JP6544989B2 - Plant construction process change impact assessment device - Google Patents
[go: Go Back, main page]

JP6544989B2 - Plant construction process change impact assessment device - Google Patents

Plant construction process change impact assessment device Download PDF

Info

Publication number
JP6544989B2
JP6544989B2 JP2015095540A JP2015095540A JP6544989B2 JP 6544989 B2 JP6544989 B2 JP 6544989B2 JP 2015095540 A JP2015095540 A JP 2015095540A JP 2015095540 A JP2015095540 A JP 2015095540A JP 6544989 B2 JP6544989 B2 JP 6544989B2
Authority
JP
Japan
Prior art keywords
work
influence
plant construction
calculation unit
construction process
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2015095540A
Other languages
Japanese (ja)
Other versions
JP2016212613A (en
Inventor
洋平 杉本
洋平 杉本
洋 関
洋 関
憲彦 中満
憲彦 中満
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi GE Vernova Nuclear Energy Ltd
Original Assignee
Hitachi-GE Nuclear Energy Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi-GE Nuclear Energy Ltd filed Critical Hitachi-GE Nuclear Energy Ltd
Priority to JP2015095540A priority Critical patent/JP6544989B2/en
Publication of JP2016212613A publication Critical patent/JP2016212613A/en
Application granted granted Critical
Publication of JP6544989B2 publication Critical patent/JP6544989B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、プラント建設時の工程変更における影響を評価するプラント建設工程影響変更評価装置に関する。   BACKGROUND OF THE INVENTION Field of the Invention The present invention relates to a plant construction process influence change evaluation apparatus for evaluating the influence of process change at the time of plant construction.

大規模なプラント建設等においては、種々の要因によって、ある作業工程が他の作業工程に影響する場合があるため、滞りなく作業を進めるためには、それらを事前に把握する必要がある。このような作業工程間の影響把握に関するものとして、例えば、特許文献1(特開2011−253347号公報)には、建設対象である躯体の打設工区と、その打設工区内に設置する機器との位置関係および躯体の建築工程を入力に基づき、当該機器の躯体への搬入可能期間を自動的に算出する技術が開示されている。   In large-scale plant construction and the like, one operation process may affect another operation process due to various factors, so in order to proceed smoothly, it is necessary to grasp them in advance. As related to grasping the influence between such work processes, for example, in Patent Document 1 (Japanese Patent Application Publication No. 2011-253347), a cast-in construction section of a frame to be constructed and equipment installed in the cast-in construction section A technology is disclosed that automatically calculates the period of time in which the device can be carried into the housing based on the positional relationship with and the construction process of the housing.

特開2011−253347号公報JP, 2011-253347, A

ところで、原子力プラントや発電プラント、化学プラントなどの大規模なプラント建設や、大多数の部品の大規模な組立作業を要する製造分野などにおいては、作業工程の一部に変更や遅延が生じるような場合には、他の作業工程および全体工程への影響を的確に把握して対策を検討し、納期遅延の防止・抑制を図ることが重要である。   By the way, in the field of large scale plant construction such as nuclear power plant, power plant, chemical plant, etc., and in the manufacturing field where large scale assembly work of most parts is required, some work processes may be changed or delayed. In this case, it is important to accurately grasp the influence on other work processes and overall processes, to consider measures, and to prevent or suppress the delay in delivery date.

しかしながら、大規模なプラント建設などでは、多種類の作業が複雑に絡み合いながら建設が進められていくため、上記従来技術のように一部の作業工程間の関係を考慮するだけでは不十分であり、ある作業工程の内容変更の全体工程への影響を抑制することができず、納期遅延などの発生が懸念される。   However, in the case of large-scale plant construction, etc., since construction is carried out while various types of work are intertwined in a complex manner, it is not sufficient just to consider the relationship between some work processes as in the above-mentioned prior art. The influence of the content change of a certain work process on the whole process can not be suppressed, and there is a concern that the delivery date may be delayed.

本発明は上記に鑑みてなされたものであり、作業工程の内容変更に係る全体工程への影響をより確実に把握し、抑制することができるプラント建設工程変更影響評価装置を提供することを目的とする。   The present invention has been made in view of the above, and it is an object of the present invention to provide a plant construction process change impact evaluation apparatus capable of more reliably grasping and suppressing the influence on the whole process related to the content change of the work process. I assume.

上記目的を達成するために、本発明は、建設対象となる構造物の建設に係る複数の作業工程の情報を記憶する建設工程情報記憶部と、前記構造物の3次元形状情報を記憶する3次元形状情報記憶部と、前記作業工程の情報と前記3次元形状情報との対応関係である工程−3Dモデルリンク情報を記憶する工程−3Dモデルリンク情報記憶部と、前記複数の作業工程のうち少なくとも1つの作業日程が変更された場合に、前記作業工程の情報と、前記3次元形状情報と、前記工程−3Dモデルリンク情報とに基づいて、その他の作業工程の作業日程への影響を計算する制御部とを備えたものとする。   In order to achieve the above object, the present invention stores a construction process information storage unit that stores information on a plurality of work processes related to construction of a structure to be constructed, and stores three-dimensional shape information of the structure. A dimensional shape information storage unit, a process-3D model link information storage unit for storing a process-3D model link information that is a correspondence between the information on the work process and the three-dimensional shape information, and the plurality of work processes When at least one work schedule is changed, the influence of work schedules on other work processes is calculated based on the information on the work process, the three-dimensional shape information, and the process-3D model link information. And a control unit.

作業工程の内容変更に係る全体工程への影響をより確実に把握し、抑制することができる。   The influence on the whole process concerning the content change of the work process can be grasped more reliably, and it can be controlled.

本発明の一実施の形態に係るプラント建設工程変更影響評価装置の全体構成を概略的に示す図である。BRIEF DESCRIPTION OF THE DRAWINGS It is a figure which shows roughly the whole structure of the plant construction process change influence evaluation apparatus which concerns on one embodiment of this invention. 工程データベースのデータ構造の一例を示す図である。It is a figure which shows an example of the data structure of process database. 3Dモデルデータベースのデータ構造の一例を示す図である。It is a figure which shows an example of the data structure of 3D model database. 工程−3Dモデルリンクデータベースのデータ構造の一例を示す図である。It is a figure which shows an example of the data structure of process 3D model link database. 作業工数データベースのデータ構造の一例を示す図である。It is a figure which shows an example of the data structure of an operation man-hour database. 制御部における建設工程変更影響評価処理の全体を示すフローチャートである。It is a flowchart which shows the whole of construction process change impact evaluation processing in a control part. 物理的距離影響計算部における工程変更影響評価処理としての物理的距離影響計算処理を示すフローチャートである。It is a flowchart which shows physical distance influence calculation processing as process change influence evaluation processing in a physical distance influence calculation part. 作業工程間の作業空間の干渉について説明する図であり、作業場所の重複を説明する図である。It is a figure explaining interference of the work space between work processes, and is a figure explaining duplication of a work place. 作業工程間の作業空間の干渉について説明する図であり、作業期間の重複を説明する図である。It is a figure explaining interference of work space between work processes, and is a figure explaining duplication of a work period. 作業空間干渉影響計算部における工程変更影響評価処理としての作業空間干渉影響計算処理を示すフローチャートである。It is a flowchart which shows the work space interference influence calculation processing as process change influence evaluation processing in a work space interference influence calculation part. 設置対象である設備を囲む壁に関する作業空間干渉影響計算処理を示すフローチャートである。It is a flowchart which shows the work space interference influence calculation process regarding the wall surrounding the installation which is installation object. 設置対象である設備の上方に位置する天井に関する作業空間干渉影響計算処理を示すフローチャートである。It is a flowchart which shows the work space interference influence calculation processing regarding the ceiling located above the installation which is installation object. 作業空間干渉影響計算部における工程変更影響評価処理としての作業リソース影響計算処理を示すフローチャートである。It is a flow chart which shows work resource influence calculation processing as process change influence evaluation processing in work space interference influence calculation part. リソース制約による遅延伝搬のイメージの一例を示す図である。It is a figure which shows an example of the image of the delay propagation by resource restrictions. 出力装置に表示される工程変更影響評価処理の様子を示す図であり、作業工程の変更を入力する前の表示例を示す図である。It is a figure which shows the mode of the process change influence evaluation process displayed on an output device, and is a figure which shows the example of a display before inputting the change of a working process. 出力装置に表示される工程変更影響評価処理の様子を示す図であり、作業工程の変更が入力された場合の工程変更影響評価処理の処理結果の表示例を示す図である。It is a figure which shows the mode of process change impact evaluation processing displayed on an output device, and is a figure showing an example of a display of a processing result of process change impact evaluation processing when change of a work process is inputted.

以下、本発明の実施の形態を図面を参照しつつ説明する。   Hereinafter, embodiments of the present invention will be described with reference to the drawings.

(1)全体構成
図1は、本発明の一実施の形態に係るプラント建設工程変更影響評価装置の全体構成を概略的に示す図である。
(1) Overall Configuration FIG. 1 is a view schematically showing the overall configuration of a plant construction process change impact assessment system according to an embodiment of the present invention.

図1において、プラント建設工程変更影響評価装置100は、建設対象となる構造物の建設に係る複数の作業工程の情報を記憶する建設工程情報データベース1と、構造物の3次元形状情報(3Dモデル)を記憶する3Dモデルデータベース2と、作業工程の情報と3次元形状情報との対応関係である工程−3Dモデルリンク情報を記憶する工程−3Dモデルリンク情報データベース3と、作業物量と作業工数との関係である建設作業工数情報を記憶する建設作業工数情報データベース4と、作業工程の作業日程等の変更の他の作業工程への影響を計算する制御部5と、マウスやキーボードなどにより構成され、作業工程に関する種々の情報の入力を行う入力装置6と、作業工程などの設定画面や計算結果を表示する表示装置等の出力装置7とを備えている。   In FIG. 1, a plant construction process change impact assessment device 100 stores a construction process information database 1 storing information of a plurality of work processes related to construction of a structure to be constructed, and three-dimensional shape information of a structure (3D model ), 3D model link information database 3 storing 3D model link information which is a correspondence relationship between work process information and 3D shape information, 3D model link information database 3, work amount and work man-hour The construction work man-hour information database 4 for storing construction work man-hour information, which is a relationship of (1), the control unit 5 for calculating the influence of changes in work schedules of work processes on other work processes, and a mouse and keyboard , An input device 6 for inputting various information related to the work process, and an output device 7 such as a display screen for displaying a setting screen of the work process or the like and a calculation result It is equipped with a.

(1−1)工程データベース1
図2は、工程データベースのデータ構造の一例を示す図である。
(1-1) Process database 1
FIG. 2 is a view showing an example of the data structure of the process database.

図2において、工程データベース1(以降、工程DB1と称する)には、建設対象となる構造物の建設に係る全体工程計画に含まれる作業工程を単位として複数のレコードが登録されている。各レコードには、プラントID(IDentification:識別子)10、建屋ID11、作業工程ID12、構造物種類13、作業工程名称14、作業エリア15、作業開始日16、作業完了日17、作業物量18、および作業人数19などが設定され格納されている。   In FIG. 2, in the process database 1 (hereinafter referred to as a process DB 1), a plurality of records are registered in units of work processes included in the overall process plan for construction of a structure to be constructed. In each record, plant ID (IDentification: identifier) 10, building ID 11, work process ID 12, structure type 13, work process name 14, work area 15, work start date 16, work completion date 17, work quantity 18, and The number of workers 19 and the like are set and stored.

プラントID10は、各レコードの作業工程の対象となるプラントの名称を表す識別子であり、「P1」などの文字列が格納される。   The plant ID 10 is an identifier that represents the name of the plant that is the target of the work process of each record, and a character string such as "P1" is stored.

建屋ID11は、各レコードの作業工程の対象となる建屋の名称を表す識別子であり、「B1」などの文字列が格納される。   The building ID 11 is an identifier that represents the name of a building that is the target of the work process of each record, and a character string such as “B1” is stored.

作業工程ID12は、各レコードの作業工程を一意に識別するためにそれぞれ付与される識別子であり、例えば「a1−P−1」のような文字列が格納される。   The work process ID 12 is an identifier assigned to uniquely identify the work process of each record, and for example, a character string such as “a1-P-1” is stored.

構造物種類13は、各レコードの作業工程の対象となる構造物の種類を示すものであり、例えば、「配管」、「電気ケーブルトレイ」、「空調ダクト」などの構造物の名称を表す文字列が格納される。   The structure type 13 indicates the type of a structure to be subjected to the work process of each record, and for example, a letter indicating the name of a structure such as "piping", "electric cable tray", "air conditioning duct" Columns are stored.

作業工程名称14は、各レコードの作業工程が工程表などに記載される場合の作業の名称を示すものであり、例えば、「搬入」、「据付」、「溶接」、「コンクリート打設」などの文字列が格納される。   The work process name 14 indicates the name of the work when the work process of each record is described in the process chart etc. For example, "import", "installation", "welding", "concrete placement", etc. The character string of is stored.

作業エリア15は、各レコードの作業工程が実施される作業領域(作業エリア)の名称を示すものであり、例えば「エリア1」や「壁工区A」、又は「a1」のような文字列が格納される。   The work area 15 indicates the name of a work area (work area) in which the work process of each record is performed, and for example, a character string such as "area 1", "wall construction area A", or "a1" Stored.

作業開始日16は、各レコードの作業工程の作業を開始する日付を示すものであり、作業完了日17は、作業工程の作業を完了する日付を示すものである。作業開始日16及び作業完了日17には、例えば、「2015/04/01」(年/月/日)などの日付データが格納される。   The work start date 16 indicates the date when the work of the work process of each record is started, and the work completion date 17 indicates the date when the work of the work process is completed. Date data such as "2015/04/01" (year / month / day) is stored in the work start date 16 and the work completion date 17, for example.

作業物量18は、各レコードの作業工程の対象となる構造物の物量を示すものであり、例えば、作業内容が配管据付作業であれば「100」(点)などの配管部品の数を表す数値が格納され、コンクリート打設であれば「50」(m)などのコンクリートの容積を表す数値が格納される。なお、作業物量15に割り当てられる物量の単位は、別途紙面又はプログラムなどに定義されている場合には、データベース上では数値のみを扱うことが可能である。 The work quantity 18 indicates the quantity of the structure to be subjected to the work process of each record. For example, if the work content is a pipe installation work, a numerical value representing the number of piping parts such as "100" (points) Is stored, and in the case of concrete placement, a numerical value representing the volume of concrete, such as “50” (m 3 ), is stored. In addition, when the unit of the physical quantity allocated to the work quantity 15 is separately defined on a paper surface, a program, or the like, it is possible to handle only numerical values on the database.

作業人数19は、各レコードの作業工程の作業に従事する作業者の人数を表すものであり、例えば「4」(人)などの人数を表す数値が格納される。   The work number 19 represents the number of workers engaged in the work of the work process of each record, and for example, a numerical value representing the number of people such as “4” (person) is stored.

例えば、図2の最上段に示すレコードは、プラント「P1」の建屋「B1」で実施される作業工程「a1−P−1」についてのレコードであり、作業者「4」(人)で配管「100」(点)を「2015/03/01」から「2015/03/30」の期間に「エリア1」に搬入する作業工程に関するものであることがわかる。さらに詳述すると、図2のレコードからは、プラント「P1」における作業エリアの「エリア1」において実施される作業工程として、4つの作業工程「a1−P−1」、「a1−P−2」、「a1−E−1」、及び「a1−D−1」があり、これら4つの作業工程をこの順番で実施するようにそれぞれの作業開始日16と作業完了日17が設定されていることがわかる。さらに、作業内容が「配管」の「据付」、「電気ケーブルトレイ」の「据付」、「空調ダクト」の「据付」である作業工程(a1−P−2、a1−E−1、a1−D−1)の作業期間がそれぞれ重複するよう設定されていることがわかる。また、作業工程の構造物種類13が「配管」である作業工程「a1−P−1」及び「a1−P−2」の作業物量18は配管部品「100」(点)に設定されており、作業人数19は作業工程「a1−P−1」が4人、作業工程「a1−P−2」が3人に設定されていることがわかる。また、作業内容が「電気ケーブルトレイ」の「据付」である作業工程「a1−E−1」の作業物量18は「80」(点)、作業人数19が「3」(人)に設定されており、作業内容が「空調ダクト」の「据付」である作業工程「a1−D−1」の作業物量18は「20」(点)、作業人数が「2」(人)に設定されていることがわかる。   For example, the record shown at the top of FIG. 2 is a record for the work process “a1-P-1” performed in the building “B1” of the plant “P1”, and the piping by the worker “4” (person) It can be seen that it relates to the work process of carrying "100" (points) into "Area 1" during the period from "2015/03/01" to "2015/03/30". More specifically, from the record in FIG. 2, four operation steps "a1-P-1", "a1-P-2" are performed as operation steps performed in "area 1" of the operation area in plant "P1". There are “a1-E-1” and “a1-D-1”, and the work start date 16 and the work completion date 17 are set such that these four work processes are performed in this order. I understand that. Furthermore, the work steps (a1-P-2, a1-E-1, a1-, the work contents being "installation" of "pipe", "installation" of "electric cable tray", and "installation" of "air conditioning duct" It can be seen that the work periods of D-1) are set to overlap with each other. In addition, the work quantity “18” of the work processes “a1-P-1” and “a1-P-2” in which the structure type 13 of the work process is “piping” is set to the piping component “100” (point) It can be seen that the number of workers 19 is set to four for the work process “a1-P-1” and three for the work process “a1-P-2”. In addition, “80” (point) is set as the work volume 18 of the work process “a1-E-1” whose work content is “installation” of “electric cable tray”, and the work number 19 is set to “3” (person) The work quantity 18 of the work process “a1-D-1” whose work content is “installation” of “air conditioning duct” is set to “20” (point) and the number of work people is “2” (person) I understand that

(1−2)3Dモデルデータベース(DB)2
図3は、3Dモデルデータベースのデータ構造の一例を示す図である。
(1-2) 3D model database (DB) 2
FIG. 3 is a view showing an example of the data structure of the 3D model database.

図3において、3Dモデルデータベース2(以降、3DモデルDB2と称する)には、建設対象となる構造物を構成する個々の部品を単位として、各部品の3Dオブジェクト(3次元形状情報)に関する複数のレコードが登録されている。各レコードには、各部品の3Dオブジェクトに関する情報として、プラントID10、建屋ID11、部品ID22、形状情報23、座標情報24、構造物種類13、および作業エリア15などが設定され格納されている。   In FIG. 3, in the 3D model database 2 (hereinafter referred to as 3D model DB 2), a plurality of 3D objects (three-dimensional shape information) relating to each part are made in units of individual parts constituting the structure to be constructed. A record has been registered. In each record, a plant ID 10, a building ID 11, a part ID 22, a shape information 23, a coordinate information 24, a structure type 13, a work area 15, and the like are set and stored as information related to the 3D object of each part.

プラントID10は、工程DB1と同様に、各レコードの部品の作業対象となるプラントの名称を表す識別子であり、「P1」などの文字列が割り当てられる。   The plant ID 10 is an identifier that represents the name of the plant that is the operation target of the parts of each record, as in the process DB 1, and a character string such as “P1” is assigned.

建屋ID11は、工程DB1と同様に、各レコードの部品の作業対象となる建屋の名称を表す識別子であり、「B1」などの文字列が格納される。   Building ID11 is an identifier showing the name of the building used as the object of work of the part of each record like process DB1, and character strings, such as "B1", are stored.

部品ID22は、各レコードの部品を一意に識別するためにそれぞれ付与される識別子であり、各部品を一意に識別することができる長さの文字列が格納される。なお、図3においては、簡略化のために「S1」、「S2」のような文字列が格納される場合を例示している。   The part ID 22 is an identifier assigned to uniquely identify the part of each record, and a character string having a length that can uniquely identify each part is stored. In addition, in FIG. 3, the case where a character string like "S1" and "S2" is stored is illustrated for simplification.

形状情報23は、各レコードの部品の形状の情報を示すものであり、例えば、「直管」、「エルボ」、「直方体」など各部品の形状を表す文字列が割り当てられる。   The shape information 23 indicates the information of the shape of the part of each record, and for example, a character string representing the shape of each part, such as “straight pipe”, “elbow”, and “rectangular parallelepiped” is assigned.

座標情報24は、各レコードの部品の作業領域(作業エリア)における空間的な位置を示すものであり、例えば、部品の形状情報23が「直管」又は「エルボ」である場合は、2つの端面(例えば、上面と底面)を形成する円の中心座標とその半径を表すデータを格納する。また、例えば、部品の形状情報23が「直方体」である場合は、その直方体の各辺を構成する12本の線分の情報(2点の端部の座標)が格納される。   The coordinate information 24 indicates the spatial position of the part of each record in the work area (work area). For example, when the shape information 23 of the part is "straight pipe" or "elbow", Data representing center coordinates of a circle forming an end face (for example, top and bottom) and its radius is stored. Further, for example, when the shape information 23 of the part is a "rectangular parallelepiped", information (coordinates of end portions of two points) of 12 line segments that constitute each side of the rectangular parallelepiped is stored.

構造物種類13は、工程DB1と同様に、各レコードの部品が構成する構造物の種類を示すものであり、例えば、「配管」、「電気ケーブルトレイ」、「空調ダクト」などの構造物の名称を表す文字列が格納される。   The structure type 13 indicates the type of the structure formed by the components of each record, as in the process DB 1. For example, the structure type 13 is a structure such as "piping", "electric cable tray", or "air conditioning duct". A string representing the name is stored.

作業エリア15は、各レコードの部品が据え付けられる作業領域(作業エリア)の名称を示すものであり、工程DB1と同様に、例えば「エリア1」や「壁工区A」、又は「a1」のような文字列が格納される。   The work area 15 indicates the name of the work area (work area) in which the components of each record are installed, and, like the process DB 1, for example, "area 1", "wall work area A", or "a1" String is stored.

(1−3)工程−3Dモデルリンクデータベース(DB)3
図4は、工程−3Dモデルリンクデータベースのデータ構造の一例を示す図である。
(1-3) Process-3D model link database (DB) 3
FIG. 4 is a view showing an example of the data structure of the process-3D model link database.

図4において、工程−3Dモデルリンクデータベース3(以降、工程−3DモデルリンクDB3と称する)には、建設対象となる構造物の建設に係る全体工程計画に含まれる各作業工程と、その作業工程の対象となる構造物を構成する部品の3Dオブジェクトとの対を単位として複数のレコードが登録されている。各レコードには、プラントID10、建屋ID11、作業工程ID12、および部品ID22などが設定され格納されている。   In FIG. 4, in the process-3D model link database 3 (hereinafter referred to as a process-3D model link DB 3), each operation process included in the entire process plan for construction of a structure to be constructed and its operation process A plurality of records are registered in units of pairs of 3D objects of parts constituting the target structure of. In each record, a plant ID 10, a building ID 11, a work process ID 12, a part ID 22, and the like are set and stored.

プラントID10は、工程DB1や3DモデルDB2と同様に、各レコードの作業工程の作業対象となるプラントの名称を表す識別子であり、「P1」などの文字列が割り当てられる。   The plant ID 10 is an identifier representing the name of a plant to be a work target of the work process of each record, similarly to the process DB 1 and the 3D model DB 2, and a character string such as "P1" is assigned.

建屋ID11は、工程DB1や3DモデルDB2と同様に、各レコードの作業工程の作業対象となる建屋の名称を表す識別子であり、「B1」などの文字列が格納される。   The building ID 11 is an identifier representing the name of a building to be a work target of the work process of each record, as in the process DB 1 and the 3D model DB 2, and a character string such as “B 1” is stored.

作業工程ID12は、工程DB1や3DモデルDB2と同様に、各レコードの作業工程を一意に識別するためにそれぞれ付与される識別子であり、例えば「a1−P−1」のような文字列が格納される。   The work process ID 12 is an identifier assigned to uniquely identify the work process of each record, similarly to the process DB 1 and the 3D model DB 2, and for example, a character string such as “a1-P-1” is stored. Be done.

部品ID22は、3DモデルDB2と同様に、各レコードの部品を一意に識別するためにそれぞれ付与される識別子であり、各部品を一意に識別することができる長さの文字列が格納される。なお、図4においても、簡略化のために「S1」、「S2」のような文字列が格納される場合を例示している。   The component ID 22 is an identifier assigned to uniquely identify the component of each record, similarly to the 3D model DB 2, and stores a character string having a length capable of uniquely identifying each component. In addition, also in FIG. 4, the case where a character string like "S1" and "S2" is stored is illustrated for simplification.

図4に例示したレコードからは、プラント「P1」の建屋「B1」において実施される作業工程「a1−P−2」で用いられる部品は「S1」〜「S3」であり、作業工程「a1−D−1」で用いられる部品は「S4」及び「S5」であり、作業工程「a1−E−1」で用いられる部品は「S6」であることがわかる。   From the record illustrated in FIG. 4, the parts used in the work process "a1-P-2" performed in the building "B1" of the plant "P1" are "S1" to "S3", and the work process "a1" The parts used in -D-1 are "S4" and "S5", and the parts used in operation process "a1-E-1" are "S6".

(1−4)作業工数データベース(DB)4
図5は、作業工数データベースのデータ構造の一例を示す図である。
(1-4) Work Effort Database (DB) 4
FIG. 5 is a view showing an example of the data structure of the work effort database.

図5において、作業工程データベース4(以降、作業工程DB4と称する)には、作業工程における作業の種類に対応する作業工数原単位を単位として複数のレコードが登録されている。各レコードには、プラントID10、建屋ID11、構造物種類13、作業工程名称14、および作業工数原単位44などが設定され格納されている。作業の種類は、プラントID10、建屋ID11、構造物種類13および作業工程名称14の組合せによって特定される。   In FIG. 5, in the work process database 4 (hereinafter referred to as work process DB 4), a plurality of records are registered in units of work man-hour basis units corresponding to types of work in the work process. In each record, a plant ID 10, a building ID 11, a structure type 13, a work process name 14, a work man-hour basis 44, and the like are set and stored. The type of work is specified by a combination of plant ID 10, building ID 11, structure type 13 and work process name 14.

プラントID10は、工程DB1や3DモデルDB2、工程−3DモデルリンクDB3などと同様に、各レコードの作業工程の作業対象となるプラントの名称を表す識別子であり、「P1」などの文字列が割り当てられる。   The plant ID 10 is an identifier representing the name of a plant to be a work target of the work process of each record, similarly to the process DB 1, 3D model DB 2, process-3D model link DB 3, etc. A character string such as “P1” is assigned. Be

建屋ID11は、工程DB1や3DモデルDB2、工程−3DモデルリンクDB3などと同様に、各レコードの作業工程の作業対象となる建屋の名称を表す識別子であり、「B1」などの文字列が格納される。   The building ID 11 is an identifier representing the name of a building to be a work target of the work process of each record, as in the process DB 1, 3D model DB 2, process-3D model link DB 3, etc. A character string such as “B1” is stored Be done.

構造物種類13は、工程DB1や工程−3DモデルリンクDB3などと同様に、各レコードの部品が構成する構造物の種類を示すものであり、例えば、「配管」、「電気ケーブルトレイ」、「空調ダクト」などの構造物の名称を表す文字列が格納される。   The structure type 13 indicates the type of the structure formed by the components of each record, as in the process DB 1 and the process 3D model link DB 3, and, for example, “pipe”, “electric cable tray”, A character string representing the name of a structure such as “air conditioning duct” is stored.

作業工程名称14は、工程DB1と同様に、各レコードの作業工程が工程表などに記載される場合の作業の名称を示すものであり、例えば、「搬入」、「据付」、「溶接」、「コンクリート打設」などの文字列が格納される。   The work process name 14 indicates the name of the work when the work process of each record is described in the process chart or the like, as in the process DB 1 and, for example, “carrying in”, “installation”, “welding”, A text string such as "concrete placement" is stored.

作業工数原単位44は、プラントID10、建屋ID11、構造物種類13および作業工程名称14の組合せによって特定される作業の種類において、単位物量あたりの作業工数を表すものであり、その作業工数を表す数値が格納される。例えば、「配管」の「搬入」に係る作業において、配管部品1点当り1人/日の場合、作業工数原単位44は「1」となる。なお、図5においては、説明のために作業工数原単位44を「M1」、「M2」等の記号で示す。   The unit number of man-hours of work 44 represents the number of man-hours of work per unit amount of substance in the type of work specified by the combination of the plant ID 10, the building ID 11, the structure type 13 and the work process name 14 A numerical value is stored. For example, in an operation relating to “carrying in” of “piping”, in the case of 1 person / day per 1 piping component, the working manhour unit 44 is “1”. In addition, in FIG. 5, the work man-hour basic unit 44 is shown by symbols, such as "M1" and "M2", for description.

図5のレコードによって、作業工数DB4の各作業工数原単位44は、プラントID10、建屋ID11、構造物種類13、及び作業工程名称14の4つによって、工程DB1の作業工程(各レコード)と対応づけることができる。そして、作業工数DB4の各レコードの作業工数原単位44と工程DB1の対応するレコードの作業物量18との積をとることで、作業工程毎の作業工数を計算することができる。   By the record of FIG. 5, each operation man-hour basic unit 44 of the operation man-hour DB 4 corresponds to the operation process (each record) of the process DB 1 by four of plant ID 10, building ID 11, structure type 13 and operation process name 14. Can be Then, by taking the product of the working man-hour basic unit 44 of each record of the work man-hour DB 4 and the work quantity 18 of the corresponding record of the process DB 1, the work man-hour for each work process can be calculated.

例えば、図5の上から二段目に示すレコードは、プラント「P1」の建屋「B1」で実施される「配管」の「据付」についての作業工数原単位はM2であることがわかる。また、図2の工程DB1に例示したレコードにおいて、プラントID10が「P1」で構造物種類13が「配管」であり、作業工程名称14が「据付」である作業工程としては「a1−P−2」があり、この作業工程の作業物量は100であることから、作業工程「a1−P−2」の作業工数は100×M2として計算することができる。   For example, in the record shown in the second row from the top of FIG. 5, it is understood that the working man-hour basis unit for “installation” of “piping” performed in the building “B1” of the plant “P1” is M2. Further, in the record illustrated in the process DB 1 of FIG. 2, the plant ID 10 is “P1”, the structure type 13 is “piping”, and the work process name 14 is “installation” “a1-P-”. Since there are 2 "and the amount of work items in this work process is 100, the work man-hour of the work process" a1-P-2 "can be calculated as 100 x M2.

(1−5)制御部5
図1において、制御部5は、建設工程変更影響評価装置100全体の動作を制御するとともに、作業工程全体を管理する作業工程管理処理を実施するものであり、工程DB1や3DモデルDB2、工程−3DモデルリンクDB3、作業工数データベース(DB)4などからの情報に基づいて各作業工程間に生じる影響を計算する物理的距離影響計算部51、作業空間干渉影響計算部52、及び作業リソース影響計算部53を備えている。
(1-5) Control unit 5
In FIG. 1, the control unit 5 controls the operation of the entire construction process change impact evaluation apparatus 100 and implements work process management processing for managing the entire work process. The process DB 1 and 3D model DB 2, process − Physical distance influence calculation unit 51, work space interference effect calculation unit 52, and work resource influence calculation that calculate the influence between each work process based on information from 3D model link DB 3 and work man-hour database (DB) 4 etc. The unit 53 is provided.

図6は、制御部における建設工程変更影響評価処理の全体を示すフローチャートである。   FIG. 6 is a flowchart showing the entire construction process change impact evaluation process in the control unit.

図6において、制御部5は、まず、作業工程(全体工程)の工程表の表示範囲の設定を読み込む(ステップS100)。工程表の表示範囲の設定は、入力装置6や出力装置7により構成されるGUI(Graphical User Interface)を用いてオペレータにより予め設定される。次に、読み込んだ表示範囲の工程、3Dモデル、工程−3Dモデルリンクの情報を工程DB1、3DモデルDB2及び工程−3DモデルリンクDB3から読み込む(ステップS110)。続いて、読み込んだ作業工程において、オペレータが入力装置6等により入力した開始日および完了日の変更に関する情報を読み込む(ステップS120)。   In FIG. 6, first, the control unit 5 reads the setting of the display range of the process chart of the work process (whole process) (step S100). The setting of the display range of the process chart is preset by the operator using a GUI (Graphical User Interface) configured by the input device 6 and the output device 7. Next, the information of the process, 3D model, and process-3D model link of the read display range is read from the process DB1, 3D model DB2 and process-3D model link DB3 (step S110). Subsequently, in the read work process, the information on the change of the start date and the completion date input by the operator using the input device 6 or the like is read (step S120).

ここで、工程のデータの順序制約条件をチェックし(ステップS130)、順序制約に違反する作業工程があるかどうかを判定する(ステップS140)。工程のデータの順序制約条件は、各作業工程間における先行・後続の順序の制約であり、工程のデータ毎に予め設定されて付されている。   Here, the order constraint condition of process data is checked (step S130), and it is determined whether there is a work process that violates the order constraint (step S140). The order constraint condition of process data is a constraint on the order of preceding and succeeding processes between work processes, and is preset and attached to each process data.

ステップS140での判定結果がYESの場合には、作業工程日程修正処理を実施し(ステップS150)、ステップS130の処理に戻る。作業工程日程修正処理は、例えば、制約を解消するような最小の日付変更量で後続の作業工程を後ろ倒しにするか、または、先行する作業工程を前倒しに修正する処理であり、修正結果を図示しない記憶装置に格納する。   If the determination result in step S140 is YES, the work process schedule correction process is performed (step S150), and the process returns to step S130. The work process schedule correction process is, for example, a process that backs up the subsequent work process with a minimum date change amount that eliminates the constraint, or a process that corrects the preceding work process in an accelerated manner, and corrects the correction result. Store in a storage device not shown.

また、ステップS140での判定結果がNOの場合には、作業工程の変更を行ったかどうかを判定し(ステップS160)、判定結果がNOの場合には処理を終了する。また、ステップS160での判定結果がYESの場合には、各情報に基づいて工程変更影響評価処理を実施し(ステップS170)、処理を終了する。工程変更影響評価処理は、作業工程の変更が他の作業工程に及ぼす影響を評価するものであり、物理的距離影響計算部51、作業空間干渉影響計算部52、及び作業リソース影響計算部53の少なくとも1つにより、工程DB1や3DモデルDB2、工程−3DモデルリンクDB3、作業工数データベース(DB)4などからの情報に基づいて各作業工程間に生じる影響が計算される。   If the determination result in step S140 is NO, it is determined whether the work process has been changed (step S160), and if the determination result is NO, the process ends. If the determination result in step S160 is YES, the process change impact evaluation process is performed based on each information (step S170), and the process is ended. The process change impact evaluation process is for evaluating the impact of the change of the work process on other work processes, and the physical distance influence calculation unit 51, the work space interference influence calculation unit 52, and the work resource influence calculation unit 53 By at least one, the influence which arises between each work process is calculated based on the information from process DB1, 3D model DB2, process-3D model link DB3, work man-hour database (DB) 4 grade.

(1−5.1)物理的距離影響計算部51
物理的距離影響計算部51は、工程変更影響評価処理の1つとして物理的距離影響計算処理を実施するものであり、作業工程間の物理的距離を計算し、算出された物理的距離に基づいて作業工程の変更の他の作業工程への影響の有無を判定するものである。ここで、作業工程間の物理的距離とは、各作業工程に関する構造物の3Dオブジェクト間の距離であり、各作業工程に関する構造物の複数の3Dオブジェクト(躯体・機器・配管・ケーブルトレイ・ダクトなど)の距離から計算される。例えば、2つの作業工程Aおよび作業工程Bの物理的距離を計算する場合は、それぞれの作業工程に関する構造物の3Dオブジェクトを1つずつ抽出し、3Dオブジェクト間の距離を計算する。作業工程A,B間の全ての3Dオブジェクトの組合せに対して距離を計算し、その最小値を2つの作業工程A,B間の物理的距離と定義する。
(1-5.1) Physical distance influence calculation unit 51
The physical distance influence calculation unit 51 performs physical distance influence calculation processing as one of process change influence evaluation processing, calculates physical distance between work steps, and calculates physical distance based on the calculated physical distance. It is determined whether or not the change of the work process has an influence on other work processes. Here, the physical distance between work processes is the distance between 3D objects of the structure related to each work process, and a plurality of 3D objects of a structure related to each work process (body, equipment, piping, cable tray, duct Etc.) is calculated. For example, when calculating the physical distance between two operation steps A and B, the 3D objects of the structure related to each operation step are extracted one by one, and the distance between the 3D objects is calculated. The distance is calculated for all 3D object combinations between work steps A and B, and the minimum value is defined as the physical distance between the two work steps A and B.

また、配管やケーブルトレイ、ダクトの据付作業などのように、ある機器や壁など特定の構造物を基点として順番に据え付けるような作業工程の場合には、2つの作業工程間に配管などのルート接続関係が存在するかどうか、また、ルート接続関係が存在する場合には、そのルート上の距離または据付物量が、作業工程への日程変更の影響を特定する上で重要となる。そのため、物理的距離影響計算部51は、ある作業工程AおよびBのそれぞれに紐づく3Dオブジェクトを全て取得し、オブジェクト間の距離に基づいて3Dオブジェクトの接続関係を判定する(すなわち、2つのオブジェクト間の距離がゼロであれば、当該オブジェクト同士は接続していると判定する)。そして、この処理を全ての作業工程に対して網羅的に実施し、作業工程間の物理的接続関係の有無を判定する。   In addition, in the case of work processes such as installation work of piping, cable trays, and ducts, where a certain structure such as a certain device or wall is installed in order as a starting point, a route such as piping between two work processes. Whether there is a connection relationship, and if there is a route connection relationship, the distance or amount of installation on the route is important in identifying the impact of the schedule change on the work process. Therefore, the physical distance influence calculation unit 51 acquires all 3D objects linked to each of the work processes A and B, and determines the connection relationship of the 3D objects based on the distance between the objects (that is, two objects If the distance between them is zero, it is determined that the objects are connected). Then, this process is comprehensively performed on all work processes, and it is determined whether or not there is a physical connection relationship between the work processes.

例えば、2つの作業工程A,Bの距離を計算する際には次のような方法が考えられる。すなわち、2つの作業工程を接続する3DオブジェクトをそれぞれA1,B1とし、また、それぞれの作業工程に紐づく3Dオブジェクトのうち、接続先の3Dオブジェクトが1つしか存在しないものをルートの端点とする。このとき、作業工程A内では、3DオブジェクトA1から複数存在する端点までのルート長またはルート上に存在する据付物量の平均値を作業工程A内の距離、同様に作業工程B内の距離を計算する。そして、作業工程間の距離については、作業工程Aが先行着手される場合には、作業工程A,B間の距離として作業工程A内の距離を利用、一方、作業工程Bが先行着手される場合には作業工程A,Bの距離として作業工程B内の距離を利用する。   For example, when calculating the distance between two work processes A and B, the following method can be considered. That is, 3D objects connecting two work processes are respectively A1 and B1, and among 3D objects linked to each work process, one having only one 3D object of connection destination is set as an end point of the route . At this time, in the work process A, the route length from the 3D object A1 to a plurality of end points or the average value of the amount of installed objects present on the route is calculated the distance in the work process A, and similarly the distance in the work process B Do. Then, as for the distance between work steps, when work step A is preceded, the distance in work step A is used as the distance between work steps A and B, while work step B is preceded. In this case, the distance in the work process B is used as the distance between the work processes A and B.

図7は、物理的距離影響計算部における工程変更影響評価処理としての物理的距離影響計算処理を示すフローチャートである。図7では、先行する作業工程の開始日および完了日に遅延が発生し、後続の作業工程の作業日程と重なりが生じてしまった場合を考える。   FIG. 7 is a flowchart showing a physical distance influence calculation process as a process change influence evaluation process in the physical distance influence calculation unit. In FIG. 7, it is assumed that a delay occurs on the start date and the completion date of the preceding work process, and an overlap with the work schedule of the subsequent work process occurs.

図7において、物理的距離影響計算部51は、まず、変更された作業工程のうち未処理の1つの作業工程を選択する(ステップS200)。次に、ステップS200で選択した作業工程と作業期間(作業日程)が重複する他の作業工程を全て抽出し(ステップS210)、各作業工程に紐付けされた3Dオブジェクトの配置データを工程−3DモデルリンクDB3から取得する(ステップS220)。続いて、作業工程間の物理的距離を計算して算出し(ステップS230)、その物理距離に基づいて、順序制約に違反する作業工程があるかどうかを判定する(ステップS240)。順序制約に違反する作業工程があるかどうかの判定は、以下の考え方に基づいて実施する。すなわち、作業工程A,Bに接続関係が存在する場合、作業工程Bが着手可能となる条件は、作業工程A,B間の距離分の作業が完了するか、または、作業工程Bが先行する他の作業工程Cに接続しているかのどちらかである。従って、まず作業工程Bの接続関係を計算し、作業工程Bに接続しかつ先行する作業工程Cが存在するかを判定する。存在しない場合は、作業工程A内で作業工程A,B間の距離に相当する物量と、作業工数DB4に格納されている単位物量当たりの作業工数データとの積を取ることで、作業工程Aの着手日から作業工程Bの着手日までに必要な作業日数を計算する。当該必要作業日数が作業工程A,Bの重なり日数を超過する場合には、作業工程Bの開始日を超過しないように後ろ倒しにする。一方、作業工程Cが存在する場合は、作業工程Cに遅延が発生しない限り、作業工程Bの日程を修正する必要は無い。   In FIG. 7, the physical distance influence calculation unit 51 first selects one unprocessed work process from the changed work processes (step S200). Next, all the other work processes in which the work process and the work period (work schedule) overlap in the work process selected in step S200 are extracted (step S210), and the arrangement data of the 3D object linked to each work process is processed -3D. It is acquired from the model link DB 3 (step S220). Subsequently, a physical distance between work steps is calculated and calculated (step S230), and it is determined whether there is a work step that violates the order constraint (step S240) based on the physical distance. The determination of whether or not there is a work process that violates the order constraint is performed based on the following concept. That is, when there is a connection relationship between work processes A and B, the condition that work process B can be started is that work for a distance between work processes A and B is completed or work process B precedes. It is either connected to another operation process C. Therefore, first, the connection relationship of the work process B is calculated, and it is determined whether there is a work process C connected to the work process B and preceding. If not present, the work process A is obtained by taking the product of the physical quantity corresponding to the distance between the work processes A and B in the work process A and the work man-hour data per unit physical quantity stored in the work man-hour DB 4 The number of work days required from the start date of the work process to the start date of the work process B is calculated. If the required work days exceeds the overlap days of the work processes A and B, the work work B start date is not exceeded. On the other hand, when there is a work process C, it is not necessary to correct the schedule of the work process B unless a delay occurs in the work process C.

したがって、ステップS240での判定結果がYESの場合には、作業工程日程修正処理を実施し(ステップS250)、続いて、未処理の変更した作業工程は有るかどうかを判定する(ステップS260)。また、ステップS240での判定結果がNOの場合には、ステップS260に進む。ステップS260での判定結果がYESの場合には、ステップS200に進み、判定結果がNOの場合には、処理を終了する。   Therefore, if the determination result in step S240 is YES, the work process schedule correction process is performed (step S250), and it is then determined whether there is an unprocessed work process that has been changed (step S260). If the determination result in step S240 is NO, control is passed to step S260. If the determination result in step S260 is YES, the process proceeds to step S200, and if the determination result is NO, the process ends.

(1−5.2)作業空間干渉影響計算部52
作業空間干渉影響計算部52は、工程変更影響評価処理の1つとして作業空間干渉影響計算処理を実施するものであり、2つの作業工程の作業空間に干渉が存在するかどうかを計算し、算出された干渉量に基づいて作業工程の変更の他の作業工程への影響の有無を判定するものである。
(1-5.2) Workspace interference effect calculation unit 52
The work space interference influence calculation unit 52 executes work space interference influence calculation processing as one of the process change influence evaluation processings, and calculates whether or not there is interference in the work spaces of the two work steps and calculates Based on the determined amount of interference, it is determined whether or not the change of the work process has an influence on other work processes.

図8及び図9は、作業工程間の作業空間の干渉について説明する図であり、図8は作業場所の重複を説明する図、図9は作業期間の重複を説明する図である。   FIGS. 8 and 9 are diagrams for explaining the interference of the work space between the work processes, FIG. 8 is a diagram for explaining the duplication of the work place, and FIG. 9 is a diagram for explaining the duplication of the work period.

図8に示すように、例えば、配管82a〜82cの上空にケーブルトレイ81a〜81cが据え付けられる場合、配管82a〜82cとケーブルトレイケーブルトレイ81a〜81cの作業空間85が重複してしまうため、同時に作業することができない。従って、図9に示すように、例えば、配管据付に関する作業工程91に遅延が生じて作業工程91aとなった場合、ケーブルトレイの据付に関する作業工程92に作業工程91の遅延の影響(すなわち、作業工程91aの影響)が生じて、作業工程92にも遅延が生じることになる。   As shown in FIG. 8, for example, when the cable trays 81a to 81c are installed in the air above the pipes 82a to 82c, the working spaces 85 of the pipes 82a to 82c and the cable trays 81a to 81c overlap at the same time. I can not work. Therefore, as shown in FIG. 9, for example, when a delay occurs in the work process 91 related to the installation of a pipe and becomes the work process 91a, the influence of the delay of the work process 91 in the work process 92 related to the installation of the cable tray The effect of step 91 a) occurs, and a delay also occurs in the work step 92.

図10は、作業空間干渉影響計算部における工程変更影響評価処理としての作業空間干渉影響計算処理を示すフローチャートである。   FIG. 10 is a flowchart showing a work space interference influence calculation process as a process change influence evaluation process in the work space interference influence calculation unit.

図10において、作業空間干渉影響計算部52は、まず、開始日または完了日が変更された作業工程の1つ(作業工程Aとする)を選択する(ステップS300)。次に、選択された作業工程の作業日程と重なりを持つ他の作業工程を全て取得する(ステップS310)。なお、ステップS310では、各作業工程に作業日程の重複日数も同時に算出する。続いて、抽出した他の作業工程から未処理の1つ(作業工程Bとする)を選択する(ステップS320)。   In FIG. 10, the work space interference influence calculation unit 52 first selects one of the work processes (referred to as work process A) whose start date or completion date has been changed (step S300). Next, all other work processes having an overlap with the work schedule of the selected work process are acquired (step S310). In step S310, the number of overlapping days of the work schedule is simultaneously calculated for each work process. Subsequently, an unprocessed one (referred to as a work process B) is selected from the extracted other work processes (step S320).

続いて、作業工程A,Bに紐付けされた3Dオブジェクトデータを取得し(ステップS330)、各3Dオブジェクトデータに基づいて3Dオブジェクトの周囲に作業空間オブジェクトを作成する(ステップS340)。作業空間オブジェクトの作成は、例えば、直方体や円柱、球体などの形状の空間オブジェクト、およびそれらの組合せによって、3Dオブジェクトに係る機器や配管の据付作業に関する作業空間を生成する。   Subsequently, 3D object data linked to the work processes A and B are acquired (step S330), and a work space object is created around the 3D object based on each 3D object data (step S340). In creating a workspace object, for example, a workspace object relating to the installation work of equipment and piping relating to a 3D object is generated by a space object having a shape such as a rectangular parallelepiped, a cylinder, or a sphere, and a combination thereof.

次に、作業工程Aの作業空間オブジェクトと作業空間Bの作業空間オブジェクトの干渉チェックを全ての組合せに対して実施し(ステップS350)、作業工程A,Bのうち先行する作業工程について、干渉が発生するオブジェクトの総数、ルート長の総和、体積の総和、面積の総和の少なくとも一つを計算する(ステップS360)。続いて、ステップS360での計算結果と、作業工数DB4に格納されている単位物量当たりの作業工数の値とを用いて、干渉するオブジェクトが示す構造物の据付作業に必要な作業日数(干渉作業日数とする)を計算する(ステップS370)。   Next, the interference check of the work space object of the work process A and the work space object of the work space B is performed on all combinations (step S350), and the interference is generated for the preceding work process among the work processes A and B. At least one of the total number of objects to be generated, the sum of route lengths, the sum of volumes, and the sum of areas is calculated (step S360). Subsequently, using the calculation result in step S360 and the value of the number of work processes per unit amount of material stored in the work process DB 4, the number of work days required for the installation work of the structure indicated by the interfering object (interference work Calculate the number of days) (step S370).

ここで、工程重複日数よりも作業干渉日数が大きいかどうかを判定し(ステップS380)、判定結果がYESの場合には、後続の作業工程の開始日および完了日を「作業干渉日数=工程重複日数」となるように修正する(ステップS390)。ステップS390での判定結果がNOの場合、またはステップS390の処理が終了した場合は、未処理の他の作業工程はあるかどうかを判定し(ステップS400)、判定結果がNOの場合にはステップS320の処理に進む。   Here, it is determined whether the number of work interference days is larger than the number of process overlap days (step S380). If the determination result is YES, the start date and the completion date of the subsequent work process are “work interference days = process overlap It corrects so that it becomes "days" (step S390). If the determination result in step S390 is NO, or if the process in step S390 is completed, it is determined whether there is any other work process that has not been processed (step S400), and if the determination result is NO, step The process proceeds to step S320.

また、ステップS400での判定結果がYESの場合には、未処理の変更した作業工程があるかどうかを判定し(ステップS410)、判定結果がNOの場合にはステップS300に進み、判定結果がYESの場合には処理を終了する。   If the determination result in step S400 is YES, it is determined whether there is an unprocessed work process that has been changed (step S410). If the determination result is NO, the process proceeds to step S300, and the determination result is If YES, the process ends.

このような作業空間干渉影響計算処理において、例えば、建設対象の構造物が原子力プラントなどの場合、大型設備の搬入を各フロアの天井を打設する前にクレーン等で搬入する必要があるため、躯体建築の作業工程の作業日程と設備搬入の作業工程の作業日程とが互いに影響する。したがって、これらを判定するために、躯体建築の作業工程と設備搬入の作業工程の作業空間の影響を計算する必要がある。   In such work space interference influence calculation processing, for example, when the structure to be constructed is a nuclear power plant or the like, it is necessary to carry in a large facility with a crane or the like before placing the ceiling of each floor. The work schedule of the work process of the frame construction and the work schedule of the work process of the equipment delivery affect each other. Therefore, in order to determine these, it is necessary to calculate the influence of the work space of the work process of a frame construction and the work process of equipment import.

したがって、作業空間干渉影響計算処理では、さらに、設置対象である設備を囲む壁及び設備の上方に位置する天井と、他の作業工程の作業空間に干渉が存在するかどうかを計算し、算出された干渉量に基づいて作業工程の変更の他の作業工程への影響の有無を判定する。   Therefore, in the work space interference influence calculation process, it is further calculated and calculated whether there is interference in the work space of another work process and the ceiling located above the wall and the equipment surrounding the equipment to be installed. Based on the amount of interference, it is determined whether or not the change of the work process has an influence on other work processes.

図11は、設置対象である設備を囲む壁に関する作業空間干渉影響計算処理を示すフローチャートである。   FIG. 11 is a flowchart showing the work space interference influence calculation process regarding the wall surrounding the installation to be installed.

図11において、作業空間干渉影響計算部52は、まず、設備3Dオブジェクトを1つ選択し、設備オブジェクトの中心を取得する(ステップ500)。次に、選択した設備と同じ高さ(フロア)に位置する壁オブジェクトを抽出する(ステップS510)。具体的には、設備オブジェクトの中心点の高さ(Z軸方向)が、壁オブジェクトの軸平行バウンディングボックスの上端の高さ以下、かつ、下端の高さ以上であるという条件で判定する。次に、抽出した壁オブジェクトをX−Y平面に射影し、外形線のX−Y座標を抽出する(ステップS520)。これは、外形線は線分であれば両端の座標、円弧であれば中心点と半径、及び両端の座標などである。次に、X−Y平面上で、中心点を端点として周囲に複数の半直線を描く(ステップS530)。これは、例えば、4方向、8方向、16方向など計算時間に応じて調整しても良い。次に、それぞれの半直線と外形線との交点を導出する(ステップS540)。これは、半直線と外形線に関するX座標値とY座標値の関係を記述した連立方程式を解くことにより導出される。そして、得られた各半直線上に存在する複数の交点の内、最も中心点(端点)に近い交点を生成している躯体オブジェクトを抽出する(ステップS550)。これにより、選択されている設備オブジェクトを取り囲む壁オブジェクトを抽出することができる。その後、選択中の設備オブジェクトと抽出した壁オブジェクトに紐づく作業工程を工程―3DモデルリンクDB3から取得すれば、壁の作業工程の完了日と設備の搬入工程の開始日との比較が可能となり、壁の建築工程(作業工程)が遅延した場合(変更された場合)の搬入工程(他の作業工程)への伝搬を計算することができる。   In FIG. 11, the work space interference influence calculation unit 52 first selects one equipment 3D object, and acquires the center of the equipment object (step 500). Next, a wall object located at the same height (floor) as the selected equipment is extracted (step S510). Specifically, it is determined under the condition that the height (Z-axis direction) of the center point of the facility object is equal to or less than the height of the upper end of the axis parallel bounding box of the wall object and equal to or larger than the height of the lower end. Next, the extracted wall object is projected on the X-Y plane, and the X-Y coordinates of the outline are extracted (step S520). This is the coordinates of both ends if the outline is a line segment, the center point and radius if an arc, and the coordinates of both ends. Next, on the XY plane, a plurality of half straight lines are drawn around the center point as an end point (step S530). For example, this may be adjusted according to the calculation time such as four directions, eight directions, and sixteen directions. Next, the intersection of each half line and the outline is derived (step S540). This is derived by solving a simultaneous equation describing the relationship between the X coordinate value and the Y coordinate value regarding the half line and the outline. Then, among the plurality of intersections existing on each of the obtained half lines, a box object generating an intersection closest to the center point (end point) is extracted (step S550). Thereby, the wall object surrounding the selected facility object can be extracted. Then, if the work process linked to the selected facility object and the extracted wall object is acquired from the process-3D model link DB 3, comparison between the completion date of the work process of the wall and the start date of the loading process of the facility becomes possible. The propagation to the loading process (other work processes) can be calculated if the wall building process (work process) is delayed (if changed).

図12は、設置対象である設備の上方に位置する天井に関する作業空間干渉影響計算処理を示すフローチャートである。   FIG. 12 is a flowchart showing the work space interference influence calculation process regarding the ceiling located above the facility to be installed.

図12において、作業空間干渉影響計算部52は、まず、選択されている設備オブジェクトとX−Y平面上で近接している天井オブジェクトを抽出するため、設備オブジェクトと躯体オブジェクトの軸平行バウンディングボックス(BB)をX−Y平面上に射影し(ステップS600)、X−Y平面上で設備オブジェクトのBBと躯体オブジェクトのBBの外形線の交差を計算する(ステップS610)。交差が存在する躯体オブジェクトは設備に近接していると判断して抽出する(ステップS620)。次に、高さ方向の絞り込みを行うため、設備オブジェクトのBBの上面のZ座標と躯体オブジェクトのBBの底面のZ座標とを比較し(ステップS630)、躯体オブジェクトの軸平行BB下面のZ座標値が設備オブジェクトの軸平行BB上面のZ座標値を上回っており、かつ、その差の絶対値が最小となるものを抽出する(ステップS640)。   In FIG. 12, the work space interference influence calculation unit 52 firstly extracts an axis parallel bounding box of the facility object and the box object in order to extract the ceiling object which is close to the selected facility object on the X-Y plane. The BB) is projected onto the X-Y plane (step S600), and the intersection of the BB of the facility object and the outline of the BB of the box object on the X-Y plane is calculated (step S610). The box object having the intersection is judged to be close to the facility and extracted (step S620). Next, in order to narrow down in the height direction, the Z coordinate of the upper surface of BB of the facility object is compared with the Z coordinate of the bottom surface of BB of the box object (step S630). A value is extracted that exceeds the Z coordinate value of the top of the axis parallel BB of the facility object, and the absolute value of the difference is minimized (step S640).

(1−5.3)作業リソース影響計算部53
作業リソース影響計算部53は、工程変更影響評価処理の1つとして作業リソース影響計算処理を実施するものであり、2つの作業工程のリソースを計算し、算出されたリソースに基づいて、作業工程の変更の他の作業工程への影響の有無を判定するものである。つまり、作業リソース影響計算部53は、作業工程に変更が発生した場合に、設備搬入前の保管スペースの充填率や、搬入作業に必要となるクレーンの稼働率といったリソース面での制約をチェックし、上限値を上回る場合には出力装置7等により警告を表示してオペレータに対策を促すものである。
(1-5.3) Work resource influence calculation unit 53
The work resource influence calculation unit 53 executes work resource influence calculation processing as one of the process change influence evaluation processing, calculates resources of two work steps, and based on the calculated resources, It is determined whether or not the change affects other work processes. That is, when a change occurs in the work process, the work resource influence calculation unit 53 checks resource constraints such as the filling rate of the storage space before the equipment is carried in and the operation rate of the crane required for the carrying in operation. If the upper limit is exceeded, a warning is displayed by the output device 7 or the like to prompt the operator to take measures.

図13は、作業空間干渉影響計算部における工程変更影響評価処理としての作業リソース影響計算処理を示すフローチャートである。   FIG. 13 is a flowchart showing work resource influence calculation processing as process change influence evaluation processing in the work space interference influence calculation unit.

図13において、作業リソース影響計算部53は、まず、変更された作業工程を1つ選択し(ステップS700)、選択された作業工程のリソースの種類を判定する(ステップS710)。ここで、リソースの種類とは、例えば、搬入工程の場合にはクレーン使用時間、仮置きや保管工程の場合保管スペースの占有率などであり、また、据付作業工程では作業者数である。   In FIG. 13, the work resource influence calculation unit 53 first selects one changed work process (step S700), and determines the type of resource of the selected work process (step S710). Here, the type of resource is, for example, crane usage time in the case of the loading process, occupancy ratio of the storage space in the case of temporary placement and storage process, etc., and the number of workers in the installation work process.

続いて、それぞれのタイプに応じたリソース使用量および全体工程でのリソース使用量を計算する(ステップS720)。例えば、クレーン使用時間の導出方法は次の通りである。すなわち、作業工程に紐づく3Dモデルの座標値と、3DモデルDB2に格納されているクレーンの配置座標値を用いて、各3Dオブジェクトに最も近いクレーンに搬入を担当させるよう割当を行う。そして作業工数DB4に格納されている作業工数を用いて3Dオブジェクトの数量を作業工数に変換する。次に、各作業工程の開始日から終了日までの期間内で均等に各3Dオブジェクトの作業工数を均す。例えば、作業工程が5日間実施され、その間に搬入する物量が配管100本だった場合、1日当り20本となるように均す。仮に作業期間が10日となった場合は1日当り10本となる。最後に、クレーン毎に総和を取ることで稼働時間の山積み(時間推移)を計算する。   Subsequently, resource usage according to each type and resource usage in the whole process are calculated (step S720). For example, the method of deriving the crane use time is as follows. That is, using the coordinate values of the 3D model linked to the work process and the arrangement coordinate values of the crane stored in the 3D model DB 2, allocation is performed so that the crane closest to each 3D object is in charge of loading. Then, the number of 3D objects is converted into work man-hours using the work man-hours stored in the work man-hour DB 4. Next, work man-hours of each 3D object are equalized evenly within a period from the start date to the end date of each work process. For example, if the work process is carried out for 5 days, and the amount of material to be carried in during that time is 100 pipes, level it so that it will be 20 per day. If the working period is 10 days, it will be 10 per day. Finally, the accumulation of operation time (time transition) is calculated by taking the sum for each crane.

また、保管スペースの占有率の導出方法は、体積を用いる場合は、一般的なCADが有する体積計算機能などを用いて3Dオブジェクトの体積を計算し、また、3DモデルDB1aに格納されている保管スペースオブジェクトの体積を計算して前者を後者で割ることで占有率を計算する。一方、面積を用いる場合は、機器の場合は据付後の状態と同じ態勢で保管されるため、軸平行バウンディングボックスの底面積を機器の占有面積とすれば良いが、配管の場合は寝かせて保管するため、保管姿勢の推定が必要である。   In the case of using a volume, the method of deriving the occupancy of the storage space calculates the volume of the 3D object using a volume calculation function of general CAD, etc., and also stores the data stored in the 3D model DB 1a. Calculate the occupancy rate by calculating the volume of the space object and dividing the former by the latter. On the other hand, in the case of using the area, in the case of equipment, it is stored in the same position as the state after installation, so the bottom area of the axial parallel bounding box may be taken as the occupied area of equipment. In order to do this, it is necessary to estimate the storage attitude.

この推定方法は次のようなものが考えられる。配管の3Dオブジェクトを構成する最小要素(円柱または円錐形状)の中心線分を抽出する。簡単化のためエルボなど配管のルートが曲線となる要素は無視する。中心線分は、円柱や円錐の上面と底面の中心点の座標及びそれらを結ぶ3次元ベクトルとして保持する。そして、同一平面上に存在する直線(ベクトル)同士を同一グループに分類する。これは、選択中の配管3Dオブジェクトの端に位置する構成要素からスタートして、順次2つのベクトルの成す角を計算し、成す角が0となるか、または、2つの直線間の最短距離が0となる場合に、当該2つの直線が同一平面に存在すると判定できる。交点を持つ場合は同一平面上に存在するため、交点を持つ場合はそれらを同一グループに分類する。   The following can be considered as this estimation method. Extract the central line segment of the smallest element (cylindrical or conical shape) that constitutes the 3D object of piping. For the sake of simplicity, we ignore elements such as elbows where the piping route is curved. The central line segment is held as the coordinates of the central point of the top and bottom of a cylinder or cone and a three-dimensional vector connecting them. Then, straight lines (vectors) present on the same plane are classified into the same group. This starts with a component located at the end of the piping 3D object being selected, and sequentially calculates the angle formed by two vectors, and the formed angle becomes 0 or the shortest distance between two straight lines is In the case of 0, it can be determined that the two straight lines are in the same plane. In the case of having an intersection, since they exist on the same plane, when having an intersection, they are classified into the same group.

詳細な手順としては、まず配管オブジェクトの端に位置する構成要素をグループ1とする。次に隣の構成要素を選択し、グループ1内に存在する全ての構成要素(最初は端に位置する構成要素のみ)と前記の方法で同一平面上に存在すると判定された場合は、当該要素をグループ1に追加し、そうでない場合はグループ2を新規作成し追加する。これを順次繰り返し、すべての構成要素をグループに分類する。分類が完了した後、グループ毎に構成要素の中心線分の長さの総和を計算し、それが最大となるグループを選択する。このグループが構成する平面が、配管を保管した際に地面と水平になる平面であると考える。そして、占有面積を計算するために、前記配管オブジェクトの構成要素毎に上面と底面の中心点を結ぶ線分を前記平面上に射影して構成される線分の長さの総和に配管の直径を掛けると良い。エルボ部分は簡単化し、上面と底面の中心点を線分で結ぶか、または、両隣に位置する円柱要素の中心線(直線)の交点を計算し、エルボ底面の中心点と当該交点を結ぶ線分、および、当該交点とエルボ上面の中心点を結ぶ線分で代替する。   As a detailed procedure, first, the component located at the end of the piping object is set as group 1. Next, the next component is selected, and if it is determined that all the components present in group 1 (initially only the components located at the end) are coplanar with the above method, the corresponding components Is added to group 1; otherwise, group 2 is newly created and added. Repeat this sequentially to categorize all components into groups. After classification is complete, the sum of the lengths of the central line segments of the components is calculated for each group, and the group that maximizes it is selected. It is considered that the plane which this group constitutes is a plane which becomes horizontal to the ground when the piping is stored. Then, in order to calculate the occupied area, the diameter of the pipe is the sum of the lengths of the line segments constructed by projecting the line segment connecting the center points of the top surface and the bottom surface on the plane for each component of the pipe object It is good to hang The elbow part is simplified, and the center point of the top and bottom is connected by a line segment, or the point of intersection of the center lines (straight lines) of the cylindrical elements located on both sides is calculated, and the line connecting the center point of the elbow bottom and the point It substitutes for a minute and a line connecting the intersection point and the center point of the upper surface of the elbow.

保管スペースのリソースの山積み(時間推移)の計算は、クレーンの稼働時間のように作業日数に応じて1日当りの数値に均すのではなく、作業期間中ずっと占有面積分のリソースを消費し続けるものとして計算する。上限値は、保管スペースを示す3Dオブジェクトの底面積を計算するか、事前にオペレータが入力装置6を介して入力しても良い。   The calculation of the accumulation (time transition) of the storage space resources is not equaling the number per day according to the working days like the working time of the crane, but continues to consume the resources for the occupied area throughout the working period Calculate as things. The upper limit value may be calculated by calculating the base area of the 3D object indicating the storage space, or the operator may input in advance via the input device 6.

そして、上限値を超過している期間が存在しないか計算する(ステップS730)。その後、図14に示すような方法で、出力装置7の表示機能を通じてオペレータに表示する。リソースが上限値を超過する場合は、作業工程の日程を調整する以外にもリソース上限値を増加させることで対応することも可能であるため、上限値の増加または作業工程の修正についてはオペレータが判断して、入力装置6を通じて行うものとする。   Then, it is calculated whether there is a period exceeding the upper limit value (step S730). Thereafter, it is displayed to the operator through the display function of the output device 7 as shown in FIG. If the resource exceeds the upper limit value, it is possible to cope by increasing the resource upper limit value in addition to adjusting the schedule of the work process, so the operator can increase the upper limit value or modify the work process. It shall be judged and performed through the input device 6.

(1−6)出力装置7
出力装置7は、作業工程などの設定画面や工程変更影響評価処理の処理結果を表示する表示機能を有している。
(1-6) Output device 7
The output device 7 has a display function of displaying a setting screen of a work process or the like and a processing result of process change impact evaluation processing.

図15及び図16は、出力装置に表示される工程変更影響評価処理の様子を示す図であり、図15は作業工程の変更を入力する前の表示例を示しており、図16は作業工程の変更が入力された場合の工程変更影響評価処理の処理結果の表示例を示すものである。   FIG. 15 and FIG. 16 are views showing the state of process change impact evaluation processing displayed on the output device, FIG. 15 shows a display example before inputting a change of the work process, and FIG. 18 shows an example of display of the process result of the process change impact evaluation process when the change of is input.

図15において、入力部801は工程の遅延影響の計算対象となる工程のプラント名、建屋名を入力する箇所であり、プルダウンにより複数の名称から選択できる。当該2つの名称を入力すると入力部804に工程表が表示される。入力部801の工程検索欄は工程の名称をオペレータがキーボードにより入力したり、プルダウンに作業工程一覧を表示させたりし、その中からオペレータに選択させ、入力結果に該当する作業工程を選択中にする。工程検索欄の右に位置する三角形のボタンは複数の検索結果に対して、順および逆順に一つずつ選択状態を変更していくボタンである。選択状態となった作業工程は後述する入力部802に情報が表示され、また、入力部804で作業工程バーの色や太さが変更されることで選択状態にあることをオペレータに強調する。また、入力部801でオペレータが作業工程バー(線)をクリックすることで直感的に作業工程を選択状態にすることも可能である。   In FIG. 15, an input unit 801 is a place for inputting a plant name and a building name of a process to be subjected to calculation of delay effects of the process, and can be selected from a plurality of names by pull-down. When the two names are input, a process chart is displayed on the input unit 804. In the process search section of the input unit 801, the operator inputs the process name by the keyboard or displays the work process list in the pull-down, and the operator selects from the list and selects the work process corresponding to the input result. Do. A triangle button located on the right of the process search field is a button for changing the selection state one by one in the order of the order and the reverse order with respect to a plurality of search results. Information is displayed on the input unit 802, which will be described later, and the input unit 804 changes the color and thickness of the operation process bar to emphasize to the operator that the selected operation process is in the selected state. Also, the operator can intuitively select the work process by clicking the work process bar (line) in the input unit 801.

入力部802は表示された工程表の中で、選択状態にある1つの作業工程に関する名称、変更タイプ、変更前の作業日程、変更後の作業日程を表示または入力する箇所である。変更タイプとは、オペレータが手動で作業日程を変更したか、または、変更影響計算結果により変更されたか、または、変更なしかのいずれか1つを表示する。変更後日程欄はオペレータがキーボードを通じて変更後の作業日程を入力しても良いし、入力部804で一般の工程管理ソフトのように作業工程バーをドラッグアンドドロップするなどして変更した結果を表示しても良い。   The input unit 802 is a place for displaying or inputting the name, change type, work schedule before change, and work schedule after change in the displayed process chart. The change type indicates whether the operator has manually changed the work schedule, or has changed according to the change impact calculation result, or only one of the changes. The post-change schedule column may be displayed by the operator using the keyboard to enter the post-change work schedule, or by dragging and dropping the work process bar in the input unit 804 like general process control software. You may.

影響計算実行ボタンは、工程変更影響の計算を実行するものであり、初期状態では入力は無効(クリックなどの入力を受け付けない状態)であり、少なくとも1つ以上の作業工程の日程がオペレータにより変更された場合に有効(クリックなどの入力を受け付ける状態)に遷移し、1度入力を受け付けると、再び無効に遷移する。ボタンが押下されて計算を実行し終えると、図16の同箇所に示すように、入力部804の工程表が変更後の工程表に置き換えられ、変更が発生した作業工程については、変更前と比較して線の色や太さを変えることによりオペレータに強調表示する。   The influence calculation execution button is to execute calculation of process change influence, and in the initial state, the input is invalid (a state where input such as click is not accepted), and at least one or more work schedule is changed by the operator When it is turned on, the state transitions to valid (a state in which an input such as a click is received), and once input is received, the state transitions to invalid again. When the button is pressed and the calculation is finished, as shown in the same part of FIG. 16, the process chart of the input unit 804 is replaced with the process chart after the change, and the work process in which the change occurs is before the change. Highlight the operator by comparing and changing the color and thickness of the line.

入力部803は変更影響計算の実行完了後に有効となり、選択工程への影響伝搬パス欄は現在選択状態にある作業工程に変更があった場合に、図16の同箇所に示すように当該変更に至るまでの変更された作業工程一覧(パス、経路)を表示するものである。当該パスが選択状態にある場合、同時に入力部804の工程表上でも当該パスを示す矢印を、他の矢印と異なる色や太さで表示することによりオペレータに強調表示する。また、選択中の影響リンク欄は、図16の同箇所に示すように、現在選択状態にある1つのリンク(2つの作業工程間における日程変更の伝搬)の名称を示すもので、先行作業工程の名称と後続作業工程の名称を表示する。これは、影響リンクの一覧をプルダウン形式で表示して選択しても良いし、入力部804上で矢印により表示される影響リンクをクリックで選択しても良い。影響理由欄は、選択状態にある影響リンクに関して、影響が発生した理由を表示するものであり、物理的距離計算部51で計算された場合には具体的な距離を数値で表示し、作業空間干渉影響計算部52で計算された場合には作業空間の干渉体積を数値で表示したり、壁―設備の関係または設備天井の関係であることが判別できる文字列で表示させたりする。CADハイライトボタンは、入力部801で入力されたプラント及び建屋に該当する3Dモデルを3D−CAD上に表示し、かつ、選択状態にある影響伝搬パスや影響リンクに係る3Dオブジェクトの色を変更することにより強調表示するためのものである。   The input unit 803 becomes effective after the execution of the change impact calculation, and when there is a change in the work process currently in the selected state, the influence propagation path on the selection step column indicates the change as shown in the same part of FIG. The list of changed work processes (paths, paths) is displayed. When the path is in a selected state, an arrow indicating the path is simultaneously displayed in the process chart of the input unit 804 in a different color or thickness from the other arrows, thereby highlighting the display to the operator. In addition, as shown in the same place in FIG. 16, the influence link column under selection shows the name of one link (propagation of schedule change between two operation steps) in the currently selected state, and the preceding operation steps Display the name of and the name of the subsequent work process. A list of influence links may be displayed and selected in a pull-down format, or an influence link displayed by an arrow on the input unit 804 may be selected by clicking. The influence reason column displays the reason why the influence occurred for the influence link in the selected state, and when calculated by the physical distance calculation unit 51, the specific distance is displayed as a numerical value, and the work space When calculated by the interference influence calculation unit 52, the interference volume of the work space is displayed as a numerical value, or displayed as a character string capable of determining that there is a wall-facility relationship or a facility ceiling relationship. The CAD highlight button displays the 3D model corresponding to the plant and building input in the input unit 801 on 3D-CAD, and changes the color of the 3D object related to the influence propagation path and influence link in the selected state By highlighting it.

(2)効果
以上のように構成した本実施の形態の作用効果を説明する。
(2) Effects The effects of the present embodiment configured as described above will be described.

原子力プラントや発電プラント、化学プラントなどの大規模なプラント建設や、大多数の部品の大規模な組立作業を要する製造分野などにおいては、作業工程の一部に変更や遅延が生じるような場合には、他の作業工程および全体工程への影響を的確に把握して対策を検討し、納期遅延の防止・抑制を図ることが重要である。しかしながら、大規模なプラント建設などでは、多種類の作業が複雑に絡み合いながら建設が進められていくため、上記従来技術のように一部の作業工程間の関係を考慮するだけでは不十分であり、ある作業工程の内容変更の全体工程への影響を抑制することができず、納期遅延などの発生が懸念される。   In the case of large-scale plant construction such as nuclear power plants, power plants, chemical plants, etc., or in the manufacturing field where large-scale assembly work of most parts is required, some work processes may be changed or delayed. It is important to accurately grasp the impact on other work processes and overall processes, to consider measures, and to prevent or suppress delays in delivery. However, in the case of large-scale plant construction, etc., since construction is carried out while various types of work are intertwined in a complex manner, it is not sufficient just to consider the relationship between some work processes as in the above-mentioned prior art. The influence of the content change of a certain work process on the whole process can not be suppressed, and there is a concern that the delivery date may be delayed.

これに対して本実施の形態においては、建設対象となる構造物の建設に係る複数の作業工程の情報を記憶する建設工程情報記憶部と、構造物の3次元形状情報を記憶する3次元形状情報記憶部と、作業工程の情報と3次元形状情報との対応関係である工程−3Dモデルリンク情報を記憶する工程−3Dモデルリンク情報記憶部とを備え、複数の作業工程のうち少なくとも1つの作業日程が変更された場合に、作業工程の情報と、3次元形状情報と、工程−3Dモデルリンク情報とに基づいて、その他の作業工程の作業日程への影響を計算するように構成したので、作業工程の内容変更に係る全体工程への影響をより確実に把握し、抑制することができる。   On the other hand, in the present embodiment, a construction process information storage unit that stores information on a plurality of work processes related to construction of a structure to be constructed, and a three-dimensional shape that stores three-dimensional shape information of the structure. An information storage unit; and a process-3D model link information storage unit for storing a process-3D model link information that is a correspondence relationship between work process information and three-dimensional shape information; at least one of a plurality of work processes In the case where the work schedule is changed, the influence on the work schedule of the other work processes is calculated based on the work process information, the three-dimensional shape information, and the process-3D model link information. The influence on the whole process related to the content change of the working process can be grasped more reliably and suppressed.

なお、本発明は上記した実施例に限定されるものではなく、様々な変形例が含まれる。例えば、上記した実施例は本発明を分かりやすく説明するために詳細に説明したものであり、必ずしも説明した全ての構成を備えるものに限定されるものではない。また、上記の各構成、機能等は、それらの一部又は全部を、例えば集積回路で設計する等により実現してもよい。また、上記の各構成、機能等は、プロセッサがそれぞれの機能を実現するプログラムを解釈し、実行することによりソフトウェアで実現してもよい。   The present invention is not limited to the embodiments described above, but includes various modifications. For example, the embodiments described above are described in detail in order to explain the present invention in an easy-to-understand manner, and are not necessarily limited to those having all the configurations described. In addition, each of the configurations, functions, and the like described above may be realized by designing a part or all of them with, for example, an integrated circuit. Further, each configuration, function, etc. described above may be realized by software by the processor interpreting and executing a program that realizes each function.

1 工程データベース
2 3Dモデルデータベース(3次元形状情報データベース)
3 工程−3Dモデルリンクデータベース
4 作業工数データベース
5 制御部
6 入力装置
7 出力装置
100 プラント建設工程変更影響評価装置
1 Process database 2 3D model database (3D shape information database)
3 process-3D model link database 4 work man-hour database 5 control section 6 input device 7 output device 100 plant construction process change impact evaluation device

Claims (8)

建設対象となる構造物の建設に係る複数の作業工程の情報を記憶する建設工程情報記憶
部と、
前記構造物の3次元形状情報を記憶する3次元形状情報記憶部と、
前記作業工程の情報と前記3次元形状情報との対応関係である工程−3Dモデルリンク情報を記憶する工程−3Dモデルリンク情報記憶部と、
前記複数の作業工程のうち少なくとも1つの作業日程が変更された場合に、前記作業工程の情報と、前記3次元形状情報と、前記工程−3Dモデルリンク情報とに基づいて、その他の作業工程の作業日程への影響を計算する制御部とを備え
前記制御部は、前記複数の作業工程でそれぞれ作業対象となる部品に応じて前記部品を内包する作業空間を生成し、前記作業日程の変更された作業工程と他の作業工程との前記作業空間同士が干渉している体積である作業空間干渉量に基づいて、前記作業工程の作業日程の変更による他の作業工程の作業日程への影響を計算する作業空間干渉影響計算部を備えたことを特徴とするプラント建設工程変更影響評価装置。
A construction process information storage unit that stores information of a plurality of work processes related to construction of a structure to be constructed;
A three-dimensional shape information storage unit that stores three-dimensional shape information of the structure;
A process-3D model link information storage unit storing a process-3D model link information that is a correspondence between the information on the work process and the three-dimensional shape information;
When at least one work schedule among the plurality of work processes is changed, based on the information on the work process, the three-dimensional shape information, and the process-3D model link information, other work processes and a control unit to calculate the impact on the work schedule,
The control unit generates a work space including the part according to a part to be worked in each of the plurality of work processes, and the work space of the work process whose work schedule has been changed and another work process According to the present invention, there is provided a work space interference influence calculation unit that calculates the influence of the change of the work schedule of the work process on the work schedule of the other work processes based on the work space interference amount that is a volume where the two interfere with each other. Plant construction process change impact assessment device that features.
請求項1記載のプラント建設工程変更影響評価装置において、
作業物量と作業工数との関係である建設作業工数情報を記憶する建設作業工数情報記憶部をさらに備えたことを特徴とするプラント建設工程変更影響評価装置。
In the plant construction process change impact evaluation device according to claim 1,
A plant construction process change impact evaluation apparatus further comprising a construction work manhour information storage unit for storing construction work manhour information that is a relationship between the amount of work items and the work manpower.
請求項1記載のプラント建設工程変更影響評価装置において、
前記制御部は、前記作業日程の変更された作業工程での作業対象となる構造物と、他の作業工程での作業対象となる構造物との間の物理的な距離に基づいて、他の作業工程の作業日程への影響を計算する物理的距離影響計算部を備えたことを特徴とするプラント建設工程変更影響評価装置。
In the plant construction process change impact evaluation device according to claim 1,
The control unit is configured to, based on a physical distance between a structure to be a work target in the changed work process of the work schedule and a structure to be a work target in another work process. A plant construction process change influence evaluation apparatus characterized by comprising a physical distance influence calculation unit that calculates an influence of a work process on a work schedule.
請求項3記載のプラント建設工程変更影響評価装置において、
前記物理的距離影響計算部は、建設対象の構造物を構成する部品の物理的連結点をたどったルート上の距離を物理的距離とすることを特徴とするプラント建設工程変更影響評価装置。
In the plant construction process change impact evaluation device according to claim 3,
The physical construction process change influence evaluation apparatus, wherein the physical distance influence calculation unit sets a distance on a route which follows a physical connection point of parts constituting a structure to be constructed as a physical distance.
請求項記載のプラント建設工程変更影響評価装置において、
前記作業空間干渉影響計算部は、作業工程での作業対象となる部品を包含する直方体、円柱、または球体から成る作業空間を生成し、その作業空間に基づいてブーリアン演算により得られる作業空間同士の干渉している体積を作業空間干渉量とすることを特徴とするプラント建設工程変更影響評価装置。
In the plant construction process change impact evaluation device according to claim 1 ,
The work space interference influence calculation unit generates a work space consisting of a rectangular parallelepiped, a cylinder, or a sphere including parts to be worked in the work process, and based on the work spaces, the work spaces obtained by the Boolean operation A plant construction process change impact evaluation apparatus characterized in that a volume that is interfering is a work space interference amount.
請求項記載のプラント建設工程変更影響評価装置において、
前記作業空間干渉影響計算部は、
建屋内に設置される設備とその周囲を取り囲む壁との対応関係、または、設備とその上部に位置する天井との対応関係を作業場所の物理的な配置とすることを特徴とするプラント建設工程変更影響評価装置。
In the plant construction process change impact evaluation device according to claim 1 ,
The work space interference effect calculation unit
A plant construction process characterized in that the correspondence between a facility installed in a building and a wall surrounding the periphery or the correspondence between a facility and a ceiling located above it is the physical arrangement of the work place Change impact assessment device.
請求項1記載のプラント建設工程変更影響評価装置において、
前記制御部は、前記作業工程に供されるクレーン使用時間または資材保管スペース占有量の少なくとも一方をリソースと定義し、前記作業日程の変更された作業工程と、他の作業工程との前記リソースの消費量にもとづいて、前記他の作業工程への影響を計算する作業リソース影響計算部を備えたことを特徴とするプラント建設工程変更影響評価装置。
In the plant construction process change impact evaluation device according to claim 1,
The control unit defines at least one of a crane use time and a material storage space occupation amount to be provided to the work process as a resource, and the resources of the work process whose work schedule is changed and another work process A plant construction process change impact evaluation apparatus, comprising: a work resource influence calculation unit that calculates an influence on the other work process based on a consumption amount.
請求項記載のプラント建設工程変更影響評価装置において、
前記制御部は、
前記作業日程の変更された作業工程での作業対象となる構造物と、他の作業工程での作業対象となる構造物との間の物理的な距離に基づいて、他の作業工程の作業日程への影響を計算する物理的距離影響計算部と、
前記作業工程に供されるクレーン使用時間または資材保管スペース占有量の少なくとも一方をリソースと定義し、前記作業日程の変更された作業工程と、他の作業工程との前記リソースの消費量にもとづいて、前記他の作業工程への影響を計算する作業リソース影響計算部とを備え、
前記物理的距離影響計算部、前記作業空間干渉影響計算部および前記作業リソース影響計算部の計算結果のうちの少なくとも1つを表示させる計算結果表示部を有する表示装置を備えたことを特徴とするプラント建設工程変更影響評価装置。
In the plant construction process change impact evaluation device according to claim 1 ,
The control unit
Work schedule of another work process based on the physical distance between the structure to be worked in the changed work process of the work schedule and the structure to be work in another work process Physical distance influence calculation unit which calculates the influence on
At least one of the crane use time and the material storage space occupancy provided to the work process is defined as a resource, and based on the consumption of the resource of the work process whose work schedule has been changed and another work process And a work resource influence calculation unit that calculates the influence on the other work process,
The display device has a calculation result display unit for displaying at least one of calculation results of the physical distance influence calculation unit, the work space interference calculation unit, and the work resource influence calculation unit. Plant construction process change impact assessment device.
JP2015095540A 2015-05-08 2015-05-08 Plant construction process change impact assessment device Active JP6544989B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015095540A JP6544989B2 (en) 2015-05-08 2015-05-08 Plant construction process change impact assessment device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015095540A JP6544989B2 (en) 2015-05-08 2015-05-08 Plant construction process change impact assessment device

Publications (2)

Publication Number Publication Date
JP2016212613A JP2016212613A (en) 2016-12-15
JP6544989B2 true JP6544989B2 (en) 2019-07-17

Family

ID=57551737

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015095540A Active JP6544989B2 (en) 2015-05-08 2015-05-08 Plant construction process change impact assessment device

Country Status (1)

Country Link
JP (1) JP6544989B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7257225B2 (en) * 2019-04-05 2023-04-13 三菱重工業株式会社 WORK SCHEDULE CREATION SYSTEM AND WORK SCHEDULE CREATION METHOD
CN116681215B (en) * 2023-07-28 2023-11-03 四川元祉智慧科技有限公司 Urban gas pipeline gridding minimum management unit division method
KR102842253B1 (en) * 2024-11-08 2025-08-06 제스트 주식회사 Apparatus and method for managing construction project documents using an artificial intelligence model

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4033291B2 (en) * 2002-05-29 2008-01-16 株式会社日立製作所 Project risk management system
JP2010066839A (en) * 2008-09-09 2010-03-25 Hitachi-Ge Nuclear Energy Ltd System and method for support of planning plant construction
JP2012137815A (en) * 2010-12-24 2012-07-19 Mitsubishi Heavy Ind Ltd Schedule correction device and schedule correction method
JP6173885B2 (en) * 2013-11-01 2017-08-02 日立Geニュークリア・エナジー株式会社 Process planning support apparatus and process planning support method

Also Published As

Publication number Publication date
JP2016212613A (en) 2016-12-15

Similar Documents

Publication Publication Date Title
EP2829993B1 (en) Design of a path connecting a first point to a second point in a three-dimensional scene
JP5665759B2 (en) Construction process creation system and construction process creation method
JP5557622B2 (en) Construction simulation method and apparatus
JP5349127B2 (en) Layout design support system, control method thereof, and control program
US8155928B2 (en) Method for generating data of plant construction simulation and system thereof
JP6725432B2 (en) Piping work route creation device, piping work route creation method and program
JP2010108321A (en) Construction progress visualization system
CN109190252A (en) A kind of construction method based on R-N5DL-BIM technology
JP2010092375A (en) Three-dimensional data generation device, method thereof, and program
JP4852496B2 (en) Project planning method, project planning program, and project planning system
CN112484695A (en) Building indoor space clear height analysis method and device based on BIM model
JP2003044115A (en) Method and device for designing manufacture line, and process designing method
JP6544989B2 (en) Plant construction process change impact assessment device
JP5673489B2 (en) Point cloud data processing apparatus, processing method, processing program, and recording medium
JP7448312B2 (en) Automatic routing method and device
Isaac et al. Work-path modeling and spatial scheduling with singularity functions
US12347058B2 (en) Element alignment for hangers in computer-aided design
CN114444163A (en) Mechanical and electrical construction method and system based on BIM technology
JP5414601B2 (en) Construction plan creation device and program
CN118235165A (en) Method and system for creating 3D models for digital twins from point clouds
JP6173885B2 (en) Process planning support apparatus and process planning support method
JP6028703B2 (en) Graph generation apparatus, graph generation method, and graph generation program
KR101773571B1 (en) System for the pipe interference checking and installation sequence identifying of the offshore plant and method of the pipe interference checking and installation sequence identifying using of the same
US20210295608A1 (en) Hanger Generation in Computer-Aided Design Programs
Korman et al. How building information modeling has changed the MEP coordination process

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20180301

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20190225

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20190305

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20190419

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20190528

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20190618

R150 Certificate of patent or registration of utility model

Ref document number: 6544989

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350