Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP6555986B2 - Combined heat and power system - Google Patents
[go: Go Back, main page]

JP6555986B2 - Combined heat and power system - Google Patents

Combined heat and power system Download PDF

Info

Publication number
JP6555986B2
JP6555986B2 JP2015170936A JP2015170936A JP6555986B2 JP 6555986 B2 JP6555986 B2 JP 6555986B2 JP 2015170936 A JP2015170936 A JP 2015170936A JP 2015170936 A JP2015170936 A JP 2015170936A JP 6555986 B2 JP6555986 B2 JP 6555986B2
Authority
JP
Japan
Prior art keywords
phase
unit
phase side
power generation
control unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2015170936A
Other languages
Japanese (ja)
Other versions
JP2017050928A (en
Inventor
達也 秋田
達也 秋田
幸嗣 桝本
幸嗣 桝本
正美 濱走
正美 濱走
和秀 指原
和秀 指原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Osaka Gas Co Ltd
Original Assignee
Osaka Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Osaka Gas Co Ltd filed Critical Osaka Gas Co Ltd
Priority to JP2015170936A priority Critical patent/JP6555986B2/en
Publication of JP2017050928A publication Critical patent/JP2017050928A/en
Application granted granted Critical
Publication of JP6555986B2 publication Critical patent/JP6555986B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/30Hydrogen technology
    • Y02E60/50Fuel cells

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Fuel Cell (AREA)

Description

本発明は、単相3線式の商用電源と系統連系される発電部と、当該発電部の排熱を回収して消費する排熱回収消費部と、前記商用電源のU相線及びV相線の夫々に各別に設置される一対の電流検出部と、前記発電部の運転を制御する発電用制御部とが設けられ、
前記発電用制御部が、前記U相線に接続されるU相側電気負荷及び前記V相線に接続されるV相側電気負荷を選択的に作用させて、一対の前記電流検出部の設置状態を診断する診断処理を実行するように構成されている熱電併給システムに関する。
The present invention includes a power generation unit interconnected with a single-phase three-wire commercial power source, a waste heat recovery and consumption unit that recovers and consumes exhaust heat of the power generation unit, a U-phase line and V of the commercial power source A pair of current detection units installed separately for each of the phase lines and a power generation control unit for controlling the operation of the power generation unit are provided,
The power generation control unit selectively operates the U-phase side electrical load connected to the U-phase line and the V-phase side electrical load connected to the V-phase line, and the pair of current detection units are installed. The present invention relates to a combined heat and power system configured to execute a diagnostic process for diagnosing a state.

かかる熱電併給システムは、発電用制御部が診断処理を実行することにより、一対の電流検出部の設置状態を診断できるようにしたものである。
つまり、例えば、一対の電流検出部の夫々が、商用電源側から負荷側に向けて流れる電流をプラスとして検出し、発電部側から商用電源側に流れる電流をマイナスとして検出する状態を適正状態とする場合において、一対の電流検出部の取付け向きが反転していると、プラスとマイナスとが逆転することになるため、一対の電流検出部の取付け向きが適正通り取付けられているか否かを診断することになり、また、一対の電流検出部が適正通りU相線及びV相線に設置されて、U相線の電流を検出する電流検出部が、適正通りU相線の電流を検出し、かつ、V相線の電流を検出する電流検出部が、適正通りV相線の電流を検出しているか否かを診断できるようにしたものである。
Such a combined heat and power system is configured such that the installation state of the pair of current detection units can be diagnosed by the power generation control unit executing diagnosis processing.
That is, for example, each of the pair of current detection units detects a current flowing from the commercial power supply side to the load side as positive, and detects a current flowing from the power generation unit side to the commercial power supply side as negative as an appropriate state. In this case, if the mounting direction of the pair of current detection units is reversed, plus and minus are reversed, so it is diagnosed whether the mounting direction of the pair of current detection units is properly installed. In addition, a pair of current detection units are properly installed on the U-phase line and V-phase line, and the current detection unit that detects the current of the U-phase line detects the current of the U-phase line as appropriate. In addition, the current detection unit that detects the current of the V-phase line can diagnose whether or not the current of the V-phase line is detected as appropriate.

かかる熱電併給システムの従来例として、発電部に、U相線に接続されるU相ヒータ手段とV相線に接続されるV相ヒータ手段とが、余剰電力消費用のヒータ手段として備えられることを利用して、U相ヒータ手段をU相側電気負荷とし、V相ヒータ手段をV相側電気負荷として使用しながら、診断処理を行うように構成されたものがある(例えば、特許文献1参照。)。   As a conventional example of such a combined heat and power system, the power generation unit is provided with a U-phase heater means connected to the U-phase line and a V-phase heater means connected to the V-phase line as heater means for surplus power consumption. Is used to perform diagnostic processing while using the U-phase heater means as the U-phase side electric load and the V-phase heater means as the V-phase side electric load (for example, Patent Document 1). reference.).

つまり、特許文献1においては、商用電源のU相線及びV相線の夫々に設置される一対の電流検出部の検出情報に基づいて、発電部に発電された電力が商用電源側に流れる、いわゆる逆潮流を回避するために、余剰電力消費用のヒータ手段としてのU相ヒータ手段やV相ヒータ手段を作動させるように構成され、そして、診断処理においては、余剰電力消費用のヒータ手段としてのU相ヒータ手段やV相ヒータ手段を、U相側電気負荷やV相側電気負荷として用いることが記載されている。   That is, in Patent Document 1, based on detection information of a pair of current detection units installed on each of the U-phase line and the V-phase line of the commercial power source, the power generated by the power generation unit flows to the commercial power source side. In order to avoid the so-called reverse power flow, the U-phase heater means and the V-phase heater means as the heater means for surplus power consumption are operated, and in the diagnosis process, as the heater means for surplus power consumption The U-phase heater means and the V-phase heater means are used as the U-phase side electric load and the V-phase side electric load.

また、特許文献1には記載されていないが、一般に、一対の電流検出部の検出情報は、商用電源の電力を使用した電力使用量を求めることにも使用され、そして、求めた電力使用量が、熱電併給システムの運転情報を指令するリモコン等に表示されることになる。
ちなみに、電力使用量は、U相線の電圧とU相線の電流との積の積算値と、V相線の電圧とV相線の電流との積の積算値とを加えた値として求められるから、U相線の電流を検出する電流検出部が、適正通りU相線の電流を検出し、かつ、V相線の電流を検出する電流検出部が、適正通りV相線の電流を検出する必要がある。
Although not described in Patent Document 1, generally, the detection information of the pair of current detection units is also used for obtaining the power usage amount using the power of the commercial power source, and the obtained power usage amount. However, it is displayed on a remote controller or the like that commands operation information of the combined heat and power system.
Incidentally, the power consumption is obtained as a value obtained by adding the integrated value of the product of the voltage of the U-phase line and the current of the U-phase line and the integrated value of the product of the voltage of the V-phase line and the current of the V-phase line. Therefore, the current detection unit that detects the current of the U-phase line detects the current of the U-phase line as appropriate, and the current detection unit that detects the current of the V-phase line properly detects the current of the V-phase line. It needs to be detected.

尚、特許文献1においては、U相ヒータ手段とV相ヒータ手段とを作動させることに代えて、発電部の発電電力を増減させながら、U相線及びV相線への電力供給量を変動させて、一対の電流検出部が適正通りU相線及びV相線に設置されているか否かを検出することも記載されているが、診断処理のために、発電部の発電電力を変動させねばならない無駄がある。   In Patent Document 1, instead of operating the U-phase heater unit and the V-phase heater unit, the amount of power supplied to the U-phase line and the V-phase line is changed while increasing or decreasing the generated power of the power generation unit. It is also described that the pair of current detection units detect whether the U-phase line and the V-phase line are properly installed. For diagnostic processing, the generated power of the power generation unit is changed. There is waste that must be done.

また、特許文献1においては、発電部が、エンジンにて駆動される発電機を備えるように構成されているが、発電部が、都市ガス等の燃料ガスを改質処理する改質部と、改質部からの水素含有ガスを燃料として発電する燃料電池とを備える形態に構成される場合もある(例えば、特許文献2参照。)。
ちなみに、特許文献2においても、特許文献1と同様に、余剰電力消費用のヒータ手段として、電気ヒータを設けることが記載されている。
Further, in Patent Document 1, the power generation unit is configured to include a generator driven by an engine, but the power generation unit includes a reforming unit that reforms a fuel gas such as city gas, In some cases, the fuel cell is configured to include a fuel cell that generates electricity using the hydrogen-containing gas from the reforming unit as fuel (see, for example, Patent Document 2).
Incidentally, in Patent Document 2, similarly to Patent Document 1, it is described that an electric heater is provided as a heater means for surplus power consumption.

特開2002−286785号公報JP 2002-286785 A 特開2005−69667号公報JP 2005-69667 A

近年では、発電部に発電された電力が商用電源側に流れる逆潮流を許容することが検討されており、この場合には、余剰電力を消費する余剰電力消費用のヒータ手段が省略されることが予想される。   In recent years, it has been studied to allow a reverse power flow in which the power generated by the power generation unit flows to the commercial power supply side. In this case, the heater means for consuming surplus power is consumed. Is expected.

また、近年では、水素ガス(水素含有ガス)を供給する設備を充実させることが検討されており、この場合には、発電部が燃料電池にて発電する場合において、都市ガス等の燃料ガスを改質処理する改質部が省略されることが予想される。   In recent years, it has been studied to enhance facilities for supplying hydrogen gas (hydrogen-containing gas). In this case, when the power generation unit generates power with a fuel cell, fuel gas such as city gas is used. It is expected that the reforming unit for the reforming process is omitted.

上記の如く、発電部に発電された電力が商用電源側に流れる逆潮流が許容されて、大きな電気負荷となる余剰電力消費用のヒータ手段が省略されると、一対の電流検出部を診断処理するため必要となるU相側電気負荷及びV相側電気負荷として、余剰電力消費用のヒータ手段を用いることができないものとなるため、一対の電流検出部を診断処理するために必要となるU相側電気負荷及びV相側電気負荷を、発電部が備える電気機器にて確保することが難しいものとなる。   As described above, when the reverse power flow through which the power generated by the power generation unit flows to the commercial power supply side is permitted and the heater means for surplus power consumption that becomes a large electric load is omitted, the pair of current detection units are subjected to diagnostic processing. Since the heater means for surplus power consumption cannot be used as the U-phase side electrical load and the V-phase side electrical load that are required to perform the U-phase side electrical load, U that is necessary for the diagnostic processing of the pair of current detection units It becomes difficult to secure the phase-side electric load and the V-phase side electric load with an electric device provided in the power generation unit.

ちなみに、発電部が、都市ガス等の燃料ガスを改質処理する改質部と、改質部からの水素含有ガスを燃料として発電する燃料電池とを備える形態に構成される場合には、起動時に、改質部の各部を昇温する起動用の電気ヒータが備えられることになるから、その起動用電気ヒータを、一対の電流検出部を診断処理するため必要となるU相側電気負荷及びV相側電気負荷として使用することが考えられる。   Incidentally, if the power generation unit is configured to include a reforming unit that reforms a fuel gas such as city gas and a fuel cell that generates power using the hydrogen-containing gas from the reforming unit as a fuel, start-up In some cases, an electric heater for starting up the temperature of each part of the reforming unit will be provided. Therefore, the electric heater for starting up is required to perform diagnostic processing on the pair of current detection units and the U-phase side electric load. It can be considered to be used as a V-phase side electric load.

しかしながら、上述の如く、改質部が省略されると、発電部が燃料電池にて構成される場合においても、一対の電流検出部を診断処理するため必要となるU相側電気負荷及びV相側電気負荷を、発電部が備える電気機器にて確保することが難しいものとなる。   However, as described above, when the reforming unit is omitted, the U-phase side electric load and the V-phase that are necessary for performing diagnostic processing on the pair of current detection units even when the power generation unit is configured by a fuel cell. It becomes difficult to secure the side electric load with an electric device provided in the power generation unit.

本発明は、上記実状に鑑みて為されたものであって、その目的は、排熱回収消費部が備える電気機器を有効利用して、一対の電流検出部の設置状態を診断する診断処理を良好に行える熱電併給システムを提供する点にある。   The present invention has been made in view of the above circumstances, and its purpose is to perform diagnostic processing for diagnosing the installation state of a pair of current detection units by effectively using an electrical device provided in the exhaust heat recovery and consumption unit. The point is to provide a cogeneration system that can perform well.

本発明の熱電併給システムは、単相3線式の商用電源と系統連系される発電部と、当該発電部の排熱を回収して消費する排熱回収消費部と、前記商用電源のU相線及びV相線の夫々に各別に設置される一対の電流検出部と、前記発電部の運転を制御する発電用制御部とが設けられ、
前記発電用制御部が、前記U相線に接続されるU相側電気負荷及び前記V相線に接続されるV相側電気負荷を選択的に作用させて、一対の前記電流検出部の設置状態を診断する診断処理を実行するように構成されているものであって、その特徴構成は、
前記排熱回収消費部が、前記U相線又は前記V相線に接続される電気機器を備える形態で設けられ、
前記発電用制御部が、前記U相側電気負荷及び前記V相側電気負荷のうちの少なくとも一方として、前記排熱回収消費部が備える前記電気機器を用いる形態で、前記診断処理を実行するように構成され
前記発電部に、前記U相線からの電力を外部に出力するU相側接続部、及び、前記V相線からの電力を外部に出力するV相側接続部が設けられ、
前記排熱回収消費部が、前記U相側接続部及び前記V相側接続部の一方に接続されかつ前記電気機器として本体側電気機器を備える本体処理部と、前記U相側接続部及び前記V相側接続部の他方に接続されかつ前記電気機器として補助側電気機器を備える補助熱源機である補助処理部とを備える形態に構成され、
前記発電用制御部が、前記本体側電気機器及び前記補助側電気機器を、前記U相側電気負荷及び前記V相側電気負荷として用いる形態で、前記診断処理を実行するように構成され、
前記U相側接続部及び前記V相側接続部が、前記発電用制御部にて断続操作自在なU相側断続部及びV相側断続部により、出力作用状態と出力停止とに切換え自在に構成され、
前記本体処理部が、前記U相側接続部及び前記V相側接続部との接続による電力供給状態において前記発電用制御部との間で通信する端末側制御部を備える形態に構成され、
前記発電用制御部が、前記診断処理の前に、前記U相側接続部及び前記V相側接続部の一方を出力作用状態に切換えて、前記端末側制御部との間で通信することにより、前記本体処理部が前記U相側接続部及び前記V相側接続部のいずれに接続されているかを判別する接続確認処理、及び、前記本体処理部が前記U相側接続部に接続される場合には、前記本体側電気機器を前記U相側電気負荷にかつ前記補助側電気機器を前記V相側電気負荷に定め、且つ、前記本体処理部が前記V相側接続部に接続される場合には、前記本体側電気機器を前記V相側電気負荷にかつ前記補助側電気機器を前記U相側電気負荷に定める負荷設定処理を実行するように構成されている点にある。
A combined heat and power system of the present invention includes a power generation unit that is grid-connected to a single-phase three-wire commercial power source, a waste heat recovery and consumption unit that recovers and consumes exhaust heat of the power generation unit, and a U of the commercial power source. A pair of current detection units installed separately for each of the phase line and the V-phase line, and a power generation control unit for controlling the operation of the power generation unit are provided,
The power generation control unit selectively operates the U-phase side electrical load connected to the U-phase line and the V-phase side electrical load connected to the V-phase line, and the pair of current detection units are installed. It is configured to execute a diagnostic process for diagnosing a state, and its characteristic configuration is
The exhaust heat recovery and consumption unit is provided in a form including an electrical device connected to the U-phase line or the V-phase line,
The power generation control unit executes the diagnosis process in a form using the electric device included in the exhaust heat recovery and consumption unit as at least one of the U-phase side electric load and the V-phase side electric load. Composed of
The power generation unit is provided with a U-phase side connection unit that outputs power from the U-phase line to the outside, and a V-phase side connection unit that outputs power from the V-phase line to the outside.
The waste heat recovery and consumption part is connected to one of the U-phase side connection part and the V-phase side connection part and includes a main body side electric device as the electric device, the U phase side connection part, and the It is comprised in the form provided with the auxiliary processing part which is an auxiliary heat source machine which is connected to the other of the V phase side connection part, and is provided with auxiliary side electric equipment as the electric equipment,
The power generation control unit is configured to execute the diagnostic processing in a form in which the main body side electric device and the auxiliary side electric device are used as the U phase side electric load and the V phase side electric load,
The U-phase side connecting portion and the V-phase side connecting portion can be switched between an output action state and an output stop by a U-phase side intermittent portion and a V-phase side intermittent portion that can be intermittently operated by the power generation control portion. Configured,
The main body processing unit is configured to include a terminal-side control unit that communicates with the power generation control unit in a power supply state by connection with the U-phase side connection unit and the V-phase side connection unit,
The power generation control unit communicates with the terminal-side control unit by switching one of the U-phase side connection unit and the V-phase side connection unit to the output operation state before the diagnosis process. A connection confirmation process for determining whether the main body processing unit is connected to the U-phase side connection unit or the V-phase side connection unit; and the main body processing unit is connected to the U-phase side connection unit In this case, the main body side electric device is set as the U-phase side electric load, the auxiliary side electric device is set as the V phase side electric load, and the main body processing unit is connected to the V phase side connection portion. In this case, it is configured to execute a load setting process in which the main body-side electric device is set as the V-phase side electric load and the auxiliary-side electric device is set as the U-phase side electric load .

すなわち、排熱回収消費部に装備する電気機器が、U相線又はV相線に接続される形態で備えられる。
そして、発電用制御部が、U相側電気負荷及びV相側電気負荷のうちの少なくとも一方として、排熱回収消費部が備える電気機器を用いる形態で、診断処理を実行するように構成されている。
That is, the electrical equipment equipped in the exhaust heat recovery and consumption unit is provided in a form connected to the U-phase line or the V-phase line.
And the control part for electric power generation is comprised so that a diagnostic process may be performed in the form using the electric equipment with which an exhaust heat recovery consumption part is provided as at least one of U phase side electric load and V phase side electric load. Yes.

つまり、排熱回収消費部に装備する電気機器として、U相線に接続される電気機器とV相線に接続される電気機器とが存在する場合において、それらの電気機器を、U相側電気負荷及びV相側電気負荷として用いる形態で、診断処理を実行させることができる。   In other words, when there are electrical devices connected to the U-phase wire and electrical devices connected to the V-phase wire as electrical devices equipped in the exhaust heat recovery and consumption unit, these electrical devices are connected to the U-phase side electricity. The diagnosis process can be executed in a form used as a load and a V-phase side electric load.

また、排熱回収消費部に装備する電気機器として、U相線に接続される電気機器とV相線に接続される電気機器とが存在する場合や、排熱回収消費部に装備する電気機器として、U相線又はV相線に接続される電気機器が存在する場合において、排熱回収消費部に装備する電気機器を、U相側電気負荷及びV相側電気負荷のうちの一方として用い、発電部が備える電気機器を、U相側電気負荷及びV相側電気負荷のうちの一方として用いる形態で、診断処理を実行させることができる。   In addition, when there are electrical devices connected to the U-phase wire and electrical devices connected to the V-phase wire as electrical devices equipped in the exhaust heat recovery and consumption unit, or electrical devices equipped in the exhaust heat recovery and consumption unit As described above, when there is an electrical device connected to the U-phase wire or the V-phase wire, the electrical device equipped in the exhaust heat recovery and consumption unit is used as one of the U-phase side electrical load and the V-phase side electrical load. The diagnostic processing can be executed in a form in which the electric device included in the power generation unit is used as one of the U-phase side electric load and the V-phase side electric load.

説明を加えると、排熱回収消費部には、湯水を循環させる湯水循環ポンプ、凍結防止用電気ヒータ等の大きな電気負荷となる電気機器が装備されるから、排熱回収消費部が装備する電気機器を、U相側電気負荷又はV相側電気負荷として使用することができる。   In other words, the waste heat recovery and consumption unit is equipped with electrical equipment that has a large electrical load, such as a hot water circulation pump that circulates hot water and an electric heater for preventing freezing. The device can be used as a U-phase side electrical load or a V-phase side electrical load.

また、発電部には、余剰電力消費用のヒータ手段や改質部が省略されたとしても、排熱を回収するために湯水を循環させる循環ポンプ、凍結防止用電気ヒータ等の電気機器が装備されるから、発電部が装備する電気機器を、U相側電気負荷又はV相側電気負荷として使用することができる。   The power generation unit is equipped with electrical equipment such as a circulation pump that circulates hot and cold water and an anti-freezing electric heater to recover exhaust heat even if the heater means and the reforming unit for surplus power consumption are omitted. Therefore, the electric equipment with which the power generation unit is equipped can be used as the U-phase side electric load or the V-phase side electric load.

以上の通り、排熱回収消費部に装備する電気機器を、U相線に接続される電気機器又はV相線に接続される電気機器として用いながら、診断処理を行うものであるから、発電部に発電された電力が商用電源側に流れる逆潮流を許容されて、余剰電力を消費する余剰電力消費用のヒータ手段が省略され、また、発電部が燃料電池にて発電する場合において、水素含有ガス(水素ガス)が供給されることにより、都市ガス等の燃料ガスを改質処理する改質部が省略されることがあっても、排熱回収消費部に装備する電気機器を利用しながら、診断処理を良好に行うことができる。   As described above, since the electrical equipment equipped in the exhaust heat recovery and consumption unit is used as an electrical device connected to the U-phase wire or an electrical device connected to the V-phase wire, diagnostic processing is performed. When the generated power is allowed to flow backward to the commercial power supply side, surplus power consumption heater means for consuming surplus power is omitted, and when the power generation unit generates power with a fuel cell, it contains hydrogen. Even if the reforming unit for reforming the fuel gas such as city gas is omitted due to the supply of gas (hydrogen gas), while using the electrical equipment equipped in the exhaust heat recovery and consumption unit The diagnostic process can be performed satisfactorily.

要するに、本発明の熱電供併給システムによれば、排熱回収消費部が備える電気機器を有効利用して、一対の電流検出部の設置状態を診断する診断処理を良好に行える。   In short, according to the combined heat and power supply system of the present invention, it is possible to satisfactorily perform diagnostic processing for diagnosing the installation state of the pair of current detection units by effectively using the electrical equipment provided in the exhaust heat recovery and consumption unit.

、排熱回収消費部の本体処理部と補助処理部とが、発電部に設けられたU相側接続部とV相側接続部とに分散して接続される。
そして、本体側電気機器及び補助側電気機器のうちの一方を、U相側電気負荷として使用し、且つ、本体側電気機器及び補助側電気機器のうちの他方を、V相側電気負荷として使用しながら、診断処理が実行されることになる。
Further , the main body processing unit and the auxiliary processing unit of the exhaust heat recovery and consumption unit are dispersedly connected to the U-phase side connection unit and the V-phase side connection unit provided in the power generation unit.
And, one of the main body side electric device and the auxiliary side electric device is used as the U-phase side electric load, and the other of the main body side electric device and the auxiliary side electric device is used as the V phase side electric load. However, the diagnostic process is executed.

説明を加えると、排熱回収消費部には、湯水を循環させる湯水循環ポンプ、凍結防止用電気ヒータ等の大きな電気負荷となる電気機器を本体側電気機器として装備する本体処理部と、湯水循環ポンプにて循環される湯水を加熱するバックアップボイラを備えた補助処理部とが装備され、補助処理部には、バックアップボイラの燃焼バーナに燃焼用空気を供給する送風機、バックアップボイラの管路の凍結を防止する凍結防止用電気ヒータ等の大きな電気負荷となる電気機器が、補助側電気機器として装備されることになる。   In other words, the waste heat recovery and consumption unit includes a main body processing unit equipped with electric equipment that is a large electric load, such as a hot water circulation pump for circulating hot water and an electric heater for freezing prevention, as a main body side electric equipment, and hot water circulation. And an auxiliary processing unit equipped with a backup boiler for heating hot water circulated by a pump. The auxiliary processing unit includes a blower for supplying combustion air to the combustion burner of the backup boiler, and freezing of the pipeline of the backup boiler. An electric device that is a large electric load, such as an anti-freezing electric heater for preventing the above, is installed as an auxiliary electric device.

したがって、本体側電気機器と補助側電気機器とを、U相側電気負荷とV相側電気負荷として使用しながら、診断処理を良好に行うことができるのである。   Therefore, the diagnostic process can be performed satisfactorily while using the main body side electric device and the auxiliary side electric device as the U phase side electric load and the V phase side electric load.

要するに、本発明の熱電併給システムの特徴構成によれば、排熱回収消費部が備える本体側電気機器及び補助側電気機器を利用しながら、診断処理を良好に行うことができる。 In short, according to the feature structure of the cogeneration system of the present invention, while using the body-side electrical equipment and auxiliary side electrical equipment provided in the exhaust heat recovery consumption unit, can be performed well diagnostic process.

、診断処理の前に実行される接続確認処理により、本体処理部がU相側接続部及びV相側接続部のいずれに接続されているかが判別され、その判別結果に基づいて、本体側電気機器と補助側電気機器とを、V相側電気負荷とU相側電気負荷とに振り分ける負荷設定処理が実行される。 Further , it is determined whether the main body processing unit is connected to the U-phase side connecting portion or the V-phase side connecting portion by the connection confirmation processing executed before the diagnosis processing, and based on the determination result, the main body side A load setting process for distributing the electrical device and the auxiliary electrical device to the V-phase electrical load and the U-phase electrical load is executed.

したがって、本体処理部がU相側接続部及びV相側接続部のいずれに接続されても、本体側電気機器と補助側電気機器とを、V相側電気負荷とU相側電気負荷とに適切に定めることができるため、診断処理を的確に行うことができる。 Therefore, even if the main body processing unit is connected to either the U-phase side connection portion or the V-phase side connection portion, the main body-side electric device and the auxiliary-side electric device are changed into the V-phase side electric load and the U-phase side electric load . Since it can determine appropriately, a diagnostic process can be performed exactly.

要するに、本発明の熱電併給システムの特徴構成によれば、本体処理部がU相側接続部及びV相側接続部のいずれに接続されても、診断処理を的確に行うことができる。
In short, according to the feature structure of the cogeneration system of the present invention, the main processing unit is also connected to one of the U-phase-side connecting portion and the V-phase-side connecting portion, can be performed accurately diagnosis process.

熱電併給システムの概略構成図Schematic configuration diagram of cogeneration system 熱源併給システムの電気系統図Electric system diagram of heat source cogeneration system テスト処理を示すフローチャートFlow chart showing test process 診断処理を示すフローチャートFlow chart showing diagnostic processing

〔実施形態〕
以下、本発明に係る熱電併給システムについて図面に基づいて説明する。
(熱電併給部の全体構成)
図1に示すように、熱電併給システムには、発電部Ha及び排熱回収消費部としての熱源部Hbを備える熱電併給部Hが備えられ、熱源部Hbには、発電部Haの排熱を回収した湯水を貯湯する貯湯タンク1や、都市ガス等の燃料ガスを用いて燃焼するバックアップボイラとしての補助熱源機2が備えられている。
Embodiment
Hereinafter, a combined heat and power system according to the present invention will be described with reference to the drawings.
(Overall configuration of the combined heat and power unit)
As shown in FIG. 1, the combined heat and power system includes a combined heat and power supply unit H including a power generation unit Ha and a heat source unit Hb as an exhaust heat recovery and consumption unit, and the heat source unit Hb receives exhaust heat from the power generation unit Ha. A hot water storage tank 1 for storing the recovered hot water and an auxiliary heat source machine 2 as a backup boiler that burns using a fuel gas such as city gas are provided.

発電部Haには、水素ガス供給源Gから水素ガス供給路3を通して供給される水素ガス(水素含有ガス)を用いて発電する燃料電池4が備えられている。尚、水素ガス供給路3には、水素ガスの供給を断続する供給断続弁3Aが設けられている。
燃料電池4は、燃料極4n及び酸素極4sを備えるセルを積層して構成されるものであって、隣接するセルの燃料極4nと酸素極4sとの間には、冷却水が通流する通流部4dが設けられている。
The power generation unit Ha includes a fuel cell 4 that generates power using hydrogen gas (hydrogen-containing gas) supplied from the hydrogen gas supply source G through the hydrogen gas supply path 3. The hydrogen gas supply path 3 is provided with a supply interrupt valve 3A for interrupting the supply of hydrogen gas.
The fuel cell 4 is configured by stacking cells including a fuel electrode 4n and an oxygen electrode 4s, and cooling water flows between the fuel electrode 4n and the oxygen electrode 4s of adjacent cells. A flow passage 4d is provided.

燃料電池4が発生する熱を冷却水にて回収する冷却水循環路5Aと、発電部Haと熱源部Hbとの間で湯水を循環する湯水循環路5Bと、冷却水循環路5Aを循環する冷却水と湯水循環路5Bを循環する湯水とを熱交換する熱交換部5Cとが設けられている。
冷却水循環路5Aには、冷却水循環ポンプPa及び冷却水貯留タンクQが設けられ、湯水循環路5Bには、湯水循環ポンプPbが設けられている。
Cooling water circulation path 5A for recovering heat generated by the fuel cell 4 with cooling water, hot water circulation path 5B for circulating hot water between the power generation unit Ha and the heat source unit Hb, and cooling water for circulation through the cooling water circulation path 5A And a heat exchanging section 5C for exchanging heat between the hot water circulating in the hot water circulation path 5B.
The cooling water circulation path 5A is provided with a cooling water circulation pump Pa and a cooling water storage tank Q, and the hot water circulation path 5B is provided with a hot water circulation pump Pb.

そして、発電部Haと熱源部Hbとの間で湯水を循環する湯水循環路5Bの湯水を、冷却水循環路5Aを循環する冷却水にて加熱して、発電部Haの排熱を熱源部Hbに供給することにより、熱源部Hbが、排熱を利用して、一般給湯、湯張給湯、暖房運転、及び、追焚き運転を行い、そして、熱量が不足する場合には、補助熱源機2を作動させるように構成されており、その詳細は後述する。   Then, hot water in the hot water circulation path 5B that circulates hot water between the power generation section Ha and the heat source section Hb is heated with cooling water that circulates in the cooling water circulation path 5A, and the exhaust heat of the power generation section Ha is converted into the heat source section Hb. When the heat source section Hb performs general hot water supply, hot water supply hot water supply, heating operation, and reheating operation using exhaust heat, and the amount of heat is insufficient, the auxiliary heat source machine 2 The details are described later.

燃料電池4の電力の出力側には、発電部Haの運転を制御する発電用制御部6が設けられている。
発電用制御部6は、系統連系用のインバータを装備して、燃料電池4の発電電力を商用電源7から受電する受電電力と同じ電圧及び同じ周波数にするように構成されている。
On the power output side of the fuel cell 4, a power generation control unit 6 that controls the operation of the power generation unit Ha is provided.
The power generation control unit 6 includes an inverter for grid connection, and is configured to set the generated power of the fuel cell 4 to the same voltage and the same frequency as the received power received from the commercial power source 7.

商用電源7は、単相3線式100/200Vである。商用電源7が接続される分電盤8には、受電電力供給ライン9が接続され、商用電源7からの電力が、受電電力供給ライン9を介してテレビ、冷蔵庫、洗濯機などの電気負荷10に供給されるように構成されている。   The commercial power source 7 is a single-phase three-wire 100 / 200V. The distribution board 8 to which the commercial power supply 7 is connected is connected to a received power supply line 9, and the electric power 10 from the commercial power supply 7 is received through the received power supply line 9 by an electric load 10 such as a television, a refrigerator, or a washing machine. It is comprised so that it may be supplied to.

発電用制御部6が、分電盤8に接続され、燃料電池4からの発電電力が受電電力供給ライン9を介して電気負荷10に供給され、かつ、余剰電力が商用電源7側に供給されるように構成されている。つまり、本実施形態の熱電併給システムは、発電部Haの電力が商用電源7側に逆潮流することが許容されるシステムとして構成されている。   The power generation control unit 6 is connected to the distribution board 8, the generated power from the fuel cell 4 is supplied to the electric load 10 through the received power supply line 9, and surplus power is supplied to the commercial power source 7 side. It is comprised so that. That is, the combined heat and power system of the present embodiment is configured as a system that allows the power of the power generation unit Ha to flow backward to the commercial power supply 7 side.

熱源部Hbには、熱源部Hbの運転を制御する端末側制御部11が設けられており、熱電併給部Hの運転を制御する運転制御部Cが、発電用制御部6と端末側制御部11とから構成されている。
発電用制御部6と端末側制御部11とは、通信ラインLにて接続されて、各種の情報を通信自在に構成され、また、発電用制御部6と端末側制御部11とに対して運転開始指令や運転停止指令等の各種の情報を指令するリモコンRが、通信ラインLに接続される形態で設けられている。
The heat source unit Hb is provided with a terminal side control unit 11 that controls the operation of the heat source unit Hb, and the operation control unit C that controls the operation of the combined heat and power supply unit H includes the power generation control unit 6 and the terminal side control unit. 11.
The power generation control unit 6 and the terminal side control unit 11 are connected via a communication line L, and are configured to be able to communicate various types of information. Further, with respect to the power generation control unit 6 and the terminal side control unit 11 A remote controller R that commands various information such as an operation start command and an operation stop command is provided in a form connected to the communication line L.

(電気系統について)
図2に示すように、分電盤8には、商用電源7のU相線U、V相線V、中性線Oが引き込まれている。
分電盤8の内部には、負荷電流を契約した設定値以下に制限するためのリミッタ(電流制限器)12、主幹ブレーカ(漏電ブレーカ)13、上述した受電電力供給ライン9を接続する複数の分岐ブレーカ14、及び、発電部Haを接続する連係ブレーカ15が装備されている。
尚、図2においては、電気負荷10に対して100Vの電力を供給する形態を例示するが、必要に応じて、電気負荷10に対して200Vの電力を供給するようにしてもよい。
(Electric system)
As shown in FIG. 2, a U-phase line U, a V-phase line V, and a neutral line O of the commercial power supply 7 are drawn into the distribution board 8.
In the distribution board 8, a limiter (current limiter) 12 for limiting the load current to a contracted set value or less, a main breaker (earth leakage breaker) 13, and a plurality of the received power supply lines 9 described above are connected. A branch breaker 14 and a linkage breaker 15 for connecting the power generation unit Ha are provided.
In addition, in FIG. 2, although the form which supplies 100V electric power with respect to the electric load 10 is illustrated, you may make it supply 200V electric power with respect to the electric load 10 as needed.

発電部Haには、内部配線Nにて発電用制御部6に接続された電源端子台16が設けられ、その電源端子台16が、外部配線Mにて連係ブレーカ15に接続されている。
内部配線Nには、U相用内線Nu、V相用内線Nv及び中性用内線Noが備えられ、外部配線Mには、U相用外線Mu、V相用外線Mv及び中性用外線Moが備えられている。
The power generation unit Ha is provided with a power supply terminal block 16 connected to the power generation control unit 6 through an internal wiring N, and the power supply terminal block 16 is connected to the linkage breaker 15 through an external wiring M.
The internal wiring N includes a U-phase extension Nu, a V-phase extension Nv, and a neutral extension No. The external wiring M includes a U-phase external line Mu, a V-phase external line Mv, and a neutral external line Mo. Is provided.

分電盤8には、商用電源7のU相線U及びV相線Vに流れる電流を各別に検出する第1電流検出部D1及び第2電流検出部D2が、U相線U及びV相線Vに対応して設置されている。
ちなみに、本実施形態においては、第1電流検出部D1及び第2電流検出部D2が、主幹ブレーカ13と分岐ブレーカ14との間に設置されているが、例えば、第1電流検出部D1及び第2電流検出部D2を、リミッタ12よりも商用電源7側に設置する等、第1電流検出部D1及び第2電流検出部D2の設置箇所は変更できる。
The distribution board 8 includes a first current detection unit D1 and a second current detection unit D2 that individually detect currents flowing in the U-phase line U and the V-phase line V of the commercial power supply 7, and the U-phase line U and the V-phase. It is installed corresponding to the line V.
Incidentally, in the present embodiment, the first current detection unit D1 and the second current detection unit D2 are installed between the main breaker 13 and the branch breaker 14, but for example, the first current detection unit D1 and the first current detection unit D1 The installation location of the 1st current detection part D1 and the 2nd current detection part D2 can be changed, such as installing 2 current detection part D2 in the commercial power supply 7 side rather than the limiter 12. FIG.

発電用制御部6には、U相用信号線Su及びV相用信号線Svが接続されている。
そして、第1電流検出部D1がU相用信号線Suに接続され、第2電流検出部D2がV相用信号線Svに接続されている。
したがって、第1電流検出部D1をU相線Uに流れる電流を検出するように設置し、第2電流検出部D2をV相線Vに流れる電流を検出するように設置することになる。
尚、第1電流検出部D1及び第2電流検出部D2を総称して、一対の電流検出部Dと呼称する。
A U-phase signal line Su and a V-phase signal line Sv are connected to the power generation control unit 6.
The first current detection unit D1 is connected to the U-phase signal line Su, and the second current detection unit D2 is connected to the V-phase signal line Sv.
Therefore, the first current detection unit D1 is installed so as to detect the current flowing through the U-phase line U, and the second current detection unit D2 is installed so as to detect the current flowing through the V-phase line V.
The first current detection unit D1 and the second current detection unit D2 are collectively referred to as a pair of current detection units D.

一対の電流検出部Dは、電流トランス式の交流電流センサを用いて構成されるものであって、本実施形態においては、設置向きが適正である場合には、商用電源7から電気負荷10に向かう方向に電流が流れると、プラスの電圧信号を出力し、商用電源7に向かう方向に電流が流れると(逆潮流で電流が流れると)、マイナスの電圧信号を出力するように構成されている。   The pair of current detection units D is configured using a current transformer type AC current sensor. In the present embodiment, when the installation direction is appropriate, the commercial power source 7 supplies the electric load 10. It is configured to output a positive voltage signal when a current flows in the direction toward it, and to output a negative voltage signal when a current flows in the direction toward the commercial power supply 7 (when a current flows in a reverse power flow). .

そして、熱電併給システムを家庭等の設置箇所に設置する際には、U相用信号線Suに接続する第1電流検出部D1を、適正な設置向きでU相線Uに設置し、V相用信号線Svに接続する第2電流検出部D2を、適正な設置向きでV相線Vに設置することになるが、本実施形態においては、発電用制御部6が、一対の電流検出部Dの設置状態が適正であるか否かを診断する診断処理を実行するように構成されており、その詳細は後述する。   When the cogeneration system is installed at a place such as a home, the first current detection unit D1 connected to the U-phase signal line Su is installed on the U-phase line U in an appropriate installation direction, and the V-phase The second current detection unit D2 connected to the signal line Sv is installed on the V-phase line V in an appropriate installation direction. In the present embodiment, the power generation control unit 6 is a pair of current detection units. It is configured to execute a diagnostic process for diagnosing whether or not the installation state of D is appropriate, details of which will be described later.

本実施形態の熱電併給システムは、逆潮流が許容される状態で商用電源7に系統連系されるものであり、第1電流検出部D1及び第2電流検出部D2の検出情報は、商用電源7の電力を使用した量(電力使用量)を求めることに使用され、求めた電力使用量が、熱電併給部Hの運転情報を指令するリモコンRに表示されることになる。   The combined heat and power system of this embodiment is grid-connected to the commercial power supply 7 in a state where reverse power flow is allowed, and the detection information of the first current detection unit D1 and the second current detection unit D2 is the commercial power supply. 7 is used to obtain the amount of power used (power consumption), and the obtained power usage is displayed on the remote controller R that commands the operation information of the combined heat and power supply unit H.

ちなみに、電力使用量は、U相線Uの電圧とU相線Uの電流との積の積算値と、V相線Vの電圧とV相線Vの電流との積の積算値とを加えた値として求められるから、1対の電流検出部Dが、U相線Uの電流及びV相線Vの電流を適切に検出する必要がある。   Incidentally, the amount of power used is the sum of the product of the voltage of the U-phase line U and the current of the U-phase line U, and the product of the product of the voltage of the V-phase line V and the current of the V-phase line V. Therefore, it is necessary for the pair of current detection units D to appropriately detect the current of the U-phase line U and the current of the V-phase line V.

発電用制御部6には、図示は省略するが、U相線Uの電圧を検出するU相側電圧検出部及びV相線Vの電圧を検出するV相側電圧検出部が設けられている。
そして、発電用制御部6に設けた演算処理部(CPU)が、U相側電圧検出部及びV相側電圧検出部の検出情報、並びに、一対の電流検出部Dの検出情報に基づいて、上述した電力使用量を求めて、求めた電力使用量をリモコンRに表示するように構成されている。
Although not shown, the power generation control unit 6 includes a U-phase side voltage detection unit that detects the voltage of the U-phase line U and a V-phase side voltage detection unit that detects the voltage of the V-phase line V. .
Then, the arithmetic processing unit (CPU) provided in the power generation control unit 6 is based on the detection information of the U-phase side voltage detection unit and the V-phase side voltage detection unit, and the detection information of the pair of current detection units D. The power usage amount described above is obtained, and the obtained power usage amount is displayed on the remote controller R.

(熱源部の構成)
図1に示すように、熱源部Hbには、上述した貯湯タンク1及び補助熱源機2に加えて、多機能循環ポンプ20、暖房用循環ポンプ21、風呂追焚用循環ポンプ22、排熱回収熱交換器23、暖房用熱交換器24、及び、風呂追焚用熱交換器25が備えられている。
また、熱源部Hbには、給湯用混合弁26、湯張弁27、暖房回路補給弁28、蓄熱切換弁29、循環開閉弁30、三方弁31、及び、循環量調整弁32が設けられている。
(Configuration of heat source)
As shown in FIG. 1, in addition to the hot water storage tank 1 and the auxiliary heat source unit 2 described above, the multi-function circulation pump 20, the heating circulation pump 21, the bath recirculation circulation pump 22, and the exhaust heat recovery are included in the heat source Hb. A heat exchanger 23, a heat exchanger 24 for heating, and a heat exchanger 25 for bath remedy are provided.
The heat source Hb is provided with a hot water supply mixing valve 26, a hot water filling valve 27, a heating circuit supply valve 28, a heat storage switching valve 29, a circulation opening / closing valve 30, a three-way valve 31, and a circulation amount adjusting valve 32. Yes.

貯湯タンク1の上部には、タンク上部路33が設けられ、貯湯タンク1の底部には、タンク下部路34が設けられている。そして、タンク上部路33が、給湯用混合弁26に接続され、タンク下部路34が、三方弁31に接続されている。
水道水等の給水源からの湯水を供給する給水路35が、給湯用混合弁26に接続される第1給水路35aと、貯湯タンク1の底部に接続される第2給水路35bとに分岐されている。
A tank upper passage 33 is provided at the upper part of the hot water storage tank 1, and a tank lower passage 34 is provided at the bottom of the hot water storage tank 1. The tank upper passage 33 is connected to the hot water supply mixing valve 26, and the tank lower passage 34 is connected to the three-way valve 31.
A water supply path 35 for supplying hot water from a water supply source such as tap water branches into a first water supply path 35 a connected to the hot water supply mixing valve 26 and a second water supply path 35 b connected to the bottom of the hot water storage tank 1. Has been.

多機能循環ポンプ20が配置される多機能循環路36が、補助熱源機2、循環量調整弁32、循環開閉弁30、暖房用熱交換器24、風呂追焚用熱交換器25、三方弁31、及び、排熱回収熱交換器23を経由する状態で設けられている。
排熱回収熱交換器23には、発電部Haと熱源部Hbとの間で湯水を循環する湯水循環路5Bが接続され、排熱回収熱交換器23により、発電部Haの排熱により多機能循環路36を循環する湯水を加熱するように構成されている。
The multi-function circulation path 36 in which the multi-function circulation pump 20 is arranged includes the auxiliary heat source unit 2, the circulation amount adjustment valve 32, the circulation on-off valve 30, the heating heat exchanger 24, the bath recuperation heat exchanger 25, and the three-way valve. 31 and the exhaust heat recovery heat exchanger 23.
The exhaust heat recovery heat exchanger 23 is connected to a hot water circulation path 5B that circulates hot water between the power generation unit Ha and the heat source unit Hb. The exhaust heat recovery heat exchanger 23 increases the amount of exhaust heat from the power generation unit Ha. The hot water circulating through the functional circuit 36 is heated.

暖房用熱交換器24と風呂追焚用熱交換器25とは、多機能循環路36に直列状態で配置され、循環開閉弁30の開閉により、暖房用熱交換器24及び風呂追焚用熱交換器25を通した湯水の通流が断続されるように構成されている。
多機能循環路36における補助熱源機2の下流側箇所とタンク上部路33とを接続する蓄熱路37が設けられ、この蓄熱路37に、蓄熱切換弁29が設けられている。
The heat exchanger 24 for heating and the heat exchanger 25 for bath remedy are arranged in series in the multi-function circulation path 36, and the heating heat exchanger 24 and the heat for bath remedy are heated by opening and closing the circulation opening / closing valve 30. The flow of hot water through the exchanger 25 is configured to be interrupted.
A heat storage path 37 for connecting the downstream side portion of the auxiliary heat source device 2 in the multi-function circulation path 36 and the tank upper path 33 is provided, and a heat storage switching valve 29 is provided in the heat storage path 37.

床暖房装置等の暖房用の端末Tに対して暖房用熱媒を循環させる暖房用循環路38が、暖房用熱交換器24を経由する状態で設けられ、暖房用循環ポンプ21が、暖房用循環路38に設けられている。
暖房用循環路38には、暖房用熱媒を短絡流動させるための短絡路38aや膨張タンク39が設けられている。また、給水路35からの湯水を膨張タンク39に補給する補給路40が設けられ、この補給路40に、暖房回路補給弁28が設けられている。
A heating circulation path 38 for circulating a heating heat medium to a heating terminal T such as a floor heating device is provided via the heating heat exchanger 24, and the heating circulation pump 21 is used for heating. It is provided in the circulation path 38.
The heating circulation path 38 is provided with a short-circuit path 38a and an expansion tank 39 for short-circuiting the heating heat medium. Further, a supply path 40 for supplying hot water from the water supply path 35 to the expansion tank 39 is provided, and a heating circuit supply valve 28 is provided in the supply path 40.

浴槽41に接続される風呂用循環路42が、風呂追焚用熱交換器25を経由する状態で設けられ、風呂追焚用循環ポンプ22が、風呂用循環路42に設けられている。
給湯用混合弁26から延出される給湯路43が、一般給湯栓(図示せず)に接続される状態で設けられ、給湯路43の途中箇所と風呂用循環路42の途中箇所とを接続する湯張路44が設けられ、この湯張路44に、湯張弁27が設けられている。
A bath circulation path 42 connected to the bathtub 41 is provided in a state of passing through the bath chasing heat exchanger 25, and a bath chasing circulation pump 22 is provided in the bath circulation path 42.
A hot water supply passage 43 extending from the hot water supply mixing valve 26 is provided in a state of being connected to a general hot water tap (not shown), and connects a midpoint of the hot water supply passage 43 and a midpoint of the bath circulation path 42. A hot water passage 44 is provided, and a hot water valve 27 is provided in the hot water passage 44.

(熱源部の作動の概要)
熱源部Hbは、循環開閉弁30を閉じ、蓄熱切換弁29を開き、かつ、三方弁31をタンク下部路34と多機能循環路36とを連通する状態に切換えた状態で、多機能循環ポンプ20を作動させることにより、貯湯運転を行うように構成されている。
(Overview of heat source operation)
The heat source Hb is a multi-function circulation pump that closes the circulation on-off valve 30, opens the heat storage switching valve 29, and switches the three-way valve 31 to a state in which the tank lower path 34 and the multi-function circulation path 36 are communicated. By operating 20, the hot water storage operation is performed.

つまり、タンク下部路34から取出した湯水を、三方弁31を経由して多機能循環路36に流動させて排熱回収熱交換器23にて加熱し、加熱した湯水を、蓄熱路37を経由して貯湯タンク1に戻すようにしながら貯湯運転を行うように構成されている。
尚、このとき、循環量調整弁32による湯水通流量の調節により、貯湯される湯水の温度を適正温度(例えば、70℃)に調節するように構成されている。
That is, the hot water taken out from the tank lower passage 34 is flowed to the multi-function circulation passage 36 via the three-way valve 31 and heated by the exhaust heat recovery heat exchanger 23, and the heated hot water is passed through the heat storage passage 37. Thus, the hot water storage operation is performed while returning to the hot water storage tank 1.
At this time, the temperature of the hot water stored is adjusted to an appropriate temperature (for example, 70 ° C.) by adjusting the hot water flow rate by the circulation amount adjusting valve 32.

また、循環開閉弁30を開き、蓄熱切換弁29を閉じ、かつ、三方弁31をタンク下部路34と多機能循環路36とを連通しない状態に切換えて、多機能循環ポンプ20を作動させることにより、多機能循環路36を通して湯水を循環させながら、暖房用循環路38を通して暖房用の端末Tに熱媒を供給する暖房運転、及び、風呂用循環路42を通して浴槽水を循環させながら加熱する風呂追焚運転を行うように構成されている。   Also, the multi-function circulation pump 20 is operated by opening the circulation on-off valve 30, closing the heat storage switching valve 29, and switching the three-way valve 31 to a state where the tank lower passage 34 and the multi-function circulation passage 36 are not communicated. Thus, while circulating hot water through the multi-function circuit 36, the heating operation for supplying the heat medium to the heating terminal T through the heating circuit 38, and heating the bath water through the bath circuit 42 are circulated. It is configured to perform bath memorial operation.

さらに、熱源部Hbは、タンク上部路33からの湯水と第1給水路35aからの湯水を混合させて給湯路43から供給する一般給湯運転、給湯路43の湯水を湯張路44に分岐させて、風呂用循環路42を通して浴槽41に供給する湯張給湯運転を行うように構成されている。   Furthermore, the heat source Hb mixes the hot water from the tank upper passage 33 and the hot water from the first water supply passage 35a and supplies the hot water from the hot water supply passage 43, and branches the hot water in the hot water supply passage 43 to the hot water passage 44. Thus, the hot water supply operation for supplying the hot water to the bathtub 41 through the bath circulation path 42 is performed.

暖房運転及び風呂追焚運転の夫々は、基本的には、多機能循環ポンプ20の作動により多機能循環路36を通して湯水を循環させて、排熱回収熱交換器23にて、発電部Haの排熱により多機能循環路36を循環する湯水を加熱することによって行われるが、発電部Haの排熱が不足するときには、補助熱源機2を作動させて、多機能循環路36を循環する湯水を加熱することになる。   In each of the heating operation and the bath retreat operation, basically, hot water is circulated through the multi-function circulation path 36 by the operation of the multi-function circulation pump 20, and the exhaust heat recovery heat exchanger 23 performs the operation of the power generation unit Ha. This is performed by heating the hot water circulating through the multi-function circulation path 36 by exhaust heat, but when the exhaust heat of the power generation unit Ha is insufficient, the auxiliary heat source unit 2 is operated to circulate through the multi-function circulation path 36. Will be heated.

一般給湯運転及び湯張給湯運転の夫々は、基本的には、貯湯タンク1の湯水を用いて行われることになるが、貯湯タンク1の貯湯熱量が不足する場合には、補助熱源機2が燃焼作動されるように構成されている。
つまり、多機能循環ポンプ20を作動させた状態で、タンク下部路34から三方弁31を経由して多機能循環路36に流動させた湯水を補助熱源機2にて加熱し、加熱した湯水を、蓄熱路37を経由してタンク上部路33に流動させることができるように構成されている。
Each of the general hot water supply operation and the hot water supply hot water operation is basically performed using the hot water in the hot water storage tank 1, but when the amount of hot water stored in the hot water storage tank 1 is insufficient, the auxiliary heat source machine 2 is It is configured to be operated by combustion.
That is, in the state where the multifunction circulation pump 20 is operated, the hot water flowing from the tank lower passage 34 to the multifunction circulation passage 36 via the three-way valve 31 is heated by the auxiliary heat source unit 2, The tank upper passage 33 can be made to flow through the heat storage passage 37.

(補助熱源機の詳細)
補助熱源機2は、図1に示すように、湯水が通流するフィンチューブ式熱交換部2A、当該フィンチューブ式熱交換部2Aを加熱する加熱用バーナ2B、及び、加熱用バーナ2Bに燃焼用空気を供給する送風ファン2Cを備えるように構成されている。
そして、補助熱源機2の運転を制御する熱源機制御部2D(図2参照)が、加熱用バーナ2B及び送風ファン2Cの作動を制御するように構成されている。
(Details of auxiliary heat source machine)
As shown in FIG. 1, the auxiliary heat source unit 2 burns into a finned tube heat exchange unit 2A through which hot water flows, a heating burner 2B that heats the finned tube heat exchange unit 2A, and a heating burner 2B. It is comprised so that the ventilation fan 2C which supplies industrial air may be provided.
And the heat source machine control part 2D (refer FIG. 2) which controls the driving | operation of the auxiliary heat source machine 2 is comprised so that the action | operation of the heating burner 2B and the ventilation fan 2C may be controlled.

すなわち、熱源機制御部2Dは、通水量センサ(図示せず)によって、フィンチューブ式熱交換部2Aを通して流動する湯水の通水量が設定通水量以上であることが検出され、且つ、湯水温度センサ(図示せず)によって、フィンチューブ式熱交換部2Aを通して流動する湯水の温度が設定目標温度(例えば、70℃)以下であることが検出されると、加熱用バーナ2B及び送風ファン2Cの作動を開始し、且つ、加熱した湯水の温度を設定目標温度(例えば、70℃)にするように、加熱用バーナ2Bの加熱量を調整するように構成されている。   That is, the heat source controller 2D detects that the amount of hot water flowing through the finned-tube heat exchange unit 2A is greater than or equal to the set water flow rate by a water flow rate sensor (not shown), and the hot water temperature sensor (Not shown), when it is detected that the temperature of the hot water flowing through the finned-tube heat exchange unit 2A is equal to or lower than a set target temperature (for example, 70 ° C.), the operation of the heating burner 2B and the blower fan 2C And the heating amount of the heating burner 2B is adjusted so that the temperature of the heated hot water becomes a set target temperature (for example, 70 ° C.).

ちなみに、図示は省略するが、端末側制御部11と熱源機制御部2Dとは通信ラインにて通信自在に接続されて、端末側制御部11が、熱源機制御部2Dに対して、加熱作動の許可を指令する指令情報等、各種の情報を指令するように構成されている。   Incidentally, although illustration is omitted, the terminal side control unit 11 and the heat source unit control unit 2D are communicatively connected via a communication line, and the terminal side control unit 11 performs heating operation with respect to the heat source unit control unit 2D. It is configured to command various information such as command information for commanding permission.

(発電部の凍結防止について)
図1に示すように、発電部Haには、冷却水循環路5Aを加熱する第1電気ヒータ46、及び、湯水循環路5Bを加熱する複数の第2電気ヒータ47が備えられている。
そして、冷却水循環路5A及び湯水循環路5Bの温度を検出する複数の温度検出センサ(図示せず)の検出温度のいずれかが凍結防止温度(例えば、5℃)以下になると、発電用制御部6が、冷却水循環ポンプPa及び湯水循環ポンプPbを作動させ、且つ、第1電気ヒータ46及び第2電気ヒータ47を作動させることによって、冷却水循環路5Aや湯水循環路5Bを昇温させるように構成されている。
(Prevention of freezing of power generation section)
As shown in FIG. 1, the power generation unit Ha includes a first electric heater 46 that heats the cooling water circulation path 5A and a plurality of second electric heaters 47 that heat the hot water circulation path 5B.
Then, when any of the detected temperatures of a plurality of temperature detection sensors (not shown) for detecting the temperatures of the cooling water circulation path 5A and the hot water circulation path 5B is equal to or lower than the freezing prevention temperature (for example, 5 ° C.), the power generation control unit 6 operates the cooling water circulation pump Pa and the hot water circulation pump Pb and operates the first electric heater 46 and the second electric heater 47 so as to raise the temperature of the cooling water circulation path 5A and the hot water circulation path 5B. It is configured.

その後、冷却水循環路5A及び湯水循環路5Bの温度を検出する複数の温度検出センサ(図示せず)の検出温度の全てが、凍結防止温度よりも高い設定終了温度(例えば、10℃)以上になると、発電用制御部6が、冷却水循環ポンプPa及び湯水循環ポンプPbの作動を停止させ、且つ、第1電気ヒータ46及び第2電気ヒータ47の作動を停止させるように構成されている。   Thereafter, all of the detected temperatures of a plurality of temperature detection sensors (not shown) for detecting the temperatures of the cooling water circulation path 5A and the hot water circulation path 5B are higher than the set end temperature (for example, 10 ° C.) higher than the freezing prevention temperature. Then, the power generation control unit 6 is configured to stop the operation of the cooling water circulation pump Pa and the hot water circulation pump Pb and stop the operation of the first electric heater 46 and the second electric heater 47.

(熱源部の凍結防止について)
図1に示すように、熱源部Hbには、給水路35、第1給水路35a、第2給水路35b、多機能循環路36、補給路40及び給湯路43の夫々を加熱する複数の第3電気ヒータ48が設けられている。
また、補助熱源機2には、フィンチューブ式熱交換部2Aの近くの管路を加熱する第4電気ヒータ49が設けられている。
(About prevention of freezing of heat source)
As shown in FIG. 1, the heat source Hb includes a plurality of first heating channels 35, a first water supply channel 35 a, a second water supply channel 35 b, a multi-function circulation channel 36, a replenishment channel 40, and a hot water supply channel 43. Three electric heaters 48 are provided.
In addition, the auxiliary heat source device 2 is provided with a fourth electric heater 49 for heating the pipe line near the finned-tube heat exchange unit 2A.

そして、給水路35、第1給水路35a、第2給水路35b、多機能循環路36、補給路40及び給湯路43の温度を検出する複数の温度検出センサ(図示せず)の検出温度のいずれかが、凍結防止温度(例えば、5℃)以下になると、端末側制御部11が、第3電気ヒータ48を作動させて、給水路35、第1給水路35a、第2給水路35b、多機能循環路36、補給路40及び給湯路43を昇温させるように構成されている。   And the detected temperature of the several temperature detection sensor (not shown) which detects the temperature of the water supply path 35, the 1st water supply path 35a, the 2nd water supply path 35b, the multifunctional circulation path 36, the replenishment path 40, and the hot water supply path 43. When any of them becomes below the freezing prevention temperature (for example, 5 ° C.), the terminal-side control unit 11 operates the third electric heater 48 to supply the water supply channel 35, the first water supply channel 35a, the second water supply channel 35b, The multifunctional circulation path 36, the replenishment path 40, and the hot water supply path 43 are configured to be heated.

その後、給水路35、第1給水路35a、第2給水路35b、多機能循環路36、補給路40及び給湯路43の温度を検出する複数の温度検出センサ(図示せず)の検出温度の全てが、凍結防止温度(例えば、5℃)よりも高い設定終了温度(例えば、10℃)以上になると、端末側制御部11が、第3電気ヒータ48の作動を停止させるように構成されている。   Thereafter, the detected temperature of a plurality of temperature detection sensors (not shown) for detecting the temperatures of the water supply passage 35, the first water supply passage 35a, the second water supply passage 35b, the multifunction circulation passage 36, the replenishment passage 40, and the hot water supply passage 43. The terminal-side control unit 11 is configured to stop the operation of the third electric heater 48 when everything reaches a set end temperature (for example, 10 ° C.) higher than the freeze prevention temperature (for example, 5 ° C.) or higher. Yes.

補助熱源機2におけるフィンチューブ式熱交換部2A又はその近くの管路部分の温度を検出する温度検出センサ(図示せず)の検出温度が、凍結防止温度(例えば、5℃)以下になると、熱源機制御部2Dが、第4電気ヒータ49を作動させて、フィンチューブ式熱交換部2A及びその近くの管路部分を昇温させるように構成されている。   When the detection temperature of a temperature detection sensor (not shown) for detecting the temperature of the fin tube type heat exchanging part 2A in the auxiliary heat source unit 2 or the pipe part in the vicinity thereof becomes a freezing prevention temperature (for example, 5 ° C.) or less, The heat source machine control unit 2D is configured to operate the fourth electric heater 49 to raise the temperature of the fin tube type heat exchange unit 2A and a pipe line portion in the vicinity thereof.

その後、フィンチューブ式熱交換部2A又はその近くの管路部分の温度を検出する温度検出センサ(図示せず)の検出温度が、結防止温度(例えば、5℃)よりも高い設定終了温度(例えば、10℃)以上になると、熱源機制御部2Dが、第4電気ヒータ49の作動を停止させるように構成されている。   Thereafter, a detection end temperature (for example, 5 ° C.) of a temperature detection sensor (not shown) that detects the temperature of the fin-tube heat exchange unit 2A or a pipe line portion in the vicinity thereof is higher than the set temperature (for example, 5 ° C.) For example, when the temperature becomes 10 ° C. or higher, the heat source controller 2D is configured to stop the operation of the fourth electric heater 49.

(発電部の駆動構成の詳細)
図2に示すように、発電部Haには、冷却水循環ポンプPaを駆動するための第1駆動回路部51、湯水循環ポンプPbを駆動するための第2駆動回路部52、第1電気ヒータ46を駆動するための第3駆動回路部53、及び、第2電気ヒータ47を駆動するための第4駆動回路部54が設けられている。
(Details of the drive configuration of the power generation unit)
As shown in FIG. 2, the power generation unit Ha includes a first drive circuit unit 51 for driving the cooling water circulation pump Pa, a second drive circuit unit 52 for driving the hot water circulation pump Pb, and a first electric heater 46. A third drive circuit unit 53 for driving the second electric heater 47 and a fourth drive circuit unit 54 for driving the second electric heater 47 are provided.

本実施形態においては、第1駆動回路部51及び第3駆動回路部53が、内部配線NにおけるU相用内線Nuと中性用内線Noとに接続され、そして、第2駆動回路部52及び第4駆動回路部54が、内部配線NにおけるV相用内線Nvと中性用内線Noとに接続されている。
そして、第1駆動回路部51、第2駆動回路部52、第3駆動回路部53及び第4駆動回路部54の夫々に対応して、電力の供給を各別に断続する第1駆動スイッチ51S、第2駆動スイッチ52S、第3駆動スイッチ53S、及び、第4駆動スイッチ54Sが設けられ、それらの第1駆動スイッチ51S〜第4駆動スイッチ54Sが、発電用制御部6の指令により断続操作されるように構成されている。
In the present embodiment, the first drive circuit unit 51 and the third drive circuit unit 53 are connected to the U-phase extension Nu and the neutral extension No in the internal wiring N, and the second drive circuit unit 52 and The fourth drive circuit unit 54 is connected to the V-phase extension Nv and the neutral extension No in the internal wiring N.
And corresponding to each of the 1st drive circuit part 51, the 2nd drive circuit part 52, the 3rd drive circuit part 53, and the 4th drive circuit part 54, the 1st drive switch 51S which interrupts supply of electric power each separately, A second drive switch 52S, a third drive switch 53S, and a fourth drive switch 54S are provided, and the first drive switch 51S to the fourth drive switch 54S are intermittently operated according to a command from the power generation control unit 6. It is configured as follows.

したがって、発電用制御部6は、第1駆動スイッチ51S〜第4駆動スイッチ54Sを断続操作することにより、冷却水循環ポンプPa、湯水循環ポンプPb、第1電気ヒータ46、第2電気ヒータ47の夫々を作動状態と作動停止状態とに切換えることができるように構成されている。   Therefore, the power generation control unit 6 intermittently operates the first drive switch 51S to the fourth drive switch 54S, thereby causing the cooling water circulation pump Pa, the hot water circulation pump Pb, the first electric heater 46, and the second electric heater 47, respectively. Can be switched between an operation state and an operation stop state.

また、発電部Haには、一対の第1端子台55A及び第2端子台55Bが設けられ、これらの第1端子台55A及び第2端子台55Bに対して、熱源部Hbの端末側制御部11及び補助熱源機2の熱源機制御部2Dが接続自在に構成されている。
そして、第1端子台55Aが、内部配線NにおけるU相用内線Nuと中性用内線Noとに接続されることにより、U相線Uからの電力を外部に出力するU相側接続部として構成され、また、第2端子台55Bが、内部配線NにおけるV相用内線Nvと中性用内線Noとに接続されることにより、V相線からの電力を外部に出力するV相側接続部として構成されている。
Further, the power generation unit Ha is provided with a pair of first terminal block 55A and second terminal block 55B, and the terminal side control unit of the heat source unit Hb with respect to the first terminal block 55A and the second terminal block 55B. 11 and the heat source machine control part 2D of the auxiliary heat source machine 2 are configured to be freely connectable.
As the first terminal block 55A is connected to the U-phase extension Nu and the neutral extension No in the internal wiring N, the U-phase side connection portion that outputs power from the U-phase line U to the outside is provided. Further, the second terminal block 55B is connected to the V-phase extension Nv and the neutral extension No in the internal wiring N, so that the power from the V-phase line is output to the outside. It is configured as a part.

第1端子台55Aと内部配線Nとの接続を断続するU相側断続部としてのU相側スイッチ56A、及び、第2端子台55Bと内部配線Nとの接続を断続するV相側断続部としてのV相側スイッチ56Bが設けられ、そして、これらのU相側スイッチ56A及びV相側スイッチ56Bが、発電用制御部6から指令線にて指令される指令情報にて断続操作されるように構成されている。
つまり、U相側接続部としての第1端子台55Aが、U相側スイッチ56Aにより、出力作用状態と出力停止状態とに切換え自在に構成され、同様に、V相側接続部としての第2端子台55Bが、V相側スイッチ56Bにより、出力作用状態と出力停止状態とに切換え自在に構成されている。
A U-phase side switch 56A serving as a U-phase side interrupting portion for interrupting the connection between the first terminal block 55A and the internal wiring N, and a V-phase side interrupting portion for interrupting the connection between the second terminal block 55B and the internal wiring N. V-phase side switch 56B is provided, and these U-phase side switch 56A and V-phase side switch 56B are intermittently operated by command information commanded from the power generation control unit 6 by command lines. It is configured.
That is, the first terminal block 55A as the U-phase side connection portion is configured to be switchable between the output action state and the output stop state by the U-phase side switch 56A, and similarly, the second terminal block 55A as the V-phase side connection portion. The terminal block 55B is configured to be switchable between an output action state and an output stop state by a V-phase side switch 56B.

端末側制御部11及び熱源機制御部2Dは、第1端子台55A及び第2端子台55Bのいずれにも接続自在に構成されているが、基本接続状態は、図2に示すように、端末側制御部11を第1端子台55Aに接続し、熱源機制御部2Dを第2端子台55Bに接続する状態である。
ちなみに、端末側制御部11及び熱源機制御部2Dは、第1中継線57A及び第2中継線57Bを介して第1端子台55A及び第2端子台55Bに接続されることになる。
The terminal side control unit 11 and the heat source unit control unit 2D are configured to be freely connectable to both the first terminal block 55A and the second terminal block 55B, but the basic connection state is as shown in FIG. The side control unit 11 is connected to the first terminal block 55A, and the heat source unit control unit 2D is connected to the second terminal block 55B.
Incidentally, the terminal side controller 11 and the heat source machine controller 2D are connected to the first terminal block 55A and the second terminal block 55B via the first relay line 57A and the second relay line 57B.

また、本実施形態においては、発電用制御部6と熱源機制御部2Dとが通信線58にて接続されており、後述する診断処理を行う際に、発電用制御部6が、熱源機制御部2Dに対して、送風ファン2C及び第4電気ヒータ49を作動させる指令情報を指令するように構成されている。   In the present embodiment, the power generation control unit 6 and the heat source unit control unit 2D are connected by the communication line 58, and the power generation control unit 6 controls the heat source unit when performing a diagnosis process to be described later. Command information for operating the blower fan 2C and the fourth electric heater 49 is commanded to the section 2D.

(熱源部の詳細)
熱源部Hbが、図2に示すように、多機能循環ポンプ20、暖房用循環ポンプ21、風呂追焚用循環ポンプ22、及び、第3電気ヒータ48を本体側電気機器E1として備える本体処理部B1と、送風ファン2C及び第4電気ヒータ49とを補助側電気機器E2として備える補助熱源機2を補助処理部B2として備える形態に構成されている。
尚、本体側電気機器E1と補助側電気機器E2とを総称して、熱源部Hbが備える電気機器Ebと呼称する。
(Details of heat source)
As shown in FIG. 2, the heat source Hb includes a multi-function circulation pump 20, a heating circulation pump 21, a bath tracking circulation pump 22, and a third electric heater 48 as a main body side electric device E <b> 1. The auxiliary heat source device 2 including B1, the blower fan 2C, and the fourth electric heater 49 as the auxiliary electric device E2 is configured as the auxiliary processing unit B2.
In addition, the main body side electric device E1 and the auxiliary side electric device E2 are collectively referred to as an electric device Eb included in the heat source unit Hb.

また、本体処理部B1が、第1端子台55A及び第2端子台55Bのいずれかとの接続による電力供給状態において、発電用制御部6との間で通信ラインLを介して通信する端末側制御部11を備える形態に構成されている。
さらに、補助処理部B2が、第1端子台55A及び第2端子台55Bのいずれかとの接続による電力供給状態において、発電用制御部6との間で通信線58を介して通信する熱源機制御部2Dを備える形態に構成されている。
Further, the terminal-side control in which the main body processing unit B1 communicates with the power generation control unit 6 via the communication line L in a power supply state by connection with either the first terminal block 55A or the second terminal block 55B. It is comprised in the form provided with the part 11. FIG.
Further, the heat source machine control in which the auxiliary processing unit B2 communicates with the power generation control unit 6 via the communication line 58 in a power supply state by connection with either the first terminal block 55A or the second terminal block 55B. It is comprised in the form provided with 2D.

つまり、熱源部Hbの本体処理部B1が、第1端子台55A及び第2端子台55Bの一方に接続されかつ電気機器Ebとして本体側電気機器E1を備え、加えて、電力供給状態において、発電用制御部6との間で通信する端末側制御部11を備えるように構成されている。
また、熱源部Hbの補助処理部B2が、第1端子台55A及び第2端子台55Bの他方に接続されかつ電気機器Ebとして補助側電気機器E2を備え、加えて、電力供給状態において、発電用制御部6との間で通信する熱源機制御部2Dを備えるように構成されている。
That is, the main body processing unit B1 of the heat source unit Hb is connected to one of the first terminal block 55A and the second terminal block 55B and includes the main body side electric device E1 as the electric device Eb. The terminal side control unit 11 that communicates with the control unit 6 is provided.
In addition, the auxiliary processing unit B2 of the heat source unit Hb is connected to the other of the first terminal block 55A and the second terminal block 55B and includes the auxiliary electric device E2 as the electric device Eb. It is comprised so that the heat source machine control part 2D communicated between the control part 6 for an operation may be provided.

ちなみに、端末側制御部11が、第1中継線57Aを介して第1端子台55A及び第2端子台55Bのいずれかに接続され、熱源機制御部2Dが、第2中継線57Bを介して第1端子台55A及び第2端子台55Bのいずれかに接続されることになる。   Incidentally, the terminal-side control unit 11 is connected to either the first terminal block 55A or the second terminal block 55B via the first relay line 57A, and the heat source unit control unit 2D is connected to the second relay line 57B. It will be connected to either the first terminal block 55A or the second terminal block 55B.

(発電用制御部の制御作動)
発電用制御部6は、燃料電池4の発電を停止させた状態で、U相線Uに接続されるU相側電気負荷Eu及びV相線Vに接続されるV相側電気負荷Evを選択的に作用させて、一対の電流検出部Dの設置状態を診断する診断処理を実行するように構成されている。
本実施形態においては、発電用制御部6が、U相側電気負荷Eu及びV相側電気負荷Evとして、熱源部Hbが備える電気機器Ebを用いるように構成されている。
(Control operation of power generation control unit)
The power generation control unit 6 selects the U-phase side electric load Eu connected to the U-phase line U and the V-phase side electric load Ev connected to the V-phase line V while the power generation of the fuel cell 4 is stopped. Thus, it is configured to execute a diagnosis process for diagnosing the installation state of the pair of current detection units D.
In the present embodiment, the power generation control unit 6 is configured to use the electric device Eb included in the heat source unit Hb as the U-phase side electric load Eu and the V-phase side electric load Ev.

すなわち、発電用制御部6が、熱源部Hbの本体処理部B1の本体側電気機器E1と補助処理部の補助側電気機器E2とを、U相線Uに接続されるU相側電気負荷Eu及びV相線Vに接続されるV相側電気負荷Evとして用いる形態で、上記診断処理を実行するように構成されている。   That is, the power generation control unit 6 connects the main body side electric device E1 of the main body processing unit B1 of the heat source unit Hb and the auxiliary side electric device E2 of the auxiliary processing unit to the U phase side electric load Eu connected to the U phase line U. The diagnostic processing is executed in a form used as the V-phase side electric load Ev connected to the V-phase line V.

また、発電用制御部6が、診断処理の前に、第1端子台55A及び第2端子台55Bの一方を出力作用状態に切換えて、端末側制御部11との間で通信することにより、本体処理部B1が第1端子台55A及び第2端子台55Bのいずれに接続されているかを判別する接続確認処理、及び、本体処理部B1が第1端子台55Aに接続される場合には、本体側電気機器E1をU相側電気負荷Euにかつ補助側電気機器E2をV相側電気負荷Evに定め、且つ、本体処理部B1が第2端子台55Bに接続される場合には、本体側電気機器E1をV相側電気負荷Evにかつ補助側電気機器E2をU相側電気負荷Euに定める負荷設定処理を実行するように構成されている。   In addition, the power generation control unit 6 switches one of the first terminal block 55A and the second terminal block 55B to the output operation state and communicates with the terminal-side control unit 11 before the diagnosis process, When the main body processing unit B1 is connected to the first terminal block 55A and the connection confirmation process for determining whether the main body processing unit B1 is connected to the first terminal block 55A. When the main body side electric device E1 is set to the U phase side electric load Eu and the auxiliary side electric device E2 is set to the V phase side electric load Ev and the main body processing unit B1 is connected to the second terminal block 55B, the main body It is configured to execute a load setting process in which the side electric device E1 is set to the V-phase side electric load Ev and the auxiliary side electric device E2 is set to the U-phase side electric load Eu.

つまり、熱電併給部Hの設置時等において、リモコンRにてテスト指令を指令することにより、発電用制御部6が、接続確認処理、負荷設定処理、及び、診断処理を順次行うテスト処理を実行するように構成されている。   In other words, when the cogeneration unit H is installed, the power generation control unit 6 executes a test process that sequentially performs a connection confirmation process, a load setting process, and a diagnosis process by instructing a test command from the remote controller R. Is configured to do.

(テスト処理の詳細)
次に、発電用制御部6が実行するテスト処理を、図3のフローチャートに基づいて説明する。
先ず、U相側スイッチ56AをONにし、かつ、V相側スイッチ56BをOFFにするスイッチ操作処理を行い(#1)、続いて、端末側制御部11との間でテスト通信を実行し(#2)、その後、端末側制御部11との間でのテスト通信が適正であるか否かを判断する(#3)。
(Details of the test process)
Next, the test process executed by the power generation control unit 6 will be described based on the flowchart of FIG.
First, switch operation processing for turning ON the U-phase side switch 56A and turning OFF the V-phase side switch 56B is performed (# 1), and then test communication is executed with the terminal-side control unit 11 ( # 2) Thereafter, it is determined whether or not the test communication with the terminal-side control unit 11 is appropriate (# 3).

ちなみに、テスト通信の目的は、端末側制御部11が第1端子台55Aに接続されることによって、端末側制御部11に第1端子台55Aから電力が供給されているか否かを確認することを目的とするものであるから、例えば、発電用制御部6が、端末側制御部11に対して応答要求情報を通信し、応答要求情報を受信した端末側制御部11が、発電用制御部6に対して応答情報を通信する形態で実行され、発電用制御部6は、端末側制御部11からの応答情報を受信すると、通信が適正であると認識することになる。   Incidentally, the purpose of the test communication is to confirm whether or not the terminal-side control unit 11 is supplied with power from the first terminal block 55A by connecting the terminal-side control unit 11 to the first terminal block 55A. Therefore, for example, the power generation control unit 6 communicates response request information to the terminal side control unit 11, and the terminal side control unit 11 that has received the response request information receives the power generation control unit. When the response information is received from the terminal-side control unit 11, the power generation control unit 6 recognizes that the communication is appropriate.

#3にて、テスト通信が適正であると判断した場合には、本体側電気機器E1をU相側電気負荷Euに設定し、且つ、補助側電気機器E2をV相側電気負荷Evに設定し、その後、診断処理に移行する(#9)。   When it is determined in # 3 that the test communication is appropriate, the main body side electric device E1 is set to the U-phase side electric load Eu and the auxiliary side electric device E2 is set to the V-phase side electric load Ev. Thereafter, the process proceeds to a diagnosis process (# 9).

#3にて、テスト通信が適正でないと判断した場合には、U相側スイッチ56AをOFFにし、かつ、V相側スイッチ56BをONにするスイッチ操作処理を行い(#5)、続いて、端末側制御部11との間でテスト通信を実行し(#6)、その後、端末側制御部11との間でのテスト通信が適正であるか否かを判断する(#7)。   If it is determined in # 3 that the test communication is not appropriate, a switch operation process for turning off the U-phase side switch 56A and turning on the V-phase side switch 56B is performed (# 5). Test communication is performed with the terminal-side control unit 11 (# 6), and then it is determined whether the test communication with the terminal-side control unit 11 is appropriate (# 7).

#7にて、テスト通信が適正であると判断した場合には、本体側電気機器E1をV相側電気負荷Evに設定し、且つ、補助側電気機器E2をU相側電気負荷Euに設定し、その後、診断処理に移行する(#9)。
#7にて、テスト通信が適正でないと判断した場合には、熱源部Hbの本体処理部B1及び補助処理部B2が発電部Haに接続されていない等の異常であるため、リモコンRにて異常状態であることを表示する等の警報処理を実行する(#10)。
If it is determined in # 7 that the test communication is appropriate, the main body side electric device E1 is set to the V-phase side electric load Ev and the auxiliary side electric device E2 is set to the U-phase side electric load Eu. Thereafter, the process proceeds to a diagnosis process (# 9).
If it is determined at # 7 that the test communication is not appropriate, the remote control R is used because the main body processing unit B1 and the auxiliary processing unit B2 of the heat source unit Hb are not connected to the power generation unit Ha. Alarm processing such as displaying an abnormal state is executed (# 10).

ちなみに、上述の#1〜#3の処理及び#5〜#7の処理が、接続確認処理に相当し、#4及び#8の処理が、負荷設定処理に相当することになる。   Incidentally, the processes of # 1 to # 3 and the processes of # 5 to # 7 described above correspond to the connection confirmation process, and the processes of # 4 and # 8 correspond to the load setting process.

(診断処理の詳細)
次に、発電用制御部6が実行する診断処理を、図4のフローチャートに基づいて説明する。
先ず、U相側電気負荷Euを投入して、一対の電流検出部Dの電流値を計測する処理を実行する(#21)。
つまり、負荷設定処理によって、本体側電気機器E1をU相側電気負荷Euに設定した場合には、発電用制御部6が端末側制御部11に対して、本体側電気機器E1を作動させることを指令することにより、端末側制御部11が本体側電気機器E1を作動させることになり、その状態において、一対の電流検出部Dの電流値を計測することになる。
(Details of diagnostic processing)
Next, diagnostic processing executed by the power generation control unit 6 will be described based on the flowchart of FIG.
First, the U-phase side electric load Eu is turned on, and the process of measuring the current values of the pair of current detection units D is executed (# 21).
That is, when the main body side electric device E1 is set to the U-phase side electric load Eu by the load setting process, the power generation control unit 6 causes the terminal side control unit 11 to operate the main body side electric device E1. , The terminal-side control unit 11 operates the main body-side electric device E1, and in this state, the current values of the pair of current detection units D are measured.

逆に、負荷設定処理によって、補助側電気機器E2をU相側電気負荷Euに設定した場合には、発電用制御部6が熱源機制御部2Dに対して、補助側電気機器E2を作動させることを指令することにより、熱源機制御部2Dが補助側電気機器E2を作動させることになり、その状態において、一対の電流検出部Dの電流値を計測することになる。   Conversely, when the auxiliary electric device E2 is set to the U-phase electric load Eu by the load setting process, the power generation control unit 6 activates the auxiliary electric device E2 with respect to the heat source unit control unit 2D. By instructing this, the heat source device control unit 2D operates the auxiliary electric device E2, and in this state, the current values of the pair of current detection units D are measured.

次に、U相側電気負荷Euを投入することによる電流値の変化が第1電流検出部D1にて検出されたか否かを判別し(#22)、電流値の変化が検出された場合には、第1電流検出部D1をU相側に設定する(#23)。
続いて、電流値が正値であるか否かを判別し(#26)、電流値が正値でない(負値である)場合には、電流値を反転させることに設定する(#27)。
Next, it is determined whether or not a change in the current value caused by turning on the U-phase side electric load Eu is detected by the first current detection unit D1 (# 22), and when a change in the current value is detected. Sets the first current detector D1 to the U-phase side (# 23).
Subsequently, it is determined whether or not the current value is a positive value (# 26). If the current value is not a positive value (a negative value), the current value is set to be inverted (# 27). .

ちなみに、U相側電気負荷Euを投入することによる電流値の変化の検出は、U相側電気負荷Euを投入する前の電流値の絶対値に対して、U相側電気負荷Euを投入した後の電流値の絶対値が設定値以上変化したか否かを検出することになる。   By the way, the detection of the change in the current value due to the input of the U-phase side electric load Eu is applied to the absolute value of the current value before the U-phase side electric load Eu is input. It is detected whether or not the absolute value of the subsequent current value has changed more than the set value.

この場合、U相側電気負荷Euを投入する前の電流値や、U相側電気負荷Euを投入した後の電流値としては、瞬時値を用いることもできるが、設定時間(例えば、1秒)の平均値や設定時間(例えば、1秒)の積算値を用いることにより、外乱の影響を除外しながら、U相側電気負荷Euを投入することによる電流値の変化を適切に検出することができる。   In this case, an instantaneous value can be used as the current value before the U-phase side electric load Eu is turned on or the current value after the U-phase side electric load Eu is turned on. ) And an integrated value of a set time (for example, 1 second), and appropriately detecting a change in current value caused by applying the U-phase side electric load Eu while excluding the influence of disturbance. Can do.

#22にて、U相側電気負荷Euを投入することによる電流値の変化が第1電流検出部D1にて検出されない場合には、U相側電気負荷Euを投入することによる電流値の変化が第2電流検出部D2にて検出されたか否かを判別し(#24)、電流値の変化が検出された場合には、第2電流検出部D2をU相側に設定する(#25)。
続いて、電流値が正値であるか否かを判別し(#26)、電流値が正値でない(負値である)場合には、電流値を反転させることに設定する(#27)。
In # 22, when the change in the current value due to the input of the U-phase side electric load Eu is not detected by the first current detector D1, the change in the current value due to the input of the U-phase side electric load Eu. Is detected by the second current detector D2 (# 24), and when a change in the current value is detected, the second current detector D2 is set to the U-phase side (# 25). ).
Subsequently, it is determined whether or not the current value is a positive value (# 26). If the current value is not a positive value (a negative value), the current value is set to be inverted (# 27). .

#24にて、U相側電気負荷Euを投入することによる電流値の変化が第2電流検出部D2にて検出されない場合には、一対の電流検出部Dを設置していない等の異常であるため、リモコンRにて異常状態であることを表示する等の警報処理を実行する(#35)。   In # 24, when the change in the current value due to turning on the U-phase side electric load Eu is not detected by the second current detection unit D2, it is an abnormality such as not installing the pair of current detection units D. Therefore, an alarm process such as displaying an abnormal state with the remote controller R is executed (# 35).

次に、V相側電気負荷Evを投入して、一対の電流検出部Dの電流値を計測する処理を実行する(#28)。
つまり、負荷設定処理によって、本体側電気機器E1をV相側電気負荷Evに設定した場合には、発電用制御部6が端末側制御部11に対して、本体側電気機器E1を作動させることを指令することにより、端末側制御部11が本体側電気機器E1を作動させることになり、その状態において、一対の電流検出部Dの電流値を計測することになる。
Next, the process of measuring the current value of the pair of current detectors D by applying the V-phase side electric load Ev is executed (# 28).
That is, when the main body side electric device E1 is set to the V-phase side electric load Ev by the load setting process, the power generation control unit 6 causes the terminal side control unit 11 to operate the main body side electric device E1. , The terminal-side control unit 11 operates the main body-side electric device E1, and in this state, the current values of the pair of current detection units D are measured.

逆に、負荷設定処理によって、補助側電気機器E2をV相側電気負荷Evに設定した場合には、発電用制御部6が熱源機制御部2Dに対して、補助側電気機器E2を作動させることを指令することにより、熱源機制御部2Dが補助側電気機器E2を作動させることになり、その状態において、一対の電流検出部Dの電流値を計測することになる。   Conversely, when the auxiliary electric device E2 is set to the V-phase electric load Ev by the load setting process, the power generation control unit 6 activates the auxiliary electric device E2 with respect to the heat source unit control unit 2D. By instructing this, the heat source device control unit 2D operates the auxiliary electric device E2, and in this state, the current values of the pair of current detection units D are measured.

次に、V相側電気負荷Evを投入することによる電流値の変化が第1電流検出部D1にて検出されたか否かを判別し(#29)、電流値の変化が検出された場合には、第1電流検出部D1をV相側に設定する(#30)。
続いて、電流値が正値であるか否かを判別し(#33)、電流値が正値でない(負値である)場合には、電流値を反転させることに設定する(#34)。
Next, it is determined whether or not a change in the current value caused by applying the V-phase side electric load Ev is detected by the first current detection unit D1 (# 29), and a change in the current value is detected. Sets the first current detection unit D1 to the V-phase side (# 30).
Subsequently, it is determined whether or not the current value is a positive value (# 33). If the current value is not a positive value (a negative value), the current value is set to be inverted (# 34). .

#29にて、V相側電気負荷Evを投入することによる電流値の変化が第1電流検出部D1にて検出されない場合には、V相側電気負荷Evを投入することによる電流値の変化が第2電流検出部D2にて検出されたか否かを判別し(#31)、電流値の変化が検出された場合には、第2電流検出部D2をV相側に設定する(#32)。
続いて、電流値が正値であるか否かを判別し(#33)、電流値が正値でない(負値である)場合には、電流値を反転させることに設定する(#34)。
In # 29, if the change in the current value due to the input of the V-phase side electric load Ev is not detected by the first current detector D1, the change in the current value due to the input of the V-phase side electric load Ev. Is detected by the second current detector D2 (# 31), and when a change in the current value is detected, the second current detector D2 is set to the V-phase side (# 32). ).
Subsequently, it is determined whether or not the current value is a positive value (# 33). If the current value is not a positive value (a negative value), the current value is set to be inverted (# 34). .

#31にて、U相側電気負荷Euを投入することによる電流値の変化が第2電流検出部D2にて検出されない場合には、一対の電流検出部Dを設置していない等の異常であるため、リモコンRにて異常状態であることを表示する等の警報処理を実行する(#35)。   In # 31, when the change in the current value due to turning on the U-phase side electric load Eu is not detected by the second current detection unit D2, it is an abnormality such as not installing the pair of current detection units D. Therefore, an alarm process such as displaying an abnormal state with the remote controller R is executed (# 35).

(第1実施形態のまとめ)
以上の通り、排熱回収消費部としての熱源部Hbに装備する電気機器Ebを、U相線Uに接続されるU相側電気負荷Eu及びV相線Vに接続されるV相側電気負荷Evとして用いながら、診断処理を行うものであるから、熱源部Hbに装備する電気機器Ebを利用しながら、診断処理を良好に行うことができる。
(Summary of the first embodiment)
As described above, the electric equipment Eb equipped in the heat source part Hb as the exhaust heat recovery and consumption part is used for the U-phase side electric load Eu connected to the U-phase line U and the V-phase side electric load connected to the V-phase line V. Since the diagnostic process is performed while being used as Ev, the diagnostic process can be performed satisfactorily while using the electric device Eb equipped in the heat source unit Hb.

すなわち、熱源部Hbが装備する電気機器Ebとしての、本体側電気機器E1及び補助側電気機器E2のうちの一方を、U相側電気負荷Euとして使用し、且つ、本体側電気機器E1及び補助側電気機器E2のうちの他方を、V相側電気負荷Evとして使用しながら、診断処理を良好に行うことができる。   That is, one of the main body side electric device E1 and the auxiliary electric device E2 as the electric device Eb equipped in the heat source unit Hb is used as the U-phase side electric load Eu, and the main body side electric device E1 and the auxiliary electric device Eb are used. The diagnostic process can be performed satisfactorily while using the other of the side electric devices E2 as the V-phase side electric load Ev.

また、診断処理の前に実行される接続確認処理により、熱源部Hbの本体処理部B1がU相側接続部としての第1端子台55A及びV相側接続部としての第2端子台55Bのいずれに接続されているかを判別し、その判別結果に基づいて、本体側電気機器E1と補助側電気機器E2とを、U相側電気負荷EuとV相側電気負荷Evとに振り分ける負荷設定処理を行うものであるから、本体処理部B1が第1端子台55Aと第2端子台55Bとのいずれに接続されても、本体側電気機器E1と補助側電気機器E2とを、U相側電気負荷EuとV相側電気負荷Evとに適切に定めることができるため、診断処理を的確に行うことができる。   In addition, the main body processing unit B1 of the heat source unit Hb is connected to the first terminal block 55A as the U-phase side connection unit and the second terminal block 55B as the V-phase side connection unit by the connection confirmation process executed before the diagnosis process. A load setting process for determining which one is connected and distributing the main body side electric device E1 and the auxiliary side electric device E2 to the U-phase side electric load Eu and the V-phase side electric load Ev based on the determination result Therefore, even if the main body processing unit B1 is connected to either the first terminal block 55A or the second terminal block 55B, the main body side electric device E1 and the auxiliary side electric device E2 are connected to the U-phase side electric device. Since the load Eu and the V-phase side electric load Ev can be appropriately determined, the diagnosis process can be performed accurately.

〔第2実施形態〕
次に、第2実施形態を説明するが、この第2実施形態は、発電用制御部6が実行するテスト処理の別実施形態を示すものであって、その他の構成は第1実施形態と同様であるので、第1実施形態と異なる部分についてのみ説明して、第1実施形態と同様な構成については、詳細な説明を省略する。
[Second Embodiment]
Next, the second embodiment will be described. This second embodiment shows another embodiment of the test process executed by the power generation control unit 6, and other configurations are the same as those of the first embodiment. Therefore, only a different part from 1st Embodiment is demonstrated, and detailed description is abbreviate | omitted about the structure similar to 1st Embodiment.

この第2実施形態においては、U相側電気負荷Euとして、熱源部Hbの本体処理部B1が備える本体側電気機器E1を用い、V相側電気負荷Evとして、発電部Haが備える電気機器を用いる形態で診断処理を行うように構成されている。   In the second embodiment, as the U-phase side electric load Eu, the main body side electric device E1 provided in the main body processing unit B1 of the heat source unit Hb is used, and as the V phase side electric load Ev, the electric device provided in the power generation unit Ha is used. It is comprised so that a diagnostic process may be performed with the form to be used.

本実施形態では、発電部Haが備える電気機器のうちで、第2駆動回路部52が、大きな電気負荷となる湯水循環ポンプPbを駆動し、第4駆動回路部54が、大きな電気負荷となる複数の第2電気ヒータ47を駆動するものである点に鑑みて、発電部HaのV相用内線Nvと中性用内線Noとに接続されている第2駆動回路部52及び第4駆動回路部54を、V相側電気負荷Evとして使用するように構成されている。   In the present embodiment, among the electric devices included in the power generation unit Ha, the second drive circuit unit 52 drives the hot water circulation pump Pb that becomes a large electric load, and the fourth drive circuit unit 54 becomes a large electric load. In view of the fact that the plurality of second electric heaters 47 are driven, the second drive circuit unit 52 and the fourth drive circuit connected to the V-phase extension Nv and the neutral extension No of the power generation unit Ha. The unit 54 is configured to be used as the V-phase side electric load Ev.

すなわち、先ず、発電用制御部6が、診断処理の前に、第1端子台55A及び第2端子台55Bの一方を出力作用状態に切換えて、端末側制御部11との間で通信することにより、本体処理部B1が第1端子台55A及び第2端子台55Bのいずれに接続されているかを判別する接続確認処理を行う。   That is, first, the power generation control unit 6 switches between one of the first terminal block 55A and the second terminal block 55B to the output operation state and communicates with the terminal-side control unit 11 before the diagnosis process. Thus, a connection confirmation process is performed to determine whether the main body processing unit B1 is connected to the first terminal block 55A or the second terminal block 55B.

そして、発電用制御部6が、万が一、第2端子台55Bに接続されている場合には、発電用制御部6を第1端子台55Aに付け替えることを促すコメントをリモコンRにて報知する等、報知処理を実行する。   In the unlikely event that the power generation control unit 6 is connected to the second terminal block 55B, a comment that prompts the user to replace the power generation control unit 6 with the first terminal block 55A is provided on the remote controller R, etc. The notification process is executed.

次に、本体処理部B1が第1端子台55Aに接続される状態において、発電用制御部6が、本体側電気機器E1をU相側電気負荷Euに設定し、かつ、発電部HaのV相用内線Nvと中性用内線Noとに接続されている第2駆動回路部52及び第4駆動回路部54をV相側電気負荷Evに設定する負荷設定処理を行う。   Next, in a state where the main body processing unit B1 is connected to the first terminal block 55A, the power generation control unit 6 sets the main body side electric device E1 to the U-phase side electric load Eu, and V of the power generation unit Ha. A load setting process for setting the second drive circuit unit 52 and the fourth drive circuit unit 54 connected to the phase extension Nv and the neutral extension No to the V-phase side electric load Ev is performed.

その後、第1実施形態と同様に、U相側電気負荷EuとV相側電気負荷Evとを選択的に作用させながら、一対の電流検出部Dの設置状態を診断する診断処理を実行する。   Thereafter, as in the first embodiment, a diagnostic process for diagnosing the installation state of the pair of current detection units D is performed while selectively acting on the U-phase side electrical load Eu and the V-phase side electrical load Ev.

つまり、熱電併給部Hの設置時等において、リモコンRにてテスト指令を指令することにより、発電用制御部6が、接続確認処理、報知処理、負荷設定処理、及び、診断処理を順次行うテスト処理を実行するように構成されている。   That is, a test in which the power generation control unit 6 sequentially performs a connection confirmation process, a notification process, a load setting process, and a diagnosis process by instructing a test command from the remote controller R when the cogeneration unit H is installed. It is configured to perform processing.

(第2実施形態のまとめ)
この第2実施形態においては、排熱回収消費部としての熱源部Hbに装備する電気機器Ebを、U相線Uに接続されるU相側電気負荷Euとして用いながら、診断処理を行うものであるから、熱源部Hbに装備する電気機器Ebを利用しながら、診断処理を良好に行うことができる。
(Summary of the second embodiment)
In the second embodiment, diagnostic processing is performed while using the electric equipment Eb equipped in the heat source unit Hb as the exhaust heat recovery and consumption unit as the U-phase side electric load Eu connected to the U-phase line U. Therefore, the diagnostic process can be performed satisfactorily while using the electric device Eb equipped in the heat source unit Hb.

すなわち、熱源部Hbが装備する電気機器Ebとしての本体側電気機器E1を、U相側電気負荷Euとして使用し、かつ、発電部Haが装備する第2駆動回路部52及び第4駆動回路部54を、V相側電気負荷Evとして使用しながら、診断処理を良好に行うことができる。   That is, the second drive circuit unit 52 and the fourth drive circuit unit that use the main body side electrical device E1 as the electrical device Eb equipped in the heat source unit Hb as the U-phase side electrical load Eu and that the power generation unit Ha equips. The diagnostic process can be performed satisfactorily while using 54 as the V-phase side electric load Ev.

また、診断処理の前に実行される接続確認処理及び報知処理により、熱源部Hbの本体処理部B1が第1端子台55Aに的確に接続される状態を現出させることにより、U相側電気負荷EuとV相側電気負荷Evとを適切に定めるようにしながら、診断処理を的確に行うことができる。   Further, the connection confirmation process and the notification process that are executed before the diagnosis process reveal a state in which the main body processing unit B1 of the heat source unit Hb is accurately connected to the first terminal block 55A. Diagnosis processing can be performed accurately while appropriately determining the load Eu and the V-phase side electric load Ev.

〔別実施形態〕
次に、その他の別実施形態を列記する。
(1)上記第1及び第2実施形態においては、熱電併給部Hの運転を制御する運転制御部Cが、発電部Haの運転を制御する発電用制御部6と熱源部Hbの運転を制御する端末側制御部11とから構成される場合を例示したが、発電用制御部6と端末側制御部11とを一つの制御部としてまとめて、運転制御部Cを一つの制御部として構成する形態で実施してもよい。
[Another embodiment]
Next, other embodiments are listed.
(1) In the first and second embodiments, the operation control unit C that controls the operation of the combined heat and power supply unit H controls the operation of the power generation control unit 6 that controls the operation of the power generation unit Ha and the operation of the heat source unit Hb. However, the power generation control unit 6 and the terminal side control unit 11 are combined as one control unit, and the operation control unit C is configured as one control unit. You may implement with a form.

(2)上記第1及び第2実施形態においては、発電部Haと熱源部Hbとを別体のユニットとして構成する場合を例示したが、発電部Haと熱源部Hbとを一つのユニットとして構成する形態で実施してもよい。 (2) In the first and second embodiments, the power generation unit Ha and the heat source unit Hb are illustrated as separate units. However, the power generation unit Ha and the heat source unit Hb are configured as a single unit. You may implement with the form to do.

(3)上記第1及び第2実施形態においては、発電部Haが、燃料電池4を備える場合を例示したが、発電部Haが、燃料ガスにて作動するエンジンと、そのエンジンにて駆動される発電機とを備える場合にも本発明は適用できるものである。 (3) In the first and second embodiments, the case where the power generation unit Ha includes the fuel cell 4 is exemplified. However, the power generation unit Ha is driven by an engine that operates with fuel gas and the engine. The present invention can also be applied to a case where a generator is provided.

(4)上記第1及び第2実施形態においては、診断処理として、U相側電気負荷EuとV相側電気負荷Evとを選択的に作用させながら、一対の電流検出部Dの設置状態、つまり、一対の電流検出部Dの夫々がU相用信号線Su及びV相用信号線Svのいずれに設置されているかの診断、及び、一対の電流検出部Dの夫々の設置向きの診断を行う場合を例示したが、例えば、U相側電気負荷EuとV相側電気負荷Evとを作用させる前に、一対の電流検出部Dの検出する電流の流れ方向に基づいて、一対の電流検出部Dの夫々の設置向きの診断を行い、その後、U相側電気負荷EuとV相側電気負荷Evとを選択的に作用させながら、一対の電流検出部Dの夫々がU相用信号線Su及びV相用信号線Svのいずれに設置されているかの診断を行うようにする等、診断処理の具体構成は各種変更できる。 (4) In the first and second embodiments, as the diagnostic process, while the U-phase side electrical load Eu and the V-phase side electrical load Ev are selectively applied, the installation state of the pair of current detection units D, That is, the diagnosis of whether each of the pair of current detection units D is installed in the U-phase signal line Su or the V-phase signal line Sv, and the diagnosis of the installation direction of each of the pair of current detection units D Although the case where it performs is illustrated, for example, before making the U-phase side electric load Eu and the V-phase side electric load Ev act, a pair of current detection is performed based on the flow direction of the current detected by the pair of current detection units D Each of the pair of current detection units D performs a U-phase signal line while selectively activating the U-phase side electrical load Eu and the V-phase side electrical load Ev. Diagnose which of the Su and V phase signal lines Sv is installed Etc. To Migihitsuji, specific configuration of the diagnostic process can various modifications.

(5)上記第1及び第2実施形態においては、診断処理において、U相側電気負荷EuやV相側電気負荷Evを一定の負荷とする場合を例示したが、診断処理を行う前に、一対の電流検出部Dの検出値に基づいて、電気負荷10によりU相用信号線Su及びV相用信号線Svに流れる電流値を検出し、そして、その電流値(絶対値)が大きいほど、U相側電気負荷EuとV相側電気負荷Evとを大きくする形態で、U相側電気負荷EuとV相側電気負荷Evとを変更するようにする等、診断処理において、U相側電気負荷EuやV相側電気負荷Evの大きさを変更させるようにしてもよい。 (5) In the first and second embodiments, the case where the U-phase side electrical load Eu and the V-phase side electrical load Ev are set to a constant load in the diagnosis process is illustrated, but before performing the diagnosis process, Based on the detection values of the pair of current detection units D, the current value flowing through the U-phase signal line Su and the V-phase signal line Sv is detected by the electric load 10, and the larger the current value (absolute value) is, the larger the current value is. In the diagnosis process, such as changing the U-phase side electrical load Eu and the V-phase side electrical load Ev by increasing the U-phase side electrical load Eu and the V-phase side electrical load Ev, the U-phase side You may make it change the magnitude | size of the electric load Eu and the V-phase side electric load Ev.

尚、上記実施形態(別実施形態を含む、以下同じ)で開示される構成は、矛盾が生じない限り、他の実施形態で開示される構成と組み合わせて適用することが可能であり、また、本明細書において開示された実施形態は例示であって、本発明の実施形態はこれに限定されず、本発明の目的を逸脱しない範囲内で適宜改変することが可能である。   The configuration disclosed in the above embodiment (including another embodiment, the same shall apply hereinafter) can be applied in combination with the configuration disclosed in the other embodiment, as long as no contradiction occurs. The embodiment disclosed in this specification is an exemplification, and the embodiment of the present invention is not limited to this. The embodiment can be appropriately modified without departing from the object of the present invention.

7 商用電源
55A U相側接続部
55B V相側接続部
56A U相側断続部
56B V相側断続部
B1 本体処理部
B2 補助処理部
C 運転制御部
D 電流検出部
Ha 発電部
Hb 排熱回収消費部
U U相線
V V相線
E1 本体側電気機器
E2 補助側電気機器
Eb 電気機器
Eu U相側電気負荷
Ev V相側電気負荷
7 Commercial power supply 55A U-phase side connection portion 55B V-phase side connection portion 56A U-phase side interruption portion 56B V-phase side interruption portion B1 Main body processing portion B2 Auxiliary processing portion C Operation control portion D Current detection portion Ha Power generation portion Hb Waste heat recovery Consumption part U U phase wire V V phase wire E1 Main body side electric device E2 Auxiliary side electric device Eb Electric device Eu U phase side electric load Ev V phase side electric load

Claims (1)

単相3線式の商用電源と系統連系される発電部と、当該発電部の排熱を回収して消費する排熱回収消費部と、前記商用電源のU相線及びV相線の夫々に各別に設置される一対の電流検出部と、前記発電部の運転を制御する発電用制御部とが設けられ、
前記発電用制御部が、前記U相線に接続されるU相側電気負荷及び前記V相線に接続されるV相側電気負荷を選択的に作用させて、一対の前記電流検出部の設置状態を診断する診断処理を実行するように構成されている熱電併給システムであって、
前記排熱回収消費部が、前記U相線又は前記V相線に接続される電気機器を備える形態で設けられ、
前記発電用制御部が、前記U相側電気負荷及び前記V相側電気負荷のうちの少なくとも一方として、前記排熱回収消費部が備える前記電気機器を用いる形態で、前記診断処理を実行するように構成され
前記発電部に、前記U相線からの電力を外部に出力するU相側接続部、及び、前記V相線からの電力を外部に出力するV相側接続部が設けられ、
前記排熱回収消費部が、前記U相側接続部及び前記V相側接続部の一方に接続されかつ前記電気機器として本体側電気機器を備える本体処理部と、前記U相側接続部及び前記V相側接続部の他方に接続されかつ前記電気機器として補助側電気機器を備える補助熱源機である補助処理部とを備える形態に構成され、
前記発電用制御部が、前記本体側電気機器及び前記補助側電気機器を、前記U相側電気負荷及び前記V相側電気負荷として用いる形態で、前記診断処理を実行するように構成され、
前記U相側接続部及び前記V相側接続部が、前記発電用制御部にて断続操作自在なU相側断続部及びV相側断続部により、出力作用状態と出力停止とに切換え自在に構成され、
前記本体処理部が、前記U相側接続部及び前記V相側接続部との接続による電力供給状態において前記発電用制御部との間で通信する端末側制御部を備える形態に構成され、
前記発電用制御部が、前記診断処理の前に、前記U相側接続部及び前記V相側接続部の一方を出力作用状態に切換えて、前記端末側制御部との間で通信することにより、前記本体処理部が前記U相側接続部及び前記V相側接続部のいずれに接続されているかを判別する接続確認処理、及び、前記本体処理部が前記U相側接続部に接続される場合には、前記本体側電気機器を前記U相側電気負荷にかつ前記補助側電気機器を前記V相側電気負荷に定め、且つ、前記本体処理部が前記V相側接続部に接続される場合には、前記本体側電気機器を前記V相側電気負荷にかつ前記補助側電気機器を前記U相側電気負荷に定める負荷設定処理を実行するように構成されている熱電併給システム。
A power generation unit interconnected with a single-phase three-wire commercial power source, a waste heat recovery and consumption unit that recovers and consumes exhaust heat of the power generation unit, and a U-phase line and a V-phase line of the commercial power source, respectively A pair of current detection units installed separately, and a power generation control unit for controlling the operation of the power generation unit,
The power generation control unit selectively operates the U-phase side electrical load connected to the U-phase line and the V-phase side electrical load connected to the V-phase line, and the pair of current detection units are installed. A combined heat and power system configured to execute a diagnostic process for diagnosing a condition,
The exhaust heat recovery and consumption unit is provided in a form including an electrical device connected to the U-phase line or the V-phase line,
The power generation control unit executes the diagnosis process in a form using the electric device included in the exhaust heat recovery and consumption unit as at least one of the U-phase side electric load and the V-phase side electric load. Composed of
The power generation unit is provided with a U-phase side connection unit that outputs power from the U-phase line to the outside, and a V-phase side connection unit that outputs power from the V-phase line to the outside.
The waste heat recovery and consumption part is connected to one of the U-phase side connection part and the V-phase side connection part and includes a main body side electric device as the electric device, the U phase side connection part, and the It is comprised in the form provided with the auxiliary processing part which is an auxiliary heat source machine which is connected to the other of the V phase side connection part, and is provided with auxiliary side electric equipment as the electric equipment,
The power generation control unit is configured to execute the diagnostic processing in a form in which the main body side electric device and the auxiliary side electric device are used as the U phase side electric load and the V phase side electric load,
The U-phase side connecting portion and the V-phase side connecting portion can be switched between an output action state and an output stop by a U-phase side intermittent portion and a V-phase side intermittent portion that can be intermittently operated by the power generation control portion. Configured,
The main body processing unit is configured to include a terminal-side control unit that communicates with the power generation control unit in a power supply state by connection with the U-phase side connection unit and the V-phase side connection unit,
The power generation control unit communicates with the terminal-side control unit by switching one of the U-phase side connection unit and the V-phase side connection unit to the output operation state before the diagnosis process. A connection confirmation process for determining whether the main body processing unit is connected to the U-phase side connection unit or the V-phase side connection unit; and the main body processing unit is connected to the U-phase side connection unit In this case, the main body side electric device is set as the U-phase side electric load, the auxiliary side electric device is set as the V phase side electric load, and the main body processing unit is connected to the V phase side connection portion. In this case, the combined heat and power system is configured to execute a load setting process in which the main body-side electric device is set to the V-phase side electric load and the auxiliary-side electric device is set to the U-phase side electric load .
JP2015170936A 2015-08-31 2015-08-31 Combined heat and power system Active JP6555986B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015170936A JP6555986B2 (en) 2015-08-31 2015-08-31 Combined heat and power system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015170936A JP6555986B2 (en) 2015-08-31 2015-08-31 Combined heat and power system

Publications (2)

Publication Number Publication Date
JP2017050928A JP2017050928A (en) 2017-03-09
JP6555986B2 true JP6555986B2 (en) 2019-08-07

Family

ID=58280498

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015170936A Active JP6555986B2 (en) 2015-08-31 2015-08-31 Combined heat and power system

Country Status (1)

Country Link
JP (1) JP6555986B2 (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4484386B2 (en) * 2001-03-27 2010-06-16 大阪瓦斯株式会社 Diagnostic device for cogeneration system
US20040030457A1 (en) * 2001-12-28 2004-02-12 Bayoumi Deia Salah-Eldin On-line control of distributed resources with different dispatching levels
JP2005184895A (en) * 2003-12-16 2005-07-07 Toshiba Corp Power supply system for single-phase load with single-phase private power generator
JP2006266243A (en) * 2005-03-25 2006-10-05 Osaka Gas Co Ltd Cogeneration system diagnosis device
JP5737110B2 (en) * 2011-09-28 2015-06-17 アイシン精機株式会社 Cogeneration system current sensor mounting state determination device

Also Published As

Publication number Publication date
JP2017050928A (en) 2017-03-09

Similar Documents

Publication Publication Date Title
JP4854549B2 (en) Combined heat and power system
JP3836796B2 (en) Cogeneration system
JP6221933B2 (en) PV-linked hot water storage system
JP4484386B2 (en) Diagnostic device for cogeneration system
JP2012225589A (en) Heat recovery device, cogeneration system, and method for detecting wrong pipe connection
JP4884030B2 (en) Combined heat and power system
JP2005069667A (en) Hot water storage hot water source
JP6521800B2 (en) Cogeneration system
JP4716352B2 (en) Hot water storage hot water source
JP5160377B2 (en) Hot water storage water heater
JP4101144B2 (en) Hot water storage water heater
JP6594117B2 (en) Combined heat and power system
JP6555986B2 (en) Combined heat and power system
JP7116907B2 (en) hot water storage system
JP6065641B2 (en) Distributed power supply system and diagnostic method thereof
JP5525359B2 (en) Waste heat recovery device
JP6551062B2 (en) Cogeneration system
JP2016008787A (en) Heat interchange unit
JP2006266243A (en) Cogeneration system diagnosis device
JP4833707B2 (en) Waste heat recovery device
JP2014025682A (en) Hot water storage device
JP2013069598A (en) Cogeneration system
JP2006267066A (en) Diagnostic device for cogeneration system
JP6015924B2 (en) Hot water storage hot water system
JP2015025586A (en) Cogeneration device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20180606

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20190325

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20190409

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20190528

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20190611

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20190709

R150 Certificate of patent or registration of utility model

Ref document number: 6555986

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150