Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP6629604B2 - Bearing mounting method and holding device used for the method - Google Patents
[go: Go Back, main page]

JP6629604B2 - Bearing mounting method and holding device used for the method - Google Patents

Bearing mounting method and holding device used for the method Download PDF

Info

Publication number
JP6629604B2
JP6629604B2 JP2016012605A JP2016012605A JP6629604B2 JP 6629604 B2 JP6629604 B2 JP 6629604B2 JP 2016012605 A JP2016012605 A JP 2016012605A JP 2016012605 A JP2016012605 A JP 2016012605A JP 6629604 B2 JP6629604 B2 JP 6629604B2
Authority
JP
Japan
Prior art keywords
anchor bolt
cast
cast concrete
post
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2016012605A
Other languages
Japanese (ja)
Other versions
JP2017133202A (en
Inventor
直也 前村
直也 前村
智里 田邊
智里 田邊
崇之 間鍋
崇之 間鍋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Pillar Packing Co Ltd
Original Assignee
Nippon Pillar Packing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Pillar Packing Co Ltd filed Critical Nippon Pillar Packing Co Ltd
Priority to JP2016012605A priority Critical patent/JP6629604B2/en
Publication of JP2017133202A publication Critical patent/JP2017133202A/en
Application granted granted Critical
Publication of JP6629604B2 publication Critical patent/JP6629604B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Description

本発明は、支承の施工方法、及びこれに用いる保持装置に関する。   The present invention relates to a bearing construction method and a holding device used for the method.

従来、構造物を支持する支承を、場所打ちコンクリート杭に定着させるための施工方法として、例えば特許文献1に記載された施工方法が知られている。この施工方法は、以下の手順で行われる。まず、地盤を掘削して掘削孔を形成し、その掘削孔内に上下方向に延びる主筋を配筋する。その際、主筋の上端部には、支承を固定するためのアンカーボルトを一体化する。   BACKGROUND ART Conventionally, as a construction method for fixing a bearing supporting a structure to a cast-in-place concrete pile, for example, a construction method described in Patent Literature 1 is known. This construction method is performed in the following procedure. First, an excavation hole is formed by excavating the ground, and a main bar extending vertically is arranged in the excavation hole. At this time, an anchor bolt for fixing the bearing is integrated with the upper end of the main bar.

次に、掘削孔内に先打ちコンクリートを打設し、上側に余盛りコンクリート部ができるように先打ちコンクリート部を形成する。これにより、アンカーボルトの下部は先打ちコンクリート部に固定される。その後、余盛りコンクリート部をはつり取り、先打ちコンクリート部の上側に後打ちコンクリートを打設して後打ちコンクリート部を形成する。そして、後打ちコンクリート部の上側に支承を設置し、支承の下部をアンカーボルトの上端部に固定する。   Next, pre-cast concrete is poured into the excavation hole, and a pre-cast concrete portion is formed so that an extra concrete portion is formed on the upper side. Thereby, the lower part of the anchor bolt is fixed to the pre-cast concrete part. Thereafter, the excess concrete portion is peeled off, and post-cast concrete is cast on the upper side of the pre-cast concrete portion to form a post-cast concrete portion. Then, a support is installed on the upper side of the post-cast concrete part, and the lower part of the support is fixed to the upper end of the anchor bolt.

特開2001−288744号公報JP 2001-288744 A

上記施工方法では、アンカーボルトは、主筋の上端部に一体化された後、先打ちコンクリート部に固定されるので、先打ちコンクリートを打設する前に、アンカーボルトを、支承を定着させる位置に位置決めしておく必要がある。しかし、先打ちコンクリートの打設前における掘削孔内には、アンカーボルトを一体化した主筋が不安定な状態で配置されているため、アンカーボルトを精度良く位置決めするのが非常に困難であった。このため、従来の施工方法にあっては、場所打ちコンクリート杭に支承を精度良く定着させることができないという問題があった。   In the above construction method, the anchor bolt is integrated with the upper end of the main bar and then fixed to the pre-cast concrete portion. Therefore, before casting the pre-cast concrete, the anchor bolt is set at a position where the bearing is fixed. It needs to be positioned. However, it was very difficult to accurately locate the anchor bolts because the main reinforcement with the anchor bolts was placed in an unstable state in the excavation hole before placing the precast concrete. . For this reason, in the conventional construction method, there was a problem that the bearing could not be accurately fixed to the cast-in-place concrete pile.

本発明はこのような事情に鑑みてなされたものであり、場所打ちコンクリート杭に対して支承を精度良く定着させることができる支承の施工方法、及びこれに用いる保持装置を提供することを目的とする。   The present invention has been made in view of such circumstances, and an object of the present invention is to provide a bearing construction method capable of accurately fixing a bearing to a cast-in-place concrete pile, and a holding device used for the method. I do.

本発明の支承の施工方法は、先打ちコンクリート部の上側に後打ちコンクリート部を形成してなる場所打ちコンクリート杭に、構造物を支持する支承をアンカーボルトにより定着させる施工方法であって、掘削孔に主筋を配筋した状態で、当該掘削孔内に先打ちコンクリートを打設し、上側に余盛り部ができるように前記先打ちコンクリート部を形成する工程と、前記余盛り部を除去し、前記先打ちコンクリート部の上面を露出させる工程と、露出した前記先打ちコンクリート部の上面において、前記アンカーボルトを、前記支承を定着させる位置に位置決めした状態で保持装置を介して保持する工程と、前記アンカーボルトを保持した状態で、前記掘削孔内に後打ちコンクリートを打設して前記後打ちコンクリート部を形成することで、前記アンカーボルトの下部を前記保持装置とともに前記後打ちコンクリート部に固定する工程と、前記後打ちコンクリート部に固定された前記アンカーボルトの上部に前記支承を固定する工程と、を含む。   The construction method of the bearing of the present invention is a construction method in which a support for supporting a structure is anchored by an anchor bolt to a cast-in-place concrete pile formed by forming a post-cast concrete part on the top of a pre-cast concrete part, In the state where the main reinforcement is arranged in the hole, a step of placing precast concrete in the excavation hole, forming the precast concrete portion so that a surplus portion is formed on the upper side, and removing the surplus portion Exposing an upper surface of the precast concrete portion, and holding the anchor bolt via a holding device in a state where the anchor bolt is positioned at a position where the support is fixed on the exposed upper surface of the precast concrete portion. In the state where the anchor bolts are held, by casting a post-cast concrete into the excavation hole to form the post-cast concrete portion, And a step of fixing the concrete portion out after the lower together with the holding device of the anchor bolt, and fixing the bearing to the top of the anchor bolt fixed to the concrete part out after the, the.

上記のように構成された支承の施工方法によれば、余盛り部を除去して露出した先打ちコンクリート部の上面に、アンカーボルトを位置決めした状態で保持装置を介して保持し、この状態から後打ちコンクリートを打設することで、アンカーボルトを後打ちコンクリート部に固定する。これにより、掘削孔内に安定した状態で配置されている先打ちコンクリート部の上面においてアンカーボルトを位置決めすることができる。したがって、従来のようにアンカーボルトを主筋に一体化する場合に比べて、アンカーボルトを精度良く位置決めすることができるので、場所打ちコンクリート杭に対して支承を精度良く定着させることができる。   According to the construction method of the bearing configured as described above, on the upper surface of the precast concrete portion exposed by removing the excess portion, the anchor bolt is positioned and held via the holding device, from this state The anchor bolt is fixed to the post-cast concrete portion by casting the post-cast concrete. Thereby, the anchor bolt can be positioned on the upper surface of the precast concrete portion which is stably arranged in the excavation hole. Therefore, the anchor bolts can be positioned with higher precision than in the case where the anchor bolts are integrated with the main bar as in the related art, so that the bearing can be accurately fixed to the cast-in-place concrete pile.

本発明の保持装置は、上記支承の施工方法に用いる保持装置であって、前記余盛り部を除去して露出した前記先打ちコンクリート部の上面に設置される架台と、前記架台に対して上下方向に位置調整可能に設けられた支持部と、前記支持部上において水平方向に位置調整可能に載置され、前記アンカーボルトを、その長手方向の少なくとも一端部が上側に突出した状態で保持可能な保持部と、を備える。   The holding device of the present invention is a holding device used for the method of mounting the bearing, wherein the mount is disposed on the upper surface of the precast concrete portion which is exposed by removing the extra bank, and A support portion provided so as to be position adjustable in the direction, and placed on the support portion so as to be position adjustable in the horizontal direction, and capable of holding the anchor bolt in a state where at least one end in the longitudinal direction thereof projects upward. Holding section.

上記のように構成された保持装置によれば、余盛り部を除去して露出した先打ちコンクリート部の上面に架台を設置し、その架台に対して支持部を上下方向に位置調整するとともに、アンカーボルトを保持した保持部を支持部に対して水平方向に位置調整することで、アンカーボルトを上下方向及び水平方向に位置決めすることができる。これにより、掘削孔内に安定した状態で配置されている先打ちコンクリート部の上面においてアンカーボルトを位置決めすることができる。したがって、従来のようにアンカーボルトを主筋に一体化する場合に比べて、アンカーボルトを精度良く位置決めすることができるので、場所打ちコンクリート杭に対して支承を精度良く定着させることができる。   According to the holding device configured as described above, the gantry is installed on the upper surface of the exposed precast concrete portion by removing the excess portion, and the support is vertically adjusted with respect to the gantry, By adjusting the position of the holding part holding the anchor bolt in the horizontal direction with respect to the support part, the anchor bolt can be positioned in the vertical and horizontal directions. Thereby, the anchor bolt can be positioned on the upper surface of the precast concrete portion which is stably arranged in the excavation hole. Therefore, the anchor bolts can be positioned with higher precision than in the case where the anchor bolts are integrated with the main bar as in the related art, so that the bearing can be accurately fixed to the cast-in-place concrete pile.

本発明によれば、場所打ちコンクリート杭に対して支承を精度良く定着させることができる。   ADVANTAGE OF THE INVENTION According to this invention, a bearing can be fixed to a cast-in-place concrete pile accurately.

本発明の一実施形態に係る支承の施工方法に用いられる保持装置の側面図である。It is a side view of the holding device used for the construction method of the bearing which concerns on one Embodiment of this invention. 本発明の一実施形態に係る支承の施工方法を示す側断面図であり、先打ちコンクリート部を形成する工程を示している。It is a sectional side view which shows the construction method of the bearing which concerns on one Embodiment of this invention, and has shown the process of forming a precast concrete part. 余盛り部を除去して先打ちコンクリート部の上面を露出させる工程を示す側断面図である。It is a sectional side view which shows the process of exposing the upper surface of a pre-cast concrete part by removing a surplus part. 先打ちコンクリート部の上面に保持装置の架台を載置する工程を示す側断面図である。It is a sectional side view which shows the process of mounting the gantry of a holding device on the upper surface of a precast concrete part. アンカーボルトを位置決めした状態で保持装置の保持板に保持する工程を示す側断面図である。It is a sectional side view which shows the process which hold | maintains the anchor bolt in the holding plate of the holding device in the state located. 帯筋及び捨て型枠を設置する工程を示す側断面図である。It is a sectional side view which shows the process of installing a stirrup and a waste form. アンカーボルトの下部を保持装置とともに後打ちコンクリート部に固定する工程を示す側断面図である。It is a sectional side view which shows the process of fixing the lower part of an anchor bolt to a post-cast concrete part with a holding device. アンカーボルトに支承を固定する工程を示す側断面図である。It is a sectional side view showing a process of fixing a bearing to an anchor bolt.

次に、本発明の好ましい実施形態について添付図面を参照しながら説明する。
図1は、本発明の一実施形態に係る支承の施工方法に用いられる保持装置の側面図である。この保持装置50は、例えば円柱状に形成された場所打ちコンクリート杭1の先打ちコンクリート部2の上面2aにおいて複数のアンカーボルトBを所定位置に保持するためのものである。保持装置50は、先打ちコンクリート部2の上面2aに設置される架台51と、この架台51に設けられた複数の支持ねじ(支持部)52と、これらの支持ねじ52上に載置される保持板(保持部)53とを備えている。
Next, a preferred embodiment of the present invention will be described with reference to the accompanying drawings.
FIG. 1 is a side view of a holding device used in a method for constructing a bearing according to an embodiment of the present invention. This holding device 50 is for holding a plurality of anchor bolts B at predetermined positions on the upper surface 2a of the precast concrete portion 2 of the cast-in-place concrete pile 1 formed in a columnar shape, for example. The holding device 50 is mounted on the support 51 provided on the upper surface 2 a of the precast concrete portion 2, a plurality of support screws (support portions) 52 provided on the support 51, and mounted on the support screws 52. And a holding plate (holding portion) 53.

架台51は、先打ちコンクリート部2の上面2aにおいて周方向に所定間隔をあけて載置される複数の脚部511によって構成されている。
各脚部511は、ベース板511aと、このベース板511aの上面に下端面が固定されて上方に延びるフレーム511bと、このフレーム511bの上端部に固定されたナット511cとを有している。
The gantry 51 is constituted by a plurality of legs 511 that are placed on the upper surface 2a of the precast concrete portion 2 at predetermined intervals in the circumferential direction.
Each leg portion 511 includes a base plate 511a, a frame 511b having a lower end surface fixed to the upper surface of the base plate 511a and extending upward, and a nut 511c fixed to an upper end portion of the frame 511b.

本実施形態のフレーム511bは、例えばアングル材により構成されている。また、フレーム511bの上下方向の長さは、ベース板511aを先打ちコンクリート部2の上面2aに載置した状態で、当該上面2aから突出する主筋5よりもフレーム511bが高くなるように設定されている。   The frame 511b of the present embodiment is made of, for example, an angle material. The length of the frame 511b in the up-down direction is set such that the frame 511b is higher than the main reinforcement 5 projecting from the upper surface 2a in a state where the base plate 511a is placed on the upper surface 2a of the precast concrete portion 2. ing.

複数の支持ねじ52の雄ねじ部52bそれぞれは、固定ナット56を介して各脚部511のナット511cに上側から締結されている。これにより、各支持ねじ52の頭部52aは、対応するフレーム511bの上端よりも上方に突出している。また、この状態で、ナット511cに対する雄ねじ部52bの締め付け量を調整することで、各支持ねじ52の頭部52aの高さ位置を、架台51の脚部511に対して上下方向に位置調整することができる。そして、位置調整後の各支持ねじ52は、固定ナット56により回り止めされる。   Each of the male screw portions 52b of the plurality of support screws 52 is fastened to the nut 511c of each leg portion 511 from above via a fixing nut 56. Thus, the head 52a of each support screw 52 protrudes above the upper end of the corresponding frame 511b. In this state, the height of the head 52a of each support screw 52 is adjusted vertically with respect to the leg 511 of the gantry 51 by adjusting the amount of tightening of the male screw 52b with respect to the nut 511c. be able to. Then, the support screws 52 after the position adjustment are prevented from rotating by the fixing nut 56.

なお、本実施形態では雄ねじ部52bを、ナット511cの上側から締結しているが、ナット511cの下側から締結してもよい。この場合、支持ねじ52の雄ねじ部52bの先端面の高さ位置を位置調整し、当該先端面に保持板53を載置すればよい。また、本実施形態では支持部52として支持ねじを用いているが、架台51に対して上下方向に位置調整可能に設けられるものであれば、寸切ボルトや他の部材により構成されていても良い。   In this embodiment, the male screw portion 52b is fastened from above the nut 511c, but may be fastened from below the nut 511c. In this case, the height position of the tip surface of the male screw portion 52b of the support screw 52 may be adjusted, and the holding plate 53 may be placed on the tip surface. Further, in the present embodiment, the support screw is used as the support portion 52. However, as long as the support portion 52 is provided so as to be capable of adjusting the position in the vertical direction with respect to the gantry 51, the support portion 52 may be formed of a cutting bolt or another member. good.

保持板53は、例えば円板状に形成された平板部材により構成されており、この保持板53の下面の中央寄り部分は、支持ねじ52の頭部52aの上面に位置調整可能に載置されている。保持板53の外周側には、厚み方向に貫通する貫通孔53aが周方向に所定間隔をあけて複数形成されている。各貫通孔53aにはアンカーボルトBがそれぞれ挿通されている。各アンカーボルトBの長手方向の一端部には、座金55を挿通した状態でダブルナット54が締結されており、このダブルナット54の下面が座金55を介して保持板53の上面に当接することで、アンカーボルトBは上記一端部を保持板53よりも上側に突出した状態で当該保持板53に保持されている。なお、保持板53とダブルナット54との間には、必ずしも座金55を設ける必要はない。   The holding plate 53 is formed of, for example, a flat plate member formed in a disk shape. A portion of the lower surface of the holding plate 53 near the center is placed on the upper surface of the head 52 a of the support screw 52 so as to be position-adjustable. ing. On the outer peripheral side of the holding plate 53, a plurality of through holes 53a penetrating in the thickness direction are formed at predetermined intervals in the circumferential direction. An anchor bolt B is inserted into each through hole 53a. A double nut 54 is fastened to one end of each anchor bolt B in the longitudinal direction with a washer 55 inserted. The lower surface of the double nut 54 contacts the upper surface of the holding plate 53 via the washer 55. Thus, the anchor bolt B is held by the holding plate 53 with the one end protruding above the holding plate 53. It is not always necessary to provide the washer 55 between the holding plate 53 and the double nut 54.

以上の構成により、支持ねじ52の頭部52aを架台51の脚部511に対して上下方向に位置調整することで、アンカーボルトBを上下方向(Z軸方向)に位置決めすることができる。また、支持ねじ52の頭部52aに載置されている保持板53を水平方向(X軸方向及びY軸方向)に位置調整することで、アンカーボルトBを架台51に対して水平方向に位置決めすることができる。   With the above configuration, by adjusting the position of the head 52a of the support screw 52 in the vertical direction with respect to the leg 511 of the gantry 51, the anchor bolt B can be positioned in the vertical direction (Z-axis direction). Further, by adjusting the position of the holding plate 53 placed on the head 52a of the support screw 52 in the horizontal direction (X-axis direction and Y-axis direction), the anchor bolt B is positioned in the horizontal direction with respect to the gantry 51. can do.

なお、本実施形態では保持部53として平板部材からなる保持板を用いているが、支持部52上において水平方向に位置調整可能に載置され、アンカーボルトBを、その長手方向の少なくとも一端部が上側に突出した状態で保持できるものであれば、他の部材により構成されていても良い。   In this embodiment, a holding plate made of a flat plate member is used as the holding portion 53. However, the holding portion 53 is mounted on the support portion 52 so as to be position-adjustable in the horizontal direction, and the anchor bolt B is attached to at least one end in its longitudinal direction. May be constituted by other members as long as they can be held in a state of projecting upward.

図2〜図8は、本発明の一実施形態に係る支承の施工方法を示す説明図である。この施工方法は、図8に示すように、先打ちコンクリート部2の上側に後打ちコンクリート部3を形成してなる場所打ちコンクリート杭1に、構造物を支持する支承20をアンカーボルトBにより定着させる施工方法である。以下、この施工方法について、図2〜図8を参照しながら説明する。   FIG. 2 to FIG. 8 are explanatory views showing a method of constructing a bearing according to an embodiment of the present invention. In this construction method, as shown in FIG. 8, a support 20 for supporting a structure is anchored to a cast-in-place concrete pile 1 formed by forming a post-cast concrete part 3 on an upper side of a pre-cast concrete part 2 with an anchor bolt B. This is the construction method to be performed. Hereinafter, this construction method will be described with reference to FIGS.

まず、図2に示すように、掘削孔10に上下方向に延びる主筋5を配筋した状態で、当該掘削孔10内に先打ちコンクリートを打設し、上側に余盛り部4ができるように先打ちコンクリート部2を形成する。その際、先打ちコンクリート部2の施工天端(上面2a)の高さH1は、場所打ちコンクリート杭1の設計天端の高さH2から、アンカーボルトBを後打ちコンクリート部3に埋め込む長さL以上を差し引いた高さとする。   First, as shown in FIG. 2, in a state where the main reinforcement 5 extending in the up-down direction is arranged in the excavation hole 10, first-cast concrete is poured into the excavation hole 10 so that the extra embossed portion 4 is formed on the upper side. A precast concrete section 2 is formed. At this time, the height H1 of the construction top (upper surface 2a) of the precast concrete part 2 is a length from the height H2 of the design top of the cast-in-place concrete pile 1 in which the anchor bolt B is embedded in the post-cast concrete part 3. The height shall be less than L.

次に、図3に示すように、余盛り部4の周囲の地盤Gを掘削した後に、余盛り部4をはつり取って除去する。これにより、先打ちコンクリート部2の上面2aが露出した状態となる。その後、露出した先打ちコンクリート部2の上面2aに上記保持装置50を設置する。   Next, as shown in FIG. 3, after excavating the ground G around the extra height portion 4, the extra height portion 4 is stripped off and removed. As a result, the upper surface 2a of the precast concrete portion 2 is exposed. Thereafter, the holding device 50 is set on the exposed upper surface 2a of the precast concrete portion 2.

具体的には、まず、図4に示すように、架台51の複数の脚部511を、先打ちコンクリート部2の上面2aにおいて主筋5よりも内側に載置し、各脚部511のナット511cに締結されている雄ねじ部52bの締め付け量を調整し、支持ねじ52における頭部52aの上面の高さ位置を調整する(図1参照)。本実施形態では、頭部52aの上面の高さH3が、上記設計天端の高さH2から、保持板53の厚みtを差し引いた高さとなるように調整する。   Specifically, first, as shown in FIG. 4, a plurality of legs 511 of the gantry 51 are placed inside the main reinforcement 5 on the upper surface 2 a of the precast concrete portion 2, and a nut 511 c of each leg 511 is placed. The height of the upper surface of the head portion 52a of the support screw 52 is adjusted by adjusting the amount of tightening of the male screw portion 52b fastened (see FIG. 1). In the present embodiment, the height H3 of the upper surface of the head 52a is adjusted to be the height obtained by subtracting the thickness t of the holding plate 53 from the height H2 of the design top end.

次に、図5に示すように、各支持ねじ52の頭部52aの上面に保持板53の下面の中央寄り部分を載置した状態で、保持板53の各貫通孔53aにアンカーボルトBを挿通し、ダブルナット54により各アンカーボルトBを保持板53に保持する。そして、各アンカーボルトBを保持した保持板53を架台51(支持ねじ52の頭部52a)に対して水平方向に位置調整する。これにより、アンカーボルトBを、支承20を定着させる位置に位置決めすることができる。保持板53の水平方向の位置調整が終了すると、保持板53を支持ねじ52の頭部52aに溶接により仮止めする。   Next, as shown in FIG. 5, the anchor bolt B is inserted into each through hole 53 a of the holding plate 53 in a state in which the central portion of the lower surface of the holding plate 53 is placed on the upper surface of the head 52 a of each support screw 52. The anchor bolts B are held on the holding plate 53 by the double nuts 54. Then, the holding plate 53 holding the anchor bolts B is horizontally adjusted with respect to the gantry 51 (the head 52a of the support screw 52). Thus, the anchor bolt B can be positioned at a position where the bearing 20 is fixed. When the horizontal position adjustment of the holding plate 53 is completed, the holding plate 53 is temporarily fixed to the head 52a of the support screw 52 by welding.

次に、図6に示すように、上面2aから突出する複数の主筋5に、円環状の帯筋6を上下方向に所定間隔をあけて複数(ここでは3個)配筋した後、先打ちコンクリート部2の上端部の外周に円筒状の捨て型枠7を組み立てる。その際、捨て型枠7の上端面の高さは、上記設計天端の高さH2と同じ高さとする。   Next, as shown in FIG. 6, after a plurality (three in this case) of a plurality of annular stirrups 6 are arranged at predetermined intervals in the up-down direction on a plurality of main streaks 5 projecting from the upper surface 2a, the first strike is performed. A cylindrical mold 7 is assembled on the outer periphery of the upper end of the concrete part 2. At this time, the height of the upper end surface of the discarding formwork 7 is set to the same height as the height H2 of the design top end.

なお、本実施形態では、先打ちコンクリート部2の上側に、架台51(アンカーボルトBの保持も含む)、帯筋6及び捨て型枠7の順に設置しているが、これらの設置順序は、現場の状況に応じて適宜変更される。例えば、先打ちコンクリート部2の上面2aの面積が広い場合には、捨て型枠7、帯筋6及び架台51の順に設置しても良い。   In the present embodiment, the gantry 51 (including the holding of the anchor bolt B), the strap 6, and the disposal form 7 are installed in this order on the upper side of the precast concrete portion 2, but the installation order is as follows. It is changed appropriately according to the situation at the site. For example, when the area of the upper surface 2a of the precast concrete portion 2 is large, the disposal form 7, the band 6, and the gantry 51 may be installed in this order.

次に、図7に示すように、捨て型枠7内に後打ちコンクリートを打設し、後打ちコンクリート部3を形成する。その際、後打ちコンクリート部3の施工天端(上面3a)の高さは、上記設計天端の高さH2と同じ高さとする。これにより、架台51、支持ねじ52、保持板53、アンカーボルトBの下部、上面2aから突出する主筋5、及び帯筋6は後打ちコンクリート部3により埋め殺しされる。したがって、アンカーボルトBは、保持装置50により位置決めされた状態で後打ちコンクリート部3に固定される。   Next, as shown in FIG. 7, post-cast concrete is poured into the waste form 7 to form the post-cast concrete portion 3. At that time, the height of the construction top (upper surface 3a) of the post-cast concrete portion 3 is the same as the height H2 of the design top. As a result, the gantry 51, the support screw 52, the holding plate 53, the lower part of the anchor bolt B, the main bar 5 and the band bar 6 protruding from the upper surface 2 a are buried and killed by the post-cast concrete portion 3. Therefore, the anchor bolt B is fixed to the post-cast concrete portion 3 while being positioned by the holding device 50.

次に、アンカーボルトBから一旦、ダブルナット54及び座金55を取り外し、図8に示すように、支承20の取付板21の厚み方向にアンカーボルトBの上部を貫通させ、当該取付板21を後打ちコンクリート部3の上面3aに載置する。そして、ダブルナット54及び座金55により、取付板21をアンカーボルトBの上部に固定する。これにより、支承20をアンカーボルトBに定着することができる。   Next, once the double nut 54 and the washer 55 are removed from the anchor bolt B, as shown in FIG. 8, the upper part of the anchor bolt B is made to penetrate in the thickness direction of the mounting plate 21 of the support 20, and the mounting plate 21 is It is placed on the upper surface 3a of the cast concrete part 3. Then, the mounting plate 21 is fixed to the upper part of the anchor bolt B by the double nut 54 and the washer 55. Thereby, the bearing 20 can be fixed to the anchor bolt B.

以上、本実施形態の支承の施工方法によれば、余盛り部4を除去して露出した先打ちコンクリート部2の上面2aに、アンカーボルトBを位置決めした状態で保持装置50を介して保持し、この状態から後打ちコンクリートを打設することで、アンカーボルトBを後打ちコンクリート部3に固定する。これにより、掘削孔10内に安定した状態で配置されている先打ちコンクリート部2の上面2aにおいてアンカーボルトBを位置決めすることができる。したがって、従来のようにアンカーボルトを主筋に一体化する場合に比べて、アンカーボルトBを精度良く位置決めすることができるので、場所打ちコンクリート杭1に対して支承20を精度良く定着させることができる。   As described above, according to the mounting method of the bearing according to the present embodiment, the anchor bolt B is held via the holding device 50 in a state where the anchor bolt B is positioned on the upper surface 2a of the precast concrete portion 2 which is exposed by removing the extra embossed portion 4. The anchor bolt B is fixed to the post-cast concrete portion 3 by casting post-cast concrete from this state. Thereby, the anchor bolt B can be positioned on the upper surface 2a of the precast concrete portion 2 which is stably arranged in the excavation hole 10. Therefore, the anchor bolts B can be positioned with higher precision than in the case where the anchor bolts are integrated with the main reinforcement as in the related art, so that the bearing 20 can be accurately fixed to the cast-in-place concrete pile 1. .

また、保持装置50によれば、余盛り部4を除去して露出した先打ちコンクリート部2の上面2aに架台51を設置し、その架台51に対して支持ねじ52を上下方向に位置調整するとともに、アンカーボルトBを保持した保持板53を支持ねじ52に対して水平方向に位置調整することで、アンカーボルトBを上下方向及び水平方向に位置決めすることができる。これにより、掘削孔10内に安定した状態で配置されている先打ちコンクリート部2の上面2aにおいてアンカーボルトBを位置決めすることができる。したがって、従来のようにアンカーボルトを主筋に一体化する場合に比べて、アンカーボルトBを精度良く位置決めすることができるので、場所打ちコンクリート杭1に対して支承20を精度良く定着させることができる。   Further, according to the holding device 50, the gantry 51 is installed on the upper surface 2 a of the precast concrete portion 2 which is exposed by removing the excess portion 4, and the support screw 52 is vertically adjusted with respect to the gantry 51. At the same time, by adjusting the position of the holding plate 53 holding the anchor bolt B in the horizontal direction with respect to the support screw 52, the anchor bolt B can be positioned in the vertical and horizontal directions. Thereby, the anchor bolt B can be positioned on the upper surface 2a of the precast concrete portion 2 which is stably arranged in the excavation hole 10. Therefore, the anchor bolts B can be positioned with higher precision than in the case where the anchor bolts are integrated with the main reinforcement as in the related art, so that the bearing 20 can be accurately fixed to the cast-in-place concrete pile 1. .

なお、今回開示された実施形態はすべての点で例示であって制限的なものではないと考えられるべきである。本発明の範囲は、上記した意味ではなく、特許請求の範囲によって示され、特許請求の範囲と均等の意味、及び範囲内でのすべての変更が含まれることが意図される。   It should be understood that the embodiments disclosed this time are illustrative in all aspects and not restrictive. The scope of the present invention is defined by the terms of the claims, rather than the description above, and is intended to include any modifications within the scope and meaning equivalent to the terms of the claims.

1 場所打ちコンクリート杭
2 先打ちコンクリート部
2a 上面
3 後打ちコンクリート部
4 余盛り部
5 主筋
10 掘削孔
20 支承
50 保持装置
51 架台
52 支持ねじ(支持部)
53 保持板(保持部)
B アンカーボルト
DESCRIPTION OF SYMBOLS 1 Cast-in-place concrete pile 2 Pre-cast concrete part 2a Top surface 3 Post-cast concrete part 4 Extention part 5 Main reinforcement 10 Drilling hole 20 Bearing 50 Holder 51 Base 52 Support screw (support part)
53 Holding plate (holding part)
B anchor bolt

Claims (2)

先打ちコンクリート部の上側に後打ちコンクリート部を形成してなる場所打ちコンクリート杭に、構造物を支持する支承をアンカーボルトにより定着させる施工方法であって、
掘削孔に主筋を配筋した状態で、当該掘削孔内に先打ちコンクリートを打設し、上側に余盛り部ができるように前記先打ちコンクリート部を形成する工程と、
前記余盛り部を除去し、前記先打ちコンクリート部の上面を露出させる工程と、
露出した前記先打ちコンクリート部の上面に、架台を設置する工程と、
前記架台に設けられた支持部を前記架台に対して上下方向に位置調整するとともに、前記支持部に載置した保持部に前記アンカーボルトを保持させた状態で前記保持部を前記支持部に対して水平方向に位置調整することで、前記アンカーボルトを、前記支承を定着させる位置に位置決めする工程と、
前記アンカーボルトを位置決めした状態で、前記掘削孔内に後打ちコンクリートを打設して前記後打ちコンクリート部を形成することで、前記アンカーボルトの下部を前記架台、前記支持部及び前記保持部とともに前記後打ちコンクリート部に固定する工程と、
前記後打ちコンクリート部に固定された前記アンカーボルトの上部に前記支承を固定する工程と、
を含む支承の施工方法。
A cast-in-place concrete pile formed by forming a post-cast concrete part on the upper side of a pre-cast concrete part, a construction method in which a support for supporting a structure is anchored by an anchor bolt,
In the state where the main reinforcement is arranged in the excavation hole, a step of casting pre-cast concrete into the excavation hole, and forming the pre-cast concrete portion so as to have an excess portion on the upper side,
Removing the excess portion, exposing the top surface of the precast concrete portion,
A step of installing a gantry on the upper surface of the exposed precast concrete portion ,
Along with adjusting the position of the support provided on the gantry in the up-down direction with respect to the gantry, the holding part is held with respect to the support in a state where the anchor bolt is held on the holding part placed on the support. a step horizontally by adjusting the position, the anchor bolts, that female positioning to a position for fixing the bearing Te,
In a state where the anchor bolt is positioned, by casting a post-cast concrete into the excavation hole to form the post-cast concrete portion, the lower part of the anchor bolt is fixed together with the gantry, the support portion, and the holding portion. Fixing the post-cast concrete part,
Fixing the bearing on top of the anchor bolt fixed to the post-cast concrete portion;
Construction method of bearing including.
先打ちコンクリート部の上側に後打ちコンクリート部を形成してなる場所打ちコンクリート杭に、構造物を支持する支承をアンカーボルトにより定着させる施工方法において、
掘削孔に主筋を配筋した状態で、当該掘削孔内に先打ちコンクリートを打設し、上側に余盛り部ができるように前記先打ちコンクリート部を形成する工程と、
前記余盛り部を除去し、前記先打ちコンクリート部の上面を露出させる工程と、
露出した前記先打ちコンクリート部の上面において、前記アンカーボルトを、前記支承を定着させる位置に位置決めした状態で保持装置を介して保持する工程と、
前記アンカーボルトを保持した状態で、前記掘削孔内に後打ちコンクリートを打設して前記後打ちコンクリート部を形成することで、前記アンカーボルトの下部を前記保持装置とともに前記後打ちコンクリート部に固定する工程と、
前記後打ちコンクリート部に固定された前記アンカーボルトの上部に前記支承を固定する工程と、を含む支承の施工方法に用いる保持装置であって、
前記余盛り部を除去して露出した前記先打ちコンクリート部の上面に設置される架台と、
前記架台に対して上下方向に位置調整可能に設けられた支持部と、
前記支持部上において水平方向に位置調整可能に載置され、前記アンカーボルトを、その長手方向の少なくとも一端部が上側に突出した状態で保持可能な保持部と、
を備える保持装置。
In a construction method in which a support for supporting a structure is anchored with anchor bolts on a cast-in-place concrete pile formed by forming a post-cast concrete part on the upper side of a pre-cast concrete part,
In the state where the main reinforcement is arranged in the excavation hole, a step of casting pre-cast concrete into the excavation hole, and forming the pre-cast concrete portion so as to have an excess portion on the upper side,
Removing the excess portion, exposing the top surface of the precast concrete portion,
Holding the anchor bolt via a holding device in a state where the anchor bolt is positioned at a position where the bearing is fixed on the exposed upper surface of the precast concrete portion;
With the anchor bolt held, a post-cast concrete is cast into the excavation hole to form the post-cast concrete portion, thereby fixing the lower portion of the anchor bolt to the post-cast concrete portion together with the holding device. The process of
Fixing the bearing on the upper part of the anchor bolt fixed to the post-cast concrete part, and a holding device used in a method of constructing the bearing,
A gantry installed on the upper surface of the precast concrete portion exposed by removing the excess portion,
A support portion provided so as to be vertically adjustable with respect to the gantry,
A holding portion that is placed on the support portion so as to be position-adjustable in the horizontal direction, and that can hold the anchor bolt in a state where at least one end portion in the longitudinal direction projects upward.
A holding device comprising:
JP2016012605A 2016-01-26 2016-01-26 Bearing mounting method and holding device used for the method Active JP6629604B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016012605A JP6629604B2 (en) 2016-01-26 2016-01-26 Bearing mounting method and holding device used for the method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016012605A JP6629604B2 (en) 2016-01-26 2016-01-26 Bearing mounting method and holding device used for the method

Publications (2)

Publication Number Publication Date
JP2017133202A JP2017133202A (en) 2017-08-03
JP6629604B2 true JP6629604B2 (en) 2020-01-15

Family

ID=59503379

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016012605A Active JP6629604B2 (en) 2016-01-26 2016-01-26 Bearing mounting method and holding device used for the method

Country Status (1)

Country Link
JP (1) JP6629604B2 (en)

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02164931A (en) * 1988-12-19 1990-06-25 Asahi Chem Ind Co Ltd Foundation construction method for building
JP4615102B2 (en) * 2000-08-21 2011-01-19 財団法人鉄道総合技術研究所 Steel pipe column erection method and cast-in-place pile head treatment method
JP2002322652A (en) * 2001-04-27 2002-11-08 Toda Constr Co Ltd Joining method between pile head and upper frame and joint structure
JP2004204605A (en) * 2002-12-26 2004-07-22 Taisei Corp Joint structure

Also Published As

Publication number Publication date
JP2017133202A (en) 2017-08-03

Similar Documents

Publication Publication Date Title
JP2019112811A (en) Main leg installation method and anchor frame installation jig
JP6629604B2 (en) Bearing mounting method and holding device used for the method
JP6632290B2 (en) Steel column leg structure and steel column leg construction method
JP6897055B2 (en) Structure installation method and installation foundation
JP4625692B2 (en) Building construction method of base-isolated structure with laminated rubber bearing
JP4949438B2 (en) Concrete foundation formation method
JP2022551760A (en) Anchor devices, anchors including anchor devices, and methods of manufacturing anchors
JP6430146B2 (en) Steel pipe covered concrete pile
JP3255253B2 (en) Construction method of pillar and its bottom support device
JPH10292668A (en) Installation method of seismic isolation device
JP2006152669A (en) Building construction method of sliding support structure of vibration isolation
JP5305941B2 (en) Floor frame height adjustment nut embedding method and floor frame height adjustment nut holder
JP2021038614A (en) Construction method of equipment installation stand, equipment installation stand and foundation bolt installation template
JP5766828B2 (en) Method for installing solar cell module installation stand and solar cell module installation stand
JP4313431B1 (en) Forming support device for box extraction and installation method thereof
JP2016075110A (en) Column installation method and column installation structure
JP6477289B2 (en) How to install the packer plate
JP2006322154A (en) Foundation construction method of building
JP6357332B2 (en) Construction method of seismic isolation foundation
JP4282847B2 (en) Seat plate installation structure and floor plate installation method
JP7790588B2 (en) Anchor support and anchor installation method
JPH0336967B2 (en)
JP5470196B2 (en) How to install the structure
JP7307670B2 (en) Pile column head joint structure and joint method
JP2001241047A (en) Method of installing anchor bolt for fixing large-sized equipment

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20180815

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20190418

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20190514

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20190704

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20191126

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20191205

R150 Certificate of patent or registration of utility model

Ref document number: 6629604

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350