Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP6549075B2 - Hydraulic drive of construction machine - Google Patents
[go: Go Back, main page]

JP6549075B2 - Hydraulic drive of construction machine - Google Patents

Hydraulic drive of construction machine Download PDF

Info

Publication number
JP6549075B2
JP6549075B2 JP2016192231A JP2016192231A JP6549075B2 JP 6549075 B2 JP6549075 B2 JP 6549075B2 JP 2016192231 A JP2016192231 A JP 2016192231A JP 2016192231 A JP2016192231 A JP 2016192231A JP 6549075 B2 JP6549075 B2 JP 6549075B2
Authority
JP
Japan
Prior art keywords
flow rate
traveling motor
target supply
target
traveling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2016192231A
Other languages
Japanese (ja)
Other versions
JP2018054051A (en
Inventor
亮平 山下
亮平 山下
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Construction Machinery Co Ltd
Original Assignee
Hitachi Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Construction Machinery Co Ltd filed Critical Hitachi Construction Machinery Co Ltd
Priority to JP2016192231A priority Critical patent/JP6549075B2/en
Publication of JP2018054051A publication Critical patent/JP2018054051A/en
Application granted granted Critical
Publication of JP6549075B2 publication Critical patent/JP6549075B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Fluid-Pressure Circuits (AREA)
  • Operation Control Of Excavators (AREA)

Description

本発明は、油圧ショベル等の建設機械の油圧駆動装置に関する。   The present invention relates to a hydraulic drive system for a construction machine such as a hydraulic shovel.

油圧ショベル等の建設機械の油圧駆動装置において、エンジン(原動機)によって駆動される可変容量型の第1及び第2の油圧ポンプと、第1の油圧ポンプからの圧油によって駆動される左走行モータと、第2の油圧ポンプからの圧油によって駆動される右走行モータと、第1の油圧ポンプから左走行モータへの圧油の流れを制御するオープンセンタ型の左走行用流量制御弁と、第2の油圧ポンプから右走行モータへの圧油の流れを制御するオープンセンタ型の右走行用流量制御弁と、左走行用流量制御弁を操作する左走行用操作装置と、右走行用流量制御弁を操作する右走行用操作装置と、第1の油圧ポンプの容量を制御する第1のレギュレータと、第2の油圧ポンプの容量を制御する第2のレギュレータと、第1及び第2のレギュレータを制御する制御装置とを備えたものが知られている(例えば特許文献1参照)。   In a hydraulic drive system of a construction machine such as a hydraulic shovel, a variable displacement first and second hydraulic pump driven by an engine (motor), and a left travel motor driven by pressure oil from the first hydraulic pump A right traveling motor driven by pressure oil from a second hydraulic pump, and an open center type left traveling flow control valve for controlling the flow of pressure oil from the first hydraulic pump to the left traveling motor; An open center type right traveling flow control valve for controlling the flow of pressure oil from the second hydraulic pump to the right traveling motor, a left traveling operation device for operating the left traveling flow control valve, and a right traveling flow A right-traveling operating device for operating the control valve, a first regulator for controlling the capacity of the first hydraulic pump, a second regulator for controlling the capacity of the second hydraulic pump, first and second regulator That a control for controlling apparatus is known (for example, see Patent Document 1).

特許文献1では、左走行用流量制御弁のセンタバイパスラインの下流側に絞りが設けられ、この絞りの上流側圧力を検出する第1の検出器が設けられている。また、右走行用流量制御弁のセンタバイパスラインの下流側に絞りが設けられ、この絞りの上流側圧力を検出する第2の検出器が設けられている。制御装置は、基本的にネガティブ制御方式であって、第1の検出器で検出された圧力が一定となるように第1のレギュレータを制御し、第2の検出器で検出された圧力が一定となるように第2のレギュレータを制御する。さらに、左走行用操作装置の操作量と右走行用操作装置の操作量との差分に応じて、内輪側の走行モータに対応する油圧ポンプの吐出流量が減少するようにレギュレータを制御する。   In Patent Document 1, a throttle is provided on the downstream side of the center bypass line of the flow control valve for left travel, and a first detector for detecting the pressure on the upstream side of the throttle is provided. Further, a throttle is provided on the downstream side of the center bypass line of the flow control valve for right travel, and a second detector for detecting the pressure on the upstream side of the throttle is provided. The control device is basically a negative control method, and controls the first regulator so that the pressure detected by the first detector becomes constant, and the pressure detected by the second detector becomes constant. The second regulator is controlled to be Furthermore, the regulator is controlled so that the discharge flow rate of the hydraulic pump corresponding to the traveling motor on the inner wheel side decreases according to the difference between the operation amount of the left traveling operation device and the operation amount of the right traveling operation device.

一方、ポジティブ制御方式の制御装置も知られている。この制御装置は、左走行用操作装置の操作量が増加するのにしたがって第1の油圧ポンプの吐出流量が増加するように第1のレギュレータを制御し、右走行用操作装置の操作量が増加するのにしたがって第2の油圧ポンプの吐出流量が増加するように第2のレギュレータを制御する。   On the other hand, a control device of a positive control system is also known. The control device controls the first regulator such that the discharge flow rate of the first hydraulic pump increases as the operation amount of the left traveling operation device increases, and the operation amount of the right traveling operation device increases. The second regulator is controlled such that the discharge flow rate of the second hydraulic pump increases as it does.

特開2014−181511号公報JP, 2014-181511, A

上述したポジティブ制御方式の制御装置を採用した場合には、次のような課題が生じる。左走行モータの負荷(詳細には、例えば走行路面の凹凸によって変化する負荷)に応じて第1の油圧ポンプの吐出圧が上昇すると、第1の油圧ポンプの吐出流量のうちの左走行用流量制御弁のブリードオフ流量の割合が増加し、左走行モータへの供給流量が減少する。同様に、右走行モータの負荷に応じて第2の油圧ポンプの吐出圧が上昇すると、第2の油圧ポンプの吐出流量のうちの右走行用流量制御弁のブリードオフ流量の割合が増加し、右走行モータへの供給流量が減少する。そのため、直進以外の走行動作(操向動作)では、操作装置の操作状況が同じであっても走行モータの負荷が変化すれば、左走行モータへの供給流量と右走行モータへの供給流量とのバランスが変化する。その結果、走行軌跡が変化してしまう。   When the control device of the positive control system described above is adopted, the following problems occur. When the discharge pressure of the first hydraulic pump increases according to the load of the left traveling motor (specifically, for example, the load that changes due to unevenness on the traveling road surface), the left traveling flow rate among the discharge flow rate of the first hydraulic pump The proportion of the bleed-off flow rate of the control valve increases, and the supply flow rate to the left travel motor decreases. Similarly, when the discharge pressure of the second hydraulic pump increases according to the load of the right traveling motor, the ratio of the bleed off flow rate of the right traveling flow control valve to the discharge flow rate of the second hydraulic pump increases. The supply flow rate to the right traveling motor decreases. Therefore, in the traveling operation (steering operation) other than straight driving, if the load of the traveling motor changes even if the operation condition of the operating device is the same, the flow rate supplied to the left traveling motor and the flow rate supplied to the right traveling motor Balance changes. As a result, the traveling locus changes.

具体的に説明すると、例えば、右走行用操作装置の操作量が最大値、左走行用操作装置の操作量が中間値であれば、右走行用流量制御弁のブリードオフ流量がゼロ、左走行用流量制御弁のブリードオフ流量がゼロより大きい。そのため、右走行モータの負荷に応じて右走行モータへの供給流量がほぼ変化しないものの、左走行モータの負荷に応じて左走行モータへの供給流量が変化する。したがって、走行軌跡が変化してしまう。   Specifically, for example, when the operation amount of the right traveling operation device is the maximum value and the operation amount of the left traveling operation device is the intermediate value, the bleed off flow rate of the right traveling flow control valve is zero, the left traveling Bleed-off flow rate of the flow control valve is greater than zero. Therefore, although the supply flow rate to the right traveling motor does not substantially change according to the load of the right traveling motor, the supply flow rate to the left traveling motor changes according to the load of the left traveling motor. Therefore, the traveling locus changes.

なお、上述したネガティブ制御方式の制御装置を採用した場合も、同様の課題が生じる。   In addition, the same subject arises also when the control apparatus of the negative control system mentioned above is employ | adopted.

本発明の目的は、走行モータの負荷の影響を受けずに走行軌跡を安定させることができる建設機械の油圧駆動装置を提供することにある。   An object of the present invention is to provide a hydraulic drive system for a construction machine capable of stabilizing a traveling track without being affected by the load of the traveling motor.

上記目的を達成するために、本発明は、原動機によって駆動される可変容量型の第1及び第2の油圧ポンプと、前記第1の油圧ポンプからの圧油によって駆動される左走行モータと、前記第2の油圧ポンプからの圧油によって駆動される右走行モータと、前記第1の油圧ポンプから前記左走行モータへの圧油の流れを制御するオープンセンタ型の左走行用流量制御弁と、前記第2の油圧ポンプから前記右走行モータへの圧油の流れを制御するオープンセンタ型の右走行用流量制御弁と、前記左走行用流量制御弁を操作する左走行用操作装置と、前記右走行用流量制御弁を操作する右走行用操作装置と、前記第1の油圧ポンプの容量を制御する第1の容量制御アクチュエータと、前記第2の油圧ポンプの容量を制御する第2の容量制御アクチュエータと、前記第1及び第2の容量制御アクチュエータを制御する制御装置とを備えた建設機械の油圧駆動装置において、前記左走行用操作装置の操作量を検出する第1の操作量検出器と、前記右走行用操作装置の操作量を検出する第2の操作量検出器と、前記第1の油圧ポンプの吐出圧を検出する第1の吐出圧検出器と、前記第2の油圧ポンプの吐出圧を検出する第2の吐出圧検出器とを備え、前記制御装置は、前記第1の操作量検出器で検出された前記左走行用操作装置の操作量が増加するのにしたがって前記左走行モータへの目標供給流量を増加するよう演算し、前記第2の操作量検出器で検出された前記右走行用操作装置の操作量が増加するのにしたがって前記右走行モータへの目標供給流量を増加するよう演算する走行モータ目標供給流量演算部と、前記第1の操作量検出器で検出された前記左走行用操作装置の操作量と前記第1の吐出圧検出器で検出された前記第1の油圧ポンプの吐出圧に基づいて前記左走行用流量制御弁のブリードオフ流量を演算し、前記第2の操作量検出器で検出された前記右走行用操作装置の操作量と前記第2の吐出圧検出器で検出された前記第2の油圧ポンプの吐出圧に基づいて前記右走行用流量制御弁のブリードオフ流量を演算するブリードオフ流量演算部と、前記左走行モータへの目標供給流量と前記左走行用流量制御弁のブリードオフ流量を加算して前記第1の油圧ポンプの目標吐出流量を演算し、前記右走行モータへの目標供給流量と前記右走行用流量制御弁のブリードオフ流量を加算することで前記第2の油圧ポンプの目標吐出流量を演算するポンプ目標吐出流量演算部と、前記第1の油圧ポンプの目標吐出流量となるように前記第1の容量制御アクチュエータを制御し、前記第2の油圧ポンプの目標吐出流量となるように前記第2の容量制御アクチュエータを制御するポンプ容量制御部とを有する。   In order to achieve the above object, the present invention provides first and second variable displacement hydraulic pumps driven by a prime mover, and a left traveling motor driven by pressure oil from the first hydraulic pump. A right traveling motor driven by pressure oil from the second hydraulic pump; and an open center type left traveling flow control valve for controlling the flow of pressurized oil from the first hydraulic pump to the left traveling motor; An open center type right traveling flow control valve for controlling the flow of pressure oil from the second hydraulic pump to the right traveling motor, and a left traveling operation device for operating the left traveling flow control valve; A right travel operating device for operating the right travel flow control valve, a first displacement control actuator for controlling the displacement of the first hydraulic pump, and a second for controlling the displacement of the second hydraulic pump Capacity control actu And a control device for controlling the first and second displacement control actuators, in a hydraulic drive system for a construction machine, a first operation amount detector for detecting an operation amount of the left traveling operation device A second operation amount detector for detecting the operation amount of the right traveling operation device, a first discharge pressure detector for detecting the discharge pressure of the first hydraulic pump, and the second hydraulic pump And a second discharge pressure detector for detecting the discharge pressure of the second driving pressure, and the control device is configured to increase the operation amount of the left traveling operation device detected by the first operation amount detector. The target supply flow rate to the left traveling motor is calculated to increase, and the target supply to the right traveling motor is increased as the operation amount of the right traveling operation device detected by the second operation amount detector is increased. Travel motor target calculated to increase flow rate According to the supply flow rate calculation unit, the operation amount of the left traveling operation device detected by the first operation amount detector and the discharge pressure of the first hydraulic pump detected by the first discharge pressure detector The bleed-off flow rate of the flow control valve for left travel is calculated based on the above, and the operation amount of the right travel operation device detected by the second operation amount detector and the second discharge pressure detector are detected. A bleed-off flow rate calculating unit for calculating the bleed-off flow rate of the flow control valve for the right traveling based on the discharge pressure of the second hydraulic pump, a target supply flow rate to the left traveling motor, and the flow control for the left traveling flow The bleed-off flow rate of the valve is added to calculate the target discharge flow rate of the first hydraulic pump, and the target supply flow rate to the right traveling motor and the bleed-off flow rate of the right traveling flow control valve are added. Target discharge flow rate of second hydraulic pump Control the first displacement control actuator so as to be the target discharge flow rate of the first hydraulic pump, and the target discharge flow rate of the second hydraulic pump And a pump displacement control unit that controls the second displacement control actuator.

本発明によれば、走行モータの負荷の影響を受けずに走行軌跡を安定させることができる。   According to the present invention, the traveling locus can be stabilized without being affected by the load of the traveling motor.

本発明の第1の実施形態における油圧ショベルの構造を表す側面図である。It is a side view showing the structure of the hydraulic shovel in a 1st embodiment of the present invention. 本発明の第1の実施形態における油圧ショベルの油圧駆動装置の構成を表す図である。It is a figure showing the composition of the hydraulic drive of the hydraulic shovel in a 1st embodiment of the present invention. 本発明の第1の実施形態における走行用流量制御弁の開口面積特性を表す図である。It is a figure showing the opening area characteristic of the flow control valve for a run in a 1st embodiment of the present invention. 本発明の第1の実施形態における油圧ショベルのコントローラの処理機能を表すブロック図である。It is a block diagram showing the processing function of the controller of the hydraulic shovel in a 1st embodiment of the present invention. 本発明の第1の実施形態における走行モータへの目標供給流量の演算テーブルを表す図である。It is a figure showing the calculation table of the target supply flow to the traveling motor in the 1st embodiment of the present invention. 本発明の第1の実施形態におけるセンタバイパス通路の開口面積の演算テーブルを表す図である。It is a figure showing the calculation table of the opening area of the center bypass passage in a 1st embodiment of the present invention. 従来技術における油圧ショベルの走行軌跡を表す上面図である。It is a top view showing the traveling locus of the hydraulic shovel in prior art. 本発明の第2の実施形態における油圧ショベルのコントローラの処理機能を表すブロック図である。It is a block diagram showing the processing function of the controller of the hydraulic shovel in a 2nd embodiment of the present invention. 本発明の第2の実施形態における一次補正量の演算テーブルを表す図である。It is a figure showing the calculation table of the amount of primary corrections in a 2nd embodiment of the present invention.

本発明の第1の実施形態を、図面を参照しつつ説明する。   A first embodiment of the present invention will be described with reference to the drawings.

図1は、本実施形態における油圧ショベルの構造を表す側面図である。なお、油圧ショベルが図1に示す状態にて、運転席に着座した運転者の前側(図1中左側)、後側(図1中右側)、左側(図1中紙面に向かって手前側)、右側(図1中紙面に向かって奥側)を、単に前側、後側、左側、右側と称する。   FIG. 1 is a side view showing a structure of a hydraulic shovel in the present embodiment. With the hydraulic shovel shown in FIG. 1, the driver's side (left side in FIG. 1), rear side (right side in FIG. 1), left side (front side in FIG. 1) facing the driver sitting on the driver's seat The right side (the back side toward the paper surface in FIG. 1) is simply referred to as the front side, the rear side, the left side, and the right side.

油圧ショベルは、走行体1と、走行体1の上側に旋回可能に設けられた旋回体2と、旋回体2の前部に連結された作業装置3とを備えている。旋回体2は、旋回モータ4(後述の図2参照)の回転駆動によって旋回するようになっている。   The hydraulic shovel includes a traveling body 1, a swing body 2 rotatably provided on the upper side of the traveling body 1, and a work device 3 connected to a front portion of the swing body 2. The revolving unit 2 is adapted to be pivoted by rotational drive of a pivoting motor 4 (see FIG. 2 described later).

走行体1は、上方から見てH字形状のトラックフレーム5を備えている。トラックフレーム5の左側後端には駆動輪6が回転可能に支持され、トラックフレーム5の左側前端には従動輪7が回転可能に支持され、これら駆動輪6と従動輪7とで履帯8が掛けまわされている。そして、左走行モータ9A(後述の図2参照)の回転駆動によって左側の駆動輪6が回転し、ひいては左側の履帯8が回転するようになっている。   The traveling body 1 includes an H-shaped track frame 5 as viewed from above. The driving wheel 6 is rotatably supported at the left rear end of the track frame 5, and the driven wheel 7 is rotatably supported at the left front end of the track frame 5. The driving wheel 6 and the driven wheel 7 form the crawler belt 8 It is being multiplied. Then, the left drive wheel 6 is rotated by the rotational drive of the left travel motor 9A (see FIG. 2 described later), and the left crawler belt 8 is thus rotated.

同様に、トラックフレーム5の右側後端には駆動輪6(図示せず)が回転可能に支持され、トラックフレーム5の右側前端には従動輪7(図示せず)が回転可能に支持され、これら駆動輪6と従動輪7とで履帯8(図示せず)が掛けまわされている。そして、右走行モータ9B(後述の図2参照)の回転駆動によって右側の駆動輪6が回転し、ひいては右側の履帯8が回転するようになっている。   Similarly, a drive wheel 6 (not shown) is rotatably supported on the right rear end of the track frame 5 and a driven wheel 7 (not shown) is rotatably supported on the right front end of the track frame 5 A crawler belt 8 (not shown) is wound around the drive wheel 6 and the driven wheel 7. Then, the drive wheel 6 on the right side is rotated by the rotational drive of the right traveling motor 9B (see FIG. 2 described later), and consequently the crawler belt 8 on the right side is rotated.

作業装置3は、旋回体2の前部に回動可能に連結されたブーム10と、ブーム10に回動可能に連結されたアーム11と、アーム11に回動可能に連結されたアタッチメント12(図1では、標準装備のバケット)とを備えている。ブーム10は、左右一対のブームシリンダ13の伸縮駆動によって回動し、アーム11は、アームシリンダ14の伸縮駆動によって回動し、アタッチメント12は、アタッチメントシリンダ15の伸縮駆動によって回動するようになっている。なお、バケットは、オプションアクチュエータ16(後述の図2参照)が組み込まれた他のアタッチメントと交換可能にしている。   The work device 3 includes a boom 10 rotatably connected to the front of the swing body 2, an arm 11 rotatably connected to the boom 10, and an attachment 12 rotatably connected to the arm 11. In FIG. 1, a bucket (standardly equipped bucket) is provided. The boom 10 is rotated by the extension and contraction drive of the pair of left and right boom cylinders 13, the arm 11 is rotated by the extension and contraction drive of the arm cylinder 14, and the attachment 12 is rotated by the extension and contraction drive of the attachment cylinder 15. ing. In addition, the bucket is made exchangeable with the other attachment in which the option actuator 16 (refer FIG. 2 mentioned later) was integrated.

旋回体2の運転室17には、運転者が着座する運転席(図示せず)が設けられている。運転席の前側には、左走行モータ9Aの動作を指示する左走行用操作装置18A(後述の図2参照)と、右走行モータ9Bの動作を指示する右走行用操作装置18B(後述の図2参照)が設けられている。走行用操作装置の外側には、オプションアクチュエータ16の動作を指示するオプション用操作装置(図示せず)が設けられている。   A driver's seat (not shown) in which a driver is seated is provided in the cab 17 of the revolving unit 2. A left traveling operation device 18A (see FIG. 2 described later) instructing the operation of the left traveling motor 9A and a right traveling operation device 18B instructing the operation of the right traveling motor 9B on the front side of the driver's seat 2) is provided. An optional operating device (not shown) for instructing the operation of the optional actuator 16 is provided outside the traveling operating device.

運転席の左側には、旋回モータ4の動作及びアームシリンダ14の動作を指示する作業用操作装置(図示せず)が設けられている。運転席の右側には、ブームシリンダ13の動作及びアタッチメントシリンダ15の動作を指示する作業用操作装置(図示せず)が設けられている。旋回体2の運転室17以外の部分には、エンジン19(後述の図2参照)等の機器が搭載されている。   On the left side of the driver's seat, a working operation device (not shown) for instructing the operation of the swing motor 4 and the operation of the arm cylinder 14 is provided. On the right side of the driver's seat, a work operation device (not shown) for instructing the operation of the boom cylinder 13 and the operation of the attachment cylinder 15 is provided. In a portion other than the cab 17 of the revolving unit 2, equipment such as an engine 19 (see FIG. 2 described later) is mounted.

図2は、本実施形態における油圧ショベルの油圧駆動装置の構成を表す図である。なお、この図2において、走行用操作装置18A,18B以外の他の操作装置の図示を省略するとともに、それらの説明を省略する。   FIG. 2 is a diagram showing a configuration of a hydraulic drive system of a hydraulic shovel in the present embodiment. In addition, in this FIG. 2, while abbreviate | omitting illustration of other operating devices other than driving | running | working operation devices 18A and 18B, those description is abbreviate | omitted.

油圧ショベルの油圧駆動装置は、エンジン19によって駆動される油圧ポンプ20A,20Bと、複数の油圧アクチュエータ(詳細には、上述した旋回モータ4、左走行モータ9A、右走行モータ9B、ブームシリンダ13、アームシリンダ14、アタッチメントシリンダ15、及びオプションアクチュエータ16)と、複数の流量制御弁(詳細には、旋回用流量制御弁21、左走行用流量制御弁22A、右走行用流量制御弁22B、ブーム用流量制御弁23A,23B、アーム用流量制御弁24A,24B、アタッチメント用流量制御弁25、及びオプション用流量制御弁26)と、コントローラ27(制御装置)とを備えている。   The hydraulic drive system of the hydraulic shovel includes hydraulic pumps 20A and 20B driven by the engine 19, and a plurality of hydraulic actuators (specifically, the above-described swing motor 4, left traveling motor 9A, right traveling motor 9B, boom cylinder 13, Arm cylinder 14, attachment cylinder 15, and optional actuator 16), a plurality of flow control valves (specifically, the flow control valve 21 for turning, the flow control valve 22A for left travel, the flow control valve 22B for right travel, boom) Flow control valves 23A and 23B, arm flow control valves 24A and 24B, attachment flow control valve 25, and option flow control valve 26), and a controller 27 (control device).

全ての流量制御弁は、オープンセンタ型であって、油圧ポンプ20Aの吐出側に接続された第1の弁グループと、油圧ポンプ20Bの吐出側に接続された第2の弁グループに分類される。   All flow control valves are open center type and are classified into a first valve group connected to the discharge side of the hydraulic pump 20A and a second valve group connected to the discharge side of the hydraulic pump 20B. .

第1の弁グループは、左走行用流量制御弁22A、オプション用流量制御弁26、ブーム用流量制御弁23A、アーム用流量制御弁24A、及び旋回用流量制御弁21を有している。走行用流量制御弁22A、オプション用流量制御弁26、ブーム用流量制御弁23A、アーム用流量制御弁24A、及び旋回用流量制御弁21は、互いにパラレルに接続されている。   The first valve group includes a left traveling flow control valve 22A, an option flow control valve 26, a boom flow control valve 23A, an arm flow control valve 24A, and a turning flow control valve 21. The travel flow control valve 22A, the option flow control valve 26, the boom flow control valve 23A, the arm flow control valve 24A, and the turning flow control valve 21 are connected in parallel to one another.

第2の弁グループは、右走行用流量制御弁22B、アタッチメント用流量制御弁25、ブーム用流量制御弁23B、及びアーム用流量制御弁24Bを有している。右走行用流量制御弁22Bは、アタッチメント用流量制御弁25、ブーム用流量制御弁23B、及びアーム用流量制御弁24Bに対してタンデムに、かつ、油圧ポンプ20Bから供給される圧油の流れに対し上流側に接続されている。アタッチメント用流量制御弁25、ブーム用流量制御弁23B、及びアーム用流量制御弁24Bは、互いにパラレルに接続されている。これにより、油圧ポンプ20Bからの圧油がアタッチメント用流量制御弁25、ブーム用流量制御弁23B、及びアーム用流量制御弁24Bよりも優先的に右走行用流量制御弁22Bに供給される。   The second valve group includes a right traveling flow control valve 22B, an attachment flow control valve 25, a boom flow control valve 23B, and an arm flow control valve 24B. The right traveling flow control valve 22B is in tandem with the flow control valve for attachment 25, the flow control valve for boom 23B, and the flow control valve for arm 24B, and the flow of pressure oil supplied from the hydraulic pump 20B. It is connected to the upstream side. The attachment flow control valve 25, the boom flow control valve 23B, and the arm flow control valve 24B are connected in parallel to one another. As a result, the pressure oil from the hydraulic pump 20B is supplied to the right traveling flow control valve 22B with priority over the attachment flow control valve 25, the boom flow control valve 23B, and the arm flow control valve 24B.

左走行用操作装置18Aは、前後方向に手でも足でも操作可能な操作レバーと、この操作レバーの中立位置から前側の操作量に対応する前側パイロット圧を生成して出力するパイロット弁と、操作レバーの中立位置から後側の操作量に対応する後側パイロット圧を生成して出力するパイロット弁とを有している。なお、2つのパイロット弁の出力ラインにはパイロット圧センサ28A,28B(操作量検出器)がそれぞれ設けられており、パイロット圧センサ28A,28Bで検出されたパイロット圧(すなわち、左走行用操作装置18Aの操作量)がコントローラ27へ出力されるようになっている。   The left traveling operation device 18A includes an operation lever that can be operated with hands and feet in the front and rear direction, a pilot valve that generates and outputs a front pilot pressure corresponding to an operation amount on the front side from the neutral position of the operation lever And a pilot valve that generates and outputs a rear side pilot pressure corresponding to a rear side operation amount from a neutral position of the lever. Pilot pressure sensors 28A and 28B (operation amount detectors) are provided on the output lines of the two pilot valves, respectively. The pilot pressure detected by the pilot pressure sensors 28A and 28B (that is, the left traveling operation device) The manipulated variable 18A is output to the controller 27.

同様に、右走行用操作装置18Bは、前後方向に手でも足でも操作可能な操作レバーと、この操作レバーの中立位置から前側の操作量に対応する前側パイロット圧を生成して出力するパイロット弁と、操作レバーの中立位置から後側の操作量に対応する後側パイロット圧を生成して出力するパイロット弁とを有している。なお、2つのパイロット弁の出力ラインにはパイロット圧センサ28C,28D(操作量検出器)がそれぞれ設けられており、パイロット圧センサ28C,28Dで検出されたパイロット圧(すなわち、右走行用操作装置18Bの操作量)がコントローラ27へ出力されるようになっている。   Similarly, the right traveling operation device 18B generates an operation lever that can be operated with hands or feet in the front-rear direction and a pilot valve that generates and outputs a front pilot pressure corresponding to an operation amount on the front side from the neutral position of the operation lever. And a pilot valve that generates and outputs a rear side pilot pressure corresponding to the rear side operation amount from the neutral position of the operation lever. Pilot pressure sensors 28C and 28D (operation amount detectors) are provided on the output lines of the two pilot valves, respectively. The pilot pressure detected by the pilot pressure sensors 28C and 28D (that is, the right traveling operation device) The manipulated variable 18 B is output to the controller 27.

左走行用流量制御弁22Aは、左走行用操作装置18Aによって操作され、油圧ポンプ20Aから左走行モータ9Aへの圧油の流れ(方向及び流量)を制御するようになっている。詳細には、例えば左走行用操作装置18Aの操作レバーが中立位置にある場合、左走行用流量制御弁22Aのスプール(弁体)がノーマル位置にある。このとき、油圧ポンプ20Aからの圧油をタンクに戻すためのセンタバイパス通路が全開となる。   The left traveling flow control valve 22A is operated by the left traveling operation device 18A to control the flow (direction and flow rate) of pressure oil from the hydraulic pump 20A to the left traveling motor 9A. Specifically, for example, when the control lever of the left traveling operation device 18A is in the neutral position, the spool (valve body) of the left traveling flow control valve 22A is in the normal position. At this time, the center bypass passage for returning the pressure oil from the hydraulic pump 20A to the tank is fully opened.

そして、左走行用操作装置18Aの操作レバーが前側に操作されて、左走行用操作装置18Aからの前側パイロット圧が左走行用流量制御弁22Aの受圧部LFに入力されると、左走行用流量制御弁22Aのスプールが図2中右側に移動する。このとき、図3で示すように、スプールのストローク量の増加にしたがってセンタバイパス通路の開口面積が減少するとともに、油圧ポンプ20Aからの圧油を左走行モータ9Aの一方側ポートへ送るためのメータイン通路の開口面積が増加し、左走行モータ9Aの他方側ポートからの圧油をタンクに送るためのメータアウト通路の開口面積が増加する。その結果、左走行モータ9Aが前方向に回転する。   Then, when the operation lever of the left traveling operation device 18A is operated to the front side and the front side pilot pressure from the left traveling operation device 18A is input to the pressure receiving portion LF of the left traveling flow control valve 22A, The spool of the flow control valve 22A moves to the right in FIG. At this time, as shown in FIG. 3, the opening area of the center bypass passage decreases as the stroke amount of the spool increases, and the meter-in for sending the pressure oil from the hydraulic pump 20A to one port of the left travel motor 9A. The opening area of the passage increases, and the opening area of the meter-out passage for sending the pressure oil from the other side port of the left travel motor 9A to the tank increases. As a result, the left travel motor 9A rotates forward.

一方、例えば左走行用操作装置18Aの操作レバーが後側に操作されて、左走行用操作装置18Aからの後側パイロット圧が左走行用流量制御弁22Aの受圧部LRに入力されると、左走行用流量制御弁22Aのスプールが図2中左側に移動する。これにより、図3で示すように、スプールのストローク量の増加にしたがってセンタバイパス通路の開口面積が減少するとともに、油圧ポンプ20Aからの圧油を左走行モータ9Aの他方側ポートへ送るためのメータイン通路の開口面積が増加し、左走行モータ9Aの一方側ポートからの圧油をタンクに送るためのメータアウト通路の開口面積が増加する。その結果、左走行モータ9Aが後方向に回転する。   On the other hand, for example, when the operation lever of the left traveling operation device 18A is operated rearward and the rear side pilot pressure from the left traveling operation device 18A is input to the pressure receiving portion LR of the left traveling flow control valve 22A, The spool of the left traveling flow control valve 22A moves to the left in FIG. As a result, as shown in FIG. 3, the opening area of the center bypass passage decreases as the stroke amount of the spool increases, and the meter-in for sending the pressure oil from the hydraulic pump 20A to the other side port of the left travel motor 9A. The opening area of the passage increases, and the opening area of the meter-out passage for sending the pressure oil from one port of the left travel motor 9A to the tank increases. As a result, the left travel motor 9A rotates in the backward direction.

右走行用流量制御弁22Bは、右走行用操作装置18Bによって操作され、油圧ポンプ20Bから右走行モータ9Bへの圧油の流れを制御するようになっている。その詳細は、左走行用流量制御弁22Aと同様であるため、説明を省略する。   The right traveling flow control valve 22B is operated by the right traveling operation device 18B to control the flow of pressure oil from the hydraulic pump 20B to the right traveling motor 9B. The details thereof are the same as those of the left traveling flow control valve 22A, and thus the description thereof is omitted.

油圧ポンプ20A,20Bは、可変容量型であって、それらの容量をそれぞれ制御する容量制御アクチュエータ29A,29Bが設けられている。各容量制御アクチュエータは、詳細を図示しないものの、コントローラ27からの制御信号によって駆動され、制御圧を生成する電磁弁と、この電磁弁で生成された制御圧によって駆動され、油圧ポンプの斜板(押しのけ容積可変部材)の傾斜角を制御するレギュレータとで構成されている。   The hydraulic pumps 20A, 20B are of variable displacement type, and are provided with displacement control actuators 29A, 29B for controlling their respective displacements. Although not shown in detail, each displacement control actuator is driven by a control signal from the controller 27 and is driven by a solenoid valve generating a control pressure and a control pressure generated by the solenoid valve. And a regulator for controlling the inclination angle of the displacement volume changing member).

油圧ポンプ20A,20Bの吐出側には吐出圧センサ30A,30B(吐出圧検出器)がそれぞれ設けられており、吐出圧センサ30A,30Bでそれぞれ検出された油圧ポンプ20Aの吐出圧及び油圧ポンプ20Bの吐出圧がコントローラ27へ出力されるようになっている。エンジン19には回転数センサ31(回転数検出器)が設けられており、回転数センサ31で検出されたエンジン19の回転数がコントローラ27へ出力されるようになっている。   Discharge pressure sensors 30A and 30B (discharge pressure detectors) are provided on the discharge side of the hydraulic pumps 20A and 20B, respectively. The discharge pressure of the hydraulic pump 20A detected by the discharge pressure sensors 30A and 30B and the hydraulic pump 20B The discharge pressure of is output to the controller 27. The engine 19 is provided with a rotational speed sensor 31 (rotational speed detector), and the rotational speed of the engine 19 detected by the rotational speed sensor 31 is output to the controller 27.

本実施形態の要部であるコントローラ27は、パイロット圧センサ28A〜28D、吐出圧センサ30A,30B、及び回転数センサ31の検出結果を入力し、それらに基づいて容量制御アクチュエータ29A,29Bを制御するようになっている。なお、コントローラ27は、プログラムに基づいて演算処理や制御処理を実行する演算制御部(例えばCPU)と、プログラムや演算処理の結果を記憶する記憶部(例えばROM、RAM)等を有するものである。   The controller 27, which is the main part of this embodiment, receives detection results of the pilot pressure sensors 28A to 28D, the discharge pressure sensors 30A and 30B, and the rotation speed sensor 31, and controls the displacement control actuators 29A and 29B based on them. It is supposed to The controller 27 includes an arithmetic control unit (for example, a CPU) that executes arithmetic processing and control processing based on a program, and a storage unit (for example, a ROM and a RAM) that stores programs and results of arithmetic processing. .

図4は、本実施形態におけるコントローラの処理機能を表すブロック図である。   FIG. 4 is a block diagram showing the processing function of the controller in the present embodiment.

本実施形態のコントローラ27は、機能的構成として、走行モータ目標供給流量演算部32、ブリードオフ流量演算部33、ポンプ目標吐出流量演算部34、及びポンプ容量制御部35を有している。また、全走行モータ目標供給動力演算部36、ブリードオフ損失演算部37、全走行モータ供給可能動力演算部38、判定部39、及び走行モータ目標供給流量補正部40を有している。   The controller 27 of the present embodiment has a traveling motor target supply flow rate calculator 32, a bleed-off flow rate calculator 33, a pump target discharge flow rate calculator 34, and a pump displacement controller 35 as functional components. Further, it has an all-traveling motor target supply power calculation unit 36, a bleed-off loss calculation unit 37, an all-traveling motor supplyable power calculation unit 38, a determination unit 39, and a travel motor target supply flow rate correction unit 40.

走行モータ目標供給流量演算部32は、走行用操作装置のパイロット圧(言い換えれば、走行用操作装置の操作量)と走行モータへの目標供給電流との関係が予め設定された演算テーブル(図5参照)を有している。この演算テーブルは、例えば走行モータの負荷が比較的小さい場合を想定して設定されている。   The traveling motor target supply flow rate calculation unit 32 is an operation table in which the relationship between the pilot pressure of the traveling operation device (in other words, the operation amount of the traveling operation device) and the target supply current to the traveling motor is preset See). The calculation table is set, for example, on the assumption that the load of the traveling motor is relatively small.

そして、前述した演算テーブルを用いることにより、パイロット圧センサ28A又は28Bで検出された左走行用操作装置18Aのパイロット圧(言い換えれば、操作量)が増加するのにしたがって、左走行モータ9Aへの目標供給流量QLTgtを増加するよう演算する。同様に、前述した演算テーブルを用いることにより、パイロット圧センサ28C又は28Dで検出された右走行用操作装置18Bのパイロット圧(言い換えれば、操作量)が増加するのにしたがって、右走行モータ9Bへの目標供給流量QRTgtを増加するよう演算する。 Then, by using the above-described calculation table, as the pilot pressure (in other words, the operation amount) of the left traveling operation device 18A detected by the pilot pressure sensor 28A or 28B increases, the left traveling motor 9A is Calculate to increase target supply flow rate QLTgt . Similarly, by using the above-described operation table, as the pilot pressure (in other words, the amount of operation) of the right traveling operation device 18B detected by the pilot pressure sensor 28C or 28D increases, to the right traveling motor 9B To increase the target supply flow rate Q RTgt of

ブリードオフ流量演算部33は、走行用操作装置のパイロット圧と走行用流量制御弁のセンタバイパス通路の開口面積との関係が予め設定された演算テーブル(図6参照)を有している。そして、前述した演算テーブルを用いることにより、パイロット圧センサ28A又は28Bで検出された左走行用操作装置18Aのパイロット圧から、左走行用流量制御弁22Aのセンタバイパス通路の開口面積ACbLを演算する。同様に、前述した演算テーブルを用いることにより、パイロット圧センサ28C又は28Dで検出された右走行用操作装置18Bのパイロット圧から、右走行用流量制御弁22Bのセンタバイパス通路の開口面積ACbRを演算する。 The bleed-off flow rate calculation unit 33 has a calculation table (see FIG. 6) in which the relationship between the pilot pressure of the traveling operation device and the opening area of the center bypass passage of the traveling flow control valve is preset. Then, by using the above-described calculation table, the opening area A CbL of the center bypass passage of the left traveling flow control valve 22A is calculated from the pilot pressure of the left traveling operation device 18A detected by the pilot pressure sensor 28A or 28B. Do. Similarly, by using the above-described operation table, the opening area A CbR of the center bypass passage of the right traveling flow control valve 22B is determined from the pilot pressure of the right traveling operation device 18B detected by the pilot pressure sensor 28C or 28D. Calculate

そして、下記の式(1)を用いて、吐出圧センサ30Aで検出された油圧ポンプ20Aの吐出圧Pと、演算された左走行用流量制御弁22Aのセンタバイパス通路の開口面積ACbLにより、左走行用流量制御弁22Aのセンタバイパス通路の流量(ブリードオフ流量)QBoLを演算する。同様に、下記の式(2)を用いて、吐出圧センサ30Bで検出された油圧ポンプ20Bの吐出圧Pと、演算された右走行用流量制御弁22Bのセンタバイパス通路の開口面積ACbRにより、右走行用流量制御弁22Bのセンタバイパス通路の流量(ブリードオフ流量)QBoRを演算する。なお、式中のCはセンタバイパス通路の流量係数、ρは圧油の密度である。 Then, using equation (1) below, and the discharge pressure P 1 of the hydraulic pump 20A detected by the discharge pressure sensor 30A, the opening area A CbL the center bypass path of the computed left traveling flow control valve 22A Then, the flow rate (bleed off flow rate) Q BoL of the center bypass passage of the left traveling flow control valve 22A is calculated. Similarly, using Equation (2) below, the discharge pressure P 2 of the detected hydraulic pump 20B by the discharge pressure sensor 30B, the center bypass passage of the opening area A CbR of the computed right traveling flow control valve 22B Thus, the flow rate (bleed-off flow rate) Q BoR of the center bypass passage of the flow control valve for right travel 22 B is calculated. Here, C d in the equation is the flow coefficient of the center bypass passage, and ρ is the density of the pressure oil.

Figure 0006549075
Figure 0006549075

Figure 0006549075
Figure 0006549075

全走行モータ目標供給動力演算部36は、下記の式(3)で示すように、吐出圧センサ30A,30Bで検出された油圧ポンプ20Aの吐出圧P及び油圧ポンプ20Bの吐出圧Pと、走行モータ目標流量演算部32で演算された左走行モータ9Aへの目標供給流量QLTgt及び右走行モータ9Bへの目標供給流量QRTgtにより、全走行モータ目標供給動力WTgtを演算する。すなわち、油圧ポンプ20Aの吐出圧Pと左走行モータ9Aへの目標供給流量QLTgtを乗算することで左走行モータ9Aへの目標供給動力を演算し、油圧ポンプ20Bの吐出圧Pと右走行モータ9Bへの目標供給流量QRTgtを乗算することで右走行モータ9Bへの目標供給動力を演算し、それらを加算することで全走行モータ目標供給動力WTgtを演算する。 All travel motor target electric power calculating unit 36, as shown by the following formula (3), the discharge pressure sensor 30A, the discharge pressure P 2 of the discharge pressure P 1 and the hydraulic pump 20B of the detected hydraulic pump 20A in 30B , by the target supply flow rate Q Rtgt to the target supply flow rate Q Ltgt and right traveling motors 9B to the left travel motor 9A calculated by the travel motor target flow rate calculation unit 32 calculates the total travel motor target supply power W Tgt. In other words, calculates a target supply power to the left traveling motor 9A by multiplying the target feed flow rate Q Ltgt to the discharge pressure P 1 and the left travel motor 9A of the hydraulic pump 20A, the hydraulic pump 20B discharge pressure P 2 and the right The target supply power to the right traveling motor 9B is calculated by multiplying the target supply flow rate QRtgt to the traveling motor 9B, and the total traveling motor target supplied power WTgt is calculated by adding them.

Figure 0006549075
Figure 0006549075

ブリードオフ損失演算部37は、下記の式(4)で示すように、吐出圧センサ30A,30Bで検出された油圧ポンプ20Aの吐出圧P及び油圧ポンプ20Bの吐出圧Pと、ブリードオフ流量演算部33で演算された左走行用流量制御弁22Aのブリードオフ流量QBoL及び右走行用流量制御弁22Bのブリードオフ流量QBoRにより、全ブリードオフ損失LBoを演算する。すなわち、油圧ポンプ20Aの吐出圧Pと左走行用流量制御弁22Aのブリードオフ流量QBoLを乗算することで左走行用流量制御弁22Aのブリードオフ損失を演算し、油圧ポンプ20Bの吐出圧Pと右走行用流量制御弁22Bのブリードオフ流量QBoRを乗算することで右走行用流量制御弁22Bのブリードオフ損失を演算し、それらを加算することで全ブリードオフ損失LBoを演算する。 Bleed-off loss calculation unit 37, as shown by the following formula (4), the discharge pressure sensor 30A, the discharge pressure P 2 of the discharge pressure P 1 and the hydraulic pump 20B of the hydraulic pump 20A detected by 30B, bleed-off the bleed-off flow rate Q BoR bleed off flow Q BoL and right traveling flow control valve 22B of the left traveling flow control valve 22A, which is calculated by the flow rate calculation unit 33 calculates the total bleed-off loss L Bo. In other words, it calculates the bleed-off loss of the left traveling flow control valve 22A by multiplying the bleed-off flow rate Q BoL discharge pressure P 1 and the left travel flow control valve 22A of the hydraulic pump 20A, the discharge pressure of the hydraulic pump 20B P 2 and calculating the bleed-off loss of the right travel flow control valve 22B by multiplying the bleed-off flow rate Q BoR the right travel flow control valve 22B, calculates the total bleed-off loss L Bo by adding them Do.

Figure 0006549075
Figure 0006549075

全走行モータ供給可能動力演算部38は、下記の式(5)で示すように、全ポンプ出力上限値WLimから全ブリードオフ損失LBoを減算して、全走行モータ供給可能動力WTrvを演算する。なお、全ポンプ出力上限値WLimは、エンジン19の出力からパイロットポンプ等の補機(図示せず)の動力と油圧ポンプ20A,20Bの駆動に伴う損失を減算することで求められる。 All the traveling motor supply can power calculation unit 38, as shown by the following formula (5), by subtracting the total bleed-off losses L Bo from full pump output upper limit value W Lim, all traveling motor supply can power W Trv Calculate The total pump output upper limit value W Lim is obtained by subtracting the power of an auxiliary machine (not shown) such as a pilot pump and the loss associated with the driving of the hydraulic pumps 20A and 20B from the output of the engine 19.

Figure 0006549075
Figure 0006549075

判定部39は、全走行モータ目標供給動力WTgtがその上限値である全走行モータ供給可能動力WTrvを超えるか否かを判定する。そして、全走行モータ目標供給動力WTgtが全走行モータ供給可能動力WTrvを超えないと判定した場合に、走行モータ目標供給流量補正部40に補正なしの指令を出力する。これにより、走行モータ目標流量演算部32で演算された左走行モータ9Aへの目標供給流量QLTgt及び右走行モータ9Bへの目標供給流量QRTgtは、走行モータ目標供給流量補正部40で補正されることなく、ポンプ目標吐出流量演算部34に出力される。 Determining unit 39, the total travel motor target electric power W Tgt determines whether more than the upper limit value in the form of the total travel motors can be supplied power W Trv. Then, when it is determined that the all traveling motor target supply power WTgt does not exceed the all traveling motor supply possible power WTrv , a no correction command is output to the traveling motor target supply flow rate correction unit 40. Thus, the target supply flow rate Q Rtgt to the target supply flow rate Q Ltgt and right traveling motors 9B to the left travel motor 9A calculated by the travel motor target flow rate calculation unit 32 is corrected by the travel motor target supply flow rate correction section 40 It is output to the pump target discharge flow rate calculating unit 34 without being generated.

このように補正が行われない場合、ポンプ目標吐出流量演算部34は、下記の式(6)で示すように、走行モータ目標流量演算部32で演算された左走行モータ9Aへの目標供給流量QLTgtとブリードオフ流量演算部33で演算された左走行用流量制御弁22Aのブリードオフ流量QBoLを加算して、油圧ポンプ20Aの目標吐出流量Q1Tgtを演算する。同様に、下記の式(7)で示すように、走行モータ目標流量演算部32で演算された右走行モータ9Bへの目標供給流量QRTgtとブリードオフ流量演算部33で演算された右走行用流量制御弁22Bのブリードオフ流量QBoRを加算して、油圧ポンプ20Bの目標吐出流量Q2Tgtを演算する。 As described above, when the correction is not performed, the pump target discharge flow rate calculating unit 34 calculates the target supply flow rate to the left traveling motor 9A calculated by the traveling motor target flow rate calculating unit 32, as shown by the following equation (6). by adding the bleed-off flow rate Q BoL of Q Ltgt and the bleed-off flow rate calculation unit 33 left running flow control valve 22A, which is calculated by, calculating a target discharge flow rate Q 1Tgt of the hydraulic pump 20A. Similarly, as shown by the following equation (7), the target supply flow rate QRTgt to the right traveling motor 9B calculated by the traveling motor target flow rate calculating unit 32 and the right traveling calculated by the bleed off flow rate calculating unit 33 The bleed-off flow rate QBoR of the flow control valve 22B is added to calculate the target discharge flow rate Q2Tgt of the hydraulic pump 20B.

Figure 0006549075
Figure 0006549075

Figure 0006549075
Figure 0006549075

判定部39は、全走行モータ目標供給動力WTgtが全走行モータ供給可能動力WTrvを超えると判定した場合に、走行モータ目標供給流量補正部40に補正ありの指令を出力する。走行モータ目標供給流量補正部40は、補正ありの指令に従い、下記の式(8)で示すように、全走行モータ目標供給動力に対する全走行モータ供給可能動力の比率(WTrv/WTgt)を左走行モータ9Aへの目標供給流量QLTgtに乗算して、左走行モータ9Aへの目標供給流量の補正値QLAvlを演算する。同様に、下記の式(9)で示すように、全走行モータ目標供給動力に対する全走行モータ供給可能動力の比率(WTrv/WTgt)を右走行モータ9Bへの目標供給流量QRTgtに乗算して、右走行モータ9Bへの目標供給流量の補正値QRAvlを演算する。 The determination unit 39 outputs a command with correction to the traveling motor target supply flow rate correction unit 40 when determining that the all traveling motor target supply power WTgt exceeds the all traveling motor supplyable power WTrv . The traveling motor target supply flow rate correction unit 40 calculates the ratio (W Trv / W Tgt ) of all traveling motor supplyable power to all traveling motor target supply power according to the command with correction as shown by the following equation (8) The target supply flow rate QLTgt to the left traveling motor 9A is multiplied to calculate the correction value QLAvl of the target supply flow rate to the left traveling motor 9A. Similarly, as shown by the following equation (9), the ratio (W Trv / W Tgt ) of the total traveling motor supplyable power to the total traveling motor target supply power is multiplied by the target supply flow rate Q RTgt to the right traveling motor 9B. Then, the correction value QRAvl of the target supply flow rate to the right traveling motor 9B is calculated.

Figure 0006549075
Figure 0006549075

Figure 0006549075
Figure 0006549075

なお、式(8)及び(9)で示すように、左走行モータ9Aへの目標供給流量QLTgt、右走行モータ9Bへの目標供給流量QRTgt、油圧ポンプ20Aの吐出圧P、油圧ポンプ20Bの吐出圧P、及び全走行モータ供給可能動力WTrvにより、左走行モータ9Aへの目標供給流量の補正値QLAvl及び右走行モータ9Bへの目標供給流量の補正値QRAvlを演算してもよい。 As indicated by equation (8) and (9), the target supply flow rate Q Ltgt to the left travel motor 9A, the target supply flow rate Q Rtgt, the discharge pressure P 1 of the hydraulic pump 20A to the right travel motor 9B, the hydraulic pump discharge pressure P 2 of 20B, and the total travel motors can be supplied power W Trv, calculates a correction value Q RAvl the target supply flow rate to the correction value Q LAvl and right traveling motors 9B of target supply flow rate to the left traveling motor 9A May be

このように補正が行われた場合、ポンプ目標吐出流量演算部34は、下記の式(10)で示すように、走行モータ目標流量補正部40で演算された左走行モータ9Aへの目標供給流量の補正値QLAvlとブリードオフ流量演算部33で演算された左走行用流量制御弁22Aのブリードオフ流量QBoLを加算して、油圧ポンプ20Aの目標吐出流量Q1Tgtを演算する。同様に、下記の式(11)で示すように、走行モータ目標流量補正部40で演算された右走行モータ9Bへの目標供給流量の補正値QRAvlとブリードオフ流量演算部33で演算された右走行用流量制御弁22Bのブリードオフ流量QBoRを加算して、油圧ポンプ20Bの目標吐出流量Q2Tgtを演算する。
When the correction is performed as described above, the pump target discharge flow rate calculation unit 34 calculates the target supply flow rate to the left traveling motor 9A calculated by the traveling motor target flow rate correction unit 40 as shown by the following equation (10). and of adding the bleed-off flow rate Q BoL correction value Q LAvl and the bleed-off flow rate calculation unit 33 left running flow control valve 22A, which is calculated by, calculating a target discharge flow rate Q 1Tgt of the hydraulic pump 20A. Similarly, as shown by the following equation (11), the correction value Q RAvl of the target supply flow rate to the right traveling motor 9B calculated by the traveling motor target flow rate correction unit 40 and the bleed off flow rate calculation unit 33 The bleed-off flow rate QBoR of the right traveling flow control valve 22B is added to calculate the target discharge flow rate Q2Tgt of the hydraulic pump 20B.

Figure 0006549075
Figure 0006549075

Figure 0006549075
Figure 0006549075

ポンプ容量制御部35は、ポンプ目標吐出流量演算部34で演算された油圧ポンプ20Aの目標吐出流量Q1Tgtを回転数センサ31で検出されたエンジン19の回転数で除算することで油圧ポンプ20Aの目標容量を演算し、これに対応する制御信号を生成して容量制御アクチュエータ29Aに出力する。これにより、ポンプ目標吐出流量演算部34で演算された油圧ポンプ20Aの目標吐出流量Q1Tgtとなるように容量制御アクチュエータ29Aを制御する。同様に、ポンプ目標吐出流量演算部34で演算された油圧ポンプ20Bの目標吐出流量Q2Tgtを回転数センサ31で検出されたエンジン19の回転数で除算することで油圧ポンプ20Bの目標容量を演算し、これに対応する制御信号を生成して容量制御アクチュエータ29Bに出力する。これにより、ポンプ目標吐出流量演算部34で演算された油圧ポンプ20Bの目標吐出流量Q2Tgtとなるように容量制御アクチュエータ29Bを制御する。 The pump displacement control unit 35 divides the target discharge flow rate Q 1 Tgt of the hydraulic pump 20 A calculated by the pump target discharge flow rate calculation unit 34 by the rotational speed of the engine 19 detected by the rotational speed sensor 31. The target capacity is calculated, and a control signal corresponding to this is generated and output to the capacity control actuator 29A. As a result, the displacement control actuator 29A is controlled such that the target discharge flow rate Q1Tgt of the hydraulic pump 20A calculated by the pump target discharge flow rate calculating unit 34 is obtained. Similarly, the target displacement of the hydraulic pump 20B is calculated by dividing the target discharge flow rate Q2Tgt of the hydraulic pump 20B calculated by the pump target discharge flow rate calculating unit 34 by the rotational speed of the engine 19 detected by the rotational speed sensor 31. Control signal corresponding to this is generated and output to the capacitance control actuator 29B. As a result, the displacement control actuator 29B is controlled to achieve the target discharge flow rate Q2Tgt of the hydraulic pump 20B calculated by the pump target discharge flow rate calculating unit 34.

次に、本実施形態の作用効果を、従来技術(詳細には、例えば、走行用操作装置の操作量が増加するのにしたがって油圧ポンプの吐出流量を増加するように制御する、一般的なポジティブ制御を行う場合)と比較しながら説明する。図7は、従来技術における油圧ショベルの走行軌跡を表す上面図である。   Next, the general effects of the present embodiment are controlled according to the prior art (in detail, for example, the discharge flow rate of the hydraulic pump is increased as the operation amount of the travel operation device increases. Description will be made in comparison with the case of performing control). FIG. 7 is a top view showing a traveling track of a hydraulic shovel in the prior art.

従来技術にて、右走行用操作装置18Bの操作量が最大値、左走行用操作装置18Aの操作量が中間値である場合、すなわち、右走行用流量制御弁22Bのブリードオフ流量がゼロ、左走行用流量制御弁22Aのブリードオフ流量がゼロより大きい場合を想定する。この場合、右走行モータ9Bの負荷に応じて油圧ポンプ20Bの吐出圧が上昇しても、右走行用流量制御弁22Bのブリードオフ流量がゼロのままであるから、右走行モータ9Bへの供給流量がほぼ変化しない。一方、左走行モータ9Aの負荷に応じて油圧ポンプ20Aの吐出圧が上昇すると、油圧ポンプ20Aの吐出流量のうちの左走行用流量制御弁22Aのブリードオフ流量の割合が増加し、左走行モータ9Aへの供給流量が減少する。   In the prior art, when the operation amount of the right traveling operation device 18B is the maximum value and the operation amount of the left traveling operation device 18A is the intermediate value, that is, the bleed off flow rate of the right traveling flow control valve 22B is zero. It is assumed that the bleed-off flow rate of the left traveling flow control valve 22A is larger than zero. In this case, even if the discharge pressure of the hydraulic pump 20B increases according to the load of the right traveling motor 9B, the bleed-off flow rate of the right traveling flow control valve 22B remains zero, so supply to the right traveling motor 9B The flow rate almost does not change. On the other hand, when the discharge pressure of the hydraulic pump 20A increases according to the load of the left traveling motor 9A, the ratio of the bleed off flow rate of the left traveling flow control valve 22A to the discharge flow of the hydraulic pump 20A increases, and the left traveling motor Supply flow rate to 9A decreases.

したがって、従来技術では、走行モータの負荷が比較的小さいときに、図7中一点鎖線Aで示すような走行軌跡となるものの、走行モータの負荷が比較的大きいときに、図7中二点鎖線Bで示すような走行軌跡に変化する。   Therefore, in the prior art, when the load on the traveling motor is relatively small, the traveling locus is as shown by the one-dot chain line A in FIG. 7, but when the load on the traveling motor is relatively large, the two-dot chain line in FIG. It changes to a running track as shown by B.

これに対し、本実施形態では、走行モータの負荷に応じて変化する走行用流量制御弁のブリードオフ流量を演算し、これを加味して油圧ポンプの吐出流量を制御する。これにより、走行モータの負荷の変化に伴う走行用流量制御弁のブリードオフ流量の変化に対応することができ、走行モータへの供給流量を安定させることができる。したがって、走行モータの負荷の影響を受けずに走行軌跡を安定させることができる。   On the other hand, in the present embodiment, the bleed-off flow rate of the traveling flow control valve, which changes in accordance with the load of the traveling motor, is calculated, and the discharge flow rate of the hydraulic pump is controlled in consideration of this. Accordingly, it is possible to cope with the change in the bleed-off flow rate of the traveling flow control valve accompanying the change in the load of the traveling motor, and to stabilize the supply flow rate to the traveling motor. Therefore, the traveling locus can be stabilized without being affected by the load of the traveling motor.

本発明の第2の実施形態を、図8及び図9を用いて説明する。なお、本実施形態において、第1の実施形態と同等の部分は同一の符号を付し、適宜、説明を省略する。   A second embodiment of the present invention will be described using FIG. 8 and FIG. In the present embodiment, parts equivalent to those in the first embodiment are given the same reference numerals, and the description will be omitted as appropriate.

図8は、本実施形態におけるコントローラの処理機能を表すブロック図である。   FIG. 8 is a block diagram showing the processing function of the controller in this embodiment.

本実施形態のコントローラ27Aの判定部39Aは、全走行モータ目標供給動力WTgtが全走行モータ供給可能動力WTrvを超えると判定した場合に、全走行モータ目標供給動力に対する全走行モータ供給可能動力の比率(WTrv/WTgt)が予め設定された所定値(但し、0を超えて1未満の値)以下であるか否かを更に判定する。そして、比率(WTrv/WTgt)が所定値を超えると判定した場合に、第1の実施形態と同様、走行モータ目標供給流量補正部40Aに補正ありの指令を出力する。走行モータ目標供給流量補正部40Aは、第1の実施形態と同様、補正ありの指令に従い、左走行モータ9Aへの目標供給流量の補正値QLAvl及び右走行モータ9Bへの目標供給流量の補正値QRAvlを演算する。 Determination unit 39A of the controller 27A of this embodiment, when the total travel motor target supply power W Tgt is determined to exceed the total travel motors can be supplied power W Trv, total travel motors can be supplied power to the total travel motor target electric power It is further determined whether or not the ratio of (W Trv / W Tgt ) is equal to or less than a predetermined value (however, greater than 0 but less than 1). When it is determined that the ratio (W Trv / W Tgt ) exceeds the predetermined value, a command with correction is output to the traveling motor target supply flow rate correction unit 40A as in the first embodiment. As in the first embodiment, the traveling motor target supply flow rate correction unit 40A corrects the correction value QLAvl of the target supply flow rate to the left traveling motor 9A and the target supply flow rate to the right traveling motor 9B according to the command with correction. Calculate the value Q RAvl .

判定部39Aは、比率(WTrv/WTgt)が所定値以下であると判定した場合に、走行モータ目標供給流量補正部40Aに一次・二次補正ありの指令を出力する。 If the determination unit 39A determines that the ratio (W Trv / W Tgt ) is equal to or less than a predetermined value, the determination unit 39A outputs a command with primary and secondary corrections to the traveling motor target supply flow rate correction unit 40A.

走行モータ目標供給流量補正部40Aは、一次・二次補正ありの指令に従い、まず、左走行モータ9Aへの目標供給流量と右走行モータ9Bへの目標供給流量との差分|QLTgt−QRTgt|を演算し、図9で示す演算テーブルを用いて一次補正量QAdjを演算する。すなわち、差分|QLTgt−QRTgt|が増加するのにしたがって一次補正量QAdjを増加するよう演算する。そして、下記の式(12)で示すように、左走行モータ9Aへの目標供給流量QLTgtと右走行モータ9Bへの目標供給流量QRTgtのうちの小さいほうから一次補正量QAdjを減算する(但し、ゼロ未満となる場合はゼロに繰り上げる)とともに、左走行モータ9Aへの目標供給流量QLTgtと右走行モータ9Bへの目標供給流量QRTgtのうちの大きいほうに一次補正量QAdjを加算して、左走行モータ9Aへの目標供給流量の一次補正値QLTgt’と右走行モータ9Bへの目標供給流量の一次補正値QRTgt’を演算する。 The traveling motor target supply flow rate correction unit 40A first calculates the difference between the target supply flow rate to the left traveling motor 9A and the target supply flow rate to the right traveling motor 9B according to the command with primary and secondary corrections | Q LTgt- Q RTgt Is calculated, and the primary correction amount Q Adj is calculated using the operation table shown in FIG. That is, the difference | calculates that to increase the primary correction amount Q Adj according to increasing | Q LTgt -Q RTgt. Then, as shown by the following equation (12), subtracts the first order correction amount Q Adj from smaller ones of the target supply flow rate Q Rtgt to the target supply flow rate Q Ltgt and right traveling motors 9B to the left travel motor 9A (However, if less than zero advance to zero) with the primary correction amount Q Adj to the larger of the target supply flow rate Q Rtgt to the target supply flow rate Q Ltgt and right traveling motors 9B to the left travel motor 9A adding to, and calculates the first-order correction value of the target supply flow rate to the left traveling motor 9A Q Ltgt 'target primary correction value Q Rtgt the supply flow rate to the right travel motor 9B'.

Figure 0006549075
Figure 0006549075


そして、下記の式(13)で示すように、左走行モータ9Aへの目標供給流量の一次補正値QLTgt’と右走行モータ9Bへの目標供給流量の一次補正値QRTgt’に対応するように全走行モータ目標供給動力の補正値WTgt’を演算する。そして、下記の式(14)で示すように、全走行モータ目標供給動力の補正値に対する全走行モータ供給可能動力の比率(WTrv/WTgt’)を左走行モータ9Aへの目標供給流量の一次補正値QLTgt’に乗算して、左走行モータ9Aへの目標供給流量の二次補正値QLAvl’を演算する。同様に、下記の式(15)で示すように、全走行モータ目標供給動力の補正値に対する全走行モータ供給可能動力の比率(WTrv/WTgt’)を右走行モータ9Bへの目標供給流量の一次補正値QRTgt’に乗算して、右走行モータ9Bへの目標供給流量の二次補正値QRAvl’を演算する。

Then, as shown by the following formula (13), so as to correspond to the primary correction value of the target supply flow rate to the left traveling motor 9A Q Ltgt 'target primary correction value Q Rtgt the supply flow rate to the right travel motor 9B' The correction value WTt 'of all traveling motor target supply power is calculated. Then, as shown by the following equation (14), the ratio (W Trv / W Tgt ') of the all traveling motor supplyable power to the correction value of the all traveling motor target supply power is set as the target supply flow rate to the left traveling motor 9A. 'by multiplying the secondary correction value Q LAvl the target supply flow rate to the left traveling motor 9A' primary correction value Q Ltgt calculates a. Similarly, as shown by the following equation (15), the ratio (W Trv / W Tgt ') of all travel motor supplyable power to the correction value of all travel motor target supply power is the target supply flow rate to the right travel motor 9B 'by multiplying the secondary correction value Q RAvl the target supply flow rate to the right travel motor 9B' primary correction value Q Rtgt of computing the.

Figure 0006549075
Figure 0006549075

Figure 0006549075
Figure 0006549075

Figure 0006549075
Figure 0006549075

なお、全走行モータ目標供給動力の補正値WTgt’を演算しなくとも、左走行モータ9Aへの目標供給流量の一次補正値QLTgt’、右走行モータ9Bへの目標供給流量の一次補正値QRTgt’、油圧ポンプ20Aの吐出圧P、油圧ポンプ20Bの吐出圧P、及び全走行モータ供給可能動力WTrvにより、左走行モータ9Aへの目標供給流量の二次補正値QLAvl’及び右走行モータ9Bへの目標供給流量の二次補正値QRAvl’を演算してもよい。 Incidentally, 'even without calculating the primary correction value Q Ltgt of the target supply flow rate to the left traveling motor 9A' correction value W Tgt of all the traveling motor target supply power, the target supply flow rate to the right travel motor 9B primary correction value Q Rtgt ', the discharge pressure P 1 of the hydraulic pump 20A, the discharge pressure P 2 of the hydraulic pump 20B, and the total travel motors can be supplied power W Trv, the target supply flow rate to the left traveling motor 9A secondary correction value Q LAvl' And you may calculate secondary correction value QRAvl 'of the target supply flow to the right traveling motor 9B.

このように一次・二次補正が行われた場合、ポンプ目標吐出流量演算部34は、下記の式(16)で示すように、走行モータ目標流量補正部40で演算された左走行モータ9Aへの目標供給流量の二次補正値QLAvl’とブリードオフ流量演算部33で演算された左走行用流量制御弁22Aのブリードオフ流量QBoLを加算して、油圧ポンプ20Aの目標吐出流量Q1Tgtを演算する。同様に、下記の式(17)で示すように、走行モータ目標流量補正部40で演算された右走行モータ9Bへの目標供給流量の二次補正値QRAvl’とブリードオフ流量演算部33で演算された右走行用流量制御弁22Bのブリードオフ流量QBoRを加算して、油圧ポンプ20Bの目標吐出流量Q2Tgtを演算する。 As described above, when the primary and secondary corrections are performed, the pump target discharge flow rate calculating unit 34 outputs the left traveling motor 9A calculated by the traveling motor target flow rate correcting unit 40 as shown by the following equation (16). The target discharge flow rate Q 1Tgt of the hydraulic pump 20A is added by adding the secondary correction value Q LAvl 'of the target supply flow rate of the target and the bleed-off flow rate Q BoL of the flow control valve for left travel 22A calculated by the bleed-off flow rate computing unit 33. Calculate Similarly, as shown by the following equation (17), the secondary correction value Q RAvl 'of the target supply flow rate to the right traveling motor 9B calculated by the traveling motor target flow rate correction unit 40 and the bleed off flow rate calculation unit 33 The bleed-off flow rate Q BoR of the right traveling flow control valve 22B calculated is added to calculate the target discharge flow rate Q2Tgt of the hydraulic pump 20B.

Figure 0006549075
Figure 0006549075

Figure 0006549075
Figure 0006549075

以上のように構成された本実施形態においても、第1の実施形態と同様、走行モータの負荷の影響を受けずに走行軌跡を安定させることができる。   Also in this embodiment configured as described above, as in the first embodiment, the traveling locus can be stabilized without being affected by the load of the traveling motor.

また、第1の実施形態では、全走行モータ目標供給動力に対する全走行モータ供給可能動力の比率(WTrv/WTgt)が所定値以下である場合、左走行用操作装置18Aの操作量と右走行用操作装置18Bの操作量との差分に対し、左走行モータ9Aへの目標供給流量の補正値QLAvlと右走行モータ9Bへの目標供給流量の補正値QRAvlとの差分(ひいては、左走行モータ9Aの回転速度と右走行モータ9Bの回転速度との差分)が小さくなる。そのため、操作性が悪化する。一方、本実施形態では、左走行モータ9Aへの目標供給流量と右走行モータ9Bへの目標供給流量との差分が大きくなるように一次補正するので、操作性の悪化を防ぐことができる。 Further, in the first embodiment, when the ratio (W Trv / W Tgt ) of all traveling motor supplyable power to all traveling motor target supply power is equal to or less than a predetermined value, the operation amount of the left traveling operation device 18A and the right to the difference between the amount of operation of the travel operation device 18B, a difference between the correction value Q RAvl the target supply flow rate to the correction value Q LAvl and the right travel motor 9B of target supply flow rate to the left traveling motor 9A (therefore, left The difference between the rotational speed of the traveling motor 9A and the rotational speed of the right traveling motor 9B is reduced. Therefore, the operability is deteriorated. On the other hand, in the present embodiment, since the primary correction is performed so that the difference between the target supply flow rate to the left traveling motor 9A and the target supply flow rate to the right traveling motor 9B becomes large, the deterioration of operability can be prevented.

なお、第1及び第2の実施形態においては、走行用操作装置18A,18Bの操作時を想定してコントローラ27又は27Aの処理機能を説明したが、走行用操作装置18A,18Bと他の操作装置の複合操作時にも適用可能である。すなわち、コントローラ27又は27Aの全走行モータ供給可能動力演算部38は、複合操作時に、ポンプ出力上限値WLimから全ブリードオフ損失LBoだけでなく他の油圧アクチュエータの動力を減算することで、全走行モータ供給可能動力WTrvを演算すればよい。 In the first and second embodiments, the processing functions of the controller 27 or 27A have been described on the assumption that the travel operation devices 18A and 18B are operated, but the travel operation devices 18A and 18B and other operations are described. It is also applicable at the time of compound operation of the device. That is, during combined operation, the all traveling motor suppliable power operation unit 38 of the controller 27 or 27A subtracts the power of not only the total bleed off loss LBo but also other hydraulic actuators from the pump output upper limit value W Lim . It is sufficient to calculate the all traveling motor supplyable power W Trv .

また、第1及び第2の実施形態においては、コントローラ27又は27Aは、全ブリードオフ損失LBoを演算するブリードオフ損失演算部37と、全ポンプ出力上限値WLimから全ブリードオフ損失LBoを減算することで全走行モータ供給可能動力WTrvを演算する全走行モータ供給可能動力演算部38とを有する場合を例にとって説明したが、これに限られず、本発明の趣旨及び技術思想を逸脱しない範囲内で変形が可能である。すなわち、コントローラは、ブリードオフ損失演算部37と全走行モータ供給可能動力演算部38を有せず、全走行モータ供給可能動力を設定値としてもよい。 In the first and second embodiments, the controller 27 or 27A, the total bleed-off loss L Bo and bleed-off loss calculation unit 37 for calculating the total bleed-off losses L Bo from full pump output upper limit value W Lim Although the case has been described by way of example in which the all travel motor can be supplied motive power calculation unit 38 that calculates all the travel motor supplyable power W Trv by subtracting the above, the invention is not limited thereto. It is possible to deform within the range of That is, the controller may not have the bleed-off loss calculating unit 37 and the all-traveling-motor available power calculating unit 38, and may use the all-traveling-motor available power as a set value.

また、第1及び第2の実施形態においては、例えばエンジン19の出力が比較的小さい等の理由から、全走行モータ目標供給動力WTgtがその上限値である全走行モータ供給可能動力WTrvを上回る場合を想定する必要がある。そのため、コントローラ27又は27Aは、全走行モータ目標供給動力演算部36、ブリードオフ損失演算部37、全走行モータ供給可能動力演算部38、判定部39、及び走行モータ目標供給流量補正部40を有する場合を例にとって説明したが、これに限られず、本発明の趣旨及び技術思想を逸脱しない範囲内で変形が可能である。すなわち、例えばエンジン19の出力が比較的大きい等の理由から、全走行モータ目標供給動力WTgtがその上限値である全走行モータ供給可能動力WTrvを上回ることがなければ、コントローラは、全走行モータ目標供給動力演算部36、ブリードオフ損失演算部37、全走行モータ供給可能動力演算部38、判定部39、及び走行モータ目標供給流量補正部40を有しなくてよい。 In the first and second embodiments, for example, because the output of the engine 19 is relatively small, the entire traveling motor target supply power WTgt is the upper limit value of the all traveling motor supplyable power WTrv . It is necessary to assume the case of exceeding. Therefore, the controller 27 or 27A includes the all travel motor target supply power calculation unit 36, the bleed-off loss calculation unit 37, the all travel motor supplyable power calculation unit 38, the determination unit 39, and the travel motor target supply flow rate correction unit 40. Although the case has been described as an example, the present invention is not limited to this, and modifications can be made without departing from the spirit and technical concept of the present invention. That is, for example, if the output power of the engine 19 is relatively large, etc., the all traveling motor target supplied power WTgt does not exceed the upper limit value of the all traveling motor supplied available power WTrv , the controller performs all traveling The motor target supply power calculation unit 36, the bleed-off loss calculation unit 37, the all travel motor supply available power calculation unit 38, the determination unit 39, and the travel motor target supply flow rate correction unit 40 may not be provided.

また、第1及び第2の実施形態においては、操作量検出器として、走行用操作装置18A,18Bのパイロット弁から出力されたパイロット圧を検出するパイロット圧センサ28A〜28Dを設けた場合を例にとって説明したが、これに限られず、本発明の趣旨及び技術思想を逸脱しない範囲内で変形が可能である。すなわち、例えば、操作レバー装置18A,18Bの操作レバーの操作量を検出するストロークセンサを設けてもよい。   In the first and second embodiments, the pilot pressure sensors 28A to 28D for detecting the pilot pressure output from the pilot valves of the travel operation devices 18A and 18B are provided as the operation amount detectors. However, the present invention is not limited to this, and modifications can be made without departing from the spirit and technical concept of the present invention. That is, for example, a stroke sensor that detects the amount of operation of the operation lever of the operation lever devices 18A and 18B may be provided.

なお、以上においては、本発明の適用対象として、油圧ショベルを例にとって説明したが、これに限られず、ホイールローダ等の他の建設機械に適用してもよい。   In addition, although the hydraulic shovel was demonstrated to the example as an application object of this invention above, it is not restricted to this, You may apply to other construction machines, such as a wheel loader.

9A 左走行モータ
9B 右走行モータ
18A 左走行用操作装置
18B 右走行用操作装置
19 エンジン(原動機)
20A,20B 油圧ポンプ
22A 左走行用流量制御弁
22B 右走行用流量制御弁
27,27A コントローラ(制御装置)
28A〜28D パイロット圧センサ(操作量検出器)
29A,29B 容量制御アクチュエータ
30A,30B 吐出圧センサ(吐出圧検出器)
32 走行モータ目標供給流量演算部
33 ブリードオフ流量演算部
34 ポンプ目標吐出流量演算部
35 ポンプ容量制御部
36 全走行モータ目標供給動力演算部
37 ブリードオフ損失演算部
38 全走行モータ供給可能動力演算部
39,39A 判定部
40,40A 走行モータ目標供給流量補正部
9A left traveling motor 9B right traveling motor 18A left traveling operation device 18B right traveling operation device 19 engine (motor)
20A, 20B Hydraulic pump 22A Left traveling flow control valve 22B Right traveling flow control valve 27, 27A Controller (control device)
28A to 28D Pilot pressure sensor (operation amount detector)
29A, 29B displacement control actuator 30A, 30B discharge pressure sensor (discharge pressure detector)
32 Travel motor target supply flow rate calculation unit 33 Bleed-off flow rate calculation unit 34 Pump target discharge flow rate calculation unit 35 Pump displacement control unit 36 All travel motor target supply power calculation unit 37 Bleed-off loss calculation unit 38 All travel motor supplyable power calculation unit 39, 39A Determination unit 40, 40A Travel motor target supply flow rate correction unit

Claims (4)

原動機によって駆動される可変容量型の第1及び第2の油圧ポンプと、前記第1の油圧ポンプからの圧油によって駆動される左走行モータと、前記第2の油圧ポンプからの圧油によって駆動される右走行モータと、前記第1の油圧ポンプから前記左走行モータへの圧油の流れを制御するオープンセンタ型の左走行用流量制御弁と、前記第2の油圧ポンプから前記右走行モータへの圧油の流れを制御するオープンセンタ型の右走行用流量制御弁と、前記左走行用流量制御弁を操作する左走行用操作装置と、前記右走行用流量制御弁を操作する右走行用操作装置と、前記第1の油圧ポンプの容量を制御する第1の容量制御アクチュエータと、前記第2の油圧ポンプの容量を制御する第2の容量制御アクチュエータと、前記第1及び第2の容量制御アクチュエータを制御する制御装置とを備えた建設機械の油圧駆動装置において、
前記左走行用操作装置の操作量を検出する第1の操作量検出器と、
前記右走行用操作装置の操作量を検出する第2の操作量検出器と、
前記第1の油圧ポンプの吐出圧を検出する第1の吐出圧検出器と、
前記第2の油圧ポンプの吐出圧を検出する第2の吐出圧検出器とを備え、
前記制御装置は、
前記第1の操作量検出器で検出された前記左走行用操作装置の操作量が増加するのにしたがって前記左走行モータへの目標供給流量を増加するよう演算し、前記第2の操作量検出器で検出された前記右走行用操作装置の操作量が増加するのにしたがって前記右走行モータへの目標供給流量を増加するよう演算する走行モータ目標供給流量演算部と、
前記第1の操作量検出器で検出された前記左走行用操作装置の操作量と前記第1の吐出圧検出器で検出された前記第1の油圧ポンプの吐出圧に基づいて前記左走行用流量制御弁のブリードオフ流量を演算し、前記第2の操作量検出器で検出された前記右走行用操作装置の操作量と前記第2の吐出圧検出器で検出された前記第2の油圧ポンプの吐出圧に基づいて前記右走行用流量制御弁のブリードオフ流量を演算するブリードオフ流量演算部と、
前記左走行モータへの目標供給流量と前記左走行用流量制御弁のブリードオフ流量を加算して前記第1の油圧ポンプの目標吐出流量を演算し、前記右走行モータへの目標供給流量と前記右走行用流量制御弁のブリードオフ流量を加算することで前記第2の油圧ポンプの目標吐出流量を演算するポンプ目標吐出流量演算部と、
前記第1の油圧ポンプの目標吐出流量となるように前記第1の容量制御アクチュエータを制御し、前記第2の油圧ポンプの目標吐出流量となるように前記第2の容量制御アクチュエータを制御するポンプ容量制御部とを有することを特徴とする建設機械の油圧駆動装置。
Variable displacement first and second hydraulic pumps driven by a prime mover, a left traveling motor driven by pressure oil from the first hydraulic pump, and pressure oil from the second hydraulic pump Right traveling motor, an open center type left traveling flow control valve for controlling the flow of pressure oil from the first hydraulic pump to the left traveling motor, and the right traveling motor from the second hydraulic pump to the right traveling motor To the right traveling flow control valve for controlling the flow of pressure oil to the right, a left traveling operation device for operating the left traveling flow control valve, and right traveling for operating the right traveling flow control valve Operating device, a first displacement control actuator for controlling the displacement of the first hydraulic pump, a second displacement control actuator for controlling the displacement of the second hydraulic pump, and the first and second displacement control actuators. Capacity control In the hydraulic drive system for a construction machine provided with a control device for controlling the actuator,
A first operation amount detector for detecting an operation amount of the left traveling operation device;
A second operation amount detector for detecting an operation amount of the right traveling operation device;
A first discharge pressure detector for detecting a discharge pressure of the first hydraulic pump;
A second discharge pressure detector for detecting the discharge pressure of the second hydraulic pump;
The controller is
Calculation is performed to increase the target supply flow rate to the left traveling motor as the operation amount of the left traveling operation device detected by the first operation amount detector increases, and the second operation amount detection A traveling motor target supply flow rate calculation unit that calculates a target supply flow rate to the right traveling motor as the operation amount of the right traveling operation device detected by the vehicle increases;
The left travel based on the operation amount of the left traveling operation device detected by the first operation amount detector and the discharge pressure of the first hydraulic pump detected by the first discharge pressure detector The bleed-off flow rate of the flow control valve is calculated, and the operation amount of the right traveling operation device detected by the second operation amount detector and the second hydraulic pressure detected by the second discharge pressure detector A bleed-off flow rate calculation unit that calculates the bleed-off flow rate of the flow control valve for right travel based on the discharge pressure of the pump;
The target discharge flow rate of the first hydraulic pump is calculated by adding the target supply flow rate to the left traveling motor and the bleed-off flow rate of the left traveling flow control valve, and the target supply flow rate to the right traveling motor A pump target discharge flow rate calculation unit that calculates the target discharge flow rate of the second hydraulic pump by adding the bleed-off flow rate of the right traveling flow control valve;
A pump that controls the first displacement control actuator to achieve a target discharge flow rate of the first hydraulic pump, and controls the second displacement control actuator to achieve a target discharge flow rate of the second hydraulic pump A hydraulic drive system for a construction machine, comprising: a capacity control unit.
請求項1に記載の建設機械の油圧駆動装置において、
前記制御装置は、
前記第1の吐出圧検出器で検出された前記第1の油圧ポンプの吐出圧と前記左走行モータへの目標供給流量を乗算することで前記左走行モータへの目標供給動力を演算し、前記第2の吐出圧検出器で検出された前記第2の油圧ポンプの吐出圧と前記右走行モータへの目標供給流量を乗算することで前記右走行モータへの目標供給動力を演算し、前記左走行モータへの目標供給動力と前記右走行モータへの目標供給動力を加算することで全走行モータ目標供給動力を演算する全走行モータ目標供給動力演算部と、
前記全走行モータ目標供給動力がその上限値である全走行モータ供給可能動力を超えるか否かを判定する判定部と、
前記判定部により前記全走行モータ目標供給動力が前記全走行モータ供給可能動力を超えると判定された場合に、前記全走行モータ目標供給動力に対する前記全走行モータ供給可能動力の比率を前記左走行モータへの目標供給流量に乗算することで前記左走行モータへの目標供給流量を補正し、前記全走行モータ目標供給動力に対する前記全走行モータ供給可能動力の比率を前記右走行モータへの目標供給流量に乗算することで前記右走行モータへの目標供給流量を補正する走行モータ目標供給流量補正部とを有し、
前記ポンプ目標吐出流量演算部は、前記走行モータ目標供給流量補正部で前記左走行モータへの目標供給流量と前記右走行モータへの目標供給流量が補正された場合に、補正された前記左走行モータへの目標供給流量と前記左走行用流量制御弁のブリードオフ流量を加算して前記第1の油圧ポンプの目標吐出流量を演算し、補正された前記右走行モータへの目標供給流量と前記右走行用流量制御弁のブリードオフ流量を加算して前記第2の油圧ポンプの目標吐出流量を演算することを特徴とする建設機械の油圧駆動装置。
The hydraulic drive system for a construction machine according to claim 1,
The controller is
The target supply power to the left traveling motor is calculated by multiplying the discharge pressure of the first hydraulic pump detected by the first discharge pressure detector and the target supply flow rate to the left traveling motor, and The target supply power to the right traveling motor is calculated by multiplying the discharge pressure of the second hydraulic pump detected by the second discharge pressure detector by the target supply flow rate to the right traveling motor, and the left An all-traveling motor target supply motive power calculation unit that calculates an all traveling motor target supply motive power by adding the target supply motive power to the traveling motor and the target supply motive power to the right traveling motor;
A determination unit that determines whether the all traveling motor target supply power exceeds the all traveling motor supplyable power which is the upper limit value;
When it is determined by the determination unit that the all-traveling motor target power supply exceeds the all-traveling motor supplyable power, a ratio of the all-traveling motor supplyable power to the all-traveling motor target power supply is the left traveling motor The target supply flow rate to the left traveling motor is corrected by multiplying the target supply flow rate to the left traveling motor, and the ratio of the all traveling motor supplyable power to the all traveling motor target supply power is the target supply flow rate to the right traveling motor A traveling motor target supply flow rate correction unit that corrects the target supply flow rate to the right traveling motor by multiplying
The pump target discharge flow rate calculation unit is configured to correct the left traveling when the target supply flow rate to the left traveling motor and the target supply flow rate to the right traveling motor are corrected by the traveling motor target supply flow correction unit. The target discharge flow rate of the first hydraulic pump is calculated by adding the target supply flow rate to the motor and the bleed-off flow rate of the left traveling flow control valve, and the corrected target supply flow rate to the right traveling motor and the A hydraulic drive system for a construction machine, wherein a target discharge flow rate of the second hydraulic pump is calculated by adding a bleed-off flow rate of a flow control valve for right travel.
請求項2に記載の建設機械の油圧駆動装置において、
前記制御装置は、
前記第1の吐出圧検出器で検出された前記第1の油圧ポンプの吐出圧と前記左走行用流量制御弁のブリードオフ流量を乗算することで前記左走行用流量制御弁のブリードオフ損失を演算し、前記第2の吐出圧検出器で検出された前記第2の油圧ポンプの吐出圧と前記右走行用流量制御弁のブリードオフ流量を乗算することで前記右走行用流量制御弁のブリードオフ損失を演算するブリードオフ損失演算部と、
全ポンプ出力上限値から前記左走行用流量制御弁のブリードオフ損失及び前記右走行用流量制御弁のブリードオフ損失を減算することで前記全走行モータ供給可能動力を演算する全走行モータ供給可能動力演算部とを有することを特徴とする建設機械の油圧駆動装置。
In the hydraulic drive system for a construction machine according to claim 2,
The controller is
By multiplying the discharge pressure of the first hydraulic pump detected by the first discharge pressure detector and the bleed-off flow rate of the left traveling flow control valve, the bleed-off loss of the left traveling flow control valve can be calculated. The bleed pressure of the right traveling flow control valve is calculated by multiplying the discharge pressure of the second hydraulic pump detected by the second discharge pressure detector and the bleed off flow rate of the right traveling flow control valve. A bleed-off loss calculation unit that calculates an off loss;
The all-traveling motor supplyable power that calculates the all-traveling motor supplyable power by subtracting the bleed-off loss of the left traveling flow control valve and the bleed-off loss of the right traveling flow control valve from the all pump output upper limit value A hydraulic drive system for a construction machine, comprising: an operation unit.
請求項2に記載の建設機械の油圧駆動装置において、
前記判定部は、前記全走行モータ目標供給動力が前記全走行モータ供給可能動力を超える場合に、前記全走行モータ目標供給動力に対する前記全走行モータ供給可能動力の比率が予め設定された所定値以下であるか否かを更に判定しており、
前記走行モータ目標供給流量補正部は、
前記全走行モータ目標供給動力に対する前記全走行モータ供給可能動力の比率が前記所定値以下である場合に、前記左走行モータへの目標供給流量と前記右走行モータへの目標供給流量との差分が増加するのにしたがって一次補正量を増加するよう演算し、前記左走行モータへの目標供給流量と前記右走行モータへの目標供給流量のうちの小さいほうから前記一次補正量を減算するとともに、前記左走行モータへの目標供給流量と前記右走行モータへの目標供給流量のうちの大きいほうに前記一次補正量を加算して、前記左走行モータへの目標供給流量と前記右走行モータへの目標供給流量を一次補正し、
前記左走行モータへの目標供給流量と前記右走行モータへの目標供給流量の一次補正に対応するように前記全走行モータ目標供給動力を補正し、補正された全走行モータ目標供給動力に対する前記全走行モータ供給可能動力の比率を一次補正された前記左走行モータへの目標供給流量に乗算することで前記左走行モータへの目標供給流量を二次補正し、補正された全走行モータ目標供給動力に対する前記全走行モータ供給可能動力の比率を一次補正された前記右走行モータへの目標供給流量に乗算することで前記右走行モータへの目標供給流量を二次補正しており、
前記ポンプ目標吐出流量演算部は、前記走行モータ目標供給流量補正部で前記左走行モータへの目標供給流量と前記右走行モータへの目標供給流量が一次及び二次補正された場合に、二次補正された前記左走行モータへの目標供給流量と前記左走行用流量制御弁のブリードオフ流量を加算して前記第1の油圧ポンプの目標吐出流量を演算し、二次補正された前記右走行モータへの目標供給流量と前記右走行用流量制御弁のブリードオフ流量を加算して前記第2の油圧ポンプの目標吐出流量を演算することを特徴とする建設機械の油圧駆動装置。
In the hydraulic drive system for a construction machine according to claim 2,
The determination unit determines that the ratio of the all-traveling motor supplyable power to the all-traveling motor target power supply is equal to or less than a predetermined value, when the all-traveling motor target power supply exceeds the all-traveling motor supplyable power. It is further determined whether or not
The traveling motor target supply flow rate correction unit
The difference between the target supply flow rate to the left traveling motor and the target supply flow rate to the right traveling motor is equal to or less than the predetermined value when the ratio of the all traveling motor supplyable power to the entire traveling motor target supply power is equal to or less The primary correction amount is calculated as it increases, and the primary correction amount is subtracted from the smaller one of the target supply flow rate to the left traveling motor and the target supply flow rate to the right traveling motor, and The primary correction amount is added to the larger of the target supply flow rate to the left traveling motor and the target supply flow to the right traveling motor, and the target supply flow rate to the left traveling motor and the target to the right traveling motor Primary correction of supply flow rate,
The all traveling motor target supply power is corrected to correspond to the primary correction of the target supply flow rate to the left traveling motor and the target supply flow rate to the right traveling motor, and the all movement motor to the all traveling motor target supply power corrected The target supply flow rate to the left traveling motor is secondarily corrected by multiplying the target supply flow rate to the left traveling motor that has been primarily corrected by the ratio of the traveling motor supplyable motive power, and the corrected all traveling motor target supply motive power The target supply flow rate to the right traveling motor is secondarily corrected by multiplying the target supply flow rate to the right traveling motor that is primarily corrected by the ratio of the all traveling motor supplyable power with respect to
The pump target discharge flow rate calculation unit is a secondary when the target supply flow rate to the left traveling motor and the target supply flow rate to the right traveling motor are corrected by the traveling motor target supply flow rate correction unit. The target delivery flow rate of the first hydraulic pump is calculated by adding the corrected target supply flow rate to the left traveling motor and the bleed-off flow rate of the left traveling flow control valve, and the second traveling corrected right traveling A hydraulic drive system for a construction machine, wherein a target discharge flow rate of the second hydraulic pump is calculated by adding a target supply flow rate to a motor and a bleed-off flow rate of the flow control valve for right travel.
JP2016192231A 2016-09-29 2016-09-29 Hydraulic drive of construction machine Active JP6549075B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016192231A JP6549075B2 (en) 2016-09-29 2016-09-29 Hydraulic drive of construction machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016192231A JP6549075B2 (en) 2016-09-29 2016-09-29 Hydraulic drive of construction machine

Publications (2)

Publication Number Publication Date
JP2018054051A JP2018054051A (en) 2018-04-05
JP6549075B2 true JP6549075B2 (en) 2019-07-24

Family

ID=61836249

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016192231A Active JP6549075B2 (en) 2016-09-29 2016-09-29 Hydraulic drive of construction machine

Country Status (1)

Country Link
JP (1) JP6549075B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116057283B (en) * 2021-03-09 2024-08-23 日立建机株式会社 Operating machinery

Also Published As

Publication number Publication date
JP2018054051A (en) 2018-04-05

Similar Documents

Publication Publication Date Title
US10837159B2 (en) Construction machine
CN106795707B (en) Excavator
CN103562565B (en) Rotary type engineering machinery
CN104755770B (en) work machinery
JP6474718B2 (en) Hydraulic control equipment for construction machinery
US10563378B2 (en) Hydraulic system for work machines
JP7499564B2 (en) Hydraulic Pump Flow Calibration System
KR101973872B1 (en) Hydraulic drive system for work machine
US11118327B2 (en) Work machine
JP6250515B2 (en) Hydraulic control equipment for construction machinery
KR20180107189A (en) Construction Machinery
WO2017094822A1 (en) Control device for hydraulic construction machinery
KR101865285B1 (en) Control system, work machine, and control method
JP2015197185A (en) Hydraulic control device or work machine
KR20190043561A (en) Hydraulic drives of working machines
CN112424483B (en) Construction machine
JP4941928B2 (en) Steering system for work vehicle
JP7314404B2 (en) working machine
JP6549075B2 (en) Hydraulic drive of construction machine
JP2019065569A (en) Hydraulic drive of construction machine
JP6585401B2 (en) Control device for work machine
JP7001574B2 (en) Construction machinery
WO2022208694A1 (en) Work machine
JP7710420B2 (en) Work Machine
JP7184725B2 (en) working machine

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20180705

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20190527

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20190604

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20190626

R150 Certificate of patent or registration of utility model

Ref document number: 6549075

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150