JP6770920B2 - Construction method of steel pipe sheet pile Izutsu offshore foundation and steel pipe sheet pile Izutsu offshore foundation - Google Patents
[go: Go Back, main page]

JP6770920B2 - Construction method of steel pipe sheet pile Izutsu offshore foundation and steel pipe sheet pile Izutsu offshore foundation - Google Patents

Construction method of steel pipe sheet pile Izutsu offshore foundation and steel pipe sheet pile Izutsu offshore foundation Download PDF

Info

Publication number
JP6770920B2
JP6770920B2 JP2017075996A JP2017075996A JP6770920B2 JP 6770920 B2 JP6770920 B2 JP 6770920B2 JP 2017075996 A JP2017075996 A JP 2017075996A JP 2017075996 A JP2017075996 A JP 2017075996A JP 6770920 B2 JP6770920 B2 JP 6770920B2
Authority
JP
Japan
Prior art keywords
steel pipe
sheet pile
pipe sheet
constituting
izutsu
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2017075996A
Other languages
Japanese (ja)
Other versions
JP2018178429A (en
Inventor
昌弘 増田
昌弘 増田
田中 秀夫
秀夫 田中
森田 達也
達也 森田
雄二 新原
雄二 新原
佐々木 豊
豊 佐々木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP2017075996A priority Critical patent/JP6770920B2/en
Publication of JP2018178429A publication Critical patent/JP2018178429A/en
Application granted granted Critical
Publication of JP6770920B2 publication Critical patent/JP6770920B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Description

本発明は、鋼管矢板井筒洋上基礎の構築方法および鋼管矢板井筒洋上基礎に関するものである。 The present invention relates to a method for constructing a steel pipe sheet pile offshore foundation and a steel pipe sheet pile Izutsu offshore foundation.

従来、国内外において、洋上での風力発電が実用化されつつある。洋上での風力発電は、陸上での風力発電と比較して、用地の確保が容易であり、発電に適した風が得やすいという利点があるが、着底式の基礎構造を採用する場合には、水底の地盤に安定した基礎を構築する必要がある。 Conventionally, wind power generation at sea has been put into practical use at home and abroad. Compared to onshore wind power generation, offshore wind power generation has the advantage that it is easier to secure land and obtain wind suitable for power generation, but when a landing-type basic structure is adopted, Need to build a stable foundation on the bottom of the water.

洋上風力発電設備の着底式の基礎構造では、大口径のモノパイル基礎である鋼管杭が一般的に用いられている。モノパイル基礎として、外周面に外向き突起を有する鋼管杭を海底地盤に設置し、内周面に内向き突起を有する鋼管外杭ソケットを鋼管杭の外側に間隔をおいて配置した後、鋼管杭と鋼管外杭ソケットとの間にグラウトを充填して両者を一体化することにより構築されるものがある(例えば、特許文献1参照)。 In the bottoming type foundation structure of offshore wind power generation equipment, steel pipe piles, which are large-diameter monopile foundations, are generally used. As a monopile foundation, steel pipe piles with outward protrusions on the outer peripheral surface are installed on the seabed ground, and steel pipe outer pile sockets with inward protrusions on the inner peripheral surface are placed at intervals outside the steel pipe piles, and then the steel pipe piles. Some are constructed by filling a grout between the steel pipe outer pile socket and the steel pipe outer pile socket to integrate the two (see, for example, Patent Document 1).

また、外径が管軸方向で変化する鋼管杭を海底に打設し、鋼管杭よりも大きな径を有し、内径が管軸方向で変化する鋼管を鋼管杭に被せ、鋼管杭と鋼管との間にグラウトを充填して両者を接合することにより構築されるものがある(例えば、特許文献2参照)。 In addition, a steel pipe pile whose outer diameter changes in the pipe axis direction is placed on the seabed, and a steel pipe having a larger diameter than the steel pipe pile and whose inner diameter changes in the pipe axis direction is put on the steel pipe pile to form a steel pipe pile and a steel pipe. Some are constructed by filling a grout between the two and joining the two (see, for example, Patent Document 2).

特許第5136726号公報Japanese Patent No. 5136726 特開2016−223251号公報Japanese Unexamined Patent Publication No. 2016-223251

しかしながら、大口径のモノパイル基礎である鋼管杭を水底に圧入するには、大型の揚重機械や特殊な傭船等が必要であり、基礎の施工費用が嵩むという問題点がある。水深が大きい海域では、特に工費が割高となる。 However, in order to press-fit a steel pipe pile, which is a large-diameter monopile foundation, into the bottom of the water, a large lifting machine, a special charter, etc. are required, and there is a problem that the construction cost of the foundation increases. Construction costs are particularly high in deep sea areas.

本発明は、前述した問題点に鑑みてなされたものであり、その目的とすることは、大口径のモノパイル基礎と比較して、簡略化した設備で構築可能であり、材料費や施工費を削減することができる鋼管矢板井筒洋上基礎の構築方法および鋼管矢板井筒洋上基礎を提供することである。 The present invention has been made in view of the above-mentioned problems, and an object of the present invention is that it can be constructed with simplified equipment as compared with a large-diameter monopile foundation, and material costs and construction costs can be reduced. It is to provide a method of constructing a steel pipe sheet pile Izutsu offshore foundation and a steel pipe sheet pile Izutsu offshore foundation that can be reduced.

前述した目的を達成するために第1の発明は、基礎構造となる鋼管矢板井筒を水底に打設する工程aと、前記鋼管矢板井筒の上部に、上部構造との中間接合部を設置する工程bと、前記鋼管矢板井筒と前記中間接合部とを固定する工程cと、を具備し、前記中間接合部は、本体部と、前記本体部の下部に一体化された脚部とからなり、前記脚部は、複数の鋼管を所定の間隔をおいて筒状に配置したものであり、前記工程bで、前記鋼管矢板井筒を構成する各鋼管の上部に、前記脚部を構成する各鋼管の下部を差し込むことを特徴とする鋼管矢板井筒洋上基礎の構築方法である。 In order to achieve the above-mentioned object, the first invention is a step a of placing a steel pipe sheet pile as a basic structure on the bottom of the water and a step of installing an intermediate joint with the superstructure on the upper part of the steel pipe sheet pile. b, and a step c for fixing the steel pipe sheet pile cylinder and the intermediate joint portion are provided, and the intermediate joint portion includes a main body portion and a leg portion integrated with the lower portion of the main body portion. The leg portion is formed by arranging a plurality of steel pipes in a tubular shape at predetermined intervals, and in the step b, each steel pipe constituting the leg portion is placed on the upper portion of each steel pipe constituting the steel pipe sheet pile cylinder. It is a method of constructing a steel pipe sheet pile Izutsu offshore foundation, which is characterized by inserting the lower part of the pipe.

第1の発明では、複数の鋼管で構成される鋼管矢板井筒を基礎構造として用い、鋼管矢板井筒を構成する各鋼管の上部に、中間接合部の脚部を構成する各鋼管の下部を差し込んで固定する。これにより、大口径のモノパイル基礎と比較して、簡略化した設備で基礎を構築することができ、材料費や施工費を削減することができる。 In the first invention, a steel pipe sheet pile composed of a plurality of steel pipes is used as a basic structure, and the lower part of each steel pipe forming the leg of the intermediate joint is inserted into the upper part of each steel pipe constituting the steel pipe sheet pile. Fix it. As a result, the foundation can be constructed with simplified equipment as compared with the large-diameter monopile foundation, and the material cost and the construction cost can be reduced.

前記工程aの前に、前記鋼管矢板井筒をあらかじめ仮組みし、仮固定した状態で所定の水域まで運搬する工程dをさらに具備してもよい。
鋼管矢板井筒を、外洋よりも風の弱い場所であらかじめ仮組みすれば、外洋で組み立てるよりも作業しやすく、風による事故等も防止できる。また、仮組み後、仮固定した状態とすることにより、洋上での運搬や水底への打設を容易に行うことができる。
Prior to the step a, the step d of temporarily assembling the steel pipe sheet pile cylinder and transporting the steel pipe sheet pile to a predetermined water area in a temporarily fixed state may be further provided.
If the steel pipe sheet pile is temporarily assembled in a place where the wind is weaker than the open ocean, it will be easier to work than assembling in the open ocean and accidents due to the wind can be prevented. In addition, by temporarily assembling and then temporarily fixing the device, it is possible to easily carry it offshore or place it on the bottom of the water.

前記鋼管矢板井筒を構成する各鋼管は、内側の所定の高さに仕切りが設けられ、前記工程bで、前記仕切りの上方に前記脚部を構成する各鋼管の下部を差し込むことが望ましい。
仕切りを設けることにより、脚部を構成する各鋼管の差し込み長さを定めることができる。また、鋼管矢板井筒を構成する各鋼管の内周面と、脚部を構成する各鋼管の外周面との間にグラウトを注入する際に、グラウトの落下を防止できる。
It is desirable that each steel pipe constituting the steel pipe sheet pile is provided with a partition at a predetermined height inside, and in the step b, the lower portion of each steel pipe constituting the leg is inserted above the partition.
By providing a partition, the insertion length of each steel pipe constituting the leg can be determined. Further, when the grout is injected between the inner peripheral surface of each steel pipe constituting the steel pipe sheet pile cylinder and the outer peripheral surface of each steel pipe constituting the leg portion, the grout can be prevented from falling.

前記工程cでは、前記鋼管矢板井筒を構成する各鋼管の内周面と、前記脚部を構成する各鋼管の外周面との間にグラウトを注入して、前記鋼管矢板井筒と前記脚部とを固定することが望ましい。
グラウトを注入することにより、鋼管矢板井筒と中間接合部の脚部とを確実に固定できる。
In the step c, grout is injected between the inner peripheral surface of each steel pipe constituting the steel pipe sheet pile and the outer peripheral surface of each steel pipe constituting the leg to form the steel pipe sheet pile and the leg. It is desirable to fix.
By injecting grout, the steel pipe sheet pile and the leg of the intermediate joint can be securely fixed.

前記工程aと前記工程bとの間には、前記鋼管矢板井筒の天端付近から所定の深さまでの範囲において、前記鋼管矢板井筒の内部に鉄筋を配筋してコンクリートを打設する工程eをさらに具備することが望ましい。
鋼管矢板井筒と中間接合部の脚部とが重なる範囲において、鋼管矢板井筒の内部に鉄筋を配筋してコンクリートを打設すれば、洋上での強風による揺れに耐えられるように補強された構造となる。
Between the step a and the step b, a step e in which reinforcing bars are arranged inside the steel pipe sheet pile in a range from the vicinity of the top of the steel pipe sheet pile to a predetermined depth and concrete is placed. It is desirable to further include.
In the range where the steel pipe sheet pile and the legs of the intermediate joint overlap, if concrete is placed inside the steel pipe sheet pile by arranging reinforcing bars, the structure is reinforced so that it can withstand the shaking caused by strong winds at sea. It becomes.

また、前記鋼管矢板井筒の継手部が幅広継手であってもよい。
幅広継手を用いれば、継手内の土砂の掘削や洗浄、モルタルの充填を確実に行うことができ、継手の止水性を高めることができる。
Further, the joint portion of the steel pipe sheet pile may be a wide joint.
If a wide joint is used, it is possible to reliably excavate and clean the earth and sand in the joint and fill the mortar, and it is possible to improve the water stopping property of the joint.

第2の発明は、水底に打設された、基礎構造となる鋼管矢板井筒と、前記鋼管矢板井筒の上部に固定された、上部構造との中間接合部と、を具備し、前記中間接合部は、本体部と、前記本体部の下部に一体化された脚部とからなり、前記脚部は、複数の鋼管を所定の間隔をおいて筒状に配置したものであり、前記鋼管矢板井筒を構成する各鋼管の上部に、前記脚部を構成する各鋼管の下部が差し込まれた状態で、前記鋼管矢板井筒と前記中間接合部とが固定されたことを特徴とする鋼管矢板井筒洋上基礎である。 The second invention comprises a steel pipe sheet pile cylinder as a foundation structure placed on the bottom of the water and an intermediate joint portion between the steel pipe sheet pile well and the upper structure fixed to the upper part of the steel pipe sheet pile. Is composed of a main body portion and a leg portion integrated with the lower portion of the main body portion, and the leg portion is formed by arranging a plurality of steel pipes in a tubular shape at predetermined intervals, and the steel pipe sheet pile is formed. A steel pipe sheet pile offshore foundation characterized in that the steel pipe sheet pile and the intermediate joint are fixed in a state where the lower part of each steel pipe constituting the leg is inserted into the upper part of each steel pipe constituting the above. Is.

第2の発明では、複数の鋼管で構成される鋼管矢板井筒が基礎構造として用いられ、鋼管矢板井筒を構成する各鋼管の上部に、中間接合部の脚部を構成する各鋼管の下部が差し込まれて固定される。これにより、大口径のモノパイル基礎と比較して、簡略化した設備で基礎が構築され、材料費や施工費を削減することができる。 In the second invention, a steel pipe sheet pile composed of a plurality of steel pipes is used as a foundation structure, and the lower part of each steel pipe forming the leg of the intermediate joint is inserted into the upper part of each steel pipe forming the steel pipe sheet pile. Is fixed. As a result, the foundation can be constructed with simplified equipment as compared with a large-diameter monopile foundation, and material costs and construction costs can be reduced.

本発明によれば、大口径のモノパイル基礎と比較して、簡略化した設備で構築可能であり、材料費や施工費を削減することができる鋼管矢板井筒洋上基礎の構築方法および鋼管矢板井筒洋上基礎を提供できる。 According to the present invention, a method for constructing a steel pipe sheet pile Izutsu offshore foundation and a steel pipe sheet pile Izutsu offshore foundation that can be constructed with simplified equipment and can reduce material costs and construction costs as compared with a large-diameter monopile foundation. Can provide the basis.

鋼管矢板井筒洋上基礎1の立面図Elevation view of steel pipe sheet pile Izutsu offshore foundation 1 鋼管矢板井筒3と中間接合部5との固定部付近の垂直方向の断面図Vertical cross-sectional view of the vicinity of the fixed portion between the steel pipe sheet pile 3 and the intermediate joint 5 鋼管矢板井筒3の鋼管9と中間接合部5の脚部7の鋼管11との固定部付近の垂直方向の断面図Vertical cross-sectional view of the vicinity of the fixed portion between the steel pipe 9 of the steel pipe sheet pile 3 and the steel pipe 11 of the leg portion 7 of the intermediate joint portion 5. 鋼管矢板井筒洋上基礎1および中間接合部5の水平方向の断面図Horizontal cross-sectional view of steel pipe sheet pile Izutsu offshore foundation 1 and intermediate joint 5 鋼管矢板井筒洋上基礎1を構築するための各工程を示す図A diagram showing each process for constructing a steel pipe sheet pile Izutsu offshore foundation 1. 鋼管矢板井筒洋上基礎1を構築するための各工程を示す図A diagram showing each process for constructing a steel pipe sheet pile Izutsu offshore foundation 1.

以下、図面に基づいて、本発明の実施形態を詳細に説明する。図1は、鋼管矢板井筒洋上基礎1の立面図である。図2は、鋼管矢板井筒3と中間接合部5との固定部付近の垂直方向の断面図である。図2は、図1に示す矢印A−Aによる断面図である。図3は、鋼管矢板井筒3の鋼管9と中間接合部5の脚部7の鋼管11との固定部付近の垂直方向の断面図であり、図2に示す範囲Bの拡大図である。図4は、鋼管矢板井筒洋上基礎1および中間接合部5の水平方向の断面図である。図4(a)は、図2に示す矢印C1−C1による断面図、図4(b)は、図2に示す矢印C2−C2による断面図である。 Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings. FIG. 1 is an elevation view of the steel pipe sheet pile Izutsu offshore foundation 1. FIG. 2 is a vertical cross-sectional view of the vicinity of the fixed portion between the steel pipe sheet pile 3 and the intermediate joint 5. FIG. 2 is a cross-sectional view taken along the line AA shown in FIG. FIG. 3 is a vertical cross-sectional view of the vicinity of the fixed portion between the steel pipe 9 of the steel pipe sheet pile 3 and the steel pipe 11 of the leg portion 7 of the intermediate joint portion 5, and is an enlarged view of the range B shown in FIG. FIG. 4 is a horizontal sectional view of the steel pipe sheet pile Izutsu offshore foundation 1 and the intermediate joint 5. 4A is a cross-sectional view taken along the line C1-C1 shown in FIG. 2, and FIG. 4B is a cross-sectional view taken along the line C2-C2 shown in FIG.

(鋼管矢板井筒洋上基礎1の構成)
図1、図2に示すように、鋼管矢板井筒洋上基礎1は、基礎構造となる鋼管矢板井筒3、上部構造13との中間接合部5、鋼板15、グラウト27、鉄筋かご31、コンクリート33等からなる。
(Structure of steel pipe sheet pile Izutsu offshore foundation 1)
As shown in FIGS. 1 and 2, the steel pipe sheet pile offshore foundation 1 includes a steel pipe sheet pile 3 as a foundation structure, an intermediate joint 5 with an upper structure 13, a steel plate 15, a grout 27, a reinforcing bar cage 31, concrete 33, and the like. Consists of.

図1、図2、図4(a)に示すように、鋼管矢板井筒3は、筒状に配置された複数の鋼管9からなる。隣接する鋼管9同士は、継手部17によって連結される。継手部17は、例えば、スリットを有する小径の鋼管を用いたP−P型継手である。鋼管矢板井筒3は、水底に打設される。 As shown in FIGS. 1, 2, and 4 (a), the steel pipe sheet pile pipe 3 is composed of a plurality of steel pipes 9 arranged in a tubular shape. Adjacent steel pipes 9 are connected to each other by a joint portion 17. The joint portion 17 is, for example, a PP type joint using a small diameter steel pipe having a slit. The steel pipe sheet pile well tube 3 is driven into the bottom of the water.

図2に示すように、鋼管矢板井筒3を構成する各鋼管9は、内周面19の所定の高さに仕切り22が設けられる。仕切り22は、仕切り板21とブラケット23とからなる。ブラケット23は、鋼管9の内周面19に溶接等により固定される。仕切り板21は、ブラケット23上に設置される。なお、ブラケット23は、必ずしも必要ではない。また、仕切り板21は、後述する中間接合部5の脚部7を構成する各鋼管11の外周面25と、鋼管矢板井筒3を構成する各鋼管9の内周面19との隙間に充填されるグラウト27の流出を防止可能であれば、他の構造であってもよい。 As shown in FIG. 2, each of the steel pipes 9 constituting the steel pipe sheet pile pipe 3 is provided with a partition 22 at a predetermined height of the inner peripheral surface 19. The partition 22 includes a partition plate 21 and a bracket 23. The bracket 23 is fixed to the inner peripheral surface 19 of the steel pipe 9 by welding or the like. The partition plate 21 is installed on the bracket 23. The bracket 23 is not always necessary. Further, the partition plate 21 is filled in the gap between the outer peripheral surface 25 of each steel pipe 11 constituting the leg portion 7 of the intermediate joint portion 5 described later and the inner peripheral surface 19 of each steel pipe 9 constituting the steel pipe sheet pile cylinder 3. Other structures may be used as long as the outflow of the grout 27 can be prevented.

図2から図4では、鋼管矢板井筒3を構成する各鋼管9の外周面18のうち、鋼管矢板井筒3の内部69側となる面を外周面18a、外部側となる面を外周面18bとする。図2に示すように、鋼管矢板井筒3を構成する各鋼管9は、鋼管矢板井筒3の内部69側の外周面18aの所定の高さにブラケット63、仕切り板65が設けられる。ブラケット63は、ブラケット23と同じ高さに設けられ、鋼管9の外周面18aに溶接等により固定される。仕切り板65は、ブラケット63上に設置される。なお、ブラケット63を用いずに、直接仕切り板65を鋼管矢板井筒3の内部69側の外周面18aに接合してもよい。なお、仕切り板65と鋼管矢板井筒3の内部69側の外周面18aとの隙間は、パテなどで埋めてもよい。 In FIGS. 2 to 4, of the outer peripheral surfaces 18 of the steel pipes 9 constituting the steel pipe sheet pile 3, the surface on the inner 69 side of the steel pipe sheet pile 3 is referred to as the outer peripheral surface 18a, and the outer surface is referred to as the outer peripheral surface 18b. To do. As shown in FIG. 2, each of the steel pipes 9 constituting the steel pipe sheet pile 3 is provided with a bracket 63 and a partition plate 65 at a predetermined height on the outer peripheral surface 18a on the inner 69 side of the steel pipe sheet pile 3. The bracket 63 is provided at the same height as the bracket 23, and is fixed to the outer peripheral surface 18a of the steel pipe 9 by welding or the like. The partition plate 65 is installed on the bracket 63. The partition plate 65 may be directly joined to the outer peripheral surface 18a on the inner 69 side of the steel pipe sheet pile 3 without using the bracket 63. The gap between the partition plate 65 and the outer peripheral surface 18a on the inner 69 side of the steel pipe sheet pile 3 may be filled with putty or the like.

図3に示すように、鋼管矢板井筒3を構成する各鋼管9は、内周面19にずれ止め35aが固定される。ずれ止め35aは、図2に示す鋼管9の天端29から仕切り板21までの高さの範囲39において、鋼管9の内周面19の全周に所定の間隔で設けられる。 As shown in FIG. 3, a slip stopper 35a is fixed to the inner peripheral surface 19 of each steel pipe 9 constituting the steel pipe sheet pile pipe 3. The slip stopper 35a is provided at a predetermined interval on the entire circumference of the inner peripheral surface 19 of the steel pipe 9 in the height range 39 from the top end 29 of the steel pipe 9 to the partition plate 21 shown in FIG.

図3、図4(a)に示すように、鋼管矢板井筒3を構成する各鋼管9は、外周面18aにスタッド37が固定される。スタッド37は、図2に示す鋼管9の天端29から仕切り板21までの高さの範囲39において、外周面18aの全面に所定の間隔で設けられる。 As shown in FIGS. 3 and 4A, studs 37 are fixed to the outer peripheral surface 18a of each steel pipe 9 constituting the steel pipe sheet pile well tube 3. The studs 37 are provided on the entire outer peripheral surface 18a at predetermined intervals in a height range 39 from the top end 29 of the steel pipe 9 shown in FIG. 2 to the partition plate 21.

図1、図2、図4(b)に示すように、中間接合部5は、本体部6と、本体部6の下部に一体化された脚部7とからなる。本体部6は、上方に行くにつれてわずかに径が縮径する鋼製の略円筒体である。脚部7は、所定の間隔71をおいて筒状に配置された複数の鋼管11からなる。図4(b)に示すように、脚部7を構成する各鋼管11は、上部の2か所に鉛直方向のスリット8を有する。本体部6と脚部7とは、脚部7の鋼管11のスリット8に本体部6の下部を挿入して、溶接により一体化される。 As shown in FIGS. 1, 2, and 4 (b), the intermediate joint portion 5 includes a main body portion 6 and a leg portion 7 integrated with the lower portion of the main body portion 6. The main body 6 is a substantially cylindrical body made of steel whose diameter slightly decreases as it goes upward. The leg portion 7 is composed of a plurality of steel pipes 11 arranged in a tubular shape at predetermined intervals 71. As shown in FIG. 4B, each steel pipe 11 constituting the leg portion 7 has slits 8 in the vertical direction at two upper positions. The main body 6 and the leg 7 are integrated by welding by inserting the lower portion of the main body 6 into the slit 8 of the steel pipe 11 of the leg 7.

図3に示すように、中間接合部5の脚部7を構成する各鋼管11は、外周面25にずれ止め35bが固定される。ずれ止め35bは、図2に示す鋼管9の天端29から仕切り板21までの高さの範囲39において、鋼管11の外周面25の全周に所定の間隔で設けられる。 As shown in FIG. 3, the slip stopper 35b is fixed to the outer peripheral surface 25 of each steel pipe 11 constituting the leg portion 7 of the intermediate joint portion 5. The slip stopper 35b is provided at a predetermined interval on the entire circumference of the outer peripheral surface 25 of the steel pipe 11 in the height range 39 from the top end 29 of the steel pipe 9 to the partition plate 21 shown in FIG.

図2、図4(a)に示すように、鋼管矢板井筒3を構成する各鋼管9の上部には、中間接合部5の脚部7を構成する各鋼管11の下部が差し込まれる。中間接合部5の脚部7を構成する各鋼管11は、中間接合部5の本体部6の下端75が、鋼管9の天端29の高さに位置するまで差し込まれる。このとき、中間接合部5の脚部7を構成する各鋼管11の下端73は、鋼管矢板井筒3を構成する各鋼管9の仕切り板21の位置近傍まで達する。 As shown in FIGS. 2 and 4A, the lower part of each steel pipe 11 forming the leg portion 7 of the intermediate joint portion 5 is inserted into the upper part of each steel pipe 9 constituting the steel pipe sheet pile cylinder 3. Each steel pipe 11 constituting the leg portion 7 of the intermediate joint portion 5 is inserted until the lower end 75 of the main body portion 6 of the intermediate joint portion 5 is located at the height of the top end 29 of the steel pipe 9. At this time, the lower end 73 of each steel pipe 11 constituting the leg portion 7 of the intermediate joint portion 5 reaches the vicinity of the position of the partition plate 21 of each steel pipe 9 constituting the steel pipe sheet pile well tube 3.

図1、図2に示すように、鋼板15は、鋼管矢板井筒3の外周に筒状に配置される。鋼板15は、鋼管9の天端29から仕切り板21までの高さの範囲39、すなわち、鋼管矢板井筒3と中間接合部5の脚部7とが重なる範囲39に設置される。図4(a)に示すように、鋼板15は、鋼管矢板井筒3を構成する各鋼管11の外周面18bに固定される。 As shown in FIGS. 1 and 2, the steel plate 15 is arranged in a tubular shape on the outer periphery of the steel pipe sheet pile cylinder 3. The steel plate 15 is installed in a height range 39 from the top end 29 of the steel pipe 9 to the partition plate 21, that is, in a range 39 where the steel pipe sheet pile 3 and the leg 7 of the intermediate joint 5 overlap. As shown in FIG. 4A, the steel plate 15 is fixed to the outer peripheral surface 18b of each steel pipe 11 constituting the steel pipe sheet pile well tube 3.

図2、図3、図4(a)に示すように、グラウト27は、鋼管矢板井筒3を構成する各鋼管9の内周面19と、中間接合部5の脚部7を構成する各鋼管11の外周面25との間に充填される。グラウト27は、鋼管矢板井筒3と脚部7とを固定するものであり、鋼管矢板井筒3と中間接合部5の脚部7とが重なる範囲39に設置される。図3に示す、鋼管9の内周面19に設けられたずれ止め35a、鋼管11の外周面25に設けられたずれ止め35bからなるずれ止め35は、グラウト27と鋼管9の内周面19および鋼管11の外周面25との付着力を高める。 As shown in FIGS. 2, 3 and 4 (a), the grout 27 is a steel pipe forming the inner peripheral surface 19 of each steel pipe 9 constituting the steel pipe sheet pile pipe 3 and the leg portion 7 of the intermediate joint 5. It is filled between the outer peripheral surface 25 of 11. The grout 27 fixes the steel pipe sheet pile 3 and the leg 7, and is installed in a range 39 where the steel pipe sheet pile 3 and the leg 7 of the intermediate joint 5 overlap. The slip stopper 35 composed of the slip stopper 35a provided on the inner peripheral surface 19 of the steel pipe 9 and the slip stopper 35b provided on the outer peripheral surface 25 of the steel pipe 11 shown in FIG. 3 is the grout 27 and the inner peripheral surface 19 of the steel pipe 9. And the adhesive force with the outer peripheral surface 25 of the steel pipe 11 is increased.

図2、図4に示すように、鉄筋かご31およびコンクリート33は、鋼管矢板井筒3の内部69に設置される。鉄筋かご31およびコンクリート33は、鋼管矢板井筒3と中間接合部5の脚部7とが重なる範囲39に設置される。図3、図4(a)に示す、鋼管矢板井筒3を構成する各鋼管9の外周面18aに設けられたスタッド37は、コンクリート33と鋼管9の外周面18aとの付着力を高める。 As shown in FIGS. 2 and 4, the reinforcing bar cage 31 and the concrete 33 are installed inside 69 of the steel pipe sheet pile well cylinder 3. The reinforcing bar cage 31 and the concrete 33 are installed in a range 39 where the steel pipe sheet pile 3 and the leg 7 of the intermediate joint 5 overlap. The studs 37 provided on the outer peripheral surface 18a of each steel pipe 9 constituting the steel pipe sheet pile 3 as shown in FIGS. 3 and 4A increase the adhesive force between the concrete 33 and the outer peripheral surface 18a of the steel pipe 9.

(鋼管矢板井筒洋上基礎1の構築方法)
次に、鋼管矢板井筒洋上基礎1の構築方法について説明する。図5、図6は、鋼管矢板井筒洋上基礎1を構築するための各工程を示す図である。図6では、鋼管矢板井筒3を構成する各鋼管9の外周面18のうち、鋼管矢板井筒3の内部69側となる面を外周面18a、外部側となる面を外周面18bとする。
(How to build steel pipe sheet pile Izutsu offshore foundation 1)
Next, a method of constructing the steel pipe sheet pile Izutsu offshore foundation 1 will be described. 5 and 6 are diagrams showing each process for constructing the steel pipe sheet pile Izutsu offshore foundation 1. In FIG. 6, of the outer peripheral surfaces 18 of the steel pipes 9 constituting the steel pipe sheet pile 3, the surface on the inner 69 side of the steel pipe sheet pile 3 is referred to as the outer peripheral surface 18a, and the outer surface is referred to as the outer peripheral surface 18b.

図5(a)は、鋼管矢板井筒3を仮組みして運搬する工程を示す図である。鋼管矢板井筒洋上基礎1を構築するには、まず、図5(a)に示すように、外洋よりも風の弱い場所の水底43に架台51を設置する。そして、架台51やクレーン等を用いて鋼管矢板井筒3を仮組みする。 FIG. 5A is a diagram showing a process of temporarily assembling and transporting the steel pipe sheet pile well cylinder 3. In order to construct the steel pipe sheet pile Izutsu offshore foundation 1, first, as shown in FIG. 5A, the gantry 51 is installed on the water bottom 43 in a place where the wind is weaker than the open ocean. Then, the steel pipe sheet pile 3 is temporarily assembled using a gantry 51, a crane, or the like.

次に、鋼管矢板井筒3の周囲に、形状保持のためのガイド49を、仮固定する。ガイド49は、環状の鋼製部材であり、例えば、点溶接によって鋼管矢板井筒3を構成する各鋼管9に仮固定される。そして、仮組みして仮固定した状態の鋼管矢板井筒3を、運搬船45のクレーン47の吊り具47aに連結し、所定の水域、すなわち鋼管矢板井筒洋上基礎1を構築する予定の水域まで運搬する。 Next, a guide 49 for maintaining the shape is temporarily fixed around the steel pipe sheet pile cylinder 3. The guide 49 is an annular steel member, and is temporarily fixed to each steel pipe 9 constituting the steel pipe sheet pile 3 by spot welding, for example. Then, the steel pipe sheet pile 3 in the temporarily assembled and temporarily fixed state is connected to the hanging tool 47a of the crane 47 of the carrier 45, and is transported to a predetermined water area, that is, the water area where the steel pipe sheet pile offshore foundation 1 is planned to be constructed. ..

図5(b)は、昇降式架台55に鋼管矢板井筒3を設置する工程を示す図である。鋼管矢板井筒洋上基礎1を構築する予定の水域では、水底43にあらかじめ床掘り53が施される。また、作業台として、昇降式架台55が設置される。昇降式架台55は、脚部55aと作業台55bとからなり、作業台55bは脚部55aに沿って昇降する。図5(b)に示す工程では、クレーン47で鋼管矢板井筒3を作業台55b内に吊り込み、作業台55bで鋼管矢板井筒3を支持した後、鋼管矢板井筒3から吊り具47aを取り外す。 FIG. 5B is a diagram showing a process of installing the steel pipe sheet pile 3 on the elevating stand 55. In the water area where the steel pipe sheet pile Izutsu offshore foundation 1 is planned to be constructed, a floor digging 53 is performed in advance on the bottom 43. In addition, an elevating stand 55 is installed as a workbench. The elevating stand 55 includes legs 55a and a workbench 55b, and the workbench 55b moves up and down along the legs 55a. In the step shown in FIG. 5B, the steel pipe sheet pile 3 is suspended in the workbench 55b by the crane 47, the steel pipe sheet pile 3 is supported by the workbench 55b, and then the hanger 47a is removed from the steel pipe sheet pile 3.

図5(c)は、鋼管矢板井筒3を水底43に打設する工程を示す図である。図5(c)に示す工程では、まず、図5(b)に示す床掘り53の部分の埋戻し61を行う。そして、杭打ち船57に設置された杭打ち機59を用いて、鋼管矢板井筒3を構成する鋼管11を1本ずつ順に水底43に打ち込む。鋼管11とガイド49との点溶接部分は打ち込みに伴って外れるため、鋼管矢板井筒3の打設時の適切な時期にガイド49を撤去する。 FIG. 5C is a diagram showing a process of driving the steel pipe sheet pile well cylinder 3 into the water bottom 43. In the step shown in FIG. 5 (c), first, the backfilling 61 of the portion of the floor digging 53 shown in FIG. 5 (b) is performed. Then, using the pile driver 59 installed on the pile driver 57, the steel pipes 11 constituting the steel pipe sheet pile pipe 3 are driven into the water bottom 43 one by one. Since the spot welded portion between the steel pipe 11 and the guide 49 comes off with the driving, the guide 49 is removed at an appropriate time when the steel pipe sheet pile 3 is driven.

図6(a)は、図5(c)に示す矢印D−Dの位置での断面図であり、鋼管矢板井筒3の打設終了後の状態を示す図である。ガイド49を用いているため、所定の形状(図では略円形)に鋼管11を打設することができる。図5(c)に示す工程では、鋼管矢板井筒3を構成する鋼管9を水底43に打ち込んだ後、図6(a)に示すように、鋼管9同士の継手部17にモルタル41を充填する。そして、継手部17の止水性を確保した後、図示しないポンプ等を用いて、鋼管矢板井筒3の内部69の水を排出する。 FIG. 6A is a cross-sectional view taken at the position of arrows DD shown in FIG. 5C, and is a diagram showing a state after the completion of placing the steel pipe sheet pile well tube 3. Since the guide 49 is used, the steel pipe 11 can be driven into a predetermined shape (substantially circular in the figure). In the step shown in FIG. 5 (c), the steel pipe 9 constituting the steel pipe sheet pile 3 is driven into the water bottom 43, and then the joint portion 17 between the steel pipes 9 is filled with mortar 41 as shown in FIG. 6 (a). .. Then, after ensuring the water stoppage of the joint portion 17, the water inside 69 of the steel pipe sheet pile well cylinder 3 is discharged by using a pump or the like (not shown).

図5(d)は、鋼管矢板井筒3の内部に鉄筋かご31等を設置する工程を示す図である。図6(b)、図6(c)は、図5(d)に示す矢印E−Eの位置での断面図であり、図6(b)は仕切り板65を設置した後の状態を、図6(c)は鉄筋かご31を設置した後の状態を示す図である。 FIG. 5D is a diagram showing a process of installing a reinforcing bar cage 31 or the like inside the steel pipe sheet pile well cylinder 3. 6 (b) and 6 (c) are cross-sectional views at the positions of arrows EE shown in FIG. 5 (d), and FIG. 6 (b) shows a state after the partition plate 65 is installed. FIG. 6C is a diagram showing a state after the reinforcing bar cage 31 is installed.

図5(d)に示す工程では、まず、図6(b)に示すように、鋼管矢板井筒3の周囲に鋼板15を筒状に配置する。鋼板15は、鋼管矢板井筒3を構成する各鋼管9の外周面18bに、溶接等によって固定する。なお、鋼板15は、必ずしも必要ではない。そして、鋼管矢板井筒3の内部69に、クレーン47を用いて仕切り板65を吊り込み、仕切り板65をブラケット63上に設置する。仕切り板65の外縁部と鋼管矢板井筒3を構成する各鋼管9の外周面18aとの隙間67は、パテ等で埋める。 In the step shown in FIG. 5D, first, as shown in FIG. 6B, the steel plate 15 is arranged in a tubular shape around the steel pipe sheet pile cylinder 3. The steel plate 15 is fixed to the outer peripheral surface 18b of each steel pipe 9 constituting the steel pipe sheet pile cylinder 3 by welding or the like. The steel plate 15 is not always necessary. Then, the partition plate 65 is suspended inside the steel pipe sheet pile 3 by using a crane 47, and the partition plate 65 is installed on the bracket 63. The gap 67 between the outer edge of the partition plate 65 and the outer peripheral surface 18a of each steel pipe 9 constituting the steel pipe sheet pile 3 is filled with putty or the like.

次に、図5(d)に示すように、クレーン47の吊り具47aに鉄筋かご31を連結する。そして、図6(c)に示すように、鋼管矢板井筒3の内部69に鉄筋かご31を吊り込み、仕切り板65上に鉄筋かご31を設置する。その後、図2に示す鋼管9の天端29から仕切り板65までの範囲39において、鋼管矢板井筒3の内部69にコンクリート33を打設する。 Next, as shown in FIG. 5D, the reinforcing bar cage 31 is connected to the hanger 47a of the crane 47. Then, as shown in FIG. 6C, the reinforcing bar cage 31 is suspended inside 69 of the steel pipe sheet pile well cylinder 3, and the reinforcing bar cage 31 is installed on the partition plate 65. After that, in the range 39 from the top end 29 of the steel pipe 9 to the partition plate 65 shown in FIG. 2, concrete 33 is placed inside 69 of the steel pipe sheet pile well tube 3.

図5(e)は、鋼管矢板井筒3の上部に中間接合部5を設置する工程を示す図である。図5(e)に示す工程では、クレーンの吊り具47aに中間接合部5を連結し、鋼管矢板井筒3上に中間接合部5を吊り降ろす。そして、鋼管矢板井筒3を構成する各鋼管9の上部に、中間接合部5の脚部7を構成する各鋼管11の下部を差し込む。 FIG. 5 (e) is a diagram showing a process of installing the intermediate joint portion 5 on the upper part of the steel pipe sheet pile well cylinder 3. In the step shown in FIG. 5 (e), the intermediate joint portion 5 is connected to the crane hanger 47a, and the intermediate joint portion 5 is suspended on the steel pipe sheet pile cylinder 3. Then, the lower part of each steel pipe 11 forming the leg portion 7 of the intermediate joint portion 5 is inserted into the upper part of each steel pipe 9 constituting the steel pipe sheet pile cylinder 3.

図5(f)は、鋼管矢板井筒3と中間接合部5とを固定する工程を示す図である。図6(d)は、図5(f)に示す矢印F−Fの位置での断面図であり、鋼管矢板井筒3と中間接合部5とを固定する前の状態を示す図である。 FIG. 5 (f) is a diagram showing a step of fixing the steel pipe sheet pile cylinder 3 and the intermediate joint portion 5. FIG. 6D is a cross-sectional view taken at the position of arrows FF shown in FIG. 5F, and is a view showing a state before fixing the steel pipe sheet pile 3 and the intermediate joint 5.

図5(f)に示す工程では、図6(d)に示す、鋼管矢板井筒3を構成する各鋼管9の内周面19と、中間接合部5の脚部7を構成する各鋼管11の外周面25との間の空隙77に、図4(a)に示すグラウト27を注入し、鋼管矢板井筒3と中間接合部5とを固定する。 In the step shown in FIG. 5 (f), the inner peripheral surface 19 of each steel pipe 9 constituting the steel pipe sheet pile cylinder 3 and each steel pipe 11 constituting the leg portion 7 of the intermediate joint portion 5 shown in FIG. 6 (d). The grout 27 shown in FIG. 4A is injected into the gap 77 between the outer peripheral surface 25 to fix the steel pipe sheet pile 3 and the intermediate joint 5.

図5(f)に示す工程の後、中間接合部5上に、図1に示す上部構造13を固定する。上部構造13は、例えば、洋上風力設備のタワーである。 After the step shown in FIG. 5 (f), the superstructure 13 shown in FIG. 1 is fixed on the intermediate joint portion 5. The superstructure 13 is, for example, a tower of an offshore wind farm.

このように、本実施の形態では、複数の鋼管9で構成される鋼管矢板井筒3を基礎構造として用い、鋼管矢板井筒3を構成する各鋼管9の上部に、中間接合部5の脚部7を構成する各鋼管11の下部を差し込んで固定し、鋼管矢板井筒洋上基礎1を構築する。これにより、大口径のモノパイル基礎と比較して、回転や転倒に対して有利な構造の基礎を簡略化した設備で構築することができ、施工費を削減することができる。また、水底43の地盤条件によっては根入れ長さを短くできるため、材料費も削減することができる。さらに、鋼管矢板井筒洋上基礎1は、将来的に撤去作業が必要となった場合に、従来のモノパイル基礎と比較して、引き抜きや切断を容易に行うことができる。 As described above, in the present embodiment, the steel pipe sheet pile 3 composed of the plurality of steel pipes 9 is used as the basic structure, and the leg portion 7 of the intermediate joint 5 is placed on the upper portion of each steel pipe 9 constituting the steel pipe sheet pile 3. The lower part of each steel pipe 11 constituting the steel pipe 11 is inserted and fixed to construct the steel pipe sheet pile Izutsu offshore foundation 1. As a result, it is possible to construct a foundation with a structure that is advantageous for rotation and overturning with a simplified facility as compared with a large-diameter monopile foundation, and it is possible to reduce the construction cost. Further, depending on the ground condition of the bottom 43, the rooting length can be shortened, so that the material cost can be reduced. Further, the steel pipe sheet pile Izutsu offshore foundation 1 can be easily pulled out and cut as compared with the conventional monopile foundation when the removal work is required in the future.

本実施の形態では、鋼管矢板井筒3をあらかじめ仮組みし、形状保持のためのガイド49で鋼管矢板井筒3の周囲を仮固定する。鋼管矢板井筒3を外洋よりも風の弱い場所であらかじめ仮組みすれば、外洋で組み立てるよりも作業しやすく、風による事故等も防止できる。また、鋼管矢板井筒3を仮組みおよび仮固定した状態とすれば、洋上での所定の水域までの運搬や水底43への打設が容易になる。 In the present embodiment, the steel pipe sheet pile 3 is temporarily assembled in advance, and the periphery of the steel pipe sheet pile 3 is temporarily fixed by the guide 49 for maintaining the shape. If the steel pipe sheet pile 3 is temporarily assembled in a place where the wind is weaker than the open ocean, the work is easier than assembling in the open ocean, and accidents due to the wind can be prevented. Further, if the steel pipe sheet pile 3 is temporarily assembled and temporarily fixed, it can be easily transported to a predetermined water area at sea and placed on the bottom 43.

本実施の形態では、鋼管矢板井筒3を構成する各鋼管9の内周面19にずれ止め35aを設け、脚部7を構成する各鋼管11の外周面25にずれ止め35bを設け、鋼管9の内周面19と鋼管11の外周面25との間の空隙77にグラウト27を注入する。ずれ止め35を設けてグラウト27を注入することにより、グラウト27と鋼管9の内周面19および鋼管11の外周面25との付着力を高め、鋼管矢板井筒3と中間接合部5の脚部7とを確実に固定できる。 In the present embodiment, a slip stopper 35a is provided on the inner peripheral surface 19 of each steel pipe 9 constituting the steel pipe sheet pile pipe 3, and a slip stopper 35b is provided on the outer peripheral surface 25 of each steel pipe 11 constituting the leg portion 7, and the steel pipe 9 is provided. The grout 27 is injected into the gap 77 between the inner peripheral surface 19 of the steel pipe 11 and the outer peripheral surface 25 of the steel pipe 11. By providing the slip stopper 35 and injecting the grout 27, the adhesive force between the grout 27 and the inner peripheral surface 19 of the steel pipe 9 and the outer peripheral surface 25 of the steel pipe 11 is increased, and the legs of the steel pipe sheet pile 3 and the intermediate joint 5 are provided. 7 and can be securely fixed.

鋼管矢板井筒3を構成する各鋼管9は、内側の所定の高さに仕切り板21が設けられる。仕切り板21を設けることにより、グラウト27の注入時に仕切り板21がグラウト27の落下を防止する。 Each steel pipe 9 constituting the steel pipe sheet pile 3 is provided with a partition plate 21 at a predetermined height inside. By providing the partition plate 21, the partition plate 21 prevents the grout 27 from falling when the grout 27 is injected.

本実施の形態では、鋼管矢板井筒3を構成する鋼管9の外周面18のうち、鋼管矢板井筒3の内部69側に位置する外周面18aにスタッド37を設ける。そして、鋼管矢板井筒3と中間接合部5の脚部7とが重なる範囲39において、鋼管矢板井筒3の内部69に鉄筋かご31を配筋してコンクリート33を打設する。スタッド37を設けることにより、コンクリート33と鋼管矢板井筒3の外周面18aとの付着力を高めることができる。 In the present embodiment, the stud 37 is provided on the outer peripheral surface 18a of the outer peripheral surface 18 of the steel pipe 9 constituting the steel pipe sheet pile 3 on the inner 69 side of the steel pipe sheet pile 3. Then, in the range 39 where the steel pipe sheet pile 3 and the leg portion 7 of the intermediate joint 5 overlap, the reinforcing bar cage 31 is arranged inside 69 of the steel pipe sheet pile 3 and the concrete 33 is placed. By providing the stud 37, the adhesive force between the concrete 33 and the outer peripheral surface 18a of the steel pipe sheet pile 3 can be increased.

また、コンクリート33を打設した範囲39の鋼管矢板井筒3の外側に、鋼板15を設置する。鋼管矢板井筒3の内部69に鉄筋コンクリート部分を設け、外側に鋼板15を設けることにより、鋼管矢板井筒洋上基礎1が、風による揺れに対して内側と外側の両方から補強された構造となる。 Further, the steel plate 15 is installed on the outside of the steel pipe sheet pile well tube 3 in the range 39 where the concrete 33 is placed. By providing a reinforced concrete portion inside 69 of the steel pipe sheet pile 3 and providing a steel plate 15 on the outside, the steel pipe sheet pile offshore foundation 1 is reinforced from both the inside and the outside against the shaking caused by the wind.

なお、本実施の形態では、鋼管矢板井筒3の内部69のブラケット63上に仕切り板65を載置した後、仕切り板65上に鉄筋かご31を設置し、コンクリート33を打設したが、施工手順はこれに限らない。鉄筋かご31の下端部に仕切り板65を一体化し、鉄筋かご31と一体化した仕切り板65を鋼管矢板井筒3の内部69に吊り降ろして、ブラケット63上に載置してもよい。また、鋼管9内に設置する仕切り板21として円形のものを図示したが、仕切り板は鋼管9と鋼管11との間の空隙77を塞げる形状であればよい。 In the present embodiment, after the partition plate 65 is placed on the bracket 63 of the inner 69 of the steel pipe sheet pile well cylinder 3, the reinforcing bar cage 31 is installed on the partition plate 65 and the concrete 33 is placed. The procedure is not limited to this. The partition plate 65 may be integrated with the lower end of the reinforcing bar cage 31, and the partition plate 65 integrated with the reinforcing bar cage 31 may be suspended from the inside 69 of the steel pipe sheet pile 3 and placed on the bracket 63. Further, although a circular partition plate 21 is shown as the partition plate 21 installed in the steel pipe 9, the partition plate may have a shape that closes the gap 77 between the steel pipe 9 and the steel pipe 11.

また、鋼板15を設置する時期は、鋼管矢板井筒3の内部69に仕切り板65を設置する前に限らない。鋼板15の設置は、鋼管矢板井筒3の水底43への打設終了以降の適切な時期に実施すればよい。 Further, the time when the steel plate 15 is installed is not limited to before the partition plate 65 is installed inside 69 of the steel pipe sheet pile well cylinder 3. The steel plate 15 may be installed at an appropriate time after the completion of placing the steel pipe sheet pile 3 on the water bottom 43.

さらに、鋼管矢板井筒3の鋼管9同士の継手部17は、P−P型継手に限らない。L−T型継手や、L−L型の幅広継手であってもよい。幅広継手を用いれば、継手内の土砂の掘削や洗浄、モルタルの充填を確実に行うことができ、継手の止水性を高めることができる。 Further, the joint portion 17 between the steel pipes 9 of the steel pipe sheet pile 3 is not limited to the PP type joint. It may be an LT type joint or an LL type wide joint. If a wide joint is used, it is possible to surely excavate and clean the earth and sand in the joint and fill the mortar, and it is possible to improve the water stopping property of the joint.

本実施の形態では、上部構造13として洋上風力装置のタワーを設置する場合を例として説明したが、上部構造は橋脚等であってもよい。また、中間接合部5として、円筒体の本体部6の下部に脚部7が一体化されたものを例示したが、中間接合部の本体部の形状は円筒体に限らない。中間接合部は、本体部の下部に、複数の鋼管を所定の間隔をおいて筒状に配置した脚部を一体化したものであればよい。 In the present embodiment, the case where the tower of the offshore wind turbine is installed as the superstructure 13 has been described as an example, but the superstructure may be a pier or the like. Further, as the intermediate joint portion 5, the leg portion 7 is integrated with the lower portion of the main body portion 6 of the cylindrical body, but the shape of the main body portion of the intermediate joint portion is not limited to the cylindrical body. The intermediate joint may be a leg portion in which a plurality of steel pipes are arranged in a tubular shape at predetermined intervals under the main body portion.

以上、添付図面を参照しながら、本発明に係る鋼管矢板井筒洋上基礎の構築方法および鋼管矢板井筒洋上基礎等の好適な実施形態について説明したが、本発明はかかる例に限定されない。当業者であれば、本願で開示した技術的思想の範疇内において、各種の変更例又は修正例に想到し得ることは明らかであり、それらについても当然に本発明の技術的範囲に属するものと了解される。 Although the method for constructing the steel pipe sheet pile Izutsu offshore foundation and the preferred embodiment of the steel pipe sheet pile Izutsu offshore foundation according to the present invention have been described above with reference to the accompanying drawings, the present invention is not limited to such an example. It is clear that a person skilled in the art can come up with various modified or modified examples within the scope of the technical idea disclosed in the present application, and these also naturally belong to the technical scope of the present invention. Understood.

1………鋼管矢板井筒洋上基礎
3………鋼管矢板井筒
5………中間接合部
6………本体部
7………脚部
8………スリット
9、11………鋼管
13………上部構造
15………鋼板
17………継手部
18、18a、18b、25………外周面
19………内周面
21、65………仕切り板
22………仕切り
23、63………ブラケット
27………グラウト
29………天端
31………鉄筋かご
33………コンクリート
35、35a、35b………ずれ止め
37………スタッド
39………範囲
41………モルタル
43………水底
45………運搬船
47………クレーン
47a………吊り具
49………ガイド
51………架台
53………床掘り
55………昇降式架台
55a………脚部
55b………作業台
57………杭打ち船
59………杭打ち機
61………埋戻し
67………隙間
69………内部
71………間隔
73、75………下端
77………空隙
1 ………… Steel pipe sheet pile Izutsu offshore foundation 3 ………… Steel pipe sheet pile Izutsu 5 ………… Intermediate joint 6 ………… Main body 7 ………… Leg 8 ………… Slit 9, 11 ………… Steel pipe 13 …… … Upper structure 15 ……… Steel plate 17 ……… Joints 18, 18a, 18b, 25 ……… Outer surface 19 ……… Inner peripheral surface 21, 65 ……… Partition plate 22 ……… Partition 23, 63… …… Bracket 27 ………… Grout 29 ………… Top 31 ………… Reinforcing bar basket 33 ………… Concrete 35, 35a, 35b ………… Anti-slip 37 ………… Stud 39 ………… Range 41 ………… Mortar 43 ………… Underwater 45 ………… Carrier 47 ………… Crane 47a ………… Suspension 49 ………… Guide 51 ………… Stand 53 ………… Floor digging 55 ………… Elevating pedestal 55a ………… Leg 55b ……… Worktable 57 ……… Grouting ship 59 ……… Grouting machine 61 ………… Backfilling 67 ………… Gap 69 ………… Internal 71 ………… Interval 73, 75 ………… Lower end 77… ...... Void

Claims (7)

基礎構造となる鋼管矢板井筒を水底に打設する工程aと、
前記鋼管矢板井筒の上部に、上部構造との中間接合部を設置する工程bと、
前記鋼管矢板井筒と前記中間接合部とを固定する工程cと、
を具備し、
前記中間接合部は、本体部と、前記本体部の下部に一体化された脚部とからなり、前記脚部は、複数の鋼管を所定の間隔をおいて筒状に配置したものであり、
前記工程bで、前記鋼管矢板井筒を構成する各鋼管の上部に、前記脚部を構成する各鋼管の下部を差し込むことを特徴とする鋼管矢板井筒洋上基礎の構築方法。
Step a of placing a steel pipe sheet pile cylinder as a foundation structure on the bottom of the water,
Step b of installing an intermediate joint with the superstructure on the upper part of the steel pipe sheet pile
Step c of fixing the steel pipe sheet pile and the intermediate joint,
Equipped with
The intermediate joint portion includes a main body portion and a leg portion integrated with the lower portion of the main body portion, and the leg portion is formed by arranging a plurality of steel pipes in a tubular shape at predetermined intervals.
A method for constructing a steel pipe sheet pile offshore foundation, which comprises inserting the lower part of each steel pipe constituting the leg into the upper part of each steel pipe constituting the steel pipe sheet pile in the step b.
前記工程aの前に、前記鋼管矢板井筒をあらかじめ仮組みし、仮固定した状態で所定の水域まで運搬する工程dをさらに具備することを特徴とする請求項1記載の鋼管矢板井筒洋上基礎の構築方法。 The steel pipe sheet pile offshore foundation according to claim 1, further comprising a step d of temporarily assembling the steel pipe sheet pile in advance and transporting the steel pipe sheet pile to a predetermined water area in a temporarily fixed state before the step a. How to build. 前記鋼管矢板井筒を構成する各鋼管は、内側の所定の高さに仕切りが設けられ、前記工程bで、前記仕切りの上方に前記脚部を構成する各鋼管の下部を差し込むことを特徴とする請求項1または請求項2記載の鋼管矢板井筒洋上基礎の構築方法。 Each steel pipe constituting the steel pipe sheet pile is provided with a partition at a predetermined height inside, and in the step b, the lower portion of each steel pipe constituting the leg is inserted above the partition. The method for constructing a steel pipe sheet pile Izutsu offshore foundation according to claim 1 or 2. 前記工程cで、前記鋼管矢板井筒を構成する各鋼管の内周面と、前記脚部を構成する各鋼管の外周面との間にグラウトを注入して、前記鋼管矢板井筒と前記脚部とを固定することを特徴とする請求項1から請求項3のいずれかに記載の鋼管矢板井筒洋上基礎の構築方法。 In the step c, grout is injected between the inner peripheral surface of each steel pipe constituting the steel pipe sheet pile and the outer peripheral surface of each steel pipe constituting the leg to form the steel pipe sheet pile and the leg. The method for constructing a steel pipe sheet pile Izutsu offshore foundation according to any one of claims 1 to 3, wherein the steel pipe sheet pile is fixed. 前記工程aと前記工程bとの間に、前記鋼管矢板井筒の天端付近から所定の深さまでの範囲において、前記鋼管矢板井筒の内部に鉄筋を配筋してコンクリートを打設する工程eをさらに具備することを特徴とする請求項1から請求項4のいずれかに記載の鋼管矢板井筒洋上基礎の構築方法。 Between the step a and the step b, a step e of arranging reinforcing bars inside the steel pipe sheet pile and placing concrete in a range from the vicinity of the top of the steel pipe sheet pile to a predetermined depth is performed. The method for constructing a steel pipe sheet pile Izutsu offshore foundation according to any one of claims 1 to 4, further comprising. 前記鋼管矢板井筒の継手部が幅広継手であることを特徴とする請求項1から請求項5のいずれかに記載の鋼管矢板井筒洋上基礎の構築方法。 The method for constructing a steel pipe sheet pile offshore foundation according to any one of claims 1 to 5, wherein the joint portion of the steel pipe sheet pile is a wide joint. 水底に打設された、基礎構造となる鋼管矢板井筒と、
前記鋼管矢板井筒の上部に固定された、上部構造との中間接合部と、
を具備し、
前記中間接合部は、本体部と、前記本体部の下部に一体化された脚部とからなり、前記脚部は、複数の鋼管を所定の間隔をおいて筒状に配置したものであり、
前記鋼管矢板井筒を構成する各鋼管の上部に、前記脚部を構成する各鋼管の下部が差し込まれた状態で、前記鋼管矢板井筒と前記中間接合部とが固定されたことを特徴とする鋼管矢板井筒洋上基礎。
A steel pipe sheet pile, which is the foundation structure, placed on the bottom of the water
An intermediate joint with the superstructure fixed to the upper part of the steel pipe sheet pile
Equipped with
The intermediate joint portion includes a main body portion and a leg portion integrated with the lower portion of the main body portion, and the leg portion is formed by arranging a plurality of steel pipes in a tubular shape at predetermined intervals.
A steel pipe characterized in that the steel pipe sheet pile and the intermediate joint are fixed in a state where the lower part of each steel pipe constituting the leg is inserted into the upper part of each steel pipe constituting the steel pipe sheet pile. Yaita Izutsu Offshore foundation.
JP2017075996A 2017-04-06 2017-04-06 Construction method of steel pipe sheet pile Izutsu offshore foundation and steel pipe sheet pile Izutsu offshore foundation Active JP6770920B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017075996A JP6770920B2 (en) 2017-04-06 2017-04-06 Construction method of steel pipe sheet pile Izutsu offshore foundation and steel pipe sheet pile Izutsu offshore foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017075996A JP6770920B2 (en) 2017-04-06 2017-04-06 Construction method of steel pipe sheet pile Izutsu offshore foundation and steel pipe sheet pile Izutsu offshore foundation

Publications (2)

Publication Number Publication Date
JP2018178429A JP2018178429A (en) 2018-11-15
JP6770920B2 true JP6770920B2 (en) 2020-10-21

Family

ID=64282558

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017075996A Active JP6770920B2 (en) 2017-04-06 2017-04-06 Construction method of steel pipe sheet pile Izutsu offshore foundation and steel pipe sheet pile Izutsu offshore foundation

Country Status (1)

Country Link
JP (1) JP6770920B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2023139585A (en) * 2022-03-22 2023-10-04 五洋建設株式会社 Reinforcement structure and reinforcement method for cylindrical body for underwater installation
CN116174985B (en) * 2022-11-23 2026-02-03 中交第一航务工程局有限公司 Manufacturing method of steel pipe cylinder structure
CN116716911B (en) * 2023-05-30 2025-03-28 中国能源建设集团广东省电力设计研究院有限公司 A wind turbine single pile foundation auxiliary structure

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3423394B2 (en) * 1994-02-08 2003-07-07 新日本製鐵株式会社 Underwater frame structure
JP4283194B2 (en) * 2004-09-17 2009-06-24 鹿島建設株式会社 Wave-absorbing structure, method for constructing wave-absorbing structure
JP2008303598A (en) * 2007-06-07 2008-12-18 Nippon Steel Corp Column base structure in multi-column type pier.
DE102012024412A1 (en) * 2012-12-14 2014-06-18 Senvion Se Method for anchoring a foundation structure and foundation structure

Also Published As

Publication number Publication date
JP2018178429A (en) 2018-11-15

Similar Documents

Publication Publication Date Title
KR101659783B1 (en) Hybrid type concrete foundation of offshore wind turbine using composite of concrete and steel sleevee and fabrication method thereof
KR101623741B1 (en) Support structure of offshore wind turbines and construction method thereof
TWI833882B (en) Monopile foundation and monopile foundation installation for an offshore structure and method of erecting a monopile foundation installation
KR101687368B1 (en) Support structure of offshore wind turbines and structure method thereof
US20150125220A1 (en) Offshore structure installation
KR101043606B1 (en) Net support mechanism of single support pile for soft ground for installation of offshore structures
JP6264776B2 (en) Suction structure
KR101772508B1 (en) Structure for supporting offshore facility and method for structuring thereof
KR101573064B1 (en) Jig for constructing pile of green energy generating plant on the sea and method for constructing pile on the sea using this same
KR20160143599A (en) Hybrid type concrete foundation of offshore wind turbine using composite of concrete and steel sleevee and fabrication method thereof
KR101106219B1 (en) Batch-mounted underwater large-diameter casing temporary structure using sheet pile and construction method
JP6770920B2 (en) Construction method of steel pipe sheet pile Izutsu offshore foundation and steel pipe sheet pile Izutsu offshore foundation
CN105780802A (en) Jacket offshore wind turbine foundation with brackets and construction method thereof
JP2020128672A (en) Installation method of mono-pile foundation for offshore wind power generation and mono-pile foundation for offshore wind power generation
KR101177396B1 (en) Installation method of fixed spiral pile sub-structure
JP2015055106A (en) Underground structure, and method of reconstructing building structure with underground skeleton
JP2019100070A (en) Foundation structure of offshore wind power generation facility, and construction method of the same
KR101636960B1 (en) Offshore multi-piled concrete foundation using transition pieces and the construction method therefor
KR20140051531A (en) Structure of offshore structure, manufacturing and constructing method thereof
JP7174639B2 (en) Substructure of foundation for offshore wind power generation and construction method for substructure of foundation for offshore wind power generation
GB2505192A (en) A pile sleeve connection for a monopole foundation
JP2016084660A (en) Foundation structure of off-shore wind turbine generator
KR101626423B1 (en) Support structure of offshore wind turbines and structure method thereof
JP6757003B2 (en) Construction method of double pipe pile and double pipe pile
KR20110013932A (en) Multi-support connector mechanism with single support pile for soft ground for installation of offshore structures

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20191028

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20200909

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20200923

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20200928

R150 Certificate of patent or registration of utility model

Ref document number: 6770920

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250