Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP6503969B2 - Determination method of metal work - Google Patents
[go: Go Back, main page]

JP6503969B2 - Determination method of metal work - Google Patents

Determination method of metal work Download PDF

Info

Publication number
JP6503969B2
JP6503969B2 JP2015156212A JP2015156212A JP6503969B2 JP 6503969 B2 JP6503969 B2 JP 6503969B2 JP 2015156212 A JP2015156212 A JP 2015156212A JP 2015156212 A JP2015156212 A JP 2015156212A JP 6503969 B2 JP6503969 B2 JP 6503969B2
Authority
JP
Japan
Prior art keywords
work
metal
inspection jig
hole
mounting surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2015156212A
Other languages
Japanese (ja)
Other versions
JP2017035700A (en
Inventor
貴尚 新美
貴尚 新美
正晃 下地
正晃 下地
信幸 正後
信幸 正後
晴久 近藤
晴久 近藤
智哉 助廣
智哉 助廣
朝倉 健
健 朝倉
健史郎 芝
健史郎 芝
中村 功
功 中村
義忠 杉浦
義忠 杉浦
剛生 三浦
剛生 三浦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toyota Motor Corp
Original Assignee
Toyota Motor Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyota Motor Corp filed Critical Toyota Motor Corp
Priority to JP2015156212A priority Critical patent/JP6503969B2/en
Publication of JP2017035700A publication Critical patent/JP2017035700A/en
Application granted granted Critical
Publication of JP6503969B2 publication Critical patent/JP6503969B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Automatic Assembly (AREA)
  • Shaping Metal By Deep-Drawing, Or The Like (AREA)

Description

本発明は、金属製ワークの判定方法に関し、詳しくは、コネクタ部材を挿し込むための貫通孔が金属製ワーク本体に立ち上がりを有するように形成されており、この金属製ワーク本体に対する貫通孔の位置ズレの有無を判定する金属製ワークの判定方法に関する。   The present invention relates to a method of determining a metal work, and more specifically, a through hole for inserting a connector member is formed to have a rising in a metal work body, and the position of the through hole with respect to the metal work body The present invention relates to a method of determining a metal work that determines the presence or absence of a shift.

従来、ハイブリッド車等のインバータやコンバータは、開口を有する金属製ケース(導電性を備えた金属製ケース)に内蔵された状態で車両ボデーに搭載されている。この開口は、金属製ケースに対して複数のボルトを介して組み付けられる金属製カバー(導電性を備えた金属製カバー)によって塞がれている。ここで、図9〜15を参照して、この金属製カバーを複数のプレス機によるプレスによって成形するプレス成形工程を説明する。まず、ステップS1に示すように、金属製カバーの素材Mとなる金属製の平板を準備する工程を行う(図9、10参照)。   Conventionally, an inverter or converter such as a hybrid vehicle is mounted on a vehicle body in a state of being incorporated in a metal case having an opening (a metal case having conductivity). The opening is closed by a metal cover (a metal cover having conductivity) assembled to the metal case via a plurality of bolts. Here, with reference to FIGS. 9-15, the press-forming process which shape | molds this metal-made cover by the press by several presses is demonstrated. First, as shown in step S1, a step of preparing a metal flat plate to be a material M of the metal cover is performed (see FIGS. 9 and 10).

次に、ステップS2に示すように、金属製カバーの概略の外形が成形されるように素材Mをプレスして打ち抜く工程を行う(図9参照)。これにより、第1のワークW1が成形される(図11参照)。次に、ステップS3に示すように、第1のワークW1に形成されたフランジ12の縁の一部をカットしてボルト取付孔14を成形すると共に、コネクタ部材(図示しない)を挿し込むための貫通孔16を成形する工程を行う(図9参照)。これにより、第2のワークW2が成形される(図12参照)。このボルト取付孔14とは、上述したように、金属製カバーによって金属製ケースを塞ぐときのボルトを挿し込むための孔のことである。   Next, as shown in step S2, the material M is pressed and punched so that the outline of the metal cover is formed (see FIG. 9). Thereby, the first work W1 is formed (see FIG. 11). Next, as shown in step S3, a part of the edge of the flange 12 formed in the first work W1 is cut to form the bolt mounting hole 14 and to insert a connector member (not shown). A step of forming the through holes 16 is performed (see FIG. 9). Thereby, the second work W2 is formed (see FIG. 12). As described above, the bolt mounting hole 14 is a hole for inserting a bolt when the metal case is closed by the metal cover.

次に、ステップS4に示すように、ステップS3によって成形されたボルト取付孔14の縁に生じたバリ(図示しない)を除去する工程を行う(図9参照)。これにより、第3のワークW3が成形される(図13参照)。次に、ステップS5に示すように、第3のワークW3のフランジ12の一部を折り曲げやさらにボルト取付孔14を成形すると共に、ステップS3によって成形された貫通孔16の縁を立ち上げる(バーリング加工する)工程を行う(図9参照)。これにより、第4のワークW4が成形される(図14参照)。最後に、ステップS6に示すように、ステップS5によって成形されたボルト取付孔14の縁に生じたバリ(図示しない)を除去する工程を行う(図9参照)。このようなプレス成形工程を経て、金属製カバー10が出来上がる(図15参照)。   Next, as shown in step S4, a step of removing burrs (not shown) formed at the edge of the bolt attachment hole 14 formed in step S3 is performed (see FIG. 9). Thereby, the third work W3 is formed (see FIG. 13). Next, as shown in step S5, part of the flange 12 of the third work W3 is bent, and further, the bolt mounting hole 14 is formed, and the edge of the through hole 16 formed in step S3 is raised (burring Process (refer to FIG. 9). Thus, the fourth work W4 is formed (see FIG. 14). Finally, as shown in step S6, a step of removing burrs (not shown) formed at the edge of the bolt attachment hole 14 formed in step S5 is performed (see FIG. 9). Through such a press forming process, the metal cover 10 is completed (see FIG. 15).

なお、出来上がった金属製カバー10は、特許文献1に開示されているマスキングが施されて電着塗装が行われている。そして、電着塗装が行われた金属製カバー10を金属製ケースに組み付けると、金属製カバー10のマスキング部(導電部)と金属製ケースとが電気的に導通した状態となる。したがって、インバータやコンバータから発せられるノイズを遮蔽できつつ、金属製ケースに対して金属製カバー10をボデーアースできる。   The finished metal cover 10 is subjected to the masking disclosed in Patent Document 1 and subjected to electrodeposition coating. Then, when the metal cover 10 on which the electrodeposition coating has been performed is attached to the metal case, the masking portion (conductive portion) of the metal cover 10 and the metal case are electrically conducted. Therefore, the metal cover 10 can be grounded to the metal case while shielding noise generated from the inverter and the converter.

特開2010−247011号公報JP, 2010-247011, A

しかしながら、上述した技術では、ステップS5において行われる貫通孔16の縁の立ち上げ(バーリング加工)は、プレス成形によって行われている。そのため、成形された第4のワークW4において、この第4のワークW4本体に対して貫通孔16が位置ズレを起こしていることがあった。すなわち、成形された第4のワークW4が不良品となっていることがあった。したがって、次の工程であるステップS6に不良品を送ってしまうことがあり、結果として、出来上がった製品(この場合、金属製カバー10)に不具合が生じていることがあった。   However, in the technique described above, the raising (burring) of the edge of the through hole 16 performed in step S5 is performed by press forming. Therefore, in the formed fourth work W4, the through hole 16 may be displaced with respect to the fourth work W4 main body. That is, in some cases, the formed fourth work W4 is a defective product. Therefore, a defective product may be sent to the next step, step S6, and as a result, a defect may occur in the finished product (in this case, the metal cover 10).

本発明は、このような課題を解決しようとするもので、その目的は、金属製のワーク本体に対してプレスによるバーリング加工を施した貫通孔を成形した場合でも、このワーク本体に対する貫通孔の位置ズレの有無を判定できる金属製ワークの判定方法を提供することである。   The present invention is intended to solve such a problem, and an object thereof is to form a through hole in which a burring process is applied to a metal work body by pressing. It is providing the determination method of the metal workpiece which can determine the presence or absence of position shift.

本発明は、上記の目的を達成するためのものであって、以下のように構成されている。
請求項1に記載の発明は、コネクタ部材を挿し込むための貫通孔が金属製ワーク本体に立ち上がりを有するように形成されており、この金属製ワーク本体に対する貫通孔の位置ズレの有無を判定する金属製ワークの判定方法である。この判定方法は、金属製ワーク本体を載置可能な載置面を有する検査治具を準備する工程と、この準備工程の後に、検査治具の載置面に金属製ワーク本体をセットする工程と、このセット工程の後に、検査治具の載置面に対して金属製ワーク本体が載置しているか否かを少なくとも3箇所判定する工程とを備えている。


The present invention is for achieving the above-mentioned object, and is configured as follows.
In the invention according to claim 1, the through hole for inserting the connector member is formed to have a rising in the metal work body, and the presence or absence of the positional deviation of the through hole with respect to the metal work body is determined It is a judgment method of metal work . In this determination method, a step of preparing an inspection jig having a mounting surface on which the metal work body can be mounted, and a step of setting the metal work body on the mounting surface of the inspection jig after the preparation step And a step of determining, after the setting step, at least three places whether or not the metal work main body is placed on the mounting surface of the inspection jig.


請求項1の発明によれば、この判定で3箇所とも載置していると判定されると、金属製ワークが検査治具の載置面に歪が生じることなく載っていると判定できる。したがって、金属製ワーク本体に対して貫通孔の位置ズレが生じていないと判定できる。一方、この判定で1箇所でも載置していないと判定されると、金属製ワークが検査治具の載置面に歪が生じた状態(例えば、金属製ワークが載置面に対して浮いた状態)で載っていると判定できる。したがって、金属製ワーク本体に対して貫通孔の位置ズレが生じていると判定できる。   According to the first aspect of the present invention, when it is determined in this determination that all three places are placed, it can be determined that the metal workpiece is placed on the placement surface of the inspection jig without distortion. Therefore, it can be determined that positional deviation of the through hole does not occur with respect to the metal work main body. On the other hand, if it is determined in this determination that even one place is not placed, a state in which the metal work is distorted on the placement face of the inspection jig (for example, the metal work floats on the placement face) State) can be determined. Therefore, it can be determined that positional deviation of the through hole occurs with respect to the metal work main body.

また、請求項2に記載の発明は、請求項1に記載の金属製ワークの判定方法であって、検査治具の載置面に対する金属製ワーク本体の載置の判定は、検査治具の載置面と金属製ワーク本体との導通の有無の判定によって行われる。   The invention according to claim 2 is the method for judging a metal work according to claim 1, wherein the judgment of the mounting of the metal work body on the mounting surface of the inspection jig is performed by the inspection jig. It is performed by determining the presence or absence of conduction between the mounting surface and the metal work body.

請求項2の発明によれば、簡便な構造で請求項1の作用効果を得ることができる。   According to the second aspect of the invention, the function and effect of the first aspect can be obtained with a simple structure.

実施例に係る金属製カバーのプレス成形工程を説明するフローである。It is a flow explaining the press molding process of the metal covers concerning an example. 図1のステップS5Aの工程で使用する検査治具の斜視図である。It is a perspective view of the inspection jig used at the process of step S5 A of FIG. 図2の平面図である。It is a top view of FIG. 図3のIV−IV線断面図である。It is the IV-IV sectional view taken on the line of FIG. 図2の正面図である。It is a front view of FIG. 図2の側面図である。It is a side view of FIG. 図1のステップS5Bの工程を施している状態を説明する斜視図である。It is a perspective view explaining the state which has given the process of step S5 B of FIG. 図7の平面図である。It is a top view of FIG. 従来技術に係る金属製カバーのプレス成形工程を説明するフローである。It is a flow explaining the press molding process of the metal covers concerning a prior art. 図9のステップS1の工程が施される前の素材の拡大図である。It is an enlarged view of the raw material before the process of step S1 of FIG. 9 is given. 図9のステップS1の工程が施されたワーク(第1のワーク)の斜視図である。It is a perspective view of the workpiece | work (1st workpiece | work) in which the process of step S1 of FIG. 9 was given. 図9のステップS2の工程が施されたワーク(第2のワーク)の斜視図である。FIG. 10 is a perspective view of a work (second work) on which the process of step S2 of FIG. 9 has been performed. 図9のステップS3の工程が施されたワーク(第3のワーク)の斜視図である。It is a perspective view of the workpiece | work (3rd workpiece | work) in which the process of step S3 of FIG. 9 was given. 図9のステップS4の工程が施されたワーク(第4のワーク)の斜視図である。FIG. 10 is a perspective view of a work (fourth work) on which the process of step S4 of FIG. 9 has been performed. 図9のステップS5の工程が施されたワーク(第5のワーク)の斜視図である。It is a perspective view of the workpiece (fifth workpiece) to which the process of step S5 of FIG. 9 was given.

以下、本発明を実施するための形態を、図1〜8を用いて説明する。従来技術で説明したように、ハイブリッド車等のインバータやコンバータは、開口を有する金属製ケース(導電性を備えた金属製ケース)に内蔵された状態で車両ボデー(いずれも図示しない)に搭載されている。この開口は、金属製ケースに対して複数のボルト(図示しない)を介して組み付けられる金属製カバー10(導電性を備えた金属製カバー)によって塞がれている。この金属とは、例えば、鉄等の導電性を有する金属のことである。   Hereinafter, modes for carrying out the present invention will be described with reference to FIGS. As described in the prior art, an inverter or converter such as a hybrid vehicle is mounted on a vehicle body (not shown) in a state of being incorporated in a metal case having an opening (a metal case having conductivity). ing. The opening is closed by a metal cover 10 (a metal cover having conductivity) assembled to the metal case via a plurality of bolts (not shown). The metal is, for example, a conductive metal such as iron.

この金属製カバー10は、従来技術で説明したように、複数のプレス機によるプレスによって成形するプレス成形工程(ステップS1〜ステップS5)を経て出来上がっている。ただし、この実施例において、プレス成形工程には、従来技術のそれとは異なり、ステップS5とステップS6との間に、第4のワークW4本体に対する貫通孔16の位置ズレの有無を判定する工程(以下、「位置ズレ判定工程」と記す)が含まれている。そのため、以下において、この位置ズレ判定工程のみを説明することとする。なお、従来技術で説明した部材と同一の部材には、図面において同一の符号を付すことで重複する説明は省略することとする。   As described in the prior art, the metal cover 10 is completed through a press forming step (steps S1 to S5) of forming by a press using a plurality of presses. However, in this embodiment, unlike the prior art in the press forming step, a step of determining the presence or absence of positional deviation of the through hole 16 with respect to the fourth workpiece W4 between step S5 and step S6 ( Hereinafter, the “positional deviation determination step” is included. Therefore, in the following, only this positional deviation determination step will be described. The same members as the members described in the prior art will be denoted by the same reference numerals in the drawings and redundant descriptions will be omitted.

はじめに、この位置ズレ判定工程で使用する検査治具20を説明することとする。図2〜6に示すように、この検査治具20は、台座22と、嵌込突起24と、6個のブロック26とから構成されている。台座22は、第4のワークW4を載置可能な載置面22aを有する矩形状に形成された部材である。この載置面22aには、後述するフランジ12の折り曲げ部を入れ込み可能な凹穴22bが適宜の箇所に形成されている。   First, the inspection jig 20 used in this positional deviation determination step will be described. As shown in FIGS. 2 to 6, the inspection jig 20 is composed of a pedestal 22, a fitting projection 24, and six blocks 26. The pedestal 22 is a member formed in a rectangular shape having a mounting surface 22 a on which the fourth workpiece W 4 can be mounted. In the mounting surface 22a, concave holes 22b into which bent portions of the flange 12 to be described later can be inserted are formed at appropriate places.

また、この載置面22aには、電極状のセンサ28が3箇所組み付けられている。このセンサ28は、載置面22aに載せた第4のワークW4に対して導通可能に台座22に組み付けられている。このセンサ28には、第1のケーブル28aが接続されている(図4参照)。一方、台座22の載置面22aに載せた第4のワークW4には、第2のケーブル(図示しない)が接続されることとなる。   In addition, three sensors 28 in the form of electrodes are attached to the mounting surface 22a. The sensor 28 is assembled to the pedestal 22 in a conductive manner with respect to the fourth workpiece W4 placed on the placement surface 22a. A first cable 28a is connected to the sensor 28 (see FIG. 4). On the other hand, a second cable (not shown) is connected to the fourth work W4 placed on the mounting surface 22a of the pedestal 22.

そのため、これら両ケーブル28aに接続される電気回路(図示しない)によってセンサ28と第4のワークW4との導通の有無を判定できる。また、この載置面22aには、第4のワークW4に形成されているボルト取付孔14に対して挿し込むことができるガイドピン30が組み付けられている。この例では、ボルト取付孔14が10箇所形成されているため、ガイドピン30も10本組み付けられている。なお、このガイドピン30の先端は、テーパを成すように形成されている。そのため、ボルト取付孔14に対してガイドピン30を挿し込み易くなっている。   Therefore, the presence or absence of conduction between the sensor 28 and the fourth work W4 can be determined by an electric circuit (not shown) connected to the both cables 28a. Further, a guide pin 30 which can be inserted into a bolt mounting hole 14 formed in the fourth work W4 is attached to the mounting surface 22a. In this example, ten bolt mounting holes 14 are formed, so ten guide pins 30 are also assembled. The tip of the guide pin 30 is formed to be tapered. Therefore, the guide pin 30 can be easily inserted into the bolt mounting hole 14.

また、嵌込突起24は、第4のワークW4に形成されている貫通孔16に対して嵌め込むことができるように台座22の載置面22aに突起状に組み付けられた部材である。また、6個のブロック26は、貫通孔16に嵌込突起24を嵌め込ませた状態で台座22の載置面22aに載せた第4のワークW4のフランジ12の縁を規制可能に台座22の載置面22aに組み付けられた部材である。   Further, the fitting projection 24 is a member assembled in a projecting manner on the mounting surface 22 a of the pedestal 22 so as to be able to be fitted into the through hole 16 formed in the fourth work W4. Further, the six blocks 26 can restrict the edge of the flange 12 of the fourth work W 4 placed on the mounting surface 22 a of the pedestal 22 in a state where the fitting projection 24 is fitted in the through hole 16. It is a member assembled | attached to the mounting surface 22a.

なお、この6個のブロック26の各先端の内側には、テーパ26aがそれぞれ形成されている。これにより、台座22の載置面22aに第4のワークW4を載せるときの案内作用を果たすことができる。これら台座22と、嵌込突起24と、6個のブロック26とから検査治具20は構成されている。   Note that tapers 26 a are respectively formed inside the tips of the six blocks 26. As a result, it is possible to perform the guiding function when the fourth work W4 is placed on the mounting surface 22a of the pedestal 22. The inspection jig 20 is composed of the pedestal 22, the fitting projection 24, and the six blocks 26.

次に、図1、7、8を参照して、上述した検査治具20を使用する位置ズレ判定工程を説明する。この位置ズレ判定工程は、図1からも明らかなように、ステップS5とステップS6との間を割り込む格好の3工程(ステップS5A、ステップS5B、ステップS5C)から構成されている。このステップS5Aの工程は、上述した検査治具20を準備する工程である。   Next, with reference to FIGS. 1, 7 and 8, the positional deviation determination step using the inspection jig 20 described above will be described. As apparent from FIG. 1, this positional deviation determination step is composed of three steps (step S5A, step S5B, and step S5C) in which the gap between step S5 and step S6 is made. The process of step S5A is a process of preparing the inspection jig 20 described above.

また、このステップS5Bの工程は、ステップS5Aの工程の後に、検査治具20の載置面22aに第4のワークW4本体を載せる(セットする)工程である。このように載せると、検査治具20の嵌込突起24が第4のワークW4に形成されている貫通孔16に対して嵌め込まれていくと共に、この検査治具20の6個のブロック26が第4のワークW4のフランジ12の縁を規制していくこととなる(図7、8参照)。このとき、検査治具20の台座22のガイドピン30が第4のワークW4に形成されているボルト取付孔14に対して挿し込まれていく。   In addition, the process of step S5B is a process of placing (setting) the fourth work W4 main body on the placement surface 22a of the inspection jig 20 after the process of step S5A. When mounted in this manner, the fitting projection 24 of the inspection jig 20 is inserted into the through hole 16 formed in the fourth work W4, and the six blocks 26 of the inspection jig 20 are The edge of the flange 12 of the fourth workpiece W4 is to be regulated (see FIGS. 7 and 8). At this time, the guide pins 30 of the pedestal 22 of the inspection jig 20 are inserted into the bolt mounting holes 14 formed in the fourth work W4.

また、このステップS5Cの工程は、ステップS5Bの工程の後に、センサ28と第4のワークW4との導通の有無を判定する工程である。なお、この判定は、3箇所のセンサ28でそれぞれ実施している。この判定で3箇所とも導通が有と判定されると、第4のワークW4が検査治具20の載置面22aに歪が生じることなく載っていると判定できる。したがって、第4のワークW4本体に対して貫通孔16および/またはボルト取付孔14の位置ズレが生じていないと判定できる。   Further, the process of step S5C is a process of determining the presence or absence of conduction between the sensor 28 and the fourth work W4 after the process of step S5B. In addition, this determination is implemented by the sensor 28 of three places, respectively. If it is determined that conduction is present at all three locations in this determination, it can be determined that the fourth workpiece W4 is placed on the placement surface 22a of the inspection jig 20 without distortion. Therefore, it can be determined that positional deviation of the through hole 16 and / or the bolt mounting hole 14 does not occur with respect to the fourth work W4 main body.

一方、この判定で1箇所でも導通が無と判定されると、第4のワークW4が検査治具20の載置面22aに歪が生じた状態(例えば、第4のワークW4のフランジ12の縁がブロック26に干渉してしまうことで、および/または、第4のワークW4のボルト取付孔14の縁がガイドピン30に干渉してしまうことで、この第4のワークW4が載置面22aに対して浮いた状態)で載っていると判定できる。したがって、第4のワークW4本体に対して貫通孔16および/またはボルト取付孔14の位置ズレが生じていると判定できる。   On the other hand, if it is determined in this determination that conduction is not present even in one place, the fourth work W4 is distorted (for example, the flange 12 of the fourth work W4) in the placement surface 22a of the inspection jig 20. The fourth work W4 is placed on the mounting surface by the fact that the edge interferes with the block 26, and / or the edge of the bolt mounting hole 14 of the fourth work W4 interferes with the guide pin 30. 22a can be determined to be in a floating state). Therefore, it can be determined that positional deviation of the through hole 16 and / or the bolt mounting hole 14 has occurred with respect to the fourth work W4 main body.

このように位置ズレが生じていると判定できると、この第4のワークW4をステップS6に送ることを中止できる。したがって、不良品が次の工程であるステップS6に送られることを防止できるため、結果として、出来上がった製品(この場合、金属製カバー10)に不具合が生じることを防止できる。もちろん、このように位置ズレが生じていると判定できると、以降において、この位置ズレが生じることがないようにプレス機(図示しない)を調節する等の対応を図ることは言うまでもない。   If it can be determined that the positional deviation has occurred as described above, the sending of the fourth work W4 to the step S6 can be stopped. Therefore, it is possible to prevent the defective product from being sent to the next step, step S6, and as a result, it is possible to prevent a defect from occurring in the finished product (in this case, the metal cover 10). Of course, if it can be determined that the positional deviation has occurred as described above, it is needless to say that, in the following, the press machine (not shown) is adjusted or the like so as not to cause the positional deviation.

上述した内容は、あくまでも本発明の一実施の形態に関するものであって、本発明が上記内容に限定されることを意味するものではない。   The above-described content relates to only one embodiment of the present invention, and does not mean that the present invention is limited to the above-described content.

実施例では、導通の有無を3箇所判定する形態を説明した。しかし、これに限定されるものでなく、少なくとも3箇所であれば何箇所判定する形態であっても構わない。   In the embodiment, an embodiment has been described in which the presence or absence of conduction is determined at three locations. However, the present invention is not limited to this, and any form may be used as long as there are at least three places.

また、実施例では、検査治具20の載置面22aに対する第4のワークW4の載置の判定は、検査治具20の載置面22aと第4のワークW4との導通の有無の判定によって行われる形態を説明した。しかし、これに限定されるものでなく、各種のセンサ類(例えば、近接スイッチ、近接センサ、光電センサ、LSセンサ、LSスイッチ等)によって判定しても構わない。   Further, in the embodiment, the determination of the placement of the fourth workpiece W4 on the placement surface 22a of the inspection jig 20 is the determination of the presence or absence of conduction between the placement surface 22a of the inspection jig 20 and the fourth workpiece W4. Explained the form performed by. However, the present invention is not limited to this, and determination may be made using various sensors (for example, a proximity switch, proximity sensor, photoelectric sensor, LS sensor, LS switch, etc.).

また、実施例では、第4のワークW4のフランジ12の縁がブロック26に干渉してしまうことで、および/または、第4のワークW4のボルト取付孔14の縁がガイドピン30に干渉してしまうことで、この第4のワークW4が載置面22aに対して浮いた状態で載っていると判定できる形態を説明した。しかし、これに限定されるものでなく、これらのいずれか一方の干渉のみで判定しても構わない。   Further, in the embodiment, the edge of the flange 12 of the fourth work W4 interferes with the block 26, and / or the edge of the bolt mounting hole 14 of the fourth work W4 interferes with the guide pin 30. An embodiment has been described in which it is possible to determine that the fourth work W4 is placed in a floating state with respect to the mounting surface 22a by having been set. However, the present invention is not limited to this, and it may be determined only by any one of these interferences.

また、金属製カバー10の貫通孔16と検査治具20の嵌込突起24との間には設計上の所定の隙を有していることは言うまでもない。このことは、金属製カバー10のフランジ12と検査治具20のブロック26との間および金属製カバー10のボルト取付孔14の縁と検査治具20のガイドピン30との間も同様である。   Moreover, it goes without saying that there is a predetermined design gap between the through hole 16 of the metal cover 10 and the fitting projection 24 of the inspection jig 20. The same applies between the flange 12 of the metal cover 10 and the block 26 of the inspection jig 20 and between the edge of the bolt mounting hole 14 of the metal cover 10 and the guide pin 30 of the inspection jig 20. .

10 金属製カバー(ワーク)
16 貫通孔
20 検査治具
22a 載置面

10 Metal cover (work)
16 through hole 20 inspection jig 22a mounting surface

Claims (2)

コネクタ部材を挿し込むための貫通孔が金属製ワーク本体に立ち上がりを有するように形成されており、この金属製ワーク本体に対する貫通孔の位置ズレの有無を判定する金属製ワークの判定方法であって、
金属製ワーク本体を載置可能な載置面を有する検査治具を準備する工程と、
この準備工程の後に、検査治具の載置面に金属製ワーク本体をセットする工程と、
このセット工程の後に、検査治具の載置面に対して金属製ワーク本体が載置しているか否かを少なくとも3箇所判定する工程と、を備えている金属製ワークの判定方法。
A through hole for inserting a connector member is formed on a metallic work body so as to have a rising edge, and the method of determining a metallic work is to determine the presence or absence of positional deviation of the through hole with respect to the metallic work body. ,
Preparing an inspection jig having a mounting surface on which the metal work body can be mounted;
After the preparation step, a step of setting the metal work body on the mounting surface of the inspection jig;
A determination method of a metal work including: a step of determining at least three places whether or not a metal work main body is mounted on a mounting surface of an inspection jig after the setting step.
請求項1に記載の金属製ワークの判定方法であって、
検査治具の載置面に対する金属製ワーク本体の載置の判定は、検査治具の載置面と金属製ワーク本体との導通の有無の判定によって行われる金属製ワークの判定方法。






The method of determining a metal work according to claim 1, wherein
The determination method of the metal workpiece | work with respect to the mounting surface of a test | inspection jig is the determination method of metal workpiece | work performed by the determination of the presence or absence of conduction with the mounting surface of a test | inspection jig, and a metal workpiece main body.






JP2015156212A 2015-08-06 2015-08-06 Determination method of metal work Active JP6503969B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015156212A JP6503969B2 (en) 2015-08-06 2015-08-06 Determination method of metal work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015156212A JP6503969B2 (en) 2015-08-06 2015-08-06 Determination method of metal work

Publications (2)

Publication Number Publication Date
JP2017035700A JP2017035700A (en) 2017-02-16
JP6503969B2 true JP6503969B2 (en) 2019-04-24

Family

ID=58047778

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015156212A Active JP6503969B2 (en) 2015-08-06 2015-08-06 Determination method of metal work

Country Status (1)

Country Link
JP (1) JP6503969B2 (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6138508U (en) * 1984-08-14 1986-03-11 ダイハツ工業株式会社 Implantation detection device
JP3517761B2 (en) * 1995-06-20 2004-04-12 株式会社トキコハイキャスト Brake caliper inspection device
JP4021210B2 (en) * 2002-01-30 2007-12-12 ダイハツ工業株式会社 Hemming system
JP5436913B2 (en) * 2009-04-10 2014-03-05 真和工業株式会社 Cleaning fluid circulation system for electrodeposition coating
JP2013090366A (en) * 2011-10-13 2013-05-13 Toyota Motor Corp Inverter unit

Also Published As

Publication number Publication date
JP2017035700A (en) 2017-02-16

Similar Documents

Publication Publication Date Title
JP6536431B2 (en) Resin molding
US6341983B1 (en) Co-molded seal and strain relief for automotive electrical connections
JP2017183075A (en) Bus bar unit and electronic apparatus with bus bar unit
TWI654072B (en) 3D printer fixture and 3D printer with the fixture
CN108701917B (en) Resin molded article and method for producing same
CN108858445B (en) PCB secondary punch forming process
JP2017027756A (en) Shield connector
JP6503969B2 (en) Determination method of metal work
DE102012201326A1 (en) Magnetic sensing device
TWI722481B (en) Lead terminal for electrolytic capacitor and electrolytic capacitor
DE112013007708T5 (en) Modularized speed sensor
CN101685924A (en) Connector housing
JP6849012B2 (en) Resin molded product
JP7734553B2 (en) Enclosures and Equipment
JP2016115562A (en) Electrical connector
KR200426244Y1 (en) Jig for inserting connector wires
KR20160108787A (en) panel forming method for vehicle
JP6881534B2 (en) Resin molded product
CN104646487A (en) Processing method of metal plate and metal plate manufactured by processing method
JP2008198697A (en) Method for grounding electromagnetic wave shielding member formed of conductive resin
JP5517743B2 (en) Microphone and microphone connector
KR101200207B1 (en) apparatus for manufacturing square cross-section plug terminal
EP3451806A1 (en) Method for manufacturing circuit board, circuit board, and cover member
CN210490051U (en) Wiring harness terminal crimping table
CN209994629U (en) Circuit boards, electronics, and connectors for holding circuit boards

Legal Events

Date Code Title Description
A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A711

Effective date: 20171214

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20171214

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20180214

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20181115

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20190108

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20190206

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20190226

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20190311

R151 Written notification of patent or utility model registration

Ref document number: 6503969

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151