JP6637722B2 - Construction method and support structure of charging pole support - Google Patents
[go: Go Back, main page]

JP6637722B2 - Construction method and support structure of charging pole support - Google Patents

Construction method and support structure of charging pole support Download PDF

Info

Publication number
JP6637722B2
JP6637722B2 JP2015209267A JP2015209267A JP6637722B2 JP 6637722 B2 JP6637722 B2 JP 6637722B2 JP 2015209267 A JP2015209267 A JP 2015209267A JP 2015209267 A JP2015209267 A JP 2015209267A JP 6637722 B2 JP6637722 B2 JP 6637722B2
Authority
JP
Japan
Prior art keywords
support
filling
column
concrete foundation
charging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2015209267A
Other languages
Japanese (ja)
Other versions
JP2017082425A (en
Inventor
真也 芦川
真也 芦川
太田 信之
信之 太田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yazaki Energy System Corp
Original Assignee
Yazaki Energy System Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yazaki Energy System Corp filed Critical Yazaki Energy System Corp
Priority to JP2015209267A priority Critical patent/JP6637722B2/en
Publication of JP2017082425A publication Critical patent/JP2017082425A/en
Application granted granted Critical
Publication of JP6637722B2 publication Critical patent/JP6637722B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Foundations (AREA)

Description

本発明は、電気自動車等に搭載されたバッテリを充電するための充電装置を設置する際、充電装置を支持する充電スタンド用支柱の施工方法および支持構造に関する。   The present invention relates to a method and a support structure of a support column for a charging stand that supports a charging device when installing a charging device for charging a battery mounted on an electric vehicle or the like.

電動モータの駆動力で走行可能な電気自動車やプラグインハイブリッド自動車等の車両の普及に伴い、この車両に搭載されたバッテリへ充電する車両用充電装置の普及が求められている。
このような車両用充電装置は、住戸の車庫(駐車スペース)などに設置されるが、例えば車庫の壁面等に固定されて設置されたり、車庫の地面に立設された充電スタンド用支柱に支持されたりしている。
With the spread of vehicles such as electric vehicles and plug-in hybrid vehicles that can be driven by the driving force of an electric motor, there is a demand for a vehicle charging device that charges a battery mounted on the vehicle.
Such a vehicle charging device is installed in a garage (parking space) of a dwelling unit, and is fixedly installed on a wall surface of the garage, for example, or supported on a charging stand support standing upright on the ground of the garage. Has been done.

ところで、上記充電スタンド用支柱のような支柱をコンクリート基礎に立設するのに用いる支柱支持構造や施工方法としては、従来より種々のものが提案されている(例えば、特許文献1参照)。
図8に示すように、特許文献1に記載された手摺用支柱支持構造501は、コンクリート基礎610に立設される手摺に設けられた手摺用支柱514を、コンクリート基礎610に結合するためのものである。
By the way, various types of support structures and construction methods used for erecting a support such as the support for the charging stand on a concrete foundation have been conventionally proposed (for example, see Patent Document 1).
As shown in FIG. 8, a handrail support structure 501 described in Patent Literature 1 is for joining a handrail support 514 provided on a handrail erected on a concrete foundation 610 to a concrete foundation 610. It is.

手摺用支柱支持構造501は、表面に仕上げ層600が設けられたコンクリート基礎610に埋設されたアンカーボルト520と、アンカーボルト520を貫通させた状態でナット521を締結してコンクリート基礎610に固定されて立ち上げられた柱支持部材532を有する柱脚部材530と、柱脚部材530に下部を固定された管状の支柱本体540と、支柱本体540の下部と柱脚部材530とで形成された手摺用支柱下部内に充填され、コンクリート基礎610と一体に固化されたグラウト材570と、を備えている。   The handrail support structure 501 is fixed to the concrete foundation 610 by fastening an anchor bolt 520 embedded in a concrete foundation 610 provided with a finishing layer 600 on the surface and a nut 521 with the anchor bolt 520 penetrating. A column base member 530 having a column support member 532 raised and raised, a tubular column main body 540 having a lower portion fixed to the column base member 530, and a handrail formed by the lower portion of the column main body 540 and the column base member 530. And a grout material 570 that is filled in the lower part of the support column and solidified integrally with the concrete foundation 610.

そこで、コンクリート基礎610にアンカーボルト520を埋設するだけでよく、専用のアンカ部材を用いる場合と比較して、施工が容易である。しかも、手摺用支柱下部内にグラウト材570を充填してコンクリート基礎610と一体に固化させたため、柱脚部材530が水に接触するのを防止して錆の発生を防ぐとともに、手摺用支柱514のぐらつき、たわみを抑制でき、高い支持強度を得ることができる。   Therefore, it is only necessary to embed the anchor bolts 520 in the concrete foundation 610, and the construction is easier than in the case where a dedicated anchor member is used. In addition, since the grout material 570 is filled in the lower part of the handrail support and solidified integrally with the concrete foundation 610, the column base member 530 is prevented from coming into contact with water to prevent rust and the handrail support 514. Wobbles and deflection can be suppressed, and high support strength can be obtained.

特開2012−67514号公報JP 2012-67514 A

ところで、上述のような従来の手摺用支柱支持構造501により支柱本体540をコンクリート基礎610に固定する場合、コンクリート基礎工事でコンクリート基礎610を打設する際にアンカーボルト520を予め埋設する。このコンクリート基礎工事後、コンクリートが固まるのを待つ数日の養生期間を設けた後に、アンカーボルト520に柱脚部材530を固定する。そして、柱脚部材530に支柱本体540を固定した後、支柱本体540の側面に設けた充填口542からグラウト材570を充填し、固化させなければならない。
そのため、上記手摺用支柱支持構造501の施工方法では、アンカーボルト埋設工程と、数日の養生期間を空けて行う支柱本体設置工程及びグラウト材充填工程とが必要となり、二日を要する施工作業となるため施工コストが高くなるという問題がある。
By the way, when fixing the pillar main body 540 to the concrete foundation 610 by the above-mentioned conventional handrail pillar support structure 501, the anchor bolt 520 is buried in advance when the concrete foundation 610 is cast in the concrete foundation construction. After this concrete foundation work, after a curing period of several days waiting for concrete to set, a column base member 530 is fixed to the anchor bolt 520. Then, after fixing the column main body 540 to the column base member 530, the grout material 570 must be filled from the filling port 542 provided on the side surface of the column main body 540 and solidified.
Therefore, the construction method of the handrail support structure 501 requires an anchor bolt burying step, a support body installation step and a grout material filling step performed after a curing period of several days, and requires two days of construction work. Therefore, there is a problem that the construction cost increases.

本発明は、上述した事情に鑑みてなされたものであり、その目的は、工期を短縮して施工コストを抑えながら、支柱内に雨水等が溜まって腐食するのを防止すると共に高い支持強度を得ることができる充電スタンド用支柱の施工方法および支持構造を提供することにある。   The present invention has been made in view of the above-described circumstances, and an object of the present invention is to reduce the construction period and suppress the construction cost, prevent rainwater and the like from accumulating in the support pillars and corrode them, and provide a high support strength. An object of the present invention is to provide a charging stand support method and a support structure that can be obtained.

前述した目的を達成するために、本発明に係る充電スタンド用支柱の施工方法は、下記
(1)の構成を特徴としている。
(1) 充電装置を支持する管状の支柱をコンクリート基礎に立設するための充電スタンド用支柱の施工方法であって、前記支柱の設置位置に埋設穴を掘る工程と、電源用ケーブルを通したPF管を前記支柱内に挿入する工程と、前記埋設穴の底面に対して垂設した状態の前記支柱の下部内に充填口から充填材を充填する工程と、前記充填材を充填した後に、前記埋設穴をコンクリートで埋戻し、前記充填材が充填された前記支柱の周囲に前記コンクリート基礎を打設する工程と、を備えたことを特徴とする充電スタンド用支柱の施工方法。
In order to achieve the above-mentioned object, a method for constructing a support for a charging stand according to the present invention is characterized by the following configuration (1).
(1) a tubular supports for the charging device to a construction method of the charging stand upright for standing on a concrete foundation, the steps of digging a buried hole in the installation position of the strut, through the power cable A step of inserting a PF pipe into the support, a step of filling a filler from a filling port in a lower portion of the support in a state of being vertically suspended with respect to a bottom surface of the buried hole, and after filling the filler, Backfilling the burial hole with concrete and placing the concrete foundation around the pillar filled with the filler.

上記(1)の構成の充電スタンド用支柱の施工方法によれば、支柱の下部内に充填した充填材が固化するための養生期間を取らずに、支柱の周囲にコンクリート基礎を打設することができる。そこで、充填材を充填する工程と、コンクリート基礎を打設する工程とを同日に行うことができるので、工期が短縮されて施工コストが安くなる。
そして、コンクリート基礎に立設された支柱は、下部内に充填した充填材がコンクリート基礎と一体に固化されることで、支柱内に雨水等が溜まって腐食するのを防止されると共に、支柱のぐらつき、たわみが抑制されて支持強度が高められる。
According to the method for constructing the charging stand support of the above configuration (1), a concrete foundation is cast around the support without taking a curing period for solidifying the filler filled in the lower part of the support. Can be. Therefore, the step of filling the filler and the step of placing the concrete foundation can be performed on the same day, so that the construction period is shortened and the construction cost is reduced.
The pillars erected on the concrete foundation are prevented from accumulating and corroding rainwater etc. in the pillars by solidifying the filler filled in the lower part with the concrete foundation. Wobble and deflection are suppressed, and support strength is increased.

また、前述した目的を達成するために、本発明に係る充電スタンド用支柱の支持構造は、下記(2)及び(3)の構成を特徴としている。
(2) 充電装置を支持し、電源用ケーブルを通したPF管が挿通される管状の支柱をコンクリート基礎に立設するための充電スタンド用支柱の支持構造であって、前記コンクリート基礎に下部が埋設された前記支柱と、前記支柱の下部内に充填された充填材と、前記支柱の下部側面に設けられ、前記支柱の周囲に打設された前記コンクリート基礎により少なくとも一部が隠れている充填口と、前記充填口より下方の前記支柱の下部側面に形成されたPF管取り入れ口と、を備えたことを特徴とする充電スタンド用支柱の支持構造。
Further, in order to achieve the above-mentioned object, a support structure of a support for a charging stand according to the present invention is characterized by the following configurations (2) and (3).
(2) to support the charging device, the tubular struts PF tube Ru is inserted through the power cable to a supporting structure of the column for charging stand for standing on a concrete foundation, the lower the concrete foundation A buried support, a filling material filled in a lower portion of the support, and a filling provided on a lower side surface of the support and at least partially hidden by the concrete foundation cast around the support. A support structure for a charging stand column, comprising: a port; and a PF pipe inlet formed on a lower side surface of the column below the filling port .

上記(2)の構成の充電スタンド用支柱の支持構造によれば、支柱の下部内に充填材を充填するため充填口が、充填の作業性を高めるために大きく開口された場合でも、コンクリート基礎により少なくとも一部が隠されるので、支柱の見栄えが低下することはない。即ち、従来の充填口は、充填の作業性を高めるために開口面積を大きくすると支柱の見栄えが低下し、支柱の見栄えを良くするために開口面積を小さくすると充填の作業性が低下してしまう。   According to the charging stand support structure of the above configuration (2), even when the filling port for filling the lower portion of the support with the filler is opened greatly to enhance the workability of the filling, the concrete foundation can be used. Since at least a part is hidden by, the appearance of the column is not reduced. That is, in the conventional filling port, when the opening area is increased in order to enhance the workability of filling, the appearance of the support decreases, and when the opening area is reduced in order to improve the appearance of the support, the workability of filling decreases. .

(3) 前記充填口が、前記充填材を充填するための充填部と、前記充填部の上方に連通して形成され、前記コンクリート基礎より露出すると共に、前記充填部より開口面積が小さい水抜き部と、を有することを特徴とする上記(2)に記載の充電スタンド用支柱の支持構造。 (3) The filling port is formed so as to communicate with a filling portion for filling the filling material and above the filling portion, is exposed from the concrete foundation, and has a drainage area smaller than the filling portion. The support structure of the charging stand support according to the above (2), comprising:

上記(3)の構成の充電スタンド用支柱の支持構造によれば、充填材を充填するための充填部と支柱内の水を排出するための水抜き部とを支柱の下部側面に一体に形成することができ、それぞれ別々に開口した場合に比べて加工コストを下げることができる。また、開口面積が大きい充填部をコンクリート基礎で隠して開口面積が小さい水抜き部だけを露出させることができるので、支柱の見栄えを損なうことがない。   According to the charging stand support structure of the above configuration (3), the filling portion for filling the filler and the drainage portion for discharging the water in the support are integrally formed on the lower side surface of the support. Therefore, the processing cost can be reduced as compared with the case where the openings are separately formed. In addition, since the filling portion having a large opening area can be hidden by the concrete foundation and only the draining portion having a small opening area can be exposed, the appearance of the column is not impaired.

本発明によれば、工期を短縮して施工コストを抑えながら、支柱内に雨水等が溜まって腐食するのを防止すると共に高い支持強度を得ることができる充電スタンド用支柱の施工方法および支持構造を提供できる。   ADVANTAGE OF THE INVENTION According to this invention, the construction method and support structure of the support | pillar for charging stands which can prevent rainwater etc. accumulating in a support | pillar and corrode and obtain high support strength, shortening a construction period and holding down construction cost Can be provided.

以上、本発明について簡潔に説明した。更に、以下に説明される発明を実施するための形態(以下、「実施形態」という。)を添付の図面を参照して通読することにより、本発明の詳細は更に明確化されるであろう。   The present invention has been briefly described above. Further, details of the present invention will be further clarified by reading through embodiments for carrying out the invention described below (hereinafter, referred to as “embodiments”) with reference to the accompanying drawings. .

本発明の一実施形態に係る充電スタンド用支柱が充電装置を支持した充電スタンドの斜視図である。It is a perspective view of the charging stand which supported the charging device with the support | pillar for charging stands which concerns on one Embodiment of this invention. 図1に示した充電スタンド用支柱の支持構造を示す断面図である。It is sectional drawing which shows the support structure of the support | pillar for charging stands shown in FIG. 図2に示した充電スタンド用支柱の全体斜視図である。FIG. 3 is an overall perspective view of a support column for a charging stand illustrated in FIG. 2. (a)及び(b)は図3に示した充電スタンド用支柱の背面図及び右側面図である。(A) and (b) are the rear view and right side view of the support | pillar for charging stands shown in FIG. (a)は図4の(a)に示した充電スタンド用支柱の要部拡大図、(b)は図3に示した充電スタンド用支柱の要部拡大図である。FIG. 4A is an enlarged view of a main part of a support for a charging stand shown in FIG. 4A, and FIG. 4B is an enlarged view of a main part of a support for a charging stand shown in FIG. 本発明の一実施形態に係る充電スタンド用支柱の施工方法を説明するための断面図である。It is sectional drawing for demonstrating the construction method of the support | pillar for charging stands which concerns on one Embodiment of this invention. (a)〜(c)は図6に示した充電スタンド用支柱の施工方法を説明するための要部拡大断面図である(A)-(c) is a principal part expanded sectional view for demonstrating the construction method of the support | pillar for charging stands shown in FIG. 従来の充電スタンドを示す斜視図である。It is a perspective view which shows the conventional charging stand.

以下、本発明に係る実施の形態の例を、図面を参照して説明する。
本実施形態に係る充電スタンド1は、図1に示すように、電気自動車を駐車する地面75に打設されたコンクリート基礎73に立設される充電スタンド用支柱11と、充電スタンド用支柱11の上部に装着される車両用充電装置(充電装置)21と、を備えている。この充電スタンド1は、車両用充電装置21を住戸の車庫(駐車スペース)などに設置するものである。
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
As shown in FIG. 1, the charging stand 1 according to the present embodiment includes a charging stand support 11 erected on a concrete foundation 73 installed on a ground 75 for parking an electric vehicle, and a charging stand support 11. And a vehicle charging device (charging device) 21 mounted on the upper part. This charging stand 1 is for installing a vehicle charging device 21 in a garage (parking space) of a dwelling unit or the like.

車両用充電装置21は、装置本体23と、充電用ケーブル43と、充電用コネクタ41とを有している。この車両用充電装置21は、電動モータの駆動力で走行可能な電気自動車やプラグインハイブリッド自動車等の車両に搭載されたバッテリへ充電する充電装置である。   The vehicle charging device 21 has a device main body 23, a charging cable 43, and a charging connector 41. The vehicle charging device 21 is a charging device that charges a battery mounted on a vehicle such as an electric vehicle or a plug-in hybrid vehicle that can run with the driving force of an electric motor.

装置本体23は、充電器を内蔵しており、前面には、充電状態等を表示するモニタ部29を有している。充電用ケーブル43は、装置本体23の下部から延出しており、充電用コネクタ41は、充電用ケーブル43の先端に設けられている。充電用コネクタ41は、車両に設けられたコネクタに対して着脱可能とされている。充電用ケーブル43は、車両のコネクタが車両用充電装置21から遠く離れた位置に配置された場合であっても、車両のコネクタに充電用コネクタ41を接続することができるように、かなりの余裕を持った長さを有している。そこで、充電用ケーブル43は、装置本体23の下部に設けられたフック27に巻回した状態で係止されることで保持されている。   The device main body 23 has a built-in charger, and has a monitor unit 29 on the front surface for displaying a charging state and the like. The charging cable 43 extends from a lower portion of the device main body 23, and the charging connector 41 is provided at a tip of the charging cable 43. The charging connector 41 is detachable from a connector provided in the vehicle. The charging cable 43 has a considerable margin so that the charging connector 41 can be connected to the vehicle connector even when the vehicle connector is arranged at a position far away from the vehicle charging device 21. Has a length. Therefore, the charging cable 43 is held by being wound around a hook 27 provided at a lower portion of the apparatus main body 23.

装置本体23は、コネクタ保持部25を有しており、このコネクタ保持部25に充電用コネクタ41が保持される。車両のバッテリへの充電時には、充電用コネクタ41を装置本体23のコネクタ保持部25から取り外して車両のコネクタへ接続する。車両のバッテリへの充電終了後は、充電用コネクタ41を車両のコネクタから外して装置本体23のコネクタ保持部25に保持させる。   The device main body 23 has a connector holding section 25, and the charging connector 41 is held by the connector holding section 25. When charging the battery of the vehicle, the charging connector 41 is detached from the connector holding portion 25 of the device main body 23 and connected to the connector of the vehicle. After the charging of the battery of the vehicle is completed, the charging connector 41 is detached from the connector of the vehicle and is held by the connector holding portion 25 of the device main body 23.

車両用充電装置21では、充電用コネクタ41を車両のコネクタに接続した状態で、装置本体23の充電器から充電用ケーブル43を介して車両側へ給電される。これにより、車両のバッテリが充電される。   In the vehicle charging device 21, power is supplied from the charger of the device main body 23 to the vehicle via the charging cable 43 in a state where the charging connector 41 is connected to the connector of the vehicle. Thereby, the battery of the vehicle is charged.

本実施形態に係る充電スタンド用支柱11は、図2〜図4に示すように、管状の支柱13と、支柱13の上端部に固定される取付プレート15と、支柱13の下端部に取付けられる固定用アングル19と、とを組み立てることで形成されている。   As shown in FIGS. 2 to 4, the charging stand column 11 according to the present embodiment is attached to a tubular column 13, a mounting plate 15 fixed to an upper end of the column 13, and a lower end of the column 13. It is formed by assembling the fixing angle 19 and the fixing angle 19.

支柱13は、ステンレスなどの金属製で、矩形断面を有する略正方形の管状に形成されている。支柱13の対向する一対の上端縁には切欠きが形成されており、取付プレート15に形成された一対の切欠き溝と咬合することで、取付プレート15を所定位置に固定している。   The support column 13 is made of metal such as stainless steel, and is formed in a substantially square tubular shape having a rectangular cross section. A notch is formed in a pair of opposing upper edges of the support 13, and the mounting plate 15 is fixed at a predetermined position by engaging with a pair of notch grooves formed in the mounting plate 15.

図4の(a)に示すように、支柱13の下部側面(本実施形態では、充電スタンド用支柱11の下部背面)には、充填材81を充填するための充填部33と支柱内の水を排出するための水抜き部35とが一体に形成された充填口37が設けられている。充填口37は、図5の(a)に示すように、充填材81を充填するための円形の充填部33と、充填部33の上方に連通して形成されて充填部33より開口面積が小さい細溝形の水抜き部35と、を有する。更に、充填口37の下方には、支柱13内に電源用ケーブルを通したPF管51を引き込むためのPF管取り入れ口31が設けられている。   As shown in FIG. 4A, a filling portion 33 for filling the filler 81 and water in the column are provided on the lower side surface of the column 13 (the lower back surface of the charging stand column 11 in this embodiment). There is provided a filling port 37 integrally formed with a drainage section 35 for discharging water. As shown in FIG. 5A, the filling port 37 is formed so as to communicate with a circular filling part 33 for filling the filling material 81 and above the filling part 33, and has an opening area larger than that of the filling part 33. A small groove-shaped drainage portion 35. Further, below the filling port 37, a PF pipe inlet 31 for drawing the PF pipe 51 through the power cable into the column 13 is provided.

また、図4の(b)に示すように、支柱13の上部側面(本実施形態では、充電スタンド用支柱11の上部右側面)には、支柱13内に挿通されたPF管51を引き出すためのPF管取り出し口39が設けられている。更に、PF管取り出し口39の下方には、アース線53を支柱13に接続するためのアースねじ穴32が設けられている。   In addition, as shown in FIG. 4B, the PF tube 51 inserted into the support 13 is pulled out from the upper side surface of the support 13 (the upper right surface of the support stand support 11 in this embodiment). PF tube outlet 39 is provided. Further, a ground screw hole 32 for connecting the ground wire 53 to the column 13 is provided below the PF pipe outlet 39.

取付プレート15は、ステンレスなどの金属板製で、略長円形の長手方向下端には、支柱13の切欠きと咬合する一対の切欠き溝が形成されている。そして、取付プレート15の前面には、車両用充電装置21を固定するためのブラケット18が溶接されている。更に、取付プレート15には、車両用充電装置21の上部を覆って太陽光を遮ると共に雨除けとなるキャップ17が取付けられている。このキャップ17には、アルミ板等のように輻射熱を反射する金属板を用いたり、遮熱塗料を塗布した金属板を用いたりすることができる。   The mounting plate 15 is made of a metal plate such as stainless steel, and has a pair of cutout grooves which are engaged with the cutouts of the support column 13 at the lower end in the substantially elliptical longitudinal direction. A bracket 18 for fixing the vehicle charging device 21 is welded to the front surface of the mounting plate 15. Further, the mounting plate 15 is provided with a cap 17 that covers the upper part of the vehicle charging device 21 and blocks sunlight and protects from rain. As the cap 17, a metal plate that reflects radiant heat, such as an aluminum plate, can be used, or a metal plate coated with a heat shielding paint can be used.

固定用アングル19の一方の片は、図3及び図5に示すように、支柱13の下端部における各側面にそれぞれ溶接されている。各固定用アングル19の他方の片には、アンカーボルト取付穴19aが設けられている。   As shown in FIGS. 3 and 5, one piece of the fixing angle 19 is welded to each side surface at the lower end of the column 13. The other piece of each fixing angle 19 is provided with an anchor bolt mounting hole 19a.

次に、本実施形態に係る充電スタンド用支柱11の支持構造について説明する。
図1及び図2に示すように、充電スタンド用支柱11における支柱13は、平面視で長方形のコンクリート基礎73の略中央部に下部が埋設された状態で立設されている。支柱13の下端部は、割栗石71から立設されたアンカーボルト61に固定用アングル19が固定されている。
Next, a support structure of the support column 11 for the charging stand according to the present embodiment will be described.
As shown in FIGS. 1 and 2, the column 13 of the charging stand column 11 is erected in a substantially central portion of a rectangular concrete foundation 73 in a plan view with a lower portion buried. At the lower end of the support 13, a fixing angle 19 is fixed to an anchor bolt 61 erected from a split stone 71.

コンクリート基礎73に埋設された支柱13の下部内には、充填材81が充填されている。そして、支柱13の下部側面に形成された充填口37は、支柱13の周囲に打設されたコンクリート基礎73によって、充填口37の一部である充填部33が隠れ、充填部33の上方に連通して形成されている水抜き部35がコンクリート基礎73より露出している。
なお、本実施形態では、充填部33と水抜き部35とが一体に形成された充填口37とされているが、本発明の充填口はこれに限らず、支柱13内の水を排出するための水抜き穴が別に形成されてもよい。
A filler 81 is filled in the lower part of the column 13 buried in the concrete foundation 73. The filling port 37 formed on the lower side surface of the column 13 hides the filling section 33 which is a part of the filling port 37 by the concrete foundation 73 cast around the column 13, and is located above the filling section 33. The drainage portion 35 formed in communication is exposed from the concrete foundation 73.
In the present embodiment, the filling portion 33 and the water draining portion 35 are formed as the filling port 37 integrally formed. However, the filling port of the present invention is not limited to this, and discharges water in the column 13. A drain hole for water may be separately formed.

上述した本実施形態に係る充電スタンド用支柱11の支持構造によれば、支柱13の下部内に充填材81を充填するため充填口37の充填部33が、充填の作業性を高めるために大きく開口された場合でも、コンクリート基礎73により充填部33が隠され、水抜き部35だけが露出するので、支柱13の見栄えが低下することはない。即ち、図8に示したような従来の充填口542は、充填の作業性を高めるために開口面積を大きくすると支柱本体540(支柱)の見栄えが低下し、支柱本体540の見栄えを良くするために開口面積を小さくすると充填の作業性が低下してしまう。   According to the support structure of the charging stand support 11 according to the present embodiment described above, the filling portion 33 of the filling port 37 for filling the lower portion of the support 13 with the filler 81 is large in order to enhance the workability of filling. Even when it is opened, the filling portion 33 is hidden by the concrete foundation 73 and only the drainage portion 35 is exposed, so that the appearance of the column 13 does not deteriorate. That is, in the conventional filling port 542 as shown in FIG. 8, if the opening area is increased to enhance the workability of filling, the appearance of the support body 540 (the support) is reduced, and the appearance of the support body 540 is improved. If the opening area is too small, the workability of filling is reduced.

更に、本実施形態の充電スタンド用支柱11の支持構造によれば、図5の(a)に示したように、充填材81を充填するための充填部33と支柱13内の水を排出するための水抜き部35とを支柱13の下部側面に一体に形成することができ、それぞれ別々に開口した場合に比べて加工コストを下げることができる。また、開口面積が大きい充填部33をコンクリート基礎73で隠して開口面積が小さい水抜き部35だけを露出させることができるので、支柱13の見栄えを損なうことがない。   Furthermore, according to the support structure of the support 11 for the charging stand of the present embodiment, as shown in FIG. 5A, the filling portion 33 for filling the filler 81 and the water in the support 13 are discharged. And the draining portion 35 can be integrally formed on the lower side surface of the column 13, so that the processing cost can be reduced as compared with the case where the openings are separately formed. In addition, since the filling portion 33 having a large opening area can be hidden by the concrete foundation 73 and only the draining portion 35 having a small opening area can be exposed, the appearance of the column 13 is not impaired.

次に、本実施形態に係る充電スタンド用支柱の施工方法について説明する。
(埋設穴を掘る工程)
先ず、図6に示すように、支柱13の設置位置である電気自動車を駐車する地面75に、埋設穴70を掘る。そして、埋設穴70の底に割栗石71を敷く。
Next, a method for constructing the support pole for a charging stand according to the present embodiment will be described.
(Process of digging a buried hole)
First, as shown in FIG. 6, a buried hole 70 is dug in the ground 75 where the electric vehicle is parked, where the support column 13 is installed. Then, a split stone 71 is laid at the bottom of the buried hole 70.

次に、支柱13を設置位置に合わせて、支柱13が埋設穴70の底面に対して垂直になるように固定する。この時、充填口37の水抜き部35が、打設されたコンクリート基礎73の上面74より上方に位置して露出できるようにする。本実施形態では、割栗石71の上に捨てコンクリートおよびアンカーボルト61を打設し、支柱13の下端部に固定した固定用アングル19のアンカーボルト取付穴19aにアンカーボルト61を通した後、アンカーボルト61にナット64を締結することで、支柱13が埋設穴70の底面に対して垂直に固定される。なお、本発明の施工方法はこれに限らず、支柱13が埋設穴70の底面に対して垂直になるように、埋設穴70の周囲に設けた枠型から伸ばした支持部材によって、支柱13をコンクリート基礎73の打設が完了するまで支持してもよい。   Next, the support 13 is aligned with the installation position, and fixed so that the support 13 is perpendicular to the bottom surface of the buried hole 70. At this time, the drainage portion 35 of the filling port 37 is located above the upper surface 74 of the cast concrete foundation 73 so as to be exposed. In the present embodiment, the concrete and the anchor bolt 61 are cast on the split stone 71, and after passing the anchor bolt 61 through the anchor bolt mounting hole 19a of the fixing angle 19 fixed to the lower end of the support 13, the anchor By fastening the nut 64 to the bolt 61, the column 13 is fixed vertically to the bottom surface of the buried hole 70. The construction method of the present invention is not limited to this. The support 13 is extended by a support member extending from a frame provided around the buried hole 70 so that the support 13 is perpendicular to the bottom surface of the buried hole 70. It may be supported until the placing of the concrete foundation 73 is completed.

そして、アース線53の一端が取り付けられたアース棒55が地面75に打ち込まれ、アース線53の他端がアースねじ穴32にねじ止めされる。
電源用ケーブルを通したPF管51は、埋設穴70に連通する配管溝72に沿って配管され、先端部51aがPF管取り入れ口31から支柱13内に挿入され、支柱13の上部側面のPF管取り出し口39から引き出される。PF管取り出し口39から引き出された先端部51aは、車両用充電装置21の装置本体23に接続される。
Then, the ground rod 55 to which one end of the ground wire 53 is attached is driven into the ground 75, and the other end of the ground wire 53 is screwed to the ground screw hole 32.
The PF pipe 51 through which the power cable is passed is piped along a pipe groove 72 communicating with the buried hole 70, and a distal end 51 a is inserted into the support 13 from the PF pipe intake 31, and the PF pipe on the upper side surface of the support 13 is It is pulled out from the pipe outlet 39. The distal end portion 51 a pulled out from the PF pipe outlet 39 is connected to the device main body 23 of the vehicle charging device 21.

(充填材を充填する工程)
次に、図7の(a),(b)に示すように、垂設した状態の支柱13の下部内に充填口37から充填材81が充填される。この際、充填材81は、図5の(a)に示すように、充填口37における充填部33の穴下ラインLまで充填される。
本実施形態における充填材81は、コンクリート基礎73を打設するコンクリートを用いることで、材料コストを下げると共に、充填材81の充填作業とコンクリート基礎73の打設作業とを連続して作業できるようにしている。勿論、本発明の充填材としては、モルタルやセメントペースト等のグラウト材を用いることもできる。
(Process of filling filler)
Next, as shown in FIGS. 7A and 7B, the filling material 81 is filled into the lower part of the column 13 in the vertically installed state from the filling port 37. At this time, the filling material 81 is filled up to the line L below the hole of the filling portion 33 in the filling port 37 as shown in FIG.
The filler 81 in the present embodiment uses concrete for placing the concrete foundation 73 so that the material cost can be reduced and the filling work of the filler 81 and the placement of the concrete foundation 73 can be performed continuously. I have to. Of course, a grout material such as mortar or cement paste can also be used as the filler of the present invention.

(コンクリート基礎を打設する工程)
次に、埋設穴70をコンクリートで埋戻し、充填材81が充填された支柱13の周囲にコンクリート基礎73を打設する。コンクリート基礎73は、図2に示したように、上面74が地面75のグラインドラインGよりも高くなるようにする。この際、図5の(a)に示すように、上面74が充填口37における水抜き部35の上端よりも低くなるようにし、水抜き部35が塞がれることがないようにする。
その後、コンクリート基礎73は十分な強度が得られるように、必要な養生期間が確保される。
(Process of placing concrete foundation)
Next, the embedding hole 70 is backfilled with concrete, and a concrete foundation 73 is cast around the column 13 filled with the filler 81. As shown in FIG. 2, the concrete foundation 73 has the upper surface 74 higher than the ground line G of the ground 75. At this time, as shown in FIG. 5A, the upper surface 74 is set lower than the upper end of the drainage portion 35 at the filling port 37, so that the drainage portion 35 is not blocked.
Thereafter, a necessary curing period is secured so that the concrete foundation 73 has sufficient strength.

上述した本実施形態に係る充電スタンド用支柱の施工方法によれば、支柱13の下部内に充填した充填材81が固化するための養生期間を取らずに、支柱13の周囲にコンクリート基礎73を打設することができる。そこで、充填材81を充填する工程と、コンクリート基礎73を打設する工程とを同日に行うことができるので、工期が短縮されて施工コストが安くなる。   According to the charging stand support method according to the present embodiment described above, the concrete foundation 73 is provided around the support 13 without taking a curing period for solidifying the filler 81 filled in the lower portion of the support 13. Can be cast. Therefore, the step of filling the filler 81 and the step of placing the concrete foundation 73 can be performed on the same day, so that the construction period is shortened and the construction cost is reduced.

そして、コンクリート基礎73に立設された支柱13は、下部内に充填した充填材81がコンクリート基礎73と一体に固化されることで、支柱13内に雨水等が溜まって腐食するのを防止されると共に、支柱13のぐらつき、たわみが抑制されて支持強度が高められる。   The pillars 13 erected on the concrete foundation 73 are prevented from accumulating and corroding rainwater and the like in the pillars 13 by solidifying the filler 81 filled in the lower part integrally with the concrete foundation 73. In addition, the wobbling and bending of the support 13 are suppressed, and the support strength is increased.

従って、本実施形態の充電スタンド用支柱11の施工方法および支持構造によれば、工期を短縮して施工コストを抑えながら、支柱13内に雨水等が溜まって腐食するのを防止すると共に高い支持強度をもった充電スタンド用支柱11を得ることができる。   Therefore, according to the construction method and support structure of the charging stand column 11 of the present embodiment, it is possible to prevent rainwater and the like from accumulating and corroding in the column 13 and to provide a high support while shortening the construction period and reducing the construction cost. It is possible to obtain the charging stand column 11 having strength.

尚、本発明は、上述した実施形態に限定されるものではなく、適宜、変形、改良、等が可能である。その他、上述した実施形態における各構成要素の材質、形状、寸法、数、配置箇所、等は本発明を達成できるものであれば任意であり、限定されない。   It should be noted that the present invention is not limited to the above-described embodiment, and can be appropriately modified and improved. In addition, the material, shape, size, number, arrangement location, and the like of each component in the above-described embodiment are arbitrary and are not limited as long as the present invention can be achieved.

例えば、上記実施形態に係る充電スタンド用支柱11は、略正方形の管状に形成された支柱13を用いているが、略長方形や略円形等の種々の管状に形成された支柱を用いることができる。   For example, the pillar 11 for a charging stand according to the above-described embodiment uses the pillar 13 formed in a substantially square tubular shape. However, various tubular shaped pillars such as a substantially rectangular shape and a substantially circular shape can be used. .

ここで、上述した本発明に係る充電スタンド用支柱の施工方法および支持構造の実施形態の特徴をそれぞれ以下に簡潔に纏めて列記する。
[1] 充電装置(車両用充電装置21)を支持する管状の支柱(13)をコンクリート基礎(73)に立設するための充電スタンド用支柱(11)の施工方法であって、前記支柱の設置位置に埋設穴(70)を掘る工程と、前記埋設穴の底面に対して垂設した状態の前記支柱の下部内に充填口(37)から充填材(81)を充填する工程と、前記埋設穴をコンクリートで埋戻し、前記充填材が充填された前記支柱の周囲に前記コンクリート基礎73を打設する工程と、を備えたことを特徴とする充電スタンド用支柱の施工方法。
[2] 充電装置(車両用充電装置21)を支持する管状の支柱(13)をコンクリート基礎(73)に立設するための充電スタンド用支柱(11)の支持構造であって、前記コンクリート基礎に下部が埋設された前記支柱と、前記支柱の下部内に充填された充填材(81)と、前記支柱の下部側面に設けられ、前記支柱の周囲に打設された前記コンクリート基礎により少なくとも一部が隠れている充填口(37)と、を備えたことを特徴とする充電スタンド用支柱の支持構造。
[3] 前記充填口が、前記充填材を充填するための充填部(33)と、前記充填部の上方に連通して形成され、前記コンクリート基礎より露出すると共に、前記充填部より開口面積が小さい水抜き部(35)と、を有することを特徴とする上記[2]に記載の充電スタンド用支柱の支持構造。
Here, the features of the embodiment of the charging stand support method and the support structure according to the present invention described above will be briefly summarized and listed below.
[1] A method for constructing a charging stand support (11) for erecting a tubular support (13) for supporting a charging device (vehicle charging device 21) on a concrete foundation (73), comprising: A step of digging a buried hole (70) at an installation position, a step of filling a filler (81) from a filling port (37) into a lower portion of the column suspended from the bottom surface of the buried hole, Backfilling the buried hole with concrete and placing the concrete foundation 73 around the support pillar filled with the filler.
[2] A supporting structure for a charging stand support (11) for erecting a tubular support (13) for supporting a charging device (a vehicle charging device 21) on a concrete base (73), wherein the concrete base is provided. At least one of the pillars having a lower part embedded therein, a filler (81) filled in the lower part of the pillar, and the concrete foundation provided on a lower side surface of the pillar and cast around the pillar. And a charging port (37) in which a portion is hidden.
[3] The filling port is formed so as to communicate with a filling part (33) for filling the filling material and above the filling part, is exposed from the concrete foundation, and has an opening area from the filling part. The support structure for a support for a charging stand according to the above [2], comprising a small drain portion (35).

1 充電スタンド
11 充電スタンド用支柱
13 支柱
21 車両用充電装置(充電装置)
33 充填部
35 水抜き部
37 充填口
73 コンクリート基礎
81 充填材
DESCRIPTION OF SYMBOLS 1 Charging stand 11 Charging stand support 13 Support 21 Vehicle charging device (charging device)
33 Filling part 35 Drainage part 37 Filling port 73 Concrete foundation 81 Filling material

Claims (3)

充電装置を支持する管状の支柱をコンクリート基礎に立設するための充電スタンド用支柱の施工方法であって、
前記支柱の設置位置に埋設穴を掘る工程と、
電源用ケーブルを通したPF管を前記支柱内に挿入する工程と、
前記埋設穴の底面に対して垂設した状態の前記支柱の下部内に充填口から充填材を充填する工程と、
前記充填材を充填した後に、前記埋設穴をコンクリートで埋戻し、前記充填材が充填された前記支柱の周囲に前記コンクリート基礎を打設する工程と、
を備えたことを特徴とする充電スタンド用支柱の施工方法。
A method of constructing a charging stand column for erecting a tubular column supporting a charging device on a concrete foundation,
Digging a buried hole at the installation position of the column,
Inserting a PF tube through a power cable into the support,
A step of filling a filler from a filling port into a lower portion of the column suspended from the bottom of the buried hole,
After filling the filler, filling the buried hole with concrete, and placing the concrete foundation around the column filled with the filler,
A method for constructing a support pole for a charging stand, comprising:
充電装置を支持し、電源用ケーブルを通したPF管が挿通される管状の支柱をコンクリート基礎に立設するための充電スタンド用支柱の支持構造であって、
前記コンクリート基礎に下部が埋設された前記支柱と、
前記支柱の下部内に充填された充填材と、
前記支柱の下部側面に設けられ、前記支柱の周囲に打設された前記コンクリート基礎により少なくとも一部が隠れている充填口と、
前記充填口より下方の前記支柱の下部側面に形成されたPF管取り入れ口と、
を備えたことを特徴とする充電スタンド用支柱の支持構造。
Supporting the charging device, the tubular struts PF tube Ru is inserted through the power cable to a supporting structure of the column for charging stand for standing on a concrete foundation,
Said pillars with a lower part buried in said concrete foundation,
A filler filled in the lower portion of the support,
A filling port that is provided on the lower side surface of the column and is at least partially hidden by the concrete foundation that is cast around the column,
A PF pipe inlet formed on a lower side surface of the column below the filling port;
A support structure for a support pole for a charging stand, comprising:
前記充填口が、
前記充填材を充填するための充填部と、
前記充填部の上方に連通して形成され、前記コンクリート基礎より露出すると共に、前記充填部より開口面積が小さい水抜き部と、
を有することを特徴とする請求項2に記載の充電スタンド用支柱の支持構造。
The filling port is
A filling unit for filling the filler,
A drain portion formed in communication with the upper portion of the filling portion and exposed from the concrete foundation, and having a smaller opening area than the filling portion;
The support structure for a support pole for a charging stand according to claim 2, comprising:
JP2015209267A 2015-10-23 2015-10-23 Construction method and support structure of charging pole support Expired - Fee Related JP6637722B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015209267A JP6637722B2 (en) 2015-10-23 2015-10-23 Construction method and support structure of charging pole support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015209267A JP6637722B2 (en) 2015-10-23 2015-10-23 Construction method and support structure of charging pole support

Publications (2)

Publication Number Publication Date
JP2017082425A JP2017082425A (en) 2017-05-18
JP6637722B2 true JP6637722B2 (en) 2020-01-29

Family

ID=58710903

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015209267A Expired - Fee Related JP6637722B2 (en) 2015-10-23 2015-10-23 Construction method and support structure of charging pole support

Country Status (1)

Country Link
JP (1) JP6637722B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7046713B2 (en) * 2018-05-21 2022-04-04 未来工業株式会社 Power pole
KR102486670B1 (en) * 2020-11-27 2023-01-12 서진산업 주식회사 Electric vehicle protect cover for protecting from foreign material

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2581815Y2 (en) * 1993-12-24 1998-09-24 株式会社竹中工務店 Fixed structure of handrails on balconies
JPH10238058A (en) * 1997-02-21 1998-09-08 Binifureemu Kogyo Kk Erecting method and erecting device for aluminum hollow stanchion
JP5485850B2 (en) * 2010-05-25 2014-05-07 積水樹脂株式会社 Enclosure and power supply device for electric vehicle using the same
JP2013079536A (en) * 2011-10-05 2013-05-02 Katsuyo Tawara Installation structure of support post
JP5895709B2 (en) * 2012-05-25 2016-03-30 シンフォニアテクノロジー株式会社 Electric vehicle charging device
JP5816637B2 (en) * 2013-01-08 2015-11-18 株式会社サンレール How to install the handrail support

Also Published As

Publication number Publication date
JP2017082425A (en) 2017-05-18

Similar Documents

Publication Publication Date Title
EP3677733B1 (en) Roof structure and construction method for same
KR101358985B1 (en) Pillar settling structure and construction method of the same with improved stability and workability
JP6637722B2 (en) Construction method and support structure of charging pole support
KR20170089357A (en) Support structure for solar modules
JP2009102896A (en) Electrical connection structure and connection method in PC pillar connection part
KR20080002652U (en) Steel pipe cycle invitation
CN208881618U (en) Charging pile prefabricated armored concrete firm banking
JP3194681U (en) Foundation stand for solar panel installation
CN205857079U (en) A kind of full-automatic lifting roadblock
US20030145556A1 (en) Working pole foundation and method
KR101085796B1 (en) Concrete foundation integrated column fixing structure
CN104895401B (en) Combined type assembly enclosing wall and construction method thereof
JP3203468U (en) Simple animal fence
CN203145328U (en) Connecting device for connecting underground diaphragm wall and connector by reinforcing bars
CN210263413U (en) Cast-in-place face bracket pre-buried plate location structure
CN108612383B (en) Pre-deviation adjustment type power transmission iron tower
JP4774502B2 (en) Simple foundation
KR20120114078A (en) A fixing structure of pillar and construction method thereof
CN223048558U (en) Multipurpose assembled enclosure supporting frame
KR20200086975A (en) Pre installed steel pole base and steel pipe
JP5638859B2 (en) Prop holder
JP5647424B2 (en) Lightning protection structure for storage tank
KR20180055398A (en) Foundation for lighting tower
JP2014140301A (en) Photovoltaic power generation device
JP2024165305A (en) Mounts and Mounting Systems

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20180919

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20190618

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20190619

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20190724

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20191217

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20191223

R150 Certificate of patent or registration of utility model

Ref document number: 6637722

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees