Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP6490351B2 - Energy transaction management system - Google Patents
[go: Go Back, main page]

JP6490351B2 - Energy transaction management system - Google Patents

Energy transaction management system Download PDF

Info

Publication number
JP6490351B2
JP6490351B2 JP2014106053A JP2014106053A JP6490351B2 JP 6490351 B2 JP6490351 B2 JP 6490351B2 JP 2014106053 A JP2014106053 A JP 2014106053A JP 2014106053 A JP2014106053 A JP 2014106053A JP 6490351 B2 JP6490351 B2 JP 6490351B2
Authority
JP
Japan
Prior art keywords
transaction
wholesale
energy
information
operation plan
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2014106053A
Other languages
Japanese (ja)
Other versions
JP2015222472A (en
JP2015222472A5 (en
Inventor
将人 内海
将人 内海
渡辺 徹
徹 渡辺
洋介 藤原
洋介 藤原
正雄 露崎
正雄 露崎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP2014106053A priority Critical patent/JP6490351B2/en
Publication of JP2015222472A publication Critical patent/JP2015222472A/en
Publication of JP2015222472A5 publication Critical patent/JP2015222472A5/en
Application granted granted Critical
Publication of JP6490351B2 publication Critical patent/JP6490351B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S50/00Market activities related to the operation of systems integrating technologies related to power network operation or related to communication or information technologies
    • Y04S50/10Energy trading, including energy flowing from end-user application to grid

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Description

本発明は、エネルギー取引管理システムに関する。 The present invention also relates to the energy transaction management systems.

近年、市場メカニズムを活用した需給安定化の方策として、需要家による一時的な消費エネルギーの調整量を供給力に見立てて電力市場で取引を行う取り組みに注目が集まっている。小口の需要家は自ら電力市場で取引を行うことが難しいため、これら小口需要家による調整エネルギーを取りまとめて電力市場に卸売りするアグリゲータと呼ばれるエネルギー取引事業者が存在する。   In recent years, as a measure for stabilizing supply and demand using market mechanisms, attention has been focused on efforts to conduct transactions in the electric power market based on temporary adjustment of energy consumption by consumers as supply capacity. Since it is difficult for small consumers to trade in the electric power market themselves, there is an energy trading company called an aggregator that collects the adjusted energy by these small consumers and wholesales them to the electric power market.

エネルギー取引事業者は、調整エネルギーの調達取引契約を需要家と予め締結する。調達取引契約で合意する事項には、例えばエネルギー取引事業者が需要家に支払う調達価格のKW・hあたりの単価、取引する調整エネルギー(以下「調達エネルギー」と呼ぶ)の量を算出する基準(以下「調達量基準」と呼ぶ)及び調達エネルギーが調達可能な継続時間(以下「調達時間基準」と呼ぶ)等がある。   An energy trading company concludes a procurement transaction contract for adjusted energy with a customer in advance. The items agreed in the procurement transaction contract include, for example, a standard for calculating a unit price per KW · h of a procurement price paid by an energy trader to a customer and an amount of adjustment energy to be traded (hereinafter referred to as “procurement energy”) ( (Hereinafter referred to as “procurement amount standard”) and duration of procurement of procurement energy (hereinafter referred to as “procurement time standard”).

エネルギー取引事業者は、調達エネルギーに基づいて、例えば小売事業者や系統運用者等と新たに卸売取引契約を締結する。卸売取引契約で合意する事項には、例えば卸売価格のKW・hあたりの単価、取引する調整エネルギー(以下「卸売エネルギー」と呼ぶ)の量を算出する基準(以下「卸売量基準」と呼ぶ)及び卸売エネルギーの受渡し開始日時と終了日時(以下「卸売時間基準」と呼ぶ)等である。   The energy trading company newly concludes a wholesale transaction contract with, for example, a retailer or a grid operator based on the procured energy. The items agreed in the wholesale transaction contract include, for example, the unit price per KW · h of the wholesale price, the standard for calculating the amount of adjustment energy to be traded (hereinafter referred to as “wholesale energy”) (hereinafter referred to as “wholesale quantity standard”) And delivery start date and time and end date and time of wholesale energy (hereinafter referred to as “wholesale time standard”).

ところで調達取引契約で合意する調達量基準と、卸売取引契約で合意する卸売量基準とは、必ずしも同一の基準であるとは限らない。加えて調達量基準自体、必ずしも需要家ごとに同一であるとは限らず、また卸売量基準自体も小売事業者や系統運用者ごとに同一であるとは限らない。すなわち調達取引契約は需要家ごとに異なる内容であり、また卸売取引契約は小売事業者や系統運用者ごとに異なる内容である場合がある。   By the way, the procurement standard agreed in the procurement transaction contract and the wholesale quantity standard agreed in the wholesale transaction contract are not necessarily the same standard. In addition, the procurement standard itself is not necessarily the same for each consumer, and the wholesale standard itself is not necessarily the same for each retailer or system operator. That is, the procurement transaction contract may have different contents for each customer, and the wholesale transaction contract may have different contents for each retailer or system operator.

またエネルギー取引事業者が卸売取引契約で合意する卸売時間基準と同じ日時を調達時間基準に対して予め適用することは難しく、そもそも調達時間基準は需要家ごとに異なる。このようにエネルギー取引事業者は、エネルギーの取引量及び取引時間の基準が異なる契約を扱いながら、電力市場で合意する卸売取引契約の条件を満たすことができるように需要家から調達エネルギーを調達しなければならない。   Moreover, it is difficult to apply in advance to the procurement time standard the same date and time as the wholesale time standard agreed by the energy trading company in the wholesale transaction contract, and the procurement time standard is different for each customer. In this way, energy trading companies procure energy procured from consumers so that they can meet the conditions of wholesale transaction agreements agreed in the electricity market, while dealing with contracts with different energy transaction volume and transaction time standards. There must be.

特許文献1には、エネルギー取引事業者による需要家からの調達エネルギーの調達に関し、複数の需要家の消費エネルギーを管理する技術が開示されている。この特許文献1に開示された技術によれば、複数の需要家からなる需要家群の消費エネルギーを統括して、効率よく高い精度で管理することができると記載されている。   Patent Document 1 discloses a technique for managing energy consumption of a plurality of consumers with respect to procurement of procurement energy from consumers by an energy trading company. According to the technique disclosed in Patent Document 1, it is described that energy consumption of a group of consumers including a plurality of customers can be integrated and efficiently managed with high accuracy.

また特許文献2には、自社発電機を有する電気事業者が利用する、物理的な制約条件も考慮した上で燃料取引市場での売買取引と電力取引市場での売買取引とについて最適な取引計画を立案するエネルギー取引支援システムが開示されている。この特許文献2に開示された技術によれば、電力及び燃料の各エネルギー取引に関して総合的な計画支援を行うことができるとしている。   Patent Document 2 also discloses an optimal transaction plan for a trading transaction in the fuel trading market and a trading transaction in the power trading market, taking into account the physical constraints used by an electric power company having its own generator. An energy trading support system for planning is disclosed. According to the technique disclosed in Patent Document 2, comprehensive planning support can be performed for each energy transaction of electric power and fuel.

特開2012−165513号公報JP 2012-165513 A 特開2007−58760号公報JP 2007-58760 A

しかしこの特許文献1及び2に記載の技術では、調達量基準と卸売量基準とが一致しない場合があることについて何ら考慮されていない。また調達エネルギーを調達する際の時間的な変化である過渡状態も考慮されていない。従って特許文献1及び2に記載の技術では、調達エネルギーを調達する場合における過渡状態は取引上考慮しないという前提の下、調達量基準と卸売量基準とが同一の契約1種のみを扱った電力取引を実現することしかできない。   However, in the techniques described in Patent Documents 1 and 2, no consideration is given to the fact that the procurement quantity standard and the wholesale quantity standard may not match. In addition, a transient state, which is a temporal change in procurement of procurement energy, is not considered. Therefore, in the technologies described in Patent Documents 1 and 2, on the premise that the transient state in procurement of procurement energy is not considered in terms of transactions, electric power handled only one contract with the same procurement quantity standard and wholesale quantity standard. You can only make a deal.

需要家から調達したエネルギーを卸売先に卸売りする際に需要家との間及び卸売先との間で締結される異なる取引契約に基づいてエネルギー取引を管理し得るエネルギー取引管理システムを提案する。 Suggest energy transaction management system that can manage the energy trading on the basis of different contracts to be entered into by and between the wholesale destination of the customer at the time of wholesale energy procured from the customer to the wholesale destination.

かかる課題を解決するために、本発明においては、エネルギー取引の計画作成と実行を行うエネルギー取引管理システムであって、取引可能なエネルギーは、需要家が所有する設備の動作を制御することにより生産され、前記需要家が所有する前記設備の動作制御は、少なくとも制御内容と制御開始時刻とを含んで構成される前記需要家の運用計画に基づいて実行されるものであって、前記需要家から調達したエネルギーの卸売先との取引契約情報に規定されるエネルギーの受渡し時間の範囲内の任意の時刻に前記需要家の運用計画の開始時刻を設定する取引時間基準変換部と、前記取引時間基準変換部により設定された開始時刻と予め設定されている制御内容とに基づいて前記需要家が所有する設備の動作制御を実行した際の時間ごとの消費エネルギー量を予測するエネルギー消費量予測部と、前記エネルギー消費量予測部により予測された消費エネルギー量と前記需要家との取引契約情報とに基づいて調達量を算出し、前記エネルギー消費量予測部により予測された消費エネルギー量と前記卸売先との取引契約情報とに基づいて卸売量を算出する取引量基準変換部とを設けるようにした。 In order to solve such a problem, in the present invention, an energy transaction management system for creating and executing an energy transaction, in which energy that can be traded is produced by controlling the operation of equipment owned by a consumer. And the operation control of the equipment owned by the customer is executed based on the operation plan of the customer including at least the control content and the control start time, and from the customer A transaction time reference conversion unit for setting a start time of the operation plan of the consumer at an arbitrary time within the range of energy delivery time specified in the transaction contract information with the wholesale supplier of the procured energy, and the transaction time reference Based on the start time set by the conversion unit and the preset control content, the consumption of each time when the operation control of the equipment owned by the consumer is executed. An energy consumption prediction unit that predicts an energy amount, and calculates a procurement amount based on the energy consumption amount predicted by the energy consumption amount prediction unit and transaction contract information with the customer, and the energy consumption amount prediction unit And a transaction amount reference conversion unit for calculating the wholesale amount based on the energy consumption predicted by the transaction and the transaction contract information with the wholesaler .

本発明によれば、需要家から調達したエネルギーを卸売先に卸売りする際に需要家との間及び卸売先との間で締結される異なる取引契約に基づいてエネルギー取引を管理することができる。   According to the present invention, when energy procured from a consumer is wholesaled to a wholesale destination, energy transactions can be managed based on different transaction contracts concluded between the consumer and the wholesale destination.

エネルギー取引管理システムの全体構成図である。It is a whole block diagram of an energy transaction management system. エネルギー取引管理システムによる処理の概要を示す概念図である。It is a conceptual diagram which shows the outline | summary of the process by an energy transaction management system. エネルギー取引管理システムの機能構成図である。It is a functional lineblock diagram of an energy transaction management system. 取引計画情報の概念図である。It is a conceptual diagram of transaction plan information. 卸売取引契約情報の概念図である。It is a conceptual diagram of wholesale transaction contract information. 調達取引契約情報の概念図である。It is a conceptual diagram of procurement transaction contract information. 運用計画情報の概念図である。It is a conceptual diagram of operation plan information. エネルギー取引計画立案処理のフローチャートである。It is a flowchart of an energy transaction planning process. 運用計画作成処理のフローチャートである。It is a flowchart of an operation plan creation process. 取引計画情報の画面構成図である。It is a screen block diagram of transaction plan information. 取引計画情報の画面構成図である。It is a screen block diagram of transaction plan information.

以下図面について、本発明の一実施の形態を詳述する。   Hereinafter, an embodiment of the present invention will be described in detail with reference to the drawings.

(1)全体構成
図1は、本実施の形態におけるエネルギー取引管理システム1の全体構成を示す。エネルギー取引管理システム1は、アグリゲータと呼ばれるエネルギー取引事業者10が調達取引契約に基づいて需要家20からエネルギーを調達し、調達したエネルギーを卸売取引契約に基づいて卸売取引先30に卸売りするためのシステムである。
(1) Overall Configuration FIG. 1 shows an overall configuration of an energy transaction management system 1 in the present embodiment. The energy transaction management system 1 is used for an energy trading company 10 called an aggregator to procure energy from a customer 20 based on a procurement transaction contract and to wholesale the procured energy to a wholesale business partner 30 based on a wholesale transaction contract. System.

エネルギー取引事業者10が需要家20から調達するエネルギーをここでは調達エネルギーと呼ぶことにする。またエネルギー取引事業者10が卸売取引先30に卸売りするエネルギーをここでは卸売エネルギーと呼ぶことにする。   Here, the energy procured by the energy trading company 10 from the customer 20 is referred to as procured energy. The energy that the energy trading company 10 wholesales to the wholesale business partner 30 is referred to herein as wholesale energy.

調達取引契約とは、エネルギー取引事業者10と需要家20との間で締結される調達エネルギーに関する取引契約である。また卸売取引契約とは、エネルギー取引事業者10と卸売取引先30との間で締結される卸売エネルギーに関する取引契約である。   The procurement transaction contract is a transaction contract relating to procurement energy concluded between the energy trading company 10 and the customer 20. The wholesale transaction contract is a transaction contract related to wholesale energy concluded between the energy trading company 10 and the wholesale business partner 30.

図1に示すようにエネルギー取引管理システム1は、エネルギー取引事業者10、需要家20及び卸売取引先30から構成される。そしてこれらは、LAN(Local Area Network)等の通信経路N1により互いに通信可能に接続される。以下これらエネルギー取引事業者10、需要家20及び卸売取引先30のそれぞれについて説明する。   As shown in FIG. 1, the energy transaction management system 1 includes an energy transaction operator 10, a customer 20, and a wholesale customer 30. These are connected so as to communicate with each other via a communication path N1 such as a LAN (Local Area Network). Hereinafter, each of these energy trading company 10, customer 20, and wholesale business partner 30 is explained.

エネルギー取引事業者10は、取引管理者11及び設備管理者12から構成される事業者である。取引管理者11は、調達取引契約に基づいて、需要家20から調達エネルギーを調達するとともに、一方で卸売取引契約に基づいて、調達エネルギーを卸売取引先30に卸売りするための計画を立案し、立案した計画を実行する事業者である。   The energy trading business 10 is a business composed of a transaction manager 11 and a facility manager 12. The transaction manager 11 procures procurement energy from the customer 20 based on the procurement transaction contract, and on the other hand, formulates a plan for wholesale the procurement energy to the wholesale business partner 30 based on the wholesale transaction contract. It is a company that executes the planned plan.

設備管理者12は、需要家20から調達エネルギーを調達する計画を実現するため、需要家20の負荷設備の運用計画を立案し、立案した運用計画を実行する事業者である。設備管理者12は、運用計画を実行する場合、設備制御端末22に対して制御信号を送信して需要家20の負荷設備を制御する。   The facility manager 12 is a business operator who formulates an operation plan for the load facility of the customer 20 and executes the planned operation plan in order to realize a plan for procuring procurement energy from the customer 20. When executing the operation plan, the facility manager 12 transmits a control signal to the facility control terminal 22 to control the load facility of the customer 20.

需要家20は、負荷設備を所有する個人又は法人である。需要家20は、情報入出力端末21を用いて、調達取引契約を取引管理者11との間で締結し、また所有する負荷設備の情報を設備管理者12との間で交換する。   The customer 20 is an individual or a corporation that owns the load facility. Using the information input / output terminal 21, the customer 20 concludes a procurement transaction contract with the transaction manager 11, and exchanges information on the load facilities owned with the facility manager 12.

卸売取引先30は、小売事業者31、取引市場運用者32及び系統運用者33から構成される。小売事業者31は、需要家20に電力を供給する一方で、供給を予定していた電力の一部をエネルギー取引事業者10を介して需要家20から買い取る事業者であり、エネルギー取引事業者10との卸売取引に関する情報を配信するための取引商品情報配信端末30Aを備える。   The wholesale business partner 30 includes a retailer 31, a trade market operator 32, and a system operator 33. The retailer 31 supplies power to the consumer 20 and purchases a part of the power scheduled to be supplied from the consumer 20 via the energy trader 10. The energy trader 31 The transaction product information distribution terminal 30 </ b> A for distributing information related to wholesale transactions with 10 is provided.

取引市場運用者32は、複数の小売事業者31やエネルギー取引事業者10に対して、エネルギー取引を行うために必要な情報や手続きを統括的に管理する事業者であり、卸売取引に関する情報を配信するための取引商品情報配信端末30Aを備える。   The transaction market operator 32 is a business operator that comprehensively manages information and procedures necessary for conducting energy transactions with respect to a plurality of retail businesses 31 and energy business operators 10, and provides information on wholesale transactions. A transaction product information distribution terminal 30A for distribution is provided.

また系統運用者33は、系統の需給管理を行うために、必要に応じてエネルギー取引事業者10からエネルギーを買い取る事業者であり、卸売取引に関する情報を配信するための取引商品情報配信端末30Aを備える。   Further, the system operator 33 is an operator who purchases energy from the energy trading company 10 as necessary in order to manage the supply and demand of the system, and uses the transaction product information distribution terminal 30A for distributing information related to wholesale transactions. Prepare.

図2は、エネルギー取引管理システム1による処理の概要を示す。ここでは特にエネルギー取引管理装置111、取引契約情報管理装置112、設備運用管理装置121及び設備情報管理装置122が実行する処理の概要について説明する。   FIG. 2 shows an outline of processing by the energy transaction management system 1. Here, an outline of processing executed by the energy transaction management device 111, the transaction contract information management device 112, the facility operation management device 121, and the facility information management device 122 will be described.

エネルギー取引管理装置111は、調達取引契約情報11252A及び運用計画情報12155Aに基づいて、卸売取引契約情報11253Aに規定されている卸売取引量及び受渡し時間を満たす取引計画情報11156Aを作成する。取引計画情報11156Aの詳細については後述するが(図4)、大きくは調達取引計画及び卸売取引計画の2つの計画の情報が含まれる。   Based on the procurement transaction contract information 11252A and the operation plan information 12155A, the energy transaction management apparatus 111 creates transaction plan information 11156A that satisfies the wholesale transaction amount and delivery time specified in the wholesale transaction contract information 11253A. The details of the transaction plan information 11156A will be described later (FIG. 4), but largely includes information on two plans, a procurement transaction plan and a wholesale transaction plan.

調達取引計画には、エネルギーの調達取引先である需要家20のID、この需要家20の負荷設備に対して適用する運用計画及びこの運用計画の開始日時が含まれる。また卸売取引計画には、調達エネルギーの卸売先である卸売取引先30のID、この卸売取引先30に対して調達エネルギーを受け渡す時間及び量が含まれる。   The procurement transaction plan includes the ID of the customer 20 who is the supplier of energy, the operation plan to be applied to the load facility of this customer 20, and the start date and time of this operation plan. Further, the wholesale transaction plan includes the ID of the wholesale business partner 30 that is the wholesale supplier of the procured energy, and the time and amount for delivering the procured energy to the wholesale business partner 30.

設備運用管理装置121は、設備情報12252Aと、運用条件情報12154Aとに基づいて、需要家20の負荷設備に対して適用可能な複数の運用計画が含まれる運用計画情報12155Aを作成する。また設備運用管理装置121は、設備情報12252Aと、消費エネルギー履歴情報12253Aとに基づいて、作成した運用計画情報12155Aに含まれる運用計画を実行した場合に予測される消費エネルギー量を運用計画ごとに予測する。   The facility operation management apparatus 121 creates operation plan information 12155A including a plurality of operation plans applicable to the load facility of the customer 20 based on the facility information 12252A and the operation condition information 12154A. In addition, the facility operation management apparatus 121 calculates, for each operation plan, the amount of energy consumed that is predicted when the operation plan included in the created operation plan information 12155A is executed based on the facility information 12252A and the energy consumption history information 12253A. Predict.

複数の運用計画を含む運用計画情報12155Aには、需要家20のID、この需要家20が所有する負荷設備、エネルギーの調達開始タイミング以降の時系列における負荷設備の負荷率の情報が含まれる。また運用条件情報12154Aには、需要家20が個別に設定した室温の許容上限値又は下限値や生産性の許容上限値又は下限値等が含まれる。運用計画情報12155Aの詳細については後述する(図7)。   The operation plan information 12155A including a plurality of operation plans includes information on the load factor of the load equipment in the time series after the ID of the consumer 20, the load equipment owned by the consumer 20, and the energy procurement start timing. Further, the operation condition information 12154A includes an allowable upper limit value or lower limit value of room temperature, an allowable upper limit value or lower limit value of productivity, etc. set individually by the customer 20. Details of the operation plan information 12155A will be described later (FIG. 7).

取引契約情報管理装置112は、エネルギー取引事業者10と需要家20との間の契約情報である調達取引契約情報11252A及びエネルギー取引事業者10と卸売取引先30との間の契約情報である卸売取引契約情報11253Aを管理する。   The transaction contract information management device 112 is a procurement transaction contract information 11252A which is contract information between the energy trading company 10 and the customer 20, and a wholesale which is contract information between the energy trading company 10 and the wholesale business partner 30. The transaction contract information 11253A is managed.

調達取引契約情報11252Aには、エネルギーの調達取引先である需要家20のID、この需要家20からエネルギーを調達する場合の調達取引価格及びこの需要家20から調達可能なエネルギーの調達量を算出する際に用いる調達量基準(ベースライン)が含まれる。調達取引契約情報11252Aの詳細については後述する(図6)。   In the procurement transaction contract information 11252A, the ID of the customer 20 who is the supplier of energy, the procurement transaction price when the energy is procured from the customer 20, and the amount of energy procured from the consumer 20 are calculated. The procurement amount standard (baseline) to be used for this is included. Details of the procurement transaction contract information 11252A will be described later (FIG. 6).

また卸売取引契約情報11253Aには、調達エネルギーの卸売先である卸売取引先30のID、この卸売取引先30に対して調達エネルギーを受け渡す時間、受け渡す量、卸売取引先30が買い取る価格、卸売取引先30に対して卸売り可能な卸売量を算出する際に用いられる卸売量基準(ベースライン)及び卸売取引先30との取引状況が含まれる。卸売取引契約情報11253Aの詳細については後述する(図5)。   Further, in the wholesale transaction contract information 11253A, the ID of the wholesale supplier 30 that is the wholesale supplier of the procurement energy, the time to deliver the procurement energy to the wholesale supplier 30, the amount to be delivered, the price that the wholesale supplier 30 purchases, The wholesale quantity standard (baseline) used when calculating the wholesale quantity that can be wholesaled to the wholesale business partner 30 and the transaction status with the wholesale business partner 30 are included. Details of the wholesale transaction contract information 11253A will be described later (FIG. 5).

設備情報管理装置122は、需要家20の負荷設備に関する情報を管理する。設備情報12252Aには、需要家20が所有する負荷設備のCOP(Coefficient Of Performance)等の物理的な特性情報、需要家20の建物の間取り又は建築素材等の情報が含まれる。また消費エネルギー履歴情報12253Aには、例えば需要家20の受電点、負荷設備又は機器単位での消費エネルギー量の時系列情報が含まれる。   The facility information management device 122 manages information related to the load facility of the customer 20. The facility information 12252A includes physical characteristic information such as COP (Coefficient Of Performance) of the load facility owned by the customer 20, information such as a floor plan of the customer 20 or a building material. The consumption energy history information 12253A includes, for example, time-series information on the amount of energy consumed in the power receiving point, load facility, or device unit of the customer 20.

(2)機能構成
図3は、エネルギー取引管理システム1の機能構成を示す。ここでは特にエネルギー取引管理装置111、取引契約情報管理装置112、設備運用管理装置121及び設備情報管理装置122の機能構成を示す。
(2) Functional Configuration FIG. 3 shows a functional configuration of the energy transaction management system 1. Here, functional configurations of the energy transaction management device 111, the transaction contract information management device 112, the facility operation management device 121, and the facility information management device 122 are particularly shown.

エネルギー取引管理装置111は、エネルギー取引管理装置111の動作を統括的に制御するCPU(Central Processing Unit)1111、入力装置1112、出力装置1113、通信装置1114及び記憶装置1115から構成される。エネルギー取引管理装置111は、例えばパーソナルコンピュータ、サーバコンピュータ又はハンドヘルドコンピュータ等の情報処理装置である。   The energy transaction management device 111 includes a CPU (Central Processing Unit) 1111 that controls the operation of the energy transaction management device 111 in an integrated manner, an input device 1112, an output device 1113, a communication device 1114, and a storage device 1115. The energy transaction management apparatus 111 is an information processing apparatus such as a personal computer, a server computer, or a handheld computer.

入力装置1112は、キーボード又はマウスから構成される。出力装置1113は、ディスプレイ又はプリンタから構成される。通信装置1114は、無線LAN又は有線LANに接続するためのNIC(Network Interface Card)を備えて構成される。記憶装置1115は、RAM(Random Access Memory)及びROM(Read Only Memory)等の記憶媒体である。   The input device 1112 includes a keyboard or a mouse. The output device 1113 includes a display or a printer. The communication device 1114 includes a NIC (Network Interface Card) for connecting to a wireless LAN or a wired LAN. The storage device 1115 is a storage medium such as a RAM (Random Access Memory) and a ROM (Read Only Memory).

記憶装置1115には、卸売計画立案部11151、調達計画立案部11152、取引時間基準変換部11153、取引量基準変換部11154及び損益評価部11155等の各種コンピュータプログラムが格納されている。   The storage device 1115 stores various computer programs such as a wholesale plan planning unit 11151, a procurement plan planning unit 11152, a transaction time standard conversion unit 11153, a transaction volume standard conversion unit 11154, and a profit / loss evaluation unit 11155.

卸売計画立案部11151は、取引商品情報配信端末30Aから卸売取引の取引価格及び受渡し時間帯等の情報を一つ以上取得し、取引価格又は損益評価部11155により評価された損益が予め設定された閾値を超える卸売取引をエネルギー取引事業者10が取引を行うことが適切な卸売取引契約として決定する。   The wholesale planning unit 11151 obtains one or more information such as the transaction price and delivery time zone of the wholesale transaction from the transaction product information distribution terminal 30A, and the profit / loss evaluated by the transaction price or the profit / loss evaluation unit 11155 is preset. A wholesale transaction exceeding the threshold is determined as an appropriate wholesale transaction contract for the energy trading company 10 to perform the transaction.

調達計画立案部11152は、卸売計画立案部11151が決定した卸売取引契約において設定されている取引量及び受渡し時間を満たすように、調達取引契約情報11252A、運用計画情報12155A及び損益評価部11155により評価される損益に基づいて、需要家20からエネルギーを調達する調達取引計画(取引計画情報11156A)を決定する。   The procurement plan planning unit 11152 is evaluated by the procurement transaction contract information 11252A, the operation plan information 12155A, and the profit and loss evaluation unit 11155 so as to satisfy the transaction volume and delivery time set in the wholesale transaction contract determined by the wholesale plan planning unit 11151. The procurement transaction plan (transaction plan information 11156A) for procuring energy from the customer 20 is determined based on the profit / loss to be made.

取引時間基準変換部11153は、卸売計画立案部11151が決定した卸売取引契約において設定されている受渡し時間の範囲内で運用計画情報12155Aに含まれる運用計画の実行開始日時を対応付ける。なお対応付けた運用計画を実行した場合の需要家20の消費エネルギー量は、エネルギー消費量予測部12152により予測される。   The transaction time reference conversion unit 11153 associates the execution start date and time of the operation plan included in the operation plan information 12155A within the delivery time set in the wholesale transaction contract determined by the wholesale plan planning unit 11151. Note that the energy consumption amount of the consumer 20 when the associated operation plan is executed is predicted by the energy consumption amount prediction unit 12152.

取引量基準変換部11154は、予測された消費エネルギー量と、調達取引契約において設定されている調達量基準(ベースライン)とに基づいて、調達量を算出する。一方で取引量基準変換部11154は、予測された消費エネルギー量と、卸売取引契約において設定されている卸売量基準(ベースライン)に基づいて、卸売量を算出する。   The transaction amount standard conversion unit 11154 calculates the procurement amount based on the predicted energy consumption amount and the procurement amount standard (baseline) set in the procurement transaction contract. On the other hand, the transaction quantity reference conversion unit 11154 calculates the wholesale quantity based on the predicted consumption energy quantity and the wholesale quantity standard (baseline) set in the wholesale transaction contract.

そして取引量基準変換部11154は、算出した調達量と、調達取引契約において設定されている調達取引価格とに基づいて、エネルギー取引事業者10がインセンティブとして需要家20に支払う調達取引額を算出する。また取引量基準変換部11154は、算出した卸売量と、卸売取引契約において設定されている卸売取引価格とに基づいて、エネルギー取引事業者10が卸売取引先30から受け取る卸売取引額を算出する。   Based on the calculated procurement amount and the procurement transaction price set in the procurement transaction contract, the transaction amount standard conversion unit 11154 calculates the amount of procurement transaction that the energy trading company 10 pays to the customer 20 as an incentive. . Further, the transaction amount reference conversion unit 11154 calculates the wholesale transaction amount that the energy trading company 10 receives from the wholesale business partner 30 based on the calculated wholesale amount and the wholesale transaction price set in the wholesale transaction contract.

損益評価部11155は、取引量基準変換部11154により算出された調達取引額と、卸売取引額とに基づいて、エネルギー取引事業者10の損益を算出して評価する。   The profit / loss evaluation unit 11155 calculates and evaluates the profit / loss of the energy trading company 10 based on the procurement transaction amount calculated by the transaction amount reference conversion unit 11154 and the wholesale transaction amount.

また記憶装置1115には、取引計画情報データベース11156が格納されており、取引計画情報データベース11156には取引計画情報11156Aが保持されている。取引計画情報11156Aの詳細については後述する(図4)。   The storage device 1115 stores a transaction plan information database 11156, and the transaction plan information database 11156 holds transaction plan information 11156A. Details of the transaction plan information 11156A will be described later (FIG. 4).

取引契約情報管理装置112は、取引契約情報管理装置112の動作を統括的に制御するCPU1121、入力装置1122、出力装置1123、通信装置1124及び記憶装置1125から構成される。取引契約情報管理装置112は、例えばパーソナルコンピュータ、サーバコンピュータ又はハンドヘルドコンピュータ等の情報処理装置である。   The transaction contract information management device 112 includes a CPU 1121 that controls the overall operation of the transaction contract information management device 112, an input device 1122, an output device 1123, a communication device 1124, and a storage device 1125. The transaction contract information management apparatus 112 is an information processing apparatus such as a personal computer, a server computer, or a handheld computer.

記憶装置1125には、情報入出力部11251等のコンピュータプログラムが格納されており、また調達取引契約情報データベース11252及び卸売取引契約情報データベース11253等のデータベースが格納されている。卸売取引契約情報データベース11253には卸売取引契約情報1125Aが保持されており、調達取引契約情報データベース11252には調達取引契約情報1125Aが保持されている。 The storage device 1125 stores computer programs such as the information input / output unit 11251 and also stores databases such as a procurement transaction contract information database 11252 and a wholesale transaction contract information database 11253. Wholesale transaction contract information database 11253 holds wholesale transaction contract information 1125 3 A, and procurement transaction contract information database 11252 holds procurement transaction contract information 1125 2 A.

情報入出力部11251は、調達取引契約情報データベース11252及び卸売取引契約情報データベース11253に対して、各種情報の登録、検索、更新又は削除を行う。調達取引契約情報11252A及び卸売取引契約情報11253Aについては図2の説明で記載した通りであり、詳細については後述する(図5、図6)。   The information input / output unit 11251 registers, searches, updates, or deletes various types of information for the procurement transaction contract information database 11252 and the wholesale transaction contract information database 11253. The procurement transaction contract information 11252A and the wholesale transaction contract information 11253A are as described in the description of FIG. 2, and details will be described later (FIGS. 5 and 6).

設備運用管理装置121は、設備運用管理装置121の動作を統括的に制御するCPU1211、入力装置1212、出力装置1213、通信装置1214及び記憶装置1215から構成される。設備運用管理装置121は、例えばパーソナルコンピュータ、サーバコンピュータ又はハンドヘルドコンピュータ等の情報処理装置である。   The facility operation management apparatus 121 includes a CPU 1211, an input device 1212, an output device 1213, a communication device 1214, and a storage device 1215 that collectively control the operation of the facility operation management device 121. The facility operation management apparatus 121 is an information processing apparatus such as a personal computer, a server computer, or a handheld computer.

記憶装置1215には、運用計画立案部12151、エネルギー消費量予測部12152、制御実行部12153等の各種コンピュータプログラムが格納されている。   The storage device 1215 stores various computer programs such as an operation planning unit 12151, an energy consumption prediction unit 12152, and a control execution unit 12153.

運用計画立案部12151は、運用計画条件情報12154A及び設備情報12252Aに基づいて、需要家20が調達エネルギーを創出するために実行可能な負荷設備の運用計画を需要家20ごとに立案する。   Based on the operation plan condition information 12154A and the facility information 12252A, the operation plan drafting unit 12151 formulates, for each customer 20, an operation plan for load facilities that can be executed by the customer 20 to create procurement energy.

エネルギー消費量予測部12152は、卸売取引契約において設定されている受渡し時間の範囲内で運用計画情報12155Aに含まれる運用計画の実行開始日時が対応付けられた場合、設備情報12252A及び消費エネルギー履歴情報12253Aに基づいて、需要家20のエネルギー消費量を対応付けられた日時ごとに予測する。   The energy consumption prediction unit 12152, when the execution start date and time of the operation plan included in the operation plan information 12155A is associated within the delivery time set in the wholesale transaction contract, the facility information 12252A and the energy consumption history information Based on 12253A, the energy consumption of the consumer 20 is predicted for each associated date and time.

制御実行部12153は、取引計画情報11156Aに含まれる取引計画に基づいて、設備制御端末22を介して需要家20の負荷設備を制御する。   The control execution unit 12153 controls the load facility of the customer 20 via the facility control terminal 22 based on the transaction plan included in the transaction plan information 11156A.

また記憶装置1215には、運用条件情報データベース12154及び運用計画情報データベース12155が格納される。運用条件情報データベース12154には運用条件情報12154Aが保持されており、運用計画情報データベース12155には運用計画情報12155Aが保持されている。運用条件情報12154Aについては図2の説明で記載した通りであり、運用計画情報12155Aについては後述する(図7)。   The storage device 1215 stores an operation condition information database 12154 and an operation plan information database 12155. The operation condition information database 12154 holds operation condition information 12154A, and the operation plan information database 12155 holds operation plan information 12155A. The operation condition information 12154A is as described in the description of FIG. 2, and the operation plan information 12155A will be described later (FIG. 7).

設備情報管理装置122は、設備情報管理装置122の動作を統括的に制御するCPU1221、入力装置1222、出力装置1223、通信装置1224及び記憶装置1225から構成される。設備情報管理装置122は、例えばパーソナルコンピュータ、サーバコンピュータ又はハンドヘルドコンピュータ等の情報処理装置である。   The facility information management device 122 includes a CPU 1221 that controls the overall operation of the facility information management device 122, an input device 1222, an output device 1223, a communication device 1224, and a storage device 1225. The facility information management device 122 is an information processing device such as a personal computer, a server computer, or a handheld computer.

記憶装置1225には、情報入出力部12251等のコンピュータプログラムが格納されており、また設備情報データベース12252及び消費エネルギー履歴情報データベース12253等のデータベースが格納されている。設備情報データベース12252には設備情報12252Aが保持されており、消費エネルギー履歴情報データベース12253には消費エネルギー履歴情報12253Aが保持されている。   The storage device 1225 stores computer programs such as the information input / output unit 12251 and stores databases such as the facility information database 12252 and the energy consumption history information database 12253. The facility information database 12252 holds facility information 12252A, and the consumption energy history information database 12253 holds consumption energy history information 12253A.

情報入出力部12251は、設備情報データベース12252及び消費エネルギー履歴情報データベース12253に対して、各種情報の登録、検索、更新又は削除を行う。設備情報12252A及び消費エネルギー履歴情報12253Aについては図2の説明で記載した通りである。   The information input / output unit 12251 registers, searches, updates, or deletes various types of information with respect to the facility information database 12252 and the energy consumption history information database 12253. The facility information 12252A and the energy consumption history information 12253A are as described in the explanation of FIG.

(3)各情報の詳細構成
図4は、取引計画情報11156Aの概念図を示す。取引計画情報11156Aは、卸売計画立案部11151及び調達計画立案部11152により作成される情報であり、設備運用管理装置121が調達エネルギーを創出するために需要家20の負荷設備を制御する際に用いられる。
(3) Detailed structure of each information FIG. 4: shows the conceptual diagram of transaction plan information 11156A. The transaction plan information 11156A is information created by the wholesale plan planning unit 11151 and the procurement plan planning unit 11152, and is used when the facility operation management device 121 controls the load facility of the customer 20 in order to create procurement energy. It is done.

具体的に取引計画情報11156Aは、卸売り契約ID欄111561、調達取引先ID欄111562、運用計画ID欄111563及び運用計画開始日時欄111564から構成される。   Specifically, the transaction plan information 11156A includes a wholesale contract ID column 111561, a procurement supplier ID column 111562, an operation plan ID column 111563, and an operation plan start date / time column 111564.

卸売り契約ID欄111561には、卸売取引契約の識別子が格納される。調達取引先ID欄111562には、調達取引を行う需要家20の識別子が格納される。運用計画ID欄111563には、負荷設備の運用計画の識別子が格納される。運用計画開始日時欄111564には、運用計画の実行開始日時が格納される。   The wholesale contract ID column 111561 stores an identifier of a wholesale transaction contract. The procurement supplier ID column 111562 stores the identifier of the customer 20 who performs the procurement transaction. The operation plan ID column 111563 stores the identifier of the operation plan of the load facility. The operation plan start date / time column 111564 stores the execution start date / time of the operation plan.

従って図4の場合、例えば卸売り契約IDが「PA03」により特定される卸売取引を実現するために、調達取引先IDが「C1」〜「C4」により特定される複数の需要家20から調達エネルギーを調達するように計画されていることが示されている。   Accordingly, in the case of FIG. 4, for example, in order to realize a wholesale transaction in which the wholesale contract ID is specified by “PA03”, the procurement energy is obtained from a plurality of customers 20 whose procurement supplier IDs are specified by “C1” to “C4”. It is shown that it is planned to procure.

またこの計画において調達先IDが「C1」により特定される需要家20は、所有する負荷設備を「C1−2」により特定される運用計画に基づいて運用することが要求されており、この「C1−2」の運用計画を「2014/1/11 09:55」から開始するように要求されていることが示されている。   Further, in this plan, the customer 20 specified by the supplier ID “C1” is required to operate the owned load facility based on the operation plan specified by “C1-2”. It is indicated that the operation plan of “C1-2” is requested to start from “2014/1/11 09:55”.

図5は、卸売取引契約情報11253Aの概念図を示す。卸売取引契約情報11253Aは、卸売計画立案部11151及び調達計画立案部11152により作成される情報であり、エネルギー取引管理装置111が取引計画情報11156Aを作成する際に用いられる。   FIG. 5 shows a conceptual diagram of wholesale transaction contract information 11253A. The wholesale transaction contract information 11253A is information created by the wholesale plan planning unit 11151 and the procurement plan planning unit 11152, and is used when the energy transaction management apparatus 111 creates the transaction plan information 11156A.

具体的に卸売取引契約情報11253Aは、卸売契約ID欄112531、卸売取引先ID欄112532、受渡し時間欄112533、卸売取引量欄112534、卸売取引価格欄112535、卸売量基準欄112536及び取引状況欄112537から構成される。   Specifically, the wholesale transaction contract information 11253A includes a wholesale contract ID column 112531, a wholesale supplier ID column 112532, a delivery time column 112533, a wholesale transaction volume column 112534, a wholesale transaction price column 112535, a wholesale volume reference column 112536, and a transaction status column 112537. Consists of

卸売契約ID欄112531には、卸売取引契約の識別子が格納される。卸売取引先ID欄112532には、卸売取引契約を締結する卸売取引先30の識別子が格納される。受渡し時間欄112533には、卸売取引契約における卸売エネルギーの受渡し日、受渡し開始時刻及び受渡し終了時刻が格納される。卸売取引量欄112534には、卸売取引契約における卸売エネルギーの卸売取引量が格納される。   The wholesale contract ID column 112531 stores an identifier of a wholesale transaction contract. The wholesale business partner ID column 112532 stores the identifier of the wholesale business partner 30 that concludes the wholesale business contract. The delivery time column 112533 stores the delivery date, delivery start time, and delivery end time of the wholesale energy in the wholesale transaction contract. The wholesale transaction amount column 112534 stores the wholesale transaction amount of wholesale energy in the wholesale transaction contract.

卸売取引価格欄112535には、卸売取引契約における取引価格が格納される。卸売量基準欄112536には、卸売取引契約における卸売エネルギーの卸売取引量を算出するための基準の情報が格納される。取引状況欄112537には、卸売取引契約の手続き状況が格納される。   The wholesale transaction price column 112535 stores the transaction price in the wholesale transaction contract. In the wholesale quantity reference column 112536, information on a reference for calculating the wholesale transaction quantity of wholesale energy in the wholesale transaction contract is stored. The transaction status column 112537 stores the procedure status of the wholesale transaction contract.

従って図5の場合、例えば卸売取引契約IDが「PA01」の卸売取引契約は、卸売取引先IDが「R1」の卸売取引先30との間における契約であることが示されている。またこの「PA01」の卸売取引契約においては、卸売エネルギーを卸売取引先30に受け渡す日時は「2014/1/10 13:00〜13:30」であり、この間に受け渡される卸売取引量は「1200kW」であり、卸売取引価格は「25円/kW・h」であることが示されている。   Therefore, in the case of FIG. 5, for example, the wholesale transaction contract with the wholesale transaction contract ID “PA01” is a contract with the wholesale transaction partner 30 with the wholesale transaction ID “R1”. In the wholesale transaction contract of “PA01”, the date and time when the wholesale energy is delivered to the wholesale business partner 30 is “2014/1/10 13: 0 to 13:30”. It is “1200 kW” and the wholesale transaction price is “25 yen / kW · h”.

また「PA01」の卸売取引契約において、「1200kW」という卸売取引量は、「直近過去3日の時間毎の平均値」のうちの受渡し時間帯における平均値から調達実行時の実消費エネルギー値を差し引いた値として算出されることが示されている。   In addition, in the wholesale transaction contract of “PA01”, the wholesale transaction amount of “1200 kW” is obtained by calculating the actual energy consumption value at the time of procurement from the average value in the delivery time zone in the “average value for every hour of the last three days”. It is shown that it is calculated as a subtracted value.

また卸売取引契約IDが「PA01」の卸売取引契約の現在の取引状況は、「約定済み」であることが示されている。なお取引状況が「注文済み未約定」の場合、エネルギー取引事業者10が卸売取引先30に対して取引要求を通知したが、まだ契約締結には至っていないことを示す。   Also, it is indicated that the current transaction status of the wholesale transaction contract with the wholesale transaction contract ID “PA01” is “contracted”. When the transaction status is “unordered”, it indicates that the energy trading company 10 has notified the wholesale customer 30 of a transaction request, but has not yet concluded a contract.

また取引状況が「未注文」の場合、卸売取引先30から卸売取引情報を受信した直後であることを示す。また取引状況が「約定済み」であるが受け渡し時間が「未受信」の場合、例えば系統運用者33と調整予備力取引が契約相当であることを示す。   Further, when the transaction status is “unordered”, it indicates that it is immediately after receiving the wholesale transaction information from the wholesale transaction partner 30. Further, when the transaction status is “confirmed” but the delivery time is “not received”, for example, it indicates that the grid operator 33 and the adjustment reserve transaction are equivalent to a contract.

図6は、調達取引契約情報11252Aの概念図を示す。調達取引契約情報11252Aは、需要家20と調達取引契約を締結した時点でエネルギー取引事業者10により入力される情報であり、エネルギー取引管理装置111が取引計画情報11156Aを作成する際に用いられる。   FIG. 6 shows a conceptual diagram of procurement transaction contract information 11252A. The procurement transaction contract information 11252A is information input by the energy trading company 10 when a procurement transaction contract is concluded with the customer 20, and is used when the energy transaction management apparatus 111 creates the transaction plan information 11156A.

具体的に調達取引契約情報11252Aは、調達契約ID欄112521、調達取引先ID欄112522、調達取引価格欄112523及び調達量基準欄112524から構成される。   Specifically, the procurement transaction contract information 11252A includes a procurement contract ID column 112521, a procurement supplier ID column 112522, a procurement transaction price column 112523, and a procurement amount reference column 112524.

調達契約ID欄112521には、調達取引契約の識別子が格納される。調達取引先ID欄112522には、調達取引契約を締結した需要家20の識別子が格納される。調達取引価格欄112523には、調達取引契約における取引価格が格納される。調達量基準欄112524には、調達取引契約における調達エネルギーの調達取引量を算出するための基準が格納される。   In the procurement contract ID column 112252, the identifier of the procurement transaction contract is stored. The procurement supplier ID column 112522 stores the identifier of the customer 20 who has concluded a procurement transaction contract. In the procurement transaction price column 112523, the transaction price in the procurement transaction contract is stored. In the procurement amount standard column 112524, a criterion for calculating the procurement transaction amount of the procurement energy in the procurement transaction contract is stored.

従って図6の場合、需要家20ごとに異なる取引価格及び調達量基準で調達取引契約が締結されていることが示されており、例えば調達契約IDが「PP01」の調達取引契約は、調達取引先IDが「C1」の需要家20が締結した契約であることが示されている。また「PP01」の調達取引契約においては、取引価格が「30円/kW・h」であり、調達量は「直近過去5日の時間毎の平均値」から調達実行時の実消費エネルギー値を差し引いた値として算出されることが示されている。   Accordingly, in the case of FIG. 6, it is shown that procurement transaction contracts are concluded with different transaction prices and procurement amount standards for each customer 20. For example, a procurement transaction contract with a procurement contract ID “PP01” It is shown that the contract is concluded by the customer 20 whose destination ID is “C1”. In addition, in the procurement transaction contract of “PP01”, the transaction price is “30 yen / kW · h”, and the procurement amount is the actual energy consumption value at the time of procurement from the “average value for every hour of the last 5 days”. It is shown that it is calculated as a subtracted value.

図7は、運用計画情報12155Aの概念図を示す。運用計画情報12155Aは、設備運用管理装置121により作成される情報であり、エネルギー取引管理装置111が取引計画情報11156Aを作成する際に用いられる。   FIG. 7 shows a conceptual diagram of the operation plan information 12155A. The operation plan information 12155A is information created by the facility operation management device 121, and is used when the energy transaction management device 111 creates the transaction plan information 11156A.

具体的に運用計画情報12155Aは、需要家ID欄121551、設備名欄121552、運用計画ID欄121553及び運転方法欄121554から構成される。   Specifically, the operation plan information 12155A includes a customer ID column 121551, an equipment name column 121552, an operation plan ID column 121553, and an operation method column 121554.

需要家ID欄121551には、エネルギー取引管理装置111において調達取引先として管理されている需要家20の識別子が格納される。設備名欄121552には、需要家20の負荷設備の名称又は識別子が格納される。運用計画ID欄121553には、負荷設備の運転方法を特定する識別子が格納される。運転方法欄121554には、調達取引実行時における負荷設備の運転方法が格納される。   The customer ID column 121551 stores the identifiers of the customers 20 managed as procurement suppliers in the energy transaction management device 111. The facility name column 121552 stores the name or identifier of the load facility of the customer 20. The operation plan ID column 121553 stores an identifier for specifying the operation method of the load facility. The operation method column 121554 stores the operation method of the load facility when the procurement transaction is executed.

従って図7の場合、調達取引実行時において需要家20ごと及び負荷設備ごとに実行可能な複数の運用計画が立案されていることが示されており、例えば調達取引実行時において「C1」の需要家20が所有する「空調」の負荷設備に対しては、「C1−1」〜「C1−3」の複数の運用計画が立案されていることが示されている。   Therefore, in the case of FIG. 7, it is shown that a plurality of operation plans that can be executed for each customer 20 and each load facility are prepared at the time of executing the procurement transaction. It is shown that a plurality of operation plans “C1-1” to “C1-3” are drafted for the load equipment of “air conditioning” owned by the house 20.

例えば「C1−1」の運用計画においては、調達取引実行時を「t0」とした場合、「空調」の負荷設備を「t0」までは「70%」の負荷率で運用し、その後「t0〜t30」の30分間は「30%」の負荷率で運用し、その後「t30〜t60」の30分間は「100%」の負荷率で運用していくように立案されていることが示されている。   For example, in the operation plan of “C1-1”, when the procurement transaction execution time is “t0”, the load equipment of “air conditioning” is operated at a load factor of “70%” until “t0”, and then “t0” It is shown that it is planned to operate at a load factor of “30%” for 30 minutes from “t30” and then to operate at a load factor of “100%” for 30 minutes from “t30 to t60”. ing.

図4〜図7において図示した以外の情報としてエネルギー取引管理システム1は、運用条件情報12154A、設備情報12252A及び消費エネルギー履歴情報12253Aを保持している。以下これら各種情報について説明する。   As information other than those illustrated in FIGS. 4 to 7, the energy transaction management system 1 holds operation condition information 12154A, facility information 12252A, and consumption energy history information 12253A. The various information will be described below.

運用条件情報12154Aは、需要家20により提供される情報であり、調達取引実行における需要家20の許容条件の情報が格納される。許容条件とは、例えば「調達取引実行時に室温が19℃を下回らないこと」等の条件である。運用条件情報12154Aは、設備運用管理装置121が運用計画情報12155Aを作成する際に用いられる。   The operation condition information 12154A is information provided by the customer 20, and stores information on the allowable conditions of the customer 20 in executing the procurement transaction. The allowable condition is a condition such as “the room temperature should not be lower than 19 ° C. when the procurement transaction is executed”. The operation condition information 12154A is used when the facility operation management apparatus 121 creates the operation plan information 12155A.

設備情報12252Aは、需要家20が所有する負荷設備の仕様情報が格納される。仕様情報とは、例えば負荷設備が「空調」の場合であればCOPが「4.0」であり、定格消費電力が「1.2kW」等の情報である。また需要家20の建物の部屋数、各部屋の面積及び体積、壁の厚みや素材等の建物設備の情報も仕様情報である。設備情報12252Aは、設備運用管理装置121が需要家20の消費エネルギー量を予測する際に用いられる。   The facility information 12252A stores specification information of load facilities owned by the customer 20. For example, when the load facility is “air conditioning”, the specification information is information such as “4.0” for COP and “1.2 kW” for rated power consumption. The specification information also includes information on the number of rooms in the building of the customer 20, the area and volume of each room, the thickness of the wall, and building facilities such as materials. The facility information 12252A is used when the facility operation management apparatus 121 predicts the energy consumption amount of the customer 20.

消費エネルギー履歴情報12253Aは、一定間隔で計測した需要家20の受電点又は負荷設備単位での消費エネルギー量の時系列の情報が格納される。例えば「C01」の需要家20の受電点で計測した消費エネルギー量が「2014/1/9 10:00〜10:30」では「3.5kW」であり、「2014/1/9 10:30〜11:00」では「3.7kW」である場合、これら時刻と消費エネルギー量とを対応付けた情報が格納される。消費エネルギー履歴情報12253Aは、設備運用管理装置121が需要家20の消費エネルギー量を予測する際に用いられる。   The energy consumption history information 12253A stores time-series information of the amount of energy consumed at a power receiving point or load equipment unit of the customer 20 measured at regular intervals. For example, when the energy consumption measured at the power receiving point of the customer 20 of “C01” is “2014/1/9 10:00 to 10:30”, it is “3.5 kW”, and “2014/1/9 10:30”. In the case of “3.7 kW” at “˜11: 00”, information in which these times are associated with the amount of energy consumption is stored. The consumption energy history information 12253A is used when the facility operation management apparatus 121 predicts the consumption energy amount of the customer 20.

(4)フローチャート
図8は、エネルギー取引計画立案処理の処理手順を示す。このエネルギー取引計画立案処理は、エネルギー取引管理装置111がエネルギー取引事業者10からの入力操作を受け付けたことを契機として実行される処理である。エネルギー取引管理装置111は、入力操作を受け付けるとステップSP1〜SPの処理を実行し、次いで設備運用管理装置121がステップSPの処理を実行し、その後再びエネルギー取引管理装置111がステップSP5〜SP9の処理を実行する。
(4) Flowchart FIG. 8 shows the processing procedure of the energy transaction planning process. This energy transaction planning process is a process that is executed when the energy transaction management device 111 receives an input operation from the energy transaction company 10. Energy transaction management device 111 executes the process of step SP1~SP 4 accepts an input operation, then facilities operations management device 121 executes the process of step SP 5, again in the energy transaction management device 111 Step SP5~ The process of SP9 is executed.

なお実際には、エネルギー取引管理装置111のCPU1111及び記憶装置1115に格納されている各種コンピュータプログラムに基づいて処理が実行され、また設備運用管理装置121のCPU1211及び記憶装置1215に格納されている各種コンピュータプログラムに基づいて処理が実行される。説明の便宜上、処理主体をエネルギー取引管理装置111及び設備運用管理装置121が備える各種コンピュータプログラムとして説明する。   In practice, processing is executed based on various computer programs stored in the CPU 1111 and the storage device 1115 of the energy transaction management apparatus 111, and various processes stored in the CPU 1211 and the storage device 1215 of the facility operation management apparatus 121. Processing is executed based on the computer program. For convenience of explanation, the processing entity will be described as various computer programs included in the energy transaction management device 111 and the facility operation management device 121.

まず卸売計画立案部11151は、取引商品情報配信端末30Aから受信した卸売取引に関する情報を参照して卸売取引を行うか否かを判断し、卸売取引を行うと判断した場合、卸売取引契約情報11253Aを作成する(SP1)。 First, the wholesale planning unit 11151 refers to the information related to the wholesale transaction received from the transaction product information distribution terminal 30A to determine whether to perform the wholesale transaction, and when determining that the wholesale transaction is to be performed, the wholesale transaction contract information 11253A. Is created (SP1).

具体的に卸売計画立案部11151は、受信した卸売取引に関する情報を参照して、卸売取引価格がエネルギー取引事業者10により予め設定されている卸売取引価格以上であり、かつ卸売取引量がエネルギー取引事業者10により予め設定されている卸売取引量の範囲内である場合、卸売取引を行うものと判断する。   Specifically, the wholesale planning unit 11151 refers to the received information on the wholesale transaction, the wholesale transaction price is equal to or higher than the wholesale transaction price preset by the energy trading company 10, and the wholesale transaction amount is the energy transaction. When it is within the range of the wholesale transaction amount set in advance by the business operator 10, it is determined that the wholesale transaction is performed.

そして卸売計画立案部11151は、受信した卸売取引に関する情報を参照して、卸売取引価格、卸売取引量、受渡し時間及び卸売量基準に卸売取引契約IDを付与し、取引状態を「未注文」として、卸売取引契約情報11253Aに追加する。   Then, the wholesale planning unit 11151 refers to the received information on the wholesale transaction, gives the wholesale transaction contract ID to the wholesale transaction price, the wholesale transaction amount, the delivery time, and the wholesale amount standard, and sets the transaction state to “unordered”. To the wholesale transaction contract information 11253A.

次いで調達計画立案部11152は、卸売取引契約情報11253Aを参照して、取引状態が「未注文」である卸売取引契約を取得し、取得した卸売取引契約に含まれる「受渡し時間」の前後に任意の緩衝時間を付加した期間を負荷設備の運用計画の対象期間として設定する(SP2)。   Next, the procurement planning unit 11152 refers to the wholesale transaction contract information 11253A, acquires a wholesale transaction contract whose transaction status is “unordered”, and optionally before and after the “delivery time” included in the acquired wholesale transaction contract. Is set as the target period of the load facility operation plan (SP2).

「運用計画の対象期間」>「受け渡し時間」とする理由は、運転を切り替えた場合の負荷設備の応答速度を考慮しているためである。例えば受け渡し時間が「10:00〜11:00」である場合、負荷設備の運転を10:00丁度に低負荷に切り替えたとしても、負荷設備の負荷率が所望の負荷率に低下するまでに5分かかることがある。この場合、調達計画立案部11152は、受け渡し時間に任意の緩衝時間を付加した「9:55〜11:05」を運用計画の対象期間として設定する。   The reason “operation plan target period”> “delivery time” is because the response speed of the load facility when operation is switched is taken into consideration. For example, when the delivery time is “10:00 to 11:00”, even if the load facility operation is switched to a low load just at 10:00, the load factor of the load facility is reduced to the desired load factor. May take 5 minutes. In this case, the procurement plan planning unit 11152 sets “9:55 to 11:05” obtained by adding an arbitrary buffer time to the delivery time as the target period of the operation plan.

次いで調達計画立案部11152は、運用計画情報12155Aを参照して、運用計画情報12155Aに含まれる需要家20(需要家ID)のうちの一の需要家20及びこの需要家20に対応付けられている一の運用計画を抽出する(SP3)。   Next, the procurement plan planning unit 11152 refers to the operation plan information 12155A and is associated with one customer 20 of the customers 20 (customer ID) included in the operation plan information 12155A and the customer 20. Is extracted (SP3).

次いで取引時間基準変換部11153は、運用計画情報12155Aを参照して、ステップSP3で抽出した需要家20に対応付けられている負荷設備の一の運用計画の開始時刻を「t0」に設定し、この運用計画の開始時刻として設定した「t0」をステップSP2で設定した運用計画の対象期間の範囲内の任意の時刻に配置する(SP4)。   Next, the transaction time reference conversion unit 11153 refers to the operation plan information 12155A, sets the start time of one operation plan of the load facility associated with the customer 20 extracted in step SP3 to “t0”, “T0” set as the start time of the operation plan is arranged at an arbitrary time within the target period of the operation plan set in step SP2 (SP4).

次いでエネルギー消費量予測部12152は、ステップSP4で配置した開始時刻に基づいて、ステップSP2で設定した対象期間内で運用計画を実行した場合の負荷設備の経時的なエネルギー消費量の予測値を算出する(SP5)。   Next, the energy consumption prediction unit 12152 calculates a predicted value of the energy consumption over time of the load facility when the operation plan is executed within the target period set in step SP2 based on the start time arranged in step SP4. (SP5).

なおエネルギー消費量の予測値の算出方法は、消費エネルギー履歴情報12253Aに基づいて作成した重回帰モデル等の統計モデルを用いた方法、設備情報12252Aの設備の仕様情報に基づいて物理シミュレーションを実行する方法、或いは、これら両方を組み合わせた方法が採用される。   As a method for calculating the predicted value of energy consumption, a physical simulation is executed based on a method using a statistical model such as a multiple regression model created based on the energy consumption history information 12253A, and facility specification information in the facility information 12252A. A method or a combination of both methods is employed.

次いで取引量基準変換部11154は、ステップSP3で抽出した需要家20との間で合意した調達取引契約(図6)に含まれる調達量基準を参照して、この需要家20の調達量基準値(ベースライン)を算出する。そして取引量基準変換部11154は、算出したベースラインと、ステップSP5で算出されたエネルギー消費量の予測値との差分に基づいて、この需要家20の調達エネルギー量を算出する(SP6)。   Next, the transaction amount standard conversion unit 11154 refers to the procurement amount standard included in the procurement transaction contract agreed with the customer 20 extracted in step SP3 (FIG. 6), and the procurement amount reference value of the customer 20 (Baseline) is calculated. And the transaction amount reference | standard conversion part 11154 calculates the procurement energy amount of this consumer 20 based on the difference of the calculated baseline and the predicted value of the energy consumption calculated by step SP5 (SP6).

すなわち取引量基準変換部11154は、運用計画を実行せずに通常通り負荷設備を運転した場合のエネルギー消費量と、運用計画を実行して消費量を抑えた場合のエネルギー消費量との差分を算出し、得られた差分値を運用計画を実行した場合にこの需要家20から調達可能な調達エネルギー量として算出する。   That is, the transaction amount reference conversion unit 11154 calculates the difference between the energy consumption when the load facility is operated as usual without executing the operation plan and the energy consumption when the operation plan is executed and the consumption is suppressed. The calculated difference value is calculated as the amount of energy that can be procured from the customer 20 when the operation plan is executed.

またステップSP6において、取引量基準変換部11154は、算出した調達エネルギー量に対し、この需要家20との間で合意した調達取引契約に含まれる調達取引価格を掛けて、この需要家20に支払う調達額を算出する(SP6)。   In step SP6, the transaction amount reference conversion unit 11154 multiplies the calculated procurement energy amount by the procurement transaction price included in the procurement transaction contract agreed with the customer 20 and pays the customer 20 to it. A procurement amount is calculated (SP6).

またステップSP6において、取引量基準変換部11154は、ステップSP3で抽出した需要家20を調達取引先として卸売取引先30との間で合意した卸売取引契約(図5)に含まれる卸売量基準を参照して、この需要家20を調達先とした場合の卸売量基準値(ベースライン)を算出する。そして取引量基準変換部11154は、算出したベースラインと、ステップSP5で算出されたエネルギー消費量の予測値との差分に基づいて、この需要家20を調達先とした場合の卸売エネルギー量を算出する(SP6)。   Further, in step SP6, the transaction quantity reference conversion unit 11154 uses the wholesale quantity standard included in the wholesale transaction contract (FIG. 5) agreed with the wholesale supplier 30 using the customer 20 extracted in step SP3 as the procurement supplier. With reference to this, a wholesale quantity reference value (baseline) when the customer 20 is the procurement source is calculated. Based on the difference between the calculated baseline and the predicted value of the energy consumption calculated at step SP5, the transaction amount reference conversion unit 11154 calculates the wholesale energy amount when the customer 20 is the procurement source. (SP6).

調達計画立案部11152は、運用計画情報12155Aを参照して、運用計画情報12155Aに含まれる全ての需要家20について上記の処理(SP3〜SP6)を繰り返す(SP7)。   The procurement plan planning unit 11152 refers to the operation plan information 12155A, and repeats the above processing (SP3 to SP6) for all customers 20 included in the operation plan information 12155A (SP7).

調達計画立案部11152は、運用計画情報12155Aに含まれる全ての需要家20について上記の処理(SP3〜SP6)を実行すると(SP7)、ステップSP6で算出された需要家20ごと(運用計画ごと)の卸売エネルギー量を時間単位で積算する。そして調達計画立案部11152は、卸売取引契約を参照して、積算した卸売エネルギー量が卸売取引量以上であるか否かを判定する(SP8)。   When the procurement plan planning unit 11152 executes the above processing (SP3 to SP6) for all the customers 20 included in the operation plan information 12155A (SP7), for each customer 20 calculated in step SP6 (for each operation plan). Total amount of wholesale energy in hours. Then, the procurement planning unit 11152 refers to the wholesale transaction contract and determines whether or not the accumulated wholesale energy amount is equal to or greater than the wholesale transaction amount (SP8).

調達計画立案部11152は、ステップSP8の判断で否定結果を得ると、ステップSP3で抽出した一の運用計画、ステップSP4で配置した運用計画の開始時刻又はこれら運用計画及び開始時刻の組み合わせに基づいて、ステップSP6で算出される卸売エネルギー量が、卸売取引契約において要求される卸売取引量を充足していないものと判断する。   When the procurement plan planning unit 11152 obtains a negative result in the determination at step SP8, the procurement plan planning unit 11152 is based on the one operation plan extracted at step SP3, the start time of the operation plan arranged at step SP4, or a combination of these operation plans and start times. It is determined that the wholesale energy amount calculated in step SP6 does not satisfy the wholesale transaction amount required in the wholesale transaction contract.

この場合、調達計画立案部11152は、ステップSP3に戻り、他の運用計画を抽出する。またはステップSP4で取引時間基準変換部11153が開始時刻「t0」を他の時刻に配置する。他の運用計画又は他の開始時刻について、上記の処理(SP5〜SP7)が繰り返し実行されることになる。   In this case, the procurement plan planning unit 11152 returns to step SP3 and extracts another operation plan. Alternatively, the transaction time reference conversion unit 11153 places the start time “t0” at another time in step SP4. The above processing (SP5 to SP7) is repeatedly executed for other operation plans or other start times.

これに対し調達計画立案部11152は、ステップSP8の判断で肯定結果を得ると、ステップSP6で算出される卸売エネルギー量が、卸売取引契約において要求される卸売取引量を充足しているものと判断する。この場合、損益評価部11155は、充足していると判断された運用計画を実行した場合に需要家20に支払う調達額及び卸売取引先30から受取る卸売額に基づいて、エネルギー取引事業者10の損益を算出する(SP9)。   On the other hand, when the procurement plan making part 11152 obtains a positive result in the determination at step SP8, it determines that the wholesale energy amount calculated at step SP6 satisfies the wholesale transaction amount required in the wholesale transaction contract. To do. In this case, the profit and loss evaluation unit 11155, based on the procurement amount paid to the customer 20 and the wholesale amount received from the wholesale business partner 30 when executing the operation plan determined to be satisfied, Profit or loss is calculated (SP9).

具体的に損益評価部11155は、ステップSP6で算出された需要家20ごとの調達額を合算して、需要家20に支払う調達額の合計金額を算出する。一方で損益評価部11155は、ステップSP6で算出された需要家20ごとの卸売エネルギー量を合算して、卸売取引先30に卸売りする卸売エネルギー量の合計量を算出する。   Specifically, the profit / loss evaluation unit 11155 calculates the total amount of the procurement amount to be paid to the customer 20 by adding the procurement amount for each customer 20 calculated in step SP6. On the other hand, the profit / loss evaluation unit 11155 calculates the total amount of wholesale energy to be wholesaled to the wholesale business partner 30 by adding up the wholesale energy amount for each customer 20 calculated in step SP6.

そして損益評価部11155は、算出した合計量に卸売取引価格を掛けて、卸売取引先30から受取る卸売額の合計金額を算出する。最後に損益評価部11155は、需要家20に支払う調達額の合計金額と、卸売取引先30から受取る卸売額の合計金額との差分に基づいて、損益を算出する。   The profit / loss evaluation unit 11155 multiplies the calculated total amount by the wholesale transaction price to calculate the total amount of wholesale received from the wholesale business partner 30. Finally, the profit / loss evaluation unit 11155 calculates profit / loss based on the difference between the total amount of procurement paid to the customer 20 and the total amount of wholesale received from the wholesale business partner 30.

次いで損益評価部11155は、ステップSP9で算出した損益額がエネルギー取引事業者10において予め設定された目標値以上であるか否かを判断する(SP10)。損益評価部11155は、ステップSP10の判断で否定結果を得ると、否定結果を調達計画立案部11152に通知する。   Next, the profit / loss evaluation unit 11155 determines whether the profit / loss calculated in step SP9 is equal to or greater than a target value set in advance in the energy trading company 10 (SP10). When the profit / loss evaluation section 11155 obtains a negative result in the determination at step SP10, the profit / loss evaluation section 11155 notifies the procurement plan planning section 11152 of the negative result.

通知を受けた調達計画立案部11152は、ステップSP3に戻り、他の運用計画を抽出する。またはステップSP4で取引時間基準変換部11153が開始時刻「t0」を他の時刻に配置する。他の運用計画又は他の開始時刻について、上記の処理(SP5〜SP9)が繰り返し実行されることになる。   Upon receipt of the notification, the procurement plan planning unit 11152 returns to step SP3 and extracts another operation plan. Alternatively, the transaction time reference conversion unit 11153 places the start time “t0” at another time in step SP4. The above processing (SP5 to SP9) is repeatedly executed for other operation plans or other start times.

これに対し損益評価部11155は、ステップSP10の判断で肯定結果を得ると、肯定結果を調達計画立案部11152に通知する。通知を受けた調達計画立案部11152は、ステップSP3で抽出した運用計画及びステップSP4で配置した運用計画の開始時刻を含む情報を取引計画情報11156Aとして作成し、作成した取引計画情報11156Aを記憶装置1115に格納する一方で、出力装置1113に出力して(SP11)、このエネルギー取引計画立案処理を終了する。   On the other hand, when the profit / loss evaluation section 11155 obtains a positive result in the determination at step SP10, the profit / loss evaluation section 11155 notifies the procurement plan planning section 11152 of the positive result. Upon receipt of the notification, the procurement plan planning unit 11152 creates information including the operation plan extracted in step SP3 and the start time of the operation plan arranged in step SP4 as transaction plan information 11156A, and the created transaction plan information 11156A is stored in the storage device. While storing in 1115, it outputs to the output device 1113 (SP11), and this energy transaction planning process is complete | finished.

なおステップSP4〜SP10までの処理は、組合せ最適化処理として一般的に知られている手法であるが、この手法に替えて、例えば分岐限定法等の手法を採用して効率的に処理するとしてもよい。また組合せ最適化処理は、需要家数及び運用計画数が増加すると組合せの数が膨大になるため、現実的な時間で処理を完了することが困難になることも考えられる。この場合、ステップSP8及びSP10における判定基準を満たす組合せが見つかった時点で最適な組合せでなくても処理を完了させるとしてもよい。   Note that the processing from step SP4 to SP10 is a method generally known as combination optimization processing. However, instead of this method, for example, a method such as a branch and bound method is employed to efficiently perform processing. Also good. Further, in the combination optimization process, if the number of customers and the number of operation plans increase, the number of combinations becomes enormous, and it may be difficult to complete the process in a realistic time. In this case, the processing may be completed even if the combination is not optimal when a combination that satisfies the determination criteria in steps SP8 and SP10 is found.

図9は、運用計画作成処理の処理手順を示す。この運用計画作成処理は、設備運用管理装置121が設備管理者12からの入力操作を受け付けたことを契機として実行される処理である。説明の便宜上、処理主体を運用計画立案部12151として説明する。   FIG. 9 shows a processing procedure of the operation plan creation process. This operation plan creation process is a process that is executed when the facility operation management apparatus 121 receives an input operation from the facility manager 12. For convenience of explanation, the processing entity will be described as an operation plan drafting unit 12151.

まず運用計画立案部12151は、設備情報12252Aを参照して、需要家単位で設備情報を取得し、取得した需要家単位の設備情報12252Aに基づいて、一又は複数の実行可能な運用計画候補を作成する(SP11)。   First, the operation plan planning unit 12151 refers to the facility information 12252A, acquires facility information for each customer, and selects one or more executable operation plan candidates based on the acquired facility information 12252A for each customer. Create (SP11).

「実行可能な運用計画候補」とは、例えば運用計画の作成対象としている需要家20の負荷設備が空調であって、空調の運転方法が「100%負荷率運転」、「70%負荷率運転」、「50%負荷率運転」、「30%負荷率運転」及び「0%負荷率運転」の5つである場合、かつ、運転方法の最小継続時間が「10分」である場合、運用計画立案部12151は、各運転方法を10分以上継続する空調の運用計画を実行可能な運用計画候補として作成する。   “Executable operation plan candidates” are, for example, the load facilities of the customer 20 for which the operation plan is created are air conditioning, and the operation method of the air conditioning is “100% load factor operation”, “70% load factor operation” ”,“ 50% load factor operation ”,“ 30% load factor operation ”, and“ 0% load factor operation ”, and when the minimum duration of the operation method is“ 10 minutes ” The planning unit 12151 creates an operation plan candidate that can execute an air conditioning operation plan that continues each operation method for 10 minutes or more.

次いで運用計画立案部12151は、ステップSP11で作成した運用計画候補のなかから一の運用計画候補を選択し(SP12)、選択した運用計画候補及び設備情報12252Aに基づいて、調達取引実行時(運用計画候補を実行した場合)における需要家20の室温及び生産性等の環境に対する影響を予測する(SP13)。   Next, the operation plan drafting unit 12151 selects one operation plan candidate from the operation plan candidates created in step SP11 (SP12), and executes a procurement transaction (operation) based on the selected operation plan candidate and facility information 12252A. The influence on the environment such as the room temperature and productivity of the customer 20 when the plan candidate is executed) is predicted (SP13).

例えば室温に対する影響を予測する場合、運用計画立案部12151は、設備情報12252Aに含まれる空調のCOP等の物理的な特性情報と、建物の面積、体積、壁厚及び建築素材等の情報とに基づいて、熱移動モデルを構築し、予測外気温値を入力とした数値計算によって室温の経時的な変化を計算して予測する。   For example, when predicting the influence on room temperature, the operation planning unit 12151 includes physical property information such as air conditioning COP included in the facility information 12252A and information such as the area, volume, wall thickness, and building material of the building. Based on this, a heat transfer model is constructed, and the change over time in room temperature is calculated and predicted by numerical calculation using the predicted outside air temperature value as input.

次いで運用計画立案部12151は、運用条件情報12154Aを参照して、この需要家20の運用条件を取得し、ステップSP13で予測した影響が運用条件を満たすか否か否かを判断する(SP14)。   Next, the operation planning unit 12151 refers to the operation condition information 12154A, acquires the operation condition of the customer 20, and determines whether or not the influence predicted in step SP13 satisfies the operation condition (SP14). .

例えばステップSP12で選択した運用計画候補が「空調を負荷率30%で60分間運用する」という運用計画候補であり、ステップSP13で予測した影響が「運用計画開始60分後の室温は19℃」であり、かつ、ステップSP14で取得した需要家20の運用条件が「室温は19℃〜25℃であること」という運用条件であった場合、運用計画立案部12151は、予測した影響が運用条件を満たすものと判断する。   For example, the operation plan candidate selected in step SP12 is an operation plan candidate that “operates air conditioning for 60 minutes at a load factor of 30%”, and the effect predicted in step SP13 is “room temperature 19 minutes after starting operation plan is 19 ° C.” And the operation condition of the customer 20 acquired in step SP14 is the operation condition that “the room temperature is 19 ° C. to 25 ° C.”, the operation plan planning unit 12151 has the predicted influence as the operation condition. Judge that it satisfies.

運用計画立案部12151は、ステップSP14の判断で肯定結果を得ると、予測した影響が運用条件を満たすと判断し、ステップSP12で選択した運用計画候補を運用計画情報12155Aとして作成して記憶装置1215に格納する(SP15)。   When the operation plan drafting unit 12151 obtains a positive result in the determination at step SP14, it determines that the predicted influence satisfies the operation condition, creates the operation plan candidate selected at step SP12 as the operation plan information 12155A, and stores the storage device 1215. (SP15).

これに対し運用計画立案部12151は、ステップSP14の判断で否定結果を得ると、予測した影響が運用条件を満たさないと判断する。そして運用計画立案部12151は、ステップSP12で選択した運用計画候補は修正可能であるか否かを判断する(SP16)。   On the other hand, if the operation plan making unit 12151 obtains a negative result in the determination at step SP14, it determines that the predicted influence does not satisfy the operation conditions. Then, the operation plan planning unit 12151 determines whether or not the operation plan candidate selected in step SP12 can be corrected (SP16).

例えばステップSP11で参照した設備情報12252Aにおいて空調の運転方法の最小継続時間が「10分」と定められており、かつ、ステップSP12で選択した運用計画候補が「空調を負荷率30%で10分間運用する」ものであるならば、これ以上運用時間を短縮することが不可能であるため、運用計画立案部12151は、この運用計画候補は修正不可能であると判断する。   For example, in the facility information 12252A referred to in step SP11, the minimum duration of the air conditioning operation method is defined as “10 minutes”, and the operation plan candidate selected in step SP12 is “air conditioning is 10 minutes at a load factor of 30%. If it is “operating”, it is impossible to further shorten the operation time, and the operation plan drafting unit 12151 determines that this operation plan candidate cannot be corrected.

運用計画立案部12151は、ステップSP16の判断で否定結果を得ると、ステップSP12で選択した運用計画候補を対象とした処理を終了し、ステップSP18に移行する。これに対し運用計画立案部12151は、ステップSP16の判断で肯定結果を得ると、設備情報12252Aを参照して、可能な範囲で運用計画候補を修正する(SP17)。   If the operation plan drafting unit 12151 obtains a negative result in the determination at step SP16, it ends the process for the operation plan candidate selected at step SP12, and proceeds to step SP18. On the other hand, when the operation plan drafting unit 12151 obtains a positive result in the determination at step SP16, it refers to the facility information 12252A and corrects the operation plan candidate as much as possible (SP17).

例えばステップSP11で参照した設備情報12252Aにおいて空調の運転方法の最小継続時間が「10分」と定められており、かつ、ステップSP12で選択した運用計画候補が「空調を負荷率30%で20分間運用する」ものであるならば、「空調を負荷率30%で15分間運用する」という運用計画候補に修正することができる。修正後、運用計画立案部12151は、ステップSP13に移行して、上記の処理を実行する。   For example, in the facility information 12252A referred to in step SP11, the minimum duration of the air conditioning operation method is defined as “10 minutes”, and the operation plan candidate selected in step SP12 is “air conditioning is 20 minutes at a load factor of 30%. If it is “operating”, it can be corrected to an operation plan candidate “operating air conditioning for 15 minutes at a load factor of 30%”. After the correction, the operation planning unit 12151 moves to step SP13 and executes the above processing.

運用計画立案部12151は、ステップSP11で作成した全ての運用計画候補について上記の処理(SP12〜SP17)を繰り返し(SP18)、需要家20ごとに実行可能な複数の運用計画候補を作成した後、この運用計画立案処理を終了する。   The operation plan planning unit 12151 repeats the above processing (SP12 to SP17) for all operation plan candidates created in step SP11 (SP18), and after creating a plurality of operation plan candidates executable for each customer 20, This operation planning process is terminated.

なお上記説明してきた運用計画立案処理(図9)が実行されて運用計画情報12155Aが作成されると、この運用計画情報12155Aを用いて取引計画立案処理(図8)が実行される。取引計画立案処理が実行されると、取引計画情報11156Aが作成される。   When the operation plan planning process (FIG. 9) described above is executed and the operation plan information 12155A is created, the transaction plan planning process (FIG. 8) is executed using the operation plan information 12155A. When the transaction plan planning process is executed, transaction plan information 11156A is created.

エネルギー取引事業者10は、この取引計画情報11156Aを用いて、卸売取引先30に対して卸売取引契約の締結依頼を注文する。注文が約定された場合、エネルギー取引管理装置111は、取引管理者11による入力操作を契機として卸売取引契約情報11253Aの取引状況を「約定済み」に書き換える。   The energy trading company 10 uses this trading plan information 11156A to order a wholesale transaction contract conclusion request to the wholesale business partner 30. When the order is executed, the energy transaction management apparatus 111 rewrites the transaction status of the wholesale transaction contract information 11253A to “confirmed” in response to an input operation by the transaction manager 11.

その後エネルギー取引管理装置111は、約定済みの取引計画情報11156Aを設備運用管理装置121に送信する。設備運用管理装置121の制御実行部12153は、受信した取引計画情報11156Aに基づいて、需要家20の設備制御端末22に制御信号を送信することにより負荷設備を制御して実際に調達取引を実行する。   Thereafter, the energy transaction management apparatus 111 transmits the contracted transaction plan information 11156A to the facility operation management apparatus 121. Based on the received transaction plan information 11156A, the control execution unit 12153 of the facility operation management apparatus 121 transmits a control signal to the facility control terminal 22 of the customer 20 to control the load facility and actually execute the procurement transaction. To do.

エネルギー取引管理システム1による以上の処理が実行されることで、需要家20と卸売取引先30との間における取引を実現することができる。   By executing the above processing by the energy transaction management system 1, it is possible to realize a transaction between the customer 20 and the wholesale business partner 30.

(5)画面構成
図10は、取引計画情報11156Aの表示画面の一例を示す。この取引計画情報11156Aは、エネルギー取引計画立案処理(図8)のステップSP11の処理が実行されることで、出力装置1113により表示される。
(5) Screen Configuration FIG. 10 shows an example of a display screen for the transaction plan information 11156A. This transaction plan information 11156A is displayed by the output device 1113 by executing the process of step SP11 of the energy transaction plan planning process (FIG. 8).

図10の場合、最終的に作成された取引計画情報11156Aのうち、C1、C2、C3及びC4の4軒の需要家20のそれぞれの運用計画C1−2、C2−1、C3−2、C4−3のみを表示対象とした場合の表示画面が示されている。   In the case of FIG. 10, among the finally created transaction plan information 11156A, the respective operation plans C1-2, C2-1, C3-2, C4 of the four customers 20 of C1, C2, C3, and C4. A display screen when only -3 is displayed is shown.

縦軸には卸売取引量、横軸には受渡し時間が示されており、運用計画C1−2、C2−1、C3−2、C4−3が実行された場合の卸売取引量を時間ごとに積算した結果が示されている。受け渡し時間の前後に所定の期間を付加した期間が運用計画の対象期間であり、運用計画の開始時刻である「t0」は、受け渡し時間の範囲内に限らず、この対象期間内に配置されていることが示されている。   The vertical axis shows the wholesale transaction volume, and the horizontal axis shows the delivery time. The wholesale transaction volume when the operation plans C1-2, C2-1, C3-2, and C4-3 are executed is shown for each hour. The accumulated result is shown. A period obtained by adding a predetermined period before and after the delivery time is the target period of the operation plan, and “t0” that is the start time of the operation plan is not limited to within the range of the delivery time, but is arranged within this target period. It has been shown that

例えば運用計画IDが「C1−2」の運用計画C12は、09:55に運用開始時刻「t0」を配置して実行されることが示されている。またこの運用計画C12が実行されると、10:20から10:45までの間の卸売取引量はマイナスの値になることが示されている。マイナスの値になる場合、エネルギー消費量予測部12152により予測された運用計画C1−2のエネルギー消費量の予測値が卸売取引契約の卸売量基準により算出される卸売基準値を超えていることを意味する。   For example, it is indicated that the operation plan C12 with the operation plan ID “C1-2” is executed with the operation start time “t0” arranged at 09:55. It is also shown that when this operation plan C12 is executed, the wholesale transaction volume between 10:20 and 10:45 becomes a negative value. In the case of a negative value, it is confirmed that the predicted value of energy consumption of the operation plan C1-2 predicted by the energy consumption prediction unit 12152 exceeds the wholesale standard value calculated by the wholesale quantity standard of the wholesale transaction contract. means.

図11は、取引計画情報11156Aの表示画面の一例を示す。図11の場合、最終的に作成された取引計画情報11156Aに含まれる全ての需要家20又はC1〜C4以外の需要家20の運用計画を表示対象とした表示画面が示されている。   FIG. 11 shows an example of a display screen of the transaction plan information 11156A. In the case of FIG. 11, the display screen which made the display object the operation plan of all the consumers 20 contained in the finally created transaction plan information 11156A or the consumers 20 other than C1-C4 is shown.

図10と同様、縦軸には卸売取引量、横軸には受け渡し時間が示されており、複数の運用計画が実行された場合の卸売取引量を時間ごとに積算した結果が示されている。卸売取引契約における卸売取引量及び受渡し時間は、破線で示される範囲であり、破線の範囲内を積算結果が覆っていることが示されている。この場合、取引計画情報11156Aに含まれる複数の運用計画を実行すると、卸売取引契約における卸売取引量及び受渡し時間を充足することが示されている。   Similar to FIG. 10, the vertical axis shows the wholesale transaction volume, and the horizontal axis shows the delivery time, and shows the result of integrating the wholesale transaction volume for each time when a plurality of operation plans are executed. . The wholesale transaction amount and the delivery time in the wholesale transaction contract are in the range indicated by the broken line, and it is shown that the integration result covers the range of the broken line. In this case, it is shown that when a plurality of operation plans included in the transaction plan information 11156A are executed, the wholesale transaction amount and the delivery time in the wholesale transaction contract are satisfied.

なお時刻によっては卸売取引量に余剰が発生する場合がある。ここでは9:55〜10:00の間において、需要家20から調達エネルギーを余計に調達していることが示されている。しかしこの場合、卸売取引契約における卸売取引量及び受け渡し時間を充足する運用計画であるため、ステップSP10の判定基準を超えているのであれば取引計画情報11156Aとして作成するとしてもよい。   Depending on the time, there may be a surplus in the wholesale transaction volume. Here, it is shown that the procurement energy is excessively procured from the customer 20 between 9:55 and 10:00. However, in this case, since the operation plan satisfies the wholesale transaction amount and the delivery time in the wholesale transaction contract, the transaction plan information 11156A may be created as long as it exceeds the criterion of step SP10.

(6)本実施の形態による効果
以上のように本実施の形態によるエネルギー取引管理システム1によれば、需要家20から収集した設備情報12252A及び運用条件情報12154Aに基づいて、調達取引実行時に実現可能な運用計画情報12155Aを作成し、卸売取引先30から受信した卸売取引契約情報11253Aで規定されている受渡し時間上に需要家20ごとの運用計画を対応付ける。その上で需要家20との調達取引契約に基づいた調達エネルギー量及び卸売取引契約に基づいた卸売エネルギー量を算出する。卸売エネルギー量の積算値が卸売取引契約で規定されている卸売取引量を満たし、かつ、調達エネルギー量、卸売エネルギー量、調達取引契約及び卸売取引契約に基づいて算出されるエネルギー取引事業者10の損益が予め設定した目標値を満たす取引計画情報11156Aを作成し、取引計画情報11156Aに基づいて、需要家20の負荷設備を制御するようにした。よってエネルギー取引事業者10は、取引量及び取引時間の異なる取引契約間でエネルギー取引を実現することができる。
(6) Effect by this Embodiment As described above, according to the energy transaction management system 1 according to this embodiment, it is realized at the time of executing a procurement transaction based on the facility information 12252A and the operation condition information 12154A collected from the customer 20. Possible operation plan information 12155A is created, and an operation plan for each customer 20 is associated with the delivery time defined in the wholesale transaction contract information 11253A received from the wholesale business partner 30. After that, the procurement energy amount based on the procurement transaction contract with the consumer 20 and the wholesale energy amount based on the wholesale transaction contract are calculated. The total value of the wholesale energy amount satisfies the wholesale transaction amount stipulated in the wholesale transaction contract, and is calculated based on the procurement energy amount, wholesale energy amount, procurement transaction contract and wholesale transaction contract. Transaction plan information 11156A satisfying a preset target value is created, and the load facility of the customer 20 is controlled based on the transaction plan information 11156A. Therefore, the energy trading company 10 can realize energy trading between trading contracts with different trading volumes and trading times.

(7)他の実施の形態
なお本実施の形態においては、調達取引エネルギー量及び卸売取引エネルギー量は一定の時間で区切られた離散値としたが、これに限らず連続値であってもよい。また負荷設備の運用計画についても、一定の時間で区切られた離散的な運用計画としたが、これに限らず運用条件を満たす連続的な運用計画としてもよい。
(7) Other Embodiments In this embodiment, the procurement transaction energy amount and the wholesale transaction energy amount are discrete values separated by a certain time, but are not limited to this and may be continuous values. . In addition, the load facility operation plan is also a discrete operation plan divided at a fixed time, but is not limited thereto, and may be a continuous operation plan that satisfies the operation conditions.

また本実施の形態においては、エネルギー取引計画立案処理(図8)においてエネルギー取引事業者10の損益を算出する際、調達エネルギー量と調達取引価格とを掛けて算出される調達額と、卸売エネルギー量と卸売取引価格とを掛けて算出される卸売額とに基づいて損益を算出するとしたが、これに限らず調達エネルギー量と卸売エネルギー量との比率と、調達取引価格とを掛けて「実質調達取引価格」を算出し、この実質調達取引価格に基づいて損益を算出するとしてもよい。また実質調達取引価格に基づいて取引計画情報11156Aを作成するとしてもよい。   Further, in the present embodiment, when calculating the profit and loss of the energy trading company 10 in the energy transaction planning process (FIG. 8), the procurement amount calculated by multiplying the procurement energy amount and the procurement transaction price, and the wholesale energy The profit and loss was calculated based on the wholesale amount calculated by multiplying the amount by the wholesale transaction price, but not limited to this, the ratio between the procurement energy amount and the wholesale energy amount multiplied by the procurement transaction price is The “procurement transaction price” may be calculated, and the profit / loss may be calculated based on the actual procurement transaction price. Transaction plan information 11156A may be created based on the actual procurement transaction price.

実質調達取引価格について具体的に説明すると、例えば調達取引契約において規定されている調達取引価格が「10円/kW・h」の場合であって、調達エネルギー量のうち半分しか卸売エネルギー量として卸売することができない場合、調達エネルギー量と卸売エネルギー量との比率は「2/1」となる。このときの実質調達取引価格は、「10円/kw・h」×「2/1」=「20円/kw・h」と算出される。この実質調達取引価格は、卸売取引価格が「20円/kw・h」より少ない場合、エネルギー取引事業者10の損益がマイナスになることを示す指標となる。   Concretely explaining the actual procurement transaction price, for example, when the procurement transaction price specified in the procurement transaction contract is “10 yen / kW · h”, only half of the procurement energy amount is wholesale as the wholesale energy amount. If this is not possible, the ratio between the amount of energy procured and the amount of wholesale energy will be “2/1”. The actual procurement transaction price at this time is calculated as “10 yen / kw · h” × “2/1” = “20 yen / kw · h”. The real procurement transaction price is an index indicating that the profit and loss of the energy trading company 10 is negative when the wholesale transaction price is less than “20 yen / kw · h”.

また本実施の形態においては、エネルギー取引計画立案処理(図8)において取引計画情報11156Aを出力装置1113に出力表示するとしたが、出力装置1113以外の他の端末(例えば取引管理者11の情報入出力端末113、設備管理者12の出力装置1213又は情報入出力端末123、需要家20の情報入出力端末21)に表示してもよい。また取引計画情報11156Aに限らず、上記の実質調達価格を表示してもよい。   In the present embodiment, the transaction plan information 11156A is output and displayed on the output device 1113 in the energy transaction plan planning process (FIG. 8), but other terminals (for example, the information input of the transaction manager 11) are displayed. The information may be displayed on the output terminal 113, the output device 1213 of the facility manager 12, the information input / output terminal 123, or the information input / output terminal 21) of the customer 20. Moreover, you may display not only the transaction plan information 11156A but said real procurement price.

また本実施の形態においては、設備管理者12の入出力操作を契機として運用計画立案処理(図9)が実行されるとしたが、この入出力操作はエネルギー取引計画立案処理(図8)の実行中を除いて任意の時点で実行される。またこの入出力操作は設備管理者12が実行するとしたが、需要家20が情報入出力端末21に出力された取引計画情報、実質調達価格又はこれら両方の情報に基づいて、情報入出力端末21を介して実行するとしてもよい。   In the present embodiment, the operation plan planning process (FIG. 9) is executed in response to the input / output operation of the facility manager 12, but this input / output operation is performed in the energy transaction plan planning process (FIG. 8). It is executed at any time except during execution. In addition, the input / output operation is performed by the facility manager 12, but the information input / output terminal 21 is based on the transaction plan information output to the information input / output terminal 21 by the customer 20, the actual procurement price or both. It may be executed via.

また本実施の形態においては、エネルギー取引計画立案処理(図8)において卸売取引契約に規定されている卸売取引量を充足する取引計画情報11156Aを作成するとしたが、これに限らず取引管理者11の入出力操作によって任意に設定された予備率を加味した卸売取引量を充足する取引計画情報11156Aを作成するとしてもよい。またこの予備率の決定方法は、運用計画情報12155Aに基づいて算出される卸売エネルギー量の変動値から確率的な手法に基づいて算出するとしてもよい。   In the present embodiment, the transaction plan information 11156A that satisfies the wholesale transaction amount stipulated in the wholesale transaction contract is created in the energy transaction plan planning process (FIG. 8). The transaction plan information 11156A that satisfies the wholesale transaction amount that takes into account the reserve rate arbitrarily set by the input / output operation may be created. In addition, this reserve ratio determination method may be calculated based on a probabilistic technique from the fluctuation value of the wholesale energy amount calculated based on the operation plan information 12155A.

また本実施の形態においては、エネルギー取引計画立案処理(図8)において目標とする卸売取引量が予め与えられているものとしたが、これに限らずエネルギー取引計画立案処理の実行時点で実行可能な取引計画に基づいて、卸売取引量を決定してもよい。   In the present embodiment, the target wholesale transaction volume is given in advance in the energy transaction planning process (FIG. 8). However, the present invention is not limited to this and can be executed at the time of execution of the energy transaction planning process. The wholesale transaction volume may be determined based on a simple transaction plan.

また本実施の形態においては、エネルギー取引計画立案処理(図8)においてエネルギー取引事業者10の損益に基づいて取引計画情報11156Aを作成するとしたが、これに限らず卸売エネルギーが変動することによって生まれる利益額のばらつき、すなわち分散又は標準偏差等に基づいて取引計画情報11156Aを作成するようにしてもよい。   In the present embodiment, the transaction plan information 11156A is created based on the profit and loss of the energy trading company 10 in the energy trading plan planning process (FIG. 8). However, the present invention is not limited to this. The transaction plan information 11156A may be created based on the variation of the profit amount, that is, the variance or the standard deviation.

また本実施の形態においては、1つの卸売取引契約に対して1回のエネルギー取引計画立案処理を実行するとしたが、これに限らず卸売取引契約に規定されている受渡し時間に至るまでに新たな外気温、運用計画又は運用条件等が得られた場合、これらを用いて任意の回数のエネルギー取引計画立案処理を繰り返し実行するとしてもよい。また調達取引実行中であっても、卸売エネルギー量の積算値が卸売取引契約で規定されている卸売取引量に満たないことが明らかになった場合、その時点でエネルギー取引計画立案処理を再度実行するとしてもよい。   In the present embodiment, one energy transaction planning process is executed for one wholesale transaction contract. However, the present invention is not limited to this, and a new delivery time is required until the delivery time specified in the wholesale transaction contract is reached. When the outside air temperature, the operation plan, the operation condition, or the like is obtained, the energy transaction plan planning process may be repeatedly executed by using these. Even if a procurement transaction is in progress, if it becomes clear that the total value of the wholesale energy amount is less than the wholesale transaction amount stipulated in the wholesale transaction contract, the energy transaction planning process is executed again at that time. You may do that.

1 エネルギー取引管理システム
10 エネルギー取引事業者
11 取引管理者
111 エネルギー取引管理装置
112 取引契約情報管理装置
113 情報入出力端末
12 設備管理者
121 設備運用管理装置
122 設備情報管理装置
123 情報入出力端末
20 需要家
21 情報入出力端末
22 設備制御端末
30 卸売取引先
30A 取引商品情報配信端末
DESCRIPTION OF SYMBOLS 1 Energy transaction management system 10 Energy transaction provider 11 Transaction manager 111 Energy transaction management device 112 Transaction contract information management device 113 Information input / output terminal 12 Facility manager 121 Facility operation management device 122 Facility information management device 123 Information input / output terminal 20 Customer 21 Information input / output terminal 22 Equipment control terminal 30 Wholesale business partner 30A Transaction product information distribution terminal

Claims (9)

エネルギー取引の計画作成と実行を行うエネルギー取引管理システムであって、
取引可能なエネルギーは、需要家が所有する設備の動作を制御することにより生産され、前記需要家が所有する前記設備の動作制御は、少なくとも制御内容と制御開始時刻とを含んで構成される前記需要家の運用計画に基づいて実行されるものであって、
前記需要家から調達したエネルギーの卸売先との取引契約情報に規定されるエネルギーの受渡し時間の範囲内の任意の時刻に前記需要家の運用計画の開始時刻を設定する取引時間基準変換部と、
前記取引時間基準変換部により設定された開始時刻と予め設定されている制御内容とに基づいて前記需要家が所有する設備の動作制御を実行した際の時間ごとの消費エネルギー量を予測するエネルギー消費量予測部と、
前記エネルギー消費量予測部により予測された消費エネルギー量と前記需要家との取引契約情報とに基づいて調達量を算出し、前記エネルギー消費量予測部により予測された消費エネルギー量と前記卸売先との取引契約情報とに基づいて卸売量を算出する取引量基準変換部と、を備える
とを特徴とするエネルギー取引管理システム。
An energy transaction management system for planning and executing energy transactions,
The energy that can be traded is produced by controlling the operation of the equipment owned by the consumer, and the operation control of the equipment owned by the consumer comprises at least the control content and the control start time. It is executed based on the customer's operation plan,
A transaction time reference conversion unit that sets a start time of the operation plan of the consumer at an arbitrary time within a range of energy delivery time defined in a transaction contract information with a wholesaler of energy procured from the consumer;
Energy consumption for predicting the amount of energy consumed per hour when the operation control of the equipment owned by the customer is executed based on the start time set by the transaction time reference conversion unit and the preset control content A quantity prediction unit;
Calculate the procurement amount based on the energy consumption amount predicted by the energy consumption amount prediction unit and the transaction contract information with the customer, the energy consumption amount predicted by the energy consumption amount prediction unit and the wholesale destination A transaction volume standard conversion unit for calculating a wholesale volume based on the transaction contract information of
Energy trading management system, wherein a call.
前記卸売先との取引契約情報を充足するように、前記需要家の運用計画を当該需要家の他の運用計画又は異なる需要家の運用計画に変更する調達計画立案部をさらに備えるA procurement plan planning unit that changes the operation plan of the consumer to another operation plan of the consumer or an operation plan of a different customer so as to satisfy the transaction contract information with the wholesaler
ことを特徴とする請求項1に記載のエネルギー取引管理システム。The energy transaction management system according to claim 1.
前記卸売先との卸売取引に関する情報を参照し、前記卸売取引の価格が予め設定されている価格以上であり、かつ前記卸売取引の卸売量が予め設定されている卸売量の範囲内であると判断した場合、前記卸売先との取引契約情報を作成する卸売計画立案部をさらに備えるWith reference to information related to wholesale transactions with the wholesale destination, the price of the wholesale transaction is equal to or higher than a preset price, and the wholesale quantity of the wholesale transaction is within a preset wholesale quantity range If it is determined, a wholesale planning unit that creates transaction contract information with the wholesaler is further provided.
ことを特徴とする請求項2に記載のエネルギー取引管理システム。The energy transaction management system according to claim 2.
前記卸売先への卸売量が前記卸売先との取引契約情報に規定されている取引目標の量よりも少ない場合、又は取引による損益が予め定めた条件に満たない場合、前記需要家の運用計画又は前記需要家の運用計画の開始時刻を変更し、前記需要家からの調達量及び前記卸売先への卸売量を前記取引量基準変換部に再算出させる調達計画立案部をさらに備えるWhen the wholesale amount to the wholesaler is less than the amount of the transaction target specified in the transaction contract information with the wholesaler, or when the profit / loss due to the transaction does not satisfy the predetermined condition, the operation plan of the consumer Or a procurement plan drafting unit that changes a start time of the operation plan of the consumer and causes the transaction amount standard conversion unit to recalculate the procurement amount from the consumer and the wholesale amount to the wholesale destination.
ことを特徴とする請求項1に記載のエネルギー取引管理システム。The energy transaction management system according to claim 1.
前記受渡し時間の前後に、前記設備の動作の応答速度に基づいて定められる時間である所定の時間を付加した期間を前記範囲として設定する調達計画立案部をさらに備えるA procurement plan planning unit is further provided that sets, as the range, a period in which a predetermined time, which is a time determined based on a response speed of the operation of the equipment, is added before and after the delivery time.
ことを特徴とする請求項1に記載のエネルギー取引管理システム。The energy transaction management system according to claim 1.
前記需要家との取引契約情報に基づいて算出する調達量と、前記卸売先との取引契約情報に基づいて算出する卸売量の比率を、前記需要家との取引契約情報に規定されている取引価格に乗算することで前記需要家との取引における実質取引価格を算出し、前記実質取引価格に基づいて損益を算出する損益評価部をさらに備えるTransactions stipulated in the transaction contract information with the consumer, the ratio of the procurement amount calculated based on the transaction contract information with the consumer and the wholesale amount calculated based on the transaction contract information with the wholesaler A profit / loss evaluation unit that calculates a real transaction price in a transaction with the customer by multiplying the price and calculates profit / loss based on the real transaction price is further provided.
ことを特徴とする請求項1に記載のエネルギー取引管理システム。The energy transaction management system according to claim 1.
前記需要家の運用計画を管理する設備運用管理装置を有し、Having a facility operation management device for managing the operation plan of the consumer;
前記設備運用管理装置は、The facility operation management device is:
前記需要家が所有する設備の仕様を規定した設備情報に基づいて、前記設備に対して1又は複数の運用計画候補情報を作成し、Based on equipment information that defines the specifications of equipment owned by the customer, create one or more operation plan candidate information for the equipment,
前記運用計画候補情報に基づいて前記設備の運用を実行した場合の外部環境の影響を予測し、Predicting the impact of the external environment when the operation of the facility is executed based on the operation plan candidate information,
前記外部環境の影響が予め設定された条件を満たす場合、前記運用計画候補情報を前記需要家の運用計画として設定する運用計画立案部を備えるWhen an influence of the external environment satisfies a preset condition, an operation plan drafting unit is provided that sets the operation plan candidate information as an operation plan for the consumer.
ことを特徴とする請求項1に記載のエネルギー取引管理システム。The energy transaction management system according to claim 1.
前記受渡し時間の前後に所定の時間を付加した期間を前記範囲として設定し、Set a period in which a predetermined time is added before and after the delivery time as the range,
前記所定の時間は、前記設備の動作の応答速度に基づいて定められる時間であり、The predetermined time is a time determined based on a response speed of operation of the equipment,
前記卸売先への卸売量が前記卸売先との取引契約情報に規定されている取引目標の量よりも少ない場合、又は取引による損益が予め定めた条件に満たない場合、前記需要家の運用計画又は前記需要家の運用計画の開始時刻を変更し、前記需要家からの調達量及び前記卸売先への卸売量を前記取引量基準変換部に再算出させる調達計画立案部をさらに備えるWhen the wholesale amount to the wholesaler is less than the amount of the transaction target specified in the transaction contract information with the wholesaler, or when the profit / loss due to the transaction does not satisfy the predetermined condition, the operation plan of the consumer Or a procurement plan drafting unit that changes a start time of the operation plan of the consumer and causes the transaction amount standard conversion unit to recalculate the procurement amount from the consumer and the wholesale amount to the wholesale destination.
を備えることを特徴とする請求項1に記載のエネルギー取引管理システム。The energy transaction management system according to claim 1, comprising:
前記需要家の運用計画を管理する設備運用管理装置を有し、Having a facility operation management device for managing the operation plan of the consumer;
前記設備運用管理装置は、The facility operation management device is:
前記需要家が所有する設備の仕様を規定した設備情報に基づいて、前記設備に対して1又は複数の運用計画候補情報を作成し、Based on equipment information that defines the specifications of equipment owned by the customer, create one or more operation plan candidate information for the equipment,
前記運用計画候補情報に基づいて前記設備の運用を実行した場合の外部環境の影響を予測し、Predicting the impact of the external environment when the operation of the facility is executed based on the operation plan candidate information,
前記外部環境の影響が予め設定された条件を満たす場合、前記運用計画候補情報を前記需要家の運用計画として設定し、If the influence of the external environment satisfies a preset condition, the operation plan candidate information is set as an operation plan for the consumer,
前記外部環境の影響が予め設定された条件を満たさない場合、前記設備情報に基づいて前記運用計画候補情報を修正し、修正した運用計画候補情報を実行した場合の外部環境の影響を再予測し、前記再予測した外部環境の影響が前記予め設定された条件を満たす場合、修正した運用計画候補情報を前記需要家の運用計画として設定する運用計画立案部を備えるWhen the influence of the external environment does not satisfy a preset condition, the operation plan candidate information is corrected based on the facility information, and the influence of the external environment when the corrected operation plan candidate information is executed is re-predicted. And an operation plan drafting unit that sets the revised operation plan candidate information as the operation plan of the customer when the re-predicted influence of the external environment satisfies the preset condition.
ことを特徴とする請求項1に記載のエネルギー取引管理システム。The energy transaction management system according to claim 1.
JP2014106053A 2014-05-22 2014-05-22 Energy transaction management system Active JP6490351B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014106053A JP6490351B2 (en) 2014-05-22 2014-05-22 Energy transaction management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014106053A JP6490351B2 (en) 2014-05-22 2014-05-22 Energy transaction management system

Publications (3)

Publication Number Publication Date
JP2015222472A JP2015222472A (en) 2015-12-10
JP2015222472A5 JP2015222472A5 (en) 2017-06-29
JP6490351B2 true JP6490351B2 (en) 2019-03-27

Family

ID=54785448

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014106053A Active JP6490351B2 (en) 2014-05-22 2014-05-22 Energy transaction management system

Country Status (1)

Country Link
JP (1) JP6490351B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7024237B2 (en) * 2017-07-20 2022-02-24 株式会社Ihi Operation plan creation support device and method
CN110322298B (en) * 2019-05-30 2023-11-17 平安科技(深圳)有限公司 Intelligent management method, device and computer equipment for information tracking
JP7669308B2 (en) * 2022-03-10 2025-04-28 株式会社東芝 POWER TRADING SUPPORT SYSTEM, POWER TRADING SUPPORT METHOD, AND POWER TRADING SUPPORT PROGRAM

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005149384A (en) * 2003-11-19 2005-06-09 Sanki Eng Co Ltd Energy evaluation method
JP5679847B2 (en) * 2011-02-04 2015-03-04 株式会社東芝 Energy management system and energy management method
JP5895627B2 (en) * 2012-03-15 2016-03-30 富士通株式会社 Control planning method, control method, and control apparatus
JP5953207B2 (en) * 2012-11-05 2016-07-20 株式会社日立製作所 Demand plan management system

Also Published As

Publication number Publication date
JP2015222472A (en) 2015-12-10

Similar Documents

Publication Publication Date Title
JP6463449B2 (en) Power transaction management system and power transaction management method
Zhang et al. Dynamic transportation planning for prefabricated component supply chain
JP6781602B2 (en) Business support system and business support method
Ahiska et al. A Markov decision process-based policy characterization approach for a stochastic inventory control problem with unreliable sourcing
JP5695848B2 (en) Simultaneous equal amount apparatus, control method thereof and program thereof
Bucking et al. On modelling of resiliency events using building performance simulation: a multi-objective approach
Moghimi et al. A short-term decision-making model for a price-maker distribution company in wholesale and retail electricity markets considering demand response and real-time pricing
JP6117984B1 (en) Supply and demand management device, supply and demand management method, and supply and demand management program
US10977609B1 (en) Distribution-independent inventory approach under multiple service level targets
JP6490351B2 (en) Energy transaction management system
CN107590548A (en) Power consumer work dispatching method and storage medium
JP2022171104A (en) Management computer for transaction of carbon dioxide credit
JP2019008501A (en) Production managing system and production managing method
JP2016148945A (en) Electricity transaction support system, electricity transaction support method and program
JP5606214B2 (en) Automatic power trading system
JP6520142B2 (en) Optimal trading volume determination system, optimal trading volume determination method and program
WO2014132369A1 (en) Demand response plan preparation system and demand response plan preparation method
Qin et al. Automatic power exchange for distributed energy resource networks: Flexibility scheduling and pricing
US20140330532A1 (en) Systems and methods for automated electricity delivery management for out-of-control-area resources
WO2018207226A1 (en) Aggregator-side system, prosumer-side system, aggregation system, and aggregation method
JP7069655B2 (en) Aggregation device, power demand control method, and power demand control program
US11393002B2 (en) Transaction system, method, and medium
JP2015222472A5 (en) Energy transaction management system
JP7618617B2 (en) Inventory management device, inventory management method, and inventory management program
JP6018105B2 (en) Prediction system, prediction method

Legal Events

Date Code Title Description
A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20170517

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20170517

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20180525

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20180710

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20180830

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20190205

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20190227

R150 Certificate of patent or registration of utility model

Ref document number: 6490351

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150