Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP6506515B2 - Allocation system and its program - Google Patents
[go: Go Back, main page]

JP6506515B2 - Allocation system and its program - Google Patents

Allocation system and its program Download PDF

Info

Publication number
JP6506515B2
JP6506515B2 JP2014167276A JP2014167276A JP6506515B2 JP 6506515 B2 JP6506515 B2 JP 6506515B2 JP 2014167276 A JP2014167276 A JP 2014167276A JP 2014167276 A JP2014167276 A JP 2014167276A JP 6506515 B2 JP6506515 B2 JP 6506515B2
Authority
JP
Japan
Prior art keywords
eaves
roof
area
ventilation
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2014167276A
Other languages
Japanese (ja)
Other versions
JP2016045551A (en
Inventor
譲 菅原
譲 菅原
徳康 豊城
徳康 豊城
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nihon Kagaku Sangyo Co Ltd
Original Assignee
Nihon Kagaku Sangyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nihon Kagaku Sangyo Co Ltd filed Critical Nihon Kagaku Sangyo Co Ltd
Priority to JP2014167276A priority Critical patent/JP6506515B2/en
Publication of JP2016045551A publication Critical patent/JP2016045551A/en
Application granted granted Critical
Publication of JP6506515B2 publication Critical patent/JP6506515B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、コンピュータシステムを利用して住宅等の建物の部材の割り付けを行なう割り付けシステム及びそのプログラムに関するものである。   The present invention relates to an allocation system and program for allocating members of a building such as a house using a computer system.

従来の住宅部材の割り付け作業及び部材の注文は次のような方法で行われていた。先ず、住宅部材の発注者は、建物の平面図と立面図とをもとに、必要とされる部材を、使用長さを住宅部材の長さで割り、使用する部材を選定しながら割り付け作業を行う。   The conventional allocation of housing parts and ordering of parts have been conducted in the following manner. First, based on the plan view and elevation view of the building, the house member orderer divides the required members by the length of the house members and allocates them while selecting the members to be used. Do the work.

住宅部材を割り付ける際に、屋根の勾配と屋根形状、軒の出寸法等に基づいて軒天板の割り付け、見切り、水切り、換気口等を外壁と屋根との関係から長さを計算して、部材割り付け図を作成し、部材表を作成して発注を行っていた。   When allocating housing members, calculate the length from the relation between the outer wall and the roof, the allocation of the eaves top plate, the parting, the drainage, the ventilation opening, etc. based on the slope of the roof and the roof shape, the dimensions of the eaves, etc. The member allocation drawing was made, the member list was made and ordering was performed.

住宅部材の発注は、工務店は、納材店に、納材店は問屋に、問屋は建材商社に、建材商社は部品メーカに発注を行っている。しかし、経由先が多くなればなるほど、発注データが手書き用紙であったり、コンピュータ入力用紙であったりして統一性が無い。また、発注方法もファクシミリ(FAX)、電話、電子データ等と様々な発注方法で発注されているのが現状である。   As for housing components, construction companies place orders for the delivery shop, delivery stores for the wholesale shop, wholesale stores for the building materials trading company, and building materials trading company for the parts maker. However, as the number of destinations increases, order data is handwritten paper or computer input paper, and there is no uniformity. In addition, the current method is to place an order by various order methods such as facsimile (FAX), telephone, electronic data, and the like.

部品メーカは、最終発注先から来た、ファクシミリ(FAX)、電子データを元に社内の製造指示書、出荷指示書に転記、入力し、ユーザの希望先に出荷していた。   The parts maker transcribes and inputs in the in-house manufacturing instruction and shipping instruction based on the facsimile (FAX) and electronic data that came from the final supplier, and has shipped it to the user's desired destination.

しかしながら、上記発注方法では、図面に精通した専門職員が割り付け図を作成しなければならず、屋根と、壁の複雑な取り合いを計算、適切な部材を割り付けるのは時間がかかり、正確な数量を拾い出すことが難しく、予備数量を多めにみて発注する必要があった。   However, in the above ordering method, specialists who are familiar with the drawings must make the allocations, calculate the complex arrangement of the roof and the wall, and allocate the appropriate members is time-consuming and accurate. It was difficult to pick up, and it was necessary to order with a large spare quantity.

また、発注経路も納材店→問屋→建材商社等のように複数の経路を経由して発注されるため発注内容を間違って自社の注文書に転記する間違いが発生し易く、納期がどのくらいで入るのか、或いは、在庫があるのか否か等の正確な情報がユーザに返答がかえるまでに時間がかかり、また、部品メーカも発注書の内容を誤ってコンピュータに入力手配する等の弊害が発生する場合もあった。   In addition, since the order route is also ordered via multiple routes such as the delivery store → wholesaler → building materials trading company etc., it is easy to make a mistake in transcribing the contents of the order incorrectly to the company's order sheet, It takes time for the user to receive the correct information, such as whether or not the product is in stock, or whether the product is out of stock, etc. In addition, there is an adverse effect such as the parts manufacturer incorrectly arranging the contents of the purchase order to the computer There was also a case.

部品メーカは、ファクシミリ(FAX)で注文が入ってきたものを再度手書きし、コンピュータ入力で製造指示書を作成し、このときに入力ミスを生じる等、或いは、電子受注で入った注文書は、中間で電子入力が間違っていた場合にはチェックするすべが無く、後で訂正の依頼を受ける等して手間がかかっていた。   The parts maker re-writes the order input by facsimile (FAX) again, creates a manufacturing instruction sheet by computer input, and at this time an input error occurs, or an order form entered by electronic order is If the electronic input was wrong in the middle, there was no way to check it, and it took time and effort to receive a request for correction later.

大手の住宅メーカでは、予めCAD(Computer Aided Design;コンピュータによる設計製図)で作成したデータから自動的に割り付けを行なうシステムを構築、そのデータを発注に繋げるシステムを持っている場合もあるが、あくまでも、住宅メーカ毎にそのシステムを使っており、一般の工務店、中小の住宅メーカは、手作業で割り付け部材を拾い出しているのが現実である。   Some major housing manufacturers have built a system that automatically assigns data from CAD (Computer Aided Design) data created in advance, and have a system that links that data to an order. In fact, each homemaker uses that system, and it is a reality that general builders and small and medium-sized homebuilders manually pick up allocated members.

コンピュータシステムを利用した住宅部材の割り付けや見積、発注等を行なうシステムは、特許文献1〜4にも提案されている。   Systems for performing allocation, estimation, ordering, etc. of housing members using a computer system are also proposed in Patent Documents 1 to 4.

特開2011−129016号公報JP, 2011-129016, A 特開2003−345835号公報JP 2003-345835 A 特開平08−147339号公報Japanese Patent Application Publication No. 08-147339 特開2001−034645号公報JP 2001-034645 A

しかしながら、前述の特許文献1〜4であっても住宅等の建物の部材の端材として用いる予備数量を正確に算出し得るものは開示されていなかった。   However, even if it is the above-mentioned patent documents 1-4, what was able to calculate correctly the reserve quantity used as an end material of a member of buildings, such as a house, was not indicated.

本発明は前記課題を解決するものであり、その目的とするところは、住宅等の建物の部材の端材として用いる予備数量を正確に算出し得る割り付けシステム及びそのプログラムを提供するものである。   This invention solves the said subject, The place made as the objective is to provide the allocation system which can calculate correctly the reserve quantity used as an end material of the member of buildings, such as a house, and its program.

前記目的を達成するための本発明に係る割り付けシステムの代表的な構成は、建物の外壁ラインを作図する外壁ライン作図手段と、建物の屋根ラインを作図する屋根ライン作図手段と、建物の屋根勾配を選択する屋根勾配選択手段と、前記外壁ライン作図手段により作図された外壁ラインと、前記屋根ライン作図手段により作図された屋根ラインと、前記屋根勾配選択手段により選択された屋根勾配とにより軒天領域を算出する軒天領域算出手段と、前記軒天領域に配置される軒天板の勾配を選択する軒天板勾配選択手段と、前記軒天領域算出手段により算出された軒天領域と、前記軒天板勾配選択手段により選択された軒天板の勾配とから前記軒天領域に配置される軒天板の種類を選択する軒天板選択手段と、前記軒天領域算出手段により算出された軒天領域の前記外壁ラインに沿った第一の長さを、前記軒天板選択手段により選択された軒天板の前記外壁ラインに沿った第二の長さで除した際の余りの長さを記憶する記憶手段と、前記軒天領域の全てについて前記軒天板を割り付けた後に、前記記憶手段に記憶された余りの長さの総計を前記第二の長さで除した数を算出する端材算出手段と、を有することを特徴とする。   The representative configuration of the allocation system according to the present invention for achieving the above object is an outer wall line drawing means for drawing an outer wall line of a building, a roof line drawing means for drawing a roof line of a building, and a roof slope of the building. The roof slope selecting means for selecting the eaves, the outer wall line drawn by the outer wall line drawing means, the roof line drawn by the roof line drawing means, and the roof slope selected by the roof slope selecting means An eaves area calculation means for calculating an area, an eaves top plate slope selection means for selecting a gradient of the eaves top plate disposed in the eaves area, and an eaves area calculated by the eaves area calculation means; An eaves top plate selecting means for selecting the type of eaves top plate disposed in the eaves area from the gradient of the eaves top board selected by the eaves top board gradient selection means, and the eaves sun area calculation means When the first length along the outer wall line of the eaves open area is divided by the second length along the outer wall line of the eaves top plate selected by the eaves top plate selection means A storage means for storing the remaining lengths, and after allocating the eaves top plate for all the eaves areas, a total of the remaining lengths stored in the storage means is divided by the second length. And a scrap calculation means for calculating the number.

また、前記目的を達成するための本発明に係る割り付けプログラムの代表的な構成は、コンピュータを、建物の外壁ラインを作図する外壁ライン作図手段、建物の屋根ラインを作図する屋根ライン作図手段、建物の屋根勾配を選択する屋根勾配選択手段と、前記外壁ライン作図手段により作図された外壁ラインと、前記屋根ライン作図手段により作図された屋根ラインと、前記屋根勾配選択手段により選択された屋根勾配とに基づいて軒天領域を算出する軒天領域算出手段、前記軒天領域に配置される軒天板の勾配を選択する軒天板勾配選択手段と、前記軒天領域算出手段により算出された軒天領域と、前記軒天板勾配選択手段により選択された軒天板の勾配とに基づいて前記軒天領域に配置される軒天板の種類を選択する軒天板選択手段と、前記軒天領域算出手段により算出された軒天領域の前記外壁ラインに沿った第一の長さを、前記軒天板選択手段により選択された軒天板の前記外壁ラインに沿った第二の長さで除した際の余りの長さを記憶する記憶手段と、前記軒天領域の全てについて前記軒天板を割り付けた後に、前記記憶手段に記憶された余りの長さの総計を前記第二の長さで除した数を算出する端材算出手段と、して機能させることを特徴とする。
Furthermore, typical structure of the allocation program according to the present invention for achieving the above object, a computer, and the outer wall line drawing means for drawing the outer wall line of the building, roof line drawing means for drawing the roof line of the building When the roof slope selection means for selecting a roof slope of buildings, and the outer wall line is plotted by the outer wall line drawing means, and roof line is plotted by the roof line drawing means, selected by the roof slope selection unit and Nokiten area calculating means for calculating the eaves sky region on the basis of the roof gradient, before and eaves ceiling plate gradient selection means for selecting a gradient of eaves top plate disposed Kinokiten region, the eaves ceiling area calculation Nokitenban selecting the eaves ceiling areas calculated by means of the type of eaves top plate disposed before Kinokiten area based on the slope of the eaves top plate selected by the eaves top plate gradient selection means Choice And stage, a first length along said outer wall line of the calculated eaves top region by the eaves ceiling area calculating means, along the outer wall line of the eaves top plate selected by the eaves top plate selection means storage means for memorize a length of remainder when divided by the second length, all of the eaves ceiling area after allocating the eaves top plate, the length of the remainder stored in the storage means an end member calculation means for exiting calculate the number obtained by dividing the second length of the total, it is to function, characterized in Rukoto.

上記構成によれば、住宅等の建物の部材の端材として用いる予備数量を正確に算出することが出来る。   According to the above configuration, it is possible to accurately calculate the reserve quantity used as an end material of a member of a building such as a house.

本発明に係る割り付けシステムにおける情報の流れを示すブロック図である。It is a block diagram which shows the flow of the information in the allocation system which concerns on this invention. 本発明に係る割り付けシステムの制御系の構成を示すブロック図である。It is a block diagram showing composition of a control system of an allocation system concerning the present invention. 本発明に係る割り付けシステムに設けられる割り付けプログラムの各処理を説明するフローチャートである。It is a flowchart explaining each processing of the allocation program provided in the allocation system which concerns on this invention. 軒天換気金物の長さに応じて割り付けを行なうプログラムによる各処理を説明するフローチャートである。It is a flowchart explaining each processing by the program which allocates according to the length of a roof ventilation metal. 軒天換気金物の換気面積に応じて割り付けを行なうプログラムによる各処理を説明するフローチャートである。It is a flowchart explaining each processing by the program which allocates according to the ventilation area of a roof ventilation metal. 軒天換気金物の端部状況に応じて付属品の割り付けを行なうプログラムによる各処理を説明するフローチャートである。It is a flowchart explaining each process by the program which allocates accessories according to the end condition of a roof ventilation metal. 軒天換気金物の端部状況に応じて付属品の割り付けを行なうプログラムによる各処理を説明するフローチャートである。It is a flowchart explaining each process by the program which allocates accessories according to the end condition of a roof ventilation metal. ユーザが本発明に係る割り付けシステムにアクセスする際の認証画面の一例を示す図である。It is a figure which shows an example of the authentication screen at the time of a user accessing the allocation system which concerns on this invention. 建物情報を入力する入力画面の一例を示す図である。It is a figure which shows an example of the input screen which inputs building information. 建物の外壁ラインを作図する様子を示す図である。It is a figure which shows a mode that the outer wall line of a building is drawn. 建物の部屋の広さを変更する様子を示す図である。It is a figure which shows a mode that the size of the room of a building is changed. 建物の屋根ラインを作図する様子を示す図である。It is a figure which shows a mode that the roof line of a building is drawn. 建物の屋根ラインを作図する様子を示す図である。It is a figure which shows a mode that the roof line of a building is drawn. 外壁ライン、屋根ライン及び屋根勾配に基づいて立体完成予想図を作図した様子を示す図である。It is a figure which shows a mode that the three-dimensional completion forecast drawing was drawn based on an outer wall line, a roof line, and a roof slope. 軒天領域に軒天板と軒天換気金物を割り付けた様子を示す図である。It is a figure which shows a mode that the eaves top plate and the eaves ventilation hardware were allocated to the eaves area | region. 軒天領域に軒天板と軒天換気金物を割り付けた様子を示す図である。It is a figure which shows a mode that the eaves top plate and the eaves ventilation hardware were allocated to the eaves area | region. 割り付けた部材名と品番と数量とを一覧した図である。It is the figure which listed the allocated member name, part number, and quantity. 割り付けた部材の見積金額を一覧した図である。It is the figure which listed the estimated amount of money of the allocated member. 軒天板の詳細を一覧した図である。It is the figure which listed the details of the eaves top plate. 発注書の一例を示す図である。It is a figure which shows an example of a purchase order. 割り付け図の一例を示す図である。It is a figure which shows an example of a layout drawing.

図により本発明に係る割り付けシステム及びそのプログラムの一実施形態を具体的に説明する。   An embodiment of an allocation system and its program according to the present invention will be specifically described with reference to the drawings.

<割り付けシステム>
図1に示すように、本発明に係る割り付けシステム1は、サーバ装置2と、ユーザ3、納材店4、問屋5、建材商社6及び部品メーカ7等で使用されるパーソナルコンピュータ、スマートフォン、携帯端末装置等のコンピュータとの間でコンピュータシステムを利用して情報入力や情報閲覧、入金処理等が可能とされている。
<Allocation system>
As shown in FIG. 1, the allocation system 1 according to the present invention is a personal computer, a smart phone, a mobile phone used by a server device 2, a user 3, a delivery shop 4, a wholesaler 5, a building materials trading company 6 and a parts maker 7 or the like. Information input, information browsing, deposit processing, and the like can be performed using a computer system with a computer such as a terminal device.

<サーバ装置>
図1に示すサーバ装置2からダウンロードした本発明に係るプログラムソフトウエアをユーザ3、納材店4、問屋5、建材商社6及び部品メーカ7等で使用されるパーソナルコンピュータ、スマートフォン、携帯端末装置等のコンピュータにインストールする。その各コンピュータの内部には、図2に示すように、制御手段となるCPU(Central Processing Unit;中央演算装置)8が設けられており、該CPU8には記憶手段となるメモリ9が接続されている。また、CPU8には、図14に示す建物10の図10及び図11に示す平面図上の外壁ライン11を作図する外壁ライン作図手段となる外壁ライン作図部12が接続されている。外壁ライン作図部12は、図10及び図11に示す部屋領域の作成ボタン15を利用して画面上でマウス等をクリックしてコーナ部を設定することでユーザ3が所望する外壁ライン11を図10及び図11に示す平面図上に作図することが出来る。
<Server device>
Personal computer, smart phone, portable terminal device, etc. used by the user 3, the delivery shop 4, the wholesaler 5, the building materials trading company 6, the parts maker 7, etc. with the program software according to the present invention downloaded from the server device 2 shown in FIG. Install on your computer. As shown in FIG. 2, a CPU (Central Processing Unit; central processing unit) 8 serving as control means is provided inside each of the computers, and a memory 9 serving as storage means is connected to the CPU 8 There is. Further, the CPU 8 is connected with an outer wall line drawing unit 12 which is an outer wall line drawing means for drawing the outer wall line 11 on the plan view shown in FIGS. 10 and 11 of the building 10 shown in FIG. The outer wall line drawing unit 12 displays the outer wall line 11 desired by the user 3 by setting a corner by clicking the mouse or the like on the screen using the creation button 15 of the room area shown in FIGS. 10 and 11. 10 and can be drawn on the plan views shown in FIG.

また、CPU8には、図14に示す建物10の図12及び図13に示す平面図上の屋根ライン13を作図する屋根ライン作図手段となる屋根ライン作図部14が接続されている。屋根ライン作図部14は、図12及び図13に示す屋根の作成ボタン16を利用して画面上でマウス等をクリックしてコーナ部を設定することでユーザ3が所望する屋根ライン13を図12及び図13に示す平面図上に作図することが出来る。   Further, to the CPU 8 is connected a roof line drawing unit 14 serving as a roof line drawing means for drawing the roof line 13 on the plan view shown in FIGS. 12 and 13 of the building 10 shown in FIG. The roof line drawing unit 14 clicks the mouse etc. on the screen using the roof creation button 16 shown in FIG. 12 and FIG. 13 to set the corner portion, and the roof line 13 desired by the user 3 is shown in FIG. And it can be drawn on the plan view shown in FIG.

更に、CPU8には、図14に示す建物10の屋根勾配を選択する屋根勾配選択手段となる屋根勾配選択部17が接続されている。屋根勾配選択部17は、図14に示す屋根の作成ボタン16の勾配ボタン16aをマウス等によりクリックして屋根勾配を適宜選択することでユーザ3が所望する屋根勾配を有する建物10の立体完成予想図を作図することが出来る。   Further, a roof slope selection unit 17 serving as a roof slope selection unit for selecting a roof slope of the building 10 shown in FIG. 14 is connected to the CPU 8. The roof slope selection unit 17 clicks the slope button 16a of the roof creation button 16 shown in FIG. 14 with a mouse or the like to appropriately select a roof slope, and thereby predicts a three-dimensional completion of the building 10 having a roof slope desired by the user 3. The figure can be drawn.

更に、CPU8には、軒天領域算出手段となる軒天領域算出部18が接続されている。軒天領域算出部18は、図2に示す外壁ライン作図部12により作図された外壁ライン11と、屋根ライン作図部14により作図された屋根ライン13と、屋根勾配選択部17により選択された屋根勾配とにより図15及び図16に示す軒天領域19を算出する。   Further, the CPU 8 is connected with an eaves area calculation unit 18 serving as eaves area calculation means. The eaves sky area calculating unit 18 includes the outer wall line 11 drawn by the outer wall line drawing unit 12 shown in FIG. 2, the roof line 13 drawn by the roof line drawing unit 14, and the roof selected by the roof slope selection unit 17. The eaves area 19 shown in FIGS. 15 and 16 is calculated based on the gradient.

図15及び図16に示すように、CPU8はCADデータに基づいて、外壁ライン11から建物10の外側に柱外面よりの見切り取付け迄の寸法を付加した領域を建物10の最外周領域として判定し、屋根ライン13に囲まれた領域から重なり合う建物10の最外周部を除外して、更に屋根ライン13の外側から屋根図面の線と部材との補正位置を差し引いた領域を軒天領域19の水平投影領域として判定し、屋根勾配選択部17により選択された屋根勾配を換算して軒天領域19として算出する。   As shown in FIG. 15 and FIG. 16, the CPU 8 determines an area obtained by adding the dimension of the parting attachment from the outer surface of the pillar from the outer wall line 11 to the outside of the building 10 as the outermost area of the building 10 based on the CAD data. , Excluding the outermost periphery of the overlapping building 10 from the area surrounded by the roof line 13, and further subtracting the correction drawing position of the line of the roof drawing and the member from the outside of the roof line 13 The roof slope selected by the roof slope selection unit 17 is determined as a projection area, and calculated as an eaves area 19.

更に、CPU8には、図15及び図16に示す軒天領域19に配置される軒天板20の勾配を選択する軒天板勾配選択手段となる軒天板勾配選択部21が接続されている。軒天板勾配選択部21は、図9に示す軒天タイプ選択欄22に表示された勾配軒天または水平軒天をマウス等によりクリックして適宜選択することでユーザ3が所望する軒天タイプを選択することが出来る。本実施形態では勾配軒天を選択した場合は、軒天板20の勾配は、屋根勾配と一致する。   Further, the CPU 8 is connected to an eaves top plate selection unit 21 serving as an eaves top plate gradient selecting means for selecting a gradient of the eaves top plate 20 disposed in the eaves area 19 shown in FIGS. . The eave top type selection unit 21 selects an eaves type desired by the user 3 by appropriately selecting the eaves or horizontal eaves displayed in the eaves type selection column 22 shown in FIG. Can be selected. In the present embodiment, when the gradient eaves is selected, the gradient of the eaves 20 corresponds to the roof gradient.

更に、CPU8には、図2に示す軒天領域算出部18により算出された軒天領域19と、軒天板勾配選択部21により選択された軒天板20の勾配とから該軒天領域19に配置される軒天板20の種類を選択する軒天板選択手段となる軒天板選択部23が接続されている。軒天板選択部23は、図9に示す軒天板タイプ選択ボタン24をマウス等によりクリックして適宜選択することでユーザ3が所望する軒天板20の種類を選択することが出来る。本実施形態では、軒天板20の長さや幅や厚さ寸法や材質等が異なる複数種類の軒天板20の部材リストが予め記憶手段となる部材情報データベース39に記憶して格納されており、図9に示す軒天板タイプ選択ボタン24をマウス等によりクリックすると、図2に示す軒天領域算出部18により算出された軒天領域19に使用可能な軒天板20の部材リストが表示され、該部材リストの中から所望の軒天板20をマウス等によりクリックして適宜選択することでユーザ3が所望する軒天板20のタイプを選択することが出来る。   Further, the CPU 8 uses the eaves area 19 calculated by the eaves area calculation part 18 shown in FIG. 2 and the gradient of the eaves top plate 20 selected by the eaves top plate slope selection part 21. An eaves top plate selection unit 23 is connected as an eaves top plate selection unit for selecting the type of the eaves top plate 20 disposed in. The eaves top plate selection unit 23 can select the type of eaves top plate 20 desired by the user 3 by clicking the eaves top plate type selection button 24 shown in FIG. In the present embodiment, a member list of a plurality of types of eaves top plates 20 having different lengths, widths, thickness dimensions, materials, etc. of the eaves top plate 20 is stored in advance in a member information database 39 serving as storage means. When the eaves top plate type selection button 24 shown in FIG. 9 is clicked on with a mouse etc., a list of usable eaves top plates 20 is displayed in the eaves area 19 calculated by the eaves area calculation unit 18 shown in FIG. It is possible to select the type of the eaves top plate 20 desired by the user 3 by clicking on the desired eaves top plate 20 from the member list by clicking with a mouse etc.

CPU8は、図2に示す軒天領域算出部18により算出された図15及び図16に示す軒天領域19の外壁ライン11に沿った第一の長さを、図2に示す軒天板選択部23(図9に示す軒天板タイプ選択ボタン24)により選択された軒天板20の外壁ライン11に沿った第二の長さで除算する算出手段を兼ねる。そして、CPU8により軒天領域19の外壁ライン11に沿った第一の長さを、軒天板20の外壁ライン11に沿った第二の長さで除した際の余りの長さを記憶手段となるメモリ9に記憶する。   The CPU 8 selects the eaves top plate shown in FIG. 2 for the first length along the outer wall line 11 of the eaves area 19 shown in FIGS. 15 and 16 calculated by the eaves area calculation unit 18 shown in FIG. It also doubles as calculation means for dividing by the second length along the outer wall line 11 of the eaves top plate 20 selected by the section 23 (eaves top plate type selection button 24 shown in FIG. 9). Then, the memory means is a remaining length when the first length along the outer wall line 11 of the eaves area 19 is divided by the second length along the outer wall line 11 of the eaves top plate 20 by the CPU 8 Are stored in the memory 9.

そして、図15及び図16に示す軒天領域19の全てについて割り付け手段を兼ねるCPU8により軒天板20を割り付けた後に、メモリ9に記憶された余りの長さの総計を算出手段を兼ねるCPU8により算出する。そして、CPU8により算出された余りの長さの総計を、軒天板20の外壁ライン11に沿った第二の長さで除した数を端材算出手段を兼ねるCPU8により算出する。   Then, after the eaves top plate 20 is allocated by the CPU 8 which also serves as the allocation means for all of the eaves area 19 shown in FIGS. 15 and 16, the total length of the remaining lengths stored in the memory 9 is obtained by the CPU 8 which also serves as the calculation means. calculate. Then, the total length of the remainders calculated by the CPU 8 is divided by the second length along the outer wall line 11 of the eaves top plate 20, and the number is calculated by the CPU 8 also serving as a scrap calculation means.

更に、CPU8には、図15及び図16に示す軒天領域19に配置される軒天換気金物25の種類を選択する軒天換気金物選択手段となる軒天換気金物選択部26が接続されている。軒天換気金物選択部26は、図15及び図16に示す換気部材の内容ボタン27をマウス等によりクリックして適宜選択することでユーザ3が所望する軒天換気金物25の種類を選択することが出来る。本実施形態では、軒天換気金物25の長さや幅や高さ寸法や材質、或いは、通気穴として機能するスリットの開口面積等が異なる複数種類の軒天換気金物25の部材リストが予め記憶手段となる部材情報データベース39に記憶して格納されており、図15及び図16に示す換気部材の内容ボタン27をマウス等によりクリックすると、図2に示す軒天領域算出部18により算出された軒天領域19に使用可能な軒天換気金物25の部材リストが表示され、該部材リストの中から所望の軒天換気金物25をマウス等によりクリックして適宜選択することでユーザ3が所望する軒天換気金物25のタイプを選択することが出来る。   Furthermore, the CPU 8 is connected to an eaves ventilation hardware selection unit 26 serving as an eaves ventilation hardware selection means for selecting the kind of the eaves ventilation hardware 25 disposed in the eaves area 19 shown in FIGS. There is. The eaves ventilation hardware selection unit 26 selects the type of eaves ventilation hardware 25 desired by the user 3 by clicking the content button 27 of the ventilation member shown in FIGS. Can do. In the present embodiment, the member list of a plurality of types of eaves ventilation hardware 25 different in length, width, height dimension and material of the eaves ventilation hardware 25, or the opening area of the slit functioning as a ventilation hole is stored in advance. When the content button 27 of the ventilation member shown in FIG. 15 and FIG. 16 is clicked on with a mouse etc., the eaves calculated by the eaves area calculation unit 18 shown in FIG. 2 are stored. A list of usable eaves ventilation vents 25 is displayed in the sky area 19, and an eaves desired by the user 3 is selected by appropriately selecting the desired eaves ventilating hardware 25 from the list by using a mouse or the like. The type of sky ventilation hardware 25 can be selected.

また、CPU8は、図2に示す軒天領域算出部18により算出された図15及び図16に示す軒天領域19の外壁ライン11に沿った第一の長さを、図2に示す軒天換気金物選択部26(図15及び図16に示す換気部材の内容ボタン27)により選択された軒天換気金物25の外壁ライン11に沿った第二の長さで除算する算出手段を兼ねる。そして、CPU8により軒天領域19の外壁ライン11に沿った第一の長さを、軒天換気金物25の外壁ライン11に沿った第二の長さで除した際の余りの長さをメモリ9に記憶する。   In addition, the CPU 8 calculates the first length along the outer wall line 11 of the eaves area 19 shown in FIGS. 15 and 16 calculated by the eaves area calculation unit 18 shown in FIG. It also doubles as a calculation means for dividing the eaves ventilation hardware 25 by the second length along the outer wall line 11 selected by the ventilation hardware selection unit 26 (the contents button 27 of the ventilation member shown in FIGS. 15 and 16). Then, the remaining length when the first length along the outer wall line 11 of the eaves area 19 is divided by the second length along the outer wall line 11 of the eaves ventilation hardware 25 by the CPU 8 is a memory Store in 9

そして、図15及び図16に示す軒天領域19の全てについて割り付け手段を兼ねるCPU8により軒天換気金物25を割り付けた後に、メモリ9に記憶された余りの長さの総計を算出手段を兼ねるCPU8により算出する。そして、CPU8により算出された余りの長さの総計を、軒天換気金物25の外壁ライン11に沿った第二の長さで除した数を端材算出手段を兼ねるCPU8により算出する。   Then, after the eaves ventilation vent 25 is allocated by the CPU 8 also serving as the allocation means for all of the eaves area 19 shown in FIGS. 15 and 16, the total length of the remainder stored in the memory 9 serves as the calculation means. Calculated by Then, the total length of the remainder calculated by the CPU 8 is divided by the second length along the outer wall line 11 of the eaves ventilation hardware 25, and the number is calculated by the CPU 8 also serving as the scrap calculation means.

更に、CPU8には、図2に示す軒天領域算出部18により算出された図15及び図16に示す軒天領域19と、図2に示す外壁ライン作図部12により作図された外壁ライン11と、図2に示す屋根ライン作図部14により作図された屋根ライン13とにより小屋裏面積を算出する小屋裏面積算出手段となる小屋裏面積算出部28が接続されている。   Further, the CPU 8 includes the eaves area 19 shown in FIGS. 15 and 16 calculated by the eaves area calculation unit 18 shown in FIG. 2 and the outer wall line 11 drawn by the outer wall line drawing unit 12 shown in FIG. A shed-to-stick area calculation unit 28 serving as a shed-to-sat area calculation means for calculating a shed-at-stich area is connected by the roof line 13 drawn by the roof line drawing unit 14 shown in FIG.

図14に示すように、CPU8はCADデータに基づいて、外壁ライン11に囲まれた領域を建物10の内部として判定し、建物10の領域の上に直接、屋根ライン13に囲まれた領域が重なる場合に小屋裏領域が発生すると判定して、その重複した領域を小屋裏面積の水平投影領域として判定し、小屋裏面積として算出する。   As shown in FIG. 14, the CPU 8 determines the area surrounded by the outer wall line 11 as the inside of the building 10 based on the CAD data, and the area surrounded by the roof line 13 is directly above the area of the building 10. When it overlaps, it is determined that an attic area is generated, and the overlapping area is determined as a horizontal projection area of an attic area, and is calculated as an attic area.

また、CPU8は、図2に示す小屋裏面積算出部28により算出された小屋裏面積に対応して必要な換気面積を算出する算出手段を兼ねる。小屋裏面積に対応して必要な換気面積は、住宅の品質確保の促進等に関する法律(品確法)と住宅金融支援機構の小屋裏換気孔の取り方の基準データテーブル等がメモリ9に記憶されている。CPU8は、メモリ9に記憶されたデータテーブル等から図2に示す小屋裏面積算出部28により算出された小屋裏換気面積に対応して必要な換気面積を呼び出して設定することが出来る。   Further, the CPU 8 doubles as a calculation means for calculating a required ventilation area corresponding to the area of the attic space calculated by the attic area calculation unit 28 shown in FIG. The memory area 9 stores the ventilation area required in response to the attic area, such as the data on promotion of securing the quality of the house (quality assurance method) and the method of obtaining the attic ventilation hole of the Housing Financial Support Organization etc. ing. The CPU 8 can call out and set a necessary ventilation area from the data table or the like stored in the memory 9 in accordance with the attic ventilation area calculated by the cabin back area calculation unit 28 shown in FIG.

一方、図2に示す軒天換気金物選択部26(図15及び図16に示す換気部材の内容ボタン27)により選択された軒天換気金物25の換気面積は、予め設定されたデータテーブル等が部材情報データベース39に記憶されている。CPU8は、部材情報データベース39に記憶されたデータテーブル等から図2に示す軒天換気金物選択部26(図15及び図16に示す換気部材の内容ボタン27)により選択された軒天換気金物25の換気面積を呼び出して設定することが出来る。   On the other hand, the ventilation area of the eaves ventilation hardware 25 selected by the eaves ventilation metal selection unit 26 (the contents button 27 of the ventilation member shown in FIGS. 15 and 16) shown in FIG. It is stored in the member information database 39. The CPU 8 uses the eaves ventilation hardware 25 selected by the eaves ventilation hardware selection unit 26 (the contents button 27 of the ventilation member shown in FIGS. 15 and 16) shown in FIG. 2 from the data table etc. stored in the member information database 39. The ventilation area of can be called and set.

そして、軒天換気金物算出手段を兼ねるCPU8により図2に示す小屋裏面積算出部28により算出された小屋裏面積に対応して必要な換気面積を、図2に示す軒天換気金物選択部26(図15及び図16に示す換気部材の内容ボタン27)により選択された軒天換気金物25の換気面積で除した際の数を算出する。   The ventilation area necessary for the ventilation area selection section 26 shown in FIG. 2 corresponds to the ventilation area required by the cabin area calculation section 28 shown in FIG. The number when dividing by the ventilation area of the eaves ventilation hardware 25 selected by the contents button 27 of the ventilation member shown in FIG. 15 and FIG. 16 is calculated.

<割り付けプログラムのダウンロード>
先ず、図3のステップS1において、本実施形態の割り付けシステム1に使用される割り付けプログラムをインターネット上でダウンロードできるダウンロードページ(ホームページ)を作成し、図1に示すユーザ3から部品メーカ7への割り付けシステム1の提供依頼に応じて、ユーザ3にID(Identification)とパスワードとを提供する。ユーザ3はインターネット上のプログラムソフトウェアのダウンロード画面にアクセスし、IDとパスワードとを入力してログインする。
<Download of allocation program>
First, in step S1 of FIG. 3, a download page (home page) is created on which the allocation program used in the allocation system 1 of this embodiment can be downloaded on the Internet, and allocation from user 3 to parts maker 7 shown in FIG. In response to the provision request of the system 1, the user 3 is provided with an ID (Identification) and a password. The user 3 accesses the program software download screen on the Internet, enters an ID and a password, and logs in.

次に、ステップS2において、ダウンロードファイルをダウンロードする。このときのダウンロードはユーザIDとパスワードとにより管理されており、一つのコンピュータに一つのダウンロードしかできないように設定されている。複数のコンピュータで必要な場合は、その数だけIDとパスワードを割り付けシステム1の提供者から入手する必要がある。   Next, in step S2, the download file is downloaded. The download at this time is managed by a user ID and a password, and is set such that only one download can be performed on one computer. If multiple computers require it, as many IDs and passwords as the number need to be allocated from the provider of the allocation system 1.

ダウンロードが完了すると、割り付けシステム1が起動するコンピュータが限定される。次に、予めユーザ3にプログラムソフトウェアを起動するためのライセンスコードとパスワードとが付与される。ステップS3において、ユーザ3は図8に示すライセンスコード入力画面29により予め付与されたライセンスコードとパスワードを毎回入力する。図8に示すライセンスコード入力画面29から入力されたライセンスコードとパスワードとをインターネットを介して割り付けシステム1の提供者のサーバ装置2が有効か否かを確認し、プログラムソフトウェアが起動する許可を与えて該プログラムソフトウェアを起動させる。   When the download is completed, the computer on which the allocation system 1 starts is limited. Next, a license code and a password for activating the program software are given to the user 3 in advance. In step S3, the user 3 inputs the license code and password given in advance on the license code input screen 29 shown in FIG. 8 each time. Assign the license code and password entered from the license code input screen 29 shown in FIG. 8 via the Internet to check whether the server device 2 of the provider of the system 1 is valid and give permission to start the program software Start the program software.

前記ステップS3において、プログラムソフトウェアが起動したら、ステップS4,S5において、図9に示す物件情報入力画面30により物件名称(邸名)、物件場所(住所)、建物のモジュール、階数、躯体の壁厚(柱幅)、屋根勾配、軒の出寸法、使用する軒天板20、使用する軒天換気金物25等の必要基本事項を入力する。   When the program software is activated in the step S3, the property name (house name), the property location (address), the module of the building, the number of floors, the wall thickness of the housing are displayed on the property information input screen 30 shown in FIG. Enter the necessary basic items such as (column width), roof slope, eaves dimensions, eaves 20 to be used, and eaves 25 to be used.

前記ステップS4,S5において、基本事項の入力が終わったら、ステップS6において、図2に示す外壁ライン作図部12により図10及び図11に示すように、外壁ライン11の入力を行なう。外壁ライン11は、図10及び図11に示す入力モードボタン31の矩形と多角を適宜選択することにより各階の部屋毎に外壁ライン11を入力する矩形入力と、一筆書きで外壁ライン11を入力する多角入力の何れかを選択することができる。   When the input of the basic items is completed in the steps S4 and S5, the outer wall line drawing unit 12 shown in FIG. 2 performs the input of the outer wall line 11 as shown in FIGS. 10 and 11 in step S6. The outer wall line 11 inputs the outer wall line 11 by one-stroke writing and the rectangular input for inputting the outer wall line 11 for each floor room by appropriately selecting the rectangle and the polygon of the input mode button 31 shown in FIGS. Any of the polygon inputs can be selected.

次にステップS7において、図2に示す屋根ライン作図部14により図12及び図13に示すように、屋根ライン13の入力を行なって屋根伏図を作成する。単純な屋根33の場合は、プログラムソフトウェアに組み込まれたCADシステムにより自動生成することが出来る。複雑な屋根33の場合は、部分的に作成し、任意に修正を加えることが可能な任意作成が可能である。   Next, in step S7, as shown in FIGS. 12 and 13 by the roof line drawing unit 14 shown in FIG. 2, the roof line 13 is input to create a roof plan. In the case of a simple roof 33, it can be automatically generated by a CAD system incorporated in program software. In the case of a complex roof 33, it is possible to create an option which can be partially created and optionally modified.

前記ステップS7において、図12及び図13に示す屋根伏図の作成が完了すれば、ステップS8に進んで、図14に示す3D建物パース図(立体完成予想図)を自動作成して建物10の外壁32や屋根33が正しく設計されているか否かの確認を行なうことが出来る。   If the roof plan shown in FIG. 12 and FIG. 13 is completed in the above-mentioned step S7, the process proceeds to step S8 to automatically create a 3D building perspective diagram (three dimensional completion forecast diagram) shown in FIG. It can be checked whether the outer wall 32 and the roof 33 are designed correctly.

次に、ステップS9において、データ作成を行い、図15及び図16に示すように、軒天板20及び軒天換気金物25の割り付け計算を行なう。次にステップS10において、図17に示す部材数量明細画面34を確認し、予備数量等を自動計算し、ユーザ3は必要に応じて適宜数量を修正した後、数量確定ボタン34aをクリックして確定する。その後、図20に示すような数量明細や金額等が入った発注書35が作成され、ユーザ3は最終確認を行って、ステップS11に進み、図18に示す発注画面36上に設けられた図示しない発注ボタンをクリックすると発注が完了する。   Next, in step S9, data creation is performed, and allocation calculation of the eaves top plate 20 and the eaves ventilation hardware 25 is performed as shown in FIGS. Next, in step S10, the member quantity detail screen 34 shown in FIG. 17 is confirmed, spare quantities and the like are automatically calculated, and the user 3 corrects the quantity as necessary, and then clicks the quantity confirmation button 34a to confirm Do. After that, the order form 35 including the quantity specification and the amount as shown in FIG. 20 is created, and the user 3 makes the final confirmation, proceeds to step S11 and displays on the order screen 36 shown in FIG. Do not place an order by clicking on the order button.

前記ステップS10において、図20に示す発注書35を出力すると同時に、ステップS12において、割り付けシステム1の提供者に発注番号と発注明細データが送られ、サーバ装置2のメモリ9に格納される。発注番号と発注明細データの格納と同時に、納期、在庫情報をユーザ3に提供する。また、必要に応じて、図21の割り付け画面37で示す部材の割り付け図の出力も可能とする。   At the same time as the order form 35 shown in FIG. 20 is output at the step S10, the order number and the order specification data are sent to the provider of the allocation system 1 at the same time as the order form 35 is stored in the memory 9 of the server device 2. At the same time as storing the order number and order specification data, delivery date and stock information are provided to the user 3. In addition, it is possible to output the member layout shown in the allocation screen 37 of FIG. 21 as necessary.

前記ステップS1において、ログインに失敗した場合には、ステップS13に進んでプログラムソフトウェアのダウンロードはできない。また、前記ステップS3において、図8に示すライセンスコード入力画面29から入力されたライセンスコードとパスワードとが合致しない場合は、ステップS14に進んでプログラムソフトウェアは起動しない。   If login fails in step S1, the process proceeds to step S13 and the program software can not be downloaded. If the license code and the password input from the license code input screen 29 shown in FIG. 8 do not match in step S3, the process proceeds to step S14 and the program software is not activated.

<軒天換気金物の割り付け動作>
次に図4を用いて軒天換気金物25の割り付け動作について説明する。前記図3のステップS9において、軒天換気金物25の割り付け動作を行なう場合には、図4のステップS21に進んで軒天換気金物25の割り付けを行なう。前記ステップS21において、外壁ライン11及び屋根ライン13の修正が終わり次第、建物データを作成して軒天換気金物25の自動割り付けを行なう。
<Allocation operation of eaves ventilation vents>
Next, the assignment operation of the eaves ventilation hardware 25 will be described with reference to FIG. In the case of performing the assignment operation of the eaves ventilation hardware 25 in step S9 of FIG. 3, the process proceeds to step S21 of FIG. 4 to perform the assignment of the eaves ventilation hardware 25. In the step S21, as soon as the correction of the outer wall line 11 and the roof line 13 is completed, building data is created and automatic allocation of the eaves ventilation metal 25 is performed.

ステップS22において、軒天板20の外壁32側及び鼻隠しケラバに軒天換気金物25が取り付く仕様の場合は、軒天換気金物25が取り付く辺の柱芯間の距離を図15に示すCADデータから自動取得して、部材情報データベース39内に登録している軒天換気金物25の長さで割り、該軒天換気金物25の必要本数を算出する。ステップS23において、軒天換気金物25が取り付く辺の柱芯間の距離が軒天換気金物25の長さで割り切れるか否かをCPU8がCADデータに基づいて判断し、割り切れる場合には、ステップS24に進んで、軒天換気金物25が取り付く全ての辺の割り付けが完了するまで、前記ステップS22〜S24を繰り返す。前記ステップS22において、軒天換気金物25が取り付く次の辺の柱芯間の距離を図15に示すCADデータから自動取得して、同様に軒天換気金物25の長さで割る。   In the case of the specification in which the eaves ventilation hardware 25 is attached to the outer wall 32 side of the eaves top plate 20 and the nose-scratched keraba in step S22, CAD data showing the distance between the column cores of the side to which the eaves ventilation hardware 25 is attached is shown in FIG. Are automatically obtained and divided by the length of the eaves ventilation hardware 25 registered in the member information database 39, and the required number of the eaves ventilation hardware 25 is calculated. In step S23, if the CPU 8 determines based on the CAD data whether the distance between the pillars of the side to which the eaves open ventilation hardware 25 is attached is divisible by the length of the eaves open ventilation hardware 25, step S24. The above steps S22 to S24 are repeated until allocation of all sides to which the eaves ventilation hardware 25 is attached is completed. In the step S22, the distance between the pillars of the next side to which the eaves ventilation hardware 25 is attached is automatically acquired from the CAD data shown in FIG. 15 and similarly divided by the length of the eaves ventilation hardware 25.

前記ステップS23において、軒天換気金物25が取り付く辺の柱芯間の距離が軒天換気金物25の長さで割り切れない場合は、ステップS25に進み、余った辺の箇所と、長さとをメモリ9内に格納して、軒天換気金物25が取り付く次の辺に対して割り付けによる該軒天換気金物25の必要本数の算出処理を行い、軒天換気金物25が取り付く全ての辺の該軒天換気金物25の必要本数の算出処理が終わるまで、ステップS22〜S25の処理を繰り返し行なう。   In step S23, when the distance between the pillars of the side to which the eaves ventilation hardware 25 is attached is not divisible by the length of the eaves ventilation hardware 25, the process proceeds to step S25, and the remaining side location and the length are stored in memory. 9 and calculate the required number of the eaves ventilation hardware 25 by allocating to the next side to which the eaves ventilation hardware 25 is attached, the eaves for all the areas where the eaves ventilation hardware 25 is attached The processes of steps S22 to S25 are repeatedly performed until the calculation process of the required number of sky ventilation hardwares 25 is completed.

前記ステップS24において、軒天換気金物25が取り付く全ての辺に対して該軒天換気金物25の割り付け処理が終了したら、ステップS26に進み、前記ステップS25においてメモリ9に格納した余りの辺の格納データが有るか否かのチェックを行なう。   When the allocation process of the eaves ventilation hardware 25 is completed for all the sides to which the eaves ventilation hardware 25 is attached in the step S24, the process proceeds to the step S26, and the remaining sides stored in the memory 9 in the step S25 are stored. Check if there is data.

前記ステップS26において、前記ステップS25でメモリ9に格納した余りの辺の格納データが有る場合は、ステップS27に進んで、余った辺のそれぞれの長さを全て加算して、新品の軒天換気金物25を割り当てる際に該軒天換気金物25の本数が最も少なくなるように割り当てて該軒天換気金物25を各部の必要な長さにカットする。   If there is stored data of the remaining side stored in the memory 9 in the step S25 in the step S26, the process proceeds to the step S27, and all the lengths of the remaining sides are added to make a new eaves ventilation When allocating the hardware 25, the eaves ventilation vent 25 is cut so as to minimize the number of the eaves ventilation vents 25 to the required length of each part.

各部の必要な長さに軒天換気金物25をカットして残った該軒天換気金物25の端材が180mm以上の場合には、ステップS28に進んで、軒天換気金物25の本数が最も少なくなるように次の余った辺に割り当てて利用する。   If the end material of the eaves ventilation hardware 25 left after cutting the eaves ventilation hardware 25 to the required length of each part is 180 mm or more, the process proceeds to step S28, and the number of eaves ventilation hardware 25 is the most. Allocate to the next surplus side so as to reduce it and use it.

本実施形態では、施工の効率化や付属品の増加を抑えるために、余った辺の一箇所につき、カットした軒天換気金物25の一個を割り付けるように設定されている。従って、前記ステップS27,S28において、カットした軒天換気金物25の端材が180mm未満になった場合や、或いは、余った辺の一箇所にカットした軒天換気金物25の端材を割り当てても長さが足りない場合は、それぞれステップS29,S30に進んで、カットした軒天換気金物25の端材を破棄し、新品の軒天換気金物25を残った余りの辺に軒天換気金物25の本数が最も少なくなるように割り当てて行く。   In this embodiment, in order to reduce the efficiency of construction and the increase in accessories, one of the cut eaves ventilation vents 25 is allocated to one place of the remaining side. Therefore, in the steps S27 and S28, when the cut end of the cut eaves ventilation vent 25 becomes less than 180 mm, or the cut end of the cut eaves ventilation 25 is allocated to one place of the surplus side If the length is not sufficient, proceed to steps S29 and S30, respectively, discard the cut end of the cut air duct 25 and leave the new air duct 25 on the remaining side. We will be assigned to minimize the number of 25.

前記ステップS26において、前記ステップS25でメモリ9に格納した全ての余りの辺に対する軒天換気金物25の割り付けが完了したら、ステップS31に進んで、使用した軒天換気金物25の数量を集計する。軒天換気金物25の端材がある場合は、該軒天換気金物25の端材のカット割り付け状況を図21に示す割り付け画面37上に表示して、どこに軒天換気金物25の端材を使用したか、どの端材が同じ軒天換気金物25からカットされたものかが目視出来るようにする。   In step S26, when the allocation of the eaves ventilation vents 25 to all the remaining sides stored in the memory 9 in the step S25 is completed, the process proceeds to step S31, and the quantity of the eaves ventilation vents 25 used is totaled. If there is an end of the eaves ventilation hardware 25, the cut allocation of the eaves of the eaves ventilation hardware 25 is displayed on the allocation screen 37 shown in FIG. 21, and where the end of the eaves ventilation hardware 25 is displayed. It makes it possible to visually identify which end material has been used and which was cut from the same eaves ventilation vent 25.

図3及び図4に示すように、本実施形態の割り付けシステム1をコンピュータシステムを利用して実行する割り付けプログラムは、図3のステップS6に示すように、図2に示す外壁ライン作図部12により図10及び図11に示すように、建物10の外壁ライン11を作図する処理と、図3のステップS7に示すように、図2に示す屋根ライン作図部14により図12及び図13に示すように、建物10の屋根ライン13を作図する処理と、図2に示す屋根勾配選択部17(図9に示す勾配ボタン16a)により建物10の屋根勾配を選択する処理と、外壁ライン作図部12により作図された外壁ライン11と、屋根ライン作図部14により作図された屋根ライン13と、屋根勾配選択部17により選択された屋根勾配とに基づいて、図2に示す軒天領域算出部18により図15及び図16に示す軒天領域19を算出する処理と、図3のステップS5に示すように、図2に示す軒天換気金物選択部26(図15及び図16に示す換気部材の内容ボタン27)により図15及び図16に示す軒天領域19に配置される軒天換気金物25の種類を選択する処理と、図4のステップS22〜S25に示すように、図2に示す軒天領域算出部18により算出された図15及び図16に示す軒天領域19の外壁ライン11に沿った第一の長さを、図2に示す軒天換気金物選択部26(図15及び図16に示す換気部材の内容ボタン27)により選択された軒天換気金物25の外壁ライン11に沿った第二の長さで除した際の余りの長さをメモリ9に記憶する処理と、図15及び図16に示す軒天領域19の全てについて軒天換気金物25を割り付けた後に、メモリ9に記憶された余りの長さの総計を軒天換気金物25の外壁ライン11に沿った第二の長さで除した数を端材算出手段となるCPU8により算出する処理とを有する。   As shown in FIGS. 3 and 4, the allocation program for executing the allocation system 1 of the present embodiment using a computer system is, as shown in step S6 of FIG. 3, an external wall line drawing unit 12 shown in FIG. As shown in FIGS. 10 and 11, the process of drawing the outer wall line 11 of the building 10, and as shown in step S7 of FIG. 3, by the roof line drawing unit 14 shown in FIG. In the process of drawing the roof line 13 of the building 10, the process of selecting the roof slope of the building 10 by the roof slope selection unit 17 (the gradient button 16a shown in FIG. 9) shown in FIG. Based on the drawn outer wall line 11, the roof line 13 drawn by the roof line drawing unit 14, and the roof slope selected by the roof slope selection unit 17, the eaves area calculation unit 18 shown in FIG. Etengen shown in Figure 15 and Figure 16 As shown in the process of calculating the area 19 and in the step S5 of FIG. 3, the eaves ventilation hardware selection unit 26 (the contents button 27 of the ventilation member shown in FIGS. 15 and 16) shown in FIG. The process of selecting the type of eaves ventilation vent 25 arranged in the eaves area 19 shown in FIG. 4 and the figures calculated by the eaves area calculation unit 18 shown in FIG. 2 as shown in steps S22 to S25 in FIG. A first length along the outer wall line 11 of the eaves area 19 shown in FIG. 15 and FIG. 16 corresponds to the eaves ventilation metal selection unit 26 shown in FIG. 2 (content button 27 of the ventilation member shown in FIGS. A process of storing the remaining length of the eaves roof ventilation hardware 25 selected by the second length along the outer wall line 11 in the memory 9; and the eaves area 19 shown in FIGS. After allocating the eaves ventilation hardware 25 for all of the above, the total length of the remaining length stored in the memory 9 is added to the outer wall line 11 of the eaves ventilation hardware 25 And a process of calculating the number divided by the second length along the line by the CPU 8 serving as the scrap calculation means.

尚、本実施形態の割り付けシステム1をコンピュータシステムを利用して実行する割り付けプログラムは、軒天換気金物25に代えて軒天板20を割り付けるプログラムとしても同様に適用出来る。例えば、図3のステップS6に示すように、図2に示す外壁ライン作図部12により図10及び図11に示すように、建物10の外壁ライン11を作図する処理と、図3のステップS7に示すように、図2に示す屋根ライン作図部14により図12及び図13に示すように、建物10の屋根ライン13を作図する処理と、図2に示す屋根勾配選択部17(図9に示す勾配ボタン16a)建物10の屋根勾配を選択する処理と、外壁ライン作図部12により作図された外壁ライン11と、屋根ライン作図部14により作図された屋根ライン13と、屋根勾配選択部17により選択された屋根勾配とに基づいて図2に示す軒天領域算出部18により図15及び図16に示す軒天領域19を算出する処理と、図2に示す軒天板勾配選択部21(図9に示す軒天タイプ選択欄22)により図15及び図16に示す軒天領域19に配置される軒天板20の勾配(傾斜配置、或いは、水平配置)を選択する処理と、図2に示す軒天領域算出部18により算出された図15及び図16に示す軒天領域19と、図2に示す軒天板勾配選択部21(図9に示す軒天タイプ選択欄22)により選択された軒天板20の勾配とに基づいて、図2に示す軒天板選択部23(図9に示す軒天板タイプ選択ボタン24)により図15及び図16に示す軒天領域19に配置される軒天板20の種類を選択する処理と、図4のステップS22〜S25において、軒天換気金物25の代わりに軒天板20として、図2に示す軒天領域算出部18により算出された図15及び図16に示す軒天領域19の外壁ライン11に沿った第一の長さを、図2に示す軒天板選択部23(図9に示す軒天板タイプ選択ボタン24)により選択された軒天板20の外壁ライン11に沿った第二の長さで除した際の余りの長さをメモリ9に記憶する処理と、図15及び図16に示す軒天領域19の全てについて軒天板20を割り付けた後に、メモリ9に記憶された余りの長さの総計を軒天板20の外壁ライン11に沿った第二の長さで除した数を端材算出手段となるCPU8により算出する処理とを有する軒天板20の割り付けプログラムとすることが出来る。図19は割り付けられた軒天板20の枚数の一例を示す。   The assignment program for executing the assignment system 1 of the present embodiment using a computer system can be similarly applied as a program for assigning the eaves top plate 20 instead of the eaves ventilation hardware 25. For example, as shown in step S6 of FIG. 3, the process of drawing the outer wall line 11 of the building 10 as shown in FIGS. 10 and 11 by the outer wall line drawing unit 12 shown in FIG. As shown in FIGS. 12 and 13 by the roof line drawing unit 14 shown in FIG. 2, a process of drawing the roof line 13 of the building 10, and a roof slope selection unit 17 shown in FIG. Gradient button 16a) A process of selecting a roof gradient of the building 10, an outer wall line 11 drawn by the outer wall line drawing unit 12, a roof line 13 drawn by the roof line drawing unit 14, and selection by the roof gradient selection unit 17 9. A process of calculating the eaves open area 19 shown in FIG. 15 and FIG. 16 by the eaves open area calculation part 18 shown in FIG. Is arranged in the eaves area 19 shown in FIG. 15 and FIG. A process of selecting a gradient (tilted arrangement or horizontal arrangement) of the eaves top plate 20, and the eaves area 19 shown in FIGS. 15 and 16 calculated by the eaves area calculation unit 18 shown in FIG. The eaves top plate selector 23 (FIG. 2) based on the gradient of the eaves top plate 20 selected by the eaves top plate gradient selector 21 shown in FIG. 2 (the eaves sky type selection column 22 shown in FIG. 9). 16. A process of selecting the type of the eaves top plate 20 disposed in the eaves area 19 shown in FIGS. 15 and 16 by the eaves top plate type selection button 24 shown in FIG. The first length along the outer wall line 11 of the eaves area 19 shown in FIG. 15 and FIG. 16 calculated by the eaves area calculation unit 18 shown in FIG. A second length along the outer wall line 11 of the eaves top plate 20 selected by the eaves top plate selection unit 23 (the eaves top plate type selection button 24 shown in FIG. 9) shown in FIG. A process of storing in memory 9 the length of the remainder when divided by the length of the remainder stored in memory 9 after the eaves top plate 20 is allocated for all the eaves areas 19 shown in FIGS. A program for allocating the eaves 20 having a process of calculating the number obtained by dividing the total sum of the eaves by the second length along the outer wall line 11 of the eaves 20 by the CPU 8 serving as the scrap calculation means It can. FIG. 19 shows an example of the number of eaves 20 allocated.

<軒天換気金物の換気面積に基づいた割り付け動作>
次に図5を用いて軒天換気金物25の換気面積に基づいた割り付け動作について説明する。前記図3のステップS9において、軒天換気金物25の換気面積に基づいた割り付け動作を行なう場合には、図5のステップS41に進んで軒天換気金物25の換気面積に基づいた割り付けを行なう。前記ステップS41において、外壁ライン11及び屋根ライン13の修正が終わり次第、建物データを作成して軒天換気金物25の換気面積に基づいた自動割り付けを行なう。
<Assignment operation based on ventilation area of eaves ventilation vents>
Next, the assignment operation based on the ventilation area of the eaves ventilation hardware 25 will be described using FIG. In the case where the allocation operation based on the ventilation area of the eaves ventilation hardware 25 is performed in step S9 of FIG. 3, the process proceeds to step S41 of FIG. 5 and allocation based on the ventilation area of the eaves ventilation hardware 25 is performed. In the step S41, as soon as the correction of the outer wall line 11 and the roof line 13 is completed, building data is created and automatic allocation is performed based on the ventilation area of the eaves ventilation hardware 25.

本実施形態では、図5のステップS42において、軒天換気金物25が軒天板20の長手方向の中心に取り付く場合の仕様について説明する。前記ステップS42において、図14に示す屋根33と建物領域との関係から小屋裏面積が自動で判断できる。これにより小屋裏面積を自動算出し、軒裏吸排気方法による必要な換気面積を自動算出する。   In the present embodiment, specifications in the case where the eaves ventilation metal fitting 25 is attached to the longitudinal center of the eaves top plate 20 in step S42 of FIG. 5 will be described. In the step S42, the area of the attic can be automatically determined from the relationship between the roof 33 and the building area shown in FIG. In this way, the attic space area is automatically calculated, and the ventilation area required by the air intake and exhaust method is automatically calculated.

次に、ステップS43において、取り付ける軒天換気金物25の換気面積と、当該建物10の必要な換気面積とから、必要となる軒天換気金物25の本数を自動算出する。次に、ステップS44において、軒天換気金物25を取り付け可能な箇所に並行する建物10の外壁32を自動判定し、最も長い外壁32の辺に軒天換気金物25を一本割り付ける。そして、ステップS45に進んで、軒天換気金物25を割り付けた外壁32の辺の長さから割り付けた軒天換気金物25の長さを引いた長さと、次に長い取り付け可能な外壁32の辺の長さとを比較して、より長い外壁32の辺に軒天換気金物25を一本割り付ける(ステップS44)。   Next, in step S43, the number of eaves ventilation hardware 25 required is automatically calculated from the ventilation area of the eaves ventilation hardware 25 to be attached and the required ventilation area of the building 10. Next, in step S44, the outer wall 32 of the building 10 parallel to the place where the eaves ventilation hardware 25 can be attached is automatically determined, and one eaves ventilation hardware 25 is allocated to the longest outer wall 32 side. Then, the process proceeds to step S45, and a length obtained by subtracting the length of the eaves ventilation hardware 25 allocated from the side length of the outer wall 32 to which the eaves ventilation hardware 25 is allocated and the side of the outer wall 32 which can be attached next By comparing the length with the length, one eaves ventilation vent 25 is allocated to the side of the longer outer wall 32 (step S44).

前記ステップS44において、算出した軒天換気金物25の必要本数がなくなるまで、前記ステップS44〜S45の動作を繰り返して建物10の外壁32の全ての辺に対して必要となる軒天換気金物25を割り付けて行く。前記ステップS44において、算出した軒天換気金物25の全ての本数を割り付けたら、ステップS46に進み、軒天換気金物25を割り付けた外壁32の辺の中心から、その辺に割り付ける軒天換気金物25の本数を均等に配置し、外壁32の辺のどこに軒天換気金物25を施工すべきか目視でわかるように図21に示す割り付け画面37上に表示する。   In step S44, the operations of steps S44 to S45 are repeated until the calculated number of eaves ventilation vents 25 disappears, and the eaves ventilation vents 25 required for all sides of the outer wall 32 of the building 10 are repeated. Allocate. After allocating all the calculated number of eaves ventilation vents 25 in step S44, the process proceeds to step S46, and the eaves ventilation vents 25 assigned to the edge from the center of the side of the outer wall 32 to which the eaves ventilation vents 25 are allocated. 21 are arranged on a layout screen 37 shown in FIG. 21 so that it can be visually recognized where on the side of the outer wall 32 the eaves ventilation hardware 25 should be installed.

図3及び図5に示すように、本実施形態の割り付けシステム1をコンピュータシステムを利用して実行する割り付けプログラムは、図3のステップS6に示すように、図2に示す外壁ライン作図部12により図10及び図11に示すように、建物10の外壁ライン11を作図する処理と、図3のステップS7に示すように、図2に示す屋根ライン作図部14により図12及び図13に示すように、建物10の屋根ライン13を作図する処理と、図2に示す屋根勾配選択部17(図9に示す勾配ボタン16a)により建物10の屋根勾配を選択する処理と、外壁ライン作図部12により作図された外壁ライン11と、屋根ライン作図部14により作図された屋根ライン13と、屋根勾配選択部17により選択された屋根勾配とに基づいて、図2に示す軒天領域算出部18により図15及び図16に示す軒天領域19を算出する処理と、図3のステップS5に示すように、図2に示す軒天換気金物選択部26(図15及び図16に示す換気部材の内容ボタン27)により図15及び図16に示す軒天領域19に配置される軒天換気金物25の種類を選択する処理と、図5のステップS42に示すように、軒天領域算出部18により算出された軒天領域19と、外壁ライン作図部12により作図された外壁ライン11と、屋根ライン作図部14により作図された屋根ライン13とに基づいて、図2に示す小屋裏面積算出部28により小屋裏面積を算出する処理と、図5のステップS43に示すように、図2に示す小屋裏面積算出部28により算出された小屋裏面積に対応して必要な換気面積を、図2に示す軒天換気金物選択部26(図15及び図16に示す換気部材の内容ボタン27)により選択された軒天換気金物25の換気面積で除した際の数を軒天換気金物算出手段となるCPU8により算出する処理とを有する。   As shown in FIGS. 3 and 5, the allocation program for executing the allocation system 1 of the present embodiment using a computer system is, as shown in step S6 of FIG. 3, an external wall line drawing unit 12 shown in FIG. As shown in FIGS. 10 and 11, the process of drawing the outer wall line 11 of the building 10, and as shown in step S7 of FIG. 3, by the roof line drawing unit 14 shown in FIG. In the process of drawing the roof line 13 of the building 10, the process of selecting the roof slope of the building 10 by the roof slope selection unit 17 (the gradient button 16a shown in FIG. 9) shown in FIG. Based on the drawn outer wall line 11, the roof line 13 drawn by the roof line drawing unit 14, and the roof slope selected by the roof slope selection unit 17, the eaves area calculation unit 18 shown in FIG. Etengen shown in Figure 15 and Figure 16 As shown in the process of calculating the area 19 and in the step S5 of FIG. 3, the eaves ventilation hardware selection unit 26 (the contents button 27 of the ventilation member shown in FIGS. 15 and 16) shown in FIG. And a process for selecting the type of eaves ventilation vent 25 disposed in the eaves area 19 and the eaves area 19 calculated by the eaves area calculator 18 as shown in step S42 of FIG. A process of calculating a buttock area by a buttocks area calculating unit 28 shown in FIG. 2 based on the outer wall line 11 drawn by the line drawing unit 12 and the roof line 13 drawn by a roof line drawing unit 14; As shown in step S43 of FIG. 5, the ventilation area necessary for the area of the attic space calculated by the attic area calculation unit 28 shown in FIG. 2 is shown in FIG. Eaves ventilation vent 25 selected by the content button 27) of the ventilation member shown in FIG. 15 and FIG. The number of time divided by the ventilation area and a process of calculating the CPU8 to be Nokiten ventilator hardware calculation means.

<付属品の割り付け動作>
次に図6及び図7を用いて付属品の割り付け動作について説明する。図4に示すステップS31、或いは、図5に示すステップS46において、軒天換気金物25の割り付けが完了した後は、図6のステップS51に進んで付属品を割り付ける。軒天換気金物25を軒天板20の外壁32側に取り付ける場合や鼻隠しケラバ側に取り付ける場合で仕様が異なる。製品同士の接続箇所や屋根勾配や軒天板20の勾配によって軒天換気金物25の端部の接続に使用する付属品が異なる。このため自動割り付けを行なった軒天換気金物25の端部の要素や建物10の形状を自動で判断して、適切な付属品を選別して割り付ける。
<Allocation of accessories>
Next, the allocation operation of accessories will be described using FIGS. 6 and 7. After the allocation of the eaves ventilation hardware 25 is completed in step S31 shown in FIG. 4 or step S46 shown in FIG. 5, the process proceeds to step S51 in FIG. 6 to allocate accessories. Specifications differ in the case where it attaches to the outer wall 32 side of the eaves top plate 20, and the case where it attaches to the nose-hidden side of the eaves roof ventilation metal 25. The accessories used to connect the ends of the eaves ventilation hardware 25 differ depending on the connection between products, the roof slope, and the slope of the eaves 20. For this reason, the elements of the end of the eaves ventilation vent 25 automatically assigned and the shape of the building 10 are judged automatically, and appropriate accessories are sorted and assigned.

先ず、図4に示すステップS31、或いは、図5に示すステップS46において、軒天換気金物25の割り付けが完了したら、ステップS51に進んで、軒天換気金物25の端部の状況を一箇所ずつ全てについてチェックする。ステップS52において、軒天換気金物25の端部に、次の軒天換気金物25が直線状に接続されるか否かをCPU8がCADデータに基づいて判断し、隣設される軒天換気金物25が直線状に接続される場合にはステップS53に進んで、隣設される軒天換気金物25間にジョイント部材を一つ取り付けて図21に示す割り付け画面37上に表示し、次の軒天換気金物25の端部をチェックする。   First, in step S31 shown in FIG. 4 or step S46 shown in FIG. 5, when allocation of the eaves ventilation hardware 25 is completed, the process proceeds to step S51, and the condition of the end of the eaves ventilation hardware 25 one by one Check for everything. In step S52, the CPU 8 determines based on the CAD data whether or not the next eaves ventilation hardware 25 is linearly connected to the end of the eaves ventilation metal 25, and the eaves ventilation hardware provided next to the eaves ventilation hardware 25 is connected. If 25 is connected in a straight line, the process proceeds to step S53, one joint member is attached between the adjacent eaves ventilation vents 25 and displayed on the allocation screen 37 shown in FIG. Check the end of the ventilation hardware 25.

前記ステップS52において、隣設される軒天換気金物25が直線状に接続されない場合には、ステップS54に進み、軒天換気金物25の端部に何もなく、ここで終了するか否かをCPU8がCADデータに基づいて判断する。前記ステップS54において、軒天換気金物25の端部に何もない場合は、ステップS55に進み、軒天換気金物25の端部にエンドカバー部材を一つ取り付けて図21に示す割り付け画面37上に表示し、次の軒天換気金物25の端部をチェックする。   In step S52, if the eaves ventilation vents 25 provided adjacent to each other are not connected in a straight line, the process proceeds to step S54, there is nothing at the end of the eaves ventilation vents 25 and whether to end here The CPU 8 makes a determination based on the CAD data. In step S54, if there is nothing at the end of the eaves ventilation hardware 25, the process proceeds to step S55, one end cover member is attached to the end of the eaves ventilation hardware 25, and the allocation screen 37 shown in FIG. Display the next, check the end of the eaves ventilation hardware 25.

前記ステップS54において、軒天換気金物25の端部が終端部でない場合は、ステップS56に進み、軒天換気金物25の端部が建物10の出隅部に配置されるか否かをCPU8がCADデータに基づいて判断し、軒天換気金物25の端部が建物10の出隅部に配置される場合には、ステップS57に進んで、CPU8がCADデータに基づいて屋根33の形状や軒天形状を更に判断して最適な付属品を選択する。   In the step S54, if the end of the eaves ventilation hardware 25 is not the termination, the CPU 8 proceeds to the step S56 and the CPU 8 determines whether the end of the eaves ventilation hardware 25 is disposed at the exit corner of the building 10 or not. If it is judged based on the CAD data and the end of the eaves ventilation hardware 25 is placed at the corner of the building 10, the process proceeds to step S57, the CPU 8 determines the shape of the roof 33 or the eaves based on the CAD data. Judge the shape of the sky further and select the best accessories.

先ず、ステップS57において、建物10の屋根形状や軒天形状が寄棟屋根で水平軒天、または、切妻屋根や片流れ屋根33で勾配軒天、または、陸屋根の場合は、ステップS58に進んで、軒天換気金物25の端部に出隅カバー部材を一つ取り付けて図21に示す割り付け画面37上に表示し、次の軒天換気金物25の端部をチェックする。   First, in step S57, in the case of the roof shape or eaves shape of the building 10 being a horizontal eaves or a gable roof or a half-flow roof 33 a slope eaves or a flat roof, go to step S58. One exit corner cover member is attached to the end of the eaves sky ventilation hardware 25, displayed on the allocation screen 37 shown in FIG. 21, and the end of the next eaves sky ventilation hardware 25 is checked.

前記ステップS57において、建物10の屋根形状や軒天形状が寄棟屋根で水平軒天でなく、または、切妻屋根や片流れ屋根33で勾配軒天でなく、または、陸屋根ではない場合には、ステップS59に進んで、CPU8がCADデータに基づいて、建物10の屋根形状や軒天形状が寄棟屋根で勾配軒天か否かを判断する。前記ステップS59において、建物10の屋根形状や軒天形状が寄棟屋根で勾配軒天である場合には、ステップS60に進んで、軒天換気金物25の端部に屋根勾配に適合する勾配出隅カバー部材を一つ取り付けて図21に示す割り付け画面37上に表示し、次の軒天換気金物25の端部をチェックする。   In the step S57, if the roof shape or eaves shape of the building 10 is not a horizontal eaves roof with a dormitory roof, or a gable roof or a half flow roof 33 is not a flat eaves roof, or a flat roof, step Proceeding to S59, the CPU 8 determines, based on the CAD data, whether the roof shape and eaves shape of the building 10 are sloped eaves with a roving roof or not. In step S59, if the roof shape and eaves shape of the building 10 is a raised eaves roof, the process proceeds to step S60, and the end of the eaves ventilation vent 25 is a slope fit to the roof slope One corner cover member is attached and displayed on the allocation screen 37 shown in FIG. 21, and the end of the next eaves ventilation vent 25 is checked.

前記ステップS59において、建物10の屋根形状や軒天形状が寄棟屋根で勾配軒天で無い場合には、ステップS61に進んで、CPU8は、建物10の屋根形状や軒天形状が切妻屋根や片流れ屋根で水平軒天であると判断し、ステップS62に進んで、軒天換気金物25の端部にエンドカバー部材を一つ取り付けて図21に示す割り付け画面37上に表示し、次の軒天換気金物25の端部をチェックする。   If it is determined in step S59 that the roof shape and eaves shape of the building 10 is a dovetail roof and is not a gradient eaves, the process proceeds to step S61 and the CPU 8 determines that the roof shape and eaves shape of the building 10 is a gable roof or Judging that it is a horizontal eaves roof with a single-flow roof, proceed to step S62, attach one end cover member to the end of eaves ventilation hardware 25, and display it on the allocation screen 37 shown in FIG. Check the end of the ventilation hardware 25.

前記ステップS56において、軒天換気金物25の端部が建物10の出隅部に取り付かない場合には、図7に示すステップS63に進んで、CPU8がCADデータに基づいて、軒天換気金物25の端部が建物10の入隅部に配置されるか否かを判断する。前記ステップS63において、軒天換気金物25の端部が建物10の入隅部に配置される場合には、ステップS64に進んで、建物10の屋根形状や軒天形状に基づいて更に付属品を選択する。   If the end of the eaves ventilation hardware 25 is not attached to the corner of the building 10 in the step S56, the CPU 8 proceeds to the step S63 shown in FIG. 7 and the eaves ventilation hardware 25 is obtained based on the CAD data. It is determined whether or not the end of the is placed at the corner of the building 10. In the case where the end of the eaves ventilation hardware 25 is placed at the inside corner of the building 10 in the step S63, the process proceeds to the step S64, and further accessories are added based on the roof shape and eaves shape of the building 10. select.

前記ステップS64において、建物10の屋根形状や軒天形状が寄棟屋根で水平軒天、または切妻屋根や片流れ屋根で水平軒天、または切妻屋根や片流れ屋根で勾配軒天で、且つ屋根一面内に建物10の入隅部がある場合、または陸屋根の場合には、ステップS65に進んで、軒天換気金物25の端部に入隅カバー部材を一つ取り付けて図21に示す割り付け画面37上に表示し、次の軒天換気金物25の端部をチェックする。   In the step S64, the roof shape and the eaves shape of the building 10 are horizontal eaves with a dormitory roof, or horizontal eaves with a gable roof or a half flow roof, or with gable eaves with a gable roof or a single flow roof, and within one roof If there is an entrance corner of the building 10, or if it is a flat roof, proceed to step S65, attach one entry corner cover member to the end of the eaves ventilation hardware 25, and on the allocation screen 37 shown in FIG. Display the next, check the end of the eaves ventilation hardware 25.

前記ステップS64において、建物10の屋根形状や軒天形状が寄棟屋根で水平軒天でなく、または切妻屋根や片流れ屋根で水平軒天でなく、または切妻屋根や片流れ屋根で勾配軒天でなく、屋根一面内に建物10の入隅部がない場合、または陸屋根でない場合には、ステップS66に進んで、建物10の屋根形状や軒天形状が寄棟屋根で勾配軒天、または切妻屋根や片流れ屋根で勾配軒天で、且つ屋根二面が接点となる建物10の入隅部か否かをCPU8がCADデータに基づいて判断し、建物10の屋根形状や軒天形状が寄棟屋根で勾配軒天、または切妻屋根や片流れ屋根で勾配軒天で、且つ屋根二面が接点となる建物10の入隅部である場合には、ステップS67に進んで、軒天換気金物25の端部に屋根勾配に適合する勾配入隅カバー部材を一つ取り付けて図21に示す割り付け画面37上に表示し、次の軒天換気金物25の端部をチェックする。   In step S64, the roof shape and eaves shape of the building 10 are not horizontal eaves with a dormitory roof, or not horizontal eaves with a gable roof or a half flow roof, or not gradient eaves with a gable roof or a single flow roof If there is no inside corner of the building 10, or if it is not a flat roof, proceed to step S66, and the roof shape or eaves shape of the building 10 is a gable roof or gable roof or a gable roof Based on the CAD data, CPU 8 determines whether it is a corner of a building 10 with a single-flow roof, a gradient eaves, and two roofs at the contact point, and the roof shape and eaves shape of the building 10 is a roof. In the case of a sloped roof or a gable roof or a single-flow roof with a sloped roof, and in the case of the inside corner of the building 10 where the two roofs are in contact, the process proceeds to step S67 and the end of the eaves ventilation metal 25 Attach one of the sloped inward cover members that fit the roof slope to the It displays on the allocation screen 37 which shows, and checks the edge part of the next eaves ventilation hardware 25. FIG.

前記ステップS66において、建物10の屋根形状や軒天形状が寄棟屋根で勾配軒天でなく、または切妻屋根や片流れ屋根で勾配軒天でなく、屋根二面が接点となる建物10の入隅部で無い場合には、ステップS68に進んで、CPU8は、建物10の屋根形状や軒天形状が切妻屋根や片流れ屋根で勾配軒天で且つ軒先端部が外壁32に突き当たる場合であると判断して、ステップS69に進み、軒天換気金物25の端部にエンドカバー部材を一つ取り付けて図21に示す割り付け画面37上に表示し、次の軒天換気金物25の端部をチェックする。   In the step S66, the roof shape and eaves shape of the building 10 is not a slope eaves with a roof, or a gable roof or a half-flow roof, not an eaves with a roof If not, the CPU 8 proceeds to step S 68 and determines that the roof shape or eaves shape of the building 10 is a graded eave with a gable roof or a half-flow roof and the eaves tip hits the outer wall 32. Then, proceed to step S69, attach one end cover member to the end of the eaves ventilation hardware 25, display it on the allocation screen 37 shown in FIG. 21, and check the end of the next eaves ventilation hardware 25 .

前記ステップS63において、CPU8がCADデータに基づいて、軒天換気金物25の端部が建物10の入隅部に配置されないと判断した場合には、ステップS70に進み、CPU8がCADデータに基づいて、軒天換気金物25の端部が切妻屋根の棟頂部に配置されるか否かを判断する。前記ステップS70において、軒天換気金物25の端部が切妻屋根の棟頂部に配置される場合には、ステップS71に進んで、軒天換気金物25の端部に屋根勾配に適合する勾配頂部カバー部材を一つ取り付けて図21に示す割り付け画面37上に表示し、次の軒天換気金物25の端部をチェックする。   If, in step S63, the CPU 8 determines based on the CAD data that the end of the eaves ventilation vent 25 is not disposed at the corner of the building 10, the process proceeds to step S70 and the CPU 8 determines based on the CAD data. Then, it is determined whether the end of the eaves ventilation vent 25 is placed at the top of the gable roof. In the step S70, when the end of the eaves ventilation hardware 25 is disposed on the ridge top of the gable roof, the process proceeds to the step S71, and the slope top cover which conforms to the roof slope at the end of the eaves ventilation hardware 25 One member is attached and displayed on the assignment screen 37 shown in FIG. 21, and the end of the next eaves ventilation hardware 25 is checked.

前記ステップS70において、軒天換気金物25の端部が切妻屋根の棟頂部に配置されない場合には、ステップS72に進んで、CPU8は、軒天換気金物25の端部に母屋下がり開始部分があると判断し、ステップS73に進んで、CPU8がCADデータに基づいて、軒天形状を判断して更に付属品を選択する。   In the step S70, if the end of the eaves ventilation hardware 25 is not arranged on the ridge top of the gable roof, the CPU 8 proceeds to the step S72 and the CPU 8 determines that the main part of the eaves ventilation hardware 25 starts to fall down In step S73, the CPU 8 determines the eaves shape based on the CAD data and further selects accessories.

前記ステップS73において、CPU8がCADデータに基づいて、軒天形状が水平軒天であるか否かを判断する。前記ステップS73において、軒天形状が水平軒天である場合には、ステップS74に進んで、軒天換気金物25の端部に屋根勾配に適合する角部カバー部材を一つ取り付けて図21に示す割り付け画面37上に表示し、次の軒天換気金物25の端部をチェックする。ただし、軒天換気金物25の端部が鼻隠しケラバに取り付く仕様の場合は、軒天換気金物25の端部にエンドカバー部材を一つ取り付けて図21に示す割り付け画面37上に表示し、次の軒天換気金物25の端部をチェックする。   In step S73, the CPU 8 determines whether the eaves shape is horizontal eaves or not based on the CAD data. In step S73, if the eaves shape is horizontal eaves, the process proceeds to step S74, and one corner cover member conforming to the roof slope is attached to the end of the eaves ventilation hardware 25 as shown in FIG. It displays on the allocation screen 37 which shows, and checks the edge part of the next eaves ventilation hardware 25. FIG. However, in the case of the specification that the end of the eaves ventilation hardware 25 is attached to the nose cover keraba, one end cover member is attached to the end of the eaves ventilation hardware 25 and displayed on the allocation screen 37 shown in FIG. Check the end of the next ventilation vent 25.

前記ステップS73において、軒天形状が水平軒天でない場合には、CPU8は、軒天形状が勾配軒天であると判断し(ステップS75)、ステップS76に進んで、軒天換気金物25の端部にエンドカバー部材を一つ取り付けて図21に示す割り付け画面37上に表示し、次の軒天換気金物25の端部をチェックする。   If the eaves shape is not a horizontal eaves in step S73, the CPU 8 determines that the eaves shape is a gradient eaves (step S75), and proceeds to step S76 and ends the eaves ventilation hardware 25. One end cover member is attached to the part and displayed on the allotment screen 37 shown in FIG. 21, and the end of the next eaves ventilation hardware 25 is checked.

前記ステップS53,S55,S58,S60,S62,S65,S67,S69,S71,S74,S76からそれぞれステップS77に進み、建物10の全ての軒天換気金物25の端部のチェックが完了するまで、前記ステップS51〜S76に示すチェックを繰り返す。前記ステップS77において、建物10の全ての軒天換気金物25の端部のチェックが終了したら、ステップS78に進んで、建物10の全ての軒天換気金物25の端部に取り付ける付属品の割り付け動作を行ない、割り付けた付属品を集計する。   The above steps S53, S55, S58, S60, S62, S65, S67, S69, S71, S74, S76 proceed to step S77, respectively, until all the eaves ventilation vents 25 of the building 10 have been checked. The check shown in the steps S51 to S76 is repeated. In the step S77, when the ends of all the eaves ventilation hardwares 25 of the building 10 have been checked, the process proceeds to step S78 and the allocation operation of the accessories attached to the ends of all the eaves ventilation hardwares 25 of the building 10 And aggregate the assigned accessories.

本実施形態では、図2に示す外壁ライン作図部12により、図10及び図11に示すように、住宅等の建物10の外壁ライン11をコンピュータの表示画面上で入力し、図10及び図11に示す屋根の作成ボタン16をマウス等によりクリックして屋根33の種類を選択し、更に、図2に示す屋根勾配選択部17により図10及び図11に示す勾配ボタン16aをマウス等によりクリックして屋根勾配を選択し、更に、図10及び図11に示す軒出ボタン16bをマウス等によりクリックして軒の出寸法を選択し、図2に示す軒天板勾配選択部21により図9に示す軒天タイプ選択欄22をマウス等によりクリックして軒天板20が水平軒天か勾配軒天かを選択し、更に、図2に示す記憶手段となる建物情報データベース38に格納された建物情報から図9に示す物件情報入力画面30の躯体の壁厚ボタン30aをマウス等によりクリックして外壁32の厚み等の各種建物情報を選択する。   In this embodiment, as shown in FIGS. 10 and 11, the outer wall line 11 of the building 10 such as a house is input on the display screen of the computer by the outer wall line drawing unit 12 shown in FIG. The roof creation button 16 shown in is clicked with a mouse or the like to select the type of roof 33. Further, the roof gradient selection unit 17 shown in FIG. 2 clicks the gradient button 16a shown in FIGS. The roof slope is selected, and further, the eaves display button 16b shown in FIGS. 10 and 11 is clicked with a mouse or the like to select the dimension of the eaves, and the eaves top plate slope selector 21 shown in FIG. A building is stored in the building information database 38 serving as the storage means shown in FIG. From the information, the wall thickness thickness of the housing of the property information input screen 30 shown in FIG. 9 30a and clicking the mouse or the like for selecting various building information such as thickness of the outer wall 32.

更に、予め登録された建物10の寸法モジュール、軒天板20、該軒天板20に取り合う各種部材の種別と、それらの定尺部材、更には、それらの各種部材を建物10の適正な位置に割り付けし、切断位置、寸法を指し示す図21の割り付け画面37で示される割り付け図と、図17の部材数量明細画面34で示される割り付け部材表とを生成し、図18の発注画面36で示される部材の割り付け情報と、住宅情報とを関連付けてメモリ9に記憶し、記憶手段となる部材情報データベース39に格納された各種部材と、その単価とを呼び出して図17の部材数量明細画面34で示される割り付け部材表に対応して当該建物10に使用する部材の見積りを算定し、図18の発注画面36上に設けられた図示しない発注ボタンをマウス等によりクリックして図20に示す発注書35を出力して発行する割り付け見積もり発注システムとして構成される。   Furthermore, the dimension module of the building 10 registered in advance, the eaves top plate 20, types of various members corresponding to the eaves top plate 20, their fixed length members, and further, those various members are properly positioned in the building 10 The layout view shown in the layout screen 37 of FIG. 21 indicating the cutting position and the dimensions is generated, and the allocation member list shown in the member quantity detail screen 34 of FIG. 17 is generated, and shown in the order screen 36 of FIG. The allocation information of the members to be stored and the house information are associated with each other and stored in the memory 9, and various members stored in the member information database 39 serving as storage means and their unit prices are called up. The estimate of the member to be used for the building 10 is calculated according to the allocated member list shown, and the order entry button shown on the order entry screen 36 of FIG. Output 35 and issue Allocation estimates configured as ordering system.

図20に示す発注書35の出力要求があったときには、CPU8により発注番号が自動発行され、記憶手段となる発注情報データベース40に格納された発注情報(図20に示す発注書35)と、発注番号とが関連付けて該発注情報データベース40に記憶される。同時に、納期と在庫情報とをサーバ装置2から自動的にユーザ3の端末装置等に送信する。   When there is a request for output of the order form 35 shown in FIG. 20, the order number is automatically issued by the CPU 8 and the order information (order form 35 shown in FIG. 20) stored in the order information database 40 serving as storage means The number is associated with the number and stored in the order information database 40. At the same time, the delivery date and the stock information are automatically transmitted from the server device 2 to the terminal device of the user 3 or the like.

サーバ装置2に格納した情報と、ユーザ3が発注ルートを選ばずに行った正式発注に発注番号が記載されていれば、サーバ装置2の発注情報データベース40に格納された発注情報を検索し、瞬時に注文明細を取り出し、製造、出荷手配を行なうことができる。   If the information stored in the server device 2 and the order number are described in the formal order that the user 3 made without selecting the order route, the order information stored in the order information database 40 of the server device 2 is searched, It is possible to take out the order details instantly and to arrange for production and shipping.

図2に示す外壁ライン作図部12で作成した図10及び図11に示す外壁ライン11と、図2に示す屋根ライン作図部14で作成した図12及び図13に示す屋根ライン13と、図2に示す建物情報データベース38に格納されている建物情報とにより、図14に示すように、瞬時に屋根33の3D建物パース図(立体完成予想図)が生成され、外壁32と屋根33との取り合いが分かる。これにより割り付ける建物10が間違いないか否かを視覚的に確認できる。   The outer wall line 11 shown in FIGS. 10 and 11 created by the outer wall line drawing unit 12 shown in FIG. 2 and the roof line 13 shown in FIGS. 12 and 13 created by the roof line drawing unit 14 shown in FIG. In accordance with the building information stored in the building information database 38, as shown in FIG. 14, a 3D building perspective view (three-dimensional completion prediction view) of the roof 33 is generated instantaneously, and the outer wall 32 and the roof 33 are exchanged. I understand. This makes it possible to visually confirm whether the assigned building 10 is correct or not.

軒天板20や軒天換気金物25の割り付けにおいて、定尺部材を切断した場合の余りを他部分に使用することで現場ロスを最小限に抑えることができる。また、軒天換気金物25が割り付けられた状態で換気面積を算出して表示することで目視確認できる。   In the allocation of the eaves 20 and the eaves-ventilating hardware 25, it is possible to minimize the site loss by using the remainder when the fixed-length members are cut for other parts. Further, the ventilation area can be visually checked by calculating and displaying the ventilation area in a state where the eaves ventilation hardware 25 is allocated.

図2に示す外壁ライン作図部12で作成した図10及び図11に示す外壁ライン11と、図2に示す屋根ライン作図部14で作成した図12及び図13に示す屋根ライン13と、図2に示す建物情報データベース38に格納されている建物情報をCADデータ等から読み込み、図21の割り付け画面37で示される割り付け図、図17の部材数量明細画面34で示される割り付け部材表、図18の発注画面36で示される図20に示す発注書35を発行することができる。   The outer wall line 11 shown in FIGS. 10 and 11 created by the outer wall line drawing unit 12 shown in FIG. 2 and the roof line 13 shown in FIGS. 12 and 13 created by the roof line drawing unit 14 shown in FIG. The building information stored in the building information database 38 shown in is read from the CAD data etc., the layout shown in the layout screen 37 in FIG. 21, the layout member list shown in the member quantity detail screen 34 in FIG. An order form 35 shown in FIG. 20 shown on the order screen 36 can be issued.

また、ユーザ3の端末装置から割り付けシステム1の提供者のサーバ装置2に送信され、発注情報データベース40に格納された発注情報を、ユーザ3と割り付けシステム1の提供者との間に入る納材店4、問屋5、建材商社6及び部品メーカ7等の中間業者に予めパスワード等を付与してアクセス権限を与え、その中間業者は、ユーザ3からの注文パスワードをキーとして入手できる。   Also, a delivery material transmitted from the terminal device of the user 3 to the server device 2 of the provider of the allocation system 1 and entering the order information stored in the order information database 40 between the user 3 and the provider of the allocation system 1 A password or the like is given in advance to an intermediary such as the store 4, the wholesaler 5, the building materials trading company 6 and the parts maker 7 to give access authority, and the intermediary can obtain the order password from the user 3 as a key.

ユーザ3は、割り付けシステム1のサーバ装置2から送信されてきた図18に示す発注画面36上に設けられた図示しない発注ボタンをマウス等によりクリックして自動作成された図20に示す発注書35を部品メーカ7の部材を購入できる納材店4等にファクシミリ(FAX)や電子メール等で発注できる。   The user 3 clicks an ordering button (not shown) provided on the ordering screen 36 shown in FIG. 18 transmitted from the server device 2 of the allocation system 1 with a mouse or the like to automatically create an ordering document 35 shown in FIG. The order can be ordered by facsimile (FAX), e-mail or the like to a delivery shop 4 or the like which can purchase the members of the parts maker 7.

ユーザ3と割り付けシステム1の提供者との間に入る納材店4、問屋5、建材商社6及び部品メーカ7等の中間業者は、ユーザ3からの発注を物流の下流側から次々と次の上流側の発注先に発注し、物流の最上流側の部品メーカ7にユーザ3からの発注が届く。ここですでに割り付けシステム1の提供者のサーバ装置2の発注情報データベース40にユーザ3からの発注内容が格納されている。   Intermediaries such as the material store 4, the wholesaler 5, the building materials trading company 6 and the parts maker 7 that enter between the user 3 and the provider of the allocation system 1 sequentially place orders from the user 3 from the downstream side of the distribution It places an order from the upstream supplier, and the part maker 7 on the most upstream side of the distribution receives an order from the user 3. Here, the order content from the user 3 is already stored in the order information database 40 of the server device 2 of the provider of the allocation system 1.

割り付けシステム1の提供者は、納材店4、問屋5、建材商社6及び部品メーカ7等の中間業者に予め受注データを閲覧可能なCSV(comma separated value;データベース等で各項目のデータをカンマで区切ったテキスト形式のファイル)を入手可能なインターネット上のウエブサイト(ホームページ)のアドレスと、アクセスキーを付与しておく。   The provider of the allocation system 1 can use the CSV (comma separated value; data base etc.) data of each item in a comma (comma separated value; database etc.) that can be used to browse order data in advance to middlemen such as the delivery shop 4, wholesaler 5, building materials trading company 6 Give the address of the website (home page) on the Internet where you can get the text file (separated by) and the access key.

ユーザ3から納材店4、問屋5、建材商社6及び部品メーカ7等の中間業者に図20に示す発注書35が到着した時点で、発注番号とアクセスキーとで、ユーザ3の発注明細を閲覧可能なCSV等の電子データが入手可能となる。   When an order form 35 shown in FIG. 20 arrives at an intermediate company such as user 3 from delivery store 4, wholesale shop 5, building materials trading company 6 and parts maker 7 etc., the order details of user 3 are ordered by order number and access key. It is possible to obtain electronic data such as CSV that can be browsed.

納材店4、問屋5、建材商社6及び部品メーカ7等の中間業者は、このデータを使って、自社のコンピュータ等の端末装置への入力ができ、発注書の作成に使用することことが出来る。次の中間業者も同様な手続きで発注明細を入手でき、仮に、アクセスキーを持たない中間業者であっても、ユーザ3が発行する図20に示す発注書35や前発注先の独自の発注書にユーザ3の発注番号が記載されていれば、次に発注する中間業者がアクセスキーを付与されている中間業者であれば、発注情報を電子データで入手でき、活用が可能となる。   Intermediaries such as delivery store 4, wholesale store 5, building materials trading company 6 and parts maker 7 can use this data to input to their own terminal devices such as computers, etc. and can be used to create purchase orders It can. The following intermediaries can also obtain order details in the same procedure, and even if they are intermediaries that do not have access keys, the order sheet 35 shown in FIG. 20 issued by user 3 and the original order sheet of the pre-supplier If the ordering number of the user 3 is described in, if the intermediary who places the order next has an access key, the ordering information can be obtained as electronic data and can be used.

物流の最上流側の部品メーカ7も発注番号をキーに、発注情報データベース40に格納された発注情報の中から、発注明細を抽出し、電子データを自社の受注システムにインプット可能となり、従来のような手入力による手間や間違いが防止出来る。   The parts maker 7 on the most upstream side of distribution can also extract order details from the order information stored in the order information database 40 using the order number as a key, and can input electronic data to its own order receiving system, It is possible to prevent trouble and mistakes due to such manual input.

本実施形態の割り付けシステム1は、部材情報データベース39に予め格納された各種部材のメーカが提供する部材情報としての製品種別、製品種別の本体長さ、役物種類とその役物が使われる条件、設計価格等と、ユーザ3により入力された外壁ライン11を入力するためのモジュール、建物階数、壁厚、屋根勾配、屋根形状、軒の出寸法、軒天板20が水平軒天か勾配軒天か等の建物情報に基づいて建物10の外壁32と、屋根33との取り合い情報を入力する。   The allocation system 1 of the present embodiment is a product type as member information provided by a manufacturer of various members stored in advance in the member information database 39, a main body length of the product type, a type of a prize, and a condition under which the prize is used. , Design price, etc., and a module for entering the outer wall line 11 input by the user 3, the number of building floors, wall thickness, roof slope, roof shape, eaves out dimension, eaves 20, horizontal eaves or slope eaves Information of connection between the outer wall 32 of the building 10 and the roof 33 is input based on the building information such as the sky.

更に、建物10の1階、2階、3階の外壁ライン11を割り付けシステム1に組み込まれたCADシステムで入力し、各階での屋根伏図を自動で、或いは任意に適合する屋根33を生成する。外壁ライン11と、軒天板20、屋根形状、屋根勾配、軒の出寸法、軒天板20が水平軒天か勾配軒天か等の建物情報に基づいてCPU8が計算し、3DのCAD情報に落とし込み、屋根伏図、3D建物パース図を作成する。   Furthermore, the external wall line 11 of the first floor, the second floor and the third floor of the building 10 is input by the CAD system incorporated in the assignment system 1, and the roof plan of each floor is automatically or arbitrarily generated. Do. The CPU 8 calculates 3D CAD information based on the building information such as the outer wall line 11, eaves top plate 20, roof shape, roof slope, eaves out dimension, eaves top plate 20 such as horizontal eaves or gradient eaves Create a roof plan, 3D building perspective drawing.

更に、図21の割り付け画面37で示す部材の割り付け図を作成する。ユーザ3が入力した情報が正しいか否かを図14に示す3D建物パース図や図21の割り付け画面37で示す部材の割り付け図で確認できる。   Furthermore, a layout drawing of members shown in the layout screen 37 of FIG. 21 is created. Whether or not the information input by the user 3 is correct can be confirmed by the 3D building perspective shown in FIG. 14 or the layout of members shown on the layout screen 37 of FIG.

図14に示す3D建物パース図や図21の割り付け画面37で示す部材の割り付け図で確認された割り付けに基づいて該図21の割り付け画面37で示す部材の割り付け図、図17の部材数量明細画面34で示す割り付け表、図18に示す発注画面36で示す部材設計単価を元に設計価格見積りの出力や図20に示す発注書35の出力ができる。   The layout of the members shown in the layout screen 37 of FIG. 21 based on the layout confirmed in the layout of the members shown in the 3D building perspective shown in FIG. 14 and the layout screen 37 of FIG. Based on the allocation table shown at 34 and the member design unit price shown on the ordering screen 36 shown in FIG. 18, the output of the design price estimate and the output of the order form 35 shown in FIG. 20 can be made.

尚、ユーザ3毎の単価は、まちまちであることから、購入する納材店4での購入価格をユーザ3自身が入力しておけば、実際の購入価格での見積りの出力が可能である。図20に示す発注書35には自動的に発注番号が付番されて該発注書35が出力される。発注書35の出力と同時に割り付けシステム1の提供者のサーバ装置2に発注情報や発注番号が送信され、該サーバ装置2に設けられた発注情報データベース40に格納される。   In addition, since the unit price for each user 3 is different, if the user 3 himself inputs the purchase price at the material store 4 to be purchased, it is possible to output an estimate at the actual purchase price. The order number is automatically numbered in the order form 35 shown in FIG. 20 and the order form 35 is output. The order information and the order number are transmitted to the server device 2 of the provider of the allocation system 1 simultaneously with the output of the order form 35, and are stored in the order information database 40 provided in the server device 2.

サーバ装置2は、発注内容を受けて、その部材の在庫と、標準納期をユーザ3の端末装置に返信、またはそれを閲覧可能とする。ユーザ3は発行された発注書35を部品メーカ7の部材を購入可能な納材店4等にファクシミリ(FAX)を送信するか。或いは、電子メールで発注する。   In response to the contents of the order, the server device 2 sends back the stock of the member and the standard delivery date to the terminal device of the user 3 or makes it possible to view it. Does the user 3 transmit a facsimile (FAX) to the delivery store 4 or the like who can purchase the issued purchase order 35 of the parts maker 7? Or order by e-mail.

すでに発注書35の内容は、割り付けシステム1の提供者のサーバ装置2の発注情報データベース40に発注番号とともに格納されている。これによりユーザ3から割り付けシステム1の提供者までの発注ルートが複数あっても途中で誤った情報に変更されていても発注番号が付いた発注書35が割り付けシステム1の提供者に到着次第、予め発注情報データベース40に格納しているユーザ3の発注内容に基づいて、従来のように手書きや手入力せずに速やかにサーバ装置2の発注情報データベース40から発注データを読み出して、製造や出荷手続きが可能となる。   The contents of the order form 35 have already been stored together with the order number in the order information database 40 of the server device 2 of the provider of the allocation system 1. As a result, even if there is a plurality of order routes from user 3 to the provider of allocation system 1, even if the information is changed to erroneous information on the way, the order form 35 with the order number arrives at the provider of allocation system 1 Based on the order contents of the user 3 stored in the order information database 40 in advance, the order data is promptly read out from the order information database 40 of the server device 2 without handwriting or manual input as in the prior art, and manufacture or shipment Procedure is possible.

ユーザ3から割り付けシステム1の提供者までの発注ルートのどこかで間違った情報を入力したり転記した場合でも、予め発注情報データベース40に格納された発注情報の確認により間違った発注を防止できる。また、正式な発注書35が届き次第、ユーザ3に確定した納入明細や納期回答が可能となる。   Even when incorrect information is input or transcribed somewhere in the order route from the user 3 to the provider of the allocation system 1, it is possible to prevent an incorrect order by confirming the order information stored in the order information database 40 in advance. In addition, as soon as the formal purchase order 35 arrives, it becomes possible for the user 3 to confirm the delivery details and delivery date.

また、図2に示す外壁ライン作図部12による図10及び図11に示す外壁ライン11の入力や図2に示す屋根ライン作図部14による図12及び図13に示す屋根ライン13の入力や図14に示す建物10の外壁32や屋根33の3D建物パース図(立体完成予想図)を自動作成する手段は、簡単なCADシステムで作成可能であるが、より入力を確実、簡単にするためにユーザ3のCADデータから、例えば、CEDXM(シーデクスマ)データ等の情報を出力、入手できれば、その情報を処理できるシステムを搭載し、CADデータの入力のみで図21の割り付け画面37に示す割り付け図や図17の部材数量明細画面34に示す割り付け表や図20に示す発注書35の発行までを簡単に行なうことが可能となる。   10 and 11 by the outer wall line drawing unit 12 shown in FIG. 2 and the roof line 13 shown in FIGS. 12 and 13 by the roof line drawing unit 14 shown in FIG. A means for automatically creating a 3D building perspective view (three-dimensional completed drawing) of the outer wall 32 and the roof 33 of the building 10 shown in FIG. Can be created by a simple CAD system, but the user If information such as, for example, CEDXM (Sidex) data etc. can be output and obtained from CAD data of No. 3, a system capable of processing the information can be installed, and only the CAD data is input. It becomes possible to easily carry out the assignment table shown on the 17 component quantity detail screen 34 and the issuance of the order form 35 shown in FIG.

CEDXM(シーデクスマ)とは、プレカット用のプログラムの統一基準である。各種CAD(CEDXM協会に加盟しているCAD)で作成した建物のCADデータをCEDXM(シーデクスマ)に変換すると、そのデータからプレカットの加工ができるデータを取得できる。そのデータでプレカットメーカは自社での加工図、加工指示を自動化して効率を図ることが出来る。本実施形態の割り付けシステム1にもCEDXM(シーデクスマ)が応用可能である。CEDXM(シーデクスマ)のデータを本実施形態の割り付けシステム1に入れると、自動的に割り付けができるようにプログラムすることができる。   CEDXM (Cidedexma) is a unified standard for programs for precut. If CAD data of a building created by various CAD (CAD which belongs to CEDXM association) is converted into CEDXM (Ciedexma), it is possible to acquire data which can be processed precut from the data. With this data, pre-cut manufacturers can automate their own processing drawings and instructions and achieve efficiency. CEDXM (Ciedexma) is applicable to the allocation system 1 of the present embodiment. When data of CEDXM (Ciedex) is put into the assignment system 1 of the present embodiment, it can be programmed to be able to assign automatically.

ユーザ3から割り付けシステム1の提供者までの発注ルートが複数介在する場合、納材店4、問屋5、建材商社6及び部品メーカ7等の中間業者で受注入力方式や発注システムが異なり、ユーザ3の発注先の選択でも発注ルートが多種、多様となり、統一された発注システムの構築は難しい。   When there are multiple ordering routes from user 3 to the provider of allocation system 1, there are different order acceptance systems and ordering systems among middlemen such as delivery store 4, wholesale store 5, building materials trading company 6 and parts maker 7 and so on. The choice of the supplier of the order also makes the ordering route diverse and diverse, making it difficult to build a unified ordering system.

しかし、発注システムで最も手間となるのは、手入力による発注内容の入力であり、間違いなく正確に入力するのは確認等を含めて大変な業務となる。本実施形態では、割り付けシステム1で、部品メーカ7は、ユーザ3の発注内容を電子データで入手可能となり、発注番号と中間業者のアクセスキーで、納材店4等の中間業者にアクセスを許可し、データを提供、閲覧可能とする。   However, what is most laborious in the order placement system is the manual entry of the contents of the order placement, and it is very difficult to enter correctly without fail, including confirmation. In the present embodiment, in the allocation system 1, the parts maker 7 can obtain the contents of the order of the user 3 as electronic data, and permits the intermediate company such as the delivery shop 4 to access with the order number and the access key of the intermediate company Provide data and make it available for browsing.

中間業者にアクセス権が無くても、発注ルートの中間業者は、図20に示す発注書35をファクシミリ(FAX)等で次の中間業者に発注し、最終的には割り付けシステム1の提供者へ発注が到着する。直近の発注先から部品メーカ7に発注が届いた後、発注データをCSV等で提供し、その前の中間業者にCSV等のデータを次々返してやれば、全て物流の下流側からデータを提供可能となり、中間業者の入力業務の簡素化が可能となる。   Even if the middleman does not have the access right, the middleman of the ordering route places an order form 35 shown in FIG. 20 by facsimile (FAX) or the like to the next middleman, and finally to the provider of the allocation system 1 An order arrives. If orders are received from the nearest supplier to the parts maker 7, order data is provided as CSV etc., and if data such as CSV is returned to the intermediate company before that one after another, all data can be provided from the downstream side of the distribution As a result, it becomes possible to simplify the input work of the middleman.

本実施形態では、ユーザ3が発注する際の手間が省けるように、住宅等の建物10の部材の割り付けシステム1のプログラムをインターネット上で公開し、ユーザ3が、簡単、正確に割り付け作業ができ、その割り付けが正しいか否かが確認可能な図14に示す3Dのパース図(立体的な完成予想図)を提供し、図21に示す割り付け画面37からなる割り付け図と、図17に示す部材数量明細画面34からなる部材表と、図20に示す発注書35の出力が可能となる。   In this embodiment, the program of the allocation system 1 of the members of the building 10 such as a house can be disclosed on the Internet so that the time when the user 3 places an order can be saved, and the user 3 can easily and accurately allocate the work. 14 provides a 3D perspective view (three-dimensional completion prediction view) shown in FIG. 14 which can confirm whether the allocation is correct or not, and an allocation view including the allocation screen 37 shown in FIG. 21 and a member shown in FIG. It becomes possible to output a parts list consisting of a quantity specification screen 34 and an order form 35 shown in FIG.

また、ユーザ3と割り付けシステム1の提供者との間に納材店4、問屋5、建材商社6及び部品メーカ7等の中間業者が複数介在しても、正確な受注情報を部品メーカ7に提供でき、ユーザ3には、発注書35の出力と同時に発注金額と在庫数、納期を提供することが出来る。また、納材店4、問屋5、建材商社6及び部品メーカ7等の中間業者には、予めアクセスコードを付与し、ユーザ3から注文が入ったら、注文ナンバーとアクセスコードとで割り付けシステム1のサーバ装置2にアクセスすれば、ユーザ3からの注文内容を中間業者も参照でき、更に、発注データも入手でき、自社のコンピュータに入力が可能となり、転記ミスや手入力の手間を省くことが可能となる。   In addition, even if there are a plurality of middlemen such as the delivery store 4, the wholesaler 5, the building materials trading company 6 and the parts maker 7 between the user 3 and the provider of the allocation system 1, accurate order information can be sent to the parts maker 7 The user 3 can be provided with the order amount, the number of stocks, and the delivery date simultaneously with the output of the purchase order 35. In addition, access codes are given in advance to intermediate companies such as delivery store 4, wholesale shop 5, building materials trading company 6 and parts maker 7, etc. When an order is received from user 3, allocation system 1 of the order number and access code If you access the server device 2, you can also refer to the contents of the order from the user 3, you can also obtain ordering data, you can input to your own computer, it is possible to save the trouble of transcription errors and manual input It becomes.

本実施形態では、住宅等の建物10の部材の割り付け作業を、図2に示す外壁ライン作図部12により図10及び図11に示す外壁ライン11の入力と、図2に示す屋根ライン作図部14により図12及び図13に示す屋根ライン13の入力と、屋根33の種類、屋根勾配、軒の出寸法、軒天板20が水平軒天か勾配軒天か、或いは、壁の厚み等の建物情報等を入力することにより、外壁ライン11に沿って配置される軒天板20や軒天換気金物25や該軒天換気金物25の端部に付属する付属品等をコンピュータ上で自動的に割り付けし、図21に示す割り付け画面37からなる割り付け図と、図17に示す部材数量明細画面34からなる部材表と、図20に示す発注書35等を発行し、割り付けされた部材の単価を登録すれば、見積金額が即座に分かり、発注書35を出力すれば、割り付けシステム1のサーバ装置2により自動発生した注文番号と、注文内容、建物情報等が送られ、部品メーカ7のサーバ装置からは部材納期、在庫が送信される。   In this embodiment, the layout work of the members of the building 10 such as a house is performed by the external wall line drawing unit 12 shown in FIG. 2 with the input of the external wall line 11 shown in FIGS. 10 and 11 and the roof line drawing unit 14 shown in FIG. 12 and 13 according to the roof line 13 type, roof 33 type, roof slope, eaves out dimension, eaves roof plate 20 is horizontal eaves or eaves or buildings such as wall thickness etc. By inputting information etc., the eaves roof 20 arranged along the outer wall line 11, the eaves ventilation vent 25 and the accessories attached to the end of the eaves ventilation 25 are automatically done on the computer The allocation chart consisting of the allocation screen 37 shown in FIG. 21, the parts list consisting of the part quantity detail screen 34 shown in FIG. 17, the order sheet 35 etc. shown in FIG. 20 is issued, and the unit price of the allocated parts If registered, the estimated amount is immediately known, and if the purchase order 35 is output, the allocation system 1 Order number and the order contents automatically generated by the server device 2, the building information, and the like are transmitted, member delivery from the server device component suppliers 7, inventory is transmitted.

本発明の活用例として、コンピュータシステムを利用して住宅等の建物の部材の割り付けを行なう割り付けシステム及びそのプログラムに適用出来る。   As an application example of the present invention, the present invention can be applied to an allocation system and its program for allocating members of a building such as a house using a computer system.

1 …割り付けシステム
2 …サーバ装置
3 …ユーザ
4 …納材店
5 …問屋
6 …建材商社
7 …部品メーカ
8 …CPU(端材算出手段;軒天換気金物算出手段)
9 …メモリ(記憶手段)
10 …建物
11 …外壁ライン
12 …外壁ライン作図部(外壁ライン作図手段)
13 …屋根ライン
14 …屋根ライン作図部(屋根ライン作図手段)
15 …部屋領域の作成ボタン
16 …屋根の作成ボタン
16a …勾配ボタン
16b …軒出ボタン
17 …屋根勾配選択部(屋根勾配選択手段)
18 …軒天領域算出部(軒天領域算出手段)
19 …軒天領域
20 …軒天板
21 …軒天板勾配選択部(軒天板勾配選択手段)
22 …軒天タイプ選択欄
23 …軒天板選択部(軒天板選択手段)
24 …軒天板タイプ選択ボタン
25 …軒天換気金物
26 …軒天換気金物選択部(軒天換気金物選択手段)
27 …換気部材の内容ボタン
28 …小屋裏面積算出部(小屋裏面積算出手段)
29 …ライセンスコード入力画面
30 …物件情報入力画面
30a …躯体の壁厚ボタン
31 …入力モードボタン
32 …外壁
33 …屋根
34 …部材数量明細画面
34a …数量確定ボタン
35 …発注書
36 …発注画面
37 …割り付け画面
38 …建物情報データベース
39 …部材情報データベース
40 …発注情報データベース
DESCRIPTION OF SYMBOLS 1 ... Allocation system 2 ... Server apparatus 3 ... User 4 ... Delivery shop 5 ... Wholesaler 6 ... Building materials trading company 7 ... Parts maker 8 ... CPU (Frap material calculation means; Eaves ventilation metal material calculation means)
9 ... Memory (storage means)
10 ... Building
11 ... External wall line
12 ... External wall line drawing unit (External wall line drawing means)
13 ... Roof line
14 ... Roof line drawing section (roof line drawing means)
15 ... Create room area button
16 ... Create roof button
16a ... slope button
16b ... eaves out button
17 ... Roof slope selection part (roof slope selection means)
18 ... eaves area calculation part (eaves area calculation means)
19 ... eaves territory
20 ... eaves top plate
21 ... Eaves top plate slope selection unit (Eaves top plate slope selection means)
22 ... Eaves type selection box
23 ... Eaves top plate selection section (Eaves top plate selection means)
24 ... Eave top plate type selection button
25 ... Eaves ventilation hardware
26 ... Eaves ventilation hardware selection part (Eaves ventilation hardware selection method)
27 ... Ventilation member content button
28 ... hut area calculation part (hut area calculation means)
29 ... License code input screen
30 ... Property information input screen
30a ... Body wall thickness button
31 ... Input mode button
32 ... outer wall
33 ... Roof
34 ... Item quantity detail screen
34a ... Quantity confirmation button
35 ... Purchase order
36 ... ordering screen
37 ... Allocation screen
38 ... Building Information Database
39 ... member information database
40 ... order information database

Claims (6)

建物の外壁ラインを作図する外壁ライン作図手段と、
建物の屋根ラインを作図する屋根ライン作図手段と、
建物の屋根勾配を選択する屋根勾配選択手段と、
前記外壁ライン作図手段により作図された外壁ラインと、前記屋根ライン作図手段により作図された屋根ラインと、前記屋根勾配選択手段により選択された屋根勾配とにより軒天領域を算出する軒天領域算出手段と、
前記軒天領域に配置される軒天板の勾配を選択する軒天板勾配選択手段と、
前記軒天領域算出手段により算出された軒天領域と、前記軒天板勾配選択手段により選択された軒天板の勾配とから前記軒天領域に配置される軒天板の種類を選択する軒天板選択手段と、
前記軒天領域算出手段により算出された軒天領域の前記外壁ラインに沿った第一の長さを、前記軒天板選択手段により選択された軒天板の前記外壁ラインに沿った第二の長さで除した際の余りの長さを記憶する記憶手段と、
前記軒天領域の全てについて前記軒天板を割り付けた後に、前記記憶手段に記憶された余りの長さの総計を前記第二の長さで除した数を算出する端材算出手段と、
を有することを特徴とする割り付けシステム。
Outer wall line drawing means for drawing the outer wall line of the building,
Roof line drawing means to draw the roof line of the building,
Roof slope selection means for selecting the roof slope of the building;
Eaves area calculation means for calculating an eaves area by the outer wall line drawn by the outer wall line drawing means, the roof line drawn by the roof line drawing means, and the roof slope selected by the roof slope selection means When,
Eaves top plate slope selection means for selecting the slope of the eaves top plate disposed in the eaves area;
An eaves for selecting the type of eaves top plate arranged in the eaves area from the eaves area calculated by the eaves area calculation means and the gradient of the eaves top plate selected by the eaves top plate slope selection means Top board selection means,
The first length along the outer wall line of the eaves area calculated by the eaves area calculation means is taken as the second length along the outer wall line of the eaves top board selected by the eaves top board selection means. Storage means for storing the remaining length divided by the length;
A scrap calculation means for calculating a number obtained by dividing the total of the remaining lengths stored in the storage means by the second length after allocating the eaves top plate to all the eaves areas;
Allocation system characterized by having.
建物の外壁ラインを作図する外壁ライン作図手段と、
建物の屋根ラインを作図する屋根ライン作図手段と、
建物の屋根勾配を選択する屋根勾配選択手段と、
前記外壁ライン作図手段により作図された外壁ラインと、前記屋根ライン作図手段により作図された屋根ラインと、前記屋根勾配選択手段により選択された屋根勾配とにより軒天領域を算出する軒天領域算出手段と、
前記軒天領域に配置される軒天換気金物の種類を選択する軒天換気金物選択手段と、
前記軒天領域算出手段により算出された軒天領域の前記外壁ラインに沿った第一の長さを、前記軒天換気金物選択手段により選択された軒天換気金物の前記外壁ラインに沿った第二の長さで除した際の余りの長さを記憶する記憶手段と、
前記軒天領域の全てについて前記軒天換気金物を割り付けた後に、前記記憶手段に記憶された余りの長さの総計を前記第二の長さで除した数を算出する端材算出手段と、
を有することを特徴とする割り付けシステム。
Outer wall line drawing means for drawing the outer wall line of the building,
Roof line drawing means to draw the roof line of the building,
Roof slope selection means for selecting the roof slope of the building;
Eaves area calculation means for calculating an eaves area by the outer wall line drawn by the outer wall line drawing means, the roof line drawn by the roof line drawing means, and the roof slope selected by the roof slope selection means When,
An eaves ventilation hardware selection means for selecting the kind of eaves ventilation hardware disposed in the eaves area;
The first length along the outer wall line of the eaves area calculated by the eaves area calculating means is the first length along the outer wall line of the eaves ventilation metal selected by the eaves ventilation metal selecting means Storage means for storing the remaining length divided by two lengths;
A scrap calculation means for calculating a number obtained by dividing the total of the lengths of the remainder stored in the storage means by the second length after allocating the eaves ventilation vents to all of the eaves area;
Allocation system characterized by having.
建物の外壁ラインを作図する外壁ライン作図手段と、
建物の屋根ラインを作図する屋根ライン作図手段と、
建物の屋根勾配を選択する屋根勾配選択手段と、
前記外壁ライン作図手段により作図された外壁ラインと、前記屋根ライン作図手段により作図された屋根ラインと、前記屋根勾配選択手段により選択された屋根勾配とにより軒天領域を算出する軒天領域算出手段と、
前記軒天領域に配置される軒天換気金物の種類を選択する軒天換気金物選択手段と、
前記軒天領域算出手段により算出された軒天領域と、前記外壁ライン作図手段により作図された外壁ラインと、前記屋根ライン作図手段により作図された屋根ラインとにより小屋裏面積を算出する小屋裏面積算出手段と、
前記小屋裏面積算出手段により算出された小屋裏面積に対応して必要な換気面積を、前記軒天換気金物選択手段により選択された軒天換気金物の換気面積で除した際の数を算出する軒天換気金物算出手段と、
を有することを特徴とする割り付けシステム。
Outer wall line drawing means for drawing the outer wall line of the building,
Roof line drawing means to draw the roof line of the building,
Roof slope selection means for selecting the roof slope of the building;
Eaves area calculation means for calculating an eaves area by the outer wall line drawn by the outer wall line drawing means, the roof line drawn by the roof line drawing means, and the roof slope selected by the roof slope selection means When,
An eaves ventilation hardware selection means for selecting the kind of eaves ventilation hardware disposed in the eaves area;
An attic bottom area for calculating a cabin back area from the eaves area calculated by the eaves area calculation means, the outer wall line drawn by the outer wall line drawing means, and the roof line drawn by the roof line drawing means Calculation means,
Calculate the number of ventilation areas required by the eaves-ventilating material selection means divided by the ventilation area of the eaves-ventilating materials selected by the eaves-ventilating material selection means, corresponding to the attic area calculated by the attic-area calculation means. Eave sky ventilation hardware calculation means,
Allocation system characterized by having.
コンピュータを、
物の外壁ラインを作図する外壁ライン作図手段と、
物の屋根ラインを作図する屋根ライン作図手段と、
物の屋根勾配を選択する屋根勾配選択手段と、
前記外壁ライン作図手段により作図された外壁ラインと、前記屋根ライン作図手段により作図された屋根ラインと、前記屋根勾配選択手段により選択された屋根勾配とに基づいて軒天領域を算出する軒天領域算出手段と、
記軒天領域に配置される軒天板の勾配を選択する軒天板勾配選択手段と、
前記軒天領域算出手段により算出された軒天領域と、前記軒天板勾配選択手段により選択された軒天板の勾配とに基づいて前記軒天領域に配置される軒天板の種類を選択する軒天板選択手段と、
前記軒天領域算出手段により算出された軒天領域の前記外壁ラインに沿った第一の長さを、前記軒天板選択手段により選択された軒天板の前記外壁ラインに沿った第二の長さで除した際の余りの長さを記憶する記憶手段と、
前記軒天領域の全てについて前記軒天板を割り付けた後に、前記記憶手段に記憶された余りの長さの総計を前記第二の長さで除した数を算出する端材算出手段と、
して機能させるための割り付けプログラム。
Computer,
And the outer wall line drawing means for drawing the outer wall line of the building,
And the roof line drawing means for drawing the roof line of the building,
And roof slope selection means for selecting a roof slope of buildings,
Nokiten region for calculating an outer wall line is plotted by the outer wall line drawing means, and roof line is plotted by the roof line drawing means, the eaves sky region on the basis of the roof slope selected by the roof slope selection unit Calculation means ,
And eaves ceiling plate gradient selection means for selecting a gradient of eaves top plate disposed before Kinokiten region,
And eaves ceiling area calculated by the eaves ceiling area calculating means, the type of eaves top plate disposed before Kinokiten area based on the slope of the eaves top plate selected by the eaves top plate gradient selection means Eaves top board selection means to choose ,
The first length along the outer wall line of the eaves area calculated by the eaves area calculation means is taken as the second length along the outer wall line of the eaves top board selected by the eaves top board selection means. storage means for memorize a length of remainder when divided by the length,
After allocating the eaves top plate for all of the eaves ceiling region, and the end material calculation means for exiting calculate the number obtained by dividing the total length of the remainder stored in the storage means at said second length,
Allocation program to function .
コンピュータを、
物の外壁ラインを作図する外壁ライン作図手段と、
物の屋根ラインを作図する屋根ライン作図手段と、
物の屋根勾配を選択する屋根勾配選択手段と、
前記外壁ライン作図手段により作図された外壁ラインと、前記屋根ライン作図手段により作図された屋根ラインと、前記屋根勾配選択手段により選択された屋根勾配とに基づいて軒天領域を算出する軒天領域算出手段と、
記軒天領域に配置される軒天換気金物の種類を選択する軒天換気金物選択手段と、
前記軒天領域算出手段により算出された軒天領域の前記外壁ラインに沿った第一の長さを、前記軒天換気金物選択手段により選択された軒天換気金物の前記外壁ラインに沿った第二の長さで除した際の余りの長さを記憶する記憶手段と、
前記軒天領域の全てについて前記軒天換気金物を割り付けた後に、前記記憶手段に記憶された余りの長さの総計を前記第二の長さで除した数を算出する端材算出手段と、
して機能させるための割り付けプログラム。
Computer,
And the outer wall line drawing means for drawing the outer wall line of the building,
And the roof line drawing means for drawing the roof line of the building,
And roof slope selection means for selecting a roof slope of buildings,
Nokiten region for calculating an outer wall line is plotted by the outer wall line drawing means, and roof line is plotted by the roof line drawing means, the eaves sky region on the basis of the roof slope selected by the roof slope selection unit Calculation means ,
And Nokiten ventilation fittings selection means for selecting the type of Nokiten ventilation fittings disposed before Kinokiten region,
The first length along the outer wall line of the eaves area calculated by the eaves area calculating means is the first length along the outer wall line of the eaves ventilation metal selected by the eaves ventilation metal selecting means storage means for memorize a length of remainder when divided by the second length,
After allocating the eaves ceiling ventilation fittings for all the eaves ceiling region, and the end material calculation means for exiting calculate the number obtained by dividing the total length of the remainder stored in the storage unit in the second length ,
Allocation program to function .
コンピュータを、
物の外壁ラインを作図する外壁ライン作図手段と、
物の屋根ラインを作図する屋根ライン作図手段と、
物の屋根勾配を選択する屋根勾配選択手段と、
前記外壁ライン作図手段により作図された外壁ラインと、前記屋根ライン作図手段により作図された屋根ラインと、前記屋根勾配選択手段により選択された屋根勾配とに基づいて軒天領域を算出する軒天領域算出手段と、
記軒天領域に配置される軒天換気金物の種類を選択する軒天換気金物選択手段と、
前記軒天領域算出手段により算出された軒天領域と、前記外壁ライン作図手段により作図された外壁ラインと、前記屋根ライン作図手段により作図された屋根ラインとに基づいて小屋裏面積を算出する小屋裏面積算出手段と、
前記小屋裏面積算出手段により算出された小屋裏面積に対応して必要な換気面積を、前記軒天換気金物選択手段により選択された軒天換気金物の換気面積で除した際の数を算出する軒天換気金物算出手段と、
して機能させるための割り付けプログラム。
Computer,
And the outer wall line drawing means for drawing the outer wall line of the building,
And the roof line drawing means for drawing the roof line of the building,
And roof slope selection means for selecting a roof slope of buildings,
Nokiten region for calculating an outer wall line is plotted by the outer wall line drawing means, and roof line is plotted by the roof line drawing means, the eaves sky region on the basis of the roof slope selected by the roof slope selection unit Calculation means ,
And Nokiten ventilation fittings selection means for selecting the type of Nokiten ventilation fittings disposed before Kinokiten region,
It calculates the eaves ceiling area calculated by the eaves ceiling area calculation means, and an outer wall line is plotted by the outer wall line drawing unit, a small Yaura area on the basis of the drawing roofing line by the roof line drawing means Attic area calculation means ,
Leaving calculate the number of time of the ventilation area required to correspond to the attic area calculated by the attic area calculation means, divided by the ventilation area of Nokiten ventilation hardware selected by the eaves ceiling ventilating hardware selection means Eaves ventilation ventilator calculation means ,
Allocation program to function .
JP2014167276A 2014-08-20 2014-08-20 Allocation system and its program Active JP6506515B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014167276A JP6506515B2 (en) 2014-08-20 2014-08-20 Allocation system and its program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014167276A JP6506515B2 (en) 2014-08-20 2014-08-20 Allocation system and its program

Publications (2)

Publication Number Publication Date
JP2016045551A JP2016045551A (en) 2016-04-04
JP6506515B2 true JP6506515B2 (en) 2019-04-24

Family

ID=55636104

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014167276A Active JP6506515B2 (en) 2014-08-20 2014-08-20 Allocation system and its program

Country Status (1)

Country Link
JP (1) JP6506515B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7257617B2 (en) * 2018-06-19 2023-04-14 パナソニックIpマネジメント株式会社 Architectural CAD (Computer Aided Design) device, architectural CAD program, and add-on program
JP7328789B2 (en) * 2019-05-13 2023-08-17 積水化学工業株式会社 INSTRUCTION FORMATION SYSTEM, INSTRUCTION FORMATION METHOD, AND PROGRAM
JP7759520B1 (en) * 2025-02-28 2025-10-23 Jfe建材株式会社 Information processing device, program, and information processing system
JP7702583B1 (en) * 2025-04-02 2025-07-03 Jfe建材株式会社 Information processing device, program, and information processing system

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH064608A (en) * 1992-06-22 1994-01-14 Sekisui Chem Co Ltd Small panel cutout indicator
JPH08147339A (en) * 1994-11-17 1996-06-07 Misawa Homes Co Ltd CAD system for roof of unit building
JP3046291B1 (en) * 1999-02-12 2000-05-29 株式会社 西田 Temporary material layout drawing drawing creating apparatus and its recording medium
JP4656713B2 (en) * 2000-10-06 2011-03-23 ミサワホーム株式会社 Construction panel production instruction information creation system
JP2002117081A (en) * 2000-10-12 2002-04-19 Powers Service Co Ltd Building estimation system
JP4919180B2 (en) * 2010-06-11 2012-04-18 積水ハウス株式会社 Information linkage system between drawing creation CAD and member development CAD

Also Published As

Publication number Publication date
JP2016045551A (en) 2016-04-04

Similar Documents

Publication Publication Date Title
AU2015101964A4 (en) Construction management system
US9311432B1 (en) Automated design and manufacturing of complex layouts
JP6887881B2 (en) Product selection system
US9489103B2 (en) Techniques for optimizing stringing of solar panel modules
JP6022396B2 (en) Estimation support apparatus and estimation support method
JP6506515B2 (en) Allocation system and its program
CN101142578A (en) Systems and methods for manufacturing custom prefabricated buildings
WO2001016812A1 (en) Remote order acceptance design system and elevator remote order acceptance method
JP6293104B2 (en) Building integration system and program
US20100191611A1 (en) Portable electronic construction estimator
WO2020138416A1 (en) Construction material arrangement processing device, construction material arrangement method, and program
JP6329022B2 (en) Renovation construction cost estimation system
KR20160131192A (en) Rebar processing integrated management system
JP2001188812A (en) Industrialized custom house design method and system
JP7200459B2 (en) Design support device
US20260030394A1 (en) System, method and computer program product for efficient design of buildings
JP4528259B2 (en) Industrialized custom house design method and system
WO2016038896A1 (en) Allocation device and program
JP7157498B1 (en) CONSTRUCTION SUPPORT METHOD, CONSTRUCTION SUPPORT PROGRAM, AND CONSTRUCTION SUPPORT DEVICE
US11836676B2 (en) Determining vendor components, kits, and logistics based on construction drawings
JP2024050326A (en) Wall estimation support device and computer program
CN113806850A (en) Digital management method, device, computer equipment and storage medium for real estate products
JP6279929B2 (en) Roof material accumulator
JP7274243B1 (en) REINFORCEMENT DELIVERY SUPPORT SYSTEM AND REINFORCEMENT DELIVERY SUPPORT METHOD
JP7195681B1 (en) REINFORCEMENT DELIVERY SUPPORT SYSTEM AND REINFORCEMENT DELIVERY SUPPORT METHOD

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20170814

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20180718

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20180807

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20181002

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20190312

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20190329

R150 Certificate of patent or registration of utility model

Ref document number: 6506515

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250