Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP6656972B2 - Removal method of solidified material from pile head of ready-made pile - Google Patents
[go: Go Back, main page]

JP6656972B2 - Removal method of solidified material from pile head of ready-made pile - Google Patents

Removal method of solidified material from pile head of ready-made pile Download PDF

Info

Publication number
JP6656972B2
JP6656972B2 JP2016060311A JP2016060311A JP6656972B2 JP 6656972 B2 JP6656972 B2 JP 6656972B2 JP 2016060311 A JP2016060311 A JP 2016060311A JP 2016060311 A JP2016060311 A JP 2016060311A JP 6656972 B2 JP6656972 B2 JP 6656972B2
Authority
JP
Japan
Prior art keywords
pile
ready
concrete
made pile
head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2016060311A
Other languages
Japanese (ja)
Other versions
JP2017172247A (en
Inventor
本田 和久
和久 本田
春樹 岡山
春樹 岡山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kumagai Gumi Co Ltd
Mitani Sekisan Co Ltd
Original Assignee
Kumagai Gumi Co Ltd
Mitani Sekisan Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kumagai Gumi Co Ltd, Mitani Sekisan Co Ltd filed Critical Kumagai Gumi Co Ltd
Priority to JP2016060311A priority Critical patent/JP6656972B2/en
Publication of JP2017172247A publication Critical patent/JP2017172247A/en
Application granted granted Critical
Publication of JP6656972B2 publication Critical patent/JP6656972B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Description

本発明は、支柱や壁、基礎等の既製杭の上部に構築するコンクリート構造物との一体性を高めるために、コンクリート構造物の一部を中詰めコンクリートとして既製杭内に打設するためのを既製杭の内部の杭頭部に形成するために、既製杭の沈設過程で既製杭内に充填されたセメント成分からなる固化物の撤去方法に関する。 The present invention, struts and walls, in order to enhance the integrity of the concrete structure to be built on top of the prefabricated pile foundation such as for pouring into the ready-made pile as medium-packed concrete part of the concrete structure The present invention relates to a method for removing a solidified material composed of a cement component filled in a ready-made pile in a process of setting the ready-made pile in order to form a hole in a pile head inside the ready-made pile.

図3を用いて、特許文献1で開示された既製杭の上部に構築するコンクリート構造物の一部を中詰めコンクリートとして既製杭内に打設するための孔119を既製杭101の内部に形成する方法について説明する。図3のa図に示したように、両端開口形の既製杭101の上側内にセメント抜取用具102が設置される。セメント抜取用具102は、逆U字状になった一対の支持部材103が紙管104の内外に跨がるように配置されて紙管104に固定され、合成樹脂からなる内側被覆体105及び合成樹脂からなる外側被覆体106が紙管104の外側及び一対の支持部材103の外側を被覆いかつ紙管104に固定され、一対の支持部材103の紙管104よりも上側の折曲部107を貫通した止棒108の両端部が既製杭101の上端面に取り付けられる。このようにセメント抜取用具102が設置された既製杭101は、一端側から、地盤111に掘削された掘削孔112に流し込まれた未硬化なコンクリート113の中に沈設されるのに伴って、掘削孔112中の未硬化なコンクリート113が上昇して既製杭101と掘削孔112との隙間114、既製杭101とセメント抜取用具102との隙間115、セメント抜取用具102の内空間116に取り込まれる。 Referring to FIG. 3, a hole 119 for driving a part of a concrete structure to be built in the upper part of the ready-made pile disclosed in Patent Document 1 into the ready-made pile as filling concrete is formed inside the ready-made pile 101. A method for performing the above will be described. As shown in FIG. 3A, a cement extraction tool 102 is installed in the upper side of a ready-made pile 101 having both ends open. The cement removal tool 102 has a pair of inverted U-shaped support members 103 arranged so as to straddle the inside and outside of the paper tube 104 and fixed to the paper tube 104, and an inner covering 105 made of synthetic resin and a synthetic resin. An outer covering 106 made of resin covers the outside of the paper tube 104 and the outside of the pair of support members 103 and is fixed to the paper tube 104, and the bent portion 107 of the pair of support members 103 above the paper tube 104 is bent. Both ends of the penetrating stop bar 108 are attached to the upper end surface of the ready-made pile 101. The ready-made stake 101 on which the cement extraction tool 102 is installed as described above is excavated from one end side in the unhardened concrete 113 poured into the excavation hole 112 excavated in the ground 111. The unhardened concrete 113 in the hole 112 rises and is taken into the gap 114 between the ready-made pile 101 and the excavation hole 112, the gap 115 between the ready-made pile 101 and the cement removal tool 102, and the inner space 116 of the cement removal tool 102.

そして、図3のb図に示したように、未硬化なコンクリート113が養生させて硬化した後、止棒108が既製杭101から外され、セメント抜取用具102の一対の支持部材103が図示のされていない建柱機でワイヤロープ等の吊り部材118を介して吊り上げられる。この吊り上げに伴って、セメント抜取用具102の内空間116に取り込まれて硬化したコンクリート113が既製杭101内で硬化したコンクリート113並びに既製杭101とセメント抜取用具102との隙間115で硬化したコンクリート113から切断されて引き上げられ、内側被覆体105及び外側被覆体106が紙管104から剥がされるとともに既製杭101とセメント抜取用具102との隙間115で硬化したコンクリート113から剥がされ、既製杭101の上側内に119が形成される。 Then, as shown in FIG. 3B, after the unhardened concrete 113 is cured and hardened, the retaining rod 108 is removed from the ready-made pile 101, and the pair of support members 103 of the cement extraction tool 102 are shown in FIG. It is hoisted via a hanging member 118 such as a wire rope by a column machine that is not installed. With this lifting, the concrete 113 taken into the inner space 116 of the cement removal tool 102 and hardened is concrete 113 hardened in the ready-made pile 101 and concrete 113 hardened in the gap 115 between the ready-made pile 101 and the cement removal tool 102. From the paper tube 104 and peeled off the hardened concrete 113 in the gap 115 between the ready-made pile 101 and the cement extraction tool 102, and the upper side of the ready-made pile 101 A hole 119 is formed therein.

しかしながら、119の計画深さが例えば3mもある場合、セメント抜取用具102を容易に撤去できなかった。また、セメント抜取用具102が撤去できた場合でも、図3のb図に示すように、119と既製杭101の内面との間には、既製杭101とセメント抜取用具102との隙間115で硬化したコンクリート113が残存する。この残存したコンクリート113は、上部構造物を構築する際に用いられるコンクリート113と品質が異なることが一般的である。そのため、既製杭101とセメント抜取用具102との隙間115で硬化して残存したコンクリート113は、オーガー削孔機で削り、さらに、ケレン等で除去している。けれども、残存したコンクリート113が孔径600mmで、深さ1mの場合、ケレン等で残存したコンクリート113を除去することは困難であった。 However, when the planned depth of the hole 119 is, for example, 3 m, the cement extraction tool 102 cannot be easily removed. In addition, even when the cement removal tool 102 can be removed, as shown in FIG. 3B, a gap 115 between the ready-made pile 101 and the cement removal tool 102 exists between the hole 119 and the inner surface of the ready-made pile 101. The hardened concrete 113 remains. The remaining concrete 113 is generally different in quality from the concrete 113 used when constructing the upper structure. Therefore, the concrete 113 hardened and left in the gap 115 between the ready-made pile 101 and the cement extraction tool 102 is shaved by an auger drill, and further removed by keren or the like. However, when the remaining concrete 113 had a hole diameter of 600 mm and a depth of 1 m, it was difficult to remove the remaining concrete 113 with kerosene or the like.

特開平5−247930号公報JP-A-5-247930

本発明は、上記背景技術に鑑みてなされたものであり、既製杭の上部に構築するコンクリート構造物の一部を中詰めコンクリートとして既製杭内に打設するためのを既製杭の内部の杭頭部に形成するために、既製杭の沈設過程で既製杭内に充填されたセメント成分からなる固化物の撤去が容易になる、既製杭の杭頭部における固化物の撤去方法の提供を目的とする。 The present invention has been made in consideration of the above background art, the hole for pouring into the ready-made pile part of the concrete structure to be built on top of the prefabricated pile as medium-packed concrete inside the prefabricated pile To provide a method for removing solidified material at the pile head of a ready-made pile, which facilitates the removal of solidified material consisting of cement components filled in the ready-made pile during the setting process of the existing pile. Aim.

本発明は、既製杭の上部に構築するコンクリート構造物の一部を中詰めコンクリートとして既製杭内に打設するためのを既製杭の内部の杭頭部に形成するために、地盤に掘削された掘削孔に流し込まれた未硬化なコンクリートの中に、杭軸方向の両端が開口した杭軸方向に連続する中空の既製杭を一端側から沈設し、この沈設により既製杭内に充填された未硬化な充填コンクリートが除去可能な貧配合のセメント成分からなる固化物となるように当該既製杭の他端側から水を上記既製杭内に充填された未硬化な充填コンクリートに中詰めコンクリートを打設する位置まで注入して、水が掘削孔から地上に溢れ出すことを確認した後、この水の注入で貧配合となったセメント成分からなる固化物を既製杭の杭頭部から除去する際に、オーガー削孔機の掘削ヘッドとして外径が既製杭の内径よりも小寸法の掘削ヘッドを使用して、当該掘削ヘッドの周縁部の一部を既製杭の内面に接触させながら固化物を掘削して除去したことを特徴とする。 The present invention, in order to form a hole for pouring into the ready-made pile as medium-packed concrete part of the concrete structure to be built on top of the prefabricated pile inside the pile head of the ready-made pile, drilling the ground In the unhardened concrete poured into the excavated hole, a hollow prefabricated pile continuous in the pile axis direction with both ends in the pile axis direction opened is sunk from one end side, and by this squatting, the prefabricated pile is filled. was as uncured filling concrete becomes solidified material comprising a cement component of the removable poor compounding, medium filled water from the other end of the prefabricated pile uncured filling concrete is filled in the prefabricated pile After pouring the concrete to the casting position and confirming that water overflows from the borehole to the ground, the solidified cement component, which was poorly compounded by this water injection, was poured from the pile head of the ready-made pile. when removing, auger Using a drilling head whose outer diameter is smaller than the inner diameter of the ready-made pile as the drilling head of the drilling machine, excavating the solidified material while contacting a part of the periphery of the drilling head with the inner surface of the ready-made pile It is characterized by being removed .

本発明は、既製杭の沈設過程で既製杭内に充填された未硬化な充填コンクリートに水を注入して上記充填コンクリートを除去可能な貧配合のセメント成分からなる固化物と成し、この貧配合のセメント成分からなる固化物を既製杭の杭頭部から除去するので、上記既製杭内の充填コンクリートが硬化した後でも容易に撤去することができる。本発明において、上記既製杭内に充填された未硬化な充填コンクリートに水を注入する場合に掘削ロッドで行えば、注水用の専用パイプを用いる必要がない。本発明において、上記既製杭内に充填された未硬化な充填コンクリートに水を注入する場合に中詰めコンクリートを打設する位置まで上記水を注入すれば、貧配合のセメント成分からなる固化物の除去後に既製杭の上部に構築されるコンクリート構造物と既製杭との一体性が高くなる。本発明において、上記貧配合のセメント成分からなる固化物の除去をオーガー削孔機で行えば、が深くても、貧配合のセメント成分からなる固化物を容易に撤去することができる。 The present invention provides a solidified product composed of a poorly-mixed cement component capable of removing the filled concrete by injecting water into the uncured filled concrete filled in the ready-made pile in the process of setting the ready-made pile. Since the solidified material composed of the cement component is removed from the pile head of the ready-made pile, it can be easily removed even after the concrete filled in the ready-made pile hardens. In the present invention, it is not necessary to use a dedicated pipe for water injection if water is injected into the unhardened filled concrete filled in the ready-made pile by using a drill rod. In the present invention, when injecting the water into the uncured filled concrete filled in the ready-made pile, the water is poured to a position where the concrete filling is poured, and a solidified product composed of a poorly-mixed cement component is obtained. The integrity of the concrete structure built on top of the ready-made pile and the ready-made pile after removal is increased. In the present invention, if the solidified material composed of the poorly-mixed cement component is removed by an auger drill, the solidified material composed of the poorly-mixed cement component can be easily removed even if the hole is deep.

なお、前記発明の概要は、本発明の必要な全ての特徴を列挙したものではなく、これらの特徴群のサブコンビネーションもまた、発明となりうる。   The summary of the invention does not list all the features required of the invention, and a sub-combination of these features may also be an invention.

本発明を実施するための形態1に係る既製杭の杭頭部における固化物の撤去方法を示し、a図は既製杭の充填コンクリート撤去準備作業の縦断面図、b図は既製杭の充填コンクリート撤去作業前を示した縦断面図、c図は既製杭の充填コンクリート撤去作業後を示した縦断面図。Fig. 3 shows a method for removing solidified material from a pile head of a ready-made pile according to the first embodiment for carrying out the present invention. FIG. 4C is a longitudinal sectional view showing the state before the removal work, and FIG. 本発明を実施するための形態1に係る既製杭の杭頭部における固化物の撤去方法よりも前工程の作業を示し、a図は地盤に掘削孔を掘削する作業を示した縦断面図、b図は掘削孔に未硬化なコンクリートを流し込む作業を示した縦断面図、c図は掘削孔に流し込まれた未硬化なコンクリートに既製杭を沈設した作業を示した縦断面図。The work of the pre-process than the method of removing the solidified material from the pile head of the ready-made pile according to the first embodiment for carrying out the present invention is shown, a diagram is a longitudinal sectional view showing the work of excavating the excavation hole in the ground, FIG. 2B is a longitudinal sectional view showing an operation of pouring unhardened concrete into the excavation hole, and FIG. 2C is a longitudinal sectional view showing an operation of setting a ready-made pile into the uncured concrete poured into the excavation hole. 従来のを既製杭の内部に形成する方法を示し、a図はセメント抜取用具を備えた既製杭が地盤に掘削された掘削孔に流し込まれた未硬化なコンクリートの中に沈設される作業を示した縦断面図、b図はセメント抜取用具の吊り上げで既製杭の上側内にを形成する作業を示した縦断面図。The conventional method of forming a hole inside a ready-made pile is shown, and the figure a shows the work in which a ready-made pile equipped with a cement extraction tool is laid in unhardened concrete poured into a drilled hole drilled in the ground. FIG. 4B is a longitudinal sectional view showing an operation of forming a hole in the upper side of a ready-made pile by lifting a cement removal tool.

本発明を実施するための形態1に係る既製杭1の沈設過程において杭頭部内に流れ込み(充填)硬化したセメント成分からなる固化物、例えば、固化物としての充填コンクリートの撤去方法は、図1のa図に示した充填コンクリート撤去準備作業と、図1のb図及びc図に示した充填コンクリート撤去作業からなる。まず、図1のa図を用いて、充填コンクリート撤去準備作業について説明する。図1のa図に示した既製杭1の充填コンクリート撤去準備作業は、地盤2に既製杭1を設置するために掘削された掘削孔3に流し込まれた未硬化なコンクリート4の中に杭軸方向の両端が開口した杭軸方向に連続する中空の両端開口形の既製杭1が既製杭1の一端側1aから沈設され、この沈設により既製杭1の内部の杭頭部に取り込まれた未硬化な充填コンクリート5が除去可能な貧配合となるように、既製杭1の内部の杭頭部における未硬化な充填コンクリート5に既製杭1の他端側1bから水6が注入されることにより、既製杭1の内部における充填コンクリート5が貧配合のまま硬化して貧配合のセメント成分からなる固化物に成るので、充填コンクリート5が硬化した後でも、貧配合のセメント成分からなる固化物としての充填コンクリート5を容易に撤去することができる。 A method for removing a solidified material composed of a cement component that has flowed (filled) and hardened into a pile head in the process of setting the ready-made pile 1 according to the first embodiment for carrying out the present invention, for example, a filled concrete as a solidified material, is shown in FIG. 1 includes a preparatory work for removing the filled concrete shown in FIG. 1A and a preparatory work for removing the filled concrete shown in FIGS. 1B and 1C. First, the preparation work for removing filled concrete will be described with reference to FIG. The preparation work for the removal of the filled concrete from the ready-made pile 1 shown in FIG. 1A is performed by placing the pile shaft in the unhardened concrete 4 that has been poured into the excavation hole 3 that has been drilled to install the ready-made pile 1 on the ground 2. A hollow prefabricated pile 1 that is continuous in the axial direction and that is open at both ends is sunk from one end 1a of the prefabricated stake 1 and is taken into the pile head inside the prefabricated stake 1 by this squatting. Water 6 is injected from the other end 1b of the ready-made pile 1 into the unhardened filled concrete 5 at the pile head inside the ready-made pile 1 so that the hard-filled concrete 5 becomes a poor mixture that can be removed. Since the filled concrete 5 in the interior of the ready-made pile 1 hardens as it is poorly mixed and becomes a solidified material composed of a poorly-mixed cement component, even after the filled concrete 5 is hardened, it becomes a solidified material composed of the poorly-mixed cement component. Filling co The cleat 5 may be easily removed.

本実施形態1の未硬化なコンクリート4は、流動性を有するコンクリートであるが、セメントミルクや、モルタル等のセメント成分からなる水硬性部材でも良い。また、水6が注入される場合、地上において、オーガー削孔機における掘削ロッド7の先端部から掘削ヘッド11が取り外された後、オーガー削孔機で掘削ロッド7の先端部が地上から既製杭1の内部における未硬化な充填コンクリート5の中に孔(既製杭1の上部に構築するコンクリート構造物の一部を中詰めコンクリートとして既製杭1内に打設するための孔)12(図1のc図参照)の中詰めコンクリートを打設する計画深さまで挿入され、この充填コンクリート5の中に挿入されかつ上昇する掘削ロッド7の先端部から水6が既製杭1の内部における未硬化な充填コンクリート5に注入終了後、上昇される。その際、水が掘削孔3から地上溢れ出すことを確認することが望ましい。掘削ロッド7は、地上から掘削ロッド7の内部を経由して下側に水6及び未硬化なコンクリート4を通すことが可能な中空になっている。上記12の中詰めコンクリートを打設する計画深さは、中詰めコンクリートを打設する位置と同義語である。上記のように中詰めコンクリートを打設する位置まで水を注入すれば、図1のc図に示した貧配合の充填コンクリート5が除去された後の12に、既製杭1の上部に構築されるコンクリート構造物の一部が中詰めコンクリートとして打設された場合において、中詰めコンクリートと既製杭との一体性が高くなる。 The uncured concrete 4 of the first embodiment is a concrete having fluidity, but may be a hydraulic member made of a cement component such as cement milk or mortar. When the water 6 is injected, after the drilling head 11 is removed from the tip of the drilling rod 7 in the auger drilling machine on the ground, the tip of the drilling rod 7 is removed from the ground by the auger drilling machine. Holes in unhardened filled concrete 5 inside 1 ( holes for casting a part of the concrete structure to be built on top of the ready-made pile 1 into the ready-made pile 1 as filling concrete) 12 (FIG. 1 ) (See FIG. C)) Water 6 is inserted from the tip of the excavating rod 7 which is inserted into the filled concrete 5 and rises, and the unhardened material inside the ready-made pile 1 is inserted. After pouring into the filled concrete 5, it is raised. At that time, it is desirable that water is to confirm that the overflow on the ground from the borehole 3. The excavating rod 7 is hollow so that water 6 and unhardened concrete 4 can pass downward from the ground via the inside of the excavating rod 7. The planned depth at which the concrete in the hole 12 is cast is synonymous with the position at which the concrete is cast. If water is poured to the position where the concrete filling is poured as described above, it is built in the hole 12 after the poorly filled concrete 5 shown in FIG. In the case where a part of the concrete structure to be cast is cast as the filled concrete, the integrity of the filled concrete and the ready-made pile is increased.

掘削孔3は、上側の縦孔8と下側の拡底部としての拡大根固め孔9とから構成される。拡大根固め孔9の底部は、既製杭1の上に構築される図示のされていない上部構造物の重さに耐えられる硬い地盤2としての支持層になっている。既製杭1は、1本のように図示したが、1本に限定されるものはなく、先端杭15(図2参照)と複数本の接続杭16(図2参照)を接続した既製杭1とからなる。   The excavation hole 3 is composed of an upper vertical hole 8 and an expanded root consolidation hole 9 as a lower expanded bottom. The bottom portion of the enlarged root consolidation hole 9 is a support layer as a hard ground 2 capable of withstanding the weight of an unillustrated superstructure constructed on the ready-made pile 1. The ready-made stake 1 is illustrated as one, but is not limited to one. The ready-made stake 1 in which the tip stake 15 (see FIG. 2) and the plurality of connection stakes 16 (see FIG. 2) are connected. Consists of

尚、図1のa図に示した既製杭1の充填コンクリート撤去準備作業が実行される以前において、地盤2に掘削孔3が掘削され、掘削孔3に既製杭1が沈設されるまでの工程については、図2で説明する。   In addition, before the preparatory work for the removal of the filled concrete of the ready-made pile 1 shown in FIG. 1A is performed, the process until the excavation hole 3 is excavated in the ground 2 and the ready-made pile 1 is set in the excavation hole 3. Will be described with reference to FIG.

次に、図1のb図及びc図を用いて、本発明を実施するための形態1に係る充填コンクリート撤去作業について説明する。図1のb図及びc図に示した充填コンクリート撤去作業は、図1のa図に示した充填コンクリート撤去準備作業の後工程として行われる。   Next, with reference to FIG. 1B and FIG. 1C, a description will be given of the operation of removing the filled concrete according to the first embodiment for carrying out the present invention. The packed concrete removal operation shown in FIGS. 1B and 1C is performed as a post-process of the packed concrete removal preparation operation shown in FIG. 1A.

図1のb図に示したように、既製杭1の杭頭部の一部が露出するように地盤2の掘削と、その杭頭部の周囲及び、上部にあるコンクリートを除去した後、杭頭部の上方に掘削ヘッド11が掘削ロッド7の先端部に取り付けられているオーガー削孔機を準備する。掘削ヘッド11の外径は、既製杭1の内径よりも小寸法になっている。そして、掘削ロッド7の下降運動と回転運動とにより、掘削ヘッド11が掘削ヘッド11の上下方向に延びる中心線を回転中心として水平方向に回転しかつ下降するのに伴って、掘削ヘッド11が地上から既製杭1の内部に存在する貧配合となった充填コンクリート5としての貧配合のセメント成分からなる固化物を12(図1のc図参照)の計画深さまで掘削する。このとき発生する充填コンクリート5の掘削物は、地上に設置されたサンドポンプで地上に吸い上げられる。 As shown in FIG. 1 b, after excavating the ground 2 so that a part of the pile head of the ready-made pile 1 is exposed, and removing the concrete around and above the pile head, the pile 2 is removed. An auger drilling machine having a drilling head 11 attached to the tip of the drilling rod 7 above the head is prepared. The outer diameter of the excavating head 11 is smaller than the inner diameter of the ready-made pile 1. The lowering and rotating movements of the drilling rod 7 cause the drilling head 11 to rotate in the horizontal direction about the center line extending in the vertical direction of the drilling head 11 as a center of rotation and to descend, so that the drilling head 11 From this, a solidified material composed of a poorly-mixed cement component as a poorly-mixed filled concrete 5 existing inside the ready-made pile 1 is excavated to a planned depth of the hole 12 (see FIG. 1C). The excavated material of the filled concrete 5 generated at this time is sucked up to the ground by a sand pump installed on the ground.

掘削ヘッド11の外径が既製杭1の内径よりも小寸法になっていることから、掘削中においては、掘削ヘッド11が水平方向に回転しかつ直線的に下降するだけではなく、掘削ヘッド11の上下方向に延びる中心線が水平面内で円形を描くように、掘削ヘッド11が水平方向に回転しながら旋回し、掘削ヘッド11の周縁部の一部が既製杭1の内面をガイドとして接触することで、充填コンクリート5を既製杭1の内面に残存することなく撤去できる。このような掘削ヘッド11による掘削により、図1のc図に示したように、12が既製杭1の内部の杭頭部に形成される。 Since the outer diameter of the excavation head 11 is smaller than the inner diameter of the ready-made pile 1, the excavation head 11 not only rotates horizontally and descends linearly during excavation, but also The drilling head 11 rotates while rotating in the horizontal direction so that the center line extending in the vertical direction of the drilling head draws a circle in a horizontal plane, and a part of the peripheral portion of the drilling head 11 contacts the inner surface of the ready-made pile 1 as a guide. Thereby, the filled concrete 5 can be removed without remaining on the inner surface of the ready-made pile 1. By the excavation by the excavation head 11, the hole 12 is formed in the pile head inside the ready-made pile 1 as shown in FIG.

既製杭1の内部に存在する貧配合となった充填コンクリート5は、未硬化な状態でも硬化した状態でもよい。例えば、現場の状況等から、図1のa図に示した既製杭1の充填コンクリート撤去準備作業の完了から数ヶ月後乃至1年後に、図1のb図及びc図に示した既製杭1の充填コンクリート撤去作業を実施しても、上記充填コンクリート5を除去できることが確認できた。   The poorly filled concrete 5 existing inside the ready-made pile 1 may be in an unhardened state or a hardened state. For example, from several months to one year after the completion of the preparatory work for removing the pre-filled concrete of the ready-made pile 1 shown in FIG. 1A from the situation at the site, the ready-made pile 1 shown in FIG. 1B and FIG. It was confirmed that the above-mentioned filled concrete 5 could be removed even if the packed concrete removing operation was performed.

図1において、既製杭1は、1本のように図示したが、1本に限定されるものはなく、図2のc図に示したように、両端開口形の先端杭15と、先端杭15の上に同軸状に接続された両端開口形の接続杭16とから構成される。接続杭16は、1本でも複数本でも良い。接続杭16が複数本の場合、複数本の接続杭16が互いに同軸状に接続される。   In FIG. 1, the ready-made pile 1 is illustrated as one, but is not limited to one, and as shown in FIG. And a connection stake 16 having both ends open and connected coaxially on the connection pile 15. One or more connection piles 16 may be used. When there are a plurality of connection piles 16, the plurality of connection piles 16 are coaxially connected to each other.

図2を用いて、本発明を実施するための形態1に係る充填コンクリート撤去準備作業の前工程として、地盤2に既製杭1を設置するための掘削孔3が掘削され、掘削孔3に既製杭1が沈設されるまでの工程について説明する。   Referring to FIG. 2, as a pre-process of the preparatory work for removing filled concrete according to the first embodiment for carrying out the present invention, a drilling hole 3 for installing a ready-made pile 1 on the ground 2 is excavated, and a ready-made A process until the pile 1 is laid will be described.

図2のa図において、オーガー削孔機における掘削ロッド7の下降運動と回転運動とにより、掘削ヘッド11が掘削ヘッド11の上下方向に延びる中心線を回転中心として水平方向に回転しかつ下降するのに伴って、上側の縦孔8と下側の拡大根固め孔9とからなる掘削孔3がベントナイト等の安定液の供給を受けながら地盤2が掘削される。拡大根固め孔9の底部は、既製杭1の上に構築される上部構造物の重さに耐えられる硬い地盤2としての支持層になっている。   In FIG. 2A, the excavating head 11 rotates horizontally and descends about a center line extending in the vertical direction of the excavating head 11 due to the downward movement and the rotational movement of the excavating rod 7 in the auger drilling machine. Accordingly, the ground 2 is excavated while the excavation hole 3 composed of the upper vertical hole 8 and the lower enlarged root compaction hole 9 is supplied with a stable liquid such as bentonite. The bottom of the expanded root consolidation hole 9 is a support layer as the hard ground 2 that can withstand the weight of the upper structure constructed on the ready-made pile 1.

次に、図2のb図に示したように、拡大根固め孔9の掘削が完了後に未硬化なコンクリート4が地上から掘削ロッド7の内部を経由して拡大根固め孔9側から縦孔8へと流し込まれる。未硬化なコンクリート4の縦孔8に流し込まれる量が上昇するのに伴って、掘削ロッド7が上昇する。そして、未硬化なコンクリート4の縦孔8に流し込まれる量が計画量に達すると、未硬化なコンクリート4の縦孔8への流し込みが完了する。   Next, as shown in FIG. 2B, after the excavation of the enlarged root consolidation hole 9 is completed, the uncured concrete 4 passes from the ground through the inside of the excavation rod 7 and the vertical hole from the enlarged root consolidation hole 9 side. It is poured into 8. As the amount of uncured concrete 4 poured into the vertical hole 8 rises, the excavating rod 7 rises. When the amount of uncured concrete 4 to be poured into the vertical hole 8 reaches the planned amount, the casting of the uncured concrete 4 into the vertical hole 8 is completed.

そして、図2のc図に示したように、先端杭15及び接続杭16が自重で掘削孔3の内部における未硬化なコンクリート4に沈設された後に図示のされていない掘削ロッド等で回転を与えられて計画深度まで沈設される。先端杭15及び接続杭16からなる既製杭1の計画深度への沈設により、先端杭15が拡大根固め孔9の未硬化なコンクリート4に定着され、既製杭1の掘削孔3への沈設工程が完了する。その後、未硬化なコンクリート4が固くならないで、図1のa図に示す掘削ロッド7が未硬化なコンクリート4に挿入可能なうちに、図1のa図に示す既製杭1の充填コンクリート撤去準備作業が施工される。   Then, as shown in FIG. 2C, after the tip pile 15 and the connection pile 16 are laid down in the uncured concrete 4 inside the drilling hole 3 by their own weight, they are rotated by a drilling rod (not shown) or the like. Given and laid down to the planned depth. The submerged pile 1 composed of the tip pile 15 and the connection pile 16 is settled to the planned depth, and the tip pile 15 is fixed to the unhardened concrete 4 in the expanded rooting hole 9, and the submerged pile 1 is set in the excavation hole 3. Is completed. After that, while the unhardened concrete 4 does not become hard, while the excavating rod 7 shown in FIG. 1A can be inserted into the unhardened concrete 4, the ready-made pile 1 shown in FIG. Work is performed.

以上、本発明を実施の形態を用いて説明したが、本発明の技術的範囲は前記実施の形態に記載の範囲には限定されない。前記実施の形態に、多様な変更または改良を加えることが可能であることが当業者にも明らかである。そのような変更または改良を加えた形態も本発明の技術的範囲に含まれ得ることが、特許請求の範囲から明らかである。   As described above, the present invention has been described using the embodiment, but the technical scope of the present invention is not limited to the scope described in the embodiment. It will be apparent to those skilled in the art that various changes or improvements can be made to the embodiment. It is apparent from the appended claims that embodiments with such changes or improvements can be included in the technical scope of the present invention.

1 既製杭
1b 既製杭1の他端側
1a 既製杭1の一端側
2 地盤
4 コンクリート
5 充填コンクリート
6 水
7 掘削ロッド
8 縦孔
9 拡大根固め孔
11 掘削ヘッド
12
15 先端杭
16 接続杭
DESCRIPTION OF SYMBOLS 1 Ready-made pile 1b The other end side 1a of the ready-made pile 1 One end side of the ready-made pile 1 Ground 4 Concrete 5 Filling concrete 6 Water 7 Drilling rod 8 Vertical hole 9 Enlarged root hole 11 Drilling head 12 hole 15 Tip pile 16 Connection pile

Claims (2)

既製杭の上部に構築するコンクリート構造物の一部を中詰めコンクリートとして既製杭内に打設するためのを既製杭の内部の杭頭部に形成するために、地盤に掘削された掘削孔に流し込まれた未硬化なコンクリートの中に、杭軸方向の両端が開口した杭軸方向に連続する中空の既製杭を一端側から沈設し、この沈設により既製杭内に充填された未硬化な充填コンクリートが除去可能な貧配合のセメント成分からなる固化物となるように当該既製杭の他端側から水を上記既製杭内に充填された未硬化な充填コンクリートに中詰めコンクリートを打設する位置まで注入して、水が掘削孔から地上に溢れ出すことを確認した後、この水の注入で貧配合となったセメント成分からなる固化物を既製杭の杭頭部から除去する際に、オーガー削孔機の掘削ヘッドとして外径が既製杭の内径よりも小寸法の掘削ヘッドを使用して、当該掘削ヘッドの周縁部の一部を既製杭の内面に接触させながら固化物を掘削して除去したことを特徴とする既製杭の杭頭部における固化物の撤去方法。 To form a hole for pouring into the ready-made pile as medium-packed concrete part of the concrete structure to be built on top of the prefabricated pile inside the pile head of the ready-made pile, drilled hole which is drilled into the ground In the uncured concrete poured into the pile, a hollow ready-made pile continuous in the pile axis direction with both ends in the pile axis direction opened is sunk from one end side, and the unhardened as the solidified material filling concrete consists cement component removable poor compounding, Da設medium packed concrete water from the other end of the prefabricated pile uncured filling concrete is filled in the prefabricated pile by injecting position to which, after the water was confirmed to overflowing on the ground from the borehole, in removing the solidified material comprising a cement component became poor mixing at the injection of the water from the pile head of the ready-made pile Auger drilling machine Outer diameter as the cutting head by using the drilling head of a small size than the inner diameter of the ready-made pile, that a part of the periphery of the drilling head has been removed by drilling solidified product while in contact with the inner surface of the prefabricated pile A method for removing solidified material from the pile head of a ready-made pile. 上記既製杭内に充填された未硬化な充填コンクリートに水を注入する場合に掘削ロッドで行うことを特徴とする請求項1記載の既製杭の杭頭部における固化物の撤去方法 The method for removing solidified material from a pile head of a ready-made pile according to claim 1, wherein water is poured into the uncured filled concrete filled in the ready-made pile using a drill rod .
JP2016060311A 2016-03-24 2016-03-24 Removal method of solidified material from pile head of ready-made pile Active JP6656972B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016060311A JP6656972B2 (en) 2016-03-24 2016-03-24 Removal method of solidified material from pile head of ready-made pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016060311A JP6656972B2 (en) 2016-03-24 2016-03-24 Removal method of solidified material from pile head of ready-made pile

Publications (2)

Publication Number Publication Date
JP2017172247A JP2017172247A (en) 2017-09-28
JP6656972B2 true JP6656972B2 (en) 2020-03-04

Family

ID=59970613

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016060311A Active JP6656972B2 (en) 2016-03-24 2016-03-24 Removal method of solidified material from pile head of ready-made pile

Country Status (1)

Country Link
JP (1) JP6656972B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110241817B (en) * 2019-06-28 2021-01-12 重庆渝高科技产业(集团)股份有限公司 Construction method for damaged anti-slide pile hole of emergency rescue project

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58168720A (en) * 1982-03-31 1983-10-05 Shimizu Constr Co Ltd Treatment of head of on-site pile
JPS6250517A (en) * 1985-08-29 1987-03-05 Asahi Chem Ind Co Ltd Method and apparatus for construction of ready-made hollow pile
JPS63197715A (en) * 1987-02-12 1988-08-16 Mitsui Constr Co Ltd Device for treating extra-concrete banking of cast-in-place pile
JPH04108910A (en) * 1990-08-28 1992-04-09 Daido Concrete Kogyo Kk Method for processing pile head of sunk concrete pile
GB9107672D0 (en) * 1991-04-11 1991-05-29 Roxbury Ltd Improvements in or relating to piles
JPH11193524A (en) * 1997-12-26 1999-07-21 Kankyo Create:Kk Pile head treatment method and pile head treatment agent for precast concrete pile
JP2000240070A (en) * 1999-02-24 2000-09-05 Aizawa Koatsu Concrete Kk Securing method for pile head reinforcing bar insertion space in foundation pile with hollow section
JP3911121B2 (en) * 2000-10-12 2007-05-09 株式会社ジオトップ Pile head processing apparatus and pile head processing method

Also Published As

Publication number Publication date
JP2017172247A (en) 2017-09-28

Similar Documents

Publication Publication Date Title
JP5707529B1 (en) Ground improvement method, excavation rod and ground improvement device used for ground improvement method
CN108316291A (en) Deep mud pit cast-in-situ bored pile and construction method
JP5078511B2 (en) Embedded pile method using earth drill machine
KR101045625B1 (en) Underground continuous wall construction method using CIP method
KR102016366B1 (en) File head trimming device and trimming method for CIP concrete pile
EP3318677A1 (en) Method for forming a reinforced pile and accessory for use therein
ITTO20110913A1 (en) PROCEDURE FOR THE CONSTRUCTION OF LARGE DIAMETER POLES AND EXCAVATION TOOL
JP6645098B2 (en) Removal method of existing pile
JP6656972B2 (en) Removal method of solidified material from pile head of ready-made pile
JP7104536B2 (en) How to build an impermeable wall
JP5948068B2 (en) Pile construction method with anchors
JP2009155807A (en) Erection method for reinforcement cage for cast-in-place pile
JP5648085B2 (en) How to build a pile
JP6634251B2 (en) Pile foundation structure, ready-made pile burying device, method of constructing pile foundation structure using said ready-made pile burying device
JP2005188237A (en) Columnar ground improving device and columnar ground improving construction method
JP4811176B2 (en) Construction method of ready-made piles
JP4872561B2 (en) Construction method of ready-made piles
JP2013142256A (en) Construction method associated with improvement of ground property
JP4490710B2 (en) Pile foundation construction equipment and construction method
JP6324604B1 (en) Installation method of prop
JP2015183374A (en) Pile construction method
JP5310364B2 (en) Method for constructing underground continuous wall having shield penetration, and underground continuous wall having shield penetration
JP2005282149A (en) Precast pile burying construction method
CN216865161U (en) Construction device for ensuring foundation quality of concrete cast-in-place pile
JP4137172B1 (en) Reinforcing bar construction in cast-in-place pile

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20181120

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20190827

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20190830

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20190926

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20200204

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20200205

R150 Certificate of patent or registration of utility model

Ref document number: 6656972

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250