Construction method of large section tunnel Download PDFInfo
- Publication number
- JP6751260B2 JP6751260B2 JP2016132048A JP2016132048A JP6751260B2 JP 6751260 B2 JP6751260 B2 JP 6751260B2 JP 2016132048 A JP2016132048 A JP 2016132048A JP 2016132048 A JP2016132048 A JP 2016132048A JP 6751260 B2 JP6751260 B2 JP 6751260B2
- Authority
- JP
- Japan
- Prior art keywords
- section
- small
- tunnel
- diameter shield
- cross
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims description 64
- 238000000034 method Methods 0.000 claims description 44
- 239000000463 material Substances 0.000 claims description 17
- 230000002093 peripheral effect Effects 0.000 claims description 16
- 230000007704 transition Effects 0.000 claims description 16
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 19
- 238000009412 basement excavation Methods 0.000 description 6
- 230000007935 neutral effect Effects 0.000 description 4
- 239000000126 substance Substances 0.000 description 4
- 238000005429 filling process Methods 0.000 description 3
- 239000003673 groundwater Substances 0.000 description 3
- 238000002347 injection Methods 0.000 description 3
- 239000007924 injection Substances 0.000 description 3
- 230000001174 ascending effect Effects 0.000 description 2
- 230000000903 blocking effect Effects 0.000 description 2
- 239000011435 rock Substances 0.000 description 2
- 238000007796 conventional method Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000009969 flowable effect Effects 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 238000009751 slip forming Methods 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
- 239000013589 supplement Substances 0.000 description 1
Images
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Description
本発明は、複数本からなる小径シールドトンネルを用いて大断面トンネルを構築する際、特にシールドトンネルに拡幅部を設ける際に適用される大断面トンネルの構築方法に関する。 The present invention relates to a method of constructing a large-section tunnel that is applied when constructing a large-section tunnel using a plurality of small-diameter shield tunnels, particularly when providing a widened portion in the shield tunnel.
シールドトンネルにおいては、その分岐合流部、典型的には本線トンネルとランプトンネルとの接合箇所における分岐合流部でトンネル断面を拡幅する必要がある。 In the shield tunnel, it is necessary to widen the tunnel cross section at the branching/merging portion, typically, the branching/merging portion at the junction between the main tunnel and the ramp tunnel.
トンネルの分岐合流部は、道路トンネルであれば、幅が20mを上回る大断面となることも多く、直径が15mを超えるシールドマシン(シールド機、以下、単にシールド)も製作されるようになってきたとはいえ、分岐合流部という限られた区間をシールドマシンで全断面掘削することは現実的ではない。 In the case of road tunnels, the junctions and junctions of tunnels often have a large cross section with a width exceeding 20 m, and shield machines (shielding machines, hereinafter simply referred to as shields) with diameters exceeding 15 m are now being manufactured. However, it is not realistic to excavate the entire section of the limited area, which is the junction, with a shield machine.
このような状況下、シールドトンネルの断面を拡幅可能な技術として、分岐合流部が構築される構築予定領域の周縁に沿って複数本からなる小径のシールドトンネルをシールドトンネルのトンネル軸線方向に沿って複数本配置し、次いで、それらを用いてRC躯体を円筒状に構築して外殻とした後、その内側領域を掘削して分岐合流部を構築する工法が開発されている(特許文献1〜4)。
Under such circumstances, as a technology that can widen the cross section of the shield tunnel, a small-diameter shield tunnel consisting of multiple pieces along the periphery of the planned construction area where the branch and merge part will be constructed is installed along the tunnel axis direction of the shield tunnel. A method of arranging a plurality of them and then constructing a RC skeleton into a cylindrical shape by using them to form an outer shell, and then excavating an inner region thereof to construct a branching and joining portion has been developed (
これらの工法においては、小径シールドトンネルを先受け構造体として周辺土圧を支持しながら、これを切り開くことでRC躯体を連続的に構築するものであるため、小径シールドトンネルの切り開きからRC躯体の構築に至るまでの間、周辺地山からの漏水を防止するとともに該地山の崩落を防止して安全性を確保することが重要となる。 In these construction methods, the small-diameter shield tunnel is used as a receiving structure to support the surrounding earth pressure, and the RC structure is continuously constructed by cutting the small-diameter shield tunnel. Until construction, it is important to prevent water leakage from surrounding rocks and prevent collapse of the rocks to ensure safety.
ここで、複数本の小径シールドトンネルは、分岐合流部におけるトンネル横断面の大きさに応じて配置する必要があるため、横断面が大きな断面位置では、隣り合う小径シールドトンネル相互の間隔が大きくなり、特許文献1〜4記載の各工法では、上述した止水性や安全性を確保すべく、周辺地山の改良をより大規模に行わねばならない。
Here, since a plurality of small-diameter shield tunnels need to be arranged according to the size of the tunnel cross section at the branching/merging portion, the interval between adjacent small-diameter shield tunnels becomes large at the cross-section position where the cross section is large. In each of the construction methods described in
一方、分岐合流部におけるトンネル横断面の大きさに応じて小径シールドトンネルの本数を断面位置ごとに変化させる工法も提案されており(特許文献5)、同工法によれば、どの断面位置でも小径シールドトンネル相互の間隔を概ね一定にすることができるため、止水性や安全性確保のための地盤改良を過大な規模で行う必要がなくなる。 On the other hand, a construction method has also been proposed in which the number of small-diameter shield tunnels is changed for each cross-section position according to the size of the tunnel cross-section at the branching/merging portion (Patent Document 5). Since the intervals between the shield tunnels can be made substantially constant, it is not necessary to carry out ground improvement for securing waterproofness and safety on an excessive scale.
加えて、上記工法によれば、小径シールドトンネル相互の間隔を小さく保つことができるため、互いに隣り合う2つの小径シールドトンネルのうち、一方の小径シールドトンネルから互いに異なる角度方向に向けて2本の突条を延設するとともに、該2本の突条を、他方の小径シールドトンネルから同様に延設された2本の突条とそれらの先端でそれぞれ接続することにより、小径シールドトンネル同士の隙間を確実に閉じることが可能となり、上記箇所における止水性確保を裏込めのみによって行いやすくなるとともに、地盤改良工事が別途必要になるとしても、その改良範囲や改良程度を最小限に抑えることができる。 In addition, according to the above-mentioned construction method, it is possible to keep the distance between the small-diameter shield tunnels small, so that of the two small-diameter shield tunnels that are adjacent to each other, two small-diameter shield tunnels are arranged in different angular directions from each other. A gap between the small-diameter shield tunnels is provided by extending the ridges and connecting the two ridges with two ridges that are similarly extended from the other small-diameter shield tunnel at their tips. Can be securely closed, and it becomes easier to secure the waterproofness at the above-mentioned locations only by backfilling, and even if ground improvement work is separately required, the extent and extent of improvement can be minimized. ..
しかしながら、上述の突条を設けるためには、小径シールドのカッターヘッドで掘削された円形断面空間を側方に余堀り可能なサイドカッターを、小径シールドの周面から突設される形で該小径シールドに設けておかねばならない。 However, in order to provide the above-mentioned ridge, a side cutter capable of laterally excavating the circular cross-sectional space excavated by the cutter head of the small-diameter shield is provided in a form protruding from the peripheral surface of the small-diameter shield. Must be provided on the small diameter shield.
そのため、小径シールドを発進到達させる際、サイドカッターが坑口周縁に設けられた環状止水部材を押し拡げて該環状止水部材を小径シールドの周面から離間させ、該離間箇所で止水性が低下する懸念があった。 Therefore, when the small-diameter shield is started and reached, the side cutter pushes and spreads the annular water-stop member provided at the rim of the wellhead to separate the annular water-stop member from the peripheral surface of the small-diameter shield. I was concerned.
加えて、上述した突条は、2本を一組として二組設ける必要があるとともに、対向する突条同士を接続しなければならないため、突条を形成するのに精度が要求されるという問題も生じていた。 In addition, it is necessary to provide two sets of the above-mentioned ridges, and two ridges facing each other must be connected to each other. Therefore, accuracy is required to form the ridges. Was also occurring.
ちなみに、この問題は、小径シールドトンネルの本数を変化させない工法、例えば特許文献1〜4記載の各工法に上記構成を適用する際にも同様に生じる。
By the way, this problem also occurs when the above configuration is applied to a construction method that does not change the number of small-diameter shield tunnels, for example, each construction method described in
本発明は、上述した事情を考慮してなされたもので、隣り合う2本の小径シールドトンネル間における止水性や安全性確保に多大なコストをかけることなく、なおかつ小径シールドを発進到達させる際に坑口での止水性低下を防止可能な大断面トンネルの構築方法を提供することを目的とする。 The present invention has been made in consideration of the above-mentioned circumstances, and when the small-diameter shield is started and reached without incurring a great cost for securing water-stopping and safety between two adjacent small-diameter shield tunnels. It is an object of the present invention to provide a method for constructing a large-section tunnel capable of preventing a decrease in water shutoff at a wellhead.
上記目的を達成するため、本発明に係る大断面トンネルの構築方法は請求項1に記載したように、大断面トンネルが構築される構築予定領域の周縁に沿って複数本からなる小径シールドトンネルを該大断面トンネルのトンネル軸線方向に延設し、該複数本の小径シールドトンネルを先受け構造体として外殻を構築した後、該外殻で囲まれた内側領域を掘削する大断面トンネルの構築方法において、
前記小径シールドトンネルを構築するにあたって小径シールドで地山掘削を行う際、隣り合う小径シールドトンネルが先行構築されている場合には、該先行構築側で、先行構築された小径シールドトンネルのシールドセグメント背後に拡がる裏込め領域の一部を切削しつつ該裏込め領域に近接する側方地山を掘削することにより、トンネル軸線方向に沿った側方空間を形成するとともに、隣り合う小径シールドトンネルが未だ構築されていない場合には、該未構築側で側方地山を掘削することにより、トンネル軸線方向に沿った側方空間を形成し、
前記側方空間の形成工程と並行して又はその形成後、該側方空間に流動性固化材を充填することにより、前記先行構築側では、前記裏込め領域と連続一体化する拡張裏込め領域を形成するとともに、前記未構築側では、あらたな裏込め領域を形成する大断面トンネルの構築方法であって、
前記小径シールドを、径方向に沿って出入自在なサイドカッターが設けられた小径シールドとし、該小径シールドを発進到達させる際には、前記サイドカッターを前記小径シールドのシールド本体周面よりも内側に退避させ、前記各側方空間を形成する際には、前記サイドカッターを前記シールド本体の周面よりも外側に突出させるものである。
In order to achieve the above object, the method for constructing a large cross section tunnel according to the present invention is, as described in
When excavating the ground with a small-diameter shield in constructing the small-diameter shield tunnel, when adjacent small-diameter shield tunnels are pre-constructed, the preceding construction side is behind the shield segment of the pre-constructed small-diameter shield tunnel. By cutting a part of the backfilling area that spreads out to the side and excavating the side ground near the backfilling area, a side space along the tunnel axis direction is formed, and adjacent small-diameter shield tunnels are still formed. When not constructed, by excavating the lateral ground on the unconstructed side, a lateral space along the tunnel axis direction is formed,
In parallel with or after the step of forming the lateral space, by filling the lateral space with a fluidized solidifying material, on the preceding construction side, an expanded backfilling area that is continuously integrated with the backfilling area. And a method for constructing a large-section tunnel for forming a new backfill region on the unconstructed side ,
The small-diameter shield is a small-diameter shield provided with a side cutter that can freely move in and out along the radial direction. When retracting and forming each of the lateral spaces, the side cutter is projected outward from the peripheral surface of the shield body .
また、本発明に係る大断面トンネルの構築方法は、前記外殻を構築する際の施工範囲が前記拡張裏込め領域の外側に拡がる隣接地山に及ぶことがないように該拡張裏込め領域を形成するものである。 Further, in the method for constructing a large-section tunnel according to the present invention, the expanded backfilling area is provided so that the construction range at the time of constructing the outer shell does not extend to the adjacent ground extending outside the expanded backfilling area. To form.
また、本発明に係る大断面トンネルの構築方法は、前記構築予定領域をシールドトンネルの拡幅予定領域とするとともに該拡幅予定領域の横断面が最大となる断面位置を基準断面位置とし、該基準断面位置と横断面の大きさが実質的に同一の区間を大断面区間、前記基準断面位置よりも横断面の大きさが小さくかつその大きさが実質的に変化しない区間を小断面区間、横断面の大きさが前記大断面区間における大きさから前記小断面区間における大きさへと徐々に変化する区間を移行区間として、前記大断面区間では、前記複数本の小径シールドトンネルが前記拡幅予定領域の横断面輪郭線に沿ってすべて配置されるように、前記小断面区間では、前記複数本の小径シールドトンネルのうち、前記基準断面位置での配置間隔とほぼ同等になるために必要な本数だけが前記横断面輪郭線に沿って配置されるように、前記移行区間では、前記複数本の小径シールドトンネルのうち、前記基準断面位置での配置間隔とほぼ同等になるために必要な本数だけが前記横断面輪郭線に沿って配置されるとともに残りがその背後に配置されるように、前記複数本の小径シールドトンネルをそれぞれ延設するとともに、前記複数本の小径シールドトンネルのうち、前記横断面輪郭線に沿って隣り合う2つの小径シールドトンネルを構築する際及び前記横断面輪郭線に沿って配置された小径シールドトンネルと該小径シールドトンネルに隣り合うように背後に配置された小径シールドトンネルとを構築する際に前記側方空間の形成工程と前記充填工程とを行うものである。 Further, in the method for constructing a large-section tunnel according to the present invention, the construction-scheduled area is set as a width-expansion area of the shield tunnel, and a cross-sectional position at which the cross-section of the width-expansion area is maximized is set as a reference cross-section position. A section having substantially the same position and cross-section size is a large-section section, and a section having a cross-section size smaller than the reference cross-section position and whose size does not substantially change is a small-section section or a cross-section. In the large section section, the plurality of small-diameter shield tunnels are arranged in the widening planned area in the large section section with a section in which the size gradually changes from the size in the large section section to the size in the small section section. In the small cross-section section, only the number necessary to be almost equal to the arrangement interval at the reference cross-section position is provided in the small cross-section section so that they are all arranged along the contour line of the cross-section. In the transition section, only the number required to be substantially equal to the arrangement interval at the reference cross-section position is provided in the transition section so as to be arranged along the cross-section contour line. The plurality of small-diameter shield tunnels are respectively extended so that they are arranged along the contour line of the cross-section and the rest are arranged behind them, and the cross-section contour of the plurality of small-diameter shield tunnels is arranged. When constructing two small-diameter shield tunnels that are adjacent to each other along a line, and a small-diameter shield tunnel that is arranged along the cross-sectional contour line and a small-diameter shield tunnel that is arranged behind the small-diameter shield tunnel so as to be adjacent to the small-diameter shield tunnel. The step of forming the lateral space and the step of filling are performed when building.
また、本発明に係る大断面トンネルの構築方法は、前記外殻を構築する際の施工範囲が、前記拡張裏込め領域のうち、前記横断面輪郭線に沿って隣り合う2つの小径シールドトンネル間に形成される拡張裏込め領域の外側に拡がる隣接地山に及ぶことがないように該拡張裏込め領域を形成するものである。 Further, in the method for constructing a large-section tunnel according to the present invention, a construction range for constructing the outer shell is such that, between the two small-diameter shield tunnels which are adjacent to each other along the contour line of the transverse section in the expanded backfilling region. The expanded backfilling area is formed so as not to reach the adjacent ground extending outside the expanded backfilling area formed in the above.
また、本発明に係る大断面トンネルの構築方法は請求項5に記載したように、大断面トンネルが構築される構築予定領域の周縁に沿って複数本からなる小径シールドトンネルを該大断面トンネルのトンネル軸線方向に延設し、該複数本の小径シールドトンネルを先受け構造体として外殻を構築した後、該外殻で囲まれた内側領域を掘削する大断面トンネルの構築方法において、
前記小径シールドトンネルを構築するにあたって小径シールドで地山掘削を行う際、隣り合う小径シールドトンネルが先行構築されている場合には、該先行構築側で、先行構築された小径シールドトンネルのシールドセグメント背後に拡がる裏込め領域の一部を切削しつつ該裏込め領域に近接する側方地山を掘削することにより、トンネル軸線方向に沿った側方空間を形成するとともに、隣り合う小径シールドトンネルが未だ構築されていない場合には、該未構築側で側方地山を掘削することにより、トンネル軸線方向に沿った側方空間を形成し、
前記側方空間の形成工程と並行して又はその形成後、該側方空間に流動性固化材を充填することにより、前記先行構築側では、前記裏込め領域と連続一体化する拡張裏込め領域を形成するとともに、前記未構築側では、あらたな裏込め領域を形成する大断面トンネルの構築方法であって、
前記側方空間を形成する工程において、先行構築側で掘削する際には、前記先行構築された小径シールドトンネルに最も近い角度位置における深さよりもその両側における深さの方が大きくなるように前記側方空間を形成し、未構築側で掘削する際には、構築予定の小径シールドトンネルに最も近い角度位置を中心とした一定角度範囲で深さがほぼ均等となるように前記側方空間を形成するものである。
また、本発明に係る大断面トンネルの構築方法は請求項6に記載したように、大断面トンネルが構築される構築予定領域の周縁に沿って複数本からなる小径シールドトンネルを該大断面トンネルのトンネル軸線方向に延設し、該複数本の小径シールドトンネルを先受け構造体として外殻を構築した後、該外殻で囲まれた内側領域を掘削する大断面トンネルの構築方法において、
前記小径シールドトンネルを構築するにあたって小径シールドで地山掘削を行う際、隣り合う小径シールドトンネルが先行構築されている場合には、該先行構築側で、先行構築された小径シールドトンネルのシールドセグメント背後に拡がる裏込め領域の一部を切削しつつ該裏込め領域に近接する側方地山を掘削することにより、トンネル軸線方向に沿った側方空間を前記小径シールドの径方向に余堀りする形で形成するとともに、隣り合う小径シールドトンネルが未だ構築されていない場合には、該未構築側で側方地山を掘削することにより、トンネル軸線方向に沿った側方空間を前記小径シールドの径方向に余堀りする形で形成し、
前記側方空間の形成工程と並行して又はその形成後、該側方空間に流動性固化材を充填することにより、前記先行構築側では、前記裏込め領域と連続一体化する拡張裏込め領域を形成するとともに、前記未構築側では、あらたな裏込め領域を形成する大断面トンネルの構築方法であって、
前記構築予定領域をシールドトンネルの拡幅予定領域とするとともに該拡幅予定領域の横断面が最大となる断面位置を基準断面位置とし、該基準断面位置と横断面の大きさが実質的に同一の区間を大断面区間、前記基準断面位置よりも横断面の大きさが小さくかつその大きさが実質的に変化しない区間を小断面区間、横断面の大きさが前記大断面区間における大きさから前記小断面区間における大きさへと徐々に変化する区間を移行区間として、前記大断面区間では、前記複数本の小径シールドトンネルが前記拡幅予定領域の横断面輪郭線に沿ってすべて配置されるように、前記小断面区間では、前記複数本の小径シールドトンネルのうち、前記基準断面位置での配置間隔とほぼ同等になるために必要な本数だけが前記横断面輪郭線に沿って配置されるように、前記移行区間では、前記複数本の小径シールドトンネルのうち、前記基準断面位置での配置間隔とほぼ同等になるために必要な本数だけが前記横断面輪郭線に沿って配置されるとともに残りがその背後に配置されるように、前記複数本の小径シールドトンネルをそれぞれ延設するとともに、前記複数本の小径シールドトンネルのうち、前記横断面輪郭線に沿って隣り合う2つの小径シールドトンネルを構築する際及び前記横断面輪郭線に沿って配置された小径シールドトンネルと該小径シールドトンネルに隣り合うように背後に配置された小径シールドトンネルとを構築する際に前記側方空間の形成工程と前記充填工程とを行うものである。
Further, as described in claim 5, the method for constructing a large cross-section tunnel according to the present invention is characterized in that a small-diameter shield tunnel consisting of a plurality of small-diameter tunnels is formed along the periphery of the construction planned region where the large cross-section tunnel is constructed. In a method of constructing a large cross-section tunnel, which extends in the direction of the tunnel axis, constructs an outer shell using the plurality of small-diameter shield tunnels as a receiving structure, and excavates an inner region surrounded by the outer shell,
When constructing the small-diameter shield tunnel, when excavating the ground with a small-diameter shield, if adjacent small-diameter shield tunnels are pre-constructed, on the preceding construction side, behind the shield segment of the pre-constructed small-diameter shield tunnel. By cutting a part of the backfilling area that spreads out to the side and excavating the side ground close to the backfilling area, a side space along the tunnel axis direction is formed, and adjacent small-diameter shield tunnels are still formed. When not constructed, by excavating the lateral ground on the unconstructed side, a lateral space along the tunnel axis direction is formed,
In parallel with or after the step of forming the lateral space, by filling the lateral space with a fluidized solidifying material, on the preceding construction side, an expanded backfilling area that is continuously integrated with the backfilling area. And a method for constructing a large-section tunnel for forming a new backfill region on the unconstructed side ,
In the step of forming the lateral space, when excavating on the pre-constructed side, the depth on both sides of the pre-constructed small-diameter shield tunnel is set to be greater than the depth on the nearest angular position. When forming a lateral space and excavating on the unconstructed side, the lateral space should be made uniform so that the depth is almost uniform within a certain angle range centered on the angle position closest to the small-diameter shield tunnel to be constructed. To form .
Further, as described in claim 6, the method for constructing a large-section tunnel according to the present invention is characterized in that a small-diameter shield tunnel consisting of a plurality of small-diameter tunnels is provided along the periphery of a construction planned region where the large-section tunnel is constructed. In a method of constructing a large cross-section tunnel, which extends in the direction of the tunnel axis, constructs an outer shell using the plurality of small-diameter shield tunnels as a receiving structure, and excavates an inner region surrounded by the outer shell,
When constructing the small-diameter shield tunnel, when excavating the ground with a small-diameter shield, if adjacent small-diameter shield tunnels are pre-constructed, on the preceding construction side, behind the shield segment of the pre-constructed small-diameter shield tunnel. By excavating the side ground close to the backfilling area while cutting a part of the backfilling area that spreads out to the side, the lateral space along the tunnel axis direction is dug in the radial direction of the small diameter shield. If a small-diameter shield tunnel adjacent to the small-diameter shield is not constructed yet, the lateral space along the tunnel axis direction is formed by excavating the side ground on the unconstructed side . It is formed in a shape that is dug in the radial direction ,
In parallel with or after the step of forming the lateral space, by filling the lateral space with a fluidized solidifying material, on the preceding construction side, an expanded backfilling area that is continuously integrated with the backfilling area. And a method for constructing a large-section tunnel for forming a new backfill region on the unconstructed side,
The area to be constructed is the area to be widened of the shield tunnel, and the cross-sectional position at which the cross-section of the area to be widened is the maximum is the reference cross-sectional position, and the reference cross-sectional position and the cross-sectional size are substantially the same. Is a large cross-section section, a section in which the size of the cross-section is smaller than the reference cross-section position and the size of which does not change substantially is a small cross-section section, and the size of the cross-section is smaller than the size in the large-section section. As a transition section a section that gradually changes to the size in the section section, in the large section section, so that the plurality of small-diameter shield tunnels are all arranged along the cross-section contour line of the widening planned region, In the small cross-section section, among the plurality of small-diameter shield tunnels, only the number necessary to be substantially equal to the arrangement interval at the reference cross-section position is arranged along the cross-section contour line, In the transition section, among the plurality of small-diameter shield tunnels, only the number necessary to be substantially equal to the arrangement interval at the reference cross-section position is arranged along the cross-section contour line, and the rest is the same. The plurality of small-diameter shield tunnels are respectively extended so as to be arranged behind, and two of the plurality of small-diameter shield tunnels that are adjacent to each other along the cross-section contour line are constructed. At the time of and at the time of constructing a small-diameter shield tunnel arranged along the cross-sectional contour line and a small-diameter shield tunnel arranged behind the small-diameter shield tunnel so as to be adjacent to the small-diameter shield tunnel, the step of forming the lateral space and the filling The process is performed.
本発明に係る大断面トンネルの構築方法においては、小径シールドトンネルを構築するにあたって小径シールドで地山掘削を行う際、隣り合う小径シールドトンネルが先行構築されている場合には、該先行構築側で、先行構築された小径シールドトンネルのシールドセグメント背後に拡がる裏込め領域の一部を切削しつつ該裏込め領域に近接する側方地山を掘削することで、トンネル軸線方向に沿った側方空間を形成する。 In the method of constructing a large cross-section tunnel according to the present invention, when excavating the ground with a small-diameter shield in constructing a small-diameter shield tunnel, when adjacent small-diameter shield tunnels are constructed in advance, on the preceding construction side By cutting a part of the backfill area that extends behind the shield segment of the small-diameter shield tunnel that was previously constructed, and excavating the side ground near the backfill area, a side space along the tunnel axis direction. To form.
一方、隣り合う小径シールドトンネルが未だ構築されていない場合には、該未構築側で側方地山を掘削することにより、トンネル軸線方向に沿った側方空間を形成する。 On the other hand, when adjacent small-diameter shield tunnels have not been constructed yet, a lateral space along the tunnel axis direction is formed by excavating the lateral ground on the unconstructed side.
これらの側方空間は、小径シールドの先端に設けられたカッターヘッドによる円形断面状の掘削空間を径方向に拡張する、つまり径方向に余堀りする形で形成される。 These lateral spaces are formed in such a manner that the excavation space having a circular cross section formed by the cutter head provided at the tip of the small-diameter shield is expanded in the radial direction, that is, is dug in the radial direction.
なお、先行構築側の側方空間を形成するにあたっては、裏込め領域の一部を切削する際、先行構築された小径シールドトンネルと干渉することがないよう、該小径シールドトンネルに最も近い角度位置における深さよりもその両側における深さの方が大きくなるように形成するのが典型例となり、未構築側の側方空間を形成するにあたっては、構築予定の小径シールドトンネルに最も近い角度位置を中心とした一定角度範囲で深さがほぼ均等となるように形成するのが典型例となる。 In forming the lateral space on the pre-constructed side, when cutting a part of the backfill area, the angular position closest to the pre-constructed small-diameter shield tunnel should be avoided so as not to interfere with the pre-constructed small-diameter shield tunnel. The typical example is to make the depth on both sides larger than the depth on the side.When forming the lateral space on the unconstructed side, center the angular position closest to the small-diameter shield tunnel to be constructed. It is a typical example to form so that the depths are substantially uniform within a certain angle range.
上述した側方空間が形成されたならば、それと並行して又はその後、該側方空間に流動性固化材を充填することにより、先行構築側では、上述の裏込め領域と連続一体化する拡張裏込め領域を形成するとともに、未構築側では、あらたな裏込め領域を形成する。 Once the above-mentioned lateral space has been formed, in parallel with or after that, by filling the lateral space with a flowable solidifying material, on the preceding construction side, the expansion which is continuously integrated with the above-mentioned backfilling region is performed. A backfill area is formed, and a new backfill area is formed on the unconstructed side.
このようにすると、隣り合う2つの小径シールドトンネル間に形成された拡張裏込め領域によって止水性と地山崩落に対する安全性が確保されるため、外殻を構築する際に大がかりな地盤改良が不要になるほか、従来工法のように、2本を一組とした突条を二組設けた上で、対向する突条同士を先端で接続するという複雑な構造を構築する必要もない。 In this way, the expanded backfilling area formed between two adjacent small-diameter shield tunnels ensures water shutoff and safety against landslides, eliminating the need for major ground improvement when constructing the outer shell. In addition, unlike the conventional method, it is not necessary to construct a complicated structure in which two sets of two ridges are provided and the opposing ridges are connected to each other at their tips.
小径シールドで地山掘削を行う際には、上述したように、隣り合う小径シールドトンネルが先行構築されている場合と未だ構築されていない場合とがあるが、例えば小径シールドトンネルの構築開始時のように、いずれの側も未構築側となる場合がある一方で、構築終了時のように、いずれの側も先行構築側となる場合があり、前者の場合には、両側であらたな裏込め領域がそれぞれ形成され、後者の場合には、両側で拡張裏込め領域がそれぞれ形成されることとなる。 When excavating the ground with a small-diameter shield, as described above, there are cases where adjacent small-diameter shield tunnels are pre-constructed and cases where they are not yet constructed. Thus, while either side may be the unconstructed side, either side may be the pre-constructed side, such as at the end of the construction.In the former case, new backfilling is performed on both sides. Regions are formed respectively, and in the latter case, extended backfill regions are formed on both sides.
拡張裏込め領域は、隣り合う2つの小径シールドトンネル間に外殻を構築する際、一定の止水性と地山崩落に対する安全性が確保されれば足りるものであって、必ずしも外殻構築時の施工範囲をすべてカバーする必要はなく、薬液注入等の止水措置を部分的に施しながら、拡張裏込め領域の機能を補う構成が可能であるが、外殻を構築する際の施工範囲が前記拡張裏込め領域の外側に拡がる隣接地山に及ぶことがないように該拡張裏込め領域を形成するようにしたならば、外殻構築作業が拡張裏込め領域内で行われることとなって、追加の止水措置を省略し、あるいは軽減することが可能となる。 The expanded backfill area is sufficient if a certain level of water stopping and safety against ground collapse are secured when constructing an outer shell between two adjacent small-diameter shield tunnels. It is not necessary to cover the entire construction range, and it is possible to configure to supplement the function of the expanded backfilling area while partially implementing water-stopping measures such as chemical injection, but the construction range when constructing the outer shell is the same as the above. If the expanded backfilling area is formed so as not to reach the adjacent ground extending outside the expanded backfilling area, the outer shell construction work is performed in the expanded backfilling area, It is possible to omit or reduce additional water shutoff measures.
本発明に係る大断面トンネルの構築方法において、小径シールドトンネルとは、大断面トンネルに対する相対的概念を表した表現であって、その径がシールド工法における当業者の認識に拘束されるものではなく、本発明の小径シールドトンネルとして、シールド工法分野で中口径と呼ばれる大きさ、例えばφ4m程度のシールドトンネルを用いる場合も本発明に包摂される。 In the method for constructing a large-section tunnel according to the present invention, the small-diameter shield tunnel is an expression representing a relative concept to the large-section tunnel, and its diameter is not restricted to the recognition of those skilled in the shield construction method. As the small-diameter shield tunnel of the present invention, a case where a shield tunnel having a size called a medium diameter in the field of the shield construction method, for example, about 4 m is used is also included in the present invention.
また、本発明に係る大断面トンネルの構築方法は、大断面トンネルの構築予定領域の周縁に沿って複数本の小径シールドトンネルを延設し、次いで、該小径シールドトンネルを利用して外殻を構築した後、該外殻の内側を掘削して大断面トンネル空間を形成する工法であって、外殻構築の際、隣り合う2本の小径シールドトンネル相互の離間による止水性や安全性の低下を防止する必要がある全ての場合に適用可能であり、複数本の小径シールドトンネルをどのように構築するかは任意であるし、大断面トンネルの用途も任意であり、さらには、断面位置によって小径シールドトンネルの本数が変化するか一定であるかも任意である。 In addition, the method for constructing a large-section tunnel according to the present invention is such that a plurality of small-diameter shield tunnels are extended along the periphery of an area where a large-section tunnel is to be constructed, and then the outer shell is formed by utilizing the small-diameter shield tunnel. After construction, it is a method of excavating the inside of the outer shell to form a large cross-section tunnel space, and when constructing the outer shell, water resistance and safety decrease due to separation between two adjacent small-diameter shield tunnels. It is applicable to all cases where it is necessary to prevent, and how to construct multiple small-diameter shield tunnels is arbitrary, and the use of large-section tunnels is also arbitrary. It is also arbitrary whether the number of small-diameter shield tunnels changes or is constant.
例えば、大断面トンネルの構築予定領域をシールドトンネルの拡幅予定領域とし、大断面区間では、複数本の小径シールドトンネルが拡幅予定領域の横断面輪郭線に沿ってすべて配置されるように、小断面区間では、複数本の小径シールドトンネルのうち、基準断面位置での配置間隔とほぼ同等になるために必要な本数だけが横断面輪郭線に沿って配置されるように、移行区間では、複数本の小径シールドトンネルのうち、基準断面位置での配置間隔とほぼ同等になるために必要な本数だけが横断面輪郭線に沿って配置されるとともに残りがその背後に配置されるように、複数本の小径シールドトンネルをそれぞれ延設する場合にも適用可能である。 For example, the area where the large-section tunnel is to be constructed is the area where the shield tunnel is to be widened, and in the large-section section, multiple small-diameter shield tunnels are all arranged along the cross-section contour line of the area to be widened. Of the multiple small-diameter shield tunnels in the section, the number of multiple tunnels in the transition section should be set so that only the number necessary to be approximately the same as the arrangement interval at the reference section position is arranged along the contour line of the cross section. Among the small-diameter shield tunnels in the above, only a plurality of tunnel tunnels should be arranged along the contour line of the cross section and the rest should be arranged behind them, in order to be almost the same as the spacing at the reference cross section position. It is also applicable when extending the small diameter shield tunnels.
かかる場合においては、複数本の小径シールドトンネルのうち、横断面輪郭線に沿って隣り合う2つの小径シールドトンネルを構築する際に上述した各側方空間の形成工程と充填工程とを行うが、横断面輪郭線に沿って配置された小径シールドトンネルが該横断面輪郭線から離隔して他の小径シールドトンネルから離脱する箇所や、横断面輪郭線から離隔する小径シールドトンネルが該横断面輪郭線に沿って配置された小径シールドトンネルに割り込むように進入する箇所では、横断面輪郭線に沿って隣り合う2つの小径シールドトンネル相互の間隔が大きくなって、上述した各側方空間の形成工程及び充填工程の実施が困難になる場合がある。 In such a case, among the plurality of small-diameter shield tunnels, when forming two small-diameter shield tunnels that are adjacent to each other along the cross-section contour line, the above-described forming process and filling process of each lateral space are performed. The small-diameter shield tunnel arranged along the cross-section contour line is separated from the cross-section contour line and separated from another small-diameter shield tunnel, or the small-diameter shield tunnel separated from the cross-section contour line is the cross-section contour line. At the location where the small-diameter shield tunnels arranged along the line are inserted so as to interrupt, the distance between two small-diameter shield tunnels that are adjacent to each other along the cross-sectional contour line becomes large, and The filling process may be difficult to perform.
しかし、その場合であっても、横断面輪郭線に沿った小径シールドトンネルの背後に、離脱又は進入しようとする小径シールドトンネルが近接配置されているので、これらを構築する際に上述した各側方空間の形成工程及び充填工程を行えば、横断面輪郭線に沿った小径シールドトンネルとその背後に配置された小径シールドトンネルとの間が確実に閉じられることとなり、その結果、横断面輪郭線に沿って隣り合う2つの小径シールドトンネル相互の間隔が大きくなる場合にも、大がかりな地盤改良を行うことなく、止水性と地山崩落に対する安全性を確保することが可能となる。 However, even in that case, since the small-diameter shield tunnels that are going to leave or enter are closely arranged behind the small-diameter shield tunnels along the cross-sectional contour line, each side mentioned above when constructing these If the forming process and the filling process of the rectangular space are performed, the small-diameter shield tunnel along the cross-section contour line and the small-diameter shield tunnel arranged behind it are securely closed, and as a result, the cross-section contour line is formed. Even if the distance between two small-diameter shield tunnels adjacent to each other along the path becomes large, it is possible to secure the water stoppage and the safety against landslides without major ground improvement.
拡幅部は、シールドトンネルの分岐合流部、特に本線トンネルとランプトンネルとの接合箇所における分岐合流部として形成される場合が典型例となるが、緊急避難ゾーン、非常駐車帯その他任意の目的で構築される拡幅部が包摂される。 The widened part is typically formed as a branching and joining part of the shield tunnel, especially as a branching and joining part at the junction of the main tunnel and the ramp tunnel, but it is constructed for an emergency evacuation zone, an emergency parking zone or any other purpose. The widened part is included.
拡張裏込め領域のうち、横断面輪郭線に沿って隣り合う2つの小径シールドトンネル間に形成される拡張裏込め領域については、上述したと同様、必ずしも外殻構築時の施工範囲をすべてカバーする必要はなく、薬液注入等の止水措置を部分的に施しながら、拡張裏込め領域の機能を補う構成が可能であるが、外殻を構築する際の施工範囲が前記拡張裏込め領域の外側に拡がる隣接地山に及ぶことがないように該拡張裏込め領域を形成するようにしたならば、外殻構築作業が拡張裏込め領域内で行われることとなって、追加の止水措置を省略し、あるいは軽減することが可能となる。 Of the expanded backfill area, the expanded backfill area formed between the two small-diameter shield tunnels that are adjacent to each other along the contour line of the cross section does not necessarily cover the entire construction range when constructing the outer shell, as described above. Although it is not necessary, it is possible to construct a structure that complements the function of the expanded backfill area while partially performing water-stopping measures such as chemical injection, but the construction range when constructing the outer shell is outside the expanded backfill area. If the expanded backfill area is formed so that it does not extend to the adjacent ground that spreads over, the outer shell construction work will be performed in the expanded backfill area, and additional water stop measures will be taken. It is possible to omit or reduce it.
一方、拡張裏込め領域のうち、横断面輪郭線に沿って配置された小径シールドトンネルと該小径シールドトンネルに隣り合うように背後に配置された小径シールドトンネルとの間に形成される拡張裏込め領域については、後者の小径シールドトンネルが横断面輪郭線から離隔しているため、該拡張裏込め領域で外殻構築時の施工範囲をすべてカバーすることは本来的に困難であって、拡張裏込め領域が形成された反対の側から地下水が外殻構築時の施工範囲に浸水するおそれがあるが、かかる場合には、拡張裏込め領域でカバーされていない範囲を薬液注入や凍結といった方法で別途止水すればよい。 On the other hand, in the expanded backfill area, the expanded backfill formed between the small-diameter shield tunnel arranged along the contour line of the transverse section and the small-diameter shield tunnel arranged behind the small-diameter shield tunnel so as to be adjacent to the small-diameter shield tunnel. As for the area, since the latter small-diameter shield tunnel is separated from the contour line of the cross section, it is inherently difficult to cover the entire construction range when constructing the outer shell in the expanded backfill area. There is a risk that groundwater will infiltrate the construction area when constructing the outer shell from the opposite side where the filling area is formed.In such a case, the area not covered by the expanded backfilling area may be injected or frozen by a method such as chemical injection. You can stop the water separately.
上述した各側方空間をどのように形成するかは任意であるが、例えば、前記小径シールドを、径方向に沿って出入自在なサイドカッターが設けられた小径シールドとし、該小径シールドを発進到達させる際には、前記サイドカッターを前記小径シールドのシールド本体周面よりも内側に退避させ、前記各側方空間を形成する際には、前記サイドカッターを前記シールド本体の周面よりも外側に突出させる構成を採用することが可能である。 How to form each of the above-mentioned lateral spaces is arbitrary, but, for example, the small-diameter shield is a small-diameter shield provided with a side cutter that can move in and out along the radial direction, and the small-diameter shield is started and reached. In doing so, the side cutter is retracted inward from the shield body peripheral surface of the small-diameter shield, and when forming the lateral spaces, the side cutter is placed outside the shield body peripheral surface. It is possible to adopt a configuration in which it projects.
かかる構成によれば、小径シールドの周面に突出物がない状態で該小径シールドの発進到達が可能になるため、発進エリアの坑口に設けられた環状止水部材は、該小径シールドの周面に密着し隙間が生じるおそれがなくなり、かくして坑口での止水性低下を防止することが可能となる。 According to this structure, since the small-diameter shield can be started and reached without any protrusion on the peripheral surface of the small-diameter shield, the annular water blocking member provided at the wellhead of the starting area is It is possible to prevent a decrease in water stoppage at the wellhead, since there is no possibility that the material will come into close contact with and there will be a gap.
以下、本発明に係る大断面トンネルの構築方法の実施の形態について、添付図面を参照して説明する。 Hereinafter, an embodiment of a method for constructing a large cross section tunnel according to the present invention will be described with reference to the accompanying drawings.
図1は、シールドトンネルとしての本線トンネル1をランプトンネル2と接合するための分岐合流部を設けるべく、該本線トンネルに大断面トンネルとしての拡幅部を形成する場合に本発明を適用した例であって、複数本の小径シールドトンネル4−1〜4−24からなる先受け構造体を示した全体平面図、図2(a)、(b)はそれぞれ、図1のA−A線、B−B線に沿う横断面図、図3(a)、(b)はそれぞれ、図1のC−C線、D−D線に沿う横断面図である。
FIG. 1 shows an example in which the present invention is applied to a case where a widened portion as a large-section tunnel is formed in the main line tunnel in order to provide a branching and joining portion for joining the
これらの図に示すように、本実施形態に係る大断面トンネルの構築方法は、まず、大断面トンネルが構築される構築予定領域であるところの本線トンネル1の拡幅予定領域3の周縁に沿って、計24本からなる小径シールドトンネル4−1〜4−24を該本線トンネルのトンネル軸線方向に沿って延設する。
As shown in these drawings, in the method of constructing a large-section tunnel according to the present embodiment, first, along the periphery of the widening planned
これら24本の小径シールドトンネル4−1〜4−24は、拡幅予定領域3の掘削前に必要となる外殻71を構築する際の先受け構造体となる。
These 24 small-diameter shield tunnels 4-1 to 4-24 serve as a front receiving structure when constructing the
小径シールドトンネル4−1〜4−24は、本線トンネル1の外側近傍に設けられた発進エリア6から小径シールドを発進させて構築すればよい。
The small-diameter shield tunnels 4-1 to 4-24 may be constructed by starting the small-diameter shield from the starting area 6 provided near the outside of the
発進エリア6は、本線トンネル1のシールドセグメント(図示せず)を内側から一部切り開いて円周トンネル掘削機を挿入設置し、該円周トンネル掘削機で本線トンネル1の外側に拡がる周辺地盤を矩形断面の環状空間が形成されるように掘削形成した後、残りのシールドセグメントを切り開いて環状のトレンチとして露出させて構成することが可能であり、該環状のトレンチから小径シールドを発進させることができる。
In the starting area 6, a shield segment (not shown) of the
ここで、小径シールドトンネル4−1〜4−24は図1に示したように、拡幅予定領域3の横断面が最大となる断面位置、本実施形態では発進エリア6近傍を基準断面位置とし、該基準断面位置と横断面の大きさが実質的に同一の区間を大断面区間、基準断面位置よりも横断面の大きさが小さくかつその大きさが実質的に変化しない区間を小断面区間、横断面の大きさが大断面区間における大きさから小断面区間における大きさへと徐々に変化する区間を移行区間として、大断面区間では図2(a)に示す通り、拡幅予定領域3の横断面輪郭線に沿ってすべて配置する。
Here, as shown in FIG. 1, the small-diameter shield tunnels 4-1 to 4-24 have a cross-section position where the cross-section of the widened
一方、小断面区間では図3(b)に示す通り、複数本の小径シールドトンネル4−1〜4−24のうち、基準断面位置での配置間隔とほぼ同等になるために必要な本数、本実施形態では18本だけを横断面輪郭線に沿って配置する。 On the other hand, in the small cross section section, as shown in FIG. 3(b), the number and the number of the small diameter shield tunnels 4-1 to 4-24 required to be almost equal to the arrangement interval at the reference cross section position. In the embodiment, only 18 are arranged along the contour line of the cross section.
また、移行区間では図2(b)に示す通り、複数本の小径シールドトンネル4−1〜4−24のうち、基準断面位置での配置間隔とほぼ同等になるために必要な本数、本実施形態では18本だけを横断面輪郭線に沿って配置するとともに、残りの6本である小径シールドトンネル4−1,4−5,4−9,4−13,4−17,4−21は、横断面輪郭線に沿って配置された小径シールドトンネルの背後に配置する。 In the transition section, as shown in FIG. 2B, the number of small-diameter shield tunnels 4-1 to 4-24, which are necessary to be almost equal to the arrangement interval at the reference cross-section position, are used. In the form, only 18 are arranged along the contour line of the cross section, and the remaining 6 small-diameter shield tunnels 4-1, 4,5, 4-9, 4-13, 4-17, 4-21 are , Behind a small-diameter shield tunnel, which is placed along the contour line of the cross section.
これら24本の小径シールドトンネル4−1〜4−24を構築するにあたっては、上述したように、発進エリア6から小径シールドを適宜発進させればよいが、該小径シールドで地山掘削を行うにあたっては、以下で詳述するように、側方地山を余堀りしつつ、該余堀りによって形成された側方空間に流動性固化材を充填することで、シールドセグメント背後に裏込め領域を形成する。 In constructing these 24 small-diameter shield tunnels 4-1 to 4-24, as described above, the small-diameter shield may be appropriately started from the starting area 6, but when performing ground excavation with the small-diameter shield. As described in detail below, while digging the side ground, the side space formed by the digging is filled with a fluidized solidifying material to provide a backfill area behind the shield segment. To form.
なお、本実施形態では、説明の便宜上、大断面区間及び移行区間では、小径シールドトンネル4−1〜4−24を構築するための小径シールドによる地山掘削を、図番号の昇順、図2(a),(b)で言えば時計回りに順次行い、小断面区間では、小径シールドトンネル4−1,4−5,4−9,4−13,4−17,4−21の6本を除く残りの18本について図番号の昇順、図3で言えば同じく時計回りに順次行うものとする。 In the present embodiment, for convenience of description, in the large cross-section section and the transition section, natural ground excavation by the small-diameter shield for constructing the small-diameter shield tunnels 4-1 to 4-24 is performed in the ascending order of the figure numbers, and FIG. Speaking of a) and (b), it is performed sequentially clockwise, and in the small cross section section, six small-diameter shield tunnels 4-1, 4,5, 4-9, 4-13, 4-17, 4-21 are used. Except for the remaining 18 lines, the processes are performed in the ascending order of the figure numbers, that is, in the clockwise direction in FIG.
まず、大断面区間では、図2(a)に示すように、24本の小径シールドトンネル4−1〜4−24を横断面輪郭線に沿ってそれらの間隔が均等になるように構築するが、地山掘削の際には、隣り合う小径シールドトンネルが先行構築された側を先行構築側、未だ構築されていない側を未構築側として、該先行構築側では、先行構築された小径シールドトンネルのシールドセグメント背後に拡がる裏込め領域の一部を切削しつつ、該裏込め領域に近接する側方地山を掘削することで、トンネル軸線方向に沿った側方空間を形成し、未構築側では側方地山を掘削することにより、トンネル軸線方向に沿った側方空間をそれぞれ形成する。 First, in the large cross section section, as shown in FIG. 2(a), 24 small-diameter shield tunnels 4-1 to 4-24 are constructed so that their intervals are equal along the contour line of the cross section. When excavating the ground, the side where adjacent small-diameter shield tunnels are pre-constructed is the pre-construction side, the side not yet constructed is the unconstructed side, and the pre-construction side is the pre-constructed small-diameter shield tunnel. While cutting a part of the backfill area that extends behind the shield segment of, the side ground along the tunnel axis direction is formed by excavating the side ground near the backfill area. Then, by excavating the lateral ground, lateral spaces are formed along the tunnel axis.
図4は、小径シールドトンネル4−1を構築する様子を示したものであって、該小径シールドトンネル構築のための地山掘削を行う時点では、隣り合う小径シールドトンネルが未だ構築されていないため、同図(a)に示すように、構築予定の小径シールドトンネル4−2に最も近い角度位置を中心とした一定角度範囲で深さがほぼ均等となるように余堀りすることで側方空間41を同図右側に形成する。また、同図左側においても、構築予定の小径シールドトンネル4−24に最も近い角度位置を中心とした一定角度範囲で深さがほぼ均等となるように余堀りすることで側方空間41を同様に形成する。
FIG. 4 shows a state in which the small-diameter shield tunnel 4-1 is constructed, and at the time of excavating the ground for constructing the small-diameter shield tunnel, the adjacent small-diameter shield tunnels have not yet been constructed. , As shown in Fig. 6(a), by digging so that the depth is almost uniform in a certain angle range centered on the angle position closest to the small-diameter shield tunnel 4-2 to be constructed, A
図4(b)は、側方空間41,41を形成可能な小径シールド42を先端側から見たものであり、シールド本体(図示せず)の先端に設けられたカッターヘッド43(シールド本体と同径)を同図紙面に垂直な軸線廻り(以下、機軸廻り)に回転させることで前方地山を掘削するとともに、該カッターヘッドに設置されたサイドカッター47によってカッターヘッド43による円形断面状の掘削空間を側方に拡張できるようになっている。
FIG. 4B is a view of the small-
サイドカッター47は、機軸廻りに揺動自在となるようにカッターヘッド43の外周リング48に設置された揺動カッターアーム46と、該揺動カッターアームの揺動中心から若干離隔した位置にロッドの先端が連結された油圧シリンダ45とで構成してある。
The
揺動カッターアーム46は、2本の切削アーム44a,44bを、全体がシールド本体側に折り曲げられた形態となるように、言い換えれば全体がブーメラン状になるように揺動中心から反対方向に延設するとともに、該各切削アームの長手縁部のうち、シールド本体とは反対の側、掘削姿勢においては地山側となる縁部に切削ビット50をそれぞれ列状に並設して構成してある。
The
油圧シリンダ45は、シリンダ側をカッターヘッド43のスポーク49に連結してあり、ロッドのストロークを中立位置に保持することで揺動カッターアーム46全体をシールド本体の周面よりも内側に退避させることができる(同図(b)実線)。
The
一方、油圧シリンダ45は、ロッドを上述の中立位置から伸長させることで、揺動カッターアーム46を反時計廻りに揺動させて切削アーム44bをシールド本体周面から外側に突出させるとともに、ロッドを中立位置から収縮させることで、揺動カッターアーム46を時計廻りに揺動させて切削アーム44aをシールド本体周面から外側に突出させるようになっており、サイドカッター47全体がカッターヘッド43の回転に連動して全体的に機軸廻りに回転するため、カッターヘッド43の時計回り及び反時計回りの回転操作にロッドの伸縮操作を加えれば、カッターヘッド43による円形断面状の掘削空間を所望の断面形状で径方向に拡張することができる。
On the other hand, in the
小径シールド42を発進エリア6から発進させる際には、油圧シリンダ45のロッドを中立位置に保持してサイドカッター47の揺動カッターアーム46をシールド本体の周面よりも内側に退避させ、発進エリア6の坑口を通過した後、上述したように揺動カッターアーム46を適宜揺動させる。
When the small-
サイドカッター47を用いて図4(a)に示すように側方地山を掘削することにより、トンネル軸線方向に沿った側方空間41,41をそれぞれ形成したならば、次に、小径シールド42のテール部でシールドセグメント51を組み立てつつ、該シールドセグメントの背後に拡がる側方空間41,41に流動性固化材としての裏込め材を充填することにより、あらたな裏込め領域52,52を形成する。
If the
次に、先行構築された小径シールドトンネル4−1の右側に図5(a)に示すように小径シールドトンネル4−2を構築するにあたっては、小径シールドトンネル4−1を構築する際と同様に小径シールド42を発進エリア6から発進させ、次いで、同図に示すように、先行構築された小径シールドトンネル4−1のシールドセグメント51背後に拡がる裏込め領域52の一部を切削しつつ、該裏込め領域に近接する側方地山を掘削することで、トンネル軸線方向に沿った先行構築側の側方空間61を形成する。
Next, in constructing the small-diameter shield tunnel 4-2 on the right side of the pre-constructed small-diameter shield tunnel 4-1, as in the case of constructing the small-diameter shield tunnel 4-1. Starting the small-
側方空間61は、小径シールドトンネル4−1の側方空間41を形成したと同様、小径シールド42のサイドカッター47を用いて形成すればよい。
The
なお、側方空間61を形成するにあたっては、裏込め領域52の一部を切削する際、先行構築された小径シールドトンネル4−1と干渉することがないよう、該小径シールドトンネルに最も近い角度位置における深さよりもその両側における深さの方が大きくなるようにする。
In forming the
一方、隣り合う小径シールドトンネル4−3が未だ構築されていない未構築側では、側方地山を掘削することにより、小径シールドトンネル4−1の側方空間41と同様にして、トンネル軸線方向に沿った側方空間41を形成する。
On the other hand, on the unconstructed side where the adjacent small-diameter shield tunnels 4-3 have not yet been constructed, by excavating the side ground, in the same manner as the
側方空間41,61が形成されたならば、図5(b)に示すように、小径シールド42のテール部でシールドセグメント51を組み立てつつ、該シールドセグメントの背後に拡がる未構築側の側方空間41に裏込め材を充填することにより、あらたな裏込め領域52を形成する。
When the
一方、先行構築側では、シールドセグメント51の背後に拡がる側方空間61に裏込め材を充填することで、小径シールドトンネル4−1の裏込め領域52と連続一体化する拡張裏込め領域62を形成する。
On the other hand, on the preceding construction side, by filling the
拡張裏込め領域62は、それらを挟むように隣り合う2つの小径シールドトンネルからそれぞれ注入された裏込め材がX字状の横断面で連続一体化したものであって、該拡張裏込め領域の外側に拡がる隣接地山に外殻71を構築する際の施工範囲が及ぶことがないように、換言すれば、隣り合う2つの小径シールドトンネル間における外殻施工範囲が該拡張裏込め領域に包含されるように形成する。
The expanded
以上の手順を繰り返すことにより、大断面区間では、小径シールドトンネル4−1〜4−23を、それらの間に拡張裏込め領域62を形成しつつ時計回りに順次構築するとともに、小径シールドトンネル4−24を、両側方が先行構築側となって拡張裏込め領域62,62が形成されるように構築することにより、小径シールドトンネル4−1〜4−24を拡幅予定領域3の横断面輪郭線に沿って同等の間隔で環状に配置する。
By repeating the above procedure, the small-diameter shield tunnels 4-1 to 4-23 are sequentially constructed in the clockwise direction while forming the expanded
次に、図1のB−B線に沿う断面図(図2(b))で示した移行区間についても、概ね大断面区間と同様に行うが、移行区間では、上述したように小径シールドトンネル4−1〜4−24のうち、基準断面位置での配置間隔とほぼ同等になるために必要な本数、本実施形態では18本だけが横断面輪郭線に沿って配置され、残りの6本である小径シールドトンネル4−1,4−5,4−9,4−13,4−17,4−21は、横断面輪郭線に沿って配置された小径シールドトンネルの背後に配置される。 Next, the transition section shown in the cross-sectional view (FIG. 2(b)) taken along the line BB of FIG. 1 is generally performed in the same manner as the large section section, but in the transition section, as described above, the small-diameter shield tunnel is used. Of 4-1 to 4-24, the number required to be almost equal to the arrangement interval at the reference cross-section position, in the present embodiment, only 18 are arranged along the cross-section contour line, and the remaining 6 The small-diameter shield tunnels 4-1, 4,5, 4-9, 4-13, 4-17, 4-21 are arranged behind the small-diameter shield tunnels arranged along the contour line of the cross section.
したがって、小径シールドトンネル4−1を構築する際にその両側方に形成すべき側方空間は、構築予定の小径シールドトンネル4−2,4−24に最も近い角度位置が図6(a)でわかる通り、小径シールドトンネル4−1を真上にして見たときに右斜め下方と左斜め下方となり、そのため、側方空間は、かかる2つの斜め角度を中心とした一定角度範囲で深さがほぼ均等となるように余堀りして形成するとともに、該各側方空間に裏込め材を充填して裏込め領域52,52を形成し、引き続き、その右側に小径シールドトンネル4−2を構築するとともに、上述したと同様に拡張裏込め領域62を形成する。
Therefore, in constructing the small-diameter shield tunnel 4-1, the lateral spaces to be formed on both sides of the small-diameter shield tunnel 4-1 have the angular positions closest to the small-diameter shield tunnels 4-2 and 4-24 to be constructed in FIG. 6(a). As can be seen, when the small-diameter shield tunnel 4-1 is viewed right above, it is diagonally downward right and diagonally downward left, so that the lateral space has a depth within a certain angular range centered on these two diagonal angles. The back-filling
小径シールドトンネル4−5,4−9,4−13,4−17,4−21については、それらを構築する時点で一方が先行構築側、他方が未構築側となるが、小径シールドトンネル4−5を例に説明すると、図6(b)に示すように、未構築側では、上述した斜め角度を中心とした一定角度範囲で深さがほぼ均等となるように側方地山を掘削して側方空間41を形成するとともに、先行構築側では、上述した斜め角度における深さよりもその両側における深さの方が大きくなるように先行構築側の裏込め領域52の一部を切削しつつ、該裏込め領域に近接する側方地山を掘削することで側方空間61を形成し、次いで、未構築側の側方空間41に裏込め材を充填することであらたな裏込め領域52を形成するとともに、先行構築側の側方空間61に裏込め材を充填することで、小径シールドトンネル4−4の裏込め領域52と連続一体化する拡張裏込め領域62を図7のように形成する。
Regarding the small-diameter shield tunnels 4-5, 4-9, 4-13, 4-17, 4-21, one is the pre-construction side and the other is the non-construction side at the time of constructing them, but the small-diameter shield tunnel 4 -5 will be described as an example, as shown in FIG. 6(b), on the non-constructed side, the side ground is excavated so that the depth becomes substantially uniform within a certain angle range centered on the above-mentioned oblique angle. To form the
拡張裏込め領域62のうち、横断面輪郭線に沿って隣り合う2つの小径シールドトンネル間に形成される拡張裏込め領域については、上述したと同様、該拡張裏込め領域の外側に拡がる隣接地山に外殻71を構築する際の施工範囲が及ぶことがないように形成する。
Of the expanded
図1のC−C線あるいはD−D線に沿う断面図(図3(a)、(b))で示した小断面区間については、図8に示すように、小径シールドトンネル4−1,4−5,4−9,4−13,4−17,4−21の6本を除く残りの18本について大断面区間と同様に構築すればよい。 As for the small section section shown in the sectional view (FIGS. 3(a) and 3(b)) taken along the line C-C or the line D-D in FIG. 1, as shown in FIG. The remaining 18 lines, except for 6 lines 4-5, 4-9, 4-13, 4-17 and 4-21, may be constructed in the same manner as the large section section.
なお、6本の小径シールドトンネル4−1,4−5,4−9,4−13,4−17,4−21は、横断面輪郭線から十分に離隔して他の小径シールドトンネルから離脱し、該各小径シールドトンネルを介して隣り合っていた2つの小径シールドトンネルが、基準断面位置での配置間隔と同等の配置間隔で横断面輪郭線に沿って直接的に隣り合うようになった時点で、すなわち図8に示した状態になれば、先受け構造体としての役目を終えるため、端部からの地下水流入が防止される形でそれらの延設を終了する。 Note that the six small-diameter shield tunnels 4-1, 4,5, 4-9, 4-13, 4-17, 4-21 are sufficiently separated from the cross-section contour line and separated from other small-diameter shield tunnels. Then, the two small-diameter shield tunnels that were adjacent to each other via the small-diameter shield tunnels are now directly adjacent to each other along the contour line of the transverse section at an arrangement interval equal to the arrangement interval at the reference cross-section position. At the time point, that is, when the state shown in FIG. 8 is reached, the role of the front receiving structure is completed, and therefore the extension of them is completed in a manner that the inflow of groundwater from the end is prevented.
小径シールドトンネル4−1〜4−24がすべての区間で構築されたならば、該小径シールドトンネルを先受け構造体として周辺土圧や水圧を支持しながら、これらを切り開いてRC躯体を円筒状に構築して外殻71とし、しかる後、その内側領域を掘削して分岐合流部を構築すればよい。
If the small-diameter shield tunnels 4-1 to 4-24 are constructed in all sections, these small-diameter shield tunnels are used as a receiving structure to support surrounding earth pressure and water pressure, and these are cut open to form an RC frame into a cylindrical shape. To form the
以上説明したように、本実施形態に係る大断面トンネルの構築方法によれば、隣り合う2つの小径シールドトンネル間に形成された拡張裏込め領域62によって大断面トンネルの外側からの止水性や地山崩落に対する安全性が確保されるため、大がかりな地盤改良が不要になるほか、従来工法のように、2本を一組とした突条を二組設けた上で、対向する突条同士を先端で接続するという複雑な構造を構築する必要もない。
As described above, according to the method of constructing a large cross section tunnel according to the present embodiment, the water blocking effect from the outside of the large cross section tunnel and the ground by the expanded backfilling
また、本実施形態に係る大断面トンネルの構築方法によれば、拡張裏込め領域62のうち、横断面輪郭線に沿って隣り合う2つの小径シールドトンネル間に形成される拡張裏込め領域については、外側に拡がる隣接地山に外殻71を構築する際の施工範囲が及ぶことがないように該拡張裏込め領域を形成したので、外殻71を構築する作業が拡張裏込め領域62内で行われることとなり、追加の止水措置を省略し、あるいは軽減することが可能となる。
Further, according to the method of constructing the large cross-section tunnel according to the present embodiment, regarding the expanded back-filling
また、本実施形態に係る大断面トンネルの構築方法によれば、横断面輪郭線に沿った小径シールドトンネルとその背後に配置された小径シールドトンネルとの間についても上述した拡張裏込め領域62を形成するようにしたので、小径シールドトンネルの本数が変化する移行区間において、隣り合う2つの小径シールドトンネル相互の間隔が大きくなっても、大がかりな地盤改良を行うことなく、拡幅予定領域3の外側から内側に向けて径方向に作用する土圧や水圧に対する安全性、さらには該方向からの地下水流入に対する止水性を確保することが可能となる。
Further, according to the method for constructing a large cross-section tunnel according to the present embodiment, the above-mentioned expanded
また、本実施形態に係る大断面トンネルの構築方法によれば、径方向に沿って出入自在なサイドカッター47が設けられた小径シールド42を用いて小径シールドトンネル4−1〜4−24を構築するとともに、サイドカッター47で余堀りして側方空間41や側方空間61を形成するようにしたので、小径シールドの周面に突出物がない状態で該小径シールドの発進到達が可能となる。
Further, according to the method of constructing the large cross section tunnel according to the present embodiment, the small diameter shield tunnels 4-1 to 4-24 are constructed using the
そのため、小径シールド42を発進到達させる際、発進エリア6の坑口に設けられた環状止水部材は、該小径シールドの周面に密着し隙間が生じるおそれがなくなり、かくして坑口での止水性低下を防止することが可能となる。
Therefore, when the small-
本実施形態では、先行構築側の側方空間を、小径シールドトンネルに最も近い角度位置における深さよりもその両側における深さの方が大きくなるように形成するとともに、未構築側の側方空間を、構築予定の小径シールドトンネルに最も近い角度位置を中心とした一定角度範囲で深さがほぼ均等となるように形成したが、隣り合う2つの小径シールドトンネルの間に拡張裏込め領域が形成されるのであれば、側方空間をどのような深さに形成するかは任意である。 In the present embodiment, the lateral space on the pre-construction side is formed such that the depths on both sides of the lateral space on the pre-construction side are larger than the depth on the angle position closest to the small diameter shield tunnel, and the lateral space on the non-construction side is formed. , The depth was formed to be almost uniform within a certain angle range centered on the angle position closest to the small-diameter shield tunnel to be constructed, but an extended backfill area was formed between two adjacent small-diameter shield tunnels. If so, the depth of forming the lateral space is arbitrary.
また、本実施形態では、大断面トンネルの構築予定領域を取り囲む小径シールドトンネルの本数が断面位置で変化する場合に本発明を適用した例を説明したが、断面位置によって小径シールドトンネルの本数が一定の場合にも本発明を適用することが可能である。 Further, in the present embodiment, an example in which the present invention is applied when the number of small-diameter shield tunnels surrounding the construction area of the large-section tunnel changes at the cross-section position, the number of small-diameter shield tunnels is constant depending on the cross-section position. In this case, the present invention can be applied.
また、本実施形態では、サイドカッター47で余堀りして側方空間41や側方空間61を形成するようにしたが、これらの側方空間をどのように形成するかは任意であって、サイドカッター47に代えて、公知の切削手段を採用することが可能である。
Further, in the present embodiment, the
また、本実施形態では特に言及しなかったが、拡張裏込め領域62のうち、横断面輪郭線に沿って配置された小径シールドトンネルと該小径シールドトンネルに隣り合うように背後に配置された小径シールドトンネルとの間、図7では、小径シールドトンネル4−2と小径シールドトンネル4−1との間や、小径シールドトンネル4−4と小径シールドトンネル4−5との間、あるいは小径シールドトンネル4−6と小径シールドトンネル4−5との間に形成される拡張裏込め領域62については、小径シールドトンネル4−1や小径シールドトンネル4−5が横断面輪郭線から離隔しているため、同図でよくわかるように、該拡張裏込め領域で外殻71を構築する際の施工範囲をすべてカバーすることは本来的に困難である。
Further, although not particularly mentioned in the present embodiment, in the expanded
この場合には、拡張裏込め領域が形成された反対の側から外殻構築時の施工範囲に浸水することがないよう、拡張裏込め領域でカバーされていない範囲を薬液注入や凍結といった方法で別途止水すればよい。 In this case, the area not covered by the expanded backfilling area should be covered with a chemical solution or frozen to prevent water from entering from the side opposite the expanded backfilling area. You can stop the water separately.
1 本線トンネル(シールドトンネル)
3 シールドトンネルの拡幅予定領域(大断面トンネルの構築予定領域)
4−1〜4−24
小径シールドトンネル
41,61 側方空間
42 小径シールド
47 サイドカッター
51 シールドセグメント
52 裏込め領域
62 拡張裏込め領域
71 外殻
1-line tunnel (shield tunnel)
3 Planned widening area for shield tunnel (Planned area for large cross-section tunnel)
4-1 to 4-24
Small-
Claims (6)
前記小径シールドトンネルを構築するにあたって小径シールドで地山掘削を行う際、隣り合う小径シールドトンネルが先行構築されている場合には、該先行構築側で、先行構築された小径シールドトンネルのシールドセグメント背後に拡がる裏込め領域の一部を切削しつつ該裏込め領域に近接する側方地山を掘削することにより、トンネル軸線方向に沿った側方空間を形成するとともに、隣り合う小径シールドトンネルが未だ構築されていない場合には、該未構築側で側方地山を掘削することにより、トンネル軸線方向に沿った側方空間を形成し、
前記側方空間の形成工程と並行して又はその形成後、該側方空間に流動性固化材を充填することにより、前記先行構築側では、前記裏込め領域と連続一体化する拡張裏込め領域を形成するとともに、前記未構築側では、あらたな裏込め領域を形成する大断面トンネルの構築方法であって、
前記小径シールドを、径方向に沿って出入自在なサイドカッターが設けられた小径シールドとし、該小径シールドを発進到達させる際には、前記サイドカッターを前記小径シールドのシールド本体周面よりも内側に退避させ、前記各側方空間を形成する際には、前記サイドカッターを前記シールド本体の周面よりも外側に突出させることを特徴とする大断面トンネルの構築方法。 A plurality of small-diameter shield tunnels are provided along the periphery of the construction area where the large-section tunnel is constructed, extending in the tunnel axial direction of the large-section tunnel, and the plurality of small-diameter shield tunnels are used as a front receiving structure. In the method of constructing a large-section tunnel in which an inner region surrounded by the outer shell is excavated after the shell is constructed,
When excavating the ground with a small-diameter shield in constructing the small-diameter shield tunnel, when adjacent small-diameter shield tunnels are pre-constructed, the preceding construction side is behind the shield segment of the pre-constructed small-diameter shield tunnel. By cutting a part of the backfilling area that spreads out to the side and excavating the side ground close to the backfilling area, a side space along the tunnel axis direction is formed, and adjacent small-diameter shield tunnels are still formed. When not constructed, by excavating the lateral ground on the unconstructed side, a lateral space along the tunnel axis direction is formed,
In parallel with or after the step of forming the lateral space, by filling the lateral space with a fluidized solidifying material, on the preceding construction side, an expanded backfilling area that is continuously integrated with the backfilling area. And a method for constructing a large-section tunnel for forming a new backfill region on the unconstructed side ,
The small-diameter shield is a small-diameter shield provided with a side cutter that can freely move in and out along the radial direction, and when the small-diameter shield is started and reached, the side cutter is placed inside the shield body peripheral surface of the small-diameter shield. A method for constructing a large cross-section tunnel, characterized in that the side cutters are projected outward from a peripheral surface of the shield body when the side cutters are retracted to form the lateral spaces .
前記小径シールドトンネルを構築するにあたって小径シールドで地山掘削を行う際、隣り合う小径シールドトンネルが先行構築されている場合には、該先行構築側で、先行構築された小径シールドトンネルのシールドセグメント背後に拡がる裏込め領域の一部を切削しつつ該裏込め領域に近接する側方地山を掘削することにより、トンネル軸線方向に沿った側方空間を形成するとともに、隣り合う小径シールドトンネルが未だ構築されていない場合には、該未構築側で側方地山を掘削することにより、トンネル軸線方向に沿った側方空間を形成し、
前記側方空間の形成工程と並行して又はその形成後、該側方空間に流動性固化材を充填することにより、前記先行構築側では、前記裏込め領域と連続一体化する拡張裏込め領域を形成するとともに、前記未構築側では、あらたな裏込め領域を形成する大断面トンネルの構築方法であって、
前記側方空間を形成する工程において、先行構築側で掘削する際には、前記先行構築された小径シールドトンネルに最も近い角度位置における深さよりもその両側における深さの方が大きくなるように前記側方空間を形成し、未構築側で掘削する際には、構築予定の小径シールドトンネルに最も近い角度位置を中心とした一定角度範囲で深さがほぼ均等となるように前記側方空間を形成することを特徴とする大断面トンネルの構築方法。 A plurality of small-diameter shield tunnels are provided along the periphery of the construction area where the large-section tunnel is constructed, extending in the tunnel axial direction of the large-section tunnel, and the plurality of small-diameter shield tunnels are used as a front receiving structure. In the method of constructing a large-section tunnel in which an inner region surrounded by the outer shell is excavated after the shell is constructed,
When excavating the ground with a small-diameter shield in constructing the small-diameter shield tunnel, when adjacent small-diameter shield tunnels are pre-constructed, the preceding construction side is behind the shield segment of the pre-constructed small-diameter shield tunnel. By cutting a part of the backfilling area that spreads out to the side and excavating the side ground near the backfilling area, a side space along the tunnel axis direction is formed, and adjacent small-diameter shield tunnels are still formed. When not constructed, by excavating the lateral ground on the unconstructed side, a lateral space along the tunnel axis direction is formed,
In parallel with or after the step of forming the lateral space, by filling the lateral space with a fluidized solidifying material, on the preceding construction side, an expanded backfilling area that is continuously integrated with the backfilling area. And a method for constructing a large-section tunnel for forming a new backfill region on the unconstructed side ,
In the step of forming the lateral space, when excavating on the pre-constructed side, the depth on both sides of the pre-constructed small-diameter shield tunnel is set to be greater than the depth on the nearest angular position. When forming a lateral space and excavating on the unconstructed side, the lateral space should be made uniform so that the depth is almost uniform within a certain angle range centered on the angle position closest to the small-diameter shield tunnel to be constructed. A method for constructing a large-section tunnel, which is characterized in that it is formed .
前記小径シールドトンネルを構築するにあたって小径シールドで地山掘削を行う際、隣り合う小径シールドトンネルが先行構築されている場合には、該先行構築側で、先行構築された小径シールドトンネルのシールドセグメント背後に拡がる裏込め領域の一部を切削しつつ該裏込め領域に近接する側方地山を掘削することにより、トンネル軸線方向に沿った側方空間を前記小径シールドの径方向に余堀りする形で形成するとともに、隣り合う小径シールドトンネルが未だ構築されていない場合には、該未構築側で側方地山を掘削することにより、トンネル軸線方向に沿った側方空間を前記小径シールドの径方向に余堀りする形で形成し、
前記側方空間の形成工程と並行して又はその形成後、該側方空間に流動性固化材を充填することにより、前記先行構築側では、前記裏込め領域と連続一体化する拡張裏込め領域を形成するとともに、前記未構築側では、あらたな裏込め領域を形成する大断面トンネルの構築方法であって、
前記構築予定領域をシールドトンネルの拡幅予定領域とするとともに該拡幅予定領域の横断面が最大となる断面位置を基準断面位置とし、該基準断面位置と横断面の大きさが実質的に同一の区間を大断面区間、前記基準断面位置よりも横断面の大きさが小さくかつその大きさが実質的に変化しない区間を小断面区間、横断面の大きさが前記大断面区間における大きさから前記小断面区間における大きさへと徐々に変化する区間を移行区間として、前記大断面区間では、前記複数本の小径シールドトンネルが前記拡幅予定領域の横断面輪郭線に沿ってすべて配置されるように、前記小断面区間では、前記複数本の小径シールドトンネルのうち、前記基準断面位置での配置間隔とほぼ同等になるために必要な本数だけが前記横断面輪郭線に沿って配置されるように、前記移行区間では、前記複数本の小径シールドトンネルのうち、前記基準断面位置での配置間隔とほぼ同等になるために必要な本数だけが前記横断面輪郭線に沿って配置されるとともに残りがその背後に配置されるように、前記複数本の小径シールドトンネルをそれぞれ延設するとともに、前記複数本の小径シールドトンネルのうち、前記横断面輪郭線に沿って隣り合う2つの小径シールドトンネルを構築する際及び前記横断面輪郭線に沿って配置された小径シールドトンネルと該小径シールドトンネルに隣り合うように背後に配置された小径シールドトンネルとを構築する際に前記側方空間の形成工程と前記充填工程とを行うことを特徴とする大断面トンネルの構築方法。 A plurality of small-diameter shield tunnels are provided along the periphery of the construction area where the large-section tunnel is constructed, extending in the tunnel axial direction of the large-section tunnel, and the plurality of small-diameter shield tunnels are used as a front receiving structure. In the method of constructing a large-section tunnel in which the inner region surrounded by the outer shell is excavated after the shell is constructed,
When constructing the small-diameter shield tunnel, when excavating the ground with a small-diameter shield, if adjacent small-diameter shield tunnels are pre-constructed, on the preceding construction side, behind the shield segment of the pre-constructed small-diameter shield tunnel. By excavating the side ground close to the backfilling area while cutting a part of the backfilling area that spreads out to the side, the lateral space along the tunnel axis direction is dug in the radial direction of the small diameter shield. If a small-diameter shield tunnel adjacent to the small-diameter shield is not constructed yet, the lateral space along the tunnel axis direction is formed by excavating the side ground on the unconstructed side . It is formed in a shape that is dug in the radial direction ,
In parallel with or after the step of forming the lateral space, by filling the lateral space with a fluidized solidifying material, on the preceding construction side, an expanded backfilling area that is continuously integrated with the backfilling area. And a method for constructing a large-section tunnel for forming a new backfill region on the unconstructed side,
The area to be constructed is the area to be widened of the shield tunnel, and the cross-sectional position at which the cross-section of the area to be widened is the maximum is the reference cross-sectional position, and the reference cross-sectional position and the cross-sectional size are substantially the same. Is a large cross-section section, a section in which the size of the cross-section is smaller than the reference cross-section position and the size of which does not change substantially is a small cross-section section, and the size of the cross-section is smaller than the size in the large-section section. As a transition section a section that gradually changes to the size in the section section, in the large section section, so that the plurality of small-diameter shield tunnels are all arranged along the cross-section contour line of the widening planned region, In the small cross-section section, among the plurality of small-diameter shield tunnels, only the number necessary to be substantially equal to the arrangement interval at the reference cross-section position is arranged along the cross-section contour line, In the transition section, among the plurality of small-diameter shield tunnels, only the number necessary to be substantially equal to the arrangement interval at the reference cross-section position is arranged along the cross-section contour line, and the rest is the same. The plurality of small-diameter shield tunnels are respectively extended so as to be arranged behind, and two of the plurality of small-diameter shield tunnels that are adjacent to each other along the contour line of the cross section are constructed. At the time of and at the time of constructing a small-diameter shield tunnel arranged along the cross-sectional contour line and a small-diameter shield tunnel arranged behind the small-diameter shield tunnel so as to be adjacent to the small-diameter shield tunnel, the step of forming the lateral space and the filling A method for constructing a large cross-section tunnel, which comprises:
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2016132048A JP6751260B2 (en) | 2016-07-01 | 2016-07-01 | Construction method of large section tunnel |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2016132048A JP6751260B2 (en) | 2016-07-01 | 2016-07-01 | Construction method of large section tunnel |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2018003453A JP2018003453A (en) | 2018-01-11 |
| JP6751260B2 true JP6751260B2 (en) | 2020-09-02 |
Family
ID=60945023
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2016132048A Active JP6751260B2 (en) | 2016-07-01 | 2016-07-01 | Construction method of large section tunnel |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP6751260B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109145520B (en) * | 2018-10-22 | 2023-03-24 | 重庆大学 | Earth-rock mixture tunnel design method based on digital image and big data |
Family Cites Families (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4607889A (en) * | 1984-11-29 | 1986-08-26 | Daiho Construction Co., Ltd. | Shield tunnel boring machine |
| JP2816397B2 (en) * | 1990-06-29 | 1998-10-27 | 清水建設株式会社 | Method of expanding and reducing diameter of tunnel |
| JP6191814B2 (en) * | 2013-03-19 | 2017-09-06 | 株式会社大林組 | Construction method of large section tunnel |
| JP6268523B2 (en) * | 2014-02-10 | 2018-01-31 | 株式会社大林組 | Construction method of large section tunnel |
-
2016
- 2016-07-01 JP JP2016132048A patent/JP6751260B2/en active Active
Also Published As
| Publication number | Publication date |
|---|---|
| JP2018003453A (en) | 2018-01-11 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP5958754B2 (en) | Construction method of large section tunnel | |
| JP6733862B2 (en) | Construction method of the underground widening part | |
| JP6751260B2 (en) | Construction method of large section tunnel | |
| JP5934598B2 (en) | Shield machine | |
| JP7021419B2 (en) | Construction method of underground widening part | |
| JP2019031772A (en) | Connection structure and connection method between shield tunnels | |
| JP7194003B2 (en) | excavator steel shell and excavator | |
| JP6268523B2 (en) | Construction method of large section tunnel | |
| JP2016017393A (en) | Construction method of large section tunnel | |
| JP4641283B2 (en) | Construction method of underground structure | |
| JP4566927B2 (en) | Construction method of underground structure | |
| JP5274328B2 (en) | Parent-child shield machine and tunnel construction method | |
| JP2018035619A (en) | Construction method of large cross section tunnel | |
| JP2016020564A (en) | Construction method of large cross-sectional tunnel | |
| JPH08260878A (en) | Adjacent shield tunnel connection method and underground space construction method | |
| JP2849605B2 (en) | Large section tunnel and its construction method | |
| JP4504844B2 (en) | Construction method of excavator and underground structure | |
| JP3590429B2 (en) | How to assemble a segment with a cutter | |
| JP6268521B2 (en) | Widening part formation method of shield tunnel | |
| JP2014231694A (en) | Joining structure and joining method of shield tunnel | |
| JP2788956B2 (en) | How to join tunnels | |
| JP6829825B2 (en) | How to build a starting area for a small-diameter shield | |
| JP4810333B2 (en) | How to build a concatenated tunnel | |
| JP2005188260A (en) | How to build a shield tunnel | |
| JP6940341B2 (en) | Tunnel excavator and tunnel construction method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20190620 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20200310 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20200313 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20200427 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20200715 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20200728 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 6751260 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |