Seismic isolation system Download PDF

Info

Publication number
JP6769841B2
JP6769841B2 JP2016223475A JP2016223475A JP6769841B2 JP 6769841 B2 JP6769841 B2 JP 6769841B2 JP 2016223475 A JP2016223475 A JP 2016223475A JP 2016223475 A JP2016223475 A JP 2016223475A JP 6769841 B2 JP6769841 B2 JP 6769841B2
Authority
JP
Japan
Prior art keywords
seismic
unit
earthquake
outlet
breaker
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2016223475A
Other languages
Japanese (ja)
Other versions
JP2018082566A (en
Inventor
昌幸 加藤
昌幸 加藤
文移 林
文移 林
孝一 石原
孝一 石原
優樹 早瀬
優樹 早瀬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kawamura Electric Inc
Original Assignee
Kawamura Electric Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kawamura Electric Inc filed Critical Kawamura Electric Inc
Priority to JP2016223475A priority Critical patent/JP6769841B2/en
Publication of JP2018082566A publication Critical patent/JP2018082566A/en
Application granted granted Critical
Publication of JP6769841B2 publication Critical patent/JP6769841B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Details Of Connecting Devices For Male And Female Coupling (AREA)
  • Distribution Board (AREA)

Description

本発明は、感震リレーを備えて所定震度以上の地震が発生したら電路を遮断する感震遮断システムに関する。 The present invention relates to a seismic shutoff system equipped with a seismic sensitive relay and shuts off an electric circuit when an earthquake of a predetermined seismic intensity or higher occurs.

通電火災の発生を防ぐために、感震器(感震リレー)を分電盤に設けて一定震度以上の地震が発生したら主幹ブレーカを遮断動作させる分電盤の普及が進んでいる。例えば、特許文献1では、分電盤内に地震の発生を受けて一定時間後に擬似漏電を発生させて主幹ブレーカを遮断させる、即ち遅延遮断を実施する漏電出力部を備えた感震リレーを設置して、一定時間後に電路全体を遮断させた。
一方で、壁面に設置されるコンセットユニットに電路を遮断する遮断機能を備えたものがある(例えば、特許文献2参照)。
In order to prevent the occurrence of energized fires, distribution boards that are equipped with seismic sensors (seismic relays) to shut off the main breaker when an earthquake with a certain seismic intensity or higher occurs are becoming widespread. For example, in Patent Document 1, a seismic relay equipped with an earth leakage output unit that interrupts the main breaker by generating a pseudo earth leakage after a certain period of time after an earthquake occurs in the distribution board is installed. Then, after a certain period of time, the entire electric circuit was cut off.
On the other hand, some conset units installed on the wall surface have a blocking function for blocking the electric circuit (see, for example, Patent Document 2).

特開2015−173522号公報JP 2015-173522 特開2006−351207号公報Japanese Unexamined Patent Publication No. 2006-351207

感震リレーを備えた上記分電盤では、遅延して擬似漏電を発生させる漏電出力部に加えて、地震の発生を感知したら即時に信号を出力する信号出力部を備えており、この信号により特定の分岐ブレーカのみ即時に遮断することが可能であった。
また、この信号を利用することで、上記特許文献2に開示されているような遮断機能を備えたコンセントユニットを遮断動作させることも可能となった。
しかしながら、外部信号により遮断動作する機能を備えた機器の動作テストをする場合は、個々に設けられているテストボタンを操作して動作確認することになり面倒であった。
The distribution board equipped with a seismic relay is equipped with a signal output unit that outputs a signal immediately when an earthquake occurs, in addition to an earth leakage output unit that delays and generates a pseudo-leakage. It was possible to immediately shut off only a specific branch breaker.
Further, by using this signal, it has become possible to shut off an outlet unit having a blocking function as disclosed in Patent Document 2.
However, when performing an operation test of a device having a function of shutting off by an external signal, it is troublesome to operate the test buttons provided individually to check the operation.

そこで、本発明はこのような問題点に鑑み、感震リレーの地震検出信号により遮断動作する分岐ブレーカの遮断機能のテストを感震リレーの操作で可能とすること、更に感震リレーの地震検出信号により遮断動作するコンセントユニットに関しても感震リレーの操作でテストできる感震遮断システムを提供することを目的としている。 Therefore, in view of such a problem, the present invention makes it possible to test the blocking function of the branch breaker that shuts off by the seismic detection signal of the seismic relay by operating the seismic relay, and further, the seism detection of the seismic relay. The purpose is to provide a quake detector system that can be tested by operating a quake detector relay even for an outlet unit that shuts off by a signal.

上記課題を解決する為に、請求項1の発明は、商用電源に接続された主電路を遮断するための主幹ブレーカと、主幹ブレーカの二次側から分岐された分岐電路を遮断するための複数の分岐ブレーカと、地震発生を感知する感震リレーとを備えて、感震リレーが所定の震度以上の地震を感知したら、その後主幹ブレーカを遅延遮断させる感震遮断システムであって、感震リレーは、遅延遮断を実施する遅延遮断出力部に加えて、所定の震度以上の地震を検知したら即時に地震検出信号を出力する信号出力部と、テスト信号として信号出力部から地震検出信号を出力させるテスト操作部とを有する一方、一部の分岐電路には、コンセントを電源から遮断する遮断機構と、遮断機構の遮断を制御する遮断制御部とを備えた遮断機能付コンセントユニットが接続されており、遮断制御部は、地震検出信号を受けて遮断機構を遮断動作させると共に、一部の分岐ブレーカが、地震検出信号を受けて遮断動作する外部遮断機能付ブレーカであることを特徴とする。
この構成によれば、テスト操作部の操作により、外部遮断機能付ブレーカは遮断動作するため、外部遮断機能付ブレーカを直接テスト操作することなく動作テストでき、外部遮断機能付ブレーカを複数備えていてもテストは1回の操作で済む。
In order to solve the above problems, the invention of claim 1 is a plurality of main breakers for blocking the main electric circuit connected to a commercial power source and a plurality of branch electric circuits for blocking the branch electric circuit branched from the secondary side of the main breaker. It is a seismic blocking system that is equipped with a branch breaker and a seismic relay that detects the occurrence of an earthquake, and if the seismic relay detects an earthquake with a predetermined seismic intensity or higher, the main breaker is then delayed and shut off. In addition to the delay cutoff output unit that implements delay cutoff, the signal output unit that outputs an earthquake detection signal immediately when an earthquake with a predetermined seismic intensity or higher is detected, and the signal output unit that outputs an earthquake detection signal as a test signal. While having a test operation unit, some branch electric circuits are connected to an outlet unit with a blocking function having a blocking mechanism that shuts off the outlet from the power supply and a blocking control unit that controls the blocking of the blocking mechanism. The cutoff control unit is characterized in that the cutoff control unit receives an earthquake detection signal to shut off the cutoff mechanism, and some of the branch breakers are breakers with an external cutoff function that receive the earthquake detection signal and perform a cutoff operation.
According to this configuration, since the breaker with the external cutoff function is cut off by the operation of the test operation unit, the operation can be tested without directly testing the breaker with the external cutoff function, and a plurality of breakers with the external cutoff function are provided. However, the test only needs to be performed once.

更に、テスト操作部の操作により、遮断機能付コンセントユニットは遮断動作する。よって、遮断機能付コンセントユニットを直接テスト操作することなく動作テストでき、遮断機能付コンセントユニットを複数備えていてもテストは1回の操作で済む。 Further, the outlet unit with a shutoff function is shut off by the operation of the test operation unit. Therefore, the operation can be tested without directly testing the outlet unit with a shutoff function, and even if a plurality of outlet units with a cutoff function are provided, the test can be performed only once.

請求項の発明は、請求項に記載の構成において、遮断機能付コンセントユニットは、コンセントのトラッキング現象を検出するトラッキング検出部を有し、遮断制御部は、トラッキング現象が検出されたら遮断機構を遮断動作させることを特徴とする。
この構成によれば、遮断機能付コンセントユニットは、地震発生に加えてトラッキングが発生した場合も遮断動作するため、電路異常による火災の発生を確実に防止できる。
According to the second aspect of the present invention, in the configuration according to the first aspect , the outlet unit with a blocking function has a tracking detection unit that detects a tracking phenomenon of the outlet, and the blocking control unit has a blocking mechanism when the tracking phenomenon is detected. It is characterized by shutting off.
According to this configuration, the outlet unit with a shutoff function shuts off even when tracking occurs in addition to the occurrence of an earthquake, so that it is possible to reliably prevent the occurrence of a fire due to an electric circuit abnormality.

本発明によれば、テスト操作部の操作により、外部遮断機能付ブレーカは遮断動作するため、外部遮断機能付ブレーカを直接テスト操作することなく動作テストでき、外部遮断機能付ブレーカを複数備えていてもテストは1回の操作で済む。
また、遮断機能付コンセントユニットを備えている場合は、テスト操作部の操作により、遮断機能付コンセントユニットも遮断動作するため、遮断機能付コンセントユニットを直接テスト操作することなく動作テストでき、遮断機能付コンセントユニットを複数備えていてもテストは1回の操作で済む。
According to the present invention, since the breaker with the external cutoff function is cut off by the operation of the test operation unit, the operation can be tested without directly performing the test operation on the breaker with the external cutoff function, and a plurality of breakers with the external cutoff function are provided. However, the test requires only one operation.
In addition, if the outlet unit with a shutoff function is provided, the outlet unit with a shutoff function can also be shut off by operating the test operation unit, so the operation can be tested without directly testing the outlet unit with a shutoff function. Even if you have multiple outlet units, you only need to perform the test once.

本発明に係る感震遮断システムの一例を示すシステム構成図である。It is a system block diagram which shows an example of the seismic isolation system which concerns on this invention. 感震リレーのブロック図である。It is a block diagram of a seismic relay. 通信計測ユニットのブロック図である。It is a block diagram of a communication measurement unit. 感震通信ユニットのブロック図である。It is a block diagram of a seismic communication unit. コンセント制御ユニットの接続説明図である。It is a connection explanatory drawing of the outlet control unit. 遮断機能付コンセントユニットのブロック図である。It is a block diagram of the outlet unit with a shutoff function.

以下、本発明を具体化した実施の形態を、図面を参照して詳細に説明する。図1は本発明に係る感震遮断システムの一例を示す構成図であり、1は住戸内に引き込まれた単相3線式電路(電圧相X,Yと中性相N)から成る商用電源が一次側に接続された主幹ブレーカ、2は主幹ブレーカ1の二次側に形成された主電路Mから分岐された個々の分岐電路を遮断するための分岐ブレーカ、3は所定の震度以上の地震を感知したら地震検出信号を出力すると共に主電路Mに擬似漏電を発生させる感震リレー、4は住戸内の使用電力情報を外部のHEMS機器11に送信する通信計測ユニット、5は感震リレー3から出力された地震検出信号を受けて特定の分岐ブレーカ2を遮断操作する感震通信ユニット、6は分岐電路の先に設けられた複数の遮断機能付コンセントユニット12を遮断動作させるコンセント制御ユニットである。 Hereinafter, embodiments embodying the present invention will be described in detail with reference to the drawings. FIG. 1 is a configuration diagram showing an example of a seismic isolation system according to the present invention, and FIG. 1 is a commercial power supply composed of a single-phase three-wire electric circuit (voltage phases X and Y and neutral phase N) drawn into a dwelling unit. Is a main breaker connected to the primary side, 2 is a branch breaker for cutting off individual branch electric circuits branched from the main electric circuit M formed on the secondary side of the main breaker 1, and 3 is an earthquake with a predetermined seismic intensity or higher. A seismic relay that outputs an earthquake detection signal and generates a pseudo-leakage in the main electric circuit M when the above is detected, 4 is a communication measurement unit that transmits power usage information in the dwelling unit to an external HEMS device 11, and 5 is a seismic relay 3. A seismic communication unit that shuts off a specific branch breaker 2 in response to an earthquake detection signal output from, and 6 is an outlet control unit that shuts off a plurality of outlet units 12 with a shutoff function provided at the end of a branch circuit. is there.

分岐ブレーカ2は分岐電路毎に設置され、外部信号による制御を受けないブレーカ群(第1のブレーカ2aの群)と、感震通信ユニット5の制御によって遮断動作するブレーカ群(第2のブレーカ2bの群)との2つの群から構成されている。
そのため、第1のブレーカ2aは従来よりある単純な構造の分岐ブレーカであるが、第2のブレーカ2bは感震通信ユニット5の制御信号を入力する外部制御端子(図示せず)を備えた外部遮断機能付ブレーカである。
The branch breaker 2 is installed for each branch electric circuit, and is a breaker group (a group of the first breaker 2a) that is not controlled by an external signal and a breaker group (a second breaker 2b) that shuts off under the control of the seismic communication unit 5. It is composed of two groups (group of) and.
Therefore, the first breaker 2a is a conventional branch breaker having a simple structure, but the second breaker 2b is an external device provided with an external control terminal (not shown) for inputting a control signal of the seismic communication unit 5. It is a breaker with a blocking function.

感震リレー3、通信計測ユニット4、感震通信ユニット5、コンセント制御ユニット6は分電盤Bの内部に組み付けられている。尚、感震リレー3、通信計測ユニット4、感震通信ユニット5は、主幹ブレーカ1の二次側に配設された主電路Mを構成する主幹バー9に、第1のブレーカ2a及び第2のブレーカ2bと共に連結されて電源が供給されるが、コンセント制御ユニット6は接点のみで構成され電源を必要としないため、分電盤Bの外に配置しても良い。 The seismic relay 3, the communication measurement unit 4, the seismic communication unit 5, and the outlet control unit 6 are assembled inside the distribution board B. The seismic relay 3, the communication measurement unit 4, and the seismic communication unit 5 are connected to the main bar 9 constituting the main electric circuit M arranged on the secondary side of the main breaker 1 with the first breaker 2a and the second. The power is supplied by being connected together with the breaker 2b of the above, but since the outlet control unit 6 is composed of only contacts and does not require a power supply, it may be arranged outside the distribution board B.

そして、感震リレー3は、伝送線L1を介して主幹ブレーカ1の1次側の一方の電圧相Yに接続され、伝送線L3を介して感震通信ユニット5に接続されている。また、感震通信ユニット5は伝送線L4を介して通信計測ユニット4に接続され、伝送線L6を介してコンセント制御ユニット6に接続されている。 The seismic relay 3 is connected to one of the voltage phases Y on the primary side of the main breaker 1 via the transmission line L1, and is connected to the seismic communication unit 5 via the transmission line L3. Further, the seismic communication unit 5 is connected to the communication measurement unit 4 via the transmission line L4, and is connected to the outlet control unit 6 via the transmission line L6.

図2は感震リレー3のブロック図を示している。感震リレー3は、図2に示すように加速度センサ31、地震発生と判定する震度を設定する震度設定部33、地震発生から一定時間後に擬似漏電を発生させて主幹ブレーカ1を遅延遮断動作させる時間を設定する遮断時間設定部34、擬似漏電を発生させる擬似漏電出力部35、警報音を発報するブザー36a、発光通知するLED36b、地震検出動作のテスト/リセットを行うテスト/リセットボタン37、地震発生と判断したら地震検出信号を出力する外部通信部38、加速度センサ31の出力から地震の震度を判定して、設定された震度以上であると判断したら地震発生と判断して各種制御信号を出力すると共に、感震リレー3全体を制御するMCU(Micro Controller Unit)39等を備えている。
尚、MCU39は、ROMやRAMなどのメモリ39a、I/O関連等の周辺機能を内蔵した集積回路であり、メモリ39aには例えば設定された震度の閾値や擬似漏電を発生させる遅延遮断の時間等が記憶される。
FIG. 2 shows a block diagram of the seismic relay 3. As shown in FIG. 2, the seismic relay 3 has an acceleration sensor 31, a seismic intensity setting unit 33 for setting a seismic intensity to be determined to be an earthquake, and a pseudo-leakage generated after a certain period of time from the occurrence of an earthquake to delay-block the main breaker 1. A cutoff time setting unit 34 for setting the time, a pseudo electric leakage output unit 35 for generating a pseudo electric leakage, a buzzer 36a for issuing an alarm sound, an LED 36b for notifying light emission, a test / reset button 37 for testing / resetting an earthquake detection operation, If it is determined that an earthquake has occurred, the seismic intensity of the earthquake is determined from the output of the external communication unit 38 that outputs the earthquake detection signal and the acceleration sensor 31, and if it is determined that the seismic intensity is higher than the set seismic intensity, it is determined that an earthquake has occurred and various control signals are output. It is equipped with an MCU (Micro Controller Unit) 39 or the like that outputs and controls the entire seismic relay 3.
The MCU 39 is an integrated circuit having built-in peripheral functions such as memory 39a such as ROM and RAM, and I / O-related functions. The memory 39a has, for example, a set seismic intensity threshold value and a delay cutoff time for generating a pseudo electric leakage. Etc. are memorized.

そして、擬似漏電出力部35が伝送線L1により主幹ブレーカ1の一次側の主電路Mの一方の電圧相Yに接続されている。更に外部通信部38が伝送線L3を介して感震通信ユニット5に接続されている。この外部通信部38は、外部への信号出力に加えて、外部から所定の信号を受信したらMCU39に送信するインターフェース回路を備えている。 Then, the pseudo earth leakage output unit 35 is connected to one voltage phase Y of the main electric circuit M on the primary side of the main breaker 1 by the transmission line L1. Further, the external communication unit 38 is connected to the seismic communication unit 5 via the transmission line L3. In addition to outputting a signal to the outside, the external communication unit 38 includes an interface circuit that transmits a predetermined signal from the outside to the MCU 39.

感震リレー3は、震度設定部33により地震検出信号を出力する震度(所定の震度)が設定され、例えば震度5弱、6等が設定される。遮断時間設定部34では、擬似漏電を発生させて遅延遮断させる時間が設定される。例えば、MCU39が地震発生と判断したら即時に外部通信部38から地震検出信号を出力するが、擬似漏電出力部35からは、例えば地震検出信号を出力してから一定の時間(例えば、3分)が経過した後に、主電路Mに擬似漏電を発生させる擬似漏電信号が出力される。そして、地震検出信号が出力されたら、ブザー36aが鳴動し、LED36bが点滅動作する。 In the seismic relay 3, the seismic intensity (predetermined seismic intensity) for outputting the seismic detection signal is set by the seismic intensity setting unit 33, and for example, seismic intensity 5 lower, 6 or the like is set. In the cutoff time setting unit 34, a time for causing a pseudo electric leakage to cause a delayed cutoff is set. For example, when the MCU 39 determines that an earthquake has occurred, the external communication unit 38 immediately outputs an earthquake detection signal, but the pseudo-leakage output unit 35 outputs, for example, an earthquake detection signal for a certain period of time (for example, 3 minutes). After that, a pseudo leakage signal that causes a pseudo leakage is output to the main electric circuit M. Then, when the earthquake detection signal is output, the buzzer 36a sounds and the LED 36b blinks.

MCU39は、感震リレー3全体の制御に加えて、感震通信ユニット5及び通信計測ユニット4を介して外部のHEMS機器11と通信を実施し、地震検出信号の送信に加えて検出した震度情報をHEMS機器11に送信する。一方、HEMS機器11から地震検出信号を出力する閾値となる震度設定や、擬似漏電を発生させて遅延遮断する時間の設定を可能としている。 In addition to controlling the entire seismic relay 3, the MCU 39 communicates with the external HEMS device 11 via the seismic communication unit 5 and the communication measurement unit 4, and transmits the seismic intensity information detected in addition to the transmission of the seismic detection signal. Is transmitted to the HEMS device 11. On the other hand, it is possible to set the seismic intensity as a threshold value for outputting the earthquake detection signal from the HEMS device 11 and to set the time for causing a pseudo electric leakage and interrupting the delay.

ここで、感震リレー3の擬似漏電出力部35が出力する擬似漏電信号について説明する。擬似漏電出力部35が主幹ブレーカ1の一次側に伝送線L1を介して接続されることで、主幹ブレーカ1の二次側電路と一次側電路との間に主幹ブレーカ1を介さない電路(擬似漏電回路)が形成され、この擬似漏電回路を感震リレー3がオンさせて通電させることで、主幹ブレーカ1は漏電発生と判断して遮断動作する。このオン操作を擬似漏電信号を出力するという。 Here, the pseudo-leakage signal output by the pseudo-leakage output unit 35 of the seismic relay 3 will be described. By connecting the pseudo earth leakage output unit 35 to the primary side of the main breaker 1 via the transmission line L1, an electric circuit (pseudo) that does not pass through the main breaker 1 between the secondary side electric circuit and the primary side electric circuit of the main breaker 1. An earth leakage circuit) is formed, and when the seismic relay 3 is turned on to energize this pseudo earth leakage circuit, the main breaker 1 determines that an earth leakage has occurred and shuts off. This on operation is called outputting a pseudo earth leakage signal.

図3は通信計測ユニット4のブロック図を示している。通信計測ユニット4は図3に示すように、主幹ブレーカ1に流れる電流を検出する主幹電流センサ13及び個々の分岐ブレーカ2に設置されて個々の分岐電流を検出する分岐電流センサ14の電流情報が入力される電流情報入力部41、感震通信ユニット5が接続される内部通信IF42、HEMS機器11と例えばLAN接続されて通信する外部通信IF43、通信計測ユニット4全体を制御する通信計測ユニットCPU44等を備えている。
尚、21は図示しない太陽光発電等の分散発電機器に対してその発電電力を計測してデータを出力する拡張計測ユニット、22は水道/ガスの使用量を算出するパルス計測ユニットであり、これらの計測ユニットも内部通信IF42に接続されて、通信計測ユニットCPU44により受信した発電電力情報や水道/ガスの使用量データがHEMS機器11に送信される。
FIG. 3 shows a block diagram of the communication measurement unit 4. As shown in FIG. 3, the communication measurement unit 4 has current information of the main current sensor 13 that detects the current flowing through the main breaker 1 and the branch current sensor 14 that is installed in each branch breaker 2 and detects each branch current. The input current information input unit 41, the internal communication IF42 to which the seismic communication unit 5 is connected, the external communication IF43 that communicates with the HEMS device 11 by connecting to a LAN, for example, the communication measurement unit CPU44 that controls the entire communication measurement unit 4, etc. It has.
Reference numeral 21 denotes an extended measurement unit that measures the generated power of distributed power generation equipment such as photovoltaic power generation and outputs data, and 22 is a pulse measurement unit that calculates the amount of water / gas used. The measurement unit is also connected to the internal communication IF 42, and the generated power information and water / gas usage data received by the communication measurement unit CPU 44 are transmitted to the HEMS device 11.

このように通信計測ユニット4は、接続された外部のHEMS機器11に対して、使用電力情報や発電電力情報、水道/ガスの使用量情報を送信する。そして、通信計測ユニットCPU44はHEMS機器11と感震リレー3との間の通信を管理し、感震通信ユニット5を介して受信した感震リレー3が出力した地震検出信号や震度情報等の感震情報をHEMS機器11に送信する一方で、HEMS機器11から感震リレー3の地震発生を判定する所定の震度の設定、或いは遅延動作時間の設定等の設定信号を受信したら感震通信ユニット5を介して感震リレー3に送信する。 In this way, the communication measurement unit 4 transmits the power consumption information, the generated power information, and the water / gas usage amount information to the connected external HEMS device 11. Then, the communication measurement unit CPU 44 manages the communication between the HEMS device 11 and the seismic intensity relay 3, and feels the seismic detection signal, the seismic intensity information, and the like output by the seismic relay 3 received via the seismic communication unit 5. While transmitting the seismic information to the HEMS device 11, when the HEMS device 11 receives a setting signal such as a predetermined seismic intensity setting for determining the occurrence of an earthquake in the seismic detection relay 3 or a delay operation time setting, the seismic communication unit 5 It is transmitted to the seismic detection relay 3 via.

図4は感震通信ユニット5のブロック図を示している。感震通信ユニット5は図4に示すように、感震リレー3と伝送線L3を介して通信する第1通信IF51、通信計測ユニット4と伝送線L4を介して通信する第2通信IF52、地震検出信号を受けて特定の分岐ブレーカ(第2のブレーカ2bの群)2を即時遮断するための第1出力部53、遮断機能付コンセントユニット12を遮断するための第2出力部54、状態を表示するLED55、感震通信ユニット5を制御する感震通信ユニットCPU56等を備えている。 FIG. 4 shows a block diagram of the seismic communication unit 5. As shown in FIG. 4, the seismic detection communication unit 5 has a first communication IF 51 that communicates with the seismic detection relay 3 via the transmission line L3, a second communication IF 52 that communicates with the communication measurement unit 4 via the transmission line L4, and an earthquake. The first output unit 53 for immediately shutting off the specific branch breaker (group of the second breaker 2b) 2 in response to the detection signal, the second output unit 54 for shutting off the outlet unit 12 with a shutoff function, and the state. It includes an LED 55 for displaying, a seismic communication unit CPU 56 for controlling the seismic communication unit 5, and the like.

第1出力部53は伝送線L5を介して第2のブレーカ2bに接続され、第2出力部54は伝送線L6を介してコンセント制御ユニット6に接続されている。コンセント制御ユニット6を介して複数の遮断機能付コンセントユニット12が接続され、これらの遮断動作が制御される。
尚、感震通信ユニット5から第2のブレーカ2bに対して出力される制御信号はa接点信号であり、第2のブレーカ2bはa接点信号を受けて遮断動作する。
The first output unit 53 is connected to the second breaker 2b via the transmission line L5, and the second output unit 54 is connected to the outlet control unit 6 via the transmission line L6. A plurality of outlet units 12 with a shutoff function are connected via the outlet control unit 6, and their shutoff operations are controlled.
The control signal output from the seismic communication unit 5 to the second breaker 2b is an a-contact signal, and the second breaker 2b receives the a-contact signal and shuts off.

そして、感震通信ユニットCPU56は、HEMS機器11と感震リレー3との間の通信を管理し、通信計測ユニット4を介してHEMS機器11から受信した感震リレー3の所定の震度設定等の設定信号を感震リレー3に送信する。尚、このとき感震リレー3が認識可能な信号に変換されて送信される。 Then, the seismic communication unit CPU 56 manages the communication between the HEMS device 11 and the seismic relay 3, and sets a predetermined seismic intensity of the seismic relay 3 received from the HEMS device 11 via the communication measurement unit 4. The setting signal is transmitted to the seismic relay 3. At this time, the seismic relay 3 is converted into a recognizable signal and transmitted.

図5はコンセント制御ユニット6の接続説明図であり、感震通信ユニット5及び個々の遮断機能付コンセントユニット12との具体的接続を示している。コンセント制御ユニット6は、中継端子台としての機能を有し、制御対象の遮断機能付コンセントユニット12とそれぞれ伝送線L7により接続されている。
感震通信ユニット5からコンセント制御ユニット6へは、具体的に遮断信号としてb接点信号が送信され、コンセント制御ユニット6の各出力部は直列接続されており、このb接点信号が中継されて出力される。
FIG. 5 is an explanatory diagram of the connection of the outlet control unit 6, showing a specific connection between the seismic communication unit 5 and the individual outlet units 12 with a blocking function. The outlet control unit 6 has a function as a relay terminal block, and is connected to the outlet unit 12 with a blocking function to be controlled by a transmission line L7, respectively.
A b-contact signal is specifically transmitted from the seismic communication unit 5 to the outlet control unit 6 as a cutoff signal, and each output unit of the outlet control unit 6 is connected in series, and this b-contact signal is relayed and output. Will be done.

図6は遮断機能付コンセットユニット12のブロック図を示している。図6に示すように、遮断機能付コンセントユニット12は、負荷から延びたプラグ(図示せず)が接続されるコンセント121に至る分岐電路を遮断する遮断機構122を備え、外部の操作(ここでは感震通信ユニット5の操作)でコンセント121の出力を遮断する機能を備えている。
具体的に、遮断機能付コンセントユニット12は、コンセント121、遮断機構122に加えて、遮断機構122を遮断動作(トリップ)させる電源トリップ回路123、コンセント121でのトラッキング現象を検出するトラッキング検出部124、トリップ動作信号を外部から入力する外部入力部125、テスト動作させるテストスイッチ126、動作状態を初期状態へ戻す停止スイッチ127、遮断機能付コンセントユニット12を制御するコンセントユニットCPU128、電源回路129等を備えている。
FIG. 6 shows a block diagram of the conset unit 12 with a blocking function. As shown in FIG. 6, the outlet unit 12 with a cutoff function includes a cutoff mechanism 122 that cuts off a branch electric path leading to an outlet 121 to which a plug (not shown) extending from the load is connected, and is operated externally (here, here). It has a function of shutting off the output of the outlet 121 by the operation of the seismic communication unit 5).
Specifically, the outlet unit 12 with a shutoff function includes a power trip circuit 123 that cuts off (trips) the shutoff mechanism 122 in addition to the outlet 121 and the shutoff mechanism 122, and a tracking detection unit 124 that detects a tracking phenomenon at the outlet 121. , External input unit 125 that inputs trip operation signal from the outside, test switch 126 that performs test operation, stop switch 127 that returns the operating state to the initial state, outlet unit CPU 128 that controls the outlet unit 12 with shutoff function, power supply circuit 129, etc. I have.

そして、外部入力部125はb接点入力部として構成され、コンセント制御ユニット6が出力するb接点信号を受けて、コンセントユニットCPU128は遮断制御を実施する。詳しくは、外部入力部125から信号が入力されたら、コンセントユニットCPU128は電源トリップ回路123を起動して遮断機構122をトリップ動作させコンセント121の出力を遮断させる。また、トラッキング検出部124がトラッキング現象を検出したら同様に遮断機構122をトリップ動作させる。 Then, the external input unit 125 is configured as a b-contact input unit, and the outlet unit CPU 128 performs cutoff control in response to the b-contact signal output by the outlet control unit 6. Specifically, when a signal is input from the external input unit 125, the outlet unit CPU 128 activates the power trip circuit 123 to trip the cutoff mechanism 122 to cut off the output of the outlet 121. Further, when the tracking detection unit 124 detects the tracking phenomenon, the blocking mechanism 122 is similarly tripped.

以上の如く構成された感震遮断システムは、地震の発生を受けて以下の様に動作する。住戸内の電気機器に商用電力が通電されている状態で地震が発生したら、加速度センサ31がそれを検知して、MCU39により震度が判定される。この判定した震度が閾値として予め震度設定部33等で設定された震度以上(例えば震度5弱以上)の地震である場合は、MCU39により以下の制御が実施される。 The seismic isolation system configured as described above operates as follows in response to the occurrence of an earthquake. If an earthquake occurs while the electrical equipment in the dwelling unit is energized with commercial power, the acceleration sensor 31 detects it and the MCU 39 determines the seismic intensity. When the determined seismic intensity is an earthquake having a seismic intensity or higher (for example, a seismic intensity of 5 lower or higher) set in advance by the seismic intensity setting unit 33 or the like as a threshold value, the MCU 39 performs the following control.

まず、即時に外部通信部38から地震検出信号が出力され、ブザー36aが鳴動して、LED36bが点滅する。そして、出力された地震検出信号は、感震通信ユニット5に伝送される。
その後、予め遮断時間設定部34等で設定されている一定の時間(遅延遮断時間)が経過したら、擬似漏電出力部35から擬似漏電が出力される。即ち、擬似漏電発生の動作を開始する。この結果、主幹ブレーカ1が遮断動作して主電路Mが商用電源から遮断され、全ての分岐電路は遮断される。
First, an earthquake detection signal is immediately output from the external communication unit 38, the buzzer 36a sounds, and the LED 36b blinks. Then, the output seismic detection signal is transmitted to the seismic communication unit 5.
After that, when a certain time (delayed earth leakage time) set in advance by the earth leakage setting unit 34 or the like elapses, the earth leakage output unit 35 outputs the earth leakage. That is, the operation of generating a pseudo electric leakage is started. As a result, the main breaker 1 is cut off, the main electric circuit M is cut off from the commercial power supply, and all the branch electric circuits are cut off.

一方、地震検出信号を受信した感震通信ユニット5では、第1出力部53に接続されている第2のブレーカ2bの群に対して遮断信号を出力して遮断動作させる。また、第2出力部54からコンセント制御ユニット6を介して、遮断機能付コンセントユニット12に対して遮断信号を出力する。この結果、主幹ブレーカ1が遮断動作する前に、第2のブレーカ2bの群及びコンセント制御ユニット6に接続されている全ての遮断機能付コンセントユニット12が遮断動作する。
更に、感震通信ユニット5は、通信計測ユニット4に対して地震発生情報を送信する。この地震発生情報を受信した通信計測ユニット4は、その情報をHEMS機器11に対して送信する。
On the other hand, the seismic communication unit 5 that has received the earthquake detection signal outputs a cutoff signal to the group of the second breakers 2b connected to the first output unit 53 to perform a cutoff operation. Further, a cutoff signal is output from the second output unit 54 to the outlet unit 12 with a cutoff function via the outlet control unit 6. As a result, before the main breaker 1 shuts off, all the outlet units 12 with a shutoff function connected to the group of the second breakers 2b and the outlet control unit 6 shut off.
Further, the seismic communication unit 5 transmits earthquake occurrence information to the communication measurement unit 4. The communication measurement unit 4 that has received the earthquake occurrence information transmits the information to the HEMS device 11.

また感震リレー3のテスト/リセットボタン37が操作されると、以下の様に動作する。テスト/リセットボタン37が操作されると、MCU39の制御により外部通信部38から地震検出信号が出力される。尚、再度操作されるとMCU39はリセットされたと判断して信号の出力を停止する。
地震検出信号が出力されることで、地震が発生した場合と同様に、地震検出信号を受けて第2のブレーカ2bが遮断動作するし、遮断機能付コンセントユニット12も遮断動作する。
When the test / reset button 37 of the seismic relay 3 is operated, the operation is as follows. When the test / reset button 37 is operated, an earthquake detection signal is output from the external communication unit 38 under the control of the MCU 39. When the operation is performed again, the MCU 39 determines that it has been reset and stops the signal output.
By outputting the earthquake detection signal, the second breaker 2b receives the earthquake detection signal and shuts off, and the outlet unit 12 with a shutoff function also shuts off, as in the case of an earthquake.

このように、テスト/リセットボタン37の操作により、第2のブレーカ2bは遮断動作するため、第2のブレーカ2bを直接テスト操作することなく動作テストでき、第2のブレーカ2bを複数備えていてもテストは1回の操作で済む。
また、テスト/リセットボタン37の操作により、遮断機能付コンセントユニット12は遮断動作するため、遮断機能付コンセントユニット12を直接テスト操作することなく動作テストでき、遮断機能付コンセントユニット12を複数備えていてもテストは1回の操作で済む。
更に、遮断機能付コンセントユニット12は、地震発生に加えてトラッキングが発生した場合も遮断動作するため、電路異常による火災の発生を確実に防止できる。
加えて、地震が発生したら遮断機能付コンセントユニット12は即時遮断するため、即時遮断操作が必要な電気機器をオフさせるために共通する分岐電路に接続されている他の電気機器も連動してオフしてしまう問題を解消でき、利便性がよい。
また、感震リレー3が地震を感知して地震検出信号を出力したら、感震通信ユニット5が分岐ブレーカ2を遮断動作させる遮断信号を出力するため、遅延遮断に加えて即時遮断も実施でき、地震の発生により火災等を引き起こしやすい電気ストーブ等を即時に遮断できる。また、HEMS機器11により地震発生と判断する震度及び遅延遮断させる時間の設定ができるため、簡易な操作で感震リレーの設定ができる。
In this way, since the second breaker 2b is shut off by the operation of the test / reset button 37, the operation can be tested without directly testing the second breaker 2b, and a plurality of the second breakers 2b are provided. However, the test only needs to be performed once.
Further, since the outlet unit 12 with a shutoff function is shut off by operating the test / reset button 37, the operation can be tested without directly testing the outlet unit 12 with a shutoff function, and a plurality of outlet units 12 with a shutoff function are provided. But the test only needs to be done once.
Further, since the outlet unit 12 with a shutoff function shuts off even when tracking occurs in addition to the occurrence of an earthquake, it is possible to reliably prevent the occurrence of a fire due to an electric circuit abnormality.
In addition, since the outlet unit 12 with a shutoff function shuts off immediately when an earthquake occurs, other electrical devices connected to the common branch electric circuit are also turned off in order to turn off the electrical devices that require immediate shutoff operation. It is convenient because it can solve the problem of
Further, when the seismic relay 3 detects an earthquake and outputs an earthquake detection signal, the seismic communication unit 5 outputs a shutoff signal for shutting off the branch breaker 2, so that immediate shutoff can be performed in addition to delay cutoff. It is possible to immediately shut off electric stoves, etc., which are prone to cause fires due to the occurrence of an earthquake. In addition, since the HEMS device 11 can set the seismic intensity for determining that an earthquake has occurred and the time for delay interruption, the seismic relay can be set with a simple operation.

尚、上記実施形態では、遮断機能付コンセントユニット12は、感震リレー3が出力した地震検出信号を感震通信ユニット5及びコンセント制御ユニット6を介して受信して遮断動作するが、遮断機能付コンセントユニット12の外部入力部125同士を直列に接続しても良く、その場合はコンセント制御ユニット6を介さず、一端を感震通信ユニット5に直接接続することも可能となる。
また、感震リレー3は信号を送信/受信する外部通信部38を備えているが、地震検出信号を出力するだけの端子であって良い。
In the above embodiment, the outlet unit 12 with a shutoff function receives the earthquake detection signal output by the seismic relay 3 via the seismic communication unit 5 and the outlet control unit 6 to perform a shutoff operation, but has a shutoff function. The external input units 125 of the outlet unit 12 may be connected in series, and in that case, one end thereof can be directly connected to the seismic communication unit 5 without going through the outlet control unit 6.
Further, although the seismic relay 3 includes an external communication unit 38 that transmits / receives a signal, it may be a terminal that only outputs an earthquake detection signal.

1・・主幹ブレーカ、2・・分岐ブレーカ、2b・・第2のブレーカ(外部遮断機能付ブレーカ)、3・・感震リレー、4・・通信計測ユニット、5・・感震通信ユニット、6・・コンセント制御ユニット、12・・遮断機能付コンセントユニット、33・・震度設定部、34・・遮断時間設定部、35・・擬似漏電出力部(遅延遮断出力部)、37・・テスト/リセットボタン(テスト操作部)、38・・外部通信部(信号出力部)、39・・MCU、39a・・メモリ、44・・通信計測ユニットCPU、121・・コンセント、122・・遮断機構、123・・電源トリップ回路、124・・トラッキング検出部、125・・外部入力部、128・・コンセントユニットCPU(遮断制御部)、B・・分電盤、M・・主電路。 1 ... Main breaker, 2 ... Branch breaker, 2b ... 2nd breaker (breaker with external cutoff function), 3 ... Seismic relay, 4 ... Communication measurement unit, 5 ... Seismic communication unit, 6・ ・ Outlet control unit, 12 ・ ・ Outlet unit with cutoff function, 33 ・ ・ Seismic intensity setting unit, 34 ・ ・ Cutoff time setting part, 35 ・ ・ Pseudo leakage output part (delay cutoff output part), 37 ・ ・ Test / reset Button (test operation unit), 38 ... external communication unit (signal output unit), 39 ... MCU, 39a ... memory, 44 ... communication measurement unit CPU, 121 ... outlet, 122 ... shutoff mechanism, 123 ...・ Power trip circuit, 124 ・ ・ Tracking detection unit, 125 ・ ・ External input unit, 128 ・ ・ Outlet unit CPU (cutoff control unit), B ・ ・ Distribution board, M ・ ・ Main line.

Claims (2)

商用電源に接続された主電路を遮断するための主幹ブレーカと、前記主幹ブレーカの二次側から分岐された分岐電路を遮断するための複数の分岐ブレーカと、地震発生を感知する感震リレーとを備えて、前記感震リレーが所定の震度以上の地震を感知したら、その後前記主幹ブレーカを遅延遮断させる感震遮断システムであって、
前記感震リレーは、前記遅延遮断を実施する遅延遮断出力部に加えて、所定の震度以上の地震を検知したら即時に地震検出信号を出力する信号出力部と、テスト信号として前記信号出力部から前記地震検出信号を出力させるテスト操作部とを有する一方、
一部の前記分岐電路には、コンセントを電源から遮断する遮断機構と、前記遮断機構の遮断を制御する遮断制御部とを備えた遮断機能付コンセントユニットが接続されており、前記遮断制御部は、前記地震検出信号を受けて前記遮断機構を遮断動作させると共に、
一部の前記分岐ブレーカが、前記地震検出信号を受けて遮断動作する外部遮断機能付ブレーカであることを特徴とする感震遮断システム。
A main breaker for cutting off the main electric circuit connected to a commercial power source, a plurality of branch breakers for cutting off the branch electric circuit branched from the secondary side of the main breaker, and a seismic relay for detecting the occurrence of an earthquake. This is a seismic shutoff system that delays and shuts off the main breaker when the seismic relay detects an earthquake with a predetermined seismic intensity or higher.
In addition to the delay cutoff output unit that executes the delay cutoff, the seismic relay has a signal output unit that immediately outputs an earthquake detection signal when an earthquake having a predetermined seismic intensity or higher is detected, and a signal output unit as a test signal. While having a test operation unit that outputs the earthquake detection signal,
A shut-off function-equipped outlet unit having a shut-off mechanism for shutting off the outlet from the power supply and a cut-off control unit for controlling the cut-off of the cut-off mechanism is connected to some of the branch electric circuits. In response to the earthquake detection signal, the shutoff mechanism is shut off and
A seismic cutoff system, wherein a part of the branch breakers is a breaker with an external cutoff function that shuts off in response to the earthquake detection signal.
前記遮断機能付コンセントユニットは、前記コンセントのトラッキング現象を検出するトラッキング検出部を有し、
前記遮断制御部は、前記トラッキング現象が検出されたら前記遮断機構を遮断動作させることを特徴とする請求項記載の感震遮断システム。
The outlet unit with a blocking function has a tracking detection unit that detects a tracking phenomenon of the outlet.
The cut-off control unit, seismic isolation system of claim 1, wherein the tracking phenomenon characterized thereby interrupting operation of the blocking mechanism if it is detected.
JP2016223475A 2016-11-16 2016-11-16 Seismic isolation system Active JP6769841B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016223475A JP6769841B2 (en) 2016-11-16 2016-11-16 Seismic isolation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016223475A JP6769841B2 (en) 2016-11-16 2016-11-16 Seismic isolation system

Publications (2)

Publication Number Publication Date
JP2018082566A JP2018082566A (en) 2018-05-24
JP6769841B2 true JP6769841B2 (en) 2020-10-14

Family

ID=62197218

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016223475A Active JP6769841B2 (en) 2016-11-16 2016-11-16 Seismic isolation system

Country Status (1)

Country Link
JP (1) JP6769841B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7178585B2 (en) * 2018-10-17 2022-11-28 パナソニックIpマネジメント株式会社 Distribution board cabinet and distribution board
JP7236699B2 (en) * 2019-05-29 2023-03-10 パナソニックIpマネジメント株式会社 Monitoring system, monitoring method, program and distribution board

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3925966B2 (en) * 1996-09-30 2007-06-06 日東工業株式会社 Distribution board with seismic relay
JP3777452B2 (en) * 1997-05-30 2006-05-24 テンパール工業株式会社 Seismic sensor unit
JP4937826B2 (en) * 2007-04-26 2012-05-23 パナソニック株式会社 Power distribution system
JP6361034B2 (en) * 2014-08-08 2018-07-25 日東工業株式会社 Failure information evaluation system

Also Published As

Publication number Publication date
JP2018082566A (en) 2018-05-24

Similar Documents

Publication Publication Date Title
JP2016211920A (en) Seismic device for distribution board
JP6413113B2 (en) Grid interconnection system
JP3960351B2 (en) Power interruption system
JP6830031B2 (en) Seismic isolation system
JP6742226B2 (en) Seismic isolation system
JP6769841B2 (en) Seismic isolation system
JP6796464B2 (en) Seismic isolation system
JP6509029B2 (en) Distribution board
JPH09327119A (en) Current cutoff apparatus in abnormality
JP7706612B2 (en) Power Switching System
US11361926B2 (en) Apparatus, system and method for alarm triggered electrical supply disconnection
JP6924610B2 (en) Seismic cutoff system
JP6830220B2 (en) Abnormality judgment method, abnormality judgment system, program, cutoff system, and distribution board
JP6403404B2 (en) Seismic plug device
JP2018007465A (en) Seismic breaking device and distribution panel for housing
JP2018068098A (en) Seismic isolation system
JP4562160B2 (en) Seismic device
JP6883472B2 (en) Distribution board
JP6704282B2 (en) Distribution board with seismic isolation function
JP6670679B2 (en) Breaker with external control function and switchboard with seismic isolation function
JP6866029B2 (en) Seismic device
JP2019067704A (en) Built-in type outlet device
JP2018042438A (en) Seismic isolation system
JP7230162B2 (en) Distribution board
JP6417550B2 (en) Seismograph

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20190920

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20200622

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20200707

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20200817

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20200901

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20200924

R150 Certificate of patent or registration of utility model

Ref document number: 6769841

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250