JP6735214B2 - Construction method of concrete slab - Google Patents
[go: Go Back, main page]

JP6735214B2 - Construction method of concrete slab - Google Patents

Construction method of concrete slab Download PDF

Info

Publication number
JP6735214B2
JP6735214B2 JP2016225908A JP2016225908A JP6735214B2 JP 6735214 B2 JP6735214 B2 JP 6735214B2 JP 2016225908 A JP2016225908 A JP 2016225908A JP 2016225908 A JP2016225908 A JP 2016225908A JP 6735214 B2 JP6735214 B2 JP 6735214B2
Authority
JP
Japan
Prior art keywords
concrete
concrete slab
slab
slabs
seismic isolation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2016225908A
Other languages
Japanese (ja)
Other versions
JP2018084029A (en
Inventor
閑田 徹志
徹志 閑田
弘泰 植松
弘泰 植松
怜一郎 中村
怜一郎 中村
匠二 富田
匠二 富田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP2016225908A priority Critical patent/JP6735214B2/en
Publication of JP2018084029A publication Critical patent/JP2018084029A/en
Application granted granted Critical
Publication of JP6735214B2 publication Critical patent/JP6735214B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Description

本発明はコンクリートスラブの施工方法に関する。 The present invention relates to a concrete slab construction method.

免震構造物では、図12(a)に簡単に示すように免震装置10の上に柱20を設け、その上のコンクリートスラブ1等を支持するものがある。このような免震構造物でコンクリートスラブ1を施工する際に、打設したコンクリートが日を経て収縮すると、図12(b)に示すようにコンクリートの収縮に追従して柱20等が水平移動し、免震装置10が水平変形(せん断変形)し歪が生じてしまう。 In some seismic isolation structures, columns 20 are provided on the seismic isolation device 10 to support the concrete slab 1 and the like thereon, as briefly shown in FIG. When the placed concrete contracts with the passage of time when the concrete slab 1 is constructed with such a seismic isolation structure, the columns 20 and the like move horizontally following the contraction of the concrete as shown in FIG. 12(b). However, the seismic isolation device 10 is deformed horizontally (shear deformation), and distortion occurs.

コンクリートの収縮には乾燥収縮と温度収縮があり、乾燥収縮と温度収縮による収縮量はコンクリートスラブの規模に応じて増加する。コンクリートスラブの規模が大きく収縮量が大きくなると、免震装置に大きな歪が生じて許容範囲を超え、所定の性能を発揮できなくなる恐れがある。 The shrinkage of concrete includes dry shrinkage and temperature shrinkage, and the shrinkage amount due to dry shrinkage and temperature shrinkage increases according to the scale of the concrete slab. If the scale of the concrete slab is large and the amount of shrinkage is large, the seismic isolation device will be distorted to a large extent, exceeding the permissible range, and the desired performance may not be achieved.

そのため、従来は、コンクリートスラブの規模を一定以下に抑えるべく、コンクリートスラブを数区画に分割して施工し、各区画のコンクリートスラブの間にエキスパンションジョイントを設ける方法が一般的であった。 Therefore, conventionally, in order to keep the scale of the concrete slab below a certain level, it has been common to divide the concrete slab into several sections for construction and provide an expansion joint between the concrete slabs in each section.

また、特許文献1には、コンクリートの収縮に伴う免震装置の歪を抑制するため、コンクリートスラブを数区画に分割して施工し、且つ各区画のコンクリートを打設し硬化した後に当該コンクリートの側方からジャッキ等で圧力を加えて強制的に収縮させ、その後隣り合う区画のコンクリートスラブの間に間詰材を充填する方法が記載されている。 Further, in Patent Document 1, in order to suppress the strain of the seismic isolation device due to the contraction of concrete, the concrete slab is divided into several sections for construction, and the concrete in each section is placed and hardened before the concrete A method is described in which pressure is applied from the side with a jack or the like to forcefully shrink the material, and then a filling material is filled between the concrete slabs in adjacent sections.

特許第5491212号Patent No. 5491212

しかしながら、コンクリートスラブの間にエキスパンションジョイントを設ける場合、施工後、建物を使用していく中でのメンテナンスが難しいという難点があった。 However, when an expansion joint is provided between the concrete slabs, there is a difficulty in that maintenance is difficult during use of the building after construction.

また、特許文献1のようにコンクリートを強制的に圧縮する場合、ジャッキによる大きな圧力が必要となる。そのため、強力なジャッキが必要でコストがかかり、ジャッキの圧力管理も難しい。また、ジャッキによる圧縮作業はコンクリートが完全に硬化した後に行う必要があるので工期面での課題もある。 Further, when the concrete is forcibly compressed as in Patent Document 1, a large pressure by the jack is required. Therefore, a strong jack is required and costly, and it is difficult to control the pressure of the jack. Further, the compression work by the jack needs to be performed after the concrete is completely hardened, which causes a problem in terms of construction period.

本発明は上記の問題に鑑みてなされたものであり、コンクリートの収縮による免震装置の歪を容易に抑制できるコンクリートスラブの施工方法を提供することを目的とする。 The present invention has been made in view of the above problems, and an object of the present invention is to provide a method for constructing a concrete slab that can easily suppress distortion of the seismic isolation device due to contraction of concrete.

前述した課題を解決するための本発明は、免震装置を介して支持される複数の区画のコンクリートスラブを形成する工程と、隣り合う区画のコンクリートスラブの少なくとも一方を移動させ、隣り合う区画のコンクリートスラブの間隔を広げる工程と、隣り合う区画のコンクリートスラブの間に間詰材を充填する工程と、を有することを特徴とするコンクリートスラブの施工方法である。 The present invention for solving the above-mentioned problems, a step of forming concrete slabs of a plurality of sections supported via a seismic isolation device, and moving at least one of the concrete slabs of adjacent sections, the adjacent sections of A method of constructing a concrete slab, comprising: a step of widening an interval between the concrete slabs; and a step of filling a space filler between the concrete slabs of adjacent sections.

本発明では、複数の区画にコンクリートを打設しコンクリートスラブを形成した後に、隣り合う区画のコンクリートスラブを移動させ、その間隔を広げて間詰材を充填する。この時免震装置には歪が生じるが、日を経てコンクリートが収縮することにより免震装置が元の形状に戻り、免震装置の歪を抑制して許容範囲内に抑えることができる。本発明では前記したようにコンクリートスラブを圧縮するのではなくコンクリートスラブを移動させるので、ジャッキ等による大きな圧力をかけることは必要なく、コストを低減でき圧力管理も容易である。またコンクリートの脱型後に作業を開始できるので工期の面でも好ましい。またコンクリートスラブの間にエキスパンションジョイントを設ける必要も特に無く、メンテナンスも容易である。 In the present invention, after concrete is cast in a plurality of sections to form a concrete slab, the concrete slabs in the adjacent sections are moved, and the intervals are widened to fill the packing material. At this time, the seismic isolation device is distorted, but as the concrete shrinks over time, the seismic isolation device returns to its original shape, and the seismic isolation device can be suppressed from being distorted within an allowable range. According to the present invention, since the concrete slab is moved instead of being compressed as described above, it is not necessary to apply a large pressure by a jack or the like, and the cost can be reduced and the pressure can be easily controlled. Further, the work can be started after the concrete is removed from the mold, which is also preferable in terms of construction period. Further, it is not necessary to provide an expansion joint between the concrete slabs, and maintenance is easy.

本発明では、例えば隣り合う区画のコンクリートスラブの両方を移動させ、前記間隔を広げる。この時、隣り合う区画のコンクリートスラブを支持する免震装置の数は同程度であることが望ましい。
本発明では、上記のように隣り合う区画のコンクリートスラブの両方を移動させ、その間隔を広げることができる。この時、両区画のコンクリートスラブを支持する免震装置の数が同程度であることで、ジャッキ等を用いてコンクリートスラブ間を押し広げる場合にこれらのコンクリートスラブを均等に移動させ、一方の区画のコンクリートスラブが大きく移動するのを防ぐことができる。
In the present invention, for example, both of the concrete slabs in the adjacent sections are moved to widen the interval. At this time, it is desirable that the number of seismic isolation devices supporting the concrete slabs in the adjacent sections be about the same.
In the present invention, both of the concrete slabs in the adjacent sections can be moved and the interval can be increased as described above. At this time, since the number of seismic isolation devices supporting the concrete slabs in both sections is the same, these concrete slabs are moved evenly when pushing between the concrete slabs using a jack etc. It is possible to prevent the concrete slab from moving greatly.

本発明では、中央の区画のコンクリートスラブの両側の区画のコンクリートスラブをそれぞれ移動させ、前記間隔を広げることも可能である。この時、前記両側の区画のコンクリートスラブを支持する免震装置の数は同程度であることが望ましい。
本発明では、上記のように中央の区画のコンクリートスラブの両側の区画のコンクリートスラブをそれぞれ移動させ、隣り合う区画のコンクリートスラブの間隔を広げることもできる。この時は、両側の区画のコンクリートスラブを支持する免震装置の数が同程度であることで、ジャッキ等を用いてコンクリートスラブ間を押し広げる場合にこれらのコンクリートスラブを均等に移動させることができる。
In the present invention, it is also possible to move the concrete slabs on both sides of the concrete slab in the central section to widen the interval. At this time, it is desirable that the number of seismic isolation devices that support the concrete slabs on both sides of the section be about the same.
In the present invention, as described above, the concrete slabs on both sides of the concrete slab in the central compartment can be moved to widen the intervals between the concrete slabs in the adjacent compartments. At this time, since the number of seismic isolation devices supporting the concrete slabs on both sides is similar, it is possible to move these concrete slabs evenly when pushing between the concrete slabs using a jack or the like. it can.

少なくともいずれかの区画のコンクリートスラブのコンクリートの打設開始日の日平均気温の平年値より、間詰材の充填開始日の日平均気温の平年値が低いことが望ましい。
これにより、温度によるコンクリートの収縮が存在する状態で間詰材の充填を行い、その後のコンクリートの温度収縮の影響を小さくして免震装置の歪を許容範囲内に収めることができる。
It is desirable that the average daily temperature of the average day of filling of the interstitial material is lower than the average ordinary temperature of the day when the concrete of the concrete slab in at least one of the sections is placed.
As a result, the filling material can be filled in a state where the concrete contracts due to the temperature, and the influence of the subsequent temperature contraction of the concrete can be reduced to keep the strain of the seismic isolation device within the allowable range.

また、所定期間内において、前記打設開始日の日平均気温の平年値から前記充填開始日の日平均気温の平年値を引いた差が最大となる前記打設開始日と前記充填開始日に、少なくともいずれかの区画のコンクリートスラブのコンクリートの打設と、間詰材の充填とをそれぞれ開始することも望ましい。
これにより、温度によるコンクリートの収縮が最大となる条件で間詰材の充填を行い、その後のコンクリートの温度収縮の影響をより小さくできる。
Further, within a predetermined period, the casting start date and the filling start date are the maximum differences obtained by subtracting the average value of the daily average temperature of the filling start date from the normal value of the daily average temperature of the placement start date. It is also desirable to start placing concrete of the concrete slab in at least one of the sections and filling filling material with the filling material.
Thereby, the filling material is filled under the condition that the shrinkage of the concrete due to the temperature is maximized, and the influence of the subsequent temperature shrinkage of the concrete can be further reduced.

コンクリートスラブの移動方向に沿って見た時に、コンクリートスラブの移動量の総和が、前記移動方向の全区画のコンクリートスラブの端から端までの長さをLとして、2×10-4×L/2以上且つ12×10-4×L/2以下となることが望ましい。また、コンクリートスラブの移動量を、コンクリートスラブの移動方向に沿ったコンクリートスラブの長さに応じて定めることも望ましい。
コンクリートスラブの移動量の総和を上記の範囲とすることで、コンクリートの乾燥収縮等に伴う変形により、最終的に免震装置を元の形状に戻すことができる。また、コンクリートの乾燥等による収縮量はその長さに依るので、コンクリートスラブの移動量をコンクリートスラブの長さに応じて定めることで、免震装置を好適に元の形状に戻すことができる。
When viewed along the moving direction of the concrete slab, the total amount of movement of the concrete slab is 2 × 10 -4 × L/, where L is the length from end to end of the concrete slab of all sections in the moving direction. It is preferably 2 or more and 12×10 −4 ×L/2 or less. It is also desirable to determine the moving amount of the concrete slab according to the length of the concrete slab along the moving direction of the concrete slab.
By setting the total amount of movement of the concrete slab within the above range, it is possible to finally restore the seismic isolation device to its original shape due to deformation due to drying shrinkage of the concrete and the like. Further, since the shrinkage amount of concrete due to drying or the like depends on its length, the seismic isolation device can be suitably returned to its original shape by determining the moving amount of the concrete slab according to the length of the concrete slab.

本発明により、コンクリートの収縮による免震装置の歪を容易に抑制できるコンクリートスラブの施工方法を提供することができる。 According to the present invention, it is possible to provide a method for constructing a concrete slab that can easily suppress distortion of the seismic isolation device due to contraction of concrete.

コンクリートスラブ1の施工方法の概略を示す図。The figure which shows the outline of the construction method of the concrete slab 1. コンクリートスラブ1の施工方法の概略を示す図。The figure which shows the outline of the construction method of the concrete slab 1. コンクリートスラブ1の施工方法の概略を示す図。The figure which shows the outline of the construction method of the concrete slab 1. コンクリートスラブ1の施工方法の概略を示す図。The figure which shows the outline of the construction method of the concrete slab 1. スラブ1の平面図。The top view of the slab 1. スラブ1の平面図。The top view of the slab 1. 免震装置10の直上階より上の階を示す図。The figure which shows the floor above the floor directly above the seismic isolation device 10. コンクリートスラブ1の施工方法の概略を示す図。The figure which shows the outline of the construction method of the concrete slab 1. コンクリートスラブ1の施工方法の概略を示す図。The figure which shows the outline of the construction method of the concrete slab 1. コンクリートスラブ1の施工方法の概略を示す図。The figure which shows the outline of the construction method of the concrete slab 1. スラブ1の平面図。The top view of the slab 1. 免震装置10の歪を示す図。The figure which shows the distortion of the seismic isolation apparatus 10.

以下、図面に基づいて本発明の好適な実施形態について詳細に説明する。 Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the drawings.

[第1の実施形態]
(1.コンクリートスラブ1の施工方法の概略)
図1〜図4は、本発明の第1の実施形態に係るコンクリートスラブの施工方法の概略を示す図である。
[First Embodiment]
(1. Outline of construction method for concrete slab 1)
1 to 4 are diagrams showing an outline of a method for constructing a concrete slab according to the first embodiment of the present invention.

図1に示すように、本実施形態では、免震構造物において免震装置10の上に柱20が設置されており、その上で型枠(不図示)を用いてコンクリートを打設することでコンクリートスラブ1(以下、単にスラブということがある)が形成される。図1の例では、施工予定領域のコンクリートスラブが2つの区画に分割して施工され、各区画のスラブ1が免震装置10を介して支持される。各区画のスラブ1からは互いの方向に向けて鉄筋11が突出しており、これらの鉄筋11によってスラブ1の間で重ね継手が形成されるようになっている。 As shown in FIG. 1, in this embodiment, a pillar 20 is installed on a seismic isolation device 10 in a seismic isolation structure, and concrete is placed using a form (not shown) on the pillar 20. A concrete slab 1 (hereinafter sometimes simply referred to as a slab) is formed. In the example of FIG. 1, the concrete slab in the planned construction area is divided into two sections for construction, and the slab 1 in each section is supported via the seismic isolation device 10. Reinforcing bars 11 project from the slabs 1 in the respective sections in the respective directions, and the reinforcing bars 11 form a lap joint between the slabs 1.

なお、各区画のスラブ1の下面には梁30が設けられる。図1の例では梁30が鉄骨梁であり、隣り合う区画の梁30同士は接合プレート31によって接合される。接合プレート31はボルト32によって各梁30に取付けられるが、一方の梁30(図1の例では左の区画の梁30)側のボルト32は接合プレート31の梁軸方向の長孔33に通された状態であり、当該ボルト32を本締めするまでは両区画の梁30が梁軸方向に相対移動可能である。 A beam 30 is provided on the lower surface of the slab 1 in each section. In the example of FIG. 1, the beam 30 is a steel beam, and the beams 30 in adjacent sections are joined by the joining plate 31. The joint plate 31 is attached to each beam 30 by a bolt 32, but the bolt 32 on the side of one beam 30 (the beam 30 in the left section in the example of FIG. 1) is passed through the elongated hole 33 in the beam axial direction of the joint plate 31. The beams 30 in both sections are relatively movable in the beam axis direction until the bolt 32 is fully tightened.

本実施形態では、各区画のスラブ1のコンクリートを打設した後、型枠(不図示)を脱型して図2(a)に示すように隣り合う区画のスラブ1の間にジャッキ2を配置する。そして、図2(b)に示すようにジャッキ2によってスラブ1の間隔を押し広げ、両区画のスラブ1を距離xだけ外側に向かって移動させる。 In this embodiment, after the concrete of the slab 1 of each section is cast, the mold (not shown) is demolded and the jack 2 is placed between the slabs 1 of the adjacent sections as shown in FIG. 2(a). Deploy. Then, as shown in FIG. 2B, the gap between the slabs 1 is widened by the jack 2 to move the slabs 1 in both sections outward by the distance x.

スラブ1の移動とともに両区画の柱20、梁30も移動し、両区画の免震装置10は柱20の移動に応じて変形する。スラブ1の移動量は、この後の乾燥収縮と温度収縮によるコンクリートの収縮量を見込んで定められ、ジャッキ2によって強制的に収縮予定分だけスラブ1が押し広げられる。 As the slab 1 moves, the columns 20 and the beams 30 in both sections also move, and the seismic isolation devices 10 in both sections deform according to the movement of the columns 20. The amount of movement of the slab 1 is determined in consideration of the amount of shrinkage of concrete due to the subsequent drying shrinkage and temperature shrinkage, and the jack 2 forcibly spreads the slab 1 by the amount to be contracted.

乾燥収縮等を考慮すると、スラブ1の移動方向(図2(b)の左右方向に対応する)に沿って見た時に、ジャッキ2によるスラブ1の移動量の総和(図2(b)の例では2x)は、2×10-4×L/2以上且つ12×10-4×L/2以下となるようにするのが望ましい。ここで、Lは上記した移動方向の全区画のスラブ1の端から端までの長さである。この長さLは、例えばスラブ1の移動前の長さ(図2(a)のL参照)とする。 Considering drying shrinkage and the like, when viewed along the moving direction of the slab 1 (corresponding to the left-right direction of FIG. 2B), the total amount of movement of the slab 1 by the jack 2 (example of FIG. 2B) Then, 2x) is preferably 2×10 −4 ×L/2 or more and 12×10 −4 ×L/2 or less. Here, L is the length from end to end of the slab 1 in all the sections in the moving direction. This length L is, for example, the length before the movement of the slab 1 (see L in FIG. 2A).

上記の範囲は、多数のコンクリートスラブの乾燥収縮による変形のデータに温度収縮による変形を加味して得られたものである。すなわち、コンクリートの乾燥による収縮量はおよそ2×10-4×L/2〜8×10-4×L/2の範囲に収まり、この範囲の最大値にコンクリートの温度変化による収縮量の最大値として4×10-4×L/2を加えることで上記の範囲を定めている。ジャッキ2によるスラブ1の移動量の総和をこの範囲内に収めることで、当該移動量によってコンクリートの乾燥等による収縮量をキャンセルし、後述するように最終的に免震装置10を元の形状に戻すことができる。 The above range is obtained by adding deformation due to temperature shrinkage to data of deformation due to drying shrinkage of many concrete slabs. That is, the amount of shrinkage due to drying of concrete falls within the range of approximately 2 × 10 -4 × L/2 to 8 × 10 -4 × L/2, and the maximum value of this range is the maximum amount of shrinkage due to temperature change of concrete. The above range is defined by adding 4×10 −4 ×L/2. By keeping the total amount of movement of the slab 1 by the jack 2 within this range, the amount of contraction due to drying of concrete is canceled by the amount of movement, and the seismic isolation device 10 is finally returned to its original shape as described later. Can be returned.

さらに、スラブ1の移動量は、上記した移動方向に沿って見た時のスラブ1の長さに応じて定めることができる。すなわち、コンクリートの乾燥や温度変化による収縮量はその長さに依るので、スラブ1の移動量をスラブ1の長さに応じて定めることで、上記と同じく当該移動量によってコンクリートの乾燥等による収縮量をキャンセルし、後述するように最終的に免震装置10を元の形状に戻すことができる。 Further, the moving amount of the slab 1 can be determined according to the length of the slab 1 when viewed along the above-described moving direction. That is, since the amount of shrinkage due to drying or temperature change of concrete depends on its length, by determining the amount of movement of the slab 1 according to the length of the slab 1, shrinkage due to drying etc. The amount can be canceled and the seismic isolation device 10 can eventually be restored to its original shape as described below.

こうしてスラブ1の間を押し広げ両区画のスラブ1を移動させた状態で、図3に示すように両区画のスラブ1の間に間詰材3を充填し、両区画のスラブ1を連結する。間詰材3には例えばコンクリートが用いられ、スラブ1間にコンクリートを後打ちすることで両区画のスラブ1が連結され一体化される。 In this way, the space between the slabs 1 is widened and the slabs 1 in both compartments are moved, and as shown in FIG. 3, the space filler 3 is filled between the slabs 1 in both compartments to connect the slabs 1 in both compartments. .. For example, concrete is used as the filling material 3, and the slabs 1 in both sections are connected and integrated by post-casting concrete between the slabs 1.

間詰材3の充填開始日(以下、連結日ということがある)は、温度収縮を考慮し、最初に少なくともいずれかの区画のスラブ1のコンクリートの打設を開始した日(以下、単にコンクリート打設開始日ということがある)の日平均気温の平年値T1より、間詰材3の充填開始日の日平均気温の平年値T2が低くなるように定めるとよい。 In consideration of temperature shrinkage, the filling start date of the filling material 3 (hereinafter sometimes referred to as a connection date) is the date when the concrete of the slab 1 in at least one of the sections is first placed (hereinafter, simply concrete It is advisable to set the average yearly temperature T2 of the average daily temperature of the filling material 3 to be lower than the average average temperature T1 of the daily average temperature (often called the start date of placing).

これにより、温度によるコンクリートの収縮が存在する状態で間詰材3の充填を行い、その後のコンクリートの温度収縮の影響を小さくして免震装置10の歪を許容範囲内に収めることができる。なお、日平均気温の平年値は、日ごとに、過去の当該日の日平均気温を過去の所定期間(例えば、過去10年、過去20年、過去30年など)で平均したものであり、気象庁が提供するデータ(気象庁ホームページ参照)を用いることができる。また、平年値として採用する値は、例えば、上記のような平年値が得られ、且つコンクリートスラブ1の施工箇所に最も近い地点の値とする。 As a result, the filling material 3 is filled in a state where the concrete contracts due to the temperature, and the influence of the subsequent temperature contraction of the concrete is reduced to keep the strain of the seismic isolation device 10 within the allowable range. In addition, the normal value of the daily average temperature is an average of the daily average temperatures of the past day on a day-to-day basis in a predetermined period in the past (for example, the past 10 years, the past 20 years, the past 30 years, etc.), Data provided by the Meteorological Agency (see the Meteorological Agency website) can be used. Moreover, the value adopted as the normal year value is, for example, the value at the point where the normal year value as described above is obtained and which is the closest to the construction site of the concrete slab 1.

特に本実施形態では、所定期間内において、コンクリート打設開始日の日平均気温の平年値T1から連結日の日平均気温の平年値T2を引いた差(T1-T2)が最大となるようなコンクリート打設開始日と連結日に、少なくともいずれかの区画のスラブ1のコンクリートの打設と、間詰材3の充填を開始する。これにより、温度によるコンクリートの収縮が最大となる条件で間詰材3の充填を行い、その後のコンクリートの温度収縮の影響をより小さくできる。上記の所定期間は、免震構造物全体の施工手順その他を考慮し、図1〜図3で説明した工程を実施可能な期間として定めることができる。 Particularly, in the present embodiment, the difference (T1-T2) obtained by subtracting the average value T2 of the average daily temperatures of the consolidated days from the average value T1 of the average daily temperatures of the concrete placing start dates within the predetermined period is the maximum. On the concrete pouring start date and the connection date, the concrete pouring of the slab 1 in at least one of the sections and the filling of the filling material 3 are started. Thereby, the filling material 3 is filled under the condition that the shrinkage of the concrete due to the temperature is maximized, and the influence of the subsequent temperature shrinkage of the concrete can be further reduced. The above-described predetermined period can be determined as a period in which the steps described in FIGS. 1 to 3 can be performed in consideration of the construction procedure of the seismic isolation structure as a whole.

なお、実際に間詰材3を充填する際には、当日の気温(例えば当日の前日までに得られる当日の予想平均気温など)を確認し、コンクリート打設開始日の日平均気温の実際の値T1’から当日の気温T2’を引いた差(T1’-T2’)と前記の(T1-T2)を比較して、これらが所定量異なる場合、例えば(T1’-T2’)の値が(T1-T2)/2未満となる場合は、間詰材3の充填を延期することもできる。 When actually filling the filling material 3, check the temperature of the day (for example, the expected average temperature of the day obtained by the day before the day), and check the actual average temperature of the day when concrete is placed. Compare the difference (T1'-T2') minus the temperature T2' of the day from the value T1' and (T1-T2), if they differ by a predetermined amount, for example, the value of (T1'-T2') When is less than (T1-T2)/2, the filling of the filling material 3 can be postponed.

こうして間詰材3の充填を行った後、日が経ち、スラブ1の乾燥収縮と温度収縮が進むことで、前記した移動分が徐々に相殺されて図4に示すように柱20が移動して元の位置に戻り、免震装置10の歪みが解消されて複数の区画が一体化したスラブ1を構築することが可能となる。接合プレート31の長孔33に通したボルト32はこの時点で本締めし、接合プレート31によって隣り合う区画の梁30同士を接合する。なお、間詰材3はスラブ1間の細い隙間に設けられるため、その収縮はスラブ1の収縮に比べて無視できる程度の大きさである。 After the filling of the filling material 3 in this way, the days pass, and the drying shrinkage and the temperature shrinkage of the slab 1 progress, whereby the above-mentioned movement amount is gradually offset and the column 20 moves as shown in FIG. It is possible to construct the slab 1 in which a plurality of sections are integrated by eliminating the distortion of the seismic isolation device 10 by returning to the original position. The bolts 32 passed through the long holes 33 of the joining plate 31 are finally tightened at this point, and the beams 30 in adjacent sections are joined by the joining plate 31. Since the filling material 3 is provided in the narrow gap between the slabs 1, the shrinkage thereof is negligible as compared with the shrinkage of the slab 1.

(2.コンクリートスラブ1の施工方法のその他の例)
以上はコンクリートスラブ1の施工方法の概略であり、図1〜図4の例では各区画のスラブ1が1つの免震装置10によって支持されている。ただし、実際にスラブ1を分割して施工する場合、各区画のスラブ1が複数の免震装置10によって支持されるようなケースが多い。
(2. Other examples of construction method of concrete slab 1)
The above is the outline of the construction method of the concrete slab 1, and in the example of FIGS. 1 to 4, the slab 1 of each section is supported by one seismic isolation device 10. However, when the slab 1 is actually divided and constructed, the slab 1 in each section is often supported by a plurality of seismic isolation devices 10.

このようなケースでは、例えば図5の平面図に示すように、隣り合う区画の免震装置10を同数とすることが望ましい。これは、両区画のスラブ1を支持する免震装置10の数が異なると、ジャッキ2によって前記のようにスラブ1を移動させる際、免震装置10の数が少なく、免震装置10による拘束力の小さい一方の区画のスラブ1が大きく移動し、最終的に免震装置10の歪が残る恐れがあるためである。なお、図5ではスラブ1から突出する鉄筋11等の図示を省略している。これは後述する図6、図11でも同様である。 In such a case, for example, as shown in the plan view of FIG. 5, it is desirable to use the same number of seismic isolation devices 10 in adjacent sections. This is because when the number of seismic isolation devices 10 supporting the slabs 1 in both sections is different, the number of seismic isolation devices 10 is small when the slab 1 is moved by the jack 2 as described above, and the seismic isolation device 10 restrains the seismic isolation devices 10. This is because the slab 1 in one of the compartments with a small force may largely move, and eventually the seismic isolation device 10 may remain distorted. Note that, in FIG. 5, illustration of the reinforcing bars 11 and the like protruding from the slab 1 is omitted. This also applies to FIGS. 6 and 11 described later.

図5では、平面の左右方向に各区画のスラブ1が並ぶように分割を行っており、当該方向の免震装置10の歪を防ぐことができるが、例えば図6の平面図のようにスラブ1を分割することにより、平面の左右方向とこれに直交する上下方向の免震装置10の歪を同時に防ぐことも可能である。この場合も、上下左右に隣り合う区画の免震装置10の数は同数とする。このように、隣り合う区画の免震装置10の数が全て同数となるようにコンクリートスラブを分割し、図1〜図4の手順で施工を行うとよい。 In FIG. 5, the slab 1 of each section is divided so as to be aligned in the left-right direction of the plane, and distortion of the seismic isolation device 10 in that direction can be prevented. For example, as shown in the plan view of FIG. It is also possible to prevent distortion of the seismic isolation device 10 in the horizontal direction of the plane and in the vertical direction orthogonal to the horizontal direction by dividing 1 at the same time. In this case as well, the number of seismic isolation devices 10 in the vertically and horizontally adjacent sections is the same. In this way, it is advisable to divide the concrete slab so that all the seismic isolation devices 10 in the adjacent sections have the same number and perform the construction in the procedure of FIGS. 1 to 4.

また、以上の例では免震装置10の直上階に関してのみ説明したが、それより上の階については、図7に示すように免震装置10の直上階のスラブ1の移動に追従できるようにしておくことが望ましい。図7の例では、免震装置10の直上階より上の階では柱20と梁30のみ構築しており、隣り合う区画の梁30は、前記と同様のボルト32と長孔33を用いた機構により梁軸方向に相対移動可能になっている。 Further, in the above example, only the floor immediately above the seismic isolation device 10 has been described, but for the floors above it, it is possible to follow the movement of the slab 1 on the floor directly above the seismic isolation device 10, as shown in FIG. 7. It is desirable to keep. In the example of FIG. 7, only the columns 20 and the beams 30 are constructed on the floors directly above the seismic isolation device 10, and the beams 30 of the adjacent sections use the same bolts 32 and elongated holes 33 as those described above. The mechanism allows relative movement in the beam axis direction.

以上説明したように、本実施形態では複数の区画にコンクリートを打設しスラブ1を形成した後に、隣り合う区画のスラブ1を移動させ、その間隔を広げて間詰材3を充填する。この時免震装置10には歪が生じるが、日を経てコンクリートが収縮することにより免震装置10が元の形状に戻り、免震装置10の歪を抑制して許容範囲内に抑えることができる。これにより、免震装置10が所定の性能を発揮することができる。 As described above, in the present embodiment, concrete is poured into a plurality of compartments to form the slab 1, then the slabs 1 in the adjacent compartments are moved, and the intervals are widened to fill the packing material 3. At this time, the seismic isolation device 10 is distorted, but as the concrete shrinks over time, the seismic isolation device 10 returns to its original shape, and the seismic isolation device 10 can be suppressed from being distorted within an allowable range. it can. Thereby, the seismic isolation device 10 can exhibit a predetermined performance.

本実施形態では、前記したように各区画のスラブ1を圧縮するのではなくスラブ1を移動させるので、ジャッキ2による大きな圧力をかけることは必要なく、コストを低減でき圧力管理も容易である。またコンクリートの脱型後に作業を開始できるので、工期の面でも望ましい。またスラブ1の間にエキスパンションジョイントを設ける必要も特に無く、メンテナンスも容易である。 In the present embodiment, since the slab 1 is moved instead of being compressed in each section as described above, it is not necessary to apply a large pressure by the jack 2, and the cost can be reduced and the pressure management is easy. In addition, the work can be started after demolding the concrete, which is desirable in terms of construction period. Further, it is not particularly necessary to provide an expansion joint between the slabs 1, and maintenance is easy.

本実施形態では、前記のように隣り合う2つの区画のスラブ1の両方を移動させ、その間隔を広げることができる。この時、両区画のスラブ1を支持する免震装置10の数が同じであることで、ジャッキ2を用いてスラブ1間を押し広げる場合にこれらのスラブ1を均等に移動させ、一方の区画のスラブ1が大きく移動するのを防ぐことができる。 In this embodiment, as described above, it is possible to move both of the slabs 1 in the two adjacent sections to widen the interval. At this time, since the number of the seismic isolation devices 10 supporting the slabs 1 in both sections is the same, when the spaces between the slabs 1 are widened using the jack 2, the slabs 1 are moved evenly and one of the sections is separated. It is possible to prevent the slab 1 from moving largely.

また本実施形態では、前記したコンクリート打設開始日の日平均気温の平年値より連結日の日平均気温の平年値が低いことで、温度によるコンクリートの収縮が存在する状態で間詰材3の充填を行い、その後のコンクリートの温度収縮の影響を小さくできる。特にコンクリート打設開始日の日平均気温の平年値から連結日の日平均気温の平年値を引いた差が最大となるようなコンクリート打設開始日と連結日に、少なくともいずれかの区画のスラブ1のコンクリートの打設と、間詰材3の充填を開始することにより、その後のコンクリートの温度収縮の影響をより小さくできる。 Further, in the present embodiment, the average value of the daily average temperature on the connecting day is lower than the average value of the average daily temperature of the concrete pouring start day described above, so that the filling material 3 of the filling material 3 is contracted in the presence of shrinkage of the concrete due to the temperature. The effect of temperature shrinkage of concrete after filling can be reduced. Especially, the slab of at least one of the sections on the concrete placing start date and the joining date, which has the maximum difference between the ordinary value of the average day temperature of the concrete placing day and the ordinary value of the average day temperature of the joining day. By starting the casting of the concrete No. 1 and the filling of the filling material 3, the influence of the subsequent temperature shrinkage of the concrete can be further reduced.

また、スラブ1の移動量の総和を前記した範囲とすることで、コンクリートの乾燥収縮等に伴う変形により、最終的に免震装置10を元の形状に戻すことができる。また、コンクリートの乾燥等による収縮量はその長さに依るので、スラブ1の移動量をスラブ1の長さに応じて定めることで、免震装置10を好適に元の形状に戻すことができる。 Further, by setting the total amount of movement of the slab 1 within the above range, the seismic isolation device 10 can be finally returned to its original shape due to the deformation caused by the drying shrinkage of concrete or the like. Further, since the shrinkage amount of concrete due to drying or the like depends on its length, by determining the moving amount of the slab 1 according to the length of the slab 1, the seismic isolation device 10 can be restored to its original shape. ..

しかしながら、本発明はこれに限ることはない。例えば本実施形態ではジャッキ2を用いてスラブ1を移動させたが、その他の移動手段によってスラブ1を移動させてもよい。例えばスラブ1の間を押し広げるのではなくスラブ1を引張って移動させるような機構を用いることも可能である。また各区画のスラブ1の平面形状も特に限定されない。 However, the present invention is not limited to this. For example, although the slab 1 is moved using the jack 2 in this embodiment, the slab 1 may be moved by other moving means. For example, it is possible to use a mechanism that pulls and moves the slab 1 instead of pushing the space between the slabs 1. Also, the planar shape of the slab 1 in each section is not particularly limited.

さらに、本実施形態では梁30を鉄骨梁としているが、これに限ることはなく、RC(鉄筋コンクリート)梁でも良い。この場合、前記のスラブ1と同様、両区画の梁30を間隔を空けて配置し、両区画の梁30から互いの方向に向けて鉄筋を突出させ、梁30の間で重ね継手を形成することが可能である。この場合も両区画の梁30はスラブ1の移動と収縮に伴って梁軸方向に相対移動可能であり、梁30の間はコンクリート等によって間詰めできる。 Further, although the beam 30 is a steel beam in the present embodiment, the beam is not limited to this and may be an RC (reinforced concrete) beam. In this case, similarly to the slab 1 described above, the beams 30 of both sections are arranged at intervals, and the reinforcing bars are projected from the beams 30 of both sections toward each other to form a lap joint between the beams 30. It is possible. Also in this case, the beams 30 in both sections can move relative to each other in the beam axial direction as the slab 1 moves and contracts, and the beams 30 can be narrowed by concrete or the like.

次に、本発明の別の例について第2の実施形態として説明する。第2の実施形態は第1の実施形態と異なる点について主に説明し、同様の点については図等で同じ符号を付すなどして説明を省略する。また、第2の実施形態で説明する構成は、必要に応じて第1の実施形態で説明した構成と組み合わせることが可能である。 Next, another example of the present invention will be described as a second embodiment. The second embodiment will mainly describe different points from the first embodiment, and similar points will be denoted by the same reference numerals in the drawings and the like, and description thereof will be omitted. Further, the configuration described in the second embodiment can be combined with the configuration described in the first embodiment as needed.

[第2の実施形態]
図8〜図10は、本発明の第2の実施形態に係るコンクリートスラブの施工方法の概略を示す図である。
[Second Embodiment]
8 to 10 are views showing the outline of the method for constructing a concrete slab according to the second embodiment of the present invention.

図8に示すように、本実施形態では施工予定領域のコンクリートスラブが3つの区画に分割して施工され、第1の実施形態と同様、各区画のスラブ1が免震装置10を介して支持される。各区画のスラブ1の下面に梁30が設けられるのも第1の実施形態と同様である。 As shown in FIG. 8, in this embodiment, the concrete slab in the planned construction area is divided into three sections, and the slab 1 in each section is supported via the seismic isolation device 10 as in the first embodiment. To be done. The beam 30 is provided on the lower surface of the slab 1 in each section, as in the first embodiment.

本実施形態では、各区画のスラブ1のコンクリートを打設した後、型枠(不図示)を脱型して図9(a)に示すように中央の区画のスラブ1とその両側の区画のスラブ1の間のそれぞれにジャッキ2を配置する。そして、図9(b)に示すようにジャッキ2によって隣り合う区画のスラブ1の間隔を広げる。この時、中央の区画のスラブ1は移動しないが、両側の区画のスラブ1は外側に距離xだけ移動する。 In this embodiment, after the concrete of the slab 1 in each section is cast, the mold (not shown) is demolded to separate the slab 1 in the central section and the sections on both sides thereof as shown in FIG. 9(a). Place the jacks 2 between the slabs 1 respectively. Then, as shown in FIG. 9B, the interval between the slabs 1 in the adjacent sections is widened by the jack 2. At this time, the slab 1 in the center section does not move, but the slabs 1 in the sections on both sides move outward by the distance x.

スラブ1の移動とともに両側の区画の柱20、梁30も移動し、両側の区画の免震装置10は柱20の移動に応じて変形する。 As the slab 1 moves, the columns 20 and beams 30 on both sides of the partition also move, and the seismic isolation devices 10 on both sides of the partition deform according to the movement of the column 20.

こうしてスラブ1を移動させ、中央の区画のスラブ1とその両側の区画のスラブ1の間を押し広げた状態で、図10(a)に示すように隣り合う区画のスラブ1の間に間詰材3を充填し、隣り合う区画のスラブ1を連結する。 In this way, the slab 1 is moved and the space between the slabs 1 in the central compartment and the slabs 1 in the compartments on both sides of the slab 1 is spread out, and as shown in FIG. The material 3 is filled and the slabs 1 in adjacent sections are connected.

前記と同様、本実施形態においても、間詰材3の充填を行った後、日が経ち、スラブ1の乾燥収縮と温度収縮が進むことで、前記した移動分が徐々に相殺されてゆき、図10(b)に示すように両側の区画の柱20が移動して元の位置に戻り、両側の区画の免震装置10の歪みが解消されて複数の区画が一体化したスラブ1を構築することが可能となる。前記と同様、接合プレート31の長孔33に通したボルト32はこの時点で本締めし、接合プレート31によって隣り合う区画の梁30同士を接合する。 Similarly to the above, also in the present embodiment, after the filling of the interstitial material 3, the days pass, and the drying shrinkage and the temperature shrinkage of the slab 1 progress, whereby the above-mentioned movement amount is gradually offset, As shown in FIG. 10( b ), the pillars 20 on both sides of the section move and return to their original positions, the strain of the seismic isolation device 10 on both sides of the section is eliminated, and a slab 1 in which a plurality of sections are integrated is constructed. It becomes possible to do. Similar to the above, the bolts 32 passed through the long holes 33 of the joining plate 31 are finally tightened at this point, and the beams 30 in the adjacent sections are joined by the joining plate 31.

ジャッキ2によるスラブ1の移動量は前記と同様であり、スラブ1の移動方向(図9(b)の左右方向に対応する)に沿って見た時に、ジャッキ2によるスラブ1の移動量の総和(図9(b)の例では2x)が、2×10-4×L/2以上且つ12×10-4×L/2以下となるように定めるのが望ましい。前記と同様、Lは上記した移動方向の全区画のスラブ1の端から端までの長さ(図9(a)のL参照)である。この他、上記した移動方向に沿ったスラブ1の長さに応じてスラブ1の移動量を定めること、コンクリート打設開始日や連結日についても第1の実施形態と略同様である。 The amount of movement of the slab 1 by the jack 2 is the same as above, and when viewed along the direction of movement of the slab 1 (corresponding to the left-right direction of FIG. 9B), the total amount of movement of the slab 1 by the jack 2 (2x in the example of FIG. 9B) is preferably set to be 2×10 −4 ×L/2 or more and 12×10 −4 ×L/2 or less. Similarly to the above, L is the length from end to end of the slab 1 in all the sections in the above-described moving direction (see L in FIG. 9A). In addition, the moving amount of the slab 1 is determined according to the length of the slab 1 along the moving direction described above, and the concrete placing start date and the connecting date are substantially the same as those in the first embodiment.

また、本実施形態では、各区画のスラブ1が複数の免震装置10によって支持されるような場合、図11の平面図に示すように、両側の区画の免震装置10が同数となるようにすることが望ましい。前記と同様、両側の区画のスラブ1を支持する免震装置10の数が異なると、ジャッキ2によって前記のようにスラブ1を移動させる際、両側の区画のスラブ1が均等に移動せず、免震装置10の数が少ない方のスラブ1が大きく移動するためである。なお、中央の区画の免震装置10については、両側の区画の免震装置10の数と異なっていても構わない。 Further, in the present embodiment, when the slab 1 of each section is supported by a plurality of seismic isolation devices 10, as shown in the plan view of FIG. Is desirable. Similarly to the above, if the number of seismic isolation devices 10 supporting the slabs 1 on both sides is different, when the slab 1 is moved by the jack 2 as described above, the slabs 1 on both sides do not move evenly, This is because the slab 1 with the smaller number of seismic isolation devices 10 moves greatly. The number of seismic isolation devices 10 in the central compartment may be different from the number of seismic isolation devices 10 in both compartments.

このように、本実施形態では、中央の区画のスラブ1の両側の区画のスラブ1をそれぞれ移動させ、隣り合う区画のスラブ1の間隔を広げることで、第1の実施形態と同様の効果が得られる。この時は、両側の区画のスラブ1を支持する免震装置10の数が同じであることで、ジャッキ2を用いてスラブ1間を押し広げる場合に両側の区画のスラブ1を均等に移動させることができる。 As described above, in the present embodiment, by moving the slabs 1 on both sides of the slab 1 in the central section and widening the interval between the slabs 1 in the adjacent sections, the same effect as that of the first embodiment can be obtained. can get. At this time, since the number of seismic isolation devices 10 supporting the slabs 1 on both sides is the same, the slabs 1 on both sides are moved evenly when the slabs 1 are widened using the jack 2. be able to.

なお、両側の区画のスラブ1の免震装置10の数は上記のように同数が理想であるが、実務上は免震装置10の数が同程度であればよく、若干異なってもよい。ここで、免震装置10の数が同程度とは、一方のスラブ1の免震装置10の数をN1、他方のスラブ1の免震装置10の数をN2とし、その誤差を2×(N1-N2)/(N1+N2)としたときに、誤差が-0.2以上0.2以下の範囲にあることをいうものとする。これは、地震応答時の免震装置10の最大設計水平変形量と免震装置10の限界水平変形量の差(余裕度)が100mm程度であり、その半分の50mm程度を本発明で対象とする躯体の収縮による変形量の限界と考えると、その20%(0.2倍)の10mmは誤差範囲と判断できるためである。これは第1の実施形態の各スラブ1の免震装置10の数についても同様である。 The number of seismic isolation devices 10 of the slabs 1 on both sides is ideally the same as described above, but in practice, the number of seismic isolation devices 10 may be approximately the same, and may be slightly different. Here, the number of seismic isolation devices 10 being approximately the same means that the number of seismic isolation devices 10 of one slab 1 is N1 and the number of seismic isolation devices 10 of the other slab 1 is N2, and the error is 2×( When N1-N2)/(N1+N2), the error is in the range of -0.2 or more and 0.2 or less. This is because the difference (margin) between the maximum designed horizontal deformation amount of the seismic isolation device 10 and the limit horizontal deformation amount of the seismic isolation device 10 at the time of an earthquake response is about 100 mm, and about 50 mm which is half of the difference is targeted by the present invention. This is because, considering it as the limit of the amount of deformation due to the contraction of the body, 20% (0.2 times) of 10 mm can be judged as the error range. This also applies to the number of seismic isolation devices 10 of each slab 1 of the first embodiment.

以上、添付図面を参照して、本発明の好適な実施形態について説明したが、本発明は係る例に限定されない。当業者であれば、本願で開示した技術的思想の範疇内において、各種の変更例または修正例に想到し得ることは明らかであり、それらについても当然に本発明の技術的範囲に属するものと了解される。 The preferred embodiments of the present invention have been described above with reference to the accompanying drawings, but the present invention is not limited to such examples. It is obvious to those skilled in the art that various changes or modifications can be conceived within the scope of the technical idea disclosed in the present application, and naturally, these also belong to the technical scope of the present invention. Understood.

1:コンクリートスラブ
2:ジャッキ
3:間詰材
10:免震装置
11;鉄筋
20:柱
30:梁
31:接合プレート
32:ボルト
33:長孔
1: Concrete slab 2: Jack 3: Packing material 10: Seismic isolation device 11; Reinforcing bar 20: Pillar 30: Beam 31: Joint plate 32: Bolt 33: Long hole

Claims (9)

免震装置を介して支持される複数の区画のコンクリートスラブを形成する工程と、
隣り合う区画のコンクリートスラブの少なくとも一方を移動させ、隣り合う区画のコンクリートスラブの間隔を広げる工程と、
隣り合う区画のコンクリートスラブの間に間詰材を充填する工程と、
を有することを特徴とするコンクリートスラブの施工方法。
Forming a concrete slab of multiple compartments supported via seismic isolation devices;
A step of moving at least one of the concrete slabs in the adjacent sections to increase the interval between the concrete slabs in the adjacent sections,
A step of filling the filling material between the concrete slabs in the adjacent sections,
A method for constructing a concrete slab, which comprises:
隣り合う区画のコンクリートスラブの両方を移動させ、前記間隔を広げることを特徴とする請求項1記載のコンクリートスラブの施工方法。 The method for constructing a concrete slab according to claim 1, wherein both of the concrete slabs in adjacent sections are moved to widen the interval. 隣り合う区画のコンクリートスラブを支持する免震装置の数は同程度であることを特徴とする請求項2記載のコンクリートスラブの施工方法。 The method for constructing a concrete slab according to claim 2, wherein the number of seismic isolation devices supporting the concrete slabs in the adjacent sections is substantially the same. 中央の区画のコンクリートスラブの両側の区画のコンクリートスラブをそれぞれ移動させ、前記間隔を広げることを特徴とする請求項1記載のコンクリートスラブの施工方法。 The method for constructing a concrete slab according to claim 1, wherein the concrete slabs on both sides of the concrete slab in the central compartment are moved to widen the intervals. 前記両側の区画のコンクリートスラブを支持する免震装置の数は同程度であることを特徴とする請求項4記載のコンクリートスラブの施工方法。 The method for constructing a concrete slab according to claim 4, characterized in that the number of seismic isolation devices supporting the concrete slabs in the sections on both sides is substantially the same. 少なくともいずれかの区画のコンクリートスラブのコンクリートの打設開始日の日平均気温の平年値より、間詰材の充填開始日の日平均気温の平年値が低いことを特徴とする請求項1から請求項5のいずれかに記載のコンクリートスラブの施工方法。 The average value of the daily average temperature of the filling start date of the filling material is lower than the average value of the average temperature of the casting start date of the concrete slab in at least one of the sections. Item 6. A method for constructing a concrete slab according to any one of Items 5. 所定期間内において、前記打設開始日の日平均気温の平年値から前記充填開始日の日平均気温の平年値を引いた差が最大となる前記打設開始日と前記充填開始日に、少なくともいずれかの区画のコンクリートスラブのコンクリートの打設と、間詰材の充填とをそれぞれ開始することを特徴とする請求項6に記載のコンクリートスラブの施工方法。 Within a predetermined period, at least the casting start date and the filling start date at which the difference obtained by subtracting the normal value of the daily average temperature of the filling start day from the normal value of the daily average temperature of the casting start date is the maximum, The method for constructing a concrete slab according to claim 6, wherein the placing of concrete of the concrete slab in any of the sections and the filling of the filling material are started respectively. コンクリートスラブの移動方向に沿って見た時に、コンクリートスラブの移動量の総和が、前記移動方向の全区画のコンクリートスラブの端から端までの長さをLとして、2×10-4×L/2以上且つ12×10-4×L/2以下となることを特徴とする請求項1から請求項7のいずれかに記載のコンクリートスラブの施工方法。 When viewed along the moving direction of the concrete slab, the total amount of movement of the concrete slab is 2 × 10 -4 × L/, where L is the length from end to end of the concrete slab of all sections in the moving direction. The method for constructing a concrete slab according to any one of claims 1 to 7, which is 2 or more and 12 x 10 -4 x L/2 or less. コンクリートスラブの移動量を、コンクリートスラブの移動方向に沿ったコンクリートスラブの長さに応じて定めることを特徴とする請求項1から請求項8のいずれかに記載のコンクリートスラブの施工方法。
The method for constructing a concrete slab according to any one of claims 1 to 8, wherein the moving amount of the concrete slab is determined according to the length of the concrete slab along the moving direction of the concrete slab.
JP2016225908A 2016-11-21 2016-11-21 Construction method of concrete slab Active JP6735214B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016225908A JP6735214B2 (en) 2016-11-21 2016-11-21 Construction method of concrete slab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016225908A JP6735214B2 (en) 2016-11-21 2016-11-21 Construction method of concrete slab

Publications (2)

Publication Number Publication Date
JP2018084029A JP2018084029A (en) 2018-05-31
JP6735214B2 true JP6735214B2 (en) 2020-08-05

Family

ID=62238311

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016225908A Active JP6735214B2 (en) 2016-11-21 2016-11-21 Construction method of concrete slab

Country Status (1)

Country Link
JP (1) JP6735214B2 (en)

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006097325A (en) * 2004-09-29 2006-04-13 Ohbayashi Corp Seismic isolation device, seismic isolation building construction method, and seismic isolation building
JP5353086B2 (en) * 2008-06-23 2013-11-27 株式会社Ihi Construction method of floor slab concrete
JP5491212B2 (en) * 2010-01-22 2014-05-14 株式会社竹中工務店 Concrete slab construction method and concrete slab

Also Published As

Publication number Publication date
JP2018084029A (en) 2018-05-31

Similar Documents

Publication Publication Date Title
EP3421680B1 (en) Method of optimizing the concrete reinforcement arrangement and orientation in concrete
Hedebratt et al. Full-scale test of a pile supported steel fibre concrete slab
US20180106473A1 (en) Structure for seismic isolation, steel support structure, and method for seismic isolation of existing steel support structures
Helmy et al. Infilled masonry walls contribution in mitigating progressive collapse of multistory reinforced concrete structures according to UFC guidelines
JP5491212B2 (en) Concrete slab construction method and concrete slab
JP6735214B2 (en) Construction method of concrete slab
JP6849871B2 (en) Culvert wall structure and culvert wall construction method
JP5078863B2 (en) Replacement method of support device and replacement support device used in the method
JP5049242B2 (en) Prestress calculation method and concrete structure construction method
JP6404013B2 (en) Construction method of seismic isolation building
JP6664697B2 (en) Foundation structure using existing piles
AU2015201724B2 (en) Armoured Joints Including Load Transfer Means
JP2016089360A (en) Building foundation structure and building foundation structure construction method
JP6655936B2 (en) Construction method of structure
KR20160000005A (en) reinforcing expansion joint for wide concrete slab by using steel plate and reinforcing method of construction using the same for wide concrete slab
JP7163561B2 (en) Concrete structure construction method
JP6710586B2 (en) Gate type structure and construction method thereof
JP7045778B2 (en) Manufacturing method of precast segment
JP7750759B2 (en) basic structure
JP6388419B1 (en) 方法 Installation method and structure
JP6710064B2 (en) Seismic isolation retrofit construction method and building construction
US20160122998A1 (en) Formwork of reducing thickness due to loading of slab cast in-situ
JP6576204B2 (en) Slab construction method
JPS5883751A (en) Construction of beam in building
JP6484447B2 (en) Concrete placement method for wall frame

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20190619

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20200515

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20200707

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20200713

R150 Certificate of patent or registration of utility model

Ref document number: 6735214

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees