Scaffolding platform for work Download PDF

Info

Publication number
JP6752482B2
JP6752482B2 JP2016088107A JP2016088107A JP6752482B2 JP 6752482 B2 JP6752482 B2 JP 6752482B2 JP 2016088107 A JP2016088107 A JP 2016088107A JP 2016088107 A JP2016088107 A JP 2016088107A JP 6752482 B2 JP6752482 B2 JP 6752482B2
Authority
JP
Japan
Prior art keywords
shaft
cylinder
work
scaffolding
scaffolding platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2016088107A
Other languages
Japanese (ja)
Other versions
JP2017197935A (en
Inventor
一郎 與那原
一郎 與那原
Original Assignee
ジャパン スチールス グループ株式会社
ジャパン スチールス グループ株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ジャパン スチールス グループ株式会社, ジャパン スチールス グループ株式会社 filed Critical ジャパン スチールス グループ株式会社
Priority to JP2016088107A priority Critical patent/JP6752482B2/en
Publication of JP2017197935A publication Critical patent/JP2017197935A/en
Application granted granted Critical
Publication of JP6752482B2 publication Critical patent/JP6752482B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Description

本発明は、筒体を連結するために使用する作業用足場台に関し、例えば、ケーソン工法に用いられるシャフトを組み立てるために好適な作業用足場台に関する。 The present invention relates to a work scaffold used for connecting cylinders, for example, a work scaffold suitable for assembling a shaft used in a caisson method.

例えば、水中や軟弱地盤に大きな構造物を構築するために、ケーソン工法が適用されている。ケーソン工法は、鉄筋コンクリート製や鋼製の大型の筒体または箱体であるケーソンを地中に埋め込んで構造物を構築する工法であり、ケーソン工法にはオープンケーソン工法とニューマチックケーソン工法がある。 For example, the caisson method is applied to construct large structures underwater or on soft ground. The caisson method is a method of constructing a structure by embedding a caisson, which is a large cylinder or box made of reinforced concrete or steel, in the ground. The caisson method includes an open caisson method and a pneumatic caisson method.

オープンケーソン工法は、ケーソンを地上に設置し、ケーソン内部を人力や掘削機により掘削しながらケーソンを沈下させて基礎構造物を構築する工法である。一方、ニューマチック工法は、潜函工法とも言われており、下端の切口よりも上方に作業室天井壁が設けられたケーソンを使用する。この工法は、作業室天井壁の下側を気密な作業室として掘削作業を行いながらケーソンを沈下させて基礎構造物を構築する工法であり、作業室に圧縮空気を送り浸水を防ぎながら掘削作業を行うことができる。沈下量が深い場合には、掘削作業の進展に伴って作業室天井壁が設けられていない上側のケーソンが下側のケーソンに継ぎ足される。 The open caisson method is a method in which a caisson is installed on the ground and the inside of the caisson is excavated by human power or an excavator while the caisson is subsided to construct a foundation structure. On the other hand, the pneumatic method is also called the submersible method, and uses a caisson in which the ceiling wall of the work room is provided above the cut at the lower end. This method is a method of constructing a foundation structure by sinking a caisson while performing excavation work with the underside of the ceiling wall of the work room as an airtight work room, and excavation work while sending compressed air to the work room to prevent inundation. It can be performed. When the amount of subsidence is deep, the upper caisson without the work room ceiling wall is added to the lower caisson as the excavation work progresses.

特許文献1に記載されるように、ケーソンの作業室天井壁の上側には、マンシャフトとマテリアルシャフトつまり連結筒体が取り付けられる。マンシャフトは地上と作業室との間で作業者が行き来するために使用され、マテリアルシャフトは作業者や掘削機により掘削された土砂を地上に搬送するために使用される。 As described in Patent Document 1, a man shaft and a material shaft, that is, a connecting cylinder are attached to the upper side of the ceiling wall of the caisson work room. Man shafts are used to move workers back and forth between the ground and the work room, and material shafts are used to transport earth and sand excavated by workers and excavators to the ground.

特許文献2には、マンシャフトとこれよりも小径のマテリアルシャフトとが同軸に組み合わされた二重筒体構造のシャフトを用いたケーソン工法が記載されており、マンシャフトとマテリアルシャフトの間には、作業者用の螺旋階段が設けられている。 Patent Document 2 describes a caisson method using a shaft having a double tubular structure in which a man shaft and a material shaft having a smaller diameter are coaxially combined, and between the man shaft and the material shaft. , A spiral staircase for workers is provided.

特開2004−183271号公報Japanese Unexamined Patent Publication No. 2004-183271 特開2006−291704号公報Japanese Unexamined Patent Publication No. 2006-291704

上述したマンシャフトやマテリアルシャフトは、作業者が移動したり、土砂を案内したりするための内径を有しており、複数の筒体つまりシャフト構成筒体を連結することにより構成される。このように、マンシャフトやマテリアルシャフトは、複数のシャフト構成筒体を連結することにより構築される連結筒体となっている。作業用天井壁が設けられたケーソンにマンシャフトやマテリアルシャフトを構築するときには、ケーソンの上下寸法に見合った長さのマンシャフトやマテリアルシャフトが構築されるように、複数のシャフト構成筒体が連結される。また、ケーソンを地中深く沈下させるために、最下段のケーソンの上側に他のケーソンが継ぎ足されるときには、マンシャフトやマテリアルシャフトもシャフト構成筒体が最上段のシャフト構成筒体に連結される。 The man shaft and the material shaft described above have an inner diameter for the operator to move and guide the earth and sand, and are configured by connecting a plurality of cylinders, that is, shaft constituent cylinders. As described above, the man shaft and the material shaft are connected cylinders constructed by connecting a plurality of shaft constituent cylinders. When constructing a man shaft or material shaft in a caisson provided with a work ceiling wall, a plurality of shaft constituent cylinders are connected so that a man shaft or material shaft having a length corresponding to the vertical dimension of the caisson is constructed. Will be done. Further, when another caisson is added to the upper side of the lowermost caisson in order to sink the caisson deep into the ground, the shaft constituent cylinder of the man shaft and the material shaft is also connected to the uppermost shaft constituent cylinder.

下側のシャフト構成筒体の上側に他のシャフト構成筒体を連結するには、連結作業が作業者により行われるので、作業用足場台が必要となる。従来では、この連結作業を行うために、ケーソンの作業用天井壁の上に作業用足場台を取り付けるようにしており、作業用天井壁の床面にシャフトの周りに作業用足場台を自立させて構築している。シャフトをケーソンの垂直壁に近接させて構築する場合には、作業用足場台を垂直壁にも連結している。 In order to connect another shaft constituent cylinder to the upper side of the lower shaft constituent cylinder, a work scaffolding platform is required because the connecting work is performed by the operator. Conventionally, in order to perform this connection work, a work scaffolding platform is mounted on the work ceiling wall of the caisson, and the work scaffolding platform is made to stand on the floor surface of the work ceiling wall around the shaft. Is building. When the shaft is constructed close to the vertical wall of the caisson, the work scaffolding is also connected to the vertical wall.

このため、作業用足場台がマンシャフトやマテリアルシャフトに沿って上下方向に敷設され、作業用足場台が大型になり、作業用足場台の装着作業およびケーソンを用いた沈下掘削作業終了後の作業用足場台の撤去作業を容易に行うことができない。また、従来では、作業用足場台は四角い枠体となっており、四角い枠体からなる作業用足場台を、円筒形状のマンシャフトやマテリアルシャフトの周囲に配置すると、作業用足場台とそれぞれのシャフトとの間に隙間が発生し、シャフト構成筒体の連結作業を安全かつ容易に行うことができない。 For this reason, the work scaffolding platform is laid vertically along the man shaft and material shaft, and the work scaffolding platform becomes large, and the work after the installation work of the work scaffolding platform and the subsidence excavation work using the caisson is completed. It is not possible to easily remove the scaffolding platform. In addition, conventionally, the work scaffolding platform is a square frame body, and when the work scaffolding platform composed of the square frame body is arranged around the cylindrical man shaft or the material shaft, the work scaffolding platform and each of them are arranged. A gap is generated between the shaft and the shaft, and it is not possible to safely and easily connect the shaft constituent cylinders.

本発明の目的は、連結筒体を構築する際における作業用足場台の装着作業の安全性と作業性を向上することにある。 An object of the present invention is to improve the safety and workability of mounting work of a work scaffolding platform when constructing a connecting cylinder.

本発明の作業用足場台は、下端部に下側フランジが設けられ、上端部に上側フランジが設けられた複数の筒体を上下方向に連結して連結筒体を構築する際に使用される作業用足場台であって、前記筒体に隙間を介して前記筒体を囲む第1の内側フレーム、および第1の前記内側フレームの外側を第1の前記内側フレームに沿って延びる第1の外側フレームを備えた下側基台と、第1の前記内側フレームに平行な第2の内側フレーム、および第1の前記外側フレームに平行な第2の外側フレームを備え、前記下側基台の上方に配置されて前記下側基台に連結部材により連結されて足場台本体を形成する上側基台と、前記上側基台に設けられ、下側の前記筒体と上側の前記筒体との連結作業を行う作業者が歩行する床材と、第1の前記内側フレームに内周面から出没自在に設けられ、前記下側フランジに係合する複数の下側の係合部材と、第2の前記内側フレームの内周面から出没自在に設けられ、前記筒体の外表面に突き当てられる複数の上側の係合部材と、を有し、前記下側フランジに係合する下側の前記係合部材と、前記筒体の外表面に突き当てられる上側の前記係合部材とにより前記足場台本体を前記筒体に締結するようにした
The work scaffolding platform of the present invention is used when a plurality of cylinders having a lower flange at the lower end and an upper flange at the upper end are connected in the vertical direction to construct a connecting cylinder. A first inner frame which is a work scaffolding platform and surrounds the cylinder through a gap in the cylinder, and a first extending outside the first inner frame along the first inner frame. A lower base with an outer frame, a second inner frame parallel to the first inner frame, and a second outer frame parallel to the first outer frame of the lower base. An upper base which is arranged above and is connected to the lower base by a connecting member to form a scaffolding base main body, and a cylinder provided on the upper base and the lower cylinder and the upper cylinder. A floor material on which an operator performing a connecting operation walks , a plurality of lower engaging members provided on the first inner frame so as to be retractable from the inner peripheral surface and engaged with the lower flange, and a second. A lower side that is provided so as to be freely retractable from the inner peripheral surface of the inner frame of the inner frame, has a plurality of upper engaging members that are abutted against the outer surface of the cylinder, and engages with the lower flange. The scaffolding base body is fastened to the cylinder by the engaging member and the upper engaging member that is abutted against the outer surface of the cylinder .

作業用足場台は、筒体を囲むように配置されて筒体の下側フランジに装着される足場台本体を有し、足場台本体には作業者用の床材が設けられるとともに、足場台本体を筒体に係合させる係合部材が設けられている。これにより、作業用足場台はそれぞれの筒体に装着され、複数の筒体を上下に連結する際には、下段側の作業用足場台に乗り込んだ作業者により上段側の筒体と下段側の筒体との連結作業を行うことができる。作業用足場台は、筒体に装着されるので、上下に連なった足場台を連結筒体の周囲に配置することが不要となり、筒体の連結作業を容易に行うことができる。したがって、連結筒体を構築する際における作業用足場台の装着作業の作業性を向上することができる。しかも、作業用足場台を筒体に対して地上で装着することができるので、作業用足場台の筒体に対する装着作業を安全に行うことができる。 The work scaffolding platform has a scaffolding platform main body that is arranged so as to surround the tubular body and is attached to the lower flange of the tubular body. The scaffolding platform main body is provided with a flooring material for workers and is provided with a scaffolding platform. An engaging member that engages the main body with the cylinder is provided. As a result, the work scaffolding platform is attached to each cylinder, and when connecting a plurality of cylinders up and down, the worker who gets into the work scaffolding platform on the lower stage side sets the upper cylinder and the lower stage side. Can be connected to the cylinder. Since the work scaffolding platform is attached to the tubular body, it is not necessary to arrange the scaffolding platforms connected vertically around the connecting tubular body, and the tubular body can be easily connected. Therefore, it is possible to improve the workability of the work of attaching the work scaffolding platform when constructing the connecting cylinder. Moreover, since the work scaffolding platform can be mounted on the cylinder on the ground, the work of mounting the work scaffolding platform on the cylinder can be safely performed.

ケーソンの一例を示す断面図である。It is sectional drawing which shows an example of a caisson. 図1に示されたマンシャフトやマテリアルシャフトを構築するためのシャフト構成筒体に対する作業用足場台の装着作業を示す正面図である。It is a front view which shows the mounting work of the work scaffolding base to the shaft structure cylinder for constructing the man shaft and the material shaft shown in FIG. 作業用足場台の足場台本体を示す斜視図である。It is a perspective view which shows the scaffolding platform main body of the scaffolding platform for work. シャフト構成筒体に足場台と手摺とが装着された状態を示す正面図である。It is a front view which shows the state which the scaffolding stand and the handrail are attached to the shaft structure cylinder. 下段側のシャフト構成筒体の上に上段側のシャフト構成筒体を搬送している状態を示す正面図である。It is a front view which shows the state which the shaft structure cylinder of the upper stage side is conveyed on the shaft structure cylinder body of a lower stage side. 下段側のシャフト構成筒体の上に上段側のシャフト構成筒体を連結した状態を示す正面図である。It is a front view which shows the state which connected the shaft structure cylinder of the upper stage side on the shaft structure cylinder body of a lower stage side. 図6におけるA−A線方向の矢視図である。FIG. 6 is a view taken along the line AA in FIG. 図6におけるB−B線方向の矢視図である。FIG. 6 is a view taken along the line BB in FIG. 梯子が設けられた足場台本体をシャフト構成筒体に装着した状態を示す斜視図である。It is a perspective view which shows the state which the scaffolding base main body provided with a ladder is attached to the shaft structure cylinder. 作業用足場台を示す平面図である。It is a top view which shows the scaffolding stand for work. (A)は足場台本体に手摺枠を組み立てている状態を示す正面図であり、(B)は手摺枠を有する手摺が足場台本体に組み付けられた状態を示す正面図である。(A) is a front view showing a state in which the handrail frame is assembled on the scaffolding base main body, and (B) is a front view showing a state in which the handrail having the handrail frame is assembled on the scaffolding base main body. 梯子と手摺とを足場台本体に組み付けて作業用足場台が組み立てられた状態を示す斜視図である。It is a perspective view which shows the state which the work scaffolding stand was assembled by assembling the ladder and the handrail to the scaffolding stand main body.

以下、本発明の実施の形態を図面に基づいて詳細に説明する。ケーソン10は、図1に示されるように、左右の垂直壁11,12と、下端の切口よりも上方の作業室天井壁13とを有し、それぞれは紙面に垂直方向に延びた箱体となっており、箱体の両端部は閉じられている。図1は、ケーソン10を地盤Aの中に沈下させている状態を示す。作業室天井壁13の下側には作業空間つまり作業室14が形成され、この作業室14に作業者や掘削機が入り込んで土砂の掘削作業が行われ、掘削作業の進行に伴ってケーソン10が沈下される。 Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings. As shown in FIG. 1, the caisson 10 has left and right vertical walls 11 and 12 and a work room ceiling wall 13 above the cut end of the lower end, each of which is a box body extending in the direction perpendicular to the paper surface. Both ends of the box are closed. FIG. 1 shows a state in which the caisson 10 is subsided in the ground A. A work space, that is, a work room 14 is formed under the ceiling wall 13 of the work room, and a worker or an excavator enters the work room 14 to excavate earth and sand, and the caisson 10 is carried out as the excavation work progresses. Is sunk.

作業室天井壁13の上側にはマンシャフト15とマテリアルシャフト16とが取り付けられる。マンシャフト15は地表面Bと作業室14との間で作業者が行き来するために使用され、マンシャフト15の上端部には作業者が待機するためのマンロック21が設けられ、内部にはマンロック21内の待機室と作業室14との間を上り下りするための梯子22がマンシャフト15に設けられている。なお、梯子22に代えて螺旋階段をマンシャフト15に設けるようにした形態や、マンシャフト15が長い場合には、エレベータをマンシャフト15に設けるようにした形態もある。 A man shaft 15 and a material shaft 16 are attached to the upper side of the work room ceiling wall 13. The man shaft 15 is used for workers to move back and forth between the ground surface B and the work room 14, and a man lock 21 is provided at the upper end of the man shaft 15 for workers to stand by. A ladder 22 for going up and down between the waiting room and the working room 14 in the man lock 21 is provided on the man shaft 15. In addition, there is a form in which a spiral staircase is provided on the man shaft 15 instead of the ladder 22, and a form in which an elevator is provided on the man shaft 15 when the man shaft 15 is long.

また、マテリアルシャフト16は作業者や掘削機により掘削された土砂を地表面Bに搬送する際に、土砂を案内するために使用され、内部には土砂バケット23がワイヤ24により上下動自在に吊り下げられる。ワイヤ24は図示しないクレーン等により上下動される。作業室14内に地上側から圧縮空気を供給するために、送気管25が作業室天井壁13に取り付けられている。マンシャフト15やマテリアルシャフト16等は、ケーソン工法が行われる前に、予めケーソン10に装着される。このようなケーソン10を用いて地中に構造物を構築する工法は、ニューマチックケーソン工法と言われる。 Further, the material shaft 16 is used to guide the earth and sand when the earth and sand excavated by the worker or the excavator is conveyed to the ground surface B, and the earth and sand bucket 23 is hung vertically by the wire 24 inside. Can be lowered. The wire 24 is moved up and down by a crane or the like (not shown). An air supply pipe 25 is attached to the ceiling wall 13 of the work room in order to supply compressed air into the work room 14 from the ground side. The man shaft 15, the material shaft 16, and the like are attached to the caisson 10 in advance before the caisson method is performed. A method of constructing a structure in the ground using such a caisson 10 is called a pneumatic caisson method.

作業室14の土砂を掘削し、ケーソン10を地表面Bから所定の深さまで沈下させることにより、ケーソン10により地中にトンネル等の基礎構造物が構築される。図1に示されたケーソン10が地表よりも下方となるように、ケーソン10をより深く沈下させる際には、ケーソン10の上側に更に他の上側のケーソンが継ぎ足される。 By excavating the earth and sand of the work room 14 and subsided the caisson 10 from the ground surface B to a predetermined depth, the caisson 10 constructs a foundation structure such as a tunnel in the ground. When the caisson 10 is subsided deeper so that the caisson 10 shown in FIG. 1 is below the ground surface, another upper caisson is added to the upper side of the caisson 10.

マンシャフト15とマテリアルシャフト16は、それぞれ所定の長さの複数の筒体、つまりシャフト構成筒体30を連結することにより構築される。マンシャフト15とマテリアルシャフト16を構成するシャフト構成筒体30の数は、構築物の規模に応じて設定される。シャフト構成筒体30を連結することにより、マンシャフト15とマテリアルシャフト16、つまり連結筒体が構築される。 The man shaft 15 and the material shaft 16 are constructed by connecting a plurality of cylinders having a predetermined length, that is, the shaft constituent cylinders 30. The number of shaft constituent cylinders 30 constituting the man shaft 15 and the material shaft 16 is set according to the scale of the structure. By connecting the shaft constituent cylinders 30, the man shaft 15 and the material shaft 16, that is, the connecting cylinders are constructed.

図2及び図4〜図8には、マンシャフト15やマテリアルシャフト16つまり連結筒体を構築するためのシャフト構成筒体30が示されている。図1に示されるマンシャフト15とマテリアルシャフト16は、横断面形状がほぼ円形であり、径が相互に相違していても、筒体であるシャフト構成筒体30を複数連結して構成されるという基本構造は同一である。 2 and 4 to 8 show a man shaft 15 and a material shaft 16, that is, a shaft constituent cylinder 30 for constructing a connecting cylinder. The man shaft 15 and the material shaft 16 shown in FIG. 1 are formed by connecting a plurality of shaft-constituting cylinders 30 which are cylinders even if the cross-sectional shapes are substantially circular and the diameters are different from each other. The basic structure is the same.

図2に示されるように、シャフト構成筒体30の下端には下側フランジ31が設けられ、上端には上側フランジ32が設けられており、下側フランジ31と上側フランジ32はシャフト構成筒体30の径方向外方に突出している。シャフト構成筒体30の外周面の下端部に複数のリブ33が固定されており、リブ33により下側フランジ31はシャフト構成筒体30の下端に固定される。それぞれのリブ33は放射方向に外方に突出するとともにシャフト構成筒体30に沿って上下方向に延びている。同様に、シャフト構成筒体30の外周面の上端部に複数のリブ34が固定されており、リブ34により上側フランジ32は、シャフト構成筒体30の上端に固定される。シャフト構成筒体30を連結することにより形成される連結筒体は、ケーソン10の作業室天井壁13に垂直方向に取り付けられるので、シャフト構成筒体30の下端と上端は、作業室天井壁13に取り付けられた状態における上下の位置を示す。 As shown in FIG. 2, a lower flange 31 is provided at the lower end of the shaft constituent cylinder 30, an upper flange 32 is provided at the upper end, and the lower flange 31 and the upper flange 32 are shaft constituent cylinders. It protrudes outward in the radial direction of 30. A plurality of ribs 33 are fixed to the lower end of the outer peripheral surface of the shaft constituent cylinder 30, and the lower flange 31 is fixed to the lower end of the shaft constituent cylinder 30 by the ribs 33. Each rib 33 projects outward in the radial direction and extends in the vertical direction along the shaft constituent cylinder 30. Similarly, a plurality of ribs 34 are fixed to the upper end of the outer peripheral surface of the shaft constituent cylinder 30, and the upper flange 32 is fixed to the upper end of the shaft constituent cylinder 30 by the ribs 34. Since the connecting cylinder formed by connecting the shaft constituent cylinders 30 is vertically attached to the working room ceiling wall 13 of the caisson 10, the lower and upper ends of the shaft constituent cylinders 30 are the working room ceiling wall 13. Indicates the vertical position when attached to.

図7に示されるように、下側フランジ31には複数の貫通孔35が設けられており、上側フランジ32にも同様の貫通孔35が設けられている。さらに、下側フランジ31をシャフト構成筒体30に固定するためのリブ33には、図2に示されるように、取付孔36が設けられており、上側フランジ32をシャフト構成筒体30に固定するためのリブ34にも、同様に取付孔36が設けられている。 As shown in FIG. 7, the lower flange 31 is provided with a plurality of through holes 35, and the upper flange 32 is also provided with a similar through hole 35. Further, as shown in FIG. 2, the rib 33 for fixing the lower flange 31 to the shaft constituent cylinder 30 is provided with a mounting hole 36, and the upper flange 32 is fixed to the shaft constituent cylinder 30. Similarly, the rib 34 is also provided with a mounting hole 36.

図2は、マンシャフト15やマテリアルシャフト16を構築するためのシャフト構成筒体30に対する作業用足場台40の装着作業を示す正面図であり、図3は作業用足場台の足場台本体を示す斜視図である。 FIG. 2 is a front view showing the work of attaching the work scaffolding base 40 to the shaft configuration cylinder 30 for constructing the man shaft 15 and the material shaft 16, and FIG. 3 shows the scaffolding base main body of the work scaffolding base. It is a perspective view.

シャフト構成筒体30は、ケーソン10から離れた位置の地表面Bに支持部材Cを介して配置される。この状態のもとで、作業用足場台40がシャフト構成筒体30に搬送される。作業用足場台40は、下側基台41と上側基台42とを備えた足場台本体43を有している。下側基台41は、図8に示されるように、下側フランジ31及び上側フランジ32の外径よりも大きい内径の環状の第1の内側フレーム44と、この内側フレーム44の外側を内側フレーム44に沿って延びる第1の外側フレーム45とを備えており、平面視においてほぼ円形である。上側基台42は、図7に示されるように、第2の内側フレーム46と第2の外側フレーム47とを備えており、第2の内側フレーム46は第1の内側フレーム44とほぼ同一径であり、第2の外側フレーム47は第1の外側フレーム45とほぼ同一径である。 The shaft constituent cylinder 30 is arranged on the ground surface B at a position away from the caisson 10 via the support member C. Under this state, the work scaffolding platform 40 is conveyed to the shaft constituent cylinder 30. The work scaffolding base 40 has a scaffolding base main body 43 including a lower base 41 and an upper base 42. As shown in FIG. 8, the lower base 41 has an annular first inner frame 44 having an inner diameter larger than the outer diameter of the lower flange 31 and the upper flange 32, and an inner frame outside the inner frame 44. It includes a first outer frame 45 extending along 44 and is substantially circular in plan view. As shown in FIG. 7, the upper base 42 includes a second inner frame 46 and a second outer frame 47, and the second inner frame 46 has substantially the same diameter as the first inner frame 44. The second outer frame 47 has substantially the same diameter as the first outer frame 45.

第1の内側フレーム44と第2の内側フレーム46は、図2および図3に示される複数の垂直方向の棒状の連結部材48により連結され、第1の外側フレーム45と第2の外側フレーム47も、複数の垂直方向の棒状の連結部材49により連結される。第1の外側フレーム45と第2の外側フレーム47は傾斜した連結部材50により連結されている。図7に示されるように、第2の内側フレーム46と第2の外側フレーム47は、放射方向の複数の棒状の連結部材51により連結される。内側フレーム46と外側フレーム47と連結部材51とを備えた上側基台42の上面には、エキスパンドメタル等からなる床材52が設けられている。床材52の径方向の幅寸法、つまり内側フレーム46と外側フレーム47の径方向の間隔寸法は、作業者Pが連結作業を円滑に行うことができる寸法に設定されている。それぞれの外側フレーム45、47は、ほぼ円形のシャフト構成筒体30と同心円形状のほぼ円形となっているが、それぞれの外側フレーム45、47を楕円形状、長円形状、多角形等の任意の形状とすることができる。 The first inner frame 44 and the second inner frame 46 are connected by a plurality of vertical rod-shaped connecting members 48 shown in FIGS. 2 and 3, and the first outer frame 45 and the second outer frame 47 are connected. Is also connected by a plurality of vertical rod-shaped connecting members 49. The first outer frame 45 and the second outer frame 47 are connected by an inclined connecting member 50. As shown in FIG. 7, the second inner frame 46 and the second outer frame 47 are connected by a plurality of rod-shaped connecting members 51 in the radial direction. A floor material 52 made of expanded metal or the like is provided on the upper surface of the upper base 42 provided with the inner frame 46, the outer frame 47, and the connecting member 51. The radial width dimension of the floor material 52, that is, the radial distance dimension between the inner frame 46 and the outer frame 47 is set to a dimension that allows the worker P to smoothly perform the connecting work. Each of the outer frames 45 and 47 has a substantially circular shape concentric with the substantially circular shaft configuration cylinder 30, but the respective outer frames 45 and 47 can be made of any shape such as an ellipse, an oval, and a polygon. It can be shaped.

上側基台42は、内側フレーム46と外側フレーム47に加えて複数の連結部材51を備えており、作業者Pにより連結作業を行うに十分な強度を有しているので、図8に示されるように、下側基台41には連結棒材は設けられていないが、連結部材51を下側基台41に設けるようにしても良い。図8に示されるように、下側基台41には、棒状の係合部材53が放射方向に移動自在に装着されており、それぞれの係合部材53は下側基台41に固定された鞘管つまりスリーブ54内に摺動自在に収容され、筒体としてのシャフト構成筒体30に向けて出没自在となっている。同様に、図7に示されるように、上側基台42には、棒状の係合部材53aが放射方向に移動自在に装着されており、それぞれの係合部材53aは上側基台42に固定された鞘管つまりスリーブ54内に摺動自在に収容され、筒体としてのシャフト構成筒体30に向けて出没自在となっている。 The upper base 42 includes a plurality of connecting members 51 in addition to the inner frame 46 and the outer frame 47, and has sufficient strength for the worker P to perform the connecting work, and is therefore shown in FIG. As described above, the lower base 41 is not provided with the connecting rod member, but the connecting member 51 may be provided on the lower base 41. As shown in FIG. 8, a rod-shaped engaging member 53 is movably mounted on the lower base 41 in the radial direction, and each engaging member 53 is fixed to the lower base 41. It is slidably housed in a sheath tube, that is, a sleeve 54, and can freely appear and disappear toward the shaft-constituting cylinder 30 as a cylinder. Similarly, as shown in FIG. 7, a rod-shaped engaging member 53a is movably mounted on the upper base 42 in the radial direction, and each engaging member 53a is fixed to the upper base 42. It is slidably housed in the sheath tube, that is, the sleeve 54, and can freely appear and disappear toward the shaft-constituting cylinder 30 as a cylinder.

それぞれの係合部材53、53aは、足場台本体43の円周方向に等間隔を隔てて6つずつ設けられている。ただし、係合部材53の本数は6本に限られることなく、少なくとも3本であれば、任意の本数とすることができる。また、足場台本体43は、組立を容易に行うように、半円形状となった2つの本体形成部材を組み立てることにより形成されている。ただし、2分割に限らず、それ以上の本体形成部材を組み立てることにより、足場台本体43を形成するようにしても良い。 Six of the engaging members 53 and 53a are provided at equal intervals in the circumferential direction of the scaffolding base main body 43. However, the number of engaging members 53 is not limited to six, and any number can be used as long as it is at least three. Further, the scaffolding base main body 43 is formed by assembling two semicircular main body forming members so that the scaffolding base main body 43 can be easily assembled. However, the scaffolding base main body 43 may be formed by assembling more than the main body forming member, not limited to the two divisions.

図2は、係合部材53、53aが径方向外方に突出移動されて、係合部材53、53aの内方端がそれぞれの内側フレーム44、46の内周面と同一かそれよりも引っ込んだ状態を示す。この状態のもとで、足場台本体43は、図示しないクレーンのワイヤ24aにより吊り下げられて、シャフト構成筒体30に向けて搬送される。足場台本体43は、ワイヤ24aに吊り下げられてシャフト構成筒体30の外側に配置される。このときには、足場台本体43の両方の内側フレーム44,46は上側フランジ32よりも大径であり、シャフト構成筒体30を、隙間を介して囲むので、足場台本体43をシャフト構成筒体30や上側フランジ32に衝突させることなく、容易に足場台本体43をシャフト構成筒体30の外側に配置することができる。しかも、足場台本体43は地表面Bに配置されたシャフト構成筒体30に対して装着することができるので、装着作業を安全に行うことができる。 In FIG. 2, the engaging members 53 and 53a are moved to project outward in the radial direction, and the inner ends of the engaging members 53 and 53a are retracted to or equal to the inner peripheral surfaces of the inner frames 44 and 46, respectively. Indicates the state. Under this state, the scaffolding base main body 43 is suspended by a wire 24a of a crane (not shown) and conveyed toward the shaft constituent cylinder 30. The scaffolding base main body 43 is suspended from the wire 24a and arranged outside the shaft constituent cylinder 30. At this time, both inner frames 44 and 46 of the scaffolding base main body 43 have a larger diameter than the upper flange 32 and surround the shaft constituent cylinder 30 with a gap, so that the scaffolding base main body 43 is surrounded by the shaft constituent cylinder 30. The scaffolding base main body 43 can be easily arranged outside the shaft constituent cylinder 30 without colliding with the upper flange 32 or the upper flange 32. Moreover, since the scaffolding base main body 43 can be mounted on the shaft-constituting cylinder 30 arranged on the ground surface B, the mounting work can be performed safely.

図4は、足場台本体43がシャフト構成筒体30の下側フランジ31の上に固定された状態を示す。足場台本体43が下側フランジ31に固定される前に、それぞれの係合部材53は、図4に示されるように、シャフト構成筒体30に向けて第1の内側フレーム44の内周面から突出移動される。したがって、足場台本体43をシャフト構成筒体30に対して、図4に示される下降限位置まで移動させると、係合部材53が下側フランジ31に係合し、足場台本体43はシャフト構成筒体30に固定される。さらに、それぞれの係合部材53aが、図4に示されるように、シャフト構成筒体30に向けて第2の内側フレーム46の内周面から突出移動される。これにより、下側の係合部材53が下側フランジ31に固定される。さらに、上側の係合部材53aがシャフト構成筒体30の外表面に当接つまり突き当てられる。このように、上下二段の係合部材53,53aにより足場台本体43を締結するようにすると、下側の係合部材53のみにより足場台本体43をシャフト構成筒体30に締結する場合よりも、より強固に足場台本体43は締結される。図示する係合部材53は下側フランジ31の上に接触する構造となっているが、それぞれの係合部材53の先端にスリットを設けて、スリット内にリブ33が入り込むようにしても良い。 FIG. 4 shows a state in which the scaffolding base main body 43 is fixed on the lower flange 31 of the shaft constituent cylinder 30. Before the scaffolding base body 43 is fixed to the lower flange 31, each engaging member 53 has an inner peripheral surface of the first inner frame 44 toward the shaft constituent cylinder 30, as shown in FIG. It is projected and moved from. Therefore, when the scaffolding base body 43 is moved to the lowering limit position shown in FIG. 4 with respect to the shaft configuration cylinder 30, the engaging member 53 engages with the lower flange 31, and the scaffolding base main body 43 has a shaft configuration. It is fixed to the cylinder 30. Further, as shown in FIG. 4, each engaging member 53a is projected and moved from the inner peripheral surface of the second inner frame 46 toward the shaft constituent cylinder 30. As a result, the lower engaging member 53 is fixed to the lower flange 31. Further, the upper engaging member 53a abuts or abuts on the outer surface of the shaft constituent cylinder 30. In this way, when the scaffolding base body 43 is fastened by the upper and lower two-stage engaging members 53, 53a, the scaffolding base main body 43 is fastened to the shaft constituent cylinder 30 only by the lower engaging member 53. However, the scaffolding base main body 43 is fastened more firmly. The engaging member 53 shown in the figure has a structure in which it contacts the lower flange 31, but a slit may be provided at the tip of each engaging member 53 so that the rib 33 can be inserted into the slit.

図4において破線で示すように、手摺55が足場台本体43の外周部に装着される。手摺55は足場台本体43に対して着脱自在となっており、足場台本体43に対する手摺55の装着は、図4に示されるように、足場台本体43がシャフト構成筒体30に装着された状態のもとで行われる。これにより、足場台本体43をシャフト構成筒体30に吊り下げて搬送する際には、手摺55がシャフト構成筒体30に装着されておらず、足場台本体43のシャフト構成筒体30に対する装着作業を容易に行うことができる。 As shown by the broken line in FIG. 4, the handrail 55 is attached to the outer peripheral portion of the scaffolding base main body 43. The handrail 55 is detachable from the scaffolding base body 43, and the scaffolding base body 43 is attached to the shaft constituent cylinder 30 as shown in FIG. 4 when the handrail 55 is attached to the scaffolding base main body 43. It is done under the condition. As a result, when the scaffolding base main body 43 is suspended from the shaft constituent cylinder 30 and conveyed, the handrail 55 is not attached to the shaft constituent cylinder 30, and the scaffolding base main body 43 is attached to the shaft constituent cylinder 30. The work can be done easily.

図9は梯子が設けられた足場台本体をシャフト構成筒体に装着した状態を示す斜視図であり、梯子38が内側フレーム44,46に固定され、梯子38が設けられた部分の床材52には、開口部39が設けられている。開口部39を覆うために、足場台本体43には図示しないハッチが開閉自在に装着される。このように、床材52に設けられた開口部39を作業者が通過するようにすると、足場台本体43の外面に梯子38を設けた形態に比して、作業者の上り下りを安全に行うことができる。なお、図9に示される梯子38は、足場台本体43から上方に突出しているが、下方に突出させるように、梯子38を足場台本体43に装着するようにしても良い。 FIG. 9 is a perspective view showing a state in which the scaffolding base body provided with the ladder is mounted on the shaft constituent cylinder, and the ladder 38 is fixed to the inner frames 44 and 46, and the floor material 52 of the portion where the ladder 38 is provided. Is provided with an opening 39. In order to cover the opening 39, a hatch (not shown) is attached to the scaffolding base main body 43 so as to be openable and closable. By allowing the worker to pass through the opening 39 provided in the floor material 52 in this way, the worker can safely go up and down as compared with the form in which the ladder 38 is provided on the outer surface of the scaffolding platform main body 43. It can be carried out. Although the ladder 38 shown in FIG. 9 projects upward from the scaffolding platform main body 43, the ladder 38 may be attached to the scaffolding platform main body 43 so as to project downward.

図10は作業用足場台40を示す平面図であり、足場台本体43の上側基台42には、手摺55を支持するために、複数の鞘管つまり手摺受け管56が設けられている。それぞれの手摺受け管56は、外側フレーム47の外面に溶接等により固定されており、図10に示される足場台本体43には、手摺受け管56が10個設けられている。なお、図10においては、手摺55は簡略化して直線により示されている。 FIG. 10 is a plan view showing the work scaffolding base 40, and a plurality of sheath pipes, that is, handrail receiving pipes 56 are provided on the upper base 42 of the scaffolding base main body 43 in order to support the handrail 55. Each handrail receiving pipe 56 is fixed to the outer surface of the outer frame 47 by welding or the like, and the scaffolding base main body 43 shown in FIG. 10 is provided with ten handrail receiving pipes 56. In FIG. 10, the handrail 55 is shown by a straight line for simplification.

手摺55は、図11に示される第1の手摺枠57と、第2の手摺枠58とを円周方向に交互に組み立てることにより足場台本体43に装着される。第1の手摺枠57は、それぞれ手摺受け管56に装着される2本の連結支柱61、62を有し、相互に平行となった両方の連結支柱61,62の間には、上桟63と、中桟64とが設けられ、両方の連結支柱61,62は上桟63と中桟64により連結されている。手摺枠57の下端部には、床材52からの物体の落下を防止するために、上桟63および中桟64よりも幅の大きい幅木65が取り付けられている。それぞれの連結支柱61、62には、複数のフック66が取り付けられており、それぞれのフック66には上下方向に貫通する取付孔が設けられている。 The handrail 55 is attached to the scaffolding base main body 43 by alternately assembling the first handrail frame 57 and the second handrail frame 58 shown in FIG. 11 in the circumferential direction. The first handrail frame 57 has two connecting columns 61 and 62, which are attached to the handrail receiving pipe 56, respectively, and an upper rail 63 is provided between both connecting columns 61 and 62 parallel to each other. And the middle rail 64 are provided, and both connecting columns 61 and 62 are connected by the upper rail 63 and the middle rail 64. A skirting board 65, which is wider than the upper rail 63 and the middle rail 64, is attached to the lower end of the handrail frame 57 in order to prevent an object from falling from the floor material 52. A plurality of hooks 66 are attached to the respective connecting columns 61 and 62, and each hook 66 is provided with an attachment hole penetrating in the vertical direction.

第2の手摺枠58は、相互に平行となった補助支柱67,68を備えており、両方の補助支柱67,68には上桟71、中桟72、および幅木73が取り付けられている。上桟71と中桟72の両端部には、第1の手摺枠57のフック66に挿入される連結ピン74が取り付けられている。したがって、図11(A)に示されるように、第2の手摺枠58の間隔を隔てて第1の手摺枠57を手摺受け管56に取り付け、両方の第1の手摺枠57の間に第2の手摺枠58を配置して、連結ピン74をフック66に挿入することにより、手摺55を組み立てることができる。図11には、2つの第1の手摺枠57と、1つの第2の手摺枠58とが示されているが、5つの第1の手摺枠57と、5つの第2の手摺枠58とにより、手摺55を組み立てることができる。 The second handrail frame 58 includes auxiliary columns 67 and 68 parallel to each other, and both auxiliary columns 67 and 68 are attached with an upper rail 71, a middle rail 72, and a skirting board 73. .. Connecting pins 74 to be inserted into hooks 66 of the first handrail frame 57 are attached to both ends of the upper rail 71 and the middle rail 72. Therefore, as shown in FIG. 11 (A), the first handrail frame 57 is attached to the handrail receiving pipe 56 at intervals of the second handrail frame 58, and the first handrail frame 57 is located between the two first handrail frames 57. The handrail 55 can be assembled by arranging the handrail frame 58 of 2 and inserting the connecting pin 74 into the hook 66. FIG. 11 shows two first handrail frames 57 and one second handrail frame 58, with five first handrail frames 57 and five second handrail frames 58. As a result, the handrail 55 can be assembled.

図12は、梯子38と手摺55とを足場台本体43に組み付けて作業用足場台40が組み立てられた状態を示す斜視図である。手摺55は、両方の手摺枠57,58を同数とすれば、足場台本体43のサイズに応じて、任意の数に設定することができる。手摺55は、図4〜図6においては破線で示され、図7および図8においては直線で示されており、それぞれ簡略化して示されている。 FIG. 12 is a perspective view showing a state in which the work scaffolding platform 40 is assembled by assembling the ladder 38 and the handrail 55 to the scaffolding platform main body 43. The number of handrails 55 can be set to an arbitrary number according to the size of the scaffolding base main body 43, assuming that both handrail frames 57 and 58 have the same number. The handrail 55 is shown by a broken line in FIGS. 4 to 6 and a straight line in FIGS. 7 and 8, respectively, which are shown in a simplified manner.

図4に示されるように、シャフト構成筒体30に足場台本体43が装着され、足場台本体43に手摺55が装着された状態のもとで、図5に示されるように、ワイヤ24aを用いて図示しないクレーンによりシャフト構成筒体30は、下段側のシャフト構成筒体30(a)の上側に連結される。下段側のシャフト構成筒体30(a)はその下段側のシャフト構成筒体30(b)に既に連結固定されている。 As shown in FIG. 4, the scaffolding base main body 43 is attached to the shaft constituent cylinder 30, and the handrail 55 is attached to the scaffolding base main body 43, and the wire 24a is attached as shown in FIG. The shaft constituent cylinder 30 is connected to the upper side of the lower shaft constituent cylinder 30 (a) by a crane (not shown). The lower shaft configuration cylinder 30 (a) is already connected and fixed to the lower shaft configuration cylinder 30 (b).

例えば、図1に示されたマンシャフト15の最下段のシャフト構成体を図5に示されたシャフト構成筒体30(b)とすると、その上段側にシャフト構成筒体30(a)が既に連結されており、シャフト構成筒体30(a)にシャフト構成筒体30を連結するために、図5は、シャフト構成筒体30をシャフト構成筒体30(a)に向けて搬送している状態を示す。図1に示されるマンシャフト15が7つのシャフト構成筒体30により組み立てられるとすると、下段側のシャフト構成筒体30から順次上段側に7つのシャフト構成筒体30が作業室天井壁13に連結されてマンシャフト15が組み立てられる。シャフト構成筒体30によりマテリアルシャフト16を組み立てる際にも同様にして所定数のシャフト構成筒体30が作業室天井壁13に連結されてマテリアルシャフト16が組み立てられる。 For example, if the lowermost shaft configuration of the man shaft 15 shown in FIG. 1 is the shaft configuration cylinder 30 (b) shown in FIG. 5, the shaft configuration cylinder 30 (a) is already on the upper side thereof. In order to connect the shaft configuration cylinder 30 to the shaft configuration cylinder 30 (a), FIG. 5 shows the shaft configuration cylinder 30 being conveyed toward the shaft configuration cylinder 30 (a). Indicates the state. Assuming that the man shaft 15 shown in FIG. 1 is assembled by seven shaft constituent cylinders 30, seven shaft constituent cylinders 30 are sequentially connected to the work room ceiling wall 13 from the lower shaft constituent cylinder 30 to the upper shaft constituent cylinder 30. The man shaft 15 is assembled. When assembling the material shaft 16 by the shaft-constituting cylinder 30, a predetermined number of shaft-constituting cylinders 30 are connected to the ceiling wall 13 of the work room to assemble the material shaft 16.

図6は、下段側のシャフト構成筒体30の上に上段側のシャフト構成筒体30を連結している状態を示す。 FIG. 6 shows a state in which the shaft configuration cylinder 30 on the upper stage side is connected on the shaft configuration cylinder body 30 on the lower stage side.

下段側のシャフト構成筒体30(a)に上段側のシャフト構成筒体30を連結するには、下段側のシャフト構成筒体30(a)の上側フランジ32と、上段側のシャフト構成筒体30の下側フランジ31とをボルト75により締結する。その締結作業は、作業者Pにより手作業により行われる。そのときには、作業者Pは、下側フランジ31と上側フランジ32の貫通孔35にボルト75を貫通させてボルト75にナット76をねじ止めすることにより上下に隣り合った両方のシャフト構成筒体30を連結する。作業者Pは、作業用足場台40の床材52の上を歩行しながら、複数個所にボルト75を取り付けることにより両方のシャフト構成筒体30を締結する。図5において、シャフト構成筒体30(a)とその下段側のシャフト構成筒体30(b)との連結も同様にして行われている。なお、図1および図5においては、上下のシャフト構成筒体30の位置関係を示すために、カッコ書きで符号a,bが示されている。また、図7および図8においては、ボルト75は図示省略されている。 In order to connect the upper shaft configuration cylinder 30 to the lower shaft configuration cylinder 30 (a), the upper flange 32 of the lower shaft configuration cylinder 30 (a) and the upper shaft configuration cylinder 30 are connected. The lower flange 31 of 30 is fastened with a bolt 75. The fastening work is manually performed by the worker P. At that time, the operator P penetrates the bolt 75 through the through hole 35 of the lower flange 31 and the upper flange 32 and screwes the nut 76 to the bolt 75 so that the shaft constituent cylinders 30 are vertically adjacent to each other. To concatenate. The worker P fastens both shaft constituent cylinders 30 by attaching bolts 75 at a plurality of places while walking on the floor material 52 of the work scaffolding platform 40. In FIG. 5, the shaft-constituting cylinder 30 (a) and the shaft-constituting cylinder 30 (b) on the lower stage side thereof are connected in the same manner. In addition, in FIGS. 1 and 5, reference numerals a and b are shown in parentheses in order to show the positional relationship between the upper and lower shaft constituent cylinders 30. Further, in FIGS. 7 and 8, the bolt 75 is not shown.

このように、床材52が設けられた作業用足場台40よりも上側のシャフト構成筒体30の連結作業を、床材52の上に乗った作業者Pによって行うので、作業者Pの操作性を考慮して、上側基台42の下側基台41に対する位置が設定される。下段側の作業用足場台40から上段側の作業用足場台40に作業者Pが乗り移る際には、上下に隣り合う作業用足場台40の間に配置された梯子38が使用される。 As described above, since the worker P who rides on the floor material 52 performs the connecting work of the shaft constituent cylinder 30 above the work scaffolding base 40 provided with the floor material 52, the operation of the worker P The position of the upper base 42 with respect to the lower base 41 is set in consideration of the property. When the worker P transfers from the lower work scaffolding platform 40 to the upper working scaffolding platform 40, a ladder 38 arranged between the vertically adjacent work scaffolding platforms 40 is used.

このように、作業用足場台40は、それぞれのシャフト構成筒体30に予め装着されるので、従来のように、作業室天井壁13に足場台を設置したり、垂直壁11,12の一方に足場台を設置したりして、シャフト構成筒体30が連結されるに伴って足場台を順次高く積み上げる操作を行うことがない。これにより、連結筒体としてのマンシャフト15やマテリアルシャフト16を構築するための作業用足場台40の装着作業を容易に行うことができる。 In this way, since the work scaffolding platform 40 is preliminarily attached to each of the shaft constituent cylinders 30, the scaffolding platform can be installed on the work room ceiling wall 13 or one of the vertical walls 11 and 12 as in the conventional case. There is no need to install scaffolding pedestals in the ceiling and to sequentially stack the scaffolding pedestals as the shaft constituent cylinders 30 are connected. As a result, the work of mounting the work scaffolding base 40 for constructing the man shaft 15 and the material shaft 16 as the connecting cylinder can be easily performed.

ケーソン10からマンシャフト15やマテリアルシャフト16を撤去する場合には、最上段のシャフト構成筒体30の下段側のシャフト構成筒体30の作業用足場台40に作業者が乗り込んでボルト75の取り外し操作を行う。このようにして、上下のシャフト構成筒体30の締結が解除されたら、最上段のシャフト構成筒体30をクレーンによりケーソン10の外部に搬出して、シャフト構成筒体30から手摺55と足場台本体43との撤去作業を行う。下段側のシャフト構成筒体30に作業者が下りるときには、梯子38が使用される。作業用足場台40が組み付けられた状態のシャフト構成筒体30をケーソン10から外部に搬送することができるので、迅速にシャフト構成筒体30を外部に搬送することができる。シャフト構成筒体30からの作業用足場台40の取り外し作業を、地上で行うことができるので、その取り外し作業を安全に行うことができる。さらに、マンシャフト15やマテリアルシャフト16を撤去した後におけるケーソン10に対する他の作業を迅速に開始することができる。 When removing the man shaft 15 and the material shaft 16 from the caisson 10, an operator gets into the work scaffolding base 40 of the shaft configuration cylinder 30 on the lower side of the uppermost shaft configuration cylinder 30 and removes the bolt 75. Perform the operation. In this way, when the upper and lower shaft constituent cylinders 30 are released from the fastening, the uppermost shaft constituent cylinder 30 is carried out of the caseon 10 by a crane, and the handrail 55 and the scaffolding stand are carried out from the shaft constituent cylinder 30. Perform the removal work with the main body 43. The ladder 38 is used when the worker descends to the shaft configuration cylinder 30 on the lower stage side. Since the shaft-constituting cylinder 30 in the state where the work scaffolding platform 40 is assembled can be transported to the outside from the caisson 10, the shaft-constituting cylinder 30 can be quickly transported to the outside. Since the work scaffolding base 40 can be removed from the shaft configuration cylinder 30 on the ground, the removal work can be safely performed. Further, other work on the caisson 10 after removing the man shaft 15 and the material shaft 16 can be started quickly.

このように、ケーソン工法を用いた基礎構造物の構築を効率的に行うことができ、マンシャフト15やマテリアルシャフト16等の連結筒体を構築する際における作業用足場台40の装着作業の作業性とシャフト構成筒体30からの作業用足場台40の取り外し作業性を向上することができる。 In this way, it is possible to efficiently construct the foundation structure using the caisson method, and the work of mounting the work scaffolding base 40 when constructing the connecting cylinders such as the man shaft 15 and the material shaft 16. Properties and shaft configuration It is possible to improve the workability of removing the work scaffolding base 40 from the tubular body 30.

図1はマンシャフト15とマテリアルシャフト16とを有するケーソン10を示し、両方のシャフトつまり連結筒体のシャフト構成筒体30に作業用足場台40を装着したが、少なくともいずれか一方のシャフトを構成するシャフト構成筒体30に作業用足場台40を装着するようにすることができる。また、この作業用足場台40は、ケーソン工法のみならず、筒体を連結して連結筒体を組み立てる場合にも適用することができる。さらに、マンシャフト15とマテリアルシャフト16としては、横断面がほぼ円形に限られることなく、楕円形、四角形、多角形などの任意の形状のものにも、作業用足場台40を用いて連結作業を行うことができる。 FIG. 1 shows a caseon 10 having a man shaft 15 and a material shaft 16, and a work scaffolding platform 40 is attached to both shafts, that is, a shaft configuration cylinder 30 of a connecting cylinder, but at least one of the shafts is configured. The work scaffolding base 40 can be attached to the shaft configuration cylinder 30. Further, the scaffolding platform 40 for work can be applied not only to the caisson method but also to the case of connecting the cylinders to assemble the connected cylinders. Further, the man shaft 15 and the material shaft 16 are not limited to having a substantially circular cross section, and can be connected to any shape such as an ellipse, a quadrangle, or a polygon by using the work scaffolding platform 40. It can be performed.

本発明は前記実施の形態に限定されるものではなく、その要旨を逸脱しない範囲で種々変更可能である。例えば、特許文献2に記載されるように、マンシャフトとマテリアルシャフトとを二重筒体構造とした場合にも、作業用足場台40を外側のシャフトに装着することができる。 The present invention is not limited to the above-described embodiment, and various modifications can be made without departing from the gist thereof. For example, as described in Patent Document 2, even when the man shaft and the material shaft have a double tubular structure, the work scaffolding platform 40 can be mounted on the outer shaft.

10 ケーソン
13 作業室天井壁
14 作業室
15 マンシャフト
16 マテリアルシャフト
22 梯子
23 土砂バケット
30 シャフト構成筒体
31 下側フランジ
32 上側フランジ
35 貫通孔
36 取付孔
40 作業用足場台
41 下側基台
42 上側基台
43 足場台本体
44 第1の内側フレーム
45 第1の外側フレーム
46 第2の内側フレーム
47 第2の外側フレーム
52 床材
53,53a 係合部材
54 スリーブ
55 手摺
56 手摺受け管
57 第1の手摺枠
58 第2の手摺枠
66 フック
74 連結ピン
75 ボルト
10 Cason 13 Work room Ceiling wall 14 Work room 15 Man shaft 16 Material shaft 22 Ladder 23 Earth and sand bucket 30 Shaft configuration Cylinder 31 Lower flange 32 Upper flange 35 Through hole 36 Mounting hole 40 Work scaffolding base 41 Lower base 42 Upper base 43 Scaffolding base body 44 First inner frame 45 First outer frame 46 Second inner frame 47 Second outer frame 52 Floor material 53, 53a Engagement member 54 Sleeve 55 Handrail 56 Handrail receiving pipe 57 1 handrail frame 58 2nd handrail frame 66 hook 74 connecting pin 75 bolt

Claims (5)

下端部に下側フランジが設けられ、上端部に上側フランジが設けられた複数の筒体を上下方向に連結して連結筒体を構築する際に使用される作業用足場台であって、
前記筒体に隙間を介して前記筒体を囲む第1の内側フレーム、および第1の前記内側フレームの外側を第1の前記内側フレームに沿って延びる第1の外側フレームを備えた下側基台と、
第1の前記内側フレームに平行な第2の内側フレーム、および第1の前記外側フレームに平行な第2の外側フレームを備え、前記下側基台の上方に配置されて前記下側基台に連結部材により連結されて足場台本体を形成する上側基台と、
前記上側基台に設けられ、下側の前記筒体と上側の前記筒体との連結作業を行う作業者が歩行する床材と、
第1の前記内側フレームに内周面から出没自在に設けられ、前記下側フランジに係合する複数の下側の係合部材と、
第2の前記内側フレームの内周面から出没自在に設けられ、前記筒体の外表面に突き当てられる複数の上側の係合部材と、を有し、
前記下側フランジに係合する下側の前記係合部材と、前記筒体の外表面に突き当てられる上側の前記係合部材とにより前記足場台本体を前記筒体に締結するようにした、作業用足場台。
A work scaffolding platform used when constructing a connecting cylinder by connecting a plurality of cylinders having a lower flange at the lower end and an upper flange at the upper end in the vertical direction.
A lower group comprising a first inner frame that surrounds the cylinder through a gap and a first outer frame that extends outside the first inner frame along the first inner frame. With a stand
A second inner frame parallel to the first inner frame and a second outer frame parallel to the first outer frame are provided and arranged above the lower base to the lower base. The upper base, which is connected by connecting members to form the scaffolding base body,
A flooring material provided on the upper base and on which an operator who performs a connecting operation between the lower cylinder and the upper cylinder walks.
A plurality of lower engaging members that are provided on the first inner frame so as to be retractable from the inner peripheral surface and engage with the lower flange.
It has a plurality of upper engaging members that are provided so as to be freely retractable from the inner peripheral surface of the second inner frame and are abutted against the outer surface of the tubular body.
The scaffolding base body is fastened to the cylinder by the lower engaging member that engages with the lower flange and the upper engaging member that is abutted against the outer surface of the cylinder. Scaffolding platform for work.
請求項1記載の作業用足場台において、前記足場台本体の外周部に複数の手摺受け管を設け、前記手摺受け管に手摺を着脱自在に設けた、作業用足場台。 The work scaffolding platform according to claim 1, wherein a plurality of handrail receiving pipes are provided on the outer peripheral portion of the scaffolding platform main body, and the handrails are detachably provided on the handrail receiving pipes . 請求項2記載の作業用足場台において、それぞれ前記手摺受け管に装着される2本の連結支柱を有する複数の第1の手摺枠と、2つの前記第1の手摺枠の間に配置される複数の第2の手摺枠とにより、前記手摺を組み立てる、作業用足場台。 In the work scaffolding platform according to claim 2, the scaffolding platform is arranged between a plurality of first handrail frames each having two connecting columns attached to the handrail receiving pipe and the two first handrail frames. A work scaffolding platform for assembling the handrail with a plurality of second handrail frames . 請求項1〜のいずれか1項に記載の作業用足場台において、前記連結筒体はケーソンの作業室天井壁の上側に装着され作業者が上り下りするマンシャフトと、土砂を地上に案内するマテリアルシャフトとの少なくともいずれか一方であり、前記筒体は前記マンシャフトと前記マテリアルシャフトを構成するシャフト構成筒体である、作業用足場台。 In the work scaffolding platform according to any one of claims 1 to 3, the connecting cylinder is mounted on the upper side of the ceiling wall of the work room of the caisson and guides the man shaft on which the worker goes up and down and the earth and sand to the ground. A scaffolding platform for work, which is at least one of the material shafts to be used, and the cylinder is a shaft-constituting cylinder constituting the man shaft and the material shaft. 請求項1〜のいずれか1項に記載の作業用足場台において、前記筒体は横断面がほぼ円形であり、前記足場台本体は平面視においてほぼ円形である、作業用足場台。 The work scaffolding platform according to any one of claims 1 to 3 , wherein the tubular body has a substantially circular cross section, and the scaffolding platform main body is substantially circular in a plan view.
JP2016088107A 2016-04-26 2016-04-26 Scaffolding platform for work Active JP6752482B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016088107A JP6752482B2 (en) 2016-04-26 2016-04-26 Scaffolding platform for work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016088107A JP6752482B2 (en) 2016-04-26 2016-04-26 Scaffolding platform for work

Publications (2)

Publication Number Publication Date
JP2017197935A JP2017197935A (en) 2017-11-02
JP6752482B2 true JP6752482B2 (en) 2020-09-09

Family

ID=60238952

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016088107A Active JP6752482B2 (en) 2016-04-26 2016-04-26 Scaffolding platform for work

Country Status (1)

Country Link
JP (1) JP6752482B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200491643Y1 (en) * 2017-11-08 2020-05-13 두산중공업 주식회사 Prefabricated staging assembly for non-destructive inspection
KR102157520B1 (en) * 2020-04-10 2020-09-18 김경옥 Safety scaffolding and installation method
KR102788948B1 (en) * 2021-11-23 2025-03-28 동일산업(주) A maintenance device for CCR

Also Published As

Publication number Publication date
JP2017197935A (en) 2017-11-02

Similar Documents

Publication Publication Date Title
JP6752482B2 (en) Scaffolding platform for work
JP6310198B2 (en) Pier construction method
CN112922029A (en) Shaft-up and shaft-down channel for constructing ultra-deep shaft by reverse construction method and building method thereof
JP6523064B2 (en) Pipe type surface collapse prevention facility and construction method of pipe type surface collapse prevention facility
JP2019148070A (en) Construction method of underground structure
JP6622504B2 (en) Chimney demolition scaffold and chimney demolition method
JP7072483B2 (en) How to build a skeleton
CN108798508B (en) Pile hole excavating method
JP4250290B2 (en) Construction method of shaft
JP6849261B1 (en) Anti-scattering curing system equipped with a sheet-like curing sheet as a whole to prevent the scattering of crushed materials above the demolition floor when dismantling a multi-story building
JP5121028B2 (en) Liner plate and deep foundation method
JP5351382B2 (en) Method for assembling shaft scaffolding and method for removing shaft scaffolding
CN113174968A (en) Construction method of manual hole digging pile
JP7097203B2 (en) Climbing telpher and how to demolish a building
JP4122501B2 (en) Caisson's mobile scaffold construction method
JP4011722B2 (en) Hanging stairs
JP2016223084A (en) Construction method of underground structure in reverse driving method
JP7058566B2 (en) How to dismantle a tubular structure
JP2000120367A (en) External fastening liner plate and method for using it
JPH11166315A (en) Structure demolition equipment
JP2011080276A (en) Method of installing suspended staircase
KR101337875B1 (en) Safety ladder for foundation construction of electric transmission steel tower
JP2003268779A (en) Pneumatic caisson and excavation in pneumatic caisson, management and recovery of excavator
JP2016180282A (en) Scaffolding device and propulsion construction method using scaffolding device
JP7018800B2 (en) Installation method of steel earth retaining material installation equipment and liner plate

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20190410

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20200219

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20200303

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20200422

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20200811

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20200813

R150 Certificate of patent or registration of utility model

Ref document number: 6752482

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250