Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP6468953B2 - Connection phase determination method, determination device, and determination program - Google Patents
[go: Go Back, main page]

JP6468953B2 - Connection phase determination method, determination device, and determination program - Google Patents

Connection phase determination method, determination device, and determination program Download PDF

Info

Publication number
JP6468953B2
JP6468953B2 JP2015118282A JP2015118282A JP6468953B2 JP 6468953 B2 JP6468953 B2 JP 6468953B2 JP 2015118282 A JP2015118282 A JP 2015118282A JP 2015118282 A JP2015118282 A JP 2015118282A JP 6468953 B2 JP6468953 B2 JP 6468953B2
Authority
JP
Japan
Prior art keywords
phase
voltage
line
connection
unbalance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2015118282A
Other languages
Japanese (ja)
Other versions
JP2017005893A (en
Inventor
貴博 奥村
貴博 奥村
敏 上村
敏 上村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central Research Institute of Electric Power Industry
Original Assignee
Central Research Institute of Electric Power Industry
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central Research Institute of Electric Power Industry filed Critical Central Research Institute of Electric Power Industry
Priority to JP2015118282A priority Critical patent/JP6468953B2/en
Publication of JP2017005893A publication Critical patent/JP2017005893A/en
Application granted granted Critical
Publication of JP6468953B2 publication Critical patent/JP6468953B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/50Arrangements for eliminating or reducing asymmetry in polyphase networks

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Description

本発明は、接続相の決定方法、決定装置、及び決定プログラムに関する。さらに詳述すると、本発明は、配電系統の配電線に既に設置されている柱上変圧器の接続相の変更や新たに設置する柱上変圧器の接続相の選定に用いて好適な技術に関する。   The present invention relates to a connection phase determination method, a determination device, and a determination program. More specifically, the present invention relates to a technique suitable for use in changing the connection phase of a pole transformer already installed in a distribution line of a distribution system or selecting a connection phase of a pole transformer to be newly installed. .

配電系統と需要家との間には柱上変圧器が設けられ、当該柱上変圧器を介して基本的には需要家への送電が行われる。このような柱上変圧器として、具体的には例えば、変圧器ケースの側面部の上部に一次ブッシングと二次ブッシングとを有し、配電系統の電圧が一次ブッシングに接続されると共に変圧器で電圧の変成を行って二次ブッシングによって需要家への送電を行うものがある(特許文献1)。そして、柱上変圧器は、三相配電線に複数設けられ、当該三相配電線における三相のうちのいずれか二相に接続される。このとき、三相配電線の三組の二相のうちの特定の一組の二相に集中して柱上変圧器が複数接続されると、三相配電線の逆相分電圧が大きくなり、三相交流電圧の不平衡の度合いが増大する虞がある。   A pole transformer is provided between the power distribution system and the customer, and basically power is transmitted to the customer via the pole transformer. As such a pole transformer, specifically, for example, there is a primary bushing and a secondary bushing at the upper part of the side surface of the transformer case, and the voltage of the distribution system is connected to the primary bushing and There is one which performs voltage transformation and transmits power to a customer by secondary bushing (Patent Document 1). A plurality of pole transformers are provided in the three-phase distribution line, and are connected to any two phases of the three phases in the three-phase distribution line. At this time, if multiple pole transformers are connected in a specific two-phase configuration among the three phases of the three-phase distribution line, the reverse phase voltage of the three-phase distribution line increases, There is a possibility that the degree of unbalance of the phase alternating voltage increases.

特開2012−216567号公報JP 2012-216567 A

近年、太陽光発電設備などの分散形電源の連系が配電系統を中心に拡大している。太陽光発電は、戸建て住宅へも普及が進んでいるため、単相低圧系統への連系が増大している。一方、戸建て住宅のオール電化も普及しており、単相低圧系統へ電気温水器やヒートポンプ式給湯機のような大容量負荷が接続されている状況にある。   In recent years, the interconnection of distributed power sources such as solar power generation facilities has been expanding mainly in the distribution system. Since photovoltaic power generation is also spreading to detached houses, the connection to single-phase low-voltage systems is increasing. On the other hand, all electrification of detached houses is widespread, and large-capacity loads such as electric water heaters and heat pump water heaters are connected to a single-phase low-voltage system.

以上のような状況下で、配電線の電圧は三相不平衡となることが予想されるため、配電系統の電圧管理,負荷管理を実施するためには、電力会社でこれまで実施されてきた電圧三相平衡を仮定した管理方法では、十分ではなくなる可能性がある。また、太陽光発電は出力が天候に左右され、給湯器等は朝方の負荷を増大させるなど、電圧三相不平衡の状態も時々刻々変化し、管理が非常に難しい状況となる。以上より、従来から電力会社が電圧平衡を維持するために実施してきた相管理では、電圧三相平衡が維持できない可能性があるという問題がある。   Under these circumstances, the distribution line voltage is expected to be three-phase unbalanced, so power companies have been implementing power management and voltage management for power distribution systems. Management methods that assume voltage three-phase balance may not be sufficient. In addition, the output of solar power generation is affected by the weather, and the state of voltage three-phase imbalance changes from time to time, such as water heaters increasing the load in the morning, making management extremely difficult. As described above, there is a problem that the three-phase voltage balance may not be maintained in the phase management that has been performed by the electric power company to maintain the voltage balance.

電圧三相不平衡が問題となる具体的事例として、例えば、配電系統における電圧制御機器は代表相のみの電圧を監視しているケースが多いため、電圧三相不平衡が発生している場合には、監視相は適正電圧を保っているものの、他の相は適正電圧を逸脱しているというケースが起こり得るという例が挙げられる。また、電圧三相不平衡はモータの停止や故障の原因となることが確認されている。   As a specific example where voltage three-phase unbalance is a problem, for example, voltage control devices in the distribution system often monitor only the voltage of the representative phase, so when voltage three-phase unbalance occurs. An example is that the monitoring phase may maintain the proper voltage, but the other phases may deviate from the proper voltage. In addition, it has been confirmed that voltage three-phase imbalance causes motor stoppage and failure.

一方、電力会社では電圧三相不平衡の実態把握などを目的として三相計測機能付開閉器の設置を始めているものの、これら機器によって得られた計測データを活用した具体的な設備構成法は明らかにされていない。   On the other hand, although electric power companies have begun installing switches with a three-phase measurement function for the purpose of grasping the actual situation of voltage three-phase imbalance, the specific equipment configuration method using measurement data obtained by these devices is clear Not been.

そこで、本発明は、配電線における電圧三相不平衡を是正するために柱上変圧器が接続されるべき接続相を、多大な手間を掛けることなく且つ大掛かりな仕組みが必要とされることなく簡便に決定することができる接続相の決定方法、決定装置、及び決定プログラムを提供することを目的とする。   Therefore, the present invention eliminates a great deal of effort and requires a large mechanism for connecting phases to which pole transformers should be connected in order to correct voltage three-phase imbalance in distribution lines. It is an object of the present invention to provide a connection phase determination method, a determination device, and a determination program that can be easily determined.

発明者は、電圧三相不平衡を是正するための柱上変圧器の接続相の決定方法の検討を行う中で、以下のような電圧三相不平衡の発生メカニズムを究明した。なお、本発明の説明においては、配電用変電所から配電線へと供給される三相交流電力の各相のことをA相,B相,C相と呼ぶ。そして、B相はA相から位相が120°遅れている相であり、C相はB相から位相が120°遅れている相である。   The inventor investigated the mechanism of occurrence of the voltage three-phase unbalance as follows, while examining the method of determining the connection phase of the pole transformer to correct the voltage three-phase unbalance. In the description of the present invention, the phases of the three-phase AC power supplied from the distribution substation to the distribution lines are referred to as A phase, B phase, and C phase. The B phase is a phase delayed by 120 ° from the A phase, and the C phase is a phase delayed by 120 ° from the B phase.

(1)基本解析
まず、図4に示す高圧配電線モデルを用いて解析を行った。このモデルは、配電線に纏わる各種評価を行う際に一般的に使用されているものであり、電気協同研究会の標準的な住宅地域モデルである(一般社団法人電気協同研究会「高圧受電設備における高調波問題の現状と対策」,第54巻第2号,平成10年)。
(1) Basic analysis First, analysis was performed using the high-voltage distribution line model shown in FIG. This model is generally used for various evaluations related to distribution lines, and is a standard residential area model of the Electric Cooperative Study Group (General Electric Corporation Electric Cooperative Study Group “High Voltage Power Receiving Equipment” "Current Status and Countermeasures for Harmonic Problems in Japan", Vol. 54, No. 2, 1998).

電気協同研究会の住宅地域モデルでは、線種は決められているものの、三相不平衡計算用の線路インピーダンスは決められていない。そこで、図5に示すデルタ配列での不平衡線路インピーダンスが用いられた。なお、デルタ配列は、各電線の線間距離が等しいため、一般的に線路インピーダンスの不平衡が小さいことが確認されている。   In the residential area model of the Electric Cooperative Society, the line type is determined, but the line impedance for three-phase unbalance calculation is not determined. Therefore, the unbalanced line impedance in the delta arrangement shown in FIG. 5 was used. In the delta arrangement, since the distance between the wires is equal, it is generally confirmed that the unbalance of the line impedance is small.

図4の高圧配電線モデルの配電線末端に、負荷カーブが図6に示すとおりである、例えばヒートポンプ式給湯機などの朝方(若しくは深夜)負荷及び太陽光発電が取り付けられたオール電化集合住宅を模擬した負荷が以下のパターン1乃至3のように接続される場合が設定された。なお、負荷の力率は1に設定された。
パターン1:CA相のみに接続(他の相には接続負荷無し)
パターン2:BC相及びCA相に接続(他の相には接続負荷無し)
パターン3:AB相,BC相,及びCA相の全てに接続
At the end of the distribution line of the high-voltage distribution line model in FIG. 4, an all-electric apartment with a load curve as shown in FIG. 6, for example, a morning (or late-night) load such as a heat pump water heater and solar power The case where the simulated load is connected as in the following patterns 1 to 3 is set. The power factor of the load was set to 1.
Pattern 1: Connect to CA phase only (no connection load for other phases)
Pattern 2: Connected to BC phase and CA phase (no connection load on other phases)
Pattern 3: Connected to all of the AB phase, BC phase, and CA phase

1)パターン1:CA相のみに接続される場合の解析結果
基本解析の条件では、朝方(深夜)負荷が働く朝方(深夜)において、図7Aのとおり、線間電圧は、BC相は上昇し、AB相及びCA相は低下した。また、図7Bのとおり、相電圧は、B相電圧は変化がなく、C相電圧は若干低下し、A相電圧は大幅に低下した。
1) Pattern 1: Analysis result when connected to CA phase only Under basic analysis conditions, in the morning (late night) when the morning (late night) load is applied, the line voltage rises in the BC phase as shown in FIG. 7A. , AB phase and CA phase decreased. Further, as shown in FIG. 7B, the phase voltage did not change, the C phase voltage slightly decreased, and the A phase voltage significantly decreased.

このメカニズムは、以下のように説明され得る。すなわち、住宅負荷のような力率が1に近い負荷がCA相に接続されると、線電流はCA相線間電圧と同位相となるため、配電線路の電圧降下は、A相電圧を押し下げるように、また、C相電圧の位相を遅らせるように働く。その結果、相電圧の絶対値としては、A相においては大きく低下するが、C相においてはA相ほどは低下しない。また、A相電圧が低下することとC相電圧の位相が遅れることとにより、線間電圧の絶対値としては、AB相及びCA相は低下し、BC相は上昇する。   This mechanism can be explained as follows. That is, when a load having a power factor close to 1 such as a house load is connected to the CA phase, the line current is in phase with the CA phase line voltage, so the voltage drop in the distribution line pushes down the A phase voltage. In addition, it works to delay the phase of the C-phase voltage. As a result, the absolute value of the phase voltage greatly decreases in the A phase, but does not decrease as much in the C phase as in the A phase. Moreover, as the phase A voltage decreases and the phase of the phase C voltage delays, the absolute value of the line voltage decreases in the AB phase and the CA phase and increases in the BC phase.

一方、太陽光発電出力が大きくなる日中においては、図7Aのとおり、線間電圧は、AB相及びCA相は上昇し、BC相は低下した。また、図7Bのとおり、相電圧は、B相電圧は変化がなく、A相電圧は大幅に上昇し、C相電圧は若干上昇した。   On the other hand, during the daytime when the photovoltaic power output increases, as shown in FIG. 7A, the line voltage increases in the AB phase and the CA phase and decreases in the BC phase. Further, as shown in FIG. 7B, the phase voltage did not change, the A phase voltage increased significantly, and the C phase voltage increased slightly.

このメカニズムは、朝方(深夜)の現象と基本原理は同じであり、以下のように説明され得る。すなわち、力率1の太陽光発電がCA相に接続されると、配電線では逆潮流が発生して電流の位相が180°反転するため、配電線路の電圧降下は、A相電圧を押し上げるように、また、C相電圧の位相を進ませるように働く。その結果、相電圧の絶対値としては、A相においては大きく上昇するが、C相においてはA相ほどは上昇しない。また、A相電圧が上昇することとC相電圧の位相が進むこととにより、線間電圧の絶対値としては、AB相及びCA相は上昇し、BC相は低下する。   This mechanism has the same basic principle as the morning (late night) phenomenon, and can be explained as follows. That is, when a photovoltaic power generation with a power factor of 1 is connected to the CA phase, a reverse power flow occurs in the distribution line, and the phase of the current is reversed by 180 °, so that the voltage drop in the distribution line pushes up the A-phase voltage. Also, it works to advance the phase of the C phase voltage. As a result, the absolute value of the phase voltage increases greatly in the A phase, but does not increase as much in the C phase as in the A phase. Further, as the A-phase voltage increases and the phase of the C-phase voltage advances, the absolute value of the line voltage increases in the AB phase and the CA phase, and decreases in the BC phase.

以上のことが、配電線末端に低圧単相負荷及び低圧単相太陽光発電をCA相のみに接続した際に発生する電圧三相不平衡のメカニズムとして知見された。   The above has been found as a mechanism of voltage three-phase unbalance that occurs when a low-voltage single-phase load and low-voltage single-phase photovoltaic power generation are connected to the CA phase only at the end of the distribution line.

ここで、上記解析結果から得られた接続負荷の不平衡(言い換えると、低圧単相負荷や低圧単相太陽光発電の不平衡接続による不平衡)と線間電圧の不平衡との間の関係を整理して図8が得られ、当該図8から、以下の関係が成立していることが知見された。
《知見》
線路インピーダンスのリアクタンス分により、重負荷相又は太陽光発電連系量の少ない相から位相が120°進んだ相の線間電圧が他相より高くなり、軽負荷相又は太陽光発電連系量の多い相から位相が120°進んだ相の線間電圧が他相より低くなる。
Here, the relationship between the unbalanced connection load (in other words, unbalanced due to unbalanced connection of low-voltage single-phase load or low-voltage single-phase photovoltaic power generation) obtained from the above analysis results and the unbalance of line voltage 8 is obtained, and it was found from FIG. 8 that the following relationship is established.
《Knowledge》
Due to the reactance of the line impedance, the line voltage of the phase advanced by 120 ° from the heavy load phase or the phase with a small amount of photovoltaic power generation is higher than the other phase, and the light load phase or the amount of photovoltaic power generation The line voltage of the phase whose phase is advanced by 120 ° from many phases becomes lower than that of the other phases.

2)パターン2:BC相及びCA相に接続される場合の解析結果
朝方(深夜)負荷が働く朝方(深夜)において、図9Aのとおり、線間電圧は、AB相及びBC相は若干低下し、CA相のみ大幅に低下した。また、図9Bのとおり、相電圧は、B相電圧は若干低下し、A相電圧及びC相電圧は大幅に低下した。
2) Pattern 2: Analysis results when connected to the BC phase and the CA phase In the morning (late night) when the morning (late night) load works, the line voltage slightly decreases in the AB and BC phases as shown in FIG. 9A. Only the CA phase was significantly reduced. Further, as shown in FIG. 9B, the phase voltage slightly decreased for the B phase voltage, and greatly decreased for the A phase voltage and the C phase voltage.

一方、太陽光発電出力が大きくなる日中においては、図9Aのとおり、線間電圧は、CA相は大幅に上昇し、AB相及びBC相は若干上昇した。また、図9Bのとおり、相電圧は、A相電圧及びC相電圧が大幅に上昇し、B相電圧は若干上昇した。   On the other hand, during the daytime when the photovoltaic power output increased, as shown in FIG. 9A, the line voltage increased significantly in the CA phase and slightly increased in the AB phase and the BC phase. Further, as shown in FIG. 9B, the phase voltage greatly increased in the A phase voltage and the C phase voltage, and the B phase voltage slightly increased.

このメカニズムも、上記パターン1のメカニズムと同様のものとして説明され得る。   This mechanism can also be described as the same as the mechanism of the pattern 1 described above.

そして、上記解析結果から得られた接続負荷の不平衡と線間電圧の不平衡との間の関係を整理して図10が得られ、当該図10から、前述の接続負荷の不平衡と線間電圧の不平衡とに係る知見が成立していることが確認された。   Then, FIG. 10 is obtained by organizing the relationship between the unbalance of the connection load and the unbalance of the line voltage obtained from the above analysis result. From FIG. It was confirmed that the knowledge about the imbalance of the inter-voltage was established.

3)パターン3:AB相,BC相,及びCA相の全てに接続される場合の解析結果
負荷は三相平衡となるため、図11A及び図11Bのとおり、線間電圧及び相電圧は、不平衡が無くなる。
3) Pattern 3: Analysis results when connected to all of the AB phase, BC phase, and CA phase Since the load is three-phase balanced, the line voltage and the phase voltage are not as shown in FIGS. 11A and 11B. Equilibrium is lost.

このメカニズムも、上記パターン1のメカニズムと同様のものとして説明され得る。   This mechanism can also be described as the same as the mechanism of the pattern 1 described above.

また、本パターンは三相平衡条件であったが、図8及び図10と同様に整理して図12が得られた。そして、図12から、三相平衡の場合においても、前述の接続負荷の不平衡と線間電圧の不平衡とに係る知見が成立していることが確認された。   Moreover, although this pattern was a three-phase equilibrium condition, FIG. 12 was obtained by arranging in the same manner as in FIGS. From FIG. 12, it was confirmed that the knowledge about the unbalance of the connection load and the unbalance of the line voltage described above was established even in the case of three-phase balance.

(2)汎用性の確認に関する解析
続いて、上述の基本解析の結果から得られた知見である「接続負荷の不平衡と線間電圧の不平衡との間の関係」は基本解析の条件の場合だけでなく実際の配電系統においても成立する関係であることを確認するため、基本解析の条件を基準としつつ以下の六つの解析を行った。
(2) Analysis on confirmation of versatility Next, the knowledge obtained from the results of the above basic analysis, “Relationship between connection load imbalance and line voltage imbalance”, is a condition of basic analysis. In order to confirm that the relationship was established not only in the case but also in the actual power distribution system, the following six analyzes were performed based on the basic analysis conditions.

なお、以下の解析I,解析II,及び解析IIIでは、配電線末端に接続する不平衡負荷について、実際の配電系統に近い回路構成とするため、特定の相の負荷及び太陽光発電の接続量が他の相よりも多い以下の二つのケースが設定された。また、線路インピーダンスは平衡とされた。
ケースa)AB相:BC相:CA相=1:1:2
ケースb)AB相:BC相:CA相=1:2:2
In the following Analysis I, Analysis II, and Analysis III, the unbalanced load connected to the end of the distribution line has a circuit configuration close to that of the actual distribution system. The following two cases with more than other phases were established. The line impedance was balanced.
Case a) AB phase: BC phase: CA phase = 1: 1: 2
Case b) AB phase: BC phase: CA phase = 1: 2: 2

〈解析I〉不平衡負荷の力率をパラメータとした解析
接続する不平衡負荷の力率が異なる条件での解析の結果、低圧負荷の力率として多い、遅れ0.9から1.0の範囲では、ケースaとケースbとのいずれの場合においても、上記知見に係る線間電圧が最も高い相及び最も低い相と重負荷相及び軽負荷相との間の関係が成立することが確認された。
<Analysis I> Analysis using power factor of unbalanced load as a parameter As a result of analysis under the condition that the power factor of connected unbalanced load is different, the power factor of low-pressure load is often in the range of 0.9 to 1.0 In either case a or case b, it is confirmed that the relationship between the phase with the highest line voltage and the lowest phase, the heavy load phase, and the light load phase according to the above knowledge is established. It was.

〈解析II〉系統力率をパラメータとした解析
不平衡負荷とは別に接続された容量の大きな平衡負荷の力率を変化させることによって系統力率を変化させた条件での解析の結果、系統力率が異なる場合でも、ケースaとケースbとのいずれの場合においても、上記知見に係る線間電圧が最も高い相及び最も低い相と重負荷相及び軽負荷相との間の関係が成立することが確認された。
<Analysis II> Analysis using the system power factor as a parameter As a result of the analysis under the condition that the system power factor is changed by changing the power factor of the balanced load with large capacity connected separately from the unbalanced load, Even when the rates are different, the relationship between the phase having the highest line voltage and the lowest line voltage, the heavy load phase, and the light load phase is established in both cases a and b. It was confirmed.

〈解析III〉線種(即ち、線路インピーダンス)をパラメータとした解析
配電線路の線種が異なる条件(具体的には、幹線:120 mm 及び25 mm のアルミ線)での解析の結果、実配電系統に近い幹線が120 mm のアルミ線である系統だけでなく、通過電流の小さい箇所において使用される25 mm のアルミ線を幹線とした系統においても、上記知見に係る線間電圧が最も高い相及び最も低い相と重負荷相及び軽負荷相との間の関係が成立することが確認された。
<Analysis III> Analysis using the line type (that is, line impedance) as a parameter As a result of the analysis under different conditions (specifically, trunk line: 120 mm 2 and 25 mm 2 aluminum wire) The line voltage related to the above knowledge is not only in the system where the trunk line close to the actual power distribution system is an aluminum wire of 120 mm 2 but also in the system using a 25 mm 2 aluminum wire used in places where the passing current is small. It was confirmed that the relationship between the highest and lowest phases and the heavy and light load phases was established.

〈解析IV〉線路インピーダンスの不平衡による電圧三相不平衡の発生メカニズム
高圧配電線の線路インピーダンスの不平衡(具体的には、装柱形態の違いによる相互インダクタンスの不平衡によるもの)による電圧三相不平衡の発生メカニズムを検証するための解析を行った。
<Analysis IV> Generation mechanism of voltage three-phase unbalance due to unbalanced line impedance Voltage three due to unbalanced line impedance of high-voltage distribution lines (specifically, due to unbalanced mutual inductance due to different column configuration) An analysis was conducted to verify the mechanism of phase imbalance.

具体的には、図5に示すデルタ配列(即ち、線路インピーダンス平衡を模擬)の場合と、図13に示す垂直配列(即ち、線路インピーダンス不平衡を模擬)の場合とが設定された。なお、垂直配列は実線路で多く用いられている装柱である。   Specifically, the case of the delta arrangement shown in FIG. 5 (that is, simulating line impedance balance) and the case of the vertical arrangement shown in FIG. 13 (that is, simulating line impedance imbalance) are set. The vertical array is a pillar that is often used in actual tracks.

また、図4の高圧配電線モデルの配電線末端に、負荷カーブが図6に示すとおりである、例えばヒートポンプ式給湯機などの朝方(若しくは深夜)負荷及び太陽光発電が取り付けられたオール電化集合住宅を模擬した負荷をAB相,BC相,及びCA相の3相全てに接続することにより、三相平衡負荷が模擬された。   Further, an all-electric assembly in which a load curve is as shown in FIG. 6 at the end of the distribution line of the high-voltage distribution model in FIG. 4, for example, a morning (or midnight) load such as a heat pump water heater and solar power generation is attached. A three-phase balanced load was simulated by connecting a load simulating a house to all three phases of the AB phase, the BC phase, and the CA phase.

まず、線路インピーダンス平衡(即ち、デルタ配列)の場合については、上記基本解析のパターン3と解析条件が同様になるため、解析結果は図11A及び図11Bのとおりとなる。   First, in the case of line impedance balance (that is, delta arrangement), the analysis conditions are the same as those in the pattern 3 of the basic analysis, and the analysis results are as shown in FIGS. 11A and 11B.

一方、線路インピーダンス不平衡(即ち、垂直配列)の場合については、線間電圧は図14Aのようになり、相電圧は図14Bのようになった。線間電圧(図14A)は、図11Aと比べ、朝方(深夜)負荷が働く朝方(深夜)において、AB相は上昇し、BC相は低下し、また、CA相はほぼ変化がなかった。相電圧は(図14B)、図11Bと比べ、朝方(深夜)負荷が働く朝方(深夜)において、B相電圧は変化がなく、A相電圧は上昇し、C相電圧は低下した。   On the other hand, in the case of the line impedance imbalance (that is, vertical arrangement), the line voltage is as shown in FIG. 14A and the phase voltage is as shown in FIG. 14B. As compared with FIG. 11A, the line voltage (FIG. 14A) increased in the morning (late night) when the morning (late night) load was applied, the AB phase increased, the BC phase decreased, and the CA phase remained almost unchanged. As for the phase voltage (FIG. 14B), compared with FIG. 11B, in the morning (late night) when the morning (late night) load works, the B phase voltage does not change, the A phase voltage increases, and the C phase voltage decreases.

以上より、デルタ配列の場合と比べ、垂直配列の場合は、線路インピーダンス不平衡の影響によって不平衡が拡大することが確認された。これは、線間距離の違いによる相互インピーダンスの違い、及び、相互インピーダンスの違いによる各相線電流の大きさの違いなどの要因が複雑に絡み合った結果、平衡状態から各電圧降下成分等の大きさが変化した結果として現れるものであると考えられた。   From the above, it was confirmed that the unbalance increased due to the influence of the line impedance imbalance in the vertical arrangement compared to the delta arrangement. This is because, as a result of complex intertwining of factors such as the difference in mutual impedance due to the difference in line distance and the difference in the magnitude of each phase line current due to the difference in mutual impedance, the magnitude of each voltage drop component, etc. from the equilibrium state. It was thought to appear as a result of changes in the

また、図14A及び図14Bにおいて、太陽光発電出力が大きくなる日中においても同様に、デルタ配列の場合と比べ、垂直配列の場合は、線路インピーダンス不平衡の影響によって不平衡が拡大することが確認された。   14A and 14B, similarly, during the daytime when the photovoltaic power output becomes large, in the case of the vertical arrangement, the imbalance may be expanded due to the influence of the line impedance imbalance in comparison with the case of the delta arrangement. confirmed.

〈解析V〉実系統レベルの配電線モデルでの検証1
上述の基本解析によって得られた接続負荷の不平衡と線間電圧の不平衡との間の関係に関する知見が実系統レベルの配電線モデルにおいても同様に成立するか否かを検証するため、複数の線路インピーダンス,複数の負荷モデル,及び複数の負荷パターンを準備し、これらの組み合わせ及び電気協同研究会の住宅地域モデルへの負荷(具体的には、負荷カーブ)の接続パターンを変えることによって作り出した種々の設定について解析を行った。
<Analysis V> Verification with a distribution line model at the actual system level 1
In order to verify whether the knowledge about the relationship between the unbalance of the connected load and the unbalance of the line voltage obtained by the basic analysis described above also applies to the distribution line model at the actual system level. Line impedance, multiple load models, and multiple load patterns are prepared, and these are created by changing the connection pattern of the load (specifically, the load curve) to the residential area model of the Electric Cooperative Society. Various settings were analyzed.

この解析では、図15に示す高圧配電線モデルを用いて解析を行った。このモデルは、配電線に纏わる各種評価を行う際に一般的に使用されているものであり、電気協同研究会の標準的な住宅地域モデルである(一般社団法人電気協同研究会「高圧受電設備における高調波問題の現状と対策」,第54巻第2号,平成10年)。   In this analysis, analysis was performed using the high-voltage distribution line model shown in FIG. This model is generally used for various evaluations related to distribution lines, and is a standard residential area model of the Electric Cooperative Study Group (General Electric Corporation Electric Cooperative Study Group “High Voltage Power Receiving Equipment” "Current Status and Countermeasures for Harmonic Problems in Japan", Vol. 54, No. 2, 1998).

そして、線路インピーダンスについては、線路インピーダンス平衡パターン(デルタ配列;図5)と線路インピーダンス不平衡パターン(垂直配列;図13)とが設定された。   For the line impedance, a line impedance balance pattern (delta arrangement; FIG. 5) and a line impedance unbalance pattern (vertical arrangement; FIG. 13) were set.

負荷モデルについては、非オール電化住宅として想定される負荷カーブと、オール電化で太陽光発電が設置されていない住宅として想定される負荷カーブと、オール電化で太陽光発電が設置されている住宅として想定される負荷カーブとが設定された。   As for the load model, it is assumed that the load curve is assumed as a non-all-electric home, the load curve is assumed as a home where all photovoltaics are not installed, and the all-electric home is installed with solar power. The expected load curve was set.

負荷パターンについては、同一の需要家が配電線の各相(線間)に均等に接続されて接続相の不平衡はないパターンと、隣の負荷点と接続相を変えて配電線全体でほぼ均等になっているものの接続位置が異なるので線路インピーダンスの影響で小さな不平衡は発生するパターン(これは、電力会社が相管理している状況を模擬したものである)と、極端なケースとして全負荷点ともに需要家接続の組み合わせを一致させて不平衡を最大にしたパターンとが設定された。   About the load pattern, the same consumer is connected to each phase (between lines) of the distribution line evenly, and there is no unbalance of the connection phase. Even though they are equal, the connection positions are different, so a small unbalance occurs due to the influence of the line impedance (this is a simulation of the situation managed by the power company), and in all extreme cases A pattern that maximizes the unbalance by setting the combination of customer connections for both load points was set.

解析の結果、朝方(深夜)負荷が働く朝方(深夜)において、平衡負荷に接続している場合及び負荷接続相を適切に管理している場合には電圧不平衡率は極めて小さい一方で、負荷の不平衡が大きい場合には電圧不平衡率が大きくなることが確認された。さらに、特に電圧三相不平衡が大きくなる場合は、線路インピーダンスの不平衡に対し、接続負荷の不平衡が主要因であって支配的であると考えられた。また、日中において、特に電圧三相不平衡が大きくなる場合は、太陽光発電の不平衡が主要因であると考えられた。   As a result of the analysis, in the morning (late night) when the morning (late night) load works, the voltage imbalance rate is very small when connected to the balanced load and when the load connection phase is properly managed. It was confirmed that the voltage unbalance rate was large when the unbalance of was large. Furthermore, especially when the voltage three-phase unbalance becomes large, it is considered that the unbalance of the connection load is the main factor and is dominant with respect to the unbalance of the line impedance. In addition, when the voltage three-phase unbalance became large during the daytime, it was considered that the unbalance of photovoltaic power generation was the main factor.

〈解析VI〉実系統レベルの配電線モデルでの検証2
上述の基本解析によって得られた接続負荷の不平衡と線間電圧の不平衡との間の関係に関する知見が実系統レベルの配電線モデルにおいても同様に成立するか否かを検証するため、線路インピーダンスを平衡パターン(デルタ配列;図5)とし、負荷モデルとして上記解析Vの三つの負荷カーブに加えてオール電化で太陽光発電が設置されている住宅で解析Vと比べて朝方(深夜)負荷の消費電力及び太陽光発電の出力を半減させた負荷カーブを加え、負荷パターンは不平衡を最大にしたものとし、電気協同研究会の住宅地域モデルへの負荷(具体的には、負荷カーブ)の接続パターンを変えることによって作り出した種々の設定について解析を行った。
<Analysis VI> Verification with distribution line model at actual system level 2
In order to verify whether the knowledge about the relationship between the unbalance of the connected load and the unbalance of the line voltage obtained by the basic analysis described above also applies to the actual distribution line model, Assuming that the impedance is an equilibrium pattern (delta arrangement; Fig. 5), in addition to the three load curves in the analysis V above as a load model, the load is in the morning (late night) compared to the analysis V in a house where photovoltaic power generation is installed with all electrification A load curve that halves the power consumption of solar power and the output of photovoltaic power generation is added, and the load pattern assumes that the imbalance is maximized, and the load on the residential area model of the Electric Cooperative Research Group (specifically, the load curve) We analyzed various settings created by changing the connection pattern.

この解析でも、図15に示す高圧配電線モデルを用いて解析を行った。   Also in this analysis, the analysis was performed using the high-voltage distribution line model shown in FIG.

解析の結果、実系統レベルの配電線モデルにおいても接続負荷の不平衡と線間電圧の不平衡との間の関係に関する知見が成立することが確認され、さらに、深夜と日中という時間帯の区分にも着目して接続負荷の不平衡と三相線間電圧の不平衡との間の関係に関して以下の知見が得られた。   As a result of the analysis, it was confirmed that knowledge about the relationship between unbalanced connection load and unbalanced line voltage was established even in the distribution system model at the actual system level. The following findings were obtained regarding the relationship between unbalanced connection loads and unbalanced voltage between three-phase lines, focusing on classification.

1)深夜について
ア)負荷が最も重い相は、線間電圧が最も高い相から位相が120°遅れている相にある。
イ)負荷が最も軽い相は、線間電圧が最も低い相から位相が120°遅れている相にある。
ウ)負荷量が3相の中で中間の相は、線間電圧が中間の相から位相が120°遅れている相にある。
1) About midnight a) The phase with the heaviest load is the phase that is 120 ° behind the phase with the highest line voltage.
B) The phase with the lightest load is the phase that is 120 ° behind the phase with the lowest line voltage.
C) Among the three phases, the intermediate phase is a phase whose line voltage is delayed by 120 ° from the intermediate phase.

2)日中について
ア)太陽光発電出力が最も多い相は、線間電圧が最も低い相から位相が120°遅れている相にある。
イ)太陽光発電出力が最も少ない(若しくは太陽光発電が無い)相は、線間電圧が最も高い相から位相が120°遅れている相にある。
ウ)太陽光発電出力が3相の中で中間の相は、線間電圧が中間の相から位相が120°遅れている相にある。
2) About daytime a) The phase with the highest photovoltaic power output is in the phase that is 120 ° behind the phase with the lowest line voltage.
B) The phase with the smallest photovoltaic power generation output (or no photovoltaic power generation) is a phase that is delayed by 120 ° from the phase with the highest line voltage.
C) The intermediate phase among the three phases of the photovoltaic power generation output is a phase in which the phase of the line voltage is delayed by 120 ° from the intermediate phase.

なお、上記の時間帯の区分について、例えば、「日中」とは太陽光発電によって電力が出力され得る時間帯、具体的には例えば日の出から日の入りまでの時間帯を言い、「深夜」とはその他の時間帯を言う。   For the above time zone classification, for example, “daytime” means a time zone during which power can be output by solar power generation, specifically, for example, a time zone from sunrise to sunset, and “midnight” Say other time zones.

本発明の接続相の決定方法は、上述の発明者独自の新たな知見に基づくものであり、配電線において計測された三相の各線間電圧が用いられて計測時刻別の線間毎の電圧不平衡率が算出され、当該電圧不平衡率が最大になっている計測時刻における三相の各線間電圧が用いられて線間毎の電圧の高低特性の組み合わせが作成され、電圧不平衡率が最大になっている計測時刻と線間毎の電圧の高低特性の組み合わせとに基づいて柱上変圧器の接続相が決定されるようにしている。   The connection phase determination method of the present invention is based on the above-mentioned new knowledge unique to the inventors, and the voltage for each line for each measurement time using the three-phase line voltage measured in the distribution line. The unbalance rate is calculated, and the three-phase line voltage at the measurement time at which the voltage unbalance rate is maximized is used to create a combination of high and low voltage characteristics for each line. The connection phase of the pole transformer is determined based on the maximum measurement time and the combination of high and low voltage characteristics for each line.

また、本発明の接続相の決定装置は、配電線において計測された三相の各線間電圧を用いて計測時刻別の線間毎の電圧不平衡率を算出する手段と、電圧不平衡率が最大になっている計測時刻における三相の各線間電圧を用いて線間毎の電圧の高低特性の組み合わせを作成する手段と、電圧不平衡率が最大になっている計測時刻と線間毎の電圧の高低特性の組み合わせとに基づいて柱上変圧器の接続相を決定する手段とを有するようにしている。   Further, the connection phase determination device of the present invention includes means for calculating a voltage unbalance rate for each line for each measurement time using the three-phase line voltages measured in the distribution line, and the voltage unbalance rate is A means to create a combination of high and low voltage characteristics for each line using the three-phase line voltages at the maximum measurement time, and the measurement time and line-to-line combinations with the highest voltage imbalance rate And means for determining the connection phase of the pole transformer based on the combination of the high and low characteristics of the voltage.

また、本発明の接続相の決定プログラムは、配電線において計測された三相の各線間電圧を用いて計測時刻別の線間毎の電圧不平衡率を算出する処理と、電圧不平衡率が最大になっている計測時刻における三相の各線間電圧を用いて線間毎の電圧の高低特性の組み合わせを作成する処理と、電圧不平衡率が最大になっている計測時刻と線間毎の電圧の高低特性の組み合わせとに基づいて柱上変圧器の接続相を決定する処理とをコンピュータに行わせるようにしている。   Further, the connection phase determination program of the present invention includes a process for calculating a voltage unbalance rate for each line for each measurement time using the three-phase line voltages measured in the distribution line, and the voltage unbalance rate is Processing to create a combination of high and low voltage characteristics for each line using the three-phase line voltages at the maximum measurement time, and the measurement time and line-to-line combinations with the highest voltage imbalance rate The computer is caused to perform processing for determining the connection phase of the pole transformer based on the combination of high and low voltage characteristics.

したがって、これらの接続相の決定方法、決定装置、及び決定プログラムによると、配電線の三相の各線間電圧を計測することにより、上述の接続負荷の不平衡と線間電圧の不平衡とに係る知見により、三相の各線間電圧の不平衡を改善するように柱上変圧器の接続相が決定される。   Therefore, according to the determination method, determination device, and determination program of these connection phases, by measuring each line voltage of the three phases of the distribution line, the above-described connection load unbalance and line voltage unbalance are achieved. Based on such knowledge, the connecting phase of the pole transformer is determined so as to improve the unbalance of the three-phase line voltages.

また、本発明の接続相の決定方法、決定装置、及び決定プログラムは、現状の三相の各線間電圧の不平衡を改善するための既設の柱上変圧器の接続相の変更と将来の三相の各線間電圧の不平衡を抑制するための新設する柱上変圧器の接続相の選定とのうちの少なくとも一方に関する決定が行われるようにしても良い。この場合には、現状における電圧三相不平衡の是正に適切な対策と将来における電圧三相不平衡の予防に適切な対策とのうちの少なくとも一方に関する決定が行われる。   In addition, the connection phase determination method, determination apparatus, and determination program of the present invention provide a method for changing the connection phase of an existing pole transformer to improve the current three-phase line voltage unbalance and the future three phases. The determination regarding at least one of the selection of the connection phase of the newly installed pole transformer for suppressing the unbalance of the line voltages of the phases may be performed. In this case, a determination is made regarding at least one of a countermeasure appropriate for correcting the current three-phase voltage imbalance and a countermeasure appropriate for preventing the voltage three-phase imbalance in the future.

ここで、実配電線路への三相計測機能付開閉器の導入が進んできている。このような背景のもと、本発明では、既設の三相計測機能付開閉器により計測されるデータを利用することによって柱上変圧器の接続相が決定されるようにしても良く、新たに必要とされる費用が抑制される。また、検討対象の配電線に三相計測機能付開閉器が設置されていないために計測機器を新たに設置する必要があるとしても、三相計測機能付開閉器によって計測されるデータには種々の用途があるので、本発明の実施のために限定されない三相計測機能付開閉器を設置することによって本発明は実施され得る。   Here, the introduction of a switch with a three-phase measurement function into an actual distribution line is progressing. Under such a background, in the present invention, the connection phase of the pole transformer may be determined by using data measured by an existing switch having a three-phase measurement function. The required cost is reduced. Even if it is necessary to install a new measuring device because there is no switch with a three-phase measurement function on the distribution line under consideration, there are various types of data measured by a switch with a three-phase measurement function. Therefore, the present invention can be implemented by installing a switch with a three-phase measurement function that is not limited to the implementation of the present invention.

上述のことも踏まえ、本発明の接続相の決定方法、決定装置、及び決定プログラムは、配電線に設置された三相計測機能付開閉器によって三相の各線間電圧が計測されるようにしても良い。この場合には、既設の三相計測機能付開閉器によって計測されるデータを利用して柱上変圧器の接続相の決定が行われたり、三相計測機能付開閉器を新たに設置する場合でも本発明の実施のために限定されない三相計測機能付開閉器を設置して柱上変圧器の接続相の決定が行われたりする。   Based on the above, the connection phase determination method, the determination device, and the determination program of the present invention are configured so that each three-phase line voltage is measured by a switch with a three-phase measurement function installed in the distribution line. Also good. In this case, when determining the connection phase of the pole transformer using the data measured by the existing switch with three-phase measurement function, or when installing a new switch with three-phase measurement function However, a switch with a three-phase measurement function that is not limited for the implementation of the present invention is installed to determine the connection phase of the pole transformer.

本発明の接続相の決定方法、決定装置、及び決定プログラムによれば、単に配電線の三相の各線間電圧を計測することによって三相の各線間電圧の不平衡を改善し得る柱上変圧器の接続相を決定することができるので、多大な手間や大掛かりな仕組みが必要とされることなく柱上変圧器の接続相の決定が可能であり、接続相の決定技術としての汎用性の向上を図ることが可能になる。   According to the determination method, the determination device, and the determination program of the connection phase of the present invention, the pole transformer that can improve the unbalance of the three-phase line voltages by simply measuring the three-phase line voltages of the distribution line. The connection phase of the transformer can be determined, so it is possible to determine the connection phase of the pole transformer without requiring a lot of labor and a large-scale mechanism. Improvements can be made.

また、本発明の接続相の決定方法、決定装置、及び決定プログラムは、現状の不平衡の改善と将来の不平衡の抑制とのうちの少なくとも一方に関する接続相の決定が行われるようにした場合には、現状における電圧三相不平衡の是正に適切な対策と将来における電圧三相不平衡の予防に適切な対策とのうちの少なくとも一方に関する決定を行うことができるので、多様な場面において必要に即した接続相の決定を行って接続相の決定技術としての汎用性のより一層の向上を図ることが可能になる。   In the connection phase determination method, determination apparatus, and determination program of the present invention, the connection phase is determined for at least one of improvement of the current unbalance and suppression of the future unbalance. Can make decisions on at least one of the appropriate measures to correct the current three-phase voltage imbalance and the appropriate measures to prevent the three-phase voltage imbalance in the future. It is possible to further improve the versatility as a connection phase determination technique by determining the connection phase according to the above.

また、本発明の接続相の決定方法、決定装置、及び決定プログラムは、三相の各線間電圧が三相計測機能付開閉器によって計測されるようにした場合には、既設の三相計測機能付開閉器によって計測されるデータを利用して柱上変圧器の接続相の決定を行うことができるので、コストを低減させることが可能になる。また、三相計測機能付開閉器を新たに設置する場合でも本発明の実施のために限定されない三相計測機能付開閉器を設置して柱上変圧器の接続相の決定を行うことができるので、機器の多様な有効活用の可能性を確保して配電系統の監視・運用全体としてコストを低減させることが可能になる。   In addition, the connection phase determination method, determination device, and determination program of the present invention provide a three-phase measurement function when the three-phase line voltage is measured by a switch with a three-phase measurement function. Since the connection phase of the pole transformer can be determined using data measured by the attached switch, the cost can be reduced. In addition, even when a switch with a three-phase measurement function is newly installed, it is possible to determine the connection phase of the pole transformer by installing a switch with a three-phase measurement function that is not limited for the implementation of the present invention. Therefore, it is possible to secure the possibility of various effective utilization of equipment and reduce the cost of the entire monitoring and operation of the distribution system.

本発明の接続相の決定方法の実施形態の一例を説明するフローチャートである。It is a flowchart explaining an example of embodiment of the determination method of the connection phase of this invention. 実施形態の接続相の決定方法を接続相の決定プログラムを用いて実施する場合の当該プログラムによって実現される接続相の決定装置の機能ブロック図である。It is a functional block diagram of a connection phase determination device realized by the program when the connection phase determination method of the embodiment is implemented using a connection phase determination program. 柱上変圧器の接続相の決定において用いられる接続相決定チャートである。It is a connection phase determination chart used in determination of the connection phase of a pole transformer. 配電線の電圧三相不平衡の解析に用いられた配電線モデルである。It is the distribution line model used for the analysis of the voltage three-phase imbalance of a distribution line. 配電線の電圧三相不平衡の解析に用いられた線路インピーダンスのうちデルタ配列を示す図である。It is a figure which shows a delta arrangement | sequence among the line impedances used for the analysis of the voltage three-phase imbalance of a distribution line. 配電線の電圧三相不平衡の解析に用いられた負荷カーブを示す図である。It is a figure which shows the load curve used for the analysis of the voltage three-phase imbalance of a distribution line. 基本解析の負荷のパターン1の場合の解析結果としての線間電圧を示す図である。It is a figure which shows the line voltage as an analysis result in the case of the pattern 1 of the load of a basic analysis. 基本解析の負荷のパターン1の場合の解析結果としての相電圧を示す図である。It is a figure which shows the phase voltage as an analysis result in the case of the pattern 1 of the load of a basic analysis. 基本解析の負荷のパターン1の場合の解析結果としての接続負荷の不平衡と線間電圧の不平衡との間の関係を示す図である。It is a figure which shows the relationship between the unbalance of a connection load and the unbalance of a line voltage as an analysis result in the case of the load pattern 1 of a basic analysis. 基本解析の負荷のパターン2の場合の解析結果としての線間電圧を示す図である。It is a figure which shows the line voltage as an analysis result in the case of the load pattern 2 of a basic analysis. 基本解析の負荷のパターン2の場合の解析結果としての相電圧を示す図である。It is a figure which shows the phase voltage as an analysis result in the case of the pattern 2 of the load of a basic analysis. 基本解析の負荷のパターン2の場合の解析結果としての接続負荷の不平衡と線間電圧の不平衡との間の関係を示す図である。It is a figure which shows the relationship between the unbalance of a connection load and the unbalance of a line voltage as an analysis result in the case of the load pattern 2 of a basic analysis. 基本解析の負荷のパターン3の場合の解析結果としての線間電圧を示す図である。It is a figure which shows the line voltage as an analysis result in the case of the pattern 3 of the load of a basic analysis. 基本解析の負荷のパターン3の場合の解析結果としての相電圧を示す図である。It is a figure which shows the phase voltage as an analysis result in the case of the pattern 3 of the load of a basic analysis. 基本解析の負荷のパターン3の場合の解析結果としての接続負荷の不平衡と線間電圧の不平衡との間の関係を示す図である。It is a figure which shows the relationship between the unbalance of a connection load and the unbalance of a line voltage as an analysis result in the case of the load pattern 3 of a basic analysis. 配電線の電圧三相不平衡の解析に用いられた線路インピーダンスのうち垂直配列を示す図である。It is a figure which shows a vertical arrangement | sequence among the line impedances used for the analysis of the voltage three-phase imbalance of a distribution line. 汎用性の確認に関する解析IVの解析結果としての線間電圧を示す図である。It is a figure which shows the line voltage as an analysis result of the analysis IV regarding confirmation of versatility. 汎用性の確認に関する解析IVの解析結果としての相電圧を示す図である。It is a figure which shows the phase voltage as an analysis result of the analysis IV regarding confirmation of versatility. 汎用性の確認に関する解析V及び解析VIに用いられた配電線モデルである。It is the distribution line model used for the analysis V and analysis VI regarding confirmation of versatility. 実施例1の改善策実施前の解析結果としての線間電圧を示す図である。It is a figure which shows the line voltage as an analysis result before implementation of the improvement measure of Example 1. FIG. 実施例1において従来手法に基づいて柱上変圧器の接続相を変更した後の解析結果としての線間電圧を示す図である。It is a figure which shows the line voltage as an analysis result after changing the connection phase of a pole transformer based on the conventional method in Example 1. FIG. 実施例1において本発明に基づいて柱上変圧器の接続相を変更した後の解析結果としての線間電圧を示す図である。In Example 1, it is a figure which shows the line voltage as an analysis result after changing the connection phase of a pole transformer based on this invention. 実施例2の改善策実施前の解析結果としての線間電圧を示す図である。It is a figure which shows the line voltage as an analysis result before implementation of the improvement measure of Example 2. FIG. 実施例2において従来手法に基づいて新たな柱上変圧器が接続された後の解析結果としての線間電圧を示す図である。It is a figure which shows the line voltage as an analysis result after a new pole transformer is connected based on the conventional method in Example 2. FIG. 実施例2において本発明に基づいて新たな柱上変圧器が接続された後の解析結果としての線間電圧を示す図である。In Example 2, it is a figure which shows the line voltage as an analysis result after a new pole transformer is connected based on this invention.

以下、本発明の構成を図面に示す実施の形態の一例に基づいて詳細に説明する。   Hereinafter, the configuration of the present invention will be described in detail based on an example of an embodiment shown in the drawings.

図1から図3に、本発明の接続相の決定方法、決定装置、及び決定プログラムの実施形態の一例を示す。   1 to 3 show an example of embodiments of a connection phase determination method, a determination device, and a determination program according to the present invention.

本実施形態の接続相の決定方法は、配電線において計測された三相の各線間電圧が用いられて計測時刻別の線間毎の電圧不平衡率が算出され(S1,S2)、当該電圧不平衡率が最大になっている計測時刻における三相の各線間電圧が用いられて線間毎の電圧の高低特性の組み合わせが作成され(S3,S4)、電圧不平衡率が最大になっている計測時刻と線間毎の電圧の高低特性の組み合わせとに基づいて柱上変圧器の接続相が決定される(S5)ようにしている(図1参照)。   The connection phase determination method of the present embodiment uses the three-phase line voltages measured in the distribution line to calculate the voltage unbalance rate for each line for each measurement time (S1, S2). The three-phase line voltage at the measurement time at which the unbalance rate is maximized is used to create a combination of high and low voltage characteristics for each line (S3, S4), and the voltage unbalance rate is maximized. The connection phase of the pole transformer is determined based on the measurement time and the combination of the high and low voltage characteristics of each line (S5) (see FIG. 1).

上記接続相の決定方法は、接続相の決定装置によって実施され得る。本実施形態の接続相の決定装置10は、配電線において計測された三相の各線間電圧の計測値の入力を受ける手段としてのデータ受部11aと、三相の各線間電圧を用いて計測時刻別の線間毎の電圧不平衡率を算出する手段としての不平衡率算出部11bと、電圧不平衡率が最大になっている計測時刻を特定する手段としての時刻特定部11cと、電圧不平衡率が最大になっている計測時刻における三相の各線間電圧を用いて線間毎の電圧の高低特性の組み合わせを作成する手段としての電圧高低判定部11dと、電圧不平衡率が最大になっている計測時刻と線間毎の電圧の高低特性の組み合わせとに基づいて柱上変圧器の接続相を決定する手段としての接続相決定部11eとを有する。   The connection phase determination method may be implemented by a connection phase determination device. The connection phase determination device 10 of the present embodiment is measured using a data receiving unit 11a as a means for receiving an input of a measured value of each three-phase line voltage measured in the distribution line, and each three-phase line voltage. An unbalance rate calculation unit 11b as a means for calculating a voltage unbalance rate for each line by time, a time specification unit 11c as a means for specifying a measurement time at which the voltage unbalance rate is maximum, a voltage A voltage level judgment unit 11d as means for creating a combination of voltage level characteristics for each line using the three-phase line voltage at the measurement time at which the unbalance rate is maximized, and the voltage unbalance rate is maximum And a connection phase determination unit 11e as means for determining the connection phase of the pole transformer based on the measurement time and the combination of the high and low voltage characteristics for each line.

また、上記接続相の決定方法及び接続相の決定装置は、接続相の決定プログラムがコンピュータ上で実行されることによっても実施・実現され得る。ここでは、接続相の決定プログラムがコンピュータ上で実行されることによって接続相の決定装置が実現されると共に接続相の決定方法が実施される場合を説明する。   Further, the connection phase determination method and the connection phase determination device can be implemented and realized by executing a connection phase determination program on a computer. Here, a case will be described in which a connection phase determination apparatus is implemented and a connection phase determination method is implemented by executing a connection phase determination program on a computer.

本実施形態の接続相の決定プログラム17を実行するためのコンピュータ10(本実施形態では、接続相の決定装置10でもある)の全体構成を図2に示す。このコンピュータ10(接続相の決定装置10)は制御部11,記憶部12,入力部13,表示部14,及びメモリ15を備え、これらが相互にバス等の信号回線によって接続されている。   FIG. 2 shows an overall configuration of a computer 10 (which is also a connection phase determination device 10 in the present embodiment) for executing the connection phase determination program 17 of the present embodiment. The computer 10 (connection phase determination device 10) includes a control unit 11, a storage unit 12, an input unit 13, a display unit 14, and a memory 15, which are connected to each other by a signal line such as a bus.

制御部11は、記憶部12に記憶されている接続相の決定プログラム17によってコンピュータ10全体の制御並びに柱上変圧器の接続相の決定に係る演算を行うものであり、例えばCPU(中央演算処理装置)である。   The control unit 11 performs calculation related to the control of the entire computer 10 and the determination of the connection phase of the pole transformer by the connection phase determination program 17 stored in the storage unit 12. Device).

記憶部12は、少なくともデータやプログラムを記憶可能な装置であり、例えばハードディスクである。   The storage unit 12 is a device that can store at least data and programs, and is, for example, a hard disk.

入力部13は、少なくとも作業者の命令や種々の情報を制御部11に与えるためのインターフェイス(即ち、情報入力の仕組み)であり、例えばキーボードやマウスである。なお、例えばキーボードとマウスとの両方のように複数種類のインターフェイスを入力部13として有するようにしても良い。   The input unit 13 is an interface (that is, an information input mechanism) for giving at least an operator's command and various information to the control unit 11, and is, for example, a keyboard or a mouse. For example, a plurality of types of interfaces such as a keyboard and a mouse may be provided as the input unit 13.

表示部14は、制御部11の制御によって文字や図形或いは画像等の描画・表示を行うものであり、例えばディスプレイである。   The display unit 14 performs drawing / display of characters, figures, images, and the like under the control of the control unit 11 and is, for example, a display.

メモリ15は、制御部11が種々の制御や演算を実行する際の作業領域であるメモリ空間となるものであり、例えばRAM(Random Access Memory の略)である。   The memory 15 serves as a memory space that is a work area when the control unit 11 executes various controls and operations, and is, for example, a RAM (abbreviation of Random Access Memory).

そして、コンピュータ10(以下、接続相の決定装置10と表記する)の制御部11には、接続相の決定プログラム17が実行されることにより、配電線において計測された三相の各線間電圧の計測値の入力を受ける処理を行うデータ受部11aと、三相の各線間電圧を用いて計測時刻別の線間毎の電圧不平衡率を算出する処理を行う不平衡率算出部11bと、電圧不平衡率が最大になっている計測時刻を特定する処理を行う時刻特定部11cと、電圧不平衡率が最大になっている計測時刻における三相の各線間電圧を用いて線間毎の電圧の高低特性の組み合わせを作成する処理を行う電圧高低判定部11dと、電圧不平衡率が最大になっている計測時刻と線間毎の電圧の高低特性の組み合わせとに基づいて柱上変圧器の接続相を決定する処理を行う接続相決定部11eとが構成される。   Then, the control unit 11 of the computer 10 (hereinafter referred to as the connection phase determination device 10) executes the connection phase determination program 17 so that the three-phase line voltages measured in the distribution lines are measured. A data receiving unit 11a that performs a process of receiving measurement values; an unbalance rate calculating unit 11b that performs a process of calculating a voltage unbalance rate for each line for each measurement time using the three-phase line voltages; A time specifying unit 11c that performs processing for specifying a measurement time at which the voltage unbalance rate is maximum, and three-phase line voltages at the measurement time at which the voltage unbalance rate is maximum are used for each line. A pole-top transformer based on a voltage level judgment unit 11d that performs processing for creating a combination of voltage level characteristics, a measurement time at which the voltage unbalance rate is maximized, and a combination of voltage level characteristics for each line. To determine the connection phase of And connecting phase determination unit 11e for performing is formed.

そして、接続相の決定方法の実行として、まず、配電線の三相の各線間電圧の計測が行われて計測データの取得が行われる(S1)。   And as execution of the determination method of a connection phase, first, measurement of each line voltage of the three phases of a distribution line is performed, and measurement data are acquired (S1).

配電線の三相(ここでは、A相,B相,及びC相)の各線間(ここでは、AB相,BC相,及びCA相)電圧の計測の仕方は、配電線の三相の各線間電圧を少なくとも計測可能であれば特定の方法や機器によるものに限定されるものではなく、配電線の三相の各線間電圧の計測が可能な方法や機器が適宜選択され得る。具体的には例えば、既設の若しくは新設の三相計測機能付開閉器が利用され得る。   How to measure the voltage (here AB phase, BC phase, and CA phase) between the three phases of the distribution line (here, A phase, B phase, and C phase) As long as the voltage between the lines can be measured, the method is not limited to a specific method or device, and a method or device that can measure the voltage between the three phases of the distribution line can be appropriately selected. Specifically, for example, an existing or new switch with a three-phase measurement function can be used.

配電線の三相の各線間電圧の計測の間隔は、特定の時間〔秒,分〕に限定されるものではなく、例えば配電線の線間電圧に関して想定される変動ピッチや必要とされる精度などが考慮されて適当な値に適宜設定され得る。具体的には例えば、15分から60分程度の範囲で適当な値に設定されることが考えられる。   The measurement interval of each line voltage of the three phases of the distribution line is not limited to a specific time [second, minute]. For example, the fluctuation pitch assumed for the line voltage of the distribution line and the required accuracy Can be appropriately set to an appropriate value. Specifically, for example, it may be set to an appropriate value in a range of about 15 minutes to 60 minutes.

なお、配電線の三相の各線間電圧に関する少なくとも一日分の計測データがあれば本発明に係る以下の処理が行われ得る。ただし、日中において太陽光発電設備が大凡性能程度の発電出力をし得るように少なくとも日中の天候が良好な日の計測データであることが望ましい。   Note that the following processing according to the present invention can be performed if there is at least one day of measurement data regarding the three-phase line voltages of the distribution line. However, it is desirable that the measurement data be measured data on a day when the weather is good at least during the day so that the solar power generation facility can generate a power output of about the performance of the daytime.

また、配電線の三相の各線間電圧は、系統によって電圧不平衡率が最大となる時刻は異なるため、24時間に亙る計測データであることが望ましい。   Also, the three-phase line voltage of the distribution line is preferably measured data for 24 hours because the time at which the voltage imbalance rate becomes maximum differs depending on the system.

計測によって得られた配電線の三相の各線間電圧の計測値は、データ受部11aを介して接続相の決定装置10に入力される。   The measured value of the three-phase line voltage of the distribution line obtained by the measurement is input to the connection phase determining device 10 via the data receiving unit 11a.

計測データ(具体的には、配電線の三相の各線間電圧の計測値,当該計測値に対応する計測時刻)は、接続相の決定装置10に、記録媒体やデータサーバを介して入力されるようにしても良いし、接続相の決定装置10と計測機器とがデータや制御指令等の信号の送受信(即ち、出入力)が可能であるように電気的に接続されて入力されるようにしても良い。   The measurement data (specifically, the measured value of each line voltage of the three phases of the distribution line and the measurement time corresponding to the measured value) are input to the connection phase determination device 10 via a recording medium or a data server. Alternatively, the connection phase determination device 10 and the measurement device may be electrically connected and input so that signals such as data and control commands can be transmitted and received (that is, input / output). Anyway.

記録媒体を介して計測データが入力される場合には、配電線の三相の各線間電圧に関する計測データが記録媒体に記録され、当該記録媒体が接続相の決定装置10の記録媒体接続用端子(図示していない)に差し込まれることによって計測データが入力されるようにしても良い。   When the measurement data is input via the recording medium, the measurement data relating to the three-phase line voltage of the distribution line is recorded on the recording medium, and the recording medium is connected to the recording medium connection terminal of the connection phase determination device 10. Measurement data may be input by being inserted into (not shown).

また、データサーバを介して計測データが入力される場合には、データサーバがバス等の信号回線によって接続相の決定装置10に接続され、当該データサーバに配電線の三相の各線間電圧に関する計測データがデータファイル等として格納(保存)され、当該データファイル等として保存された計測データが読み込まれるようにしても良い。   When measurement data is input via a data server, the data server is connected to the connection phase determination device 10 via a signal line such as a bus, and the data server relates to the three-phase line voltages of the distribution lines. The measurement data may be stored (saved) as a data file or the like, and the measurement data saved as the data file or the like may be read.

また、接続相の決定装置10と計測機器とが電気的に接続されて計測データが入力される場合には、例えば、各々に接続されて敷設されたケーブル等が用いられる有線による信号送受の仕組みを介して信号の送受信が可能であるように電気的に接続されるようにしても良いし、各々に接続された無線信号送受信機が用いられる無線による信号送受の仕組みを介して信号の送受信が可能であるように電気的に接続されるようにしても良い。そして、これら信号送受の仕組みによって計測データが入力されるようにしても良い。   In addition, when the connection phase determination device 10 and the measurement device are electrically connected and measurement data is input, for example, a wired signal transmission / reception mechanism in which cables connected to each other are used. May be electrically connected so that signals can be transmitted / received via a wireless signal, and signals can be transmitted / received via a wireless signal transmission / reception mechanism using a wireless signal transceiver connected to each. It may be electrically connected as possible. Then, measurement data may be input by such a signal transmission / reception mechanism.

さらに、記録媒体やデータサーバや有線・無線による信号送受の仕組みが組み合わされて用いられて計測データが接続相の決定装置10に入力されるようにしても良い。   Furthermore, the measurement data may be input to the connection phase determination device 10 by using a combination of a recording medium, a data server, and a wired / wireless signal transmission / reception mechanism.

そして、データ受部11aにより、入力された計測データとしての配電線の三相の各線間電圧の計測値及び当該計測値に対応する(言い換えると、計測値毎の)計測時刻がメモリ15に記憶させられる。   Then, the data receiving unit 11a stores in the memory 15 the measurement values of the three-phase line voltages of the distribution lines as the input measurement data and the measurement times corresponding to the measurement values (in other words, for each measurement value). Be made.

次に、制御部11の不平衡率算出部11bにより、S1の処理によって計測されて取得された計測データが用いられて計測時刻別の線間毎の電圧不平衡率の算出が行われる(S2)。   Next, the unbalance rate calculation unit 11b of the control unit 11 calculates the voltage unbalance rate for each line by measurement time using the measurement data measured and acquired by the process of S1 (S2). ).

具体的には、不平衡率算出部11bにより、S1の処理においてメモリ15に記憶された計測データ(即ち、配電線の三相の各線間電圧の計測値,計測時刻)が読み込まれ、計測時刻別に線間毎に逆相電圧〔V〕を正相電圧〔V〕で除すことによって電圧不平衡率〔%〕が算出される。   Specifically, the measurement data stored in the memory 15 in the process of S1 (that is, the measurement values and measurement times of the three-phase line voltages of the distribution lines) are read by the unbalance rate calculation unit 11b, and the measurement time Separately, the voltage imbalance ratio [%] is calculated by dividing the negative phase voltage [V] by the positive phase voltage [V] for each line.

そして、不平衡率算出部11bにより、算出された電圧不平衡率の値が、計測時刻及び線間種類と関連づけられて(言い換えると、計測時刻及び線間種類と共に)メモリ15に記憶させられる。   Then, the value of the voltage unbalance rate calculated by the unbalance rate calculation unit 11b is stored in the memory 15 in association with the measurement time and the line type (in other words, together with the measurement time and the line type).

次に、制御部11の時刻特定部11cにより、S2の処理によって算出された計測時刻別の線間毎の電圧不平衡率に基づいて電圧不平衡率が最大になっている計測時刻の特定が行われる(S3)。   Next, the time specifying unit 11c of the control unit 11 specifies the measurement time at which the voltage unbalance rate is maximum based on the voltage unbalance rate for each line for each measurement time calculated by the process of S2. Performed (S3).

具体的には、時刻特定部11cにより、S2の処理においてメモリ15に記憶された計測時刻と当該計測時刻における線間毎の電圧不平衡率の値が読み込まれ、電圧不平衡率が最大になっている計測時刻が特定される。   Specifically, the time specifying unit 11c reads the measurement time stored in the memory 15 in the process of S2 and the value of the voltage unbalance rate for each line at the measurement time, and the voltage unbalance rate is maximized. Measurement time is identified.

ここでは、或る計測時刻の或る線間種類の電圧不平衡率が、他の計測時刻の他の線間種類の電圧不平衡率と比べて最大になっているとき、前記或る計測時刻の他の線間種類の電圧不平衡率の大きさに拘わらず、前記或る計測時刻が電圧不平衡率が最大になっている計測時刻(以下「不平衡最大時刻」という)であるとされる。   Here, when the voltage unbalance rate of a certain line type at a certain measurement time is maximum compared with the voltage unbalance rate of another line type at another measurement time, the certain measurement time Regardless of the voltage unbalance rate of other line types, the certain measurement time is the measurement time at which the voltage unbalance rate is maximum (hereinafter referred to as “unbalance maximum time”). The

そして、時刻特定部11cにより、特定された不平衡最大時刻がメモリ15に記憶させられる。   Then, the specified unbalanced maximum time is stored in the memory 15 by the time specifying unit 11c.

次に、制御部11の電圧高低判定部11dにより、S3の処理によって特定された不平衡最大時刻と当該不平衡最大時刻における計測データに基づいて各線間電圧の高低特性の判定が行われる(S4)。   Next, the voltage level determination unit 11d of the control unit 11 determines the level characteristics of each line voltage based on the unbalance maximum time specified by the process of S3 and the measurement data at the maximum unbalance time (S4). ).

具体的には、電圧高低判定部11dにより、S3の処理においてメモリ15に記憶された不平衡最大時刻が読み込まれ、さらに、S1の処理においてメモリ15に記憶された計測データのうち不平衡最大時刻における配電線の三相の各線間電圧の計測値が読み込まれる。   Specifically, the voltage high / low determination unit 11d reads the unbalanced maximum time stored in the memory 15 in the process of S3, and further, the unbalanced maximum time of the measurement data stored in the memory 15 in the process of S1. The measured value of each line voltage of the three phases of the distribution line is read.

そして、電圧高低判定部11dにより、不平衡最大時刻における各線間電圧の相互比較による線間毎の電圧の高低が判定される。   Then, the voltage level determination unit 11d determines the level of the voltage for each line by mutual comparison of the line voltages at the unbalanced maximum time.

三相の各線間の電圧の相互比較による(言い換えると、相互の相対的な関係における)高低特性は、相対的な関係における高低の水準を表す「低い」,「中間」,及び「高い」の指標が用いられて以下の組み合わせのうちのいずれかに当てはめられる。
1) 低い:一つ,中間:一つ,高い:一つ
2) 低い:一つ,高い:二つ
3) 低い:二つ,高い:一つ
The high and low characteristics (in other words, relative to each other) of the voltages between the three-phase lines are expressed as “low”, “medium”, and “high” representing the level of high and low in the relative relationship. Indicators are used to fit into one of the following combinations:
1) Low: One, Middle: One, High: One 2) Low: One, High: Two 3) Low: Two, High: One

ここで、各線間電圧の相互比較による「中間」と「低い」や「高い」とを区別したり、「低い」と「高い」とを区別したりするための電圧の差違の閾値は、特定の値に限定されるものではなく、配電線に連系している負荷や太陽光発電の定格容量などが考慮されたうえで適宜設定される。   Here, the threshold of the voltage difference for distinguishing between “intermediate” and “low” or “high” by inter-comparison of each line voltage, or to distinguish between “low” and “high” is specified. It is not limited to this value, and is set as appropriate in consideration of the load connected to the distribution line, the rated capacity of solar power generation, and the like.

なお、電圧の差違の閾値は、電圧相互の差の絶対値として設定されるようにしても良いし、電圧相互の差の絶対値の相対割合として設定されるようにしても良い。   The threshold value for the voltage difference may be set as an absolute value of the difference between the voltages, or may be set as a relative ratio of the absolute value of the difference between the voltages.

S2の処理の結果としては、具体的には例えば、配電線のA相,B相,及びC相の三相のAB相,BC相,及びCA相の各線間の電圧の組み合わせを[AB相,BC相,CA相]と表すとすると、各線間電圧の組み合わせとして[低い,高い,中間]や[高い,低い,高い]や[低い,低い,高い]などの組み合わせが作成される。   As a result of the process of S2, specifically, for example, a combination of voltages between the three phases AB, BC, and CA of the A phase, B phase, and C phase of the distribution line is set to [AB phase. , BC phase, CA phase], combinations such as [low, high, middle], [high, low, high] and [low, low, high] are created as combinations of line voltages.

そして、電圧高低判定部11dにより、作成された線間毎の電圧の高低特性の組み合わせがメモリ15に記憶させられる。   Then, the voltage high / low determination unit 11d stores in the memory 15 a combination of the generated voltage high / low characteristics for each line.

次に、制御部11の接続相決定部11eにより、S3の処理によって特定された不平衡最大時刻とS4の処理によって判定されて作成された線間毎の電圧の高低特性の組み合わせとに基づいて柱上変圧器の接続相の決定が行われる(S5)。   Next, the connection phase determination unit 11e of the control unit 11 based on the combination of the maximum unbalance time specified by the process of S3 and the voltage high / low characteristic of each line created by the process of S4. The connection phase of the pole transformer is determined (S5).

具体的には、接続相決定部11eにより、S4の処理においてメモリ15に記憶された不平衡最大時刻と線間毎の電圧の高低特性の組み合わせとが読み込まれる。   Specifically, the connection phase determination unit 11e reads the maximum unbalance time stored in the memory 15 in the process of S4 and the combination of high and low voltage characteristics for each line.

そして、本発明では、接続負荷の不平衡と線間電圧の不平衡とに係る、発明者独自の新たな知見に基づいて導出された図3に示す接続相決定チャートが用いられて柱上変圧器(具体的には、単相変圧器や灯動共用変圧器のように三相配電線における三相のうちのいずれか二相に接続される変圧器)の接続相が決定される。   And in this invention, the connection phase determination chart shown in FIG. 3 derived | led-out based on the inventor's new new knowledge regarding the unbalance of a connection load and the unbalance of a line voltage is used. The connection phase of the transformer (specifically, a transformer connected to any two of the three phases of the three-phase distribution line such as a single-phase transformer or a lighting common transformer) is determined.

図3に示す接続相決定チャートは、電圧三相不平衡が発生する時間帯に基本的には対応する「時間帯」による区分を有し、具体的には「深夜」と「日中」とに区分されている。   The connection phase determination chart shown in FIG. 3 has a division by “time zone” basically corresponding to a time zone in which voltage three-phase imbalance occurs, specifically “midnight” and “daytime”. It is divided into.

そして、この接続相決定チャートの基本的な考え方は、「接続負荷の影響による電圧三相不平衡」は「深夜」区分に列挙されている線間電圧の高低特性の組み合わせ(図3では、「線間電圧(計測データ)/ AB相|BC相|CA相」と表示している)に対応する改善策を実施し、一方、「太陽光発電の影響による電圧三相不平衡」は「日中」区分に列挙されている線間電圧の高低特性の組み合わせに対応する改善策を実施するというものである。   The basic concept of this connection phase determination chart is that “voltage three-phase unbalance due to the influence of connection load” is a combination of the high and low characteristics of the line voltage listed in the “midnight” category (in FIG. (Measured data) / AB phase | BC phase | CA phase "), while" voltage three-phase imbalance due to solar power generation " The improvement measures corresponding to the combination of the high and low characteristics of the line voltage listed in the “medium” category are implemented.

なお、「日中」と「深夜」とを区分する時刻、言い換えると、「日中」時間帯と「深夜」時間帯とを特定する時刻は、特定の時刻に限定されるものではなく、太陽光発電によって電力が出力され得る時間帯を基本として、具体的には例えば日の出時刻や日の入り時刻などが考慮されて、適当な時刻に適宜設定され得る。   It should be noted that the time for distinguishing between “daytime” and “midnight”, in other words, the time for specifying “daytime” time zone and “midnight” time zone is not limited to a specific time, Based on the time zone in which power can be output by photovoltaic power generation, specifically, for example, the sunrise time or sunset time can be taken into consideration, and the time can be set appropriately.

図3に示す接続相決定チャートは、また、現状の電圧三相不平衡を改善する場合の対策と将来の電圧三相不平衡を抑制する場合の対策とに区分されている。現状の電圧三相不平衡を改善する場合は具体的には既に設置されている柱上変圧器の接続相を変更する場合に対応するものであり、将来の電圧三相不平衡を抑制する場合は具体的には新たに設置する柱上変圧器の接続相を選定する場合に対応するものである。   The connection phase determination chart shown in FIG. 3 is also divided into measures for improving the current voltage three-phase unbalance and measures for suppressing the future voltage three-phase unbalance. To improve the current voltage three-phase unbalance, specifically, it corresponds to the case of changing the connection phase of the pole transformer that has already been installed. Specifically, this corresponds to the case where the connection phase of the pole transformer to be newly installed is selected.

図3に示す接続相決定チャートは、具体的には以下の手順によって用いられる。
1)まず、不平衡最大時刻が日中であるのか深夜であるのかが判定される。
2)そして、不平衡最大時刻が「日中」である場合には図3のうちの「時間帯」が「日中」区分が原則として参照され、不平衡最大時刻が「深夜」である場合には図3のうちの「時間帯」が「深夜」区分が参照される。
3)ただし、不平衡最大時刻が日中でありながらも、当該不平衡最大時刻において線間電圧の上昇が起こっていないときは、図3のうちの「時間帯」が「深夜」区分が参照される。
4)また、不平衡最大時刻が日中でありながらも、太陽光発電設備が連系されていない柱上変圧器が新たに設置されるときは、図3のうちの「時間帯」が「深夜」区分が参照される。
Specifically, the connection phase determination chart shown in FIG. 3 is used by the following procedure.
1) First, it is determined whether the unbalanced maximum time is daytime or midnight.
2) When the maximum unbalance time is “daytime”, the “time zone” in FIG. 3 is referred to in principle as “daytime”, and the maximum unbalance time is “midnight”. In FIG. 3, the “time zone” section of “midnight” is referred to.
3) However, if the maximum unbalanced time is during the day, but the line voltage does not rise at the maximum unbalanced time, refer to the “midnight” section for “time zone” in FIG. Is done.
4) In addition, when a pole transformer without a connected solar power generation facility is newly installed even though the unbalanced maximum time is during the day, the “time zone” in FIG. Reference is made to the “Midnight” category.

図3に示す接続相決定チャートは、〈I〉現状の電圧三相不平衡を改善する場合と〈II〉将来の電圧三相不平衡を抑制する場合とのそれぞれで具体的には例えば以下のように用いられる。   Specifically, the connection phase determination chart shown in FIG. 3 includes <I> a case where current three-phase unbalance is improved and <II> a case where future voltage three-phase unbalance is suppressed. Used as follows.

〈I〉現状の電圧三相不平衡を改善する場合 <I> To improve the current voltage three-phase imbalance

メモリ15から読み込まれた不平衡最大時刻が午前4時であって例えば日の入り後且つ日の出前であることが考慮されて「時間帯」が「深夜」であると判定された場合の例を説明する。   An example will be described in which it is determined that the “time zone” is “late night” in consideration of the fact that the maximum unbalance time read from the memory 15 is 4 am, for example, after sunset and before sunrise. .

まず、メモリ15から読み込まれた線間電圧の高低特性の組み合わせが[AB相,BC相,CA相]=[中間,高い,低い]である場合には、「S1の処理において三相の各線間電圧の計測が行われた配電線に設置されている柱上変圧器」若しくは「S1の処理において三相の各線間電圧の計測が行われた配電線に接続している配電線に設置されている柱上変圧器」についてCA相への接続をAB相への接続に変更する(図3のうち「時間帯」が「深夜」区分の7段目を参照)。   First, when the combination of the high and low characteristics of the line voltage read from the memory 15 is [AB phase, BC phase, CA phase] = [intermediate, high, low], “the three-phase lines in the processing of S1”. Installed on the distribution line connected to the distribution line where the three-phase line voltage was measured in the process of S1 " The connection to the CA phase is changed to the connection to the AB phase for the “pole transformer” (refer to the seventh stage of the “midnight” section in FIG. 3).

なお、「深夜」時間帯において線間電圧の高低特性の組み合わせが[AB相,BC相,CA相]=[中間,高い,低い]である場合は、負荷の状況が[AB相,BC相,CA相]=[軽い,中間,重い]であると想定される(図3のうち「時間帯」が「深夜」区分の7段目を参照)。   When the combination of the high and low characteristics of the line voltage in the “midnight” time zone is [AB phase, BC phase, CA phase] = [intermediate, high, low], the load status is [AB phase, BC phase] , CA phase] = [light, intermediate, heavy] (refer to the 7th stage of “midnight” in FIG. 3).

このため、現状の電圧三相不平衡を改善するために負荷が最も重い相から最も軽い相へと負荷をシフトさせるように柱上変圧器の接続相を変更するようにし、上記の場合では具体的にCA相への接続をAB相への接続に変更する。   For this reason, in order to improve the current voltage three-phase imbalance, the connection phase of the pole transformer is changed so that the load is shifted from the heaviest phase to the lightest phase. Therefore, the connection to the CA phase is changed to the connection to the AB phase.

また、メモリ15から読み込まれた線間電圧の高低特性の組み合わせが[AB相,BC相,CA相]=[高い,高い,低い]である場合には、「S1の処理において三相の各線間電圧の計測が行われた配電線に設置されている柱上変圧器」若しくは「S1の処理において三相の各線間電圧の計測が行われた配電線に接続している配電線に設置されている柱上変圧器」についてBC相への接続若しくはCA相への接続をAB相への接続に変更する(図3のうち「時間帯」が「深夜」区分の4段目を参照)。   Further, when the combination of the high and low characteristics of the line voltage read from the memory 15 is [AB phase, BC phase, CA phase] = [high, high, low], “three-phase lines in the processing of S1”. Installed on the distribution line connected to the distribution line where the three-phase line voltage was measured in the process of S1 " The connection to the BC phase or the connection to the CA phase is changed to the connection to the AB phase for the “post-pole transformer” (refer to the fourth stage of the “midnight” section in FIG. 3).

なお、「深夜」時間帯において線間電圧の高低特性の組み合わせが[AB相,BC相,CA相]=[高い,高い,低い]である場合は、負荷の状況が[AB相,BC相,CA相]=[軽い,重い,重い]であると想定される(図3のうち「時間帯」が「深夜」区分の4段目を参照)。   When the combination of the high and low characteristics of the line voltage is [AB phase, BC phase, CA phase] = [high, high, low] in the “midnight” time zone, the load status is [AB phase, BC phase] , CA phase] = [light, heavy, heavy] (refer to the fourth stage of “midnight” in FIG. 3).

このため、現状の電圧三相不平衡を改善するために負荷が重い相から最も軽い相へと負荷をシフトさせるように柱上変圧器の接続相を変更するようにし、上記の場合では具体的にBC相への接続とCA相への接続とのうちのどちらかをAB相への接続に変更する。   For this reason, in order to improve the current voltage three-phase imbalance, the connection phase of the pole transformer is changed to shift the load from the heavy load phase to the lightest phase. One of the connection to the BC phase and the connection to the CA phase is changed to the connection to the AB phase.

次に、メモリ15から読み込まれた不平衡最大時刻が午後1時であって例えば日の出後且つ日の入り前であることが考慮されて「時間帯」が「日中」であると判定された場合の例を説明する。   Next, in the case where it is determined that the “time zone” is “daytime” in consideration of the fact that the maximum unbalance time read from the memory 15 is 1:00 pm, for example, after sunrise and before sunset An example will be described.

この場合には、S1の処理においてメモリ15に記憶された計測データのうち不平衡最大時刻(ここでの例では具体的には午後1時)における配電線の三相の各線間電圧の計測値が読み込まれる。   In this case, among the measurement data stored in the memory 15 in the process of S1, the measured value of each line voltage of the three phases of the distribution line at the maximum unbalance time (specifically, 1 pm in this example). Is read.

そして、各線間電圧のうちの少なくとも一つが正相電圧を大きく上回っているとき(以下「電圧上昇ありのとき」という)は接続相決定チャートの「日中」区分を参照し、一方で、いずれの線間電圧も正相電圧を大きく上回っていないとき(以下「電圧上昇なしのとき」という)は接続相決定チャートの「深夜」区分を参照する。   When at least one of the line voltages is significantly higher than the positive phase voltage (hereinafter referred to as “when voltage rises”), refer to the “daytime” category in the connection phase determination chart. When the line voltage is not much higher than the positive phase voltage (hereinafter referred to as “when there is no voltage rise”), the “late night” section of the connection phase determination chart is referred to.

なお、線間電圧が正相電圧を大きく上回っているか否かを判断するための正相電圧との電圧の差分の閾値は、特定の値に限定されるものではなく、適当な値に適宜設定される。   Note that the threshold value of the voltage difference from the positive phase voltage for determining whether or not the line voltage greatly exceeds the positive phase voltage is not limited to a specific value, and is appropriately set to an appropriate value. Is done.

そして、電圧上昇ありのときで、メモリ15から読み込まれた線間電圧の高低特性の組み合わせが[AB相,BC相,CA相]=[高い,低い,中間]である場合には、「S1の処理において三相の各線間電圧の計測が行われた配電線に設置されている柱上変圧器」若しくは「S1の処理において三相の各線間電圧の計測が行われた配電線に接続している配電線に設置されている柱上変圧器」についてCA相への接続をBC相への接続に変更する(図3のうち「時間帯」が「日中」区分の9段目を参照)。   When the voltage rise is present and the combination of the high and low characteristics of the line voltage read from the memory 15 is [AB phase, BC phase, CA phase] = [high, low, middle], “S1 Connected to the distribution line where the three-phase line voltage was measured in the process of S1, or the transformer on the pole installed in the distribution line where the three-phase line voltage was measured in the process of The connection to the CA phase is changed to the connection to the BC phase for the pole transformer installed on the distribution line (see the 9th stage of the “daytime” category in FIG. 3) ).

ここで、不平衡最大時刻が日中であり且つ日中において電圧上昇が起こっている場合には、電圧三相不平衡の原因は太陽光発電であると考え、「時間帯」について「日中」区分を参照する。   Here, when the maximum unbalance time is daytime and voltage rises during the daytime, the cause of voltage three-phase unbalance is considered to be solar power generation. Refer to the category.

そして、「日中」時間帯において電圧上昇ありのときで線間電圧の高低特性の組み合わせが[AB相,BC相,CA相]=[高い,低い,中間]である場合は、太陽光発電出力の状況が[AB相,BC相,CA相]=[中間,少ない,多い]であると想定される(図3のうち「時間帯」が「日中」区分の9段目を参照)。ここで、太陽光発電出力が少ない状況には、太陽光発電出力が無い場合も含まれる。   When the voltage rises in the “daytime” time zone and the combination of the high and low characteristics of the line voltage is [AB phase, BC phase, CA phase] = [high, low, middle], solar power generation It is assumed that the output status is [AB phase, BC phase, CA phase] = [intermediate, few, many] (see “9th stage of“ day ”” category in FIG. 3). . Here, the situation where the photovoltaic power output is low includes the case where there is no photovoltaic power output.

このため、現状の電圧三相不平衡を改善するために太陽光発電出力が最も多い相から最も少ない相へと太陽光発電出力を配分するように太陽光発電設備が連系されている柱上変圧器の接続相を変更するようにし、上記の場合では具体的にCA相への接続をBC相への接続に変更する。   For this reason, in order to improve the current voltage three-phase imbalance, the pillars where the photovoltaic power generation facilities are connected to distribute the photovoltaic power output from the phase with the largest photovoltaic power output to the phase with the smallest photovoltaic power output. The connection phase of the transformer is changed. In the above case, the connection to the CA phase is specifically changed to the connection to the BC phase.

一方、電圧上昇なしのときで、メモリ15から読み込まれた線間電圧の高低特性の組み合わせが[AB相,BC相,CA相]=[高い,低い,中間]である場合には、「S1の処理において三相の各線間電圧の計測が行われた配電線に設置されている柱上変圧器」若しくは「S1の処理において三相の各線間電圧の計測が行われた配電線に接続している配電線に設置されている柱上変圧器」についてBC相への接続をCA相への接続に変更する(図3のうち「時間帯」が「深夜」区分の10段目を参照)。   On the other hand, when there is no voltage rise and the combination of the high and low characteristics of the line voltage read from the memory 15 is [AB phase, BC phase, CA phase] = [high, low, middle], “S1 Connected to the distribution line where the three-phase line voltage was measured in the process of S1, or the transformer on the pole installed in the distribution line where the three-phase line voltage was measured in the process of Change the connection to the BC phase to the connection to the CA phase for the pole transformer installed on the distribution line (see the 10th stage of the “midnight” section in FIG. 3) .

ここで、不平衡最大時刻が日中であっても、日中において電圧上昇が起こっていない場合には、電圧三相不平衡の原因は太陽光発電ではなく接続負荷であると考え、「時間帯」について「深夜」区分を参照する。   Here, even if the maximum unbalance time is during the daytime, if there is no voltage rise during the daytime, it is considered that the cause of the voltage three-phase unbalance is not the photovoltaic power generation but the connected load. Refer to the “Midnight” category for “Obi”.

そして、「深夜」区分においては、[AB相,BC相,CA相]=[高い,低い,中間]である場合は、負荷の状況が[AB相,BC相,CA相]=[中間,重い,軽い]であると想定される(図3のうち「時間帯」が「深夜」区分の10段目を参照)。   In the “midnight” section, when [AB phase, BC phase, CA phase] = [high, low, intermediate], the load status is [AB phase, BC phase, CA phase] = [intermediate, Heavy (light) ”(refer to the 10th stage of“ midnight ”in FIG. 3).

このため、現状の電圧三相不平衡を改善するために負荷が最も重い相から最も軽い相へと負荷をシフトさせるように柱上変圧器の接続相を変更するようにし、上記の場合では具体的にBC相への接続をCA相への接続に変更する。   For this reason, in order to improve the current voltage three-phase imbalance, the connection phase of the pole transformer is changed so that the load is shifted from the heaviest phase to the lightest phase. Therefore, the connection to the BC phase is changed to the connection to the CA phase.

〈II〉将来の電圧三相不平衡を抑制する場合 <II> When suppressing future voltage three-phase imbalance

メモリ15から読み込まれた不平衡最大時刻が午前4時であって例えば日の入り後且つ日の出前であることが考慮されて「時間帯」が「深夜」であると判定された場合の例を説明する。   An example will be described in which it is determined that the “time zone” is “late night” in consideration of the fact that the maximum unbalance time read from the memory 15 is 4 am, for example, after sunset and before sunrise. .

まず、メモリ15から読み込まれた線間電圧の高低特性の組み合わせが[AB相,BC相,CA相]=[中間,高い,低い]である場合には、「S1の処理において三相の各線間電圧の計測が行われた配電線に対して新たに設置する柱上変圧器」若しくは「S1の処理において三相の各線間電圧の計測が行われた配電線に接続している配電線に対して新たに設置する柱上変圧器」をAB相へと接続する(図3のうち「時間帯」が「深夜」区分の7段目を参照)。   First, when the combination of the high and low characteristics of the line voltage read from the memory 15 is [AB phase, BC phase, CA phase] = [intermediate, high, low], “the three-phase lines in the processing of S1”. To the distribution line connected to the distribution line for which the three-phase line voltage was measured in the process of S1, or to the newly installed pole transformer for the distribution line for which the voltage measurement was performed On the other hand, the pole transformer to be newly installed is connected to the AB phase (refer to the 7th stage of “midnight” in FIG. 3).

なお、「深夜」時間帯において線間電圧の高低特性の組み合わせが[AB相,BC相,CA相]=[中間,高い,低い]である場合は、負荷の状況が[AB相,BC相,CA相]=[軽い,中間,重い]であると想定される(図3のうち「時間帯」が「深夜」区分の7段目を参照)。   When the combination of the high and low characteristics of the line voltage in the “midnight” time zone is [AB phase, BC phase, CA phase] = [intermediate, high, low], the load status is [AB phase, BC phase] , CA phase] = [light, intermediate, heavy] (refer to the 7th stage of “midnight” in FIG. 3).

このため、将来の電圧三相不平衡を抑制するために現状において負荷が最も軽い相に負荷を分担させるように新設する柱上変圧器の接続相を選定するようにし、上記の場合では具体的にAB相へと接続する。   For this reason, in order to suppress future voltage three-phase imbalance, the connection phase of the newly installed pole transformer is selected so that the load is shared with the lightest phase in the current situation. To the AB phase.

また、メモリ15から読み込まれた線間電圧の高低特性の組み合わせが[AB相,BC相,CA相]=[低い,低い,高い]である場合には、「S1の処理において三相の各線間電圧の計測が行われた配電線に対して新たに設置する柱上変圧器」若しくは「S1の処理において三相の各線間電圧の計測が行われた配電線に接続している配電線に対して新たに設置する柱上変圧器」をBC相若しくはCA相へと接続する(図3のうち「時間帯」が「深夜」区分の2段目を参照)。   When the combination of the high and low characteristics of the line voltage read from the memory 15 is [AB phase, BC phase, CA phase] = [low, low, high], “the three-phase lines in the processing of S1”. To the distribution line connected to the distribution line for which the three-phase line voltage was measured in the process of S1, or to the newly installed pole transformer for the distribution line for which the voltage measurement was performed On the other hand, the newly installed pole transformer is connected to the BC phase or the CA phase (refer to the second stage of “midnight” in FIG. 3).

なお、「深夜」時間帯において線間電圧の高低特性の組み合わせが[AB相,BC相,CA相]=[低い,低い,高い]である場合は、負荷の状況が[AB相,BC相,CA相]=[重い,軽い,軽い]であると想定される(図3のうち「時間帯」が「深夜」区分の2段目を参照)。   When the combination of the high and low characteristics of the line voltage is [AB phase, BC phase, CA phase] = [low, low, high] in the “midnight” time zone, the load status is [AB phase, BC phase] , CA phase] = [heavy, light, light] (refer to the second stage of “midnight” in FIG. 3).

このため、将来の電圧三相不平衡を抑制するために現状において負荷が軽い相に負荷を分担させるように新設する柱上変圧器の接続相を選定するようにし、上記の場合では具体的にBC相若しくはCA相へと接続する。   For this reason, in order to suppress future voltage three-phase imbalance, the connection phase of the pole transformer to be newly installed should be selected so that the load is shared with the currently lighter phase. Connect to BC phase or CA phase.

次に、メモリ15から読み込まれた不平衡最大時刻が午後1時であって例えば日の出後且つ日の入り前であることが考慮されて「時間帯」が「日中」であると判定された場合の例を説明する。   Next, in the case where it is determined that the “time zone” is “daytime” in consideration of the fact that the maximum unbalance time read from the memory 15 is 1:00 pm, for example, after sunrise and before sunset An example will be described.

この場合には、太陽光発電設備が連系されている柱上変圧器を新たに設置するとき(以下「発電連系ありのとき」という)は接続相決定チャートの「日中」区分を参照し、一方で、太陽光発電設備が連系されていない柱上変圧器を新たに設置するとき(以下「発電連系なしのとき」という)は接続相決定チャートの「深夜」区分を参照する。   In this case, refer to the “Daytime” section of the connection phase determination chart when installing a pole transformer that is connected to a photovoltaic power generation facility (hereinafter referred to as “when power generation is present”). On the other hand, when installing a pole transformer that is not connected to photovoltaic power generation facilities (hereinafter referred to as “when no power generation is connected”), refer to the “midnight” section of the connection phase determination chart. .

そして、発電連系ありのときで、メモリ15から読み込まれた線間電圧の高低特性の組み合わせが[AB相,BC相,CA相]=[高い,低い,中間]である場合には、「S1の処理において三相の各線間電圧の計測が行われた配電線に対して新たに設置する柱上変圧器」若しくは「S1の処理において三相の各線間電圧の計測が行われた配電線に接続している配電線に対して新たに設置する柱上変圧器」をBC相へと接続する(図3のうち「時間帯」が「日中」区分の9段目を参照)。   Then, when there is power generation interconnection and the combination of the high and low characteristics of the line voltage read from the memory 15 is [AB phase, BC phase, CA phase] = [high, low, middle], “ Newly installed pole transformer for the distribution line in which the three-phase line voltage is measured in the process of S1 or the distribution line in which the three-phase line voltage is measured in the process of S1 The pole-mounted transformer newly installed for the distribution line connected to is connected to the BC phase (refer to the ninth stage of the “daytime” category in FIG. 3).

ここで、不平衡最大時刻が日中であり且つ配電線に新たに設置する柱上変圧器に太陽光発電設備が連系されている場合には、電圧三相不平衡を抑制するために留意すべき要素は太陽光発電であると考え、「時間帯」について「日中」区分を参照する。   Here, when solar power generation equipment is connected to a pole transformer newly installed on the distribution line when the maximum unbalance time is during the day, care should be taken to suppress voltage three-phase unbalance. Considering that solar power generation should be an element, refer to “Daytime” category for “Time zone”.

そして、「日中」時間帯において発電連系ありのときで線間電圧の高低特性の組み合わせが[AB相,BC相,CA相]=[高い,低い,中間]である場合は、太陽光発電出力の状況が[AB相,BC相,CA相]=[中間,少ない,多い]であると想定される(図3のうち「時間帯」が「日中」区分の9段目を参照)。ここで、太陽光発電出力が少ない状況には、太陽光発電出力が無い場合も含まれる。   If the combination of high and low characteristics of the line voltage is [AB phase, BC phase, CA phase] = [high, low, intermediate] when there is power generation interconnection in the “daytime” time zone, It is assumed that the status of power generation output is [AB phase, BC phase, CA phase] = [intermediate, low, high] (see "9th stage" in Fig. 3 where "time zone" is "daytime") ). Here, the situation where the photovoltaic power output is low includes the case where there is no photovoltaic power output.

このため、将来の電圧三相不平衡を抑制するために太陽光発電出力が現状において最も少ない相へと太陽光発電出力を配分するように太陽光発電設備が連系されている新設の柱上変圧器の接続相を選定するようにし、上記の場合では具体的にBC相へと接続する。   For this reason, in order to suppress future voltage three-phase imbalance, a new pillar where photovoltaic power generation facilities are connected to distribute the photovoltaic power generation output to the phase where the photovoltaic power generation output is the smallest in the present situation. The connection phase of the transformer is selected, and in the above case, it is specifically connected to the BC phase.

一方、発電連系なしのときで、メモリ15から読み込まれた線間電圧の高低特性の組み合わせが[AB相,BC相,CA相]=[高い,低い,中間]である場合には、「S1の処理において三相の各線間電圧の計測が行われた配電線に対して新たに設置する柱上変圧器」若しくは「S1の処理において三相の各線間電圧の計測が行われた配電線に接続している配電線に対して新たに設置する柱上変圧器」をCA相へと接続する(図3のうち「時間帯」が「深夜」区分の10段目を参照)。   On the other hand, when there is no power generation interconnection and the combination of the high and low characteristics of the line voltage read from the memory 15 is [AB phase, BC phase, CA phase] = [high, low, intermediate], “ Newly installed pole transformer for the distribution line in which the three-phase line voltage is measured in the process of S1 or the distribution line in which the three-phase line voltage is measured in the process of S1 The pole-mounted transformer newly installed with respect to the distribution line connected to is connected to the CA phase (refer to the 10th stage of “midnight” in FIG. 3).

ここで、不平衡最大時刻が日中であっても、配電線に新たに設置する柱上変圧器に太陽光発電設備が連系されていない場合には、電圧三相不平衡を抑制するために留意すべき要素は太陽光発電ではなく接続負荷であると考え、「時間帯」について「深夜」区分を参照する。   Here, even if the maximum unbalance time is during the daytime, in order to suppress voltage three-phase unbalance when solar power generation equipment is not connected to the pole transformer newly installed on the distribution line We consider that the factor to be noted is connected load, not photovoltaic power generation, and refer to the “midnight” category for “time zone”.

そして、「深夜」区分においては、[AB相,BC相,CA相]=[高い,低い,中間]である場合は、負荷の状況が[AB相,BC相,CA相]=[中間,重い,軽い]であると想定される(図3のうち「時間帯」が「深夜」区分の10段目を参照)。   In the “midnight” section, when [AB phase, BC phase, CA phase] = [high, low, intermediate], the load status is [AB phase, BC phase, CA phase] = [intermediate, Heavy (light) ”(refer to the 10th stage of“ midnight ”in FIG. 3).

このため、将来の電圧三相不平衡を抑制するために現状において負荷が最も軽い相に負荷を分担させるように新設する柱上変圧器の接続相を選定するようにし、上記の場合では具体的にCA相へと接続する。   For this reason, in order to suppress future voltage three-phase imbalance, the connection phase of the newly installed pole transformer is selected so that the load is shared with the lightest phase in the current situation. To the CA phase.

なお、発電連系あり且つ電圧上昇なしのときは、不平衡最大時刻が日中であっても日中において電圧上昇が起こっていない場合には(たとえ、配電線に新たに設置する柱上変圧器に太陽光発電設備が連系されている場合であっても)電圧三相不平衡の原因は太陽光発電ではなく接続負荷であると考えられるために現状の電圧三相不平衡を改善することを重視して「時間帯」について原則として「深夜」区分を参照する。ただし、発電連系あり且つ電圧上昇なしのときで、配電線に新たに設置する柱上変圧器に連系される太陽光発電設備が大規模であって発電出力が大きいことが想定されるときなどは、不平衡最大時刻が日中であり且つ配電線に新たに設置する柱上変圧器に大規模・大出力の太陽光発電設備が連系されている場合には(たとえ、現状では日中において電圧上昇が起こっていない場合であっても)電圧三相不平衡を抑制するために留意すべき要素は太陽光発電であるとも考えられるために将来の電圧三相不平衡を改善することを重視して「時間帯」について「日中」区分を参照するようにしても良い。   When power generation is connected and there is no voltage rise, even if the unbalanced maximum time is during the daytime, if there is no voltage rise during the daytime (for example, the pole transformer newly installed on the distribution line) The current voltage three-phase imbalance is improved because the cause of the voltage three-phase imbalance is not the photovoltaic power generation but the connected load. As a general rule, refer to the “midnight” category for “time zone”. However, when it is assumed that the photovoltaic power generation equipment connected to the pole transformer newly installed in the distribution line is large and the power generation output is large when there is power generation connection and there is no voltage increase When the unbalanced maximum time is during the daytime and a large-scale / high-output photovoltaic power generation facility is connected to the pole transformer newly installed on the distribution line (for example, the current To improve the future voltage three-phase imbalance because the factor to be noted to suppress the voltage three-phase imbalance (even if there is no voltage rise in the middle) is also considered to be solar power generation The “daytime” section may be referred to for the “time zone” with emphasis on the “time zone”.

図3に示す接続相決定チャートの、〈I〉現状の電圧三相不平衡を改善する場合と〈II〉将来の電圧三相不平衡を抑制する場合とのそれぞれにおける用いられ方の例は以上の通りである。   Examples of how to use the connection phase determination chart shown in FIG. 3 in the case of <I> improving the current voltage three-phase unbalance and in the case of <II> suppressing the voltage three-phase unbalance in the future. It is as follows.

そして、図3に示す接続相決定チャートの内容が接続相の決定プログラム17内に規定され、接続相決定部11eにより、不平衡最大時刻と線間電圧の高低特性の組み合わせとの読み込み、並びに、必要な場合における不平衡最大時刻における各線間電圧の計測値の読み込み及び電圧上昇あり/なしの判断が行われると共に、接続相決定チャートに従う柱上変圧器の接続相の変更や選定が行われる。   The contents of the connection phase determination chart shown in FIG. 3 are defined in the connection phase determination program 17, and the connection phase determination unit 11e reads the combination of the maximum unbalance time and the high / low characteristics of the line voltage, and When necessary, reading of the measured value of each line voltage at the unbalanced maximum time and determination of presence / absence of voltage increase are performed, and the connection phase of the pole transformer is changed or selected according to the connection phase determination chart.

なお、現状の電圧三相不平衡を改善する場合と将来の電圧三相不平衡を抑制する場合とに関しては、作業者によって入力部13を介して予め指定がされて当該指定された場合に対応する対策のみが決定されるようにしても良いし、両方の場合のそれぞれに対応する対策が決定されるようにしても良い。   In addition, regarding the case of improving the current voltage three-phase imbalance and the case of suppressing the voltage three-phase imbalance in the future, it corresponds to the case where the operator has designated in advance via the input unit 13 and the designation is made. Only countermeasures to be performed may be determined, or countermeasures corresponding to both cases may be determined.

言い換えると、本発明は、現状の電圧三相不平衡を改善する場合の対策と将来の電圧三相不平衡を抑制する場合の対策とのうちの少なくとも一つを決定するようにしても良い。すなわち、柱上変圧器の新設を前提とせずに既設の柱上変圧器の接続相の変更のみを検討する場合は現状の電圧三相不平衡を改善する場合の対策のみを決定し、新設する柱上変圧器の接続相の選定のみを検討する場合には将来の電圧三相不平衡を抑制する場合の対策のみを決定し、また、既設の柱上変圧器の接続相の変更と新設する柱上変圧器の接続相の選定との両面から検討する場合は現状の電圧三相不平衡を改善する場合の対策と将来の電圧三相不平衡を抑制する場合の対策との両方を決定するようにする。   In other words, the present invention may determine at least one of a countermeasure for improving the current voltage three-phase imbalance and a countermeasure for suppressing the future voltage three-phase imbalance. In other words, when considering only changing the connection phase of an existing pole transformer without assuming the installation of a pole transformer, determine only the measures to improve the current voltage three-phase imbalance and establish a new one. When considering only the selection of the connection phase of the pole transformer, decide only the countermeasures to suppress the future voltage three-phase imbalance, and change the connection phase of the existing pole transformer and establish a new one When considering from the viewpoint of selection of the connecting phase of the pole transformer, determine both the measures to improve the current voltage three-phase imbalance and the measures to suppress the voltage three-phase imbalance in the future Like that.

また、太陽光発電設備が連系されている柱上変圧器が新たに設置される場合と、太陽光発電設備が連系されていない柱上変圧器が新たに設置される場合とに関しては、作業者によって入力部13を介して予め指定がされて当該指定された場合に対応する対策のみが決定されるようにしても良いし、両方の場合のそれぞれに対応する対策が決定されるようにしても良い。   In addition, regarding the case where a pole transformer that is connected to solar power generation equipment is newly installed and the case where a pole transformer that is not connected to solar power generation equipment is newly installed, Only the countermeasure corresponding to the case where the operator has designated in advance via the input unit 13 and the designation is made may be determined, or the countermeasure corresponding to each of both cases may be determined. May be.

そして、接続相決定部11eにより、現状の電圧三相不平衡を改善する場合の既設柱上変圧器の接続相の変更内容や、将来の電圧三相不平衡を抑制する場合の新設柱上変圧器の接続相の選定内容が、データファイル等に記録されて記憶部12などに格納(保存)されたり表示部14に表示されたりする。   Then, the connection phase determination unit 11e changes the connection phase of the existing pole transformer when the current voltage three-phase unbalance is improved, or a new pole transformer that suppresses the future voltage three-phase imbalance. The selection contents of the connection phase of the device are recorded in a data file or the like and stored (saved) in the storage unit 12 or displayed on the display unit 14.

そして、制御部11は、或る既設の柱上変圧器若しくは新設する柱上変圧器に関する処理を終了する(END)。   And the control part 11 complete | finishes the process regarding a certain existing pole transformer or the newly installed pole transformer (END).

以上のように構成された接続相の決定方法、決定装置、及び決定プログラムによれば、単に配電線の三相の各線間電圧を計測することによって三相の各線間電圧の不平衡を改善し得る柱上変圧器の接続相を決定することができるので、多大な手間や大掛かりな仕組みが必要とされることなく柱上変圧器の接続相の決定が可能であり、接続相の決定技術としての汎用性の向上を図ることが可能になる。   According to the connection phase determination method, determination apparatus, and determination program configured as described above, the unbalance of the three-phase line voltages can be improved by simply measuring the three-phase line voltages of the distribution lines. Because the connection phase of the pole transformer can be determined, it is possible to determine the connection phase of the pole transformer without requiring a lot of effort and a large-scale mechanism. It is possible to improve the versatility.

以上のように構成された接続相の決定方法、決定装置、及び決定プログラムによれば、また、現状における電圧三相不平衡の是正に適切な対策と将来における電圧三相不平衡の予防に適切な対策とに関する決定を行うことができるので、多様な場面において必要に即した接続相の決定を行うことが可能であり、この点においても接続相の決定技術としての汎用性の向上を図ることが可能になる。   According to the connection phase determination method, determination apparatus, and determination program configured as described above, it is also appropriate to correct current three-phase voltage imbalance and prevent voltage three-phase imbalance in the future. Since it is possible to make decisions regarding appropriate countermeasures, it is possible to determine the connection phase according to need in various situations, and in this respect as well, to improve the versatility as a connection phase determination technique Is possible.

なお、上述の形態は本発明を実施する際の好適な形態の一例ではあるものの本発明の実施の形態が上述のものに限定されるものではなく、本発明の要旨を逸脱しない範囲において本発明は種々変形実施可能である。例えば、上述の実施形態では「接続負荷の影響による電圧三相不平衡」に対応する「深夜」区分と「太陽光発電の影響による電圧三相不平衡」に対応する「日中」区分とを有する接続相決定チャート(図3参照)が用いられるようにしているが、これに限られず、太陽光発電設備が連系されていない柱上変圧器の接続相の変更や太陽光発電設備が連系されていない柱上変圧器を新設する際の接続相の選定を行う場合には「深夜」区分のみの接続相決定チャートが用いられるようにしても良い。   Although the above-described embodiment is an example of a preferred embodiment for carrying out the present invention, the embodiment of the present invention is not limited to the above-described embodiment, and the present invention is not deviated from the gist of the present invention. Various modifications can be made. For example, in the above-described embodiment, the “midnight” category corresponding to “voltage three-phase imbalance due to the influence of connected load” and the “daytime” category corresponding to “voltage three-phase imbalance due to the effect of photovoltaic power generation” are classified. The connection phase determination chart (see FIG. 3) is used, but the present invention is not limited to this, and the connection phase of the pole transformer that is not connected to the photovoltaic power generation facility or the photovoltaic power generation facility is connected. When selecting a connection phase when newly installing a pole transformer that is not connected, a connection phase determination chart for only the “late night” section may be used.

本発明の接続相の決定方法による配電線の電圧三相不平衡の改善効果の検証例を図16,図17A,及び図17Bを用いて説明する。本実施例では、電圧三相不平衡の改善策として柱上変圧器(具体的には、単相変圧器や灯動共用変圧器のように三相配電線における三相のうちのいずれか二相に接続される変圧器)接続相の変更を実施する場合を取り上げて効果を検証する。   The verification example of the improvement effect of the voltage three-phase imbalance of the distribution line by the determination method of the connection phase of this invention is demonstrated using FIG. 16, FIG. 17A and FIG. 17B. In this embodiment, as a measure for improving the voltage three-phase unbalance, a pole transformer (specifically, any two of the three phases in a three-phase distribution line such as a single-phase transformer or a lighting common transformer) Transformer connected to) The effect is verified by taking up the case of changing the connection phase.

本実施例では、[課題を解決するための手段]において整理した〈解析VI〉で用いられた解析ケースが改善策実施前のケースとされた。   In this example, the analysis case used in <Analysis VI> arranged in [Means for Solving the Problems] is the case before implementation of the improvement measure.

そして、改善策として、第32負荷点よりも負荷側(即ち、配電用変電所と反対側である下流側)において柱上変圧器の接続相の変更が実施される場合を考える。   As a measure for improvement, consider a case where the connection phase of the pole transformer is changed on the load side (that is, the downstream side opposite to the distribution substation) from the 32nd load point.

まず、改善策実施前の状態は図16に示す通りである。すなわち、配電線の三相の各線間電圧の計測が行われると、改善策実施前の実態として図16に示す計測データが取得される。   First, the state before the implementation of the improvement measure is as shown in FIG. That is, when the three-phase line voltage of the distribution line is measured, the measurement data shown in FIG. 16 is acquired as the actual state before the improvement measure is implemented.

ここで、電圧三相不平衡の改善策として柱上変圧器の接続相の変更が実施される場合、従来は、線間電圧の絶対値から判断して以下のような対策がとられることが一般的である。   Here, when the connection phase of the pole transformer is changed as a measure for improving the voltage three-phase imbalance, conventionally, the following measures may be taken based on the absolute value of the line voltage. It is common.

深夜時間帯に着目し、線間電圧が最も低いCA相を重負荷相であると判定すると共に線間電圧が最も高いAB相を軽負荷相であると判定し、柱上変圧器の接続相をCA相からAB相へと変更することが適切であると判断する。   Focusing on the midnight time zone, it is determined that the CA phase with the lowest line voltage is a heavy load phase, the AB phase with the highest line voltage is determined to be a light load phase, and the connection phase of the pole transformer Is determined to be appropriate from CA phase to AB phase.

また、日中時間帯に着目し、線間電圧が最も高いCA相を太陽光発電設備連系の多い相であると判定すると共に線間電圧が最も低いAB相を太陽光発電設備連系が少ない相であると判定し、柱上変圧器の接続相をCA相からAB相へと変更することが適切であると判断する。   Also, paying attention to daytime hours, the CA phase with the highest line voltage is determined to be a phase with many photovoltaic power generation interconnections, and the AB phase with the lowest line voltage is the PV power generation interconnection. It is determined that there are few phases, and it is determined that it is appropriate to change the connection phase of the pole transformer from the CA phase to the AB phase.

これに対して本発明の接続相の決定方法によると、深夜時間帯における線間電圧の高低特性の組み合わせが[AB相,BC相,CA相]=[高い,中間,低い]であるので、図3のうち「時間帯」が「深夜」区分の八段目に該当し、柱上変圧器の接続相をBC相からAB相へと変更することが最適であると決定される。   On the other hand, according to the connection phase determination method of the present invention, the combination of the high and low characteristics of the line voltage in the midnight time zone is [AB phase, BC phase, CA phase] = [high, middle, low] In FIG. 3, the “time zone” corresponds to the eighth stage of the “midnight” section, and it is determined that it is optimal to change the connection phase of the pole transformer from the BC phase to the AB phase.

また、日中時間帯における線間電圧の高低特性の組み合わせが[AB相,BC相,CA相]=[低い,中間,高い]であるので、図3のうち「時間帯」が「日中」区分の八段目に該当し、柱上変圧器の接続相をBC相からAB相へと変更することが最適であると決定される。   Further, since the combination of the high and low characteristics of the line voltage in the daytime time zone is [AB phase, BC phase, CA phase] = [low, middle, high], the “time zone” in FIG. It is determined that it is optimal to change the connection phase of the pole transformer from the BC phase to the AB phase.

すなわち、本発明の接続相の決定方法によると、深夜時間帯に着目した場合も日中時間帯に着目した場合も、柱上変圧器の接続相をBC相からAB相へと変更することが最適であると決定される。   That is, according to the connection phase determination method of the present invention, it is possible to change the connection phase of the pole transformer from the BC phase to the AB phase regardless of whether it is focused on the midnight time zone or the daytime time zone. Determined to be optimal.

そして、従来手法に基づいて柱上変圧器の接続相をCA相からAB相へと変更した後の三相の各線間電圧として図17Aに示す結果が得られ、本発明に基づいて柱上変圧器の接続相をBC相からAB相へと変更した後の三相の各線間電圧として図17Bに示す結果が得られた。   The result shown in FIG. 17A is obtained as the three-phase line voltage after changing the connection phase of the pole transformer from the CA phase to the AB phase based on the conventional method. The result shown in FIG. 17B was obtained as the line voltage of each of the three phases after changing the connecting phase of the vessel from the BC phase to the AB phase.

図17Aに示す結果から、従来手法では、電圧不平衡率は若干低減するものの、BC相電圧がAB相電圧から離れてCA相電圧に概ね一致するほどに近付いてしまい、三相の線間電圧を相互に近づけるという不平衡改善効果は得られないことが確認された。   From the results shown in FIG. 17A, in the conventional method, although the voltage imbalance rate is slightly reduced, the BC phase voltage is separated from the AB phase voltage and approaches the CA phase voltage so as to approach the three phase line voltage. It was confirmed that the imbalance improvement effect of bringing the two close to each other cannot be obtained.

これに対して図17Bに示す結果から、本発明によれば、電圧不平衡率が従来手法と比べて大幅に低減すると共に三相の線間電圧が相互に近付くという理想的な不平衡改善効果が得られることが確認された。   On the other hand, from the result shown in FIG. 17B, according to the present invention, the ideal unbalance improvement effect that the voltage unbalance rate is greatly reduced as compared with the conventional method and the three-phase line voltages approach each other. It was confirmed that

以上の結果から、本発明では、柱上変圧器の接続相の変更を実施する場合に電圧不平衡率を低減させ且つ三相の線間電圧を相互に近付けるという理想的な不平衡改善効果が得られるように変更前後の接続相を決定可能であることが確認された。   From the above results, the present invention has an ideal unbalance improvement effect of reducing the voltage unbalance rate and bringing the three-phase line voltages close to each other when changing the connection phase of the pole transformer. It was confirmed that the connection phase before and after the change can be determined so as to be obtained.

本発明の接続相の決定方法による配電線の電圧三相不平衡の改善効果の他の検証例を図18,図19A,及び図19Bを用いて説明する。本実施例では、電圧三相不平衡の改善策として太陽光発電設備が連系された柱上変圧器(具体的には、単相変圧器や灯動共用変圧器のように三相配電線における三相のうちのいずれか二相に接続される変圧器)が新たに接続される場合を取り上げて効果を検証する。   Another verification example of the effect of improving the voltage three-phase imbalance of the distribution line by the connection phase determination method of the present invention will be described with reference to FIGS. 18, 19A, and 19B. In this example, as a measure for improving the voltage three-phase imbalance, a pole transformer in which photovoltaic power generation facilities are connected (specifically, in a three-phase distribution line such as a single-phase transformer or a lighting common transformer) The effect is verified by taking up the case where a transformer connected to any two of the three phases) is newly connected.

本実施例では、[課題を解決するための手段]において整理した〈解析VI〉で用いられた解析ケースが改善策実施前のケースとされた。   In this example, the analysis case used in <Analysis VI> arranged in [Means for Solving the Problems] is the case before implementation of the improvement measure.

そして、第39負荷点に、ヒートポンプ式給湯機などの朝方(深夜)負荷及び太陽光発電が取り付けられたオール電化集合住宅を模擬した負荷が新設される場合を考える。   Then, consider a case where a morning (late night) load such as a heat pump type hot water heater and a load simulating an all-electric apartment house to which photovoltaic power generation is attached are newly installed at the 39th load point.

まず、改善策実施前の状態は図18に示す通りである。すなわち、配電線の三相の各線間電圧の計測が行われると、改善策実施前の実態として図18に示す計測データが取得される。   First, the state before implementation of the improvement measures is as shown in FIG. That is, when the three-phase line voltage of the distribution line is measured, the measurement data shown in FIG. 18 is acquired as the actual state before implementation of the improvement measure.

ここで、太陽光発電設備が連系された柱上変圧器が新たに接続される場合、従来は、線間電圧の絶対値から判断して以下のような対策がとられることが一般的である。   Here, when a pole transformer connected to a photovoltaic power generation facility is newly connected, conventionally, the following measures are generally taken based on the absolute value of the line voltage. is there.

深夜時間帯に着目し、線間電圧が最も高いAB相を軽負荷相であると判定し、新たな柱上変圧器をAB相へと接続することが適切であると判断する。   Focusing on the midnight time zone, it is determined that the AB phase with the highest line voltage is a light load phase, and it is appropriate to connect a new pole transformer to the AB phase.

また、日中時間帯に着目し、線間電圧が最も低いAB相を太陽光発電設備連系が少ない相であると判定し、新たな柱上変圧器をAB相へと接続することが適切であると判断する。   In addition, paying attention to the daytime hours, it is appropriate to determine that the AB phase with the lowest line voltage is a phase with less photovoltaic power generation equipment interconnection, and connect a new pole transformer to the AB phase. It is judged that.

これに対して本発明の接続相の決定方法によると、深夜時間帯における線間電圧の高低特性の組み合わせが[AB相,BC相,CA相]=[高い,低い,中間]であるので、図3のうち「時間帯」が「深夜」区分の十段目に該当し、新たな柱上変圧器をCA相へと接続することが最適であると決定される。   On the other hand, according to the connection phase determination method of the present invention, the combination of the high and low characteristics of the line voltage in the midnight time zone is [AB phase, BC phase, CA phase] = [high, low, middle] In FIG. 3, “time zone” corresponds to the tenth stage of the “midnight” section, and it is determined that it is optimal to connect a new pole transformer to the CA phase.

また、日中時間帯における線間電圧の高低特性の組み合わせが[AB相,BC相,CA相]=[低い,高い,中間]であるので、図3のうち「時間帯」が「日中」区分の十段目に該当し、新たな柱上変圧器をCA相へと接続することが最適であると決定される。   Further, since the combination of the high and low characteristics of the line voltage in the daytime time zone is [AB phase, BC phase, CA phase] = [low, high, middle], the “time zone” in FIG. It is determined that it is optimal to connect a new pole transformer to the CA phase.

すなわち、本発明の接続相の決定方法によると、深夜時間帯に着目した場合も日中時間帯に着目した場合も、太陽光発電設備が連系された新たな柱上変圧器をCA相へと接続することが最適であると決定される。   That is, according to the connection phase determination method of the present invention, the new pole transformer with the photovoltaic power generation system connected to the CA phase, regardless of whether it is focused on the midnight time zone or the daytime time zone. Is determined to be optimal.

そして、従来手法に基づいて柱上変圧器をAB相へと新たに接続した後の三相の各線間電圧として図19Aに示す結果が得られ、本発明に基づいて柱上変圧器をCA相へと新たに接続した後の三相の各線間電圧として図19Bに示す結果が得られた。   Then, the results shown in FIG. 19A are obtained as the three-phase line voltages after the pole transformer is newly connected to the AB phase based on the conventional method, and the pole transformer is connected to the CA phase based on the present invention. The results shown in FIG. 19B were obtained as the three-phase line voltages after the new connection.

図19Aに示す結果から、従来手法では、三相の線間電圧を相互に近づけるという不平衡改善効果は得られないことが確認された。   From the results shown in FIG. 19A, it was confirmed that the conventional method cannot obtain the imbalance improvement effect of bringing the three-phase line voltages close to each other.

これに対して図19Bに示す結果から、本発明によれば、電圧不平衡率が低減すると共に三相の線間電圧が相互に近付くという理想的な不平衡改善効果が得られることが確認された。   On the other hand, from the result shown in FIG. 19B, according to the present invention, it is confirmed that the ideal unbalance improvement effect that the voltage unbalance rate is reduced and the three-phase line voltages approach each other can be obtained. It was.

以上の結果から、本発明では、太陽光発電設備が連系された柱上変圧器を新たに接続する場合に電圧不平衡率を低減させ且つ三相の線間電圧を相互に近付けるという理想的な不平衡改善効果が得られるように接続相を決定可能であることが確認された。   From the above results, the present invention is ideal in reducing the voltage imbalance rate and bringing the three-phase line voltages close to each other when newly connecting a pole transformer to which a photovoltaic power generation facility is connected. It was confirmed that the connected phase can be determined so as to obtain an unbalance improvement effect.

10 接続相の決定装置
17 接続相の決定プログラム
10 Connection Phase Determination Device 17 Connection Phase Determination Program

Claims (9)

配電線において計測された三相の各線間電圧が用いられて計測時刻別の線間毎の電圧不平衡率が算出され、当該電圧不平衡率が最大になっている計測時刻における前記三相の各線間電圧が用いられて線間毎の電圧の高低特性の組み合わせが作成され、前記電圧不平衡率が最大になっている計測時刻と前記線間毎の電圧の高低特性の組み合わせとに基づいて柱上変圧器の接続相が決定されることを特徴とする接続相の決定方法。   The voltage of each three-phase line measured in the distribution line is used to calculate the voltage unbalance rate for each line for each measurement time, and the three-phase voltage at the measurement time at which the voltage unbalance rate is maximum is calculated. Each line voltage is used to create a combination of high and low voltage characteristics for each line, based on the measurement time at which the voltage unbalance rate is maximized and the combination of high and low voltage characteristics for each line. A method for determining a connection phase, wherein a connection phase of a pole transformer is determined. 現状の前記三相の各線間電圧の不平衡を改善するための既設の柱上変圧器の接続相の変更と、将来の前記三相の各線間電圧の不平衡を抑制するための新設する柱上変圧器の接続相の選定とのうちの少なくとも一方に関する決定が行われることを特徴とする請求項1記載の接続相の決定方法。   Changing the connection phase of the existing pole transformer to improve the current unbalance of the three-phase line voltage, and a new pillar to suppress the unbalance of the three-phase line voltage in the future The method for determining a connection phase according to claim 1, wherein determination regarding at least one of selection of a connection phase of the upper transformer is performed. 前記配電線に設置された三相計測機能付開閉器によって前記三相の各線間電圧が計測されることを特徴とする請求項1記載の接続相の決定方法。   The connection phase determination method according to claim 1, wherein each of the three-phase line voltages is measured by a switch equipped with a three-phase measurement function installed in the distribution line. 配電線において計測された三相の各線間電圧を用いて計測時刻別の線間毎の電圧不平衡率を算出する手段と、前記電圧不平衡率が最大になっている計測時刻における前記三相の各線間電圧を用いて線間毎の電圧の高低特性の組み合わせを作成する手段と、前記電圧不平衡率が最大になっている計測時刻と前記線間毎の電圧の高低特性の組み合わせとに基づいて柱上変圧器の接続相を決定する手段とを有することを特徴とする接続相の決定装置。   Means for calculating a voltage unbalance rate for each line by measurement time using each of the three-phase line voltages measured in the distribution line, and the three phases at the measurement time at which the voltage unbalance rate is maximum A means for creating a combination of high and low voltage characteristics for each line using each line voltage, a measurement time at which the voltage imbalance rate is maximized, and a combination of high and low voltage characteristics for each line. Means for determining a connection phase of the pole transformer based on the connection phase. 現状の前記三相の各線間電圧の不平衡を改善するための既設の柱上変圧器の接続相の変更と、将来の前記三相の各線間電圧の不平衡を抑制するための新設する柱上変圧器の接続相の選定とのうちの少なくとも一方に関する決定が行われることを特徴とする請求項4記載の接続相の決定装置。   Changing the connection phase of the existing pole transformer to improve the current unbalance of the three-phase line voltage, and a new pillar to suppress the unbalance of the three-phase line voltage in the future 5. The connection phase determination device according to claim 4, wherein determination regarding at least one of selection of a connection phase of the upper transformer is performed. 前記配電線に設置された三相計測機能付開閉器によって前記三相の各線間電圧が計測されることを特徴とする請求項4記載の接続相の決定装置。   The connection phase determination device according to claim 4, wherein the three-phase line voltage is measured by a switch with a three-phase measurement function installed in the distribution line. 配電線において計測された三相の各線間電圧を用いて計測時刻別の線間毎の電圧不平衡率を算出する処理と、前記電圧不平衡率が最大になっている計測時刻における前記三相の各線間電圧を用いて線間毎の電圧の高低特性の組み合わせを作成する処理と、前記電圧不平衡率が最大になっている計測時刻と前記線間毎の電圧の高低特性の組み合わせとに基づいて柱上変圧器の接続相を決定する処理とをコンピュータに行わせることを特徴とする接続相の決定プログラム。   A process of calculating a voltage unbalance rate for each line by measurement time using each of the three-phase line voltages measured in the distribution line, and the three phases at the measurement time at which the voltage unbalance rate is maximum A process for creating a combination of high and low voltage characteristics for each line using each line voltage, a measurement time at which the voltage imbalance rate is maximized, and a combination of high and low voltage characteristics for each line. A connection phase determination program characterized by causing a computer to perform processing for determining a connection phase of a pole transformer based on the computer. 現状の前記三相の各線間電圧の不平衡を改善するための既設の柱上変圧器の接続相の変更と、将来の前記三相の各線間電圧の不平衡を抑制するための新設する柱上変圧器の接続相の選定とのうちの少なくとも一方に関する決定が行われることを特徴とする請求項7記載の接続相の決定プログラム。   Changing the connection phase of the existing pole transformer to improve the current unbalance of the three-phase line voltage, and a new pillar to suppress the unbalance of the three-phase line voltage in the future 8. The connection phase determination program according to claim 7, wherein determination regarding at least one of selection of a connection phase of the upper transformer is performed. 前記配電線に設置された三相計測機能付開閉器によって前記三相の各線間電圧が計測されることを特徴とする請求項7記載の接続相の決定プログラム。   The connection phase determination program according to claim 7, wherein the three-phase line voltage is measured by a switch with a three-phase measurement function installed in the distribution line.
JP2015118282A 2015-06-11 2015-06-11 Connection phase determination method, determination device, and determination program Active JP6468953B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015118282A JP6468953B2 (en) 2015-06-11 2015-06-11 Connection phase determination method, determination device, and determination program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015118282A JP6468953B2 (en) 2015-06-11 2015-06-11 Connection phase determination method, determination device, and determination program

Publications (2)

Publication Number Publication Date
JP2017005893A JP2017005893A (en) 2017-01-05
JP6468953B2 true JP6468953B2 (en) 2019-02-13

Family

ID=57751981

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015118282A Active JP6468953B2 (en) 2015-06-11 2015-06-11 Connection phase determination method, determination device, and determination program

Country Status (1)

Country Link
JP (1) JP6468953B2 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6992486B2 (en) * 2017-12-20 2022-01-13 中国電力株式会社 System imbalance reduction device, system imbalance reduction method
JP6985648B2 (en) * 2018-03-27 2021-12-22 東京電力ホールディングス株式会社 Methods and equipment for monitoring and suppressing voltage imbalance in distribution lines
CN108414821B (en) * 2018-05-17 2023-05-19 福建奥通迈胜电力科技有限公司 Distribution transformer low-voltage side voltage three-phase imbalance evaluation method based on zero sequence voltage
JP7200016B2 (en) * 2019-03-14 2023-01-06 河村電器産業株式会社 Distribution balance monitoring system
JP7570290B2 (en) * 2021-06-16 2024-10-21 三菱電機株式会社 Connection phase estimation system and connection phase estimation method
WO2024019253A1 (en) * 2022-07-19 2024-01-25 주식회사 씨드앤 Apparatus and method for predicting temperature change amount of target area
CN114935697B (en) * 2022-07-25 2022-12-30 广东电网有限责任公司佛山供电局 Three-phase load unbalance identification method, system, equipment and medium

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4886666B2 (en) * 2007-11-19 2012-02-29 株式会社日立製作所 Voltage imbalance cancellation support apparatus, support method and program thereof
JP5506502B2 (en) * 2010-03-31 2014-05-28 三菱電機株式会社 Detection system for influence of photovoltaic power generation facilities on three-phase distribution lines
JP5730652B2 (en) * 2011-04-18 2015-06-10 中国電力株式会社 Voltage adjusting device and voltage adjusting method
JP6063180B2 (en) * 2012-08-29 2017-01-18 株式会社東光高岳 Distribution line voltage regulator and voltage regulation method
JP5608774B2 (en) * 2013-03-21 2014-10-15 中国電力株式会社 Connection phase determination method and connection phase determination device
JP6049557B2 (en) * 2013-07-03 2016-12-21 三菱電機株式会社 Voltage control method for distribution system

Also Published As

Publication number Publication date
JP2017005893A (en) 2017-01-05

Similar Documents

Publication Publication Date Title
JP6468953B2 (en) Connection phase determination method, determination device, and determination program
EP2941824B1 (en) Inverter system enabling self-configuration
Gonzalez et al. LV distribution network feeders in Belgium and power quality issues due to increasing PV penetration levels
Ochoa et al. Evaluating distributed time-varying generation through a multiobjective index
Sheng et al. CDFLOW: A practical tool for tracing stationary behaviors of general distribution networks
Sciano et al. Evaluation of DC links on dense-load urban distribution networks
Görbe et al. Reduction of power losses with smart grids fueled with renewable sources and applying EV batteries
Kongtrakul et al. Comprehensive review and a novel technique on voltage unbalance compensation
Weckx et al. Reducing grid losses and voltage unbalance with PV inverters
CN108233400A (en) A kind of more feed-in interaction factor computational methods of meter and hvdc control mode
Efkarpidis et al. Optimal placement and sizing of active in-line voltage regulators in flemish LV distribution grids
Haghi et al. Feeder impact assessment of smart inverter settings to support high PV penetration in California
CN105659463A (en) Device and method for controlling the stability of a local network using an adjustable local network transformer
CN102542355A (en) Operation planning part load method
CN109659934B (en) Optimization method of new energy grid-connected planning based on short-circuit current margin
CN106208083B (en) A kind of method and device obtaining THE UPFC configuration
JP5345453B2 (en) Demand curve separation method, separation device, and separation program
Safitri et al. Monte Carlo-based stochastic analysis results for coordination of single-phase rooftop PVs in low voltage residential networks
Kim et al. Economic analysis on multi-terminal VSC HVDC systems with wind farms based on hierarchical optimal power flow with stability constraint
CN109327051A (en) Method and device for determining design parameters of AC and DC distribution network
Juanuwattanakul et al. Voltage stability enhancement for unbalanced multiphase distribution networks
Kramer Models poised to boost grid efficiency
Moghbel et al. Optimal siting and sizing of multiple active power line conditioners to minimize network THD considering harmonic couplings
Ibrahimi et al. Impact of distributed capacitors on voltage profile and power losses in real low voltage distribution networks
Ellis et al. Model makers

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20180315

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20181219

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20190115

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20190115

R150 Certificate of patent or registration of utility model

Ref document number: 6468953

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250