JP6694367B2 - Method for manufacturing concrete pit of radioactive waste burial facility and concrete pit of radioactive waste burial facility - Google Patents
[go: Go Back, main page]

JP6694367B2 - Method for manufacturing concrete pit of radioactive waste burial facility and concrete pit of radioactive waste burial facility - Google Patents

Method for manufacturing concrete pit of radioactive waste burial facility and concrete pit of radioactive waste burial facility Download PDF

Info

Publication number
JP6694367B2
JP6694367B2 JP2016211858A JP2016211858A JP6694367B2 JP 6694367 B2 JP6694367 B2 JP 6694367B2 JP 2016211858 A JP2016211858 A JP 2016211858A JP 2016211858 A JP2016211858 A JP 2016211858A JP 6694367 B2 JP6694367 B2 JP 6694367B2
Authority
JP
Japan
Prior art keywords
plate
assembly
concrete pit
shaped member
wall portion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2016211858A
Other languages
Japanese (ja)
Other versions
JP2018072142A (en
Inventor
真一 武地
真一 武地
泰宏 須山
泰宏 須山
亮一 金澤
亮一 金澤
健吾 関
健吾 関
佐藤 公彦
公彦 佐藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP2016211858A priority Critical patent/JP6694367B2/en
Publication of JP2018072142A publication Critical patent/JP2018072142A/en
Application granted granted Critical
Publication of JP6694367B2 publication Critical patent/JP6694367B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Description

本発明は、放射性廃棄物埋設施設のコンクリートピットの製造方法、及び放射性廃棄物埋設施設のコンクリートピットに関する。   The present invention relates to a method for manufacturing a concrete pit for a radioactive waste burial facility, and a concrete pit for a radioactive waste burial facility.

従来の放射性廃棄物埋設施設のコンクリートピットとして、特許文献1に示すものが知られている。このコンクリートピットは、土壌もしくは岩盤に形成された溝部に埋設されており、内部に放射性廃棄物を密閉状態で収容するものである。コンクリートピットは、放射性廃棄物を収容した状態で地中に埋設される。   As a concrete pit of a conventional radioactive waste burial facility, the one shown in Patent Document 1 is known. This concrete pit is buried in a groove formed in soil or rock and contains radioactive waste in a sealed state. The concrete pit is buried in the ground while containing radioactive waste.

特開2015−34798号公報JP, 2015-34798, A

上述のような放射性廃棄物埋設施設のコンクリートピットは、現場でコンクリートを打設することによって構成されていた。しかしながら、コンクリートピットの壁部のすべてをコンクリートを打設することによって形成する場合、構築に時間がかかってしまうという問題があった。従って、工期を短縮することができる放射性廃棄物埋設施設のコンクリートピットの製造方法が必要とされていた。   The concrete pit of the radioactive waste burial facility as described above was constructed by pouring concrete on site. However, when all the walls of the concrete pit are formed by pouring concrete, there is a problem that it takes time to construct. Therefore, there is a need for a method of manufacturing a concrete pit for a radioactive waste burial facility that can shorten the construction period.

本発明は、上記課題の解決のためになされたものであり、工期を短縮できる放射性廃棄物埋設施設のコンクリートピットの製造方法、及び放射性廃棄物埋設施設のコンクリートピットを提供することを目的とする。   The present invention has been made to solve the above problems, and an object of the present invention is to provide a method for manufacturing a concrete pit of a radioactive waste burial facility that can shorten the construction period, and a concrete pit of a radioactive waste burial facility. ..

本発明の一側面に係る放射性廃棄物埋設施設のコンクリートピットの製造方法において、コンクリートピットを構成する少なくとも一部の壁部を形成する壁部形成工程は、当該壁部の設置位置に板状部材を配置する板状部材配置工程を含む。   In the method for manufacturing a concrete pit of a radioactive waste burying facility according to one aspect of the present invention, the wall forming step of forming at least a part of the wall forming the concrete pit includes a plate-shaped member at the installation position of the wall. And a plate-shaped member arranging step for arranging.

この放射性廃棄物埋設施設のコンクリートピットの製造方法では、コンクリートピットを構成する少なくとも一部の壁部を形成する壁部形成工程は、当該壁部の設置位置に板状部材を配置する板状部材配置工程を含む。このように、コンクリートピットを構成する少なくとも一部の壁部は、設置位置に配置された板状部材を含む構成となる。従って、壁部の全てをコンクリートの打設によって形成する場合に比して、予め形成された板状部材を用いることで、壁部を短時間で形成することができる。以上より、工期を短縮することができる。   In this method for manufacturing a concrete pit of a radioactive waste burial facility, in the wall forming step of forming at least a part of the wall forming the concrete pit, the plate-like member for arranging the plate-like member at the installation position of the wall Including a placement step. As described above, at least a part of the wall portion forming the concrete pit has a configuration including the plate-like member arranged at the installation position. Therefore, the wall portion can be formed in a shorter time by using the plate member that is formed in advance, as compared with the case where the entire wall portion is formed by pouring concrete. From the above, the construction period can be shortened.

板状部材配置工程においては、互いに交差する少なくとも二面を有する組立体を配置し、組立体は、少なくとも一面に、壁部の設置位置に配置される板状部材を含んでよい。このように、少なくとも板状部材を含み、少なくとも二面を有するように構築された組立体を予め準備しておき、現場にて当該組立体を配置するだけで、コンクリートピットの壁部を形成することができる。従って、工期を更に短縮することができる。   In the plate member arranging step, an assembly having at least two surfaces intersecting with each other may be arranged, and the assembly may include a plate member arranged at the installation position of the wall portion on at least one surface. As described above, the wall portion of the concrete pit is formed only by preparing in advance an assembly including at least a plate-shaped member and having at least two surfaces and arranging the assembly on site. be able to. Therefore, the construction period can be further shortened.

壁部は一の組立体の板状部材と、他の組立体の板状部材の組み合わせによって構成されてよい。このような構成によれば、組立体の一面当たりの板状部材の重量が軽くなる。従って、一面当たりの板状部材が一枚の壁部の全体を構成する場合に比して、組立体内での重心の偏りを低減できる。従って、組立体を搬送するときに当該組立体のバランスが良くなる。   The wall portion may be formed by a combination of a plate-shaped member of one assembly and a plate-shaped member of another assembly. With such a configuration, the weight of the plate member per one surface of the assembly is reduced. Therefore, the deviation of the center of gravity in the assembly can be reduced as compared with the case where the plate-shaped member per surface constitutes the entire wall portion. Therefore, the balance of the assembly is improved when the assembly is transported.

一の組立体の板状部材と、他の組立体の板状部材との間には隙間が形成され、当該隙間には充填材が充填されてよい。これにより、組立体の板状部材を充填材の型枠のように機能させることができるため、型枠を構築する時間を短縮することができる。   A gap may be formed between the plate-shaped member of one assembly and the plate-shaped member of another assembly, and the gap may be filled with a filler. Accordingly, the plate-shaped member of the assembly can be made to function like a mold of the filler, so that the time for constructing the mold can be shortened.

組立体の板状部材は、一枚の壁部の全体を構成してよい。これにより、板状部材だけで壁部の全体を構成できるので、工期を短縮することができる。   The plate-shaped member of the assembly may form the entire one wall portion. With this, the entire wall portion can be configured only by the plate-shaped member, so that the construction period can be shortened.

組立体の少なくとも一面に、細孔を有するポーラス層を含んでよい。これにより、ポーラス層を容易に構成することができる。   At least one surface of the assembly may include a porous layer having pores. This makes it possible to easily form the porous layer.

板状部材は、壁部の一部分を構成してよい。板状部材は壁部の一部分を構成するものであるため、壁部全体を構成するものに比べ、重量が軽く、設置等の作業を行いやすくなる。   The plate-shaped member may form a part of the wall portion. Since the plate-shaped member constitutes a part of the wall portion, the plate-shaped member is lighter in weight than that constituting the entire wall portion, and the work such as installation becomes easier.

板状部材は、壁部の厚さ方向における一部分を構成してよい。これにより、搬送するときの重量が軽くなるという効果が得られる。   The plate-shaped member may form a part in the thickness direction of the wall portion. As a result, it is possible to obtain the effect of reducing the weight when transported.

壁部は、厚さ方向に対向する複数の板状部材を含んで構成され、板状部材同士の間の隙間には、充填材が充填されてよい。これにより、板状部材を充填材の型枠のように機能させることができるため、型枠を構築する時間を短縮することができる。   The wall portion may include a plurality of plate-shaped members facing each other in the thickness direction, and the gap between the plate-shaped members may be filled with a filler. This allows the plate-shaped member to function like a mold for the filling material, thus shortening the time for constructing the mold.

板状部材は、壁部の横方向における一部分を構成してよい。これにより、搬送するときの重量が軽くなるという効果を得ることができる。   The plate-shaped member may form a part of the wall portion in the lateral direction. As a result, it is possible to obtain the effect of reducing the weight when transported.

板状部材は、壁部の高さ方向における一部分を構成してよい。これにより、搬送するときの重量が軽くなるという効果、及び下部から順に組み立てられるため組立時のバランスが良くなるという効果を得ることができる。   The plate-shaped member may form a part in the height direction of the wall portion. As a result, it is possible to obtain an effect that the weight is reduced when transported and an effect that the balance at the time of assembling is improved because the parts are assembled in order from the bottom.

本発明の一側面に係る放射性廃棄物埋設施設のコンクリートピットにおいて、コンクリートピットを構成する少なくとも一部の壁部は、板状部材を含んで構成される。   In the concrete pit of the radioactive waste burying facility according to one aspect of the present invention, at least a part of the wall portion forming the concrete pit includes a plate member.

この放射性廃棄物埋設施設のコンクリートピットによれば、上述の放射性廃棄物埋設施設のコンクリートピットの製造方法と同様の作用・効果を得ることができる。   According to this concrete pit of the radioactive waste burial facility, it is possible to obtain the same action and effect as the method for manufacturing the concrete pit of the radioactive waste burial facility described above.

コンクリートピットは、互いに交差する少なくとも二面を有する組立体を備え、組立体は、少なくとも一面に、壁部に含まれる板状部材を含んでよい。このように、少なくとも板状部材を含み、予め二面を有するように構築された組立体を予め準備しておき、現場にて当該組立体を配置するだけで、コンクリートピットの壁部を形成することができる。従って、工期を更に短縮することができる。   The concrete pit may include an assembly having at least two surfaces intersecting with each other, and the assembly may include a plate-shaped member included in a wall on at least one surface. As described above, the wall portion of the concrete pit is formed only by preparing in advance an assembly that includes at least a plate-shaped member and is constructed so as to have two surfaces, and disposing the assembly on site. be able to. Therefore, the construction period can be further shortened.

板状部材は、壁部の一部分を構成してよい。板状部材は壁部の一部分を構成するものであるため、壁部全体を構成するものに比べ、重量が軽く、設置等の作業を行いやすくなる。   The plate-shaped member may form a part of the wall portion. Since the plate-shaped member constitutes a part of the wall portion, the plate-shaped member is lighter in weight than that constituting the entire wall portion, and the work such as installation becomes easier.

本発明によれば、放射性廃棄物埋設施設のコンクリートピットの工期を短縮できる。   According to the present invention, the construction period of the concrete pit of the radioactive waste burial facility can be shortened.

放射性廃棄物埋設施設を上方から見た図である。It is the figure which looked at a radioactive waste burial facility from the upper part. 図1に示すII−II線に沿った断面図である。It is sectional drawing which followed the II-II line shown in FIG. コンクリートピットの組立体の組み合わせ構成の一例を概念的に示した平面図である。It is a top view which showed notionally an example of the combination structure of the assembly of a concrete pit. 図3に示すIV-IV線に沿った断面図である。FIG. 4 is a sectional view taken along line IV-IV shown in FIG. 3. コンクリートピットの製造方法を説明するための断面図である。It is sectional drawing for demonstrating the manufacturing method of a concrete pit. 組立体の斜視図である。It is a perspective view of an assembly. 変形例に係るコンクリートピットの製造方法を説明するための断面図である。It is sectional drawing for demonstrating the manufacturing method of the concrete pit which concerns on a modification. 変形例に係るコンクリートピットの製造方法を説明するための斜視図である。It is a perspective view for explaining the manufacturing method of the concrete pit which concerns on a modification. 図8に示すIX−IX線に沿った断面図である。FIG. 9 is a sectional view taken along line IX-IX shown in FIG. 8. 変形例に係るコンクリートピットの製造方法を説明するための斜視図である。It is a perspective view for explaining the manufacturing method of the concrete pit which concerns on a modification. 変形例に係るコンクリートピットの製造方法を説明するための斜視図である。It is a perspective view for explaining the manufacturing method of the concrete pit which concerns on a modification.

以下、図面を参照しながら、本発明の一側面に係る放射性廃棄物埋設施設のコンクリートピット、及びその製造方法の好適な実施形態について詳細に説明する。   Hereinafter, preferred embodiments of a concrete pit of a radioactive waste burying facility and a manufacturing method thereof according to an aspect of the present invention will be described in detail with reference to the drawings.

図1は、放射性廃棄物埋設施設を上方から見た図である。ただし、図1では、コンクリートピット10の土壌もしくは岩盤を除去した状態を示している。図1に示すように、放射性廃棄物埋設施設100は、紙面における縦方向及び横方向に配列された複数のコンクリートピット10を備えている。図2は、図1に示すII−II線に沿った断面図である。図2に示すように、コンクリートピット10は、土壌105(岩盤でもよいが、ここでは土壌を例示する)を掘削することで形成された溝部101の底面上に配置される。また、溝部101内は、コンクリートピット10と共に混合土102で埋められる。混合土102として、例えば、ペントナイト混合土が用いられる。また、混合土102及び土壌105の上側は、覆土103で覆われる。なお、以降の説明においては、コンクリートピット10の配列方向における一方の方向を「X軸方向」とし、当該配列方向における他方の方向を「Y軸方向」として説明を行う場合がある。   FIG. 1 is a view of a radioactive waste burial facility viewed from above. However, FIG. 1 shows a state in which the soil or bedrock of the concrete pit 10 is removed. As shown in FIG. 1, the radioactive waste burial facility 100 includes a plurality of concrete pits 10 arranged in a vertical direction and a horizontal direction on a paper surface. FIG. 2 is a cross-sectional view taken along the line II-II shown in FIG. As shown in FIG. 2, the concrete pit 10 is arranged on the bottom surface of the groove portion 101 formed by excavating the soil 105 (which may be rock, but soil is exemplified here). Further, the inside of the groove portion 101 is filled with the mixed soil 102 together with the concrete pit 10. As the mixed soil 102, for example, pentonite mixed soil is used. The upper sides of the mixed soil 102 and the soil 105 are covered with a soil 103. In the following description, one direction in the arrangement direction of the concrete pits 10 may be referred to as “X-axis direction” and the other direction in the arrangement direction may be referred to as “Y-axis direction”.

コンクリートピット10は、扁平な直方体をなしており、内部に空間を有している。コンクリートピット10は、溝部101の底面上で水平方向に広がる矩形状の底壁11と、底壁11の四方の外縁部から上方へ向かって立ち上がる側壁12と、底壁11と水平に対向して外縁部が側壁12と連結される上壁13と、を備える。底壁11、側壁12、及び上壁13は、コンクリートピット10の外壁を構成する。底壁11及び上壁13は、Y軸方向と平行な一対の外縁部と、X軸方向と平行な一対の外縁部と、を有する。従って、四方の側壁12のうち、一対の側壁12はX軸方向と平行に延び、他の一対の側壁12はY軸方向と平行に延びる。   The concrete pit 10 has a flat rectangular parallelepiped shape and has a space inside. The concrete pit 10 has a rectangular bottom wall 11 that spreads horizontally on the bottom surface of the groove portion 101, side walls 12 that rise upward from four outer edge portions of the bottom wall 11, and horizontally confronts the bottom wall 11. An upper wall 13 whose outer edge is connected to the side wall 12. The bottom wall 11, the side wall 12, and the upper wall 13 form an outer wall of the concrete pit 10. The bottom wall 11 and the upper wall 13 have a pair of outer edge portions parallel to the Y-axis direction and a pair of outer edge portions parallel to the X-axis direction. Therefore, among the four side walls 12, the pair of side walls 12 extends parallel to the X-axis direction, and the other pair of side walls 12 extends parallel to the Y-axis direction.

また、当該外壁によってコンクリートピット10の内部に形成される内部空間は、上下方向に延びる複数の中仕切り14によって区切られる。中仕切り14は、コンクリートピット10内においてX軸方向に延びると共に、Y軸方向へ一定間隔を空けて複数配列される。また、中仕切り14は、コンクリートピット10内においてY軸方向に延びると共に、X軸方向へ一定間隔を空けて複数配列される。また、各中仕切り14は、底壁11から上壁13に至るまで延びており、下端及び上端が底壁11及び上壁13にそれぞれ固定されている。   Further, the internal space formed inside the concrete pit 10 by the outer wall is partitioned by a plurality of partitions 14 extending in the vertical direction. The partition walls 14 extend in the X-axis direction in the concrete pit 10 and are arranged in the Y-axis direction at regular intervals. Further, the partition walls 14 extend in the Y-axis direction in the concrete pit 10 and are arranged in the X-axis direction at regular intervals. Further, each partition 14 extends from the bottom wall 11 to the upper wall 13, and the lower end and the upper end are fixed to the bottom wall 11 and the upper wall 13, respectively.

コンクリートピット10は、内部を中仕切り14で区切られることで、複数の収納空間16を有する。放射性廃棄物Rは、それぞれの収納空間16の内部に収納される。放射性廃棄物Rはドラム缶に詰められて、収納空間16内で俵積みされる。また、収納空間16のうち、放射性廃棄物R以外の空間はコンクリート等の充填材17で隙間なく埋められる。なお、各コンクリートピット10には、水の浸入を点検する点検路18が設けられている。   The concrete pit 10 has a plurality of storage spaces 16 by partitioning the inside by a partition 14. The radioactive waste R is stored in each storage space 16. The radioactive waste R is packed in drums and stacked in the storage space 16 in a bag. In addition, in the storage space 16, the space other than the radioactive waste R is filled with a filling material 17 such as concrete without a gap. Each concrete pit 10 is provided with an inspection path 18 for inspecting water intrusion.

次に、本実施形態に係るコンクリートピット10の製造方法について説明する。コンクリートピット10の製造方法は、コンクリートピット10を埋設するための溝部101を形成する工程と、底壁11及び側壁12をコンクリートピット10の外壁として形成する外壁形成工程と、コンクリートピット10を構成する少なくとも一部の壁部(本実施形態では中仕切り14)を形成する壁部形成工程と、コンクリートピット10内に放射性廃棄物Rを配置してコンクリート等の充填材17を充填して固める放射性廃棄物配置工程と、コンクリートピット10の上壁13を形成して放射性廃棄物Rを収納空間16内に密閉する上壁形成工程と、コンクリートピット10を混合土102及び覆土103で覆うことで地中に埋め込む埋め込み工程と、を備える。   Next, a method for manufacturing the concrete pit 10 according to the present embodiment will be described. The method for manufacturing the concrete pit 10 comprises a step of forming a groove portion 101 for burying the concrete pit 10, an outer wall forming step of forming the bottom wall 11 and the side wall 12 as outer walls of the concrete pit 10, and the concrete pit 10. A wall forming step of forming at least a part of the wall (the partition 14 in the present embodiment), and a radioactive waste in which the radioactive waste R is placed in the concrete pit 10 and filled with a filler 17 such as concrete to be solidified. By placing the upper wall 13 of the concrete pit 10 and forming the upper wall 13 of the concrete pit 10 to seal the radioactive waste R in the storage space 16, and by covering the concrete pit 10 with the mixed soil 102 and the soil 103. And a step of embedding in.

上述の製造方法のうち、壁部形成工程について詳細に説明する。なお、当該説明を行うために、図3及び図4を参照して、本実施形態に係る製造方法によって製造されたコンクリートピット10の構成について詳細に説明する。ただし、図3及び図4のコンクリートピット10は構成の一例にすぎず、各壁部の形状や収納空間16の個数などは特に限定されず、適宜変更可能である。図3に示すコンクリートピット10では、上壁13、内部の放射性廃棄物R及び充填材17が省略されている。また、図4に示すコンクリートピット10では、内部の放射性廃棄物R及び充填材17が省略されている。   The wall forming step of the above manufacturing method will be described in detail. In order to make the description, the configuration of the concrete pit 10 manufactured by the manufacturing method according to the present embodiment will be described in detail with reference to FIGS. 3 and 4. However, the concrete pit 10 of FIGS. 3 and 4 is only an example of the configuration, and the shape of each wall portion, the number of the storage spaces 16 and the like are not particularly limited and can be appropriately changed. In the concrete pit 10 shown in FIG. 3, the upper wall 13, the radioactive waste R inside and the filler 17 are omitted. Further, in the concrete pit 10 shown in FIG. 4, the radioactive waste R and the filling material 17 inside are omitted.

図3及び図4に示すコンクリートピット10においては、X軸方向負側の側壁12を側壁12Aとし、X軸方向正側の側壁12を側壁12Bとし、Y軸方向負側の側壁12を側壁12Cとし、Y軸方向正側の側壁12を側壁12Dとする。また、X軸方向負側から正側へ向かって中仕切り14A,14B,14Cが形成されているものとする。Y軸方向負側から正側へ向かって中仕切り14D,14E,14Fが形成されているものとする。このように構成されたコンクリートピット10の内部は、16個の収納空間16に区切られる。説明の便宜上、図3に示すように、それぞれの収納空間16に対して「16〜1616」という符合を付す。また、側壁12A,12B,12C,12Dの内側の表面にはポーラス層26A,26B,26C,26Dが形成される。また、底壁11の上面にも、収納空間16〜1616のそれぞれに対応する部分にポーラス層26Eが形成される。ポーラス層26は、各収納空間16内で発生した水を点検路18まで伝わせる層である。ポーラス層26A〜26Eは、内部に細孔を有したポーラスコンクリートによって構成される部材である。 In the concrete pit 10 shown in FIGS. 3 and 4, the side wall 12 on the X axis direction negative side is the side wall 12A, the side wall 12 on the X axis direction positive side is the side wall 12B, and the side wall 12 on the Y axis direction negative side is the side wall 12C. And the side wall 12 on the Y axis direction positive side is defined as a side wall 12D. Further, it is assumed that the intermediate partitions 14A, 14B, 14C are formed from the negative side in the X-axis direction toward the positive side. Partitions 14D, 14E, and 14F are formed from the Y axis direction negative side toward the positive side. The interior of the concrete pit 10 thus configured is divided into 16 storage spaces 16. For convenience of explanation, as shown in FIG. 3, each storage space 16 is denoted by “16 1 to 16 16 ”. Porous layers 26A, 26B, 26C and 26D are formed on the inner surfaces of the side walls 12A, 12B, 12C and 12D. Further, on the upper surface of the bottom wall 11, the porous layer 26E is formed in the portion corresponding to each of the storage spaces 16 1 to 16 16 . The porous layer 26 is a layer for transmitting the water generated in each storage space 16 to the inspection path 18. The porous layers 26A to 26E are members made of porous concrete having pores inside.

次に、上述のようなコンクリートピット10を構築するためには、図5に示すように、外壁形成工程にて、外壁として底壁11及び側壁12を形成しておく。当該状態では、上壁13が形成されておらず、側壁12の上端側に開口部21が形成されている。なお、底壁11及び側壁12で構成されて開口部21が形成されものを以降の説明では「構築物20」と称する場合がある。   Next, in order to construct the concrete pit 10 as described above, the bottom wall 11 and the side wall 12 are formed as outer walls in the outer wall forming step as shown in FIG. In this state, the upper wall 13 is not formed and the opening 21 is formed on the upper end side of the side wall 12. In addition, what is formed by the bottom wall 11 and the side wall 12 and has the opening 21 formed therein may be referred to as a "building 20" in the following description.

このような構築物20に対して、壁部形成工程が実行されることで、中仕切り14及びポーラス層26が形成される。なお、本明細書において「壁部」とは、コンクリートピット10のうち、構造物としての強度、及び収納空間16の密閉性を確保するための部材のことを指す。「壁部」は、中仕切り14の他、側壁12を含みうる。「壁部」は、コンクリートや鉄筋や金属板等によって構成される。ただし、ポーラス層26は、「壁部」に含まれないものとする。本実施形態では、中仕切り14が「壁部」に該当する。   By performing the wall forming step on the structure 20 as described above, the partition 14 and the porous layer 26 are formed. In the present specification, the “wall part” refers to a member of the concrete pit 10 for ensuring the strength as a structure and the hermeticity of the storage space 16. The “wall portion” may include the side wall 12 in addition to the partition 14. The "wall" is made of concrete, reinforcing bars, metal plates, or the like. However, the porous layer 26 is not included in the “wall portion”. In the present embodiment, the partition 14 corresponds to the "wall portion".

壁部形成工程は、壁部である中仕切り14の設置位置に板状部材30を配置する板状部材配置工程を含んでいる。なお、「板状部材」とは、コンクリートピット10の構築現場でコンクリートを打設することによって形成された部材ではなく、予め形成された部材である。構築現場では、予め形成された板状部材30を搬入し、目的の設置箇所に設置することで壁部を形成することができる。また、壁部形成工程を実行することでコンクリートピット10において、コンクリートピット10を構成する少なくとも一部の壁部は、板状部材30を含んで構成される。板状部材30は、構築現場で形成するものでなく、予め形成しておいて搬送可能なものであれば、材料は特に限定されない。例えば、板状部材30の材料は、予め打設された鉄筋コンクリートの部材(いわゆるプレキャスト部材)で構成されていてもよく、鉄等の金属製の板で構成されていてもよい。本実施形態では、板状部材30としてプレキャスト部材を採用した場合を例にして説明する。ここで、完成後のコンクリートピット10の壁部の中には、板状部材30によって構成される部分(又は壁部全体)が形成されるが、使用者は、壁部の対象部分(又は全体)が板状部材30で構成されたかものであるか、現場でコンクリートの打設によって構成されたものであるか、材料が同じコンクリートであったとしても見分けることができる。具体的には、使用者は、コンクリート表面状態や打継部・接合部の状態などの点から板状部材30で構成されていることを見分けることができる。   The wall portion forming step includes a plate-shaped member arranging step of arranging the plate-shaped member 30 at the installation position of the partition 14 which is the wall portion. The “plate-shaped member” is not a member formed by pouring concrete at the construction site of the concrete pit 10 but a member formed in advance. At the construction site, the wall member can be formed by bringing in the plate-shaped member 30 formed in advance and installing it at the intended installation location. Further, in the concrete pit 10 by performing the wall forming step, at least a part of the wall forming the concrete pit 10 includes the plate member 30. The plate-shaped member 30 is not formed at the construction site, and the material is not particularly limited as long as it is preformed and can be conveyed. For example, the material of the plate-shaped member 30 may be composed of a reinforced concrete member (so-called precast member) that has been cast in advance, or may be composed of a metal plate such as iron. In this embodiment, a case where a precast member is used as the plate member 30 will be described as an example. Here, in the wall portion of the concrete pit 10 after completion, a portion (or the entire wall portion) formed by the plate-shaped member 30 is formed, but the user can ) Is composed of the plate-shaped member 30, is constructed by pouring concrete at the site, or is made of the same material. Specifically, the user can distinguish that the plate-shaped member 30 is used in terms of the concrete surface condition and the condition of the joints and joints.

また、本実施形態に係る板状部材配置工程においては、互いに交差する少なくとも二面を有する組立体40を配置する。すなわち、図5に示すように、構築物20に対して、開口部21から複数の組立体40を上方から挿入する。組立体40を配置するときは、クレーン等の重機械で吊るして搬送及び降下させることで、所望の位置に配置する。   Further, in the plate-shaped member arranging step according to this embodiment, the assembly 40 having at least two surfaces intersecting with each other is arranged. That is, as shown in FIG. 5, the plurality of assemblies 40 are inserted into the structure 20 through the openings 21 from above. When arranging the assembly 40, the assembly 40 is hung by a heavy machine such as a crane to be transported and lowered to be arranged at a desired position.

図3及び図5に示すように、組立体40は、少なくとも一面に、壁部45である中仕切り14の設置位置に配置される板状部材30を含む。組立体40の板状部材30は、一枚の壁部の全体を構成する。なお、ここでの「一枚の壁部」とは、一つの収納空間16を仕切る四方向の面のうち、一の面を構成する壁部45のことを指す。従って、板状部材30が「一枚の壁部の全体を構成する」状態とは、収納空間16を仕切っている一枚の壁部が、継目なく一体的に形成された一枚の板状部材30で構成されている状態の事をいう。また、組立体40は、少なくとも一面に、細孔を有するポーラス層26を含む。   As shown in FIGS. 3 and 5, the assembly 40 includes, on at least one surface thereof, the plate-shaped member 30 arranged at the installation position of the partition 14 which is the wall portion 45. The plate-shaped member 30 of the assembly 40 constitutes one wall portion as a whole. It should be noted that the term “one wall portion” as used herein refers to the wall portion 45 that constitutes one surface of the four-direction surfaces that partition one storage space 16. Therefore, the state in which the plate-shaped member 30 "constitutes the entire one wall portion" means that one wall portion that partitions the storage space 16 is a single plate-shaped member that is integrally and seamlessly formed. It means a state of being composed of the member 30. The assembly 40 also includes the porous layer 26 having pores on at least one surface.

組立体40の構成について、図3を参照して詳細に説明する。また、説明の便宜上、収納空間16〜1616を形成する各組立体40に対して「40〜4016」という符合を付す。本実施形態では、各組立体40は、X軸方向正側の壁部45(中仕切り14A,14B,14C)を構成する板状部材30Aを有する。ただし、コンクリートピット10のX軸方向正側の側壁12Bに面した組立体40,40,4012,4016では、側壁12B自体がX軸方向正側の壁部を構成するので、板状部材30Aが設けられていない。また、コンクリートピット10のX軸方向負側の側壁12Aに面した組立体40,40,40,4013では、側壁12A自体がX軸方向正側の壁部45を構成するので、板状部材が設けられていない。以上のような構成により、収納空間16,16,1612,1616以外の各収納空間16のX軸方向正側の壁部45は、対応する組立体40の板状部材30Aによって構成される。収納空間16,16,1612,1616のX軸方向正側の壁部45は側壁12Bによって構成される。収納空間16,16,16,1613以外の各収納空間16のX軸方向負側の壁部45は、X軸方向負側に隣り合う組立体40の板状部材30Aによって構成される。X軸方向負側に隣り合う組立体40とは、例えば、収納空間16にとっての組立体40の事である。収納空間16,16,16,1613のX軸方向負側の壁部45は側壁12Aによって構成される。 The configuration of the assembly 40 will be described in detail with reference to FIG. Further, for the sake of convenience of description, each assembly 40 forming the storage spaces 16 1 to 16 16 is denoted by “40 1 to 40 16 ”. In the present embodiment, each assembly 40 has a plate-shaped member 30A that constitutes the wall portion 45 (intermediate partitions 14A, 14B, 14C) on the X axis direction positive side. However, in the assemblies 40 4 , 40 8 , 40 12 , 40 16 facing the side wall 12B on the positive side in the X-axis direction of the concrete pit 10, since the side wall 12B itself constitutes the wall portion on the positive side in the X-axis direction, The member 30A is not provided. Further, in the assemblies 40 1 , 40 5 , 40 9 , 40 13 facing the side wall 12A on the X axis direction negative side of the concrete pit 10, since the side wall 12A itself constitutes the wall portion 45 on the X axis direction positive side, No plate member is provided. With the above configuration, the wall portion 45 on the X-axis direction positive side of each storage space 16 other than the storage spaces 16 4 , 16 8 , 16 12 , 16 16 is configured by the plate-shaped member 30A of the corresponding assembly 40. To be done. The wall portion 45 on the X-axis direction positive side of the storage spaces 16 4 , 16 8 , 16 12 , 16 16 is configured by the side wall 12B. The wall portion 45 on the X axis direction negative side of each of the storage spaces 16 other than the storage spaces 16 1 , 16 5 , 16 9 and 16 13 is configured by the plate-shaped member 30A of the assembly 40 adjacent to the X axis direction negative side. It The assembly 40 adjacent to the negative side in the X-axis direction is, for example, the assembly 40 1 in the storage space 16 2 . The wall portion 45 of the storage spaces 16 1 , 16 5 , 16 9 and 16 13 on the negative side in the X-axis direction is configured by the side wall 12A.

また、各組立体40は、Y軸方向正側の壁部(中仕切り14D,14E,14F)45を構成する板状部材30Bを有する。ただし、コンクリートピット10のY軸方向正側の側壁12Dに面した組立体4013,4014,4015,4016では、側壁12D自体がY軸方向正側の壁部を構成するので、板状部材30Bが設けられていない。また、コンクリートピット10のY軸方向負側の側壁12Cに面した組立体40,40,40,40では、側壁12C自体がY軸方向負側の壁部45を構成するので、板状部材が設けられていない。以上のような構成により、収納空間1613,1614,1615,1616以外の各収納空間16のY軸方向正側の壁部45は、対応する組立体40の板状部材30Bによって構成される。収納空間1613,1614,1615,1616のY軸方向正側の壁部45は側壁12Dによって構成される。収納空間16,16,16,16以外の各収納空間16のY軸方向負側の壁部45は、Y軸方向負側に隣り合う組立体40の板状部材30Bによって構成される。Y軸方向負側に隣り合う組立体40とは、例えば、収納空間16にとっての組立体40の事である。収納空間16,16,16,16のY軸方向負側の壁部45は側壁12Dによって構成される。 Further, each assembly 40 has a plate-shaped member 30B that constitutes a wall portion (intermediate partitions 14D, 14E, 14F) 45 on the Y axis direction positive side. However, in the assemblies 40 13 , 40 14 , 40 15 , 40 16 facing the side wall 12D on the positive side in the Y-axis direction of the concrete pit 10, since the side wall 12D itself constitutes the wall portion on the positive side in the Y-axis direction, The member 30B is not provided. Further, in the assemblies 40 1 , 40 2 , 40 3 , 40 4 facing the side wall 12C on the negative side in the Y-axis direction of the concrete pit 10, since the side wall 12C itself constitutes the wall portion 45 on the negative side in the Y-axis direction, No plate member is provided. With the above configuration, the wall portion 45 on the Y axis direction positive side of each storage space 16 other than the storage spaces 16 13 , 16 14 , 16 15 , 16 16 is formed by the plate-shaped member 30B of the corresponding assembly 40. To be done. The wall portion 45 on the Y axis direction positive side of the storage spaces 16 13 , 16 14 , 16 15 , 16 16 is configured by the side wall 12D. The wall portion 45 on the Y axis direction negative side of each of the storage spaces 16 other than the storage spaces 16 1 , 16 2 , 16 3 , and 16 4 is configured by the plate-shaped member 30B of the assembly 40 adjacent to the Y axis direction negative side. It The assembly 40 adjacent in the Y axis direction negative side, for example, is that the assembly 40 1 for the storage space 16 5. The wall portion 45 on the Y axis direction negative side of the storage spaces 16 1 , 16 2 , 16 3 , 16 4 is configured by the side wall 12D.

また、コンクリートピット10のX軸方向負側の側壁12Aに面した組立体40,40,40,4013は、X軸方向負側に側壁12Aの内側の表面を覆うポーラス層26Aを有している。コンクリートピット10のX軸方向正側の側壁12Bに面した組立体40,40,4012,4016は、側壁12Bの内側の表面を覆うポーラス層26Bを有している。コンクリートピット10のY軸方向負側の側壁12Cに面した組立体40,40,40,40は、Y軸方向負側に側壁12Cの内側の表面を覆うポーラス層26Cを有している。コンクリートピット10のY軸方向正側の側壁12Dに面した組立体4013,4014,4015,4016は、側壁12Dの内側の表面を覆うポーラス層26Dを有している。また、全ての組立体40〜4016は、底壁11の上面を覆うポーラス層26Eを有している(図4及び図5も参照)。 Further, the assemblies 40 1 , 40 5 , 40 9 , 40 13 facing the side wall 12A on the negative side in the X-axis direction of the concrete pit 10 have a porous layer 26A covering the inner surface of the side wall 12A on the negative side in the X-axis direction. Have The assemblies 40 4 , 40 8 , 40 12 , 40 16 facing the side wall 12B on the X axis direction positive side of the concrete pit 10 have a porous layer 26B covering the inner surface of the side wall 12B. The assemblies 40 1 , 40 2 , 40 3 , 40 4 facing the sidewall 12C on the negative side in the Y-axis direction of the concrete pit 10 have a porous layer 26C covering the inner surface of the sidewall 12C on the negative side in the Y-axis direction. ing. The assembly 40 13, 40 14, 40 15, 40 16 facing the side wall 12D of the Y-axis direction positive side of the concrete pit 10 has a porous layer 26D that covers the inner surface of the side wall 12D. Further, all the assemblies 40 1 to 40 16 have a porous layer 26E that covers the upper surface of the bottom wall 11 (see also FIGS. 4 and 5).

図6は、図3に示す組立体のうち組立体40の斜視図である。上述のように、組立体40は、X軸方向正側の面に板状部材30A、Y軸方向負側の面に板状部材30B、X軸方向負側の面にポーラス層26A、Y軸方向負側の面にポーラス層26C、下方の面にポーラス層26Eを有している。また、組立体40の上方の面は開口している。図6に示すように、板状部材30A,30Bは、高さ方向の全域、幅方向の全域及び厚さ方向の全域のいずれにおいても分割されておらず、一枚の一体化された板部材として構成されている。すなわち、板状部材30A,30Bは、一枚の壁部45を構成している。なお、板状部材30Aと板状部材30Bとは、互いに接続される角部において一体化している。すなわち、板状部材30A及び板状部材30Bは、互いに一体化された一個のL字状の部材として構成されている。ただし、板状部材30A及び板状部材30Bは互いに分離されて、独立した一枚の部材であってもよい。また、板状部材30A,30B、ポーラス層26A,26C,26Eが互いに接続される角部においては、アングル部材32によって補強されている。以上のように、組立体40は、少なくとも一面に板状部材30を有し、少なくとも一面にポーラス層26を有している。また、他の組立体40も、図3に示すように、少なくとも一面に板状部材30を有し、少なくとも一面にポーラス層26を有している。よって、他の組立体40も、図6に示す組立体40と同趣旨の構成を有している。 Figure 6 is a perspective view of the assembly 40 1 out of the assembly shown in FIG. As mentioned above, the assembly 40 1, X-axis direction positive side to the plate-like member 30A, Y-axis direction negative side of the surface in the plate-like member 30B, X-axis direction negative side of the surface a porous layer 26A, Y The surface on the axially negative side has a porous layer 26C, and the surface on the lower side has a porous layer 26E. Further, the upper surface of the assembly 40 1 is open. As shown in FIG. 6, the plate-shaped members 30A and 30B are not divided in any of the entire area in the height direction, the entire area in the width direction, and the entire area in the thickness direction, and thus one plate member is integrated. Is configured as. That is, the plate-shaped members 30A and 30B form a single wall 45. The plate-shaped member 30A and the plate-shaped member 30B are integrated at the corners connected to each other. That is, the plate-shaped member 30A and the plate-shaped member 30B are configured as one L-shaped member integrated with each other. However, the plate-shaped member 30A and the plate-shaped member 30B may be separated from each other and may be independent members. Further, the corner portions where the plate members 30A and 30B and the porous layers 26A, 26C and 26E are connected to each other are reinforced by the angle member 32. As described above, the assembly 40 1 may have a plate-like member 30 on at least one surface has a porous layer 26 on at least one surface. As shown in FIG. 3, the other assembly 40 also has the plate member 30 on at least one surface and the porous layer 26 on at least one surface. Therefore, the other assembly 40 also has the same structure as the assembly 40 1 shown in FIG.

次に、本実施形態に係る放射性廃棄物埋設施設のコンクリートピット10の作用・効果について説明する。   Next, the operation / effect of the concrete pit 10 of the radioactive waste burying facility according to the present embodiment will be described.

コンクリートピット10の製造方法では、コンクリートピット10を構成する少なくとも一部の壁部45を形成する壁部形成工程は、当該壁部45の設置位置に板状部材30を配置する板状部材配置工程を含む。このように、コンクリートピット10を構成する少なくとも一部の壁部45は、設置位置に配置された板状部材30を含む構成となる。従って、壁部45の全てをコンクリートの打設によって形成する場合に比して、予め形成された板状部材30を用いることで、壁部45を短時間で形成することができる。以上より、工期を短縮することができる。例えば、寒冷地では冬期に、さらに梅雨や台風シーズンにおいては屋外でのコンクリートピットの構築作業ができないため、工期の短縮化を図ることで早期に構築作業を完了させることができる。   In the method for manufacturing the concrete pit 10, the wall forming step of forming at least a part of the wall 45 forming the concrete pit 10 is a plate-like member arranging step of arranging the plate-like member 30 at the installation position of the wall 45. including. As described above, at least a part of the wall portions 45 that configure the concrete pit 10 has a configuration including the plate-shaped member 30 arranged at the installation position. Therefore, the wall portion 45 can be formed in a short time by using the plate-shaped member 30 formed in advance, as compared with the case where the entire wall portion 45 is formed by pouring concrete. From the above, the construction period can be shortened. For example, since it is not possible to construct a concrete pit outdoors in the cold season in winter and in the rainy season or typhoon season, the construction work can be completed early by shortening the construction period.

板状部材配置工程においては、互いに交差する少なくとも二面を有する組立体40を配置し、組立体40は、少なくとも一面に、壁部45の設置位置に配置される板状部材30を含んでいる。このように、少なくとも板状部材30を含み、少なくとも二面を有するように構築された組立体40を予め準備しておき、現場にて当該組立体40を配置するだけで、コンクリートピット10の壁部45を形成することができる。従って、工期を更に短縮することができる。   In the plate member arranging step, the assembly 40 having at least two surfaces intersecting each other is arranged, and the assembly 40 includes the plate member 30 arranged at the installation position of the wall portion 45 on at least one surface. .. As described above, the assembly 40 including at least the plate-shaped member 30 and constructed to have at least two surfaces is prepared in advance, and the assembly 40 is simply arranged on the spot, so that the wall of the concrete pit 10 can be formed. The portion 45 can be formed. Therefore, the construction period can be further shortened.

組立体40の板状部材30は、一枚の壁部45の全体を構成する。これにより、板状部材30だけで壁部45の全体を構成できるので、工期を短縮することができる。   The plate-shaped member 30 of the assembly 40 constitutes one wall portion 45 as a whole. As a result, the entire wall portion 45 can be configured only by the plate-shaped member 30, so that the construction period can be shortened.

組立体40の少なくとも一面に、細孔を有するポーラス層26を含んでいる。これにより、ポーラス層26を容易に構成することができる。   At least one surface of the assembly 40 includes a porous layer 26 having pores. Thereby, the porous layer 26 can be easily configured.

また、本実施形態に係る放射性廃棄物埋設施設100のコンクリートピット10において、コンクリートピット10を構成する少なくとも一部の壁部45は、板状部材30を含んで構成される。   Further, in the concrete pit 10 of the radioactive waste burying facility 100 according to the present embodiment, at least a part of the wall portion 45 that constitutes the concrete pit 10 is configured to include the plate member 30.

この放射性廃棄物埋設施設100のコンクリートピット10によれば、上述の放射性廃棄物埋設施設100のコンクリートピット10の製造方法と同様の作用・効果を得ることができる。   According to the concrete pit 10 of the radioactive waste burial facility 100, it is possible to obtain the same actions and effects as the method for manufacturing the concrete pit 10 of the radioactive waste burial facility 100 described above.

コンクリートピット10は、互いに交差する少なくとも二面を有する組立体40を備え、組立体40は、少なくとも一面に、壁部45に含まれる板状部材30を含んでいる。このように、少なくとも板状部材30を含み、少なくとも二面を有するように構築された組立体40を予め準備しておき、現場にて当該組立体40を配置するだけで、コンクリートピット10の壁部45を形成することができる。従って、工期を更に短縮することができる。   The concrete pit 10 includes an assembly 40 having at least two surfaces intersecting with each other, and the assembly 40 includes a plate member 30 included in a wall portion 45 on at least one surface. As described above, the assembly 40 including at least the plate-shaped member 30 and constructed to have at least two surfaces is prepared in advance, and the assembly 40 is simply arranged on the spot, so that the wall of the concrete pit 10 can be formed. The portion 45 can be formed. Therefore, the construction period can be further shortened.

本発明は、上記実施形態に限られるものではない。   The present invention is not limited to the above embodiment.

例えば、上述の実施形態では、組立体40のX軸方向正側及びY軸方向負側に板状部材30A,30Bが形成されていたが、X軸方向負側及びY軸方向負側に板状部材30が形成されてもよい。また、側壁12A,12B,12C,12Dも板状部材によって構成されてもよい。   For example, in the above-described embodiment, the plate-shaped members 30A and 30B are formed on the X-axis direction positive side and the Y-axis direction negative side of the assembly 40, but the plate members are formed on the X-axis direction negative side and the Y-axis direction negative side. The member 30 may be formed. Further, the side walls 12A, 12B, 12C, 12D may also be configured by plate members.

また、例えば、図7に示すように、壁部45は一の組立体40の板状部材30と、他の組立体40の板状部材30の組み合わせによって構成されてよい。具体的には、組立体40,40,40のX軸方向正側の板状部材30Aの厚さは、中仕切り14の厚さの半分に設定されている。また、組立体40,40,40は、X軸方向負側に板状部材30Cを有している。板状部材30Cの厚さは、中仕切り14の厚さの半分に設定されている。壁部45である中仕切り14Aは、組立体40の板状部材30Aと、組立体40の板状部材30Cとの組み合わせによって構成される。壁部45である中仕切り14Bは、組立体40の板状部材30Aと、組立体40の板状部材30Cとの組み合わせによって構成される。壁部45である中仕切り14Cは、組立体40の板状部材30Aと、組立体40の板状部材30Cとの組み合わせによって構成される。なお、中仕切り14D,14E,14Fについても同様に、各組立体40の板状部材30の組み合わせによって構成される。 Further, for example, as shown in FIG. 7, the wall portion 45 may be configured by a combination of the plate-shaped member 30 of one assembly 40 and the plate-shaped member 30 of another assembly 40. Specifically, the thickness of the plate-shaped member 30A on the positive side in the X-axis direction of the assemblies 40 1 , 40 2 , 40 3 is set to half the thickness of the partition 14. The assemblies 40 2 , 40 3 , 40 4 have a plate-shaped member 30C on the X axis direction negative side. The thickness of the plate member 30C is set to half the thickness of the partition 14. Partition 14A in a wall portion 45 is composed of a plate-shaped member 30A of the assembly 40 1, by the combination of the plate-like member 30C of the assembly 40 2. Partition 14B in a wall portion 45 is composed of a plate-shaped member 30A of the assembly 40 2, in combination with the plate-like member 30C of the assembly 40 3. Partition 14C in a wall portion 45 is composed of a plate-shaped member 30A of the assembly 40 3, in combination with the plate-like member 30C of the assembly 40 4. The partitions 14D, 14E, and 14F are also configured by combining the plate-shaped members 30 of each assembly 40 in the same manner.

このような構成によれば、組立体40の一面当たりの板状部材30の重量が軽くなる。従って、一面当たりの板状部材30が一枚の壁部の全体を構成する場合(例えば図5の構成)に比して、組立体40内での重心の偏りを低減できる。更には、一つの組立体40の一面あたりの板状部材30が壁部の半分の厚みになることで、他の組立体40がもう半分の厚みを補うために板状部材30を有することになる。この場合、他の組立体40は、図5の構成では板状部材30を有していなかった位置に、半分の厚みの板状部材30を有することになる。すなわち、他の組立体40の面の数が増える。このように面の数が増えると、その分、組立体40内での重心の偏りを更に低減できる。従って、組立体を搬送するときに当該組立体のバランスが良くなる。例えば、図5に示す構成では、組立体40,40はX軸方向のうち正側のみに中仕切り14一枚分の厚さを有する板状部材30Aを有していた。従って、組立体40,40は、X軸方向正側の面には重たい板状部材30Aを有する反面、X軸方向負側の面には何も設けられていない。従って、搬送時に吊り下げを行った場合、組立体40,40はX軸方向正側に重心が偏る。一方、図7に示す組立体40,40はX軸方向の両側に、中仕切り14の半分の厚さの板状部材30A,30Cを有している。すなわち、一面あたりの板状部材30の重量を軽くし、当該軽くなった板状部材30をX軸方向の両側に配置することができる。従って、組立体40,40を搬送するときに当該組立体のバランスが良くなる。 With such a configuration, the weight of the plate member 30 per one surface of the assembly 40 is reduced. Therefore, the deviation of the center of gravity in the assembly 40 can be reduced as compared to the case where the plate-shaped member 30 per one surface constitutes the entire wall portion (for example, the configuration of FIG. 5). Furthermore, since the plate-shaped member 30 per surface of one assembly 40 has a thickness half that of the wall portion, the other assembly 40 has the plate-shaped member 30 to supplement the thickness of the other half. Become. In this case, the other assembly 40 has the plate-shaped member 30 having a half thickness at the position where the plate-shaped member 30 was not provided in the configuration of FIG. That is, the number of surfaces of the other assembly 40 increases. By increasing the number of surfaces in this manner, the deviation of the center of gravity in the assembly 40 can be further reduced. Therefore, the balance of the assembly is improved when the assembly is transported. For example, in the configuration shown in FIG. 5, the assemblies 40 2 and 40 3 have the plate-shaped member 30A having the thickness of one partition 14 only on the positive side in the X-axis direction. Therefore, while the assemblies 40 2 and 40 3 have the heavy plate-shaped member 30A on the surface on the X axis direction positive side, nothing is provided on the surface on the X axis direction negative side. Therefore, when suspended during transportation, the centers of gravity of the assemblies 40 2 and 40 3 are biased to the positive side in the X-axis direction. On the other hand, the assemblies 40 2 and 40 3 shown in FIG. 7 have plate-shaped members 30A and 30C having a thickness half that of the partition 14 on both sides in the X-axis direction. That is, the weight of the plate-shaped member 30 per surface can be reduced, and the reduced plate-shaped member 30 can be arranged on both sides in the X-axis direction. Therefore, when the assemblies 40 2 and 40 3 are transported, the balance of the assemblies is improved.

また、図8及び図9に示すような構成を採用してもよい。図8及び図9に示す構成では、一の組立体50の板状部材51と、他の組立体50の板状部材51との間には隙間が形成され、当該隙間には充填材52が充填されている。具体的には、組立体50は、四方に板状部材51を有する。また、組立体50は板状部材51で取り囲まれる空間(収納空間となる空間)に足場53を有している。なお、板状部材51は、鉄筋コンクリートで構成されていてもよく、鉄等の金属製の板部材で構成されていてもよい。   Moreover, you may employ | adopt the structure as shown in FIG. 8 and FIG. In the configurations shown in FIGS. 8 and 9, a gap is formed between the plate-shaped member 51 of one assembly 50 and the plate-shaped member 51 of the other assembly 50, and the filler 52 is placed in the gap. It is filled. Specifically, the assembly 50 has plate-shaped members 51 on all sides. Further, the assembly 50 has a scaffold 53 in a space surrounded by the plate member 51 (a space serving as a storage space). The plate member 51 may be made of reinforced concrete or may be made of a metal plate member such as iron.

図9に示すように、一の組立体50の板状部材51は、他の組立体50の板状部材51と対向すると共に、隙間を形成するように配置される。当該隙間に充填材52が充填されて硬化する。充填材52として、コンクリート等が採用される。これによって、一対の板状部材51及び硬化した充填材52によって壁部55が形成される。なお、組立体50の板状部材51のうち、足場53を挟んで互いに対向するものは、連結棒54で互いに連結されてよい。これにより、充填材52を充填する前の板状部材51を支持することができる。以上により、組立体50の板状部材51を充填材52の型枠のように機能させることができるため、型枠を構築する時間を短縮することができる。   As shown in FIG. 9, the plate-shaped member 51 of one assembly 50 faces the plate-shaped member 51 of the other assembly 50 and is arranged so as to form a gap. The gap 52 is filled with the filler 52 and cured. Concrete or the like is adopted as the filler 52. As a result, the wall 55 is formed by the pair of plate-shaped members 51 and the cured filler 52. Note that, among the plate-shaped members 51 of the assembly 50, those that face each other with the scaffold 53 interposed therebetween may be connected to each other by a connecting rod 54. Thereby, the plate-shaped member 51 before being filled with the filler 52 can be supported. As described above, since the plate-shaped member 51 of the assembly 50 can function like the mold of the filler 52, it is possible to shorten the time for constructing the mold.

上述の実施形態及び変形例では、複数の面を有する組立体を配置することによって壁部を構成していた。これに代えて、一枚の板状部材を壁部に対応する位置に配置してもよい。また、一枚の板状部材は一枚あたりの壁部全体を構成するものであってもよいが、板状部材は、壁部の一部分を構成してよい。このような構成によれば、板状部材は壁部の一部分を構成するものであるため、一枚あたりの壁部全体を構成するものに比べ、重量が軽く、設置等の作業を行いやすくなる。   In the above-described embodiment and modification, the wall portion is configured by disposing the assembly having the plurality of surfaces. Instead of this, one plate-shaped member may be arranged at a position corresponding to the wall portion. Further, one plate-shaped member may constitute the entire wall portion per sheet, but the plate-shaped member may constitute a part of the wall portion. According to such a configuration, since the plate-like member constitutes a part of the wall portion, the weight is lighter than that of the whole wall portion per sheet, and the work such as installation becomes easier. ..

具体的には、前述の図8及び図9に示す構成において、板状部材51を組立体50の状態で配置するのではなく、他の部材から独立した一枚の板状部材51として配置してよい。このような形態では、板状部材51は、壁部55の厚さ方向における一部分を構成することになる。このような構成によれば、搬送するときの重量が軽くなる、という効果が得られる。なお、収容空間の四方の板状部材51が配置された後に、収容空間内に足場53が構築されてよい。   Specifically, in the configuration shown in FIG. 8 and FIG. 9 described above, the plate member 51 is not arranged in the state of the assembly 50, but is arranged as a single plate member 51 independent of other members. You may. In such a form, the plate member 51 constitutes a part of the wall portion 55 in the thickness direction. According to such a configuration, it is possible to obtain an effect that the weight for transportation is reduced. Note that the scaffolds 53 may be constructed in the accommodation space after the plate-shaped members 51 on the four sides of the accommodation space are arranged.

また、壁部55は、厚さ方向に対向する複数の板状部材51を含んで構成され、板状部材51同士の間の隙間には、充填材52が充填される。これにより、板状部材51を充填材52の型枠のように機能させることができるため、型枠を構築する時間を短縮することができる。   The wall 55 is configured to include a plurality of plate-shaped members 51 facing each other in the thickness direction, and the gap between the plate-shaped members 51 is filled with the filler 52. This allows the plate-like member 51 to function like a mold for the filler 52, and thus the time for constructing the mold can be shortened.

また、図10に示すように、板状部材61は、壁部65の高さ方向における一部分を構成してよい。図10に示す例では、壁部が高さ方向に複数枚に分割された状態の板状部材61が用いられる。板状部材61は内部に鉄筋63が複数配置されており、横方向の端面及び下端面からも鉄筋63が露出している。板状部材61は、上方に向かって積み上げられる。板状部材61が交差するコーナー部分では、鉄筋63が互いに交差した状態となる。当該コーナー部分に対してモルタル等が充填されることで継手部64が形成される。以上のように、板状部材61が壁部65の高さ方向における一部分を構成することにより、搬送するときの重量が軽くなるという効果を得ることができる。   Further, as shown in FIG. 10, the plate member 61 may form a part of the wall portion 65 in the height direction. In the example shown in FIG. 10, the plate member 61 in which the wall portion is divided into a plurality of pieces in the height direction is used. A plurality of reinforcing bars 63 are arranged inside the plate-shaped member 61, and the reinforcing bars 63 are also exposed from the end face and the lower end face in the lateral direction. The plate-shaped members 61 are stacked upward. At the corner portions where the plate-shaped members 61 intersect, the reinforcing bars 63 intersect each other. The joint portion 64 is formed by filling the corner portion with mortar or the like. As described above, since the plate-shaped member 61 constitutes a part of the wall portion 65 in the height direction, it is possible to obtain the effect of reducing the weight of the transportation.

また、図11に示すように、板状部材71は、壁部75の横方向における一部分を構成してよい。図11に示す例では、壁部75の横方向における一部分として構成された板状部材71が用いられる。板状部材71は内部に鉄筋73が複数配置されており、横方向の端面からも鉄筋73が露出している。板状部材71は、壁部75における横方向の中央位置に配置される。板状部材71が交差するコーナー部分では、鉄筋73が互いに交差した状態となる。当該コーナー部分では鉄筋を指示する継手部74が形成される。また、継手部74と板状部材71との間もモルタル等を充填することによって充填部72が形成される。以上のように、板状部材71が壁部75の横方向における一部分を構成することにより、搬送するときの重量が軽くなるという効果、及び下部から順に組み立てられるため組立時のバランスが良くなるという効果を得ることができる。   Further, as shown in FIG. 11, the plate member 71 may constitute a part of the wall portion 75 in the lateral direction. In the example shown in FIG. 11, the plate member 71 configured as a part of the wall portion 75 in the lateral direction is used. A plurality of reinforcing bars 73 are arranged inside the plate-shaped member 71, and the reinforcing bars 73 are also exposed from the end faces in the lateral direction. The plate-shaped member 71 is arranged at a central position in the lateral direction of the wall portion 75. At the corners where the plate members 71 intersect, the reinforcing bars 73 intersect each other. At the corner portion, a joint portion 74 that indicates a reinforcing bar is formed. The space between the joint portion 74 and the plate member 71 is also filled with mortar or the like to form the filling portion 72. As described above, since the plate-shaped member 71 constitutes a part of the wall portion 75 in the lateral direction, the effect of reducing the weight during transportation and the fact that the parts are assembled in order from the bottom improves the balance during assembly. The effect can be obtained.

10…コンクリートピット、12…側壁(壁部)、14…中仕切り(壁部)、26…ポーラス層、30,51,61,71…板状部材、40,50…組立体、45,55,65,75…壁部、100…放射性廃棄物埋設施設。   10 ... Concrete pit, 12 ... Side wall (wall part), 14 ... Middle partition (wall part), 26 ... Porous layer, 30, 51, 61, 71 ... Plate member, 40, 50 ... Assembly, 45, 55, 65, 75 ... Walls, 100 ... Radioactive waste burial facility.

Claims (4)

放射性廃棄物埋設施設のコンクリートピットの製造方法であって、
前記コンクリートピットを構成する少なくとも一部の壁部を形成する壁部形成工程は、当該壁部の設置位置に板状部材を配置する板状部材配置工程を含み、
前記板状部材配置工程においては、互いに交差する少なくとも二面を有する組立体を配置し、
前記組立体は、少なくとも一面に、前記壁部の前記設置位置に配置される前記板状部材を含み、
前記組立体の少なくとも一面に、細孔を有するポーラス層を含む、放射性廃棄物埋設施設のコンクリートピットの製造方法。
A method for manufacturing a concrete pit of a radioactive waste burial facility,
Wall forming step of forming at least part of a wall portion constituting the concrete pit, seen including a plate-like member disposing step of disposing the plate member to the installation position of the wall portion,
In the plate member arranging step, an assembly having at least two surfaces intersecting with each other is arranged,
The assembly includes, on at least one surface, the plate-shaped member arranged at the installation position of the wall portion,
A method of manufacturing a concrete pit of a radioactive waste burial facility, comprising a porous layer having pores on at least one surface of the assembly .
前記壁部は一の組立体の前記板状部材と、他の組立体の前記板状部材の組み合わせによって構成される、請求項1に記載の放射性廃棄物埋設施設のコンクリートピットの製造方法。 The method for manufacturing a concrete pit of a radioactive waste burial facility according to claim 1 , wherein the wall portion is configured by a combination of the plate member of one assembly and the plate member of another assembly. 前記一の組立体の前記板状部材と、前記他の組立体の前記板状部材との間には隙間が形成され、当該隙間には充填材が充填される、請求項2に記載の放射性廃棄物埋設施設のコンクリートピットの製造方法。 The radioactive substance according to claim 2 , wherein a gap is formed between the plate-shaped member of the one assembly and the plate-shaped member of the other assembly, and the gap is filled with a filler. Method for manufacturing concrete pits in waste burial facilities. 放射性廃棄物埋設施設のコンクリートピットであって、
前記コンクリートピットを構成する少なくとも一部の壁部は、板状部材を含んで構成され
前記コンクリートピットは、互いに交差する少なくとも二面を有する組立体を備え、
前記組立体は、少なくとも一面に、前記壁部に含まれる前記板状部材を含み、
前記組立体の少なくとも一面に、細孔を有するポーラス層を含む、放射性廃棄物埋設施設のコンクリートピット。
A concrete pit of a radioactive waste burial facility,
At least a part of the wall portion constituting the concrete pit is configured to include a plate-shaped member ,
The concrete pit comprises an assembly having at least two sides intersecting each other,
The assembly includes, on at least one surface thereof, the plate-shaped member included in the wall portion,
A concrete pit for a radioactive waste burial facility comprising a porous layer having pores on at least one side of the assembly .
JP2016211858A 2016-10-28 2016-10-28 Method for manufacturing concrete pit of radioactive waste burial facility and concrete pit of radioactive waste burial facility Expired - Fee Related JP6694367B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016211858A JP6694367B2 (en) 2016-10-28 2016-10-28 Method for manufacturing concrete pit of radioactive waste burial facility and concrete pit of radioactive waste burial facility

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016211858A JP6694367B2 (en) 2016-10-28 2016-10-28 Method for manufacturing concrete pit of radioactive waste burial facility and concrete pit of radioactive waste burial facility

Publications (2)

Publication Number Publication Date
JP2018072142A JP2018072142A (en) 2018-05-10
JP6694367B2 true JP6694367B2 (en) 2020-05-13

Family

ID=62114131

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016211858A Expired - Fee Related JP6694367B2 (en) 2016-10-28 2016-10-28 Method for manufacturing concrete pit of radioactive waste burial facility and concrete pit of radioactive waste burial facility

Country Status (1)

Country Link
JP (1) JP6694367B2 (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0631884B2 (en) * 1985-07-31 1994-04-27 清水建設株式会社 Radioactive waste closed equipment with double structure
US4950105A (en) * 1989-03-30 1990-08-21 Westinghouse Electric Corp. Inspectable vault system for the disposal of radioactive waste having a liquid collection system
JP3772646B2 (en) * 2000-06-15 2006-05-10 株式会社大林組 Construction method of radioactive waste disposal site
JP5758733B2 (en) * 2011-07-29 2015-08-05 大成建設株式会社 Temporary storage of radioactive material-containing soil
JP6238049B2 (en) * 2013-08-09 2017-11-29 清水建設株式会社 Radioactive waste disposal facility

Also Published As

Publication number Publication date
JP2018072142A (en) 2018-05-10

Similar Documents

Publication Publication Date Title
KR101584070B1 (en) Loop steel bottom mounted precast bridge deck module
JP6252835B2 (en) Box culvert and its construction method
KR101570938B1 (en) Method for constructing dam using steel pipe pile and precast concrete block
JP7200048B2 (en) pile foundation structure
GB1600045A (en) Structure made of pre-fabricated elements
ES2408238B1 (en) CONSTRUCTION SYSTEM
JP6694367B2 (en) Method for manufacturing concrete pit of radioactive waste burial facility and concrete pit of radioactive waste burial facility
JP6767864B2 (en) How to build the structure inside the tunnel and the structure inside the tunnel
ES2246667B1 (en) METHOD OF MANUFACTURE OF PREFABRICATED WALL SANDWICH TYPE OF REINFORCED CONCRETE CONCRETE WITH EXPANDED POLYSTYRENE AND WALL OBTAINED BY SUCH METHOD.
JPH08302808A (en) How to join large PC wall slabs
JP2008190232A (en) Exterior foundation unit, exterior foundation structure, and construction method of exterior foundation
JPH11107293A (en) Foundation structure of building, foundation construction method, and block for foundation
JP2016098479A (en) Precast concrete member used for constructing foundation, and foundation construction method
JP4699185B2 (en) Seismic wall and its construction method
JP6816941B2 (en) Foundation structure of seismic isolated building
JP6255607B2 (en) Foundation construction method
JPH0813626A (en) Joining method of precast concrete boards and joining structure
JP3677834B2 (en) Structure of connecting part of reinforced concrete basement building unit
JP2008095385A (en) Ditch cover mounting structure
JP2010265596A (en) Construction method for structure
JP7027861B2 (en) Foundation structure of the building
JP2019138085A (en) Compartment structure and construction method of the same
JP2022033211A (en) Building foundation structure and its construction method
KR102050804B1 (en) Block assembly for beam construction and construction method of beam using the same
KR200433699Y1 (en) Reinforcement retaining wall

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20190304

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20200108

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20200114

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20200313

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20200414

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20200417

R150 Certificate of patent or registration of utility model

Ref document number: 6694367

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees