JP6595404B2 - Steel tower foundation concrete form and steel tower foundation concrete construction method - Google Patents
[go: Go Back, main page]

JP6595404B2 - Steel tower foundation concrete form and steel tower foundation concrete construction method - Google Patents

Steel tower foundation concrete form and steel tower foundation concrete construction method Download PDF

Info

Publication number
JP6595404B2
JP6595404B2 JP2016099173A JP2016099173A JP6595404B2 JP 6595404 B2 JP6595404 B2 JP 6595404B2 JP 2016099173 A JP2016099173 A JP 2016099173A JP 2016099173 A JP2016099173 A JP 2016099173A JP 6595404 B2 JP6595404 B2 JP 6595404B2
Authority
JP
Japan
Prior art keywords
formwork
concrete
foundation
steel tower
lid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2016099173A
Other languages
Japanese (ja)
Other versions
JP2017206854A (en
Inventor
亮太 森谷
茂樹 金子
光久 西村
智昭 佐藤
義弘 大津
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nikken Fence and Metal Corp
Original Assignee
Nikken Fence and Metal Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nikken Fence and Metal Corp filed Critical Nikken Fence and Metal Corp
Priority to JP2016099173A priority Critical patent/JP6595404B2/en
Publication of JP2017206854A publication Critical patent/JP2017206854A/en
Application granted granted Critical
Publication of JP6595404B2 publication Critical patent/JP6595404B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Description

本発明は、鉄塔基礎コンクリート用型枠および鉄塔基礎コンクリート施工方法に関する。   The present invention relates to a steel tower foundation concrete form and a steel tower foundation concrete construction method.

従来、送電線基礎コンクリートの打設を行う際は、ベースコンクリートを打設してベース部Aを設けた後、ベース上に柱体型枠を設置し、柱体型枠の内部にコンクリートを投入して柱体部を設けていた。しかし、ベース部Aと柱体部の打ち継ぎ部分に不純物が混入する可能性があることから、打ち継ぎ構造を回避することを目的として、ベース部Aと柱体部の基礎部を同時にコンクリート打設する技術が開発されている(例えば、特許文献1参照)。   Conventionally, when placing the power line foundation concrete, after placing the base concrete and providing the base part A, the column body formwork is installed on the base, and the concrete is put into the column body formwork. A column body was provided. However, since impurities may be mixed in the joint portion between the base portion A and the column body portion, the base portion A and the base portion of the column body portion are simultaneously placed into the concrete for the purpose of avoiding the joint structure. The technique to install is developed (for example, refer patent document 1).

特開平11−61853号公報Japanese Patent Laid-Open No. 11-61853

しかしながら、従来、ベース部Aと柱体部の打設は、ベース部Aを養生して固化させた後に柱体部の打設を行うため、日をおいて別々の日に行っていた。特許文献1に示す技術でも、ベース部Aと柱体部の基礎部を同時にコンクリート打設した後、柱体部の上部型枠を積載して柱体部の上部のコンクリート打設を行うため、柱体部の基礎部と上部の打設は別々の日に行われる。   However, conventionally, the base part A and the columnar part are placed on separate days in order to place the columnar part after the base part A is cured and solidified. Even in the technique shown in Patent Document 1, after placing the base portion A and the base portion of the column body portion into the concrete at the same time, the upper formwork of the column body portion is loaded and the concrete is placed on the upper portion of the column body portion. The foundation and upper part of the column are placed on different days.

このため、ベース部Aまたはベース部Aと柱体部の基礎部の養生期間を要し、施工に日数がかかるという課題があった。また、山間部の現場でヘリコプターにより資材を運んでコンクリート打設を行う際は、天候悪化等による作業中止や作業工程の変化をしばしば余儀なくされ、それによってヘリコプターの手配など様々な経費の増加が生じるという課題があった。   For this reason, the curing period of the base part A or the base part A and the base part of the column body part was required, and there was a problem that the construction took days. Also, when carrying concrete with a helicopter at the site in a mountainous area, it is often necessary to cancel the work due to bad weather, etc., or to change the work process, thereby increasing various expenses such as arranging a helicopter There was a problem.

本発明は、このような課題に着目してなされたもので、施工期間の短縮と経費削減を図ることができる鉄塔基礎コンクリート用型枠および鉄塔基礎コンクリート施工方法を提供することを目的としている。   This invention was made paying attention to such a subject, and it aims at providing the steel tower foundation concrete formwork and the steel tower foundation concrete construction method which can aim at shortening of a construction period and cost reduction.

上記目的を達成するために、本発明に係る鉄塔基礎コンクリート用型枠は、下端部が基礎設置用穴の底部に配置されて縦方向に伸びる主脚材の周囲に設けられる鉄塔基礎コンクリート用型枠であって、前記主脚材の下端部を包囲するよう前記基礎設置用穴の底部に設けられる型枠受架台と、前記型枠受架台の上部に前記主脚材を包囲するよう設けられる柱体型枠と、前記型枠受架台の上部と前記基礎設置用穴の内壁部とで支持され、前記型枠受架台の上部と前記内壁部との間で前記基礎設置用穴を塞ぐ蓋材とを、有することを特徴とする。   In order to achieve the above object, a steel tower foundation concrete mold according to the present invention is a steel tower foundation concrete mold provided at the bottom of a main leg extending in the vertical direction with the lower end portion arranged at the bottom of a hole for foundation installation. A frame support base provided at the bottom of the foundation mounting hole so as to surround a lower end portion of the main leg member; and a main frame member provided so as to surround the main leg member at an upper portion of the mold base support. A lid member that is supported by a columnar formwork, an upper portion of the formwork support and an inner wall portion of the foundation installation hole, and closes the foundation installation hole between the upper portion of the formwork support and the inner wall portion. It is characterized by having.

本発明に係る鉄塔基礎コンクリート施工方法は、基礎設置用穴を形成する工程と、前記基礎設置用穴の底部に主脚材の下端部を配置し、前記主脚材を縦方向に伸びるよう設置する工程と、前記主脚材の下端部を包囲するよう前記基礎設置用穴の底部に型枠受架台を設置する工程と、前記型枠受架台の上部に前記主脚材を包囲するよう柱体型枠を設ける工程と、蓋材を前記型枠受架台の上部と前記基礎設置用穴の内壁部とで支持し、コンクリート打設口を開けて前記蓋材により前記型枠受架台の上部と前記内壁部との間で前記基礎設置用穴を塞ぐ工程と、前記基礎設置用穴の内部に前記コンクリート打設口から前記蓋材の高さまでコンクリートを打設する工程と、前記柱体型枠の内部にコンクリートを打設する工程とを、有することを特徴とする。
打設したコンクリートが固化後は、打設したコンクリートから蓋材および柱体型枠を取り外す。
The steel tower foundation concrete construction method according to the present invention includes a step of forming a hole for foundation installation, a lower end portion of a main leg material disposed at the bottom of the hole for foundation installation, and the main leg material is installed to extend in a vertical direction. A step of installing a formwork stand at the bottom of the foundation installation hole so as to surround a lower end portion of the main leg member, and a column surrounding the main leg member at an upper portion of the formwork stand. A step of providing a body frame, a lid material supported by an upper part of the mold frame support base and an inner wall portion of the foundation installation hole, a concrete placement opening is opened, and the upper part of the mold frame support base is formed by the lid material. A step of closing the foundation installation hole between the inner wall portion, a step of placing concrete from the concrete placement opening to the height of the lid member in the foundation installation hole, and And a step of placing concrete inside. .
After the cast concrete is solidified, the lid member and the column form are removed from the cast concrete.

本発明に係る鉄塔基礎コンクリート用型枠および鉄塔基礎コンクリート施工方法では、蓋材が型枠受架台の上部と内壁部との間で基礎設置用穴を塞ぎ、型枠受架台の上部に柱体型枠が設けられるので、基礎設置用穴の内部に蓋材の高さまでコンクリートを打設した後すぐに、柱体型枠の内部にコンクリートを打設することができる。このため、柱体部のコンクリート打設にベース部Aの固化を待つ必要がないので、施工期間を短縮することができる。   In the steel tower foundation concrete formwork and steel tower foundation concrete construction method according to the present invention, the lid material closes the foundation installation hole between the upper part of the formwork cradle and the inner wall part, and the columnar mold is formed on the upper part of the formwork cradle. Since the frame is provided, the concrete can be placed inside the columnar formwork immediately after the concrete is placed up to the height of the lid material inside the hole for foundation installation. For this reason, since it is not necessary to wait for solidification of the base part A for the concrete placement of the columnar part, the construction period can be shortened.

また、山間部の現場でヘリコプターにより資材を運んでコンクリート打設を行う際にも、ベース部Aのコンクリート打設と柱体部のコンクリート打設を1度に行うことができるので、ヘリコプターによる空輸回数が減少し、経費削減を図ることができる。   In addition, when carrying concrete with a helicopter on the site in a mountainous area, it is possible to perform concrete placement in the base part A and concrete placement in the column body at one time, so air transportation by helicopter The number of times can be reduced and the cost can be reduced.

本発明に係る鉄塔基礎コンクリート用型枠において、前記蓋材は複数の分割蓋を横方向に着脱可能に連結して成り、各分割蓋は複数の通水孔を有することが好ましい。
この場合、任意の分割蓋を外してコンクリート打設口を設け、基礎設置用穴の内部へのコンクリート打設を容易にすることができる。また、蓋材を複数の分割蓋に分けることにより、蓋材の運搬を容易にすることができる。複数の分割蓋は着脱可能に連結されるため、ベース部Aの造成後は取り外して再利用しやすい。各分割蓋は複数の通水孔を有するので、ベース部Aのコンクリートの養生中の水・空気を通水孔から逃がすことができる。通水孔からベース部Aのコンクリートの打設状況を確認することもできる。
蓋材は、作業員がその上に乗って作業できる強度を有することが好ましい。通水孔を有する分割蓋は、パンチングメタルから成ることが好ましい。
In the steel tower foundation concrete form according to the present invention, it is preferable that the lid member is formed by detachably connecting a plurality of divided lids in the lateral direction, and each divided lid has a plurality of water passage holes.
In this case, it is possible to remove the optional divided lid and provide a concrete placement opening to facilitate the placement of the concrete into the foundation installation hole. In addition, the lid material can be easily transported by dividing the lid material into a plurality of divided lids. Since the plurality of divided lids are detachably connected, it is easy to remove and reuse after the base portion A is formed. Since each divided lid has a plurality of water passage holes, water / air can be escaped from the water holes during curing of the concrete of the base portion A. It is also possible to confirm the concrete placement condition of the base part A from the water passage hole.
It is preferable that the lid member has a strength that allows an operator to work on the lid member. It is preferable that the division | segmentation lid | cover which has a water flow hole consists of punching metal.

本発明に係る鉄塔基礎コンクリート用型枠は、蓋固定部材を有し、前記基礎設置用穴は内壁部にライナープレートを有し、前記ライナープレートは内周にフランジ状の継目を有し、前記蓋固定部材は上端に前記継目に着脱可能に取り付けられる上端取付部を有し、下端に前記蓋材に着脱可能に取り付けられる下端取付部を有することが好ましい。
この場合、蓋固定部材により、蓋材を基礎設置用穴の内壁部のライナープレートに固定することができる。このため、蓋材の固定を確実にすることができる。蓋固定部材は、ライナープレートおよび蓋材から取り外して再利用することができる。
The formwork for steel tower foundation concrete according to the present invention has a lid fixing member, the foundation installation hole has a liner plate on an inner wall portion, the liner plate has a flange-like seam on the inner periphery, It is preferable that the lid fixing member has an upper end attachment portion that is detachably attached to the joint at the upper end, and a lower end attachment portion that is detachably attached to the lid member at the lower end.
In this case, the lid member can be secured to the liner plate on the inner wall portion of the foundation installation hole by the lid fixing member. For this reason, fixation of a cover material can be ensured. The lid fixing member can be removed from the liner plate and the lid member and reused.

本発明に係る鉄塔基礎コンクリート用型枠において、前記型枠受架台は3本以上の脚部と支持枠とを有し、前記支持枠は各脚部の上部に高さ調節可能かつ着脱可能に取り付けられ、前記柱体型枠は前記支持枠に着脱可能に取り付けられることが好ましい。
この場合、支持枠は、各脚部の位置の高さを調節することにより、水平になるよう調節することができる。
In the formwork for steel tower foundation concrete according to the present invention, the formwork stand has three or more legs and a support frame, and the height of the support frame is adjustable and detachable at the upper part of each leg. It is attached, and it is preferred that the pillar form frame is detachably attached to the support frame.
In this case, the support frame can be adjusted to be horizontal by adjusting the height of the position of each leg.

本発明によれば、施工期間の短縮と経費削減を図ることができる鉄塔基礎コンクリート用型枠および鉄塔基礎コンクリート施工方法を提供することができる。   ADVANTAGE OF THE INVENTION According to this invention, the formwork for steel tower foundation concrete and the steel tower foundation concrete construction method which can aim at shortening of a construction period and cost reduction can be provided.

本発明の実施の形態の鉄塔基礎コンクリート用型枠の使用状態を示す断面図である。It is sectional drawing which shows the use condition of the steel tower foundation concrete formwork of embodiment of this invention. 本発明の実施の形態の鉄塔基礎コンクリート施工方法の主脚材および碇材の据付・配筋工程を示す斜視図である。It is a perspective view which shows the installation / bar arrangement process of the main leg material of a steel tower foundation concrete construction method of embodiment of this invention, and a brazing material. 本発明の実施の形態の鉄塔基礎コンクリート用型枠に用いられる(A)型枠受架台の脚部の斜視図、(B)型枠受架台の支持枠の斜視図、(C)蓋材の斜視図、(D)蓋材を構成する分割蓋の平面図、(E)蓋固定部材の正面図である。(A) A perspective view of a leg portion of a formwork cradle used for a steel tower foundation concrete form according to an embodiment of the present invention, (B) a perspective view of a support frame of the formwork cradle, and (C) a lid material It is a perspective view, (D) The top view of the division | segmentation lid | cover which comprises a cover material, (E) The front view of a lid | cover fixing member. 本発明の実施の形態の鉄塔基礎コンクリート施工方法の型枠受架台の組立・据付工程を示す斜視図である。It is a perspective view which shows the assembly and installation process of the formwork stand of the steel tower foundation concrete construction method of embodiment of this invention. 本発明の実施の形態の鉄塔基礎コンクリート施工方法の柱体型枠の最下段の据付工程を示す斜視図である。It is a perspective view which shows the installation process of the lowest step of the column formwork of the steel tower foundation concrete construction method of embodiment of this invention. 本発明の実施の形態の鉄塔基礎コンクリート用型枠の型枠受架台の支持枠と柱体型枠との固定状態を示す断面図である。It is sectional drawing which shows the fixed state of the support frame of the form support stand of the tower foundation concrete form of the embodiment of this invention, and a column body formwork. 本発明の実施の形態の鉄塔基礎コンクリート施工方法の柱体型枠の上段の据付工程を示す斜視図である。It is a perspective view which shows the installation process of the upper stage of the column-form frame of the steel tower foundation concrete construction method of embodiment of this invention. 本発明の実施の形態の鉄塔基礎コンクリート施工方法の蓋材の取付工程を示す斜視図である。It is a perspective view which shows the attachment process of the cover material of the steel tower foundation concrete construction method of embodiment of this invention. 本発明の実施の形態の鉄塔基礎コンクリート施工方法の蓋材に蓋固定部材を取り付ける工程を示す斜視図である。It is a perspective view which shows the process of attaching a cover fixing member to the cover material of the steel tower foundation concrete construction method of embodiment of this invention. 本発明の実施の形態の鉄塔基礎コンクリート用型枠の蓋固定部材の使用状態を示す断面図である。It is sectional drawing which shows the use condition of the cover fixing member of the steel tower foundation concrete formwork of embodiment of this invention. 本発明の実施の形態の鉄塔基礎コンクリート施工方法のベース部Aのコンクリート打設工程を示す斜視図である。It is a perspective view which shows the concrete placement process of the base part A of the steel tower foundation concrete construction method of embodiment of this invention. 本発明の実施の形態の鉄塔基礎コンクリート施工方法の(A)柱体部のコンクリート打設工程を示す斜視図,(B)柱体部のコンクリート打設時の締固め状態を示す断面図である。BRIEF DESCRIPTION OF THE DRAWINGS (A) The perspective view which shows the concrete placement process of the pillar part of the steel tower foundation concrete construction method of embodiment of this invention, (B) It is sectional drawing which shows the compaction state at the time of concrete placement of a pillar part . 本発明の実施の形態の鉄塔基礎コンクリート施工方法による脱枠完了状態を示す断面図である。It is sectional drawing which shows the deframed completion state by the steel tower foundation concrete construction method of embodiment of this invention. 本発明の実施の形態の鉄塔基礎コンクリート施工方法により造成された鉄塔基礎コンクリートのベース部Aの一部を示す断面図である。It is sectional drawing which shows a part of base part A of the steel tower foundation concrete constructed | assembled by the steel tower foundation concrete construction method of embodiment of this invention.

以下、図面に基づき、本発明の実施の形態について説明する。
図1に示すように、送電鉄塔基礎コンクリートを造成するとき、まず、基礎設置用穴1を形成する。基礎設置用穴1は円筒状のベース部収容部分1aと円筒状の柱体型枠収容部分1bとから成り、ベース部収容部分1aに対し、柱体型枠収容部分1bの径が大きくなっている。柱体型枠収容部分1bの内壁部には、ライナープレート2が設けられる。ライナープレート2は、高さ方向に間隔をあけて、内周に複数のフランジ状の継目2aを有している。
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
As shown in FIG. 1, when building a power transmission tower foundation concrete, first, a foundation installation hole 1 is formed. The base installation hole 1 includes a cylindrical base portion accommodating portion 1a and a cylindrical columnar frame accommodating portion 1b. The diameter of the columnar frame accommodating portion 1b is larger than the base portion accommodating portion 1a. A liner plate 2 is provided on the inner wall portion of the columnar mold housing portion 1b. The liner plate 2 has a plurality of flange-shaped seams 2a on the inner periphery at intervals in the height direction.

図2に示すように、基礎設置用穴1の底部に主脚材3の下端部を配置し、主脚材3を縦方向に伸びるよう設置する。主脚材3の下端部には、アングル鋼から成る2本の碇材4をT字状に配置してボルトで固定する。主脚材3の周囲に間隔をあけて配筋材5を設ける。   As shown in FIG. 2, the lower end portion of the main leg member 3 is disposed at the bottom of the foundation installation hole 1, and the main leg member 3 is installed so as to extend in the vertical direction. Two ribs 4 made of angle steel are arranged in a T shape at the lower end of the main leg 3 and fixed with bolts. Reinforcing bars 5 are provided around the main leg 3 at intervals.

基礎設置用穴1に鉄塔基礎コンクリート用型枠を設置する。図3および図7に示すように、鉄塔基礎コンクリート用型枠は、型枠受架台10と、柱体型枠20と、蓋材30と、蓋固定部材40とを有している。型枠受架台10の4本の脚部11は、正方形の頂点の位置に配置され、2つのリング状の補強フープ筋12にそれぞれ固定されている。図6に示すように、各脚部11の上端にはボルト状に雄ネジが形成され、調整ナット13および取付ナット14が螺合されている。図4に示すように、主脚材3および基礎設置用穴1の内壁との間に間隔をあけて主脚材3を包囲するよう、基礎設置用穴1の底部に各脚部11を設置する。   The steel tower foundation concrete form is installed in the hole 1 for foundation installation. As shown in FIGS. 3 and 7, the steel tower foundation concrete formwork includes a formwork stand 10, a columnar formwork 20, a lid member 30, and a lid fixing member 40. The four legs 11 of the mold support 10 are arranged at the positions of the apexes of the square, and are fixed to the two ring-shaped reinforcing hoops 12 respectively. As shown in FIG. 6, a male screw is formed in a bolt shape at the upper end of each leg portion 11, and an adjustment nut 13 and a mounting nut 14 are screwed together. As shown in FIG. 4, each leg 11 is installed at the bottom of the foundation installation hole 1 so as to surround the main leg 3 with a space between the main leg 3 and the inner wall of the foundation installation hole 1. To do.

図6に示すように、支持枠15は、断面がF字状のリングから成り、リング状の溝部15aと、溝部15aより内側に突出するフランジ部15bとを有している。溝部15aには、4つのボルト穴15cが形成されている。各ボルト穴15cには各脚部11の上端が挿入され、溝部15aが調整ナット13と取付ナット14とに挟まれて、支持枠15は、各脚部11の上部に高さ調節可能かつ着脱可能に取り付けられている。支持枠15は、各脚部11の位置の高さを調節することにより、水平になるよう調節される。   As shown in FIG. 6, the support frame 15 is formed of a ring having an F-shaped cross section, and includes a ring-shaped groove portion 15 a and a flange portion 15 b that protrudes inward from the groove portion 15 a. Four bolt holes 15c are formed in the groove portion 15a. The upper ends of the respective leg portions 11 are inserted into the respective bolt holes 15c, the groove portions 15a are sandwiched between the adjustment nuts 13 and the mounting nuts 14, and the support frame 15 is adjustable in height at the upper portion of each leg portion 11 and is detachable. It is attached as possible. The support frame 15 is adjusted to be horizontal by adjusting the height of the position of each leg 11.

図5に示すように、型枠受架台10の支持枠15の上に主脚材3との間に間隔をあけて主脚材3を包囲するよう柱体型枠20の最下段21を設ける。柱体型枠20は、図7に示すように、細長い円錐台型筒体から成り、複数の短い円錐台型の筒体型枠22に分割可能となっている。柱体型枠20には、既存品を用いることができる。柱体型枠20の最下段21および各筒体型枠22は、上端および下端に外周側に突出するフランジ23を有している。図6に示すように、最下段21の筒体型枠22は、下側のフランジ23を支持枠15のフランジ部15bの上に載せて固定金具24で挟み、ボルトおよびナットまたはU字クリップによりフランジ部15bに着脱可能に取り付けられる。柱体型枠20の最下段21の位置を調整、確認後、各脚部11の下端台座11aをモルタルで基礎設置用穴1の底部に固定する。   As shown in FIG. 5, the lowermost step 21 of the columnar mold 20 is provided on the support frame 15 of the mold support 10 so as to surround the main leg 3 with a space between the main leg 3. As shown in FIG. 7, the columnar mold 20 is formed of an elongated truncated cone cylinder, and can be divided into a plurality of short truncated cone cylinders 22. An existing product can be used for the columnar formwork 20. The lowermost stage 21 and each cylindrical formwork 22 of the columnar formwork 20 have flanges 23 projecting outward from the upper and lower ends. As shown in FIG. 6, the cylindrical mold 22 in the lowermost stage 21 has a lower flange 23 placed on the flange portion 15b of the support frame 15 and sandwiched between fixing brackets 24, and is flanged with bolts and nuts or U-shaped clips. It is detachably attached to the part 15b. After adjusting and confirming the position of the lowermost stage 21 of the columnar mold 20, the lower pedestal 11a of each leg 11 is fixed to the bottom of the foundation installation hole 1 with mortar.

図8に示すように、蓋材30を型枠受架台10の上部の支持枠15と基礎設置用穴1の内壁部とで支持されるように配置し、蓋材30で型枠受架台10の支持枠15と内壁部との間で基礎設置用穴1を塞ぐ。蓋材30は、複数の分割蓋31を横方向に着脱可能に連結して成る。蓋材30は、複数の分割蓋31に分けられるので、運搬を容易にすることができる。各分割蓋31は、全体に複数の通水孔32を有するリング状の板を半径方向に伸びる複数の直線で分割し、分割された板の周囲を側壁で包囲した形状を有している。通水孔32は、パンチングにより形成される。各分割蓋31は、他の分割蓋31と側壁を重ね合わせ、側壁に設けた複数の取付け孔にU字クリップなどの連結部材を着脱可能に挿入して連結されている。なお、連結部材は、ボルトおよびナットでもよい。   As shown in FIG. 8, the lid member 30 is disposed so as to be supported by the upper support frame 15 of the mold support base 10 and the inner wall portion of the foundation installation hole 1. The foundation installation hole 1 is closed between the support frame 15 and the inner wall. The lid member 30 is formed by detachably connecting a plurality of divided lids 31 in the horizontal direction. Since the lid | cover material 30 is divided | segmented into the some division | segmentation lid | cover 31, it can make it easy to convey. Each divided lid 31 has a shape in which a ring-shaped plate having a plurality of water passage holes 32 is divided by a plurality of straight lines extending in the radial direction, and the periphery of the divided plate is surrounded by side walls. The water passage hole 32 is formed by punching. Each divided lid 31 is connected to another divided lid 31 by overlapping a side wall, and connecting members such as U-shaped clips are detachably inserted into a plurality of mounting holes provided on the side wall. The connecting member may be a bolt and a nut.

図9に示すように、蓋材30は、4箇所で蓋固定部材40によりライナープレート2に取り付けられる。図10に示すように、蓋固定部材40は、細長い棒状であって、上端にライナープレート2の継目2aに着脱可能に取り付けられる上端取付部41を有し、下端に蓋材30に着脱可能に取り付けられる下端取付部42を有する。上端取付部41は、互いに締付け可能な2枚の板材から成り、上下に重なる2つのライナープレート2の継目2aを各板材の間に挟んで締付けることによりライナープレート2に取り付けられる。   As shown in FIG. 9, the lid member 30 is attached to the liner plate 2 by lid fixing members 40 at four locations. As shown in FIG. 10, the lid fixing member 40 has an elongated bar shape, and has an upper end attachment portion 41 that is detachably attached to the joint 2 a of the liner plate 2 at the upper end, and is detachable from the lid member 30 at the lower end. It has the lower end attachment part 42 attached. The upper end mounting portion 41 is composed of two plate materials that can be fastened to each other, and is attached to the liner plate 2 by clamping the joints 2a of the two liner plates 2 that overlap each other between the plate materials.

図3(E)に示すように、下端取付部42は、ボルト穴42aを有する。下端取付部42は、ボルト穴42aと蓋材30の側壁の取付け孔とにボルトを挿入しナットで締付けることにより蓋材30に取り付けられる。蓋固定部材40は、ターンバックル43を有し、長さを調整可能である。蓋材30は、蓋固定部材40により確実に固定され、作業員がその上に乗って作業できる強度を有する。   As shown in FIG. 3 (E), the lower end attachment portion 42 has a bolt hole 42a. The lower end attachment portion 42 is attached to the lid member 30 by inserting a bolt into the bolt hole 42a and the attachment hole on the side wall of the lid member 30 and fastening with a nut. The lid fixing member 40 has a turnbuckle 43 and can be adjusted in length. The lid member 30 is securely fixed by the lid fixing member 40 and has a strength that allows an operator to work on the lid member 30.

数箇所、例えば4箇所の分割蓋31を取り外し、蓋材30の下側の基礎設置用穴1へのコンクリート打設口を開ける。分割蓋31は着脱可能なため、基礎設置用穴1の内部へのコンクリート打設を容易にすることができる。図11に示すように、打設シュート6を設置し、打設シュート6を通してコンクリート打設口7から基礎設置用穴1の内部にコンクリートを打設する。蓋材30の下方に打設されたコンクリートがベース部Aとなる。ベース部Aの打設は、蓋材30の通水孔32からコンクリートがにじみ出る程度まで行う。コンクリート打設後、取り外した分割蓋31を元に戻してコンクリート打設口7を閉じる。蓋材30の通水孔32から溢れ出た水やコンクリートは、除去する。通水孔32からベース部Aのコンクリートの打設状況を確認することもできる。   Several division lids 31 are removed, for example, four places, and a concrete placement opening to the foundation installation hole 1 on the lower side of the lid member 30 is opened. Since the division | segmentation lid | cover 31 can be attached or detached, the concrete placement inside the hole 1 for foundation installation can be made easy. As shown in FIG. 11, the placement chute 6 is installed, and concrete is placed through the placement chute 6 from the concrete placement opening 7 into the foundation installation hole 1. The concrete placed below the lid member 30 becomes the base portion A. The base portion A is placed until the concrete oozes out from the water passage hole 32 of the lid member 30. After the concrete is placed, the removed split lid 31 is returned to the original position, and the concrete placing port 7 is closed. Water and concrete overflowing from the water passage holes 32 of the lid member 30 are removed. It is also possible to confirm the concrete placement state of the base portion A from the water passage hole 32.

図12(A)に示すように、柱体型枠20の上部開口25から内部にコンクリートを打設する。その際、図12(B)に示すように、柱体型枠20の上部開口25から蓋材30の下側のベース部Aのコンクリートまでバイブレータ8を差し込み、コンクリートの締固めを適度に行う。柱体型枠20の内部にコンクリート打設後、養生を行う。このとき、各分割蓋31は複数の通水孔32を有するので、ベース部Aのコンクリートの養生中の水・空気を通水孔32から逃がすことができる。   As shown in FIG. 12 (A), concrete is poured into the inside from the upper opening 25 of the columnar mold 20. At that time, as shown in FIG. 12 (B), the vibrator 8 is inserted from the upper opening 25 of the columnar mold 20 to the concrete of the base portion A on the lower side of the lid member 30, and the concrete is compacted appropriately. Curing is performed after placing the concrete in the columnar formwork 20. At this time, since each divided lid 31 has a plurality of water passage holes 32, the water / air can be escaped from the water holes 32 during curing of the concrete of the base portion A.

図13に示すように、養生期間が終了して打設したコンクリートが固化後、蓋材30および柱体型枠20を打設したコンクリートから取り外す。蓋固定部材40は、ライナープレート2および蓋材30から取り外して再利用することができる。複数の分割蓋31は着脱可能に連結されるため、取り外して再利用しやすい。柱体型枠20も再利用可能である。各脚材の上部から調整ナット13および取付ナット14を取り外したならば、図14に示すように、取り外した後の穴をモルタル9で補修する。
こうして、図13に示す鉄塔基礎コンクリートが完成する。
As shown in FIG. 13, after the curing period is over and the placed concrete is solidified, the lid member 30 and the columnar formwork 20 are removed from the placed concrete. The lid fixing member 40 can be removed from the liner plate 2 and the lid member 30 and reused. Since the plurality of divided lids 31 are detachably connected, they can be easily removed and reused. The column form 20 can also be reused. When the adjusting nut 13 and the mounting nut 14 are removed from the upper part of each leg member, the removed holes are repaired with a mortar 9 as shown in FIG.
In this way, the steel tower foundation concrete shown in FIG. 13 is completed.

本発明の実施の形態の鉄塔基礎コンクリート用型枠および鉄塔基礎コンクリート施工方法では、蓋材30が型枠受架台10の上部と内壁部との間で基礎設置用穴1を塞ぎ、型枠受架台10の上部に柱体型枠20が設けられるので、基礎設置用穴1の内部に蓋材30の高さまでコンクリートを打設した後すぐに、柱体型枠20の内部にコンクリートを打設することができる。このため、柱体部Bのコンクリート打設にベース部Aの固化を待つ必要がないので、施工期間を短縮することができる。また、ベース部Aと柱体部Bとに打継目が発生しないため、鉄塔基礎コンクリートの品質を向上させることができる。   In the steel tower foundation concrete form and the steel tower foundation concrete construction method of the embodiment of the present invention, the lid member 30 closes the foundation installation hole 1 between the upper part of the form support base 10 and the inner wall part, and the form support is received. Since the columnar formwork 20 is provided at the top of the gantry 10, the concrete is placed inside the columnar formwork 20 immediately after the concrete is placed up to the height of the lid 30 inside the hole 1 for foundation installation. Can do. For this reason, since it is not necessary to wait for the solidification of the base part A for the concrete placement of the columnar part B, the construction period can be shortened. Moreover, since a joint is not generated between the base part A and the columnar part B, the quality of the steel tower foundation concrete can be improved.

さらに、山間部の現場でヘリコプターにより資材を運んでコンクリート打設を行う際にも、ベース部Aのコンクリート打設と柱体部Bのコンクリート打設を1度に行うことができるので、ヘリコプターによる空輸回数が減少し、経費削減を図ることができる。   Furthermore, when carrying concrete with a helicopter on the site in a mountainous area, the concrete placement of the base part A and the concrete placement of the columnar part B can be performed at one time. The number of airlifts can be reduced, reducing costs.

1 基礎設置用穴
1a ベース部収容部分
1b ベース部収容部分
2 ライナープレート
2a 継目
3 主脚材
4 碇材
5 配筋材
6 打設シュート
7 コンクリート打設口
8 バイブレータ
9 モルタル
10 型枠受架台
11 脚部
11a 下端台座
12 補強フープ筋
13 調整ナット
14 取付ナット
15 支持枠
15a 溝部
15b フランジ部
15c ボルト穴
20 柱体型枠
21 柱体型枠の最下段
22 筒体型枠
23 フランジ
24 固定金具
25 上部開口
30 蓋材
31 分割蓋
32 通水孔
40 蓋固定部材
41 上端取付部
42 下端取付部
42a ボルト穴
43 ターンバックル
A ベース部
B 柱体部
DESCRIPTION OF SYMBOLS 1 Hole for base installation 1a Base part accommodating part 1b Base part accommodating part 2 Liner plate 2a Joint 3 Main leg material 4 Saddle material 5 Reinforcement material 6 Placing chute 7 Concrete placing port 8 Vibrator 9 Mortar 10 Formwork stand 11 Leg part 11a Bottom pedestal 12 Reinforcement hoop bar 13 Adjustment nut 14 Mounting nut 15 Support frame 15a Groove part 15b Flange part 15c Bolt hole 20 Column body frame 21 Bottom stage of column body mold frame 22 Cylindrical mold frame 23 Flange 24 Fixing bracket 25 Upper opening 30 Lid material 31 Divided lid 32 Water passage hole 40 Lid fixing member 41 Upper end mounting portion 42 Lower end mounting portion 42a Bolt hole 43 Turnbuckle A Base portion B Column body portion

Claims (5)

下端部が基礎設置用穴の底部に配置されて縦方向に伸びる主脚材の周囲に設けられる鉄塔基礎コンクリート用型枠であって、
前記主脚材の下端部を包囲するよう前記基礎設置用穴の底部に設けられる型枠受架台と、
前記型枠受架台の上部に前記主脚材を包囲するよう設けられる柱体型枠と、
前記型枠受架台の上部と前記基礎設置用穴の内壁部とで支持され、前記型枠受架台の上部と前記内壁部との間で前記基礎設置用穴を塞ぐ蓋材とを、
有することを特徴とする鉄塔基礎コンクリート用型枠。
It is a formwork for steel tower foundation concrete provided at the periphery of the main legs that are arranged at the bottom of the hole for foundation installation and extend vertically.
A formwork cradle provided at the bottom of the foundation mounting hole so as to surround the lower end of the main leg,
A columnar formwork provided to surround the main leg material on the upper part of the formwork support;
A lid member that is supported by the upper part of the formwork support and the inner wall part of the hole for foundation installation, and closes the hole for foundation installation between the upper part of the formwork support and the inner wall part,
The formwork for steel tower foundation concrete characterized by having.
前記蓋材は複数の分割蓋を横方向に着脱可能に連結して成り、各分割蓋は複数の通水孔を有することを、特徴とする請求項1記載の鉄塔基礎コンクリート用型枠。   2. The formwork for steel tower foundation concrete according to claim 1, wherein the lid member is formed by detachably connecting a plurality of divided lids in the lateral direction, and each divided lid has a plurality of water passage holes. 蓋固定部材を有し、前記基礎設置用穴は内壁部にライナープレートを有し、前記ライナープレートは内周にフランジ状の継目を有し、前記蓋固定部材は上端に前記継目に着脱可能に取り付けられる上端取付部を有し、下端に前記蓋材に着脱可能に取り付けられる下端取付部を有することを、特徴とする請求項1または2記載の鉄塔基礎コンクリート用型枠。   It has a lid fixing member, the foundation mounting hole has a liner plate on the inner wall, the liner plate has a flange-like seam on the inner periphery, and the lid fixing member is removable at the upper end of the seam The formwork for steel tower foundation concrete according to claim 1 or 2, further comprising a top end mounting portion to be mounted and a bottom end mounting portion detachably mounted to the lid member at a lower end. 前記型枠受架台は3本以上の脚部と支持枠とを有し、前記支持枠は各脚部の上部に高さ調節可能かつ着脱可能に取り付けられ、前記柱体型枠は前記支持枠に着脱可能に取り付けられることを、特徴とする請求項1、2または3記載の鉄塔基礎コンクリート用型枠。   The form cradle has three or more legs and a support frame, and the support frame is detachably attached to the upper part of each leg, and the columnar form frame is attached to the support frame. The formwork for steel tower foundation concrete according to claim 1, 2 or 3, characterized by being detachably attached. 基礎設置用穴を形成する工程と、
前記基礎設置用穴の底部に主脚材の下端部を配置し、前記主脚材を縦方向に伸びるよう設置する工程と、
前記主脚材の下端部を包囲するよう前記基礎設置用穴の底部に型枠受架台を設置する工程と、
前記型枠受架台の上部に前記主脚材を包囲するよう柱体型枠を設ける工程と、
蓋材を前記型枠受架台の上部と前記基礎設置用穴の内壁部とで支持し、コンクリート打設口を開けて前記蓋材により前記型枠受架台の上部と前記内壁部との間で前記基礎設置用穴を塞ぐ工程と、
前記基礎設置用穴の内部に前記コンクリート打設口から前記蓋材の高さまでコンクリートを打設する工程と、
前記柱体型枠の内部にコンクリートを打設する工程とを、
有することを特徴とする鉄塔基礎コンクリート施工方法。
Forming a hole for foundation installation;
Placing the lower end of the main leg at the bottom of the foundation installation hole, and installing the main leg to extend in the vertical direction;
Installing a formwork cradle at the bottom of the foundation installation hole to surround the lower end of the main leg;
Providing a columnar mold so as to surround the main leg material on the upper part of the mold support;
A lid material is supported by the upper part of the formwork cradle and the inner wall part of the foundation mounting hole, and a concrete placement opening is opened between the upper part of the formwork cradle and the inner wall part by the lid material. A step of closing the hole for foundation installation;
Placing concrete from the concrete placement opening to the height of the lid material inside the foundation installation hole;
Placing concrete inside the columnar formwork,
A steel tower foundation concrete construction method characterized by comprising:
JP2016099173A 2016-05-18 2016-05-18 Steel tower foundation concrete form and steel tower foundation concrete construction method Active JP6595404B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016099173A JP6595404B2 (en) 2016-05-18 2016-05-18 Steel tower foundation concrete form and steel tower foundation concrete construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016099173A JP6595404B2 (en) 2016-05-18 2016-05-18 Steel tower foundation concrete form and steel tower foundation concrete construction method

Publications (2)

Publication Number Publication Date
JP2017206854A JP2017206854A (en) 2017-11-24
JP6595404B2 true JP6595404B2 (en) 2019-10-23

Family

ID=60416328

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016099173A Active JP6595404B2 (en) 2016-05-18 2016-05-18 Steel tower foundation concrete form and steel tower foundation concrete construction method

Country Status (1)

Country Link
JP (1) JP6595404B2 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109505304A (en) * 2018-11-13 2019-03-22 青海送变电工程有限公司 A kind of permafrost soil area assembled type base for power transmission line iron tower prefab-form
CN109797773B (en) * 2019-03-11 2023-08-18 浙江大学城市学院 Prefabricated steel structure tower crane foundation cap with freely adjustable angle and position
KR102311110B1 (en) * 2019-12-19 2021-10-08 에스오씨기술지주 주식회사 Structure of the Vertical Sphere for the Cross Sectional Variation and its Construction Method
CN111008426B (en) * 2019-12-20 2020-08-28 国网山西省电力公司晋城供电公司 Method and device for processing thickness of base plate of transmission line tower in goaf
KR102529237B1 (en) * 2021-02-04 2023-05-08 주식회사 케이씨씨글라스 One touch mold

Also Published As

Publication number Publication date
JP2017206854A (en) 2017-11-24

Similar Documents

Publication Publication Date Title
JP6595404B2 (en) Steel tower foundation concrete form and steel tower foundation concrete construction method
CN101813069B (en) Foundation for enabling anchoring of wind turbine tower thereto by means of replaceable through-bolts
KR101852578B1 (en) Segment type arch structure and method for constructing this same
JP6865550B2 (en) How to build silo roof and silo roof structure
JP4448556B1 (en) Existing steel pipe column corrosion prevention reinforcement
US7670084B2 (en) Precasting of fabricated flumes for machining coolant systems
JPH11181795A (en) Machine foundation
US20160376756A1 (en) Precast concrete bridge unit and headwall assembly and method of production
JP2015101823A (en) Positioning member and construction method
CN103882868B (en) Bored concrete pile encloses the unilateral formwork supporting structure and construction method of purlin in going along with sb. to guard him
KR20210068958A (en) Basic column rod fixing system for pricast concrete column
JP2017061803A (en) Positioning jig for pillar anchor bolts and construction method for steel pillar legs
JP6654918B2 (en) Fixing method and joint structure of joint steel frame in composite structure
JP3037912B2 (en) Power transmission tower foundation construction method and pillar formwork
KR101561488B1 (en) Compass type height adjuster for manhole
KR20170026791A (en) Precast panel structure and construction method thereof
CN113356090B (en) Processing method of support cushion stone template of highway bridge
KR101641334B1 (en) Assembly round form and, method for constructing concrete building using this same
JP2015218557A (en) Construction method of concrete beam or slab and form shoring
KR101542045B1 (en) Constructing pier for method and apparatus(WALKING FORM)
JP7174573B2 (en) Method for using filling device and method for manufacturing cement-based member
JP7149744B2 (en) Seismic isolation upper foundation structure, its fabrication method, and seismic isolation foundation construction method
JP3072102U (en) Reinforcing bar jig for pier construction
JP2016132917A (en) Installation method for foundation structure
JP7378861B1 (en) Concrete template and method for manufacturing concrete template

Legal Events

Date Code Title Description
A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20160519

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20181211

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20181212

TRDD Decision of grant or rejection written
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20190918

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20190924

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20190926

R150 Certificate of patent or registration of utility model

Ref document number: 6595404

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250