JP6689732B2 - Power system control device and power system control method - Google Patents
[go: Go Back, main page]

JP6689732B2 - Power system control device and power system control method - Google Patents

Power system control device and power system control method Download PDF

Info

Publication number
JP6689732B2
JP6689732B2 JP2016233273A JP2016233273A JP6689732B2 JP 6689732 B2 JP6689732 B2 JP 6689732B2 JP 2016233273 A JP2016233273 A JP 2016233273A JP 2016233273 A JP2016233273 A JP 2016233273A JP 6689732 B2 JP6689732 B2 JP 6689732B2
Authority
JP
Japan
Prior art keywords
data
state
power system
control
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2016233273A
Other languages
Japanese (ja)
Other versions
JP2018093583A (en
Inventor
晋也 末永
晋也 末永
泰之 多田
泰之 多田
博貴 森部
博貴 森部
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP2016233273A priority Critical patent/JP6689732B2/en
Priority to PCT/JP2017/032215 priority patent/WO2018100825A1/en
Publication of JP2018093583A publication Critical patent/JP2018093583A/en
Application granted granted Critical
Publication of JP6689732B2 publication Critical patent/JP6689732B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/12Arrangements for adjusting voltage in AC networks by changing a characteristic of the network load

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、電力系統を制御する技術に関する。   The present invention relates to a technique for controlling a power system.

温室効果ガスの排出量削減に向けた再生可能エネルギーの導入が進んでいる。再生可能エネルギー発電には例えば風力発電および太陽光発電などがある。風力発電または太陽光発電などによる電源は、気候の変動によって発電電力量(発電量)が変動するため、電力系統の送電電力量(送電量)を変動させ、電力系統を不安定にし、信頼性を低下させる恐れがある。   Renewable energy is being introduced to reduce greenhouse gas emissions. Renewable energy power generation includes, for example, wind power generation and solar power generation. The power generation amount (power generation amount) of wind power generation or solar power generation changes due to climate change. Therefore, the power transmission amount (power transmission amount) of the power system fluctuates, making the power system unstable and reliable. May decrease.

電力系統の信頼性を向上するには、急激に送電量が変化しても対応できるように、電力系統システムの全体の設備に余裕を持たせておくという方法が考えられる。送電経路または機器の二重化による冗長性の確保、あるいは各経路が送電することが可能な容量を増加することによる状態変化への耐性の向上によって、電力系統の信頼性を向上することが可能である。   In order to improve the reliability of the electric power system, it is conceivable to give a margin to the entire equipment of the electric power system so that it can cope with a sudden change in the power transmission amount. It is possible to improve the reliability of the power system by ensuring redundancy by duplicating power transmission paths or equipment, or by improving resistance to state changes by increasing the capacity that can be transmitted by each path. .

しかしながらその一方で、市場自由化の流れの中でコストを低減するという要求が高まっている。信頼性を向上させるためとは言え、大幅な設備投資は好ましくない。また、運用コストもできるだけ抑えることが好ましい。   On the other hand, however, there is an increasing demand for cost reduction in the course of market liberalization. Although it is intended to improve reliability, large capital investment is not preferable. It is also preferable to keep the operating cost as low as possible.

非特許文献1には、信頼性を維持あるいは向上、設備投資の抑制、運用コストの低減といった様々な要求に対して最適な電力系統状態を演算する最適潮流計算方法が開示されている。また、特許文献1には、最適潮流計算において算出した最適制御量が、時間の経過により、実際に制御を行う時点では最適なものではなくなってしまうという問題に対処する方法が記載されている。   Non-Patent Document 1 discloses an optimum power flow calculation method for calculating an optimum power system state in response to various requirements such as maintaining or improving reliability, suppressing capital investment, and reducing operating costs. Further, Patent Document 1 describes a method for dealing with the problem that the optimum control amount calculated in the optimum power flow calculation is not optimum at the time of actual control due to the passage of time.

関根泰次、外6名共著、「電力系統の最適潮流計算≪OPF;Optimal Power Flow≫」、一般社団法人日本電気協会、平成14年3月Yasuji Sekine and 6 others, "Optimal Power Flow Calculation for Electric Power System << OPF; Optimal Power Flow >>", Japan Electric Association, March 2002

特開2010−136600号公報JP, 2010-136600, A

特許文献1に開示された技術は、変電所で測定された需要電力のデータを元に、メタヒューリスティック手法を用いて、将来の変電所ごとの需要を予測し、予測された需要のデータを基に最適制御量を算出し、算出した制御量を用いて電力系統を制御するものである。需要電力として有効電力および無効電力が測定され、将来の変電所ごとの需要の予測に用いられる。その際、制御量の演算から適用までに要する時間を考慮し、制御を適用する時点で最適な制御量となるように演算が行われる。つまり、特許文献1では電力系統の未来の状態を事前に予測する。   The technology disclosed in Patent Document 1 uses a metaheuristic method to predict the demand for each future substation based on the data of the demand power measured at the substation, and based on the data of the predicted demand. The optimal control amount is calculated, and the electric power system is controlled using the calculated control amount. Active power and reactive power are measured as demand power, and used to predict future demand for each substation. At that time, considering the time required from the calculation of the control amount to the application, the calculation is performed so that the optimum control amount is obtained when the control is applied. That is, in Patent Document 1, the future state of the power system is predicted in advance.

しかし、事前予測の精度には限界があり、電力系統の実際の状態が事前に予測したものと大きく異なる場合がある。特許文献1の技術では、このような場合でも、事前に予測した演算結果を適用してしまうため、電力系統に必ずしも適切な制御を行えない場合がある。   However, there is a limit to the accuracy of the preliminary prediction, and the actual state of the power system may differ greatly from that predicted in advance. Even in such a case, the technique of Patent Document 1 applies the calculation result predicted in advance, and thus it may not always be possible to appropriately control the power system.

本発明の目的は、予測の演算に時間を要する電力系統の制御において適切な制御を可能にする技術を提供することである。   An object of the present invention is to provide a technique that enables appropriate control in control of a power system that requires time for calculation of prediction.

本発明の一態様による、電力系統制御装置は、所定時刻の電力系統の制御データを生成し、前記所定時刻に前記制御データに基づいて前記電力系統を制御する電力系統制御装置であって、前記電力系統の状態を示す状態データを取得する系統状態取得部と、前記取得された状態データに基づいて、前記電力系統に関する制御を実行する未来の時刻である指定時刻における前記電力系統の複数の状態を予測した複数の状態予測データを生成し、前記複数の状態予測データのそれぞれに対応する制御データである複数の制御候補データを生成する予測演算部と、前記指定時刻に取得された状態データを利用して、前記複数の状態予測データからいずれかを選択する比較部と、前記選択された状態予測データに対応する制御候補データに基づいて前記電力系統に関する制御を実行する実行部と、を有する。   An electric power system control device according to an aspect of the present invention is a power system control device that generates control data of an electric power system at a predetermined time and controls the electric power system based on the control data at the predetermined time. A system state acquisition unit that acquires state data indicating a state of the power system, and a plurality of states of the power system at a specified time that is a future time to execute control related to the power system based on the acquired state data. A plurality of state prediction data that predicts, a prediction calculation unit that generates a plurality of control candidate data that is control data corresponding to each of the plurality of state prediction data, and the state data acquired at the specified time. Utilizing a comparison unit that selects one of the plurality of state prediction data, and a control unit based on control candidate data corresponding to the selected state prediction data. Having an execution unit for executing control related power system, the.

本発明によれば、複数の状態予測データとそれらに対応する制御候補データを予め作成し、実際の状態に基づいて選択した制御候補データで制御を実行するので、予測の演算に時間がかかり制御を実行するまでに状態が変化したとしても、より適切な制御を実行することができる。   According to the present invention, a plurality of state prediction data and control candidate data corresponding to them are created in advance, and control is executed with the control candidate data selected based on the actual state. Even if the state changes by the time of executing, more appropriate control can be executed.

実施例1のシステム構成の一例を示すブロック図である。2 is a block diagram showing an example of a system configuration of Example 1. FIG. 実施例1における特定の測定ポイントについての環境状態データ211の一例を示す図である。5 is a diagram showing an example of environmental condition data 211 regarding a specific measurement point in Example 1. FIG. 実施例1における機器設定データ212の一例を示す図である。5 is a diagram showing an example of device setting data 212 in Example 1. FIG. 実施例1における機器状態データ213の一例を示す図である。6 is a diagram showing an example of device state data 213 in Example 1. FIG. 実施例1における系統構成データ202の一例を示す図である。3 is a diagram showing an example of system configuration data 202 in Embodiment 1. FIG. 実施例1での制御部10における、最適な電力系統状態への制御を実施する処理例を示すフローチャートである。5 is a flowchart showing a processing example in the control unit 10 according to the first embodiment for performing control to an optimum power system state. 実施例1における、予測演算部102が系統予測データを作成する処理の一例を示すフローチャーである。5 is a flowchart showing an example of a process in which the prediction calculation unit 102 creates systematic prediction data in the first embodiment. 実施例1における特定の測定ポイントの系統予測データ203の一例を示す図である。FIG. 5 is a diagram showing an example of systematic prediction data 203 of a specific measurement point in the first embodiment. 実施例1における系統制御データ204の一例を示す図である。5 is a diagram showing an example of system control data 204 in Example 1. FIG. 実施例1において、比較部103が、適用優先順位を演算する処理例を示すフローチャートである。7 is a flowchart illustrating a processing example in which the comparison unit 103 calculates an application priority order in the first embodiment. 実施例2において、判定部104が、適用対象の系統制御データを選択する処理例を示すフローチャートである。10 is a flowchart showing a processing example in which the determination unit 104 selects system control data to be applied in the second embodiment. 実施例3のシステム構成の一例を示すブロック図である。9 is a block diagram showing an example of a system configuration of Example 3. FIG. 実施例4における特定の測定ポイントの系統予測データ203の一例を示す図である。FIG. 13 is a diagram showing an example of systematic prediction data 203 at a specific measurement point in the fourth embodiment. 実施例4における系統制御データ204の一例を示す図である。FIG. 14 is a diagram showing an example of system control data 204 in the fourth embodiment. 実施例4において、比較部103が適用優先順位を演算する処理例を示すフローチャートである。16 is a flowchart illustrating a processing example in which a comparison unit 103 calculates an application priority order in a fourth example. 実施例5において、判定部104が適用対象の系統制御データを選択する処理の一例を示すフローチャートである。16 is a flowchart illustrating an example of processing in which the determination unit 104 selects system control data to be applied in the fifth embodiment. 実施例5における制御データ選択画面の一例を示す図である。FIG. 16 is a diagram showing an example of a control data selection screen in the fifth embodiment.

各種実施例について図面を用いて説明する。なお、図面において、同一部分または同様部分には同一符号を付与する。   Various embodiments will be described with reference to the drawings. In the drawings, the same reference numerals are given to the same or similar parts.

図1は、実施例1のシステム構成の一例を示すブロック図である。図1における1は系統制御装置、2は通信ネットワーク、3は電力系統、4は計測機器、5は電気機器を示す。   FIG. 1 is a block diagram illustrating an example of the system configuration of the first embodiment. In FIG. 1, 1 is a system controller, 2 is a communication network, 3 is a power system, 4 is measuring equipment, and 5 is electrical equipment.

本実施例では、電力系統3の計測機器4が取得した系統の各種データを元に、将来の指定日時の電力系統3の状態を複数個予測して複数の系統予測データを生成し、各予測に対応する最適な系統制御データを演算し、上記指定日時に、予測した複数の系統予測データと実際に計測した電力系統3の状態データとを比較して、複数の系統予測データに対応する系統制御データのそれぞれに優先順位を付け、優先順位の高い系統制御データを元に、電気機器5を制御する。   In this embodiment, based on various data of the grid acquired by the measuring device 4 of the power grid 3, a plurality of states of the power grid 3 at a future specified date and time are predicted to generate a plurality of grid prediction data, and each prediction is performed. The optimum grid control data corresponding to the above is calculated, and at the specified date and time, the plurality of predicted grid prediction data and the actually measured status data of the power grid 3 are compared, and the grid corresponding to the plurality of grid prediction data is calculated. Priorities are assigned to the respective control data, and the electric device 5 is controlled based on the system control data having a high priority.

本実施例によれば、制御を実行する時刻における実際の電力系統3の状態に適した制御を電力系統3の機器に適用することができる。   According to this embodiment, the control suitable for the actual state of the power system 3 at the time when the control is executed can be applied to the devices of the power system 3.

系統制御装置1は、制御部10、記録部20、最適演算部30、通信部40、入力部50、および表示部60を含む。   The system control device 1 includes a control unit 10, a recording unit 20, an optimum calculation unit 30, a communication unit 40, an input unit 50, and a display unit 60.

系統制御装置1は、一例として、CPU、メモリ、ハードディスクあるいはSSD等の記憶装置、および通信機能を備えたサーバである。制御部10および最適演算部30は、メモリに記憶された制御プログラムにしたがって処理を行うCPUによって実現される。記録部20は、メモリおよび記憶装置により実現される。通信部40は、通信ネットワーク2を介した通信を行う。系統制御装置1は、物理的に単一のサーバではなく、相互に通信可能に接続された複数のサーバにより実現されても良い。   The system control device 1 is, for example, a server having a CPU, a memory, a storage device such as a hard disk or SSD, and a communication function. The control unit 10 and the optimum calculation unit 30 are realized by a CPU that performs processing according to a control program stored in the memory. The recording unit 20 is realized by a memory and a storage device. The communication unit 40 performs communication via the communication network 2. The system control device 1 may be implemented by a plurality of servers that are communicably connected to each other, instead of being physically a single server.

入力部50は、例えば、キーボード、マウス等のポインティングデバイス、タッチパネル、および音声指示装置など、情報を入力する
少なくとも1つの装置を含む。表示部60は、例えば、ディスプレイ装置、プリンタ、および音声出力装置など、情報を出力する少なくとも1つの装置を含む。
The input unit 50 includes at least one device that inputs information, such as a keyboard, a pointing device such as a mouse, a touch panel, and a voice instruction device. The display unit 60 includes at least one device that outputs information, such as a display device, a printer, and a voice output device.

系統制御装置1は、通信部40に接続された通信ネットワーク2を介して、電力系統3に設けられた複数の計測機器4で計測された電力系統3の状態を示す状態データを取得することができる。また、電力系統3に含まれる複数の電気機器5に対して、制御に適用するためのデータを含む制御指令を送信することで、電気機器5の動作状態を制御することができる。   The system control device 1 can acquire state data indicating the state of the power system 3 measured by a plurality of measuring devices 4 provided in the power system 3 via the communication network 2 connected to the communication unit 40. it can. In addition, the operating state of the electric device 5 can be controlled by transmitting a control command including data to be applied to control to the plurality of electric devices 5 included in the power system 3.

電力系統3は、不図示の、発電装置を用いて発電を行う発電所の設備と、発電所が発生した電力を消費する需要家の設備と、発電所から需要家までの電力を送る電力流通設備とを含む。これらの設備には様々な電気機器5が含まれている。更に、電力系統3は、これらの設備の状態を計測する計測機器4を含む。   The power system 3 includes equipment (not shown) of a power plant that generates electric power using a power generator, equipment of a consumer who consumes the power generated by the power plant, and power distribution that sends power from the power station to the consumer. Including equipment. Various electric devices 5 are included in these facilities. Further, the power system 3 includes a measuring device 4 that measures the states of these facilities.

発電装置としては、火力発電、水力発電、原子力発電、地熱発電、太陽光発電、および風力発電を含む様々な発電方法による発電装置が考えられる。   As the power generation device, power generation devices by various power generation methods including thermal power generation, hydraulic power generation, nuclear power generation, geothermal power generation, solar power generation, and wind power generation can be considered.

電力流通設備は、架空送電線、地中送電線、変圧器、遮断器、および調相設備を含む、送配電に関わる設備である。   The power distribution facility is a facility related to power transmission and distribution, including an overhead power transmission line, an underground power transmission line, a transformer, a circuit breaker, and a phasing facility.

計測機器4は、電力系統3の特定の測定ポイントにおいて特定の計測項目の状態を計測する装置である。電力系統3には、複数の測定ポイントに計測機器4が設けられる。   The measuring device 4 is a device that measures the state of a specific measurement item at a specific measurement point of the power system 3. The electric power system 3 is provided with measuring devices 4 at a plurality of measuring points.

計測項目には、例えば、電力系統3の電力情報、気象情報、電気機器5の設定状態情報、電気機器5の動作状態情報、電力潮流状態を変化させる装置の動作状態情報、他にも様々な値が含まれる。電力系統3の電力情報には、例えば、電力系統3の特定ポイントの電圧値、位相、電力値などが含まれる。気象情報には、気温、風速、風向、降水量、日射量などが含まれる。電力潮流状態を変化させる装置は、例えば、電力流通設備あるいは発電装置である。   The measurement items include, for example, electric power information of the electric power system 3, weather information, setting state information of the electric device 5, operating state information of the electric device 5, operating state information of a device that changes the electric power flow state, and various other items. Contains the value. The electric power information of the electric power system 3 includes, for example, a voltage value, a phase, an electric power value, etc. of a specific point of the electric power system 3. The meteorological information includes temperature, wind speed, wind direction, precipitation amount, solar radiation amount, and the like. The device that changes the power flow state is, for example, a power distribution facility or a power generation device.

測定ポイントには、発電所および変電所の母線、電力流通設備、需要家が含まれる。1つの測定ポイントには、1つの計測機器4が設けられてもよいし、複数の計測機器4が設けられてもよい。   The measurement points include busbars of power plants and substations, power distribution facilities, and consumers. One measurement device 4 may be provided at one measurement point, or a plurality of measurement devices 4 may be provided.

計測機器4が計測した値は状態データとして、通信ネットワーク2を介して、系統制御装置1に送信される。このとき、計測した値と共に、その値が計測された時刻を示す計測日時情報が送信されても良い。   The value measured by the measuring device 4 is transmitted as state data to the system control device 1 via the communication network 2. At this time, the measurement date and time information indicating the time when the value is measured may be transmitted together with the measured value.

電気機器5は、電力系統3を構成する機器の内、電気を利用あるいは扱う機器であり、例えば、電力系統3の電力潮流状態を変化させうる機器である。電気機器5には、例えば、発電装置、変圧器、遮断器、調相設備などの電力系統3の電力潮流状態を変更するための装置が含まれる。ただし、電気機器5に他の様々な装置を含んでも良い。電気機器5は、系統制御装置1が通信ネットワーク2を介して送信した制御指令を受信すると、制御指令に応じて設定状態や動作状態を変更することができる。   The electric device 5 is a device that uses or handles electricity among the devices that form the power system 3, and is, for example, a device that can change the power flow state of the power system 3. The electric device 5 includes, for example, a device for changing the power flow state of the power system 3, such as a power generator, a transformer, a circuit breaker, and a phase adjusting facility. However, the electric device 5 may include various other devices. When the electric equipment 5 receives the control command transmitted from the system control device 1 via the communication network 2, the electric device 5 can change the setting state and the operating state according to the control command.

系統制御装置1の制御部10は、系統状態取得部101、予測演算部102、比較部103、および判定部104を含む。   The control unit 10 of the system control device 1 includes a system state acquisition unit 101, a prediction calculation unit 102, a comparison unit 103, and a determination unit 104.

系統状態取得部101は、定期的に、もしくは制御部10から指示を受けたときに、計測機器4が送信した系統状態データを、通信部40を介して取得し、系統状態データ201として計測日時と共に記録部20に記録する。
系統状態取得部101は、系統状態データ201を記録する際、電力系統3の状態を推定することが可能な場合には、記録部20から系統構成データ202を取得し、状態推定演算により系統状態データを補正し、補正後のデータを記録部20に格納することにしてもよい。
The system status acquisition unit 101 acquires, via the communication unit 40, the system status data transmitted by the measuring device 4 on a regular basis or when receiving an instruction from the control unit 10, and measures the system status data 201 as the measurement date and time. It is recorded together with the recording unit 20.
When recording the system state data 201, when the system state acquisition unit 101 can estimate the state of the power system 3, the system state acquisition unit 101 acquires the system configuration data 202 from the recording unit 20 and calculates the system state by state estimation calculation. The data may be corrected and the corrected data may be stored in the recording unit 20.

系統状態データ201には、環境状態データ211、機器設定データ212、および機器状態データ213が含まれる。   The system status data 201 includes environmental status data 211, device setting data 212, and device status data 213.

環境状態データ211は、気象情報、負荷に流れる有効電力および無効電力の情報、発電設備が発電する有効電力の情報が含まれる。   The environmental condition data 211 includes weather information, information on active power and reactive power flowing through the load, and information on active power generated by the power generation facility.

機器設定データ212は、電気機器5に設定された設定値を含む。   The device setting data 212 includes setting values set for the electric device 5.

機器状態データ213は、電気機器5、電力流通設備、および発電装置といった電力潮流状態を変化させる機器の動作状態を含む。   The device state data 213 includes operating states of devices such as the electric device 5, the power distribution facility, and the power generator that change the power flow state.

図2は、実施例1における特定の測定ポイントについての環境状態データ211の一例を示す図である。   FIG. 2 is a diagram illustrating an example of the environmental state data 211 regarding a specific measurement point according to the first embodiment.

環境状態データ211は、特定の測定ポイントにおける測定値が時系列で格納されるテーブルデータであり、項目の一例として、通し番号D101、計測日時D102、気温D103、有効電力D104、無効電力D105といった項目が含まれる。D103〜D105は、測定された値が格納される項目であり、時間の経過とともに変化する測定値が、D101、D102と共に格納されていく。   The environmental condition data 211 is table data in which measured values at specific measurement points are stored in time series, and as an example of items, items such as serial number D101, measurement date / time D102, temperature D103, active power D104, and reactive power D105 are included. included. D103 to D105 are items in which measured values are stored, and measured values that change over time are stored together with D101 and D102.

本実施例の気温D103は気象情報であり、測定ポイントにて測定された気温が格納される。しかし、実際の測定ポイントで測定した値を記録する代わりに、地形的に隣接した測定ポイントでの測定値を記録するようにしても良い。   The temperature D103 of this embodiment is meteorological information, and the temperature measured at the measurement point is stored. However, instead of recording the values measured at actual measurement points, the measurement values at topographically adjacent measurement points may be recorded.

また、他の例として、気温D103の代わりに、あるいは気温D103に加えて他の気象情報を環境状態データ211に記録してもよい。具体的には、気象情報として、気温、風速、風向、降水量、日射量の1つもしくは複数を環境状態データ211に記録してもよい。また、その他の気象情報を環境状態データ211に含んでもよい。   Further, as another example, instead of the temperature D103, or in addition to the temperature D103, other weather information may be recorded in the environmental condition data 211. Specifically, one or more of temperature, wind speed, wind direction, precipitation amount, and solar radiation amount may be recorded in the environmental condition data 211 as the weather information. Further, other weather information may be included in the environmental condition data 211.

有効電力D104と無効電力D105は電力情報の例である。環境状態データ211に、電力情報として、有効電力、無効電力、皮相電力、位相、電圧、電流の1つもしくは複数を含むようにしても良く、その他の電力情報を含むようにしても良い。   Active power D104 and reactive power D105 are examples of power information. The environmental state data 211 may include, as the power information, one or more of active power, reactive power, apparent power, phase, voltage, and current, or may include other power information.

図3は、実施例1における機器設定データ212の一例を示す図である。   FIG. 3 is a diagram illustrating an example of the device setting data 212 according to the first embodiment.

機器設定データ212は、機器に設定された設定値の情報が時系列で格納されるテーブルデータである。機器設定データ212には、項目として、通し番号D201、計測日時D202、調相設備1Aの投入量D203、調相設備1Bの投入量D204、変圧器1Aのタップ位置D205、変圧器1Bのタップ位置D206が含まれる。   The device setting data 212 is table data in which information on setting values set in the device is stored in time series. The device setting data 212 includes, as items, a serial number D201, a measurement date / time D202, an input amount D203 of the phase adjusting equipment 1A, an input amount D204 of the phase adjusting equipment 1B, a tap position D205 of the transformer 1A, and a tap position D206 of the transformer 1B. Is included.

ここに示したD203〜D206は、電気機器5の設定情報の一例であり、その他の設定情報の組み合わせであっても良い。設定情報は、電気機器5に付随する計測機器4が電気機器5から取得した設定情報であってもよく、あるいは電気機器5に設定した設定情報であってもよい。   D203 to D206 shown here are examples of the setting information of the electric device 5, and may be a combination of other setting information. The setting information may be setting information acquired from the electric device 5 by the measuring device 4 attached to the electric device 5, or may be setting information set in the electric device 5.

図4は、実施例1における機器状態データ213の一例を示す図である。   FIG. 4 is a diagram illustrating an example of the device status data 213 according to the first embodiment.

機器状態データ213は、機器の動作状態が時系列で格納されるテーブルデータであり、項目として、通し番号D301、計測日時D302、調相設備1Aの動作状態D303、調相設備1Bの動作状態D304、変圧器1Aの動作状態D305、および変圧器1Bの動作状態D306を含む。   The equipment state data 213 is table data in which the operation states of the equipment are stored in time series, and the items are a serial number D301, a measurement date / time D302, an operation state D303 of the phase adjusting equipment 1A, an operation state D304 of the phase adjusting equipment 1B, It includes an operating state D305 of the transformer 1A and an operating state D306 of the transformer 1B.

ここに示したD303〜306は一例であり、遮断器あるいは開閉器など開閉装置の開閉状態、送電線の送電ステータスが含まれても良い。また、電力流通設備あるいは発電装置などの電力潮流状態を変化させる電気機器5の各種動作状態、および計測機器4が取得したその他の機器の各種動作情報から選択された任意の情報の組み合わせであっても良い。   D303 to 306 shown here are examples, and the open / close state of a switchgear such as a circuit breaker or a switch, and the power transmission status of a power transmission line may be included. In addition, it is a combination of various operating states of the electrical equipment 5 that changes the power flow state of the power distribution facility or the power generator, and arbitrary information selected from various operating information of other equipment acquired by the measuring equipment 4. Is also good.

図5は、実施例1における系統構成データ202の一例を示す図である。ここでは送電線の例が示されている。系統構成データ202に項目として含まれる、D401は通し番号、D402は名称、D403は定格電圧、D404は基準容量、D405は線路長、D406は抵抗値、D407はリアクタンスといったパラメータであり、機器ごとの値が格納される。系統構成データ202には、電力系統の解析に必要な情報の内、電力系統3を構成する機器のパラメータ情報、あるいは機器の相互の電気的な接続情報などの短時間では変化しない情報が保存される。   FIG. 5 is a diagram illustrating an example of the system configuration data 202 according to the first embodiment. Here, an example of a transmission line is shown. D401 is a serial number, D402 is a name, D403 is a rated voltage, D403 is a rated capacity, D405 is a reference length, D405 is a line length, D406 is a resistance value, and D407 is a parameter such as reactance, which are included in the system configuration data 202 as values for each device. Is stored. The system configuration data 202 stores information that does not change in a short time, such as parameter information of the devices that configure the power system 3 or mutual electrical connection information of the devices among the information necessary for analyzing the power system. It

なお、図5には、送電線の場合を取り上げて示しているが、他の機器の場合には、異なるパラメータ項目を保存するようにしても良い。   Although FIG. 5 shows the case of a power transmission line, different parameter items may be stored for other devices.

図6は、実施例1での制御部10における、最適な電力系統状態への制御を実施する処理例を示すフローチャートである。   FIG. 6 is a flowchart illustrating an example of processing performed by the control unit 10 according to the first embodiment to perform control to an optimum power system state.

まず、制御部10は、入力部50を介してユーザの指示もしくは事前の設定により、指定日時の最適な電力系統3の状態の演算および電力系統3への制御の適用が指示されると、予測演算部102により、系統状態データ201および系統構成データ202を利用して、上記指定日時の系統予測データを複数個作成する(ステップS101)。   First, the control unit 10 predicts that the user is instructed via the input unit 50 or is set in advance to instruct calculation of the state of the optimum power system 3 at the designated date and time and application of control to the power system 3. The computing unit 102 uses the system status data 201 and the system configuration data 202 to create a plurality of system prediction data at the specified date and time (step S101).

その際、予測演算部102は、過去から現在までの電力系統3の状態と、電力系統3の構成に基づいて、現在から指定日時までに起こり得る電力系統3の状態の変化を複数通り予測し、それぞれの場合の系統予測データを作成すればよい。具体的には、予測演算部102は、系統状態データ201に蓄積されたデータを元に、指定日時の環境状態を複数通り予測し、各予測に基づく系統予測データを作成し、系統予測データ202として記録する。   At that time, the prediction calculation unit 102 predicts a plurality of possible changes in the state of the electric power system 3 from the present to the designated date and time based on the state of the electric power system 3 from the past to the present and the configuration of the electric power system 3. , Systematic prediction data for each case may be created. Specifically, the prediction calculation unit 102 predicts a plurality of environmental conditions at a designated date and time based on the data accumulated in the system status data 201, creates system prediction data based on each prediction, and the system prediction data 202 To record as.

次に、制御部10は、最適演算部30により、上記複数の系統予測データのそれぞれに基づいて、最適な系統状態を達成するための系統制御データを算出する(ステップS102)。   Next, the control unit 10 causes the optimum calculation unit 30 to calculate system control data for achieving an optimum system state based on each of the plurality of system prediction data (step S102).

次に、制御部10は、上記指定日時すなわち系統制御データの適用を開始する日時の間近になると、比較部103により、最新の系統状態データと、系統制御データの算出の基となった各系統予測データとを比較し、各系統制御データに適用の優先順位を決定する(ステップS103)。   Next, when the specified date and time, that is, the date and time when the application of the system control data is started, is approached, the control unit 10 causes the comparison unit 103 to calculate the latest system state data and each system on which the system control data is calculated. The prediction data is compared to determine the priority order of application to each system control data (step S103).

比較部103による優先順位の決定を行うタイミングは、指定日時に系統制御データを制御に適用できるように、指定日時から、制御や演算等に要する時間を考慮した所定時間だけ遡ったタイミングとすればよい。   The timing of determining the priority order by the comparison unit 103 may be a timing that is traced back from the designated date and time by a predetermined time in consideration of the time required for control and calculation so that the system control data can be applied to the control at the designated date and time. Good.

また、系統制御データの優先順位は、その系統制御データに対応する系統予測データが最新の系統状態データに近いほど高優先となるように算出するとよい。   Further, the priority order of the grid control data may be calculated such that the grid prediction data corresponding to the grid control data has a higher priority as it is closer to the latest grid status data.

次に、制御部10は、判定部104により、複数の系統制御データの内、最上位の優先順位の系統制御データを選択する(ステップS104)。   Next, the control unit 10 causes the determination unit 104 to select the highest priority system control data from the plurality of system control data (step S104).

最後に、制御部10は、実行部105により、判定部104により選択された系統制御データに基づく制御を実行する(ステップS105)。その際、実行部105は、選択された系統制御データに記載された制御値を実現する制御指令を生成し、電力系統3における制御対象の電気機器5に送信する。   Finally, the control unit 10 causes the execution unit 105 to execute control based on the system control data selected by the determination unit 104 (step S105). In that case, the execution part 105 produces | generates the control command which implement | achieves the control value described in the selected system control data, and transmits to the electric equipment 5 of the control object in the electric power system 3.

図7は、実施例1における、予測演算部102が系統予測データを作成する処理の一例を示すフローチャーである。   FIG. 7 is a flowchart illustrating an example of a process in which the prediction calculation unit 102 creates systematic prediction data according to the first embodiment.

まず、予測演算部102は、指定された将来日時(指定日時)の系統予測データを作成することを要求する指示を受信すると、環境状態データ211を取得する(ステップS201)。   First, when the prediction calculation unit 102 receives an instruction to create systematic prediction data of a specified future date and time (specified date and time), the prediction calculation unit 102 acquires the environmental condition data 211 (step S201).

次に、予測演算部201は、取得した環境状態データを元に、指定日時の気象状態を複数通り予測し、複数の予測気象情報を作成する(ステップS202)。   Next, the prediction calculation unit 201 predicts a plurality of weather conditions at the designated date and time based on the acquired environmental condition data and creates a plurality of predicted weather information (step S202).

次に、予測演算部201は、作成した予測気象情報のそれぞれに対応した負荷量を、環境状態データに対する統計演算により、生成する(ステップS203)。ここで生成される負荷量(予測負荷量)が系統予測データの一例である。   Next, the prediction calculation part 201 produces | generates the load amount corresponding to each of the produced forecast weather information by the statistical calculation with respect to environmental condition data (step S203). The load amount (predicted load amount) generated here is an example of system prediction data.

ステップS202における予測気象情報の作成手法は、簡単な例として、蓄積された環境状態データ211から、過去の年における指定日時と同一日付およびその前後数日の指定日時と同一時刻におけるデータを抽出し、それらのデータに基づき、統計的属性の異なる複数の統計量を算出し、算出した複数の統計量のそれぞれを予測気象情報とする手法を用いることができる。   As a simple example, the method of creating the forecast weather information in step S202 is to extract the data at the same time as the specified date and time in the past year and several days before and after the specified date and time from the accumulated environmental condition data 211. It is possible to use a method in which a plurality of statistical quantities having different statistical attributes are calculated based on the data and each of the calculated plurality of statistical quantities is used as predicted weather information.

例えば気温について、抽出された複数の気温のデータを用いて、それらの平均値、最高値、最低値を複数の予測気象情報とすることが考えられる。   For example, regarding the temperature, it is conceivable to use a plurality of extracted temperature data and set the average value, the highest value, and the lowest value thereof as the plurality of forecast weather information.

しかし、予測気象情報の作成手法は、将来の日時における気象を予測することができればよく、特に限定されることはない。他の例として、他の統計演算により予測気象情報を作成してもよいし、既知のメタヒューリスティックな手法により予測気象情報を作成してもよい。また、予測気象情報の作成に、系統状態データ201だけでなく、系統構成データ202を利用してもよい。   However, the method of creating the forecast weather information is not particularly limited as long as it is possible to forecast the weather at a future date and time. As another example, the forecasted weather information may be created by another statistical calculation, or the forecasted weather information may be created by a known metaheuristic method. Further, not only the system state data 201 but also the system configuration data 202 may be used to create the forecast weather information.

ステップS203において予測負荷量の作成手法には、簡単には例えば、蓄積された環境状態データから、予測気象に最も近いデータに対応する負荷量を予測負荷量とする手法があるが、さらに、その他の統計演算や公知例1のようなメタヒューリスティックな手法により、予測負荷量を生成するようにしても良く、将来の日時の負荷量を予測できれば、手法は限定しない。気象情報を利用せずに予測負荷量を生成する場合においては、ステップS202の実行や環境状態データ211の気象情報は不要として良い。また、データ生成に必要であれば系統状態データ201に加え、系統構成データ202を利用しても良い。   As a method of creating the predicted load amount in step S203, for example, there is a simple method of setting the predicted load amount to the load amount corresponding to the data closest to the predicted weather from the accumulated environmental condition data. The predicted load amount may be generated by the statistical calculation of ## EQU1 ## or a metaheuristic method such as the known example 1, and the method is not limited as long as the load amount at a future date and time can be predicted. When generating the predicted load amount without using the weather information, the execution of step S202 and the weather information of the environmental condition data 211 may be unnecessary. If necessary for data generation, the system configuration data 202 may be used in addition to the system status data 201.

図8は、実施例1における特定の測定ポイントの系統予測データ203の一例を示す図である。   FIG. 8 is a diagram illustrating an example of the systematic prediction data 203 at a specific measurement point according to the first embodiment.

系統予測データ203は、特定の測定ポイントでの予測値を複数格納するテーブルデータであり、項目として、系統予測データを特定するためのユニークなID D501、予測の演算を行った日時を示す予測実施日時D502、予測の対象として指定された日時(指定日時)を示す指定日時D503、予測される気温を示す気温D504、予測される有効電力を示す有効電力D505、および予測される無効電力を示す無効電力D506が含まれる。   The systematic prediction data 203 is table data that stores a plurality of predicted values at specific measurement points, and includes a unique ID D501 for specifying the systematic prediction data and a prediction execution indicating the date and time when the prediction calculation is performed. Date / time D502, designated date / time D503 indicating the date / time (designated date / time) designated as the target of prediction, temperature D504 indicating the predicted temperature, active power D505 indicating the predicted active power, and invalid indicating the predicted reactive power. Electric power D506 is included.

気温D504は気象情報の例である。気温D504として、実際の測定ポイントでの予測される気温の値を用いてもよいし、測定ポイントに地形的に近接する位置での予測される気温の値を採用しても良い。   The air temperature D504 is an example of weather information. As the temperature D504, a predicted temperature value at an actual measurement point may be used, or a predicted temperature value at a position topographically close to the measurement point may be used.

また、系統予測データ203には、気象情報として、気温、風速、風向、降水量、および日射量のいずれか1つもしくは複数を含むようにしても良く、その他の気象状態を示す情報を含むようにしても良い。   Further, the systematic prediction data 203 may include any one or more of temperature, wind speed, wind direction, precipitation amount, and solar radiation amount as weather information, and may include information indicating other weather conditions. .

有効電力D505と無効電力D506は電力情報の例である。系統予測データ203には、電力情報として、有効電力、無効電力、皮相電力、位相、電圧、電流の1つもしくは複数を含めても良く、その他の電力に関連する情報を含めても良い。   Active power D505 and reactive power D506 are examples of power information. The system prediction data 203 may include, as the power information, one or more of active power, reactive power, apparent power, phase, voltage, and current, and may also include other power-related information.

最適演算部30は、図8に例示された系統予測データ203における指定日時の系統予測データと、最新の機器設定データ212とに基づいて、最適な電力系統状態を実現する系統制御データを生成し、制御部10へ提供する。制御部10は、受信した系統制御データに対応する系統予測データのIDを付加して、系統制御データ204に記録する。系統制御データの生成に、系統構成データ202および/または最新の機器状態データ213を利用しても良い。   The optimum calculation unit 30 generates grid control data that realizes an optimum power grid state based on the grid prediction data at the designated date and time in the grid prediction data 203 illustrated in FIG. 8 and the latest device setting data 212. , To the control unit 10. The control unit 10 adds the ID of the system prediction data corresponding to the received system control data and records it in the system control data 204. The system configuration data 202 and / or the latest device status data 213 may be used to generate the system control data.

最適演算部30による最適な電力系統状態を求める演算は、電力損失の低減、あるいは電圧の安定性の向上を目的とし、その目的に最適な電力系統状態を算出するものである。実際の演算は、例えば、電力損失あるいはその低減を表現する目的関数を与え、電力系統の潮流方程式の制約条件と、電圧範囲といったその他の等式制約条件および不等式制約条件とを満足する変数の組み合わせの中から、上記目的関数を最小もしくは最大とする変数の組み合わせを演算する手法とすればよい。変数としては、各母線電圧、調相設備投入量、変圧器タップ位置などが利用可能である。最適演算部30の演算手法として、例えば、非特許文献1に記載された既知の方法を用いることができるが、その方法に限定されることはない。最適な電力系統状態を算出することができる演算方法であれば、どのような方法であっても良い。   The calculation for obtaining the optimum power system state by the optimum calculation unit 30 is intended to reduce the power loss or improve the stability of the voltage, and calculate the optimum power system state for that purpose. The actual calculation is, for example, a combination of variables that give an objective function expressing power loss or reduction and satisfy the constraints of the power flow equation of the power system and other equality constraints and inequality constraints such as the voltage range. From among the above, a method of computing a combination of variables that minimizes or maximizes the above objective function may be used. As the variables, each bus voltage, the input amount of the phase adjusting equipment, the transformer tap position, etc. can be used. As a calculation method of the optimum calculation unit 30, for example, a known method described in Non-Patent Document 1 can be used, but the calculation method is not limited to that method. Any method may be used as long as it is a calculation method capable of calculating the optimum power system state.

図9は、実施例1における系統制御データ204の一例を示す図である。   FIG. 9 is a diagram illustrating an example of the system control data 204 according to the first embodiment.

系統制御データ204は、電力系統3の制御に適用される設定パラメータを格納したテーブルデータである。系統制御データ204には、複数の系統予測データに対応する複数の系統制御データが格納される。系統制御データ204には、項目として、系統制御データの通し番号D601、元になった
系統予測データのID D602、系統制御データを適用する優先順位D603、系統制御データの適用を開始する日時を示す適用開始日時D604、調相設備1Aの投入量D605、調相設備1Bの投入量D606、変圧器1Aのタップ位置D607、および変圧器1Bのタップ位置D608が含まれる。
The system control data 204 is table data that stores setting parameters applied to control of the power system 3. The system control data 204 stores a plurality of system control data corresponding to a plurality of system prediction data. The system control data 204 includes, as items, a serial number D601 of the system control data, an ID D602 of the original system prediction data, a priority D603 to which the system control data is applied, and a date and time when the system control data is applied. The start date and time D604, the input amount D605 of the phase adjusting equipment 1A, the input amount D606 of the phase adjusting equipment 1B, the tap position D607 of the transformer 1A, and the tap position D608 of the transformer 1B are included.

D605〜D608は、電気機器5に設定する設定値である。図9に示した以外に、発電機の端子電圧の目標値、開閉器の開閉状態などを含んでもよい。   D605 to D608 are setting values set in the electric device 5. Other than those shown in FIG. 9, the target value of the terminal voltage of the generator, the open / closed state of the switch, etc. may be included.

適用優先順位D603の値は、比較部103により追記される。比較部103は、最新の環境状態データを元に、どの系統予測データが適切に実際の状態を示しているかを算出し、その算出結果に応じて複数の系統制御データのそれぞれに適用優先順位を付与する。   The value of the application priority order D603 is added by the comparison unit 103. The comparison unit 103 calculates which system prediction data appropriately indicates the actual state based on the latest environmental condition data, and assigns an application priority to each of the plurality of system control data according to the calculation result. Give.

図10は、実施例1において、比較部103が、適用優先順位を演算する処理例を示すフローチャートである。   FIG. 10 is a flowchart illustrating a processing example in which the comparison unit 103 calculates the application priority order according to the first embodiment.

まず、比較部103は、制御部10から特定の系統制御データについて、優先順位の演算を指示されると、環境状態データ211から最新の環境状態を示すデータ(最新環境状態データ)を取得する(ステップS301)。   First, when the control unit 10 is instructed by the control unit 10 to calculate the priority of specific system control data, the comparison unit 103 acquires data indicating the latest environmental state (latest environmental state data) from the environmental state data 211 ( Step S301).

さらに、比較部103は、比較演算の方法を表した比較演算データ205を取得する(ステップS302)。   Further, the comparison unit 103 acquires the comparison calculation data 205 representing the comparison calculation method (step S302).

さらに、比較部103は、図9に例示された系統制御データの予測データIDにより特定される、各系統制御データに対応した系統予測データを取得する(ステップS303)。   Further, the comparison unit 103 acquires the system prediction data corresponding to each system control data specified by the prediction data ID of the system control data illustrated in FIG. 9 (step S303).

次に、比較部103は、比較演算データ205を利用し、所定の比較演算方法で各系統予測データと最新環境状態データとを比較し、最新環境状態データにより示される環境状態に近い状態を示す系統予測データが高優先となるように、各系統予測データに優先順位を付与する(ステップS304)。   Next, the comparison unit 103 uses the comparison calculation data 205, compares each system prediction data with the latest environmental condition data by a predetermined comparison calculation method, and indicates a state close to the environmental condition indicated by the latest environmental condition data. Priorities are given to the respective system prediction data so that the system prediction data has a high priority (step S304).

最後に、比較部103は、系統制御データ204の予測データID D602を参照しながら、各系統予測データに対応する系統制御データに対して、ステップS304で算出した優先順位を追記する(ステップS305)。   Lastly, the comparing unit 103 adds the priority order calculated in step S304 to the system control data corresponding to each system prediction data, with reference to the prediction data ID D602 of the system control data 204 (step S305). .

比較演算データ205は、ステップS304において、系統予測データと最新環境状態データとを比較する比較演算の方法を示すデータである。ステップS304における比較演算の方法としては、例えば、系統予測データの各予測値と、対応する最新環境状態データとの、重み付き平均二乗誤差の総和を算出し、その値が小さい系統予測データほど優先順位が高くなるように演算を行えばよい。本実施例の重み付き平均二乗誤差は、式(1)を用いて算出できる。   The comparison calculation data 205 is data indicating a method of comparison calculation for comparing the system prediction data and the latest environmental condition data in step S304. As the method of the comparison calculation in step S304, for example, the sum of weighted mean squared errors of each predicted value of the systematic prediction data and the corresponding latest environmental state data is calculated, and the systematic prediction data having a smaller value is prioritized. The calculation may be performed so that the rank becomes higher. The weighted mean square error of the present embodiment can be calculated using the equation (1).

Figure 0006689732
ここで、Eはi番目(i=1,2,…,N)の系統予測データについての重み付き平均二乗誤差である。xi,jはi番目の系統予測データのj番目(j=1,2,…,M)の項目の予測値である。yはxi,jと同じ項目の最新環境状態データの値である。wはj番目の項目に対する重み付けである。
Figure 0006689732
Here, E i is a weighted mean square error for the i-th (i = 1, 2, ..., N) systematic prediction data. x i, j is the predicted value of the j-th (j = 1, 2, ..., M) item of the i-th system prediction data. y j is the value of the latest environmental state data of the same item as x i, j . w j is a weight for the j-th item.

は、項目ごとの重要性と値の範囲などを考慮して任意に指定可能な正の値である。wとして、例えば、各項目における平均値の逆数を算出し、その値を、重視する項目については重視する度合いの分だけ増加させた値を採用しても良い。ただし、それに限定されることはなく他の値を採用しても良い。wは比較演算データ205として記録しておいてもよい。 w j is a positive value that can be arbitrarily designated in consideration of the importance of each item and the range of values. As w j , for example, a value obtained by calculating the reciprocal of the average value of each item and increasing the value by the degree of importance of the item of importance may be adopted. However, it is not limited to this, and other values may be adopted. The w j may be recorded as the comparison calculation data 205.

判定部104は、以上のように算出された優先順位が最も高い系統制御データ204を実際に適用する系統制御データとして選択する。   The determination unit 104 selects the system control data 204 with the highest priority calculated as described above as the system control data to be actually applied.

以上により、将来の予測に基づき最適な電力系統状態の算出し、算出した結果を電力系統へ適用する場合に、適用時の実際の状態に即した、電力系統状態への制御を行うことが可能となる。   As described above, when the optimum power system state is calculated based on future predictions and the calculated result is applied to the power system, it is possible to control the power system state according to the actual state at the time of application. Becomes

本実施例に含まれる内容を以下のように整理することができる。   The contents included in this embodiment can be organized as follows.

系統制御装置1は、所定時刻の電力系統3の制御データを生成し、所定時刻に制御データに基づいて電力系統3を制御するものである。系統制御装置1において、系統状態取得部101は、電力系統3の状態を示す状態データ(系統状態データ)を取得する。予測演算部102は、取得された状態データに基づいて、電力系統3に関する制御を実行する未来の時刻である指定時刻(指定日時)における電力系統3の複数の状態を予測した複数の状態予測データ(系統予測データ)を生成し、複数の状態予測データのそれぞれに対応する制御データである複数の制御候補データ(系統制御データ)を生成する。比較部103は、指定時刻に取得された状態データを利用して、複数の状態予測データからいずれかを選択する。実行部105は、選択された状態予測データに対応する制御候補データに基づいて電力系統3に関する制御を実行する。以上のように、複数の状態予測データとそれらに対応する制御候補データを予め作成し、実際の状態に基づいて選択した制御候補データで制御を実行するので、予測の演算に時間がかかり制御を実行するまでに状態が変化したとしても適切な制御を実行することができる。   The system control device 1 generates control data of the power system 3 at a predetermined time and controls the power system 3 based on the control data at a predetermined time. In the grid control device 1, the grid status acquisition unit 101 acquires status data (grid status data) indicating the status of the power grid 3. The prediction calculation unit 102 predicts, based on the acquired state data, a plurality of state prediction data that predicts a plurality of states of the power system 3 at a designated time (designated date and time) that is a future time at which control regarding the power system 3 is executed. (System prediction data) is generated, and a plurality of control candidate data (system control data) that is control data corresponding to each of the plurality of state prediction data is generated. The comparison unit 103 uses the state data acquired at the designated time to select any one of the plurality of state prediction data. The executing unit 105 executes the control regarding the electric power system 3 based on the control candidate data corresponding to the selected state prediction data. As described above, since a plurality of state prediction data and control candidate data corresponding to them are created in advance and control is executed with the control candidate data selected based on the actual state, it takes time to calculate the prediction and control is performed. Appropriate control can be executed even if the state changes before the execution.

また、比較部103は、複数の状態予測データが示す状態と、指定時刻における電力系統の状態との類似度(優先順位)を算出し、類似度の最も高い状態予測データを選択してもよい。複数の制御候補データから実際の状態に最も近い状態予測データに対応する制御候補データを選択して制御を実行するので、実際に近い状態に応じた制御を実行することができる。   Further, the comparison unit 103 may calculate the degree of similarity (priority order) between the state indicated by the plurality of state prediction data and the state of the power system at the designated time, and select the state prediction data having the highest degree of similarity. . Since the control candidate data corresponding to the state prediction data closest to the actual state is selected from the plurality of control candidate data and the control is executed, the control according to the state close to the actual state can be executed.

また、比較部103は、複数の状態予測データが示す状態と、指定時刻における電力系統3の状態との重み付き平均二乗誤差を算出し、重み付き平均二条誤差が最も小さい状態予測データを類似度が最も高いと判断してもよい。重み付き平均事情誤差により、実際の状態に最も近い状態を示す状態予測データを容易に高い精度で求めることができる。   Further, the comparison unit 103 calculates a weighted mean square error between the state indicated by the plurality of state prediction data and the state of the power system 3 at the specified time, and calculates the state prediction data having the smallest weighted average two-row error as the degree of similarity. May be judged to be the highest. With the weighted average situation error, the state prediction data indicating the state closest to the actual state can be easily obtained with high accuracy.

また、上記電力系統3に関する制御には、発電装置の出力電圧の設定値の決定、調相設備の投入量の決定、または変圧器のタップ位置の決定が含まれてもよい。   Further, the control related to the power system 3 may include determination of a set value of the output voltage of the power generation device, determination of the input amount of the phase adjusting equipment, or determination of the tap position of the transformer.

また、上記状態予測データは、電力系統3の負荷の消費電力を予測したデータ、および発電装置の発電量を予測したデータが含まれてもよい。   Further, the state prediction data may include data that predicts the power consumption of the load of the power system 3 and data that predicts the amount of power generation of the power generation device.

また、状態データには、測定された気温、風速、風向、降水量、または日射量のデータが含まれてもよい。   In addition, the state data may include data on the measured temperature, wind speed, wind direction, precipitation amount, or solar radiation amount.

実施例2では、系統制御装置1は、実施例1の当該装置が有する機能に加え、系統予測データが生成された後に電力系統3に大きな状態変化があった場合、選択された制御候補データによる制御を実行しないようにする機能を備える。本実施例では、演算された系統制御データが不適当となるような電力系統3の機器の故障や変更が発生しても、より好ましい制御を行うことが可能となる。   In the second embodiment, in addition to the function of the device of the first embodiment, the system control device 1 depends on the selected control candidate data when there is a large state change in the power system 3 after the system prediction data is generated. It has a function to prevent the control from being executed. In the present embodiment, it is possible to perform more preferable control even if the device of the power system 3 is broken or changed such that the calculated system control data becomes unsuitable.

ここでは実施例2について主に実施例1と異なる部分について説明する。   Here, the difference between the second embodiment and the first embodiment will be mainly described.

実施例2では、判定部104が、実際に適用する系統制御データを選択する際の処理が実施例1とは異なる。   In the second embodiment, the processing when the determination unit 104 selects the system control data to be actually applied is different from that in the first embodiment.

判定部104は、機器状態データにおいて、規定以上の故障や変化が発生していない場合に、系統制御データ204の優先順位が最も高いものを、実際に適用する系統制御データとして選択し、発生していた場合には、系統制御データなしを選択する。   The determination unit 104 selects the highest priority of the system control data 204 as the system control data to be actually applied when the failure or change in the device state data that is higher than the specified value has not occurred, and the system control data 204 is generated. If there is, select no system control data.

図11は、実施例2において、判定部104が、適用対象の系統制御データを選択する処理例を示すフローチャートである。   FIG. 11 is a flowchart illustrating a processing example in which the determination unit 104 selects system control data to be applied in the second embodiment.

まず、判定部104は、特定の日時の系統制御データが要求された場合、該当日時の複数の系統制御データ204を取得し(ステップS401)、その中から優先順位が最高の系統制御データを選択する(ステップS402)。   First, when the system control data of a specific date and time is requested, the determination unit 104 acquires a plurality of system control data 204 of the relevant date and time (step S401) and selects the system control data with the highest priority from among them. (Step S402).

次に、判定部104は、機器状態データ213を取得する(ステップS403)。更に、判定部104は、機器状態データ213に基づき、電力系統3に規定以上の故障あるいは規定以上の状態の変化が発生しているか否かを判定する(ステップS404)。   Next, the determination unit 104 acquires the device status data 213 (step S403). Furthermore, the determination unit 104 determines, based on the device state data 213, whether or not a failure above the regulation or a change in the state above the regulation has occurred in the power system 3 (step S404).

規定以上の故障および規定以上の状態の変化が発生していなければ(ステップS404でN)、判定部104は、ステップS402で選択した系統制御データを実際に適用する系統制御データとし、その系統制御データを制御部10に通知する。   If a failure above the stipulation and a change in the state above the stipulation have not occurred (N in step S404), the determination unit 104 sets the grid control data selected in step S402 as the grid control data to be actually applied, and the grid control The data is notified to the control unit 10.

一方、規定以上の故障あるいは規定以上の状態の変化が発生していれば(ステップS404でY)、判定部104は、適用する系統制御データがないことを制御部10に通知する(ステップS406)。   On the other hand, if a failure above the regulation or a change in the state above the regulation has occurred (Y in step S404), the determination unit 104 notifies the control unit 10 that there is no system control data to be applied (step S406). .

上記ステップS404における判定方法の例として、最新の機器制御データを取得して、故障が2箇所以上発生している場合には、規定以上の故障が発生していると判定することにしてもよい。   As an example of the determination method in step S404, the latest device control data may be acquired, and when two or more faults occur, it may be determined that a fault more than the specified fault has occurred. .

また、他の判定方法の例として、ステップS402で選択された系統制御データに対応する系統予測データの予測実施日時における系統制御データと、最新の機器状態データ213とを比較し、2箇所以上の遮断器の状態が変化した場合には規定以上の状態変化が発生したと判定することししてもよい。   In addition, as an example of another determination method, the system control data at the prediction execution date and time of the system prediction data corresponding to the system control data selected in step S402 and the latest device state data 213 are compared, and two or more locations are compared. When the state of the circuit breaker changes, it may be determined that the state change more than the specified has occurred.

以上により、将来の予測に基づき最適な電力系統状態の算出し、算出した結果を電力系統へ適用するのに際し、電力系統3の状態が大きく変化した場合に、意図しないような制御を実行してしまうことを回避しつつ、適用時の実際の状態に即した、電力系統状態への制御を行うことができる。   As described above, when the optimum power system state is calculated based on the future prediction and the calculated result is applied to the power system, when the state of the power system 3 changes significantly, unintended control is executed. It is possible to perform control to the power system state in accordance with the actual state at the time of application while avoiding the accident.

本実施例の内容を以下のように整理することができる。   The contents of this embodiment can be organized as follows.

本実施例では、判定部104は、状態予測データが生成された後に電力系統3に所定の状態変化があった場合、選択された制御候補データによる制御を実行しないと判定する。複数の状態予測データの範囲内で対応できない程の状態変化があった場合には、選択された制御候補データによる制御を実行しないようにするので、予測を超えた状態変化があった場合に不適切な制御が実行されるのを防止することができる。   In the present embodiment, the determination unit 104 determines not to execute the control based on the selected control candidate data when the power system 3 has a predetermined state change after the state prediction data is generated. If there is a state change that cannot be handled within the range of multiple state prediction data, the control by the selected control candidate data is not executed. It is possible to prevent appropriate control from being executed.

また、判定部104は、状態予測データが生成された後に電力系統3に2か所以上の故障が発生した場合、選択された制御候補データによる制御を実行しないと判定してもよい。例えば二重障害を想定しないという考えで状態の予測方法を定め、想定しない二重障害が発生した場合に、選択された制御候補データによる制御を実行しないというように、制御方法の明瞭な設計が可能である。   In addition, the determination unit 104 may determine not to execute the control based on the selected control candidate data when two or more failures occur in the power system 3 after the state prediction data is generated. For example, a clear design of the control method should be adopted such that a method of predicting the state is set on the assumption that no double failure is assumed, and if an unexpected double failure occurs, control will not be executed by the selected control candidate data. It is possible.

実施例3は、系統制御装置1が電力系統3の外部の情報源に接続して外部データを取得し、系統予測データの生成に利用する点で実施例1と異なる。以下、実施例3について主に実施例1と異なる部分を説明する。   The third embodiment is different from the first embodiment in that the grid control device 1 connects to an information source outside the power grid 3 to acquire external data and uses the data to generate grid prediction data. The third embodiment will be described below mainly with respect to the differences from the first embodiment.

図12は、実施例3のシステム構成の一例を示すブロック図である。図12に示した実施例2のシステムは、図1に示した実施例1のシステムに加えて、第2通信ネットワーク6、気象情報サーバ7、および電力情報サーバ8を含む。また、実施例2の系統制御装置1は、図1に示した実施例1の系統制御装置1に加えて第2通信部70を有する。   FIG. 12 is a block diagram showing an example of the system configuration of the third embodiment. The system of the second embodiment shown in FIG. 12 includes a second communication network 6, a weather information server 7, and a power information server 8 in addition to the system of the first embodiment shown in FIG. The system control device 1 of the second embodiment has a second communication unit 70 in addition to the system control device 1 of the first embodiment shown in FIG.

系統制御装置1は、第2通信部70に接続された第2通信ネットワーク6を介して、気象情報サーバ7および電力情報サーバ8からデータを取得することができる。第2通信部70および第2通信ネットワーク6は、物理的には同じ機器で構成されても良い。   The system control device 1 can acquire data from the weather information server 7 and the power information server 8 via the second communication network 6 connected to the second communication unit 70. The second communication unit 70 and the second communication network 6 may be physically configured by the same device.

気象情報サーバ7は現在および将来の気象情報を提供するサーバである。気象情報サーバ7から提供される現在の気象情報は環境状態データの気象情報として利用可能である。また、気象情報サーバ7から提供される将来の気象情報は系統予測データの気象情報として利用可能である。気象情報サーバ7が提供するデータは、気象情報を提供するサービスを実施する気象情報サービス法人から提供されたものであることが想定できる。   The weather information server 7 is a server that provides current and future weather information. The current weather information provided from the weather information server 7 can be used as the weather information of the environmental condition data. Further, future weather information provided from the weather information server 7 can be used as weather information of system prediction data. It can be assumed that the data provided by the weather information server 7 is provided by a weather information service corporation that implements a service that provides weather information.

電力情報サーバ8は、現在および将来の電力情報を提供するサーバである。電力情報サーバ8から提供される現在の電力情報は、各測定ポイントの環境状態データの電力情報として利用可能である。また、電力情報サーバ8から提供される将来の電力情報は系統予測データの電力情報として利用可能である。この電力情報には、発電運用計画、発電量条件、およびデマンドレスポンス制御計画のような電力情報を提供する。   The power information server 8 is a server that provides current and future power information. The current power information provided from the power information server 8 can be used as the power information of the environmental condition data of each measurement point. The future power information provided by the power information server 8 can be used as the power information of the system prediction data. This power information is provided with power information such as a power generation operation plan, a power generation amount condition, and a demand response control plan.

電力情報サーバ8から提供されるデータは、例えば、電力系統の広域運用機関のような電力系統3を監督する上位の機関から提供されるデータや、公共の電力市場から提供されるデータであっても良い。   The data provided from the power information server 8 is, for example, data provided from a higher-ranking organization that supervises the power system 3, such as a wide area operating organization of the power system, or data provided from the public power market. Is also good.

系統状態取得部101は、計測機器4が提供する環境状態データと、気象情報サーバ7と電力情報サーバ8が提供する環境状態データとの両方もしくは一方を蓄積する。   The system status acquisition unit 101 stores both or one of the environmental status data provided by the measuring device 4 and the environmental status data provided by the weather information server 7 and the power information server 8.

予測演算部102は、環境状態データ211を元に予測した気象情報および電力情報のデータと、気象情報サーバ7および電力情報サーバ8が提供するデータとの両方もしくは一方を系統予測データ203に蓄積できる。   The prediction calculation unit 102 can store, in the system prediction data 203, either or both of the weather information and power information data predicted based on the environmental state data 211 and the data provided by the weather information server 7 and the power information server 8. .

以上説明したように、本実施例によれば、将来の予測に基づき最適な電力系統3の状態を算出し、算出した結果を電力系統3へ適用するのに際し、予測精度向上や予測範囲の拡大を図りつつ、適用時の実際の状態に即した、電力系統状態への制御を行うことができる。   As described above, according to this embodiment, when the optimum state of the power system 3 is calculated based on the future prediction and the calculated result is applied to the power system 3, the prediction accuracy is improved and the prediction range is expanded. It is possible to control the power system state according to the actual state at the time of application.

本実施例を以下のように整理することができる。   This embodiment can be organized as follows.

系統状態取得部101は、更に、第2通信ネットワーク6を介して電力系統3の外部にあり所定の外部データを提供する外部情報サーバ(気象情報サーバ7、電力情報サーバ8)と接続し、外部情報サーバから外部データを取得する。予測演算部102は、状態データと外部データに基づいて、状態予測データを生成する。それゆえ、電力系統3の状態だけでなく外部環境も考慮して電力系統3の複数の状態を予測するので、高い精度で電力系統の状態を予測することができる。   The system status acquisition unit 101 is further connected to an external information server (weather information server 7, power information server 8) outside the power system 3 and providing predetermined external data via the second communication network 6, Get external data from the information server. The prediction calculation unit 102 generates state prediction data based on the state data and external data. Therefore, the plurality of states of the power system 3 are predicted in consideration of not only the state of the power system 3 but also the external environment, so that the state of the power system can be predicted with high accuracy.

また、上述の状態データが電力系統3の負荷を示すデータを含み、外部データが気象情報サーバから提供される気象データを含んでもよい。気象データは、気温が高いとエアコンの使用量が増えるというように電力系統3の負荷に直接的に影響するだけでなく、温度が電力系統3の特性に変化をもたらすパラメータでもあるので、気象データを用いて電力系統3の負荷を予測すると高い精度の予測が可能となる。   Further, the above-mentioned state data may include data indicating the load on the power system 3, and the external data may include weather data provided from the weather information server. The meteorological data not only directly influences the load on the power system 3 such that the usage of the air conditioner increases when the temperature is high, but is also a parameter that causes the temperature to change the characteristics of the power system 3. If the load of the power system 3 is predicted using, it is possible to predict with high accuracy.

また、外部データが、再生可能エネルギーの発電量を予測した発電予測データを含んでもよい。電力系統3の状態予測において再生可能エネルギーの発電予想を考慮することができる。   In addition, the external data may include power generation prediction data that predicts the power generation amount of renewable energy. The power generation prediction of renewable energy can be taken into consideration in the state prediction of the power system 3.

また、外部データが、発電計画を示す発電計画データを含んでもよい。電力系統3の状態予測において発電計画を考慮することができる。   In addition, the external data may include power generation plan data indicating a power generation plan. The power generation plan can be considered in the state prediction of the power system 3.

実施例4は、系統制御装置1が、電力系統3の時系列の状態を複数通り予測し、複数の時系列の状態のそれぞれに対応する時系列の制御データを複数通り作成し、予想した時系列の状態の中で、現在およびそれから予想される状態に最も近い時系列の状態に対応する時系列の制御データに基づいて電力系統3に制御を実行する点で実施例1と異なる。以下、実施例4について主に実施例1と異なる部分を説明する。   In the fourth embodiment, the grid control device 1 predicts a plurality of time-series states of the power system 3, and creates a plurality of time-series control data corresponding to each of the plurality of time-series states. This is different from the first embodiment in that the power system 3 is controlled based on the time-series control data corresponding to the time-series state that is closest to the current state and the state expected from the current state among the sequence states. Hereinafter, the parts of the fourth embodiment that are different from the first embodiment will be mainly described.

実施例4の基本的なシステム構成は図1に示した実施例1のものと同様である。本実施例では、最適演算部30は、単一の日時の系統予測データではなく、ある期間での複数の日時の系統予測データを元に、最適な電力系統3の状態を実現する系統制御データを生成する。複数の日時の系統電力データに対して最適な電力系統3の状態を算出する演算は例えば公知の方法を用いればよい。一例として非特許文献1に記載された方法がある。   The basic system configuration of the fourth embodiment is similar to that of the first embodiment shown in FIG. In the present embodiment, the optimum operation unit 30 does not use the system prediction data for a single date and time but the system control data for realizing the optimum state of the power system 3 based on the system prediction data for a plurality of dates and times in a certain period. To generate. A known method may be used for the calculation for calculating the optimum state of the power grid 3 for the grid power data at a plurality of dates and times. As an example, there is a method described in Non-Patent Document 1.

本実施例では、予測演算部102は、ステップS202にて、指定日時から指定日時の所定時間後までの時系列の気象状態を複数通り予測し、系統予測データに含めるデータとして時系列の予測気象情報を複数通り作成する。   In the present embodiment, in step S202, the prediction calculation unit 102 predicts a plurality of time-series weather conditions from the specified date and time to a predetermined time after the specified date and time, and predicts the time-series weather as data to be included in the system prediction data. Create multiple sets of information.

図13は、実施例4における特定の測定ポイントの系統予測データ203の一例を示す図である。系統予測データ203は、系統予測データを特定するためのユニークID D701、予測を行った日時である予測実施日時D702、予測のターゲットとして指定された日時である指定日時D703、指定日時以降の複数の日時を時系列として指定した詳細日時D704、各詳細日時における気温D705、有効電力D706、無効電力D707といった項目を含む。気温D705は気象状態を予測した予測気象情報に属する。有効電力D706および無効電力D707は、例えば送電電力を予測した予測電力情報である。このように系統予測データ203には特定の測定ポイントの複数の項目の予測情報が格納されてもよい。ユニークID D701は、1通りの時系列の系統予測データに対して付与される。図13には、ユニークID D701がA1である時系列の系統予測データと、ユニークID D701がA2である時系列の系統予測データが示されている。それらは同じ指定時刻に対応する2通りの系統予測データである。   FIG. 13 is a diagram illustrating an example of the systematic prediction data 203 at a specific measurement point according to the fourth embodiment. The systematic prediction data 203 includes a unique ID D701 for identifying the systematic predicted data, a predicted execution date / time D702 that is the date and time when the prediction was performed, a designated date / time D703 that is the date / time designated as the target of the prediction, and a plurality of designated dates and times. It includes items such as detailed date / time D704 in which the date / time is designated as a time series, temperature D705 at each detailed date / time, active power D706, and reactive power D707. The temperature D705 belongs to the forecast weather information that predicts the weather condition. The active power D706 and the reactive power D707 are, for example, predicted power information that predicts transmitted power. In this way, the systematic prediction data 203 may store prediction information of a plurality of items at specific measurement points. The unique ID D701 is assigned to one type of time-series systematic prediction data. FIG. 13 shows time-series systematic prediction data in which the unique ID D701 is A1 and time-series systematic prediction data in which the unique ID D701 is A2. They are two types of system prediction data corresponding to the same designated time.

最適演算部30は、系統予測データに含まれる各詳細日時に対して、電力系統3の最適な状態を実現する制御内容を算出し、これら制御内容をまとめて系統制御データを生成する。   The optimal calculation part 30 calculates the control content which implement | achieves the optimal state of the electric power system 3 with respect to each detailed date and time contained in system prediction data, and collects these control content, and produces | generates system control data.

図14は、実施例4における系統制御データ204の一例を示す図である。系統制御データ204は、通し番号D801、元になった予測データのユニークID D802、その系統制御データを適用する優先順位D803、その系統制御データの適用開始日時D804、適用開始日時以降の複数の日時を時系列として指定した詳細日時D805、詳細日時毎の調相設備1Aの投入量D806、調相設備1Bの投入量D807、変圧器1Aのタップ位置D808、変圧器1Bのタップ位置D809といった項目を含む。詳細日時毎の調相設備1Aの投入量D806、調相設備1Bの投入量D807、変圧器1Aのタップ位置D808、変圧器1Bのタップ位置D809は、詳細日時に適用する制御パラメータである。このように系統制御データには複数の設備に設定する制御パラメータが含まれていてもよい。   FIG. 14 is a diagram illustrating an example of the system control data 204 according to the fourth embodiment. The system control data 204 includes a serial number D801, a unique ID D802 of the original predicted data, a priority D803 to which the system control data is applied, an application start date / time D804 of the system control data, and a plurality of date / time after the application start date / time. Includes items such as the detailed date and time D805 designated as a time series, the input amount D806 of the phase adjusting equipment 1A, the input amount D807 of the phase adjusting equipment 1B, the tap position D808 of the transformer 1A, and the tap position D809 of the transformer 1B for each detailed date and time. . The input amount D806 of the phase adjusting equipment 1A, the input amount D807 of the phase adjusting equipment 1B, the tap position D808 of the transformer 1A, and the tap position D809 of the transformer 1B for each detailed date and time are control parameters applied to the detailed date and time. Thus, the system control data may include control parameters set for a plurality of facilities.

ここに示した調相設備1Aの投入量D806、調相設備1Bの投入量D807、変圧器1Aのタップ位置D808、変圧器1Bのタップ位置D809は、電気機器5の設定状態の一例である。他の制御パラメータとして、例えば、発電機の端子電圧の目標値、開閉器の開閉状態などを含んだ組み合わせであってもよい。   The input amount D806 of the phase adjusting equipment 1A, the input amount D807 of the phase adjusting equipment 1B, the tap position D808 of the transformer 1A, and the tap position D809 of the transformer 1B shown here are examples of the setting state of the electric device 5. As another control parameter, for example, a combination including a target value of the terminal voltage of the generator, a switching state of the switch, and the like may be used.

優先順位D803は比較部103により追記される項目である。   The priority order D803 is an item added by the comparison unit 103.

詳細日時D805は、最適演算部30の演算方法に応じて定まり、元になった系統予測データの詳細日時と同一でもよく、あるいは異なってもよい。   The detailed date and time D805 is determined according to the calculation method of the optimum calculation unit 30, and may be the same as or different from the detailed date and time of the original system prediction data.

図15は、実施例4において、比較部103が適用優先順位を演算する処理例を示すフローチャートである。   FIG. 15 is a flowchart illustrating a processing example in which the comparing unit 103 calculates the application priority order in the fourth embodiment.

比較部103は、制御部10から特定の適用開始日時の系統制御データについて優先順位の演算を指示されると、予測演算部102から比較用予測データを取得する(ステップS501)。優先順位の演算は適用開始日時が近づいてくると指示される。比較用予測データは、適用開始日時からその所定時間後までの環境状態を予測したデータである。適用開始日時が近づいているので、この比較用予測データは予測精度が高い。   When the control unit 10 is instructed by the control unit 10 to calculate the priority of the system control data having a specific application start date and time, the comparison unit 103 acquires the comparison prediction data from the prediction calculation unit 102 (step S501). The priority calculation is instructed when the application start date and time approaches. The comparison prediction data is data that predicts the environmental condition from the application start date and time to a predetermined time later. Since the application start date and time are approaching, the comparison prediction data has high prediction accuracy.

更に、比較部103は、比較演算の方法を表した比較演算データ205を取得する(ステップS502)。更に、比較部103は、各系統制御データに対応した系統予測データを、系統制御データのユニークIDを元に、図13に例示した系統予測データ203から取得する(ステップS503)。   Further, the comparison unit 103 acquires the comparison calculation data 205 representing the comparison calculation method (step S502). Furthermore, the comparison unit 103 acquires the system prediction data corresponding to each system control data from the system prediction data 203 illustrated in FIG. 13 based on the unique ID of the system control data (step S503).

次に、比較部103は、比較演算データ205に基づく比較演算方法により、系統予測データと比較用予測データとを比較する。そして、比較部103は、比較用予測データとの類似度が高いほど優先順位が高くなるように、系統予測データの優先順位を算出する(ステップS504)。   Next, the comparison unit 103 compares the system prediction data with the comparison prediction data by the comparison calculation method based on the comparison calculation data 205. Then, the comparison unit 103 calculates the priority order of the systematic prediction data such that the higher the similarity to the comparison prediction data, the higher the priority order (step S504).

最後に、比較部103は、ステップS504で算出した各系統予測データの優先順位を、各系統予測データに対応する系統制御データに付加する(ステップS505)。   Finally, the comparison unit 103 adds the priority order of each system prediction data calculated in step S504 to the system control data corresponding to each system prediction data (step S505).

上記比較部103に対して、予測演算部102は、ステップS501にて、適用開始日時からの時系列の系統予測データの内、最新の環境状態データを前提にした場合に、最も高い発生確率を持つ系統予測データを作成し、比較用予測データとして比較部103に提供する。   With respect to the comparison unit 103, in step S501, the prediction calculation unit 102 determines the highest occurrence probability in the case of assuming the latest environmental condition data among the time-series systematic prediction data from the application start date and time. The systematic prediction data is created and provided to the comparison unit 103 as comparative prediction data.

ステップS504における比較演算の方法としては、例えば、系統予測データの各予測値と、対応する比較用予測データとの、重み付き平均二乗誤差の総和が小さいほど優先順位が高くなるように比較演算を行なうことが考えられる。重み付き平均二乗誤差は、式(2)により算出できる。   As the method of the comparison operation in step S504, for example, the comparison operation is performed such that the smaller the sum of the weighted mean square errors of each prediction value of the system prediction data and the corresponding comparison prediction data is, the higher the priority is. It is possible to do it. The weighted mean square error can be calculated by the equation (2).

Figure 0006689732
ここで、Eはi番目(i=1,2,…,N)の系統予測データについての重み付き平均二乗誤差、xi,j,kはi番目の系統予測データのj番目(j=1,2,…,M)の項目におけるk番目(k=1,2,…,L)の詳細日時の予測値、yj,kはxi,j,kと同じ項目と同じ詳細日時の比較用予測データの値、wはj番目の項目に対する重み、vはk番目の詳細日時データに対する重みである。
Figure 0006689732
Here, E i is the weighted mean square error for the i-th (i = 1, 2, ..., N) system-predicted data, and x i, j, k is the j-th (j = j = j-th) of the i-th system-predicted data. 1, 2, ..., M) The predicted value of the k-th (k = 1, 2, ..., L) detailed date / time, y j, k is the same item as x i, j, k The value of the prediction data for comparison, w j is the weight for the j-th item, and v k is the weight for the k-th detailed date and time data.

重みwは、項目ごとの重要性と変数範囲などを考慮して任意に指定可能な正の値である。例えば、変数範囲を考慮して各項目における平均値の逆数を重みwとして用いてもよい。あるいは、項目ごとの重要性を考慮し、上記平均値の逆数に対して、重視する項目の値を増加させる処理をした値を重みwとして用いても良い。あるいは、更に他の値を利用しても良い。 The weight w j is a positive value that can be arbitrarily designated in consideration of the importance of each item, the variable range, and the like. For example, the reciprocal of the average value of each item may be used as the weight w j in consideration of the variable range. Alternatively, considering the importance of each item, a value obtained by performing a process of increasing the value of the item to be emphasized with respect to the reciprocal of the average value may be used as the weight w j . Alternatively, another value may be used.

重みvは、詳細日時ごとの重要性を考慮して任意に設定可能な正の値である。例えば、適用開始日時に近い項目を重要性が高いという考えで、重みvを大きい値にしてもよい。 The weight v k is a positive value that can be arbitrarily set in consideration of the importance of each detailed date and time. For example, the weight v k may be set to a large value in consideration of the importance of the item close to the application start date and time.

なお、重みwや重みvは、比較演算方法を決めるものなので、比較演算データ205として記録することにしてもよい。 Since the weight w j and the weight v k determine the comparison calculation method, they may be recorded as the comparison calculation data 205.

以上、本実施例によれば、単一の指定日時の系統予測データではなく、ある期間内の複数の日時の系統予測データを元に電力系統3の最適な状態を算出し、算出結果を電力系統3へ適用し、適用時の実際の状態に適した電力系統3の制御を行うことができる。   As described above, according to the present embodiment, the optimum state of the power system 3 is calculated based on the system prediction data of a plurality of dates and times within a certain period, instead of the system prediction data of a single designated date and time, and the calculation result is the power. It can be applied to the grid 3 to control the power grid 3 suitable for the actual state at the time of application.

本実施例のように整理することもできる。   It can also be organized as in this embodiment.

予測演算部102は、指定時刻からその指定時刻の所定時間後までの電力系統3の状態を予測した複数の状態予測時系列データ(時系列の系統予測データ)を生成し、複数の状態予測時系列データのそれぞれに対応する時系列の制御データである制御候補時系列データを予め生成する。そして、指定時刻になると、予測演算部102は、指定時刻(適用開始時刻)の電力系統3の実際の状態を示す状態データとその指定時刻の所定時間後までの電力系統3の状態を予測した最新予測データ(比較用予測データ)を生成する。比較部103は、指定時刻に取得された状態データと最新予測データを利用し、複数の状態予測時系列データから、指定時刻から指定時刻の所定時間後までの状態との類似度が最も高い状態を示す状態予測時系列データを選択する。実行部105は、選択された状態予測時系列データに対応する制御候補時系列データに基づいて電力系統3に関する制御を実行する。時系列の状態を複数予測し、指定時刻の実際の状態およびその直後の予測される状態に基づいて選択した制御候補時系列データを用いて制御を実行するので、電力系統3に対して適切な時系列の制御を行うことができる。   The prediction calculation unit 102 generates a plurality of state prediction time-series data (time-series system prediction data) that predicts the state of the power system 3 from a designated time to a predetermined time after the designated time. Control candidate time series data, which is time series control data corresponding to each series data, is generated in advance. Then, when the designated time comes, the prediction calculation unit 102 predicts the state data indicating the actual state of the power system 3 at the designated time (application start time) and the state of the power system 3 until a predetermined time after the designated time. The latest prediction data (comparison prediction data) is generated. The comparing unit 103 uses the state data acquired at the designated time and the latest prediction data, and has the highest degree of similarity with the state from the designated time to the prescribed time after the designated time from the plurality of state prediction time series data. Select the state prediction time series data that indicates. The execution unit 105 executes the control regarding the power system 3 based on the control candidate time series data corresponding to the selected state prediction time series data. Since a plurality of time-series states are predicted and the control is executed using the control candidate time-series data selected based on the actual state at the specified time and the predicted state immediately after that, it is appropriate for the power system 3. Time-series control can be performed.

実施例5は、系統制御装置1が電力系統3の制御にユーザの選択を反映する点で実施例1と異なる。実施例5の基本的なシステム構成は図1に示した実施例1のものと同様である。本実施例では、判定部104が、実際に適用する系統制御データを選択する際の処理が実施例1とは異なる。   The fifth embodiment differs from the first embodiment in that the system control device 1 reflects the user's selection in the control of the power system 3. The basic system configuration of the fifth embodiment is similar to that of the first embodiment shown in FIG. In this embodiment, the determination unit 104 is different from the first embodiment in the processing when selecting the system control data to be actually applied.

判定部104は、比較部103により複数の系統制御データに優先順位が付与されると、それら系統制御データを表示部60に表示させ、ユーザにいずれかの系統制御データを選択するように促す。例えば、複数の系統制御データを優先順位が高い順に表示することにしてもよい。   When the comparison unit 103 gives priority to a plurality of system control data, the determination unit 104 causes the display unit 60 to display the system control data and prompts the user to select any system control data. For example, a plurality of system control data may be displayed in descending order of priority.

ユーザがいずれかの系統制御データを選択すると、判定部104は、ユーザの選択した系統制御データを実際に適用する系統制御データとして決定する。   When the user selects any system control data, the determination unit 104 determines the system control data selected by the user as the system control data to be actually applied.

図16は、実施例5において、判定部104が適用対象の系統制御データを選択する処理の一例を示すフローチャートである。   FIG. 16 is a flowchart illustrating an example of processing in which the determination unit 104 selects system control data to be applied in the fifth embodiment.

判定部104は、特定の日時の系統制御データが要求されると、その特定日時の複数の系統制御データを取得し(ステップS401)、取得した系統制御データを表示部60に表示させる(ステップS407)。   When the system control data of a specific date and time is requested, the determination unit 104 acquires a plurality of system control data of the specific date and time (step S401) and displays the acquired system control data on the display unit 60 (step S407). ).

次に、判定部104は、ユーザがいずれかの系統制御データを選択すると(ステップS408)、上記選択された系統制御データを、実際の制御に適用する対象の系統制御データとして制御部10に通知する(ステップS409)。   Next, when the user selects any system control data (step S408), the determination unit 104 notifies the control unit 10 of the selected system control data as system control data to be applied to actual control. (Step S409).

なお、ステップS408において、ユーザがいずれの系統制御データも選択していない旨の信号を入力部50から受信した場合、判定部104は、予め定められた系統制御データを実際の制御に適用することにしてもよい。あるいは、その場合、判定部104は、優先順位の最も高い系統制御データを実際の制御に適用することことにしてもよい。また、判定部104は、所定時間のタイマを設定し、系統制御データをユーザが選択したことを示す信号を受信せずタイムアウトした場合、予め定められた系統制御データ、あるいは優先順位の最も高い系統制御データを実際の制御に適用することことにしてもよい。   In addition, in step S408, when the user receives a signal from the input unit 50 indicating that no system control data has been selected, the determination unit 104 applies the predetermined system control data to actual control. You may Alternatively, in that case, the determination unit 104 may apply the system control data with the highest priority to the actual control. Further, when the determination unit 104 sets a timer for a predetermined time and times out without receiving a signal indicating that the system control data has been selected by the user, the determination unit 104 determines a predetermined system control data or a system with the highest priority. The control data may be applied to actual control.

図17は、実施例5における制御データ選択画面の一例を示す図である。制御データ選択画面G101には、適用の優先順位G102、調相設備の投入量G103、変圧器のタップ位置G104といった項目が表示される。   FIG. 17 is a diagram illustrating an example of the control data selection screen according to the fifth embodiment. On the control data selection screen G101, items such as an application priority order G102, a phase adjusting equipment input amount G103, and a transformer tap position G104 are displayed.

表示内容は系統制御データを基に作成される。例えば、制御データ選択画面G101には系統制御データの全部または一部が表示される。具体的には、調相設備の投入量G103および変圧器のタップ位置G104には、図9に例示した系統制御データに含まれている調相設備1Aの投入量D605、調相設備1Bの投入量D606、変圧器1Aのタップ位置D607、および変圧器1Bのタップ位置D608の値が表示される。   The display content is created based on the system control data. For example, the control data selection screen G101 displays all or part of the system control data. Specifically, in the input amount G103 of the phase adjusting equipment and the tap position G104 of the transformer, the input amount D605 of the phase adjusting equipment 1A and the input of the phase adjusting equipment 1B included in the system control data illustrated in FIG. The values of the quantity D606, the tap position D607 of the transformer 1A, and the tap position D608 of the transformer 1B are displayed.

優先順位G102には一例として系統制御データの優先順位D603が表示されている。しかし、比較部103が優先順位を演算する際に利用した誤差データといった、各系統制御データを系統予測データと比較した結果が判別できるようなデータを優先順位の代わりとして表示してもよい。   The priority order G102 displays the priority order D603 of the system control data as an example. However, data such as error data used when the comparison unit 103 calculates the priority order, which can determine the result of comparing each system control data with the system prediction data, may be displayed instead of the priority order.

また、制御データ選択画面G101に、生成された複数の系統制御データを全て表示しなくてもよい。例えば、優先順位が上位所定個の系統制御データを表示し、それより優先順位が低い系統制御データを表示しないことにしてもよい。   Further, it is not necessary to display all the generated plurality of system control data on the control data selection screen G101. For example, it is possible to display a predetermined number of system control data with higher priority and not display system control data with lower priority.

また、優先順位G102、調相設備の投入量G103、変圧器のタップ位置G104は、図17に示したように、同じ画面上に一括で表示してもよいし、各系統制御データにリンクされた別の画面に表示してもよい。   Further, the priority order G102, the input amount G103 of the phase adjusting equipment, and the tap position G104 of the transformer may be collectively displayed on the same screen as shown in FIG. 17, or may be linked to each system control data. It may be displayed on another screen.

また、制御無しが表示されたボタンを表示しどの系統制御データの制御も適用しないことをユーザが選択できるようにしてもよい。   Further, a button displaying "no control" may be displayed so that the user can select not to apply the control of any system control data.

以上、本実施例によれば、電力系統3に関連する将来の状態を予測し、その予測結果をユーザに提示することにより、電力系統3の状態に基づく優先順位とユーザの選択とを反映した系統制御データを用いた制御を実行することができる。ユーザが適切な系統制御データを適用するのを補助することができる。   As described above, according to the present embodiment, the future state related to the power system 3 is predicted, and the prediction result is presented to the user to reflect the priority order based on the state of the power system 3 and the user's selection. Control using the system control data can be executed. It can assist the user in applying the appropriate grid control data.

本実施例に含まれる内容を以下のように整理することができる。   The contents included in this embodiment can be organized as follows.

判定部104は、比較部103の処理結果をユーザに提示して、制御候補データのいずれかをユーザに選択させる。実行部105は、ユーザが選択した制御候補データに基づく制御を実行する。このように本実施例では、実行する制御をユーザの観点で事前に確認することができるので、不適切な制御が自動的に実行されるのを抑制することができる。   The determination unit 104 presents the processing result of the comparison unit 103 to the user and causes the user to select any of the control candidate data. The execution unit 105 executes control based on the control candidate data selected by the user. As described above, in this embodiment, the control to be executed can be confirmed in advance from the user's point of view, so that it is possible to prevent the inappropriate control from being automatically executed.

以上、本発明の各種実施例について説明したが、本発明は上記した実施例に限定されるものではなく、様々な変形例が含まれる。例えば、上記した実施例は本発明を分かりやすく説明するために詳細に説明したものであり、必ずしも説明した全ての構成を備えるものに限定されるものではない。また、ある実施例の構成の一部を他の実施例の構成に置き換えることが可能であり、また、ある実施例の構成に他の実施例の構成を加えることも可能である。また、各実施例の構成の一部について、他の構成の追加・削除・置換をすることが可能である。   Although various embodiments of the present invention have been described above, the present invention is not limited to the above-mentioned embodiments and includes various modifications. For example, the above-described embodiments have been described in detail for the purpose of explaining the present invention in an easy-to-understand manner, and are not necessarily limited to those having all the configurations described. Further, a part of the configuration of a certain embodiment can be replaced with the configuration of another embodiment, and the configuration of another embodiment can be added to the configuration of a certain embodiment. Further, it is possible to add / delete / replace other configurations with respect to a part of the configurations of the respective embodiments.

また、上記の各構成、機能、処理部、処理手段等は、それらの一部又は全部を、例えば集積回路で設計する等によりハードウェアで実現してもよい。また、上記の各構成、機能等は、プロセッサがそれぞれの機能を実現するプログラムを解釈し、実行することによりソフトウェアで実現してもよい。各機能を実現するプログラム、テーブル、ファイル等の情報は、メモリや、ハードディスク、SSD(Solid State Drive)等の記録装置、または、ICカード、SDカード、DVD等の記録媒体に置くことができる。   Further, the above-described respective configurations, functions, processing units, processing means, etc. may be realized by hardware by designing a part or all of them with, for example, an integrated circuit. Further, each of the above-described configurations, functions and the like may be realized by software by a processor interpreting and executing a program for realizing each function. Information such as a program, a table, and a file that realizes each function can be placed in a memory, a hard disk, a recording device such as an SSD (Solid State Drive), or a recording medium such as an IC card, an SD card, and a DVD.

また、制御線や情報線は説明上必要と考えられるものを示しており、製品上必ずしも全ての制御線や情報線を示しているとは限らない。実際には殆ど全ての構成が相互に接続されていると考えてもよい。   Further, the control lines and information lines are shown as being considered necessary for explanation, and not all control lines and information lines are shown in the product. In reality, it may be considered that almost all the configurations are connected to each other.

1…系統制御装置、10…制御部、101…系統状態取得部、101…制御データ選択画面G、102…予測演算部、103…比較部、104…判定部、105…実行部、2…通信ネットワーク、20…記録部、201…予測演算部、3…電力系統、30…最適演算部、4…計測機器、40…通信部、5…電気機器、50…入力部、6…通信ネットワーク、60…表示部、7…気象情報サーバ、70…通信部、8…電力情報サーバ DESCRIPTION OF SYMBOLS 1 ... System control device, 10 ... Control part, 101 ... System state acquisition part, 101 ... Control data selection screen G, 102 ... Prediction calculation part, 103 ... Comparison part, 104 ... Judgment part, 105 ... Execution part, 2 ... Communication Network, 20 ... Recording unit, 201 ... Prediction calculation unit, 3 ... Power system, 30 ... Optimal calculation unit, 4 ... Measuring device, 40 ... Communication unit, 5 ... Electrical device, 50 ... Input unit, 6 ... Communication network, 60 ... Display unit, 7 ... Weather information server, 70 ... Communication unit, 8 ... Power information server

Claims (15)

所定時刻の電力系統の制御データを生成し、前記所定時刻に前記制御データに基づいて前記電力系統を制御する電力系統制御装置であって、
前記電力系統の状態を示す状態データを取得する系統状態取得部と、
前記取得された状態データに基づいて、前記電力系統に関する制御を実行する未来の時刻である指定時刻における前記電力系統の複数の状態を予測した複数の状態予測データを生成し、前記複数の状態予測データのそれぞれに対応する制御データである複数の制御候補データを生成する予測演算部と、
前記指定時刻に取得された状態データを利用して、前記複数の状態予測データからいずれかを選択する比較部と、
前記選択された状態予測データに対応する制御候補データに基づいて前記電力系統に関する制御を実行する実行部と、を有する電力系統制御装置。
A power system control device that generates control data of a power system at a predetermined time and controls the power system based on the control data at the predetermined time,
A system status acquisition unit that acquires status data indicating the status of the power system,
On the basis of the acquired state data, a plurality of state prediction data that predicts a plurality of states of the power system at a specified time, which is a future time when the control related to the power system is executed, are generated, and the plurality of state predictions are performed. A prediction calculation unit that generates a plurality of control candidate data that are control data corresponding to each of the data,
Using the state data acquired at the specified time, a comparison unit that selects one from the plurality of state prediction data,
An electric power system control device comprising: an execution unit that executes control related to the electric power system based on control candidate data corresponding to the selected state prediction data.
前記比較部は、前記複数の状態予測データが示す状態と、前記指定時刻における前記電力系統の状態との類似度を算出し、前記類似度の最も高い状態予測データを選択する、
請求項1に記載の電力系統制御装置。
The comparison unit calculates the degree of similarity between the state indicated by the plurality of state prediction data and the state of the power system at the designated time, and selects the state prediction data having the highest degree of similarity.
The power system control device according to claim 1.
前記比較部は、前記複数の状態予測データが示す状態と、前記指定時刻における前記電力系統の状態との重み付き平均二乗誤差を算出し、前記重み付き平均二条誤差が最も小さい状態予測データを前記類似度が最も高いと判断する、
請求項2に記載の電力系統制御装置。
The comparison unit calculates a weighted mean square error between the state indicated by the plurality of state prediction data and the state of the power system at the designated time, and the state prediction data in which the weighted average two-row error is the smallest is Judge that the similarity is the highest,
The power system control device according to claim 2.
前記状態予測データが生成された後に前記電力系統に所定の状態変化があった場合、前記選択された制御候補データによる制御を実行しないと判定する判定部を更に有する、請求項1に記載の電力系統制御装置。   The power according to claim 1, further comprising: a determination unit that determines not to perform the control based on the selected control candidate data when the power system has a predetermined state change after the state prediction data is generated. System control device. 前記判定部は、前記状態予測データが生成された後に前記電力系統に2か所以上の故障が発生した場合、前記選択された制御候補データによる制御を実行しないと判定する、請求項4に記載の電力系統制御装置。   The said determination part determines that the control by the selected control candidate data is not performed, when two or more faults generate | occur | produce in the said electric power system after the said state prediction data are produced | generated. Power system controller. 前記系統状態取得部は、更に、通信ネットワークを介して前記電力系統の外部にあり所定の外部データを提供する外部情報サーバと接続し、前記外部情報サーバから前記外部データを取得し、
前記予測演算部は、前記状態データと前記外部データに基づいて、前記状態予測データを生成する、
請求項1に記載の電力系統制御装置。
The system status acquisition unit is further connected to an external information server that is outside the power system and provides predetermined external data via a communication network, and acquires the external data from the external information server,
The prediction calculation unit generates the state prediction data based on the state data and the external data,
The power system control device according to claim 1.
前記状態データが前記電力系統の負荷を示すデータを含み、
前記外部データが気象情報サーバから提供される気象データを含む、
請求項6に記載の電力系統制御装置。
The state data includes data indicating the load of the power system,
The external data includes weather data provided by a weather information server,
The power system control device according to claim 6.
前記外部データが、再生可能エネルギーの発電量を予測した発電予測データを含む、
請求項6に記載の電力系統制御装置。
The external data includes power generation prediction data that predicts the power generation amount of renewable energy,
The power system control device according to claim 6.
前記外部データが、発電計画を示す発電計画データを含む、
請求項6に記載の電力系統制御装置。
The external data includes power generation plan data indicating a power generation plan,
The power system control device according to claim 6.
前記予測演算部は、前記指定時刻から該指定時刻の所定時間後までの前記電力系統の状態を予測した複数の状態予測時系列データを生成し、前記複数の状態予測時系列データのそれぞれに対応する時系列の制御データである制御候補時系列データを予め生成し、前記指定時刻になると、前記指定時刻の前記電力系統の実際の状態を示す状態データと前記指定時刻の前記所定時間後までの前記電力系統の状態を予測した最新予測データを生成し、
前記比較部は、前記指定時刻に取得された前記状態データと前記最新予測データを利用し、前記複数の状態予測時系列データから、前記指定時刻から前記指定時刻の前記所定時間後までの状態との類似度が最も高い状態を示す状態予測時系列データを選択し、
前記実行部は、前記選択された状態予測時系列データに対応する制御候補時系列データに基づいて前記電力系統に関する制御を実行する、
請求項1に記載の電力系統制御装置。
The prediction calculation unit generates a plurality of state prediction time series data that predicts a state of the power system from the designated time to a predetermined time after the designated time, and corresponds to each of the plurality of state prediction time series data. The control candidate time-series data that is time-series control data is generated in advance, and when the designated time comes, the state data indicating the actual state of the power system at the designated time and the predetermined time after the designated time. Generate the latest prediction data that predicts the state of the power system,
The comparison unit uses the state data and the latest prediction data acquired at the designated time, and from the plurality of state prediction time series data, the state from the designated time to the predetermined time after the designated time and Select the state prediction time series data showing the state with the highest similarity of
The execution unit executes control relating to the power system based on control candidate time series data corresponding to the selected state prediction time series data,
The power system control device according to claim 1.
記比較部の処理結果をユーザに提示して、前記制御候補データのいずれかをユーザに選択させる判定部を更に有し
前記実行部は、前記ユーザが選択した制御候補データに基づく制御を実行する、
請求項1に記載の電力系統制御装置。
Presents the processing result of the previous SL comparison unit on the user, further comprising a determination unit which Ru is selected by the user one of the control candidate data,
The execution unit executes control based on the control candidate data selected by the user,
The power system control device according to claim 1.
前記電力系統に関する制御には、発電装置の出力電圧の設定値の決定、調相設備の投入量の決定、または変圧器のタップ位置の決定が含まれる、請求項1に記載の電力系統制御装置。   The electric power system control device according to claim 1, wherein the control relating to the electric power system includes determination of a set value of an output voltage of a power generation device, determination of an input amount of a phase adjusting facility, or determination of a tap position of a transformer. . 前記状態予測データは、前記電力系統の負荷の消費電力を予測したデータ、および発電装置の発電量を予測したデータが含まれる、請求項1に記載の電力系統制御装置。   The power system control device according to claim 1, wherein the state prediction data includes data that predicts power consumption of a load of the power system and data that predicts power generation amount of a power generation device. 前記状態データには、測定された気温、風速、風向、降水量、または日射量のデータが含まれる、請求項1に記載の電力系統制御装置。   The power system control device according to claim 1, wherein the state data includes data of measured temperature, wind speed, wind direction, precipitation amount, or insolation amount. 所定時刻の電力系統の制御データを生成し、前記所定時刻に前記制御データに基づいて前記電力系統を制御するための電力系統制御方法であって、
系統状態取得手段が、前記電力系統の状態を示す状態データを取得し、
予測演算手段が、前記取得された状態データに基づいて、前記電力系統に関する制御を実行する未来の時刻である指定時刻における前記電力系統の複数の状態を予測した複数の状態予測データを生成し、前記複数の状態予測データのそれぞれに対応する制御データである複数の制御候補データを生成し、
比較手段が、前記指定時刻に取得された状態データを利用して、前記複数の状態予測データからいずれかを選択し、
実行手段が、前記選択された状態予測データに対応する制御候補データに基づいて前記電力系統に関する制御を実行する、電力系統制御方法。
A power system control method for generating control data of a power system at a predetermined time, and controlling the power system based on the control data at the predetermined time,
The system status acquisition means acquires status data indicating the status of the power system,
Prediction calculation means, based on the acquired state data, to generate a plurality of state prediction data that predicts a plurality of states of the power system at a specified time, which is a future time to execute control related to the power system, Generating a plurality of control candidate data which is control data corresponding to each of the plurality of state prediction data,
Comparing means, using the state data acquired at the specified time, selects any one of the plurality of state prediction data,
A power system control method, wherein the executing means executes control relating to the power system based on control candidate data corresponding to the selected state prediction data.
JP2016233273A 2016-11-30 2016-11-30 Power system control device and power system control method Expired - Fee Related JP6689732B2 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2016233273A JP6689732B2 (en) 2016-11-30 2016-11-30 Power system control device and power system control method
PCT/JP2017/032215 WO2018100825A1 (en) 2016-11-30 2017-09-07 Power system control device and power system control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016233273A JP6689732B2 (en) 2016-11-30 2016-11-30 Power system control device and power system control method

Publications (2)

Publication Number Publication Date
JP2018093583A JP2018093583A (en) 2018-06-14
JP6689732B2 true JP6689732B2 (en) 2020-04-28

Family

ID=62241555

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016233273A Expired - Fee Related JP6689732B2 (en) 2016-11-30 2016-11-30 Power system control device and power system control method

Country Status (2)

Country Link
JP (1) JP6689732B2 (en)
WO (1) WO2018100825A1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7496286B2 (en) * 2020-10-20 2024-06-06 株式会社日立製作所 A system that supports the creation of power system plans that change the configuration of a power system
CN115906601A (en) * 2021-09-29 2023-04-04 株式会社日立制作所 Optimization method and device for power management system

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5248372B2 (en) * 2009-03-11 2013-07-31 株式会社東芝 Power generation plan creation method, device, program, and storage device
US10345842B2 (en) * 2011-10-31 2019-07-09 Mitsubishi Electric Corporation Power-distribution-system voltage control system, power-distribution-system voltage control method, and centralized voltage control apparatus
WO2013080308A1 (en) * 2011-11-29 2013-06-06 株式会社日立製作所 Consumer energy management system and consumer energy management method

Also Published As

Publication number Publication date
WO2018100825A1 (en) 2018-06-07
JP2018093583A (en) 2018-06-14

Similar Documents

Publication Publication Date Title
Pereira et al. Composite generation/transmission reliability evaluation
Liu et al. Hierarchical distribution system adaptive restoration with diverse distributed energy resources
Kahrobaee et al. Optimum sizing of distributed generation and storage capacity in smart households
Dehghanian et al. Probabilistic decision making for the bulk power system optimal topology control
Dong et al. Using IS to assess an electric power system's real-time stability
Duan et al. Smart meters enabling voltage monitoring and control: The last-mile voltage stability issue
JP7254041B2 (en) SYSTEM PLANNING SUPPORT SYSTEM AND SYSTEM PLANNING SUPPORT METHOD
Elazab et al. Reviewing the frontier: modeling and energy management strategies for sustainable 100% renewable microgrids
EP3958422A1 (en) Method and computer system for generating a decision logic for a controller
Liere‐Netheler et al. Optimised curtailment of distributed generators for the provision of congestion management services considering discrete controllability
Moya et al. A hierarchical framework for demand-side frequency control
JP6689732B2 (en) Power system control device and power system control method
Braun et al. Predictions and decision making for resilient intelligent sustainable energy systems
JP7149237B2 (en) Power system controller
Manolis et al. MAS based demand response application in port city using reefers
JP2019201505A (en) Power system monitoring system, power system monitoring method, and program
Bhattacharya et al. Intelligent subset selection of power generators for economic dispatch
JP7608281B2 (en) Power system control device, power system control system, and power system control method
Huang et al. Two-stage stochastic programming models and algorithms
JP6753763B2 (en) System control device, system control system, and system control method
JP7077176B2 (en) System control device and system control method
Chen et al. Bringing probabilistic analysis capability from planning to operation
EP4734314A1 (en) Evaluation device and evaluation method for power grid facility
JP7692792B2 (en) Information processing device and method
Bukhsh et al. A multiperiod OPF model under renewable generation uncertainty and demand side flexibility

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20190319

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20191217

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20200108

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20200324

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20200408

R150 Certificate of patent or registration of utility model

Ref document number: 6689732

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees