JP6652797B2 - Steel pipe joint structure of steel slit dam - Google Patents
[go: Go Back, main page]

JP6652797B2 - Steel pipe joint structure of steel slit dam - Google Patents

Steel pipe joint structure of steel slit dam Download PDF

Info

Publication number
JP6652797B2
JP6652797B2 JP2015161730A JP2015161730A JP6652797B2 JP 6652797 B2 JP6652797 B2 JP 6652797B2 JP 2015161730 A JP2015161730 A JP 2015161730A JP 2015161730 A JP2015161730 A JP 2015161730A JP 6652797 B2 JP6652797 B2 JP 6652797B2
Authority
JP
Japan
Prior art keywords
steel pipe
steel
flange
flanged
joint structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2015161730A
Other languages
Japanese (ja)
Other versions
JP2017040073A (en
Inventor
ひろし 國領
ひろし 國領
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Metal Products Co Ltd
Original Assignee
Nippon Steel Metal Products Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Steel Metal Products Co Ltd filed Critical Nippon Steel Metal Products Co Ltd
Priority to JP2015161730A priority Critical patent/JP6652797B2/en
Publication of JP2017040073A publication Critical patent/JP2017040073A/en
Application granted granted Critical
Publication of JP6652797B2 publication Critical patent/JP6652797B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Description

この発明は、河川の横断方向両岸のコンクリート堤体間に設けられる鋼製スリットダムを構成するフランジ付き鋼管同士の接合部継手構造の技術分野に属する。   The present invention belongs to a technical field of a joint joint structure between flanged steel pipes constituting a steel slit dam provided between concrete embankments on both banks in a transverse direction of a river.

河川の横断方向両岸のコンクリート堤体間に立設され、土石流捕捉工対策、或いは流木捕捉工対策として巨礫、或いは流木などの流下物を効果的に捕捉する鋼製スリットダムがよく知られている。
この鋼製スリットダムは、透過型砂防堰堤等とも呼ばれ、今日まで、様々な形状、構造の技術が開示され、実施に供されている(例えば、特許文献1〜4参照)。
前記鋼製スリットダムは、鋼管からなる支柱や梁を立体的に接合して構築されている。前記接合手段には、搬送に適したサイズで製造された各ブロック(パーツ)の接合部位をフランジ付き鋼管とし、現場で当該フランジ付き鋼管同士を突き合わせ、各フランジ孔にボルトを通しナットで締結して接合するフランジ接合が多用されている(前記特許文献1〜4の図面等参照)。
Steel slit dams are well-established between concrete embankments on both banks in the transverse direction of the river, and are effective in trapping debris and driftwood, and effectively trapping boulders or driftwood. I have.
This steel slit dam is also called a transmission type sabo dam, etc., and until now, various shapes and structures have been disclosed and put into practice (for example, see Patent Documents 1 to 4).
The steel slit dam is constructed by three-dimensionally joining columns and beams made of a steel pipe. In the joining means, a joining portion of each block (part) manufactured in a size suitable for transportation is a steel pipe with a flange, the steel pipes with the flange are butt-joined on site, bolts are passed through the respective flange holes and fastened with nuts. Flange joining is often used (see drawings in Patent Documents 1 to 4 and the like).

特開2002−188134号公報JP 2002-188134 A 特開2013−204272号公報JP 2013-204272 A 特開2009−127280号公報JP 2009-127280 A 特開2009−24364号公報JP 2009-24364 A

前記したように、鋼製スリットダムを構築する際に多用されるフランジ接合であるが、特に鋼製スリットダムの上流側で実施する場合、図9と図10に示したように、巨礫がフランジ接合部又は鋼管の中間部に衝突(直撃)することによる衝撃等(図中の矢印参照)により、前記フランジ接合部が開いたり、芯ずれしたり(ずり動いたり)して強度・剛性が(急激に)低下する懸念がある。更に他のフランジ接合部にも悪影響を及ぼし、ひいては鋼製スリットダム自体が倒壊する等、その用をなさない懸念もある。
前記特許文献1には、図12に示すように、鞘管(36)を用いた接合手段が開示されてはいるものの、取り付け及び取り外しが容易で熟練工を必要としない、機械的接合に非常に優れたフランジ接合について改良した技術は今のところ見当たらない。
As described above, flange joining is often used when constructing a steel slit dam. Particularly when performed on the upstream side of a steel slit dam, as shown in FIGS. The impact or the like (see the arrow in the figure) caused by a collision (direct hit) with the joint or the middle part of the steel pipe causes the flange joint to open or misalign (move), resulting in strength and rigidity ( (Suddenly) there is a concern. In addition, there is a concern that other flange joints may be adversely affected, and thus the steel slit dam itself may be collapsed or not used.
Although Patent Document 1 discloses a joining means using a sheath tube (36) as shown in FIG. 12, it is very easy to attach and detach and does not require a skilled worker. There is currently no improved technique for good flange bonding.

本発明は、上述した背景技術の課題に鑑みて案出されたものであり、その目的とするところは、前記フランジ接合部のせん断抵抗力及び曲げ抵抗力を高めて巨礫の衝撃等による開き、又は芯ずれを極力防止することにより当該フランジ接合部の強度・剛性を保持し、ひいては所定の耐用年数まで所要の強度・剛性を保持した安定性、安全性に優れた鋼製スリットダムを実現し、近年の増大する土石流規模や想定外規模の土石流・巨礫の衝突にも対応できる、鋼製スリットダムの鋼管継手構造を提供することにある。   The present invention has been devised in view of the above-described problems of the background art, and its purpose is to increase the shear resistance and bending resistance of the flange joint to open due to the impact of boulders, Alternatively, by preventing the misalignment as much as possible, the strength and rigidity of the flange joint is maintained, and as a result, a steel slit dam with excellent stability and safety that maintains the required strength and rigidity up to a predetermined service life is realized. Another object of the present invention is to provide a steel pipe joint structure of a steel slit dam capable of coping with a recent increase in debris flow scale and unexpected debris flow and boulder collision.

上記課題を解決するための手段として、請求項1に記載した発明に係る鋼製スリットダムの鋼管継手構造は、河川の横断方向両岸のコンクリート堤体間に設けられる鋼製スリットダムのフランジ付き鋼管継手構造において、
一方のフランジ付き鋼管の接合端部には、他方のフランジ付き鋼管内に挿入可能な当該鋼管よりも細径のホゾ部材が突設されており、当該ホゾ部材が他方のフランジ付き鋼管内に挿入されて、接合する鋼管のフランジ同士が突き合わされた状態でフランジ接合されてなることを特徴とする。
As a means for solving the above problems, a steel pipe joint structure of a steel slit dam according to the invention described in claim 1 is provided with a flange of a steel slit dam provided between concrete embankments on both banks in a transverse direction of a river. In steel pipe joint structure,
At the joining end of one of the flanged steel pipes, a mortise member having a smaller diameter than the steel pipe that can be inserted into the other flanged steel pipe is protruded, and the mortise member is inserted into the other flanged steel pipe. Then, the flanges of the steel pipes to be joined are flange-joined in a state where the flanges abut each other .

請求項2に記載した発明は、請求項1に記載した発明に係る鋼製スリットダムの鋼管継手構造において、前記一方のフランジ付き鋼管は、鋼管の外方に突き出る環状又は円盤状のフランジ付き鋼管であることを特徴とする。   According to a second aspect of the present invention, in the steel pipe joint structure for a steel slit dam according to the first aspect, the one flanged steel pipe is an annular or disk-shaped flanged steel pipe protruding outward from the steel pipe. It is characterized by being.

請求項3に記載した発明に係る鋼製スリットダムの鋼管継手構造は、河川の横断方向両岸のコンクリート堤体間に設けられる鋼製スリットダムのフランジ付き鋼管継手構造において、
一方のフランジ付き鋼管の接合端部には、他方のフランジ付き鋼管内に挿入可能な当該鋼管よりも細径のホゾ部材が、前記一方のフランジ付き鋼管の接合端部の内側面に内接させてその一部を外方へ突き出すように設けられており、当該ホゾ部材の突き出し部分が他方のフランジ付き鋼管内に挿入されて、接合する鋼管のフランジ同士が突き合わされた状態でフランジ接合されてなることを特徴とする。
請求項に記載した発明に係る鋼製スリットダムの鋼管継手構造は、河川の横断方向両岸のコンクリート堤体間に設けられる鋼製スリットダムのフランジ付き鋼管継手構造において、
一方のフランジ付き鋼管の接合端部は、他方のフランジ付き鋼管よりも大きい拡径鋼管が一体的に取りつけられ、他方のフランジ付き鋼管の接合端部は、その端縁よりも内側の部位に環状のフランジが外設されており、当該環状のフランジから外側に突き出た鋼管が前記一方のフランジ付き鋼管の前記拡径鋼管内に挿入されて、接合する鋼管のフランジ同士が突き合わされた状態でフランジ接合されてなることを特徴とする。
The steel pipe joint structure of a steel slit dam according to the invention described in claim 3 is a steel pipe joint structure with a flange of a steel slit dam provided between concrete embankments on both banks in a transverse direction of a river,
At the joint end of one flanged steel pipe, a tenon member smaller in diameter than the steel pipe insertable into the other flanged steel pipe is inscribed on the inner surface of the joint end of the one flanged steel pipe. The protruding part of the tenon member is inserted into the other flanged steel pipe, and the flanges of the steel pipes to be joined are flange-joined in a state where the flanges of the steel pipes are joined to each other. It is characterized by becoming.
The steel pipe joint structure of a steel slit dam according to the invention described in claim 4 is a steel pipe joint structure with a flange of a steel slit dam provided between concrete embankments on both banks in a transverse direction of a river,
Joint end portion of one of the flanged steel pipe is greater diameter steel pipe than the other flanged steel pipe is found attached integrally, the joint end portion of the other flanged steel tubes, a portion of the inner than the edge An annular flange is provided externally, and a steel pipe projecting outward from the annular flange is inserted into the enlarged steel pipe of the one flanged steel pipe, and the flanges of the steel pipes to be joined are brought into contact with each other. It is characterized by being flanged.

請求項に記載した発明に係る鋼製スリットダムの鋼管継手構造は、河川の横断方向両岸のコンクリート堤体間に設けられる鋼製スリットダムのフランジ付き鋼管継手構造にお
いて、
一方のフランジ付き鋼管と他方のフランジ付き鋼管は、中央部に環状のフランジを外設したインナースリーブ部材を介して共締めによりフランジ接合されてなることを特徴とする。
The steel pipe joint structure of the steel slit dam according to the invention described in claim 5 is a steel pipe joint structure with a flange of a steel slit dam provided between concrete embankments on both banks in a transverse direction of a river,
The one flanged steel pipe and the other flanged steel pipe are characterized in that they are flange-joined by co-tightening via an inner sleeve member having an annular flange externally provided at the center.

請求項に記載した発明は、請求項に記載した発明に係る鋼製スリットダムの鋼管継手構造において、前記双方のフランジ付き鋼管は、鋼管の内外方に突き出る環状のフランジを備え、内方の突き出し部にはキー溝が形成され、前記インナースリーブ部材は、前記鋼管の環状フランジ内に挿入可能な大きさとされ、管軸方向両端部にキーが外設されており、前記キー溝内に挿入されたキーを回転させて引き抜き不能状態にした上でフランジ接合されてなることを特徴とする。 According to a sixth aspect of the present invention, in the steel pipe joint structure for a steel slit dam according to the fifth aspect of the present invention, the two steel pipes with flanges have annular flanges protruding inward and outward of the steel pipe. A key groove is formed at the protrusion of the inner sleeve member, and the inner sleeve member has a size that can be inserted into the annular flange of the steel pipe, and a key is externally provided at both ends in the pipe axial direction, and the inner sleeve member is provided inside the key groove. It is characterized in that the inserted key is rotated to make it impossible to pull out and then flanged.

請求項に記載した発明は、請求項1〜のいずれか一に記載した発明に係る鋼製スリットダムの鋼管継手構造において、前記一方又は他方のフランジ付き鋼管のフランジの外周面には、前記フランジ接合部を覆う保護ケーシングが設けられていることを特徴とする。 The invention described in claim 7 is the steel pipe joint structure of the steel slit dam according to any one of claims 1 to 6 , wherein the outer peripheral surface of the flange of the one or other flanged steel pipe has: A protection casing for covering the flange joint is provided.

本発明にかかる鋼製スリットダムの鋼管継手構造によれば、以下の作用効果を奏する。
(1)従来一般のフランジ接合(突き合わせボルト接合)に加え、ホゾとホゾ穴の関係のごとくホゾ部材等が環状のフランジ内へ嵌め込まれ拘束(ホールド)された所謂二重管構造を実現できるので、更に強固に接合でき、ホゾ部材等、ひいては互いに接合された鋼管の反りや捻れの防止にも寄与することができる。
したがって、前記フランジ接合部のせん断抵抗力及び曲げ抵抗力を効果的に高めることができるので、巨礫の衝撃等による開き、又は芯ずれを極力防止することにより当該フランジ接合部の強度・剛性を保持し、ひいては所定の耐用年数まで所要の強度・剛性を保持した安定性、安全性に優れた鋼製スリットダムを実現し、近年の増大する土石流規模や想定外規模の土石流・巨礫の衝突にも対応できる。
また、前記作用効果を、従来一般のフランジ接合作業と同様の手順と手間により実現できるので、至極合理的である。
(2)請求項にかかる鋼製スリットダムの鋼管継手構造によれば、上記作用効果(1)に加え、二重管構造を構成する内管に相当する部材が破損等した場合、内管の交換作業を容易に行うことができる。また、3枚のフランジでフランジ接合部を実現できるので、1枚当たりの板厚を小さくでき、フランジの溶接作業を省力化できる。
(3)請求項にかかる鋼製スリットダムの鋼管継手構造によれば、上記作用効果(1)、(2)に加え、キーとキー溝による離脱防止効果により、曲げ抵抗力を更に高めることができる。
(4)請求項にかかる鋼製スリットダムの鋼管継手構造によれば、上記作用効果(1)に加え、保護ケーシングがフランジ接合部を巨礫の直撃から護るので、巨礫の衝撃等による開き、又は芯ずれをさらに防止することができる。
According to the steel pipe joint structure of the steel slit dam according to the present invention, the following effects can be obtained.
(1) In addition to the conventional general flange joint (butt bolt joint), a so-called double pipe structure in which a tenon member or the like is fitted into an annular flange and held (held) as in the relationship between a tenon and a tenon hole can be realized. Further, it is possible to further firmly join, and it can also contribute to prevention of warpage and twisting of the tenon member and the like, and furthermore, the steel pipes joined to each other.
Therefore, since the shear resistance and the bending resistance of the flange joint can be effectively increased, the strength and rigidity of the flange joint can be maintained by minimizing opening or misalignment due to impact of boulders. In addition, a steel slit dam with excellent stability and safety that maintains the required strength and rigidity up to the specified service life has been realized, and is capable of responding to the recent increase in debris flow scale and unexpected scale debris flow and boulder collision. Can respond.
In addition, the above-described operation and effect can be realized by the same procedure and labor as the conventional general flange joining operation, so that it is extremely rational.
(2) According to the steel pipe joint structure of the steel slit dam according to claim 5 , in addition to the above operation and effect (1), when the member corresponding to the inner pipe constituting the double pipe structure is damaged, etc. Can be easily replaced. In addition, since the flange joint can be realized with three flanges, the thickness per sheet can be reduced, and the welding work of the flange can be saved.
(3) According to the steel pipe joint structure of the steel slit dam according to the sixth aspect , in addition to the above effects (1) and (2), the bending resistance is further enhanced by the detachment preventing effect of the key and the key groove. Can be.
(4) According to the steel pipe joint structure of the steel slit dam according to claim 7 , in addition to the effect (1), since the protective casing protects the flange joint portion from the direct impact of the boulders, it opens due to the impact of the boulders, Alternatively, misalignment can be further prevented.

Aは、実施例1にかかる鋼製スリットダムの鋼管継手構造の接合態様を概略的に示した分解斜視図であり、Bは、フランジ接合部を示した正面図であり、Cは、BのC−C線矢視断面図である。FIG. 1A is an exploded perspective view schematically showing a joining mode of a steel pipe joint structure of a steel slit dam according to a first embodiment, FIG. 1B is a front view showing a flange joining section, and FIG. It is CC sectional view taken on the line. Aは、実施例2にかかる鋼製スリットダムの鋼管継手構造のフランジ接合部を示した正面図であり、Bは、AのB−B線矢視断面図である。A is a front view showing a flange joint portion of the steel pipe joint structure of the steel slit dam according to Example 2, and B is a cross-sectional view of A taken along line BB. Aは、実施例3にかかる鋼製スリットダムの鋼管継手構造のフランジ接合部を示した正面図であり、Bは、AのB−B線矢視断面図である。A is a front view showing a flange joint portion of the steel pipe joint structure of the steel slit dam according to Example 3, and B is a cross-sectional view of A taken along line BB. Aは、実施例4にかかる鋼製スリットダムの鋼管継手構造の接合態様を概略的に示した分解斜視図であり、Bは、フランジ接合部を示した正面図であり、Cは、BのC−C線矢視断面図である。A is an exploded perspective view schematically showing a joining mode of a steel pipe joint structure of a steel slit dam according to Example 4, B is a front view showing a flange joining section, and C is a B view of FIG. It is CC sectional view taken on the line. Aは、実施例5にかかる鋼製スリットダムの鋼管継手構造の接合態様を概略的に示した分解斜視図であり、Bは、フランジ接合部を示した正面図であり、Cは、BのC−C線矢視断面図である。A is an exploded perspective view schematically showing a joining mode of a steel pipe joint structure of a steel slit dam according to Example 5, B is a front view showing a flange joint, and C is a sectional view of FIG. It is CC sectional view taken on the line. Aは、実施例6にかかる鋼製スリットダムの鋼管継手構造の接合態様を概略的に示した分解斜視図であり、Bは、フランジ接合部を示した正面図であり、Cは、BのC−C線矢視断面図である。A is an exploded perspective view schematically showing a joining mode of a steel pipe joint structure of a steel slit dam according to Example 6, B is a front view showing a flange joint, and C is a sectional view of B. It is CC sectional view taken on the line. Aは、実施例7にかかる鋼製スリットダムの鋼管継手構造のフランジ接合部を示した正面図であり、Bは、AのB−B線矢視断面図である。A is a front view showing a flange joint portion of the steel pipe joint structure of the steel slit dam according to Example 7, and B is a cross-sectional view of A taken along line BB. Aは、実施例8にかかる鋼製スリットダムの鋼管継手構造の接合態様を概略的に示した分解斜視図であり、Bは、フランジ接合部を示した正面図であり、Cは、フランジ側からみたフランジ付き鋼管の側面図であり、Dは、同インナースリーブ部材の側面図である。A is an exploded perspective view schematically showing a joining mode of a steel pipe joint structure of a steel slit dam according to Example 8, B is a front view showing a flange joint, and C is a flange side. It is a side view of the steel pipe with a flange seen from, and D is a side view of the inner sleeve member. Aは、従来技術にかかる鋼製スリットダムの鋼管継手構造を概略的に示した正面図であり、Bは、巨礫の衝撃等によりフランジ接合部が開いた状態を概略的に示した正面図であり、Cは、巨礫の衝撃等によりフランジ接合部が芯ずれした状態を概略的に示した正面図である。A is a front view schematically showing a steel pipe joint structure of a steel slit dam according to the related art, and B is a front view schematically showing a state in which a flange joint is opened due to boulder impact or the like. FIG. 4C is a front view schematically showing a state in which the flange joint is misaligned due to bombardment impact or the like. は、従来技術にかかる鋼製スリットダムの鋼管継手構造を概略的に示した正面図であり、Bは、巨礫の衝撃等によりフランジ接合部が開いた状態を概略的に示した正面図であり、Cは、巨礫の衝撃等によりフランジ接合部が芯ずれした状態を概略的に示した正面図である。Is a front view schematically showing a steel pipe joint structure of a steel slit dam according to the prior art, and B is a front view schematically showing a state in which a flange joint is opened due to boulder impact or the like. C is a front view schematically showing a state in which the flange joint is misaligned due to bombardment impact or the like.

本発明は、河川の横断方向両岸のコンクリート堤体間に設けられる鋼製スリットダムのフランジ付き鋼管継手構造において、そのフランジ接合部の補強(強化)、具体的には以下の実施例で逐一説明するが、要するに前記フランジ接合部を、ホゾ部を嵌入する等して所謂二重管構造に構成し、せん断抵抗力及び曲げ抵抗力を高める技術的思想に立脚している。
なお、実施例を説明するために用いる図は、図示の便宜上、一例として水平に接合する場合を記載しているが勿論これに限定されない。本発明(にかかるフランジ付き鋼管継手構造)を適用する部位に方向性はなく、水平方向、鉛直方向、傾斜方向等、あらゆる方向に適宜継ぎ足して接合し、鋼製スリットダムを立体的に構築することができる。もっとも、本発明をすべての接合部に適用しても良いし、要所(例えば、上流側に設置する鋼管のみ)に限定して適用しても良い。実施のバリエーションは多様に考えられる。
以下、本発明に係る鋼製スリットダムのフランジ付き鋼管継手構造の実施例について図面に基づいて説明する。
The present invention relates to a flanged steel pipe joint structure of a steel slit dam provided between concrete levee bodies on both banks in the transverse direction of a river, and more specifically to reinforcing (strengthening) the flange joint, specifically, in the following examples. In brief, the flange joint is formed into a so-called double-pipe structure by fitting a tenon part or the like, and is based on a technical idea of increasing a shear resistance and a bending resistance.
In addition, the drawings used for describing the embodiments show a case where they are horizontally joined as an example for convenience of illustration, but are not limited to this. The portion to which the present invention (the steel pipe joint structure with flange according to the present invention) is applied has no directionality, and is appropriately added and joined in all directions such as a horizontal direction, a vertical direction, and an inclined direction to form a steel slit dam three-dimensionally. be able to. Of course, the present invention may be applied to all the joints, or may be applied only to important points (for example, only a steel pipe installed on the upstream side). There are various implementation variations.
Hereinafter, an embodiment of a steel pipe joint structure with a flange of a steel slit dam according to the present invention will be described with reference to the drawings.

実施例1にかかる鋼製スリットダムの鋼管継手構造は、図1A〜Cに示したように、河川の横断方向両岸のコンクリート堤体間に設けられる鋼製スリットダム(図示省略)のフランジ付き鋼管継手構造であり、一方のフランジ付き鋼管1の接合端部には、他方のフランジ付き鋼管2内に挿入可能な当該鋼管よりも細径のホゾ部材5が突設されており、当該ホゾ部材5が他方のフランジ付き鋼管2内に挿入されて、接合する鋼管のフランジ同士が突き合わされた状態でフランジ接合されてなる。
ちなみに図中の符号3は、鋼管の外方に突き出る円盤状のフランジを示し、符号4は、鋼管の外方に突き出る環状のフランジを示している。
As shown in FIGS. 1A to 1C, the steel pipe joint structure of the steel slit dam according to the first embodiment has a flange of a steel slit dam (not shown) provided between concrete embankments on both banks in the transverse direction of the river. It has a steel pipe joint structure, and at the joining end of one flanged steel pipe 1, a tenon member 5 having a smaller diameter than the steel pipe insertable into the other flanged steel pipe 2 is provided to protrude. 5 is inserted into the other flanged steel pipe 2, and the flanges of the steel pipes to be joined are flanged and joined together.
Incidentally, reference numeral 3 in the drawing indicates a disk-shaped flange protruding outward from the steel pipe, and reference numeral 4 indicates an annular flange protruding outward from the steel pipe.

念のため、前記フランジ接合とは、当該フランジ付き鋼管1、2(厳密にはフランジ3、4)同士を突き合わせ、芯を一致させた各フランジ孔3a、4aにボルト6を通しナット7で締結して接合する手段をいう。
本実施例に用いる鋼管1、2の大きさ(形態)は、構造設計に応じて適宜設計変更されるが、外径(φ)400〜600mm程度、板厚(t)9〜22mm程度が一般的である。もとより、フランジ接合する鋼管1、2の大きさは一致させておくことが好ましい。
以下に説明する実施例についても同様の技術的思想とする。
As a precautionary measure, the flange joining means that the flanged steel pipes 1 and 2 (strictly speaking, the flanges 3 and 4) are abutted to each other, the bolts 6 are passed through the flange holes 3a and 4a whose cores are aligned, and the nuts 7 are fastened. Means to join.
The size (form) of the steel pipes 1 and 2 used in the present embodiment is appropriately changed depending on the structural design, but generally the outer diameter (φ) is about 400 to 600 mm and the thickness (t) is about 9 to 22 mm. It is a target. Of course, it is preferable that the sizes of the steel pipes 1 and 2 to be flange-joined are matched.
The same technical idea is applied to the embodiments described below.

具体的に、前記一方のフランジ付き鋼管1は、外径400mm程度、板厚9mm程度の大きさで実施している。当該鋼管1の接合端縁には、外径600mm程度、板厚36mm程度の円盤状のフランジ3が前記鋼管1と芯が一致するように溶接(全周溶接)により固着(固定)されている。さらに、前記円盤状のフランジ3の外側面には、外径250mm程度、板厚7mm程度、全長250mm程度の円筒形状のホゾ部材5が前記鋼管1及び円盤状のフランジ3と芯が一致するように溶接により固着されている。
前記他方のフランジ付き鋼管2は、外径400mm程度、板厚9mm程度の大きさで実施している。当該鋼管2の接合端縁には、外径600mm程度、内径250mm程度、板厚36mm程度の環状のフランジ4が前記鋼管2と芯が一致するように溶接により固着されている。すなわち、前記環状のフランジ4の内径は、前記ホゾ部材5が略内接する大きさとされている。
よって、前記一方のフランジ付き鋼管1のホゾ部材5(外径250mm程度)を他方のフランジ付き鋼管2の環状のフランジ4(内径250mm程度)内へ嵌め込んでさらに進入させると、当該鋼管1、2のフランジ3、4同士が突き合う構成となる。その後は、芯を一致させた各フランジ孔3a、4aにボルト6を通しナット7で締結して接合する所謂フランジ接合を行うことにより鋼管継手構造を実現する。
なお、前記各寸法は、一例を示したものにすぎず、構造設計に応じて適宜変更可能である。
More specifically, the one flanged steel pipe 1 has an outer diameter of about 400 mm and a plate thickness of about 9 mm. A disc-shaped flange 3 having an outer diameter of about 600 mm and a plate thickness of about 36 mm is fixed (fixed) to the joining edge of the steel pipe 1 by welding (all-around welding) so that the steel pipe 1 and the core are aligned. . Furthermore, a cylindrical tenon member 5 having an outer diameter of about 250 mm, a plate thickness of about 7 mm, and a total length of about 250 mm is provided on the outer surface of the disc-shaped flange 3 so that the core coincides with the steel pipe 1 and the disc-shaped flange 3. Is fixed by welding.
The other flanged steel pipe 2 has an outer diameter of about 400 mm and a thickness of about 9 mm. An annular flange 4 having an outer diameter of about 600 mm, an inner diameter of about 250 mm, and a plate thickness of about 36 mm is fixed to the joining edge of the steel pipe 2 by welding so that the steel pipe 2 and the core are aligned. That is, the inner diameter of the annular flange 4 is set to a size such that the tenon member 5 is substantially inscribed.
Accordingly, when the mortise member 5 (about 250 mm in outer diameter) of the one flanged steel pipe 1 is fitted into the annular flange 4 (about 250 mm in inner diameter) of the other flanged steel pipe 2 and further advanced, the steel pipe 1, The two flanges 3 and 4 are configured to abut each other. Thereafter, so-called flange joining is performed in which the bolts 6 are passed through the flange holes 3a and 4a having the aligned cores and fastened by the nuts 7 to join, thereby realizing a steel pipe joint structure.
In addition, each said dimension is only an example, and can be changed suitably according to a structural design.

上記構成の鋼製スリットダムの鋼管継手構造によれば、従来一般のフランジ接合(突き合わせボルト接合)に加え、ホゾとホゾ穴の関係のごとく前記ホゾ部材5が環状のフランジ4内へ嵌め込まれ拘束(ホールド)された所謂二重管構造を実現できるので、更に強固に接合でき、ホゾ部材5、ひいては前記鋼管1、2の反りや捻れの防止にも寄与することができる。
したがって、前記フランジ接合部のせん断抵抗力及び曲げ抵抗力を効果的に高めることができるので、巨礫の衝撃等による開き、又は芯ずれを極力防止することにより当該フランジ接合部の強度・剛性を保持し、ひいては所定の耐用年数まで所要の強度・剛性を保持した安定性、安全性に優れた鋼製スリットダムを実現し、近年の増大する土石流規模や想定外規模の土石流・巨礫の衝突にも対応できる。
また、前記作用効果を、従来一般のフランジ接合作業と同様の手順と手間により実現できるので、至極合理的である。
According to the steel pipe joint structure of the steel slit dam having the above-described structure, in addition to the conventional general flange connection (butting bolt connection), the mortise member 5 is fitted into the annular flange 4 as shown in the relationship between the mortise and the mortise hole, and restrained. Since a so-called double pipe structure held (held) can be realized, it is possible to further firmly join and contribute to prevention of warpage and twisting of the tenon member 5 and thus the steel pipes 1 and 2.
Therefore, since the shear resistance and the bending resistance of the flange joint can be effectively increased, the strength and rigidity of the flange joint can be maintained by minimizing opening or misalignment due to impact of boulders. In addition, a steel slit dam with excellent stability and safety that maintains the required strength and rigidity up to the specified service life has been realized, and is capable of responding to the recent increase in debris flow scale and unexpected scale debris flow and boulder collision. Can respond.
In addition, the above-described operation and effect can be realized by the same procedure and labor as those of the conventional general flange joining operation, which is extremely reasonable.

図2A、Bに示した鋼製スリットダムの鋼管継手構造は、上記実施例1と比し、前記ホゾ部材5の形態、これに伴う環状のフランジ4の形態のみ相違する。その他の構成要素は上記実施例1と同一なので同一の符号を付してその説明を適宜省略する。   The steel pipe joint structure of the steel slit dam shown in FIGS. 2A and 2B is different from the first embodiment only in the form of the tenon member 5 and the form of the annular flange 4 associated therewith. The other components are the same as those in the first embodiment, and thus are denoted by the same reference numerals and description thereof will be omitted as appropriate.

すなわち、この実施例2にかかる鋼製スリットダムの鋼管継手構造は、一方のフランジ付き鋼管1の円盤状のフランジ3の外側面に、外径382mm程度、板厚7mm程度、全長250mm程度の円筒形状のホゾ部材5’が前記鋼管1及び円盤状のフランジ3と芯が一致するように溶接により固着されている。
前記他方のフランジ付き鋼管2の接合端縁には、外径600mm程度、内径382mm程度、板厚36mm程度の環状のフランジ4’が前記鋼管2と芯が一致するように溶接により固着されている。すなわち、前記環状のフランジ4’及び鋼管2の内径は、前記ホゾ部材5’が略内接する大きさとされている。
よって、前記一方のフランジ付き鋼管1のホゾ部材5’(外径382mm程度)を他方のフランジ付き鋼管2の環状のフランジ4’(内径382mm程度)内へ嵌め込んでさらに進入させると、当該鋼管1、2のフランジ3、4’同士が突き合う構成となる。その後は、芯を一致させた各フランジ孔にボルト6を通しナット7を締結して接合する所謂フランジ接合を行うことにより鋼管継手構造を実現する。
なお、前記各寸法は、一例を示したものにすぎず、構造設計に応じて適宜変更可能である。
That is, the steel pipe joint structure of the steel slit dam according to the second embodiment has a cylindrical shape having an outer diameter of about 382 mm, a plate thickness of about 7 mm, and a total length of about 250 mm on the outer surface of the disk-shaped flange 3 of the one flanged steel pipe 1. A tenon member 5 ′ having a shape is fixed by welding so that the steel tube 1 and the disk-shaped flange 3 are aligned with the core.
An annular flange 4 'having an outer diameter of about 600 mm, an inner diameter of about 382 mm, and a thickness of about 36 mm is fixed to the joining edge of the other flanged steel pipe 2 by welding so that the steel pipe 2 and the core are aligned. . That is, the inner diameters of the annular flange 4 ′ and the steel pipe 2 are set to a size such that the tenon member 5 ′ is substantially inscribed.
Therefore, when the tenon member 5 '(outer diameter of about 382 mm) of the one flanged steel pipe 1 is fitted into the annular flange 4' (about 382 mm in inner diameter) of the other flanged steel pipe 2 and further advanced, the steel pipe is inserted. The first and second flanges 3 and 4 'are configured to abut each other. Thereafter, so-called flange joining is performed in which the bolts 6 are passed through the flange holes having the aligned cores and the nuts 7 are fastened and joined, thereby realizing a steel pipe joint structure.
In addition, each said dimension is only an example, and can be changed suitably according to a structural design.

上記構成の鋼製スリットダムの鋼管継手構造によれば、上記実施例1と同様の作用効果を奏する。
すなわち、従来一般のフランジ接合に加え、ホゾとホゾ穴の関係のごとく前記ホゾ部材5’が環状のフランジ4’(鋼管2)内へ嵌め込まれ拘束(ホールド)された所謂二重管構造を実現できるので、更に強固に接合でき、ホゾ部材5’、ひいては前記鋼管1、2の反りや捻れの防止にも寄与することができる。
したがって、前記フランジ接合部のせん断抵抗力及び曲げ抵抗力を効果的に高めることができるので、巨礫の衝撃等による開き、又は芯ずれを極力防止することにより当該フランジ接合部の強度・剛性を保持し、ひいては所定の耐用年数まで所要の強度・剛性を保持した安定性、安全性に優れた鋼製スリットダムを実現し、近年の増大する土石流規模や想定外規模の土石流・巨礫の衝突にも対応できる。
また、前記作用効果を、従来一般のフランジ接合作業と同様の手順と手間により実現できるので、至極合理的である。
According to the steel pipe joint structure of the steel slit dam having the above configuration, the same operation and effect as those of the first embodiment can be obtained.
That is, in addition to the conventional general flange joining, a so-called double pipe structure in which the tenon member 5 ′ is fitted into the annular flange 4 ′ (steel pipe 2) and restrained (held) as in the relationship between a tenon and a mortise hole is realized. Therefore, it is possible to further firmly join, and it is possible to contribute to prevention of warpage and twist of the tenon member 5 ′ and thus the steel pipes 1 and 2.
Therefore, since the shear resistance and the bending resistance of the flange joint can be effectively increased, the strength and rigidity of the flange joint can be maintained by minimizing opening or misalignment due to impact of boulders. In addition, a steel slit dam with excellent stability and safety that maintains the required strength and rigidity up to the specified service life has been realized, and is capable of responding to the recent increase in debris flow scale and unexpected scale debris flow and boulder collision. Can respond.
In addition, the above-described operation and effect can be realized by the same procedure and labor as the conventional general flange joining operation, so that it is extremely rational.

図3A、Bに示した鋼製スリットダムの鋼管継手構造は、上記実施例1と比し、フランジ3、4を、ともに上記実施例2の環状のフランジ4’と同一形状としたこと、及び前記ホゾ部材5の形態のみ相違する。その他の構成要素は上記実施例1と同一なので同一の符号を付してその説明を適宜省略する。   In the steel pipe joint structure of the steel slit dam shown in FIGS. 3A and 3B, both the flanges 3 and 4 have the same shape as the annular flange 4 ′ of the second embodiment, as compared with the first embodiment. Only the form of the tenon member 5 is different. The other components are the same as those in the first embodiment, and thus are denoted by the same reference numerals and description thereof will be omitted as appropriate.

すなわち、この実施例3にかかる鋼製スリットダムの鋼管継手構造は、前記一方のフランジ付き鋼管1の接合端縁には、外径600mm程度、内径382mm程度、板厚36mm程度の環状のフランジ3’が前記鋼管1と芯が一致するように溶接により固着されている。さらに、当該フランジ3’付き鋼管1の内側面には、外径382mm程度、板厚7mm程度、全長400mm程度の円筒形状のホゾ部材5vの一部(150mm)を内接させて、部分的(250mm程度)に外方へ突き出すように溶接により固着されている。
前記他方のフランジ付き鋼管2の形態は上記実施例2と同様であり、その接合端縁には、外径600mm程度、内径382mm程度、板厚36mm程度の環状のフランジ4’が前記鋼管2と芯が一致するように溶接により固着されている。すなわち、前記環状のフランジ4’及び鋼管2の内径は、前記ホゾ部材5vが略内接する大きさとされている。
よって、前記一方のフランジ付き鋼管1のホゾ部材5v(外径382mm程度)を他方のフランジ付き鋼管2の環状のフランジ4’(内径382mm程度)内へ嵌め込んでさらに進入させると、当該鋼管1、2のフランジ3’、4’同士が突き合う構成となる。その後は、芯を一致させた各フランジ孔にボルト6を通しナット7を締結して接合する所謂フランジ接合を行うことにより鋼管継手構造を実現する。
なお、前記各寸法は、一例を示したものにすぎず、構造設計に応じて適宜変更可能である。
That is, in the steel pipe joint structure of the steel slit dam according to the third embodiment, an annular flange 3 having an outer diameter of about 600 mm, an inner diameter of about 382 mm, and a plate thickness of about 36 mm is provided at the joining edge of the one flanged steel pipe 1. Is fixed by welding so that the steel tube 1 and the core are aligned. Further, a part (150 mm) of a cylindrical tenon member 5v having an outer diameter of about 382 mm, a plate thickness of about 7 mm, and a total length of about 400 mm is inscribed on the inner surface of the steel pipe 1 with the flange 3 ′ to partially ( (About 250 mm) so as to project outward.
The form of the other flanged steel pipe 2 is the same as that of the second embodiment, and an annular flange 4 ′ having an outer diameter of about 600 mm, an inner diameter of about 382 mm, and a plate thickness of about 36 mm is formed at the joining edge thereof. It is fixed by welding so that the cores coincide. That is, the inner diameter of the annular flange 4 ′ and the inner diameter of the steel pipe 2 are set to a size such that the tenon member 5 v is substantially inscribed.
Accordingly, when the tenon member 5v (about 382 mm in outer diameter) of the one flanged steel pipe 1 is fitted into the annular flange 4 ′ (about 382 mm in inner diameter) of the other flanged steel pipe 2 and further advanced, the steel pipe 1 is inserted. The two flanges 3 ′ and 4 ′ abut each other. Thereafter, so-called flange joining is performed in which the bolts 6 are passed through the flange holes having the aligned cores and the nuts 7 are fastened and joined, thereby realizing a steel pipe joint structure.
In addition, each said dimension is only an example, and can be changed suitably according to a structural design.

上記構成の鋼製スリットダムの鋼管継手構造によれば、上記実施例1、2と同様の作用効果を奏する。
すなわち、従来一般のフランジ接合に加え、ホゾとホゾ穴の関係のごとく前記ホゾ部材5vが環状のフランジ4’(鋼管2)内へ嵌め込まれ拘束(ホールド)された所謂二重管構造を実現できるので、更に強固に接合でき、ホゾ部材5v、ひいては前記鋼管1、2の反りや捻れの防止にも寄与することができる。
したがって、前記フランジ接合部のせん断抵抗力及び曲げ抵抗力を効果的に高めることができるので、巨礫の衝撃等による開き、又は芯ずれを極力防止することにより当該フランジ接合部の強度・剛性を保持し、ひいては所定の耐用年数まで所要の強度・剛性を保持した安定性、安全性に優れた鋼製スリットダムを実現し、近年の増大する土石流規模や想定外規模の土石流・巨礫の衝突にも対応できる。
また、前記作用効果を、従来一般のフランジ接合作業と同様の手順と手間により実現できるので、至極合理的である。
According to the steel pipe joint structure of the steel slit dam having the above configuration, the same operation and effect as those of the first and second embodiments can be obtained.
That is, in addition to the conventional general flange joining, a so-called double pipe structure in which the tenon member 5v is fitted and restrained (held) in the annular flange 4 '(steel pipe 2) as in the relationship between a tenon and a tenon hole can be realized. Therefore, it is possible to join more firmly, and it is also possible to contribute to prevention of warpage and twisting of the mortise member 5v and thus the steel pipes 1 and 2.
Therefore, since the shear resistance and the bending resistance of the flange joint can be effectively increased, the strength and rigidity of the flange joint can be maintained by minimizing opening or misalignment due to impact of boulders. In addition, a steel slit dam with excellent stability and safety that maintains the required strength and rigidity up to the specified service life has been realized, and is capable of responding to the recent increase in debris flow scale and unexpected scale debris flow and boulder collision. Can respond.
In addition, the above-described operation and effect can be realized by the same procedure and labor as the conventional general flange joining operation, so that it is extremely rational.

実施例4にかかる鋼製スリットダムの鋼管継手構造は、図4A?Cに示したように、河川の横断方向両岸のコンクリート堤体間に設けられる鋼製スリットダムのフランジ付き鋼管継手構造であり、一方のフランジ付き鋼管11の接合端部は、他方のフランジ付き鋼管12よりも大きい拡径鋼管11aが一体的に取りつけられ、他方のフランジ付き鋼管12の接合端部は、その端縁よりも内側の部位(本実施例では前記拡径鋼管11aの管軸方向長さL(図4B参照)分だけ鋼管12が突き出る部位)に環状のフランジ14が外設されており、当該環状のフランジ14から外側に突き出た鋼管12が前記一方のフランジ付き鋼管11の拡径鋼管11a内に挿入されて、接合する鋼管のフランジ同士が突き合わされた状態でフランジ接合されてなる。
ちなみに図中の符号13は、環状のフランジを示している。
The steel pipe joint structure of the steel slit dam according to the fourth embodiment is, as shown in FIGS. 4A to 4C, a flanged steel pipe joint structure of a steel slit dam provided between concrete embankments on both banks in the transverse direction of the river. The joint end of one flanged steel pipe 11 is integrally attached with an enlarged steel pipe 11a larger than the other flanged steel pipe 12, and the joint end of the other flanged steel pipe 12 is closer to the end. An annular flange 14 is externally provided at an inner portion (in this embodiment, a portion where the steel pipe 12 protrudes by a length L (see FIG. 4B) in the pipe axis direction of the enlarged diameter steel pipe 11a). The steel pipe 12 protruding outward from 14 is inserted into the enlarged diameter steel pipe 11a of the one flanged steel pipe 11, and the flanges of the steel pipes to be joined are flange-joined in a state where the flanges abut each other. .
Reference numeral 13 in the drawing indicates an annular flange.

具体的に、前記一方のフランジ付き鋼管11は、外径400mm程度、板厚9mm程度の大きさで実施され、前記拡径鋼管11aは、外径418mm程度、板厚9mm程度、管軸方向長さが220mm程度の形態で実施されている。さらに、当該拡径鋼管11aの端縁の外周面には外径600mm程度、内径418mm程度、板厚36mm程度の環状のフランジ13が前記鋼管11及び拡径鋼管11aと芯が一致するように溶接により固着されている。
前記他方のフランジ付き鋼管12は、外径400mm程度、板厚9mm程度の大きさで実施され、当該鋼管12に外設されるフランジ14は、外径600mm程度、内径400mm程度、板厚36mm程度で、前記鋼管12と芯が一致するように溶接により固着されている。すなわち、前記拡径鋼管11aの内径(400mm)は、前記鋼管12が略内接する大きさとされている。
Specifically, the one flanged steel pipe 11 has an outer diameter of about 400 mm and a plate thickness of about 9 mm, and the expanded steel pipe 11a has an outer diameter of about 418 mm, a plate thickness of about 9 mm, and a pipe axial length. Is implemented in a form of about 220 mm. Further, an outer diameter of about 600mm on the outer peripheral surface of the edge of the enlarged diameter steel pipe 11a, an inner diameter of about 418Mm, as annular flange 13 about the plate thickness 36mm is the steel pipe 11 and the enlarged diameter steel pipe 11a and the core are matched welding Is fixed.
The other flanged steel pipe 12 has an outer diameter of about 400 mm and a plate thickness of about 9 mm, and the flange 14 provided on the steel pipe 12 has an outer diameter of about 600 mm, an inner diameter of about 400 mm, and a plate thickness of about 36 mm. The steel pipe 12 and the core are fixed by welding so as to coincide with the core. That is, the inner diameter (400 mm) of the enlarged diameter steel pipe 11a is set to a size such that the steel pipe 12 is substantially inscribed.

上記した寸法のとおり、前記一方のフランジ付き鋼管11側に設ける環状のフランジ13と他方のフランジ付き鋼管12側に設ける環状のフランジ14とは、外径が同じで内径が異なる。もとより、フランジ孔13a、14aは芯が一致するように設けられている。 前記フランジ14は、上記した通り、本実施例では前記拡径鋼管11aの管軸方向長さ(L=220mm程度)分だけ鋼管12が突き出る部位に設けて実施しているがこれに限定されない。前記寸法より短くても(例えば、L=50mm程度でも)よい。もっとも、前記L寸法は、長い方がせん断抵抗力及び曲げ抵抗力は増加する。 As described above, the annular flange 13 provided on the one flanged steel pipe 11 side and the annular flange 14 provided on the other flanged steel pipe 12 have the same outer diameter and different inner diameters. Of course, the flange holes 13a and 14a are provided so that the cores coincide. As described above, in the present embodiment, the flange 14 is provided at a position where the steel pipe 12 protrudes by the length in the pipe axis direction (L = about 220 mm) of the expanded steel pipe 11a, but is not limited thereto. It may be shorter than the above dimensions (for example, L = about 50 mm). However, the longer the L dimension, the greater the shear resistance and bending resistance.

なお、前記各寸法は、一例を示したものにすぎず、構造設計に応じて適宜変更可能である。特に、前記鋼管12の突き出し寸法Lは、前記せん断抵抗力及び曲げ抵抗力を効果的に発揮できる寸法で実施され、例えば、50〜300mm等、使用する鋼管11、12の外径を(φ)とすると、1/2φ〜1φの範囲で実施することが好ましい。
かくして、前記他方のフランジ付き鋼管12を一方のフランジ付き鋼管11の拡径鋼管11a内へ嵌め込んでさらに進入させると、当該鋼管11、12のフランジ13、14同士が突き合う構成となる。その後は、芯を一致させた各フランジ孔13a、14aにボルト6を通しナット7で締結して接合する所謂フランジ接合を行うことにより鋼管継手構造を実現する。
In addition, each said dimension is only an example, and can be changed suitably according to a structural design. In particular, the projecting dimension L of the steel pipe 12 is set to a dimension that can effectively exert the shear resistance and the bending resistance. For example, the outer diameter of the steel pipes 11 and 12 to be used, such as 50 to 300 mm, is (φ). Then, it is preferable to carry out the process in the range of 1 / 2φ to 1φ.
Thus, when the other flanged steel pipe 12 is fitted into the expanded steel pipe 11a of the one flanged steel pipe 11 and further advanced, the flanges 13 and 14 of the steel pipes 11 and 12 abut against each other. After that, a so-called flange joint in which the bolts 6 are passed through the flange holes 13a and 14a having the aligned cores and fastened with the nuts 7 to perform joining is realized, thereby realizing a steel pipe joint structure.

上記構成の鋼製スリットダムの鋼管継手構造によれば、従来一般のフランジ接合(突き
合わせボルト接合)に加え、ホゾとホゾ穴の関係のごとく前記鋼管12が拡径鋼管11a内へ嵌め込まれ拘束(ホールド)された所謂二重管構造を実現できるので、更に強固に接合でき、前記鋼管11、12の反りや捻れの防止にも寄与することができる。
したがって、前記フランジ接合部のせん断抵抗力及び曲げ抵抗力を効果的に高めることができるので、巨礫の衝撃等による開き、又は芯ずれを極力防止することにより当該フランジ接合部の強度・剛性を保持し、ひいては所定の耐用年数まで所要の強度・剛性を保持した安定性、安全性に優れた鋼製スリットダムを実現し、近年の増大する土石流規模や想定外規模の土石流・巨礫の衝突にも対応できる。
また、前記作用効果を、従来一般のフランジ接合作業と同様の手順と手間により実現できるので、至極合理的である。
[実施例5]
According to the steel pipe joint structure of the steel slit dam having the above-described configuration, in addition to the conventional general flange connection (butt bolt connection), the steel pipe 12 is fitted into the enlarged diameter steel pipe 11a as in the relationship between a mortise and a mortise hole and restrained ( Since a so-called double-pipe structure which is held) can be realized, it is possible to join more firmly and to contribute to prevention of warpage and twist of the steel pipes 11 and 12.
Therefore, since the shear resistance and the bending resistance of the flange joint can be effectively increased, the strength and rigidity of the flange joint can be maintained by minimizing opening or misalignment due to impact of boulders. In addition, a steel slit dam with excellent stability and safety that maintains the required strength and rigidity up to the specified service life has been realized, and is capable of responding to the recent increase in debris flow scale and unexpected scale debris flow and boulder collision. Can respond.
In addition, the above-described operation and effect can be realized by the same procedure and labor as the conventional general flange joining operation, so that it is extremely rational.
[Example 5]

図5A〜Cに示した鋼製スリットダムの鋼管継手構造は、上記実施例4と比し、前記一方のフランジ付き鋼管11のフランジ13の外周面に、前記フランジ接合部を覆う保護ケーシング15が設けられていることが相違する。その他の構成要素は上記実施例4と同一なので同一の符号を付してその説明を適宜省略する。 The steel pipe joint structure of the steel slit dam shown in FIGS. 5A to 5C is different from that of the fourth embodiment in that the protective casing 15 covering the flange joint is provided on the outer peripheral surface of the flange 13 of the one flanged steel pipe 11. The difference is that they are provided. The other components are the same as those in the fourth embodiment, and thus are denoted by the same reference numerals and description thereof will be omitted as appropriate.

すなわち、この実施例5にかかる鋼製スリットダムの鋼管継手構造は、前記保護ケーシング15が、図5A〜Cに示したように、断面L字型の円環状に形成されており、前記一方のフランジ付き鋼管11のフランジ13の外周面に外接する円筒部は、外径620mm程度、内径600mm程度、板厚12mm程度の均等断面形状とされ、当該鋼管11の外周面に外接する底面部は、外径624mm程度、内径400mm程度の環状に形成されている。
また、当該保護ケーシング15の管軸方向長さは、底面部が前記拡径鋼管11aの基端部(段部)に掛け留めたとき、円筒部の先端縁がフランジ接合部を覆う程度(具体的には、図5Bの左側から右側へ、底面部の板厚(5mm)、拡径鋼管11aの全長(220mm)、フランジ14の板厚(36mm)、ボルト6の頭部(20mm)を足した281mm程度)の長さで実施されている。
That is, in the steel pipe joint structure of the steel slit dam according to the fifth embodiment, as shown in FIGS. 5A to 5C, the protective casing 15 is formed in an annular shape having an L-shaped cross section. The cylindrical portion circumscribing the outer peripheral surface of the flange 13 of the flanged steel pipe 11 has an outer diameter of about 620 mm, an inner diameter of about 600 mm, and a plate thickness of about 12 mm. It is formed in an annular shape with an outer diameter of about 624 mm and an inner diameter of about 400 mm.
Further, the length of the protective casing 15 in the tube axis direction is such that the distal end edge of the cylindrical portion covers the flange joint when the bottom portion is hung on the base end (step portion) of the expanded steel pipe 11a (specifically, Specifically, from the left side to the right side in FIG. 5B, the thickness of the bottom portion (5 mm), the total length of the expanded steel pipe 11a (220 mm), the thickness of the flange 14 (36 mm), and the head of the bolt 6 (20 mm) are added. 281 mm).

なお、前記保護ケーシング15の形態はもちろん上記寸法に限定されず、前記フランジ接合部を覆うことができるように、所要の強度・剛性を備えて前記フランジ付き鋼管11に固着して実施できればよい。また、図示は省略したが、前記保護ケーシング15は、他方のフランジ付き鋼管12に、やはり前記フランジ接合部を覆うことができるように、所要の強度・剛性を備えて固着して実施することもできる。
もっとも、前記保護ケーシング15を設ける側のフランジ13(フランジ孔13a)は、ボルト接合作業を考慮し、予めナット7を溶接しておく。
The form of the protective casing 15 is of course not limited to the above dimensions, and it is sufficient that the protective casing 15 is fixed to the flanged steel pipe 11 with required strength and rigidity so as to cover the flange joint. Although not shown, the protective casing 15 may be fixed to the other flanged steel pipe 12 with the required strength and rigidity so that the flange joint can be covered again. it can.
However, the nut 7 is welded to the flange 13 (flange hole 13a) on the side where the protective casing 15 is provided in advance in consideration of the bolt joining operation.

かくして、前記他方のフランジ付き鋼管12を一方のフランジ付き鋼管11の拡径鋼管11a内へ嵌め込んでさらに進入させると、当該鋼管11、12のフランジ13、14同士が突き合う構成となる。その後は、芯を一致させた各フランジ孔13a、14aにおいて、フランジ孔13a側に設けた溶接ナット7にボルト6を通して接合する所謂フランジ接合を行うことにより鋼管継手構造を実現する。 Thus, when the other flanged steel pipe 12 is fitted into the expanded steel pipe 11a of the one flanged steel pipe 11 and further advanced, the flanges 13 and 14 of the steel pipes 11 and 12 abut against each other. Thereafter, in each of the flange holes 13a and 14a whose cores are aligned, a so-called flange joint is performed in which the bolt 6 is joined to the welding nut 7 provided on the flange hole 13a side to realize a steel pipe joint structure.

上記構成の鋼製スリットダムの鋼管継手構造によれば、上記実施例4と同様の作用効果(段落[0029]参照)に加え、前記保護ケーシング15が、フランジ接合部を巨礫の直撃から護るので、巨礫の衝撃等による開き、又は芯ずれをさらに防止することにより当該フランジ接合部の強度・剛性を保持し、ひいては所定の耐用年数まで所要の強度・剛性を保持した安定性、安全性に非常に優れた鋼製スリットダムを実現し、近年の増大する土石流規模や想定外規模の土石流・巨礫の衝突にも対応できる。   According to the steel pipe joint structure of the steel slit dam having the above configuration, in addition to the same operation and effect as in the fourth embodiment (see paragraph [0029]), since the protective casing 15 protects the flange joint from direct impact of boulders. By maintaining the strength and rigidity of the flange joint by further preventing opening or misalignment due to boulder impact, etc., the stability and safety of the required strength and rigidity up to the specified service life are maintained. It realizes an excellent steel slit dam and can cope with the recent increase in debris flow scale and unexpected scale of debris flow and boulder collision.

実施例6にかかる鋼製スリットダムの鋼管継手構造は、図6A?Cに示したように、河川の横断方向両岸のコンクリート堤体間に設けられる鋼製スリットダムのフランジ付き鋼管継手構造であり、一方のフランジ付き鋼管21と他方のフランジ付き鋼管22は、中央部(中間部)に環状のフランジ26を外設したインナースリーブ部材23を介して共締めによりフランジ接合されてなる。
ちなみに図中の符号24、25は、一対の環状のフランジを示している。
The steel pipe joint structure of the steel slit dam according to the sixth embodiment is, as shown in FIGS. 6A to 6C, a flanged steel pipe joint structure of a steel slit dam provided between concrete embankments on both banks in the transverse direction of the river. In addition, one flanged steel pipe 21 and the other flanged steel pipe 22 are flange-joined by co-tightening via an inner sleeve member 23 having an annular flange 26 provided at the center (intermediate part).
Incidentally, reference numerals 24 and 25 in the drawing indicate a pair of annular flanges.

具体的に、前記一方のフランジ付き鋼管21は、外径400mm程度、板厚9mm程度の大きさで実施している。当該鋼管21の接合端縁には、外径600mm程度、内径382mm程度、板厚24mm程度の環状のフランジ24が前記鋼管21と芯が一致するように溶接により固着されている。
前記他方のフランジ付き鋼管22は、前記一方のフランジ付き鋼管21と同形・同大(管軸長さは考慮しない。)で実施されている。
また、前記インナースリーブ部材23は、外径382mm程度、板厚9mm程度、管軸方向長さが470mm程度の円筒形状で実施されている。当該部材23に外設する環状のフランジ26は、外径600mm程度、内径382mm程度、板厚24mm程度で実施されている。
More specifically, the one flanged steel pipe 21 has an outer diameter of about 400 mm and a thickness of about 9 mm. An annular flange 24 having an outer diameter of about 600 mm, an inner diameter of about 382 mm, and a plate thickness of about 24 mm is fixed to the joining edge of the steel pipe 21 by welding so that the steel pipe 21 and the core are aligned.
The other flanged steel pipe 22 has the same shape and the same size as the one flanged steel pipe 21 (the pipe shaft length is not considered).
The inner sleeve member 23 has a cylindrical shape with an outer diameter of about 382 mm, a plate thickness of about 9 mm, and a length in the tube axis direction of about 470 mm. The annular flange 26 provided outside the member 23 has an outer diameter of about 600 mm, an inner diameter of about 382 mm, and a plate thickness of about 24 mm.

すなわち、前記フランジ付き鋼管21、22の内径(382mm)は、ともに前記インナースリーブ部材23が略内接する大きさとされている。もとより、前記環状のフランジ24、25、及び26に設けたフランジ孔24a、25a、及び26aは芯が一致するように設けられている。
なお、前記各寸法は、一例を示したものにすぎず、構造設計に応じて適宜変更可能である。特に、インナースリーブ部材23の管軸方向長さは、フランジ接合部において、せん断抵抗力及び曲げ抵抗力を効果的に発揮できる寸法で実施され、例えば、100〜600mm等、使用する鋼管21、22の外径を(φ)とすると、1φ〜2φの範囲(即ち、鋼管21、22に1/2φ〜1φずつ均等に跨がる範囲)で実施することが好ましい。
That is, the inner diameter (382 mm) of each of the flanged steel pipes 21 and 22 is set to a size such that the inner sleeve member 23 is substantially inscribed. Of course, the flange holes 24a, 25a, and 26a provided in the annular flanges 24, 25, and 26 are provided so that the cores are aligned.
In addition, each said dimension is only an example, and can be changed suitably according to a structural design. In particular, the length of the inner sleeve member 23 in the tube axis direction is set to a size capable of effectively exhibiting the shear resistance and the bending resistance at the flange joint portion, and is, for example, 100 to 600 mm or the like. When the outer diameter of the steel pipe is (φ), it is preferable to perform the processing in a range of 1φ to 2φ (that is, a range in which the steel pipes 21 and 22 are evenly spread by 1 / 2φ to 1φ each).

かくして、前記インナースリーブ部材23を、一方のフランジ付き鋼管21内へ嵌め込むと共に、他方のフランジ付き鋼管22内へ嵌め込むと、互いの環状のフランジ24、25、26同士が突き合う構成となり、当該インナースリーブ部材23が、双方の前記鋼管21、22に均等に跨がる構造となる。その後は、芯を一致させた各フランジ孔24a、25a、26aにボルト6を通しナット7で締結して接合する所謂フランジ接合を行うことにより鋼管継手構造を実現する。   Thus, when the inner sleeve member 23 is fitted into the one flanged steel pipe 21 and the other flanged steel pipe 22, the annular flanges 24, 25, 26 abut each other, The inner sleeve member 23 has a structure that straddles both the steel pipes 21 and 22 evenly. After that, a so-called flange joint is performed in which the bolts 6 are passed through the flange holes 24a, 25a, and 26a whose cores are aligned and fastened by the nuts 7 to join, thereby realizing a steel pipe joint structure.

上記構成の鋼製スリットダムの鋼管継手構造によれば、従来一般のフランジ接合に加え、ホゾとホゾ穴の関係のごとく前記インナースリーブ部材23が前記鋼管21、22内に略均等に跨がるように嵌め込まれ拘束(ホールド)された所謂二重管構造を実現できるので、更に強固に接合でき、インナースリーブ部材23、ひいては前記鋼管21、22の反りや捻れの防止にも寄与することができる。
したがって、前記フランジ接合部のせん断抵抗力及び曲げ抵抗力を効果的に高めることができるので、巨礫の衝撃等による開き、又は芯ずれを極力防止することにより当該フランジ接合部の強度・剛性を保持し、ひいては所定の耐用年数まで所要の強度・剛性を保持した安定性、安全性に優れた鋼製スリットダムを実現し、近年の増大する土石流規模や想定外規模の土石流・巨礫の衝突にも対応できる。
According to the steel pipe joint structure of the steel slit dam having the above-described configuration, in addition to the conventional general flange joining, the inner sleeve member 23 substantially evenly straddles the steel pipes 21 and 22 as in the relationship between a tenon and a tenon hole. A so-called double pipe structure fitted and held (held) as described above can be realized, so that it is possible to join more firmly and to contribute to prevention of warpage and twist of the inner sleeve member 23, and furthermore, the steel pipes 21 and 22. .
Therefore, since the shear resistance and the bending resistance of the flange joint can be effectively increased, the strength and rigidity of the flange joint can be maintained by minimizing opening or misalignment due to impact of boulders. In addition, a steel slit dam with excellent stability and safety that maintains the required strength and rigidity up to the specified service life has been realized, and is capable of responding to the recent increase in debris flow scale and unexpected scale debris flow and boulder collision. Can respond.

加えて、二重管構造を構成する内管に相当する部材(本実施例6ではインナースリーブ部材23)が破損等した場合、上記実施例1〜5と比し、内管の交換作業を容易に行うことができる。
また、フランジ接合部を施工するにあたり、上記実施例1〜5では2枚のフランジで計72mmのフランジ厚を実現しているところ、本実施例6では3枚のフランジで同等のフランジ厚を実現できるので、1枚当たりの板厚を小さくできる。よって、フランジの溶接作業を省力化することができる。
In addition, when a member corresponding to the inner tube constituting the double tube structure (the inner sleeve member 23 in the sixth embodiment) is damaged or the like, the replacement operation of the inner tube is easier than in the first to fifth embodiments. Can be done.
In addition, when constructing the flange joint, in the above Examples 1 to 5, two flanges achieve a total flange thickness of 72 mm, but in Example 6, three flanges achieve the same flange thickness. Therefore, the thickness per sheet can be reduced. Therefore, labor for welding the flange can be saved.

図7A、Bに示した鋼製スリットダムの鋼管継手構造は、上記実施例6と比し、前記インナースリーブ部材23の外径、これに伴う環状のフランジ24、25、26の形態のみ相違する。その他の構成要素は上記実施例6と同一なので同一の符号を付してその説明を適宜省略する。   The steel pipe joint structure of the steel slit dam shown in FIGS. 7A and 7B differs from that of the sixth embodiment only in the outer diameter of the inner sleeve member 23 and the form of the annular flanges 24, 25 and 26 associated therewith. . The other components are the same as those in the sixth embodiment, and thus are denoted by the same reference numerals and description thereof will be omitted as appropriate.

すなわち、この実施例7にかかる鋼製スリットダムの鋼管継手構造は、前記インナースリーブ部材23’が、外径250mm程度、板厚7mm程度、管軸方向長さが470mm程度の円筒形状で実施されている。当該部材23’に外設する環状のフランジ26’は、外径600mm程度、内径250mm程度、板厚24mm程度で実施されている。
これに伴い、一方のフランジ付き鋼管21の接合端縁には、外径600mm程度、内径250mm程度、板厚24mm程度の環状のフランジ24’が前記鋼管21と芯が一致するように溶接により固着されている。
他方のフランジ付き鋼管22は、前記一方のフランジ付き鋼管21と同様に、その接合端縁に、外径600mm程度、内径250mm程度、板厚24mm程度の環状のフランジ25’が前記鋼管22と芯が一致するように溶接により固着されている。
すなわち、前記フランジ付き鋼管21、22の環状フランジ24’、25’の内径(250mm)は、ともに前記インナースリーブ部材23’が略内接する大きさとされている。
That is, in the steel pipe joint structure of the steel slit dam according to the seventh embodiment, the inner sleeve member 23 'is formed in a cylindrical shape having an outer diameter of about 250 mm, a plate thickness of about 7 mm, and a length in the pipe axis direction of about 470 mm. ing. The annular flange 26 'provided outside the member 23' has an outer diameter of about 600 mm, an inner diameter of about 250 mm, and a plate thickness of about 24 mm.
Accordingly, an annular flange 24 ′ having an outer diameter of about 600 mm, an inner diameter of about 250 mm, and a plate thickness of about 24 mm is fixed to the joining edge of one of the flanged steel pipes 21 by welding so that the core is aligned with the steel pipe 21. Have been.
Similarly to the one flanged steel pipe 21, the other flanged steel pipe 22 has an annular flange 25 ′ having an outer diameter of about 600 mm, an inner diameter of about 250 mm, and a plate thickness of about 24 mm at the joining edge thereof. Are fixed by welding so as to coincide with each other.
That is, the inner diameters (250 mm) of the annular flanges 24 ′, 25 ′ of the flanged steel pipes 21, 22 are both sized such that the inner sleeve member 23 ′ is substantially inscribed.

かくして、前記インナースリーブ部材23’を、一方のフランジ付き鋼管21の環状フランジ24’内へ嵌め込むと共に、他方のフランジ付き鋼管22の環状フランジ25’内へ嵌め込むと、互いの環状のフランジ24’、25’、26’同士が突き合う構成となり、当該インナースリーブ部材23’が、双方の前記鋼管21、22に均等に跨がる構造となる。その後は、芯を一致させた各フランジ孔にボルト6を通しナット7で締結して接合する所謂フランジ接合を行うことにより鋼管継手構造を実現する。   Thus, when the inner sleeve member 23 ′ is fitted into the annular flange 24 ′ of the one flanged steel pipe 21 and the other inner flange member 23 ′ is fitted into the annular flange 25 ′ of the other flanged steel pipe 22, the respective annular flanges 24 ′ are formed. , 25 ', 26' abut each other, and the inner sleeve member 23 'straddles both the steel pipes 21, 22 evenly. Thereafter, the steel pipe joint structure is realized by performing so-called flange joining in which the bolts 6 are passed through the flange holes having the aligned cores and fastened with the nuts 7 to join.

上記構成の鋼製スリットダムの鋼管継手構造によれば、上記実施例6と同様の作用効果を奏する。
すなわち、従来一般のフランジ接合に加え、ホゾとホゾ穴の関係のごとく前記インナースリーブ部材23’が前記鋼管21、22内に略均等に跨がるように嵌め込まれ、双方の環状フランジ24’、25’で拘束(ホールド)された所謂二重管構造を実現できるので、更に強固に接合でき、インナースリーブ部材23’、ひいては前記鋼管21、22の反りや捻れの防止にも寄与することができる。
したがって、前記フランジ接合部のせん断抵抗力及び曲げ抵抗力を効果的に高めることができるので、巨礫の衝撃等による開き、又は芯ずれを極力防止することにより当該フランジ接合部の強度・剛性を保持し、ひいては所定の耐用年数まで所要の強度・剛性を保持した安定性、安全性に優れた鋼製スリットダムを実現し、近年の増大する土石流規模や想定外規模の土石流・巨礫の衝突にも対応できる。
加えて、上記実施例1〜5と比し、交換作業を容易に行うことができ、フランジの溶接作業を省力化することもできる。
According to the steel pipe joint structure of the steel slit dam having the above configuration, the same operation and effect as those of the sixth embodiment can be obtained.
That is, in addition to the conventional general flange joining, the inner sleeve member 23 'is fitted into the steel pipes 21 and 22 so as to straddle substantially evenly as in the relationship between a tenon and a tenon hole, and both annular flanges 24', Since a so-called double pipe structure restrained (held) by 25 'can be realized, it is possible to join more firmly and to contribute to prevention of warping and twisting of the inner sleeve member 23' and thus the steel pipes 21 and 22. .
Therefore, since the shear resistance and the bending resistance of the flange joint can be effectively increased, the strength and rigidity of the flange joint can be maintained by minimizing opening or misalignment due to impact of boulders. In addition, a steel slit dam with excellent stability and safety that maintains the required strength and rigidity up to the specified service life has been realized, and is capable of responding to the recent increase in debris flow scale and unexpected scale debris flow and boulder collision. Can respond.
In addition, as compared with the above-described first to fifth embodiments, the replacement operation can be easily performed, and the welding operation of the flange can be saved.

図8A〜Dに示した鋼製スリットダムの鋼管継手構造は、上記実施例6と比し、前記インナースリーブ部材23、および一対のフランジ付き鋼管21、22(鋼管長さまでは考慮しない。)を用いて接合する点は同じである。しかし、当該鋼管21、22側にキー溝を形成し、前記インナースリーブ部材23にキーを形成することにより、接合する鋼管21、22同士の接合力(特には曲げ抵抗力)を高めた点が相違する。   The steel pipe joint structure of the steel slit dam shown in FIGS. 8A to 8D differs from that of the sixth embodiment in that the inner sleeve member 23 and the pair of flanged steel pipes 21 and 22 (not taken into account for the length of the steel pipe). The same points are used for joining. However, by forming a key groove on the steel pipes 21 and 22 side and forming a key on the inner sleeve member 23, the joining force (particularly, bending resistance) between the joined steel pipes 21 and 22 is increased. Different.

すなわち、この実施例8に係る鋼製スリットダムの鋼管継手構造は、双方のフランジ付き鋼管31、32が、鋼管31、32の内外方に突き出る環状のフランジ34、35を備え、内方の突き出し部にはキー溝34b、35bが形成され、前記インナースリーブ部材33は、前記鋼管31、32の環状フランジ34、35内に挿入可能な大きさとされ、管軸方向両端部にキー33b、33bが外設されており、前記キー溝34b、35b内に挿入されたキー33b、33bを回転させて引き抜き不能状態にした上でフランジ接合されてなる。   That is, in the steel pipe joint structure of the steel slit dam according to the eighth embodiment, both the flanged steel pipes 31 and 32 include the annular flanges 34 and 35 protruding inward and outward of the steel pipes 31 and 32, respectively. The inner sleeve member 33 is sized to be inserted into the annular flanges 34, 35 of the steel pipes 31, 32, and the keys 33b, 33b are provided at both ends in the pipe axis direction. The keys 33b, 33b inserted in the key grooves 34b, 35b are externally provided, and the keys 33b, 33b are rotated so that they cannot be pulled out, and are flanged.

具体的に、前記一方のフランジ付き鋼管31は、外径400mm程度、板厚9mm程度の大きさで実施している。当該鋼管31の接合端縁には、外径600mm程度、内径310mm程度、板厚24mm程度の環状のフランジ34が前記鋼管31と芯が一致するように溶接により固着されている。さらに、前記環状のフランジ34の内周面は、その一部を円弧状に切り欠いてキー溝34bを形成している。
前記他方のフランジ付き鋼管32の構成も同様に、外径400mm程度、板厚9mm程度の大きさで実施され、当該鋼管32の接合端縁には、外径600mm程度、内径310mm程度、板厚24mm程度の環状のフランジ35が前記鋼管32と芯が一致するように溶接により固着されている。さらに、前記環状のフランジ35の内周面は、その一部を円弧状に切り欠いてキー溝35bを形成している。
一方、前記インナースリーブ部材33は、外径310mm程度、板厚7mm程度、管軸方向長さが160mm程度の円筒形状で実施されている。当該部材33の中央部に外設する環状のフランジ36は、外径600mm程度、内径310mm程度、板厚19mm程度で実施されている。さらに、前記インナースリーブ部材33の管軸方向両端部には、前記キー溝34b、35b内に挿入可能な大きさのキー33b、33bが溶接又は一体成形により外設(突設)されている。前記キー33bの形態は、本実施例では一例として、前記キー溝34b、35bよりも僅かに小ぶりな円弧形状で、幅寸(管軸方向長さ)は25mm程度で実施されている。
Specifically, the one flanged steel pipe 31 has an outer diameter of about 400 mm and a plate thickness of about 9 mm. An annular flange 34 having an outer diameter of about 600 mm, an inner diameter of about 310 mm, and a plate thickness of about 24 mm is fixed to the joining edge of the steel pipe 31 by welding so that the steel pipe 31 and the core are aligned. Further, the inner peripheral surface of the annular flange 34 is partially cut out in an arc shape to form a key groove 34b.
Similarly, the configuration of the other flanged steel pipe 32 is implemented with an outer diameter of about 400 mm and a plate thickness of about 9 mm, and the joining edge of the steel pipe 32 has an outer diameter of about 600 mm, an inner diameter of about 310 mm, and a thickness of about 310 mm. An annular flange 35 of about 24 mm is fixed by welding so that the steel pipe 32 and the core are aligned. Further, the inner peripheral surface of the annular flange 35 is partially cut out in an arc shape to form a key groove 35b.
On the other hand, the inner sleeve member 33 has a cylindrical shape with an outer diameter of about 310 mm, a plate thickness of about 7 mm, and a length in the tube axis direction of about 160 mm. The annular flange 36 provided at the center of the member 33 has an outer diameter of about 600 mm, an inner diameter of about 310 mm, and a plate thickness of about 19 mm. Further, keys 33b, 33b of a size that can be inserted into the key grooves 34b, 35b are externally provided (projected) by welding or integral molding at both ends in the tube axis direction of the inner sleeve member 33. In this embodiment, as an example, the key 33b is formed in an arc shape slightly smaller than the key grooves 34b and 35b, and has a width (length in the tube axis direction) of about 25 mm.

かくして、前記インナースリーブ部材33を、一方のフランジ付き鋼管31の環状フランジ34内へ、対応するキー33bとキー溝34bとの位置合わせを行って差し込み、続いて他方のフランジ付き鋼管32(環状のフランジ35)を、前記インナースリーブ部材33へ、対応するキー33bとキー溝35bとの位置合わせを行って嵌め込み、当該3つの部材の各フランジ(34、35、36)を突き合わせる。その後、前記インナースリーブ部材33を所要の角度(1つ又は2つ程度のフランジ孔分)回転させる。
そうすると、前記インナースリーブ部材33が、キー効果による引き抜き不能状態で、双方の前記鋼管31、32に均等に跨がる構成となる。しかる後、芯を一致させた各フランジ孔にボルト6を通しナット7で締結して接合する所謂フランジ接合を行うことにより鋼管継手構造を実現する。
なお、前記キー33bとキー溝34bはともにバランスよく複数箇所に設けて実施することもできる。また、キー溝34bを、キー33bの数量よりも多く形成し、位置合わせ作業を効率よく行うよう実施することもできる。
Thus, the inner sleeve member 33 is inserted into the annular flange 34 of the one flanged steel pipe 31 by aligning the corresponding key 33b with the key groove 34b, and then the other flanged steel pipe 32 (the annular The flange 35) is fitted into the inner sleeve member 33 by aligning the corresponding key 33b with the key groove 35b, and butting the flanges (34, 35, 36) of the three members. Thereafter, the inner sleeve member 33 is rotated by a required angle (about one or two flange holes).
Then, the inner sleeve member 33 straddles both of the steel pipes 31 and 32 evenly in a state where the inner sleeve member 33 cannot be pulled out due to the key effect. Thereafter, the steel pipe joint structure is realized by performing so-called flange joining in which the bolts 6 are passed through the flange holes having the aligned cores and fastened with the nuts 7 to join.
In addition, the key 33b and the key groove 34b can be provided at a plurality of locations with good balance. Further, the number of the key grooves 34b may be formed to be larger than the number of the keys 33b so that the alignment operation can be performed efficiently.

上記構成の鋼製スリットダムの鋼管継手構造によれば、上記実施例7と同様の作用効果(段落[0044]参照)に加え、前記キー33bとキー溝34b、34bによる離脱防止効果により、曲げ抵抗力を更に高めることができる。   According to the steel pipe joint structure of the steel slit dam having the above-described configuration, in addition to the same operation and effect as in the seventh embodiment (see paragraph [0044]), the key 33b and the key grooves 34b and 34b are bent by the detachment preventing effect. Resistance can be further increased.

以上、実施例を図面に基づいて説明したが、本発明は、図示例の限りではなく、その技術的思想を逸脱しない範囲において、当業者が通常に行う設計変更、応用のバリエーションの範囲を含むことを念のために言及する。
例えば、上記実施例5で説明した保護ケーシング15(図5参照)は、実施例4(図4参照)に適用する場合に限らず、その他の実施例、すなわち実施例1〜実施例3(図1〜図3参照)、および実施例6〜実施例8(図6〜図8参照)にも同様に適用することができ、同様の効果を奏することができる。
Although the embodiments have been described with reference to the drawings, the present invention is not limited to the illustrated examples, and includes a range of design changes and application variations that are normally performed by those skilled in the art without departing from the technical idea thereof. I will mention it just in case.
For example, the protective casing 15 (see FIG. 5) described in the fifth embodiment is not limited to being applied to the fourth embodiment (see FIG. 4), but may be applied to other embodiments, that is, the first to third embodiments (see FIG. 5). 1 to 3) and Embodiments 6 to 8 (see FIGS. 6 to 8), and similar effects can be obtained.

1 フランジ付き鋼管
2 フランジ付き鋼管
3 円盤状のフランジ
3a フランジ孔
3’ 環状のフランジ
4 環状のフランジ
4a フランジ孔
4’ 環状のフランジ
5 ホゾ部材
5’ ホゾ部材
5v ホゾ部材
6 ボルト
7 ナット
11 フランジ付き鋼管
11a 拡径鋼管
12 フランジ付き鋼管
13 環状のフランジ
13a フランジ孔
14 環状のフランジ
14a フランジ孔
15 保護ケーシング
21 フランジ付き鋼管
22 フランジ付き鋼管
23 インナースリーブ部材
23’ インナースリーブ部材
24 環状のフランジ
24a フランジ孔
24’ 環状のフランジ
25 環状のフランジ
25a フランジ孔
25’ 環状のフランジ
26 環状のフランジ
26a フランジ孔
26’ 環状のフランジ
31 フランジ付き鋼管
32 フランジ付き鋼管
33 インナースリーブ部材
33b キー(突設部)
34 環状のフランジ
34b キー溝
35 環状のフランジ
35b キー溝
36 環状のフランジ
Reference Signs List 1 steel pipe with flange 2 steel pipe with flange 3 disk-shaped flange 3a flange hole 3 'annular flange 4 annular flange 4a flange hole 4' annular flange 5 mortise member 5 'mortise member 5v mortise member 6 bolt 7 nut 11 with flange Steel pipe 11a Expanded steel pipe 12 Flanged steel pipe 13 Annular flange 13a Flange hole 14 Annular flange 14a Flange hole 15 Protective casing 21 Flanged steel pipe 22 Flanged steel pipe 23 Inner sleeve member 23 'Inner sleeve member 24 Annular flange 24a Flange hole 24 'Annular flange 25 Annular flange 25a Flange hole 25' Annular flange 26 Annular flange 26a Flange hole 26 'Annular flange 31 Flanged steel pipe 32 Flanged steel pipe 33 Inner sleeve member 33 b key (projecting part)
34 annular flange 34b key groove 35 annular flange 35b key groove 36 annular flange

Claims (7)

河川の横断方向両岸のコンクリート堤体間に設けられる鋼製スリットダムのフランジ付き鋼管継手構造において、
一方のフランジ付き鋼管の接合端部には、他方のフランジ付き鋼管内に挿入可能な当該鋼管よりも細径のホゾ部材が突設されており、当該ホゾ部材が他方のフランジ付き鋼管内に挿入されて、接合する鋼管のフランジ同士が突き合わされた状態でフランジ接合されてなることを特徴とする、鋼製スリットダムの鋼管継手構造。
In a steel pipe joint structure with a flange of a steel slit dam installed between concrete embankments on both banks in the transverse direction of the river,
At the joining end of one of the flanged steel pipes, a mortise member having a smaller diameter than the steel pipe that can be inserted into the other flanged steel pipe is protruded, and the mortise member is inserted into the other flanged steel pipe. A steel pipe joint structure for a steel slit dam , wherein the flanges of the steel pipes to be joined are flanged in a state where the flanges of the steel pipes abut against each other .
前記一方のフランジ付き鋼管は、鋼管の外方に突き出る環状又は円盤状のフランジ付き鋼管であることを特徴とする、請求項1に記載した鋼製スリットダムの鋼管継手構造。   The steel pipe joint structure for a steel slit dam according to claim 1, wherein the one flanged steel pipe is an annular or disk-shaped flanged steel pipe protruding outward from the steel pipe. 河川の横断方向両岸のコンクリート堤体間に設けられる鋼製スリットダムのフランジ付き鋼管継手構造において、In the flanged steel pipe joint structure of the steel slit dam installed between the concrete embankments on both banks in the cross direction of the river,
一方のフランジ付き鋼管の接合端部には、他方のフランジ付き鋼管内に挿入可能な当該鋼管よりも細径のホゾ部材が、前記一方のフランジ付き鋼管の接合端部の内側面に内接させてその一部を外方へ突き出すように設けられており、当該ホゾ部材の突き出し部分が他方のフランジ付き鋼管内に挿入されて、接合する鋼管のフランジ同士が突き合わされた状態でフランジ接合されてなることを特徴とする、鋼製スリットダムの鋼管継手構造。  At the joint end of one flanged steel pipe, a tenon member smaller in diameter than the steel pipe insertable into the other flanged steel pipe is inscribed on the inner surface of the joint end of the one flanged steel pipe. The protruding part of the tenon member is inserted into the other flanged steel pipe, and the flanges of the steel pipes to be joined are flange-joined in a state where the flanges of the steel pipes are joined to each other. A steel pipe joint structure of a steel slit dam.
河川の横断方向両岸のコンクリート堤体間に設けられる鋼製スリットダムのフランジ付き鋼管継手構造において、
一方のフランジ付き鋼管の接合端部は、他方のフランジ付き鋼管よりも大きい拡径鋼管が一体的に取りつけられ、他方のフランジ付き鋼管の接合端部は、その端縁よりも内側の部位に環状のフランジが外設されており、当該環状のフランジから外側に突き出た鋼管が前記一方のフランジ付き鋼管の前記拡径鋼管内に挿入されて、接合する鋼管のフランジ同士が突き合わされた状態でフランジ接合されてなることを特徴とする、鋼製スリットダムの鋼管継手構造。
In a steel pipe joint structure with a flange of a steel slit dam installed between concrete embankments on both banks in the transverse direction of the river,
Joint end portion of one of the flanged steel pipe is greater diameter steel pipe than the other flanged steel pipe is found attached integrally, the joint end portion of the other flanged steel tubes, a portion of the inner than the edge An annular flange is provided externally, and a steel pipe projecting outward from the annular flange is inserted into the enlarged steel pipe of the one flanged steel pipe, and the flanges of the steel pipes to be joined are brought into contact with each other. A steel pipe joint structure of a steel slit dam characterized by being flanged.
河川の横断方向両岸のコンクリート堤体間に設けられる鋼製スリットダムのフランジ付き鋼管継手構造において、
一方のフランジ付き鋼管と他方のフランジ付き鋼管は、中央部に環状のフランジを外設したインナースリーブ部材を介して共締めによりフランジ接合されてなることを特徴とする、鋼製スリットダムの鋼管継手構造。
In a steel pipe joint structure with a flange of a steel slit dam installed between concrete embankments on both banks in the transverse direction of the river,
A steel pipe joint for a steel slit dam, wherein one of the flanged steel pipes and the other flanged steel pipe are flange-joined together through an inner sleeve member having an annular flange externally provided at the center. Construction.
前記双方のフランジ付き鋼管は、鋼管の内外方に突き出る環状のフランジを備え、内方の突き出し部にはキー溝が形成され、前記インナースリーブ部材は、前記鋼管の環状フランジ内に挿入可能な大きさとされ、管軸方向両端部にキーが外設されており、前記キー溝内に挿入されたキーを回転させて引き抜き不能状態にした上でフランジ接合されてなることを特徴とする、請求項に記載した鋼製スリットダムの鋼管継手構造。 The two flanged steel pipes each have an annular flange projecting inward and outward of the steel pipe, a keyway is formed in the inward projection, and the inner sleeve member is large enough to be inserted into the annular flange of the steel pipe. A key is externally provided at both ends in the pipe axis direction, and the key inserted into the key groove is rotated so as to be in a state where it cannot be pulled out, and is flange-joined. 5. The steel pipe joint structure of the steel slit dam described in 5 . 前記一方又は他方のフランジ付き鋼管のフランジの外周面には、前記フランジ接合部を覆う保護ケーシングが設けられていることを特徴とする、請求項1〜のいずれか一に記載した鋼製スリットダムの鋼管継手構造。 The steel slit according to any one of claims 1 to 6 , wherein a protective casing that covers the flange joint is provided on an outer peripheral surface of a flange of the one or other flanged steel pipe. Dam steel pipe joint structure.
JP2015161730A 2015-08-19 2015-08-19 Steel pipe joint structure of steel slit dam Active JP6652797B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015161730A JP6652797B2 (en) 2015-08-19 2015-08-19 Steel pipe joint structure of steel slit dam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015161730A JP6652797B2 (en) 2015-08-19 2015-08-19 Steel pipe joint structure of steel slit dam

Publications (2)

Publication Number Publication Date
JP2017040073A JP2017040073A (en) 2017-02-23
JP6652797B2 true JP6652797B2 (en) 2020-02-26

Family

ID=58203550

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015161730A Active JP6652797B2 (en) 2015-08-19 2015-08-19 Steel pipe joint structure of steel slit dam

Country Status (1)

Country Link
JP (1) JP6652797B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7001507B2 (en) * 2018-03-16 2022-01-19 株式会社共生 Permeation type dam and its construction method
JP7168479B2 (en) * 2019-02-06 2022-11-09 Jfe建材株式会社 Construction method of trapping body, trapping body and dam
JP7807624B2 (en) * 2021-12-28 2026-01-28 日鉄建材株式会社 Steel pipe joint structure of steel slit dam and steel slit dam

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3380526B2 (en) * 2000-06-21 2003-02-24 国産ラセン管株式会社 Conduit connection device
JP2002188134A (en) * 2000-12-18 2002-07-05 Nippon Steel Corp Steel slit dam structure and construction method
JP5129977B2 (en) * 2007-04-19 2013-01-30 日鐵住金建材株式会社 Steel slit dam
JP4954097B2 (en) * 2008-01-11 2012-06-13 日鐵住金建材株式会社 Repair method for steel slit dam
JP2010019298A (en) * 2008-07-09 2010-01-28 Toyox Co Ltd Joint
JP6201609B2 (en) * 2013-10-08 2017-09-27 東京電力ホールディングス株式会社 Oil leakage prevention structure and oil leakage prevention method

Also Published As

Publication number Publication date
JP2017040073A (en) 2017-02-23

Similar Documents

Publication Publication Date Title
JP5623923B2 (en) Steel pipe joint structure
JP6652797B2 (en) Steel pipe joint structure of steel slit dam
JP4576899B2 (en) Method for manufacturing column-beam joint structure and column-beam joint structure
JP5554441B2 (en) End joint structure of steel pipe members
JP6587111B2 (en) Braces and brace mounting structure
JP6652798B2 (en) Housing type reinforcing member and method and structure for reinforcing flange joint of steel slit dam using the same
JP6857968B2 (en) Beam reinforcement
JP4945294B2 (en) segment
JP4859069B2 (en) Beam reinforcement structure
JP6893799B2 (en) Beam flint connection structure and beam flint connection piece
JP2007002578A (en) Reinforced structure of steel reinforced concrete structure and its construction method
JP4450579B2 (en) Steel pipe and steel pipe connection structure
JP5222584B2 (en) Concrete structure
JP4185073B2 (en) Beam reinforcement structure
JP7807624B2 (en) Steel pipe joint structure of steel slit dam and steel slit dam
JP4278105B2 (en) Reinforcement structure of steel reinforced concrete structural material, its construction method, and steel reinforcing member
JP7406764B2 (en) Joint structure of steel pipe columns
JP3169022U (en) End joint structure of steel pipe members
JP6652803B2 (en) Pipe connection structure and pipe connection method
WO2021245736A1 (en) Joining hardware
JP6894303B2 (en) Reinforcing bar joining structure and reinforcing bar joining method
JP6551167B2 (en) Butt weld joint structure, joint structure, structure and joining method
JP6641907B2 (en) Steel pipe coupler structure
JP2015172271A (en) Joint structure of buckling restraining brace
JP5953872B2 (en) Beam-column joint structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20180730

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20190529

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20190611

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20190806

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20191226

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20200124

R150 Certificate of patent or registration of utility model

Ref document number: 6652797

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250