Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP6574338B2 - Wall structure and repair method thereof - Google Patents
[go: Go Back, main page]

JP6574338B2 - Wall structure and repair method thereof - Google Patents

Wall structure and repair method thereof Download PDF

Info

Publication number
JP6574338B2
JP6574338B2 JP2015111486A JP2015111486A JP6574338B2 JP 6574338 B2 JP6574338 B2 JP 6574338B2 JP 2015111486 A JP2015111486 A JP 2015111486A JP 2015111486 A JP2015111486 A JP 2015111486A JP 6574338 B2 JP6574338 B2 JP 6574338B2
Authority
JP
Japan
Prior art keywords
rod
outer frame
nut
repair
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2015111486A
Other languages
Japanese (ja)
Other versions
JP2016223191A (en
Inventor
貴裕 小室
貴裕 小室
吉川 裕之
裕之 吉川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Metal Products and Engineering Inc
Original Assignee
JFE Metal Products and Engineering Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JFE Metal Products and Engineering Inc filed Critical JFE Metal Products and Engineering Inc
Priority to JP2015111486A priority Critical patent/JP6574338B2/en
Publication of JP2016223191A publication Critical patent/JP2016223191A/en
Application granted granted Critical
Publication of JP6574338B2 publication Critical patent/JP6574338B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Description

本発明は、壁体構造物およびその補修方法に関する。   The present invention relates to a wall structure and a repair method thereof.

堰堤や擁壁、あるいは護岸などでは、土石流などが発生した場合に、これをせき止めることが求められる。このため、土石流などの発生が想定される傾斜地などに、壁体構造物が構築されることがある。このような壁体構造物としては、四方を面状体で囲んで形成された鋼製枠を複数並設し、これらの鋼製枠の中に石材などの中詰め材を充填したものが知られている。なお、これらの鋼製枠は、背面からの土圧や土石流による衝撃力に対して、鋼製枠自体および中詰め材の重量(鋼製枠体の自重)により抵抗する。   When a debris flow or the like occurs on a dam, retaining wall, or revetment, it is required to dampen it. For this reason, a wall structure may be constructed on an inclined land where occurrence of debris flow or the like is assumed. As such a wall structure, there is known a structure in which a plurality of steel frames formed by enclosing four sides with a planar body are arranged side by side, and filling materials such as stone are filled in these steel frames. It has been. In addition, these steel frames resist the impact force due to earth pressure or debris flow from the back by the weight of the steel frame itself and the filling material (self weight of the steel frame body).

また、このような壁体構造物に用いられる鋼製枠として、従来、前面体と後面体を備えるものがある(たとえば、特許文献1参照)。この鋼製枠における前面体は、矩形状の枠体に棒状の前面材を複数並設して構成されている。同様に、後面体は、矩形状の枠体に棒状の後面材を複数並設して構成されている。   Moreover, as a steel frame used for such a wall structure, there is a conventional one having a front body and a rear body (see, for example, Patent Document 1). The front body in this steel frame is configured by arranging a plurality of rod-shaped front members side by side on a rectangular frame. Similarly, the rear surface body is configured by arranging a plurality of rod-shaped rear surface materials in parallel on a rectangular frame.

前面体における複数の前面材は、所定の間隔を置いて配設されており、隣り合う前面材同士の間の幅は、それらの前面材同士の間から中詰め材が流出しない程度の幅とされている。同様に、後面体における複数の後面材についても、中詰め材の流出が阻止される程度の幅をもって複数の後面材が並設されている。さらに、前面体の枠体と後面体の枠体とがつなぎ材によって接続されている。これらの中詰め材が充填された鋼製枠が複数並設されて壁体構造物が構築されている。   The plurality of front materials in the front body are arranged at a predetermined interval, and the width between adjacent front materials is such that the filling material does not flow out from between the front materials. Has been. Similarly, with respect to the plurality of rear surface members in the rear surface body, the plurality of rear surface members are arranged side by side with a width that prevents the outflow of the filling material. Furthermore, the frame body of the front body and the frame body of the rear body are connected by a connecting material. A wall structure is constructed by arranging a plurality of steel frames filled with these filling materials.

特開2014−189980号公報JP 2014-189980 A

この種の壁面構造体は、土石流などの発生が想定される場所に構築されることから、厳しい自然環境にさらされ、さらには長期間にわたって使用されることが少なくない。このため、地形の変形や経年劣化によって前面材や後面材が変形し、あるいは枠体との固定箇所が破損等して、前面材や後面材が枠体から外れてしまうことがある。前面材や後面材が枠体から外れてしまうと、鋼製枠に充填された中詰め材の流出などが想定される。このような中詰め材の流出を阻止する等のため、前面材や後面材が枠体から外れてしまった場合には、枠体に前面材または後面材を再度取り付けて壁体構造物を補修することが求められる。   Since this type of wall structure is constructed in a place where debris flow or the like is expected, it is often exposed to a harsh natural environment and used for a long period of time. For this reason, the front material and the rear material may be deformed due to deformation of the terrain and aging, or the fixing portion with the frame body may be damaged, and the front material and the rear material may be detached from the frame body. When the front material and the rear material are detached from the frame, the outflow of the filling material filled in the steel frame is assumed. To prevent the filling material from flowing out, repair the wall structure by reattaching the front or rear material to the frame when the front or rear material is detached from the frame. It is required to do.

しかし、上記特許文献1に開示された壁体構造物を構築する際には、たとえば工場などで製造された鋼製枠を構築現場に搬入して規定の位置に設置し、順次中詰め材を充填しながら、隣接する鋼製枠を設置する。この作業を繰り返して複数の鋼製枠を並設して壁体構造物を構築する。   However, when constructing the wall structure disclosed in Patent Document 1, for example, a steel frame manufactured in a factory or the like is brought into the construction site and installed at a specified position, and the filling material is sequentially added. While filling, install an adjacent steel frame. This work is repeated to construct a wall structure by arranging a plurality of steel frames side by side.

このため、構築後の壁体構造物における鋼製枠から前面材または後面材を取り付ける補修を行う際には、壁体構造物が構築された現場で作業を行わなければならない。壁体構造物における鋼製枠はもともと工場等で製造されていることが多いことから、枠体から前面材または後面材が外れた後、再度枠体に前面材または後面材を取り付ける作業は困難なものとなり、補修作業に大きな手間がかかってしまうという問題があった。   For this reason, when performing the repair which attaches a front surface material or a rear surface material from the steel frame in the wall structure after construction, you have to work on the field where the wall structure was constructed. Since steel frames in wall structures are often manufactured at factories, etc., it is difficult to attach the front or rear material to the frame again after the front or rear material is removed from the frame. As a result, there was a problem that the repair work would take a lot of trouble.

そこで、本発明の課題は、枠体から前面体等が外れた際の補修作業を容易に行うことができる壁体構造物およびその補修方法を提供することである。   Accordingly, an object of the present invention is to provide a wall structure and a repair method thereof that can easily perform repair work when a front body or the like is detached from a frame.

上記課題を解決するための本発明に係る壁体構造物は、前面体および後面体を備え、前面体と後面体との間に中詰め材が充填された壁体構造物であって、前面体および後面体の少なくとも一方が、互いに向かい合わせて配置された外枠部材と、向かい合う外枠部材の間に掛け渡された棒状部材と、外枠部材に棒状部材を固定する固定部材と、を備え、外枠部材における棒状部材が配置された側にフランジが形成されており、固定部材は、フランジにはめ込まれたクリップナットと、クリップナットにおけるナット部に締め付けられたボルトと、を有して構成されていることを特徴とする。   A wall structure according to the present invention for solving the above problems is a wall structure that includes a front body and a rear body, and is filled with a filling material between the front body and the rear body. An outer frame member in which at least one of the body and the rear body is arranged to face each other, a rod-shaped member that is spanned between the opposed outer frame members, and a fixing member that fixes the rod-shaped member to the outer frame member A flange is formed on a side of the outer frame member on which the rod-like member is disposed, and the fixing member has a clip nut fitted into the flange and a bolt fastened to the nut portion of the clip nut. It is configured.

本発明に係る壁体構造物においては、外枠部材に棒状部材が固定されて前面体または後面体が設けられている。壁体構造物は、構築後、厳しい自然環境にさらされることが少なくなく、前面体や後面体から棒状部材が外れてしまうことがある。前面体などから棒状部材が外れてしまった場合、これを補修して新たに外枠部材に棒状部材を取り付けることが求められる。このため、たとえば外枠部材の内側にナットを配置し、外枠部材の外側からボルトをねじ込んで外枠部材に棒状部材を固定することが考えられる。ところが、外枠部材の内側には中詰め材が充填されていることから、外枠部材の内側に作業員が手を入れるなどの作業が困難であり、外枠部材の内側にボルトを配置しておくのが難しかった。   In the wall structure according to the present invention, a rod-like member is fixed to the outer frame member, and a front body or a rear body is provided. The wall structure is often exposed to a harsh natural environment after construction, and the rod-shaped member may come off from the front body and the rear body. When the rod-like member is detached from the front body or the like, it is required to repair it and newly attach the rod-like member to the outer frame member. For this reason, for example, it is conceivable that a nut is disposed inside the outer frame member, and a bolt is screwed from the outside of the outer frame member to fix the rod-shaped member to the outer frame member. However, since the inside of the outer frame member is filled with filling material, it is difficult for an operator to put a hand inside the outer frame member, and bolts are arranged inside the outer frame member. It was difficult to keep.

この点、本発明に係る壁体構造物においては、外枠部材に形成されたフランジにはめ込まれるクリップナットを備えている。クリップナットは、構築後の壁体構造物に対しても容易に取り付けることができるため、クリップナットのクリップ部分をフランジにはめ込んでおくことで、ナットを配置することができる。したがって、作業員がナットを持って配置する必要がなく、外枠部材の内側でボルトを配置できるので、外枠部材に棒状部材を取り付ける作業を容易に行うことができる。よって、外枠部材から前面材などの棒状部材が外れた際の補修作業を行う際の手間を軽減することができる。   In this regard, the wall structure according to the present invention includes a clip nut that is fitted into a flange formed on the outer frame member. Since the clip nut can be easily attached to the wall structure after construction, the nut can be arranged by fitting the clip portion of the clip nut into the flange. Therefore, it is not necessary for the worker to arrange with a nut, and the bolt can be arranged inside the outer frame member. Therefore, the operation of attaching the rod-shaped member to the outer frame member can be easily performed. Therefore, the trouble at the time of repair work when the rod-like member such as the front member is detached from the outer frame member can be reduced.

ここで、棒状部材における外枠部材側端部に、ボルトが貫通する貫通孔が形成された取付プレートが取り付けられており、ボルトの頭部とクリップナットにおけるナット部とによって、フランジと取付プレートを挟んで締め付けることで、外枠部材と棒状部材とが固定されている態様とすることができる。   Here, a mounting plate having a through hole through which a bolt passes is attached to the outer frame member side end of the rod-shaped member, and the flange and the mounting plate are connected by the bolt head and the nut portion of the clip nut. It can be set as the aspect by which the outer frame member and the rod-shaped member are being fixed by pinching and pinching.

このように、ボルトが貫通する貫通孔が形成された取付プレートが棒状部材の外枠部材側端部に取り付けられていることにより、棒状部材を固定する際に、ボルトとナットで締め付ける部分の厚みを薄くできる。したがって、棒状部材を外枠部材に対して強固に固定することができる。   Thus, the thickness of the portion to be tightened with the bolt and nut when fixing the rod-shaped member by attaching the mounting plate in which the through-hole through which the bolt passes is attached to the outer frame member side end of the rod-shaped member. Can be thinned. Therefore, the rod-shaped member can be firmly fixed to the outer frame member.

また、取付プレートに形成された貫通孔が、棒状部材の延在方向に沿った長孔である態様とすることができる。   Moreover, the through-hole formed in the attachment plate can be set as the aspect which is a long hole along the extension direction of a rod-shaped member.

このように、取付プレートに形成された貫通孔が、棒状部材の延在方向に沿った長孔であることにより、貫通孔にボルトを貫通させる際のズレを許容できるので、その分外枠部材に対する棒状部材の取付にかかる手間を軽減することができる。さらには、長孔が棒状部材の延在方向に沿っているので、棒状部材が取り付けられた後において、その長手方向への微少な移動を許容することができる。したがって、棒状部材が外枠部材から外れにくくなるようにすることができる。   As described above, since the through hole formed in the mounting plate is a long hole along the extending direction of the rod-like member, it is possible to allow a shift when the bolt is passed through the through hole, and accordingly, the outer frame member. It is possible to reduce the time and effort required for attaching the rod-shaped member to the. Furthermore, since the elongated hole is along the extending direction of the rod-shaped member, a slight movement in the longitudinal direction can be allowed after the rod-shaped member is attached. Therefore, it is possible to make it difficult for the rod-shaped member to be detached from the outer frame member.

他方、上記課題を解決した本発明に係る壁体構造物の製造方法は、前面体および後面体を備え、前面体と後面体との間に中詰め材が充填された壁体構造物における前面体および後面体の少なくとも一方が、互いに向かい合わせて配置された外枠部材と、向かい合う外枠部材の間に掛け渡された棒状部材と、外枠部材に棒状部材を固定する固定部材と、を備える壁体構造物の補修方法であって、外枠部材の棒状部材側に形成されたフランジにクリップナットをはめ込み、クリップナットにおけるナット部にボルトを締め付けることで、外枠部材と棒状部材とを固定することを特徴とする。   On the other hand, the manufacturing method of the wall structure according to the present invention that has solved the above-described problems includes a front surface and a rear surface, and the front surface of the wall structure that is filled with filling material between the front surface and the rear surface. An outer frame member in which at least one of the body and the rear body is arranged to face each other, a rod-shaped member that is spanned between the opposed outer frame members, and a fixing member that fixes the rod-shaped member to the outer frame member A method for repairing a wall structure comprising a clip nut fitted into a flange formed on a rod-like member side of an outer frame member, and tightening a bolt on a nut portion of the clip nut, whereby the outer frame member and the rod-like member are It is fixed.

このように、本発明によれば、枠体から前面体等が外れた際の補修作業を容易に行うことができる壁体構造物およびその補修方法を提供することができる。   Thus, according to the present invention, it is possible to provide a wall structure and a repair method thereof that can easily perform repair work when the front body and the like are detached from the frame.

堰堤に用いられる鋼製枠の斜視図である。It is a perspective view of the steel frame used for a dam. 堰堤の斜視図である。It is a perspective view of a dam. 鋼製枠の要部拡大図である。It is a principal part enlarged view of a steel frame. 鋼製枠の側面図である。It is a side view of a steel frame. 鋼製枠の補修手順を説明する説明図である。It is explanatory drawing explaining the repair procedure of steel frames. 図5に続く手順を説明する説明図である。It is explanatory drawing explaining the procedure following FIG. (a)は、図6(a)の工程の正面図、(b)は、(a)の工程の側断面図である。(A) is a front view of the process of Fig.6 (a), (b) is a sectional side view of the process of (a).

以下、本発明の好適な実施形態について、図面を参照して説明する。図1は本発明の実施形態に係る堰堤に用いられる鋼製枠の斜視図、図2は堰堤の斜視図である。また、図3は鋼製枠の要部拡大図、図4は鋼製枠の側面図である。   Preferred embodiments of the present invention will be described below with reference to the drawings. FIG. 1 is a perspective view of a steel frame used for a dam according to an embodiment of the present invention, and FIG. 2 is a perspective view of the dam. 3 is an enlarged view of the main part of the steel frame, and FIG. 4 is a side view of the steel frame.

図1に示すように、本実施形態に係る鋼製枠Wは、前面体1および後面体2を備えている。鋼製枠Wは、図2に示す堰堤Xに用いられるものであり、前面体1は、堰堤Xにおける下流側に配置され、後面体2は上流側に配置される。また、図2に示すように、複数の面体および枠体が上下左右に適宜並設されて、堰堤Xが形成される。なお、堰堤Xに設定される鋼製枠としては、図1に示す形状のもののほか、種々の形状のものがあり、種々の形状の鋼製枠が組み合わされて堰堤Xが形成される。   As shown in FIG. 1, the steel frame W according to the present embodiment includes a front body 1 and a rear body 2. The steel frame W is used for the dam X shown in FIG. 2, and the front body 1 is disposed on the downstream side of the dam X, and the rear body 2 is disposed on the upstream side. Further, as shown in FIG. 2, a plurality of face bodies and a frame body are appropriately arranged in the vertical and horizontal directions, and the dam X is formed. In addition to the shape shown in FIG. 1, the steel frame set for the dam X includes various shapes, and the dam X is formed by combining various shapes of steel frames.

鋼製枠Wにおける前面体1と後面体2とのそれぞれ上部は、上面体3を介して接続されており、前面体1と後面体2とのそれぞれ下部は、底面体4を介して接続されている。さらに、前面体1と後面体2とのそれぞれの高さ方向中央位置には、長尺状のつなぎ材Tが掛け渡されている。また、前面体1とつなぎ材Tとの間、底面体4とつなぎ材Tとの間には、それぞれ斜め材Nが配置されている。   Each upper part of the front body 1 and the rear body 2 in the steel frame W is connected via the upper surface body 3, and each lower part of the front body 1 and the rear body 2 is connected via the bottom body 4. ing. Further, a long connecting material T is stretched over the center positions of the front body 1 and the rear body 2 in the height direction. In addition, diagonal materials N are disposed between the front body 1 and the connecting material T and between the bottom surface body 4 and the connecting material T, respectively.

前面体1は、高さ方向に延在する長尺状のフレーム材11および横方向に延在する長尺状のビーム材12を備えている。ビーム材12は、上段、中段、および下段にそれぞれ配置されている。また、フレーム材11は、ビーム材12の端部同士を結んで、左中右にそれぞれ配置されている。なお、以下の説明では、上中下段のビーム材12をそれぞれ上ビーム材12U、中ビーム材12M、および下ビーム材12Lともいう。また、これらのビーム材12U,12M,12Lが本発明の外枠部材となる。   The front body 1 includes a long frame material 11 extending in the height direction and a long beam material 12 extending in the lateral direction. The beam members 12 are arranged on the upper, middle, and lower stages, respectively. Further, the frame material 11 is arranged at the left middle right by connecting the ends of the beam material 12 to each other. In the following description, the upper, lower, and lower beam members 12 are also referred to as an upper beam member 12U, a middle beam member 12M, and a lower beam member 12L, respectively. Further, these beam members 12U, 12M, and 12L are the outer frame members of the present invention.

また、フレーム材11とビーム材12とが重なり合う位置には、ジョイント13が設けられており、フレーム材11およびビーム材12の端部同士がそれぞれジョイント13によって接合されている。さらに、上ビーム材12Uの下面には下方に立ち下がる立下フランジ12Aが形成され、中ビーム材12Mの上面には、上方向に立ち上がる立上フランジ12Bが形成されている。同様に、中ビーム材12Mの下面には下方に立ち下がる立下フランジ12Cが形成され、下ビーム材12Lの上面には、上方向に立ち上がる立上フランジ12Dが形成されている。   Further, a joint 13 is provided at a position where the frame material 11 and the beam material 12 overlap each other, and ends of the frame material 11 and the beam material 12 are joined to each other by the joint 13. Further, a falling flange 12A is formed on the lower surface of the upper beam member 12U. A rising flange 12B is formed on the upper surface of the middle beam member 12M. Similarly, a falling flange 12C that falls downward is formed on the lower surface of the middle beam member 12M, and a rising flange 12D that rises upward is formed on the upper surface of the lower beam member 12L.

さらに、上ビーム材12Uと中ビーム材12Mとの間、および中ビーム材12Mと下ビーム材12Lとの間には、それぞれ棒状部材である前面材14が掛け渡されている。前面材14の上下端部には、それぞれ貫通孔が形成され、図3に示すように、ビーム材12におけるフランジ12C,12Dにおける前面材14の取付位置にもそれぞれ貫通孔12C1,12D1がそれぞれ形成されている。なお、図示はしないが、フランジ12A,12Bにも、同様の貫通孔が形成されている。これらの前面材14およびビーム材12のフランジ12Aに形成された貫通孔12A1〜12D1をピンが貫通し、ピンの両端に抜け止めを形成し、さらには溶接が施されることでビーム材12U,12M,12Lのフランジ12A〜12Dに前面材14が固定されている。なお、本実施形態における棒状部材は、断面形状が略U型である略U形鋼としているが、本発明の棒状部材は、略U形鋼に限定されるものではなく、丸鋼、異型棒鋼、形鋼、鋼管であってもよい。   Further, a front member 14 which is a rod-like member is stretched between the upper beam member 12U and the middle beam member 12M and between the middle beam member 12M and the lower beam member 12L. Through holes are formed in the upper and lower ends of the front member 14, and as shown in FIG. 3, through holes 12C1 and 12D1 are also formed in the mounting positions of the front member 14 on the flanges 12C and 12D of the beam member 12, respectively. Has been. Although not shown, similar through holes are formed in the flanges 12A and 12B. The pins penetrate through the through holes 12A1 to 12D1 formed in the front member 14 and the flange 12A of the beam member 12, form stoppers at both ends of the pin, and are further welded so that the beam member 12U, A front member 14 is fixed to the flanges 12A to 12D of 12M and 12L. In addition, although the rod-shaped member in this embodiment is made into the substantially U-shaped steel whose cross-sectional shape is a substantially U shape, the rod-shaped member of this invention is not limited to a substantially U-shaped steel, Round steel, atypical steel bar It may be a shape steel or a steel pipe.

前面材14は、長尺状の部材であり、フレーム材11と略平行配置されている。また、前面材14は、1組のビーム材12に対して複数本配設されている。これらの前面材14は、互いに平行に配置されるとともに、ビーム材12の長手方向に対して略等間隔をおいて配置されている。   The front member 14 is a long member and is arranged substantially in parallel with the frame member 11. Further, a plurality of front members 14 are arranged for one set of beam members 12. These front members 14 are arranged in parallel to each other, and are arranged at substantially equal intervals with respect to the longitudinal direction of the beam member 12.

さらに、前面体1における上下方向に離間するビーム材12同士の間には、複数本の前面材14の他、数本の補修前面材50が取り付けられている。補修前面材50は、構築された堰堤Xにおいて、数本の前面材14が破損した後、その破損した前面材14の代わりにビーム材12同士の間に現場で取り付けられたものである。   Further, several repair front members 50 are attached between the beam members 12 spaced apart in the vertical direction in the front body 1 in addition to the plurality of front members 14. The repair front material 50 is attached in the field between the beam materials 12 instead of the damaged front material 14 after several front materials 14 are damaged in the constructed dam X.

補修前面材50は、図3に示すように、棒状部51を備えており、棒状部51の両端には、それぞれ取付プレート52、52が溶接されて固定されている。また、取付プレート52には、ボルト貫通孔53が形成されている。ボルト貫通孔53には、ボルト54が貫通している。このボルト貫通孔53は、棒状部51の延在方向に沿った長孔とされている。   As shown in FIG. 3, the repair front material 50 includes a rod-shaped portion 51, and attachment plates 52 and 52 are welded and fixed to both ends of the rod-shaped portion 51, respectively. In addition, a bolt through hole 53 is formed in the mounting plate 52. Bolts 54 pass through the bolt through holes 53. The bolt through hole 53 is a long hole along the extending direction of the rod-like portion 51.

さらに、ビーム材12におけるフランジ12A〜12Dの補修前面材50が取り付けられている位置には、それぞれクリップナット60が取り付けられている。クリップナット60は、クリップ部61を備えており、クリップ部61における略中央部分にナット部62が設けられている。また、クリップ部61におけるナット部62が設けられた位置には貫通孔63が形成されている。   Furthermore, the clip nut 60 is attached to the position where the repair front material 50 of the flanges 12 </ b> A to 12 </ b> D in the beam material 12 is attached. The clip nut 60 includes a clip portion 61, and a nut portion 62 is provided at a substantially central portion of the clip portion 61. A through hole 63 is formed at a position where the nut portion 62 is provided in the clip portion 61.

ボルト54のねじ部は、クリップナット60におけるナット部62に締め付けられている。このボルト54の頭部とクリップナット60のナット部62によって取付プレート52がクリップ部61に締め付けられている。こうして、補修前面材50がクリップナット60を介してビーム材12のフランジ12A〜12Dに固定されている。   The screw portion of the bolt 54 is fastened to the nut portion 62 of the clip nut 60. The mounting plate 52 is fastened to the clip portion 61 by the head of the bolt 54 and the nut portion 62 of the clip nut 60. Thus, the repair front material 50 is fixed to the flanges 12 </ b> A to 12 </ b> D of the beam material 12 through the clip nut 60.

後面体2は、前面体1と同様のフレーム材21およびビーム材22を備えている。また、フレーム材21とビーム材22とが重なり合う部分には、ジョイント23が設けられており、フレーム材21およびビーム材22の端部同士がジョイント23で接合されている。さらに、上下に併設されて2本のビーム材22同士の間には、後面材24が配設されている。フレーム材21、ビーム材22、ジョイント23、および後面材24の配置態様は、前面体1のフレーム材11、ビーム材12、ジョイント13、および前面材14の配置態様と同様である。   The rear surface body 2 includes the same frame material 21 and beam material 22 as the front surface body 1. Further, a joint 23 is provided at a portion where the frame material 21 and the beam material 22 overlap each other, and ends of the frame material 21 and the beam material 22 are joined by the joint 23. Further, a rear surface member 24 is disposed between the two beam members 22 that are provided side by side. The arrangement mode of the frame material 21, the beam material 22, the joint 23, and the rear surface material 24 is the same as the arrangement mode of the frame material 11, the beam material 12, the joint 13, and the front surface material 14 of the front body 1.

上面体3は、前面体1および後面体2の上側にそれぞれ配置された上ビーム材12U,22Uの間にそれぞれ掛け渡された複数本の上面材31を備えている。これらの複数の上面材31は、いずれも鋼製であり、ビーム材12の長手方向に対して略等間隔をおいて配置されている。   The upper surface body 3 includes a plurality of upper surface materials 31 that are respectively spanned between the upper beam members 12U and 22U that are respectively arranged on the upper side of the front surface body 1 and the rear surface body 2. The plurality of upper surface materials 31 are all made of steel and are arranged at substantially equal intervals with respect to the longitudinal direction of the beam material 12.

底面体4は、前面体1および後面体2の下側にそれぞれ配置された下ビーム材12L,22Lに平行に配置された長尺状の幅方向部材41を備えている。幅方向部材41は、前面体1および後面体2の下側にそれぞれ配置された下ビーム材12L,22Lの略中央位置に配置されている。また、下ビーム材12L,22Lと幅方向部材41との間には、長尺状の奥行き方向部材42が配設されている。   The bottom surface body 4 includes a long width direction member 41 disposed in parallel to the lower beam members 12L and 22L disposed below the front surface body 1 and the rear surface body 2, respectively. The width direction member 41 is disposed at substantially the center position of the lower beam members 12L and 22L disposed on the lower side of the front body 1 and the rear body 2, respectively. In addition, an elongated depth direction member 42 is disposed between the lower beam members 12 </ b> L and 22 </ b> L and the width direction member 41.

さらに、隣接する奥行き方向部材42同士の間には、図示しない長尺状の底面材が複数本配設されている。底面材は、互い略等間隔で配置されており、前面体1の下ビーム材12Lと幅方向部材41との間、および後面体2の下ビーム材22Lと幅方向部材41との間に掛け渡されて配設されている。   Further, a plurality of long bottom materials (not shown) are disposed between adjacent depth direction members 42. The bottom surface materials are arranged at substantially equal intervals, and are hung between the lower beam material 12L of the front body 1 and the width direction member 41 and between the lower beam material 22L of the rear surface body 2 and the width direction member 41. It is delivered and arranged.

また、鋼製枠Wの内側には、図4に示すように、中詰め材Cが設けられている。中詰め材Cは、たとえば現地発生土砂や小礫材(15cm未満の礫)などによって構成されている。中詰め材Cは、堰堤Xの組立てが進むにつれて鋼製枠Wの内側に投入され、最終的に鋼製枠Wの内側に充填される。前面体1における隣接する前面材14または補修前面材50同士の離間距離および、後面体2における隣接する後面材24同士の離間距離は、それぞれ中詰め材Cが流出しない程度の幅とされている。   Moreover, as shown in FIG. 4, the filling material C is provided inside the steel frame W. As shown in FIG. The filling material C is composed of, for example, locally generated earth and sand, pebbles (gravels less than 15 cm), and the like. As the assembling of the dam X proceeds, the filling material C is introduced into the steel frame W and finally filled into the steel frame W. The separation distance between adjacent front members 14 or repair front members 50 in the front body 1 and the separation distance between adjacent rear members 24 in the rear body 2 are such widths that the filling material C does not flow out. .

これらの前面体1、後面体2、上面体3、および底面体4に囲まれて形成される鋼製枠Wは、図2に示すように、複数併設されて堰堤Xとなる。当該堰堤Xの面材は、中詰め材Cの圧力(土圧)に耐えうる必要があるため、下方に配置される面体の方が、上方に配置される面体よりも前面材14同士の離間幅が狭くされており、上方からかかる荷重を支えている。   As shown in FIG. 2, a plurality of steel frames W formed by being surrounded by the front body 1, the rear body 2, the top body 3, and the bottom body 4 are provided as a dam X. Since the face material of the dam X needs to be able to withstand the pressure (earth pressure) of the filling material C, the face member disposed below is more separated from the front member 14 than the face member disposed above. The width is narrowed to support the load applied from above.

このような堰堤Xは、土石流の発生などが想定される傾斜地など、厳しい自然にさらされる環境に構築され、長期間にわたって使用される。このため、地形の変形や経年劣化によって前面材14が変形し、あるいはビーム材12,22との固定箇所が破損等して、前面材14がビーム材12から外れてしまうことがある。この問題は、後面体2における後面材24とビーム材22との間に対しても同様に起こりえる。なお、前面材14や後面材24が外れてしまった状態であっても、中詰め材Cは礫の噛み合いなどによって一時的に安定状態にあるため、直ぐに中詰め材Cが流出することはない。   Such a dam X is constructed in an environment exposed to harsh nature, such as an inclined land where the occurrence of debris flow is assumed, and is used over a long period of time. For this reason, the front member 14 may be detached from the beam member 12 because the front member 14 is deformed due to deformation of the terrain or aging, or the fixing portions with the beam members 12 and 22 are damaged. This problem can also occur between the rear face member 24 and the beam member 22 in the rear face body 2. Even when the front member 14 and the rear member 24 are detached, the filling material C is temporarily in a stable state due to the engagement of gravel, and therefore the filling material C does not flow out immediately. .

ただし、このように前面材14や後面材24がビーム材12,22から外れてしまった状態が長期にわたると、中詰め材Cは雨水などの影響を受けて安定状態が崩れるため、鋼製枠Wから漸次流出し、鋼製枠体の自重による安定性に影響を及ぼす懸念がある。こうした懸念を払拭するために、ビーム材12等のフランジ12A〜12Dから前面材14が外れた場合には、その外れた位置に、補修前面材50などを取り付けて、鋼製枠Wの修復を図る。こうした修復を行うことで、鋼製枠Wの機能を長期間にわたって維持できるようにしている。   However, if the state in which the front member 14 and the rear member 24 are detached from the beam members 12 and 22 for a long period of time as described above, the filling member C is affected by rainwater and the stable state is lost. There is concern that it will gradually flow out of W and affect the stability due to the weight of the steel frame. In order to eliminate such a concern, when the front member 14 is detached from the flanges 12A to 12D such as the beam member 12, the repair front member 50 is attached to the removed member 14 to repair the steel frame W. Plan. By performing such repair, the function of the steel frame W can be maintained over a long period of time.

ここで、たとえば、鋼製枠Wの補修時、鋼製枠Wの施工時と同様に破損した前面材14などに代えて新たに前面材14などを取り付けることが考えられる。しかし、鋼製枠Wの補修は、鋼製枠Wが構築された現場で行われるため、鋼製枠Wを施工する際と同様に前面材14をビーム材12に取り付けるためには、ビーム材12,22にボルトを溶接しておくなど、鋼製枠Wが構築された現場で溶接を行う必要が生じ、その溶接を行うための準備に大きな手間が掛かる。   Here, for example, when repairing the steel frame W, it may be possible to attach a new front material 14 or the like instead of the damaged front material 14 or the like in the construction of the steel frame W. However, since the repair of the steel frame W is performed at the site where the steel frame W is constructed, in order to attach the front material 14 to the beam material 12 in the same manner as when the steel frame W is constructed, the beam material is used. For example, it is necessary to perform welding at the site where the steel frame W is constructed, such as welding bolts 12 and 22, and much preparation is required for the welding.

また、ビーム材12,12に対してボルトナットを用いて前面材14を固定することも考えられる。しかしその場合、鋼製枠Wの外側からナットを支えながら取付作業を行う必要が生じる。このため、フランジ12A〜12Dの裏側に作業員の手などを差し込んでナットを支えなければならず、その手間が非常に大きくなる。   It is also conceivable to fix the front member 14 to the beam members 12 and 12 using bolts and nuts. However, in that case, it is necessary to perform the mounting operation while supporting the nut from the outside of the steel frame W. For this reason, an operator's hand etc. must be inserted in the back side of flange 12A-12D, and a nut must be supported, and the effort becomes very large.

この点、本実施形態では、鋼製枠Wの補修に当たって、前面材14ではなく補修前面材50を用いている。この補修前面材50では、ボルト54がねじ込まれるナットとしてクリップナット60におけるナット部62が用いられている。このため、ボルト54をナット部62にねじ込む際には、ナット部62を作業員が支える必要がなくなるので、補修前面材50の取付作業は容易となり、鋼製枠Wの補修作業にかかる手間を軽減することができる。   In this respect, in the present embodiment, the repair front material 50 is used instead of the front material 14 in repairing the steel frame W. In the repair front material 50, the nut portion 62 of the clip nut 60 is used as a nut into which the bolt 54 is screwed. For this reason, when the bolt 54 is screwed into the nut portion 62, it is not necessary for the operator to support the nut portion 62, so that the repair front member 50 can be easily attached, and the labor required for the repair work of the steel frame W can be reduced. Can be reduced.

続いて、本実施形態に係る鋼製枠Wの補修方法について、図5等を参照して説明する。図5は、鋼製枠の補修手順を説明する説明図、図6は、図5に続く手順を説明する説明図である。鋼製枠Wを長期間設置した状態とすると、図5(a)に示すように、前面体1におけるビーム材12に取り付けられた前面材14が破損したり、あるいは前面材14が外れたりすることがある。同様に、後面体2における後面材24が破損したり、ビーム材22から外れたりすることがある。これらの修復を前面材14の修復を例として説明する。   Then, the repair method of the steel frame W which concerns on this embodiment is demonstrated with reference to FIG. FIG. 5 is an explanatory diagram for explaining the repair procedure of the steel frame, and FIG. 6 is an explanatory diagram for explaining the procedure following FIG. When the steel frame W is installed for a long period of time, as shown in FIG. 5A, the front member 14 attached to the beam member 12 in the front body 1 is damaged or the front member 14 is detached. Sometimes. Similarly, the rear surface member 24 in the rear surface body 2 may be damaged or detached from the beam material 22. These restorations will be described by taking the restoration of the front member 14 as an example.

鋼製枠Wの補修を開始する際には、図3に示す補修前面材50をビーム材12における補修箇所に取り付ける。そのため、図5(a)に示すように、ビーム材12に破損した前面材14の一部がビーム材12に固定された状態のままとなっている場合には、ビーム材12から破損した前面材14を取り外す。すると、図5(b)に示すように、ビーム材12M,12Lにおけるフランジ12C,12Dに前面材14が取り付けられていない状態となる。また、ビーム材12の周囲に前面材14がある場合には、その前面材14を除去する。さらに、前面材14を固定していたボルトがフランジ12C,12Dに残っている場合には、このボルトも合わせて除去する。   When the repair of the steel frame W is started, the repair front material 50 shown in FIG. 3 is attached to the repair site in the beam material 12. Therefore, as shown in FIG. 5A, when a part of the front material 14 damaged by the beam material 12 remains fixed to the beam material 12, the front surface damaged from the beam material 12 is obtained. Remove the material 14. Then, as shown in FIG. 5B, the front member 14 is not attached to the flanges 12C and 12D of the beam members 12M and 12L. Further, when the front member 14 is present around the beam member 12, the front member 14 is removed. Further, when the bolt that has fixed the front member 14 remains on the flanges 12C and 12D, the bolt is also removed.

次に、この前面材14が取り付けられていた箇所に、図3に示す補修前面材50を取り付ける。そのため、まず、図6(a)および図7(a)に示すように、ビーム材12Mのフランジ12Cにクリップナット60を取り付ける。このとき、クリップナット60に形成された貫通孔63を、フランジ12C,12Dに形成された貫通孔12C1,12D1に合わせる位置でクリップナット60の位置決めを行う。また、クリップナット60におけるナット部62は、フランジ12C,12Dの内側に配置しておく。このとき、クリップナット60のクリップ部61をビーム材12M,12Lのフランジ12C,12Dにはめ込むだけでクリップナット60をビーム材12M,12Lに取り付けることができる。   Next, the repair front material 50 shown in FIG. 3 is attached to the place where the front material 14 was attached. Therefore, first, as shown in FIGS. 6A and 7A, the clip nut 60 is attached to the flange 12C of the beam material 12M. At this time, the clip nut 60 is positioned at a position where the through hole 63 formed in the clip nut 60 is aligned with the through holes 12C1 and 12D1 formed in the flanges 12C and 12D. Moreover, the nut part 62 in the clip nut 60 is arrange | positioned inside flange 12C, 12D. At this time, the clip nut 60 can be attached to the beam members 12M and 12L simply by fitting the clip portion 61 of the clip nut 60 into the flanges 12C and 12D of the beam members 12M and 12L.

こうしてクリップナット60を取り付けたら、図6(b)および図7(b)に示すように、補修前面材50の取付プレート52,52をそれぞれクリップナット60におけるクリップ部61に位置合わせする。このとき、取付プレート52,52に形成されたボルト貫通孔53と、クリップナット60のクリップ部61に形成された貫通孔63が略同心状となるように取付プレート52を配置する。   When the clip nut 60 is thus attached, the attachment plates 52 and 52 of the repair front material 50 are aligned with the clip portion 61 of the clip nut 60, as shown in FIGS. 6B and 7B. At this time, the mounting plate 52 is arranged so that the bolt through holes 53 formed in the mounting plates 52 and 52 and the through holes 63 formed in the clip portion 61 of the clip nut 60 are substantially concentric.

取付プレート52,52の配置が済んだら、中ビーム材12Mのフランジ12Cの外側からボルト貫通孔53に向けてボルト54のねじ部を挿入する。ボルト貫通孔53から挿入されたボルトのねじ部は、クリップナット60におけるナット部62に当接するので、そのままボルト54を回転させてボルト54をナット部62にねじ込んでいく。   After the mounting plates 52 and 52 are arranged, the thread portion of the bolt 54 is inserted from the outside of the flange 12C of the intermediate beam member 12M toward the bolt through hole 53. Since the screw portion of the bolt inserted from the bolt through hole 53 contacts the nut portion 62 of the clip nut 60, the bolt 54 is rotated as it is and the bolt 54 is screwed into the nut portion 62.

このとき、ナット部62はクリップ部61に固定されているので、ボルト54を回転させる際にボルト54とともに供回りすることが抑制される。このため、作業員等が鋼製枠Wの外側からナット部62を支えていなくても、ボルト54をナット部62にねじ込んでいくことができる。こうして、ボルト54をナット部62にねじ込んでいくことにより、ボルト54の頭部とナット部62によって、補修前面材50の取付プレート52、クリップナット60のクリップ部61、およびフランジ12Aを挟み込んで、補修前面材50の上部を中ビーム材12Mに対して固定する。   At this time, since the nut portion 62 is fixed to the clip portion 61, it is suppressed that the nut portion 62 is rotated together with the bolt 54 when the bolt 54 is rotated. For this reason, even if an operator or the like does not support the nut portion 62 from the outside of the steel frame W, the bolt 54 can be screwed into the nut portion 62. Thus, by screwing the bolt 54 into the nut portion 62, the mounting plate 52 of the repair front material 50, the clip portion 61 of the clip nut 60, and the flange 12A are sandwiched between the head portion of the bolt 54 and the nut portion 62. The upper part of the repair front material 50 is fixed to the middle beam material 12M.

補修前面材50の上部を中ビーム材12Mに対して固定したら、続いて、補修前面材50の下部を下ビーム材12Lに対して固定する。補修前面材50の下部を下ビーム材12Lに固定する手順は、補修前面材50の上部を中ビーム材12Mに固定する手順とほぼ同様である。こうして、補修前面材50を取り付けることによる補修作業が終了する。   After the upper part of the repair front member 50 is fixed to the middle beam member 12M, the lower part of the repair front member 50 is fixed to the lower beam member 12L. The procedure for fixing the lower portion of the repair front material 50 to the lower beam material 12L is substantially the same as the procedure for fixing the upper portion of the repair front material 50 to the middle beam material 12M. Thus, the repair work by attaching the repair front material 50 is completed.

このように、本実施形態に係る鋼製枠Wの補修方法においては、前面材14が破損した鋼製枠Wの補修を行うにあたり、破損した前面材14に代えて補修前面材50を用いている。また、後面材24が破損した場合にも、補修前面材50と同様の補修後面材を用いて鋼製枠Wの補修を行うようにしている。補修前面材50を用いた補修を行うにあたり、ビーム材12M,12Lには、クリップナット60を予め取り付けている。この予め取り付けられたクリップナット60を用いることにより、ボルト54を用いて補修前面材50をビーム材12M,12Lに取り付ける際、ビーム材12M,12Lのフランジ12Cの裏側に位置するナットを作業員などが支持している必要がなくなる。したがって、補修前面材50の取付作業を鋼製枠Wの外側のみから行うことができ、施工の手間を軽減することができる。   Thus, in the repair method of the steel frame W according to the present embodiment, when repairing the steel frame W in which the front material 14 is damaged, the repair front material 50 is used instead of the damaged front material 14. Yes. Further, even when the rear face member 24 is damaged, the steel frame W is repaired using the repaired rear face member similar to the repair front member 50. When performing repair using the repair front material 50, clip nuts 60 are attached in advance to the beam materials 12M and 12L. When the repair front member 50 is attached to the beam members 12M and 12L using the bolt 54 by using the clip nut 60 attached in advance, a nut positioned on the back side of the flange 12C of the beam members 12M and 12L is used as an operator. No longer need to support. Therefore, the attachment work of the repair front material 50 can be performed only from the outside of the steel frame W, and the labor of construction can be reduced.

また、クリップナット60におけるナット部62は、ビーム材12M,12Lにおけるフランジ12Cの裏側に配置されている。また、補修前面材50は取付プレート52を介しているため、ボルト54の頭部とナット部62でクリップナット60のクリップ部61およびビーム材12M,12Lのフランジ12C、および取付プレート52を挟んで補修前面材50をビーム材12に固定している。したがって、ボルト54とナット部62で締め付ける部分の厚みを薄くできるので、補修前面材50をビーム材12に対して強固に固定することができる。   Moreover, the nut part 62 in the clip nut 60 is arrange | positioned at the back side of the flange 12C in beam material 12M, 12L. Further, since the repair front material 50 is provided with the mounting plate 52, the head portion of the bolt 54 and the nut portion 62 sandwich the clip portion 61 of the clip nut 60, the flanges 12C of the beam members 12M and 12L, and the mounting plate 52. The repair front material 50 is fixed to the beam material 12. Therefore, since the thickness of the part fastened by the bolt 54 and the nut part 62 can be reduced, the repair front material 50 can be firmly fixed to the beam material 12.

さらに、補修前面材50の取付プレート52に形成されたボルト貫通孔53は、棒状部51の延在方向に沿った長孔とされている。このため、ボルト貫通孔53にボルト54を貫通させる際のズレを許容できるので、その分ビーム材12に対する補修前面材50の取付にかかる手間を軽減することができる。さらには、貫通孔63の長手方向が棒状部51の延在方向に沿っているので、棒状部51がビーム材12M,12L取り付けられた後において、その長手方向への微少な移動を許容することができる。したがって、補修前面材50がビーム材12から外れにくくなるようにすることができる。   Further, the bolt through hole 53 formed in the attachment plate 52 of the repair front material 50 is a long hole along the extending direction of the rod-like portion 51. For this reason, since the shift | offset | difference at the time of making the volt | bolt 54 penetrate to the volt | bolt through-hole 53 can be accept | permitted, the effort concerning attachment of the repair front material 50 with respect to the beam material 12 can be reduced. Furthermore, since the longitudinal direction of the through-hole 63 is along the extending direction of the rod-shaped portion 51, a slight movement in the longitudinal direction is allowed after the rod-shaped portion 51 is attached to the beam members 12M and 12L. Can do. Therefore, it is possible to make it difficult for the repair front material 50 to be detached from the beam material 12.

以上、本発明の一実施形態について説明したが、本発明は上記実施形態に限定されるものではない。たとえば、上記実施形態では、補修前面材50の上下双方において、クリップナット60を介して補修前面材50を固定している。これに対して、補修前面材50の一方について、クリップナット60を介した補修前面材50を固定する態様とすることもできる。この場合、クリップナット60を介して固定した側と反対側の端部については、たとえば取付プレート52に代えて、ビーム材12のフランジ12Cにはめ込み可能なスリットを形成したはめ込み部材で固定することもできる。このようなはめ込み部材を用いることで、クリップナットを用いる必要がなくなり、部品点数の削減に寄与することができる。また、ボルト留めなどの作業が不要になるので、取付作業の手間の軽減にもつながる。   Although one embodiment of the present invention has been described above, the present invention is not limited to the above embodiment. For example, in the above embodiment, the repair front material 50 is fixed via the clip nut 60 on both the upper and lower sides of the repair front material 50. On the other hand, it can also be set as the aspect which fixes the repair front material 50 via the clip nut 60 about one side of the repair front material 50. FIG. In this case, the end opposite to the side fixed through the clip nut 60 may be fixed by a fitting member in which a slit that can be fitted into the flange 12C of the beam member 12 is formed instead of the mounting plate 52, for example. it can. By using such a fitting member, it is not necessary to use a clip nut, which can contribute to a reduction in the number of parts. In addition, since work such as bolting is not necessary, it is possible to reduce the labor of mounting work.

また、上記実施形態では、前面材14や後面材24に代えて補修前面材(補修後面材)を用いるようにしているが、上面体3の上面材31などについても同様の補修材を用いることができる。さらに、上記実施形態では、ビーム材12におけるフランジ12Cにはあらかじめボルトを貫通させる貫通孔12C1が形成されているが、この貫通孔が形成されていないビーム材におけるフランジにクリップナットを用いて補修前面材などを取り付ける態様とすることもできる。この場合、クリップナットにおけるクリップ部にフランジと重ならない余剰部を形成し、この余剰部にボルトを貫通させる貫通孔を形成する態様とすることができる。あるいは、現場でフランジに貫通孔を形成してからクリップナットを取り付ける態様とすることもできる。   Moreover, in the said embodiment, it replaces with the front material 14 and the rear surface material 24, but it is made to use a repair front material (surface material after repair), but the same repair material is used also about the upper surface material 31 of the upper surface body 3, etc. Can do. Furthermore, in the said embodiment, although the through-hole 12C1 which penetrates a volt | bolt is beforehand formed in the flange 12C in the beam material 12, it uses a clip nut for the flange in the beam material in which this through-hole is not formed, and repairs front surface. It can also be set as the aspect which attaches material etc. In this case, it is possible to form a surplus portion that does not overlap the flange in the clip portion of the clip nut, and to form a through hole through which the bolt penetrates in the surplus portion. Or it can also be set as the aspect which attaches a clip nut after forming a through-hole in a flange in the field.

1…前面体
2…後面体
3…上面体
4…底面体
5…エキスパンドメタル
11…フレーム材
12…ビーム材
12U…上ビーム材
12M…中ビーム材
12L…下ビーム材
13…ジョイント
14…前面材
21…フレーム材
22…ビーム材
23…ジョイント
24…後面材
41…幅方向部材
42…奥行き方向部材
50…補修前面材
51…棒状部
52…取付プレート
53…ボルト貫通孔
54…ボルト
60…クリップナット
61…クリップ部
62…ナット部
63…貫通孔
C…中詰め材
W…鋼製枠
X…堰堤
DESCRIPTION OF SYMBOLS 1 ... Front body 2 ... Rear surface body 3 ... Top surface body 4 ... Bottom body 5 ... Expand metal 11 ... Frame material 12 ... Beam material 12U ... Upper beam material 12M ... Middle beam material 12L ... Lower beam material 13 ... Joint 14 ... Front material DESCRIPTION OF SYMBOLS 21 ... Frame material 22 ... Beam material 23 ... Joint 24 ... Rear surface material 41 ... Width direction member 42 ... Depth direction member 50 ... Repair front material 51 ... Rod-shaped part 52 ... Mounting plate 53 ... Bolt through-hole 54 ... Bolt 60 ... Clip nut 61 ... Clip part 62 ... Nut part 63 ... Through hole C ... Filling material W ... Steel frame X ... Weir

Claims (2)

前面体および後面体を備え、前記前面体と前記後面体との間に中詰め材が充填された壁体構造物であって、
前記前面体および後面体の少なくとも一方が、
互いに向かい合わせて配置された外枠部材と、
向かい合う前記外枠部材の間に掛け渡された棒状部材と、
前記外枠部材に前記棒状部材を固定する固定部材と、を備え、
前記外枠部材における前記棒状部材が配置された側にフランジが形成されており、
前記固定部材は、前記フランジにはめ込まれたクリップナットと、前記クリップナットにおけるナット部に締め付けられたボルトと、を有して構成されており、
前記棒状部材における前記外枠部材側端部に、前記ボルトが貫通する貫通孔が形成された取付プレートが取り付けられており、
前記ボルトの頭部と前記クリップナットにおける前記ナット部とによって、前記フランジと前記取付プレートを挟んで締め付けることで、前記外枠部材と前記棒状部材とが固定されており、
前記取付プレートに形成された貫通孔が、前記棒状部材の延在方向に沿った長孔である、ことを特徴とする壁体構造物。
A wall structure including a front body and a rear body, and filled with a filling material between the front body and the rear body,
At least one of the front body and the rear body is
Outer frame members arranged facing each other;
A rod-shaped member spanned between the outer frame members facing each other;
A fixing member for fixing the rod-shaped member to the outer frame member,
A flange is formed on the side of the outer frame member where the rod-shaped member is disposed,
The fixing member includes a clip nut fitted into the flange, and a bolt fastened to a nut portion of the clip nut ,
A mounting plate in which a through-hole through which the bolt passes is formed is attached to the outer frame member side end of the rod-shaped member,
The outer frame member and the rod-shaped member are fixed by clamping the flange and the mounting plate by the nut portion of the bolt and the nut portion of the clip nut,
The wall structure , wherein the through hole formed in the mounting plate is a long hole along the extending direction of the rod-shaped member .
前面体および後面体を備え、前記前面体と前記後面体との間に中詰め材が充填された壁体構造物における前記前面体および後面体の少なくとも一方が、
互いに向かい合わせて配置された外枠部材と、
向かい合う前記外枠部材の間に掛け渡された棒状部材と、
前記外枠部材に前記棒状部材を固定する固定部材と、を備える壁体構造物の補修方法であって、
前記外枠部材の前記棒状部材側に形成されたフランジにクリップナットをはめ込み、
前記クリップナットにおけるナット部にボルトを締め付けることで、前記外枠部材と前記棒状部材とを固定することを特徴とする壁体構造物の補修方法。
At least one of the front body and the rear body in a wall structure including a front body and a rear body and filled with a filling material between the front body and the rear body,
Outer frame members arranged facing each other;
A rod-shaped member spanned between the outer frame members facing each other;
A fixing member for fixing the rod-shaped member to the outer frame member, and a repair method for a wall structure,
Fit a clip nut to the flange formed on the rod-like member side of the outer frame member,
A method of repairing a wall structure, wherein the outer frame member and the rod-shaped member are fixed by tightening a bolt to a nut portion of the clip nut.
JP2015111486A 2015-06-01 2015-06-01 Wall structure and repair method thereof Active JP6574338B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015111486A JP6574338B2 (en) 2015-06-01 2015-06-01 Wall structure and repair method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015111486A JP6574338B2 (en) 2015-06-01 2015-06-01 Wall structure and repair method thereof

Publications (2)

Publication Number Publication Date
JP2016223191A JP2016223191A (en) 2016-12-28
JP6574338B2 true JP6574338B2 (en) 2019-09-11

Family

ID=57747620

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015111486A Active JP6574338B2 (en) 2015-06-01 2015-06-01 Wall structure and repair method thereof

Country Status (1)

Country Link
JP (1) JP6574338B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2023151579A (en) * 2022-03-31 2023-10-16 Jfe建材株式会社 Method of constructing steel frames, civil engineering structures and civil engineering structures

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5280630A (en) * 1975-12-26 1977-07-06 Nittetsu Kinzoku Kogyo Kk Method of laying box frame made of steel
JPS5599397U (en) * 1978-12-29 1980-07-10
JPH0645689Y2 (en) * 1990-01-19 1994-11-24 株式会社日立ビルシステムサービス Crisp nut
JP3612356B2 (en) * 1995-01-30 2005-01-19 ランデス株式会社 Installation structure of concrete formwork
JP4400807B2 (en) * 2000-08-18 2010-01-20 一般社団法人音・環境保全技術研究会 Y-type noise barrier
JP4412572B2 (en) * 2001-02-21 2010-02-10 株式会社インバックス Exterior wall unit, concrete structure and construction method of the same structure
JP5268833B2 (en) * 2009-08-31 2013-08-21 日鐵住金建材株式会社 Steel joining method and structure
JP5823318B2 (en) * 2012-03-06 2015-11-25 日鐵住金建材株式会社 Repair structure for filling structure and protector mounting bracket used therefor
JP5975917B2 (en) * 2013-03-26 2016-08-23 Jfe建材株式会社 Wall structure

Also Published As

Publication number Publication date
JP2016223191A (en) 2016-12-28

Similar Documents

Publication Publication Date Title
JP5946041B2 (en) Column beam connection structure, column beam connection method, and precast concrete stigma member
JP5278982B1 (en) Formwork apparatus for prismatic concrete structure and construction method using the same
JP6829631B2 (en) Construction method of column base, reinforcement method of existing column base
JP5975917B2 (en) Wall structure
JP5888796B2 (en) Gantry
KR20120131996A (en) Structure of temporary installation for land-side protection wall, and construction method thereof
JP6574338B2 (en) Wall structure and repair method thereof
JP2018091099A (en) Reinforcing metal fitting for concrete bridge pier, reinforcing tool for concrete bridge pier and construction method for reinforcing concrete bridge pier
JP5989597B2 (en) Temporary seismic structure and its construction method during construction of seismic isolation for existing frame
KR20180026286A (en) Grid precast concrete structure and constructing method thereof
JP2017008603A (en) Formwork
JP6432786B2 (en) Beam material load bearing structure and beam material repair method
JP5143526B2 (en) Building column base structure
KR20180135656A (en) Aseismatic Reinforcement Steel Frame with Anchor Plate and Aseismatic Reinforcement Method using thereof
JP2016089549A (en) Structure and method for joining reinforced concrete beam and steel column or column comprising steel column
JP6782887B2 (en) Aperture reinforcement unit
JP6717636B2 (en) Vibration control device
JP6286737B2 (en) Fixed structure of floor slab panel
JP2015129426A (en) Method and structure for joining reinforced concrete beam to steel column or column with steel frame
JP6491895B2 (en) Reinforcement frame for temporary structures
KR101216127B1 (en) Connection method of column and beam for steel structure using inserting connection apparatus
JP7274992B2 (en) Anchor bolt fixture and anchor frame
JP6102614B2 (en) Building basic structure
WO2018061075A1 (en) Formwork
KR20180001035A (en) Horizontal structural frame and the construction method using them

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20180412

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20190125

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20190304

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20190424

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20190805

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20190816

R150 Certificate of patent or registration of utility model

Ref document number: 6574338

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250