JP6558904B2 - Pile guide guide member and tunnel ground support method - Google Patents
Pile guide guide member and tunnel ground support method Download PDFInfo
- Publication number
- JP6558904B2 JP6558904B2 JP2015016245A JP2015016245A JP6558904B2 JP 6558904 B2 JP6558904 B2 JP 6558904B2 JP 2015016245 A JP2015016245 A JP 2015016245A JP 2015016245 A JP2015016245 A JP 2015016245A JP 6558904 B2 JP6558904 B2 JP 6558904B2
- Authority
- JP
- Japan
- Prior art keywords
- tunnel
- guide
- pile
- guide member
- support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Description
本発明は、支保工の沈下を抑制するためのパイルを案内するガイド部材およびこのガイド部材を用いたトンネル地盤支持方法に関する。 The present invention relates to a guide member for guiding a pile for suppressing settlement of a support work and a tunnel ground support method using the guide member.
トンネルを掘削する際、新たに掘削された部分の内壁にアーチ状の支保工を次々と設置して、トンネル内壁を支持することは周知である。この支保工の脚部から、パイルを斜め下方に、すなわち下方に向かうにしたがってトンネル中心から離れるように傾斜して埋設することにより、支保工の沈下を抑制し、ひいてはトンネル上方の地盤沈下を抑制することも周知である。 When excavating a tunnel, it is well known to support the inner wall of the tunnel by successively installing arch-shaped supporters on the inner wall of the newly excavated portion. By embedding the pile from the legs of the support construction obliquely downward, that is, away from the center of the tunnel as it goes downward, the settlement of the support work is suppressed, and consequently the land subsidence above the tunnel is suppressed. It is also well known to do.
前記パイルを正確に方向付けするために、特許文献1では、支保工のH型鋼からなるアーチ部材の下端近傍にガイド部材を固定している。このガイド部材は板部とこの板部を貫通する複数の筒部とを有しており、この筒部の内部空間がガイド通路となって、斜め下方に延びるパイルを案内する。
In order to orient the pile accurately, in
特許文献1に記述されたガイド部材において、斜め下方に延びる複数のパイルは、トンネルの奥行方向と直交する垂直面(支保工が配置された垂直面)と平行に延びており、これから掘削を進めようとする地盤(掘削方向の前方の地盤)を支持する役割を持たない。
In the guide member described in
本発明は、前記課題を解決したもので、トンネルの支保工の脚部に設けられ、支保工の沈下を抑制するためのパイルを案内するガイド部材において、前記パイルを通すための複数のガイド通路を有し、前記複数のガイド通路の中心軸線が、下方に向かうにしたがってトンネル中心から離れるように傾斜し、前記複数のガイド通路の少なくとも1つの中心軸線が、前記トンネル奥行方向と直交する垂直面に対して傾斜し、掘削方向に斜め下方に延びていることを特徴とする。
この構成によれば、掘削方向に斜め下方に延びるパイルにより、これから掘削を進めようとする地盤を支持することができ、掘削作業を円滑に行うことができる。
The present invention solves the above-mentioned problem, and is provided at a leg of a tunnel support work and guides a pile for suppressing settlement of the support work, and a plurality of guide passages for passing the pile. A vertical plane in which at least one central axis of the plurality of guide passages is perpendicular to the depth direction of the tunnel. It is characterized in that it is inclined with respect to and extends obliquely downward in the excavation direction.
According to this structure, the ground which is going to advance excavation from now on can be supported by the pile extended diagonally downward in the excavation direction, and excavation work can be performed smoothly.
好ましくは、前記複数のガイド通路のうちの少なくとも2つの中心軸線の延び方向が、互いに異なる。
この構成によれば、支保工の荷重負担を分散することができる。
Preferably, the extending directions of at least two central axes of the plurality of guide passages are different from each other.
According to this structure, the load burden of a support work can be disperse | distributed.
好ましくは、前記複数のガイド通路のうちの少なくとも2つの中心軸線が、掘削方向に斜め下方に延び、前記トンネルの側方から見て、当該少なくとも2つの中心軸線の、前記トンネル奥行方向と直交する垂直面に対する傾斜角度が、互いに異なる。
この構成によれば、掘削を進めようとする地盤をより一層良好に支持することができるとともに、荷重負担を分散することができる。
Preferably, at least two central axes of the plurality of guide passages extend obliquely downward in the excavation direction, and are orthogonal to the tunnel depth direction of the at least two central axes when viewed from the side of the tunnel. The inclination angles with respect to the vertical plane are different from each other.
According to this configuration, it is possible to better support the ground on which excavation is to be advanced and to distribute the load burden.
好ましくは、前記トンネルの奥行方向から見て、前記複数のガイド通路のうちの少なくとも2つの中心軸線の、前記トンネルの奥行方向に延びる垂直面に対する傾斜角度が、互いに異なる。
この構成によれば、荷重負担を分散することができる。
Preferably, when viewed from the depth direction of the tunnel, inclination angles of at least two central axes of the plurality of guide passages with respect to a vertical plane extending in the depth direction of the tunnel are different from each other.
According to this configuration, the load burden can be distributed.
好ましくは、前記ガイド部材は上記ガイド通路を3つ以上備え、全てのガイド通路の中心軸線が下方に向かうにしたがってトンネル中心から離れるように傾斜するとともに、掘削方向に斜め下方に延び、全てのガイド通路の中心軸線が互いに異なる方向に延びている。
この構成によれば、掘削を進めようとする地盤の支持と、荷重負担をの分散を最大限に発揮することができる。
Preferably, the guide member includes three or more guide passages, and the central axis of all the guide passages is inclined so as to be separated from the tunnel center as it goes downward, and extends obliquely downward in the excavation direction. The central axes of the passages extend in different directions.
According to this configuration, it is possible to maximize the support of the ground to be excavated and the dispersion of the load burden.
本発明の他の態様によれば、トンネル地盤支持方法において、上記ガイド部材を、前記支保工の脚部に固定し、前記ガイド部材の前記複数のガイド通路にそれぞれ前記パイルを挿通して地中に斜め下方に埋設し、少なくとも1本のパイルを、前記トンネル奥行方向と直交する垂直面に対して傾斜させ、掘削方向に斜め下方に延ばすことにより、掘削方向の前方の地盤を支持することを特徴とする。 According to another aspect of the present invention, in the tunnel ground support method, the guide member is fixed to a leg portion of the support work, and the piles are respectively inserted into the plurality of guide passages of the guide member to be underground. And supporting the ground in front of the excavation direction by inclining at least one pile with respect to a vertical plane perpendicular to the tunnel depth direction and extending obliquely downward in the excavation direction. Features.
本発明によれば、掘削を進めようとする地盤を支持することができ、掘削作業を円滑に行うことができる。 ADVANTAGE OF THE INVENTION According to this invention, the ground which is going to advance excavation can be supported, and excavation work can be performed smoothly.
以下、本発明の第1実施形態をなすガイド部材を組み込んだトンネル支保工の沈下抑制構造について、図1〜図6を参照しながら説明する。
図1、図2は、支保工1および沈下抑制構造5の全体構成を概略的に示す。この支保工1は、略半円形状に湾曲したH型鋼からなるアーチ部材2と、このアーチ部材2の両下端に固定された水平なベース板3とを備えている。このアーチ部材2の下端近傍部とベース板3により、支保工1の脚部1aが構成されている。
Hereinafter, a settlement restraining structure of a tunnel support work incorporating a guide member constituting a first embodiment of the present invention will be described with reference to FIGS.
1 and 2 schematically show the entire structure of the
トンネルの掘削工程において、所定距離掘削する度にトンネルの内壁に支保工1が設置される。その結果、支保工1は、所定距離毎に例えば1mおきにトンネルの奥行方向に沿って次々に設置され、トンネル内壁を支持する。
In the tunnel excavation process, the
最新の支保工1が設置される度に、その両脚部1aには沈下抑制構造5が設けられる。各沈下抑制構造5は、下方に向かうにしたがってトンネル中心から離れるように傾斜して埋設された複数例えば3本のパイル11,12,13と、これらパイル11,12,13を案内する後述のガイド部材20を備えている。パイル11,12,13は例えば周壁に多数の孔を有する鋼管からなる。
Each time the
なお、最新の支保工1が設置される度に、沈下抑制構造5の他に、トンネルの天井壁から掘削方向に斜め上方に延びるパイルを埋設したり、トンネル内壁に放射状にパイルを埋設するが、本願発明の要旨ではないので詳細な説明を省略する。
Each time the
図3、図4に示すように、ガイド部材20は、平板形状の板部25(ベース部)と、この板部25を貫通するようにして板部25に固定された複数例えば3つの筒部21,22,23を有している。これら筒部21,22,23の内部空間が、パイル11,12,13を案内するガイド通路21a,22a,23aとして提供される。
As shown in FIGS. 3 and 4, the
図4に示すように、ガイド部材20の板部25は、その一側縁部に複数の取付穴25aを有している。図6に示すように、ねじ26を取付穴25aからベース板3の一側縁部(例えば、トンネル掘削方向Fの側縁部)に形成されたねじ穴にねじ込むことにより、ガイド部材20の板部25が水平をなしてベース板3に固定される。なお、ベース板3において、トンネル掘削方向Fの反対側の側縁部にガイド部材20を固定してもよい。
As shown in FIG. 4, the
図3、図4に示すように、ガイド部材20のガイド通路21a,22a,23aの中心軸線21a’,22a’,23a’は、互いに平行ではなく、異なる方向に延びている。以下、この中心軸線21a’,22a’,23a’の延び方向について、トンネルの奥行方向に延びる垂直面Aと、奥行方向と直交する垂直面例えば支保工1が配置された垂直面Bを基準として説明する。これら垂直面A,Bは互いに直交している。
As shown in FIGS. 3 and 4, the
図3に示すように、ガイド部材20が支保工1のベース板3に固定された状態で、トンネル奥行方向から見た時、ガイド通路21a,22a,23aの中心軸線21a’,22a’,23a’は、下方に向かうにしたがってトンネル中心から離れるように傾斜しており、垂直面Aに対する角度θ1A、θ2A、θ3Aが互いに異なっている。例えば、θ1A>θ2A>θ3Aである。
As shown in FIG. 3, when the
図4に示すように、ガイド部材20が支保工1のベース板3に固定された状態で、ガイド通路21a,22a,23aの中心軸線21a’,22a’,23a’は、下方に向かうにしたがって掘削方向Fに進むように垂直面Bに対して傾斜し、トンネルの上方から見た時、垂直面Bに対する角度θ1B、θ2B、θ3Bが互いに異なっている。例えば、θ1B<θ2B<θ3Bである。
As shown in FIG. 4, with the
上述したようにガイド通路21a,22a,23aの中心軸線21a’,22a’,23a’が掘削方向Fに斜め下方に延びるので、トンネルの側方、すなわちトンネル奥行方向と直交する方向から見た時、ガイド通路21a,22a,23aの中心軸線21a’,22a’,23a’は垂直面Bに対して傾斜し、これら中心軸線21a’,22a’,23a’の垂直面Bに対する角度θ1B’、θ2B’、θ3B’も互いに異なっている。例えば、θ1B’<θ2B’<θ3B’である。これら角度θ1B’、θ2B’、θ3B’は、図3、図4から容易に推測できるので図示しない。
As described above, since the
前記構成のガイド部材20を最新の支保工1の脚部1aに固定した状態で、パイル11,12,13を、ガイド部材20のガイド通路21a,22a,23aにそれぞれ挿通して地中に斜め下方に埋設する。パイル11,12,13は、ガイド通路21a,22a,23aの中心軸線21a’,22a’,23a’に沿って延びる。ガイド部材20を用いることによってパイル11,12,13は正確に方向付けされて埋設される。パイル11,12,13の埋設後に凝固剤を注入して地中に浸透凝固させる。
In a state where the
沈下抑制構造5の斜め下方に埋設されたパイル11〜13により、支保工1の脚部1aの沈下を抑制することができる。
パイル11〜13は、垂直面Bに対して傾斜し、掘削方向Fに斜め下方に延びているため、これから掘削する地盤(掘削方向の前方の地盤)の荷重を負担でき、その沈下を抑制できる。
パイル11,12,13は、互いに異なる方向に延びているので、荷重負担を分散することができる。
The
Since the
Since the
図7は、本発明の第2実施形態を示す。この実施形態では、支保工1のベース板3における地中側すなわちトンネル中心から遠い方の側縁部にガイド部材20が固定されている。その他は第1実施形態と同様である。
FIG. 7 shows a second embodiment of the present invention. In this embodiment, the
本発明は、前記実施形態に制約されず、種々の態様を採用することができる。例えば、
ガイド部材のガイド通路は2つでもよいし、3つ以上でもよい。
ガイド部材は支保工のアーチ部材の下端近傍に固定してもよい。このガイド部材には、斜め下方に埋設されるパイプのみならず水平方向に埋設されるパイルを案内するガイド通路を一緒に形成してもよい。
複数のガイド通路の中心軸線の全てまたは一部が互いに平行に延びていてもよい。
The present invention is not limited to the above-described embodiment, and various aspects can be adopted. For example,
The guide member may have two guide passages or three or more guide passages.
The guide member may be fixed near the lower end of the arch member of the support work. The guide member may be formed with a guide passage for guiding not only a pipe buried obliquely below but also a pile buried in the horizontal direction.
All or some of the central axes of the plurality of guide passages may extend in parallel to each other.
本発明は、トンネル支保工の沈下を抑制するためのパイルを案内するガイド部材に適用することができる。 The present invention can be applied to a guide member for guiding a pile for suppressing settlement of a tunnel support work.
1 支保工
1a 支保工の脚部
5 沈下抑制構造
11〜13 パイル
20 ガイド部材
21a,22a,23a ガイド通路
21a’,22a’,23a’ ガイド通路の中心軸線
A トンネル奥行方向に延びる垂直面
B トンネル奥行方向と直交する垂直面
F 掘削方向
DESCRIPTION OF
Claims (3)
前記パイルを通すための複数のガイド通路を有し、
前記複数のガイド通路の中心軸線が、下方に向かうにしたがってトンネル中心から離れるように傾斜し、
前記複数のガイド通路のうちの少なくとも2つのガイド通路の中心軸線が、前記トンネル奥行方向と直交する垂直面に対して傾斜し、掘削方向に斜め下方に延びており、
前記少なくとも2つのガイド通路の中心軸線は、前記トンネルの側方および上方から見て、前記トンネル奥行方向と直交する垂直面に対する傾斜角度が互いに異なるとともに、前記トンネルの奥行方向および上方から見て、前記トンネルの奥行方向に延びる垂直面に対する傾斜角度が互いに異なることを特徴とするパイル案内用ガイド部材。 A flat plate-shaped guide member that is horizontally fixed to the leg of the tunnel support and guides the pile for suppressing the settlement of the support ,
A plurality of guide passages for passing the pile;
A center axis of the plurality of guide passages is inclined so as to be away from the tunnel center as it goes downward,
A central axis of at least two of the plurality of guide passages is inclined with respect to a vertical plane perpendicular to the tunnel depth direction, and extends obliquely downward in the excavation direction;
The central axes of the at least two guide passages have different inclination angles with respect to a vertical plane perpendicular to the tunnel depth direction when viewed from the side and above the tunnel, and when viewed from the tunnel depth direction and from above, A guide member for a pile guide, wherein the inclination angles with respect to a vertical plane extending in the depth direction of the tunnel are different from each other .
前記パイルを通すための3つ以上のガイド通路を有し、
全てのガイド通路の中心軸線は、下方に向かうにしたがってトンネル中心から離れるように傾斜するとともに、掘削方向に斜め下方に延び、
全てのガイド通路の中心軸線は、前記トンネルの側方および上方から見て前記トンネル奥行方向と直交する垂直面に対する傾斜角度が互いに異なるとともに、前記トンネルの奥行方向および上方から見て、前記トンネルの奥行方向に延びる垂直面に対する傾斜角度が互いに異なることを特徴とするパイル案内用ガイド部材。 A plate-shaped guide member that is horizontally fixed to a tunnel support leg and guides a pile for suppressing settlement of the support work ,
Having three or more guide passages for passing the pile;
The central axis of all guide passages inclines away from the tunnel center as it goes downward, and extends obliquely downward in the excavation direction,
The central axes of all the guide passages have different inclination angles with respect to a vertical plane perpendicular to the tunnel depth direction when viewed from the side and the upper side of the tunnel, and when viewed from the tunnel depth direction and the upper side , A guide member for a pile guide, wherein the inclination angles with respect to a vertical plane extending in the depth direction are different from each other.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2015016245A JP6558904B2 (en) | 2015-01-30 | 2015-01-30 | Pile guide guide member and tunnel ground support method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2015016245A JP6558904B2 (en) | 2015-01-30 | 2015-01-30 | Pile guide guide member and tunnel ground support method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2016141946A JP2016141946A (en) | 2016-08-08 |
| JP6558904B2 true JP6558904B2 (en) | 2019-08-14 |
Family
ID=56569917
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2015016245A Active JP6558904B2 (en) | 2015-01-30 | 2015-01-30 | Pile guide guide member and tunnel ground support method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP6558904B2 (en) |
Family Cites Families (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3076927B2 (en) * | 1991-07-19 | 2000-08-14 | 株式会社間組 | First-strength reinforcement structure and construction method for underground space |
| JP3436973B2 (en) * | 1994-05-31 | 2003-08-18 | 前田建設工業株式会社 | Prior reinforcement method of tunnel leg |
| JP2000073697A (en) * | 1998-08-28 | 2000-03-07 | Kumagai Gumi Co Ltd | Leg pile method |
| JP3621880B2 (en) * | 2000-11-13 | 2005-02-16 | 鹿島建設株式会社 | Tunnel construction method and tunnel |
| JP2002220997A (en) * | 2001-01-25 | 2002-08-09 | Ohbayashi Corp | Construction method for stabilizing tunnel |
| EP1674657A1 (en) * | 2004-12-21 | 2006-06-28 | Strukton Infratechnieken B.V. | Method of building a tunnel |
| JP4757620B2 (en) * | 2005-12-15 | 2011-08-24 | 株式会社奥村組 | Tunnel support subsidence suppression structure |
| JP6232743B2 (en) * | 2013-05-23 | 2017-11-22 | 株式会社大林組 | Tunnel construction method and tunnel |
| JP3188774U (en) * | 2013-11-26 | 2014-02-06 | 前田工繊株式会社 | Simple foundation |
-
2015
- 2015-01-30 JP JP2015016245A patent/JP6558904B2/en active Active
Also Published As
| Publication number | Publication date |
|---|---|
| JP2016141946A (en) | 2016-08-08 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP6558904B2 (en) | Pile guide guide member and tunnel ground support method | |
| JP6586873B2 (en) | Ground stabilization structure and ground stabilization method | |
| JP3188774U (en) | Simple foundation | |
| KR101980134B1 (en) | The self-supporting type prestress beam for earth retaining earth which can improve earth pressure holding force and shape deformation | |
| JP6829454B2 (en) | Horizontal sheet pile arrangement space forming device | |
| JP2014025281A (en) | Connecting member | |
| JP2017210859A (en) | Pile | |
| KR101507991B1 (en) | Bracket for earth anchor | |
| KR101386558B1 (en) | Construction method of earth retaining wall using phc pile | |
| JP2017193857A (en) | Attachment structure of transverse member and guard fence | |
| JP6631189B2 (en) | Ground stabilization structure | |
| KR200486046Y1 (en) | Apparatus of casing guide for a excavator | |
| KR102199665B1 (en) | Bracket Apparatus For Earth Anchor For Soil Retainning Method | |
| KR20140042051A (en) | Temporary facilities structure | |
| KR20160115276A (en) | Soil retaining structure of two rows pile by using anchors and method thereof | |
| JP5953856B2 (en) | Diagonal pile construction method | |
| JP6462505B2 (en) | Earth retaining wall structure and its construction method | |
| JP6824597B2 (en) | Mechanical agitator used for ground improvement work | |
| KR101866792B1 (en) | Temporary retaining wall structure | |
| JP2017031727A (en) | Deformation prevention structure of retaining wall and deformation prevention method of retaining wall | |
| KR101750435B1 (en) | Steel pipe pole | |
| JP3170488U (en) | Concrete foundation | |
| JP2009114687A (en) | Hardware for holding interval between foundation forms and for holding anchor bolt | |
| KR101673152B1 (en) | Plate Anchor Construction Apparatus using Suction Piles | |
| JP7432234B2 (en) | drain |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20171016 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20180709 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20180821 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20180920 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20190115 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20190228 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20190709 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20190716 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 6558904 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |