Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP6534005B2 - Suspension support structure for piping provided with a plurality of piping suspension supports - Google Patents
[go: Go Back, main page]

JP6534005B2 - Suspension support structure for piping provided with a plurality of piping suspension supports - Google Patents

Suspension support structure for piping provided with a plurality of piping suspension supports Download PDF

Info

Publication number
JP6534005B2
JP6534005B2 JP2017168215A JP2017168215A JP6534005B2 JP 6534005 B2 JP6534005 B2 JP 6534005B2 JP 2017168215 A JP2017168215 A JP 2017168215A JP 2017168215 A JP2017168215 A JP 2017168215A JP 6534005 B2 JP6534005 B2 JP 6534005B2
Authority
JP
Japan
Prior art keywords
support
suspension
piping
suspension support
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2017168215A
Other languages
Japanese (ja)
Other versions
JP2019044853A (en
Inventor
隆次郎 渋谷
隆次郎 渋谷
Original Assignee
株式会社アカギ
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社アカギ filed Critical 株式会社アカギ
Priority to JP2017168215A priority Critical patent/JP6534005B2/en
Publication of JP2019044853A publication Critical patent/JP2019044853A/en
Application granted granted Critical
Publication of JP6534005B2 publication Critical patent/JP6534005B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)
  • Connection Of Plates (AREA)
  • Clamps And Clips (AREA)

Description

本発明は複数の配管吊下支持具を具備する配管の吊下支持構造に関し、詳しくは天井スラブやトンネル天井等の取付面に、各種配管類を数mから数十m以上に及ぶ長尺スパンで吊下支持する複数の配管吊下支持具を具備する配管の吊下支持構造に関する。
The present invention relates to a suspension support structure for piping provided with a plurality of piping suspension supports, and more specifically, a long span of various piping ranging from several meters to several tens of meters or more on a mounting surface such as a ceiling slab or a tunnel ceiling. BACKGROUND OF THE INVENTION The present invention relates to a suspension support structure for piping provided with a plurality of piping suspension supports suspendedly supported .

天井スラブやトンネル天井等の取付面に各種配管類を吊下支持するには、例えば、特許文献1〜3等に示すような、吊りボルトと配管バンドとから成る支持構成を一組とする同構成の吊下支持具、或いは、斜めに垂設した1本又は2本の吊下支持杆を更に付加した支持構成を一組とする同構成の吊下支持具を、数mないし数十m間隔で複数個配設することにより行われている。   In order to suspend and support various types of piping on mounting surfaces such as ceiling slabs and tunnel ceilings, for example, as shown in Patent Documents 1 to 3 and the like, a supporting structure consisting of a suspending bolt and a piping band is regarded as one set. The suspension support having the configuration or the suspension support having the same configuration as a set of support configurations additionally including one or two suspension support rods hanging obliquely is several meters to several tens of meters It is carried out by arranging plural pieces at intervals.

上記の吊下支持構成は、たとえ数百mないし数百m以上に及ぶトンネル内配管等のように超長尺スパンにおける吊下支持であっても、前記したような同構成の配管支持具を多数個用いることにより行われている。   The above-described suspension support configuration is the same as the above-described piping support even if it is a suspension support in an ultra-long span, such as in-tunnel piping ranging from several hundred meters to several hundred meters or more. It is carried out by using many pieces.

特開2004−150452号JP 2004-150452 実用新案登録第2524340号Utility model registration No. 2524340 登録実用新案第3148361号Registered Utility Model No. 3148361

同構成の配管支持具を長尺スパンにおいて複数個ないし多数個用いて吊下支持した場合、地震等の揺れが発生すると、配管軸方向の振動負荷と配管軸直交方向の振動負荷とが同時に生じることに加えて、捻れを含む軸線回り方向に傾動・揺動する負荷・モーメント・応力・歪等をも生じることになり、揺れを収束させることができないことが多いだけでなく、複数個ないし多数個の配管支持具に掛かる負荷・モーメント・応力・歪等が同調して増幅されてしまうこともあり、配管支持具に歪みや破損が生じ易く、耐震強度の点で問題が起き易いことが判った。   When a plurality of or a plurality of piping supports of the same configuration are suspended and supported using a long span, vibration load in the axial direction of the pipe and vibration load in the orthogonal direction of the pipe axis simultaneously occur when vibration such as earthquake occurs. In addition to twisting, it also causes loads, moments, stresses, strains, etc. that tilt and swing in the direction of the axis, including twisting, and in many cases it is not possible to converge swings, The load, moment, stress, strain, etc. applied to each piping support may be synchronized and amplified, so it is easy to cause distortion or breakage in the piping support, and it is known that problems are likely to occur in terms of earthquake resistance. The

そこで本発明の課題は、トンネル天井への長尺スパンにおける配管吊下支持であっても地震時の防震性及び耐震性の高い複数の配管吊下支持具を具備する配管の吊下支持構造を提供することにある。
尚、本発明において「防震」、「耐震」は「防振」、「耐振」を含むものとする。
Therefore, an object of the present invention is to provide a pipe suspension support structure having a plurality of pipe suspension supports having high seismic resistance and earthquake resistance even in the case of a suspended pipe support in a long span to a tunnel ceiling. It is to provide.
In the present invention, “seismic” and “seismic” include “anti-vibration” and “anti-vibration”.

上記課題を解決する本発明は下記構成を有する。   The present invention which solves the above-mentioned subject has the following composition.

1.配管を抱持するバンド抱持部と、該バンド抱持部の開放両端部に連設されたバンド端部とを有し、天井スラブやトンネル天井等の取付面から吊り下げられる吊りボルトに、タンバックルの如き吊下接続部材を介して前記バンド端部を接続することにより、配管の1点吊下支持構成を有する配管吊下支持具と、
配管を抱持するバンド抱持部と、該バンド抱持部の左側方部から左横方向外側に延伸した状態で設けられた左係止部とを有し、この左係止部には透孔が形成され、この透孔に、前記取付面であって配管軸方向の左前方位置と左後方位置に一端が固定されて斜めに吊下げられる2本の吊りボルトの如き左前方吊下支持杆・左後方吊下支持杆の各々の他端が直接又は間接的に接続取付された状態で係合されることにより、配管の左方向における斜め2点吊下支持が可能な構成の左サポート支持構成を有する配管吊下支持具と、
配管を抱持するバンド抱持部と、該バンド抱持部の右側方部から右横方向外側に延伸した状態で設けられた右係止部とを有し、この右係止部には透孔が形成され、この透孔に、前記取付面であって配管軸方向の右前方位置と右後方位置に一端が固定されて斜めに吊下げられる2本の吊りボルトの如き右前方吊下支持杆・右後方吊下支持杆の各々の他端が直接又は間接的に接続取付された状態で係合されることにより、配管の右方向における斜め2点吊下支持が可能な構成の右サポート支持構成を有する配管吊下支持具と、
を有して成り、
左サポート支持構成を有する配管吊下支持具と、右サポート支持構成を有する配管吊下支持具とを、配管軸方向において、間に1点吊下支持構成を有する配管吊下支持具を挟んだ状態で交互に吊下配設する構成を、配管すべき略全域に亘って繰り返して配設することによって、1点吊下支持構成を挟んで隣接する2種類の斜め2点吊下支持構成である左サポート支持構成・右サポート支持構成を有する配管吊下支持具同士が平面視した際に配管軸方向において対称の斜め吊下支持構成を有する構成であること、
を特徴とする複数の配管吊下支持具を具備する配管の吊下支持構造
1. A suspension bolt for retaining piping and a band end connected to the open ends of the suspension band, and a suspension bolt suspended from a mounting surface such as a ceiling slab or a tunnel ceiling, A piping suspension support having a one-point suspension support structure for piping by connecting the band end portion via a suspension connection member such as a tan buckle;
A band holding portion for holding a pipe, and a left locking portion provided so as to extend outward in the left lateral direction from the left side portion of the band holding portion. A left front suspension support such as two suspension bolts which are formed with holes and whose one end is fixed at the mounting surface and at the left front position and the left rear position in the axial direction of the pipe in this through hole Left support for left diagonal support in the left direction of piping by engaging with the other end of each of the rod and left rear hanging support rod directly or indirectly connected and attached A pipe suspension support having a support configuration;
A band holding portion for holding a pipe, and a right locking portion provided in a state of extending laterally outward from the right side of the band holding portion, the right locking portion Right front suspension support such as two suspension bolts which are formed with holes and whose one end is fixed at the mounting surface and at the right front position and the right rear position in the axial direction of the pipe in this through hole Right support with support for diagonal two-point suspension in the right direction of piping by being engaged with the other end of each of the right and left hanging support rods directly or indirectly connected and attached A pipe suspension support having a support configuration;
Consists of
A piping suspension support having a left support support configuration and a piping suspension support having a right support support configuration are sandwiched between the piping suspension support having a one-point suspension support configuration in the axial direction of the piping By alternately arranging the hanging arrangement alternately in the state over the entire area to be plumbed, two diagonal two-point hanging supporting arrangements adjacent to each other across the one-point hanging supporting arrangement are provided. The piping suspension supports having a certain left support support configuration and right support support configuration have a configuration having an oblique suspension support configuration symmetrical in the piping axis direction when viewed in plan view,
A suspension support structure for piping comprising a plurality of piping suspension supports characterized by the above .

2.前記左係止部・右係止部の各々の透孔に、少なくとも2つの透孔を有する板状部材から成る接続板部材が接続取付された状態であり、
左係止部に接続される接続板部材の2つの透孔に、前記左前方吊下支持杆・左後方吊下支持杆の各々の他端が挿通されてナット螺合された状態であり、
右係止部に接続される接続板部材の2つの透孔に前記右前方吊下支持杆・右後方吊下支持杆の各々の他端が挿通されてナット螺合された状態であること、
と特徴とする上記1に記載の複数の配管吊下支持具を具備する配管の吊下支持構造
2. A connecting plate member formed of a plate-like member having at least two through holes is connected and attached to the through holes of each of the left locking portion and the right locking portion,
The other end of each of the left front suspension support rod and the left rear suspension support rod is inserted into the two through holes of the connection plate member connected to the left locking portion and is screwed with a nut,
The other end of each of the right front suspension support rod and the right rear suspension support rod is inserted into the two through holes of the connection plate member connected to the right locking portion and screwed into a nut,
A suspension support structure for a pipe comprising the plurality of pipe suspension supports according to the above 1).

3.前記左係止部・右係止部の各々の透孔が2つの透孔から成り、
左係止部の2つの透孔の、一方の透孔に前記左前方吊下支持杆の他端が挿通されてナット螺合された状態であると共に、他方の透孔に前記左後方吊下支持杆の他端が挿通されてナット螺合された状態であり、
右係止部の2つの透孔の、一方の透孔に前記右前方吊下支持杆の他端が挿通されてナット螺合された状態であると共に、他方の透孔に前記右後方吊下支持杆の他端が挿通されてナット螺合された状態であること、
を特徴とする上記1に記載の複数の配管吊下支持具を具備する配管の吊下支持構造
3. Each through hole of the left locking portion and the right locking portion comprises two through holes,
The other end of the left front suspension support rod is inserted into one of the two through holes of the left locking portion and screwed into a nut, and the left rear is suspended in the other through hole. The other end of the support rod is inserted and screwed into a nut,
The other end of the right front suspension support rod is inserted into one through hole of the two through holes of the right locking portion and is screwed with a nut, and the other through hole is suspended in the right rear The other end of the support rod is inserted and screwed into a nut,
A suspension support structure for piping comprising the plurality of piping suspension supports according to 1 above, characterized in that

4.上接続板と下接続板との2枚一組から成る板状部材の各々が両端に透孔を有し、一端の透孔部分において上接続板と下接続板とを前記一端の透孔を連通させた状態で重層すると共に、この重層する一端の透孔を更に前記左係止部の透孔と連通させた状態でボルト・ナットにより螺合接続し、且つ、上接続板・下接続板の他端の透孔に、前記左前方吊下支持杆・左後方吊下支持杆の他端が挿通されてナット螺合接続する構成であり、
上記構成を有する2枚一組の上接続板・下接続板を更に一組用いて、一端の透孔部分において上接続板と下接続板とを前記一端の透孔を連通させた状態で重層すると共に、この重層する一端の透孔を更に前記右係止部の透孔と連通させた状態でボルト・ナットにより螺合接続し、且つ、上接続板・下接続板の他端の透孔に、前記右前方吊下支持杆・右後方吊下支持杆の他端が挿通されてナット螺合接続する構成であること、
を特徴とする上記1に記載の複数の配管吊下支持具を具備する配管の吊下支持構造
4. Each of the plate members consisting of a pair of upper connection plate and lower connection plate has through holes at both ends, and the upper connection plate and lower connection plate at the through hole portion of one end are the through holes of the one end Overlapping in a communication state and screwing connection by means of a bolt and a nut in a state in which the through hole at one end of the layer is further communicated with the through hole of the left locking portion, and an upper connecting plate and a lower connecting plate The other end of the left front suspension support rod and the other end of the left rear suspension support rod are inserted into the through hole at the other end of the connector for nut screw connection,
The upper connection plate and the lower connection plate having the above-mentioned configuration are further combined into one layer, and the upper connection plate and the lower connection plate are communicated at the one end through the through hole portion. In addition, in a state where the through-hole at one end to be superimposed is further communicated with the through-hole of the right locking portion, screw connection is performed by a bolt and a nut, and the through-hole at the other end of the upper connection plate and lower connection plate And the other end of the right front suspension support rod and the right rear suspension support rod are inserted through and screw connected.
A suspension support structure for piping comprising the plurality of piping suspension supports according to 1 above, characterized in that

5.前記上接続板と下接続板が、同形・同大の同一構成であることを特徴とする上記4に記載の複数の配管吊下支持具を具備する配管の吊下支持構造
5. The suspension support structure for piping comprising the plurality of piping suspension supports according to the above 4, wherein the upper connection plate and the lower connection plate have the same configuration and the same configuration.

6.前記上接続板と下接続板との重層する一端の透孔に挿通したボルトに、該ボルトの螺旋部分に噛合うことによって該ボルトの透孔からの脱落を防止するボルトの脱落防止具が取り付けられる構成であることを特徴とする上記5に記載の複数の配管吊下支持具を具備する配管の吊下支持構造
6. The bolt inserted in the through hole at one end of the upper connection plate and the lower connection plate is attached to the bolt drop prevention device for preventing the bolt from falling out of the through hole by meshing with the spiral portion of the bolt A pipe suspension support structure comprising the plurality of pipe suspension supports according to 5 above, characterized in that

7.左サポート支持構成を有する配管吊下支持具・右サポート支持構成を有する配管吊下支持具の各々のバンド抱持部が、相対向する半円形状の2つのバンド抱持部が円形に組合うことによって配管を抱持可能であり、該2つのバンド抱持部の各々の一端に左係止部・右係止部が連設された状態で設けられており、且つ該2つのバンド抱持部の各々の他端が組式又は蝶番式の如き接続部により拡開可能に接続された構成であることを特徴とする上記1〜6のいずれかに記載の複数の配管吊下支持具を具備する配管の吊下支持構造
7. The band holding portion of each of the pipe suspension support having the left support support configuration and the pipe suspension support having the right support support configuration has two semicircular band holding portions facing each other in a circular shape. And the left locking portion and the right locking portion are connected to one end of each of the two band holding portions, and the two band holding portions are provided. The plurality of pipe suspension supports according to any one of the above 1 to 6, characterized in that the other end of each of the parts is connected so as to be spreadable by a connecting part such as a combination type or a hinge type. Suspension support structure for equipped piping .

8.左サポート支持構成を有する配管吊下支持具・右サポート支持構成を有する配管吊下支持具の各々のバンド抱持具が一本の帯状バンド体を環状に彎曲することによって配管を抱持可能であり、この帯状バンド体の開放両端部に左係止部・右係止部が連設された構成であることを特徴とする上記1〜6のいずれかに記載の複数の配管吊下支持具を具備する配管の吊下支持構造
8. Each of the band holders of the pipe suspension support having the left support support configuration and the pipe suspension support having the right support support configuration can hold the pipe by curving one strip band body The plurality of pipe suspension supports according to any one of the above 1 to 6, characterized in that the left locking portion and the right locking portion are continuously provided at the open both end portions of the band-shaped band body. Suspension support structure for piping equipped with

請求項1に示す発明によれば、トンネル天井への長尺スパンにおける配管吊下支持であっても地震時の防震性及び耐震性の高い複数の配管吊下支持具を具備する配管の吊下支持構造を提供することができる。
According to the first aspect of the present invention, the suspension of piping having a plurality of piping suspension supports having high seismic resistance and earthquake resistance even in the event of an earthquake even if the piping suspension is supported by the long span to the tunnel ceiling A support structure can be provided.

特に、2種類の斜め2点吊下支持構成(左サポート支持構成・右サポート支持構成)を有する配管吊下支持具を、配管軸方向において、間に1点吊下支持構成を有する配管吊下支持具を挟んだ状態で交互に吊下配設した構成とすることによって、1点吊下支持構成を挟んで隣接する2種類の斜め吊下支持構成を有する配管吊下支持具同士が平面視した際に配管軸方向において対称の斜め2点吊下支持構成となるので、配管軸方向の振動負荷と配管軸直交方向の振動負荷とが同時に生じることに加えて、捻れを含む軸線回り方向に傾動・揺動する負荷・モーメント・応力・歪等をも生じた場合であっても、様々な方向における揺れを対称構成の2種類の斜め2点吊下支持構成が互いに打ち消す作用効果を発揮し、揺れを収束させることができる。従って、長尺スパンにおける配管吊下支持であっても、複数個ないし多数個の配管支持具に掛かる負荷・モーメント・応力・歪等が同調して増幅されてしまうことを抑制することができ、配管支持具に歪みや破損が生じ難いという効果を有している。また、地震時に震源地の違いによって地震波の入射方向が変わっても、様々な振動方向にも対処することができるという、本発明に係る特定の2種類の斜め2点吊下支持構成による相乗効果を有している。   In particular, a piping suspension support having two types of diagonal two-point suspension support configurations (left support support configuration and right support support configuration) is suspended in the piping axis direction by one-point suspension support configuration By adopting a configuration in which the support members are alternately hung in a state in which the support is sandwiched, the pipe suspension supports having two types of diagonally suspended support configurations adjacent to each other with the one-point suspended support configuration in plan view Since the diagonal two-point suspension support configuration is symmetrical in the pipe axis direction when carrying out, in addition to the vibration load in the pipe axis direction and the vibration load in the pipe axis orthogonal direction simultaneously being generated, Even when tilting, swinging load, moment, stress, strain, etc. are generated, the two diagonal two-point suspension support configurations of the symmetrical configuration mutually cancel out the swing in various directions. Can converge the shakingTherefore, even in the case of the suspension suspension support in the long span, it is possible to suppress that the load, the moment, the stress, the strain and the like applied to a plurality or a plurality of piping supports are synchronized and amplified. It has the effect that distortion and breakage do not easily occur in the piping support. In addition, even if the incident direction of the seismic wave is changed due to the difference of the hypocenter at the time of earthquake, various vibration directions can be dealt with, and the synergetic effect by the two kinds of two diagonal suspension support configurations according to the present invention have.

また、吊りボルトと配管支持バンドとによる通常の1点吊下支持構成を有する既存の配管設備に、上記した2種類の斜め2点吊下支持構成を有する配管吊下支持具を付加することによって本発明と同様の斜め2点吊下支持構成を有する配管吊下支持具とすることもできる。この場合、既存の1点吊下支持構成を本発明の1点吊下支持構成と見做すことができる。また、既存の1点吊下支持構成の間に、本発明の全ての構成を付加することもできる。即ち、本発明において、間に配設される1点吊下支持構成を有する配管吊下支持具は、少なくとも1つあればよく、1つあったり、2つ以上あったり、混在していてもよい。   In addition, by adding the above-described two types of diagonal suspension supporting structure having diagonal two points suspension to the existing piping installation having a usual one point suspension supporting configuration by the suspension bolt and the piping support band It is also possible to provide a pipe suspension support having an oblique two-point suspension support configuration similar to that of the present invention. In this case, the existing one-point suspension support structure can be regarded as the one-point suspension support structure of the present invention. Also, all of the configurations of the present invention can be added between existing single point suspension support configurations. That is, in the present invention, at least one pipe hanging support having a one-point hanging support structure disposed between can be one, one, two or more, or mixed. Good.

以上の効果によって、配管支持具や吊りボルト等の配管支持構成のみならず、配管そのもの、配管の接続部分・継手部分の歪み・損傷・破損等を著しく抑制することができるので、一箇所の被災が全システムに影響を及ぼす水道管等に代表されるライフラインに特に有用である。   By the above effects, not only the piping support structure such as the piping support and the suspension bolt but also distortion, damage, breakage, etc. of the piping itself, the connecting portion of the piping, and the joint portion can be remarkably suppressed. Is particularly useful for lifelines represented by water pipes and the like that affect the entire system.

請求項2に示す発明によれば、左係止部に左前方吊下支持杆・左後方吊下支持杆を、右係止部に右前方吊下支持杆・右後方吊下支持杆を、各々接続板部材を介して間接的に係合接続することができるので防振(防震)性を発揮した状態での複数点吊下支持が得られる。   According to the second aspect of the present invention, the left locking portion has a left front suspension support rod / left rear suspension support rod, and the right locking portion has a right front suspension support rod / right rear suspension support rod. Since each can be engaged and connected indirectly via the connecting plate members, multiple point suspension support can be obtained in the state of exhibiting anti-vibration properties.

請求項3に示す発明によれば、左係止部に左前方吊下支持杆・左後方吊下支持杆を、右係止部に右前方吊下支持杆・右後方吊下支持杆を、各々直接係合接続することができるので防振(防震)性を発揮した状態での複数点吊下支持が得られる。   According to the invention as set forth in claim 3, the left locking portion is a left front suspension support rod / left rear suspension support rod, and the right locking portion is a right front suspension support rod / right rear suspension support rod. Since each can be directly engaged and connected, multiple point suspension support can be obtained in a state of exhibiting anti-vibration (shockproof) performance.

請求項4に示す発明によれば、左係止部・右係止部の各々に2枚の板状部材から成る上接続板・下接続板を一端を重合させた状態で接続し、この上接続板・下接続板の他端に各吊下支持杆を係合接続することにより、防振(防震)性を発揮した状態での複数点吊下支持が得られる。しかも、上接続板・下接続板は一端を重合させた際の2枚の重合角度を吊下支持杆の斜め吊下支持の角度に応じて変更することができるので、より安定した状態での複数点吊下支持が得られる。   According to the invention described in claim 4, the upper connecting plate and the lower connecting plate consisting of two plate members are connected to each of the left locking portion and the right locking portion in a state where one end is superposed, By engaging and connecting each suspension support rod to the other end of the connection plate and the lower connection plate, a multipoint suspension support can be obtained in a state of exhibiting anti-vibration (shockproof) performance. Moreover, since the upper connecting plate and the lower connecting plate can change the polymerization angle of the two sheets when one end is polymerized according to the angle of the diagonal suspension support of the suspension support rod, the more stable state Multiple point suspension support is obtained.

請求項5に示す発明によれば、上接続板と下接続板とを全く同一構成の板部材を用いる構成なので、この2枚を重層する上下関係に注意を払うことなく、どちらが上でも下でも接続板部材として機能する。更に、その製造に際しては、金型等の製造設備が一種でよいために生産効率が高く、製造コストを下げることができ、一種類の板部材のみが製造されるため在庫管理・発注受注管理・納品管理が容易である。   According to the invention as set forth in claim 5, since the upper connecting plate and the lower connecting plate are configured using plate members having the same configuration completely, without paying attention to the upper / lower relationship of overlaying the two sheets, either is above or below It functions as a connecting plate member. Furthermore, in the case of the manufacturing, since the manufacturing equipment such as a mold may be one kind, the production efficiency is high, the manufacturing cost can be reduced, and only one type of plate member is manufactured. Delivery management is easy.

請求項6に示す発明によれば、上接続板と下接続板との重層部分の透孔に挿通したボルトにクリップ等の脱落防止具を装着することによってナットを外してもボルトが透孔から脱落することを防止できる。従って、取付け作業における作業性が良好であり、ボルト等のパーツ落下や紛失等を抑制することができるので、作業効率が高いだけでなく安全性向上にも寄与する。   According to the invention as set forth in claim 6, the bolt is inserted from the through hole even if the nut is removed by attaching the dropout preventing tool such as a clip to the bolt inserted through the through hole of the upper connecting plate and the lower connecting plate. It can prevent falling off. Therefore, the workability in the mounting operation is good, and it is possible to suppress the dropping or loss of parts such as bolts, which contributes not only to high working efficiency but also to improvement in safety.

請求項7に示す発明によれば、一般的な組式の配管支持バンドをそのまま利用することもできるので容易に且つ低コストで提供することが可能である。   According to the seventh aspect of the present invention, since a general assembly type piping support band can be used as it is, it can be provided easily and at low cost.

請求項8に示す発明によれば、一般的な提灯式の配管支持バンドをそのまま利用することもできるので容易に且つ低コストで提供することが可能である。   According to the eighth aspect of the present invention, since a general lantern type piping support band can be used as it is, it can be provided easily and at low cost.

本発明に係る配管吊下支持具の使用状態の実施例を示す概略側面図(配管軸直交方向の側面から見た図)The schematic side view which shows the Example of use condition of the piping suspension support which concerns on this invention (figure seen from the side surface of piping axis orthogonal direction) 図1の概略平面図(配管軸直交方向である上方から見た図(II−II線方向平面図))A schematic plan view of FIG. 1 (a view from above which is a direction perpendicular to the piping axis (plan view in the direction of the line II-II)) 図1の左サポート支持構成を有する配管吊下支持具のみの概略正面図(配管軸方向から見た図)Schematic front view of only the piping suspension support having the left support support configuration of FIG. 1 (viewed from the piping axial direction) 図1の右サポート支持構成を有する配管吊下支持具のみの概略正面図(配管軸方向から見た図)Schematic front view of only the piping suspension support having the right support support configuration of FIG. 1 (viewed from the piping axial direction) 図1の1点吊下支持構成を有する配管吊下支持具のみの概略正面図(配管軸方向から見た図)Schematic front view of only the piping suspension support having the one-point suspension support configuration of FIG. 1 (viewed from the piping axial direction) 左係止部(右係止部)と左前方吊下支持杆(右前方吊下支持杆)・左後方吊下支持杆(右後方吊下支持杆)の接続構成の一例を示す要部拡大側面図Main part enlargement showing an example of the connection configuration of the left locking portion (right locking portion) and the left front suspension support rod (right front suspension support rod) / left rear suspension support rod (right rear suspension support rod) Side view 左係止部(右係止部)と左前方吊下支持杆(右前方吊下支持杆)・左後方吊下支持杆(右後方吊下支持杆)の接続構成の他の例を示す要部拡大側面図It is necessary to show another example of the connection configuration of the left locking part (right locking part) and the left front suspension support rod (right front suspension support rod) / left rear suspension support rod (right rear suspension support rod) Part side view 右係止部(左係止部)と右前方吊下支持杆(左前方吊下支持杆)・右後方吊下支持杆(左後方吊下支持杆)の接続構成の更に他の例を示す要部概略平面図The other example of the connection composition of a right stop part (left stop part), a right front suspension support rod (left front suspension support rod) and a right rear suspension support rod (left rear suspension support rod) is shown. Main part schematic plan view 図8の上接続板と下接続板とを重ね合わせた状態を示す側面図The side view which shows the state which piled up the upper connection board of FIG. 8, and the lower connection board 図8の上接続板と下接続板とを一端部分において重層した状態を示す底面図Bottom view showing a state in which the upper connection plate and the lower connection plate of FIG. 8 are overlaid at one end portion

次に、添付の図面に従って本発明を詳細に説明する。   The present invention will now be described in detail according to the attached drawings.

本発明に係る複数の配管吊下支持具を具備する配管の吊下支持構造は、天井スラブやトンネル天井等の取付面に、給水管、排水管、送風管等の各種配管類を数mから数十mに及び長尺スパン、或いは数百m以上に及ぶ超長尺スパンで吊下支持するものであり、配管を抱持した配管バンドを取付面から垂設された釣りボルトと取付面から斜めに垂設した吊下支持杆とによって防振(防震)状態で多点吊下支持する支持構成を1組の吊下支持具とし、この吊下支持具を数mないし数十m間隔で複数個配設する構成である。 The suspension support structure of the pipe comprising the plurality of pipe suspension supports according to the present invention comprises various pipes such as a water supply pipe, a drainage pipe, and a blower pipe from several meters on the mounting surface such as a ceiling slab or a tunnel ceiling. It is suspended and supported by a long span of several tens of meters, or an ultralong span of several hundreds of meters or more, and a piping band holding piping from a mounting bolt hanging from the mounting surface and the mounting surface A support structure that supports multiple points in an anti-vibration (shockproof) state by a hanging support rod that is vertically installed is used as a set of suspension supports, and this suspension supports are separated by several meters to several tens of meters. It is the structure which arranges plural pieces.

固定支持する種々の配管としては、一般的な鋼管の他、鋼管に代わって近年多く用いられるようになった合成樹脂管(ポリエチレン管、架橋ポリエチレン管、ポリブデン管、塩化ビニル管、プロピレン管、ABS管等)の固定支持にも有効である。   In addition to general steel pipes, synthetic resin pipes (polyethylene pipes, cross-linked polyethylene pipes, polybudden pipes, vinyl chloride pipes, propylene pipes, ABS pipes, etc. that have come to be widely used in recent years in place of steel pipes as various pipes fixed and supported. It is also effective for the fixed support of the pipe etc.).

本発明の配管吊下支持具1の具体的構成としては、図1〜図5に示すように、
配管Pを抱持するバンド抱持部11と、該バンド抱持部11の開放両端部に連設されたバンド端部13・13とを有し、天井スラブやトンネル天井等の取付面2から吊り下げられる吊りボルト3に、タンバックルの如き吊下接続部材31を介して前記バンド端部13・13を接続することにより、配管Pの1点吊下支持構成Nを有する配管吊下支持具1と、
配管Pを抱持するバンド抱持部11と、該バンド抱持部11の左側方部から左横方向外側に延伸した状態で設けられた左係止部14とを有し、この左係止部14には透孔が形成され、この透孔に、前記取付面2であって配管軸方向の左前方位置と左後方位置に一端が固定されて斜めに吊下げられる2本の吊りボルトの如き左前方吊下支持杆6・左後方吊下支持杆7の各々の他端が直接又は間接的に接続取付された状態で係合されることにより、配管Pの左方向における斜め2点吊下支持が可能な構成の左サポート支持構成Lを有する配管吊下支持具1と、
配管Pを抱持するバンド抱持部11と、該バンド抱持部11の右側方部から右横方向外側に延伸した状態で設けられた右係止部15とを有し、この右係止部15には透孔が形成され、この透孔に、前記取付面2であって配管軸方向の右前方位置と右後方位置に一端が固定されて斜めに吊下げられる2本の吊りボルトの如き右前方吊下支持杆8・右後方吊下支持杆9の各々の他端が直接又は間接的に接続取付された状態で係合されることにより、配管Pの右方向における斜め2点吊下支持が可能な構成の右サポート支持構成Rを有する配管吊下支持具1と、
を有して成り、
左サポート支持構成Lを有する配管吊下支持具1と、右サポート支持構成Rを有する配管吊下支持具1とを、間に1点吊下支持構成Nを有する配管吊下支持具1を挟んだ状態で交互に吊下配設する構成を、配管すべき略全域に亘って繰り返して配設することによって、1点吊下支持構成Nを挟んで隣接する2種類の斜め2点吊下支持構成である左サポート支持構成L・右サポート支持構成Rを有する配管吊下支持具1・1同士が平面視した際に配管軸方向において対称の斜め吊下支持構成を有する構成であること、
を主構成とするものである。
As a concrete composition of piping suspension support 1 of the present invention, as shown in Drawing 1-Drawing 5,
A band holding portion 11 for holding the pipe P and band end portions 13 and 13 connected to the open both end portions of the band holding portion 11 from the attachment surface 2 such as a ceiling slab or a tunnel ceiling A piping suspension support having a one-point suspension support structure N of piping P by connecting the band ends 13 and 13 to the suspension bolt 3 to be suspended via a suspension connection member 31 such as a tan buckle. 1 and
A band holding portion 11 for holding the pipe P, and a left locking portion 14 provided so as to extend outward in the left lateral direction from the left side portion of the band holding portion 11, and this left locking A through hole is formed in the portion 14, and in the through hole, one end of the mounting surface 2 is fixed to the left front position and the left rear position in the axial direction of the pipe, and the two suspension bolts suspended obliquely Such that the other end of each of the left front suspension support rod 6 and the left rear suspension support rod 7 is engaged directly or indirectly connected and attached, the diagonal two-point suspension in the left direction of the pipe P A pipe suspension support 1 having a left support support configuration L configured to be able to be supported below;
A band holding portion 11 for holding the pipe P, and a right locking portion 15 provided in a state of extending outward in the right lateral direction from the right side portion of the band holding portion 11, and this right locking A through hole is formed in the portion 15, and in the through hole, one end of the mounting surface 2 is fixed to the right front position and the right rear position in the axial direction of the pipe, and the two suspension bolts suspended obliquely Such that the other end of each of the right front suspension support rod 8 and the right rear suspension support rod 9 is engaged in a directly or indirectly connected and attached state, the diagonal two-point suspension of the pipe P in the right direction A pipe suspension support 1 having a right support support configuration R configured to be able to be supported below,
Consists of
The pipe suspension support 1 having the left support support structure L and the pipe suspension support 1 having the right support support structure R are sandwiched between the pipe suspension support 1 having the one point suspension support structure N. Two types of diagonal two-point suspension supports adjacent to each other across the one-point suspension support configuration N by repeatedly arranging the configuration in which the suspension arrangement is alternately arranged in the warped state over substantially the entire area to be piping When the pipe suspension supports 1 and 1 having the left support support configuration L and the right support support configuration R are in plan view, they have a configuration having a diagonal suspension support configuration symmetrical in the pipe axis direction,
The main component is

尚、左サポート支持構成Lを有する配管吊下支持具1の左係止部14の透孔への左前方吊下支持杆6・左後方吊下支持杆7の各一端の接続取付は、図1〜図3に示す本実施例においてはナット61・ナット71の螺合によって行われ、右サポート支持構成Rを有する配管吊下支持具1の右係止部15の透孔への右前方吊下支持杆8・右後方吊下支持杆9の各一端の接続取付は、図1、図2、図4に示す本実施例においてはナット81・ナット91の螺合によって行われる。   The connection attachment of each end of the left front suspension support rod 6 and the left rear suspension support rod 7 to the through hole of the left locking portion 14 of the piping suspension support 1 having the left support support structure L is shown in FIG. In the present embodiment shown in FIGS. 1 to 3, the right front suspension to the through hole of the right locking portion 15 of the pipe suspension support 1 which is performed by screwing the nut 61 and the nut 71 and has the right support support configuration R Connection and attachment of each end of the lower support rod 8 and the right rear hanging support rod 9 are performed by screwing of a nut 81 and a nut 91 in the embodiment shown in FIG. 1, FIG. 2 and FIG.

尚また、符号16は吊下接続部材31にバンド端部13・13を接続固定するためのボルト・ナットを示し、符号12は2つのバンド抱持部11・11の下端部分を接続する組式又は蝶番式(本実施例では蝶番式)の如き接続部を示す。   Reference numeral 16 denotes a bolt and a nut for connecting and fixing the band ends 13 and 13 to the hanging connection member 31, and reference numeral 12 denotes a combination type for connecting lower end portions of the two band holding portions 11 and 11. Or a connection such as hinged (in this example, hinged).

以下、本発明の構成について更に詳説する。   Hereinafter, the configuration of the present invention will be described in more detail.

本発明の配管吊下支持具1は、この種の配管吊下支持具に用いられる材料として公知公用のものを特別の制限なく用いることができ、好ましくはステンレスやその他の金属製である。   The piping suspension support 1 of the present invention can be used as a material used for this type of piping suspension support without particular limitation, and is preferably made of stainless steel or other metal.

左サポート支持構成L・右サポート支持構成Rの各々の配管吊下支持具1の左係止部14・右係止部15は、その形成に際しての基点位置が本実施例ではバンド抱持部11の左右の側方部の略中央位置であるが、略中央位置より上方位置或いは下方位置であってもよく、この基点の位置を含めて左係止部14・右係止部15の延伸角度については、左係止部14・右係止部15に螺合係止される左前方吊下支持杆6・左後方吊下支持杆7・右前方吊下支持杆8・右後方吊下支持杆9の吊下げ角度等の諸条件によって適宜設定される。   The left locking portion 14 and the right locking portion 15 of the pipe suspension support 1 of each of the left support support configuration L and the right support support configuration R have their base positions in forming the band holding portion 11 in this embodiment. Of the left and right side parts, but may be above or below the approximate center position, and the extension angles of the left locking portion 14 and the right locking portion 15 including the position of this base point The left front suspension support rod 6, the left rear suspension support rod 7, the right front suspension support rod 8, and the right rear suspension support are screwed and locked to the left locking portion 14 and the right locking portion 15, respectively. It sets suitably according to various conditions, such as a hanging angle of the collar 9.

左係止部14・右係止部15の形成構成としては、図1〜図4に示す本実施例では、バンド抱持部11の開放両端部に連設されたバンド端部13・13をそのまま左係止部14・右係止部15として利用している。即ち、左サポート支持構成L・右サポート支持構成Rを有する配管吊下支持具1として、公知公用の一般的な構成の配管バンドをそのまま利用している。   In the present embodiment shown in FIGS. 1 to 4, as the configuration for forming the left locking portion 14 and the right locking portion 15, the band end portions 13 and 13 connected to the open both end portions of the band holding portion 11 are shown. It is used as the left locking portion 14 and the right locking portion 15 as it is. That is, as the piping suspension support 1 having the left support support configuration L and the right support support configuration R, a piping band having a known configuration and a general configuration is used as it is.

1点吊下支持構成Nは、図5に示すように、吊りボルト3と、該吊りボルト3にタンバックルの如き吊下接続部材31を介してバンド端部13を接続して、バンド抱持部11に抱持した配管Pを取付面2に吊下支持する公知公用の一般的な構成の配管吊下支持具1とを用いた構成を挙げることができる。   As shown in FIG. 5, in the one-point suspension support structure N, the band end 13 is connected to the suspension bolt 3 and the suspension bolt 3 via a suspension connection member 31 such as a tongue buckle, The structure using the piping suspension support 1 of the well-known and common general structure which carries out suspension support of the piping P which was held to the part 11 on the attachment surface 2 can be mentioned.

以上の構成を有する本発明の配管吊下支持具1は、その使用に際して図1及び図2に示すように、
先ず、図5に示す1点吊下支持構成Nを有する配管吊下支持具1を、取付面2に一端が固定される吊りボルト3にタンバックルの如き吊下接続部材31を介してバンド端部13をボルト・ナット16により固定することで前記取付面2に吊下支持し、
次に、図3に示す左サポート支持構成Lを有する配管吊下支持具1を、取付面2に一端が固定され、斜め吊下げする公知公用の吊りボルトの如き左前方吊下支持杆6・左後方吊下支持杆7の他端を左係止部14の透孔に挿通してナット61・71によって螺合緊締することによって配管Pの左方向における斜め2点吊下支持し、
更に、図4に示す右サポート支持構成Rの配管支持具1を、取付面2に一端が固定され、斜め吊下げする公知公用の吊りボルトの如き右前方吊下支持杆8・右後方吊下支持杆9の他端を右係止部15の透孔に挿通してナット81・91によって螺合緊締することによって配管Pの右方向における斜め2点吊下支持し、
上記の左サポート支持構成Lを有する配管吊下支持具1と、右サポート支持構成Rを有する配管吊下支持具1とを、配管軸方向において、間に1点吊下支持構成Nを挟んだ状態で交互に繰り返して吊下配設した構成とする。かかる構成によって、1点吊下支持構成Nを挟んで隣接する2種類の斜め2点吊下支持構成L・Rを有する配管吊下支持具1・1同士が図2に示すように平面視した際に配管軸方向において対称の斜め2点吊下支持構成を有する構成となる。
The piping suspension support 1 of the present invention having the above configuration is used as shown in FIG. 1 and FIG.
First, the piping suspension support 1 having the one-point suspension support structure N shown in FIG. 5 is connected to the suspension bolt 3 whose one end is fixed to the mounting surface 2 via the suspension connection member 31 such as a tan buckle. The part 13 is suspended and supported on the mounting surface 2 by fixing the part 13 with a bolt and a nut 16,
Next, the left front suspension support rod 6 such as a publicly known suspension bolt having one end fixed to the attachment surface 2 and suspended diagonally by suspending the piping suspension support 1 having the left support support structure L shown in FIG. The other end of the left rear hanging support rod 7 is inserted into the through hole of the left locking portion 14 and screwed and tightened by the nuts 61 and 71 to support the diagonal two points in the left direction of the pipe P
Furthermore, right front suspension support rod 8 such as a conventional suspension bolt which has one end fixed to mounting surface 2 and diagonally suspends piping support 1 of right support support configuration R shown in FIG. The other end of the support rod 9 is inserted into the through hole of the right locking portion 15 and screwed and tightened by the nuts 81 and 91 to support the diagonal two points in the right direction of the pipe P,
The piping suspension support 1 having the left support support configuration L and the piping suspension support 1 having the right support support configuration R are sandwiched by one point suspension support configuration N in the piping axial direction. In this state, the suspension is alternately repeated. With this configuration, the pipe suspension supports 1 and 1 having two types of diagonal two-point suspension support configurations L and R adjacent to each other with the one-point suspension support configuration N in a plan view as shown in FIG. 2 In this case, it is configured to have a diagonal two-point suspension support configuration that is symmetrical in the pipe axis direction.

以上の構成、即ち、1点吊下支持構成Nを間に挟んだ状態で2種類の斜め2点吊下支持構成L・Rを有する配管吊下支持具1・1を配管軸方向において交互に用いて配管Pを吊下支持することによって、この2種類(L・R)の配管吊下支持具1が、隣接するもの同士で平面視した際に配管軸方向において対称の斜め2点吊下支持構成となるので、配管軸方向の振動負荷と配管軸直交方向の振動負荷とが同時に生じることに加えて、捻れを含む軸線回り方向に傾動・揺動する振動負荷をも生じた場合であっても、様々な方向における揺れを対称構成の2種類のサポート支持構成L・Rが互いに打ち消す作用効果を発揮し、揺れを収束させることができる。従って、長尺スパンや超長尺スパンにおける配管吊下支持であっても、複数個ないし多数個の配管支持具1・1・1・・・に掛かる負荷が同調して増幅されてしまうことを抑制することができ、配管支持具1に歪みや破損が生じ難いという、本発明に係る特定の2種類の斜め2点吊下支持構成による相乗効果を有している。   The piping suspension supports 1 and 1 having two types of diagonal two-point suspension support configurations L and R with the above configuration, that is, one-point suspension support configuration N sandwiched alternately in the piping axial direction By suspending and supporting the pipe P by using the pipe P, when the two types (L and R) of the pipe suspension support 1 are planarly viewed by the adjacent ones, the diagonal two points suspended symmetrically in the pipe axis direction Since it becomes a support configuration, in addition to the vibration load in the pipe axis direction and the vibration load in the pipe axis orthogonal direction simultaneously being generated, a vibration load that tilts and swings around the axis including twist is also generated. Even in this case, the two types of support support configurations L and R in the symmetrical configuration cancel each other out in various directions to exert an operation effect to cancel each other, and the movement can be converged. Therefore, even in the case of suspension support for piping in long spans or ultra-long spans, the loads applied to a plurality or a large number of piping supports 1 1 1... Are synchronized and amplified. It has the synergetic effect by two kinds of two kinds of slant two-point suspension support composition concerning the present invention that it can control and it is hard to produce distortion and breakage in piping support 1.

また、吊りボルト3と配管支持バンド1とによる通常の1点吊下支持構成N・N・N・・・を有する既存の配管設備に、上記した2種類のサポート支持構成L・Rを付加することによって本発明と同様のサポート支持構成を有する配管吊下支持具とすることもできる。   In addition, the above-described two types of support support configurations L and R are added to the existing piping installation having a normal one-point suspension support configuration N, N, N ... by the suspension bolt 3 and the piping support band 1 Thus, it is also possible to provide a pipe suspension support having a support support configuration similar to that of the present invention.

尚、図1〜図3では、左サポート支持構成Lの左係止部14に対する左前方吊下支持杆6・左後方吊下支持杆7の接続と、右サポート支持構成Rの右係止部15に対する第3吊下支持杆8・第4吊下支持杆9の接続とは、いずれも左係止部14・右係止部15の接続部分の面に対して斜めに各2本ずつが挿通状態で接続されるため、透孔・透孔は、各々2本の吊りボルト(左前方吊下支持杆6と左後方吊下支持杆7の2本、右前方吊下支持杆8と右後方吊下支持杆9の2本)の端部が挿通可能な直径及び/又は形状に穿かれていることが好ましく、本実施例では、透孔・透孔は長孔に穿かれている。尚、長孔に代えて、2本の吊りボルトの端部が挿通可能な大径の透孔であってもよい。   1 to 3, the connection of the left front suspension support rod 6 and the left rear suspension support rod 7 to the left locking portion 14 of the left support support configuration L and the right locking portion of the right support support configuration R The connection of the third suspension support rod 8 and the fourth suspension support rod 9 with respect to 15 is two each at an angle to the surface of the connection portion of the left locking portion 14 and the right locking portion 15. In order to be connected in the inserted state, the through holes and the through holes are respectively two suspension bolts (two for the left front suspension support rod 6 and the left rear suspension support rod 7, the right front suspension support rod 8 and the right It is preferable that the end portions of the two rear suspension support rods 9 be bored in a diameter and / or shape which can be inserted, and in this embodiment, the through holes are formed in the long holes. In addition, it may replace with a long hole and the large diameter through-hole which the edge part of two suspension bolts can penetrate can be used.

上記の左係止部14に対する左前方吊下支持杆6・左後方吊下支持杆7の接続構成、右係止部15に対する右前方吊下支持杆8・右後方吊下支持杆9の接続構成としては、図6、図7、図8に示す態様を採ることもできる。   Connection configuration of left front suspension support rod 6 · left rear suspension support rod 7 to the above-mentioned left locking portion 14, connection of right front suspension support rod 8 · right rear suspension support rod 9 to the right locking portion 15 As a structure, the aspect shown to FIG. 6, FIG. 7, FIG. 8 can also be taken.

図6に示す接続構成は、左係止部14(右係止部15)に、複数の透孔が設けられた板状部材から成る接続板部材10Aをボルト・ナット10Dにより接続し、この接続板部材10Aに設けられた2つの透孔の内の一方の透孔に左前方吊下支持杆6(右前方吊下支持杆8)を挿通してナット61(ナット81)により緊締すると共に、他方の透孔に左後方吊下支持杆7(右後方吊下支持杆9)を挿通してナット71(ナット91)により緊締する構成である。図6において、( )内に示す符号は、右係止部15の各構成、即ち、右係止部15、右前方吊下支持杆8、ナット81、右後方吊下支持杆9、ナット91を各々示す。尚、左係止部14に接続した接続板部材10Aは同構成のままで右係止部15に接続可能である。   In the connection configuration shown in FIG. 6, a connection plate member 10A made of a plate-like member provided with a plurality of through holes is connected to the left locking portion 14 (right locking portion 15) by a bolt and a nut 10D. The left front suspension support rod 6 (right front suspension support rod 8) is inserted into one of two through holes provided in the plate member 10A and tightened with a nut 61 (nut 81), The left rear suspension support rod 7 (right rear suspension support rod 9) is inserted into the other through hole and tightened by a nut 71 (nut 91). In FIG. 6, the symbols shown in () indicate the components of the right locking portion 15, that is, the right locking portion 15, the right front suspension support rod 8, the nut 81, the right rear suspension support rod 9, and the nut 91. Respectively. The connecting plate member 10A connected to the left locking portion 14 can be connected to the right locking portion 15 with the same configuration.

図7に示す接続構成は、左係止部14(右係止部15)の透孔を2つ形成することにより、2つの透孔から成る透孔の一方の透孔に左前方吊下支持杆6(右前方吊下支持杆8)を挿通してナット61(ナット81)により緊締すると共に、他方の透孔に左後方吊下支持杆7(右後方吊下支持杆9)を挿通してナット71(ナット91)により緊締する構成である。図7において、( )内に示す符号は、右係止部15の各構成、即ち、右係止部15、右前方吊下支持杆8、ナット81、右後方吊下支持杆9、ナット91を各々示す。   The connection configuration shown in FIG. 7 is such that by forming two through holes of the left locking portion 14 (right locking portion 15), the left front suspension support is formed in one through hole of the two through holes. Insert the rod 6 (right front suspension support rod 8) and tighten with the nut 61 (nut 81), and insert the left rear suspension support rod 7 (right rear suspension support rod 9) into the other through hole It is the structure tightened by the nut 71 (nut 91). In FIG. 7, the reference numerals in parentheses indicate the components of the right locking portion 15, that is, the right locking portion 15, the right front suspension support rod 8, the nut 81, the right rear suspension support rod 9, and the nut 91. Respectively.

図8に示す接続構成は、2つの透孔及び屈曲部を有する同一形状又は近似形状の2枚の板部材である上接続板10Bと下接続板10Cとを、各々の一方の端部を重層した状態で右係止部15(左係止部14)にボルト・ナット10Dにより接続し、上接続板10Bの他方の端部に設けられた透孔に右前方吊下支持杆8(左前方吊下支持杆6)を挿通してナット81(ナット61)により緊締すると共に、下接続板10Cの他方の透孔に右後方吊下支持杆9(左後方吊下支持杆7)を挿通してナット91(ナット71)により緊締する構成である。図8において、( )内に示す符号は、左係止部14の各構成、即ち、左係止部14、左前方吊下支持杆6、ナット61、左後方吊下支持杆7、ナット71を各々示す。図8に示す実施例に用いられる上接続板10B・下接続板10Cは、図9の重ね合わせた状態を示す側面図から判るように同形・同大の同一形状となっている。かかる構成によれば、上接続板10Bと下接続板10Cとを重層する際に上下関係に注意を払うことなく、どちらが上でも下でも接続板部材として機能し、更に、その製造に際しては金型等の製造設備が一種でよいために生産効率が高く、製造コストを下げることができ、一種類の板部材のみが製造されるため在庫管理・発注受注管理・納品管理が容易である。   The connection configuration shown in FIG. 8 is an upper connection plate 10B and a lower connection plate 10C, which are two plate members of the same shape or an approximate shape having two through holes and a bent portion, one end of each being layered The right front suspension support rod 8 (left front) is connected to the through hole provided at the other end of the upper connection plate 10B by connecting to the right locking portion 15 (left locking portion 14) with the bolt and nut 10D The suspension support rod 6) is inserted and tightened by a nut 81 (nut 61), and the right rear suspension support rod 9 (left rear suspension support rod 7) is inserted into the other through hole of the lower connection plate 10C. As a result, tightening is performed by means of the nut 91 (nut 71). In FIG. 8, the reference numerals in parentheses indicate the components of the left locking portion 14, that is, the left locking portion 14, the left front hanging support rod 6, the nut 61, the left rear hanging support rod 7, and the nut 71. Respectively. The upper connecting plate 10B and the lower connecting plate 10C used in the embodiment shown in FIG. 8 have the same shape and size as shown in the side view of FIG. According to this configuration, when the upper connection plate 10B and the lower connection plate 10C are overlaid, they function as a connection plate member regardless of the upper and lower relationship without paying attention to the upper and lower relationship, and further, a mold is produced in the manufacture thereof. The production efficiency is high because only one kind of manufacturing equipment is required, and the manufacturing cost can be reduced. Since only one type of plate member is manufactured, inventory management, order acceptance management, and delivery management are easy.

更に、図10に示すように、上接続板10Bと下接続板10Cの重層部分の透孔に挿通したボルトにクリップ等の脱落防止具10Eを装着することによってナットを外してもボルトが透孔から脱落することを防止できる。従って、取付け作業における作業性が良好であり、ボルト等のパーツ落下や紛失等を抑制することができるので、作業効率が高いだけでなく安全性向上にも寄与する。   Furthermore, as shown in FIG. 10, even if the nut is removed by attaching the dropout prevention tool 10E such as a clip to the bolt inserted in the through hole of the upper connecting plate 10B and the lower connecting plate 10C, the bolt is through hole Can be prevented from falling out of Therefore, the workability in the mounting operation is good, and it is possible to suppress the dropping or loss of parts such as bolts, which contributes not only to high working efficiency but also to improvement in safety.

尚、本実施例に用いられる上接続板10Bと下接続板10Cとしては、図8〜図10に示す構成のものの他、例えば、実開昭64−25821号(吊りボルトの振れ止め金具)等を用いることができる。   As the upper connection plate 10B and the lower connection plate 10C used in the present embodiment, in addition to the configurations shown in FIG. 8 to FIG. 10, for example, the Japanese Utility Model Application Publication No. 64-25821 (sway fitting for suspension bolt) etc. Can be used.

また、図1〜図4に示す上記実施例では、バンド抱持部11の開放両端部に連設されたバンド端部を左係止部14・右係止部15とした構成であるが、本発明はかかる構成に限定されず、バンド抱持部11と同素材であって別体構成である板材をバンド抱持部11の形成位置に溶接・融着・接着・ネジ留めの如き固着手段により止着した構成とすることもできるし、或いはバンド抱持部の一部を切起すことにより形成した構成とすることもできる。   Further, in the above embodiment shown in FIGS. 1 to 4, the band end portions connected to the open both end portions of the band holding portion 11 are the left locking portion 14 and the right locking portion 15, but The present invention is not limited to such a configuration, and a fixing member such as welding, fusion, adhesion, screwing, etc. is formed of a plate material which is the same material as the band holding portion 11 and is a separate structure at the formation position of the band holding portion 11 It is also possible to adopt a construction which is fixed by means of the above-mentioned construction or to form a construction formed by cutting and raising a part of the band holding portion.

更に、図1〜図5に示す上記実施例では、配管吊下支持具1の本体が半円状の2本のバンド抱持部11を下方の蝶番式の接続部12で接続した構成であるが、この種の配管バンドとして公知公用の構成及び素材を有する種々仕様のものを特別の制限なく用いることができ。例えば、組式構成の接続部を有する配管バンドであってもよいし、1本の環状の帯状板材から形成された提灯式の配管バンドであってもよい。   Furthermore, in the embodiment shown in FIGS. 1 to 5, the main body of the piping suspension support 1 is configured by connecting two semicircular band holding portions 11 by the lower hinge type connection portion 12. However, it is possible to use various types of piping bands known in this art as piping bands of this type and having various specifications and materials without particular limitations. For example, it may be a piping band which has a connection part of a combination type composition, and may be a lantern type piping band formed from one annular beltlike plate material.

1 配管吊下支持具
10A 接続板部材
10B 上接続板
10C 下接続板
10D ボルト・ナット
10E 脱落防止具
11 バンド抱持部
12 接続部
13 バンド端部
14 左係止部
15 右係止部
16 ボルト・ナット
2 取付面
3 吊りボルト
31 吊下接続部材
6 左前方吊下支持杆
61 ナット
7 左後方吊下支持杆
71 ナット
8 右前方吊下支持杆
81 ナット
9 右後方吊下支持杆
91 ナット
P 配管
L 左サポート支持構成
R 右サポート支持構成
N 1点吊下支持構成
DESCRIPTION OF SYMBOLS 1 Piping suspension support 10A Connection plate member 10B Upper connection plate 10C Lower connection plate 10D Bolt and nut 10E Drop-off prevention device 11 Band holding portion 12 Connection portion 13 Band end portion 14 Left locking portion 15 Right locking portion 16 bolt・ Nut 2 Mounting surface 3 Suspension bolt 31 Suspension connection member 6 Left front suspension support rod 61 Nut 7 Left rear suspension support rod 71 Nut 8 Right front suspension support rod 81 Nut 9 Right rear suspension support rod 91 Nut P Piping L Left support support configuration R Right support support configuration N 1 point suspension support configuration

Claims (8)

配管を抱持するバンド抱持部と、該バンド抱持部の開放両端部に連設されたバンド端部とを有し、天井スラブやトンネル天井等の取付面から吊り下げられる吊りボルトに、タンバックルの如き吊下接続部材を介して前記バンド端部を接続することにより、配管の1点吊下支持構成を有する配管吊下支持具と、
配管を抱持するバンド抱持部と、該バンド抱持部の左側方部から左横方向外側に延伸した状態で設けられた左係止部とを有し、この左係止部には透孔が形成され、この透孔に、前記取付面であって配管軸方向の左前方位置と左後方位置に一端が固定されて斜めに吊下げられる2本の吊りボルトの如き左前方吊下支持杆・左後方吊下支持杆の各々の他端が直接又は間接的に接続取付された状態で係合されることにより、配管の左方向における斜め2点吊下支持が可能な構成の左サポート支持構成を有する配管吊下支持具と、
配管を抱持するバンド抱持部と、該バンド抱持部の右側方部から右横方向外側に延伸した状態で設けられた右係止部とを有し、この右係止部には透孔が形成され、この透孔に、前記取付面であって配管軸方向の右前方位置と右後方位置に一端が固定されて斜めに吊下げられる2本の吊りボルトの如き右前方吊下支持杆・右後方吊下支持杆の各々の他端が直接又は間接的に接続取付された状態で係合されることにより、配管の右方向における斜め2点吊下支持が可能な構成の右サポート支持構成を有する配管吊下支持具と、
を有して成り、
左サポート支持構成を有する配管吊下支持具と、右サポート支持構成を有する配管吊下支持具とを、配管軸方向において、間に1点吊下支持構成を有する配管吊下支持具を挟んだ状態で交互に吊下配設する構成を、配管すべき略全域に亘って繰り返して配設することによって、1点吊下支持構成を挟んで隣接する2種類の斜め2点吊下支持構成である左サポート支持構成・右サポート支持構成を有する配管吊下支持具同士が平面視した際に配管軸方向において対称の斜め吊下支持構成を有する構成であること、
を特徴とする複数の配管吊下支持具を具備する配管の吊下支持構造
A suspension bolt for retaining piping and a band end connected to the open ends of the suspension band, and a suspension bolt suspended from a mounting surface such as a ceiling slab or a tunnel ceiling, A piping suspension support having a one-point suspension support structure for piping by connecting the band end portion via a suspension connection member such as a tan buckle;
A band holding portion for holding a pipe, and a left locking portion provided so as to extend outward in the left lateral direction from the left side portion of the band holding portion. A left front suspension support such as two suspension bolts which are formed with holes and whose one end is fixed at the mounting surface and at the left front position and the left rear position in the axial direction of the pipe in this through hole Left support for left diagonal support in the left direction of piping by engaging with the other end of each of the rod and left rear hanging support rod directly or indirectly connected and attached A pipe suspension support having a support configuration;
A band holding portion for holding a pipe, and a right locking portion provided in a state of extending laterally outward from the right side of the band holding portion, the right locking portion Right front suspension support such as two suspension bolts which are formed with holes and whose one end is fixed at the mounting surface and at the right front position and the right rear position in the axial direction of the pipe in this through hole Right support with support for diagonal two-point suspension in the right direction of piping by being engaged with the other end of each of the right and left hanging support rods directly or indirectly connected and attached A pipe suspension support having a support configuration;
Consists of
A piping suspension support having a left support support configuration and a piping suspension support having a right support support configuration are sandwiched between the piping suspension support having a one-point suspension support configuration in the axial direction of the piping By alternately arranging the hanging arrangement alternately in the state over the entire area to be plumbed, two diagonal two-point hanging supporting arrangements adjacent to each other across the one-point hanging supporting arrangement are provided. The piping suspension supports having a certain left support support configuration and right support support configuration have a configuration having an oblique suspension support configuration symmetrical in the piping axis direction when viewed in plan view,
A suspension support structure for piping comprising a plurality of piping suspension supports characterized by the above .
前記左係止部・右係止部の各々の透孔に、少なくとも2つの透孔を有する板状部材から成る接続板部材が接続取付された状態であり、
左係止部に接続される接続板部材の2つの透孔に、前記左前方吊下支持杆・左後方吊下支持杆の各々の他端が挿通されてナット螺合された状態であり、
右係止部に接続される接続板部材の2つの透孔に前記右前方吊下支持杆・右後方吊下支持杆の各々の他端が挿通されてナット螺合された状態であること、
と特徴とする請求項1に記載の複数の配管吊下支持具を具備する配管の吊下支持構造
A connecting plate member formed of a plate-like member having at least two through holes is connected and attached to the through holes of each of the left locking portion and the right locking portion,
The other end of each of the left front suspension support rod and the left rear suspension support rod is inserted into the two through holes of the connection plate member connected to the left locking portion and is screwed with a nut,
The other end of each of the right front suspension support rod and the right rear suspension support rod is inserted into the two through holes of the connection plate member connected to the right locking portion and screwed into a nut,
A pipe suspension support structure comprising the plurality of pipe suspension supports according to claim 1.
前記左係止部・右係止部の各々の透孔が2つの透孔から成り、
左係止部の2つの透孔の、一方の透孔に前記左前方吊下支持杆の他端が挿通されてナット螺合された状態であると共に、他方の透孔に前記左後方吊下支持杆の他端が挿通されてナット螺合された状態であり、
右係止部の2つの透孔の、一方の透孔に前記右前方吊下支持杆の他端が挿通されてナット螺合された状態であると共に、他方の透孔に前記右後方吊下支持杆の他端が挿通されてナット螺合された状態であること、
を特徴とする請求項1に記載の複数の配管吊下支持具を具備する配管の吊下支持構造
Each through hole of the left locking portion and the right locking portion comprises two through holes,
The other end of the left front suspension support rod is inserted into one of the two through holes of the left locking portion and screwed into a nut, and the left rear is suspended in the other through hole. The other end of the support rod is inserted and screwed into a nut,
The other end of the right front suspension support rod is inserted into one through hole of the two through holes of the right locking portion and is screwed with a nut, and the other through hole is suspended in the right rear The other end of the support rod is inserted and screwed into a nut,
A pipe suspension support structure comprising the plurality of pipe suspension supports according to claim 1.
上接続板と下接続板との2枚一組から成る板状部材の各々が両端に透孔を有し、一端の透孔部分において上接続板と下接続板とを前記一端の透孔を連通させた状態で重層すると共に、この重層する一端の透孔を更に前記左係止部の透孔と連通させた状態でボルト・ナットにより螺合接続し、且つ、上接続板・下接続板の他端の透孔に、前記左前方吊下支持杆・左後方吊下支持杆の他端が挿通されてナット螺合接続する構成であり、
上記構成を有する2枚一組の上接続板・下接続板を更に一組用いて、一端の透孔部分において上接続板と下接続板とを前記一端の透孔を連通させた状態で重層すると共に、この重層する一端の透孔を更に前記右係止部の透孔と連通させた状態でボルト・ナットにより螺合接続し、且つ、上接続板・下接続板の他端の透孔に、前記右前方吊下支持杆・右後方吊下支持杆の他端が挿通されてナット螺合接続する構成であること、
を特徴とする請求項1に記載の複数の配管吊下支持具を具備する配管の吊下支持構造
Each of the plate members consisting of a pair of upper connection plate and lower connection plate has through holes at both ends, and the upper connection plate and lower connection plate at the through hole portion of one end are the through holes of the one end Overlapping in a communication state and screwing connection by means of a bolt and a nut in a state in which the through hole at one end of the layer is further communicated with the through hole of the left locking portion, and an upper connecting plate and a lower connecting plate The other end of the left front suspension support rod and the other end of the left rear suspension support rod are inserted into the through hole at the other end of the connector for nut screw connection,
The upper connection plate and the lower connection plate having the above-mentioned configuration are further combined into one layer, and the upper connection plate and the lower connection plate are communicated at the one end through the through hole portion. In addition, in a state where the through-hole at one end to be superimposed is further communicated with the through-hole of the right locking portion, screw connection is performed by a bolt and a nut, and the through-hole at the other end of the upper connection plate and lower connection plate And the other end of the right front suspension support rod and the right rear suspension support rod are inserted through and screw connected.
A pipe suspension support structure comprising the plurality of pipe suspension supports according to claim 1.
前記上接続板と下接続板が、同形・同大の同一構成であることを特徴とする請求項4に記載の複数の配管吊下支持具を具備する配管の吊下支持構造5. A pipe suspension support structure comprising a plurality of pipe suspension supports according to claim 4, wherein the upper connection plate and the lower connection plate have the same configuration and size. 前記上接続板と下接続板との重層する一端の透孔に挿通したボルトに、該ボルトの螺旋部分に噛合うことによって該ボルトの透孔からの脱落を防止するボルトの脱落防止具が取り付けられる構成であることを特徴とする請求項5に記載の複数の配管吊下支持具を具備する配管の吊下支持構造The bolt inserted in the through hole at one end of the upper connection plate and the lower connection plate is attached to the bolt drop prevention device for preventing the bolt from falling out of the through hole by meshing with the spiral portion of the bolt The suspension support structure of piping provided with the plurality of piping suspension supports according to claim 5. 左サポート支持構成を有する配管吊下支持具・右サポート支持構成を有する配管吊下支持具の各々のバンド抱持部が、相対向する半円形状の2つのバンド抱持部が円形に組合うことによって配管を抱持可能であり、該2つのバンド抱持部の各々の一端に左係止部・右係止部が連設された状態で設けられており、且つ該2つのバンド抱持部の各々の他端が組式又は蝶番式の如き接続部により拡開可能に接続された構成であることを特徴とする請求項1〜6のいずれかに記載の複数の配管吊下支持具を具備する配管の吊下支持構造The band holding portion of each of the pipe suspension support having the left support support configuration and the pipe suspension support having the right support support configuration has two semicircular band holding portions facing each other in a circular shape. And the left locking portion and the right locking portion are connected to one end of each of the two band holding portions, and the two band holding portions are provided. The plurality of pipe suspension supports according to any one of claims 1 to 6, characterized in that the other end of each of the parts is spreadably connected by a connecting part such as a combination type or a hinge type. Suspension support structure for piping equipped with 左サポート支持構成を有する配管吊下支持具・右サポート支持構成を有する配管吊下支持具の各々のバンド抱持具が一本の帯状バンド体を環状に彎曲することによって配管を抱持可能であり、この帯状バンド体の開放両端部に左係止部・右係止部が連設された構成であることを特徴とする請求項1〜6のいずれかに記載の複数の配管吊下支持具を具備する配管の吊下支持構造Each of the band holders of the pipe suspension support having the left support support configuration and the pipe suspension support having the right support support configuration can hold the pipe by curving one strip band body The plurality of pipe suspension supports according to any one of claims 1 to 6, characterized in that the left locking portion and the right locking portion are continuously provided at the open both end portions of the band-shaped band body. Suspension support structure for piping equipped with tools.
JP2017168215A 2017-09-01 2017-09-01 Suspension support structure for piping provided with a plurality of piping suspension supports Expired - Fee Related JP6534005B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017168215A JP6534005B2 (en) 2017-09-01 2017-09-01 Suspension support structure for piping provided with a plurality of piping suspension supports

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017168215A JP6534005B2 (en) 2017-09-01 2017-09-01 Suspension support structure for piping provided with a plurality of piping suspension supports

Publications (2)

Publication Number Publication Date
JP2019044853A JP2019044853A (en) 2019-03-22
JP6534005B2 true JP6534005B2 (en) 2019-06-26

Family

ID=65812851

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017168215A Expired - Fee Related JP6534005B2 (en) 2017-09-01 2017-09-01 Suspension support structure for piping provided with a plurality of piping suspension supports

Country Status (1)

Country Link
JP (1) JP6534005B2 (en)

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4078752A (en) * 1977-01-21 1978-03-14 Kin-Line, Inc. Conduit support and seismic bracing system
JPS6298015A (en) * 1985-10-22 1987-05-07 森電機株式会社 Falling-off and loss preventive device for bolt
US5295646A (en) * 1993-04-02 1994-03-22 Roth Steven A Longitudinal U-clip
JP3917145B2 (en) * 2004-04-20 2007-05-23 株式会社ブレスト工業研究所 Oblique hanging bolt mounting device
JP5458199B1 (en) * 2013-03-25 2014-04-02 株式会社ブレスト工業研究所 Mounting bracket for suspension bolt
JP6170721B2 (en) * 2013-05-13 2017-07-26 日栄インテック株式会社 Suspension support device
JP6142438B2 (en) * 2015-06-30 2017-06-07 株式会社アカギ Pipe suspension support
CN205938191U (en) * 2016-08-25 2017-02-08 安固士(天津)建筑材料有限公司 Heavy -calibre anti -seismic support

Also Published As

Publication number Publication date
JP2019044853A (en) 2019-03-22

Similar Documents

Publication Publication Date Title
JP6142438B2 (en) Pipe suspension support
US6799607B1 (en) Sanitary conduit support systems and methods
JP3153187U (en) Pipe suspension support
US20160289957A1 (en) Bracket for seismic bracing of conduits
US20140008500A1 (en) Para-seismic support for pipes
JP3153185U (en) Pipe suspension support
JP3153186U (en) Pipe suspension support
JP6550615B2 (en) Suspension support structure for piping provided with a plurality of piping suspension supports
JP6534007B2 (en) Suspension support structure for piping provided with a plurality of piping suspension supports
JP6534006B2 (en) Suspension support structure for piping provided with a plurality of piping suspension supports
JP6534005B2 (en) Suspension support structure for piping provided with a plurality of piping suspension supports
JP6550616B2 (en) Suspension support structure for piping provided with a plurality of piping suspension supports
JP2019086015A (en) Suspension supporting structure of pipe including plural pipe suspension supporting tools
JP6481869B2 (en) Piping suspension support structure comprising a plurality of piping suspension supports
JP2019074148A (en) Pipe suspension supporting structure including plural pipe suspension supporting tools
JP6454896B1 (en) Piping suspension support structure comprising a plurality of piping suspension supports
JP2019074147A (en) Pipe suspension supporting structure including plural pipe suspension supporting tools
JP6481870B2 (en) Piping suspension support structure comprising a plurality of piping suspension supports
JP6561419B2 (en) Piping suspension support structure comprising a plurality of piping suspension supports
JP6561420B2 (en) Piping suspension support structure comprising a plurality of piping suspension supports
JP2019074149A (en) Pipe suspension supporting structure including plural pipe suspension supporting tools
JP2019074150A (en) Pipe suspension supporting structure including plural pipe suspension supporting tools
JP2016217045A (en) Fall prevention structure of suspension ceiling
JP6454895B1 (en) Piping suspension support structure comprising a plurality of piping suspension supports
JP2019027581A (en) Piping suspension support structure comprising a plurality of piping suspension supports

Legal Events

Date Code Title Description
TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20190326

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A711

Effective date: 20190513

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20190513

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20190513

R150 Certificate of patent or registration of utility model

Ref document number: 6534005

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees