JP6729211B2 - Crane information presentation system - Google Patents
[go: Go Back, main page]

JP6729211B2 - Crane information presentation system - Google Patents

Crane information presentation system Download PDF

Info

Publication number
JP6729211B2
JP6729211B2 JP2016174368A JP2016174368A JP6729211B2 JP 6729211 B2 JP6729211 B2 JP 6729211B2 JP 2016174368 A JP2016174368 A JP 2016174368A JP 2016174368 A JP2016174368 A JP 2016174368A JP 6729211 B2 JP6729211 B2 JP 6729211B2
Authority
JP
Japan
Prior art keywords
sheave
bending
stretching
load
wire rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2016174368A
Other languages
Japanese (ja)
Other versions
JP2018039603A (en
Inventor
孝昌 平手
孝昌 平手
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kobelco Construction Machinery Co Ltd
Original Assignee
Kobelco Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kobelco Construction Machinery Co Ltd filed Critical Kobelco Construction Machinery Co Ltd
Priority to JP2016174368A priority Critical patent/JP6729211B2/en
Publication of JP2018039603A publication Critical patent/JP2018039603A/en
Application granted granted Critical
Publication of JP6729211B2 publication Critical patent/JP6729211B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Control And Safety Of Cranes (AREA)

Description

本発明は、クレーンの情報提示システムに関する。 The present invention relates to a crane information presentation system.

クレーンは、吊荷の巻き上げ及び巻下を行うワイヤーロープや、ブーム等の起伏部材を起伏させるためのワイヤーロープを備えている。これらのワイヤーロープは、クレーン作業に伴う負荷がかかることにより劣化する。したがって、ワイヤーロープの劣化を管理し、交換時期をユーザに把握させることが望ましい。 The crane includes a wire rope for hoisting and unwinding a suspended load, and a wire rope for hoisting a hoisting member such as a boom. These wire ropes deteriorate due to the load associated with crane work. Therefore, it is desirable to manage the deterioration of the wire rope and let the user know when to replace it.

特許文献1は、クレーンの巻上ウインチのドラムの回転量を検出し、検出した回転量からドラムに残っているロープの巻層及び巻列を算出し、算出したロープの巻層及び巻列の数を表示部に表示するシステムを開示する。 Patent Document 1 detects the rotation amount of a drum of a hoisting winch of a crane, calculates the winding layer and winding train of the rope remaining on the drum from the detected rotation amount, and calculates the winding layer and winding train of the calculated rope. A system for displaying a number on a display unit is disclosed.

特許文献2は、巻上ウインチドラムに巻かれたロープの巻き取り及び繰り出しを検出する第1の検出器と、ロープの移動量を検出する第2の検出器との検出信号から、作業前の揚程特性を算出して記憶回路に登録する。そして、特許文献2は、作業中に、第1の検出器からの検出信号に対応する揚程を記憶回路から読み出し、表示器に表示する技術を開示する。 Japanese Patent Application Laid-Open No. 2004-242242 discloses a detection signal from a first detector that detects the winding and unwinding of a rope wound around a hoisting winch drum and a second detector that detects the movement amount of the rope, before the work. The lift characteristic is calculated and registered in the memory circuit. Then, Patent Document 2 discloses a technique in which, during the operation, the lift corresponding to the detection signal from the first detector is read from the storage circuit and displayed on the display.

特許文献3は、吊ロープの繰り出し位置がドラム外周に接する層から何番目の層に当たるかを示す巻層番号と、吊ロープを繰り出している列がドラム端部から何番目に当たるかを示す列番号とを考慮に入れて、吊ロープの移動量を求め、作業具またはフックの深度を求める技術を開示する。 Patent Document 3 discloses a winding layer number indicating which position of the suspension rope is paid out from the layer in contact with the outer circumference of the drum, and a column number indicating the number of the line where the hanging rope is paid out from the end of the drum. A technique for determining the amount of movement of the suspension rope and determining the depth of the work implement or the hook will be disclosed in consideration of and.

特開平11−240689号公報JP-A-11-240689 特開平8−192991号公報JP-A-8-192991 特開平4−38394号公報JP-A-4-38394

しかし、ワイヤーロープの交換時期を判断するための指針となる情報を提示する従来の技術は存在しない。そのため、前述の従来技術では、ワイヤーロープをウインチドラムに装着してからの経過時間、或いはクレーンの稼働時間が、規定の時間に達した場合、一律にワイヤーロープの交換時期が到来したと判断せざるを得なかった。 However, there is no conventional technique that presents information that serves as a guide for determining when to replace the wire rope. Therefore, in the above-mentioned conventional technique, if the elapsed time after the wire rope is attached to the winch drum, or the operating time of the crane reaches the specified time, it is determined that it is time to replace the wire rope. I had no choice.

したがって、実際には交換を要するほどワイヤーロープが劣化していないにも拘わらず、早期にワイヤーロープが交換され、経済的負担が増大するという問題があった。逆に、ワイヤーロープが劣化しているにも拘わらず、ワイヤーロープが交換されず、安全性に欠けるという問題があった。 Therefore, although the wire rope is not deteriorated so much that it actually needs to be replaced, there is a problem that the wire rope is replaced early and the economic burden increases. On the contrary, there is a problem in that the wire rope is not exchanged even though the wire rope is deteriorated and the safety is poor.

また、クレーンでは、吊ロープや起伏ロープといった複数のワイヤーロープがあり、それぞれ、使用時間が異なっており、劣化の度合いが異なっているにも拘わらず、一律に交換されるという問題もあった。 In addition, the crane has a plurality of wire ropes such as a hanging rope and a undulating rope, and each has a problem that they are uniformly replaced despite different use times and different degrees of deterioration.

本発明の目的は、ワイヤーロープの交換時期を適切に判断するための指針となる情報を提示する情報提示システムを提供することである。 An object of the present invention is to provide an information presentation system that presents information that serves as a guideline for appropriately determining the replacement time of a wire rope.

本発明の一態様に係る情報提示システムは、少なくとも1つのシーブを介して対象物を吊り下げるワイヤーロープを巻き取るウインチを備えたクレーンにおいて、前記ワイヤーロープに関する情報を提示する情報提示システムであって、前記ワイヤーロープにかかる負荷の指標値である負荷指標値を算出する負荷算出部と、前記ワイヤーロープを複数の区間に区分したときの各区間における前記シーブに対する前記ワイヤーロープの通過長が基準値を超えた回数である曲げ伸ばし回数を、前記算出された負荷指標値に応じてカウントするカウント部と、前記カウント部によるカウント結果に基づいて、前記負荷指標値に応じた前記区間毎の曲げ伸ばし回数を示す統計情報を生成する統計情報生成部と、前記生成された前記統計情報を提示する提示部とを備え、前記カウント部は、ある区間が前記シーブを通過する途中で前記ワイヤーロープの巻き方向が切り替わって当該区間のシーブに対するトータルの通過長が前記基準値を超えた場合、当該区間に対するカウントを行わない。 An information presenting system according to an aspect of the present invention is a crane that includes a winch that winds a wire rope that suspends an object through at least one sheave, and is an information presenting system that presents information about the wire rope. A load calculation unit that calculates a load index value that is an index value of a load applied to the wire rope, and a passage length of the wire rope with respect to the sheave in each section when the wire rope is divided into a plurality of sections is a reference value. The number of times of bending and stretching, which is the number of times over, counting unit that counts according to the calculated load index value, and based on the count result by the counting unit, bending and stretching for each section according to the load index value. a statistical information generating unit that generates statistical information indicating the number of times, e Bei a presentation unit for presenting the statistical information the generated, the counting unit, of the wire rope in the middle of the certain section to pass through the sieve When the winding direction is switched and the total passing length of the sheave in the section exceeds the reference value, the section is not counted.

本態様によれば、シーブに対するワイヤーロープの区間毎の通過長が、基準値を超えた回数である曲げ伸ばし回数であって、負荷指標値に応じた曲げ伸ばし回数がカウントされる。そして、カウント結果に基づいて、負荷指標値に応じた区間毎の曲げ伸ばし回数を示す統計情報が生成され、生成された統計情報が提示される。 According to this aspect, the number of times the wire rope passes through the sheave for each section is the number of times of bending and stretching which is the number of times exceeding the reference value, and the number of times of bending and stretching according to the load index value is counted. Then, based on the count result, statistical information indicating the number of times of bending and stretching for each section according to the load index value is generated, and the generated statistical information is presented.

ワイヤーロープは、シーブを通過するとき、外側が引っ張られ且つ内側が収縮されてシーブの円弧に沿って曲げ伸ばされた後、曲げ伸ばしが解放される。このように、曲げ伸ばしと曲げ伸ばしの解放とが連続すると、ワイヤーロープの金属疲労が進行する。したがって、ワイヤーロープの区間毎に曲げ伸ばし回数を負荷指標値に応じてカウントすることで得られる統計情報は、ワイヤーロープがどの区間がどの程度劣化したかを示す。 When the wire rope passes through the sheave, the outside is pulled and the inside is contracted to bend and extend along the arc of the sheave, and then the bend and extension are released. In this way, when bending and stretching and releasing of bending and stretching continue, metal fatigue of the wire rope progresses. Therefore, the statistical information obtained by counting the number of times of bending and stretching for each section of the wire rope according to the load index value indicates which section of the wire rope has deteriorated and to what extent.

そのため、ユーザは、統計情報に基づいて、ワイヤーロープの疲労の偏りを把握し、ワイヤーロープの適切な交換時期を判断できる。その結果、本態様は、ワイヤーロープが劣化していないにも拘わらず、ワイヤーロープの交換を強制する事態を回避でき、経済的負担の減少及び資源の効率的な活用を図ることができる。また、本態様は、劣化したワイヤーロープの使用が継続されることが防止され、安全性を確保できる。 Therefore, the user can grasp the bias of the fatigue of the wire rope based on the statistical information, and determine the appropriate time to replace the wire rope. As a result, in this aspect, it is possible to avoid the situation in which the wire rope is forced to be replaced even though the wire rope is not deteriorated, and it is possible to reduce the economic burden and efficiently use resources. Further, in this aspect, it is possible to prevent the continued use of the deteriorated wire rope and ensure safety.

また、この統計情報は、試験機による実験データではなく実際のクレーンのデータから生成された情報であるため、信頼性の高い統計情報を提供できる。 In addition, since this statistical information is information generated from actual crane data, not experimental data obtained by a test machine, highly reliable statistical information can be provided.

上記態様において、前記統計情報生成部は、前記算出された負荷指標値が予め定められた複数の負荷区分のうち、いずれの負荷区分に属するかを特定し、前記特定した負荷区分に応じた前記区間毎の前記曲げ伸ばし回数を示す情報を前記統計情報として生成してもよい。 In the above aspect, the statistical information generation unit identifies which load category the calculated load index value belongs to among a plurality of predetermined load categories, and which corresponds to the identified load category. Information indicating the number of times of bending and stretching for each section may be generated as the statistical information.

本態様では、負荷指標値が負荷区分に区分けされた区間毎の曲げ伸ばし回数を示す統計情報がユーザに提示されるので、負荷区分と区間とに応じた曲げ伸ばし回数を例えば表形式で示す統計情報をユーザに提示できる。その結果、ユーザにとって理解容易な統計情報を提示できる。 In this aspect, since the statistical information indicating the number of bending and stretching for each section in which the load index value is divided into the load sections is presented to the user, the statistics indicating the number of bending and stretching according to the load section and the section in, for example, a table format. Information can be presented to the user. As a result, it is possible to present statistical information that is easy for the user to understand.

上記態様において、前記ワイヤーロープは、前記クレーンの起伏部材に取り付けられ、
前記ワイヤーロープは複数のシーブに掛け回され、
前記情報提示システムは、
前記作業装置の姿勢を検出する姿勢検出部と、
前記ウインチから繰り出された前記ワイヤーロープの長さの指標値である繰出長指標値を算出する繰出長算出部とを更に備え、
前記カウント部は、前記算出された繰出長指標値と前記検出された姿勢と前記シーブの掛数とに基づいて、前記ワイヤーロープ上での各シーブの位置を算出し、各シーブに対する前記区間毎の通過長を算出してもよい。
In the above aspect, the wire rope is attached to the undulating member of the crane,
The wire rope is hung around multiple sheaves,
The information presentation system,
A posture detection unit that detects the posture of the working device,
Further comprising a payout length calculation unit for calculating a payout length index value that is an index value of the length of the wire rope paid out from the winch,
The counting unit calculates the position of each sheave on the wire rope based on the calculated feeding length index value, the detected posture, and the number of sheaves of the sheave, and for each section for each sheave. May be calculated.

本態様によれば、繰出長指標値と起伏部材の姿勢と掛数とに基づいてシーブの位置が算出されている。ここで、ウインチから繰り出されるワイヤーロープ上でのシーブの位置は、ワイヤーロープの繰出長と、起伏部材の姿勢と、掛数とが分かれば一意的に特定できる。よって、本態様は、ワイヤーロープ上でのシーブの位置を正確に算出できる。 According to this aspect, the position of the sheave is calculated based on the feeding length index value, the posture of the undulating member, and the number of hooks. Here, the position of the sheave on the wire rope paid out from the winch can be uniquely specified if the payout length of the wire rope, the posture of the undulating member, and the number of hooks are known. Therefore, in this aspect, the position of the sheave on the wire rope can be accurately calculated.

上記態様において、前記情報提示システムは、情報処理装置と、前記情報処理装置とネットワークを介して接続されたサーバとを備え、
前記情報処理装置は、前記負荷算出部と前記カウント部とを備え、
前記サーバは、前記統計情報生成部を備え、
前記情報処理装置は、前記カウント部によるカウント結果を蓄積し、一定の期間が経過する度に前記蓄積したカウント結果を前記サーバに送信してもよい。
In the above aspect, the information presentation system includes an information processing device and a server connected to the information processing device via a network,
The information processing device includes the load calculation unit and the counting unit,
The server includes the statistical information generation unit,
The information processing apparatus may accumulate the counting result by the counting unit, and transmit the accumulated counting result to the server every time a certain period of time elapses.

本態様によれば、一定の期間が経過する度にカウント結果がサーバに送信されるので、サーバは1つのカウント結果が得られる度に情報処理装置にアクセスする必要がない。そのため、サーバ及び情報処理装置間の通信負荷の軽減を図ることができる。 According to this aspect, since the count result is transmitted to the server every time a certain period of time has passed, the server does not need to access the information processing device every time one count result is obtained. Therefore, the communication load between the server and the information processing device can be reduced.

上記態様において、前記基準値は、前記シーブの円周の少なくとも1/4の値であることが好ましい。 In the above aspect, it is preferable that the reference value is at least ¼ of the circumference of the sheave.

ワイヤーロープは、シーブを通過する時の通過長が僅かであれば、発生する曲げ伸ばしが小さいので、曲げ伸ばし回数としてカウントするのは妥当ではない。本態様は、基準値がシーブの円周の少なくとも1/4に設定されている。そのため、本態様は、ワイヤーロープの通過長が僅かであるにも拘わらず、曲げ伸ばし回数がカウントアップされる事態を回避できる。その結果、本態様は、ワイヤーロープの劣化を精度良く示す曲げ伸ばし回数を算出できる。 If the wire rope has a small passage length when passing through the sheave, the bending and stretching that occurs is small, so it is not appropriate to count it as the number of bending and stretching. In this aspect, the reference value is set to at least 1/4 of the circumference of the sheave. Therefore, in this aspect, it is possible to avoid the situation where the number of times of bending and stretching is counted up even though the length of passage of the wire rope is short. As a result, in this aspect, it is possible to calculate the number of times of bending and stretching, which accurately indicates the deterioration of the wire rope.

本発明によれば、ワイヤーロープの交換時期を適切に判断するための指針となる情報を提示できる。 According to the present invention, it is possible to present information that serves as a guideline for appropriately determining the replacement time of a wire rope.

本発明の実施の形態による情報提示システムが適用されたクレーンの全体構成を示す図である。It is a figure which shows the whole structure of the crane to which the information presentation system by embodiment of this invention was applied. 情報提示システムの概略的な全体構成を示す図である。It is a figure which shows the schematic whole structure of an information presentation system. 図2に示す情報処理装置、サーバ、及び端末の構成を示す図である。It is a figure which shows the structure of the information processing apparatus, server, and terminal shown in FIG. シーブの掛数と巻上速度との関係を示す図である。It is a figure which shows the relationship between the number of sheaves and the hoisting speed. シーブの掛数と巻上速度との関係を示す図である。It is a figure which shows the relationship between the number of sheaves and the hoisting speed. 曲げ伸ばし回数がカウントされるケースの第1例を示した図である。It is a figure showing the 1st example of the case where the number of times of bending and stretching is counted. 曲げ伸ばし回数がカウントされるケースの第2例を示した図である。It is a figure showing the 2nd example of the case where the number of times of bending and stretching is counted. 曲げ伸ばし回数がカウントされないケースを示した図である。It is a figure showing the case where the number of times of bending and stretching is not counted. 吊ロープと各シーブとの位置関係を示す図である。It is a figure which shows the positional relationship of a suspension rope and each sheave. 吊ロープと各シーブとの位置関係を示す図である。It is a figure which shows the positional relationship of a suspension rope and each sheave. 通過長が算出される様子を示す図である。It is a figure which shows a mode that a passage length is calculated. 統計情報が登録された統計情報テーブルのデータ構造を示す図である。It is a figure which shows the data structure of the statistical information table with which the statistical information was registered. 曲げ伸ばし回数の分布図の第一例を示す図である。It is a figure which shows the 1st example of a distribution map of the number of times of bending and stretching. 曲げ伸ばし回数の分布図の第二例を示す図である。It is a figure which shows the 2nd example of a distribution map of the number of times of bending and stretching. 曲げ伸ばし回数の分布図の第三例を示す図である。It is a figure which shows the 3rd example of the distribution chart of the number of times of bending and stretching. 建方作業の説明図である。It is an explanatory view of erection work. 基礎土木作業の説明図である。It is an explanatory view of basic civil engineering work. 情報提示システムの処理を示すフローチャートである。It is a flowchart which shows the process of an information presentation system. データロガーによる日報データ及び月報データの生成処理を示すフローチャートである。It is a flow chart which shows generation processing of daily report data and monthly report data by a data logger. 変形例1にかかる情報提示システム1の構成の一例を示すブロック図である。9 is a block diagram showing an example of a configuration of an information presentation system 1 according to Modification 1. FIG. 吊ロープの状態履歴が蓄積された状態履歴テーブルのデータ構造の一例を示す図である。It is a figure which shows an example of the data structure of the state history table in which the state history of the hanging rope was accumulated. 曲げ伸ばし履歴が登録された曲げ伸ばし履歴テーブルのデータ構造を示す図である。It is a figure which shows the data structure of the bending and stretching history table with which the bending and stretching history was registered. 2次元の曲げ伸ばし回数の分布図の一例を示す図である。It is a figure which shows an example of a distribution chart of the number of times of two-dimensional bending and stretching.

図1は、本発明の実施の形態による情報提示システム1が適用されたクレーン2の全体構成を示す図である。クレーン2は、自走可能な下部走行体40と、その下部走行体40上に縦軸回りに旋回可能となるように搭載された上部旋回体46とを備える。 FIG. 1 is a diagram showing an overall configuration of a crane 2 to which an information presentation system 1 according to an embodiment of the present invention is applied. The crane 2 is provided with a self-propelled lower traveling unit 40 and an upper revolving unit 46 mounted on the lower traveling unit 40 so as to be rotatable around the vertical axis.

上部旋回体46には、クレーン作業を行うための作業装置50が設けられている。この作業装置50は、起伏部材としてのブーム51と、マスト52と、ガントリ53と、マスト側スプレッダ55と、ガントリ側スプレッダ56と、巻上ウインチ61と、起伏ウインチ62と、フック装置64と、吊ロープ66と、起伏ロープ67と、ガイライン68と、を有する。 The upper swing body 46 is provided with a working device 50 for performing a crane work. The working device 50 includes a boom 51 as a hoisting member, a mast 52, a gantry 53, a mast side spreader 55, a gantry side spreader 56, a hoisting winch 61, a hoisting winch 62, and a hook device 64. The hanging rope 66, the undulating rope 67, and the guy line 68 are included.

ブーム51は、起伏可能となるように上部旋回体46の前部に取り付けられている。ブーム51の先端の前方側にはトップシーブ51aが設けられている。ブーム51の先端の後方側にはアイドラシーブ51bが設けられている。 The boom 51 is attached to the front part of the upper swing body 46 so that it can be raised and lowered. A top sheave 51a is provided on the front side of the tip of the boom 51. An idler sheave 51b is provided on the rear side of the tip of the boom 51.

マスト52は、上部旋回体46においてブーム51の後方の位置に設けられている。マスト52は、その下端部を支点として回動可能となるように設けられている。このマスト52の上端部にマスト側スプレッダ55が設けられている。また、マスト52の先端は、ガイライン68を介してブーム51の先端部に接続されている。 The mast 52 is provided at a position behind the boom 51 in the upper swing body 46. The mast 52 is provided so as to be rotatable around its lower end as a fulcrum. A mast side spreader 55 is provided at the upper end of the mast 52. The tip of the mast 52 is connected to the tip of the boom 51 via a guy line 68.

ガントリ53は、上部旋回体46においてマスト52のさらに後方の位置、すなわち上部旋回体46の後部に立設されている。このガントリ53の上端部にガントリ側スプレッダ56が設けられている。 The gantry 53 is erected on the upper swing body 46 at a position further rearward of the mast 52, that is, at a rear portion of the upper swing body 46. A gantry-side spreader 56 is provided on the upper end of the gantry 53.

巻上ウインチ61は、本発明におけるウインチの一例であり、上部旋回体46に搭載されている。巻上ウインチ61は、ワイヤーロープである吊ロープ66が巻かれた巻上ドラム61aを有する。巻上ドラム61aから繰り出された吊ロープ66は、ブーム51の先端へ延び、アイドラシーブ51b及びトップシーブ51aを介してブーム51の先端から垂れ下がる。吊ロープ66の先端にはフック装置64が吊り下げられている。フック装置64は、吊荷100を吊り下げる。フック装置64は図略のフックシーブを備えており、このフックシーブとトップシーブ51aとに吊ロープ66が所定の掛数で掛けられている。 The hoisting winch 61 is an example of a winch according to the present invention, and is mounted on the upper swing body 46. The hoisting winch 61 has a hoisting drum 61a around which a hanging rope 66 which is a wire rope is wound. The suspension rope 66 fed from the hoisting drum 61a extends to the tip of the boom 51, and hangs down from the tip of the boom 51 via the idler sheave 51b and the top sheave 51a. A hook device 64 is suspended at the tip of the suspension rope 66. The hook device 64 suspends the suspended load 100. The hook device 64 includes a hook sheave (not shown), and a hanging rope 66 is hung on the hook sheave and the top sheave 51a with a predetermined number of hooks.

巻上ウインチ61は、巻上ドラム61aを回転させて吊ロープ66の巻き取り及び繰り出すことにより、フック装置64及びフック装置64に吊り下げられた吊荷100の巻上及び巻下を行う。 The hoisting winch 61 performs hoisting and unwinding of the hook device 64 and the suspended load 100 suspended by the hook device 64 by rotating the hoisting drum 61a and winding up and unwinding the hanging rope 66.

起伏ウインチ62は、本発明におけるウインチの別の一例であり、ガントリ53の下部に設けられている。起伏ウインチ62は、ワイヤーロープである起伏ロープ67が巻かれた起伏ドラム62a(ドラムの一例)を有する。起伏ドラム62aから繰り出された起伏ロープ67は、ガントリ側スプレッダ56のシーブとマスト側スプレッダ55のシーブとに掛け回されている。起伏ウインチ62は、起伏ドラム62aを回転させて起伏ロープ67を巻き取ることにより、マスト側スプレッダ55をガントリ側スプレッダ56側へ引き寄せる。これにより、マスト52は、後方へ回動して、ガイライン68を介してブーム51の先端部を後方へ引っ張り、ブーム51を起立させる。また、起伏ウインチ62は、起伏ドラム62aを回転させて起伏ロープ67を繰り出すことにより、マスト側スプレッダ55をガントリ側スプレッダ56から前方へ離反させる。これにより、マスト52は、前方へ回動して、ブーム51を倒伏させる。 The undulating winch 62 is another example of the winch according to the present invention, and is provided below the gantry 53. The undulating winch 62 has an undulating drum 62a (an example of a drum) around which an undulating rope 67 that is a wire rope is wound. The hoisting rope 67 fed from the hoisting drum 62 a is wound around the sheave of the gantry side spreader 56 and the sheave of the mast side spreader 55. The hoisting winch 62 draws the mast side spreader 55 toward the gantry side spreader 56 by rotating the hoisting drum 62a and winding the hoisting rope 67. As a result, the mast 52 rotates rearward, pulls the tip end portion of the boom 51 rearward via the guy line 68, and erects the boom 51. Further, the hoisting winch 62 causes the mast side spreader 55 to be separated from the gantry side spreader 56 forward by rotating the hoisting drum 62 a and feeding the hoisting rope 67. As a result, the mast 52 rotates forward and the boom 51 is laid down.

図4、図5は、シーブの掛数と巻上速度との関係を示す図である。掛数が1回である1本掛けの場合、吊ロープ66はトップシーブ51aを介して直接、フック装置64に取り付けられる。この場合、フック装置64の巻上速度は、巻上ドラム61aの巻上速度V1と同じになる。一方、掛数が5回である5本掛けの場合、吊ロープ66は、3つのトップシーブ51aと2つのフックシーブ51cとの間を交互に往復する。この場合、フック装置64の巻上速度は、巻上ドラム61aの巻上速度V1の1/5になる。 4 and 5 are views showing the relationship between the number of sheaves and the hoisting speed. In the case of a single hanging, in which the number of hangings is one, the hanging rope 66 is directly attached to the hook device 64 via the top sheave 51a. In this case, the hoisting speed of the hook device 64 is the same as the hoisting speed V1 of the hoisting drum 61a. On the other hand, in the case of the five-hanging number of five, the hanging rope 66 alternately reciprocates between the three top sheaves 51a and the two hook sheaves 51c. In this case, the hoisting speed of the hook device 64 is ⅕ of the hoisting speed V1 of the hoisting drum 61a.

図5では、掛数が9回である9本掛けの場合が示されている。この場合、吊ロープ66は、5本のトップシーブ51aと4本のフックシーブ51cとの間を交互に往復する。例えば、安全荷重が6.6tの吊ロープ66を使って、55tの吊荷を吊り上げるためには、55/6.6=8.3なので、最低9回の掛数が必要となる。よって、図5の例では、55tの吊荷を安全に巻き上げることができる。 FIG. 5 shows the case of 9-line multiplication with the number of multiplications being 9. In this case, the suspension rope 66 alternately reciprocates between the five top sheaves 51a and the four hook sheaves 51c. For example, in order to lift a suspended load of 55 tons using the suspension rope 66 with a safety load of 6.6 tons, 55/6.6=8.3, so a minimum of 9 times of suspension is required. Therefore, in the example of FIG. 5, the 55t suspended load can be safely wound up.

本実施形態による情報提示システム1は、以上のようなクレーン2の吊ロープ66及び起伏ロープ67についての交換時期の判断の指針となる情報を提示するものである。図2は、情報提示システム1の概略的な全体構成を示す図である。 The information presentation system 1 according to the present embodiment presents information that serves as a guide for determining the replacement timing of the suspension rope 66 and the undulation rope 67 of the crane 2 as described above. FIG. 2 is a diagram showing a schematic overall configuration of the information presentation system 1.

情報提示システム1は、複数のクレーン2についての情報を取得して提示する。情報提示システム1は、図2に示すように、各クレーン2に搭載された情報処理装置4と、サーバ10と、端末14とを備える。情報処理装置4及びサーバ10間は、例えば、携帯電話網6を介して接続されている。サーバ10及び端末14間は、例えば、インターネット通信網12を介して接続されている。情報処理装置4は、自己が搭載されたクレーン2についての各種情報を取得する。 The information presentation system 1 acquires and presents information about a plurality of cranes 2. As shown in FIG. 2, the information presentation system 1 includes an information processing device 4 mounted on each crane 2, a server 10, and a terminal 14. The information processing device 4 and the server 10 are connected, for example, via a mobile phone network 6. The server 10 and the terminal 14 are connected via, for example, the Internet communication network 12. The information processing device 4 acquires various kinds of information about the crane 2 on which the information processing device 4 is mounted.

図3は、図2に示す情報処理装置4、サーバ10、及び端末14の構成を示す図である。情報処理装置4は、センサ部18と、過負荷防止装置19と、第1コントローラ21と、第2コントローラ22と、ECU(Engine Control Unit)24と、データロガー28とを備える。過負荷防止装置19と、第1コントローラ21と、第2コントローラ22と、ECU24とは、CAN(Control Area Network)バス30を介して相互に通信可能に接続されている。ここでは、CANバス30が採用されているが、車載ネットワークとしてCAN以外のネットワークが採用されるのであれば、そのネットワークの規格に準拠したバスがCANバス30の代わりに採用されてもよい。 FIG. 3 is a diagram showing the configurations of the information processing device 4, the server 10, and the terminal 14 shown in FIG. The information processing device 4 includes a sensor unit 18, an overload prevention device 19, a first controller 21, a second controller 22, an ECU (Engine Control Unit) 24, and a data logger 28. The overload prevention device 19, the first controller 21, the second controller 22, and the ECU 24 are communicatively connected to each other via a CAN (Control Area Network) bus 30. Although the CAN bus 30 is adopted here, if a network other than CAN is adopted as the vehicle-mounted network, a bus complying with the standard of the network may be adopted instead of the CAN bus 30.

センサ部18は、クレーン2の各作動部の動作に関する値を検出する複数のセンサを備える。具体的には、センサ部18は、回転量センサ41と、回転量センサ42と、負荷センサ43と、負荷センサ44と、角度センサ45とを備える。 The sensor unit 18 includes a plurality of sensors that detect values related to the operation of each operating unit of the crane 2. Specifically, the sensor unit 18 includes a rotation amount sensor 41, a rotation amount sensor 42, a load sensor 43, a load sensor 44, and an angle sensor 45.

回転量センサ41は、例えば、近接センサと処理部とを含み、巻上ドラム61aの回転量を所定の制御周期(例えば、数百msec)で検出し、第1コントローラ21に出力する。回転量センサ42は、例えば、近接センサと処理部とを含み、起伏ドラム62aの回転量を制御周期で検出し、第2コントローラ22に出力する。 The rotation amount sensor 41 includes, for example, a proximity sensor and a processing unit, detects the rotation amount of the hoisting drum 61a in a predetermined control cycle (for example, several hundred msec), and outputs it to the first controller 21. The rotation amount sensor 42 includes, for example, a proximity sensor and a processing unit, detects the rotation amount of the undulating drum 62a in a control cycle, and outputs the rotation amount to the second controller 22.

回転量センサ41は、例えば、一対の近接センサを備える。一対の近接センサは、巻上ドラム61aの回転軸と同軸に設けられた歯車の凸部を検出する一対の磁気センサで構成される。一対の近接センサは、歯車の周方向に並んで配置され、検出した歯車の凸部の数に応じたパルスを含むパルス信号を出力する。したがって、回転量センサ41の処理部はこのパルス信号に含まれるパルス数をカウントすることで、巻上ドラム61aの回転量を検知できる。また、一対の近接センサは、歯車の周方向に並んで配置されているので、どちらの近接センサが先にパルス信号を出力したかにより、回転量センサ41の処理部は、巻上ドラム61aの回転方向を検出できる。したがって、回転量センサ41の処理部は、巻上ドラム61aの回転方向をプラス及びマイナスで区別する回転量を算出し、第1コントローラ21に出力すればよい。 The rotation amount sensor 41 includes, for example, a pair of proximity sensors. The pair of proximity sensors is composed of a pair of magnetic sensors that detect a convex portion of a gear that is provided coaxially with the rotating shaft of the hoisting drum 61a. The pair of proximity sensors are arranged side by side in the circumferential direction of the gear, and output a pulse signal including a pulse corresponding to the number of detected convex portions of the gear. Therefore, the processing unit of the rotation amount sensor 41 can detect the rotation amount of the hoisting drum 61a by counting the number of pulses included in this pulse signal. Further, since the pair of proximity sensors are arranged side by side in the circumferential direction of the gear, the processing unit of the rotation amount sensor 41 determines the proximity of the hoisting drum 61a depending on which proximity sensor outputs the pulse signal first. The direction of rotation can be detected. Therefore, the processing unit of the rotation amount sensor 41 may calculate a rotation amount that distinguishes the rotation direction of the hoisting drum 61a by plus and minus, and output the rotation amount to the first controller 21.

以上のことは、回転量センサ42も同じである。なお、回転量センサ41,42としては、ロータリーエンコーダやレゾルバが採用されてもよい。 The above also applies to the rotation amount sensor 42. A rotary encoder or a resolver may be used as the rotation amount sensors 41 and 42.

負荷センサ43は、例えば、ロードセルで構成され、巻上ドラム61aにかかる負荷を制御周期で検出し、検出した負荷を示す負荷データを過負荷防止装置19に出力する。負荷センサ44は、例えば、ロードセルで構成され、起伏ドラム62aにかかる負荷を制御周期で検出し、検出した負荷を示す負荷データを過負荷防止装置19に出力する。 The load sensor 43 is composed of, for example, a load cell, detects a load applied to the hoisting drum 61a in a control cycle, and outputs load data indicating the detected load to the overload prevention device 19. The load sensor 44 is composed of, for example, a load cell, detects a load applied to the undulating drum 62a in a control cycle, and outputs load data indicating the detected load to the overload prevention device 19.

角度センサ45は、ブーム51の姿勢を示すブーム角度を検出し、制御周期で過負荷防止装置19に出力する。詳細には、角度センサ45は、ブーム51の上部旋回体46側の端部であるブームポイントに設けられている。 The angle sensor 45 detects a boom angle indicating the attitude of the boom 51 and outputs the boom angle to the overload prevention device 19 in a control cycle. Specifically, the angle sensor 45 is provided at a boom point, which is an end of the boom 51 on the upper swing body 46 side.

図3の例では、センサ部18と、第1コントローラ21、第2コントローラ22、及び過負荷防止装置19とは専用の信号線を介して接続されているが、これは一例である。センサ部18は、CANバス30に接続されていてもよい。 In the example of FIG. 3, the sensor unit 18, the first controller 21, the second controller 22, and the overload prevention device 19 are connected via a dedicated signal line, but this is an example. The sensor unit 18 may be connected to the CAN bus 30.

過負荷防止装置19は、例えば、マイクロコントローラで構成され、クレーン作業中に作業装置50にかかる負荷が過負荷状態になることを防止する。過負荷防止装置19は、負荷算出部191を備える。負荷算出部191は、負荷センサ43が検出した巻上ドラム61aの負荷データに基づいて、吊ロープ66にかかる実荷重を算出する。そして、過負荷防止装置19は、吊ロープ66の定格荷重に対する、吊ロープ66にかかる実荷重の比率を吊ロープ66の負荷率として算出する。 The overload prevention device 19 is composed of, for example, a microcontroller and prevents the load applied to the work device 50 from being overloaded during crane work. The overload prevention device 19 includes a load calculation unit 191. The load calculator 191 calculates the actual load applied to the suspension rope 66 based on the load data of the hoisting drum 61a detected by the load sensor 43. Then, the overload prevention device 19 calculates the ratio of the actual load applied to the suspension rope 66 to the rated load of the suspension rope 66 as the load factor of the suspension rope 66.

定格荷重は、例えば、現在のブーム51の姿勢を示すブーム角度と、ブーム51に取り付けられているアタッチメントの種類と、吊ロープ66のシーブへの掛数と、作業半径とを用いて算出される。アタッチメントの種類及び掛数は、例えば、ユーザが事前に入力したデータから決定される。作業半径は、例えば、ブーム角度と、ブーム51の全長とから決定される。 The rated load is calculated using, for example, the boom angle indicating the current attitude of the boom 51, the type of attachment attached to the boom 51, the number of hooks of the suspension rope 66 on the sheave, and the working radius. .. The type and number of attachments are determined, for example, from the data previously input by the user. The working radius is determined, for example, from the boom angle and the total length of the boom 51.

同様に、過負荷防止装置19は、負荷センサ44から出力された起伏ドラム62aの負荷データに基づいて、起伏ロープ67にかかる実荷重を算出する。そして、過負荷防止装置19は、起伏ロープ67の定格荷重に対する、起伏ロープ67にかかる実荷重の比率を起伏ロープ67の負荷率として算出する。吊ロープ66及び起伏ロープ67の負荷率は、負荷指標値の一例に相当する。 Similarly, the overload prevention device 19 calculates the actual load applied to the undulating rope 67 based on the load data of the undulating drum 62a output from the load sensor 44. Then, the overload prevention device 19 calculates the ratio of the actual load applied to the undulating rope 67 to the rated load of the undulating rope 67 as the load factor of the undulating rope 67. The load factors of the hanging rope 66 and the undulating rope 67 correspond to an example of load index values.

過負荷防止装置19は、吊ロープ66の負荷率又は起伏ロープ67の負荷率が、所定の負荷率上限値(例えば、105%)を超えたとき、過負荷状態が発生したと判断してクレーン2の稼働を停止させる。なお、過負荷防止装置19は、吊ロープ66の実負荷が吊ロープ66の定格負荷を超えたとき、又は起伏ロープ67の実負荷が起伏ロープ67の定格負荷を超えたとき、過負荷状態が発生したと判断してもよい。 When the load factor of the suspension rope 66 or the load factor of the undulating rope 67 exceeds a predetermined load factor upper limit value (for example, 105%), the overload prevention device 19 determines that an overload condition has occurred and determines that the crane Stop the operation of 2. In addition, when the actual load of the suspension rope 66 exceeds the rated load of the suspension rope 66, or when the actual load of the undulation rope 67 exceeds the rated load of the undulation rope 67, the overload prevention device 19 detects an overload state. It may be determined that it has occurred.

第1コントローラ21は、例えば、マイクロコントローラで構成され、巻上ウインチ61の制御を司る。第1コントローラ21は、繰出長算出部211を備える。 The first controller 21 is composed of, for example, a microcontroller and controls the hoisting winch 61. The first controller 21 includes a payout length calculation unit 211.

繰出長算出部211は、回転量センサ41により検出された回転量から巻上ドラム61aから繰り出されている吊ロープ66の長さである繰出長を算出する。繰出長算出部211は、吊ロープ66の繰出長を制御周期(例えば、数百msec)で算出する。 The payout length calculation unit 211 calculates the payout length, which is the length of the suspension rope 66 paid out from the hoisting drum 61a, from the rotation amount detected by the rotation amount sensor 41. The payout length calculation unit 211 calculates the payout length of the suspension rope 66 in a control cycle (for example, several hundred msec).

ここで、繰出長算出部211は、巻上ドラム61aの回転量と、巻上ドラム61aに巻かれている吊ロープ66の巻層及び巻列の相関関係を示す換算情報を用いて、巻上ドラム61aに残存する吊ロープ66の残存量を算出し、吊ロープ66の全長から算出した残存量を差し引くことで、吊ロープ66の繰出長を算出すればよい。 Here, the payout length calculation unit 211 uses the conversion information indicating the correlation between the rotation amount of the hoisting drum 61a and the winding layers and winding rows of the suspension rope 66 wound on the hoisting drum 61a. The payout length of the hanging rope 66 may be calculated by calculating the remaining amount of the hanging rope 66 remaining on the drum 61a and subtracting the calculated remaining amount from the total length of the hanging rope 66.

第2コントローラ22は、例えば、マイクロコントローラで構成され、起伏ウインチ62の制御を司る。第2コントローラ22は、繰出長算出部221を備える。 The second controller 22 is composed of, for example, a microcontroller, and controls the undulating winch 62. The second controller 22 includes a payout length calculation unit 221.

繰出長算出部221は、回転量センサ42により検出された回転量から起伏ドラム62aから繰り出されている起伏ロープ67の長さである繰出長を算出する。繰出長算出部221は、起伏ロープ67の繰出長を制御周期(例えば、数百msec)で算出する。 The feeding length calculation unit 221 calculates the feeding length, which is the length of the undulating rope 67 fed from the undulating drum 62a, from the rotation amount detected by the rotation amount sensor 42. The feeding length calculation unit 221 calculates the feeding length of the undulating rope 67 in a control cycle (for example, several hundred msec).

ここで、繰出長算出部221は、起伏ドラム62aの回転量と、起伏ドラム62aに巻かれている起伏ロープ67の巻層及び巻列の相関関係を示す換算情報を用いて、起伏ドラム62aに残存する起伏ロープ67の残存量を算出し、起伏ロープ67の全長から算出した残存量を差し引くことで、起伏ロープ67の繰出長を算出すればよい。 Here, the payout length calculation unit 221 uses the conversion information indicating the correlation between the rotation amount of the undulating drum 62a and the winding layer and winding sequence of the undulating rope 67 wound around the undulating drum 62a, to determine the undulating drum 62a. The payout length of the undulating rope 67 may be calculated by calculating the remaining amount of the remaining undulating rope 67 and subtracting the calculated remaining amount from the total length of the undulating rope 67.

ECU24は、例えば、マイクロコントローラで構成され、クレーン2のエンジンの回転数を制御する。 The ECU 24 is composed of, for example, a microcontroller and controls the rotation speed of the engine of the crane 2.

第1コントローラ21は、繰出長算出部211が算出した吊ロープ66の繰出長をCANバス30へ制御周期で出力する。第2コントローラ22は、繰出長算出部221が算出した起伏ロープ67の繰出長をCANバス30へ制御周期で出力する。過負荷防止装置19は、吊ロープ66、起伏ロープ67についての定格荷重と実荷重と負荷率とをCANバス30に制御周期で出力すると共に、ブーム角度をCANバス30に制御周期で出力する。 The first controller 21 outputs the payout length of the suspension rope 66 calculated by the payout length calculation unit 211 to the CAN bus 30 in a control cycle. The second controller 22 outputs the payout length of the undulating rope 67 calculated by the payout length calculation unit 221 to the CAN bus 30 in a control cycle. The overload prevention device 19 outputs the rated load, the actual load, and the load factor of the suspension rope 66 and the undulating rope 67 to the CAN bus 30 in a control cycle, and outputs the boom angle to the CAN bus 30 in a control cycle.

データロガー28は、例えば、マイクロコントローラで構成され、CANバス30に流れる各種データを取得して蓄積する。データロガー28は、カウント部281及びメモリ282を備える。 The data logger 28 is composed of, for example, a microcontroller, and acquires and stores various data flowing through the CAN bus 30. The data logger 28 includes a counting unit 281 and a memory 282.

カウント部281は、制御周期でCANバス30上に出力される、吊ロープ66についての繰出長と定格荷重と実荷重と負荷率とをCANバス30から取り込むと共にブーム角度をCANバス30から取り込む。そして、カウント部281は、取り込んだデータを対応付けてメモリ282に記憶する。これにより、吊ロープ66についての、繰出長と、定格荷重と、負荷率と、ブーム角度とが時系列で対応付けられた状態履歴がメモリ282に蓄積されていく。 The counting unit 281 takes in the payout length, the rated load, the actual load, and the load factor of the suspension rope 66, which are output to the CAN bus 30 in the control cycle, from the CAN bus 30 and the boom angle from the CAN bus 30. Then, the counting unit 281 stores the captured data in the memory 282 in association with each other. As a result, a state history in which the payout length, rated load, load factor, and boom angle of the suspension rope 66 are associated in time series is accumulated in the memory 282.

図21は、吊ロープ66の状態履歴が蓄積された状態履歴テーブルT19のデータ構造の一例を示す図である。図21に示すように、状態履歴テーブルT19は、1つのレコードに1つの状態履歴が割り付けられている。状態履歴は、「日時」、「繰出長」、「定格荷重」、「実負荷」、「負荷率」、及び「ブーム角度」が対応付けられたデータである。「日時」は、状態履歴を取得した日時を示す。「繰出長」、「定格負荷」、「実荷重」、「負荷率」、及び「ブーム角度」は上述したので説明を省く。 FIG. 21 is a diagram showing an example of the data structure of the state history table T19 in which the state history of the suspension rope 66 is accumulated. As shown in FIG. 21, in the state history table T19, one state history is assigned to one record. The state history is data in which “date and time”, “feed length”, “rated load”, “actual load”, “load factor”, and “boom angle” are associated with each other. “Date and time” indicates the date and time when the state history was acquired. The "feed length", "rated load", "actual load", "load factor", and "boom angle" have been described above, and therefore description thereof will be omitted.

また、カウント部281は、起伏ロープ67についても、繰出長と定格荷重と実荷重と負荷率とをCANバス30から取り込み、ブーム角度と対応付けてメモリ282に記憶する。これにより、吊ロープ66と同様、起伏ロープ67の状態履歴がメモリ282に蓄積されていく。起伏ロープ67の状態履歴も、図21に示す吊ロープ66の状態履歴テーブルT19と同様、テーブル形式でメモリ282に蓄積されていく。 Further, the counting unit 281 also takes in the payout length, the rated load, the actual load, and the load factor of the undulating rope 67 from the CAN bus 30, and stores them in the memory 282 in association with the boom angle. As a result, like the suspension rope 66, the state history of the undulating rope 67 is accumulated in the memory 282. The state history of the undulating rope 67 is also accumulated in the memory 282 in a table format, like the state history table T19 of the suspension rope 66 shown in FIG.

図3に参照を戻す。カウント部281は、吊ロープ66を複数の区間に区分したときの各区間におけるシーブに対する吊ロープ66の通過長が、基準値を超えた回数である曲げ伸ばし回数を、負荷率に応じてカウントする。カウント部281は、起伏ロープ67についても、吊ロープ66と同様、負荷率に応じた曲げ伸ばし回数をカウントする。 Referring back to FIG. The counting unit 281 counts the number of times of bending and stretching, which is the number of times the passage length of the suspension rope 66 with respect to the sheave in each section when the suspension rope 66 is divided into a plurality of sections, exceeds a reference value, according to the load factor. .. The counting unit 281 counts the number of times of bending and stretching of the undulating rope 67 according to the load factor, as in the suspension rope 66.

図6は、曲げ伸ばし回数がカウントされるケースの第1例を示した図である。図6の例では、吊ロープ66又は起伏ロープ67であるワイヤーロープ602があるシーブ601を通過する様子が示されている。 FIG. 6 is a diagram showing a first example of a case where the number of times of bending and stretching is counted. In the example of FIG. 6, a state where the wire rope 602, which is the suspension rope 66 or the undulation rope 67, passes through the sheave 601 is shown.

ワイヤーロープ602は、複数の金属素線で構成されている。ワイヤーロープ602は、シーブ601を通過するとき、外側が引っ張られ且つ内側が収縮されてシーブ601の円弧に沿って曲げ伸ばされた後、曲げ伸ばしが解放される。このように、曲げ伸ばしと曲げ伸ばしの解放とが連続すると、ワイヤーロープ602の金属疲労が進行する。したがって、ワイヤーロープ602の区間毎に曲げ伸ばし回数をカウントすれば、ワイヤーロープ602がどの程度劣化したかが分かる。 The wire rope 602 is composed of a plurality of metal element wires. When the wire rope 602 passes through the sheave 601, the outside is pulled and the inside is contracted to be bent and stretched along the arc of the sheave 601, and then the bending and stretching are released. In this way, when bending and stretching and releasing of bending and stretching continue, metal fatigue of the wire rope 602 progresses. Therefore, by counting the number of times of bending and stretching for each section of the wire rope 602, it is possible to know how much the wire rope 602 has deteriorated.

そこで、カウント部281は、ワイヤーロープ602の区間毎に曲げ伸ばし回数をカウントする。ここでは、カウント部281は、ある区間におけるシーブ601の通過長がシーブ601の例えば1/4周移動する毎に1カウントする。 Therefore, the counting unit 281 counts the number of times of bending and stretching for each section of the wire rope 602. Here, the counting unit 281 counts 1 every time the passing length of the sheave 601 in a certain section moves, for example, ¼ round of the sheave 601.

図6の例では、シーブ601は時計回りに回転している。セクション(A)では、区間R1の先端がシーブ601に到達している。セクション(B)では、セクション(A)に対してシーブ601が90度回転し、区間R1の先端がシーブ601の頂上に到達している。これにより、区間R1におけるシーブ601の通過長が1/4周になったので、区間R1の曲げ伸ばし回数が1カウントされる。セクション(C)では、セクション(B)に対してシーブ601が更に90度回転し、区間R1の先端がシーブ601の右端に到達している。これにより、区間R1の曲げ伸ばし回数は更に1カウントされる。よって、図6の例では区間R1における曲げ伸ばし回数は2回となる。 In the example of FIG. 6, the sheave 601 is rotating clockwise. In the section (A), the tip of the section R1 reaches the sheave 601. In the section (B), the sheave 601 rotates 90 degrees with respect to the section (A), and the tip of the section R1 reaches the top of the sheave 601. As a result, the passing length of the sheave 601 in the section R1 becomes 1/4 round, so the number of bending and stretching in the section R1 is counted by one. In the section (C), the sheave 601 further rotates 90 degrees with respect to the section (B), and the tip of the section R1 reaches the right end of the sheave 601. As a result, the number of bending and stretching in the section R1 is further counted by 1. Therefore, in the example of FIG. 6, the number of times of bending and stretching in the section R1 is two.

図7は、曲げ伸ばし回数がカウントされるケースの第2例を示した図である。図7の例でも、シーブ601は時計回りに回転している。図7の例では、区間R1は先端から順に小区間R11,R12,R13を含んでいる。小区間R11〜R13は、それぞれ、シーブ601の1周分の長さの区間である。 FIG. 7 is a diagram showing a second example of the case where the number of times of bending and stretching is counted. Also in the example of FIG. 7, the sheave 601 is rotating clockwise. In the example of FIG. 7, the section R1 includes small sections R11, R12, and R13 in order from the tip. The small sections R11 to R13 are sections each having a length of one round of the sheave 601.

セクション(A)では、小区間R11の先端がシーブ601に到達している。セクション(B)では、セクション(A)に対してシーブ601が1周分回転し、小区間R11の後端がシーブ601の右端に到達している。セクション(C)では、セクション(B)に対してシーブ601が更に2周分回転し、小区間R13の後端がシーブ601の右端に到達している。したがって、図7のケースでは、区間R1のシーブ601の通過長がシーブ601の3周分であるので、区間R1に対する曲げ伸ばし回数は、12(=3×4)回となる。 In the section (A), the tip of the small section R11 reaches the sheave 601. In the section (B), the sheave 601 rotates one round with respect to the section (A), and the rear end of the small section R11 reaches the right end of the sheave 601. In the section (C), the sheave 601 rotates two more turns with respect to the section (B), and the rear end of the small section R13 reaches the right end of the sheave 601. Therefore, in the case of FIG. 7, since the passage length of the sheave 601 in the section R1 is three turns of the sheave 601, the number of times of bending and stretching for the section R1 is 12 (=3×4).

図8は、曲げ伸ばし回数がカウントされないケースを示した図である。セクション(A)では、区間R1の先端がシーブ601に到達している。セクション(B)では、セクション(A)に対してシーブ601が時計回りに約45度回転している。セクション(C)では、セクション(B)に対してシーブ601が反時計回りに約45度回転している。このように、図8の例では、区間R1におけるシーブ601のトータルの通過長は、シーブ601の1/4周分であるが、途中で方向が切り替わっている。この場合、カウント部281は、区間R1における曲げ伸ばし回数を1カウントしない。これは、ワイヤーロープ602のシーブ601に対する通過長が一方向にある程度の距離(ここでは、シーブ601の1/4周分)以上でなければ、ワイヤーロープ602の劣化はさほど進行しないとの考えに基づいている。なお、ワイヤーロープの方向(巻上方向、巻下方向)は例えば、操作レバー(図略)の傾倒方向から判断できる。 FIG. 8 is a diagram showing a case where the number of times of bending and stretching is not counted. In the section (A), the tip of the section R1 reaches the sheave 601. In the section (B), the sheave 601 rotates clockwise about 45 degrees with respect to the section (A). In the section (C), the sheave 601 rotates counterclockwise about 45 degrees with respect to the section (B). As described above, in the example of FIG. 8, the total passing length of the sheave 601 in the section R1 is 1/4 round of the sheave 601, but the direction is switched in the middle. In this case, the counting unit 281 does not count the number of times of bending and stretching in the section R1. This is based on the idea that the wire rope 602 does not deteriorate so much unless the passage length of the wire rope 602 with respect to the sheave 601 is more than a certain distance in one direction (here, a quarter of the sheave 601). Is based. The direction of the wire rope (winding direction, winding direction) can be determined from the tilting direction of the operation lever (not shown), for example.

ここで、ワイヤーロープ602上のどの区間がどのシーブ601を通過したかを判定するためには、カウント部281は、ワイヤーロープ602上でのシーブ601の位置を知る必要がある。 Here, in order to determine which section on the wire rope 602 has passed which sheave 601, the counting unit 281 needs to know the position of the sheave 601 on the wire rope 602.

図9及び図10は、吊ロープ66と各シーブとの位置関係を示す図である。図9において、x軸は地面と平行な方向を示し、y軸は地面と直行する方向を示す。また、図9において、x軸は右側がプラス、左側がマイナスであり、y軸は上側がプラス、下側がマイナスである。 9 and 10 are views showing the positional relationship between the suspension rope 66 and each sheave. In FIG. 9, the x-axis shows the direction parallel to the ground, and the y-axis shows the direction orthogonal to the ground. Further, in FIG. 9, the x-axis is positive on the right side and negative on the left side, and the y-axis is positive on the upper side and negative on the lower side.

ブームポイントP91を基準としたときのアイドラシーブ51bのx軸方向の距離Z1は、角度センサ45が検出したブーム角度θbを用いて式(1)で表される。 The distance Z1 of the idler sheave 51b in the x-axis direction with respect to the boom point P91 is represented by the equation (1) using the boom angle θb detected by the angle sensor 45.

Z1=Li・cos(θb+θis) (1)
LiはブームポイントP91とアイドラシーブ51bの中心(以下、「アイドラシーブポイントP93」と呼ぶ。)との距離であり、既知である。θisは、ブーム中心線L91と距離Liとのなす角度であり、既知である。Lbはブーム長Lbであり、ブーム51のブーム中心線L91上を通る。
Z1=Li·cos(θb+θis) (1)
Li is a distance between the boom point P91 and the center of the idler sheave 51b (hereinafter, referred to as “idle sheave point P93”) and is known. θis is an angle formed by the boom center line L91 and the distance Li and is known. Lb is a boom length Lb, and passes on the boom center line L91 of the boom 51.

ブームポイントP91を基準としたときのアイドラシーブ51bのy軸方向の距離Z2は、角度センサ45が検出したブーム角度θbを用いて式(2)で表される。 The distance Z2 of the idler sheave 51b in the y-axis direction with respect to the boom point P91 is represented by the equation (2) using the boom angle θb detected by the angle sensor 45.

Z2=Li・sin(θb+θis) (2)
巻上ドラム61aの中心(以下、「巻上ドラムポイントP92」と呼ぶ。)とアイドラシーブポイントP93との距離Z3は、距離Z1と、距離Z2とを用いて式(3)で表される。
Z2=Li·sin(θb+θis) (2)
The distance Z3 between the center of the hoisting drum 61a (hereinafter referred to as "hoisting drum point P92") and the idler sheave point P93 is represented by the equation (3) using the distance Z1 and the distance Z2.

Z3=√((Z1+Fdx)+(Z2−Fdy)) (3)
Fdxは、ブームポイントP91と巻上ドラムポイントP92とのx軸方向の距離であり、既知である。Fdyは、ブームポイントP91と巻上ドラムポイントP92とのy軸方向の距離であり、既知である。
Z3=√((Z1+Fdx) 2 +(Z2-Fdy) 2 ) (3)
Fdx is the distance between the boom point P91 and the hoisting drum point P92 in the x-axis direction, and is known. Fdy is the distance between the boom point P91 and the hoisting drum point P92 in the y-axis direction, and is known.

巻上ドラム61aからアイドラシーブ51b間の吊ロープ66の長さを想定した距離hkfは、距離Z3を用いて式(4)で表される。 The distance hkf assuming the length of the suspension rope 66 between the hoisting drum 61a and the idler sheave 51b is expressed by the equation (4) using the distance Z3.

hkf=√(Z3−(Pcd/2)) (4)
Pcdは巻上ドラム61aの直径に、巻上ドラム61aに巻き取られている吊ロープ66の層の厚みを加算した値であり、クレーンの機種と巻層とにより一意に決まる。
hkf=√(Z3 2 −(Pcd/2) 2 ) (4)
Pcd is a value obtained by adding the thickness of the layer of the suspension rope 66 wound around the hoisting drum 61a to the diameter of the hoisting drum 61a, and is uniquely determined by the crane model and the hoisting layer.

図10を参照し、吊ロープ66の先端(ロープエンドE1)はフックシーブ51cの中心にあるフックシーブポイントP96に位置している。 Referring to FIG. 10, the tip (rope end E1) of the hanging rope 66 is located at a hook sheave point P96 at the center of the hook sheave 51c.

図10において、角度θpeはブームポイントP91を基準とするロープエンドE1とブーム中心線L91とのなす角度であり、既知である。距離LpeはトップシーブポイントP94とロープエンドE1間の長さであり、既知である。距離LiyはアイドラシーブポイントP93とブーム中心線L91との距離であり、既知である。 In FIG. 10, the angle θpe is an angle formed by the rope end E1 and the boom center line L91 with the boom point P91 as a reference, and is known. The distance Lpe is the length between the top sheave point P94 and the rope end E1 and is known. The distance Liy is a distance between the idler sheave point P93 and the boom center line L91, and is known.

距離Lpeにおける地面と直行する成分である距離hpeは下記の式(5)で表される。 The distance hpe, which is a component orthogonal to the ground at the distance Lpe, is expressed by the following equation (5).

hpe=Lpe×sin(θb−θpe) (5)
吊ロープ66の変化量Lch1は、吊ロープ66の掛数nfが奇数の場合、下記の式(6)で表され、吊ロープ66の掛数nfが偶数の場合、下記の式(7)で表される。
hpe=Lpe×sin(θb−θpe) (5)
The amount of change Lch1 of the suspension rope 66 is expressed by the following equation (6) when the number of suspensions nf of the suspension rope 66 is odd, and by the following equation (7) when the number of suspensions nf of the suspension rope 66 is even. expressed.

Lch1=hkf/nf (6)
Lch1=((hkf)−(hpe))/nf (7)
このように、Li、θis、Fdx、Fdyは既知なので、ブーム角度θb、Pcdが判ると、距離hkfが算出できる。また、Pcdは巻上ドラム61aの回転量から算出できる。そこで、カウント部281は、制御周期毎にブーム角度θb及び巻上ドラム61aの回転量を取得し、距離hkfを求める。
Lch1=hkf/nf (6)
Lch1=((hkf)-(hpe))/nf (7)
Thus, since Li, θis, Fdx, and Fdy are known, the distance hkf can be calculated when the boom angles θb and Pcd are known. Further, Pcd can be calculated from the rotation amount of the hoisting drum 61a. Therefore, the counting unit 281 acquires the boom angle θb and the rotation amount of the hoisting drum 61a for each control cycle, and obtains the distance hkf.

また、ブーム長Lb、θis、θpe、Lpe、及び掛数nfは既知なので、吊ロープ66の繰出長と距離hkfとが判れば、吊ロープ66上でのアイドラシーブ51b、トップシーブ51a、及びフックシーブ51cの位置を特定できる。 Further, since the boom lengths Lb, θis, θpe, Lpe, and the number of hooks nf are known, if the payout length of the suspension rope 66 and the distance hkf are known, the idler sheave 51b, the top sheave 51a, and the hook sheave on the suspension rope 66 are known. The position of 51c can be specified.

そこで、カウント部281は、距離hkfと吊ロープ66の繰出長とに応じた各シーブの吊ロープ66上での位置が事前に定められた位置情報テーブルを備えておく。そして、カウント部281は、制御周期毎に繰出長算出部211から取得した吊ロープ66の繰出長と、算出した距離hkfとに対応する各シーブの吊ロープ66上での位置を位置情報テーブルを参照して決定すればよい。 Therefore, the counting unit 281 is provided with a position information table in which the position of each sheave on the suspension rope 66 according to the distance hkf and the feeding length of the suspension rope 66 is predetermined. Then, the counting unit 281 calculates the position on the suspension rope 66 of each sheave corresponding to the calculated length hkf and the payout length of the suspension rope 66 acquired from the payout length calculation unit 211 for each control cycle by using the position information table. It may be determined by referring to it.

位置情報テーブルは、各シーブの位置として、例えば、各シーブとワイヤーロープとが当接する領域上の1点(例えば、一端又は他端)を採用してもよいし、各シーブとワイヤーロープとが当接する領域を規定する2点(一端及び他端)を採用してもよい。 The position information table may adopt, as the position of each sheave, for example, one point (for example, one end or the other end) on the region where each sheave and the wire rope contact each other, or each sheave and wire rope may be adopted. Two points (one end and the other end) that define the contact area may be adopted.

代替的には、吊ロープ66上での各シーブの初期位置が判れば、初期位置に対して変化量Lch1を増減させることで、各シーブの現在位置を特定できる。そこで、カウント部281は、位置情報テーブルを用いて吊ロープ66の各シーブの初期位置を求め、以後、制御周期毎に変化量Lch1を求め、求めた変化量Lch1で各シーブの現在位置を増減させることで、各シーブの位置を決定してもよい。 Alternatively, if the initial position of each sheave on the suspension rope 66 is known, the current position of each sheave can be specified by increasing or decreasing the variation Lch1 with respect to the initial position. Therefore, the counting unit 281 obtains the initial position of each sheave of the suspension rope 66 using the position information table, thereafter obtains the variation amount Lch1 for each control cycle, and increases or decreases the current position of each sheave with the obtained variation amount Lch1. By doing so, the position of each sheave may be determined.

なお、カウント部281は、起伏ロープ67についても、吊ロープ66と同様の手法を用いて起伏ロープ67上での各シーブの位置を求めればよい。 The counting unit 281 may also determine the position of each sheave on the undulating rope 67 using the same method as that of the suspension rope 66.

そして、カウント部281は、巻上又は巻下操作が入力されてから停止されるまでの間に算出した各シーブの位置を時系列に追跡し、各シーブに対するワイヤーロープの区間毎の通過長を算出する。ここで、区間とは、例えば、ワイヤーロープを先端から所定間隔毎(例えば、10m毎)に区分した領域である。 The counting unit 281 time-sequentially tracks the position of each sheave calculated from when the hoisting or unwinding operation is input to when the shelving operation is stopped, and determines the passing length of each wire rope section for each sheave. calculate. Here, the section is, for example, an area obtained by dividing the wire rope at a predetermined interval (for example, every 10 m) from the tip.

図11は、通過長が算出される様子を示す図である。図11の上段は巻上操作の開始時を示し、図11の下段は巻上操作の終了時を示している。図11において、区間Rn,Rn+1,Rn+2,Rn+3は、それぞれ、n,n+1,n+2,n+3番目の区間を示している。なお、nは任意の整数である。 FIG. 11 is a diagram showing how the passage length is calculated. The upper part of FIG. 11 shows the start time of the hoisting operation, and the lower part of FIG. 11 shows the end time of the hoisting operation. In FIG. 11, sections Rn, Rn+1, Rn+2, and Rn+3 indicate the nth, n+1, n+2, and n+3th sections, respectively. Note that n is an arbitrary integer.

上段に示すように巻上操作の開始時には、1つ目のシーブは位置P11に位置しており、2つ目のシーブは位置P21に位置している。また、下段に示すように巻上操作の終了時には1つ目のシーブは位置P11’に位置しており、2つ目のシーブは位置P21’に位置している。 As shown in the upper row, at the start of the hoisting operation, the first sheave is located at position P11 and the second sheave is located at position P21. Further, as shown in the lower part, at the end of the hoisting operation, the first sheave is located at the position P11' and the second sheave is located at the position P21'.

ワイヤーロープは、1つ目のシーブに対して区間Rnと区間Rn+1とを跨いで通過しており、2つ目のシーブに対して区間Rn+2と区間Rn+3とを跨いで通過している。したがって、カウント部281は、区間Rnによる1つ目のシーブの通過長L11と、区間Rn+1による1つ目のシーブの通過長L12とをそれぞれ追跡する。また、カウント部281は、区間Rn+2による2つ目のシーブの通過長L21と、区間Rn+3による2つ目のシーブの通過長L22とをそれぞれ追跡する。 The wire rope passes over the section Rn and the section Rn+1 for the first sheave, and passes over the section Rn+2 and the section Rn+3 for the second sheave. Therefore, the counting unit 281 tracks the passage length L11 of the first sheave in the section Rn and the passage length L12 of the first sheave in the section Rn+1. Further, the counting unit 281 tracks the passage length L21 of the second sheave in the section Rn+2 and the passage length L22 of the second sheave in the section Rn+3, respectively.

そして、カウント部281は、例えば、通過長L11が1つ目のシーブの1/4周になる度に区間Rnの曲げ伸ばし回数としてカウントする。カウント部281は、他の通過長L12,L21,L22についても通過長L11と同様に曲げ伸ばし回数をカウントする。そして、カウント部281は、区間毎の曲げ伸ばし回数を、そのときの負荷率と対応付けてメモリ282に蓄積する。以下、区間毎の曲げ伸ばし回数と負荷率とが対応付けられたデータを曲げ伸ばし履歴と記述する。ここで、1回の巻上又は巻下操作中は、吊荷は変動しないので、負荷率は一定とみなすことができる。したがって、1回の巻上又は巻下操作における区間毎の曲げ伸ばし回数をそのときの負荷率と対応付けてメモリ282に蓄積することで、カウント部281は、負荷率に応じた曲げ伸ばし回数をカウントできる。 Then, the counting unit 281 counts as the number of times of bending and stretching in the section Rn, for example, every time the passage length L11 becomes 1/4 round of the first sheave. The counting unit 281 counts the number of times of bending and stretching for the other passage lengths L12, L21, L22 as well as the passage length L11. Then, the counting unit 281 stores the number of times of bending and stretching for each section in the memory 282 in association with the load factor at that time. Hereinafter, the data in which the number of bending and stretching for each section and the load factor are associated with each other will be described as a bending and stretching history. Here, since the suspended load does not change during one winding operation or one winding operation, the load factor can be regarded as constant. Therefore, the count unit 281 stores the number of bending and stretching according to the load factor by storing the number of bending and stretching for each section in one winding or unwinding operation in the memory 282 in association with the load factor at that time. You can count.

図22は、曲げ伸ばし履歴が登録された曲げ伸ばし履歴テーブルT20のデータ構造を示す図である。曲げ伸ばし履歴テーブルT20は、1つのレコードに1つの曲げ伸ばし履歴が割り付けられている。曲げ伸ばし履歴は、例えば、「日時」、「曲げ伸ばし回数」、及び「負荷率」が対応付けられたデータである。「日時」は、曲げ伸ばし回数の算出日時を示す。「曲げ伸ばし回数」は、例えば、「区間R1:1回、区間R2:3回、区間R3:4回、」というように区間毎の曲げ伸ばし回数を示す。「負荷率」は、曲げ伸ばし回数が算出されたときの負荷率を示す。 FIG. 22 is a diagram showing a data structure of a bending and stretching history table T20 in which bending and stretching history is registered. In the bending/stretching history table T20, one bending/stretching history is assigned to one record. The bending and stretching history is, for example, data in which “date and time”, “number of times of bending and stretching”, and “load factor” are associated with each other. “Date and time” indicates the date and time when the number of bending and stretching is calculated. The “number of times of bending and stretching” indicates the number of times of bending and stretching for each section, for example, “section R1: 1 time, section R2: 3 times, section R3: 4 times”. The “load factor” indicates the load factor when the number of bending and stretching is calculated.

図3に参照を戻す。データロガー28は、例えば、一定期間が経過すると、メモリ282に蓄積された一定期間分の履歴情報及び曲げ伸ばし履歴をサーバ10に送信する。 Referring back to FIG. For example, the data logger 28 transmits history information and bending history for a certain period accumulated in the memory 282 to the server 10 after a certain period has elapsed.

サーバ10は、統計情報生成部101を備える。統計情報生成部101は、データロガー28から送信された曲げ伸ばし履歴に基づいて、負荷率に応じた区間毎の曲げ伸ばし回数を示す統計情報を生成する。 The server 10 includes a statistical information generation unit 101. The statistical information generation unit 101 generates statistical information indicating the number of times of bending and stretching for each section according to the load factor, based on the bending and stretching history transmitted from the data logger 28.

具体的には、統計情報生成部101は、曲げ伸ばし履歴に含まれる負荷率が予め定められた複数の負荷区分のうち、いずれの負荷区分に属するかを特定し、特定した負荷区分に応じた区間毎の曲げ伸ばし回数を統計情報として生成する。 Specifically, the statistical information generation unit 101 identifies which load category the load factor included in the bending and stretching history belongs to among a plurality of predetermined load categories, and responds to the identified load category. The number of bending and stretching for each section is generated as statistical information.

図12は、統計情報が登録された統計情報テーブルT11のデータ構造を示す図である。統計情報テーブルT11は、「負荷率」と、「曲げ伸ばし回数」とが対応づけられたテーブルである。「負荷率」は、複数の負荷区分に分けられている。図12の例では、負荷率(=m)は、「m<5%」、「5%≦m<60%」、「60%≦m<90%」、「90%≦m<105%」、「105%≦m」の5つの負荷区分に分けられている。また、図12の例では、ワイヤーロープは、全長が600mであり、10m毎に60個の区間R1〜R60に区分されている。そして、統計情報テーブルT11の各セルには、負荷区分と区間とに対応する曲げ伸ばし回数の累積値が格納されている。 FIG. 12 is a diagram showing a data structure of the statistical information table T11 in which statistical information is registered. The statistical information table T11 is a table in which “load factor” and “bending and stretching times” are associated with each other. The “load factor” is divided into a plurality of load categories. In the example of FIG. 12, the load factor (=m) is “m<5%”, “5%≦m<60%”, “60%≦m<90%”, “90%≦m<105%”. , “105%≦m” are divided into five load categories. In the example of FIG. 12, the wire rope has a total length of 600 m and is divided into 60 sections R1 to R60 every 10 m. Then, in each cell of the statistical information table T11, the cumulative value of the bending and stretching times corresponding to the load classification and the section is stored.

統計情報生成部101は、1つの曲げ伸ばし履歴について、その曲げ伸ばし履歴に含まれる負荷率が属する負荷区分とその曲げ伸ばし履歴に含まれる区間とに対応するセルを特定し、特定したセルに、対応する曲げ伸ばし回数を投票することで、統計情報テーブルT11を生成すればよい。 The statistical information generation unit 101 specifies, for one bending and stretching history, a cell corresponding to a load section to which a load factor included in the bending and stretching history belongs and a section included in the bending and stretching history, and in the specified cell, The statistical information table T11 may be generated by voting the corresponding number of times of bending and stretching.

例えば、負荷率「50%」であり、曲げ伸ばし回数「区間R1:1回、区間R3:1回、区間R4:2回」の曲げ伸ばし履歴があったとすると、負荷区分「5%≦m<60%」と、区間「R1」、「R3」、「R4」とに対応する3つのセルに現在登録されている曲げ伸ばし回数が、それぞれ、「1回」、「1回」、「2回」増加される。 For example, if the load factor is "50%" and there is a bending and stretching history of the number of times of bending and stretching "section R1: 1 time, section R3: 1 time, section R4: 2 times", load category "5%≤m< The bending and stretching times currently registered in the three cells corresponding to “60%” and the sections “R1”, “R3”, and “R4” are “1 time”, “1 time”, and “2 times”, respectively. Will be increased.

統計情報生成部101は、生成した統計情報テーブルT11に基づいて曲げ伸ばし回数の分布図を生成する。 The statistical information generating unit 101 generates a distribution map of the number of times of bending and stretching based on the generated statistical information table T11.

図13は、曲げ伸ばし回数の分布図の第一例を示す図である。図13において、縦軸は曲げ伸ばしの累積回数を示し、奥行軸は負荷率を示し、横軸は区間を示している。図13の例では、「m<5%」、「60%≦m<90%」、「90%≦m<105%」の負荷区分において、「110m〜150m」の5つの区間の曲げ伸ばしの累積回数が大きいことが示されている。したがって、これら5つの区間における劣化が他の区間よりも進行していることが分かる。このように、曲げ伸ばし回数の分布図は、負荷率に応じた区間毎の曲げ伸ばしの累積回数が示されているので、ユーザは一目でワイヤーロープのどの位置の劣化が進行しているかを容易に認識できる。 FIG. 13 is a diagram showing a first example of a distribution diagram of the number of times of bending and stretching. In FIG. 13, the vertical axis represents the cumulative number of bending and stretching, the depth axis represents the load factor, and the horizontal axis represents the section. In the example of FIG. 13, in the load classification of “m<5%”, “60%≦m<90%”, and “90%≦m<105%”, bending and stretching of five sections of “110 m to 150 m” are performed. It is shown that the cumulative number is large. Therefore, it can be seen that the deterioration in these five sections is more advanced than in the other sections. In this way, the distribution chart of the number of times of bending and stretching shows the cumulative number of times of bending and stretching for each section according to the load factor, so that the user can easily see at which position of the wire rope the deterioration is progressing. Can be recognized by.

図14は、曲げ伸ばし回数の分布図の第二例を示す図である。図14では、クレーン2が建方作業を行ったときの曲げ伸ばし回数の分布図が示されている。図16は、建方作業の説明図である。建方作業では、クレーン2は、吊荷1501を、地面から、数十m〜数百mの高さまで巻き上げる作業を繰り返す。 FIG. 14 is a diagram showing a second example of a distribution diagram of the number of times of bending and stretching. FIG. 14 shows a distribution diagram of the number of times of bending and stretching when the crane 2 performs a erection work. FIG. 16 is an explanatory diagram of the erection work. In the erection work, the crane 2 repeats the work of hoisting the suspended load 1501 from the ground to a height of several tens m to several hundred m.

したがって、建方作業における曲げ伸ばし回数の分布図では、図14に示すように、特定の区間(ここでは、170m〜200m)に曲げ伸ばし回数の累積値が集中する傾向が見られる。 Therefore, in the distribution chart of the bending and stretching times in the erection work, as shown in FIG. 14, there is a tendency that the cumulative value of the bending and stretching times is concentrated in a specific section (here, 170 m to 200 m).

図15は、曲げ伸ばし回数の分布図の第三例を示す図である。図15では、クレーン2が基礎土木作業を行ったときの曲げ伸ばし回数の分布図が示されている。図17は、基礎土木作業の説明図である。基礎土木作業では、クレーン2は、棒状体1601を一定方向に一定間隔で地中に埋める作業を繰り返す。そのため、ワイヤーロープの移動量は建方作業ほど大きくない。 FIG. 15 is a diagram showing a third example of a distribution diagram of the number of times of bending and stretching. FIG. 15 shows a distribution diagram of the number of times of bending and stretching when the crane 2 performs basic civil engineering work. FIG. 17 is an explanatory diagram of basic civil engineering work. In the basic civil engineering work, the crane 2 repeats the work of burying the rod-shaped bodies 1601 in the ground at regular intervals in a constant direction. Therefore, the movement amount of the wire rope is not so large as that of the erection work.

したがって、基礎土木作業における曲げ伸ばし回数の分布図では、図15に示すように、建方作業より更に狭い特定の区間(120m〜140m)で曲げ伸ばし回数が集中する傾向が見られる。 Therefore, in the distribution chart of the number of bending and stretching in the basic civil engineering work, as shown in FIG. 15, there is a tendency that the number of bending and stretching is concentrated in a specific section (120 m to 140 m) narrower than the erection work.

このように、曲げ伸ばし回数の分布図には、クレーン2が主に行った作業の特徴が表れるので、ワイヤーロープの劣化の度合いのみならず、クレーン2の作業履歴も判別できる。 In this way, the distribution diagram of the number of times of bending and stretching shows the characteristics of the work mainly performed by the crane 2, so that not only the degree of deterioration of the wire rope but also the work history of the crane 2 can be determined.

図18は、情報提示システム1の処理を示すフローチャートである。図18において、1列目は、ECU24の処理を示し、2列目は第1コントローラ21及び第2コントローラ22(以下、両者を纏めて「MC」と表す。)の処理を示し、3列目は過負荷防止装置19(ML)の処理を示し、4列目はデータロガー28の処理を示す。 FIG. 18 is a flowchart showing the processing of the information presentation system 1. In FIG. 18, the first column shows the process of the ECU 24, the second column shows the process of the first controller 21 and the second controller 22 (hereinafter, both are collectively referred to as “MC”), and the third column. Indicates the processing of the overload prevention device 19 (ML), and the fourth column shows the processing of the data logger 28.

まず、クレーン2のイグニッションキーがユーザによってオンされると、ECU24、MC、過負荷防止装置19がそれぞれオン状態になる(S101,S111,S121)。データロガー28は、クレーン2のバッテリ(図略)に直接接続されており、常時電力が供給されている。イグニッションキーがオフの状態では、データロガー28は、省電力モードになっている(S131)。そして、イグニションキーがオンされると、省電力モードから通常モードに復帰する(S132)。その他、データロガー28は、携帯電話通信網からの着信要求、定期的なタイマ割り込みが発生した場合、省電力モードから通常モードに復帰する。 First, when the user turns on the ignition key of the crane 2, the ECU 24, the MC, and the overload prevention device 19 are turned on (S101, S111, S121). The data logger 28 is directly connected to the battery (not shown) of the crane 2 and is constantly supplied with electric power. When the ignition key is off, the data logger 28 is in the power saving mode (S131). Then, when the ignition key is turned on, the power saving mode is returned to the normal mode (S132). In addition, the data logger 28 returns from the power saving mode to the normal mode when an incoming call request from the mobile phone communication network or a periodic timer interrupt occurs.

ECU24は、オン状態になると(S101)、エンジン(図略)をスタートとさせ(S102)、エンジンの稼働情報をCANバス30に定期的に出力する(S103)。ここでは、エンジンの稼働情報として、例えば、エンジンの回転数が含まれる。S104では、イグニッションキーがオフされたので、ECU24はオフ状態になる。 When the ECU 24 is turned on (S101), the engine (not shown) is started (S102), and engine operation information is periodically output to the CAN bus 30 (S103). Here, the engine operation information includes, for example, the engine speed. In S104, since the ignition key is turned off, the ECU 24 is turned off.

MCは、オン状態になると(S111)、初期化処理を行い(S112)、データ復元処理を行う(S113)。MCは、前回オフ状態にされる直前に処理したデータを終了時データとして不揮発性メモリ(図略)に保存する。データ復元処理では、今回、オン状態にされたとき、不揮発性メモリに保存された終了時データがMCによって読み出される。ここでは、終了時データは繰出長が該当する。 When the MC is turned on (S111), it performs initialization processing (S112) and data restoration processing (S113). The MC stores the data processed immediately before it is turned off last time in the nonvolatile memory (not shown) as the end data. In the data restoration process, when turned on this time, the end-time data stored in the nonvolatile memory is read by the MC. Here, the end length data corresponds to the feed length.

次に、MCは制御周期の計時を開始する(S114)。以降、MCは、イグニッションキーがオフされなければ(S116でNO)、吊ロープ66及び起伏ロープ67の繰出長を算出し、CANバス30に出力する処理を制御周期毎に繰り返す(S115)。詳細には、MCは巻上ドラム61a及び起伏ドラム62aの回転量を回転量センサ41,42から取得し、取得した回転量から上述した手法を用いて吊ロープ66及び起伏ロープ67の繰出長を算出する。 Next, the MC starts measuring the control cycle (S114). After that, if the ignition key is not turned off (NO in S116), the MC repeats the process of calculating the payout length of the suspension rope 66 and the undulating rope 67 and outputting the same to the CAN bus 30 for each control cycle (S115). Specifically, the MC acquires the rotation amounts of the hoisting drum 61a and the undulating drum 62a from the rotation amount sensors 41 and 42, and determines the payout length of the hanging rope 66 and the undulating rope 67 from the acquired rotation amount using the above-described method. calculate.

一方、イグニッションキーがオフされると(S116でYES)、MCは不揮発性メモリに終了時データを保存するデータ保存処理を実行し(S117)、オフ状態になる(S118)。 On the other hand, when the ignition key is turned off (YES in S116), the MC executes a data saving process of saving the end data in the nonvolatile memory (S117), and is turned off (S118).

過負荷防止装置19は、オン状態になると(S121)、初期化処理を行い(S122)、データ復元処理を行う(S123)。データ復元処理はS113で説明した処理と同じ処理である。ここでは終了時データとして負荷率が採用され、負荷率が読み出される。 When the overload prevention device 19 is turned on (S121), it performs initialization processing (S122) and data restoration processing (S123). The data restoration process is the same as the process described in S113. Here, the load factor is adopted as the end data, and the load factor is read.

次に、過負荷防止装置19は制御周期の計時を開始する(S124)。以降、過負荷防止装置19は、イグニッションキーがオフされなければ(S126でNO)、吊ロープ66及び起伏ロープ67の負荷率を算出し、CANバス30に出力する処理を制御周期毎に繰り返す(S125)。詳細には、過負荷防止装置19は、吊ロープ66及び起伏ロープ67の負荷データを負荷センサ43,44から取得すると共に、ブーム角度を角度センサ45から取得し、取得した負荷データとブーム角度とから上述した手法を用いて吊ロープ66及び起伏ロープ67の負荷率を算出する。S125では、負荷率を算出したときの定格荷重、実荷重、及びブーム角度も合わせて出力される。以下、S125で出力されるデータ群を「負荷率等」と表す。 Next, the overload prevention device 19 starts measuring the control cycle (S124). After that, if the ignition key is not turned off (NO in S126), the overload prevention device 19 calculates the load factors of the suspension rope 66 and the undulating rope 67, and repeats the process of outputting to the CAN bus 30 every control cycle ( S125). In detail, the overload prevention device 19 acquires the load data of the suspension rope 66 and the undulating rope 67 from the load sensors 43 and 44, acquires the boom angle from the angle sensor 45, and acquires the acquired load data and boom angle. From the above, the load factors of the suspension rope 66 and the undulating rope 67 are calculated using the method described above. In S125, the rated load, the actual load, and the boom angle when the load factor is calculated are also output. Hereinafter, the data group output in S125 will be referred to as "load factor or the like".

一方、イグニッションキーがオフされると(S126でYES)、過負荷防止装置19は不揮発性メモリに終了時データを保存するデータ保存処理を実行し(S127)、オフ状態になる(S128)。 On the other hand, when the ignition key is turned off (YES in S126), the overload prevention device 19 executes a data saving process of saving the end-time data in the nonvolatile memory (S127), and turns off (S128).

データロガー28は省電力モードから通常モードに復帰すると(S132)、状態履歴のデータ復元処理を行い(S133)、メモリ282から終了時データを読み出す。ここでは、前回オフ状態にされる直前にメモリ282に保存された吊ロープ66及び起伏ロープ67についての状態履歴が終了時データとして読み出される。 When the data logger 28 returns from the power saving mode to the normal mode (S132), it performs a state history data restoration process (S133), and reads the end data from the memory 282. Here, the state history of the suspension rope 66 and the undulating rope 67 stored in the memory 282 immediately before being turned off last time is read as the end time data.

次に、データロガー28は、曲げ伸ばし履歴のデータ復元処理を行う(S134)。ここで、データロガー28は、前回オフ状態にされたときにメモリ282に保存した曲げ伸ばし履歴を終了時データとしてメモリ282から読み出す。 Next, the data logger 28 performs a bending/stretching history data restoration process (S134). Here, the data logger 28 reads out the bending and stretching history stored in the memory 282 when it was turned off last time from the memory 282 as end data.

次に、データロガー28は、制御周期の計時を開始する(S135)。次に、データロガー28は、CANバス30に流れるデータを受信する処理を制御周期毎に繰り返す(S136)。ここでは、S115において、MCから出力された吊ロープ66及び起伏ロープ67のそれぞれの繰出長が制御周期毎に受信される。また、ここでは、S125において、過負荷防止装置19から出力された負荷率等が制御周期毎に受信される。 Next, the data logger 28 starts measuring the control cycle (S135). Next, the data logger 28 repeats the process of receiving the data flowing through the CAN bus 30 every control cycle (S136). Here, in S115, the respective feeding lengths of the suspension rope 66 and the undulating rope 67 output from the MC are received in each control cycle. Further, here, in S125, the load factor and the like output from the overload prevention device 19 is received for each control cycle.

次に、データロガー28は、吊ロープ66及び起伏ロープ67のそれぞれについての繰出長、定格荷重、及び負荷率と、ブーム角度とを対応付けた状態履歴を状態履歴テーブルT19に蓄積する(S137)。 Next, the data logger 28 accumulates in the state history table T19 a state history in which the payout length, the rated load, and the load factor for each of the suspension rope 66 and the undulating rope 67 are associated with the boom angle (S137). ..

次に、データロガー28は、各シーブにおける吊ロープ66及び起伏ロープ67の通過長を算出する(S138)。 Next, the data logger 28 calculates the passage length of the suspension rope 66 and the undulation rope 67 in each sheave (S138).

詳細には、データロガー28は、巻上又は巻下操作が入力されていれば、以下の処理を行う。まず、データロガー28は、現在のブーム角度θbから、上述した式(1)〜(4)の演算を行い、距離hkf(図9参照)を算出する。次に、データロガー28は、S136で受信した吊ロープ66の繰出長と距離hkfとに応じた各シーブの吊ロープ66上での位置を位置情報テーブルから求める。次に、データロガー28は、前回求めた各シーブの吊ロープ66上の位置と、今回求めた各シーブの吊ロープ66上の位置との差から通過長の区間毎の変化量を求める。次に、データロガー28は、算出した区間毎の変化量を積算することで、現在の通過長を区間毎に求める。 Specifically, the data logger 28 performs the following processing if a hoisting or lowering operation is input. First, the data logger 28 calculates the distance hkf (see FIG. 9) from the current boom angle θb by performing the calculations of the above equations (1) to (4). Next, the data logger 28 obtains, from the position information table, the position of each sheave on the suspension rope 66 according to the feeding length of the suspension rope 66 and the distance hkf received in S136. Next, the data logger 28 obtains the amount of change in the passage length for each section from the difference between the position of the sheave on the suspension rope 66 obtained last time and the position of the sheave on the suspension rope 66 obtained this time. Next, the data logger 28 obtains the current passage length for each section by integrating the calculated change amount for each section.

S138では、巻上操作又は巻下操作中、区間毎の変化量を積算する処理が繰り返されることで、吊ロープ66の区間毎のシーブの通過長が算出される。S138では、起伏ロープ67についても吊ロープ66と同様に、区間毎のシーブの通過長が算出される。 In S138, the process of accumulating the amount of change for each section is repeated during the hoisting operation or the lowering operation, and thus the sheave passage length of each section of the suspension rope 66 is calculated. In S138, the passing length of the sheave for each section is calculated for the undulating rope 67 as well as the hanging rope 66.

次に、データロガー28は、区間毎に算出したシーブの通過長が1/4周になる都度、曲げ伸ばし回数をカウントアップする(S139)。 Next, the data logger 28 counts up the number of times of bending and stretching each time the sheave passage length calculated for each section becomes 1/4 round (S139).

次に、データロガー28は、算出した区間毎の曲げ伸ばし回数を、S136で取得した負荷率と、算出日時と対応付けて曲げ伸ばし履歴として曲げ伸ばし履歴テーブルT20保存する(S140)。詳細には、巻上又は巻下操作が開始されると、曲げ伸ばし履歴テーブルT20に新たなレコードが作成され、そのレコードの「曲げ伸ばし回数」、及び「負荷率」が更新されていく。そして、巻上又は巻下操作が終了すると、そのレコードへの更新が終了され、1つの曲げ伸ばし履歴が確定する。 Next, the data logger 28 stores the calculated bending/bending number for each section in the bending/bending history table T20 as a bending/bending history in association with the load factor acquired in S136 and the calculation date/time (S140). Specifically, when the hoisting or lowering operation is started, a new record is created in the bending and stretching history table T20, and the "bending and stretching number" and "load factor" of the record are updated. Then, when the winding or winding operation is completed, the update to the record is completed, and one bending and stretching history is fixed.

次に、イグニッションキーがオフされなければ(S141でNO)、データロガー28は、処理をS136に戻し、制御周期が到来する毎にS136〜S141の処理を繰り返す。 Next, if the ignition key is not turned off (NO in S141), the data logger 28 returns the processing to S136 and repeats the processing of S136 to S141 every time the control cycle comes.

一方、イグニッションキーがオフされると(S141でYES)、データロガー28は、終了時データをメモリ282に記憶させるデータ保存処理を実行する(S142)。ここでは、イグニッションキーがオフされる直前に算出された曲げ伸ばし履歴と状態履歴とが最終データとしてメモリ282に保存される。 On the other hand, when the ignition key is turned off (YES in S141), the data logger 28 executes a data saving process of storing the end time data in the memory 282 (S142). Here, the bending and stretching history and the state history calculated immediately before the ignition key is turned off are stored in the memory 282 as final data.

図19は、データロガー28による日報データ及び月報データの生成処理を示すフローチャートである。この処理は、タイマー割り込みが発生する度に実行される(S200)。ここで、タイマー割り込みは、所定時刻(例えば、0時0分0秒)が到来する度に実行される。よって、図19のフローチャートは1日に1回実行される。 FIG. 19 is a flowchart showing a process of generating daily report data and monthly report data by the data logger 28. This process is executed every time a timer interrupt occurs (S200). Here, the timer interrupt is executed every time a predetermined time (for example, 0 hour 0 minute 0 second) arrives. Therefore, the flowchart of FIG. 19 is executed once a day.

まず、データロガー28は、タイマー割り込みが発生時に(S200)、省電力モードになっており(S201)、タイマー割り込みが発生するとデータロガー28は、省電力モードから通常モードに復帰する(S202)。 First, the data logger 28 is in the power saving mode when a timer interrupt occurs (S200) (S201), and when the timer interrupt occurs, the data logger 28 returns from the power saving mode to the normal mode (S202).

次に、データロガー28は、状態履歴のデータ復元処理を行う(S203)。ここでは、前回、図19のフローチャートが終了する直前にメモリ282に保存された状態履歴が終了時データとして読み出される。次に、データロガー28は、曲げ伸ばし履歴のデータ復元処理を行う(S204)。ここでは、前回、図19のフローチャートが終了する直前にメモリ282に保存された曲げ伸ばし履歴が終了時データとして読み出される。 Next, the data logger 28 performs state history data restoration processing (S203). Here, last time, the state history stored in the memory 282 immediately before the end of the flowchart of FIG. 19 is read as the end time data. Next, the data logger 28 performs a data restoration process of the bending and stretching history (S204). Here, the bending and stretching history stored in the memory 282 immediately before the end of the flowchart of FIG. 19 is read as the end time data.

次に、データロガー28は、現在の日付情報を取得する(S205)。ここで、データロガー28は、常時時刻を計時するリアルタイムクロック(RTC)を備えており、RTCから現在の日付情報を取得すればよい。日付情報は、例えば、「2016年5月30日」というように、「年」と「月」と「日」とで構成されている。 Next, the data logger 28 acquires current date information (S205). Here, the data logger 28 includes a real-time clock (RTC) that constantly measures the time, and the current date information may be acquired from the RTC. The date information is composed of “year”, “month”, and “day” such as “May 30, 2016”.

次に、データロガー28は、1日分の状態履歴をメモリ282が保存する状態履歴テーブルT19から読み出し、読み出した1日分の状態履歴にS282で取得した現在の日付情報を対応付けて日報データを生成し、サーバ10に送信する(S207)。 Next, the data logger 28 reads the one-day state history from the state history table T19 stored in the memory 282, associates the read one-day state history with the current date information acquired in S282, and outputs the daily report data. Is generated and transmitted to the server 10 (S207).

次に、データロガー28は、前回、送信した日報データに対応付けられた日付情報が示す「月」が、今回送信した日報データに対応付けられた日付情報が示す「月」に対して変化しているか否かを判定する(S208でYES)。S208でYESの場合、データロガー28は、曲げ伸ばし履歴の月報データを生成する(S209)。一方、S208でNOの場合、データロガー28は、処理をS208に進める。これにより、1ヶ月に1回、月報データが生成される。S209では、先月の1ヶ月分の曲げ伸ばし履歴が纏められ、1ヶ月分の月報データが生成される。 Next, in the data logger 28, the “month” indicated by the date information associated with the daily report data transmitted last time is changed from the “month” indicated by the date information associated with the daily report data transmitted this time. It is determined whether or not (YES in S208). In the case of YES in S208, the data logger 28 generates monthly report data of bending and stretching history (S209). On the other hand, in the case of NO in S208, the data logger 28 advances the processing to S208. As a result, monthly report data is generated once a month. In step S209, the bending and stretching history for the last month is collected and monthly report data for one month is generated.

次に、データロガー28は、S209で生成した月報データをサーバ10に送信する(S210)。次に、データロガー28は、メモリ282に記憶された曲げ伸ばし履歴テーブルT20から先月1ヶ月分の曲げ伸ばし履歴を削除する(S211)。 Next, the data logger 28 transmits the monthly report data generated in S209 to the server 10 (S210). Next, the data logger 28 deletes the bending and stretching history for the last month from the bending and stretching history table T20 stored in the memory 282 (S211).

次に、データロガー28は、最新の状態履歴を終了時データとしてメモリ282に保存する(S212)。次に、データロガー28は、省電力モードに復帰する(S213)。 Next, the data logger 28 stores the latest state history in the memory 282 as end-time data (S212). Next, the data logger 28 returns to the power saving mode (S213).

このように、図19のフローチャートによれば、曲げ伸ばし履歴が月単位で纏めてサーバ10に送信されるので、情報処理装置4は、曲げ伸ばし履歴が生成されるたびにサーバ10にアクセスする必要がなくなる。そのため、サーバ10及び情報処理装置4間の通信負荷の軽減を図ることができる。 As described above, according to the flowchart of FIG. 19, since the bending and stretching history is collectively transmitted to the server 10 on a monthly basis, the information processing device 4 needs to access the server 10 every time the bending and stretching history is generated. Disappears. Therefore, the communication load between the server 10 and the information processing device 4 can be reduced.

サーバ10の統計情報生成部101は、月報データを取得すると、月報データに含まれる曲げ伸ばし履歴を1つずつ抽出し、抽出した曲げ伸ばし履歴が示す区間毎の曲げ伸ばし回数を図12に示す統計情報テーブルT11の対応するセルに投票していくことで、統計情報を生成する。そして、サーバ10は、生成した統計情報を図略のメモリに保存すればよい。 When the statistical information generation unit 101 of the server 10 acquires the monthly report data, it extracts the bending and stretching histories included in the monthly report data one by one, and the statistics of bending and stretching for each section indicated by the extracted bending and stretching history are shown in FIG. Statistical information is generated by voting for the corresponding cell in the information table T11. Then, the server 10 may store the generated statistical information in a memory (not shown).

そして、サーバ10は、端末14から統計情報の取得要求を受信すると、統計情報から曲げ伸ばし回数の分布図(図13)を生成し、端末14に送信すればよい。或いは、サーバ10は、端末14から統計情報の取得要求を受信すると、統計情報を端末14に送信し、統計情報から曲げ伸ばし回数の分布図を端末14に生成させてもよい。そして、端末14は、曲げ伸ばし回数の分布図を提示部141に表示すればよい。また、端末14は、図12に示す統計情報テーブルT11自体を提示部141に表示してもよい。 When the server 10 receives the statistical information acquisition request from the terminal 14, the server 10 may generate a distribution map (FIG. 13) of the number of times of bending and stretching from the statistical information and transmit it to the terminal 14. Alternatively, when the server 10 receives the statistical information acquisition request from the terminal 14, the server 10 may transmit the statistical information to the terminal 14 and cause the terminal 14 to generate a distribution map of the number of times of bending and stretching from the statistical information. Then, the terminal 14 may display a distribution chart of the number of times of bending and stretching on the presentation unit 141. Further, the terminal 14 may display the statistical information table T11 shown in FIG. 12 on the presentation unit 141.

なお、本実施の形態では、図2に示すように、サーバ10は複数のクレーン2から複数の統計情報を取得する。そのため、統計情報生成部101は、例えば、各クレーン2の識別情報と対応付けて各クレーン2の統計情報を図略のメモリに保存すればよい。そして、サーバ10は、クレーン2の識別情報が指定された統計情報の取得要求を、統計情報を端末14から受信すると、該当する統計情報を端末14に送信すればよい。 In this embodiment, as shown in FIG. 2, the server 10 acquires a plurality of pieces of statistical information from a plurality of cranes 2. Therefore, the statistical information generation unit 101 may store the statistical information of each crane 2 in a memory (not shown) in association with the identification information of each crane 2, for example. Then, when the server 10 receives the statistical information acquisition request specifying the identification information of the crane 2 from the terminal 14, the server 10 may transmit the relevant statistical information to the terminal 14.

このように、本実施の形態によれば、シーブに対するワイヤーロープの区間毎の曲げ伸ばし回数であって、負荷率に応じた曲げ伸ばし回数がカウントされる。そして、カウント結果に基づいて、負荷率に応じた区間毎の曲げ伸ばし回数を示す統計情報が生成され、生成された統計情報が提示される。 In this way, according to the present embodiment, the number of times of bending and stretching for each section of the wire rope with respect to the sheave, that is, the number of times of bending and stretching according to the load factor is counted. Then, based on the count result, statistical information indicating the number of times of bending and stretching for each section according to the load factor is generated, and the generated statistical information is presented.

そのため、ユーザは、統計情報に基づいて、ワイヤーロープの疲労の偏りを把握し、ワイヤーロープの適切な交換時期を判断できる。その結果、本実施の形態は、ワイヤーロープが劣化していないにも拘わらず、ワイヤーロープの交換を強制する事態を回避でき、経済的負担の減少及び資源の効率的な活用を図ることができる。また、本実施の形態は、劣化したワイヤーロープの使用が継続されることが防止され、安全性を確保できる。 Therefore, the user can grasp the bias of the fatigue of the wire rope based on the statistical information, and determine the appropriate time to replace the wire rope. As a result, in the present embodiment, it is possible to avoid the situation in which the wire rope is forced to be replaced, even though the wire rope has not deteriorated, and it is possible to reduce the economic burden and efficiently use resources. .. In addition, in the present embodiment, it is possible to prevent the continued use of the deteriorated wire rope and ensure safety.

また、この統計情報は、試験機による実験データではなく実際のクレーンのデータから生成された情報であるため、信頼性の高い統計情報を提供できる。 In addition, since this statistical information is information generated from actual crane data, not experimental data obtained by a test machine, highly reliable statistical information can be provided.

(変形例1)
実施の形態1では、統計情報生成部101は、サーバ10に設けられていたが、本実施の形態はこれに限定されず、統計情報生成部101は、情報処理装置4に設けられてもよい。
(Modification 1)
In the first embodiment, the statistical information generation unit 101 is provided in the server 10, but the present embodiment is not limited to this, and the statistical information generation unit 101 may be provided in the information processing device 4. ..

図20は、変形例1にかかる情報提示システム1の構成の一例を示すブロック図である。図20に示すように、統計情報生成部101は、情報処理装置4に設けられている。 20: is a block diagram which shows an example of a structure of the information presentation system 1 concerning the modification 1. As shown in FIG. As shown in FIG. 20, the statistical information generation unit 101 is provided in the information processing device 4.

この場合、統計情報生成部101は、例えば、カウント部281により1つの曲げ伸ばし履歴が作成される度に、その曲げ伸ばし履歴を統計情報テーブルT11に投票していくことで、統計情報を生成すればよい。或いは、統計情報生成部101は、例えば、カウント部281により一定期間(例えば、1日、1週間、1ヶ月)の曲げ伸ばし履歴が作成される度に、その曲げ伸ばし履歴を統計情報テーブルT11に投票していくことで統計情報を生成してもよい。 In this case, the statistical information generation unit 101 generates statistical information by voting the bending and stretching history in the statistical information table T11 every time one bending and stretching history is created by the counting unit 281. Good. Alternatively, for example, every time the counting unit 281 creates a bending/stretching history for a certain period (for example, one day, one week, one month), the statistical information generating unit 101 stores the bending/stretching history in the statistical information table T11. Statistical information may be generated by voting.

また、この場合、端末14はUSB(Universal Serial Bus)等の通信ラインを介して、情報処理装置4と接続されてもよい。そして、端末14は、統計情報生成部101で生成された統計情報を読み取って、自身が備える不揮発性のメモリ(図略)に保存してもよい。ここで、不揮発性のメモリとしては、USBメモリが採用されてもよいし、ハードディスクが採用されてもよい。 In this case, the terminal 14 may be connected to the information processing device 4 via a communication line such as a USB (Universal Serial Bus). Then, the terminal 14 may read the statistical information generated by the statistical information generation unit 101 and store the statistical information in a non-volatile memory (not shown) included therein. Here, a USB memory or a hard disk may be used as the non-volatile memory.

端末14としては、例えばパーソナルコンピュータが用いられる。そして、端末14は、統計情報生成部101から読み取った統計情報を所定のアプリケーションソフトウェアで解析し、曲げ伸ばし回数の分布図を生成し、提示部141に表示させてもよい。 As the terminal 14, for example, a personal computer is used. Then, the terminal 14 may analyze the statistical information read from the statistical information generation unit 101 with predetermined application software, generate a distribution map of the number of bending and stretching, and display the distribution unit 141 on the presentation unit 141.

変形例1においては、統計情報生成部101は、生成した曲げ伸ばし回数の分布図をクレーン2に設けられた操作パネルに表示させてもよい。 In the first modification, the statistical information generation unit 101 may display the generated distribution map of the bending and stretching times on the operation panel provided in the crane 2.

この場合、統計情報生成部101は、現時点でメモリ282に記憶されている曲げ伸ばし履歴から統計情報を生成し、生成した統計情報から曲げ伸ばし回数の分布図を生成し、クレーン2の操作パネルに表示させてもよい。この場合、クレーン2の搭乗者はリアルタイムで統計情報を確認できる。 In this case, the statistical information generation unit 101 generates statistical information from the bending and stretching history currently stored in the memory 282, generates a distribution map of the number of bending and stretching from the generated statistical information, and displays it on the operation panel of the crane 2. It may be displayed. In this case, the passenger of the crane 2 can confirm the statistical information in real time.

(変形例2)
カウント部281及び統計情報生成部101はサーバ10に設けられていてもよい。この場合、情報処理装置4は、吊ロープ66及び起伏ロープ67の繰出長と、過負荷防止装置19が算出した負荷率とをメモリ282に保存する。そして、一定期間(例えば、1日、1週間、1ヶ月)が経過すると、情報処理装置4は、繰出長及び負荷率をサーバ10に送信し、カウント部281に曲げ伸ばし履歴を生成させればよい。この場合、情報処理装置4は、曲げ伸ばし履歴を生成する必要がないので、処理負荷が軽減される。
(Modification 2)
The counting unit 281 and the statistical information generating unit 101 may be provided in the server 10. In this case, the information processing device 4 stores the feeding length of the suspension rope 66 and the undulating rope 67 and the load factor calculated by the overload prevention device 19 in the memory 282. Then, when a certain period (for example, one day, one week, one month) has passed, the information processing device 4 transmits the feeding length and the load factor to the server 10 and causes the counting unit 281 to generate a bending and stretching history. Good. In this case, since the information processing device 4 does not need to generate the bending and stretching history, the processing load is reduced.

(変形例3)
上記実施の形態では、図13に示すような3次元の曲げ伸ばし回数の分布図が採用されていたが、本発明はこれに限定されず、2次元の曲げ伸ばし回数の分布図が採用されてもよい。図23は、2次元の曲げ伸ばし回数の分布図の一例を示す図である。図23は、過負荷状態が発生したときの曲げ伸ばし回数の分布を示している。
(Modification 3)
In the above embodiment, the three-dimensional distribution of bending and stretching times as shown in FIG. 13 is adopted, but the present invention is not limited to this, and a two-dimensional distribution of bending and stretching times is adopted. Good. FIG. 23 is a diagram showing an example of a distribution diagram of the number of times of bending and stretching in two dimensions. FIG. 23 shows the distribution of the number of times of bending and stretching when an overload condition occurs.

図23の例では、過負荷状態が発生した回数番目毎に色分けされた、区分毎の曲げ伸ばし回数が示されている。140mの区間におけるバーの高さは、曲げ伸ばし回数が13回を示しているが、そのバーの内訳は、2回目の過負荷状態での曲げ伸ばし回数が3回、3回目の過負荷状態での曲げ伸ばし回数が6回、4回目の過負荷状態での曲げ伸ばし回数が2回、5回目での曲げ伸ばし回数が1回である。 In the example of FIG. 23, the number of times of bending and stretching for each section is shown, which is color-coded for each number of times when an overload condition occurs. The height of the bar in the 140m section shows that the number of bending and stretching is 13 times. The breakdown of the bar is that the number of bending and stretching in the second overloaded state is 3 times and in the third overloaded state. The number of times of bending and stretching is 6, and the number of times of bending and stretching in the fourth overloaded state is 2, and the number of times of bending and stretching is 5 times.

したがって、図23に示す2次元の曲げ伸ばし回数の分布から過負荷状態が発生したときに、どの区間で曲げ伸ばしが多く発生したのかを過負荷状態の発生番目ごとに認識することができる。 Therefore, from the two-dimensional distribution of bending and stretching times shown in FIG. 23, when an overload state occurs, it is possible to recognize in which section the bending and stretching often occur for each occurrence of the overload state.

(変形例4)
上記実施の形態では、情報処理装置4は、図2に示すように、携帯電話網6を介してサーバ10と接続されていたが、本発明はこれに限定されない。例えば、情報処理装置4は、LAN(Local Area Network)やインターネット通信網を介して接続されていてもよい。
(Modification 4)
In the above embodiment, the information processing device 4 was connected to the server 10 via the mobile phone network 6 as shown in FIG. 2, but the present invention is not limited to this. For example, the information processing device 4 may be connected via a LAN (Local Area Network) or an internet communication network.

(変形例5)
統計情報生成部101は、生成した統計情報からワイヤーロープの劣化の度合いを判定してもよい。この場合、統計情報生成部101は、図12に示す統計情報テーブルT11の各セルに重み値を設定する。そして、統計情報生成部101は、各セルの重み値に各セルの曲げ伸ばし回数を乗じた値を統計処理し、得られた値をワイヤーロープの劣化の度合いを示す評価値として算出すればよい。評価値としては、各セルの重み値に各セルの曲げ伸ばし回数を乗じた値の加算平均値が採用できる。また、統計情報生成部101は、過去のメンテナンス情報から各区間についての痛みやすさを判定し、痛みやすい区間は値が高く、痛みにくい区間は値が低くなるように重み値を設定してもよい。
(Modification 5)
The statistical information generation unit 101 may determine the degree of deterioration of the wire rope from the generated statistical information. In this case, the statistical information generation unit 101 sets a weight value for each cell of the statistical information table T11 shown in FIG. Then, the statistical information generation unit 101 may statistically process a value obtained by multiplying the weight value of each cell by the number of bending and stretching of each cell, and calculate the obtained value as an evaluation value indicating the degree of deterioration of the wire rope. .. As the evaluation value, an addition average value of values obtained by multiplying the weight value of each cell by the number of bending and stretching times of each cell can be adopted. In addition, the statistical information generation unit 101 determines the ease of pain for each section from the past maintenance information, and sets the weight value such that the value is high in the section that is easy to pain and low in the section that is hard to pain. Good.

そして、統計情報生成部101は、算出した評価値を端末14の提示部141に表示させる、或いは、クレーン2の操作パネルに表示させることにより、ユーザに評価値を提示すればよい。これにより、ユーザにワイヤーロープがどの程度疲労しているかを示す判断材料を提示できる。 Then, the statistical information generation unit 101 may present the evaluation value to the user by displaying the calculated evaluation value on the presentation unit 141 of the terminal 14 or by displaying it on the operation panel of the crane 2. As a result, it is possible to present the user with judgment information indicating how tired the wire rope is.

また、統計情報生成部101は、図12に示す統計情報テーブルT11において、統計的な特徴量を算出することで、ワイヤーロープの劣化の度合いを算出してもよい。この場合、特徴量が一致又は類似するワイヤーロープは、同等の疲労が進行していると判断できる。特徴量としては、例えば、分散が採用できる。 In addition, the statistical information generation unit 101 may calculate the degree of deterioration of the wire rope by calculating a statistical feature amount in the statistical information table T11 illustrated in FIG. In this case, it can be determined that the wire ropes having the same or similar characteristic amounts have the same fatigue. As the characteristic amount, for example, dispersion can be adopted.

(変形例6)
クレーン2は、報知部として、オペレータに吊ロープ66及び起伏ロープ67の点検を促すメッセージを表示する表示モニタ等を備えていてもよい。この場合、統計情報生成部101は、例えば、変形例5で算出した評価値が基準値を超えた場合に、点検を促すメッセージを端末14の提示部141或いはクレーン2の操作パネルに表示させればよい。
(Modification 6)
The crane 2 may include a display monitor or the like as a notification unit that displays a message prompting the operator to inspect the suspension rope 66 and the undulating rope 67. In this case, for example, when the evaluation value calculated in the modified example 5 exceeds the reference value, the statistical information generation unit 101 causes a message prompting an inspection to be displayed on the presentation unit 141 of the terminal 14 or the operation panel of the crane 2. Good.

(変形例7)
また、本発明による負荷指標値として、負荷率の代わりに、吊ロープ66,起伏ロープ67にかかる実荷重が採用されてもよい。
(Modification 7)
Further, as the load index value according to the present invention, the actual load applied to the suspension rope 66 and the undulating rope 67 may be adopted instead of the load factor.

(変形例8)
上記実施の形態では、曲げ伸ばし回数をカウントする際の基準値をシーブの1/4周としたが、本発明はこれに限定されない。例えば、シーブの半径や、シーブに種類に応じて、基準値は変更されてもよい。例えば、アイドラシーブ51bにおいては、吊ロープ66との当接する円弧の長さが1/2周より短いこともある。この場合、基準値はアイドラシーブ51bの1/4周以下の値(例えば1/8周)に設定されてもよい。また、シーブの半径が小さいほど曲げ伸ばし時にワイヤーロープにかかる負荷が増大するので、シーブの半径が小さくなるにつれて、1回のカウント値を増大させてもよい。
(Modification 8)
In the above-mentioned embodiment, the reference value when counting the number of bending and stretching is set to ¼ circumference of the sheave, but the present invention is not limited to this. For example, the reference value may be changed according to the radius of the sheave and the type of the sheave. For example, in the idler sheave 51b, the length of the arc contacting the suspension rope 66 may be shorter than 1/2 turn. In this case, the reference value may be set to a value equal to or less than 1/4 round of the idler sheave 51b (for example, 1/8 round). Further, the smaller the radius of the sheave, the more the load applied to the wire rope during bending and stretching. Therefore, the count value for one time may be increased as the radius of the sheave becomes smaller.

T11 統計情報テーブル
T19 状態履歴テーブル
T20 曲げ伸ばし履歴テーブル
1 情報提示システム
2 クレーン
4 情報処理装置
6 携帯電話網
10 サーバ
12 インターネット通信網
14 端末
18 センサ部
19 過負荷防止装置
21 第1コントローラ
22 第2コントローラ
28 データロガー
30 CANバス
41,42 回転量センサ
43,44 負荷センサ
45 角度センサ
51 ブーム
51a トップシーブ
51b アイドラシーブ
51c フックシーブ
61 巻上ウインチ
61a 巻上ドラム
62 起伏ウインチ
62a 起伏ドラム
64 フック装置
66 吊ロープ
67 起伏ロープ
100 吊荷
101 統計情報生成部
141 提示部
191 負荷算出部
211,221 繰出長算出部
281 カウント部
282 メモリ
601 シーブ
602 ワイヤーロープ
T11 Statistical information table T19 State history table T20 Bending and stretching history table 1 Information presentation system 2 Crane 4 Information processing device 6 Mobile phone network 10 Server 12 Internet communication network 14 Terminal 18 Sensor section 19 Overload prevention device 21 First controller 22 Second Controller 28 Data logger 30 CAN bus 41,42 Rotation amount sensor 43,44 Load sensor 45 Angle sensor 51 Boom 51a Top sheave 51b Idler sheave 51c Hook sheave 61 Hoisting winch 61a Hoisting drum 62 Hoisting winch 62a Hoisting drum 64 Hooking device 66 Hanging Rope 67 Undulating rope 100 Suspended load 101 Statistical information generation unit 141 Presentation unit 191 Load calculation unit 211,221 Delivery length calculation unit 281 Count unit 282 Memory 601 Sheave 602 Wire rope

Claims (5)

少なくとも1つのシーブを介して対象物を吊り下げるワイヤーロープを巻き取るウインチを備えたクレーンにおいて、前記ワイヤーロープに関する情報を提示する情報提示システムであって、
前記ワイヤーロープにかかる負荷の指標値である負荷指標値を算出する負荷算出部と、
前記ワイヤーロープを複数の区間に区分したときの各区間における前記シーブに対する前記ワイヤーロープの通過長が基準値を超えた回数である曲げ伸ばし回数を、前記算出された負荷指標値に応じてカウントするカウント部と、
前記カウント部によるカウント結果に基づいて、前記負荷指標値に応じた前記区間毎の曲げ伸ばし回数を示す統計情報を生成する統計情報生成部と、
前記生成された前記統計情報を提示する提示部とを備え、
前記カウント部は、ある区間が前記シーブを通過する途中で前記ワイヤーロープの巻き方向が切り替わって当該区間のシーブに対するトータルの通過長が前記基準値を超えた場合、当該区間に対するカウントを行わない、
情報提示システム。
A crane having a winch for winding a wire rope for suspending an object through at least one sheave, wherein the information presenting system presents information about the wire rope.
A load calculation unit that calculates a load index value that is an index value of the load on the wire rope,
When the wire rope is divided into a plurality of sections, the number of times of bending and stretching, which is the number of times the length of the wire rope with respect to the sheave in each section exceeds a reference value, is counted according to the calculated load index value. Counting part,
A statistical information generation unit that generates statistical information indicating the number of times of bending and stretching for each section according to the load index value, based on the counting result by the counting unit,
E Bei a presentation unit for presenting the generated the statistical information,
The counting unit, when the winding direction of the wire rope is switched in the middle of passing a certain section through the sheave and the total passing length for the sheave of the section exceeds the reference value, does not count for the section.
Information presentation system.
前記統計情報生成部は、前記算出された負荷指標値が予め定められた複数の負荷区分のうち、いずれの負荷区分に属するかを特定し、前記特定した負荷区分に応じた前記区間毎の前記曲げ伸ばし回数を示す情報を前記統計情報として生成する請求項1記載の情報提示システム。 The statistical information generation unit identifies which load category the calculated load index value belongs to among a plurality of predetermined load categories, and the section for each of the sections according to the identified load category. The information presentation system according to claim 1, wherein information indicating the number of times of bending and stretching is generated as the statistical information. 前記ワイヤーロープは、前記クレーンの起伏部材に取り付けられ、
前記ワイヤーロープは複数のシーブに掛け回され、
前記情報提示システムは、
業装置の姿勢を検出する姿勢検出部と、
前記ウインチから繰り出された前記ワイヤーロープの長さの指標値である繰出長指標値を算出する繰出長算出部とを更に備え、
前記カウント部は、前記算出された繰出長指標値と前記検出された姿勢と前記シーブの掛数とに基づいて、前記ワイヤーロープ上での各シーブの位置を算出し、各シーブに対する前記区間毎の通過長を算出する請求項1又は2記載の情報提示システム。
The wire rope is attached to the undulating member of the crane,
The wire rope is hung around multiple sheaves,
The information presentation system,
And the attitude detection unit for detecting the attitude of the work equipment,
Further comprising a payout length calculation unit for calculating a payout length index value that is an index value of the length of the wire rope paid out from the winch,
The counting unit calculates the position of each sheave on the wire rope based on the calculated feeding length index value, the detected posture, and the number of sheaves of the sheave, and for each section for each sheave. The information presentation system according to claim 1, wherein the passage length of the information is calculated.
前記情報提示システムは、情報処理装置と、前記情報処理装置とネットワークを介して接続されたサーバとを備え、
前記情報処理装置は、前記負荷算出部と前記カウント部とを備え、
前記サーバは、前記統計情報生成部を備え、
前記情報処理装置は、前記カウント部によるカウント結果を蓄積し、一定の期間が経過する度に前記蓄積したカウント結果を前記サーバに送信する請求項1〜3のいずれかに記載の情報提示システム。
The information presentation system includes an information processing device and a server connected to the information processing device via a network,
The information processing device includes the load calculation unit and the counting unit,
The server includes the statistical information generation unit,
4. The information presentation system according to claim 1, wherein the information processing device accumulates the counting result by the counting unit and transmits the accumulated counting result to the server every time a certain period of time elapses.
前記基準値は、前記シーブの円周の少なくとも1/4の値を持つ請求項1〜4のいずれかに記載の情報提示システム。 The information presentation system according to any one of claims 1 to 4, wherein the reference value has a value of at least 1/4 of a circumference of the sheave.
JP2016174368A 2016-09-07 2016-09-07 Crane information presentation system Active JP6729211B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016174368A JP6729211B2 (en) 2016-09-07 2016-09-07 Crane information presentation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016174368A JP6729211B2 (en) 2016-09-07 2016-09-07 Crane information presentation system

Publications (2)

Publication Number Publication Date
JP2018039603A JP2018039603A (en) 2018-03-15
JP6729211B2 true JP6729211B2 (en) 2020-07-22

Family

ID=61625079

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016174368A Active JP6729211B2 (en) 2016-09-07 2016-09-07 Crane information presentation system

Country Status (1)

Country Link
JP (1) JP6729211B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7346354B2 (en) * 2020-04-21 2023-09-19 株式会社日立産機システム Wire rope monitoring equipment and crane systems
JP2022062629A (en) * 2020-10-08 2022-04-20 五洋建設株式会社 System for specifying unwound length of cable, program, and method of managing unwinding of cable
CN113479775B (en) * 2021-06-28 2024-07-02 杭州鸿泉物联网技术股份有限公司 Crane lifting load identification method and identification system
CN116735827A (en) * 2023-05-11 2023-09-12 首钢京唐钢铁联合有限责任公司 Wire rope detection methods, devices and equipment for vertical loopers

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2748836B2 (en) * 1993-12-16 1998-05-13 日本鋼管株式会社 Crane wire rope life prediction method and apparatus
JP5479728B2 (en) * 2008-12-25 2014-04-23 株式会社日立産機システム Wire rope monitoring device and wire rope monitoring method
JP5381106B2 (en) * 2009-01-07 2014-01-08 コベルコクレーン株式会社 Crane operation evaluation device
JP5832381B2 (en) * 2012-06-07 2015-12-16 日立住友重機械建機クレーン株式会社 Work machine
JP2014163047A (en) * 2013-02-21 2014-09-08 Hitachi Constr Mach Co Ltd Fatigue strength evaluating device for construction machine
DE102015006992B4 (en) * 2014-06-10 2021-04-15 Liebherr-Werk Ehingen Gmbh Method and system for calculating data for the operation of a crane
JP6435162B2 (en) * 2014-10-31 2018-12-05 株式会社相浦機械 Crane wire rope fatigue measurement method and apparatus

Also Published As

Publication number Publication date
JP2018039603A (en) 2018-03-15

Similar Documents

Publication Publication Date Title
JP6729211B2 (en) Crane information presentation system
JP6123835B2 (en) Crane information presentation system
CN105347211B (en) Derrick crane panorama visible, controllable, intellectual monitoring and safeguarding integrated system
JP5642039B2 (en) Abnormal state management apparatus for worker and abnormal state management method for work site
CN106056863B (en) Ancient tower monitoring and warning system based on Internet of Things
CN111196561B (en) Tower crane warning method, device and system
CN113724105A (en) Building construction site monitoring system and monitoring method thereof
JP6972868B2 (en) Safety judgment program, safety judgment method and safety judgment device
CN109160419B (en) Anti-collision central processing device for building construction tower crane group
JP5914382B2 (en) Status monitoring system, status monitoring device, and terminal device
CN118482687B (en) Tunnel sedimentation monitoring system based on Ad hoc network acquisition
CN119294834B (en) An intelligent assessment system for subway construction safety risks
KR101844533B1 (en) Construction Monitering System for monitering progress of construction and Method thereof
WO2018235445A1 (en) INFORMATION PROCESSING APPARATUS, INFORMATION PROCESSING METHOD, AND CONTROL PROGRAM
CN111259538B (en) Vibration alarm method, storage medium and electronic equipment
JPWO2015037113A1 (en) Abnormality diagnosis method and apparatus
JP2019067207A (en) Work determination program, work determination method and work determination apparatus
CN106679626B (en) Real-time monitoring method and system for inclination and collapse of communication iron tower
CN116517788B (en) Online monitoring system and method for structural health of concrete tower of wind turbine generator
US12559909B2 (en) Construction assistance system
JP2013174983A (en) Reservoir dynamic state monitoring system
CN201082846Y (en) Real-time safety supervisory system for hoisting device
CN111170184B (en) Real-time monitoring and early warning system and method for tower crane
CN111898094A (en) Method and device for processing foundation pit monitoring data, electronic equipment and storage medium
CN111196572A (en) Safety protection method for tower crane

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20190423

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20200205

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20200225

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20200424

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20200602

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20200615

R150 Certificate of patent or registration of utility model

Ref document number: 6729211

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250