2を有している。
Hereinafter, the repair method of the sludge incinerator of embodiment of this invention is demonstrated in detail with reference to drawings.
FIG. 1 is a side sectional view for explaining the outline of a fluidized bed incinerator 1 to which a method for repairing a sludge incinerator according to an embodiment of the present invention is applied. The fluidized bed incinerator 1 is a sludge incinerator for burning dewatered cake that has been concentrated and dewatered in a facility such as a sewage treatment plant. As shown in FIG. 1, the fluidized bed incinerator 1 has a cylindrical furnace body 2 having a wind box 3 below.

流動床焼却炉1の炉本体2は、中心軸が鉛直方向に沿う円筒形状をなしており、下部には、炉本体2の内部を上下方向に区分けする分散板4が設けられている。風箱3は、分散板4の下方の空間であり、風箱3には、ブロワ(図示せず)から一次空気導入口6を介して一次空気A1が供給される。   The furnace main body 2 of the fluidized bed incinerator 1 has a cylindrical shape whose central axis extends along the vertical direction, and a dispersion plate 4 that divides the interior of the furnace main body 2 in the vertical direction is provided at the lower part. The wind box 3 is a space below the dispersion plate 4, and primary air A <b> 1 is supplied to the wind box 3 from a blower (not shown) through the primary air inlet 6.

分散板4の上方には、流動媒体として流動砂8が堆積され砂層部7が形成されている。砂層部7より上方はフリーボード部9となっている。
脱水ケーキは、投入機(図示せず)から投入口10を介して炉本体2内部の砂層部7に投入される。
Above the dispersion plate 4, fluid sand 8 is deposited as a fluid medium to form a sand layer portion 7. Above the sand layer portion 7 is a free board portion 9.
The dehydrated cake is charged into the sand layer portion 7 inside the furnace body 2 through a charging port 10 from a charging machine (not shown).

炉本体2のフリーボード部9には、少なくとも一つの二次空気導入口12を設けることができる。
炉本体2の上部は、上方に凸の円錐形状となるように、上方に向かって絞り込まれている。炉本体2の頂部、即ち、円錐形状の頂点には、排ガスEを排出する排出口13が設けられている。排出口13から排出された排ガスEは、例えば、ガス冷却塔や、バグフィルタなどの排ガス処理装置に導入される。
The free board part 9 of the furnace body 2 can be provided with at least one secondary air inlet 12.
The upper part of the furnace body 2 is narrowed upward so as to have an upward convex conical shape. A discharge port 13 for discharging the exhaust gas E is provided at the top of the furnace body 2, that is, at the apex of the conical shape. The exhaust gas E discharged from the discharge port 13 is introduced into an exhaust gas treatment device such as a gas cooling tower or a bag filter, for example.

上記流動床焼却炉1においては、一次空気A1を分散板4を介して砂層部7(以下、流動層部という)に導入して流動化させた後、助燃油投入口(図せず)より助燃剤を投入して流動層部を燃焼高温化させる。この状態で、流動層部に投入された脱水ケーキは、高温の流動層部において流動砂8との接触により一次空気A1により支燃されてガス化、燃焼する。この時、流動層部で発生した未燃ガスは、二次空気A2によりフリーボード部9で再燃焼する。   In the fluidized bed incinerator 1, the primary air A <b> 1 is introduced into the sand layer portion 7 (hereinafter referred to as the fluidized bed portion) through the dispersion plate 4 and fluidized, and then from the auxiliary fuel inlet (not shown). An auxiliary combustor is added and the fluidized bed is heated to a high temperature. In this state, the dehydrated cake thrown into the fluidized bed part is supported by the primary air A1 in contact with the fluidized sand 8 in the hot fluidized bed part, and is gasified and burned. At this time, the unburned gas generated in the fluidized bed portion is reburned in the free board portion 9 by the secondary air A2.

炉本体2は、一般構造用圧延鋼材などの鋼材によって形成されている鋼製ケーシング15であり、鋼製ケーシング15の内周面は炉内ライニングである耐火材及び断熱材で内張りされている。具体的には、図2に示すように、炉本体2を構成する鋼製ケーシング15の内周面に断熱キャスタブルによって断熱層16が形成されている。断熱層16の内周面に耐火キャスタブルによって耐火層17が形成されている。   The furnace body 2 is a steel casing 15 formed of a steel material such as a general structural rolled steel material, and the inner peripheral surface of the steel casing 15 is lined with a refractory material and a heat insulating material which are furnace linings. Specifically, as shown in FIG. 2, a heat insulating layer 16 is formed on the inner peripheral surface of a steel casing 15 constituting the furnace body 2 by heat insulating castable. A fireproof layer 17 is formed on the inner peripheral surface of the heat insulating layer 16 by fireproof castable.

ここで、流動床焼却炉1は、経年使用により、排ガスEが耐火層17の裏側に回ることによって、炉本体2が腐食される。特に、排ガスEや酸性ガスに曝されるフリーボード部9は腐食され易く、当該箇所においては、10年程度で補修が必要となる。以下、炉本体2の補修方法について具体的に説明する。   Here, in the fluidized bed incinerator 1, the furnace main body 2 is corroded as the exhaust gas E turns to the back side of the refractory layer 17 by use over time. In particular, the free board portion 9 exposed to the exhaust gas E and the acid gas is easily corroded, and repairs are required in about 10 years at the location. Hereinafter, the repair method of the furnace body 2 will be described in detail.

本実施形態の炉本体2の補修方法は、炉本体2にサドル部18(図3参照)を形成するサドル部形成工程と、炉本体2を支持する支持工程と、炉本体2の一部を除去する除去工程と、炉本体2に第一フランジ部22(図4参照)を形成するフランジ部形成工程と、交換用炉体23(図5参照)を形成する交換用炉体形成工程と、交換用炉体23を一体の筒状に組立てる組立工程と、炉本体2の外周面に設けられた第一フランジ部22と交換用炉体23の外周面に設けられた第二フランジ部25とを接合する接合工程と、を有する。   The repair method of the furnace body 2 of the present embodiment includes a saddle part forming step for forming a saddle portion 18 (see FIG. 3) in the furnace body 2, a supporting step for supporting the furnace body 2, and a part of the furnace body 2. A removing step for removing, a flange portion forming step for forming the first flange portion 22 (see FIG. 4) in the furnace body 2, a replacement furnace forming step for forming the replacement furnace body 23 (see FIG. 5), An assembling process for assembling the replacement furnace body 23 into an integral cylinder; a first flange portion 22 provided on the outer peripheral surface of the furnace body 2; a second flange portion 25 provided on the outer peripheral surface of the replacement furnace body 23; And a bonding step of bonding.

本実施形態の炉本体2の補修方法は、腐食などの不具合が確認された部分の上方及び下方を輪切り状に切断して炉本体2の一部を除去し、切断箇所C(図3参照)の代替となる交換用炉体23を切断箇所Cに取り付ける。これにより、炉本体2の全体を交換することなく、炉本体2の補修を行う。   In the repair method of the furnace body 2 according to the present embodiment, the upper and lower portions of the portion where defects such as corrosion are confirmed are cut into a ring shape to remove a part of the furnace body 2, and a cutting point C (see FIG. 3). A replacement furnace body 23 which is an alternative to the above is attached to the cut portion C. As a result, the furnace body 2 is repaired without replacing the entire furnace body 2.

次に、炉本体2の補修方法の各工程について詳細に説明する。
サドル部形成工程は、炉本体2における切断箇所Cとなる箇所の上方の部位に、複数のサドル部18(支持部材)を形成する工程である。図3に示すように、炉本体2の外周面より径方向外周側に突出する部材である。サドル部18は鋼材によって形成されており、炉本体2の周方向に複数設けられている。
Next, each process of the repair method of the furnace main body 2 is demonstrated in detail.
The saddle portion forming step is a step of forming a plurality of saddle portions 18 (support members) in a portion above the portion that becomes the cut portion C in the furnace body 2. As shown in FIG. 3, it is a member that protrudes radially outward from the outer peripheral surface of the furnace body 2. The saddle portion 18 is formed of a steel material, and a plurality of saddle portions 18 are provided in the circumferential direction of the furnace body 2.

支持工程は、サドル部形成工程にて形成されたサドル部18を用いて、炉本体2における切断箇所Cの上方の部位を支持する工程である。図3に示すように、支持工程においては、所定の梁19(支持構造物)に設置されたジャッキ20を用いてサドル部18を支持する。これにより、切断箇所Cより上方位置の炉本体2が支持される。
ジャッキ20は、油圧ジャッキを用いることが好ましく、また、梁19とサドル部18との間の鉛直方向の間隔が小さい場合には、爪付きのジャッキを用いることが好ましい。また、梁19は、既設の梁19を用いる場合は、適宜補強することが好ましい。
The supporting step is a step of supporting a portion above the cutting point C in the furnace body 2 using the saddle portion 18 formed in the saddle portion forming step. As shown in FIG. 3, in the supporting step, the saddle portion 18 is supported using a jack 20 installed on a predetermined beam 19 (supporting structure). Thereby, the furnace main body 2 located above the cutting location C is supported.
The jack 20 is preferably a hydraulic jack. When the vertical distance between the beam 19 and the saddle portion 18 is small, it is preferable to use a jack with a claw. Moreover, when the existing beam 19 is used, it is preferable to reinforce the beam 19 appropriately.

除去工程は、炉本体2の一部、即ち、腐食などの不具合が確認された部分である切断箇所Cを除去する工程である。除去工程は、炉本体2を軸方向の二ヶ所(符号Pで示す)で輪切り状に切断して、切断箇所Cを除去する。切断は、例えば、ガスバーナーによって実施することができる。切断箇所Cよりも上方の炉本体2は、サドル部形成工程にて形成されたサドル部18によって支持されている。   The removal step is a step of removing a part of the furnace body 2, that is, a cut portion C that is a portion where defects such as corrosion have been confirmed. In the removing step, the furnace body 2 is cut into a ring shape at two axial positions (indicated by reference symbol P), and the cut portion C is removed. The cutting can be performed by, for example, a gas burner. The furnace body 2 above the cutting point C is supported by a saddle portion 18 formed in the saddle portion forming step.

フランジ部形成工程は、切断箇所Cを除去することによって形成された炉本体2の縁部に第一フランジ部22を形成する工程である。第一フランジ部22は、炉本体2の円形の縁部より径方向外周側に鍔状に突出するように形成される。
第一フランジ部22は、軸方向から見て、円形の外形を有する板状の部材である。第一フランジ部22は、例えば、溶接によって炉本体2の縁部に接合される。
A flange part formation process is a process of forming the 1st flange part 22 in the edge of the furnace main body 2 formed by removing the cutting location C. FIG. The first flange portion 22 is formed so as to protrude like a bowl from the circular edge of the furnace body 2 toward the radially outer peripheral side.
The first flange portion 22 is a plate-like member having a circular outer shape when viewed from the axial direction. The 1st flange part 22 is joined to the edge of the furnace main body 2 by welding, for example.

ここで、サドル部形成工程にて形成されるサドル部18は、第一フランジ部22より径方向外方に突出している。即ち、サドル部18の径方向の長さW2は第一フランジ部22の径方向の幅W1よりも長く、サドル部18の径方向外周側の端部は、第一フランジ部22の径方向外周側の端部より径方向外周側に突出している。これにより、ジャッキ20を用いて炉本体2を支持する際に、ジャッキ20を第一フランジ部22よりも径方向外周側に設置した場合においても、サドル部18を支持することができる。   Here, the saddle portion 18 formed in the saddle portion forming step protrudes radially outward from the first flange portion 22. That is, the radial length W2 of the saddle portion 18 is longer than the radial width W1 of the first flange portion 22, and the end portion on the radial outer peripheral side of the saddle portion 18 is the radial outer periphery of the first flange portion 22. It protrudes radially outward from the end of the side. Thereby, when supporting the furnace main body 2 using the jack 20, even when the jack 20 is installed in the radial direction outer peripheral side rather than the 1st flange part 22, the saddle part 18 can be supported.

交換用炉体形成工程は、全体として切断箇所Cに対応する筒状をなし、周方向に分割された交換用炉体23を形成する工程である。交換用炉体23は、四つに分割されており、組立工程にて、例えば溶接により筒状となるように接合される。分割箇所を図5の符号Dで示す。
まず、例えば四つに分割されている交換用炉体23を一体の筒状をなすものとして説明する。図5に示すように、交換用炉体23は、円筒形状の本体部24と、本体部24の軸方向の両端部に形成されている第二フランジ部25と、を有している。
The replacement furnace body forming step is a step of forming a replacement furnace body 23 that has a cylindrical shape corresponding to the cut portion C as a whole and is divided in the circumferential direction. The replacement furnace body 23 is divided into four parts, and is joined so as to form a cylinder by welding, for example, in the assembly process. A division | segmentation location is shown with the code | symbol D of FIG.
First, for example, the replacement furnace body 23 divided into four parts will be described as an integral cylinder. As shown in FIG. 5, the replacement furnace body 23 includes a cylindrical main body portion 24 and second flange portions 25 formed at both end portions in the axial direction of the main body portion 24.

第二フランジ部25は、本体部24の円形の縁部より、径方向外周側に鍔状に突出して形成されている。第二フランジ部25の形状は、上述したフランジ部形成工程において形成される第一フランジ部22と略同様である。
交換用炉体23は、炉本体2と同様に、鋼材によって形成されており、本体部24の内周面は炉内ライニングである耐火材及び断熱材で内張りされていてもよい。
The second flange portion 25 is formed so as to protrude from the circular edge portion of the main body portion 24 in a radial shape on the outer peripheral side in the radial direction. The shape of the 2nd flange part 25 is substantially the same as the 1st flange part 22 formed in the flange part formation process mentioned above.
Similar to the furnace body 2, the replacement furnace body 23 is formed of a steel material, and the inner peripheral surface of the body portion 24 may be lined with a refractory material and a heat insulating material that are linings in the furnace.

次に、四つに分割された交換用炉体23の個々の部位の形状について説明する。
図6に示すように、分割された交換用炉体23である分割交換用炉体26は、縦断方向の断面を縁取りする側面フランジ部27を有している。側面フランジ部27は、交換用炉体23の分割線から径方向外周側に突出するように形成される。側面フランジ部27は、交換用炉体23の周方向から見て、矩形の外形を有する板状の部材である。側面フランジ部27の径方向の幅は、炉本体2のフランジ部22,25と同様の寸法とすることが好ましい。
Next, the shape of each part of the replacement furnace body 23 divided into four parts will be described.
As shown in FIG. 6, the divided replacement furnace body 26, which is a divided replacement furnace body 23, has a side flange portion 27 that borders a cross section in the longitudinal direction. The side flange portion 27 is formed so as to protrude from the dividing line of the replacement furnace body 23 to the radially outer peripheral side. The side flange portion 27 is a plate-like member having a rectangular outer shape when viewed from the circumferential direction of the replacement furnace body 23. The radial width of the side flange portion 27 is preferably the same size as the flange portions 22 and 25 of the furnace body 2.

組立工程は、分割された交換用炉体23である分割交換用炉体26を、流動床焼却炉1が設置されている場所に搬入して、分割交換用炉体26を一体の筒状に組立てる工程である。
組立工程では、分割交換用炉体26同士を、側面フランジ部27を用いて、例えば、溶接によって互いに接合する。接合された側面フランジ部27同士は、例えば、六角ボルトなどの締結部材を用いて締結することが好ましい。六角ボルトを用いて締結することによって、側面フランジ部27同士の接合を強固にすることができる。
In the assembling process, the divided replacement furnace body 26 which is the divided replacement furnace body 23 is carried into the place where the fluidized bed incinerator 1 is installed, and the divided replacement furnace body 26 is formed into an integral cylinder. This is an assembly process.
In the assembly process, the split replacement furnace bodies 26 are joined to each other by, for example, welding using the side flange portions 27. The joined side flange portions 27 are preferably fastened using a fastening member such as a hexagon bolt, for example. By fastening using hexagon bolts, the joining of the side flange portions 27 can be strengthened.

接合工程は、図7に示すように、炉本体2の外周面に設けられた第一フランジ部22と交換用炉体23の外周面に設けられた第二フランジ部25とを接合する工程である。
ここで、フランジ部22,25の径方向の幅は、炉本体2の変形を許容する寸法とされている。即ち、炉本体2が経年使用に伴い変形した場合においても、フランジ部22,25同士を接合することにより、炉本体2の変形を吸収できる寸法とされている。
接合されたフランジ部22,25同士は、例えば、六角ボルトなどの締結部材を用いて締結することが好ましい。六角ボルトを用いて締結することによって、フランジ部22,25同士の接合を強固にすることができる。
As shown in FIG. 7, the joining step is a step of joining the first flange portion 22 provided on the outer peripheral surface of the furnace body 2 and the second flange portion 25 provided on the outer peripheral surface of the replacement furnace body 23. is there.
Here, the radial widths of the flange portions 22 and 25 are dimensions that allow deformation of the furnace body 2. That is, even when the furnace body 2 is deformed with age, the flange parts 22 and 25 are joined to each other so that the deformation of the furnace body 2 can be absorbed.
The joined flange portions 22 and 25 are preferably fastened using a fastening member such as a hexagon bolt, for example. By fastening using hexagon bolts, the joint between the flange portions 22 and 25 can be strengthened.

上記実施形態によれば、経年使用により炉本体2が腐食された場合においても、短工期、低コストで、炉本体2を補修することができる。また、交換用炉体23が、炉本体2と同様の鋼材によって形成されており、また、フランジ部22,25を介して炉本体2と交換用炉体23とを接合することによって、炉本体2の補修後の強度を新規焼却炉と同等とすることができる。   According to the said embodiment, even when the furnace main body 2 is corroded by aged use, the furnace main body 2 can be repaired with a short construction period and low cost. Further, the replacement furnace body 23 is formed of the same steel material as that of the furnace body 2, and the furnace body 2 and the replacement furnace body 23 are joined to each other via the flange portions 22 and 25, thereby the furnace body. The strength after repair of 2 can be made equivalent to that of a new incinerator.

また、交換用炉体23が周方向に分割されていることによって、作業空間に限りがある場合においても、交換用炉体23の搬入、組み立てを行うことができる。   Further, since the replacement furnace body 23 is divided in the circumferential direction, the replacement furnace body 23 can be carried in and assembled even when the work space is limited.

なお、本発明の技術範囲は上記の実施形態に限定されるものではなく、本発明の趣旨を逸脱しない範囲において、種々の変更を加えることが可能である。
例えば、上記実施形態の支持工程においては、切断箇所Cより上方位置の炉本体2をジャッキ20により下方より支持する構成としたが、炉本体2をクレーン等で吊り上げてもよい。
また、上記実施形態では、流動床焼却炉1の炉本体2の補修を例に説明したが、本実施形態の汚泥焼却炉の補修方法を循環型流動炉の補修に適用してもよい。
また、上記実施形態では、一ヶ所のみの切断箇所Cのみを除去する構成としたが、複数個所の切断箇所Cを除去して同時に複数個所の補修を実施してもよい。
The technical scope of the present invention is not limited to the above embodiment, and various modifications can be made without departing from the spirit of the present invention.
For example, in the support step of the above embodiment, the furnace body 2 located above the cutting point C is supported from below by the jack 20, but the furnace body 2 may be lifted by a crane or the like.
Moreover, in the said embodiment, although the repair of the furnace main body 2 of the fluidized bed incinerator 1 was demonstrated to the example, you may apply the repair method of the sludge incinerator of this embodiment to the repair of a circulation type fluidized furnace.
Moreover, in the said embodiment, although it was set as the structure which removes only the cutting location C of one place, you may implement the repair of several locations simultaneously by removing the cutting location C of several locations.

1 流動床焼却炉
2 炉本体
3 風箱
4 分散板
6 一次空気導入口
7 砂層部
8 流動砂
9 フリーボード部
10 投入口
12 二次空気導入口
13 排出口
15 鋼製ケーシング
16 断熱層
17 耐火層
18 サドル部(支持部材)
19 梁
20 ジャッキ
22 第一フランジ部
23 交換用炉体
24 本体部
25 第二フランジ部
26 分割交換用炉体
27 側面フランジ部
A1 一次空気
C 切断箇所
E 排ガス
DESCRIPTION OF SYMBOLS 1 Fluidized bed incinerator 2 Furnace main body 3 Wind box 4 Dispersion plate 6 Primary air inlet 7 Sand layer part 8 Fluid sand 9 Free board part 10 Input port 12 Secondary air inlet 13 Discharge port 15 Steel casing 16 Thermal insulation layer 17 Fireproof Layer 18 Saddle (support member)
DESCRIPTION OF SYMBOLS 19 Beam 20 Jack 22 1st flange part 23 Replacement furnace body 24 Main body part 25 Second flange part 26 Split replacement furnace body 27 Side flange part A1 Primary air C Cutting location E Exhaust gas

Claims (2)

筒状の炉本体に複数のサドル部を形成するサドル部形成工程と、
前記サドル部を梁に設置されたジャッキで支持する支持工程と、
前記サドル部より下方で、前記炉本体を軸方向の複数個所で輪切り状に切断して切断箇所を除去する除去工程と、
全体として、前記切断箇所に対応する筒状をなし、周方向に複数に分割された交換用炉体を形成する交換用炉体形成工程と、
前記サドル部を前記ジャッキで支持しながら、前記切断箇所を除去することによって形成された前記炉本体の縁部に、前記縁部より径方向外周側に鍔状に突出し、且つ、前記径方向の長さが前記サドル部より短く前記ジャッキに接しない第一フランジ部を形成するフランジ部形成工程と、
前記交換用炉体を前記炉本体の前記切断箇所にそれぞれ搬入して一体の筒状に組立てる組立工程と、
前記サドル部を前記ジャッキで支持しながら、前記交換用炉体の縁部より径方向外周側に鍔状に突出し、前記径方向の長さが前記第一フランジ部と同様の第二フランジ部と前記第一フランジ部とを接合する接合工程と、
を有する汚泥焼却炉の補修方法。
A saddle part forming step of forming a plurality of saddle parts in a cylindrical furnace body;
A supporting step of supporting the saddle portion with a jack installed on the beam;
Below the saddle portion, a removal step of cutting the furnace main body into a plurality of portions in the axial direction and removing the cut portions ,
As a whole, a replacement furnace body forming step for forming a replacement furnace body divided into a plurality of parts in the circumferential direction, which has a cylindrical shape corresponding to the cut portion,
While supporting the saddle portion with the jack, the edge of the furnace body formed by removing the cut portion protrudes in a bowl shape radially outward from the edge, and the radial direction A flange portion forming step of forming a first flange portion whose length is shorter than the saddle portion and does not contact the jack;
An assembly step of bringing the replacement furnace body into the cut portion of the furnace body and assembling it into an integral cylinder;
While supporting the saddle portion with the jack, the flange portion protrudes radially outward from the edge portion of the replacement furnace body , and the length in the radial direction is the same as that of the first flange portion. A joining step of joining the first flange portion ;
Repair method for sludge incinerators.
前記交換用炉体は、縦断方向の断面を縁取りする側面フランジ部により互いに接合されている請求項1に記載の汚泥焼却炉の補修方法。   The method for repairing a sludge incinerator according to claim 1, wherein the replacement furnace bodies are joined to each other by side flange portions that frame a cross section in a longitudinal direction.
JP2014242318A 2014-11-28 2014-11-28 Sludge incinerator repair method Active JP6458930B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014242318A JP6458930B2 (en) 2014-11-28 2014-11-28 Sludge incinerator repair method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014242318A JP6458930B2 (en) 2014-11-28 2014-11-28 Sludge incinerator repair method

Publications (2)

Publication Number Publication Date
JP2016102633A JP2016102633A (en) 2016-06-02
JP6458930B2 true JP6458930B2 (en) 2019-01-30

Family

ID=56088648

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014242318A Active JP6458930B2 (en) 2014-11-28 2014-11-28 Sludge incinerator repair method

Country Status (1)

Country Link
JP (1) JP6458930B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6503599B1 (en) * 2018-09-20 2019-04-24 三菱重工環境・化学エンジニアリング株式会社 Repairing furnace for split replacement and fluid bed incinerator
JP7236196B2 (en) * 2019-02-07 2023-03-09 三菱重工業株式会社 Cyclone, gasifier, combined gasification combined cycle facility, and method for manufacturing cyclone

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08178542A (en) * 1994-12-28 1996-07-12 Mitsubishi Heavy Ind Ltd Separate type rotary kiln furnace
JP2000179817A (en) * 1998-12-11 2000-06-27 Daido Steel Co Ltd Waste melting furnace
JP2004125343A (en) * 2002-10-07 2004-04-22 Kangen Yoyu Gijutsu Kenkyusho:Kk Small reduction gasification melting furnace and repair method for the furnace
JP2004347212A (en) * 2003-05-21 2004-12-09 Babcock Hitachi Kk Gasification and melting apparatus
JP2007107812A (en) * 2005-10-13 2007-04-26 Hitachi Ltd Kiln repair method
JP5336893B2 (en) * 2009-03-18 2013-11-06 新日鉄住金エンジニアリング株式会社 How to replace the bottom block of a blast furnace
JP6115444B2 (en) * 2012-10-30 2017-04-19 Jfeスチール株式会社 Structure update method and structure construction method

Also Published As

Publication number Publication date
JP2016102633A (en) 2016-06-02

Similar Documents

Publication Publication Date Title
JPS5952552A (en) Cyclone separator
JP6458930B2 (en) Sludge incinerator repair method
KR920004878B1 (en) Method for reshaping gas turbine engine combustor part
JP6137094B2 (en) Repair method around the coke oven flue hole
JP2007107789A (en) Installation method of boiler equipment
CN201262393Y (en) Dry-type under-bed ignition device for circulating fluidized bed boiler
JP6503599B1 (en) Repairing furnace for split replacement and fluid bed incinerator
JP2007107785A (en) Installation method of boiler equipment
KR20130000676U (en) Exhaust duct surpportting structure of gas turbine for offshore platform
JP5169034B2 (en) Coke dry fire extinguishing equipment construction and repair method
JP6691834B2 (en) Heat transfer tube of fluidized bed boiler
KR200452693Y1 (en) Air nozzle liner for incinerator
JP5934605B2 (en) Heat treatment method for boiler membrane panels
JPS609566Y2 (en) double barrel smoke tube
JPS609210B2 (en) Incinerator side wall structure
CN215926893U (en) Main workshop of waste incineration power plant
CN223020294U (en) Tail gas incinerator lining structure convenient to install and detach
JP3431407B2 (en) Dry distillation pyrolysis reactor for waste
CN2628885Y (en) Combined chamber body for thermal state slag treatment
CN111023141B (en) A vertical porous medium furnace boiler
JP3731389B2 (en) Installation method of inner cylinder for blast furnace dust remover
JP5919874B2 (en) Furnace end structure of rotary kiln
JP2000282117A (en) How to replace the inner cylinder of the dust remover
CN106802089A (en) regenerator
JP2013044482A (en) Method of repairing furnace wall of rotary kiln

Legal Events

Date Code Title Description
A625 Written request for application examination (by other person)

Free format text: JAPANESE INTERMEDIATE CODE: A625

Effective date: 20170907

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20180511

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20180522

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20180720

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20180723

RD03 Notification of appointment of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7423

Effective date: 20181109

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20181204

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20181211

R150 Certificate of patent or registration of utility model

Ref document number: 6458930

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150