JP6534938B2 - Lining plate installation and rain curing jig and lining plate installation method using the jig - Google Patents
[go: Go Back, main page]

JP6534938B2 - Lining plate installation and rain curing jig and lining plate installation method using the jig - Google Patents

Lining plate installation and rain curing jig and lining plate installation method using the jig Download PDF

Info

Publication number
JP6534938B2
JP6534938B2 JP2016008455A JP2016008455A JP6534938B2 JP 6534938 B2 JP6534938 B2 JP 6534938B2 JP 2016008455 A JP2016008455 A JP 2016008455A JP 2016008455 A JP2016008455 A JP 2016008455A JP 6534938 B2 JP6534938 B2 JP 6534938B2
Authority
JP
Japan
Prior art keywords
lining
lining plate
plate installation
rain
container
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2016008455A
Other languages
Japanese (ja)
Other versions
JP2017128907A (en
Inventor
輔 鈴木
輔 鈴木
祐樹 三浦
祐樹 三浦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi GE Vernova Nuclear Energy Ltd
Original Assignee
Hitachi-GE Nuclear Energy Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi-GE Nuclear Energy Ltd filed Critical Hitachi-GE Nuclear Energy Ltd
Priority to JP2016008455A priority Critical patent/JP6534938B2/en
Publication of JP2017128907A publication Critical patent/JP2017128907A/en
Application granted granted Critical
Publication of JP6534938B2 publication Critical patent/JP6534938B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

本発明はライニングプレート据付兼雨養生治具及びこの治具を用いたライニングプレート据付方法に係り、特に、壁躯体コンクリートで構成されるライニング内張り容器の内面にライニングプレートを設置するものに好適なライニングプレート据付兼雨養生治具及びこの治具を用いたライニングプレート据付方法に関する。   The present invention relates to a lining plate installation and rain curing jig and a lining plate installation method using the jig, and in particular, a lining suitable for installing a lining plate on the inner surface of a lining lining container made of wall concrete The present invention relates to a plate installation and rain curing jig and a lining plate installation method using the jig.

壁躯体コンクリートで構成される容器状の大規模構造物のうち、躯体内面の全面にライニングプレートを設置する必要のある構造物として、原子力発電設備等で用いられるライニング内張り容器(例えば、燃料貯蔵プール)がある。その構造は、容器状のコンクリート躯体面に、予め埋設された下地材を使用して複数枚のライニングプレートを据付けるものである。   A lining-lined container (for example, a fuel storage pool) used in a nuclear power generation facility or the like as a structure requiring installation of a lining plate on the entire inner surface of a container-like large-scale container-like structure composed of wall concrete ). The structure is that a plurality of lining plates are installed on a container-like concrete casing surface using a pre-embedded foundation material.

例えば、原子力発電設備等で用いられるライニング内張り容器の工事では、ライニング内張り容器の躯体コンクリートを構築するための躯体工事と、躯体表面にライニングプレートを設置する機械工事の2種類の工事が併進した作業が行われ、各々の工事においてライニング内張り容器の壁躯体と同等の高さを要する足場等の作業床が必要となる。   For example, in the construction of lining liners used in nuclear power facilities etc., there are two types of work: a construction of a frame concrete for constructing a lining concrete of a lining liner and a construction work of installing a lining plate on the surface of the construction. Each work requires a work floor, such as a scaffolding, that requires the same height as the wall of the lining container.

また、上述した機械工事のライニングプレート据付作業には、大型の揚重設備(例えば、クレーン)を用いて作業を実施しているが、大型の揚重設備は、作業エリアの制約により併用されているため、揚重設備を専従できず作業を実施するタイミングに影響を受ける。   In addition, for lining plate installation work of mechanical work mentioned above, work is carried out using a large lifting equipment (for example, a crane), but a large lifting equipment is used in combination due to the restriction of the work area Therefore, the lifting equipment can not be dedicated and affected by the timing of work.

特に、原子力発電設備の燃料貯蔵プールのようなライニング内張り容器の工事は、長期間コンクリート躯体に屋根が無い状態が続くが、複数枚で構成されるライニングプレート同士を貼り付けて溶接する際に、雨水や雪等がライニングプレート面及びコンクリート躯体面に付着する恐れがある。ライニングプレート面及びコンクリート躯体面に雨水や雪等が付着すると、これらの面が湿った状態となるため、ライニングプレートの発錆の誘発や溶接品質に悪影響を与える可能性がある。   In particular, in the construction of lining containers such as fuel storage pools of nuclear power generation facilities, there is a roof-free condition for a long period of time, but when attaching and welding lining plates composed of multiple sheets, Rain water, snow, etc. may adhere to the lining plate surface and the concrete casing surface. If rain water, snow or the like adheres to the lining plate surface and the concrete casing surface, these surfaces become wet, which may cause rusting of the lining plate and adversely affect the welding quality.

このため、ライニングプレートの設置時には、雨水や雪等からの防護が必要となるが、上述の通り、ライニング内張り容器の工事は大型揚重設備を用いて実施しているため、コンクリート躯体に屋根等の設置が難しく、ライニングプレートの設置時の雨水や雪等からの防護が困難となり、天候によっても工事期間は影響を受ける他、機械工事のライニングプレートの据付作業及びライニングプレートの貼り付け溶接にも影響が生じる。   For this reason, when installing lining plates, protection from rain water and snow etc. is required, but as mentioned above, since the work of lining lining containers is carried out using a large lifting equipment, a concrete frame and a roof etc. Installation is difficult, protection from rainwater and snow during installation of lining plates is difficult, and the construction period is affected by the weather, and also for installation work of lining plates for mechanical work and pasting welding of lining plates There will be an impact.

このような、密閉された既設地下タンク内を雨水や雪等から防護するための雨養生設備が不要となる方法として、既設地下タンクの内壁構造物を補修作業する内壁構築工法が特許文献1に記載されている。   As a method for eliminating the need for rain curing equipment for protecting the inside of a sealed existing underground tank from rainwater, snow, etc., Patent Document 1 discloses an inner wall construction method for repairing the inner wall structure of the existing underground tank. Have been described.

この特許文献1には、既設地下タンク内の上端の側壁に、アンカーボルトにより固定したブラケットを用いて走行レール及びホイストクレーンを設定した既設地下タンクの内壁構造物を補修作業する内壁構築工法が開示されている。   Patent Document 1 discloses an inner wall construction method for repairing an inner wall structure of an existing underground tank in which a traveling rail and a hoist crane are set using a bracket fixed by an anchor bolt on a side wall of an upper end in the existing underground tank. It is done.

これは、密閉された既設タンクにおいて、予め計画された搬入口より資機材をタンク内に搬入し、その資機材を所望の位置及び高さまで容易に移動でき、また、密閉された既設地下タンク内であるため、雨水や雪等から防護するための雨養生設備は不要となる。   In this case, in the sealed existing tank, materials and equipment can be carried into the tank from a planned loading port, and the materials and materials can be easily moved to a desired position and height, and inside the sealed existing underground tank Therefore, rain curing equipment for protecting from rain water and snow etc. is unnecessary.

特開平1−102175号公報Unexamined-Japanese-Patent No. 1-102175

しかしながら、従来の工法では、他の作業(例えば、躯体工事)と併用していた大型揚重設備を用いて機械工事のライニングプレートの据付作業を実施していたため、他の作業(例えば、躯体工事)と併用されている大型揚重設備を機械工事側で専従できず。作業を実施するタイミングに影響を受け非効率であるという問題があった。   However, in the conventional construction method, the installation work of the lining plate for the mechanical work is performed using the large lifting equipment used in combination with the other work (for example, the construction work), so another work (for example, the construction work) The large scale lifting equipment used in conjunction with) can not be dedicated to the machine construction side. There is a problem that it is inefficient because it is affected by the timing of performing work.

また、機械工事のライニングプレートの据付作業を行うには、雨水や雪等からの防護を必要となるが、機械工事は上述した通り大型揚重設備を用いての作業であるため、雨水や雪等からの防護ができないといった問題が生じた。   In addition, in order to perform installation work of lining plates for mechanical work, protection from rain water and snow etc. is required, but since mechanical work is work using a large lifting equipment as described above, rain water and snow There was a problem that protection from

一方、特許文献1に記載の工法は、予めブラケット他を設定するために、既設地下タンク内での付帯作業(例えば、アンカーボルト設定作業他)が必要であること。また、他の揚重設備が設置されていない密閉された既設地下タンク内で、その付帯工事を含むブラケット他の設定をするためには、資機材を人力で運ぶ必要があり安全面に欠ける。これを補うために、付帯作業を伴わないブラケットの固定方法や資機材を設定するための揚重設備を設ける等にて解決する手法も考えられるが、密閉された既設地下タンク内の作業が故に他の揚重設備を設けることは困難であり、かつ、付帯作業を伴わないブラケットの固定方法は、重量物を支持、運搬する設備として強固な固定を強いられるため、返って付帯作業が増えことが想定され合理性にかける。   On the other hand, in the construction method described in Patent Document 1, incidental work (for example, anchor bolt setting work and the like) in the existing underground tank is necessary in order to set the bracket and the like in advance. In addition, it is necessary to manually carry materials and equipment in order to make other settings such as a bracket including incidental work in a sealed existing underground tank where no other lifting equipment is installed, and it is not safe. In order to compensate for this, there is also a method of solving by fixing the bracket without accompanying work and setting up lifting equipment for setting materials and materials etc., but it is possible to work in the sealed existing underground tank. It is difficult to set up other lifting equipment, and the method of fixing the bracket without accompanying work will increase the accompanying work because it is forced to firmly fix as a facility to support and transport heavy objects. Is assumed to be rational.

本発明は上述の点に鑑みなされたもので、その目的とするところは、大型揚重設備を用いて躯体工事と機械工事を併用して行うものであっても、各々の工事の作業効率を阻害することなく、しかも、ライニングプレートの据付作業の際には雨水や雪等から防護することができるライニングプレート据付兼雨養生治具及びこの治具を用いたライニングプレート据付方法を提供することにある。   The present invention has been made in view of the above-mentioned point, and the purpose of the present invention is to carry out the work efficiency of each work even if the frame work and the machine work are performed in combination using a large lifting equipment. Furthermore, it is possible to provide a lining plate installation / rain curing jig that can be protected from rain water, snow, etc. when installing a lining plate, and a lining plate installation method using this jig. is there.

本発明のライニングプレート据付兼雨養生治具は、上記目的を達成するために、容器状構造物のライニング内張り容器の内側に、複数のライニングプレートを据付ける際に用いられるライニングプレート据付兼雨養生治具であって、前記ライニングプレート据付兼雨養生治具は、横行レールと、該横行レールを支持するH鋼材から成る長尺な大引きと、前記横行レールを横行可能とするトロリを介して取付けられるか又は前記横行レールに直接取付けられたホイストクレーンと、該ホイストクレーンに設けられた吊りフックと、前記長尺な大引きの一方側を支持し、前記容器状構造物に設けられた手摺りに取付けられている第1のパイプサポートと、前記長尺な大引きの他方側を支持し、前記ライニング内張り容器内に設置された作業床に取付けられている大引き受けと、前記手摺りに取付けられている第2のパイプサポートと、前記作業床に取付けられている第3のパイプサポートと、前記第2及び第3のパイプサポートに支持され、前記吊りフックで吊上げられた前記ライニングプレートの据付け作業時に雨水又は雪から防護する屋根部材とを備えていることを特徴とする。 The lining plate installation and rain curing jig of the present invention is a lining plate installation and rain curing used when installing a plurality of lining plates inside a lining lining container of a container-like structure to achieve the above object. a jig, the lining plate mounting and rain curing jig via the transverse rail, and a large pulling elongated consisting of H steel for supporting the transverse line rail, the trolley to enable transverse the traverse rail a mounting is or hoist crane mounted directly on the transverse rail, hands and hanging hook provided on the hoist crane, and supports one side of the long large pull, provided on the container-like structure A first pipe support attached to the slide and the other side of the long pull are supported on a work floor installed in the lining liner container. Supported by the second support, the second pipe support attached to the handrail, the third pipe support attached to the work floor, and the second and third pipe supports A roof member is provided to protect from rain water or snow during the installation operation of the lining plate lifted by the suspension hook.

また、本発明のライニングプレート据付兼雨養生治具を用いたライニングプレート据付方法は、上記目的を達成するために、複数枚にまとめて容器状のライニング内張り容器に搬入されたライニングプレートを、上記構成のライニングプレート据付兼雨養生治具を用いて屋根部材により雨水又は雪から防護した状態で1枚毎に吊り上げると共に、前記ライニングプレートを1枚毎に雨水又は雪から防護した状態で前記ライニング内張り容器の内側の所定位置に移動して据付けることを特徴とする。   Further, the lining plate installation method using the lining plate installation and rain curing jig of the present invention, in order to achieve the above object, the lining plate carried into a plurality of container-like lining inner liner containers, The lining lining is installed while protecting it from rain water or snow by the roof member using the lining plate installation and rain curing jig of the configuration, and the lining lining in a state where the lining plate is protected from rain water or snow one by one It is characterized in that it is moved and installed at a predetermined position inside the container.

本発明によれば、大型揚重設備を用いて躯体工事と機械工事を併用して行うものであっても、各々の工事の作業効率を阻害することなく、しかも、ライニングプレートの据付作業の際には雨水や雪等から防護することができる。   According to the present invention, even when the frame work and the machine work are performed in combination using the large lifting equipment, the work of installing the lining plate can be performed without impairing the work efficiency of each work. Can be protected from rainwater and snow.

本発明のライニングプレート据付兼雨養生治具の実施例1が、原子力発電所等で用いられるライニング内張り容器である燃料貯蔵プールに設置された状態を示す縦断面図である。1 is a longitudinal sectional view showing a state in which a lining plate installation and rain curing jig of the present invention is installed in a fuel storage pool which is a lining lining container used in a nuclear power plant or the like. 図1のライニングプレート据付兼雨養生治具の詳細を示す拡大断面図である。It is an expanded sectional view which shows the detail of the lining plate installation and rain curing jig of FIG. 本発明のライニングプレート据付兼雨養生治具の実施例1における作業工程を説明するための縦断面図である。It is a longitudinal cross-sectional view for demonstrating the operation | work process in Example 1 of the lining plate installation and rain curing jig of this invention. ライニング内張り容器の内側にライニングプレートを据付ける従来の工法を説明するための縦断面図である。It is a longitudinal cross-sectional view for demonstrating the conventional construction method which installs a lining plate inside a lining lining container.

以下、図示した実施例に基づいて本発明のライニングプレート据付兼雨養生治具及びこの治具を用いたライニングプレート据付方法を説明する。   Hereinafter, a lining plate installation and rain curing jig of the present invention and a lining plate installation method using this jig will be described based on the illustrated embodiment.

図1及び図2に、本発明のライニングプレート据付兼雨養生治具の実施例1が、原子力発電所等で用いられるライニング内張り容器である燃料貯蔵プールに設置された状態を示す。   1 and 2 show a first embodiment of the lining plate installation and rain curing jig of the present invention installed in a fuel storage pool which is a lining lining container used in a nuclear power plant or the like.

該図に示す如く、本実施例のライニングプレート据付兼雨養生治具7は、横行レール9と、この横行レール9と直交するように配置されて横行レール9を支持するH鋼材から成る長尺な大引き8と、横行レール9を横行可能とするギヤトロリ10と、ギヤトロリ10に取付けられたホイストクレーン11と、このホイストクレーン11に設けられた第1の吊りフック12aと、ホイストクレーン11に設けられた第1の吊りフック12aを介して取り付けられたチェーンブロック装置13と、このチェーンブロック装置13に設けられた第2の吊りフック12bと、長尺な大引き8の一方側(図2の右側)を支持し、容器状構造物のライニング内張り容器(燃料貯蔵プール)3のオペレーションフロア1に設けられた手摺り5bに取付けられている第1のパイプサポート14aと、長尺な大引き8の他方側(図2の左側)を支持し、ライニング内張り容器3内に設置された作業床4bに取付けられている大引き受け15と、手摺り5bに取付けられている第2のパイプサポート14bと、作業床4bに取付けられている第3のパイプサポート14cと、第2及び第3のパイプサポート14b及び14cに支持され、第2の吊りフック12bで吊上げられたライニングプレート6a、6bの据付け作業時に雨水又は雪から防護する屋根部材16とから概略構成されている。   As shown in the figure, the lining plate installation and rain curing jig 7 of the present embodiment is a long rail made of H steel material which is disposed so as to be orthogonal to the traverse rail 9 and the traverse rail 9. Provided on the hoist crane 11, a hoist crane 11 attached to the walk trolley 10, a first suspension hook 12a provided on the hoist crane 11, and a hoistway crane 8 capable of traversing the traverse rail 9; The chain block device 13 attached via the first suspension hook 12a, the second suspension hook 12b provided on the chain block device 13, and one side of the long pull 8 (FIG. 2 On the right side) and attached to the handrail 5b provided on the operation floor 1 of the lining lining container (fuel storage pool) 3 of the container-like structure A first pipe support 14a, and a large support 15 which is supported on the other side (left side in FIG. 2) of the long large pull 8 and is attached to a work floor 4b installed in the lining lining container 3; Supported by a second pipe support 14b attached to the handrail 5b, a third pipe support 14c attached to the work floor 4b, and second and third pipe supports 14b and 14c; It is roughly comprised from the roof member 16 protected from rain water or snow at the time of installation work of lining plate 6a, 6b lifted with the suspending hook 12b.

なお、チェーンブロック装置13は必ずしも必要とはせず、また、横行可能なホイストクレーン11を、ギヤトロリ10を介さずに直接横行レール9に設置してもライニングプレート6a、6bの据付作業は可能である。   The chain block device 13 is not always necessary, and the installation work of the lining plates 6a and 6b is possible even if the traversable hoist crane 11 is installed directly on the traverse rail 9 without the gear trolley 10 is there.

そして、図1に示すように、予め大型揚重設備(例えば、クレーン)2でライニングプレート6aを、ライニング内張り容器3内の所定の位置に搬入後、本実施例のライニングプレート据付兼雨養生治具7を用いて、ライニング内張り容器3の内側の全周に渡り設置されている既存の足場等からなる作業床4a及び4bと、ライニング内張り容器3内への墜落防止用の手摺り5a及び5bを利用して設置する。   Then, as shown in FIG. 1, after carrying in the lining plate 6a to a predetermined position in the lining container 3 in advance with a large lifting equipment (for example, a crane) 2, the lining plate installation and rain curing of this embodiment Working floors 4a and 4b made of existing scaffolds and the like installed all over the inside of lining lining container 3 using tool 7 and handrails 5a and 5b for preventing falling into lining lining container 3 Install using.

図1では、一部分のみの設定状態を示しているが、屋根部材16については、ライニング内張り容器3の全周に設置し、モノレールについてはライニングプレートの設置作業を実施している壁だけに設置し、据付作業が完了する毎に移動するものである。   Although FIG. 1 shows only a part of the set state, the roof member 16 is installed on the entire periphery of the lining lining container 3 and the monorail is installed only on the wall on which the lining plate is installed. , Move every time the installation work is completed.

また、本実施例のライニングプレート据付兼雨養生治具7は、既存の足場等からなる作業床4b及び墜落防止用に設けられた手摺り5bより支持できるものであり、第1のパイプサポート14a及び大引き受け15によって支持されている。この第1のパイプサポート14a及び大引き受け15は、足場材で用いられるジャッキベース等の高さを調整できる構造を持つものである。   In addition, the lining plate installation and rain curing jig 7 of the present embodiment can be supported by the work floor 4b made of existing scaffolding and the like and the handrail 5b provided for preventing the fall, and the first pipe support 14a And supported by a large underwriter15. The first pipe support 14a and the large support 15 have a structure capable of adjusting the height of a jack base or the like used in the scaffold material.

また、第1のパイプサポート14aとH鋼材からなる大引き8との取り合い部は、ボルト等で締結できる構造をもつものである(図示せず)。また、H鋼材からなる大引き8と作業床4bの取り合い部は、大引き受け15によって支持されている。これにより、大引き8が作業床4bに強固に固定される。   Further, the connecting portion between the first pipe support 14a and the large pull 8 made of H steel material has a structure that can be fastened by a bolt or the like (not shown). Further, the connection between the large pull 8 made of H steel and the work floor 4 b is supported by a large take on 15. As a result, the large pull 8 is firmly fixed to the work floor 4 b.

更に、本実施例のライニングプレート据付兼雨養生治具7には、雨水や雪等からの防護設備である屋根部材16(第2及び第3のパイプサポート14b及び14cに支持されている)を具備しており、ライニングプレートの据付作業におけるライニングプレートの貼り付け溶接は勿論、雨水や雪等からの影響を防護可能となる。   Furthermore, in the lining plate installation and rain curing jig 7 of this embodiment, a roof member 16 (supported by the second and third pipe supports 14b and 14c), which is a protection facility against rain water, snow, etc. It is possible to protect the influence from rain water, snow, etc. as well as sticking welding of the lining plate in the installation work of the lining plate.

図4に、比較のためライニング内張り容器3の内側にライニングプレートを据付ける従来の工法を示す。   FIG. 4 shows a conventional method of installing a lining plate inside the lining liner container 3 for comparison.

該図に示す如く、通常、オペレーションフロア1に設置されているライニング内張り容器3の内側の全周に渡り足場等からなる作業床4a及び4bが設置されており、更に、ライニング内張り容器3内への墜落防止用の手摺り5a及び5bが設けられている。   As shown in the figure, generally, work floors 4a and 4b made of a scaffold etc. are installed all over the inside of lining lining container 3 installed on operation floor 1, and further, inside lining lining container 3 Handrails 5a and 5b are provided for preventing the fall.

従って、従来の工法では、オペレーションフロア1に設置された大型揚重設備2より躯体コンクリートを構築するための躯体工事と、躯体表面にライニングプレートを設置する機械工事の2種類の工事が併進して作業が行われているため、ライニングプレートを設置する機械工事は、大型揚重設備2の使用制限の他、雨水や雪等からの防護設備の設置が困難であり、作業を実施するタイミングに影響を受けていた。   Therefore, in the conventional construction method, there are two types of construction work: construction of a frame concrete from the large lifting equipment 2 installed on the operation floor 1, and construction of a lining plate on the surface of the construction. Since the work is being carried out, mechanical work to install lining plates is difficult to set up protection equipment against rain water, snow, etc., in addition to the use restriction of large lifting equipment 2, which affects the timing to carry out the work It was received.

このように、従来の工法では、大型揚重設備2を用いて作業した場合には、雨水や雪等からの防護設備を設置するのは困難であったが、本実施例のライニングプレート据付兼雨養生治具7を用いれば、容易に雨水や雪等からの防護設備が設置可能となる。   Thus, in the conventional construction method, when working with the large lifting equipment 2, it was difficult to install protection equipment from rain water, snow, etc. If the rain curing jig 7 is used, protection equipment from rain water, snow, etc. can be easily installed.

図3を用いて、本実施例のライニングプレート据付兼雨養生治具7における作業工程について説明する。   The work process in the lining plate installation and rain curing jig 7 of this embodiment will be described with reference to FIG.

該図に示す如く、本実施例では、複数枚にまとめて容器状のライニング内張り容器3に搬入されたライニングプレート6aを、上述したライニングプレート据付兼雨養生治具7を用いて屋根部材16により雨水又は雪から防護した状態で1枚毎に吊り上げると共に、ライニングプレート6aを1枚毎に雨水又は雪から防護した状態でライニング内張り容器3の内側の所定位置に移動して据付けるものである。   As shown in this figure, in the present embodiment, the lining plate 6a carried into a plurality of container-like lining lining containers 3 is carried by the roof member 16 using the lining plate installation and rain curing jig 7 described above. While being lifted one by one in a state protected from rain water or snow, the lining plate 6a can be moved to a predetermined position inside the lining container 3 while being protected from rain water or snow one by one.

即ち、ライニングプレートの据付手順としては、複数枚にまとめて搬入したライニングプレート6aを、本実施例のライニングプレート据付兼雨養生治具7を用いて1枚毎に吊上げ(この状態がライニングプレート6b)、決められたライニング内張り容器3内の設定位置に移動し、ライニングプレート6aを据付けるものである。   That is, as the installation procedure of the lining plate, the lining plate 6a which has been carried into a plurality of sheets collectively is lifted one by one using the lining plate installation and rain curing jig 7 of this embodiment (this state is the lining plate 6b ), It moves to the set position in the lining lining container 3 decided, and installs the lining plate 6a.

この際、ライニング内張り容器3の内側の所定位置に移動して据付けられた複数枚のライニングプレート6b同士は、屋根部材16により雨水や雪から防護した状態で溶接接合される。   At this time, the plurality of lining plates 6b moved to a predetermined position inside the lining container 3 are welded and joined together in a state protected from rain water and snow by the roof member 16.

このように、本実施例のライニングプレート据付兼雨養生治具7を用いれば、躯体コンクリートを構築するための躯体工事に影響なく、また、併用されていた大型揚重設備2の使用に制限等なく、躯体表面にライニングプレート6bを設置する機械工事が可能であり、長期間、コンクリート躯体に屋根部材が無い状態が続く中でも、溶接品質他に影響なくライニングプレート6bの据付作業が可能となる。   Thus, if the lining plate installation and rain curing jig 7 of this embodiment is used, there is no influence on the frame construction for constructing the frame concrete, and the use of the large lifting equipment 2 used in combination is also restricted. Instead, the mechanical work of installing the lining plate 6b on the surface of the casing is possible, and the installation work of the lining plate 6b can be performed without any influence on the welding quality and the like even if the concrete casing does not have a roof member for a long time.

従って、本実施例によれば、ライニング内張り容器3の工事において、躯体工事と機械工事各々の作業効率を阻害することなく、従来併用されていた大型揚重設備2は、ライニングプレート6aをライニング内張り容器3内に搬入した以降は使用せずとも機械工事のライニングプレート据付作業が可能となり、機械工事の作業を実施するタイミングに影響がない。また、従来工法では雨水や雪等からの防護設備の設置が困難であったが、雨水や雪等からの防護設備(屋根部材16)を具備しているため、雨水や雪等からの防護が可能であり、ライニングプレート貼り付け溶接の溶接品質にも影響を低減することができる。   Therefore, according to the present embodiment, in the construction of the lining container 3, the large lifting equipment 2 conventionally used in combination with the lining plate 6 a as the lining without disturbing the work efficiency of each of the frame construction and the machine construction. After being carried into the container 3, the lining plate installation work of the mechanical work becomes possible without using it, and there is no influence on the timing of carrying out the work of the mechanical work. Moreover, although it was difficult to install protection equipment from rainwater and snow etc. by the conventional construction method, protection equipment from rainwater and snow etc. is provided because protection equipment (roof member 16) from rain water and snow etc is provided. It is possible, and the influence can also be reduced on the welding quality of lining plate affixing welding.

また、全てのライニングプレート6bの据付作業が完了したら、隣の壁のライニングプレートを据付けるが、溶接作業でも本実施例の雨養生屋根(屋根部材16)を使用するため、雨養生屋根を残置したまま、下部のチェーンブロック13、ホイストクレーン11、ギヤトロリ10、横行レール9、大引き8、大引き受け15、第1のパイプサポート14aだけを順番に解体できる構造としている。これらを解体後は、ライニングプレート据付兼雨養生治具7を隣の壁の養生屋根の下に本実施例と同様に設置し、ライニングプレートの据付け作業に使用する。   In addition, when the installation work of all lining plate 6b is completed, the lining plate of the next wall is installed, but in order to use the rain curing roof (roof member 16) of this example also in the welding work, leaving a rain curing roof As it is, only the lower chain block 13, the hoist crane 11, the gear trolley 10, the traverse rail 9, the large pulling 8, the large underwriting 15, and the first pipe support 14a can be disassembled in order. After disassembling these, the lining plate installation and rain curing jig 7 is installed under the curing roof of the adjacent wall in the same manner as the present embodiment and used for the lining plate installation work.

なお、本発明は上記した実施例に限定されるものではなく、様々な変形例が含まれる。例えば、上記した実施例は本発明を分かり易く説明するために詳細に説明したものであり、必ずしも説明した全ての構成を備えるものに限定されるものではない。また、ある実施例の構成の一部を他の実施例の構成を置き換えることが可能であり、また、ある実施例の構成に他の実施例の構成を加えることも可能である。また、各実施例の構成の一部について、他の構成の追加・削除・置換をすることが可能である。   The present invention is not limited to the embodiments described above, but includes various modifications. For example, the embodiments described above are described in detail in order to explain the present invention in an easy-to-understand manner, and are not necessarily limited to those having all the configurations described. Also, part of the configuration of one embodiment can be replaced with the configuration of another embodiment, and the configuration of another embodiment can be added to the configuration of one embodiment. In addition, with respect to a part of the configuration of each embodiment, it is possible to add, delete, and replace other configurations.

1…オペレーションフロア、2…大型揚重設備、3…ライニング内張り容器、4a、4b…作業床、5a、5b…手摺り、6a、6b…ライニングプレート、7…ライニングプレート据付兼雨養生治具、8…大引き、9…横行レール、10…ギヤトロリ、11…ホイストクレーン、12a…第1の吊フック、12b…第2の吊フック、13…チェーンブロック装置、14a…第1のパイプサポート、14b…第2のパイプサポート、14c…第3のパイプサポート、15…大引き受け、16…屋根部材。   DESCRIPTION OF SYMBOLS 1 ... Operation floor, 2 ... large-scale lifting equipment, 3 ... lining lining container, 4a, 4b ... work floor, 5a, 5b ... handrail, 6a, 6b ... lining plate, 7 ... lining plate installation and rain curing jig, 8: large pulling, 9: traverse rail, 10: gear trolley, 11: hoist crane, 12a: first suspension hook, 12b: second suspension hook, 13: chain block device, 14a: first pipe support, 14b ... 2nd pipe support, 14c ... 3rd pipe support, 15 ... large acceptance, 16 ... roof member.

Claims (7)

容器状構造物のライニング内張り容器の内側に、複数のライニングプレートを据付ける際に用いられるライニングプレート据付兼雨養生治具であって、
前記ライニングプレート据付兼雨養生治具は、横行レールと、該横行レールを支持するH鋼材から成る長尺な大引きと、前記横行レールを横行可能とするトロリを介して取付けられるか又は前記横行レールに直接取付けられたホイストクレーンと、該ホイストクレーンに設けられた吊りフックと、前記長尺な大引きの一方側を支持し、前記容器状構造物に設けられた手摺りに取付けられている第1のパイプサポートと、前記長尺な大引きの他方側を支持し、前記ライニング内張り容器内に設置された作業床に取付けられている大引き受けと、前記手摺りに取付けられている第2のパイプサポートと、前記作業床に取付けられている第3のパイプサポートと、前記第2及び第3のパイプサポートに支持され、前記吊りフックで吊上げられた前記ライニングプレートの据付け作業時に雨水又は雪から防護する屋根部材とを備えていることを特徴とするライニングプレート据付兼雨養生治具。
A lining plate installation and rain curing jig used when installing a plurality of lining plates inside a lining lining container of a container-like structure, comprising:
The lining plate installation and rain curing jig is attached or traversed through a traverse rail, a long, large pull consisting of H steel material supporting the traverse rail, and a trolley capable of traversing the traverse rail A hoist crane directly attached to a rail, a suspending hook provided to the hoist crane, and one side of the long and large pull are supported and attached to a handrail provided to the container-like structure A first support for the pipe and the other end of the elongated pull, and a second support attached to a work floor installed in the lining liner vessel, and a second attached to the handrail A third pipe support attached to the work floor, and the second and third pipe supports supported by the work floor and lifted by the suspension hook Lining plate mounting and rain curing jig, characterized in that it comprises a roof member to protect from rain or snow during the installation work of innings plate.
請求項1に記載のライニングプレート据付兼雨養生治具において、
前記ホイストクレーンに設けられた前記吊りフックを介してチェーンブロック装置が取り付けられ、該チェーンブロック装置に設けられた第2の吊りフックで前記ライニングプレートが吊上げられることを特徴とするライニングプレート据付兼雨養生治具。
In the lining plate installation and rain curing jig according to claim 1,
A lining plate is installed and installed, characterized in that a chain block device is attached via the suspension hook provided on the hoist crane, and the lining plate is lifted by a second suspension hook provided on the chain block device. Curing jig.
請求項1又は2に記載のライニングプレート据付兼雨養生治具において、
前記手摺りは、前記容器状構造物に設けられた前記ライニング内張り容器内への墜落防止用であり、前記作業床は、前記ライニング内張り容器の内側の容器全周に設けられた渡り足場であることを特徴とするライニングプレート据付兼雨養生治具。
In the lining plate installation and rain curing jig according to claim 1 or 2,
The handrail is for preventing falling into the lining liner container provided in the container-like structure, and the work floor is a transition scaffold provided on the entire circumference of the container inside the lining liner container. Lining plate installation and rain curing jig characterized by that.
請求項1乃至3のいずれか1項に記載のライニングプレート据付兼雨養生治具において、
前記大引き受け及び前記第1のパイプサポートは、高さが調整できるジャッキベースであることを特徴とするライニングプレート据付兼雨養生治具。
In the lining plate installation and rain curing jig according to any one of claims 1 to 3,
A lining plate installation and rain curing jig characterized in that the large acceptance and the first pipe support are jack bases whose height can be adjusted.
請求項1乃至4のいずれか1項に記載のライニングプレート据付兼雨養生治具において、
前記大引き受けと前記第1のパイプサポートは、ボルトで締結されていることを特徴とするライニングプレート据付兼雨養生治具。
In the lining plate installation and rain curing jig according to any one of claims 1 to 4,
A lining plate installation and rain curing jig characterized in that the large support and the first pipe support are fastened by bolts.
複数枚にまとめて容器状のライニング内張り容器に搬入されたライニングプレートを、請求項1乃至5のいずれか1項に記載のライニングプレート据付兼雨養生治具を用いて屋根部材により雨水又は雪から防護した状態で1枚毎に吊り上げると共に、前記ライニングプレートを1枚毎に雨水又は雪から防護した状態で前記ライニング内張り容器の内側の所定位置に移動して据付けることを特徴とするライニングプレート据付兼雨養生治具を用いたライニングプレート据付方法。   A lining plate carried into a plurality of container-like lining lining containers is carried out from rain water or snow by a roof member using a lining plate installation and rain curing jig according to any one of claims 1 to 5. A lining plate is characterized in that it is lifted in a guarded state one by one, and the lining plate is moved and installed at a predetermined position inside the lining lining container while being protected from rain water or snow one by one. Lining plate installation method using a rain curing jig. 請求項6に記載のライニングプレート据付兼雨養生治具を用いたライニングプレート据付方法において、
前記ライニング内張り容器の内側の所定位置に移動して据付けられた複数枚の前記ライニングプレート同士は、雨水又は雪から防護した状態で溶接接合されることを特徴とするライニングプレート据付兼雨養生治具を用いたライニングプレート据付方法。
In a lining plate installation method using a lining plate installation and rain curing jig according to claim 6,
A lining plate installation and rain curing jig characterized in that a plurality of the lining plates moved and installed to a predetermined position inside the lining lining container are welded and protected in a state protected from rain water or snow. Lining plate installation method using.
JP2016008455A 2016-01-20 2016-01-20 Lining plate installation and rain curing jig and lining plate installation method using the jig Active JP6534938B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016008455A JP6534938B2 (en) 2016-01-20 2016-01-20 Lining plate installation and rain curing jig and lining plate installation method using the jig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016008455A JP6534938B2 (en) 2016-01-20 2016-01-20 Lining plate installation and rain curing jig and lining plate installation method using the jig

Publications (2)

Publication Number Publication Date
JP2017128907A JP2017128907A (en) 2017-07-27
JP6534938B2 true JP6534938B2 (en) 2019-06-26

Family

ID=59395479

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016008455A Active JP6534938B2 (en) 2016-01-20 2016-01-20 Lining plate installation and rain curing jig and lining plate installation method using the jig

Country Status (1)

Country Link
JP (1) JP6534938B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108766605B (en) * 2018-05-22 2020-04-24 广东核电合营有限公司 Method for positioning grid in spent fuel pool of million-kilowatt nuclear power plant
CN114260634B (en) * 2022-01-21 2023-07-25 中车株洲车辆有限公司 Underframe assembling tool and assembling method

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5761162A (en) * 1980-09-29 1982-04-13 Hitachi Ltd Lining plate assembling apparatus
JP2615080B2 (en) * 1987-10-15 1997-05-28 西松建設株式会社 Construction method of inner wall of existing underground tank
JP2602190Y2 (en) * 1993-08-05 1999-12-27 日本セイフティー株式会社 Simple scaffolding roof
JP2597404Y2 (en) * 1993-10-07 1999-07-05 日本ビソー株式会社 All-weather work gondola
JPH1077742A (en) * 1996-07-11 1998-03-24 Hitachi Ltd How to build a plant
JP2955849B2 (en) * 1998-02-06 1999-10-04 川崎重工業株式会社 Construction method of building under temporary roof

Also Published As

Publication number Publication date
JP2017128907A (en) 2017-07-27

Similar Documents

Publication Publication Date Title
CN107558723B (en) Method for manufacturing and installing hanging bracket of hanging basket for inclined roof
CN104947926B (en) Hard protection device for upper formwork system of inner barrel of core barrel and construction method of hard protection device
CN103206089A (en) Fabricated aluminum alloy formwork system construction method
CN104032967B (en) Prefabricated assembled frame structure component construction method for hanging
CN106437188B (en) A kind of reinforced concrete structure girder adds the reinforcement means of steel construction box beam
CN105569242A (en) Assembling method for composite floor slabs
CN104264706B (en) External elevator steel beam foundation structure and construction method thereof
CN204001652U (en) The portable exterior wall operating platform of fabricated shear wall structure
JP6534938B2 (en) Lining plate installation and rain curing jig and lining plate installation method using the jig
CN102392550A (en) Reverse installation method for flue gas desulfurization and absorption tower
CN103114754A (en) Alternative hoisting method for conjoined coal bunker top truss girder pre-placing
CN202945798U (en) Overhanging type scaffold corner device
CN108868101A (en) Super high-rise roofing curtain wall installation system and construction method thereof
CN104775606A (en) Operation platform for prefabricated assembled residential building wall plate construction and construction method thereof
JP2010242308A (en) Method for demolishing high-rise building of concrete slab structure, and concrete slab demolition equipment
CN104499706A (en) Elevator well template platform and construction method thereof
CN111847272A (en) Supporting method of tower crane for renovation of existing buildings
CN110578338A (en) An integrally movable aluminum alloy formwork system and operation method
CN212359061U (en) PC staircase safety protection operation platform
CN209509453U (en) A kind of skyscraper cast-in-place concrete structure tool-type builder's jack
CN209244309U (en) A kind of curtain wall dismounting device
CN218623494U (en) Structure is demolishd to precast concrete cladding panel
CN110306784A (en) A kind of aluminum tunnel modular system and its operating method
CN109138492A (en) A kind of curtain wall removes device and method for dismounting
CN204402001U (en) For the mobile operating platform system that structure for steel structure roof inner slab is installed

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20180219

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20181119

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20181204

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20190110

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20190514

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20190530

R150 Certificate of patent or registration of utility model

Ref document number: 6534938

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer