Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP6792428B2 - Bridge inspection equipment - Google Patents
[go: Go Back, main page]

JP6792428B2 - Bridge inspection equipment - Google Patents

Bridge inspection equipment Download PDF

Info

Publication number
JP6792428B2
JP6792428B2 JP2016227825A JP2016227825A JP6792428B2 JP 6792428 B2 JP6792428 B2 JP 6792428B2 JP 2016227825 A JP2016227825 A JP 2016227825A JP 2016227825 A JP2016227825 A JP 2016227825A JP 6792428 B2 JP6792428 B2 JP 6792428B2
Authority
JP
Japan
Prior art keywords
arm
bridge
horizontal arm
inspection device
vertical arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2016227825A
Other languages
Japanese (ja)
Other versions
JP2018084086A (en
Inventor
健司 梅津
健司 梅津
藤原 保久
保久 藤原
春日 昭夫
昭夫 春日
一清 玉置
一清 玉置
聡 綿谷
聡 綿谷
孝夫 掛橋
孝夫 掛橋
史隆 千葉
史隆 千葉
陽介 鯉渕
陽介 鯉渕
丹野 浩二
浩二 丹野
堀田 大地
大地 堀田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumitomo Mitsui Construction Co Ltd
Original Assignee
Sumitomo Mitsui Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Mitsui Construction Co Ltd filed Critical Sumitomo Mitsui Construction Co Ltd
Priority to JP2016227825A priority Critical patent/JP6792428B2/en
Publication of JP2018084086A publication Critical patent/JP2018084086A/en
Application granted granted Critical
Publication of JP6792428B2 publication Critical patent/JP6792428B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Description

本発明は、橋桁の下面及び側面並びに床版の下面等の橋梁の下部を下方から点検するための橋梁点検装置に関する。 The present invention relates to a bridge inspection device for inspecting the lower surface and side surfaces of a bridge girder and the lower portion of a bridge such as the lower surface of a plate slab from below.

橋梁の下面などは直接目視して点検することが困難であるため、カメラ等の撮影機構により橋梁の下面を撮影できるようにした点検装置が提案されている(例えば、特許文献1〜3参照)。また、撮影機構に加え、クラックゲージ板を操作する操作機構や打撃点検具を操作する打撃点検機構を備えた点検装置等も提案されている(例えば、特許文献4参照)。 Since it is difficult to directly visually inspect the lower surface of a bridge or the like, an inspection device capable of photographing the lower surface of the bridge by an imaging mechanism such as a camera has been proposed (see, for example, Patent Documents 1 to 3). .. Further, in addition to the photographing mechanism, an inspection device including an operation mechanism for operating the crack gauge plate and a impact inspection mechanism for operating the impact inspection tool has been proposed (see, for example, Patent Document 4).

特許文献1に記載の橋梁点検装置は、橋梁の高欄上を走行する上部支持台で水平方向の第1のアームを、長手方向を軸として回転するように支承し、第1のアームで、略垂直方向に延びる第2のアームを、長手方向を軸として回転するように支承し、第2のアームで、長手方向に多段に伸縮自在に構成された第3のアームを片持ち状態で支承し、第3のアームの先端にカメラを回転駆動可能に取り付けている。この橋梁点検装置では、上部支持台が、台枠の下面に高欄に直交するように跨って高欄上を滑走する棒状ローラーを設けられることで、機器を高欄に配置して高欄上を移動させながら撮影ができる。 The bridge inspection device described in Patent Document 1 is an upper support that runs on a balustrade of a bridge and supports a first arm in the horizontal direction so as to rotate about the longitudinal direction. The second arm extending in the vertical direction is supported so as to rotate about the longitudinal direction, and the second arm is supported in a cantilevered state with the third arm configured to be telescopic in multiple stages in the longitudinal direction. , The camera is rotatably attached to the tip of the third arm. In this bridge inspection device, the upper support base is provided with a rod-shaped roller that slides on the balustrade so as to be orthogonal to the balustrade on the lower surface of the underframe, so that the equipment is arranged on the balustrade and moved on the balustrade. You can shoot.

特許文献2に記載の橋梁点検装置は、高欄上を移動可能な台車に支持されて先端部が橋の側方外部にオーバーハングして張り出される基部アームと、基部アームの先端部に取り付けられ昇降可能且つ垂直軸線回りに回動可能に垂直ロッドを保持するロッドホルダと、垂直ロッドの下端部に中間部を固定されて水平方向に延在する水平アームと、水平アーム上の一方の側に取り付けられたカメラと、他方の側に取り付けられたバランスウェイトとを備えている。また、水平アームの撓みを防止するために、垂直ロッドの下端部と水平アームの一方の側とにテンションワイヤが設けられている。 The bridge inspection device described in Patent Document 2 is attached to a base arm that is supported by a trolley that can move on a balustrade and whose tip overhangs to the outside of the side of the bridge, and to the tip of the base arm. A rod holder that holds the vertical rod so that it can be raised and lowered and that can rotate around the vertical axis, a horizontal arm that has an intermediate part fixed to the lower end of the vertical rod and extends in the horizontal direction, and one side on the horizontal arm. It has an attached camera and a balance weight attached to the other side. Further, in order to prevent the horizontal arm from bending, tension wires are provided on the lower end of the vertical rod and one side of the horizontal arm.

特許文献3及び特許文献4に記載の橋梁点検装置では、垂直ロッドとの間に張架されるテンションワイヤが水平アームの垂直ロッドによる支点の両側(カメラ側及びバランスウェイト側)に設けられている。 In the bridge inspection device described in Patent Document 3 and Patent Document 4, tension wires stretched between the bridge inspection device and the vertical rod are provided on both sides (camera side and balance weight side) of the fulcrum by the vertical rod of the horizontal arm. ..

特開2007−77653号公報JP-A-2007-77653 特開2010−209666号公報JP-A-2010-209666 特開2009−275385号公報Japanese Unexamined Patent Publication No. 2009-275385 特開2015−34445号公報JP-A-2015-34445

しかしながら、従来の橋梁点検装置では、カメラ等の点検部が取り付けられた水平アーム及び鉛直アームは、高欄上を走行する支持台に水平に支持される基部アームによって支持されている。従って、支持台の走行によって点検部が揺れると、揺れが収まるまで撮影等の点検作業を行うことができない。また、支持台が走行していなくても、鉛直アームの昇降や回動によってカメラが揺れることや、水平アームや鉛直アームが風を受けて点検部が揺れることもある。点検部の揺れを抑制するためには、支持台及び基部アームの支持剛性や鉛直アーム及び水平アームの剛性を高くする必要があるが、このような高剛性の構成にすると点検装置が大型化及び重量化する。また、取り扱いが煩雑になる。 However, in the conventional bridge inspection device, the horizontal arm and the vertical arm to which the inspection unit such as a camera is attached are supported by the base arm which is horizontally supported by the support base running on the balustrade. Therefore, if the inspection unit shakes due to the running of the support base, inspection work such as photographing cannot be performed until the shaking stops. Further, even if the support base is not running, the camera may shake due to the raising / lowering or rotation of the vertical arm, or the horizontal arm or the vertical arm may receive the wind and the inspection unit may shake. In order to suppress the shaking of the inspection part, it is necessary to increase the support rigidity of the support base and the base arm and the rigidity of the vertical arm and the horizontal arm. However, such a high rigidity configuration makes the inspection device larger and larger. Weight up. In addition, handling becomes complicated.

本発明は、このような背景に鑑み、大型化及び重量化を抑制しつつ点検部の揺れを抑制でき、取り扱いが容易な橋梁点検装置を提供することを課題とする。 In view of such a background, it is an object of the present invention to provide a bridge inspection device that can suppress the shaking of the inspection unit while suppressing the increase in size and weight and is easy to handle.

このような課題を解決するために、本発明に係る橋梁点検装置(10、110)は、橋梁(1、101)の高欄(6)に走行可能に取り付けられる台車ユニット(11)と、前記台車ユニットに昇降可能且つ鉛直軸線回りに回動可能に取り付けられ、前記橋梁の外側に略鉛直に配置される鉛直アーム(40)と、前記鉛直アームの下端部に橋軸方向に延びる軸線回りに回動可能に中間部を結合され、前記橋梁の下方に配置される一側部分(41A)、及び前記橋梁の外側に配置される他側部分(41B)を有する水平アーム(41)と、前記水平アームにおける前記一側部分に設けられ、前記橋梁を下方から点検する点検部(45)と、前記水平アームの前記他側部分の下方に配置されるカウンタウェイト(48)と、前記水平アームの前記他側部分に設けられた第1ガイド部(46)と、前記鉛直アームの前記水平アームとの結合部よりも高い位置に設けられた第2ガイド部(47)と、前記カウンタウェイトから、前記第1ガイド部及前記第2ガイド部を通って前記水平アームの前記一側部分に亘って張設され、前記カウンタウェイトの荷重を作用させることで前記一側部分を上方に付勢する第1吊り材(49)と、前記水平アームの前記一側部分に上方へ突出するように設けられ、前記橋梁の下面に当接する束部(42)とを備える。 In order to solve such a problem, the bridge inspection device (10, 110) according to the present invention includes a trolley unit (11) movably attached to a high column (6) of the bridge (1, 101) and the trolley. A vertical arm (40) that can be raised and lowered and rotatably attached to the unit and is arranged substantially vertically on the outside of the bridge, and a vertical arm (40) that rotates around the axis extending in the bridge axis direction at the lower end of the vertical arm. A horizontal arm (41) having a one-sided portion (41A) movably connected to the middle portion and arranged below the bridge and another side portion (41B) arranged outside the bridge, and the horizontal. An inspection unit (45) provided on the one side portion of the arm for inspecting the bridge from below, a counter weight (48) arranged below the other side portion of the horizontal arm, and the horizontal arm. From the first guide portion (46) provided on the other side portion, the second guide portion (47) provided at a position higher than the joint portion of the vertical arm with the horizontal arm, and the counter weight, the said is stretched over the one side portion of the horizontal arm through a first guide portion及beauty the second guide portion, the biasing said one side portion upward by the action of the load of the counterweight 1 Suspended member (49) and a bundle portion (42) provided on the one side portion of the horizontal arm so as to project upward and abutting on the lower surface of the bridge.

この構成によれば、鉛直アームによって回動可能に支持される水平アームは、カウンタウェイトによって付勢されて束部を橋梁の下面に当接させる。そのため、高剛性の構成にしなくても、水平アームの一側部分の揺れが抑制され、一側部分に設けられる点検部の揺れも抑制される。また、高剛性の構成にしなくても、束部と第1吊り材とによって点検部の揺れを抑制できるため、橋梁点検装置の大型化及び重量化を抑制できる。 According to this configuration, the horizontal arm rotatably supported by the vertical arm is urged by the counterweight to bring the bundle to the underside of the bridge. Therefore, even if the configuration is not highly rigid, the shaking of one side portion of the horizontal arm is suppressed, and the shaking of the inspection unit provided on one side portion is also suppressed. Further, even if the structure is not highly rigid, the bundle portion and the first suspension member can suppress the shaking of the inspection portion, so that it is possible to suppress the increase in size and weight of the bridge inspection device.

また、上記の発明において、前記水平アーム(41)の前記鉛直アーム(40)に対する橋軸方向の軸線回りの回動を許容する回動許容状態と、前記水平アームの前記鉛直アームに対する回動を規制する回動規制状態とを切り替える切替機構(52)を更に備えるとよい。 Further, in the above invention, the rotation allowed state in which the horizontal arm (41) is allowed to rotate about the axis in the bridge axis direction with respect to the vertical arm (40) and the rotation of the horizontal arm with respect to the vertical arm are defined. It is preferable to further provide a switching mechanism (52) for switching between the restricted rotation restricted state.

この構成によれば、切替機構の操作により、点検を行う時には橋梁点検装置を回動許容状態にし、橋梁点検装置の高欄への取付時や高欄からの撤去時、移動時等に橋梁点検装置を回動規制状態にすることができるため、取り扱いが容易である。 According to this configuration, the bridge inspection device is allowed to rotate when inspecting by operating the switching mechanism, and the bridge inspection device is installed when the bridge inspection device is attached to the balustrade, removed from the balustrade, or moved. It is easy to handle because it can be in a rotation restricted state.

また、上記の発明において、前記水平アーム(41)の前記鉛直アーム(40)に対する橋軸方向の軸線回りの回動角度を所定の角度範囲に規制するストッパ(51、52)を更に備えるとよい。 Further, in the above invention, it is preferable to further provide stoppers (51, 52) for restricting the rotation angle of the horizontal arm (41) with respect to the vertical arm (40) around the axis in the bridge axis direction within a predetermined angle range. ..

この構成によれば、水平アームが所定の回動角度を超えて鉛直アームに対して傾斜することがないため、点検部等が操作ミスによって損傷することが抑制される。 According to this configuration, since the horizontal arm does not tilt with respect to the vertical arm beyond a predetermined rotation angle, it is possible to prevent the inspection unit and the like from being damaged due to an operation error.

また、上記の発明において、前記束部(42)が前記橋梁の下面に転接するローラー(43)を上端に有するとよい。 Further, in the above invention, it is preferable that the bundle portion (42) has a roller (43) at the upper end, which is in contact with the lower surface of the bridge.

この構成によれば、束部を橋梁の下面に当接させたまま、鉛直アームを鉛直軸線回りに回動させて点検部を移動させることや、台車ユニットを走行させて橋梁点検装置を移動することができる。 According to this configuration, the inspection unit is moved by rotating the vertical arm around the vertical axis while the bundle portion is in contact with the lower surface of the bridge, or the trolley unit is moved to move the bridge inspection device. be able to.

また、上記の発明において、前記鉛直アーム(40)の引張軸力を検出する軸力センサ(39)と、前記台車ユニット(11)の走行時に(ステップST3:Yes)、前記軸力センサの検出値が大きくなった時に(ステップST5:No)前記台車ユニットから前記水平アーム(41)の前記中間部までの長さを長くし(ステップST7)、前記軸力センサの検出値が小さくなった時に(ステップST5:Yes)前記台車ユニットから前記水平アームの前記中間部までの長さを短くする(ステップST6)ように、前記鉛直アームを駆動するアーム駆動装置(38)とを更に備えるとよい。 Further, in the above invention, the axial force sensor (39) for detecting the tensile axial force of the vertical arm (40) and the axial force sensor for detecting the axial force sensor (step ST3: Yes) when the carriage unit (11) is running (step ST3: Yes). When the value becomes large (step ST5: No), the length from the trolley unit to the intermediate portion of the horizontal arm (41) is increased (step ST7), and when the detected value of the axial force sensor becomes small. (Step ST5: Yes) An arm drive device (38) for driving the vertical arm may be further provided so as to shorten the length from the carriage unit to the intermediate portion of the horizontal arm (step ST6).

台車ユニットが高欄を走行している時には高欄から橋梁の下面までの高さが変化することがある。水平アームの撓みによる上向きのばね力を加えて束部のローラーを橋梁の下面に当接させた状態で台車ユニットを走行させている時に、この高さが小さくなった場合、高さ変化が小さいうちは、水平アームの撓みが小さくなって鉛直アームの軸力(引張力)が小さくなり、高さ変化が大きくなると、束部のローラーが橋梁の下面から離れて水平アームが揺れ易くなる。逆に、この高さが大きくなった場合には、水平アームの撓みが大きくなって鉛直アームの軸力が大きくなってしまう。この構成によれば、台車ユニットの走行時に高欄から橋梁の下面までの高さが変化しても、台車ユニットから水平アームの中間部までの長さが変更されるため、鉛直アームの軸力変化を小さくすることができる。 When the bogie unit is traveling on the balustrade, the height from the balustrade to the underside of the bridge may change. When the bogie unit is running with the rollers of the bundle part in contact with the lower surface of the bridge by applying an upward spring force due to the bending of the horizontal arm, if this height becomes small, the height change is small. When the bending of the horizontal arm becomes small, the axial force (tensile force) of the vertical arm becomes small, and the height change becomes large, the roller of the bundle portion separates from the lower surface of the bridge and the horizontal arm easily swings. On the contrary, when this height is increased, the bending of the horizontal arm is increased and the axial force of the vertical arm is increased. According to this configuration, even if the height from the balustrade to the lower surface of the bridge changes while the bogie unit is running, the length from the bogie unit to the middle part of the horizontal arm is changed, so that the axial force of the vertical arm changes. Can be made smaller.

また、上記の発明において、前記アーム駆動装置(38)は、前記ローラー(43)が前記橋梁(1、101)の下面に当接する所定の軸力範囲(RP)に前記軸力センサの値が収まるように前記鉛直アーム(40)を駆動する(ステップST4〜ステップST7)とよい。 Further, in the above invention, in the arm driving device (38), the value of the axial force sensor is set in a predetermined axial force range (RP) in which the roller (43) abuts on the lower surface of the bridge (1, 101). It is preferable to drive the vertical arm (40) so that it fits (steps ST4 to ST7).

この構成によれば、所定の値を超えて鉛直アームに軸力が加わることを防止できると共に、ローラーが橋梁の下面から離れることも防止できる。 According to this configuration, it is possible to prevent an axial force from being applied to the vertical arm exceeding a predetermined value, and it is also possible to prevent the roller from separating from the lower surface of the bridge.

また、上記の発明において、前記アーム駆動装置(38)が前記台車ユニット(11)に設けられて前記鉛直アーム(40)を昇降可能に支持するとよい。 Further, in the above invention, it is preferable that the arm driving device (38) is provided on the bogie unit (11) to support the vertical arm (40) so as to be able to move up and down.

この構成によれば、台車ユニットにより支持される鉛直アーム以下の点検ユニット部の重量増大を防止できる。 According to this configuration, it is possible to prevent an increase in the weight of the inspection unit portion below the vertical arm supported by the bogie unit.

また、上記の発明において、前記第1吊り材(49)が、前記水平アーム(41)における前記束部(42)が設けられた部分に連結されるとよい。 Further, in the above invention, the first suspending member (49) may be connected to a portion of the horizontal arm (41) provided with the bundle portion (42).

この構成によれば、水平アームの一側部分を持ち上げる力が束部に直接的に作用するため、水平アームの曲げモーメントを抑制できる。 According to this configuration, the force for lifting one side portion of the horizontal arm acts directly on the bundle portion, so that the bending moment of the horizontal arm can be suppressed.

また、上記の発明において、前記第1ガイド部(46)及び前記第2ガイド部(47)が滑車であるとよい。 Further, in the above invention, the first guide portion (46) and the second guide portion (47) may be pulleys.

この構成によれば、カウンタウェイトの荷重が第1吊り材を介して確実に水平アームの一側部分に伝達されるため、カウンタウェイトの重量増大を抑制できる。 According to this configuration, the load of the counterweight is surely transmitted to one side portion of the horizontal arm via the first suspension member, so that the weight increase of the counterweight can be suppressed.

また、上記の発明において、前記第2ガイド部(47)が、前記鉛直アーム(40)に上下動可能に設けられた可動滑車であるとよい。 Further, in the above invention, it is preferable that the second guide portion (47) is a movable pulley provided on the vertical arm (40) so as to be vertically movable.

この構成によれば、水平アームの一側部分に作用する上向きの分力の大きさを適宜変更できる。或いは、橋梁の断面形状や橋梁点検装置の取付状況に応じて第2ガイド部の位置を適宜変更できる。 According to this configuration, the magnitude of the upward component force acting on one side portion of the horizontal arm can be appropriately changed. Alternatively, the position of the second guide portion can be appropriately changed according to the cross-sectional shape of the bridge and the mounting condition of the bridge inspection device.

また、上記の発明において、前記第2ガイド部(47)が前記鉛直アーム(40)の橋軸方向の両側に設けられ、前記第1吊り材(49)が、前記鉛直アーム(40)の橋軸方向の両側に設けられて対応する側の前記第2ガイド部に案内されるとよい。 Further, in the above invention, the second guide portion (47) is provided on both sides of the vertical arm (40) in the bridge axis direction, and the first suspension member (49) is a bridge of the vertical arm (40). It may be provided on both sides in the axial direction and guided to the second guide portion on the corresponding side.

この構成によれば、鉛直アームにねじりの力が作用することが抑制されるため、鉛直アームを高剛性にしなくてよい。 According to this configuration, it is not necessary to make the vertical arm highly rigid because the torsional force applied to the vertical arm is suppressed.

また、上記の発明において、前記水平アーム(41)の前記他側部分(41B)に設けられた第3ガイド部(146)と、前記鉛直アーム(4)の前記第2ガイド部(47)よりも低い位置に設けられた第4ガイド部(147)と、前記カウンタウェイト(48)から、前記第3ガイド部及前記第4ガイド部を通って前記水平アームの前記一側部分(41A)に亘って張設され、前記カウンタウェイトの荷重を作用させることで前記第1吊り材(49)と協働して前記一側部分を上方に付勢する第2吊り材(149)を更に備えるとよい。 Further, in the above invention, the said third guide portion provided on the other side portion (41B) and (146), the vertical arm and the second guide portion (4 0) of the horizontal arm (41) (47) fourth guide portion (147), said counter wait (48), the third guide portion及beauty the one side portion of the horizontal arm through the fourth guide portion (41A provided at a position lower than ) to over is stretched, the second suspension member counterweights the first suspension member by exerting a load of in cooperation with the (49) for biasing said one side portion upwardly (149) further You should prepare.

この構成によれば、第1吊り材が第1ガイド部又は第2ガイド部から外れたとしても、カウンタウェイトが第2吊り材により支持されるため、作業ミスによるカウンタウェイトの落下を防止できる。より正確には、落下によって水平アームや鉛直アームに加わる衝撃荷重が大きくなることを抑制できる。 According to this configuration, even if the first suspension member comes off from the first guide portion or the second guide portion, the counterweight is supported by the second suspension member, so that the counterweight can be prevented from falling due to a work error. More precisely, it is possible to suppress an increase in the impact load applied to the horizontal arm and the vertical arm due to the fall.

また、上記の発明において、前記第4ガイド部(147)が、前記カウンタウェイト(48)を支持する前記第2吊り材(149)の経路長を変更させる経路長変更手段(147c)を有し、当該経路長変更手段により前記第2吊り材の経路長が短くされることにより、前記カウンタウェイトの支持が前記第2吊り材から前記第1吊り材に盛り替えられるとよい。 Further, in the above invention, the fourth guide portion (147) has a path length changing means (147c) for changing the path length of the second suspending member (149) supporting the counterweight (48). It is preferable that the support of the counterweight is replaced from the second suspension member to the first suspension member by shortening the path length of the second suspension member by the path length changing means.

この構成によれば、橋梁点検時には、より高い位置を通る第1吊り材によりカウンタウェイトを支持し、橋梁点検装置の高欄への取付時や高欄からの撤去時には、より低い位置を通る第2吊り材によりカウンタウェイトを支持できる。従って、点検時の水平アームの曲げ応力を低減し、取付・撤去作業を容易にできる。 According to this configuration, the counterweight is supported by the first suspension material that passes through a higher position during bridge inspection, and the second suspension that passes through a lower position when the bridge inspection device is attached to or removed from the balustrade. The material can support the counterweight. Therefore, the bending stress of the horizontal arm at the time of inspection can be reduced, and the installation / removal work can be facilitated.

また、上記の発明において、前記台車ユニット(11)が、前記高欄(6)に走行可能に取り付けられる台車(12)と、前記台車の上方に橋軸直角方向に配置されるベース部(31)、及び前記ベース部の橋軸直角方向の外端に一体に設けられ、前記高欄の外側に鉛直に配置されて前記鉛直アーム(40)を昇降可能に保持するアームホルダ(32)を有するアーム保持装置(13)と、前記ベース部の後端を橋軸方向の軸線回りに回動可能且つ着脱可能に前記台車に連結すると共に、前記ベース部を橋軸直角方向にスライド可能に前記台車に連結する連結機構(20)とを備え、前記アーム保持装置が、前記アームホルダを前記橋梁の外側で鉛直に配置した点検用の姿勢と前記アームホルダを前記台車の上方で斜めに配置した着脱用の姿勢との間で姿勢変更可能であるとよい。 Further, in the above invention, the trolley unit (11) is mounted on the balustrade (6) so as to be travelable, and the trolley (12) and the base portion (31) arranged above the trolley in the direction perpendicular to the bridge axis. , And an arm holder having an arm holder (32) integrally provided at the outer end of the base portion in the direction perpendicular to the bridge axis and vertically arranged outside the balustrade to hold the vertical arm (40) up and down. The device (13) and the rear end of the base portion are rotatably and detachably connected to the trolley around the axis in the bridge axis direction, and the base portion is slidably connected to the trolley in the direction perpendicular to the bridge axis. The arm holding device is provided with a connecting mechanism (20) for inspection, in which the arm holder is vertically arranged outside the bridge and for attachment / detachment in which the arm holder is obliquely arranged above the trolley. It is good that the posture can be changed between the posture and the posture.

この構成によれば、アーム保持装置を台車に取り付ける作業及び台車から取り外す作業を容易且つ安全にすることができる。 According to this configuration, the work of attaching the arm holding device to the trolley and the work of removing it from the trolley can be facilitated and safe.

また、上記の発明において、前記連結機構(20)の橋軸直角方向の外端には、前記アーム保持装置(13)が前記点検用の姿勢と前記着脱用の姿勢との間で姿勢変更する時に前記アームホルダ(32)をガイドすると共に、前記アーム保持装置が前記着脱用の姿勢にある時に前記アームホルダの橋軸直角方向外方への移動を規制するように構成されたガイドローラー(24)が設けられているとよい。 Further, in the above invention, the arm holding device (13) changes the posture between the inspection posture and the attachment / detachment posture at the outer end of the connection mechanism (20) in the direction perpendicular to the bridge axis. A guide roller (24) configured to sometimes guide the arm holder (32) and restrict the movement of the arm holder outward in the direction perpendicular to the bridge axis when the arm holding device is in the detachable posture. ) May be provided.

この構成によれば、着脱用の姿勢にあるアーム保持装置が点検用の姿勢側へ姿勢変更することが規制されるため、アーム保持装置の着脱作業をより容易且つ安全にすることができる。 According to this configuration, the arm holding device in the attachment / detachment posture is restricted from changing its posture to the inspection posture side, so that the attachment / detachment work of the arm holding device can be made easier and safer.

このように本発明によれば、大型化及び重量化を抑制しつつ点検部の揺れを抑制でき、取り扱いが容易な橋梁点検装置を提供することができる。 As described above, according to the present invention, it is possible to provide a bridge inspection device that can suppress the shaking of the inspection unit while suppressing the increase in size and weight, and is easy to handle.

第1実施形態に係る橋梁点検装置の取付状態を示す側面図Side view showing the mounting state of the bridge inspection device according to the first embodiment 図1に示される橋梁点検装置の要部拡大図Enlarged view of the main part of the bridge inspection device shown in FIG. 図1に示される橋梁点検装置の要部正面図(図1中のIII矢視図)Front view of the main part of the bridge inspection device shown in FIG. 1 (arrow view III in FIG. 1) 図1中のIV部を拡大して示す動作説明図Operation explanatory view showing enlarged part IV in FIG. 図1に示される制御装置の機能ブロック図Functional block diagram of the control device shown in FIG. 制御装置による鉛直アーム昇降制御のフローチャートFlow chart of vertical arm elevating control by control device 本発明に係る橋梁点検装置(A)と比較例に係る点検装置(B)〜(E)とのそれぞれの構造モデル図Structural model diagrams of the bridge inspection device (A) according to the present invention and the inspection devices (B) to (E) according to the comparative example. 本発明に係る橋梁点検装置(A)と比較例に係る点検装置(B)との曲げモーメント(1)及び変位(2)を示す比較図A comparative diagram showing a bending moment (1) and a displacement (2) between the bridge inspection device (A) according to the present invention and the inspection device (B) according to a comparative example. 本発明に係る橋梁点検装置(A)と比較例に係る点検装置(B)、(C)との曲げモーメント(1)及び変位(2)を示す比較図Comparative diagram showing bending moment (1) and displacement (2) between the bridge inspection device (A) according to the present invention and the inspection devices (B) and (C) according to the comparative example. 本発明に係る橋梁点検装置(A)と比較例に係る点検装置(B)との曲げモーメント(1)及び変位(2)を示す比較図A comparative diagram showing a bending moment (1) and a displacement (2) between the bridge inspection device (A) according to the present invention and the inspection device (B) according to a comparative example. 図1に示される橋梁点検装置の取付手順の説明図Explanatory drawing of installation procedure of bridge inspection apparatus shown in FIG. 図1に示される橋梁点検装置の取付手順の説明図Explanatory drawing of installation procedure of bridge inspection apparatus shown in FIG. 図1に示される橋梁点検装置の取付手順の説明図Explanatory drawing of installation procedure of bridge inspection apparatus shown in FIG. 図1に示される橋梁点検装置の取付手順の説明図Explanatory drawing of installation procedure of bridge inspection apparatus shown in FIG. 図1に示される橋梁点検装置の取付手順の説明図Explanatory drawing of installation procedure of bridge inspection apparatus shown in FIG. 第2実施形態に係る橋梁点検装置の取付状態を示す側面図Side view showing the mounting state of the bridge inspection device according to the second embodiment 図16に示されるサドルの(A)第1ワイヤを張った状態、(B)第1ワイヤを緩めた状態を示す概略構成図Schematic configuration diagram showing (A) a state in which the first wire of the saddle is stretched and (B) a state in which the first wire is loosened as shown in FIG. 本発明に係る橋梁点検装置をT桁橋に適用した例を示す図The figure which shows the example which applied the bridge inspection apparatus which concerns on this invention to a T girder bridge

以下、図面を参照して、本発明に係る橋梁点検装置10の実施形態について詳細に説明する。 Hereinafter, embodiments of the bridge inspection device 10 according to the present invention will be described in detail with reference to the drawings.

≪第1実施形態≫
まず、図1〜図15を参照して第1実施形態を説明する。図1は、橋梁1に取り付けられ、点検可能な状態とされた実施形態に係る橋梁点検装置10を示す側面図であり、横断面で示される橋梁1に橋梁点検装置10が取り付けられている。橋梁1は、略水平に延在する下床版2と、下床版2の橋軸直交方向の両端部から立ち上がる一対のウェブ3と、一対のウェブ3の上端に連結して略水平に延在する上床版4とから構成される鉄筋コンクリートからなる単一箱桁橋である。一対のウェブ3は、下床版2の左右の両端から上方に向けて開く向きに傾斜している。上床版4は、一対のウェブ3の上端同士を連結して下床版2と協働して箱形断面を形成する。また、上床版4は、ウェブ3のそれぞれから側方に張り出す左右の張出部5を有しており、これにより橋梁1の幅員を増大させている。張出部5の張り出し端には、上方に向けて突出する鉄筋コンクリートからなる高欄6が設けられている。
<< First Embodiment >>
First, the first embodiment will be described with reference to FIGS. 1 to 15. FIG. 1 is a side view showing the bridge inspection device 10 according to the embodiment which is attached to the bridge 1 and is in an inspectable state, and the bridge inspection device 10 is attached to the bridge 1 shown in the cross section. The bridge 1 extends substantially horizontally by being connected to the lower floor slab 2 extending substantially horizontally, a pair of webs 3 rising from both ends of the lower floor slab 2 in the direction orthogonal to the bridge axis, and the upper ends of the pair of webs 3. It is a single box girder bridge made of reinforced concrete composed of the existing upper floor slab 4. The pair of webs 3 are inclined so as to open upward from the left and right ends of the lower floor slab 2. The upper floor slab 4 connects the upper ends of the pair of webs 3 to each other and cooperates with the lower floor slab 2 to form a box-shaped cross section. Further, the upper floor slab 4 has left and right overhanging portions 5 protruding laterally from each of the webs 3, thereby increasing the width of the bridge 1. At the overhanging end of the overhanging portion 5, a balustrade 6 made of reinforced concrete projecting upward is provided.

張出部5は、片持ち支持されたウェブ3の上端部近傍で最も厚く、張り出し端側ほど薄くなるテーパ形状とされている。張出部5の下面は水平面に対して傾斜している。高欄6は、略鉛直に延在する外面と上方に向けて外方へ傾斜する内面とを有するテーパ形状とされている。本明細書では、水平面に対して45°以下の傾斜角をもって下方に向く面を橋梁1の下面とし、水平面に対して45°よりも大きな傾斜角をもって外側方に向く面を橋梁1の外側面とする。また、水平面に対して45°以下の傾斜角をもって上方に向く面を橋梁1の上面とし、水平面に対して45°よりも大きな傾斜角をもって内側方に向く面を橋梁1の内側面とする。従って、張出部5の下面及び下床版2の下面は橋梁1の下面であり、ウェブ3の外面及び高欄6の外面は橋梁1の外側面である。また、上床版4の上面及び高欄6の上面は橋梁1の上面であり、高欄6の内面は橋梁1の内側面である。 The overhanging portion 5 has a tapered shape that is thickest in the vicinity of the upper end portion of the cantilevered web 3 and becomes thinner toward the overhanging end side. The lower surface of the overhanging portion 5 is inclined with respect to the horizontal plane. The balustrade 6 has a tapered shape having an outer surface extending substantially vertically and an inner surface sloping outward toward the upper side. In the present specification, the surface facing downward with an inclination angle of 45 ° or less with respect to the horizontal plane is the lower surface of the bridge 1, and the surface facing outward with an inclination angle larger than 45 ° with respect to the horizontal plane is the outer surface of the bridge 1. And. Further, the surface facing upward with an inclination angle of 45 ° or less with respect to the horizontal plane is defined as the upper surface of the bridge 1, and the surface facing inward with an inclination angle larger than 45 ° with respect to the horizontal plane is defined as the inner surface of the bridge 1. Therefore, the lower surface of the overhanging portion 5 and the lower surface of the lower floor slab 2 are the lower surface of the bridge 1, and the outer surface of the web 3 and the outer surface of the balustrade 6 are the outer surfaces of the bridge 1. Further, the upper surface of the upper floor slab 4 and the upper surface of the balustrade 6 are the upper surfaces of the bridge 1, and the inner surface of the balustrade 6 is the inner surface of the bridge 1.

橋梁1の下面は、特別な足場等を用いないと人が目視で点検することができない。そこで、橋梁1の下面を撮影するために橋梁点検装置10が用いられる。以下、橋梁点検装置10について説明する。なお、橋梁点検装置10は、これを操作する操作者が上床版4上で操作するものであるため、橋梁1の外側方に向く操作者を基準として前後左右の方向を定める。図示の例では、橋梁点検装置10が橋梁1の右側に取り付けられており、橋梁1の右外方が橋梁点検装置10の前方となり、橋梁1の内方が橋梁点検装置10の後方となる。 The lower surface of the bridge 1 cannot be visually inspected by a person without using a special scaffolding or the like. Therefore, the bridge inspection device 10 is used to photograph the lower surface of the bridge 1. Hereinafter, the bridge inspection device 10 will be described. Since the bridge inspection device 10 is operated by the operator who operates the bridge inspection device 10 on the upper floor slab 4, the front-back and left-right directions are determined with reference to the operator facing the outside of the bridge 1. In the illustrated example, the bridge inspection device 10 is attached to the right side of the bridge 1, the outer right side of the bridge 1 is the front side of the bridge inspection device 10, and the inner side of the bridge 1 is the rear side of the bridge inspection device 10.

図2は、橋梁点検装置10の要部拡大図である。図1及び図2に示されるように、橋梁点検装置10は、高欄6に取り付けられる台車ユニット11を有している。台車ユニット11は、高欄6を前後方向(橋軸直角方向)に跨ぐように高欄6の上部に取り付けられる台車12と、台車12に取り付けられるアーム保持装置13とを有している。台車12は、高欄6の上方に前後方向に張り出すように設けられる車体上部14U及び車体上部14Uの前端から下方へ垂下する車体前部14Fを有するL字形状の車体本体14を有している。車体本体14の後部には、車体上部14Uから下方へ垂下する車体後部15が前後方向に移動可能且つ所望の位置で固定可能に取り付けられている。車体後部15は、車体前部14Fと協働して高欄6を前後から挟み込む。 FIG. 2 is an enlarged view of a main part of the bridge inspection device 10. As shown in FIGS. 1 and 2, the bridge inspection device 10 has a bogie unit 11 attached to the balustrade 6. The bogie unit 11 has a bogie 12 attached to the upper part of the bogie 6 so as to straddle the balustrade 6 in the front-rear direction (direction perpendicular to the bridge axis), and an arm holding device 13 attached to the bogie 12. The bogie 12 has an L-shaped vehicle body body 14 having a vehicle body upper portion 14U provided so as to project in the front-rear direction above the balustrade 6 and a vehicle body front portion 14F hanging downward from the front end of the vehicle body upper portion 14U. .. A rear portion 15 of the vehicle body, which hangs downward from the upper portion 14U of the vehicle body, is attached to the rear portion of the vehicle body body 14 so as to be movable in the front-rear direction and fixed at a desired position. The vehicle body rear portion 15 cooperates with the vehicle body front portion 14F to sandwich the balustrade 6 from the front and rear.

車体上部14Uには、前後に延びる回転軸を有し、高欄6の上面に転接する上車輪16が左右に離間する2ヶ所に取り付けられている。車体前部14Fには、鉛直に延びる回転軸を有し、高欄6の外面に転接する前車輪17が、上下に2段且つ各段において左右に2ヶ所の合計4ヶ所に取り付けられている。車体後部15には、鉛直に延びる回転軸を有し、高欄6の内面に転接する後車輪18が、左右に離間する2ヶ所に取り付けられている。後車輪18は、上段の前車輪17よりも若干低い位置に配置されている。以下、上車輪16、前車輪17及び後車輪18を総称して、車輪16〜18という。これらの車輪16〜18によって台車12は高欄6上を走行可能になっている。上車輪16は台車12に搭載された駆動源19によって駆動される駆動輪となっており、上車輪16が駆動されることにより、台車12は高欄6上を橋軸方向に自走する。なお、全ての車輪16〜18が高欄6に常時転接している必要はない。 The upper portion 14U of the vehicle body has a rotating shaft extending in the front-rear direction, and upper wheels 16 that are connected to the upper surface of the balustrade 6 are attached at two locations separated from each other to the left and right. The front portion 14F of the vehicle body has a rotating shaft extending vertically, and front wheels 17 that tangent to the outer surface of the balustrade 6 are attached to a total of four locations, two in the vertical direction and two in the left and right in each stage. The rear portion 15 of the vehicle body has a rotating shaft extending vertically, and rear wheels 18 that tangent to the inner surface of the balustrade 6 are attached at two locations separated from each other to the left and right. The rear wheel 18 is arranged at a position slightly lower than that of the upper front wheel 17. Hereinafter, the upper wheel 16, the front wheel 17, and the rear wheel 18 are collectively referred to as wheels 16-18. These wheels 16 to 18 allow the carriage 12 to travel on the balustrade 6. The upper wheel 16 is a drive wheel driven by a drive source 19 mounted on the bogie 12, and when the upper wheel 16 is driven, the bogie 12 self-propells on the balustrade 6 in the bridge axis direction. It is not necessary that all the wheels 16 to 18 are constantly transferred to the balustrade 6.

台車12は、これらの車輪16〜18によって左右方向(橋軸方向)に移動可能とされると共に、左右方向の所定の位置に固定されるように走行ブレーキ機構を備えている。走行ブレーキ機構は、台車12が手動である場合に、車輪16〜18の回転を阻止するブレーキ部材により構成されてもよく、台車12が電動である場合に、駆動輪の動力伝達機構に組み込まれた逆入力防止機構により構成されてもよい。或いは、高欄6に挟み込む力を加えるように当接する当接機構によって走行ブレーキ機構が構成されてもよい。 The carriage 12 is made movable in the left-right direction (bridge axis direction) by these wheels 16 to 18, and is provided with a traveling brake mechanism so as to be fixed at a predetermined position in the left-right direction. The traveling brake mechanism may be composed of a braking member that blocks the rotation of the wheels 16 to 18 when the bogie 12 is manual, and is incorporated in the power transmission mechanism of the drive wheels when the bogie 12 is electric. It may also be configured by a reverse input prevention mechanism. Alternatively, the traveling brake mechanism may be configured by an abutting mechanism that contacts the balustrade 6 so as to apply a sandwiching force.

車体上部14Uの上方には連結機構20が設けられている。連結機構20は、車体上部14Uに固定されたフレーム部21と、フレーム部21に前後方向に移動可能に支持されたスライダ部22とを有している。スライダ部22の後端にはアーム保持装置13を左右方向の軸線回りに回動可能且つ着脱可能に支持する枢支部23が形成されている。即ち、連結機構20は、ベース部31を橋軸方向の軸線回りに回動可能に台車12に連結すると共に、アーム保持装置13を橋軸直角方向にスライド可能且つ着脱可能に台車12に連結する。また、フレーム部21の前端には、フレーム部21から前方及び上方へ突出するように配置され、橋軸方向の回転軸を有するガイドローラー24が設けられている。ガイドローラー24の機能については後に説明する。 A connecting mechanism 20 is provided above the upper portion 14U of the vehicle body. The connecting mechanism 20 has a frame portion 21 fixed to the upper portion 14U of the vehicle body and a slider portion 22 movably supported by the frame portion 21 in the front-rear direction. At the rear end of the slider portion 22, a pivot portion 23 that rotatably and detachably supports the arm holding device 13 around the axis in the left-right direction is formed. That is, the connecting mechanism 20 connects the base portion 31 to the carriage 12 so as to be rotatable around the axis in the bridge axis direction, and connects the arm holding device 13 to the carriage 12 so as to be slidable and detachable in the direction perpendicular to the bridge axis. .. Further, at the front end of the frame portion 21, a guide roller 24 which is arranged so as to project forward and upward from the frame portion 21 and has a rotation axis in the bridge axis direction is provided. The function of the guide roller 24 will be described later.

アーム保持装置13は、台車12の上方で前後方向に延在するベース部31と、ベース部31の前端(橋軸直角方向の外端)に一体に設けられ、高欄6の外側に高欄6の側面に沿って鉛直に配置されるアームホルダ32とを有している。アーム保持装置13は、ベース部31の後端が連結機構20の枢支部23に左右方向の軸線回りに回動可能に取り付けられることによって連結機構20を介して台車12に連結される。 The arm holding device 13 is integrally provided at the front end (outer end in the direction perpendicular to the bridge axis) of the base portion 31 extending in the front-rear direction above the carriage 12 and the balustrade 6 outside the balustrade 6. It has an arm holder 32 that is arranged vertically along the side surface. The arm holding device 13 is connected to the carriage 12 via the connecting mechanism 20 by rotatably attaching the rear end of the base portion 31 to the pivot portion 23 of the connecting mechanism 20 around the axis in the left-right direction.

アームホルダ32は、鉛直アーム40を保持すると共に鉛直アーム40を回転させる電動回転機構33と、鉛直アーム40を昇降させる電動ウィンチ34とを備えている。これにより、アームホルダ32は、高欄6の外側に鉛直に配置される鉛直アーム40を昇降可能且つ鉛直軸線回りに回転可能に保持する。電動回転機構33は、鉛直アーム40を保持する保持部を回転させることによって鉛直アーム40を回転させる。電動ウィンチ34は、電動回転機構33が鉛直アーム40の保持を解除した状態で、鉛直アーム40の先端部に係止されたワイヤ35の巻き上げ及び送り出しを行うことによって鉛直アーム40を昇降させる。また、アームホルダ32には、電動回転機構33を上下に昇降させることで鉛直アーム40を昇降させるアーム昇降装置36が設けられている。アーム昇降装置36は、制御装置37により駆動制御され、後述する台車ユニット11の走行時に、ワイヤ35を介して電動ウィンチ34が鉛直アーム40を支持していない状態で、鉛直アーム40を保持した電動回転機構33をアームホルダ32の高さの範囲で昇降させる。即ち、アーム昇降装置36と制御装置37とにより、鉛直アーム40を昇降駆動するアーム駆動装置38(図5)が構成される。 The arm holder 32 includes an electric rotation mechanism 33 that holds the vertical arm 40 and rotates the vertical arm 40, and an electric winch 34 that raises and lowers the vertical arm 40. As a result, the arm holder 32 holds the vertical arm 40 vertically arranged on the outside of the balustrade 6 so as to be able to move up and down and rotatably around the vertical axis. The electric rotation mechanism 33 rotates the vertical arm 40 by rotating a holding portion that holds the vertical arm 40. The electric winch 34 raises and lowers the vertical arm 40 by winding up and feeding out the wire 35 locked to the tip of the vertical arm 40 in a state where the electric rotation mechanism 33 releases the holding of the vertical arm 40. Further, the arm holder 32 is provided with an arm lifting device 36 that raises and lowers the vertical arm 40 by raising and lowering the electric rotation mechanism 33 up and down. The arm elevating device 36 is driven and controlled by the control device 37, and holds the vertical arm 40 in a state where the electric winch 34 does not support the vertical arm 40 via the wire 35 when the carriage unit 11 described later is traveling. The rotation mechanism 33 is moved up and down within the height range of the arm holder 32. That is, the arm elevating device 36 and the control device 37 constitute an arm driving device 38 (FIG. 5) that elevates and drives the vertical arm 40.

図1に示されるように、鉛直アーム40は、アーム保持装置13により保持された状態で、下端が下床版2の下面よりも所定寸法(後述する束部42の高さ)以上下方に位置する長さに伸長するように構成されている。鉛直アーム40は、継ぎ足し式で伸長しても伸縮式で伸長してもよい。鉛直アーム40の、アーム保持装置13よりも下方の中間部には、鉛直アーム40の軸力(引張力)を検出する軸力センサ39が設けられている。軸力センサ39は、後述する第2滑車47よりも高い位置に設けられており、検出した鉛直アーム40の軸力を制御装置37に送出する。 As shown in FIG. 1, the lower end of the vertical arm 40 is positioned below a predetermined dimension (height of the bundle portion 42 described later) or more below the lower surface of the lower floor slab 2 while being held by the arm holding device 13. It is configured to extend to the desired length. The vertical arm 40 may be extended by a replenishment type or a telescopic type. An axial force sensor 39 for detecting the axial force (tensile force) of the vertical arm 40 is provided in the middle portion of the vertical arm 40 below the arm holding device 13. The axial force sensor 39 is provided at a position higher than the second pulley 47, which will be described later, and sends the detected axial force of the vertical arm 40 to the control device 37.

鉛直アーム40の下端には、橋軸直角方向に概ね水平に延在する水平アーム41が設けられている。水平アーム41は、その長手方向の中間部を左右方向(橋軸方向)の軸線回りに回動可能に鉛直アーム40に結合されている。鉛直アーム40は、水平アーム41の長手方向の中央よりも前方(橋軸直角方向外方)の位置で水平アーム41に結合している。つまり、水平アーム41における、鉛直アーム40との結合部に対して後方側(橋軸直角方向内方側)の第1部分41Aは、前方側(橋軸直角方向外方側)の第2部分41Bよりも長くなっている。 At the lower end of the vertical arm 40, a horizontal arm 41 extending substantially horizontally in the direction perpendicular to the bridge axis is provided. The horizontal arm 41 is coupled to the vertical arm 40 so that the intermediate portion in the longitudinal direction thereof can be rotated around the axis in the left-right direction (bridge axis direction). The vertical arm 40 is connected to the horizontal arm 41 at a position in front of the center in the longitudinal direction of the horizontal arm 41 (outside in the direction perpendicular to the bridge axis). That is, the first portion 41A of the horizontal arm 41 on the rear side (inward side in the direction perpendicular to the bridge axis) with respect to the joint portion with the vertical arm 40 is the second portion on the front side (outside side in the direction perpendicular to the bridge axis). It is longer than 41B.

水平アーム41の第1部分41Aは、橋梁1の下方に配置され、下床版2の下方に至る長さを有している。水平アーム41の第1部分41Aには、橋梁1を下方から点検するために橋梁1の下面を撮影する点検カメラ45が取り付けられている。点検カメラ45は、遠隔操作によって撮影方向(アングル)や撮影倍率の変更、撮像(シャッター操作)、或いは撮影開始や撮影停止を操作できるように構成されている。点検カメラ45は、水平アーム41の第1部分41Aを長手方向に移動可能に構成されていてもよい。 The first portion 41A of the horizontal arm 41 is arranged below the bridge 1 and has a length extending below the lower floor slab 2. An inspection camera 45 that photographs the lower surface of the bridge 1 in order to inspect the bridge 1 from below is attached to the first portion 41A of the horizontal arm 41. The inspection camera 45 is configured to be able to change the shooting direction (angle) and shooting magnification, capture images (shutter operation), or start or stop shooting by remote control. The inspection camera 45 may be configured so that the first portion 41A of the horizontal arm 41 can be moved in the longitudinal direction.

水平アーム41の第1部分41Aの長手方向の中間部には、上方へ突出する束部42が設けられている。束部42は、水平アーム41の第1部分41Aのうち、鉛直アーム40との結合部から後方へ第2部分41Bの長さよりも大きく離れた位置に固定されている。束部42の先端には橋軸直角方向に延びる回転軸を有するローラー43が取り付けられている。図1に示されるように橋梁点検装置10が点検可能に橋梁1に取り付けられた状態では、ローラー43は下床版2の下面に転接している。 A bundle portion 42 projecting upward is provided at an intermediate portion in the longitudinal direction of the first portion 41A of the horizontal arm 41. The bundle portion 42 is fixed at a position of the first portion 41A of the horizontal arm 41 that is farther rearward from the joint portion with the vertical arm 40 than the length of the second portion 41B. A roller 43 having a rotating shaft extending in the direction perpendicular to the bridge axis is attached to the tip of the bundle portion 42. As shown in FIG. 1, when the bridge inspection device 10 is attached to the bridge 1 so as to be inspectable, the roller 43 is in contact with the lower surface of the lower floor slab 2.

一方、水平アーム41の第2部分41Bは橋梁1の外方に配置されており、その先端には左右方向の回転軸を有する第1滑車46が取り付けられている。また、鉛直アーム40の水平アーム41との結合部よりも高い位置には第2滑車47が設けられている。第1滑車46には、その下方に配置されたカウンタウェイト48に一端を連結された第1吊り材49が巻き掛けられている。第1吊り材49は、カウンタウェイト48から、ガイド部として機能する第1滑車46及び第2滑車47をこの順に通った後、水平アーム41の第1部分41Aに亘って張設されている。より詳細には、第1吊り材49の他端は、水平アーム41における束部42が設けられた部分に連結されている。これにより、第1吊り材49は、カウンタウェイト48の荷重を上方斜め前方に向く力に変換して水平アーム41の第1部分41Aに作用させることで、第1部分41Aを上方に付勢する。 On the other hand, the second portion 41B of the horizontal arm 41 is arranged outside the bridge 1, and a first pulley 46 having a rotation axis in the left-right direction is attached to the tip thereof. Further, a second pulley 47 is provided at a position higher than the joint portion of the vertical arm 40 with the horizontal arm 41. A first suspension member 49 having one end connected to a counterweight 48 arranged below the first pulley 46 is wound around the first pulley 46. The first suspension member 49 is stretched from the counterweight 48 over the first portion 41A of the horizontal arm 41 after passing through the first pulley 46 and the second pulley 47 functioning as guide portions in this order. More specifically, the other end of the first suspension member 49 is connected to a portion of the horizontal arm 41 where the bundle portion 42 is provided. As a result, the first suspending member 49 converts the load of the counterweight 48 into a force directed diagonally upward and forward and acts on the first portion 41A of the horizontal arm 41 to urge the first portion 41A upward. ..

水平アーム41の第1部分41Aが第2部分41Bよりも長く、且つ第1部分41Aに点検カメラ45や束部42が設けられている。そのため、カウンタウェイト48が設けられていない場合には、水平アーム41は第1部分41Aが下方へ回動するようなバランス状態にある(重心が鉛直アーム40との結合部よりも後方にある)。本実施形態では、カウンタウェイト48の荷重が上方斜め前方に向く力となって水平アーム41の第1部分41Aに作用する。そして、水平アーム41が第1部分41Aを上方へ回動させるようなバランス状態になるように、第1滑車46の位置及びカウンタウェイト48の荷重が設定されている。 The first portion 41A of the horizontal arm 41 is longer than the second portion 41B, and the inspection camera 45 and the bundle portion 42 are provided in the first portion 41A. Therefore, when the counterweight 48 is not provided, the horizontal arm 41 is in a balanced state in which the first portion 41A rotates downward (the center of gravity is behind the joint with the vertical arm 40). .. In the present embodiment, the load of the counterweight 48 acts as a force that tends upward and diagonally forward and acts on the first portion 41A of the horizontal arm 41. The position of the first pulley 46 and the load of the counterweight 48 are set so that the horizontal arm 41 is in a balanced state so as to rotate the first portion 41A upward.

図3は、図1中のIII矢視図であり、橋梁点検装置10の下部(鉛直アーム40と水平アーム41との結合部周辺)の正面図を示している。図1及び図3に示されるように、第1滑車46は水平アーム41の軸線上に配置されている。一方、第2滑車47は、鉛直アーム40の橋軸方向の両側に左右対称に一対に設けられている。第1吊り材49は2本で1組とされ、第2滑車47のそれぞれに1本の第1吊り材49が巻き掛けられ、2本の第1吊り材49は共に第1滑車46に巻き掛けられている。 FIG. 3 is a view taken along the line III in FIG. 1, and shows a front view of the lower part of the bridge inspection device 10 (around the joint portion between the vertical arm 40 and the horizontal arm 41). As shown in FIGS. 1 and 3, the first pulley 46 is arranged on the axis of the horizontal arm 41. On the other hand, the second pulley 47 is provided symmetrically on both sides of the vertical arm 40 in the bridge axis direction in a pair. The first suspension member 49 is formed into a set of two, one first suspension member 49 is wound around each of the second pulleys 47, and both of the two first suspension members 49 are wound around the first pulley 46. It is hung.

一対の第2滑車47は共通の支持部材50によって軸支されている。共通の支持部材50は、鉛直アーム40の前面に鉛直に形成されたスリット40aを通って鉛直アーム40の内部に延びており、鉛直アーム40の内部に配置された図示しないケーブルによって上下動可能に懸吊されている。つまり、一対の第2滑車47は、共通の支持部材50がケーブルによって上下駆動されることにより、鉛直アーム40における高さ位置を変更可能な可動滑車として構成されている。第1滑車46及び第2滑車47は、第2滑車47が上下動した際に相対移動する第1吊り材49を案内するガイド部としても機能する。 The pair of second pulleys 47 are pivotally supported by a common support member 50. The common support member 50 extends inside the vertical arm 40 through a slit 40a formed vertically on the front surface of the vertical arm 40, and can be moved up and down by a cable (not shown) arranged inside the vertical arm 40. Suspended. That is, the pair of second pulleys 47 are configured as movable pulleys whose height position on the vertical arm 40 can be changed by driving the common support member 50 up and down by a cable. The first pulley 46 and the second pulley 47 also function as a guide portion for guiding the first suspension member 49 that moves relative to each other when the second pulley 47 moves up and down.

図1に示されるように、カウンタウェイト48が水平アーム41の第1部分41Aを上方に付勢する力は、第1吊り材49の張設角度に応じて変化する。即ち、第1吊り材49を伝わって水平アーム41の第1部分41Aに作用する力は、第1部分41Aを長手方向(長軸直角方向)に圧縮する分力と第1部分41Aを上方へ回動させる分力とに分かれる。そして、水平アーム41に対する第1吊り材49の角度が大きくなるほど、第1部分41Aを上方へ回動させる分力が大きくなることで、第1部分41Aの曲げモーメントが小さくなり、撓みも小さくなる。一方、軸力センサ39が設けられた位置の鉛直アーム40の軸力は、第1吊り材49の張設角度が変化しても、外力が加わらない限り変化しない。 As shown in FIG. 1, the force with which the counterweight 48 urges the first portion 41A of the horizontal arm 41 upward changes according to the tension angle of the first suspension member 49. That is, the force acting on the first portion 41A of the horizontal arm 41 transmitted through the first suspension member 49 is a component force that compresses the first portion 41A in the longitudinal direction (long axis perpendicular direction) and the first portion 41A upward. It is divided into a component force to rotate. Then, as the angle of the first suspending member 49 with respect to the horizontal arm 41 increases, the component force for rotating the first portion 41A upward increases, so that the bending moment of the first portion 41A decreases and the bending also decreases. .. On the other hand, the axial force of the vertical arm 40 at the position where the axial force sensor 39 is provided does not change even if the tensioning angle of the first suspension member 49 changes, unless an external force is applied.

図4は、図1中のIV部(鉛直アーム40と水平アーム41との結合部周辺)を示す拡大図であり、図4(A)は図1の状態を、図4(B)は、(A)から動作した状態を示している。図1及び図4(A)に示されるように、鉛直アーム40の下端部には、前方に延出し、水平アーム41が前方の第2部分41Bを上方へ移動させる向きに回動することを阻止する第1ストッパ部材51が固定されている。 FIG. 4 is an enlarged view showing the IV portion (around the joint portion between the vertical arm 40 and the horizontal arm 41) in FIG. 1, FIG. 4 (A) shows the state of FIG. 1, and FIG. 4 (B) shows the state of FIG. The operating state is shown from (A). As shown in FIGS. 1 and 4A, the lower end of the vertical arm 40 extends forward, and the horizontal arm 41 rotates in a direction to move the front second portion 41B upward. The first stopper member 51 to prevent is fixed.

鉛直アーム40の下端部には、水平アーム41の第1部分41Aに上方から当接する第2ストッパ部材52が水平アーム41の支持軸を中心として回動可能に設けられている。第2ストッパ部材52は、遠隔操作される図示しない駆動力源によって図4(A)に示す状態と図4(B)に示す状態とを取り得るように回動駆動される。図4(A)に示される状態では、第2ストッパ部材52が水平アーム41の第1部分41Aを押し下げ、水平アーム41の第2部分41Bが第1ストッパ部材51に当接している。この状態では、水平アーム41は鉛直アーム40に剛結合されて概ね水平に延在しており、水平アーム41の鉛直アーム40に対する回動が規制されている(以下、この状態を回動規制状態という)。 At the lower end of the vertical arm 40, a second stopper member 52 that comes into contact with the first portion 41A of the horizontal arm 41 from above is rotatably provided about a support shaft of the horizontal arm 41. The second stopper member 52 is rotationally driven by a remotely controlled driving force source (not shown) so as to be able to take the state shown in FIG. 4A and the state shown in FIG. 4B. In the state shown in FIG. 4A, the second stopper member 52 pushes down the first portion 41A of the horizontal arm 41, and the second portion 41B of the horizontal arm 41 is in contact with the first stopper member 51. In this state, the horizontal arm 41 is rigidly coupled to the vertical arm 40 and extends substantially horizontally, and the rotation of the horizontal arm 41 with respect to the vertical arm 40 is restricted (hereinafter, this state is a rotation restricted state). ).

図4(B)では、第2ストッパ部材52が水平アーム41との当接面52aを上方に移動させるように回動駆動されている。なお、水平アーム41は第1部分41Aを下方へ回動させるようなバランス状態にあるが、図4(B)では、束部42が下床版2の下面に当接していることによって水平アーム41の回動が阻止され、第2ストッパ部材52の当接面52aと水平アーム41の上面との間に隙間が形成されている。一方、束部42が下床版2の下面に当接していない場合には、水平アーム41は想像線で示す位置まで時計回りに回動し、第1部分41Aを第2ストッパ部材52に当接させる。そのような状態で第2ストッパ部材52が反時計回りに回動駆動されると、第2ストッパ部材52が第1部分41Aを押し下げることで水平アーム41は図4(A)に示される回動位置に駆動される。 In FIG. 4B, the second stopper member 52 is rotationally driven so as to move the contact surface 52a with the horizontal arm 41 upward. The horizontal arm 41 is in a balanced state so as to rotate the first portion 41A downward. However, in FIG. 4B, the horizontal arm 41 is in contact with the lower surface of the lower floor slab 2. The rotation of the 41 is prevented, and a gap is formed between the contact surface 52a of the second stopper member 52 and the upper surface of the horizontal arm 41. On the other hand, when the bundle portion 42 is not in contact with the lower surface of the lower floor slab 2, the horizontal arm 41 rotates clockwise to the position indicated by the imaginary line, and the first portion 41A hits the second stopper member 52. Get in touch. When the second stopper member 52 is rotationally driven counterclockwise in such a state, the second stopper member 52 pushes down the first portion 41A, so that the horizontal arm 41 rotates as shown in FIG. 4 (A). Driven to position.

即ち、図4(B)に示される状態では、水平アーム41の鉛直アーム40に対する回動が、第1ストッパ部材51に当接する回動角度(実線)と第2ストッパ部材52に当接する回動角度(想像線)との間の角度範囲で許容されている(以下、この状態を回動許容状態という)。言い換えれば、第1ストッパ部材51及び第2ストッパ部材52が、水平アーム41の鉛直アーム40に対する回動角度を所定の角度範囲に規制するストッパを構成している。そして、第2ストッパ部材52が、回動駆動されることによって回動規制状態と回動許容状態とを切り替える切替機構を構成している。 That is, in the state shown in FIG. 4B, the rotation of the horizontal arm 41 with respect to the vertical arm 40 is the rotation angle (solid line) that abuts on the first stopper member 51 and the rotation that abuts on the second stopper member 52. It is allowed in an angle range between the angle (imaginary line) (hereinafter, this state is referred to as a rotation allowed state). In other words, the first stopper member 51 and the second stopper member 52 constitute a stopper that regulates the rotation angle of the horizontal arm 41 with respect to the vertical arm 40 within a predetermined angle range. Then, the second stopper member 52 constitutes a switching mechanism for switching between a rotation restricting state and a rotation allowing state by being rotationally driven.

このように構成された橋梁点検装置10は、作業者が次のような典型的な操作を行うことによって橋梁1の点検を行う。 The bridge inspection device 10 configured in this way inspects the bridge 1 by the operator performing a typical operation as follows.

まず、作業者は、橋梁点検装置10を概ね図1に示されるような状態にセットする。具体的には、台車ユニット11が高欄6に取り付けられ、アーム保持装置13によって鉛直アーム40が保持され、鉛直アーム40の下端から水平アーム41が橋軸直角方向の両方に延びた状態にセットする。この状態では、橋梁点検装置10が第2ストッパ部材52によって水平アーム41の回動を規制された回動規制状態となっている。一方、第2滑車47が上側に配置されていることで、水平アーム41は第1部分41Aを上方へ回動させる比較的大きな力を第1吊り材49から受けている。また、この状態では、束部42のローラー43が橋梁1の下面に当接しない高さにとなるように、鉛直アーム40がアーム保持装置13によって保持されている。なお、水平アーム41の延在方向は、アーム保持装置13に備えられた電動回転機構33によってアームホルダ32を回転駆動することで調整可能である。 First, the operator sets the bridge inspection device 10 in a state as shown in FIG. Specifically, the bogie unit 11 is attached to the balustrade 6, the vertical arm 40 is held by the arm holding device 13, and the horizontal arm 41 is set so as to extend from the lower end of the vertical arm 40 in both directions perpendicular to the bridge axis. .. In this state, the bridge inspection device 10 is in a rotation-regulated state in which the rotation of the horizontal arm 41 is restricted by the second stopper member 52. On the other hand, since the second pulley 47 is arranged on the upper side, the horizontal arm 41 receives a relatively large force from the first suspension member 49 to rotate the first portion 41A upward. Further, in this state, the vertical arm 40 is held by the arm holding device 13 so that the roller 43 of the bundle portion 42 does not come into contact with the lower surface of the bridge 1. The extending direction of the horizontal arm 41 can be adjusted by rotationally driving the arm holder 32 by the electric rotation mechanism 33 provided in the arm holding device 13.

この状態から、作業者は当接面52aが上方に移動するように第2ストッパ部材52を回動駆動して、橋梁点検装置10を回動許容状態にする。すると、水平アーム41が第1部分41Aを上方へ移動させる向きに回動し、束部42のローラー43が橋梁1の下面に当接する。束部42(ローラー43)が橋梁1の下面に当接することにより、点検カメラ45の揺れは早期に収まる。点検カメラ45の揺れが収まった後、作業者は遠隔操作によって点検カメラ45による橋梁1の下方からの点検(撮影)を行う。 From this state, the operator rotationally drives the second stopper member 52 so that the contact surface 52a moves upward, and puts the bridge inspection device 10 in a rotation-allowed state. Then, the horizontal arm 41 rotates in the direction of moving the first portion 41A upward, and the roller 43 of the bundle portion 42 comes into contact with the lower surface of the bridge 1. When the bundle portion 42 (roller 43) comes into contact with the lower surface of the bridge 1, the shaking of the inspection camera 45 is settled at an early stage. After the shaking of the inspection camera 45 has subsided, the operator remotely inspects (photographs) the bridge 1 from below by the inspection camera 45.

1つの点検スパン(点検カメラ45が撮影可能な橋軸方向範囲)の点検が終わると、作業者は、そのままの状態で台車ユニット11を走行させて橋梁点検装置10を次の点検スパンに移動させる。この際、点検カメラ45が揺れることがあるが、水平アーム41は束部42(ローラー43)を橋梁1の下面に当接させており、束部42から点検カメラ45までの距離が短いため、揺れは早期に収束する。 When the inspection of one inspection span (the range in the bridge axis direction in which the inspection camera 45 can take a picture) is completed, the operator runs the bogie unit 11 as it is and moves the bridge inspection device 10 to the next inspection span. .. At this time, the inspection camera 45 may shake, but the horizontal arm 41 has the bundle portion 42 (roller 43) in contact with the lower surface of the bridge 1, and the distance from the bundle portion 42 to the inspection camera 45 is short. The shaking converges early.

或いは、1つの点検スパンの点検後、作業者は、第2ストッパ部材52を図4(A)に示される位置に駆動して橋梁点検装置10を回動規制状態にしてもよい。具体的には、作業者は、橋梁点検装置10を回動規制状態にした後、束部42が橋梁1の下面から離間するように水平アーム41を回動させた後に台車ユニット11を走行させて橋梁点検装置10を次の点検スパンに移動させてもよい。 Alternatively, after the inspection of one inspection span, the operator may drive the second stopper member 52 to the position shown in FIG. 4A to put the bridge inspection device 10 in the rotation restricted state. Specifically, the operator puts the bridge inspection device 10 in a rotation-restricted state, then rotates the horizontal arm 41 so that the bundle portion 42 is separated from the lower surface of the bridge 1, and then runs the carriage unit 11. The bridge inspection device 10 may be moved to the next inspection span.

このようにすると、台車ユニット11の走行時に束部42のローラー43が橋梁1の下面に転接していないため、ローラー43の移動距離が台車ユニット11の移動距離よりも短くなること、つまり水平アーム41の延在方向が水平面内でずれることが防止できる。 In this way, since the roller 43 of the bundle portion 42 is not transferred to the lower surface of the bridge 1 when the bogie unit 11 is traveling, the moving distance of the roller 43 is shorter than the moving distance of the bogie unit 11, that is, the horizontal arm. It is possible to prevent the extending direction of 41 from shifting in the horizontal plane.

一方、このようにすると、ローラー43を橋梁1に転接させたまま移動する場合に比べ、橋梁点検装置10の移動時に水平アーム41及び点検カメラ45が大きく揺れることがある。しかしながら、作業者が第2ストッパ部材52を操作して橋梁点検装置10を回動許容状態にすることで、水平アーム41が回動して束部42が橋梁1の下面に当接するため、水平アーム41及び点検カメラ45の揺れは早期に収束する。 On the other hand, in this way, the horizontal arm 41 and the inspection camera 45 may be shaken significantly when the bridge inspection device 10 is moved, as compared with the case where the roller 43 is moved while being transferred to the bridge 1. However, when the operator operates the second stopper member 52 to allow the bridge inspection device 10 to rotate, the horizontal arm 41 rotates and the bundle portion 42 comes into contact with the lower surface of the bridge 1, so that it is horizontal. The shaking of the arm 41 and the inspection camera 45 converges at an early stage.

台車ユニット11が高欄6を走行している時には高欄6から橋梁1の下面までの高さが変化することがある。水平アーム41の撓みによる上向きのばね力を加えて束部42のローラー43を橋梁1の下面に当接させた状態で台車ユニット11を走行させている時に、この高さが小さくなった場合、高さ変化が小さいうちは、水平アーム41の撓みが小さくなって鉛直アーム40の軸力(引張力)が小さくなり、高さ変化が大きくなると、束部42のローラー43が橋梁1の下面から離れて水平アーム41が揺れ易くなる。逆に、この高さが大きくなった場合には、水平アーム41の撓みが大きくなって鉛直アーム40の軸力が大きくなってしまう。 When the bogie unit 11 is traveling on the balustrade 6, the height from the balustrade 6 to the lower surface of the bridge 1 may change. When the bogie unit 11 is running with the roller 43 of the bundle portion 42 in contact with the lower surface of the bridge 1 by applying an upward spring force due to the bending of the horizontal arm 41, when this height becomes small. While the height change is small, the bending of the horizontal arm 41 is small, the axial force (tensile force) of the vertical arm 40 is small, and when the height change is large, the roller 43 of the bundle portion 42 is moved from the lower surface of the bridge 1. The horizontal arm 41 is easily shaken apart. On the contrary, when this height is increased, the bending of the horizontal arm 41 is increased and the axial force of the vertical arm 40 is increased.

そこで、制御装置37は、台車ユニット11の走行時に、ローラー43が橋梁1の下面に当接する所定の軸力範囲RPに軸力センサ39の値が収まるように、軸力センサ39の検出値が大きくなった時に台車ユニット11から水平アーム41の中間部までの長さを長くし、軸力センサ39の検出値が小さくなった時に台車ユニット11から水平アーム41の中間部までの長さを短くするように、鉛直アーム40を駆動する。以下、制御装置37について具体的に説明する。 Therefore, in the control device 37, the detection value of the axial force sensor 39 is set so that the value of the axial force sensor 39 falls within the predetermined axial force range RP in which the roller 43 abuts on the lower surface of the bridge 1 when the bogie unit 11 is traveling. When it becomes large, the length from the bogie unit 11 to the middle part of the horizontal arm 41 is lengthened, and when the detection value of the axial force sensor 39 becomes small, the length from the bogie unit 11 to the middle part of the horizontal arm 41 is shortened. The vertical arm 40 is driven so as to do so. Hereinafter, the control device 37 will be specifically described.

図5は、制御装置37の機能ブロック図である。制御装置37には、入力操作部60において作業者が行った操作の操作信号SIが入力インターフェース61を介して入力される。操作信号SIには、制御のオン・オフ信号の他、水平アーム41や点検カメラ45、カウンタウェイト48等の重量に応じて設定される設定荷重Psが含まれる。入力インターフェース61は、無線によるものであってもよく、有線によるものであってもよい。また、制御装置37の入力インターフェース61には、軸力センサ39が検出した鉛直アーム40の軸力Pが入力されると共に、台車ユニット11から、高欄6上を走行している(駆動源19が駆動輪を駆動している)ことを示す走行駆動信号Sdが入力される。 FIG. 5 is a functional block diagram of the control device 37. The operation signal SI of the operation performed by the operator in the input operation unit 60 is input to the control device 37 via the input interface 61. In addition to the control on / off signal, the operation signal SI includes a set load Ps set according to the weight of the horizontal arm 41, the inspection camera 45, the counter weight 48, and the like. The input interface 61 may be wireless or wired. Further, the axial force P of the vertical arm 40 detected by the axial force sensor 39 is input to the input interface 61 of the control device 37, and the trolley unit 11 travels on the balustrade 6 (the drive source 19 is running on the balustrade 6). A traveling drive signal Sd indicating that the drive wheels are being driven) is input.

入力インターフェース61を介して入力された設定荷重Psは、上下限値設定部62において、鉛直アーム40の上限軸力Pmax及び下限軸力Pminの演算に利用される。例えば、上下限値設定部62は、入力された設定荷重Psに対し、設定荷重Psに1.1を乗算することにより上限軸力Pmaxを算出し、設定荷重Psに0.9を乗算することにより下限軸力Pminを算出する。或いは、上下限値設定部62は、入力された設定荷重Psに対し、所定の許容軸力変化量を加算することにより上限軸力Pmaxを算出し、所定の許容軸力変化量を減算することにより下限軸力Pminを算出してもよい。即ち、上下限値設定部62は、上限軸力Pmax及び下限軸力Pminを算出することで、所定の軸力範囲RPを設定する。 The set load Ps input via the input interface 61 is used in the upper / lower limit value setting unit 62 for calculating the upper limit axial force Pmax and the lower limit axial force Pmin of the vertical arm 40. For example, the upper / lower limit value setting unit 62 calculates the upper limit axial force Pmax by multiplying the set load Ps by 1.1 with respect to the input set load Ps, and multiplies the set load Ps by 0.9. The lower limit axial force Pmin is calculated by. Alternatively, the upper / lower limit value setting unit 62 calculates the upper limit axial force Pmax by adding a predetermined allowable axial force change amount to the input set load Ps, and subtracts the predetermined allowable axial force change amount. The lower limit axial force Pmin may be calculated by That is, the upper / lower limit value setting unit 62 sets a predetermined axial force range RP by calculating the upper limit axial force Pmax and the lower limit axial force Pmin.

入力インターフェース61を介して入力された台車ユニット11の走行駆動信号Sdは、走行判定部63において、台車ユニット11が高欄6上を走行していることの判定に利用される。具体的は、走行判定部63は、走行方向に関わらず、駆動源19が駆動輪の駆動を開始した時に、台車ユニット11の走行開始を判定し、駆動源19が駆動輪の駆動を停止した時に、台車ユニット11の走行開始を判定する。走行判定部63は、台車ユニット11が走行を継続している間、走行信号Srを生成する。 The travel drive signal Sd of the bogie unit 11 input via the input interface 61 is used by the travel determination unit 63 to determine that the bogie unit 11 is traveling on the balustrade 6. Specifically, the travel determination unit 63 determines the start of travel of the bogie unit 11 when the drive source 19 starts driving the drive wheels regardless of the travel direction, and the drive source 19 stops driving the drive wheels. Occasionally, the start of travel of the bogie unit 11 is determined. The travel determination unit 63 generates a travel signal Sr while the bogie unit 11 continues traveling.

軸力差演算部64は、走行信号Srが生成されている時に、軸力センサ39からの軸力Pと所定の軸力範囲RPとに基づいて軸力差ΔPを算出する。具体的には、軸力差演算部64は、軸力Pが上限軸力Pmaxよりも大きい場合に、軸力Pから上限軸力Pmaxを減算して軸力差ΔPを算出し、軸力Pが下限軸力Pminよりも小さい場合に、軸力Pから下限軸力Pminを減算して負値の軸力差ΔPを算出する。 The axial force difference calculation unit 64 calculates the axial force difference ΔP based on the axial force P from the axial force sensor 39 and the predetermined axial force range RP when the traveling signal Sr is generated. Specifically, when the axial force P is larger than the upper limit axial force Pmax, the axial force difference calculation unit 64 calculates the axial force difference ΔP by subtracting the upper limit axial force Pmax from the axial force P, and calculates the axial force difference ΔP. Is smaller than the lower limit axial force Pmin, the lower limit axial force Pmin is subtracted from the axial force P to calculate the negative axial force difference ΔP.

軸力差演算部64において算出された軸力差ΔPは、昇降量演算部65において、鉛直アーム40の昇降量Dの演算に利用される。昇降量演算部65は、軸力差ΔPに基づいて、例えば軸力差ΔPに所定の係数を乗算することにより、昇降量Dを算出する。正の軸力差ΔPに基づいて算出される正の昇降量Dは鉛直アーム40を下降させるべき下降量を示し、負の軸力差ΔPに基づいて算出される負の昇降量Dは鉛直アーム40を上昇させるべき上昇量を示す。 The axial force difference ΔP calculated by the axial force difference calculation unit 64 is used by the elevating amount calculation unit 65 to calculate the elevating amount D of the vertical arm 40. The lifting amount calculation unit 65 calculates the lifting amount D based on the axial force difference ΔP, for example, by multiplying the axial force difference ΔP by a predetermined coefficient. The positive lifting amount D calculated based on the positive axial force difference ΔP indicates the lowering amount to lower the vertical arm 40, and the negative lifting amount D calculated based on the negative axial force difference ΔP is the vertical arm. Indicates the amount of increase in which 40 should be increased.

昇降量演算部65において算出された昇降量Dは、出力インターフェース66を介してアーム昇降装置36に向けて駆動信号Smとして出力される。即ち、制御装置37は、駆動信号Smが示す昇降量Dだけ鉛直アーム40を下降(昇降量Dが負の値の場合は上昇)させるようにアーム昇降装置36を駆動制御する。 The elevating amount D calculated by the elevating amount calculation unit 65 is output as a drive signal Sm toward the arm elevating device 36 via the output interface 66. That is, the control device 37 drives and controls the arm elevating device 36 so as to lower the vertical arm 40 by the elevating amount D indicated by the drive signal Sm (increase when the elevating amount D is a negative value).

図6は、制御装置37が上記のように鉛直アーム40を昇降させる鉛直アーム昇降制御のフローチャートを示している。制御装置37は、入力操作部60からオン信号が入力されることにより、図6に示される鉛直アーム昇降制御を開始する。以下、図6を参照して、制御装置37による鉛直アーム昇降制御の手順を説明する。 FIG. 6 shows a flowchart of vertical arm elevating control in which the control device 37 elevates and elevates the vertical arm 40 as described above. The control device 37 starts the vertical arm elevating control shown in FIG. 6 when an ON signal is input from the input operation unit 60. Hereinafter, the procedure of vertical arm elevating control by the control device 37 will be described with reference to FIG.

制御装置37は、入力操作部60からオン信号が入力されると、まず、設定荷重Psが入力されているか否かを判定する(ステップST1)。設定荷重Psは、入力操作部60から入力されて記憶されていた値であってもよく、新たに入力される値でもよい。設定荷重Psが入力されていない場合(ステップST1:No)、制御装置37は設定荷重Psが入力されるまでステップST1の処理を繰り返す。この際、ディスプレイや音声等によって操作者に設定荷重Psの入力を促す処理を制御装置37が行ってもよい。 When the ON signal is input from the input operation unit 60, the control device 37 first determines whether or not the set load Ps is input (step ST1). The set load Ps may be a value input and stored from the input operation unit 60, or may be a newly input value. When the set load Ps is not input (step ST1: No), the control device 37 repeats the process of step ST1 until the set load Ps is input. At this time, the control device 37 may perform a process of prompting the operator to input the set load Ps by a display, voice, or the like.

設定荷重Psが入力されている場合(ステップST1:No)、制御装置37は、設定荷重Psに基づいて、鉛直アーム40の上限軸力Pmax及び下限軸力Pminを算出する。即ち、所定の軸力範囲RPを設定する(ステップST2)。 When the set load Ps is input (step ST1: No), the control device 37 calculates the upper limit axial force Pmax and the lower limit axial force Pmin of the vertical arm 40 based on the set load Ps. That is, a predetermined axial force range RP is set (step ST2).

次に、制御装置37は、台車ユニット11が高欄6上の走行を開始したか否か、即ち走行信号Srが生成されているか否かを判定する(ステップST3)。台車ユニット11が走行を開始していない場合(ステップST3:No)、制御装置37は上記ステップST3の判定を繰り返す。台車ユニット11が走行を開始した場合(ステップST3:Yes)、制御装置37は、軸力センサ39が検出する軸力Pが、下限軸力Pmin以上且つ上限軸力Pmax以下であるか否か、即ち所定の軸力範囲RP内にあるか否かを判定する(ステップST4)。軸力Pが下限軸力Pmin以上且つ上限軸力Pmax以下である場合(ステップST4:Yes)、制御装置37は鉛直アーム40の昇降量Dを算出することなくステップST8の処理に進む。 Next, the control device 37 determines whether or not the bogie unit 11 has started traveling on the balustrade 6, that is, whether or not the traveling signal Sr is generated (step ST3). When the bogie unit 11 has not started traveling (step ST3: No), the control device 37 repeats the determination in step ST3. When the bogie unit 11 starts traveling (step ST3: Yes), the control device 37 determines whether or not the axial force P detected by the axial force sensor 39 is equal to or greater than the lower limit axial force Pmin and equal to or less than the upper limit axial force Pmax. That is, it is determined whether or not it is within the predetermined axial force range RP (step ST4). When the axial force P is equal to or greater than the lower limit axial force Pmin and equal to or less than the upper limit axial force Pmax (step ST4: Yes), the control device 37 proceeds to the process of step ST8 without calculating the lifting amount D of the vertical arm 40.

一方、ステップST4で軸力Pが下限軸力Pmin以上且つ上限軸力Pmax以下でないと判定された場合(No)、制御装置37は、軸力Pが下限軸力Pmin未満であるか否かを判定する(ステップST5)。軸力Pが下限軸力Pmin未満である場合(ステップST5:Yes)、制御装置37は鉛直アーム40の昇降量Dとして負の値である上昇量を算出して、鉛直アーム40を上昇させるようにアーム昇降装置36を駆動制御する(ステップST6)。他方、軸力Pが上限軸力Pmaxを超えている場合(ステップST5:No)、制御装置37は鉛直アーム40の昇降量Dとして正の値である下降量を算出して、鉛直アーム40を下降させるようにアーム昇降装置36を駆動制御する(ステップST7)。即ち、ステップST4で軸力Pが下限軸力Pmin以上且つ上限軸力Pmax以下でないと判定された場合(No)、制御装置37は、ローラー43が橋梁1の下面に当接する所定の軸力範囲RPに軸力センサ39の値が収まるように、軸力センサ39の検出値が大きくなった時に台車ユニット11から水平アーム41の中間部までの長さを長くし、軸力センサ39の検出値が小さくなった時に台車ユニット11から水平アーム41の中間部までの長さを短くするように、鉛直アーム40を駆動する。 On the other hand, when it is determined in step ST4 that the axial force P is not equal to or more than the lower limit axial force Pmin and not less than or equal to the upper limit axial force Pmax (No), the control device 37 determines whether or not the axial force P is less than the lower limit axial force Pmin. Judgment (step ST5). When the axial force P is less than the lower limit axial force Pmin (step ST5: Yes), the control device 37 calculates a negative value as the lifting amount D of the vertical arm 40 and raises the vertical arm 40. The arm lifting device 36 is driven and controlled (step ST6). On the other hand, when the axial force P exceeds the upper limit axial force Pmax (step ST5: No), the control device 37 calculates a lowering amount which is a positive value as the raising / lowering amount D of the vertical arm 40, and causes the vertical arm 40 to move. The arm elevating device 36 is driven and controlled so as to be lowered (step ST7). That is, when it is determined in step ST4 that the axial force P is not equal to or greater than the lower limit axial force Pmin and not less than or equal to the upper limit axial force Pmax (No), the control device 37 has a predetermined axial force range in which the roller 43 abuts on the lower surface of the bridge 1. When the detected value of the axial force sensor 39 becomes large, the length from the carriage unit 11 to the middle part of the horizontal arm 41 is lengthened so that the value of the axial force sensor 39 fits in the RP, and the detected value of the axial force sensor 39 is increased. The vertical arm 40 is driven so as to shorten the length from the carriage unit 11 to the intermediate portion of the horizontal arm 41 when the size becomes smaller.

その後、制御装置37は、台車ユニット11が高欄6上の走行を停止したか否かを判定する(ステップST8)。台車ユニット11が高欄6上の走行を停止していない場合(ステップST8:No)、制御装置37は上記ステップST4以降の手順を繰り返す。台車ユニット11が高欄6上の走行を停止した場合(ステップST8:Yes)、制御装置37は入力操作部60からオフ信号が入力されたか否かを判定する(ステップST9)。オフ信号が入力されていない場合(ステップST9:No)、制御装置37は上記ステップST3以降の手順を繰り返す。オフ信号が入力された場合(ステップST9:Yes)、制御装置37は鉛直アーム昇降制御を終了する。 After that, the control device 37 determines whether or not the bogie unit 11 has stopped traveling on the balustrade 6 (step ST8). When the bogie unit 11 has not stopped traveling on the balustrade 6 (step ST8: No), the control device 37 repeats the steps after step ST4. When the bogie unit 11 stops traveling on the balustrade 6 (step ST8: Yes), the control device 37 determines whether or not an off signal has been input from the input operation unit 60 (step ST9). When the off signal is not input (step ST9: No), the control device 37 repeats the steps after step ST3. When the off signal is input (step ST9: Yes), the control device 37 ends the vertical arm elevating control.

このように、台車ユニット11の走行時に高欄6から橋梁1の下面までの高さが変化しても、アーム駆動装置38は、ローラー43が橋梁1の下面に当接する所定の軸力範囲RP(Pmax〜Pmin)に軸力センサ39の値が収まるように鉛直アーム40を駆動するし、台車ユニット11から水平アーム41の中間部までの長さが変更されるため、鉛直アーム40の軸力変化が小さくなり、所定の値を超えて鉛直アーム40に軸力が加わることが防止されると共に、ローラー43が橋梁1の下面から離れることも防止される。 In this way, even if the height from the balustrade 6 to the lower surface of the bridge 1 changes while the bogie unit 11 is traveling, the arm drive device 38 has a predetermined axial force range RP (in which the roller 43 abuts on the lower surface of the bridge 1). The vertical arm 40 is driven so that the value of the axial force sensor 39 fits in (Pmax to Pmin), and the length from the bogie unit 11 to the middle portion of the horizontal arm 41 is changed, so that the axial force of the vertical arm 40 changes. Is reduced, axial force is prevented from being applied to the vertical arm 40 in excess of a predetermined value, and the roller 43 is also prevented from being separated from the lower surface of the bridge 1.

橋梁点検装置10の移動後、上記同様に点検カメラ45による橋梁1の下方からの点検を行う。以上の手順を繰り返すことにより、橋梁点検装置10による複数の点検スパンの点検を短時間で終わらせることができる。 After the bridge inspection device 10 is moved, the inspection camera 45 is used to inspect the bridge 1 from below in the same manner as described above. By repeating the above procedure, the inspection of the plurality of inspection spans by the bridge inspection device 10 can be completed in a short time.

このように構成され、このように操作される橋梁点検装置10によれば、次のような作用効果を得ることができる。 According to the bridge inspection device 10 configured in this way and operated in this way, the following effects can be obtained.

即ち、図1に示されるように、第2滑車47を上側に配置することで、鉛直アーム40によって回動可能に支持される水平アーム41がカウンタウェイト48によって付勢されて束部42のローラー43を橋梁1の下面に当接させる。これにより、鉛直アーム40や水平アーム41が高剛性に構成されていなくても、水平アーム41の第1部分41Aの揺れが抑制され、第1部分41Aに設けられた点検カメラ45の揺れも抑制される。そのため、点検カメラ45の揺れが収まる時間が短縮され、点検カメラ45による点検作業(撮影作業)を短時間に行うことができる。また、鉛直アーム40や水平アーム41を高剛性の構成にしなくても、束部42と第1吊り材49とによって点検カメラ45の揺れが抑制されるため、橋梁点検装置10の大型化及び重量化を抑制できる。 That is, as shown in FIG. 1, by arranging the second pulley 47 on the upper side, the horizontal arm 41 rotatably supported by the vertical arm 40 is urged by the counterweight 48 and the roller of the bundle portion 42. The 43 is brought into contact with the lower surface of the bridge 1. As a result, even if the vertical arm 40 and the horizontal arm 41 are not configured to have high rigidity, the shaking of the first portion 41A of the horizontal arm 41 is suppressed, and the shaking of the inspection camera 45 provided in the first portion 41A is also suppressed. Will be done. Therefore, the time for the inspection camera 45 to stop shaking is shortened, and the inspection work (shooting work) by the inspection camera 45 can be performed in a short time. Further, even if the vertical arm 40 and the horizontal arm 41 are not configured to have a high rigidity, the bundle portion 42 and the first suspension member 49 suppress the shaking of the inspection camera 45, so that the bridge inspection device 10 is increased in size and weight. It can suppress the change.

ここで、本実施形態に係る橋梁点検装置10の力学的有利性について詳細に説明する。 Here, the mechanical advantage of the bridge inspection device 10 according to the present embodiment will be described in detail.

図7(A)は、本発明に係る橋梁点検装置10の構造モデルを、図7(B)〜(E)は、比較例に係る点検装置の構造モデルをそれぞれ示している。図7(A)に示されるように、本発明に係る橋梁点検装置10は、鉛直アーム40の上端が固定され、鉛直アーム40の下端に水平アーム41がヒンジ結合され、水平アーム41の第1部分41Aの中間部に束部42が設けられ、水平アーム41の第1部分41Aの中間部に一端が固定された第1吊り材49が、鉛直アーム40の中間部に設けられた第2滑車47及び水平アーム41の第2部分41Bの先端に設けられた第1滑車46を経由してカウンタウェイト48を支持する第1構造を有している。 7 (A) shows a structural model of the bridge inspection device 10 according to the present invention, and FIGS. 7 (B) to 7 (E) show a structural model of the inspection device according to a comparative example. As shown in FIG. 7A, in the bridge inspection device 10 according to the present invention, the upper end of the vertical arm 40 is fixed, the horizontal arm 41 is hinged to the lower end of the vertical arm 40, and the first horizontal arm 41 is the first. A first suspension member 49 having a bundle portion 42 provided in the middle portion of the portion 41A and one end fixed to the intermediate portion of the first portion 41A of the horizontal arm 41 is provided in the middle portion of the vertical arm 40. It has a first structure that supports the counter weight 48 via the first pulley 46 provided at the tip of the second portion 41B of the 47 and the horizontal arm 41.

図7(B)に示される第2構造は、水平アーム41に束部42が設けられず、水平アーム41が鉛直アーム40に剛結合している点で第1構造と異なっている。図7(C)に示される第3構造は、第1吊り材49が設けられず、カウンタウェイト48が水平アーム41の第2部分41Bの先端に直接支持されている点で第1構造と異なっている。図7(D)に示される第4構造は、水平アーム41の第2部分41Bの長さが短くなっている点で第1構造と異なっている。図7(E)に示される第5構造は、鉛直アーム40に設けられる第2滑車47の位置が低くなっている点で第1構造と異なっている。 The second structure shown in FIG. 7B is different from the first structure in that the horizontal arm 41 is not provided with the bundle portion 42 and the horizontal arm 41 is rigidly coupled to the vertical arm 40. The third structure shown in FIG. 7C is different from the first structure in that the first suspension member 49 is not provided and the counterweight 48 is directly supported by the tip of the second portion 41B of the horizontal arm 41. ing. The fourth structure shown in FIG. 7D is different from the first structure in that the length of the second portion 41B of the horizontal arm 41 is shortened. The fifth structure shown in FIG. 7 (E) is different from the first structure in that the position of the second pulley 47 provided on the vertical arm 40 is lowered.

これらのモデルについて、鉛直アーム40及び水平アーム41の構造(断面積や断面二次モーメント、単位重量等)を同一にして、水平アーム41の曲げモーメントと、鉛直アーム40及び水平アーム41の変位とをそれぞれ計算した。なお、第1構造では、鉛直アーム40と水平アーム41との結合点(以下、アーム結合点という。)から束部42及び第1吊り材49の結合部までの距離を3m、第2滑車47までの距離を3.5m、第1滑車46までの距離を2.91mとした。第4構造では、アーム結合点から第1滑車46までの距離を0.97mとし、第5構造では、アーム結合点から第2滑車47までの距離を0.875mとした。 For these models, the structures of the vertical arm 40 and the horizontal arm 41 (cross-sectional area, moment of inertia of area, unit weight, etc.) are made the same, and the bending moment of the horizontal arm 41 and the displacement of the vertical arm 40 and the horizontal arm 41 are Was calculated respectively. In the first structure, the distance from the joint point between the vertical arm 40 and the horizontal arm 41 (hereinafter referred to as the arm joint point) to the joint portion between the bundle portion 42 and the first suspension member 49 is 3 m, and the second pulley 47. The distance to the first pulley 46 was set to 3.5 m, and the distance to the first pulley 46 was set to 2.91 m. In the fourth structure, the distance from the arm coupling point to the first pulley 46 was 0.97 m, and in the fifth structure, the distance from the arm coupling point to the second pulley 47 was 0.875 m.

図8(A)は、本発明に係る第1構造の(1)曲げモーメントを上段に、(2)変位を下段に示し、図8(B)は、比較例に係る第2構造の(1)曲げモーメントを上段に、(2)変位を下段に示している。カウンタウェイト48の重量は、(A)に示す第1構造の束部42に圧縮軸力が生じるよう、0.2kNに設定した。この時の束部42の軸力は0.01kNである。カウンタウェイト48の重量は、(B)の第2構造においても同じ値(0.2kN)に設定した。 FIG. 8 (A) shows the (1) bending moment of the first structure according to the present invention in the upper row, (2) the displacement in the lower row, and FIG. 8 (B) shows the second structure (1) according to the comparative example. ) Bending moment is shown in the upper row, and (2) Displacement is shown in the lower row. The weight of the counterweight 48 was set to 0.2 kN so that a compression axial force was generated in the bundle portion 42 of the first structure shown in (A). The axial force of the bundle portion 42 at this time is 0.01 kN. The weight of the counterweight 48 was set to the same value (0.2 kN) in the second structure (B).

図8(A)の第1構造では、水平アーム41が鉛直アーム40にヒンジ結合されているため、鉛直アーム40に変位は生じず、束部42が水平アーム41をバランスさせている。一方、(B)の第2構造では、束部42がないことから、水平アーム41はバランスせず、鉛直アーム40に変位が生じている。曲げモーメントは、第1吊り材49が連結された点において第1構造及び第2構造共に−0.18kN・mであり、アーム結合点においては、第1構造では−0.31kN・mであり、第2構造では−0.26kN・mである。本発明に係る第1構造では、アーム結合点の曲げモーメント(の絶対値)は第2構造に比べて若干大きくなるが、束部42が橋梁1の下面に当接するため、水平アーム41を揺れ難くすることができる。なお、アーム結合点においる曲げモーメントは、第2構造においてカウンタウェイト48を設けない場合(図示しない)の−0.72kN・mに比べれば、第1構造であっても36%低減する。 In the first structure of FIG. 8A, since the horizontal arm 41 is hinged to the vertical arm 40, no displacement occurs in the vertical arm 40, and the bundle portion 42 balances the horizontal arm 41. On the other hand, in the second structure (B), since the bundle portion 42 is not provided, the horizontal arm 41 is not balanced and the vertical arm 40 is displaced. The bending moment is −0.18 kN · m for both the first structure and the second structure at the point where the first suspension member 49 is connected, and −0.31 kN · m for the first structure at the arm coupling point. In the second structure, it is −0.26 kN · m. In the first structure according to the present invention, the bending moment (absolute value) of the arm coupling point is slightly larger than that of the second structure, but the bundle portion 42 abuts on the lower surface of the bridge 1, so that the horizontal arm 41 swings. It can be difficult. The bending moment at the arm coupling point is reduced by 36% even in the first structure, as compared with −0.72 kN · m when the counterweight 48 is not provided in the second structure (not shown).

図9(A)は、本発明に係る第1構造の(1)曲げモーメントを上段に、(2)変位を下段に示し、図9(C)は、比較例に係る第3構造の(1)曲げモーメントを上段に、(2)変位を下段に示している。カウンタウェイト48の重量は、(A)の第1構造では、図8の比較例と同じ0.2kNであり、(C)の第3構造においても同じ値(0.2kN)に設定した。 9 (A) shows the (1) bending moment of the first structure according to the present invention in the upper row, (2) the displacement in the lower row, and FIG. 9 (C) shows (1) of the third structure according to the comparative example. ) Bending moment is shown in the upper row, and (2) Displacement is shown in the lower row. The weight of the counterweight 48 was set to 0.2 kN in the first structure of (A), which is the same as in the comparative example of FIG. 8, and to the same value (0.2 kN) in the third structure of (C).

図9(C)の第3構造においても、束部42には(A)と同じ0.01kNの圧縮軸力が生じるが、第1吊り材49が設けられていないことから、アーム結合点と第1滑車46との間の曲げモーメントが非常に大きくなる。即ち、第1構造のように傾斜配置した第1吊り材49によりカウンタウェイト48を支持することで、アーム結合点と第1滑車46との間の曲げモーメントを非常に小さくできることがわかる。 Also in the third structure of FIG. 9 (C), the same compressive axial force of 0.01 kN as in (A) is generated in the bundle portion 42, but since the first suspension member 49 is not provided, it is a joint point with the arm. The bending moment with the first pulley 46 becomes very large. That is, it can be seen that the bending moment between the arm coupling point and the first pulley 46 can be made very small by supporting the counterweight 48 by the first suspension member 49 which is inclinedly arranged as in the first structure.

図10(A)は、本発明に係る第1構造の(1)曲げモーメントを上段に、(2)変位を下段に示し、図10(D)は、比較例に係る第4構造の(1)曲げモーメントを上段に、(2)変位を下段に示し、図10(E)は、比較例に係る第5構造の(1)曲げモーメントを上段に、(2)変位を下段に示している。カウンタウェイト48の重量は、(A)の第1構造では、図8及び図9の比較例と同じ0.2kNである。 FIG. 10 (A) shows the (1) bending moment of the first structure according to the present invention in the upper row, (2) the displacement in the lower row, and FIG. 10 (D) shows the fourth structure (1) according to the comparative example. ) Bending moment is shown in the upper row, (2) Displacement is shown in the lower row, and FIG. 10 (E) shows (1) bending moment in the upper row and (2) displacement in the lower row in the fifth structure according to the comparative example. .. In the first structure of (A), the weight of the counterweight 48 is 0.2 kN, which is the same as the comparative example of FIGS. 8 and 9.

図10(D)の第4構造では、(A)に比べ、アーム結合点と第1滑車46との間の曲げモーメントが小さくなっている。但しこれは、(D)の第4構造において束部42に(A)と同じ0.01kNの圧縮軸力が生じるようにするために、カウンタウェイト48の重量を0.586kNに設定したことに起因する。即ち、水平アーム41の第2部分41Bの長さを短くするほど、カウンタウェイト48を重くしなければならない。 In the fourth structure of FIG. 10 (D), the bending moment between the arm coupling point and the first pulley 46 is smaller than that of (A). However, this is because the weight of the counterweight 48 is set to 0.586 kN in order to generate the same compression axial force of 0.01 kN as in (A) in the bundle portion 42 in the fourth structure of (D). to cause. That is, the shorter the length of the second portion 41B of the horizontal arm 41, the heavier the counterweight 48 must be.

図10(E)の第5構造では、カウンタウェイト48の重量を0.234kNに設定している。この時の束部42の軸力は0.03kN(圧縮)である。(E)の第5構造では、第1吊り材49の傾斜角度が小さいため、水平アーム41の右端の変位が大きく、且つアーム結合点と第1滑車46との間の曲げモーメントが大きくなっている。即ち、アーム結合点から第2滑車47までの距離が短いと、水平アーム41に高い曲げ剛性を持たせなければならない。 In the fifth structure of FIG. 10 (E), the weight of the counterweight 48 is set to 0.234 kN. The axial force of the bundle portion 42 at this time is 0.03 kN (compression). In the fifth structure of (E), since the inclination angle of the first suspension member 49 is small, the displacement of the right end of the horizontal arm 41 is large, and the bending moment between the arm coupling point and the first pulley 46 is large. There is. That is, if the distance from the arm coupling point to the second pulley 47 is short, the horizontal arm 41 must have high flexural rigidity.

以上のことから、鉛直アーム40の下端部に水平アーム41を回動可能に設け、カウンタウェイト48を支持する第1吊り材49を、第1滑車46及び第2滑車47を通して水平アーム41の第1部分41Aを上方に付勢し、束部42を橋梁1の下面に当接させることにより、高剛性の構成にしなくても、水平アーム41の揺れを抑制できることがわかる。なお、カウンタウェイト48を軽くするためには、第1滑車46をアーム結合部からできるだけ離れた位置に配置するのが好ましく、水平アーム41に求められる剛性を低くするためには、第2滑車47をアーム結合部からできるだけ離れた高い位置に配置するのが好ましい。 From the above, the horizontal arm 41 is rotatably provided at the lower end of the vertical arm 40, and the first suspension member 49 that supports the counterweight 48 is passed through the first pulley 46 and the second pulley 47 to the first horizontal arm 41. It can be seen that by urging the one portion 41A upward and bringing the bundle portion 42 into contact with the lower surface of the bridge 1, the swing of the horizontal arm 41 can be suppressed without having a highly rigid configuration. In addition, in order to make the counterweight 48 lighter, it is preferable to arrange the first pulley 46 at a position as far as possible from the arm joint portion, and in order to reduce the rigidity required for the horizontal arm 41, the second pulley 47 Is preferably placed at a high position as far as possible from the arm coupling portion.

続けて、橋梁点検装置10の作用効果を説明する。図4に示されるように、第2ストッパ部材52は、水平アーム41の鉛直アーム40に対する回動を許容する回動許容状態と、水平アーム41の鉛直アーム40に対する回動を規制する回動規制状態とを切り替える切替機構として機能する。そのため、第2ストッパ部材52の操作により、点検を行う時には橋梁点検装置10を回動許容状態にし、橋梁点検装置10の高欄6への取付時や高欄6からの撤去時、移動時等に橋梁点検装置10を回動規制状態にすることができるため、取り扱いが容易である。 Subsequently, the operation and effect of the bridge inspection device 10 will be described. As shown in FIG. 4, the second stopper member 52 is in a rotation-allowed state that allows the horizontal arm 41 to rotate with respect to the vertical arm 40, and a rotation regulation that regulates the rotation of the horizontal arm 41 with respect to the vertical arm 40. It functions as a switching mechanism to switch between states. Therefore, by operating the second stopper member 52, the bridge inspection device 10 is placed in a rotation-allowable state when performing inspection, and the bridge is attached to the balustrade 6 of the bridge inspection device 10, removed from the balustrade 6, moved, and the like. Since the inspection device 10 can be put into the rotation restricted state, it is easy to handle.

図1及び図4に示されるように、第1ストッパ部材51及び第2ストッパ部材52は、水平アーム41の鉛直アーム40に対する回動角度を所定の角度範囲に規制するストッパとして機能する。そのため、水平アーム41が所定の回動角度を超えて鉛直アーム40に対して傾斜することがなく、橋梁1の点検部等が操作ミスによって損傷することが抑制される。 As shown in FIGS. 1 and 4, the first stopper member 51 and the second stopper member 52 function as stoppers that regulate the rotation angle of the horizontal arm 41 with respect to the vertical arm 40 within a predetermined angle range. Therefore, the horizontal arm 41 does not incline with respect to the vertical arm 40 beyond a predetermined rotation angle, and the inspection portion of the bridge 1 and the like are prevented from being damaged due to an operation error.

図1に示されるように、束部42は橋梁1の下面に転接するローラー43を上端に有している。そのため、束部42を橋梁1の下面に当接させたまま、鉛直アーム40を鉛直軸線回りに回動させて点検カメラ45を移動させることや、台車ユニット11を走行させて橋梁点検装置10を移動することができる。 As shown in FIG. 1, the bundle portion 42 has a roller 43 at the upper end that tangents to the lower surface of the bridge 1. Therefore, while the bundle portion 42 is in contact with the lower surface of the bridge 1, the vertical arm 40 is rotated around the vertical axis to move the inspection camera 45, or the carriage unit 11 is run to move the bridge inspection device 10. You can move.

鉛直アーム40には、その引張軸力を検出する軸力センサ39が設けられている。アーム駆動装置38の制御装置37は、図6に示されるように、台車ユニット11の走行時に(ステップST3:Yes)、軸力センサ39の検出値が大きくなった時に(ステップST5:No)台車ユニット11から水平アーム41の中間部までの長さを長くし(ステップST7)、軸力センサ39の検出値が小さくなった時に(ステップST5:Yes)台車ユニット11から水平アーム41の中間部までの長さを短くする(ステップST6)ように、鉛直アーム40を駆動するアーム昇降装置36を制御する。そのため、台車ユニット11の走行時に高欄6から橋梁1の下面までの高さが変化しても、台車ユニット11から水平アーム41の中間部までの長さが変更されるため、鉛直アーム40の軸力変化を小さくすることができる。 The vertical arm 40 is provided with an axial force sensor 39 for detecting the tensile axial force. As shown in FIG. 6, the control device 37 of the arm drive device 38 is a bogie when the detection value of the axial force sensor 39 becomes large (step ST5: No) when the bogie unit 11 is traveling (step ST3: Yes). When the length from the unit 11 to the middle part of the horizontal arm 41 is increased (step ST7) and the detected value of the axial force sensor 39 becomes small (step ST5: Yes), from the bogie unit 11 to the middle part of the horizontal arm 41. The arm elevating device 36 that drives the vertical arm 40 is controlled so as to shorten the length of the vertical arm 40 (step ST6). Therefore, even if the height from the balustrade 6 to the lower surface of the bridge 1 changes during the traveling of the bogie unit 11, the length from the bogie unit 11 to the intermediate portion of the horizontal arm 41 is changed, so that the shaft of the vertical arm 40 is changed. The force change can be reduced.

また、アーム駆動装置38は、ローラー43が橋梁1の下面に当接する所定の軸力範囲RPに軸力センサ39の値が収まるように鉛直アーム40を駆動する(ステップST4〜ステップST7)。そのため、所定の値を超えて鉛直アーム40に軸力が加わることを防止できると共に、ローラー43が橋梁1の下面から離れることも防止できる。 Further, the arm driving device 38 drives the vertical arm 40 so that the value of the axial force sensor 39 falls within the predetermined axial force range RP in which the roller 43 abuts on the lower surface of the bridge 1 (steps ST4 to ST7). Therefore, it is possible to prevent an axial force from being applied to the vertical arm 40 in excess of a predetermined value, and it is also possible to prevent the roller 43 from being separated from the lower surface of the bridge 1.

図1に示されるように、アーム昇降装置36と制御装置37とにより構成されるアーム駆動装置38(図5)が台車ユニット11に設けられて鉛直アーム40を昇降可能に支持する。そのため、台車ユニット11により支持される鉛直アーム40以下の点検ユニット部の重量増大を防止できる。 As shown in FIG. 1, an arm driving device 38 (FIG. 5) including an arm lifting device 36 and a control device 37 is provided on the bogie unit 11 to support the vertical arm 40 so as to be liftable. Therefore, it is possible to prevent an increase in the weight of the inspection unit portion of the vertical arm 40 or less supported by the bogie unit 11.

第1吊り材49は、水平アーム41における束部42が設けられた部分に連結されている。そのため、水平アーム41の第1部分41Aを持ち上げる力が束部42に直接的に作用することにより、水平アーム41の曲げモーメントが抑制される。 The first suspension member 49 is connected to a portion of the horizontal arm 41 where the bundle portion 42 is provided. Therefore, the force for lifting the first portion 41A of the horizontal arm 41 acts directly on the bundle portion 42, so that the bending moment of the horizontal arm 41 is suppressed.

水平アーム41の第2部分41Bに設けられた第1吊り材49のガイド部及び鉛直アーム40の水平アーム41との結合部よりも高い位置に設けられた第1吊り材49のガイド部は、第1滑車46及び第2滑車47によって構成されている。そのため、カウンタウェイト48の荷重が第1吊り材49を介して確実に水平アーム41の第1部分41Aに伝達される。これにより、カウンタウェイト48の重量増大を抑制できる。 The guide portion of the first suspension member 49 provided in the second portion 41B of the horizontal arm 41 and the guide portion of the first suspension member 49 provided at a position higher than the joint portion of the vertical arm 40 with the horizontal arm 41 are It is composed of a first pulley 46 and a second pulley 47. Therefore, the load of the counterweight 48 is reliably transmitted to the first portion 41A of the horizontal arm 41 via the first suspension member 49. As a result, the weight increase of the counterweight 48 can be suppressed.

図1及び図2に示されるように、鉛直アーム40の水平アーム41との結合部よりも高い位置に設けられた第1吊り材49のガイド部をなす第2滑車47は、鉛直アーム40に上下動可能に設けられた可動滑車である。そのため、水平アーム41の第1部分41Aに作用する上向きの分力の大きさを適宜変更できる。或いは、橋梁1の断面形状や橋梁点検装置10の取付状況に応じて第2滑車47の位置を適宜変更できる。 As shown in FIGS. 1 and 2, the second pulley 47 forming the guide portion of the first suspension member 49 provided at a position higher than the joint portion of the vertical arm 40 with the horizontal arm 41 is attached to the vertical arm 40. It is a movable pulley that can be moved up and down. Therefore, the magnitude of the upward component force acting on the first portion 41A of the horizontal arm 41 can be appropriately changed. Alternatively, the position of the second pulley 47 can be appropriately changed according to the cross-sectional shape of the bridge 1 and the mounting condition of the bridge inspection device 10.

第2滑車47が鉛直アーム40の橋軸方向の両側に設けられ、第1吊り材49は、鉛直アーム40の橋軸方向の両側に設けられて対応する側の第2滑車47に案内される。そのため、鉛直アーム40にねじりの力が作用することが抑制される。従って、鉛直アーム40を高剛性にしなくてよい。 The second pulleys 47 are provided on both sides of the vertical arm 40 in the bridge axis direction, and the first suspension members 49 are provided on both sides of the vertical arm 40 in the bridge axis direction and are guided by the second pulley 47 on the corresponding side. .. Therefore, the torsional force acting on the vertical arm 40 is suppressed. Therefore, the vertical arm 40 does not have to be highly rigid.

次に、図11〜図15を参照して、橋梁点検装置10の高欄6への取付手順を説明する。なお、図12〜図14では、鉛直アーム40や水平アーム41に取り付けられている束部42や点検カメラ45、第1滑車46、第2滑車47、カウンタウェイト48、支持部材50、第1ストッパ部材51、第2ストッパ部材52を省略し、橋梁点検装置10を簡略化して示す。 Next, the procedure for attaching the bridge inspection device 10 to the balustrade 6 will be described with reference to FIGS. 11 to 15. In addition, in FIGS. 12 to 14, the bundle portion 42 attached to the vertical arm 40 and the horizontal arm 41, the inspection camera 45, the first pulley 46, the second pulley 47, the counterweight 48, the support member 50, and the first stopper. The bridge inspection device 10 is shown in a simplified manner by omitting the member 51 and the second stopper member 52.

図11に示されるように、作業者は、連結機構20が一体に取り付けられた台車12を高欄6にセットする。この際、車体後部15を車体本体14に対して前方へスライドさせ、前車輪17と後車輪18とによって高欄6を前後から挟み込み、がたつきが生じないようにする。 As shown in FIG. 11, the operator sets the carriage 12 to which the connecting mechanism 20 is integrally attached in the balustrade 6. At this time, the rear portion 15 of the vehicle body is slid forward with respect to the vehicle body body 14, and the balustrade 6 is sandwiched between the front wheels 17 and the rear wheels 18 from the front and rear to prevent rattling.

次に、作業者は、図12に示されるように、連結機構20のスライダ部22を後方に引き出し、アーム保持装置13のベース部31の後端をスライダ部22の枢支部23に連結する。これにより、アーム保持装置13が連結機構20を介して台車12に装着される。この状態では、アーム保持装置13は、アームホルダ32を台車12の上方で斜めに配置した着脱用の姿勢をとっている。また、この状態では、アームホルダ32の下端後部がガイドローラー24の後方で連結機構20の前部の上に載置されており、アーム保持装置13の前方への移動がガイドローラー24によって規制されている。 Next, as shown in FIG. 12, the operator pulls out the slider portion 22 of the connecting mechanism 20 rearward, and connects the rear end of the base portion 31 of the arm holding device 13 to the pivot portion 23 of the slider portion 22. As a result, the arm holding device 13 is attached to the carriage 12 via the connecting mechanism 20. In this state, the arm holding device 13 is in a detachable posture in which the arm holder 32 is diagonally arranged above the carriage 12. Further, in this state, the lower end rear portion of the arm holder 32 is placed behind the guide roller 24 on the front portion of the connecting mechanism 20, and the forward movement of the arm holding device 13 is restricted by the guide roller 24. ing.

なお、アーム保持装置13には短縮された鉛直アーム40が保持され、鉛直アーム40の下端には水平アーム41が橋軸方向に延在する向きに連結されている。また、橋梁点検装置10は、第2ストッパ部材52(図4)が水平アーム41を鉛直アーム40に剛結合する図4(A)に示される回動規制状態とされている。 A shortened vertical arm 40 is held by the arm holding device 13, and a horizontal arm 41 is connected to the lower end of the vertical arm 40 in a direction extending in the bridge axis direction. Further, the bridge inspection device 10 is in the rotation restricted state shown in FIG. 4 (A) in which the second stopper member 52 (FIG. 4) rigidly connects the horizontal arm 41 to the vertical arm 40.

図13に示されるように、作業者は、連結機構20のスライダ部22を前方へ若干量移動させ、アームホルダ32の下端後部を、ガイドローラー24を乗り越えるように前方移動させることで、アーム保持装置13の前方への移動規制を解除する。この際、ガイドローラー24は、これを乗り越えるアームホルダ32の下面に転接していた状態から、転接位置をアームホルダ32の後面に変化させ、それ以降も続けてアームホルダ32をガイドする。 As shown in FIG. 13, the operator moves the slider portion 22 of the connecting mechanism 20 forward by a small amount, and moves the lower end rear portion of the arm holder 32 forward so as to get over the guide roller 24 to hold the arm. The restriction on the forward movement of the device 13 is lifted. At this time, the guide roller 24 changes the transition position from the state of being in contact with the lower surface of the arm holder 32 overcoming this to the rear surface of the arm holder 32, and continues to guide the arm holder 32 thereafter.

作業者は、続けて連結機構20のスライダ部22を前方へ移動させることで、アーム保持装置13を図14に示される姿勢まで姿勢変化させる。この状態では、アーム保持装置13は、アームホルダ32を橋梁1の高欄6の外側で鉛直に配置した点検用の姿勢をとっている。つまり、アーム保持装置13は、連結機構20によって点検用の姿勢と着脱用の姿勢との間で姿勢変更可能に台車12に連結されている。その後、作業者は、アームホルダ32に電動ウィンチ34を取り付け、ワイヤ35(図1)を鉛直アーム40の下端に連結する。 The operator continuously moves the slider portion 22 of the connecting mechanism 20 forward to change the posture of the arm holding device 13 to the posture shown in FIG. In this state, the arm holding device 13 is in an inspection posture in which the arm holder 32 is vertically arranged outside the balustrade 6 of the bridge 1. That is, the arm holding device 13 is connected to the carriage 12 by the connecting mechanism 20 so that the posture can be changed between the inspection posture and the attachment / detachment posture. After that, the operator attaches the electric winch 34 to the arm holder 32 and connects the wire 35 (FIG. 1) to the lower end of the vertical arm 40.

次に、図15に示されるように、作業者は、アームホルダ32に備えられた電動回転機構33による鉛直アーム40の保持を解除し、電動ウィンチ34を操作してワイヤ35を送り出して鉛直アーム40を伸長させる。これにより、水平アーム41を下床版2の下面よりも束部42の高さ寸法以上下方に配置する。その後、作業者は、電動回転機構33に鉛直アーム40を保持させ、電動回転機構33を回転操作することで水平アーム41を橋軸直角方向に延在するように回動させる。 Next, as shown in FIG. 15, the operator releases the holding of the vertical arm 40 by the electric rotation mechanism 33 provided in the arm holder 32, operates the electric winch 34, sends out the wire 35, and sends out the vertical arm. 40 is stretched. As a result, the horizontal arm 41 is arranged below the lower surface of the lower floor slab 2 by the height dimension of the bundle portion 42 or more. After that, the operator holds the vertical arm 40 in the electric rotation mechanism 33, and rotates the electric rotation mechanism 33 to rotate the horizontal arm 41 so as to extend in the direction perpendicular to the bridge axis.

最後に、作業者は、第2滑車47を上方へ移動させることで、水平アーム41に作用する曲げモーメントを小さくする。これと共に、作業者は、第2ストッパ部材52の当接面52aが水平アーム41から離れるように第2ストッパ部材52を操作し、橋梁点検装置10を図4(B)に示される回動許容状態にする。なお、これら2つの作業はどちらを先に行ってもよい。これにより、橋梁点検装置10は、図1に示されるように束部42のローラー43が橋梁1の下面に当接し、点検カメラ45の揺れを早期に収束させ得る状態になる。 Finally, the operator moves the second pulley 47 upward to reduce the bending moment acting on the horizontal arm 41. At the same time, the operator operates the second stopper member 52 so that the contact surface 52a of the second stopper member 52 is separated from the horizontal arm 41, and allows the bridge inspection device 10 to rotate as shown in FIG. 4 (B). Put it in a state. Either of these two operations may be performed first. As a result, in the bridge inspection device 10, as shown in FIG. 1, the roller 43 of the bundle portion 42 comes into contact with the lower surface of the bridge 1, and the shaking of the inspection camera 45 can be converged at an early stage.

橋梁1の下方からの点検が完了した後、橋梁点検装置10を高欄6から取り外す際には、上記手順と逆の手順をとればよい。また、橋脚に対して橋軸方向一方側の橋梁1の点検を終え、続けて橋軸方向他方側の橋梁1の点検を行う場合には、橋梁点検装置10を高欄6から取り外すことなく、次の手順をとればよい。即ち、電動回転機構33を回転操作して水平アーム41を橋軸方向に延在させた状態で台車12を走行させた後に、電動回転機構33を再度回転操作して水平アーム41を橋軸直角方向に延在させればよい。 When the bridge inspection device 10 is removed from the balustrade 6 after the inspection from below the bridge 1 is completed, the procedure opposite to the above procedure may be taken. Further, when inspecting the bridge 1 on one side in the bridge axis direction with respect to the pier and then inspecting the bridge 1 on the other side in the bridge axis direction, the bridge inspection device 10 is not removed from the balustrade 6 and is next. You can take the procedure of. That is, after the electric rotation mechanism 33 is rotated to run the carriage 12 with the horizontal arm 41 extending in the bridge axis direction, the electric rotation mechanism 33 is rotated again to rotate the horizontal arm 41 at right angles to the bridge axis. It may extend in the direction.

このように、本実施形態の橋梁点検装置10では、図1に示されるように、台車ユニット11が、高欄6に走行可能に取り付けられる台車12と、アーム保持装置13と、連結機構20とを備えている。そして、アーム保持装置13は、台車12の上方に橋軸直角方向に配置されるベース部31と、ベース部31の橋軸直角方向の外端に一体に設けられ、高欄6の外側に鉛直に配置されて鉛直アーム40を昇降可能に保持するアームホルダ32とを有する。また、連結機構20は、ベース部31の後端を橋軸方向の軸線回りに回動可能且つ着脱可能に台車12に連結すると共に、ベース部31を橋軸直角方向にスライド可能に台車12に連結する。そして、アーム保持装置13が、アームホルダ32を橋梁1の外側で鉛直に配置した点検用の姿勢(図1)と、アームホルダ32を台車12の上方で斜めに配置した着脱用の姿勢(図12)との間で姿勢変更可能である。そのため、アーム保持装置13を台車12に取り付ける作業及び台車12から取り外す作業が容易且つ安全に行える。 As described above, in the bridge inspection device 10 of the present embodiment, as shown in FIG. 1, the bogie unit 11 is attached to the bogie 6 so as to be able to travel, the arm holding device 13, and the connecting mechanism 20. I have. The arm holding device 13 is integrally provided at the outer end of the base portion 31 in the direction perpendicular to the bridge axis with the base portion 31 arranged above the carriage 12 in the direction perpendicular to the bridge axis, and is vertically provided outside the balustrade 6. It has an arm holder 32 that is arranged and holds the vertical arm 40 so as to be able to move up and down. Further, the connecting mechanism 20 connects the rear end of the base portion 31 to the carriage 12 so as to be rotatable and detachable around the axis in the bridge axis direction, and the base portion 31 can be slidably connected to the carriage 12 in the direction perpendicular to the bridge axis. connect. Then, the arm holding device 13 has an inspection posture (FIG. 1) in which the arm holder 32 is vertically arranged on the outside of the bridge 1 and a detachable posture (FIG. 1) in which the arm holder 32 is obliquely arranged above the carriage 12. The posture can be changed with 12). Therefore, the work of attaching the arm holding device 13 to the carriage 12 and the operation of removing it from the carriage 12 can be easily and safely performed.

また、図1及び図12に示されるように、連結機構20の橋軸直角方向の外端には、アーム保持装置13が点検用の姿勢(図1)と着脱用の姿勢(図12)との間で姿勢変更する時にアームホルダ32をガイドするガイドローラー24が設けられている。そして、ガイドローラー24は、アーム保持装置13が着脱用の姿勢にある時にアームホルダ32の橋軸直角方向外方への移動を規制する。これにより、着脱用の姿勢にあるアーム保持装置13が点検用の姿勢側へ姿勢変更することが規制され、アーム保持装置13の着脱作業がより容易且つ安全に行える。 Further, as shown in FIGS. 1 and 12, at the outer end of the connecting mechanism 20 in the direction perpendicular to the bridge axis, the arm holding device 13 has a posture for inspection (FIG. 1) and a posture for attachment / detachment (FIG. 12). A guide roller 24 is provided to guide the arm holder 32 when the posture is changed between the two. Then, the guide roller 24 regulates the movement of the arm holder 32 outward in the direction perpendicular to the bridge axis when the arm holding device 13 is in the attachment / detachment posture. As a result, the arm holding device 13 in the attachment / detachment posture is restricted from changing its posture to the inspection posture side, and the attachment / detachment work of the arm holding device 13 can be performed more easily and safely.

≪第2実施形態≫
次に、図16及び図17を参照して、第2実施形態を説明する。図16は、第2実施形態に係る橋梁点検装置110の取付状態を示す側面図であり、図1に対応している。第1実施形態と共通する要素には同一の符号を付し、重複する説明は省略する。
<< Second Embodiment >>
Next, a second embodiment will be described with reference to FIGS. 16 and 17. FIG. 16 is a side view showing an attached state of the bridge inspection device 110 according to the second embodiment, and corresponds to FIG. The elements common to the first embodiment are designated by the same reference numerals, and duplicate description will be omitted.

図16に示されるように、本実施形態の橋梁点検装置110では、第2滑車47が鉛直アーム40に移動不能に且つ着脱可能に取り付けられており、第2滑車47の下方には、第2吊り材149を巻き付けるためのサドル147が鉛直アーム40に固定されている。サドル147は、第2吊り材149のガイド部として機能する。第2吊り材149は、カウンタウェイト48から、ガイド部として機能する第3滑車146及びサドル147をこの順に通った後、水平アーム41の第1部分41Aに亘って張設されている。第3滑車146は、第1滑車46と同じ大きさとされて第1滑車46と同軸に設けられている。第1吊り材49及び第2吊り材149は、橋梁1の点検時に第1吊り材49がカウンタウェイト48を支持し、橋梁点検装置110の取付時及び撤去時に第2吊り材149がカウンタウェイト48を支持するように盛り替えて選択的に使用される。 As shown in FIG. 16, in the bridge inspection device 110 of the present embodiment, the second pulley 47 is immovably and detachably attached to the vertical arm 40, and the second pulley 47 is below the second pulley 47. A saddle 147 for winding the suspension member 149 is fixed to the vertical arm 40. The saddle 147 functions as a guide portion of the second suspension member 149. The second suspension member 149 is stretched from the counterweight 48 over the first portion 41A of the horizontal arm 41 after passing through the third pulley 146 and the saddle 147 that function as guide portions in this order. The third pulley 146 has the same size as the first pulley 46 and is provided coaxially with the first pulley 46. In the first suspension member 49 and the second suspension member 149, the first suspension member 49 supports the counterweight 48 when the bridge 1 is inspected, and the second suspension member 149 supports the counterweight 48 when the bridge inspection device 110 is attached or removed. It is selectively used by refilling to support.

図17は、図16に示されるサドル147の(A)第1ワイヤを張った状態、(B)第1ワイヤを緩めた状態を示す概略構成図である。図17(A)に示されるように、サドル147は、2つのサドル半体147a、147bと、2つのサドル半体147a、147bを、互いの距離を変更可能に連結する連結部147cとを有している。サドル147には、2つのサドル半体147a、147bを全周に亘って取り囲むように第2吊り材149が巻き掛けられている。 FIG. 17 is a schematic configuration diagram showing a state in which (A) the first wire of the saddle 147 shown in FIG. 16 is stretched and (B) a state in which the first wire is loosened. As shown in FIG. 17 (A), the saddle 147 has a connecting portion 147c that connects the two saddle halves 147a and 147b and the two saddle halves 147a and 147b so that their distances from each other can be changed. doing. A second suspension member 149 is wound around the saddle 147 so as to surround the two saddle halves 147a and 147b over the entire circumference.

連結部147cは、遠隔操作によって2つのサドル半体147a、147bの距離を変更する。連結部147cは、橋梁点検装置110の取付時及び撤去時には、図17(A)に示されるように2つのサドル半体147a、147bを離間させ、橋梁1の点検時には、図17(B)に示されるように2つのサドル半体147a、147bを近づけるように操作される。連結部147cが2つのサドル半体147a、147bを図17(A)の位置から図17(B)の位置に変位させることにより、第2吊り材149の経路長が短くなる。即ち、連結部147cは、第2吊り材149の経路長を変更させる経路長変更手段を構成する。第1吊り材49は、サドル147が図17(A)の状態の時にはカウンタウェイト48を支持せず、サドル147が図17(B)の状態の時にカウンタウェイト48を支持する長さに設定される。これにより、連結部147cが第2吊り材149の経路長を短くすることにより、カウンタウェイト48の支持が第2吊り材149から第1吊り材49に盛り替えられる。 The connecting portion 147c changes the distance between the two saddle halves 147a and 147b by remote control. The connecting portion 147c separates the two saddle halves 147a and 147b as shown in FIG. 17A when the bridge inspection device 110 is attached and removed, and when the bridge 1 is inspected, the connecting portion 147c is shown in FIG. 17B. The two saddle halves 147a and 147b are manipulated to bring them closer together as shown. The connecting portion 147c displaces the two saddle halves 147a and 147b from the position shown in FIG. 17A to the position shown in FIG. 17B, so that the path length of the second suspension member 149 is shortened. That is, the connecting portion 147c constitutes a path length changing means for changing the path length of the second suspension member 149. The first suspension member 49 is set to a length that does not support the counterweight 48 when the saddle 147 is in the state of FIG. 17 (A) and supports the counterweight 48 when the saddle 147 is in the state of FIG. 17 (B). To. As a result, the connecting portion 147c shortens the path length of the second suspension member 149, so that the support of the counterweight 48 is replaced from the second suspension member 149 to the first suspension member 49.

カウンタウェイト48の支持の盛り替えは、具体的には次のように行われる。即ち、図14に示されるように、アーム保持装置13が橋梁1の高欄6の外側にセットされ、水平アーム41が比較的高い位置にある時には、第2吊り材149のみが設けられている。その後、作業者は、鉛直アーム40を伸長させながら水平アーム41を降下させ、第2滑車47の取付部がアームホルダ32よりも低くなった後、第2滑車47を鉛直アーム40に取り付けると共に、上記の長さに設定された第1吊り材49を第2滑車47に巻き掛ける。更に鉛直アーム40を伸長させ、水平アーム41を図15に示される高さまで降下させた後、作業者は、鉛直アーム40を回動させる前に、サドル147を図17(A)の状態から図17(B)の状態に変化させる。これにより、カウンタウェイト48の支持が第2吊り材149から第1吊り材49に盛り替えられる。その後、作業者は、鉛直アーム40を回動させ、図15の状態とする。橋梁点検装置110を撤去する際には、逆の手順を行えばよい。 Specifically, the support of the counterweight 48 is rearranged as follows. That is, as shown in FIG. 14, when the arm holding device 13 is set outside the balustrade 6 of the bridge 1 and the horizontal arm 41 is at a relatively high position, only the second suspension member 149 is provided. After that, the operator lowers the horizontal arm 41 while extending the vertical arm 40, and after the attachment portion of the second pulley 47 becomes lower than the arm holder 32, the second pulley 47 is attached to the vertical arm 40 and is attached. The first suspension member 49 set to the above length is wound around the second pulley 47. After further extending the vertical arm 40 and lowering the horizontal arm 41 to the height shown in FIG. 15, the operator views the saddle 147 from the state shown in FIG. 17 (A) before rotating the vertical arm 40. Change to the state of 17 (B). As a result, the support of the counterweight 48 is replaced from the second suspension member 149 to the first suspension member 49. After that, the operator rotates the vertical arm 40 to bring it to the state shown in FIG. When removing the bridge inspection device 110, the reverse procedure may be performed.

このように構成された本実施形態の橋梁点検装置110では、次のような作用効果が得られる。即ち、図16に示されるように、橋梁点検装置110は、カウンタウェイト48から、水平アーム41の第2部分41Bに設けられた第3滑車146及び鉛直アーム40の第2滑車47よりも低い位置に設けられたサドル147を通って水平アーム41の第1部分41Aに亘って張設され、第1吊り材49と協働して第1部分41Aを上方に付勢する第2吊り材149を更に備えている。そのため、第1吊り材49が第1滑車46又は第2滑車47から外れたとしても、カウンタウェイト48が第2吊り材149により支持されるため、作業ミスによるカウンタウェイト48の落下が防止される。より正確には、落下によって水平アーム41や鉛直アーム40に加わる衝撃荷重が大きくなることが抑制される。 The bridge inspection device 110 of the present embodiment configured in this way has the following effects. That is, as shown in FIG. 16, the bridge inspection device 110 is located lower than the counterweight 48 than the third pulley 146 and the second pulley 47 of the vertical arm 40 provided in the second portion 41B of the horizontal arm 41. A second suspension member 149 that is stretched over the first portion 41A of the horizontal arm 41 through a saddle 147 provided in the above and urges the first portion 41A upward in cooperation with the first suspension member 49. Further prepared. Therefore, even if the first suspension member 49 comes off from the first pulley 46 or the second pulley 47, the counterweight 48 is supported by the second suspension member 149, so that the counterweight 48 is prevented from falling due to a work error. .. More precisely, it is suppressed that the impact load applied to the horizontal arm 41 and the vertical arm 40 due to the fall is increased.

図17に示されるように、サドル147が、カウンタウェイト48を支持する第2吊り材149の経路長を変更させる連結部147cを有し、連結部147cにより第2吊り材149の経路長が短くされることにより、カウンタウェイト48の支持が第2吊り材149から第1吊り材49に盛り替えられる。そのため、橋梁点検時には、より高い位置を通る第1吊り材49によりカウンタウェイト48を支持し、橋梁点検装置110の高欄6への取付時や高欄6からの撤去時には、より低い位置を通る第2吊り材149によりカウンタウェイト48を支持できる。従って、点検時の水平アーム41の曲げ応力を低減し、取付・撤去作業を容易にできる。 As shown in FIG. 17, the saddle 147 has a connecting portion 147c that changes the path length of the second suspending member 149 that supports the counterweight 48, and the connecting portion 147c shortens the path length of the second suspending member 149. The support of the counterweight 48 is replaced from the second hanging member 149 to the first hanging member 49. Therefore, at the time of bridge inspection, the counterweight 48 is supported by the first suspension member 49 passing through the higher position, and at the time of attaching the bridge inspection device 110 to the balustrade 6 or removing it from the balustrade 6, the second suspension member passing through the lower position. The counterweight 48 can be supported by the suspending member 149. Therefore, the bending stress of the horizontal arm 41 at the time of inspection can be reduced, and the installation / removal work can be facilitated.

以上で具体的実施形態の説明を終えるが、本発明は上記実施形態に限定されることなく幅広く変形実施することができる。例えば、上記実施形態では、一例として鉄筋コンクリートからなる単一箱桁橋に本発明に係る橋梁点検装置10を適用したが、多主桁箱桁橋や、多重箱桁橋、T桁橋101、中空床版桁橋、版桁橋、鈑桁橋(プレートガーダー橋)、吊床版橋等、他の構造の橋梁上部工にも広く適用することができる。図18は、本発明に係る橋梁点検装置10をT桁橋101に適用した例を示す橋梁点検装置10の側面図である。T桁橋101は、複数の桁102と、複数の桁102の上部を連結する床版103とにより構成される。橋梁点検装置10を用いてT桁橋101を点検する際には、束部42を1つの桁102の下面に当接させるとよい。 Although the description of the specific embodiment is completed above, the present invention can be widely modified without being limited to the above embodiment. For example, in the above embodiment, the bridge inspection device 10 according to the present invention is applied to a single box girder bridge made of reinforced concrete as an example, but a multi-main girder box girder bridge, a multiple box girder bridge, a T girder bridge 101, and a hollow It can be widely applied to bridge superstructures of other structures such as slab girder bridges, slab girder bridges, plate girder bridges (plate girder bridges), and suspended slab bridges. FIG. 18 is a side view of the bridge inspection device 10 showing an example in which the bridge inspection device 10 according to the present invention is applied to the T girder bridge 101. The T-girder bridge 101 is composed of a plurality of girders 102 and a floor slab 103 connecting the upper portions of the plurality of girders 102. When inspecting the T-girder bridge 101 using the bridge inspection device 10, it is preferable that the bundle portion 42 is brought into contact with the lower surface of one girder 102.

また、上記実施形態では、点検カメラ45による撮影によって橋梁1の下方からの点検を行っているが、クラックゲージによる点検やハンマによる打撃点検を行うように構成された点検部を橋梁点検装置10が有していてもよい。この他、各部材や部位の具体的構成や配置、数量、角度など、本発明の趣旨を逸脱しない範囲であれば適宜変更可能である。一方、上記実施形態に示した各構成要素は必ずしも全てが必須ではなく、適宜選択することができる。 Further, in the above embodiment, the inspection from below the bridge 1 is performed by taking a picture with the inspection camera 45, but the bridge inspection device 10 has an inspection unit configured to perform an inspection with a crack gauge and a impact inspection with a hammer. You may have. In addition, the specific configuration, arrangement, quantity, angle, etc. of each member or portion can be appropriately changed as long as it does not deviate from the gist of the present invention. On the other hand, not all of the components shown in the above embodiments are essential, and they can be appropriately selected.

1 橋梁
6 高欄
10 橋梁点検装置
11 台車ユニット
12 台車
13 アーム保持装置
20 連結機構
24 ガイドローラー
31 ベース部
32 アームホルダ
36 アーム昇降装置
37 制御装置
38 アーム駆動装置
39 軸力センサ
40 鉛直アーム
41 水平アーム
41A 第1部分(一側部分)
41B 第2部分(他側部分)
42 束部
43 ローラー
45 点検カメラ(点検部)
46 第1滑車(第1ガイド部)
47 第2滑車(第2ガイド部)
48 カウンタウェイト
49 第1吊り材
51 第1ストッパ部材(切替機構)
52 第2ストッパ部材(ストッパ、切替機構)
110 橋梁点検装置
146 第3滑車(第3ガイド部)
147 サドル(第4ガイド部)
147c 連結部(経路長変更手段)
149 第2吊り材
1 Bridge 6 High column 10 Bridge inspection device 11 Cart unit 12 Cart 13 Arm holding device 20 Connecting mechanism 24 Guide roller 31 Base 32 Arm holder 36 Arm lifting device 37 Control device 38 Arm drive device 39 Axial force sensor 40 Vertical arm 41 Horizontal arm 41A 1st part (one side part)
41B 2nd part (other side part)
42 Bundle part 43 Roller 45 Inspection camera (Inspection part)
46 1st pulley (1st guide part)
47 2nd pulley (2nd guide)
48 Counterweight 49 1st hanging material 51 1st stopper member (switching mechanism)
52 Second stopper member (stopper, switching mechanism)
110 Bridge inspection device 146 3rd pulley (3rd guide)
147 saddle (4th guide)
147c connecting part (path length changing means)
149 Second hanging material

Claims (15)

橋梁の高欄に走行可能に取り付けられる台車ユニットと、
前記台車ユニットに昇降可能且つ鉛直軸線回りに回動可能に取り付けられ、前記橋梁の外側に略鉛直に配置される鉛直アームと、
前記鉛直アームの下端部に橋軸方向に延びる軸線回りに回動可能に中間部を結合され、前記橋梁の下方に配置される一側部分、及び前記橋梁の外側に配置される他側部分を有する水平アームと、
前記水平アームにおける前記一側部分に設けられ、前記橋梁を下方から点検する点検部と、
前記水平アームの前記他側部分の下方に配置されるカウンタウェイトと、
前記水平アームの前記他側部分に設けられた第1ガイド部と、
前記鉛直アームの前記水平アームとの結合部よりも高い位置に設けられた第2ガイド部と、
前記カウンタウェイトから、前記第1ガイド部及び前記第2ガイド部を通って前記水平アームの前記一側部分に亘って張設され、前記カウンタウェイトの荷重を作用させることで前記一側部分を上方に付勢する第1吊り材と、
前記水平アームの前記一側部分に上方へ突出するように設けられ、前記橋梁の下面に当接する束部とを備えることを特徴とする橋梁点検装置。
A bogie unit that can be mounted on the railing of the bridge so that it can run,
A vertical arm that can be raised and lowered and rotatably attached to the bogie unit and is arranged substantially vertically on the outside of the bridge.
An intermediate portion is rotatably connected to the lower end of the vertical arm around an axis extending in the direction of the bridge, and one side portion arranged below the bridge and the other side portion arranged outside the bridge are attached. With a horizontal arm
An inspection unit provided on one side of the horizontal arm to inspect the bridge from below,
A counterweight located below the other side of the horizontal arm,
A first guide portion provided on the other side portion of the horizontal arm and
A second guide portion provided at a position higher than the joint portion of the vertical arm with the horizontal arm, and
From the counterweight, said first guide section and through the second guide portion is stretched over said one side portion of the horizontal arm, the upper the one side portion by the action of the load of the counterweight The first hanging material that urges the
A bridge inspection device provided on the one side portion of the horizontal arm so as to project upward, and provided with a bundle portion that abuts on the lower surface of the bridge.
前記水平アームの前記鉛直アームに対する橋軸方向の軸線回りの回動を許容する回動許容状態と、前記水平アームの前記鉛直アームに対する回動を規制する回動規制状態とを切り替える切替機構を更に備えることを特徴とする請求項1に記載の橋梁点検装置。 Further, a switching mechanism for switching between a rotation allowed state in which the horizontal arm is allowed to rotate around the axis in the bridge axis direction with respect to the vertical arm and a rotation restricted state in which the rotation of the horizontal arm with respect to the vertical arm is restricted The bridge inspection device according to claim 1, wherein the bridge inspection device is provided. 前記水平アームの前記鉛直アームに対する橋軸方向の軸線回りの回動を所定の回動角度に規制するストッパを更に備えることを特徴とする請求項1又は請求項2に記載の橋梁点検装置。 The bridge inspection device according to claim 1 or 2, further comprising a stopper that restricts the rotation of the horizontal arm around the axis in the bridge axis direction with respect to the vertical arm to a predetermined rotation angle. 前記束部が前記橋梁の下面に転接するローラーを上端に有することを特徴とする請求項1〜請求項3のいずれかに記載の橋梁点検装置。 The bridge inspection device according to any one of claims 1 to 3, wherein the bundle portion has a roller at the upper end which is in contact with the lower surface of the bridge. 前記鉛直アームの引張軸力を検出する軸力センサと、
前記台車ユニットの走行時に、前記軸力センサの検出値が大きくなった時に前記台車ユニットから前記水平アームの前記中間部までの長さを長くし、前記軸力センサの検出値が小さくなった時に前記台車ユニットから前記水平アームの前記中間部までの長さを短くするように、前記鉛直アームを駆動するアーム駆動装置とを更に備えることを特徴とする請求項4に記載の橋梁点検装置。
An axial force sensor that detects the tensile axial force of the vertical arm and
When the detection value of the axial force sensor is increased during the traveling of the bogie unit, the length from the bogie unit to the intermediate portion of the horizontal arm is increased, and when the detected value of the axial force sensor is decreased. The bridge inspection device according to claim 4, further comprising an arm drive device for driving the vertical arm so as to shorten the length from the bogie unit to the intermediate portion of the horizontal arm.
前記アーム駆動装置は、前記ローラーが前記橋梁の下面に当接する所定の軸力範囲に前記軸力センサの値が収まるように前記鉛直アームを駆動することを特徴とする請求項5に記載の橋梁点検装置。 The bridge according to claim 5, wherein the arm driving device drives the vertical arm so that the value of the axial force sensor falls within a predetermined axial force range in which the roller abuts on the lower surface of the bridge. Inspection device. 前記アーム駆動装置が前記台車ユニットに設けられて前記鉛直アームを昇降可能に支持することを特徴とする請求項5又は請求項6に記載の橋梁点検装置。 The bridge inspection device according to claim 5 or 6, wherein the arm driving device is provided on the bogie unit to support the vertical arm so as to be able to move up and down. 前記第1吊り材が、前記水平アームにおける前記束部が設けられた部分に連結されることを特徴とする請求項1〜請求項7のいずれかに記載の橋梁点検装置。 The bridge inspection device according to any one of claims 1 to 7, wherein the first suspension member is connected to a portion of the horizontal arm provided with the bundle portion. 前記第1ガイド部及び前記第2ガイド部が滑車であることを特徴とする請求項1〜請求項8のいずれかに記載の橋梁点検装置。 The bridge inspection device according to any one of claims 1 to 8, wherein the first guide portion and the second guide portion are pulleys. 前記第2ガイド部が、前記鉛直アームに上下動可能に設けられた可動滑車であることを特徴とする請求項1〜請求項9のいずれかに記載の橋梁点検装置。 The bridge inspection device according to any one of claims 1 to 9, wherein the second guide portion is a movable pulley provided on the vertical arm so as to be vertically movable. 前記第2ガイド部が前記鉛直アームの橋軸方向の両側に設けられ、
前記第1吊り材が、前記鉛直アームの橋軸方向の両側に設けられて対応する側の前記第2ガイド部に案内されることを特徴とする請求項1〜請求項10のいずれかに記載の橋梁点検装置。
The second guide portions are provided on both sides of the vertical arm in the bridge axial direction.
The first suspension member according to any one of claims 1 to 10, wherein the first suspension member is provided on both sides of the vertical arm in the bridge axis direction and is guided to the second guide portion on the corresponding side. Bridge inspection equipment.
前記水平アームの前記他側部分に設けられた第3ガイド部と、
前記鉛直アームの前記第2ガイド部よりも低い位置に設けられた第4ガイド部と、
前記カウンタウェイトから、前記第3ガイド部及び前記第4ガイド部を通って前記水平アームの前記一側部分に亘って張設され、前記カウンタウェイトの荷重を作用させることで前記第1吊り材と協働して前記一側部分を上方に付勢する第2吊り材を更に備えることを特徴とする請求項1〜請求項9のいずれかに記載の橋梁点検装置。
A third guide portion provided on the other side portion of the horizontal arm and
A fourth guide portion provided at a position lower than the second guide portion of the vertical arm, and a fourth guide portion.
From the counterweight, said third guide portion and over said one side portion of the horizontal arm through the fourth guide portion is stretched, and the first suspension member by exerting a load of the counterweight The bridge inspection device according to any one of claims 1 to 9, further comprising a second suspension member for cooperating to urge the one side portion upward.
前記第4ガイド部が、前記カウンタウェイトを支持する前記第2吊り材の経路長を変更させる経路長変更手段を有し、当該経路長変更手段により前記第2吊り材の経路長が短くされることにより、前記カウンタウェイトの支持が前記第2吊り材から前記第1吊り材に盛り替えられることを特徴とする請求項12に記載の橋梁点検装置。 The fourth guide portion has a path length changing means for changing the path length of the second suspending material that supports the counterweight, and the path length changing means shortens the path length of the second suspending material. The bridge inspection device according to claim 12, wherein the support of the counterweight is replaced with the first suspension member from the second suspension member. 前記台車ユニットが、
前記高欄に走行可能に取り付けられる台車と、
前記台車の上方に橋軸直角方向に配置されるベース部、及び前記ベース部の橋軸直角方向の外端に一体に設けられ、前記高欄の外側に鉛直に配置されて前記鉛直アームを昇降可能に保持するアームホルダを有するアーム保持装置と、
前記ベース部の後端を橋軸方向の軸線回りに回動可能且つ着脱可能に前記台車に連結すると共に、前記ベース部を橋軸直角方向にスライド可能に前記台車に連結する連結機構とを備え、
前記アーム保持装置が、前記アームホルダを前記橋梁の外側で鉛直に配置した点検用の姿勢と前記アームホルダを前記台車の上方で斜めに配置した着脱用の姿勢との間で姿勢変更可能であることを特徴とする請求項1〜請求項13のいずれかに記載の橋梁点検装置。
The bogie unit
A dolly that can be mounted on the balustrade and
A base portion arranged above the trolley in a direction perpendicular to the bridge axis and an outer end of the base portion in a direction perpendicular to the bridge axis are integrally provided, and are vertically arranged outside the balustrade so that the vertical arm can be raised and lowered. An arm holding device having an arm holder to hold the
The rear end of the base portion is rotatably and detachably connected to the bogie in the direction of the bridge axis, and the base portion is slidably connected to the bogie in the direction perpendicular to the bridge axis. ,
The arm holding device can change the posture between an inspection posture in which the arm holder is vertically arranged on the outside of the bridge and a detachable posture in which the arm holder is obliquely arranged above the carriage. The bridge inspection device according to any one of claims 1 to 13, wherein the bridge inspection device is characterized.
前記連結機構の橋軸直角方向の外端には、前記アーム保持装置が前記点検用の姿勢と前記着脱用の姿勢との間で姿勢変更する時に前記アームホルダをガイドすると共に、前記アーム保持装置が前記着脱用の姿勢にある時に前記アームホルダの橋軸直角方向外方への移動を規制するように構成されたガイドローラーが設けられていることを特徴とする請求項14に記載の橋梁点検装置。 At the outer end of the connecting mechanism in the direction perpendicular to the bridge axis, the arm holder is guided when the arm holding device changes its posture between the inspection posture and the attachment / detachment posture, and the arm holding device is guided. The bridge inspection according to claim 14, wherein a guide roller is provided so as to restrict the movement of the arm holder outward in the direction perpendicular to the bridge axis when the arm holder is in the detachable posture. apparatus.
JP2016227825A 2016-11-24 2016-11-24 Bridge inspection equipment Active JP6792428B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016227825A JP6792428B2 (en) 2016-11-24 2016-11-24 Bridge inspection equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016227825A JP6792428B2 (en) 2016-11-24 2016-11-24 Bridge inspection equipment

Publications (2)

Publication Number Publication Date
JP2018084086A JP2018084086A (en) 2018-05-31
JP6792428B2 true JP6792428B2 (en) 2020-11-25

Family

ID=62238344

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016227825A Active JP6792428B2 (en) 2016-11-24 2016-11-24 Bridge inspection equipment

Country Status (1)

Country Link
JP (1) JP6792428B2 (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7075363B2 (en) * 2019-01-25 2022-05-25 三井住友建設株式会社 Bridge inspection equipment
JP7154152B2 (en) * 2019-02-20 2022-10-17 三井住友建設株式会社 Bridge inspection device
CN111549673A (en) * 2020-05-15 2020-08-18 贵州路桥集团有限公司 Appearance modification equipment for concrete cast-in-place box girder
KR102206391B1 (en) * 2020-06-23 2021-01-22 주식회사 청안아이에스엠 Apparatus for checking bridge
CN113136807B (en) * 2021-05-18 2024-09-24 中国五冶集团有限公司 Arc-shaped landscape bridge railing positioning device and use method
CN114604806B (en) * 2022-03-27 2024-06-04 河南省泰贸照明科技工程有限公司 Maintenance device for bridge body brightening process
CN114687287B (en) * 2022-04-19 2024-02-27 李国中 Multifunctional bridge detection equipment and application method thereof
CN116716803A (en) * 2023-06-14 2023-09-08 广东大道检测技术有限公司 Cantilever mechanism and bridge detection device
CN116659780B (en) * 2023-08-01 2023-10-13 山东蒙山路桥有限公司 Bridge beam slab load testing device for road bridge construction
JP2025029231A (en) * 2023-08-21 2025-03-06 国立大学法人 東京大学 Robot Arm

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3865578B2 (en) * 2000-10-23 2007-01-10 鹿島建設株式会社 Moving scaffold for bridge
JP2004293176A (en) * 2003-03-27 2004-10-21 Geo Frontier Kk Protective scaffold unit for bridge and protective construction method using it
JP4782163B2 (en) * 2008-05-13 2011-09-28 ジビル調査設計株式会社 Structure inspection device
JP5246624B2 (en) * 2009-03-06 2013-07-24 有限会社インテス Bridge inspection device and bridge inspection method
JP2011032641A (en) * 2009-07-29 2011-02-17 Tokyo Univ Of Science Bridge inspection method and bridge inspection apparatus
FI123034B (en) * 2010-11-12 2012-10-15 Moldtech Oy Rack Mounting Arrangement
JP6155227B2 (en) * 2014-05-23 2017-06-28 株式会社Ntec Bridge inspection device
JP2015224512A (en) * 2014-05-29 2015-12-14 株式会社熊谷組 Bridge floor slab undersurface inspection device
JP6018691B1 (en) * 2015-12-11 2016-11-02 株式会社フジみらい Suspension scaffold construction method and suspension scaffold with float in bridge structure

Also Published As

Publication number Publication date
JP2018084086A (en) 2018-05-31

Similar Documents

Publication Publication Date Title
JP6792428B2 (en) Bridge inspection equipment
JP5198973B2 (en) Bridge overhang installation device and installation method
CN100339291C (en) Mobile crane and its assembly and disassembly method
KR101939162B1 (en) Cable inspection trolley having balance frame and folding-type driving wheel
CN113401757A (en) Track positioning system
JP5823196B2 (en) Traction ability testing device
CN210104560U (en) A portable bridge inspection bracket
JP5502234B2 (en) Double deck elevator
JP5986030B2 (en) Grab bucket runout control method for rope trolley crane
CN110725707B (en) Integral arch frame installation method and integral arch frame installation trolley
CN205312840U (en) Stopper loading and unloading anchor clamps
CN218708860U (en) Building construction material hoisting structure
CN201340686Y (en) Adjustable crane arm frame system model
CN118495422A (en) Lifting device for construction operation platform
JP2022145593A (en) Mobile crane comprising device for facilitating or fully automatically carrying out raising and/or setting-down process of derricking boom, and corresponding method
CN206318494U (en) A kind of ceramic tile overturning device and ceramic tile palletizing apparatus
JP6897216B2 (en) Under-bridge inspection device and under-bridge inspection method
JP2020083550A (en) Cargo handling machine operation support device
CN210856960U (en) Intelligent tensioning construction trolley for assisting whole prestressed hogging moment of T-shaped beam
JP7230175B2 (en) Elevator system for construction work and method for extending governor rope of elevator system for construction work
JPH10226474A (en) Wire rope inspection method and inspection device
CN223659712U (en) A remote directional lifting system for live tubing operation
JP2009196790A (en) Elevator
JP2002338156A (en) Inspection device for elevator governor
JP6610914B2 (en) Inspection method for elevator safety device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20190731

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20200415

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20200526

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20200707

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A711

Effective date: 20200717

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20200717

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20201104

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20201106

R150 Certificate of patent or registration of utility model

Ref document number: 6792428

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250