JP6533550B2 - Method of dismantling tower supported chimney - Google Patents
[go: Go Back, main page]

JP6533550B2 - Method of dismantling tower supported chimney - Google Patents

Method of dismantling tower supported chimney Download PDF

Info

Publication number
JP6533550B2
JP6533550B2 JP2017066939A JP2017066939A JP6533550B2 JP 6533550 B2 JP6533550 B2 JP 6533550B2 JP 2017066939 A JP2017066939 A JP 2017066939A JP 2017066939 A JP2017066939 A JP 2017066939A JP 6533550 B2 JP6533550 B2 JP 6533550B2
Authority
JP
Japan
Prior art keywords
tower
jack
steel tower
block
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2017066939A
Other languages
Japanese (ja)
Other versions
JP2018168601A (en
Inventor
昌久 古市
昌久 古市
尚貴 須山
尚貴 須山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taihei Dengyo Kaisha Ltd
Original Assignee
Taihei Dengyo Kaisha Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taihei Dengyo Kaisha Ltd filed Critical Taihei Dengyo Kaisha Ltd
Priority to JP2017066939A priority Critical patent/JP6533550B2/en
Publication of JP2018168601A publication Critical patent/JP2018168601A/en
Application granted granted Critical
Publication of JP6533550B2 publication Critical patent/JP6533550B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Description

この発明は、鉄塔支持型煙突の解体方法、特に、大型クレーンを使用することなく、鉄塔支持型煙突を容易に安全かつ確実に解体することができる、鉄塔支持型煙突の解体方法に関するものである。   The present invention relates to a method for disassembling a tower-supported chimney, and more particularly to a method for disassembling a tower-supported chimney that can easily and safely disassemble the tower-supported chimney without using a large crane. .

鉄塔支持型煙突の解体方法の一例が特許文献1に開示されている。以下の、この鉄塔支持型煙突の解体方法を従来解体方法といい、図面を参照しながら説明する。   Patent Document 1 discloses an example of a method for disassembling a tower-supported chimney. The following dismantling method of the tower-supported chimney is referred to as a conventional dismantling method and will be described with reference to the drawings.

図9は、従来解体方法を示す説明図であり、(a)は、筒身11Aを撤去した図、(b) は、筒身11Bを撤去した図、(c)は、クローラクレーンにより鉄塔の中間部12Bを撤去した後、筒身11Cと筒身11Dを撤去した図、(d)は、ジャッキによる筒身の吊り位置を変えた図、(e)は、筒身11Eから筒身11Iを撤去した図、(f)は、ジャッキによる筒身の吊り位置を変えた図、(g)は、筒身の頂部を解体する図である。   Fig. 9 is an explanatory view showing a conventional dismantling method, in which (a) is a drawing in which the cylinder body 11A is removed, (b) is a drawing in which the cylinder body 11B is removed, and (c) is a drawing of a steel tower by a crawler crane. After removing the middle part 12B, the figure which removed the cylinder body 11C and the cylinder body 11D, (d) changed the hanging position of the cylinder body by the jack, (e), the cylinder body 11I from the cylinder body 11E (F) is a diagram in which the hanging position of the cylinder body by the jack is changed, and (g) is a diagram in which the top of the cylinder body is disassembled.

従来解体方法は、以下の工程からなっている。   The conventional disassembly method consists of the following steps.

(第1の筒身部分解体工程)
先ず、図9(a)に示すように、筒身11を部分解体する。すなわち、鉄塔12の第2支持点S2にジャッキ15を取り付け、ジャッキ15により筒身11を支持しつつ筒身11の下端部を切断位置20で所定長さだけ切断し、切断した筒身11Aを搬送台車21に搭載して撤去した後、筒身11をジャッキダウンする。この際、安定に自立している鉄塔12に設けられているガイドローラ16によって筒身11のジャッキダウンを支持案内することによって、ジャッキダウン作業を容易にかつ安全に行うことができる。なお、図中の17、18は、補強材、22は、搬送台車21が走行するためのレールである。そして、上記のような、筒身11の下端部に対する切断撤去とジャッキダウンを行って、図9(b)に示すように、筒身11Bを切断撤去して、筒身11をほぼ第4支持点S4の高さとなるまで解体する。
(First tube part dismantling process)
First, as shown in FIG. 9A, the tube body 11 is partially disassembled. That is, the jack 15 is attached to the second support point S2 of the steel tower 12, the lower end of the cylindrical body 11 is cut at a cutting position 20 by a predetermined length while supporting the cylindrical body 11 by the jack 15 and the cut cylindrical body 11A is cut. After being mounted on the transport carriage 21 and removed, the cylinder body 11 is jacked down. At this time, the jack-down operation can be performed easily and safely by supporting and guiding the jack-down of the cylindrical body 11 by the guide rollers 16 provided in the steel tower 12 which is stably standing by itself. Reference numerals 17 and 18 in the drawing denote reinforcing members, and reference numeral 22 denotes a rail on which the transport carriage 21 travels. Then, as described above, the lower end portion of the cylinder body 11 is cut and removed and jacked down, and as shown in FIG. 9B, the cylinder body 11B is cut and removed to substantially support the cylinder body 11 as the fourth support. Dismantle until the height of the point S4 is reached.

(鉄塔の中間部解体工程)
次に、鉄塔12の上部12Aを筒身11に保持させた状態で、図9(b)に示すように、クローラクレーン30を用いて、鉄塔12の中間部12Bを解体撤去する。なお、ここで、鉄塔12の上部12Aは、第3支持点S3と第4支持点S4の間の部分であり、鉄塔12の中間部12Bは、第2支持点S2と第3支持点S3の間の部分である。
(Medium part dismantling process of steel tower)
Next, in a state where the upper portion 12A of the steel tower 12 is held by the cylindrical body 11, as shown in FIG. 9B, the middle portion 12B of the steel tower 12 is disassembled and removed using the crawler crane 30. Here, the upper portion 12A of the steel tower 12 is a portion between the third support point S3 and the fourth support point S4, and the middle portion 12B of the steel tower 12 is a portion between the second support point S2 and the third support point S3. It is a part between.

(第2の筒身部分解体工程)
次に、上述した筒身部分解体工程と同様にして、筒身11の下端部に対する切断撤去とジャッキダウンとを繰り返して、図9(c)に示すように、筒身11C、11Dを切断撤去して、鉄塔12の上部12Aが鉄塔12の下部12Cに近づく位置になるまで解体撤去する。なお、ここで、鉄塔12の下部12Cは、第2支持点S2から下方の部分である。
(Second tube part dismantling process)
Next, cutting and removing the lower end portion of the tube body 11 and jacking down are repeated in the same manner as the tube body partial disassembling process described above, and as shown in FIG. 9C, the tube bodies 11C and 11D are cut away and removed. Then, the upper part 12A of the steel tower 12 is dismantled and removed until it becomes a position approaching the lower part 12C of the steel tower 12. Here, the lower portion 12C of the steel tower 12 is a portion below the second support point S2.

(鉄塔の上部解体工程)
次に、図9(d)に示すように、ジャッキ15による筒身11の吊り位置を変え、クローラクレーン30を用いて、鉄塔12の上部12Aを解体撤去する。
(Upper dismantling process of steel tower)
Next, as shown in FIG. 9D, the hanging position of the cylinder body 11 by the jacks 15 is changed, and the upper portion 12A of the steel tower 12 is disassembled and removed using the crawler crane 30.

(第3の筒身部分解体工程)
次に、上述した筒身部分解体工程及び第2の筒身部分解体工程と同様にして、筒身11の下端部に対する切断撤去とジャッキダウンとを繰り返して、図9(d)、図9(e)、図9(f)に示すように、筒身11Eから11Mを順次切断撤去する。
(Third tube part dismantling process)
Next, in the same manner as in the partially dismantling process of the tubular body and the second disassembling process of the tubular body described above, cutting and removing the lower end portion of the tubular body 11 and jacking down are repeated, as shown in FIG. e) As shown in FIG. 9F, the cylinder bodies 11E to 11M are cut off and removed sequentially.

(鉄塔の下部解体工程)
最後に、クローラクレーン30を用いて、鉄塔12の下部12Cと、残った筒身11を解体撤去する。これによって、図9(g)に示すように、鉄塔支持型煙突10の解体が完了する。
(Lower dismantling process of steel tower)
Finally, using the crawler crane 30, the lower portion 12C of the steel tower 12 and the remaining cylindrical body 11 are disassembled and removed. As a result, as shown in FIG. 9 (g), the dismantling of the tower-supported chimney 10 is completed.

特許第4559313号公報Patent No. 4559313 gazette 特許第5563697号公報Patent No. 5563697 gazette 特許第2828430号公報Patent No. 2828430

上記従来解体方法によれば、煙突の高さ相当の超大型クレーンを使用することなく、鉄塔支持型煙突を安全かつ確実に解体することができるが、高所部分の鉄塔12A、12Bの撤去に大型クレーンを必要とするといった問題があった。   According to the above-mentioned conventional dismantling method, the tower supported chimney can be dismantled safely and reliably without using a super large crane equivalent to the height of the chimney, but when removing the steel towers 12A and 12B at high places. There was a problem that a large crane was required.

従って、この発明の目的は、大型クレーンを使用することなく、鉄塔支持型煙突を容易に安全かつ確実に解体することができる、鉄塔支持型煙突の解体方法を提供することにある。   Therefore, an object of the present invention is to provide a method for disassembling a tower-supported chimney that can easily and safely disassemble the tower-supported chimney without using a large crane.

この発明は、上記目的を達成するためになされたものであって、下記を特徴とするものである。   This invention was made in order to achieve the said objective, Comprising: The following is characterized.

請求項1記載の発明は、複数本の筒身の周囲に、前記筒身を支持する鉄塔が構築された鉄塔支持型煙突の解体方法において、下記(a)工程から(h)工程を備え、
(a)前記鉄塔の下部に、前記筒身を吊り上げ可能な筒身吊り上げ用ジャッキを設置し、前記筒身の頂部に、切断された鉄塔ブロックをヒンジを支点として倒す鉄塔ブロック倒し用ジャッキと、前記鉄塔ブロックを吊り下ろす鉄塔ブロック吊り下ろし用ジャッキとを設置し、地上に、前記鉄塔ブロック吊り下ろし用ジャッキにより吊り下ろされる前記鉄塔ブロックをガイドする鉄塔ブロックガイド用ジャッキを設置するジャッキ設置工程、
(b)前記鉄塔の上段の下部と、前記鉄塔の次段の上部とをヒンジにより連結する連結工程、
(c)前記鉄塔の上段を複数個の鉄塔ブロックに切断する鉄塔切断工程、
(d)前記鉄塔ブロック倒し用ジャッキと、前記鉄塔ブロックガイド用ジャッキとを操作して、前記鉄塔ブロックを前記ヒンジを支点として下方に倒す鉄塔ブロック倒し工程、
(e)前記ヒンジを前記鉄塔から切り離すヒンジ切り離し工程、
(f)前記鉄塔ブロック吊り下ろし用ジャッキと、前記鉄塔ブロック倒し用ジャッキと、前記鉄塔ブロックガイド用ジャッキとを操作して、前記鉄塔ブロックを吊り下ろす鉄塔ブロック吊り下ろし工程、
(g)前記(b)工程から前記(f)工程によって、前記鉄塔の上段を解体した後、前記筒身吊り上げ用ジャッキに前記筒身の荷重を預けた状態で、前記筒身の下部を切断し、撤去する筒身切断撤去工程、
(h)前記筒身吊り上げ用ジャッキにより前記筒身を吊り下ろす筒身吊り下ろし工程、
前記(b)工程から前記(h)工程を、前記鉄塔の上段から下段に亘って順次、繰り返し行うことに特徴を有するものである。
The invention according to claim 1 is the dismantling method of an iron tower supported chimney in which a steel tower supporting the cylindrical body is constructed around a plurality of cylindrical bodies, comprising the following steps (a) to (h):
(A) A jack for lifting a cylinder body which can lift the cylinder body is installed at the lower part of the steel tower, and a steel tower block lowering jack for lowering the cut tower block with a hinge as a fulcrum at the top of the cylinder body; Jack installation step of installing a tower block hanging jack for hanging the tower block and installing a tower block guide jack for guiding the tower block suspended by the tower block hanging jack on the ground;
(B) a connecting step of connecting the lower portion of the upper stage of the steel tower and the upper portion of the next stage of the steel tower by a hinge;
(C) an iron tower cutting process for cutting the upper stage of the steel tower into a plurality of steel tower blocks;
(D) A tower block lowering step of tilting the tower block downward with the hinge as a fulcrum by operating the tower block lowering jack and the tower block guide jack.
(E) a hinge separating step of separating the hinge from the steel tower;
(F) A tower block suspension step of suspending the tower block by operating the jack for hanging the tower block, the jack for laying the tower block, and the jack for guiding the tower block,
(G) After dismantling the upper stage of the steel tower from the step (b) to the step (f), the lower portion of the cylinder body is cut in a state where the load of the cylinder body is deposited on the cylinder body lifting jack Tube removal and removal process to remove and
(H) A tubular body hanging step of suspending and lowering the tubular body by the tubular body lifting jack
The method is characterized in that the steps (b) to (h) are repeatedly performed sequentially from the upper stage to the lower stage of the steel tower.

請求項2に記載の発明は、請求項1に記載の発明において、前記筒身は、4本であることに特徴を有するものである。   The invention according to claim 2 is characterized in that, in the invention according to claim 1, the number of the body is four.

請求項3に記載の発明は、請求項1または2に記載の発明において、前記鉄塔は、平面形状が正方形であることに特徴を有するものである。   The invention set forth in claim 3 is characterized in that, in the invention set forth in claim 1 or 2, the steel tower has a square planar shape.

請求項4に記載の発明は、請求項1から3の何れか1つに記載の発明において、前記鉄塔ブロックは、平面形状コ字形をなし、2つからなっていることに特徴を有するものである。   The invention according to a fourth aspect is the invention according to any one of the first to third aspects, wherein the steel tower block has a planar U-shape, and is characterized by being composed of two. is there.

この発明によれば、鉄塔の上段の下部と、鉄塔の次段の上部とをヒンジにより連結し、次いで、鉄塔の上段を複数個の鉄塔ブロックに切断し、次いで、鉄塔ブロックをヒンジを支点として下方に倒し、次いで、ヒンジを鉄塔から切り離し、次いで、鉄塔ブロックを吊り下ろし、次いで、筒身の下部を切断した後、筒身を吊り下ろす工程を繰り返し行うことによって、大型クレーンを使用することなく、鉄塔支持型煙突を容易に安全かつ確実に解体することができる。   According to this invention, the lower part of the upper stage of the steel tower and the upper part of the next stage of the steel tower are connected by a hinge, and then the upper stage of the steel tower is cut into a plurality of steel tower blocks, and then the steel tower block is used as a hinge Lowering down, then disconnecting the hinge from the tower, then hanging down the tower block, and then cutting off the lower part of the cylinder body, and repeatedly using the process of suspending and lowering the cylinder body without using a large crane The tower supported chimney can be dismantled easily and safely.

この発明の、鉄塔支持型煙突の解体方法によって、筒身吊り上げ用ジャッキと、鉄塔ブロック倒し用ジャッキと、鉄塔ブロック吊り下ろし用ジャッキと、鉄塔ブロックガイド用ジャッキとを設置した鉄塔支持型煙突を示す平面図である。A tower support chimney on which a jack for lifting a cylinder, a jack for lowering a tower block, a jack for lifting a tower block, and a jack for guiding a tower block guide are provided by the disassembling method of the tower supporting chimney according to the present invention. It is a top view. 鉄塔ブロック倒し用ジャッキと、鉄塔ブロック吊り下ろし用ジャッキと、鉄塔ブロックガイド用ジャッキとの設置部分の拡大図である。It is an enlarged view of the installation part of the jack for a steel tower block fall, the jack for hanging a steel tower block, and the jack for a steel tower block guide. 筒身吊り上げ用ジャッキの設置部分の拡大図である。It is an enlarged view of the installation part of the jack for body lifting. 煙突を示す平面図である。It is a top view which shows a chimney. この発明の、鉄塔支持型煙突の解体方法によって、鉄塔の1段目(最上段)の鉄塔ブロックを吊り下ろす工程を示す正面図である。It is a front view which shows the process of suspending the tower block of the 1st step (uppermost step) of a tower by the dismantling method of the tower support type | mold chimney of this invention. この発明の、鉄塔支持型煙突の解体方法によって、鉄塔の1段目を解体した後、筒身の下部を切断し、撤去し、この後、筒身を吊り下ろす工程を示す正面図である。After disassembling the first step of the steel tower by the dismantling method of the steel tower support type chimney of this invention, it is a front view showing a process of cutting the lower part of the cylinder and removing it, and then suspending and lowering the cylinder. この発明の、鉄塔支持型煙突の解体方法によって、筒身吊り上げ用ジャッキを据え替える工程を示す正面図である。It is a front view which shows the process of changing the jack for cylinder body lifting by the dismantling method of a steel tower support type | mold chimney of this invention. この発明の、鉄塔支持型煙突の解体方法によって、鉄塔の2段目の鉄塔ブロックを吊り下ろす工程を示す正面図である。It is a front view which shows the process of hanging down the 2nd-tier steel tower block of a steel tower by the dismantling method of a steel tower support type | mold chimney of this invention. この発明の、鉄塔支持型煙突の解体方法によって、鉄塔の2段目を解体した後、筒身の下部を切断し、撤去し、この後、筒身を吊り下ろす工程を示す正面図である。After dismantling the second stage of the steel tower by the dismantling method of the steel tower support type chimney of the present invention, it is a front view showing a process of cutting and removing the lower part of the cylinder body and then suspending and lowering the cylinder body. この発明の、鉄塔支持型煙突の解体方法によって、筒身吊り上げ用ジャッキを据え替える工程を示す正面図である。It is a front view which shows the process of changing the jack for cylinder body lifting by the dismantling method of a steel tower support type | mold chimney of this invention. この発明の、鉄塔支持型煙突の解体方法によって、鉄塔の3段目の鉄塔ブロックを吊り下ろす工程を示す正面図である。It is a front view which shows the process of suspending the 3rd-tier steel tower block of a steel tower by the dismantling method of a steel tower support type | mold chimney of this invention. この発明の、鉄塔支持型煙突の解体方法によって、鉄塔の3段目を解体した後、筒身の下部を切断し、撤去し、この後、筒身を吊り下ろす工程を示す正面図である。After disassembling the third stage of the steel tower by the dismantling method of the steel tower support type chimney of this invention, it is a front view showing a process of cutting the lower part of the cylinder and removing it, and then suspending and lowering the cylinder. この発明の、鉄塔支持型煙突の解体方法によって、筒身吊り上げ用ジャッキを据え替える工程を示す正面図である。It is a front view which shows the process of changing the jack for cylinder body lifting by the dismantling method of a steel tower support type | mold chimney of this invention. この発明の、鉄塔支持型煙突の解体方法によって、鉄塔の4段目の鉄塔ブロックを吊り下ろす工程を示す正面図である。It is a front view which shows the process of suspending the 4th-tier steel tower block of a steel tower by the dismantling method of a steel tower support type | mold chimney of this invention. この発明の、鉄塔支持型煙突の解体方法によって、鉄塔の4段目を解体した後、筒身の下部を切断し、撤去し、この後、筒身を吊り下ろす工程を示す正面図である。After disassembling the fourth stage of the steel tower by the dismantling method of the steel tower support type chimney of this invention, it is a front view showing a process of cutting the lower part of the cylinder and removing it, and then suspending and lowering the cylinder. この発明の、鉄塔支持型煙突の解体方法によって、筒身吊り上げ用ジャッキを据え替える工程を示す正面図である。It is a front view which shows the process of changing the jack for cylinder body lifting by the dismantling method of a steel tower support type | mold chimney of this invention. この発明の、鉄塔支持型煙突の解体方法によって、クレーンにより、鉄塔ブロック倒し用ジャッキと、鉄塔ブロック吊り下ろし用ジャッキと、鉄塔ブロックガイド用ジャッキとを吊り下ろす工程を示す正面図である。It is a front view showing a process of suspending a tower block lowering jack, a tower block hanging jack, and a tower block guide jack by a crane according to the disassembling method of a tower supporting chimney of the present invention. この発明の、鉄塔支持型煙突の解体方法によって、筒身の下部を切断した後、撤去し、この後、筒身を吊り下ろす工程を示す正面図である。It is a front view which shows the process of suspending and lowering a lower part of a cylinder after removing the lower part of a cylinder by the dismantling method of a steel tower support type | mold chimney of this invention. この発明の、鉄塔支持型煙突の解体方法によって、筒身吊り上げ用ジャッキを据え替える工程を示す正面図である。It is a front view which shows the process of changing the jack for cylinder body lifting by the dismantling method of a steel tower support type | mold chimney of this invention. この発明の、鉄塔支持型煙突の解体方法によって、筒身の下部を切断した後、撤去し、この後、筒身を吊り下ろす工程を示す正面図である。It is a front view which shows the process of suspending and lowering a lower part of a cylinder after removing the lower part of a cylinder by the dismantling method of a steel tower support type | mold chimney of this invention. この発明の、鉄塔支持型煙突の解体方法によって、筒身頂部を撤去する工程を示す正面図である。It is a front view which shows the process of removing a cylinder body top part by the dismantling method of the tower support type | mold chimney of this invention. この発明の、鉄塔支持型煙突の解体方法によって、クレーンにより、筒身吊り上げ用ジャッキを撤去する工程を示す正面図である。It is a front view which shows the process of removing the cylinder body lifting jack by a crane by the dismantling method of a steel tower support type | mold chimney of this invention. この発明の、鉄塔支持型煙突の解体方法によって、鉄塔の最下段(5段目)を解体する工程を示す正面図である。It is a front view which shows the process of dismantling the lowest stage (5th stage) of a steel tower by the dismantling method of a steel tower support type | mold chimney of this invention. ヒンジ部分を示す正面図である。It is a front view which shows a hinge part. ヒンジ部分を示す側面図である。It is a side view showing a hinge part. 鉄塔ブロックをヒンジを支点として下方に倒した状態を示す正面図である。It is a front view which shows the state which turned down the steel tower block on the hinge as a fulcrum. 従来解体方法により筒身11Aを撤去した図である。It is the figure which removed 11 A of cylinder bodies by the conventional dismantling method. 従来解体方法により筒身11Bを撤去した図である。It is the figure which removed cylinder body 11B by the conventional dismantling method. 従来解体方法によりクローラクレーンにより鉄塔の中間部12Bを撤去した後、筒身11Cと筒身11Dを撤去した図である。It is the figure which removed 11 C of cylinder bodies and 11 D of cylinder bodies after removing intermediate part 12B of a steel tower with a crawler crane by the conventional dismantling method. 従来解体方法によりジャッキによる筒身の吊り位置を変えた図である。It is the figure which changed the suspension position of the cylinder body by a jack by the conventional dismantling method. 従来解体方法により筒身11Eから筒身11Iを撤去した図である。It is the figure which removed cylinder body 11I from cylinder body 11E by the conventional dismantling method. 従来解体方法によりジャッキによる筒身の吊り位置を変えた図である。It is the figure which changed the suspension position of the cylinder body by a jack by the conventional dismantling method. 従来解体方法により筒身の頂部を解体する図である。It is a figure which disassembles the top of a cylinder by the conventional disassembling method.

この発明の、鉄塔支持型煙突の解体方法の一実施態様を、図面を参照しながら説明する。   One embodiment of a method of disassembling a tower-supported chimney of the present invention will be described with reference to the drawings.

図1は、この発明の、鉄塔支持型煙突の解体方法によって、筒身吊り上げ用ジャッキと、鉄塔ブロック倒し用ジャッキと、鉄塔ブロック吊り下ろし用ジャッキと、鉄塔ブロックガイド用ジャッキとを設置した鉄塔支持型煙突を示す平面図、図2は、鉄塔ブロック倒し用ジャッキと、鉄塔ブロック吊り下ろし用ジャッキと、鉄塔ブロックガイド用ジャッキとの設置部分の拡大図、図3は、筒身吊り上げ用ジャッキの設置部分の拡大図、図4は、煙突を示す平面図である。   FIG. 1 shows a tower support provided with a jack for lifting a cylindrical body, a jack for lowering a tower block, a jack for lifting a tower block, and a jack for guiding a tower block guide according to the disassembling method of the tower supporting chimney of the present invention. 2 is a plan view showing a chimney, FIG. 2 is an enlarged view of an installation portion of a steel tower block lowering jack, a steel tower block hanging jack, and a steel tower block guide jack, FIG. 3 is an installation of a cylindrical body lifting jack FIG. 4 is a plan view showing a chimney, with an enlarged view of a part.

図1から図4において、1は、複数本(この例では、4本)の筒身、2は、4本の筒身1の外側に構築された、筒身1を支持する鉄塔である。この例では、図1に示すように、鉄塔2を、5段階、すなわち、1段目(最上段)、2段目、3段目、4段目、5段目(最下段)に分割して解体、撤去する。鉄塔2は、図4に示すように、平面形状正方形をなしている。   In FIGS. 1 to 4, reference numeral 1 denotes a plurality (four in this example) of cylinder bodies, and 2 denotes an iron tower constructed on the outside of four cylinder bodies 1 to support the cylinder body 1. In this example, as shown in FIG. 1, the steel tower 2 is divided into five stages, ie, the first stage (uppermost stage), the second stage, the third stage, the fourth stage, and the fifth stage (lowermost stage). Dismantle and remove. The tower 2 has a plane shape square, as shown in FIG.

3は、4本の筒身1の中央部に設置されたエレベータ用シャフト(図4参照)であり、エレベータは、例えば、足場の構築時等において使用する。   Reference numeral 3 denotes an elevator shaft (see FIG. 4) installed at the central part of the four cylindrical bodies 1, and the elevator is used, for example, when constructing a scaffold.

4は、鉄塔2の下部に設置された、筒身1を吊り上げ可能な筒身吊り上げ用ジャッキである。筒身吊り上げ用ジャッキ4としては、例えば、特許文献2に開示された大形ジャッキを使用する。   Reference numeral 4 denotes a cylinder lifting jack installed at the lower part of the steel tower 2 and capable of lifting the cylinder 1. For example, a large-sized jack disclosed in Patent Document 2 is used as the cylinder body lifting jack 4.

5は、筒身1の頂部に設置された鉄塔ブロック倒し用ジャッキであり、後述する切断された平面形状コ字形をなす鉄塔ブロック2aを、後述するヒンジ8を支点として倒す際に使用するジャッキである。   Reference numeral 5 denotes a steel tower block lowering jack installed at the top of the cylinder body 1, which is used when the steel tower block 2 a having a cut flat shape C-shape to be described later is used as a fulcrum to be described later. is there.

6は、筒身1の頂部に設置された鉄塔ブロック吊り下ろし用ジャッキであり、鉄塔ブロック2aを吊り下ろす際に使用するジャッキである。   6 is a jack for hanging the steel tower block installed at the top of the cylinder 1 and is a jack used when hanging down the steel tower block 2a.

7は、地上に設置された鉄塔ブロックガイド用ジャッキであり、鉄塔ブロック吊り下ろし用ジャッキ6により吊り下ろされる鉄塔ブロック2aをガイドする際に使用するジャッキである。   Reference numeral 7 is a jack for a steel tower block guide installed on the ground, and is a jack used to guide the steel tower block 2 a suspended by the steel tower block hanging jack 6.

鉄塔ブロック倒し用ジャッキ5、鉄塔ブロック吊り下ろし用ジャッキ6、鉄塔ブロックガイド用ジャッキ7としては、例えば、特許文献3に開示された小型ジャッキを使用する。   As the steel tower block lowering jack 5, the steel tower block lifting jack 6, and the steel tower block guide jack 7, for example, a small jack disclosed in Patent Document 3 is used.

8は、鉄塔ブロック2aの下部と、未切断の鉄塔2の上部とを連結するヒンジである。   8 is a hinge which connects the lower part of the tower block 2a and the upper part of the uncut tower 2.

次に、この発明の、鉄塔支持型煙突の解体方法による煙突の解体方法について説明する。   Next, the method of disassembling a chimney by the method of disassembling a tower-supported chimney according to the present invention will be described.

(a)工程(ジャッキ設置工程)
先ず、図5(a)、図2、図3に示すように、鉄塔2の下部に、筒身1を吊り上げ可能な筒身吊り上げ用ジャッキ4を設置し、筒身1の頂部に、切断された鉄塔ブロック2aをヒンジ8を支点として倒す鉄塔ブロック倒し用ジャッキ5と、鉄塔ブロック2aを吊り下ろす鉄塔ブロック吊り下ろし用ジャッキ6とを設置し、地上に、鉄塔ブロック吊り下ろし用ジャッキ6により吊り下ろされる鉄塔ブロック2aをガイドする鉄塔ブロックガイド用ジャッキ7を設置する。
(A) Process (jack installation process)
First, as shown in FIG. 5A, FIG. 2 and FIG. 3, a cylinder lifting jack 4 capable of lifting the cylinder body 1 is installed at the lower part of the steel tower 2 and cut at the top of the cylinder body 1 A steel tower block lowering jack 5 for lowering the steel tower block 2a with the hinge 8 as a fulcrum 8 and a steel tower block hanging jack 6 for suspending the steel tower block 2a are installed and suspended by the steel tower block hanging jack 6 on the ground. A jack 7 for guiding a steel tower block for guiding the steel tower block 2a to be mounted is installed.

(b)工程(連結工程)
次に、図5(a)、図2に示すように、鉄塔2の1段目、すなわち、鉄塔2の最上段の下部と、鉄塔2の2段目、すなわち、次段の上部とをヒンジ8により連結する。
(B) Process (connection process)
Next, as shown in FIG. 5 (a) and FIG. 2, the first stage of the iron tower 2, ie, the lower portion of the uppermost stage of the steel tower 2, and the second stage of the steel tower 2, ie, the upper portion of the next stage, are hinged Connect by 8.

(c)工程(鉄塔切断工程)
次に、鉄塔2の1段目を2つの平面形状コ字形の鉄塔ブロック2aに切断する。すなわち、図2、図5(a)中、切断線(A−A)で示すように、鉄塔2の1段目をその高さ方向に切断し、図6中、切断線を(B−B)で示すように、ヒンジ8部分の鉄塔を水平方向に切断する。
(C) Process (steel tower cutting process)
Next, the first stage of the tower 2 is cut into two square U-shaped tower blocks 2a. That is, as shown by the cutting line (A-A) in FIG. 2 and FIG. 5 (a), the first stage of the steel tower 2 is cut in the height direction, and the cutting line in FIG. As shown in), horizontally cut the steel tower of the hinge 8 part.

(d)(鉄塔ブロック倒し工程)
次に、図5(a)に示すように、鉄塔ブロック倒し用ジャッキ5と、鉄塔ブロックガイド用ジャッキ7とを操作して、1段目の鉄塔ブロック2aをヒンジ8を支点として下方に倒す。
(D) (steel tower block defeat process)
Next, as shown in FIG. 5A, the steel tower block lowering jack 5 and the steel tower block guiding jack 7 are operated to lower the first steel tower block 2a downward with the hinge 8 as a fulcrum.

(e)(ヒンジ切り離し工程)
次に、ヒンジ8を鉄塔2から切り離す。このときの切断線を、図8中、(C−C)で示す。
(E) (hinge separation process)
Next, the hinge 8 is separated from the steel tower 2. The cutting line at this time is shown by (C-C) in FIG.

(f)(鉄塔ブロック吊り下ろし工程)
次に、図5(a)に示すように、鉄塔ブロック吊り下ろし用ジャッキ6と、鉄塔ブロック倒し用ジャッキ5と、鉄塔ブロックガイド用ジャッキ7とを操作して、1段目の鉄塔ブロック2aを地上に吊り下ろす。すなわち、鉄塔ブロック吊り下ろし用ジャッキ6と、鉄塔ブロック倒し用ジャッキ5とを調整しながら鉄塔ブロック1aを吊り下ろしていき、地上近くで鉄塔ブロックガイド用ジャッキ7を張って、徐々に鉄塔ブロック1aを水平状態に戻して、地上に着座させる。
(F) (pile tower block lifting process)
Next, as shown in FIG. 5 (a), the steel tower block hanging jack 6, the steel tower block lowering jack 5, and the steel tower block guiding jack 7 are operated to make the first stage steel tower block 2a. Hang it on the ground. That is, while adjusting the steel tower block hanging jack 6 and the steel tower block lowering jack 5, the steel tower block 1a is hung down, the steel tower block guiding jack 7 is stretched near the ground, and the steel tower block 1a is gradually Return to horizontal position and sit on the ground.

(g)(筒身切断撤去工程)
次に、前記(b)工程から前記(f)工程によって、鉄塔2の1段目を解体した後、筒身吊り上げ用ジャッキ4に筒身1の荷重を預けた状態で、筒身1の下部を切断し、撤去する。このときの切断線を、図5(b)中、(D−D)で示す(後述する工程においても同様)。
(G) (incision removal process)
Next, after disassembling the first stage of the steel tower 2 by the process (b) to the process (f), the lower part of the tubular body 1 is loaded with the load of the tubular body 1 by the tubular body lifting jack 4 Disconnect and remove. The cutting line at this time is shown by (D-D) in FIG. 5 (b) (the same applies to the steps described later).

(h)筒身吊り下ろし工程
次に、図5(b)に示すように、筒身吊り上げ用ジャッキ4により筒身1を、その切断撤去毎に地上に吊り下ろす。なお、エレベータシャフト3は、筒身1の切断時に切断して、撤去する。以下の工程においても同様である。
(H) Tube Body Hanging Step Next, as shown in FIG. 5 (b), the cylinder body 1 is suspended by the cylinder body lifting jack 4 on the ground every cutting and removal. The elevator shaft 3 is cut at the time of cutting the cylinder body 1 and removed. The same applies to the following steps.

このようにして、鉄塔2の1段目の解体が終了したら、前記(b)工程から前記(h)工程を、鉄塔2の2段目から4段目に亘って順次、繰り返し行う。   Thus, when the first stage of the steel tower 2 is dismantled, the steps (b) to (h) are repeated sequentially from the second stage to the fourth stage of the steel tower 2.

すなわち、鉄塔2の1段目の解体が終了したら、図5(c)に示すように、筒身吊り上げ用ジャッキ4を据え替えた後、図5(d)に示すように、鉄塔2の2段目の下部と、鉄塔2の3段目の上部とをヒンジ8により連結する。   That is, after dismantling the first stage of the steel tower 2, as shown in FIG. 5 (c), after replacing the jack 4 for lifting the body, as shown in FIG. 5 (d), 2 of the steel tower 2 The lower part of the stage and the upper part of the third stage of the steel tower 2 are connected by a hinge 8.

次に、鉄塔2の2段目を2つの平面形状コ字形の鉄塔ブロック2aに切断する。   Next, the second stage of the steel tower 2 is cut into two square U-shaped steel tower blocks 2a.

次に、図5(d)に示すように、鉄塔ブロック倒し用ジャッキ5と、鉄塔ブロックガイド用ジャッキ7とを操作して、2段目の鉄塔ブロック2aをヒンジ8を支点として下方に倒す。   Next, as shown in FIG. 5 (d), the steel tower block lowering jack 5 and the steel tower block guiding jack 7 are operated to lower the second steel tower block 2a downward with the hinge 8 as a fulcrum.

次に、ヒンジ8を鉄塔2から切り離す。   Next, the hinge 8 is separated from the steel tower 2.

次に、鉄塔ブロック吊り下ろし用ジャッキ6と、鉄塔ブロック倒し用ジャッキ5と、鉄塔ブロックガイド用ジャッキ7とを操作して、2段目の鉄塔ブロック2aを地上に吊り下ろす。   Next, the steel tower block hanging jack 6, the steel tower block lowering jack 5, and the steel tower block guiding jack 7 are operated to suspend the second steel tower block 2a on the ground.

次に、上記工程によって、鉄塔2の2段目を解体した後、筒身吊り上げ用ジャッキ4に筒身1の荷重を預けた状態で、筒身1の下部を切断し、撤去する。   Next, after dismantling the second stage of the steel tower 2 in the above process, the lower part of the cylinder 1 is cut and removed in a state where the load of the cylinder 1 is deposited on the cylinder lifting jack 4.

次に、図5(e)に示すように、筒身吊り上げ用ジャッキ4により筒身1を、その切断撤去毎に地上に吊り下ろす。   Next, as shown in FIG. 5 (e), the cylinder body 1 is suspended by the cylinder body lifting jack 4 on the ground every cutting and removal.

次に、図5(f)に示すように、筒身吊り上げ用ジャッキ4を据え替えた後、図5(g)から図5(j)に示すように、鉄塔2の3段目から4段目についても同様な工程を繰り返し行って、3段目から4段目の鉄塔2を解体する。   Next, as shown in FIG. 5 (f), after replacing the jack 4 for lifting the body, as shown in FIG. 5 (g) to FIG. 5 (j), the third to fourth steps of the steel tower 2 are carried out. The same process is repeated for the eyes, and the third to fourth stages of the steel tower 2 are disassembled.

このようにして、鉄塔2の1段目から4段目の解体が終了したら、図5(k)に示すように、筒身吊り上げ用ジャッキ4により筒身1を、その切断撤去毎に地上に吊り下ろす。   In this way, when the first to fourth steps of dismantling of the steel tower 2 are completed, as shown in FIG. 5 (k), the cylinder 1 is lifted by the cylinder lifting jack 4 and the ground is removed each time it is removed. Hang it down.

次に、図5(l)に示すように、筒身吊り上げ用ジャッキ4を据え替える。   Next, as shown in FIG. 5 (l), the cylinder lifting jack 4 is changed.

次に、図5(m)に示すように、クレーン9により、鉄塔ブロック倒し用ジャッキ5と、鉄塔ブロック吊り下ろし用ジャッキ6とを地上に吊り下ろす。   Next, as shown in FIG. 5 (m), the steel tower block lowering jack 5 and the steel tower block hanging jack 6 are suspended by the crane 9 on the ground.

次に、図5(n)に示すように、筒身1の下部を切断した後、撤去し、この後、筒身吊り上げ用ジャッキ4により筒身1を吊り下ろす。   Next, as shown in FIG. 5 (n), the lower portion of the cylinder body 1 is cut and removed, and then the cylinder body 1 is suspended by the cylinder body lifting jack 4.

次に、図5(o)に示すように、筒身吊り上げ用ジャッキ4を据え替える。   Next, as shown in FIG. 5 (o), the cylinder lifting jack 4 is changed.

次に、図5(p)に示すように、筒身1の下部を切断した後、撤去し、この後、筒身吊り上げ用ジャッキ4により筒身1を吊り下ろす工程を繰り返し行う。   Next, as shown in FIG. 5 (p), the lower part of the cylinder 1 is cut and removed, and then the step of suspending the cylinder 1 with the cylinder lifting jack 4 is repeated.

次に、図5(q)に示すように、筒身頂部1aを撤去する。   Next, as shown in FIG. 5 (q), the tube top 1a is removed.

次に、図5(r)に示すように、クレーン9により、筒身吊り上げ用ジャッキ1bを撤去する。   Next, as shown in FIG. 5 (r), the cylinder lifting jack 1 b is removed by the crane 9.

次に、図5(s)に示すように、鉄塔2の5段目を解体する。   Next, as shown in FIG. 5 (s), the fifth stage of the steel tower 2 is disassembled.

以上のようにして、この発明により鉄塔支持型煙突を解体することができる。   As described above, the tower-supported chimney can be disassembled according to the present invention.

この発明によれば、鉄塔2の1段目と、鉄塔の2段目とをヒンジ8により連結した後、鉄塔2の1段目を2つの鉄塔ブロック2aに切断し、次いで、鉄塔ブロック2aをヒンジ8を支点として鉄塔ブロック倒し用ジャッキ5と鉄塔ブロックガイド用ジャッキ7とにより下方に倒し、次いで、ヒンジ8を鉄塔2から切り離した後、鉄塔ブロック2aを鉄塔ブロック吊り下ろし用ジャッキ6と、鉄塔ブロック倒し用ジャッキ5と、鉄塔ブロックガイド用ジャッキ7とを操作して吊り下ろし、次いで、筒身1の下部を切断した後、筒身1を筒身吊り上げ用ジャッキ4により吊り下ろす工程を繰り返し行うことによって、大型クレーンを使用することなく、鉄塔支持型煙突を容易に安全かつ確実に解体することができる。   According to this invention, after the first stage of the steel tower 2 and the second stage of the steel tower are connected by the hinge 8, the first stage of the steel tower 2 is cut into two steel tower blocks 2a, and then the steel tower block 2a is The hinge 8 is used as a fulcrum to lower the steel block downwards by the steel tower block lowering jack 5 and the steel tower block guide jack 7 and then the hinge 8 is separated from the steel tower 2, and then the steel tower block 2a is suspended for the steel tower block hanging jack 6 The block lowering jack 5 and the steel tower block guide jack 7 are operated and suspended, and then the lower portion of the tubular body 1 is cut, and then the tubular body 1 is repeatedly hung up and down with the tubular lifting jack 4 Thus, the tower-supported chimney can be easily and safely disassembled without using a large crane.

1:筒身
1a:筒身頂部
2:鉄塔
2a:鉄塔ブロック
3:エレベータシャフト
4:筒身吊り上げ用ジャッキ
5:鉄塔ブロック倒し用ジャッキ
6:鉄塔ブロック吊り下ろし用ジャッキ
7:鉄塔ブロックガイド用ジャッキ
8:ヒンジ
9:クレーン
11:筒身
12:鉄塔
15:ジャッキ
16:ガイドローラ
17:補強材
18:補強材
20:切断位置
21:搬送台車
22:レール
30:クローラクレーン
1: Tube body 1a: Tube body top 2: Iron tower 2a: Tower block 3: Elevator shaft 4: Jack for lifting the cylinder 5: Jack for tilting the tower block 6: Jack for lifting the tower block 7: Jack for jack of the tower block guide 8 Reference Signs List: Hinge 9: Crane 11: Body 12: Tower 15: Jack 16: Guide roller 17: Reinforcement 18: Reinforcement 20: Cutting position 21: Transport bogie 22: Rail 30: Crawler crane

Claims (4)

複数本の筒身の周囲に、前記筒身を支持する鉄塔が構築された鉄塔支持型煙突の解体方法において、下記(a)工程から(h)工程を備え、
(a)前記鉄塔の下部に、前記筒身を吊り上げ可能な筒身吊り上げ用ジャッキを設置し、前記筒身の頂部に、切断された鉄塔ブロックをヒンジを支点として倒す鉄塔ブロック倒し用ジャッキと、前記鉄塔ブロックを吊り下ろす鉄塔ブロック吊り下ろし用ジャッキとを設置し、地上に、前記鉄塔ブロック吊り下ろし用ジャッキにより吊り下ろされる前記鉄塔ブロックをガイドする鉄塔ブロックガイド用ジャッキを設置するジャッキ設置工程、
(b)前記鉄塔の上段の下部と、前記鉄塔の次段の上部とをヒンジにより連結する連結工程、
(c)前記鉄塔の上段を複数個の鉄塔ブロックに切断する鉄塔切断工程、
(d)前記鉄塔ブロック倒し用ジャッキと、前記鉄塔ブロックガイド用ジャッキとを操作して、前記鉄塔ブロックを前記ヒンジを支点として下方に倒す鉄塔ブロック倒し工程、
(e)前記ヒンジを前記鉄塔から切り離すヒンジ切り離し工程、
(f)前記鉄塔ブロック吊り下ろし用ジャッキと、前記鉄塔ブロック倒し用ジャッキと、前記鉄塔ブロックガイド用ジャッキとを操作して、前記鉄塔ブロックを吊り下ろす鉄塔ブロック吊り下ろし工程、
(g)前記(b)工程から前記(f)工程によって、前記鉄塔の上段を解体した後、前記筒身吊り上げ用ジャッキに前記筒身の荷重を預けた状態で、前記筒身の下部を切断し、撤去する筒身切断撤去工程、
(h)前記筒身吊り上げ用ジャッキにより前記筒身を吊り下ろす筒身吊り下ろし工程、
前記(b)工程から前記(h)工程を、前記鉄塔の上段から下段に亘って順次、繰り返し行うことを特徴とする、鉄塔支持型煙突の解体方法。
A dismantling method of a tower supporting chimney in which a steel tower supporting the cylindrical body is constructed around a plurality of cylindrical bodies, comprising the following steps (a) to (h):
(A) A jack for lifting a cylinder body which can lift the cylinder body is installed at the lower part of the steel tower, and a steel tower block lowering jack for lowering the cut tower block with a hinge as a fulcrum at the top of the cylinder body; Jack installation step of installing a tower block hanging jack for hanging the tower block and installing a tower block guide jack for guiding the tower block suspended by the tower block hanging jack on the ground;
(B) a connecting step of connecting the lower portion of the upper stage of the steel tower and the upper portion of the next stage of the steel tower by a hinge;
(C) an iron tower cutting process for cutting the upper stage of the steel tower into a plurality of steel tower blocks;
(D) A tower block lowering step of tilting the tower block downward with the hinge as a fulcrum by operating the tower block lowering jack and the tower block guide jack.
(E) a hinge separating step of separating the hinge from the steel tower;
(F) A tower block suspension step of suspending the tower block by operating the jack for hanging the tower block, the jack for laying the tower block, and the jack for guiding the tower block,
(G) After dismantling the upper stage of the steel tower from the step (b) to the step (f), the lower portion of the cylinder body is cut in a state where the load of the cylinder body is deposited on the cylinder body lifting jack Tube removal and removal process to remove and
(H) A tubular body hanging step of suspending and lowering the tubular body by the tubular body lifting jack
A method of disassembling a tower-supported chimney, comprising repeatedly performing the steps (b) to (h) sequentially from the upper stage to the lower stage of the steel tower.
前記筒身は、4本であることを特徴とする、請求項1に記載の、鉄塔支持型煙突の解体方法。   The method for disassembling a tower-supported chimney according to claim 1, wherein the number of the cylindrical body is four. 請求項1または2に記載の発明において、前記鉄塔は、平面形状が正方形であることを特徴とする、請求項1または2に記載の、鉄塔支持型煙突の解体方法。   The method according to claim 1 or 2, wherein the iron tower has a square planar shape. 前記鉄塔ブロックは、平面形状コ字形をなし、2つからなっていることを特徴とする、請求項1から3の何れか1つに記載の、鉄塔支持型煙突の解体方法。   The method for disassembling a tower-supporting chimney according to any one of claims 1 to 3, wherein the tower block has a U-shaped planar shape and consists of two.
JP2017066939A 2017-03-30 2017-03-30 Method of dismantling tower supported chimney Active JP6533550B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017066939A JP6533550B2 (en) 2017-03-30 2017-03-30 Method of dismantling tower supported chimney

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017066939A JP6533550B2 (en) 2017-03-30 2017-03-30 Method of dismantling tower supported chimney

Publications (2)

Publication Number Publication Date
JP2018168601A JP2018168601A (en) 2018-11-01
JP6533550B2 true JP6533550B2 (en) 2019-06-19

Family

ID=64019326

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017066939A Active JP6533550B2 (en) 2017-03-30 2017-03-30 Method of dismantling tower supported chimney

Country Status (1)

Country Link
JP (1) JP6533550B2 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108571183B (en) * 2018-06-11 2023-12-19 威海市华塔建筑机械有限公司 Chimney structure dismantling device and method
CN112144905A (en) * 2020-09-22 2020-12-29 九州职业技术学院 Waste coal storage bin reinforcing method
CN112502472B (en) * 2020-11-27 2022-07-19 上海建工五建集团有限公司 Support bearing capacity conversion device and construction method thereof
CN115354882B (en) * 2022-07-15 2023-08-22 安徽送变电工程有限公司 Method for dismantling ultra-large spanning old electric tower
WO2024157454A1 (en) * 2023-01-27 2024-08-02 三菱重工業株式会社 Method for dismantling construction structure
CN117166816B (en) * 2023-11-03 2024-04-12 北京市第三建筑工程有限公司 Method for dismantling overhanging arc-shaped beam of high-rise building
CN119370754B (en) * 2024-11-08 2025-11-28 中船华南船舶机械广州有限公司 Crane tower body dismounting method

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010242429A (en) * 2009-04-08 2010-10-28 Takenaka Komuten Co Ltd Demolition method for steel tower
JP5737571B2 (en) * 2011-04-18 2015-06-17 古河C&B株式会社 Dismantling method
JP5977216B2 (en) * 2013-09-11 2016-08-24 太平電業株式会社 Demolition method of tower-supported chimney

Also Published As

Publication number Publication date
JP2018168601A (en) 2018-11-01

Similar Documents

Publication Publication Date Title
JP6533550B2 (en) Method of dismantling tower supported chimney
JP5540568B2 (en) Blast furnace furnace body construction and repair method
JP5435569B2 (en) Dismantling equipment and method for dismantling steel tower support
JP5977216B2 (en) Demolition method of tower-supported chimney
CN106086295B (en) Converter jacking apparatus
JP5213381B2 (en) Demolition and construction method of blast furnace hot stove
JP6839681B2 (en) How to dismantle a tower-supported chimney
JP5750362B2 (en) Demolition method for tower structure
CN106011369A (en) Converter trunnion bearing replacing method
JP2012052306A (en) Stack dismantlement method
JP4001332B2 (en) Chimney demolition scaffold device and chimney demolition method using the device
JP6543654B2 (en) Demolition method of collective chimney
CN116498118A (en) Temporary Support Removal Method for Cantilevered Steel Structure Construction
JP5252634B2 (en) Crane updating device and crane updating method using the same
JP6185007B2 (en) Dismantling method of polar crane in reactor containment vessel
JP2019206817A (en) Demolition method for steel tower- supported chimney and demolishing device for steel tower-supported chimney
JP2016176271A (en) Multi-leg steel stack demolition method
US9764932B2 (en) Jacking tower installation system
JP5989688B2 (en) Dismantling method for reactor pressure vessel
JP6159197B2 (en) Steel tower dismantling method and dismantling apparatus
JP5953404B1 (en) Dismantling method of multi-legged steel chimney
JP6285386B2 (en) Dismantling method of multi-legged steel chimney
JP5941696B2 (en) Storage tank dismantling method and construction method, and dismantling or construction equipment
JP2021080772A (en) Tower-shaped structure dismantling method and tower-shaped structure dismantling device
JP6650918B2 (en) Dismantling method of floating roof type circular tank

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20190418

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20190507

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20190524

R150 Certificate of patent or registration of utility model

Ref document number: 6533550

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250